WO2021114652A1 - Fixing device having two-hoop structure - Google Patents

Fixing device having two-hoop structure Download PDF

Info

Publication number
WO2021114652A1
WO2021114652A1 PCT/CN2020/100799 CN2020100799W WO2021114652A1 WO 2021114652 A1 WO2021114652 A1 WO 2021114652A1 CN 2020100799 W CN2020100799 W CN 2020100799W WO 2021114652 A1 WO2021114652 A1 WO 2021114652A1
Authority
WO
WIPO (PCT)
Prior art keywords
hoop
main
hoop body
fixing device
pieces
Prior art date
Application number
PCT/CN2020/100799
Other languages
French (fr)
Chinese (zh)
Inventor
刘垣贤
杨贶
Original Assignee
深圳市洲明科技股份有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 深圳市洲明科技股份有限公司 filed Critical 深圳市洲明科技股份有限公司
Publication of WO2021114652A1 publication Critical patent/WO2021114652A1/en

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16MFRAMES, CASINGS OR BEDS OF ENGINES, MACHINES OR APPARATUS, NOT SPECIFIC TO ENGINES, MACHINES OR APPARATUS PROVIDED FOR ELSEWHERE; STANDS; SUPPORTS
    • F16M13/00Other supports for positioning apparatus or articles; Means for steadying hand-held apparatus or articles
    • F16M13/02Other supports for positioning apparatus or articles; Means for steadying hand-held apparatus or articles for supporting on, or attaching to, an object, e.g. tree, gate, window-frame, cycle
    • F16M13/022Other supports for positioning apparatus or articles; Means for steadying hand-held apparatus or articles for supporting on, or attaching to, an object, e.g. tree, gate, window-frame, cycle repositionable
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16BDEVICES FOR FASTENING OR SECURING CONSTRUCTIONAL ELEMENTS OR MACHINE PARTS TOGETHER, e.g. NAILS, BOLTS, CIRCLIPS, CLAMPS, CLIPS OR WEDGES; JOINTS OR JOINTING
    • F16B2/00Friction-grip releasable fastenings
    • F16B2/02Clamps, i.e. with gripping action effected by positive means other than the inherent resistance to deformation of the material of the fastening
    • F16B2/06Clamps, i.e. with gripping action effected by positive means other than the inherent resistance to deformation of the material of the fastening external, i.e. with contracting action
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16BDEVICES FOR FASTENING OR SECURING CONSTRUCTIONAL ELEMENTS OR MACHINE PARTS TOGETHER, e.g. NAILS, BOLTS, CIRCLIPS, CLAMPS, CLIPS OR WEDGES; JOINTS OR JOINTING
    • F16B2/00Friction-grip releasable fastenings
    • F16B2/02Clamps, i.e. with gripping action effected by positive means other than the inherent resistance to deformation of the material of the fastening
    • F16B2/06Clamps, i.e. with gripping action effected by positive means other than the inherent resistance to deformation of the material of the fastening external, i.e. with contracting action
    • F16B2/065Clamps, i.e. with gripping action effected by positive means other than the inherent resistance to deformation of the material of the fastening external, i.e. with contracting action using screw-thread elements
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16MFRAMES, CASINGS OR BEDS OF ENGINES, MACHINES OR APPARATUS, NOT SPECIFIC TO ENGINES, MACHINES OR APPARATUS PROVIDED FOR ELSEWHERE; STANDS; SUPPORTS
    • F16M13/00Other supports for positioning apparatus or articles; Means for steadying hand-held apparatus or articles
    • F16M13/02Other supports for positioning apparatus or articles; Means for steadying hand-held apparatus or articles for supporting on, or attaching to, an object, e.g. tree, gate, window-frame, cycle

