WIPO (PCT)
Prior art keywords
plant
condition
operating conditions
conditions
operating
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Ceased
Application number
PCT/JP2020/028135
Other languages
English (en)
French (fr)
Japanese (ja)
Inventor
田中 鉄也
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Power Ltd
Original Assignee
Mitsubishi Power Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Power Ltd filed Critical Mitsubishi Power Ltd
Priority to KR1020217041686A priority Critical patent/KR20220011163A/ko
Publication of WO2021015176A1 publication Critical patent/WO2021015176A1/ja
Anticipated expiration legal-status Critical
Ceased legal-status Critical Current

Links

Images

Classifications

    • G—PHYSICS
    • G05—CONTROLLING; REGULATING
    • G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B23/00—Testing or monitoring of control systems or parts thereof
    • G05B23/02—Electric testing or monitoring
    • G—PHYSICS
    • G06—COMPUTING OR CALCULATING; COUNTING
    • G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06—Energy or water supply
    • Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00—Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50—Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Definitions

  • the present invention relates to an operation comparison device, an operation comparison method and a program.
  • the present application claims priority with respect to Japanese Patent Application No. 2019-133828 filed in Japan on July 19, 2019, the contents of which are incorporated herein by reference.
  • an application that estimates the behavior of a plant using a computer model consisting of characteristic functions indicating the characteristics of each facility is used (see, for example, Patent Document 1).
  • the data of the target facility can be obtained even when the characteristics of the target facility change without using the data of various other facilities regardless of the facility attribute. It is possible to estimate the energy fluctuation cost when the energy saving measures are not implemented in the period after the energy saving measures.
  • the energy variable cost estimation program described in Patent Document 1 for example, when the plant is operated in two periods that are later in time, the plant is operated in the later period under the operating conditions of the earlier period. Then, the energy variable cost when assuming that is estimated.
  • the present invention has been made in view of the above circumstances, and provides an operation comparison device, an operation comparison method, and a program capable of quantitatively comparing the effects when the operating conditions of a plant are changed.
  • the purpose is to be described.
  • the operation comparison device is based on a condition input unit that accepts input of a requirement condition that is a condition to be satisfied among a plurality of operation conditions related to a plant, and a plurality of algorithms. It includes an operation condition calculation unit that calculates a plurality of operation conditions that satisfy the conditions, and a presentation unit that presents the plurality of operation conditions.
  • the plurality of algorithms include an algorithm for calculating the operation condition by a simulation based on a plant model simulating the behavior of the plant. It may include an algorithm for calculating the operating conditions based on the past operation of the plant.
  • the plurality of algorithms calculate the operation conditions by simulation based on a plant model that simulates the behavior of the plant.
  • the operating conditions are calculated based on an algorithm that calculates the operating conditions based on the past operation of the plant before the introduction of the operating condition proposal program and the past operation of the plant after the introduction of the operating condition proposal program. It may include an algorithm.
  • the algorithm for calculating the operation condition based on the past operation of the plant is based on the past operation of the plant. It may be an algorithm that uses a learning model trained using the operating conditions as a training data set.
  • the program includes a step of accepting input of a requirement condition which is a condition to be satisfied among a plurality of operating conditions related to a plant, and a plurality of requirements satisfying the above requirements based on a plurality of algorithms.
  • the computer is made to execute the step of calculating the operating conditions and the step of presenting the plurality of operating conditions.
  • FIG. 1 is a block diagram showing a configuration example of the operation comparison device according to the first embodiment.
  • FIG. 2 is a schematic diagram showing a configuration example of the cogeneration system according to the first embodiment.
  • an operating condition proposal program that proposes operating conditions of each plant that satisfies the operating requirements is introduced. Examples of operating conditions include the load of steam generating equipment and the load of power generation equipment in the cogeneration system 2, the amount of power received from the outside, and the like. The operator operates each plant with reference to the operating conditions calculated by the operating condition proposal program.
  • the operation comparison device 1 shown in FIG. 1 is a device that compares the operation conditions of the cogeneration system 2 proposed by the operation condition proposal program with the operation conditions according to the operation policy before the introduction of the operation condition proposal program. It is configured using a computer such as a server or a personal computer. That is, the operator of the cogeneration system 2 can quantitatively recognize the validity of the driving conditions proposed by the driving condition proposal program by referring to the information presented by the driving comparison device 1.
