WO2020244387A1 - Equipment ledger management method and system - Google Patents

Equipment ledger management method and system Download PDF

Info

Publication number
WO2020244387A1
WO2020244387A1 PCT/CN2020/091377 CN2020091377W WO2020244387A1 WO 2020244387 A1 WO2020244387 A1 WO 2020244387A1 CN 2020091377 W CN2020091377 W CN 2020091377W WO 2020244387 A1 WO2020244387 A1 WO 2020244387A1
Authority
WO
WIPO (PCT)
Prior art keywords
asset
equipment
information
management system
indicated
Prior art date
Application number
PCT/CN2020/091377
Other languages
French (fr)
Chinese (zh)
Inventor
温婉
Original Assignee
京东方科技集团股份有限公司
鄂尔多斯市源盛光电有限责任公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 京东方科技集团股份有限公司, 鄂尔多斯市源盛光电有限责任公司 filed Critical 京东方科技集团股份有限公司
Publication of WO2020244387A1 publication Critical patent/WO2020244387A1/en

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0637Strategic management or analysis, e.g. setting a goal or target of an organisation; Planning actions based on goals; Analysis or evaluation of effectiveness of goals
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management

Definitions

  • the present disclosure relates to the technical field of ledger management, and in particular to a method and system for device ledger management.
  • Asset management is the main data to grasp the status of enterprise equipment assets and reflect the changes in the amount of enterprise equipment system ownership and its distribution.
  • Asset management usually includes financial management, equipment management, etc.
  • the current financial management mainly relies on the Enterprise Resource Planning (ERP) system
  • the equipment management mainly relies on the Assets Management System (AMS) system.
  • ERP Enterprise Resource Planning
  • AMS Assets Management System
  • the ERP system and the AMS system work separately, and the information for the same asset sometimes needs to be manually entered in different systems, resulting in a high repetitive work rate.
  • the ERP system and the AMS system are mainly manually checked, and management is not timely; and there may be asset transfers in the intermediate links. Due to the high error rate of manual checking, it is easy to cause inconsistencies in the same information in different systems.
  • the embodiments of the present disclosure provide a device account management method and system, and the specific solutions are as follows:
  • an embodiment of the present disclosure provides a device account management method, which includes:
  • the business process management system When the business process management system receives the first trigger instruction, it sends business approval information to the enterprise resource planning system; the first trigger instruction is used to indicate that the equipment asset plan in the business approval information is feasible;
  • the enterprise resource planning system creates and sends equipment asset information to the fixed asset management system according to the received business approval information, where the equipment asset information includes equipment storage information and usage information, and the usage information includes the department of use Information and user information;
  • the fixed asset management system judges whether the equipment asset information is consistent with preset information
  • the fixed asset management system determines that the equipment asset information is consistent with the preset information, it updates the stored equipment asset list.
  • the device account management method provided by the embodiment of the present disclosure further includes:
  • the business process management system receives the input business approval information
  • the business process management system receives the first trigger instructions input by at least two management roles for the business approval information respectively; wherein, the management role includes at least a management user of the enterprise resource planning system and the fixed asset Administrative users of the management system.
  • the device account management method provided by the embodiment of the present disclosure further includes:
  • the fixed asset management system determines that the equipment asset information is inconsistent with the preset information, it sends a first response message to the enterprise resource planning system, where the first response message is used to indicate the enterprise resource
  • the planning system reconfirms whether the equipment asset information is correct
  • the enterprise resource planning system resends the equipment asset information to the fixed asset management system.
  • the fixed asset management system when the fixed asset management system determines that the device asset information is consistent with the preset information, it updates the stored device asset list, including :
  • the fixed asset management system judges whether the equipment indicated by the equipment asset information is in the fixed asset management system
  • the equipment indicated by the equipment asset information exists in the fixed asset management system, determining whether the user indicated by the user information in the equipment asset information is a non-stock user;
  • the user indicated by the user information is a non-inventory user, setting the status of the device indicated by the device asset information in the new device asset list to the issuing status;
  • the user indicated by the user information is an inventory user, determining whether the quantity of equipment indicated by the equipment asset information is less than the quantity of the equipment in the fixed asset management system;
  • a new equipment asset list is generated, and the equipment indicated by the equipment asset information is listed in the new equipment asset list.
  • the status in the equipment asset list is set to recycling status
  • the status of the equipment indicated by the equipment asset information in the new equipment asset list is set to scrap status.
  • the device account management method provided by the embodiment of the present disclosure further includes:
  • the fixed asset management system receives a pre-operation instruction for the first device, and the pre-operation indicated by the pre-operation instruction includes a pre-transfer operation, a pre-warehouse operation, or a pre-issuance operation;
  • the fixed asset management system adds the first device to the pre-operation asset list according to the pre-operation instruction, and updates the equipment asset information of the first device.
  • the device account management method provided by the embodiment of the present disclosure further includes:
  • the fixed asset management system sends the pre-operational asset list to the business process management system
  • the business process management system creates business approval information according to the equipment asset information in the pre-operational asset list.
  • the device account management method provided by the embodiment of the present disclosure further includes:
  • the fixed asset management system sends asset maintenance information to the business process management system, where the asset maintenance information is used to indicate the reason for the asset retirement;
  • the business process management system reviews the reported asset retirement business according to the asset maintenance information.