Definitions

  • This application relates to the technical field of suspension fixing, and in particular to a fixing device with a double-hoop structure.
  • a single hoop is set at the upper and lower ends of the hanging object, and each single hoop is tightly hung on the pole so that the hanging object is fixed on the pole.
  • Single hoop fixation is prone to the following problems: the height of the suspension is unstable, and the suspension is prone to slide down.
  • a fixing device with a double hoop structure includes a main hoop mechanism, the main hoop mechanism includes a mounting plate, a connecting block, and a main hoop body; the main hoop body has a first end surface and a second end surface opposite to each other; The main hoop body has a first hoop cavity with two ends open; the connecting blocks are respectively connected with the mounting plate and the outer side wall of the main hoop body; the connecting block is parallel to the first end surface
  • the surface is provided with a protruding portion, the protruding portion is provided with a strip-shaped through hole, and the strip-shaped through hole extends obliquely with respect to the axial direction of the main hoop body; a secondary hoop mechanism, which includes a secondary hoop body and a tight A firmware, the secondary hoop body has a second hoop cavity with both ends open; the outer side wall of the secondary hoop body is protrudingly provided with a connecting piece, and the connecting piece passes
  • the main hoop body includes at least one first fracture, and the side walls of two opposite ends of the first fracture respectively extend outward to form opposite first fixing pieces.
  • the fixing plates are respectively provided with first connecting holes, and the first connecting pieces are installed in the first connecting holes.
  • the number of the first fracture is at least two, and each of the first fractures is distributed on the main hoop body at intervals.
  • the main hoop body is provided with a first threaded hole, and a first screw connection is passed through the first threaded hole.
  • the secondary hoop body includes at least one second fracture, and the side walls of two opposite ends of at least one of the second fractures respectively extend outward to form opposite second fixing pieces.
  • the second fixing pieces are respectively provided with second connecting holes, and second connecting pieces are installed in the second connecting holes.
  • the secondary hoop body includes at least two second fractures, and each of the second fractures is distributed on the secondary hoop body at intervals; the side walls of two opposite ends of one of the second fractures are respectively Extend outwards to form the opposite connecting pieces, and the opposite connecting pieces are respectively provided with through holes for the fasteners to pass through.
  • the secondary hoop body is provided with a second threaded hole, and a second threaded member is penetrated in the second threaded hole.
  • the main hoop body includes at least two first hoop pieces, and the opposite ends of each two adjacent first hoop pieces are connected by the first connecting member.
  • the distance between the end of the bar-shaped through hole far away from the main hoop body and the axis of the main hoop body is greater than that of the end of the bar-shaped through hole close to the main hoop body and the main hoop body. The distance of the axis.
  • the mounting board includes a connecting board body and a fixed board body, the connecting board body is connected with the connecting block, and the fixed board body is used for connecting with a hanging object.
  • the fixed plate body and the connecting block are arranged on two opposite sides of the connecting plate block.
  • the fixed plate body is perpendicular to the connecting plate block.
  • protrusion and one of the first hoop pieces are integrally formed.
  • the secondary hoop body includes at least two second hoop pieces.
  • the mounting plate is used to install the suspension
  • the double hoop structure is used for the main hoop body and the auxiliary hoop body respectively
  • the main hoop body is used to sleeve the pole
  • the auxiliary hoop body is also used for sleeve It is arranged on the pole, specifically, the first hoop cavity and the second hoop cavity both sleeve the pole.
  • the secondary hoop body is connected with the protrusion of the main hoop mechanism through fasteners, thereby connecting with the main hoop body.
  • the main hoop body and the auxiliary hoop body are jointly sleeved with the pole, which increases the friction between the fixing device with the double hoop structure and the pole, so that the suspension is more stably fixed on the pole.
  • the strip-shaped through holes extend obliquely.
  • Figure 1 is a perspective view of an embodiment of a fixing device with a double hoop structure
  • Figure 2 is an exploded view of the fixing device with a double hoop structure shown in Figure 1;
  • Fig. 3 is a bottom perspective view of the fixing device with a double hoop structure shown in Fig. 1 installing a hanging object on a pole.
  • a fixing device 10 with a double hoop structure provided in an embodiment includes a main hoop mechanism 100 and a secondary hoop mechanism 200.
  • the main hoop mechanism 100 includes a mounting plate 110, a connecting block 120 and a main hoop body 130 connected together.
  • the main hoop body 130 forms an annular structure with at least one fracture, and a suitable connecting structure or connecting piece may be provided at the fracture of the main hoop body 130. 1 and 2 at the same time, the main hoop body 130 has a first end surface 131 and a second end surface (not shown) opposite to each other.
  • the main hoop body 130 has a first hoop cavity 132 open at both ends, and the main hoop body 130 forms a ring structure.
  • One end of the connecting block 120 is connected to the mounting board 110, and the other end is connected to the outer side wall of the main hoop body 130.
  • a surface of the connecting block 120 parallel to the first end surface 131 is provided with a protrusion 121.
  • the protrusion 121 is provided with a bar-shaped through hole 121 a, and the bar-shaped through hole 121 a extends obliquely with respect to the axial direction of the main hoop body 130.
  • the distance between the end of the bar-shaped through hole 121a far away from the main hoop body 130 and the axis of the main hoop body 130 is greater than the distance between the end of the bar-shaped through hole 121a, which is close to the main hoop body 130 and the axis of the main hoop body 130.
  • the secondary hoop mechanism 200 includes a secondary hoop body 210 and a fastener 220.
  • the secondary hoop body 210 has a second hoop cavity 211 open at both ends, the secondary hoop body 210 forms a ring structure with at least one second fracture 213, and the second fracture 213 of the main hoop body 130 can be provided There is a suitable connection structure or connector.
  • the outer side wall of the secondary hoop body 210 is provided with a connecting piece 212 protruding outward, and the connecting piece 212 is provided with a through hole for the fastener 220 to pass through.
  • the fastener 220 passes through the strip-shaped through hole 121 a and the through hole, connects the protrusion 121 and the connecting piece 212 together, and fixes the secondary hoop body 210 on the main hoop mechanism 100.
  • the fastener 220 can slide along the extending direction of the bar-shaped through hole 121a.
  • there are two connecting pieces 212 which are distributed at two opposite ends of a second fracture 213 of the secondary hoop body 210, and the two connecting pieces 212 at the opposite ends clamp
  • the protrusion 121 makes the secondary hoop body 210 stably fixed on the protrusion 121.
  • the first hoop cavity 132 and the second hoop cavity 211 are aligned.
  • the inner peripheral wall of the first hoop cavity 132 is used to abut against the outer peripheral wall of the external pole, and the inner peripheral wall of the second hoop cavity 211 is used to contact the outer pole.
  • the outer peripheral wall abuts, so that the main hoop body 130 and the auxiliary hoop body 210 hug the pole to be fixed on the pole.
  • the second end surface is located below the first end surface 131, the secondary hoop body 210 is located above the main hoop body 130, and the secondary hoop body 210 is located on the first end surface. 131 side. In other embodiments, the second end surface may be located above the first end surface 131.
  • the above-mentioned fixing device 10 with a double hoop structure is respectively the main hoop body 130 and the auxiliary hoop body 210.
  • the mounting plate 110 is used to install the suspension 20, the main hoop body 130 and the auxiliary hoop body.
  • the center line of 210 is centered and can hold the pole 30 together.
  • the first hoop cavity 132 and the second hoop cavity 211 both sleeve the pole 30, and the secondary hoop body 210 is connected to the main hoop body 130 by the fastener 220.
  • the main hoop body 130 and the auxiliary hoop body 210 jointly hug the pole 30, which increases the friction between the fixing device 10 with a double hoop structure and the pole 30, so that the suspension 20 is more stably fixed on the pole 30.
  • the fastener 220 will move in the direction of the suspension 20, driving the auxiliary hoop body 210 to also move toward The suspension 20 moves in the direction, so that the friction between the secondary hoop body 210 and the pole 30 will increase, which can prevent the main hoop body 130 from moving further down.
  • the protrusion 121 and the connecting block 120 are integrally formed, so that when the secondary hoop body 210 and the pole 30 are pressed tighter, the main hoop body 130 can be more stably prevented from moving down further. .
  • at least a part of the mounting plate 110, the connecting block 120 and the main hoop body 130 are integrally formed, so that the structure of the whole main hoop mechanism 100 is compact and firm.
  • the main hoop body 130 is formed by connecting at least two first hoop pieces, for example.
  • the main hoop body 130 includes two first hoop pieces, and at least one first fracture 133 is formed between the two first hoop pieces.
  • a first hoop piece and the protrusion 121 are integrally formed.
  • the number of the first fractures 133 is two, and each of the first fractures 133 is distributed on the main hoop body 130 at intervals.
  • the side walls of the opposite ends of the first fracture 133 respectively extend outward to form two opposite first fixing pieces 134, and the two first fixing pieces 134 are respectively provided with first connecting holes (not shown in the figure) ), the first connecting member 135 sequentially passes through the first connecting holes of the two first fixing pieces 134 to connect the two first fixing pieces 134 together.
  • the first connecting member 135 is, for example, a bolt, so that the distance between the two opposite first fixing pieces 134 can be conveniently adjusted, so that the width of the first fracture 133 is adjustable. By adjusting the distance between the two opposite first fixing pieces 134 to be smaller, the main hoop body 130 can tighten the pole 30.
  • the width of the first fracture 133 is greater than or equal to zero, and when the width of the first fracture 133 is equal to zero, the gap between the two first fixing pieces 134 is zero.
  • the width of the first fracture 133 is adjustable, and the width can be changed according to the size of the cross section of the pole 30 sheathed by the main hoop body 130.
  • the main hoop body 130 includes a plurality of first hoop pieces, and each first hoop piece is provided with a first fixing piece at both ends.
  • the piece 134 is connected to the first fixing piece 134 by the first connecting member 135, so that all the first hoop pieces are connected together. In this way, when the main hoop body 130 is to be sleeved on the pole 30, each of the first hoop pieces can be separated first, and after the first hoop piece is installed on the pole 30, each hoop is connected by the first connecting member 135.
  • the first fixing pieces 134 of two adjacent first hoop pieces are connected, that is, each of the first hoop pieces is connected to the main hoop body 130 that is surrounded by a ring.
  • the number of the first fracture 133 is one. Except for the pair of first hoop pieces at the first fracture 133, the other first hoop pieces may be connected by hinges.
  • the main hoop body 130 is provided with a first threaded hole (not shown), and the first threaded hole A first screw connection 136 is provided in the middle pass.
  • the first screw 136 passes through the first threaded hole and can be pressed against the side wall of the pole 30, so that the main hoop body 130 can be more stably sleeved on the pole 30, so that the hanging object 20 can pass through the main hoop.
  • the body 130 is hung on the pole 30 more firmly.
  • the main hoop body 130 is not easy to rotate because the first screw member 136 abuts against the side wall of the mast 30, so that it is not easy for the suspension 20 to receive an external force. Rotate around the pole 30.
  • the auxiliary hoop body 210 is formed by connecting at least two second hoop pieces, for example.
  • the secondary hoop body 210 includes two second hoop pieces, and at least one second fracture 213 is formed between the two second hoop pieces.
  • the secondary hoop body 210 includes two second fractures 213, one of the second fractures 213 is used to engage with the protrusion 121, and the other second fracture 213 has two opposite ends.
  • the walls respectively extend outward to form two opposite second fixing pieces 214.
  • the two second fixing pieces 214 are respectively provided with second connecting holes (not shown), and the second connecting pieces 215 pass through the two in turn.
  • the second connecting hole of the second fixing piece 214 is used to connect the second fixing piece 214 together.
  • the second connecting member 215 is, for example, a bolt, so that the distance between the two second fixing pieces 214 can be conveniently adjusted, so that the width of the second fracture 213 can be adjusted.
  • the width of the second fracture 213 corresponding to the second connecting member 215 is greater than or equal to zero.
  • the width of the second fracture 213 is equal to zero, the gap between the two second fixing pieces 214 is zero.
  • the width of the second fracture 213 corresponding to the second connecting member 215 is adjustable, and the width can be changed according to the size of the cross section of the pole 30 sheathed by the secondary hoop body 210.
  • the secondary hoop body 210 includes a plurality of second hoop pieces, and the number of the second fractures 213 is at least two.
  • the second fractures 213 are distributed on the secondary hoop body 210 at intervals. Except for the second fractures 213 for mounting the protrusions 121, the side walls of the two opposite ends of the other second fractures 213 respectively extend outward to obtain two opposite second fixing pieces 214, each The two opposite second fixing pieces 214 are respectively connected by a second connecting member 215.
  • each second hoop piece can be separated first, and then the two second hoop pieces are connected to the protrusion 121, and then the second connecting piece 215 All the second hoop pieces are installed on the pole 30, so that each second hoop piece is connected to the auxiliary hoop body 210 that is surrounded by a ring.
  • the secondary hoop body 210 includes a plurality of second hoop pieces, the number of the second fractures 213 is two, one second fracture 213 is used to accommodate the protrusion 121, and one second fracture 213 is correspondingly provided with
  • the second connecting member 215 may be hingedly connected between two adjacent second hoop pieces that are not used to form the second fracture 213.
  • the secondary hoop body 210 is provided with a second threaded hole, and the second threaded hole is pierced with a second threaded hole.
  • Two screw connection 216 The second screw member 216 passes through the first threaded hole and can be pressed against the side wall of the pole 30, so that the secondary hoop body 210 can be sleeved on the pole 30 more stably, and then cooperate with the main hoop body 130
  • the first screw member 136 abuts against the pole 30, so that the suspension 20 is more stably hung on the pole 30 through the entire fixing device 10 with a double hoop structure.
  • the secondary hoop body 210 is not easy to rotate, and then it is matched with the first threaded connection of the main hoop body 130.
  • the member 136 is tightly pressed against the pole 30, so that when the suspension 20 receives an external force, it is more difficult to rotate around the pole 30.
  • the mounting plate 110 includes a connecting plate body 111 and a fixing plate body 112, the connecting plate body 111 is connected to the connecting block 120, and the fixing plate body 112 Used to connect with the suspension 20. Further, the fixing board 112 and the connecting block 120 are arranged on two opposite sides of the connecting board 111.
  • a plurality of fixing devices 10 having a double-hoop structure can be provided. As shown in FIG. 3, for example, two fixing devices 10 with a double-hoop structure may be provided, respectively close to the two ends of the suspension 20, and one of the fixing devices 10 with a double-hoop structure has a fixing plate 112 and the top end of the suspension 20.
  • the fixing plate 112 of the other fixing device 10 with a double-hoop structure is connected to the bottom end surface of the suspension 20, so that one of the two fixing devices 10 with a double-hoop structure plays a role of pulling and the other plays a supporting role. effect.
  • three fixing devices 10 having a double-hoop structure may be provided for fixing the hanger 20 on the pole 30.
  • two fixing devices 10 with a double-hoop structure are respectively located close to the two end faces of the suspension 20, and have a fixing plate, and the third is close to the middle of the suspension 20, and directly passes through without fixing.
  • the mounting board 110 of the board body 112 is connected to the outer side wall of the suspension 20. In this way, the hanging object 20 can be more stably suspended on the pole 30 through a plurality of fixing devices 10 having a double-hoop structure.