  • FIG. 2 shows two plants 20 and each facility for generating steam and electric power installed in the plant 30 as a cogeneration system 2.
  • Fuel 41 is supplied to the plant 20 and the plant 30 via the pipe 42.
  • the plant 20 includes a first boiler 24 and a second boiler 25, a gas turbine GT (hereinafter, also simply referred to as GT), and a back pressure turbine BT (hereinafter, also simply referred to as BT).
  • GT gas turbine GT
  • BT back pressure turbine BT
  • the LP (low voltage) process steam 53 and the electric power (transmission 54) are supplied to the plant 20 or other equipment (not shown) in the plant 30.
  • the plant 30 includes two third boilers 31 and a fourth boiler 32, two condensate turbines CT1 (hereinafter, also simply referred to as CT1) and a condensate turbine CT2 (hereinafter, also simply referred to as CT2).
  • the HP process steam 51 and the electric power (transmission 54) generated by using the third boiler 31, the fourth boiler 32, the condensate turbine CT1 and the condensate turbine CT2 are transferred into the plant 30 or the plant 20. Supply to other equipment not shown in.
  • the plant 20 and the plant 30 can also receive electric power 55 supplied from the outside such as an electric power company.
  • At least one of the ascites turbines CT1 and CT2 may be drawn to the MP process steam 52 or the LP process steam 53.
  • the operation comparison device 1 is not limited to the cogeneration system as shown in FIG. 2, and can be calculated for a power generation facility or a power generation system composed of a power generation facility and a power storage facility.
  • power generation equipment using a steam turbine hereinafter, also referred to as ST
  • solar power generation equipment solar power generation equipment
  • wind power generation equipment wind power generation equipment
  • hydroelectric power generation equipment and the like can be included in the calculation.
  • the operation comparison device 1 has a condition input unit 11 and proposed operation conditions as functional elements composed of a combination of hardware possessed by a computer constituting the operation comparison device 1 and software such as programs and data.
  • a calculation unit 12, a past operation condition calculation unit 13, a presentation unit 14, and a storage unit 19 are provided.
  • the storage unit 19 stores the plant model 16, the operation reproduction model 17, and the learning data set 18.
  • the operation reproduction model 17 is a trained model in which the values of the past actual operating conditions of the plant are learned as the training data set 18, and includes the pre-introduction model 171 and the post-introduction model 172.
  • the condition input unit 11 receives the input of the requirement condition 15 of the plant to be calculated.
  • the plant requirement condition 15 is data indicating the requirement condition (demand condition, constraint condition of each facility, etc.) of the plant to be calculated such as the plant 20 and the plant 30 shown in FIG. 2, for example, electric power.
  • Demand corresponding to power transmission 54 in FIG. 2
  • steam demand corresponding to HP process steam 51, MP process steam 52 and LP process steam 53 in FIG. 2
  • power received corresponding to power receiving 55 in FIG. 2).
  • Includes values of) operational limits for BT, ST, CT, etc., operational limits for power transmission and reception, weather conditions, unit prices for fuel and electricity, etc. That is, the requirement condition 15 is given as a constraint among the operating conditions of the plant.
  • the proposed operating condition calculation unit 12 calculates the operating condition satisfying the required condition 15 by the operating condition proposal program. Specifically, the proposed operating condition calculation unit 12 calculates the operating conditions of the plant satisfying the required condition 15 by a simulation based on the plant model 16 that simulates the behavior of the plant.
  • the plant model 16 is a model (simulation model) that simulates the behavior of the plant.
  • the past operation condition calculation unit 13 calculates the operation condition based on the past operation policy of the plant by inputting the requirement condition to be evaluated into the operation reproduction model 17.
  • the operation reproduction model 17 is a learning model that reproduces the past operation policy, and by using the operation reproduction model 17, how the operation conditions of the plant are set in the past operation policy in the requirement conditions to be evaluated. It can be estimated.
  • the pre-introduction model 171 included in the operation reproduction model 17 is a trained model in which the values of the past operation conditions before the introduction of the operation condition proposal program are learned as the learning data set 18.
  • the post-introduction model 172 is a trained model in which the past operating conditions after the introduction of the operating condition proposal program are learned as the learning data set 18.
  • the pre-introduction model 171 is a learning model based on past driving results before the introduction of the operating condition proposal program
  • the post-introduction model 172 is, for example, from after the introduction of the operating condition proposal program to the present. It is a learning model based on past driving results.
  • the past operation condition calculation unit 13 calculates the pre-introduction operation condition by inputting the requirement condition into the pre-introduction model 171 and calculates the post-introduction operation condition by inputting the requirement condition into the post-introduction model 172.