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Clamps And Clips (AREA)
  • Connection Of Plates (AREA)

Abstract

A fixing device (10) having a two-hoop structure comprises a primary hoop structure (100). The primary hoop structure comprises a mounting plate (110), a connecting block (120), and a primary hoop body (130). The primary hoop body has a first end surface (131) and a second end surface facing away from each other. The primary hoop body has a first hoop accommodation cavity (132) having openings at two ends. The connecting block is respectively connected to the mounting plate and an outer side wall of the primary hoop body. A protruding portion (121) is provided on a surface of the connecting block parallel with the first end surface. A strip-shaped through-hole (121a) is provided on the protruding portion. The strip-shaped through-hole is provided at an angle with respect to the axial direction of the primary hoop body. The fixing device (10) comprises a secondary hoop structure (200). The secondary hoop structure comprises a secondary hoop body (210) and a fastener (220). The secondary hoop structure has a second hoop accommodation cavity (211) having openings at two ends. A connecting piece (212) protrudes at an outer side wall of the secondary hoop body. The connecting piece is connected to the protruding portion by means of the fastener passing through the strip-shaped through-hole. The first hoop accommodation cavity and the second hoop accommodation cavity are aligned with each other.

Description

具有双箍结构的固定装置Fixing device with double hoop structure 技术领域Technical field
本申请涉及悬挂固定技术领域,特别是涉及一种具有双箍结构的固定装置。This application relates to the technical field of suspension fixing, and in particular to a fixing device with a double-hoop structure.
背景技术Background technique
如需要在户外柱杆上附加悬挂物,一般在悬挂物对应的上下两端各设置一个单箍,各单箍抱紧柱杆,使得悬挂物固定在柱杆上。单箍固定容易出现以下问题:悬挂物的高度不稳定,易出现悬挂物下滑现象。If it is necessary to attach a hanging object to the outdoor pole, generally a single hoop is set at the upper and lower ends of the hanging object, and each single hoop is tightly hung on the pole so that the hanging object is fixed on the pole. Single hoop fixation is prone to the following problems: the height of the suspension is unstable, and the suspension is prone to slide down.
发明内容Summary of the invention
一种具有双箍结构的固定装置,包括:主箍机构,所述主箍机构包括安装板、连接块和主箍体;所述主箍体具有相背的第一端面和第二端面;所述主箍体具有两端开口的第一箍设腔体;所述连接块分别与所述安装板和所述主箍体的外侧壁连接;所述连接块的平行于所述第一端面的表面设有凸起部,所述凸起部开设有条形通孔,所述条形通孔相对主箍体的轴线方向倾斜延伸;副箍机构,所述副箍机构包括副箍体和紧固件,所述副箍体具有两端开口的第二箍设腔体;所述副箍体的外侧壁凸设有连接片,所述连接片通过穿设过所述条形通孔的所述紧固件与所述凸起部连接;所述第一箍设腔体与所述第二箍设腔体相对准。A fixing device with a double hoop structure includes a main hoop mechanism, the main hoop mechanism includes a mounting plate, a connecting block, and a main hoop body; the main hoop body has a first end surface and a second end surface opposite to each other; The main hoop body has a first hoop cavity with two ends open; the connecting blocks are respectively connected with the mounting plate and the outer side wall of the main hoop body; the connecting block is parallel to the first end surface The surface is provided with a protruding portion, the protruding portion is provided with a strip-shaped through hole, and the strip-shaped through hole extends obliquely with respect to the axial direction of the main hoop body; a secondary hoop mechanism, which includes a secondary hoop body and a tight A firmware, the secondary hoop body has a second hoop cavity with both ends open; the outer side wall of the secondary hoop body is protrudingly provided with a connecting piece, and the connecting piece passes through all of the strip through holes The fastener is connected with the protrusion; the first hoop cavity is aligned with the second hoop cavity.
进一步地,所述主箍体包括至少一个第一断口,所述第一断口的相对的两个端部的侧壁分别向外延伸,以形成相对的第一固定片,所述相对的第一固定片分别开设有第一连接孔,所述第一连接孔中安装有第一连接件。Further, the main hoop body includes at least one first fracture, and the side walls of two opposite ends of the first fracture respectively extend outward to form opposite first fixing pieces. The fixing plates are respectively provided with first connecting holes, and the first connecting pieces are installed in the first connecting holes.
进一步地,所述第一断口的数目为至少两个,各所述第一断口间隔分布于所述主箍体上。Further, the number of the first fracture is at least two, and each of the first fractures is distributed on the main hoop body at intervals.
进一步地,所述主箍体开设有第一螺纹孔,所述第一螺纹孔中穿设有第一螺接件。Further, the main hoop body is provided with a first threaded hole, and a first screw connection is passed through the first threaded hole.
进一步地,所述副箍体包括至少一个第二断口,至少一个所述第二断口的相对的两个端部的侧壁分别向外延伸,以形成相对的第二固定片,所述相对的第二固定片分别设有第二连接孔,所述第二连接孔中安装有第二连接件。Further, the secondary hoop body includes at least one second fracture, and the side walls of two opposite ends of at least one of the second fractures respectively extend outward to form opposite second fixing pieces. The second fixing pieces are respectively provided with second connecting holes, and second connecting pieces are installed in the second connecting holes.
进一步地,所述副箍体包括至少两个第二断口,各所述第二断口间隔分布于所述副箍体上;其中一个所述第二断口的相对的两个端部的侧壁分别向外延伸,以形成相对的所述连接片,所述相对的连接片分别设有供所述紧固件穿过的穿设孔。Further, the secondary hoop body includes at least two second fractures, and each of the second fractures is distributed on the secondary hoop body at intervals; the side walls of two opposite ends of one of the second fractures are respectively Extend outwards to form the opposite connecting pieces, and the opposite connecting pieces are respectively provided with through holes for the fasteners to pass through.
进一步地,所述副箍体开设有第二螺纹孔,所述第二螺纹孔中穿设有第二螺接件。Further, the secondary hoop body is provided with a second threaded hole, and a second threaded member is penetrated in the second threaded hole.
进一步地,所述主箍体包括至少两个第一箍片,每相邻的两个所述第一箍片的相对端部通过所述第一连接件连接。Further, the main hoop body includes at least two first hoop pieces, and the opposite ends of each two adjacent first hoop pieces are connected by the first connecting member.
进一步地,所述条形通孔的远离所述主箍体的一端与所述主箍体的轴线的距离大于所述条形通孔的靠近所述主箍体的一端与所述主箍体的轴线的距离。Further, the distance between the end of the bar-shaped through hole far away from the main hoop body and the axis of the main hoop body is greater than that of the end of the bar-shaped through hole close to the main hoop body and the main hoop body. The distance of the axis.
进一步地,所述安装板包括连接板体和固定板体,所述连接板体和所述连接块连接,所述固定板体用于与悬挂物连接。Further, the mounting board includes a connecting board body and a fixed board body, the connecting board body is connected with the connecting block, and the fixed board body is used for connecting with a hanging object.
进一步地,所述固定板体和所述连接块布置在所述连接板块的相反的两个侧面上。Further, the fixed plate body and the connecting block are arranged on two opposite sides of the connecting plate block.
进一步地,所述固定板体垂直于所述连接板块。Further, the fixed plate body is perpendicular to the connecting plate block.
进一步地,所述凸起部与一个所述第一箍片一体成型。Further, the protrusion and one of the first hoop pieces are integrally formed.
进一步地,所述副箍体包括至少两个第二箍片。Further, the secondary hoop body includes at least two second hoop pieces.
上述的具有双箍结构的固定装置,安装板用于安装悬挂物,双箍结构分别为主箍体和副箍体,主箍体用于套设在柱杆上,副箍体也用于套设在柱杆上,具体地,第一箍设腔体和第二箍设腔体均套住柱杆。副箍体通过紧固件与主箍机构的凸起部连接,从而与主箍体连接。通过主箍体和副箍体共同套设柱杆,增大了具有双箍结构的固定装置与柱杆的摩擦力,使得悬挂物更加稳定地固定在柱杆上。进一步地,在一些方案中,条形通孔倾斜地延伸,当主箍体受到悬挂物的重力往下位移时,紧固件将往悬挂物的方向移动,带动副箍体也往悬挂物方向移动,这样使得副箍体与柱杆间的摩擦力将加大,可防止主箍体进一步下移。In the above-mentioned fixing device with a double hoop structure, the mounting plate is used to install the suspension, and the double hoop structure is used for the main hoop body and the auxiliary hoop body respectively, the main hoop body is used to sleeve the pole, and the auxiliary hoop body is also used for sleeve It is arranged on the pole, specifically, the first hoop cavity and the second hoop cavity both sleeve the pole. The secondary hoop body is connected with the protrusion of the main hoop mechanism through fasteners, thereby connecting with the main hoop body. The main hoop body and the auxiliary hoop body are jointly sleeved with the pole, which increases the friction between the fixing device with the double hoop structure and the pole, so that the suspension is more stably fixed on the pole. Further, in some solutions, the strip-shaped through holes extend obliquely. When the main hoop body is displaced downward by the gravity of the suspended object, the fastener will move in the direction of the suspended object, driving the secondary hoop body to also move in the direction of the suspended object. , So that the friction between the secondary hoop body and the pole will increase, which can prevent the main hoop body from moving down further.