  • the pre-introduction model 171 it is possible to estimate how the operating conditions were set in the required conditions to be evaluated, for example, in the past operating policies before the introduction of the operating condition proposal program. it can.
  • the post-introduction model 172 it is possible to estimate how the operating conditions are set in the operating policy after the operating condition proposal program is introduced in the required conditions to be evaluated. .. That is, the user can recognize how the operation of the plant has changed due to the introduction of the operation condition proposal program by comparing the operation condition before introduction and the operation condition after introduction.
  • the presentation unit 14 provides information based on the operating conditions (proposed by the operating condition proposal program) calculated by the proposed operating condition calculation unit 12, and the pre-introduction operation conditions and post-introduction operation conditions calculated by the past operation condition calculation unit 13. To present.
  • the user can quantitatively evaluate the validity of the operating condition proposal program by comparing the operating conditions proposed by the operating condition proposal program with the operating conditions before introduction.
  • the user can quantitatively evaluate how the operation of the plant changed before and after the introduction of the operation condition proposal program by comparing the operation conditions before and after the introduction. it can.
  • the user can quantitatively evaluate the validity of the operation policy of the plant after the introduction of the operation condition proposal program by comparing the operation conditions proposed by the operation condition proposal program with the operation conditions after introduction. it can.
  • the operator refers to the operating conditions presented by the operating condition proposal program, but may operate under conditions different from the presented operating conditions. Therefore, the operating conditions calculated by the proposed operating condition calculation unit 12 may differ from the past operating conditions calculated by the past operating condition calculation unit 13 based on the post-introduction model 172.
  • FIG. 3 is a schematic diagram showing an example of the data input / output relationship of the operation comparison device 1 in the first embodiment.
  • the operation comparison device 1 receives the input of the requirement condition 15 and the learning data set 18 as the input 110.
  • the operation comparison device 1 has operation restrictions 114 such as power demand 111, steam demand (HP / MP / LP) 112, power reception / transmission power 113, BT / ST / GT, etc. as requirement condition 15. Accepts the input of power transmission / reception operation limit 115. Of the required conditions 15, the received / transmitted power 113 is an optional condition. Further, the operation comparison device 1 accepts the input of the past operation conditions 117 as the learning data set 18.
  • the operation comparison device 1 outputs the operation condition 120a and the past operation condition 120b as the output 120.
  • the operating condition 120a and the past operating condition 120b include the boiler load 121, the GT load 122, the BT load 123, the CT load 124, the power received / transmitted power 125, the fuel cost and the like 126.
  • the power reception / transmission power 125 is calculated when the power reception / transmission power 113 is not set as the requirement condition 15.
  • the proposed operation condition calculation unit 12 sets the power demand 111, steam demand (HP / MP / LP) 112, power reception / transmission power 113, BT / ST / GT and other operation restrictions 114, and power transmission / power reception.
  • the boiler load 121, GT load 122, BT load 123, CT load 124, power received / transmitted power 125, fuel cost, etc. 126 that satisfy the operation limit 115 of the above are calculated.
  • the past operation condition calculation unit 13 applies the operation reproduction model 17, the power demand 111, the steam demand (HP / MP / LP) 112, the power reception / transmission power 113, the operation limit 114 such as BT / ST / GT, and the power transmission / transmission.
  • the boiler load 121, GT load 122, BT load 123, CT load 124, power receiving / transmitting power 125, fuel cost, etc. 126 are calculated.
  • FIG. 4 is a flowchart showing an operation example of the operation comparison device 1 according to the first embodiment.
  • the condition input unit 11 of the operation comparison device 1 receives the input of the required condition from the user (step S101).
  • the user inputs an arbitrary item from a plurality of operating conditions as a requirement condition.
  • the proposed operating condition calculation unit 12 calculates the operating condition according to the operating condition proposal program based on the received required condition (step S102).
  • the past operation condition calculation unit 13 constructs the pre-introduction model 171 based on the requirement condition for which the input is received in step S101 (step S103). That is, the past operating condition calculation unit 13 uses the value of the past operating condition of the plant before the introduction of the operating condition proposal program as the required condition in step S101 as an input sample, and sets other operating conditions.
  • the pre-introduction model 171 is trained using the training data set 18 as an output sample.
  • the past operation condition calculation unit 13 calculates the pre-introduction operation condition by inputting the requirement condition input in step S101 into the pre-introduction model 171 (step S104).
  • the past operation condition calculation unit 13 constructs the post-introduction model 172 based on the requirement conditions input received in step S101 (step S105). That is, the past operating condition calculation unit 13 uses the value of the past operating condition of the plant after introducing the operating condition proposal program as the required condition in step S101 as an input sample, and sets other operating conditions.