附图说明Description of the drawings
图1为一实施例的具有双箍结构的固定装置的立体图;Figure 1 is a perspective view of an embodiment of a fixing device with a double hoop structure;
图2为图1所示的具有双箍结构的固定装置的分解图;Figure 2 is an exploded view of the fixing device with a double hoop structure shown in Figure 1;
图3为图1所示的具有双箍结构的固定装置将悬挂物安装在柱杆上的仰视立体图。Fig. 3 is a bottom perspective view of the fixing device with a double hoop structure shown in Fig. 1 installing a hanging object on a pole.
具体实施方式Detailed ways
为了便于理解本申请,下面将参照相关附图对具有双箍结构的固定装置进行更全面的描述。附图中给出了具有双箍结构的固定装置的首选实施例。但是,具有双箍结构的固定装置可以以许多不同的形式来实现,并不限于本文所描述的实施例。相反地,提供这些实施例的目的是使对具有双箍结构的固定装置的公开内容更加透彻全面。In order to facilitate the understanding of the present application, a more comprehensive description of the fixing device with a double hoop structure will be given below with reference to related drawings. A preferred embodiment of a fixing device with a double hoop structure is shown in the drawings. However, the fixing device with the double hoop structure can be implemented in many different forms and is not limited to the embodiments described herein. On the contrary, the purpose of providing these embodiments is to make the disclosure of the fixing device with the double cuff structure more thorough and comprehensive.
需要说明的是,当元件被称为“固定于”另一个元件,它可以直接在另一个元件上或者也可以存在居中的元件。当一个元件被认为是“连接”另一个元件,它可以是直接连接到另一个元件或者可能同时存在居中元件。本文所使用的术语“垂直的”、“水平的”、“左”、“右”以及类似的表述只是为了说明的目的,并不表示是唯一的实施方式。It should be noted that when an element is referred to as being "fixed to" another element, it can be directly on the other element or a central element may also be present. When an element is considered to be "connected" to another element, it can be directly connected to the other element or an intermediate element may be present at the same time. The terms "vertical", "horizontal", "left", "right" and similar expressions used herein are for illustrative purposes only, and are not meant to be the only embodiments.
除非另有定义,本文所使用的所有的技术和科学术语与属于本申请的技术领域的技术人员通常理解的含义相同。本文中在具有双箍结构的固定装置的说明书中所使用的术语只是为了描述具体的实施例的目的,不是旨在于限制本申请。本文所使用的术语“及/或”包括一个或多个相关的所列项目的任意的和所有的组合。Unless otherwise defined, all technical and scientific terms used herein have the same meaning as commonly understood by those skilled in the technical field of this application. The terminology used in the description of the fixing device with a double hoop structure herein is only for the purpose of describing specific embodiments, and is not intended to limit the application. The term "and/or" as used herein includes any and all combinations of one or more related listed items.
如图1所示,一实施例提供的具有双箍结构的固定装置10,包括主箍机构100和副箍机构200。As shown in FIG. 1, a fixing device 10 with a double hoop structure provided in an embodiment includes a main hoop mechanism 100 and a secondary hoop mechanism 200.
所述主箍机构100包括连接在一起的安装板110、连接块120和主箍体130。所述主箍体130形成具有至少一个断口的环状结构,主箍体130的断口处可以设置有合适的连接结构或者连接件。同时参阅图1和图2,所述主箍体130具有相背的第一端面131和第二端面(图未示)。所述主箍体130具有两端开口的第一箍设腔体132,所述主箍体130形成环状结构。所述连接块120的一端与所述安装板110连接,另一端与所述主箍体130的外侧壁连接。所述连接块120的平行于所述第一端面131的表面设有凸起部121。所述凸起部121开设有条形通孔121a,所述条形通孔121a相对主箍体130的轴线方向倾斜延伸。例如,条形通孔121a的远离所述主箍体130的一端与主箍体130的轴线的距离大于条形通孔121a的靠近主箍体130的一端与主箍体130的轴线的距离。The main hoop mechanism 100 includes a mounting plate 110, a connecting block 120 and a main hoop body 130 connected together. The main hoop body 130 forms an annular structure with at least one fracture, and a suitable connecting structure or connecting piece may be provided at the fracture of the main hoop body 130. 1 and 2 at the same time, the main hoop body 130 has a first end surface 131 and a second end surface (not shown) opposite to each other. The main hoop body 130 has a first hoop cavity 132 open at both ends, and the main hoop body 130 forms a ring structure. One end of the connecting block 120 is connected to the mounting board 110, and the other end is connected to the outer side wall of the main hoop body 130. A surface of the connecting block 120 parallel to the first end surface 131 is provided with a protrusion 121. The protrusion 121 is provided with a bar-shaped through hole 121 a, and the bar-shaped through hole 121 a extends obliquely with respect to the axial direction of the main hoop body 130. For example, the distance between the end of the bar-shaped through hole 121a far away from the main hoop body 130 and the axis of the main hoop body 130 is greater than the distance between the end of the bar-shaped through hole 121a, which is close to the main hoop body 130 and the axis of the main hoop body 130.
所述副箍机构200包括副箍体210和紧固件220。所述副箍体210具有两端开口的第二箍设腔体211,所述副箍体210形成具有至少一个第二断口213的环状结构,主箍体130的第二断口213处可以设置有合适的连接结构或者连接件。所述副箍体210的外侧壁设置有向外突出的连接片212,连接片212设置有供紧固件220穿过的穿设孔。紧固件220穿过条形通孔121a和穿设孔,将凸起部121和连接片212连接在一起,将副箍体210固定在主箍机构100上。紧固件220能够沿所述条形通孔121a的延伸方向滑动。在本实施例中,连接片212为两个,分布在副箍体210的一个第二断口213的两个相对的端部处,在该相对的端部处的两个连接片212夹持住凸起部121,使副箍体210稳定地固定在凸起部121上。The secondary hoop mechanism 200 includes a secondary hoop body 210 and a fastener 220. The secondary hoop body 210 has a second hoop cavity 211 open at both ends, the secondary hoop body 210 forms a ring structure with at least one second fracture 213, and the second fracture 213 of the main hoop body 130 can be provided There is a suitable connection structure or connector. The outer side wall of the secondary hoop body 210 is provided with a connecting piece 212 protruding outward, and the connecting piece 212 is provided with a through hole for the fastener 220 to pass through. The fastener 220 passes through the strip-shaped through hole 121 a and the through hole, connects the protrusion 121 and the connecting piece 212 together, and fixes the secondary hoop body 210 on the main hoop mechanism 100. The fastener 220 can slide along the extending direction of the bar-shaped through hole 121a. In this embodiment, there are two connecting pieces 212, which are distributed at two opposite ends of a second fracture 213 of the secondary hoop body 210, and the two connecting pieces 212 at the opposite ends clamp The protrusion 121 makes the secondary hoop body 210 stably fixed on the protrusion 121.
所述第一箍设腔体132与第二箍设腔体211相对准。在本实施例中,所述第一箍设腔体132的内周壁用于与外部的柱杆的外周壁抵接,所述第二箍设腔体211的内周壁用于与外部柱 杆的外周壁抵接,使主箍体130和副箍体210抱紧柱杆以固定在柱杆上。The first hoop cavity 132 and the second hoop cavity 211 are aligned. In this embodiment, the inner peripheral wall of the first hoop cavity 132 is used to abut against the outer peripheral wall of the external pole, and the inner peripheral wall of the second hoop cavity 211 is used to contact the outer pole. The outer peripheral wall abuts, so that the main hoop body 130 and the auxiliary hoop body 210 hug the pole to be fixed on the pole.
图1和图2中,所述第二端面位于所述第一端面131的下方,所述副箍体210位于所述主箍体130的上方,所述副箍体210位于所述第一端面131的一侧。在其他实施例中,第二端面可以位于第一端面131的上方。In FIGS. 1 and 2, the second end surface is located below the first end surface 131, the secondary hoop body 210 is located above the main hoop body 130, and the secondary hoop body 210 is located on the first end surface. 131 side. In other embodiments, the second end surface may be located above the first end surface 131.