  • the post-introduction model 172 is trained using the training data set 18 as an output sample.
  • the past operating condition calculation unit 13 calculates the post-introduction operating condition by inputting the required condition input in step S101 into the post-introduction model 172 (step S106).
  • the presentation unit 14 presents the calculation results of step S102, step S104, and step S106 in a form that can be compared (step S107).
  • FIG. 5 is a schematic diagram for explaining an operation example of the condition input unit and the presentation unit according to the first embodiment.
  • FIG. 5 is an example of output by the presentation unit 14 on the display screen of the display device and the printing paper surface of the printing device.
  • FIG. 6 is a schematic diagram for explaining an operation example of the presentation unit according to the first embodiment.
  • step S1 power demand 85 MW, SH air supply demand 125 (t / h), SM air supply demand 100 (t / h), SL air supply demand 25 (t / h), boiler operating load upper limit 100 (%), BT operating load upper limit 100 (%), GT operating load upper limit 100 (%), CT1 operating load upper limit 100 (%), CT2 operating load upper limit 100 (%) ), Atmospheric temperature 25 (° C.), and precipitation 0 (mm) are set. That is, in FIG. 5, the value in the column of "required condition" in the row of item numbers "1" to "4" corresponds to the operating condition 15 of the plant accepted by the condition input unit 11.
  • the presentation unit 14 sets the current operating conditions (for example, recommended operation) as, for example, balloons G11 to G17 with respect to the image showing the configuration of the cogeneration system 2 described with reference to FIG. Point) -based information is presented.
  • the presenting unit 14 calculates the operating conditions based on two or more different operating policies and presents them.
  • the operation comparison device 1 can quantitatively compare the difference in operation conditions depending on the operation policy when the required conditions of the plant are changed in real time.
  • the presentation unit 14 presents the proposed operation condition and the pre-introduction operation condition proposed by the operation condition proposal program. As a result, the user can quantitatively evaluate the validity of the operating condition proposal program by comparing the proposed operating condition with the pre-introduction operating condition. Further, according to the present embodiment, the presentation unit 14 presents the pre-introduction operation condition and the post-introduction operation condition. This allows the user to quantitatively evaluate how the plant operation has changed before and after the introduction of the operating condition proposal program. Further, according to the present embodiment, the presentation unit 14 presents the proposed operation condition proposed by the operation condition proposal program and the post-introduction operation condition. As a result, the user can quantitatively evaluate the validity of the operation policy of the plant after the introduction of the operation condition proposal program.
  • FIG. 7 is a schematic block diagram showing a configuration of a computer according to at least one embodiment.
  • the computer 90 includes a processor 91, a main memory 92, a storage 93, and an interface 94.
  • the above-mentioned operation comparison device 1 is mounted on the computer 90.
  • the operation of each processing unit described above is stored in the storage 93 in the form of a program.
  • the processor 91 reads a program from the storage 93, expands it into the main memory 92, and executes the above processing according to the program. Further, the processor 91 secures a storage area corresponding to each of the above-mentioned storage units in the main memory 92 according to the program.
  • the program may be for realizing a part of the functions exerted on the computer 90.
  • the program may exert its function in combination with another program already stored in the storage or in combination with another program mounted on another device.
  • the computer may include a custom LSI (Large Scale Integrated Circuit) such as a PLD (Programmable Logic Device) in addition to or in place of the above configuration.
  • PLDs include PAL (Programmable Array Logic), GAL (Generic Array Logic), CPLD (Complex Programmable Logic Device), and FPGA (Field Programmable Gate Array).
  • PLDs Programmable Integrated Circuit
  • PAL Programmable Array Logic
  • GAL Generic Array Logic
  • CPLD Complex Programmable Logic Device
  • FPGA Field Programmable Gate Array
  • Examples of the storage 93 include HDD (Hard Disk Drive), SSD (Solid State Drive), magnetic disk, optical magnetic disk, CD-ROM (Compact Disc Read Only Memory), DVD-ROM (Digital Versatile Disc Read Only Memory). , Semiconductor memory and the like.
  • the storage 93 may be internal media directly connected to the bus of the computer 90, or external media connected to the computer 90 via the interface 94 or a communication line. When this program is distributed to the computer 90 via a communication line, the distributed computer 90 may expand the program in the main memory 92 and execute the above process.
  • the storage 93 is a non-temporary tangible storage medium.
  • Operation comparison device 1 Operation comparison device 2 Cogeneration system 11 Condition input unit 12 Proposed operation condition calculation unit 13 Past operation condition calculation unit 14 Presentation unit 15 Plant requirement 16 Plant model 17 Operation reproduction model 18 Learning data set 19 Storage units 20, 30 Plant 171 Pre-introduction model 172 Post-introduction model