上述的具有双箍结构的固定装置10,双箍结构分别为主箍体130和副箍体210,如图3所示,安装板110用于安装悬挂物20,主箍体130和副箍体210的中心线对中并能够共同抱紧柱杆30。具体地,第一箍设腔体132和第二箍设腔体211均套住柱杆30,副箍体210通过紧固件220与主箍体130连接。通过主箍体130和副箍体210共同抱紧柱杆30,增大了具有双箍结构的固定装置10与柱杆30的摩擦力,使得悬挂物20更加稳定地固定在柱杆30上。参见图1,当主箍体130受到悬挂物20的重力而往下位移时,由于条形通孔121a的倾斜设计,紧固件220将往悬挂物20的方向移动,带动副箍体210也往悬挂物20方向移动,这样使得副箍体210与柱杆30间的摩擦力将加大,可防止主箍体130进一步下移。The above-mentioned fixing device 10 with a double hoop structure, the double hoop structure is respectively the main hoop body 130 and the auxiliary hoop body 210. As shown in FIG. 3, the mounting plate 110 is used to install the suspension 20, the main hoop body 130 and the auxiliary hoop body. The center line of 210 is centered and can hold the pole 30 together. Specifically, the first hoop cavity 132 and the second hoop cavity 211 both sleeve the pole 30, and the secondary hoop body 210 is connected to the main hoop body 130 by the fastener 220. The main hoop body 130 and the auxiliary hoop body 210 jointly hug the pole 30, which increases the friction between the fixing device 10 with a double hoop structure and the pole 30, so that the suspension 20 is more stably fixed on the pole 30. Referring to FIG. 1, when the main hoop body 130 is displaced downward by the gravity of the suspension 20, due to the inclined design of the bar-shaped through hole 121a, the fastener 220 will move in the direction of the suspension 20, driving the auxiliary hoop body 210 to also move toward The suspension 20 moves in the direction, so that the friction between the secondary hoop body 210 and the pole 30 will increase, which can prevent the main hoop body 130 from moving further down.
在其中一个实施例中,所述凸起部121和所述连接块120一体成型,这样使得副箍体210与柱杆30抵得更紧时,可以更稳定地防止主箍体130进一步下移。在其中一个实施例中,所述安装板110、所述连接块120及所述主箍体130的至少一部分一体成型,这样使得整个主箍机构100的结构紧凑牢固。In one of the embodiments, the protrusion 121 and the connecting block 120 are integrally formed, so that when the secondary hoop body 210 and the pole 30 are pressed tighter, the main hoop body 130 can be more stably prevented from moving down further. . In one of the embodiments, at least a part of the mounting plate 110, the connecting block 120 and the main hoop body 130 are integrally formed, so that the structure of the whole main hoop mechanism 100 is compact and firm.
为了便于主箍体130套设至柱杆30上,主箍体130例如由至少两个第一箍片连接而成。在其中一个实施例中,主箍体130包括两个第一箍片,两个第一箍片之间形成至少一个第一断口133。在一些实施例中,一个第一箍片与凸起部121一体成型。本实施例中,所述第一断口133的数目为两个,各所述第一断口133间隔分布于所述主箍体130上。所述第一断口133的相对端部的侧壁分别向外延伸,以形成两个相对的第一固定片134,两个所述第一固定片134分别开设有第一连接孔(图未示),第一连接件135依次穿过两个所述第一固定片134的第一连接孔以将两个所述第一固定片134连接在一起。打开各个第一断口133时,便于将主箍体130套在柱杆30上,而后可以通过第一连接件135将各第一断口133处的第一固定片134锁在一起。第一连接件135例如是螺栓,这样可以方便地调节相对的两个第一固定片134之间的间距,使第一断口133的宽度可调。将相对的两个第一固定片134之间的间距调小,即可使主箍体130箍紧柱杆30。In order to facilitate the main hoop body 130 to be sleeved on the pole 30, the main hoop body 130 is formed by connecting at least two first hoop pieces, for example. In one of the embodiments, the main hoop body 130 includes two first hoop pieces, and at least one first fracture 133 is formed between the two first hoop pieces. In some embodiments, a first hoop piece and the protrusion 121 are integrally formed. In this embodiment, the number of the first fractures 133 is two, and each of the first fractures 133 is distributed on the main hoop body 130 at intervals. The side walls of the opposite ends of the first fracture 133 respectively extend outward to form two opposite first fixing pieces 134, and the two first fixing pieces 134 are respectively provided with first connecting holes (not shown in the figure) ), the first connecting member 135 sequentially passes through the first connecting holes of the two first fixing pieces 134 to connect the two first fixing pieces 134 together. When each first fracture 133 is opened, it is convenient to put the main hoop body 130 on the pole 30, and then the first fixing piece 134 at each first fracture 133 can be locked together by the first connecting member 135. The first connecting member 135 is, for example, a bolt, so that the distance between the two opposite first fixing pieces 134 can be conveniently adjusted, so that the width of the first fracture 133 is adjustable. By adjusting the distance between the two opposite first fixing pieces 134 to be smaller, the main hoop body 130 can tighten the pole 30.
在本实施例中,第一断口133的宽度大于或等于零,当第一断口133的宽度等于零时,两个第一固定片134之间的间隙为零。在本实施例中,所述第一断口133的宽度可调,宽度的大 小可以根据主箍体130所套设的柱杆30的横截面的大小而变化。In this embodiment, the width of the first fracture 133 is greater than or equal to zero, and when the width of the first fracture 133 is equal to zero, the gap between the two first fixing pieces 134 is zero. In this embodiment, the width of the first fracture 133 is adjustable, and the width can be changed according to the size of the cross section of the pole 30 sheathed by the main hoop body 130.
为了更加便于主箍体130套设至柱杆30上,在其中一个实施例中,主箍体130包括多个第一箍片,每一个第一箍片的两端分别设有一个第一固定片134,通过第一连接件135将第一固定片134连接的方式,使得所有的第一箍片连接在一起。这样,当要将主箍体130套设于柱杆30上时,各个第一箍片首先可以是分离的,将第一箍片安在柱杆30上后,通过第一连接件135将每相邻的两个第一箍片的第一固定片134连接起来,即使得各个第一箍片连接围成环状的主箍体130。在其中一个实施例中,所述第一断口133的数目为一个,除了第一断口133处的一对第一箍片外,其他的第一箍片可以通过铰接的方式连接。In order to make it easier for the main hoop body 130 to be sleeved on the pole 30, in one of the embodiments, the main hoop body 130 includes a plurality of first hoop pieces, and each first hoop piece is provided with a first fixing piece at both ends. The piece 134 is connected to the first fixing piece 134 by the first connecting member 135, so that all the first hoop pieces are connected together. In this way, when the main hoop body 130 is to be sleeved on the pole 30, each of the first hoop pieces can be separated first, and after the first hoop piece is installed on the pole 30, each hoop is connected by the first connecting member 135. The first fixing pieces 134 of two adjacent first hoop pieces are connected, that is, each of the first hoop pieces is connected to the main hoop body 130 that is surrounded by a ring. In one of the embodiments, the number of the first fracture 133 is one. Except for the pair of first hoop pieces at the first fracture 133, the other first hoop pieces may be connected by hinges.
为了使得主箍体130能够更加稳固地套设在柱杆30上,在其中一个实施例中,所述主箍体130上开设有第一螺纹孔(图未示),所述第一螺纹孔中穿设有第一螺接件136。第一螺接件136穿过第一螺纹孔并能够抵压在柱杆30的侧壁上,这样使得主箍体130能够更加稳固地套设在柱杆30上,使得悬挂物20通过主箍体130更加稳固地悬挂在柱杆30上。而且,当柱杆30为圆柱体状时,由于第一螺接件136抵紧在柱杆30的侧壁上,因此主箍体130不容易旋转,这样悬挂物20在受到外力时,不容易绕柱杆30旋转。In order to enable the main hoop body 130 to be more stably sleeved on the pole 30, in one of the embodiments, the main hoop body 130 is provided with a first threaded hole (not shown), and the first threaded hole A first screw connection 136 is provided in the middle pass. The first screw 136 passes through the first threaded hole and can be pressed against the side wall of the pole 30, so that the main hoop body 130 can be more stably sleeved on the pole 30, so that the hanging object 20 can pass through the main hoop. The body 130 is hung on the pole 30 more firmly. Moreover, when the mast 30 is cylindrical, the main hoop body 130 is not easy to rotate because the first screw member 136 abuts against the side wall of the mast 30, so that it is not easy for the suspension 20 to receive an external force. Rotate around the pole 30.
为了便于副箍体210套设至柱杆30上,副箍体210例如由至少两个第二箍片连接而成。在其中一个实施例中,副箍体210包括两个第二箍片,两个第二箍片之间形成至少一个第二断口213。在本实施例中,所述副箍体210包括两个第二断口213,其中一个第二断口213处用于和凸起部121接合,另一个第二断口213的两个相对端部的侧壁分别向外延伸,以形成两个相对的第二固定片214,两个所述第二固定片214分别开设有第二连接孔(图未示),第二连接件215依次穿过两个第二固定片214的第二连接孔以将第二固定片214连接在一起。打开各个第二断口213时,便于将副箍体210套在柱杆30上,而后可以通过紧固件220、第二连接件215将两个第二箍片锁在一起。第二连接件215例如是螺栓,这样可以方便地调节两个第二固定片214之间的间距,使第二断口213的宽度可调。将两个第二固定片214之间的间距调小,即可使得副箍体210箍紧柱杆30。In order to facilitate the sleeve of the auxiliary hoop body 210 to the pole 30, the auxiliary hoop body 210 is formed by connecting at least two second hoop pieces, for example. In one of the embodiments, the secondary hoop body 210 includes two second hoop pieces, and at least one second fracture 213 is formed between the two second hoop pieces. In this embodiment, the secondary hoop body 210 includes two second fractures 213, one of the second fractures 213 is used to engage with the protrusion 121, and the other second fracture 213 has two opposite ends. The walls respectively extend outward to form two opposite second fixing pieces 214. The two second fixing pieces 214 are respectively provided with second connecting holes (not shown), and the second connecting pieces 215 pass through the two in turn. The second connecting hole of the second fixing piece 214 is used to connect the second fixing piece 214 together. When each second fracture 213 is opened, it is convenient to sleeve the secondary hoop body 210 on the pole 30, and then the two second hoop pieces can be locked together by the fastener 220 and the second connecting member 215. The second connecting member 215 is, for example, a bolt, so that the distance between the two second fixing pieces 214 can be conveniently adjusted, so that the width of the second fracture 213 can be adjusted. By adjusting the distance between the two second fixing pieces 214 to be smaller, the secondary hoop body 210 can tighten the pole 30.