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Health & Medical Sciences (AREA)
  • Economics (AREA)
  • General Physics & Mathematics (AREA)
  • Physics & Mathematics (AREA)
  • Strategic Management (AREA)
  • General Business, Economics & Management (AREA)
  • Marketing (AREA)
  • Primary Health Care (AREA)
  • General Health & Medical Sciences (AREA)
  • Tourism & Hospitality (AREA)
  • Water Supply & Treatment (AREA)
  • Human Resources & Organizations (AREA)
  • Public Health (AREA)
  • Theoretical Computer Science (AREA)
  • Automation & Control Theory (AREA)
  • Testing And Monitoring For Control Systems (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Selective Calling Equipment (AREA)
  • Executing Machine-Instructions (AREA)
  • Debugging And Monitoring (AREA)
PCT/JP2020/028135 2019-07-19 2020-07-20 運転比較装置、運転比較方法およびプログラム Ceased WO2021015176A1 (ja)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020217041686A KR20220011163A (ko) 2019-07-19 2020-07-20 운전 비교 장치, 운전 비교 방법 및 프로그램

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2019133828A JP7364382B2 (ja) 2019-07-19 2019-07-19 運転比較装置、運転比較方法およびプログラム
JP2019-133828 2019-07-19

Publications (1)

Publication Number Publication Date
WO2021015176A1 true WO2021015176A1 (ja) 2021-01-28

Family

ID=74193655

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2020/028135 Ceased WO2021015176A1 (ja) 2019-07-19 2020-07-20 運転比較装置、運転比較方法およびプログラム

Country Status (4)

Country Link
JP (2) JP7364382B2 (enExample)
KR (1) KR20220011163A (enExample)
TW (2) TWI760791B (enExample)
WO (1) WO2021015176A1 (enExample)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US12681468B2 (en) * 2022-04-12 2026-07-14 Mitsubishi Heavy Industries, Ltd. Data processing device and data processing method

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002062901A (ja) * 2000-08-18 2002-02-28 Toshiba Corp プラント運転制御装置、プラント運転制御方法およびプラント運転制御プログラムを記憶した記憶媒体
WO2019107511A1 (ja) * 2017-11-29 2019-06-06 三菱日立パワーシステムズ株式会社 運転条件評価装置、運転条件評価方法、及び発電プラントの制御システム
JP2019096227A (ja) * 2017-11-27 2019-06-20 横河電機株式会社 操業改善効果算出装置、操業改善効果算出方法、操業改善効果算出プログラム、および記録媒体