在本实施例中,对应于第二连接件215的第二断口213的宽度大于或等于零,当第二断口213的宽度等于零时,两个第二固定片214之间的间隙为零。在本实施例中,对应于第二连接件215的所述第二断口213的宽度可调,宽度的大小可以根据副箍体210所套设的柱杆30的横截面的大小而变化。In this embodiment, the width of the second fracture 213 corresponding to the second connecting member 215 is greater than or equal to zero. When the width of the second fracture 213 is equal to zero, the gap between the two second fixing pieces 214 is zero. In this embodiment, the width of the second fracture 213 corresponding to the second connecting member 215 is adjustable, and the width can be changed according to the size of the cross section of the pole 30 sheathed by the secondary hoop body 210.
为了更加便于副箍体210套设至柱杆30上,在其中一个实施例中,副箍体210包括多个 第二箍片,所述第二断口213的数目为至少两个,各所述第二断口213间隔分布于所述副箍体210上。在用于安装凸起部121的第二断口213之外,其他各个第二断口213的两个相对端部的侧壁分别向外延伸得到的两个相对的所述第二固定片214,每两个相对的第二固定片214分别通过第二连接件215连接。这样,当要将副箍体210套设于柱杆30上时,各个第二箍片首先可以是分离的,然后将两个第二箍片和凸起部121连接,然后通过第二连接件215将所有第二箍片安装在柱杆30上,使各个第二箍片连接围成环状的副箍体210。在其中一个实施例中,副箍体210包括多个第二箍片,第二断口213的数目为两个,一个第二断口213用于容纳凸起部121,一个第二断口213对应设置有第二连接件215,不用于形成第二断口213的相邻的两个第二箍片之间可以通过铰接的方式连接。In order to make it easier for the secondary hoop body 210 to be sleeved on the pole 30, in one of the embodiments, the secondary hoop body 210 includes a plurality of second hoop pieces, and the number of the second fractures 213 is at least two. The second fractures 213 are distributed on the secondary hoop body 210 at intervals. Except for the second fractures 213 for mounting the protrusions 121, the side walls of the two opposite ends of the other second fractures 213 respectively extend outward to obtain two opposite second fixing pieces 214, each The two opposite second fixing pieces 214 are respectively connected by a second connecting member 215. In this way, when the secondary hoop body 210 is to be sleeved on the pole 30, each second hoop piece can be separated first, and then the two second hoop pieces are connected to the protrusion 121, and then the second connecting piece 215 All the second hoop pieces are installed on the pole 30, so that each second hoop piece is connected to the auxiliary hoop body 210 that is surrounded by a ring. In one of the embodiments, the secondary hoop body 210 includes a plurality of second hoop pieces, the number of the second fractures 213 is two, one second fracture 213 is used to accommodate the protrusion 121, and one second fracture 213 is correspondingly provided with The second connecting member 215 may be hingedly connected between two adjacent second hoop pieces that are not used to form the second fracture 213.
为了使得副箍体210能够更加稳固地套设在柱杆30上,在其中一个实施例中,所述副箍体210上开设有第二螺纹孔,所述第二螺纹孔中穿设有第二螺接件216。第二螺接件216穿过第一螺纹孔并能够抵紧在柱杆30的侧壁上,这样使得副箍体210能够更加稳固地套设在柱杆30上,再配合主箍体130的第一螺接件136与柱杆30抵紧,使得悬挂物20通过整个具有双箍结构的固定装置10更加稳固地悬挂在柱杆30上。而且,当柱杆30为圆柱体状时,由于第二螺接件216抵紧在柱杆30的侧壁上,因此副箍体210不容易旋转,再配合主箍体130的第一螺接件136与柱杆30抵紧,这样悬挂物20在受到外力时,更不容易绕柱杆30旋转。In order to enable the secondary hoop body 210 to be more stably sleeved on the pole 30, in one of the embodiments, the secondary hoop body 210 is provided with a second threaded hole, and the second threaded hole is pierced with a second threaded hole. Two screw connection 216. The second screw member 216 passes through the first threaded hole and can be pressed against the side wall of the pole 30, so that the secondary hoop body 210 can be sleeved on the pole 30 more stably, and then cooperate with the main hoop body 130 The first screw member 136 abuts against the pole 30, so that the suspension 20 is more stably hung on the pole 30 through the entire fixing device 10 with a double hoop structure. Moreover, when the pole 30 is cylindrical, since the second screw member 216 abuts against the side wall of the pole 30, the secondary hoop body 210 is not easy to rotate, and then it is matched with the first threaded connection of the main hoop body 130. The member 136 is tightly pressed against the pole 30, so that when the suspension 20 receives an external force, it is more difficult to rotate around the pole 30.
为了便于安装悬挂物20,在其中一个实施例中,所述安装板110包括连接板体111和固定板体112,所述连接板体111和所述连接块120连接,所述固定板体112用于与悬挂物20连接。进一步地,固定板体112和连接块120布置在连接板体111的相反的两个侧面上。当要将悬挂物20固定在柱杆30上时,可以设置多个具有双箍结构的固定装置10。如图3所示,例如可以设置两个具有双箍结构的固定装置10,分别靠近悬挂物20的两端,其中一个具有双箍结构的固定装置10的固定板体112与悬挂物20的顶端面连接,另一个具有双箍结构的固定装置10的固定板体112与悬挂物20的底端面连接,这样两个具有双箍结构的固定装置10一个起到拉的作用,一个起到托的作用。In order to facilitate the installation of the suspension 20, in one of the embodiments, the mounting plate 110 includes a connecting plate body 111 and a fixing plate body 112, the connecting plate body 111 is connected to the connecting block 120, and the fixing plate body 112 Used to connect with the suspension 20. Further, the fixing board 112 and the connecting block 120 are arranged on two opposite sides of the connecting board 111. When the hanging object 20 is to be fixed on the pole 30, a plurality of fixing devices 10 having a double-hoop structure can be provided. As shown in FIG. 3, for example, two fixing devices 10 with a double-hoop structure may be provided, respectively close to the two ends of the suspension 20, and one of the fixing devices 10 with a double-hoop structure has a fixing plate 112 and the top end of the suspension 20. The fixing plate 112 of the other fixing device 10 with a double-hoop structure is connected to the bottom end surface of the suspension 20, so that one of the two fixing devices 10 with a double-hoop structure plays a role of pulling and the other plays a supporting role. effect.
在一些实施例中,例如可以提供三个具有双箍结构的固定装置10用于将悬挂物20固定在柱杆30上。其中,两个具有双箍结构的固定装置10分别位于靠近悬挂物20的两个端面的位置,且具有固定板,第三个则靠近悬挂物20的中部的位置,且直接通过不带有固定板体112的安装板110与悬挂物20的外侧壁连接。这样,通过多个具有双箍结构的固定装置10可以使悬挂物20更加稳固地悬挂在柱杆30上。In some embodiments, for example, three fixing devices 10 having a double-hoop structure may be provided for fixing the hanger 20 on the pole 30. Among them, two fixing devices 10 with a double-hoop structure are respectively located close to the two end faces of the suspension 20, and have a fixing plate, and the third is close to the middle of the suspension 20, and directly passes through without fixing. The mounting board 110 of the board body 112 is connected to the outer side wall of the suspension 20. In this way, the hanging object 20 can be more stably suspended on the pole 30 through a plurality of fixing devices 10 having a double-hoop structure.
以上所述实施例的各技术特征可以进行任意的组合,为使描述简洁,未对上述实施例中的各个技术特征所有可能的组合都进行描述,然而,只要这些技术特征的组合不存在矛盾,都应当认为是本说明书记载的范围。The technical features of the above-mentioned embodiments can be combined arbitrarily. In order to make the description concise, all possible combinations of the various technical features in the above-mentioned embodiments are not described. However, as long as there is no contradiction in the combination of these technical features, All should be considered as the scope of this specification.
以上所述实施例仅表达了本申请的几种实施方式,其描述较为具体和详细,但并不能因此而理解为对申请专利范围的限制。应当指出的是,对于本领域的普通技术人员来说,在不脱离本申请构思的前提下,还可以做出若干变形和改进,这些都属于本申请的保护范围。因此,本申请专利的保护范围应以所附权利要求为准。The above-mentioned embodiments only express several implementation manners of the present application, and their description is relatively specific and detailed, but they should not be interpreted as a limitation on the scope of the patent application. It should be pointed out that for those of ordinary skill in the art, without departing from the concept of this application, several modifications and improvements can be made, and these all fall within the protection scope of this application. Therefore, the scope of protection of the patent of this application shall be subject to the appended claims.