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4016307B2 (ja) * 1998-12-08 2007-12-05 株式会社安川電機 下水処理プロセスシミュレータ
JP4579137B2 (ja) 2005-11-09 2010-11-10 三菱電機株式会社 エネルギー変動費推定装置およびエネルギー変動費推定プログラム
JP5475546B2 (ja) 2010-05-25 2014-04-16 パナソニック株式会社 省エネ診断システム
JP5751045B2 (ja) * 2010-08-31 2015-07-22 富士電機株式会社 プラントの運転条件最適化システム、プラントの運転条件最適化方法、プラントの運転条件最適化プログラム
JP2019113883A (ja) * 2016-03-25 2019-07-11 株式会社日立製作所 稼働補助装置及び風力発電システム

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002062901A (ja) * 2000-08-18 2002-02-28 Toshiba Corp プラント運転制御装置、プラント運転制御方法およびプラント運転制御プログラムを記憶した記憶媒体
JP2019096227A (ja) * 2017-11-27 2019-06-20 横河電機株式会社 操業改善効果算出装置、操業改善効果算出方法、操業改善効果算出プログラム、および記録媒体
WO2019107511A1 (ja) * 2017-11-29 2019-06-06 三菱日立パワーシステムズ株式会社 運転条件評価装置、運転条件評価方法、及び発電プラントの制御システム

Also Published As

Publication number Publication date
JP7364382B2 (ja) 2023-10-18
TWI802281B (zh) 2023-05-11
TWI760791B (zh) 2022-04-11
JP2021018602A (ja) 2021-02-15
JP2023168555A (ja) 2023-11-24
KR20220011163A (ko) 2022-01-27
TW202223718A (zh) 2022-06-16
JP7752666B2 (ja) 2025-10-10
TW202111589A (zh) 2021-03-16

Similar Documents

Publication Publication Date Title
JP6025237B2 (ja) 発電プラント性能を予測する方法およびシステム
Fleming et al. The SOWFA super-controller: A high-fidelity tool for evaluating wind plant control approaches
Yao et al. Stochastic day-ahead scheduling of integrated energy distribution network with identifying redundant gas network constraints
US11461727B2 (en) Plant evaluation system, plant evaluation method, and program
JP4486657B2 (ja) 要員配置最適化プログラム、要員配置最適化方法および要員配置最適化装置
JP2016136001A (ja) 予測装置
WO2020197612A1 (en) Method and system for automated aggregation of carbon offsets
JP7752666B2 (ja) 表示装置、表示方法およびプログラム
Weckesser et al. Equivalent to represent inertial and primary frequency control effects of an external system
JP2013120601A (ja) 将来の発電プラント能力を評価するためのシステム及び方法
JP2013235512A (ja) 数理計画問題を解くための装置、プログラムおよび方法
JP2019002574A (ja) 燃料削減率出力システム、燃料削減率出力方法、および燃料削減率出力プログラム
CN115640692A (zh) 工况验证的方法、装置、存储介质及电子设备
CN103701125B (zh) 一种基于序列二次规划法的配电网柔性潮流算法
JP6150553B2 (ja) 運転操作評価装置、運転操作評価方法および運転操作評価プログラム
KR102881311B1 (ko) 연산 장치, 플랜트, 연산 방법 및 프로그램
JP2023176094A (ja) 最適化装置、最適化方法、および、プログラム
JP2024106823A (ja) 情報処理方法、プログラム及び情報処理装置
KR20240050832A (ko) 산업용 데이터셋을 수집하기 위한 가상 환경 프레임워크 장치 및 방법
Chu et al. A kernel partial least squares method for gas turbine power plant performance prediction
Maslowski et al. Regional Modeling and Prediction of the Arctic Climate System
WO2009093360A1 (ja) 回路シミュレータおよび回路シミュレーション方法
JP2024106822A (ja) 情報処理方法、プログラム及び情報処理装置
Chen et al. A data-driven reduced-order modeling method for dynamic wind farm control
CN119180416A (zh) 综合能源系统的碳减排方法

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 20844250

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 20217041686

Country of ref document: KR

Kind code of ref document: A

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 20844250

Country of ref document: EP

Kind code of ref document: A1