Claims (14)

  1. 一种具有双箍结构的固定装置,包括:A fixing device with a double hoop structure, including:
    主箍机构,所述主箍机构包括安装板、连接块和主箍体;所述主箍体具有相背的第一端面和第二端面;所述主箍体具有两端开口的第一箍设腔体;所述连接块分别与所述安装板和所述主箍体的外侧壁连接;所述连接块的平行于所述第一端面的表面设有凸起部,所述凸起部开设有条形通孔,所述条形通孔相对主箍体的轴线方向倾斜延伸;The main hoop mechanism, the main hoop mechanism includes a mounting plate, a connecting block, and a main hoop body; the main hoop body has a first end surface and a second end surface opposite to each other; the main hoop body has a first hoop open at both ends A cavity is provided; the connecting block is respectively connected with the mounting plate and the outer side wall of the main hoop body; the surface of the connecting block parallel to the first end surface is provided with a convex portion, the convex portion A strip-shaped through hole is opened, and the strip-shaped through hole extends obliquely with respect to the axial direction of the main hoop body;
    副箍机构,所述副箍机构包括副箍体和紧固件,所述副箍体具有两端开口的第二箍设腔体;所述副箍体的外侧壁凸设有连接片,所述连接片通过穿设过所述条形通孔的所述紧固件与所述凸起部连接;所述第一箍设腔体与所述第二箍设腔体相对准。A secondary hoop mechanism, the secondary hoop mechanism includes a secondary hoop body and a fastener, the secondary hoop body has a second hoop cavity with two ends open; the outer side wall of the secondary hoop body is convexly provided with a connecting piece, so The connecting piece is connected to the protruding portion through the fastener passing through the bar-shaped through hole; the first hoop cavity is aligned with the second hoop cavity.
  2. 根据权利要求1所述的具有双箍结构的固定装置,其中,所述主箍体包括至少一个第一断口,所述第一断口的相对的两个端部的侧壁分别向外延伸,以形成相对的第一固定片,所述相对的第一固定片分别开设有第一连接孔,所述第一连接孔中安装有第一连接件。The fixing device with a double hoop structure according to claim 1, wherein the main hoop body includes at least one first fracture, and the side walls of two opposite ends of the first fracture respectively extend outward to The opposite first fixing pieces are formed, and the opposite first fixing pieces are respectively provided with first connecting holes, and the first connecting parts are installed in the first connecting holes.
  3. 根据权利要求2所述的具有双箍结构的固定装置,其中,所述第一断口的数目为至少两个,各所述第一断口间隔分布于所述主箍体上。The fixing device with a double hoop structure according to claim 2, wherein the number of the first fractures is at least two, and each of the first fractures is distributed on the main hoop body at intervals.
  4. 根据权利要求1所述的具有双箍结构的固定装置,其中,所述主箍体开设有第一螺纹孔,所述第一螺纹孔中穿设有第一螺接件。The fixing device with a double hoop structure according to claim 1, wherein the main hoop body is provided with a first threaded hole, and a first screw connection is penetrated in the first threaded hole.
  5. 根据权利要求1所述的具有双箍结构的固定装置,其中,所述副箍体包括至少一个第二断口,至少一个所述第二断口的相对的两个端部的侧壁分别向外延伸,以形成相对的第二固定片,所述相对的第二固定片分别设有第二连接孔,所述第二连接孔中安装有第二连接件。The fixing device with a double hoop structure according to claim 1, wherein the secondary hoop body includes at least one second fracture, and the side walls of two opposite ends of at least one of the second fractures respectively extend outward , To form opposite second fixing pieces, the opposite second fixing pieces are respectively provided with second connecting holes, and second connecting pieces are installed in the second connecting holes.
  6. 根据权利要求5所述的具有双箍结构的固定装置,其中,所述副箍体包括至少两个第二断口,各所述第二断口间隔分布于所述副箍体上;其中一个所述第二断口的相对的两个端部的侧壁分别向外延伸,以形成相对的所述连接片,所述相对的连接片分别设有供所述紧固件穿过的穿设孔。The fixing device with a double hoop structure according to claim 5, wherein the secondary hoop body includes at least two second fractures, and each of the second fractures is distributed on the secondary hoop body at intervals; one of the The side walls of the two opposite ends of the second fracture respectively extend outward to form the opposite connecting pieces, and the opposite connecting pieces are respectively provided with through holes for the fasteners to pass through.
  7. 根据权利要求1所述的具有双箍结构的固定装置,其中,所述副箍体开设有第二螺纹孔,所述第二螺纹孔中穿设有第二螺接件。The fixing device with a double hoop structure according to claim 1, wherein the secondary hoop body is provided with a second threaded hole, and a second screw connection is penetrated in the second threaded hole.
  8. 根据权利要求2所述的具有双箍结构的固定装置,其中,所述主箍体包括至少两个第一箍片,每相邻的两个所述第一箍片的相对端部通过所述第一连接件连接。The fixing device with a double hoop structure according to claim 2, wherein the main hoop body includes at least two first hoop pieces, and the opposite ends of every two adjacent first hoop pieces pass through the The first connecting piece is connected.
  9. 根据权利要求1所述的具有双箍结构的固定装置,其中,所述条形通孔的远离所述主箍体的一端与所述主箍体的轴线的距离大于所述条形通孔的靠近所述主箍体的一端与所述主箍体的轴线的距离。The fixing device with a double hoop structure according to claim 1, wherein the distance between the end of the bar-shaped through hole far from the main hoop body and the axis of the main hoop body is greater than that of the bar-shaped through hole The distance between the end close to the main hoop body and the axis of the main hoop body.
  10. 根据权利要求1所述的具有双箍结构的固定装置,其中,所述安装板包括连接板体和固定板体,所述连接板体和所述连接块连接,所述固定板体用于与悬挂物连接。The fixing device with a double hoop structure according to claim 1, wherein the mounting plate comprises a connecting plate body and a fixing plate body, the connecting plate body is connected to the connecting block, and the fixing plate body is used to connect with Suspended objects are connected.
  11. 根据权利要求1所述的具有双箍结构的固定装置,其中,所述固定板体和所述连接块布置在所述连接板块的相反的两个侧面上。The fixing device with a double hoop structure according to claim 1, wherein the fixing plate body and the connecting block are arranged on two opposite sides of the connecting plate block.
  12. 根据权利要求11所述的具有双箍结构的固定装置,其中,所述固定板体垂直于所述连接板块。The fixing device with a double hoop structure according to claim 11, wherein the fixing plate body is perpendicular to the connecting plate block.
  13. 根据权利要求8所述的具有双箍结构的固定装置,其中,所述凸起部与一个所述第一箍片一体成型。8. The fixing device with a double hoop structure according to claim 8, wherein the protrusion and one of the first hoop pieces are integrally formed.
  14. 根据权利要求5所述的具有双箍结构的固定装置,其中,所述副箍体包括至少两个第二箍片。The fixing device with a double hoop structure according to claim 5, wherein the secondary hoop body includes at least two second hoop pieces.
PCT/CN2020/100799 2019-12-13 2020-07-08 Fixing device having two-hoop structure WO2021114652A1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201911280372.3A CN112984342B (en) 2019-12-13 2019-12-13 Fixing device with double hoop structure
CN201911280372.3 2019-12-13

Publications (1)

Publication Number Publication Date
WO2021114652A1 true WO2021114652A1 (en) 2021-06-17

Family

ID=76329342

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2020/100799 WO2021114652A1 (en) 2019-12-13 2020-07-08 Fixing device having two-hoop structure

Country Status (2)

Country Link
CN (1) CN112984342B (en)
WO (1) WO2021114652A1 (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NL8001530A (en) * 1980-03-14 1981-10-16 Elverding & Kruijff B V Signboard securing bracket to post - has annular parts permanently hinging together via locking ring
NL192469C (en) * 1991-01-24 1997-08-04 Konstruktie En Plaatbewerking Assembly for securing an object to a tube.
CN2339700Y (en) * 1998-08-07 1999-09-22 珠海市共创有限公司 Integrated vertical self-adaptive fixed single lock
EP1146276B1 (en) * 2000-03-23 2004-07-28 REHAU AG + Co Device for the fastening of pipes
DE202004009155U1 (en) * 2004-06-09 2005-10-27 Kwasny, Siegfried Road sign clamp, has support and clamping units exhibiting respective plug-in connection units, which form plug connector for detachable plug-in connection between units, where support and clamping units are made of plastics
CN101708747A (en) * 2009-11-10 2010-05-19 力帆实业(集团)股份有限公司 Motorcycle speedometer flexible shaft limit structure
CN203472984U (en) * 2013-08-01 2014-03-12 北京汽车股份有限公司 Steering oil tank fixing device and vehicle
CN208123735U (en) * 2018-03-13 2018-11-20 河北创美科技有限公司 A kind of leak source device handling industrial pipeline

Family Cites Families (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4946122A (en) * 1989-09-29 1990-08-07 The United States Of America As Represented By The Administrator Of The National Aeronautics And Space Administration Post clamp
US5088672A (en) * 1991-01-02 1992-02-18 Neuendorf Paul A Circumscribing sign clamp and method of fabrication
CN101789573A (en) * 2010-03-31 2010-07-28 如皋市凯凯电信器材有限公司 Lever-type leakage cable fixture
CN202691509U (en) * 2012-03-19 2013-01-23 新邮通信设备有限公司 Outdoor multi-environmental quick-fastening installation rack
CN204828151U (en) * 2015-05-19 2015-12-02 金方明 Tight piece is pressed from both sides to shoemaking machine pendulum rod double -end
CN205423417U (en) * 2015-12-04 2016-08-03 重庆长安汽车股份有限公司 Clamp with positioning looseness resistant function
CN205876882U (en) * 2016-07-05 2017-01-11 富顺县电力金具有限公司 Novel double tops cover staple bolt
CN207213975U (en) * 2017-08-16 2018-04-10 广东洲明节能科技有限公司 Lamp stand fixing device
CN207393652U (en) * 2017-09-19 2018-05-22 天津威全新能源科技有限公司 Double-jacket tube photovoltaic bracket anchor ear
CN110005667B (en) * 2019-05-09 2024-03-22 河北鸿宇通信器材有限公司 Complete set hoop and use method

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NL8001530A (en) * 1980-03-14 1981-10-16 Elverding & Kruijff B V Signboard securing bracket to post - has annular parts permanently hinging together via locking ring
NL192469C (en) * 1991-01-24 1997-08-04 Konstruktie En Plaatbewerking Assembly for securing an object to a tube.
CN2339700Y (en) * 1998-08-07 1999-09-22 珠海市共创有限公司 Integrated vertical self-adaptive fixed single lock
EP1146276B1 (en) * 2000-03-23 2004-07-28 REHAU AG + Co Device for the fastening of pipes
DE202004009155U1 (en) * 2004-06-09 2005-10-27 Kwasny, Siegfried Road sign clamp, has support and clamping units exhibiting respective plug-in connection units, which form plug connector for detachable plug-in connection between units, where support and clamping units are made of plastics
CN101708747A (en) * 2009-11-10 2010-05-19 力帆实业(集团)股份有限公司 Motorcycle speedometer flexible shaft limit structure
CN203472984U (en) * 2013-08-01 2014-03-12 北京汽车股份有限公司 Steering oil tank fixing device and vehicle
CN208123735U (en) * 2018-03-13 2018-11-20 河北创美科技有限公司 A kind of leak source device handling industrial pipeline

Also Published As

Publication number Publication date
CN112984342A (en) 2021-06-18
CN112984342B (en) 2022-01-04

Similar Documents

Publication Publication Date Title
US7195038B2 (en) Conduit supports
US8091852B2 (en) Hanger device and method for hanging an object
US10367340B2 (en) Assembly cable tray using retardant plastics and joint device thereof
US9376812B2 (en) Ceiling panel mounting system
CN102076919B (en) System consisting of sections and junction elements for forming load-bearing structures
US20190376338A1 (en) Fastening System and Window Shade Including the Same
US20220243478A1 (en) System wall for building interior
JP2007255181A (en) Shape steel for illumination wall and illumination wall shape steel system
WO2021114652A1 (en) Fixing device having two-hoop structure
US20200383509A1 (en) Flat-mounted connector for pipes
CN205640155U (en) Stores pylon and display device
KR101574463B1 (en) Installation hanger of carrying channel for ceiling
ES2851075T3 (en) Fixing set
KR101815254B1 (en) A hanger for cable
KR102491454B1 (en) The bracket for fixing, exterior panel
US11009054B2 (en) Fixing device, display module and display device
JP7168978B2 (en) Suspension bolt fixture
KR200210942Y1 (en) Lightweight steel frame clip for ceiling construction
EP2988051B1 (en) Multifunctional fixture apparatus and assembly thereof
KR20110005427U (en) Horizontal bar connecting device for hanger
KR200346414Y1 (en) holding device for hang a board
US20240133579A1 (en) Apparatus and System for Joining Ducts
KR102579516B1 (en) A fixing device of slate for building
JP3231237U (en) Bolt connector
KR102055932B1 (en) A sectional shelf capable of installing pipe hanger

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 20898795

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 20898795

Country of ref document: EP

Kind code of ref document: A1