  • the device account management method provided by the embodiment of the present disclosure further includes:
  • the fixed asset management system sends asset inventory data to the business process management system
  • the business process management system generates an asset inventory form according to the asset inventory data
  • the business process management system approves the business approval information according to the asset inventory form.
  • an equipment ledger management system includes a business process management system, an enterprise resource planning system, and a fixed asset management system; among them,
  • the business process management system is configured to send business approval information to an enterprise resource planning system when receiving a first trigger instruction; the first trigger instruction is used to indicate that the equipment asset plan in the business approval information is feasible;
  • the enterprise resource planning system is configured to create and send equipment asset information to the fixed asset management system according to the received business approval information, where the equipment asset information includes equipment inventory information and usage information, and the use Information includes user information and user information;
  • the fixed asset management system is configured to determine whether the equipment asset information is consistent with preset information, and when it is determined that the equipment asset information is consistent with the preset information, update the stored equipment asset list.
  • the business process management system is further configured to:
  • the management role includes at least a management user of the enterprise resource planning system and a management user of the fixed asset management system.
  • the fixed asset management system is further configured to report to the enterprise resource if it is determined that the equipment asset information is inconsistent with the preset information
  • the planning system sends a first response message, where the first response message is used to instruct the enterprise resource planning system to reconfirm whether the equipment asset information is correct;
  • the enterprise resource planning system is further configured to resend the equipment asset information to the fixed asset management system.
  • the fixed asset management is specifically configured as:
  • the equipment indicated by the equipment asset information exists in the fixed asset management system, determining whether the user indicated by the user information in the equipment asset information is a non-stock user;
  • the user indicated by the user information is a non-inventory user, setting the status of the device indicated by the device asset information in the new device asset list to the issuing status;
  • the user indicated by the user information is an inventory user, determining whether the quantity of equipment indicated by the equipment asset information is less than the quantity of the equipment in the fixed asset management system;
  • a new equipment asset list is generated, and the equipment indicated by the equipment asset information is listed in the new equipment asset list.
  • the status in the equipment asset list is set to recycling status
  • the status of the equipment indicated by the equipment asset information in the new equipment asset list is set to scrap status.
  • the fixed asset management system is further configured to:
  • the pre-operation indicated by the pre-operation instruction includes a pre-transfer operation, a pre-stocking operation, or a pre-issuing operation
  • the fixed asset management system is further configured to send the pre-operational asset list to the business process management system;
  • the business process management system is further configured to create business approval information based on the equipment asset information in the pre-operational asset list.
  • the fixed asset management system is further configured to send asset maintenance information to the business process management system, wherein the asset maintenance information Used to indicate the reason for asset retirement;
  • the business process management system is further configured to review the reported asset retirement business according to the asset maintenance information.
  • the fixed asset management system is further configured to send asset inventory data to the business process management system;
  • the business process management system is further configured to generate an asset inventory form according to the asset inventory data
  • the business process management system is also configured to approve the business approval information on the asset inventory form.
  • a computer-readable non-volatile storage medium stores computer-executable instructions, which when executed by a processor realizes the present disclosure Any of the foregoing device account management methods provided by the embodiment.
  • a terminal device which includes: a memory and a processor;
  • the memory is used to store program instructions
  • the processor is configured to call the program instructions stored in the memory, and execute any of the foregoing device account management methods provided in the embodiments of the present disclosure according to the obtained program.
  • FIG. 1 is a schematic structural diagram of an equipment ledger management system provided by an embodiment of the disclosure
  • FIG. 2 is a flowchart of a method for device account management provided by an embodiment of the disclosure
  • FIG. 3 is a schematic diagram of information interaction of the equipment ledger management system provided by an embodiment of the disclosure.
  • FIG. 4 is a schematic diagram of information interaction of the equipment ledger management system provided by an embodiment of the disclosure.
  • FIG. 5 is a schematic diagram of functional modules of the AMS system provided by the embodiments of the disclosure.
  • Fig. 6 is a schematic structural diagram of a terminal device provided by an embodiment of the disclosure.
  • the enterprise resource planning (ERP) system and the AMS system both need to manually enter the asset information of the equipment repeatedly, and the repetitive work rate is high, and the data between the two are mainly manually checked, and the error rate is high.
  • ERP enterprise resource planning
  • the embodiments of the present disclosure provide a device ledger management method.
  • the business process management (BPM) system, ERP system, and AMS system involved in the method can communicate with each other, that is, information can be realized. Interaction, so as to avoid the need for manual verification due to their independent work, try to avoid the error rate of manual verification, and facilitate management.
  • an embodiment of the present disclosure provides an equipment ledger management system.
  • the system includes a BPM system, a BRP system, and an AMS system.
  • the BPM system, the BRP system, and the AMS system can all communicate with each other.
  • the BPM system can configure purchase forms, deployment forms, transfer forms, scrap forms, etc. according to the information entered by users, and is mainly used for reviewing the processes of asset procurement, deployment, transfer, and scrapping.
  • the ERP system is mainly used for the creation and transfer of assets, such as the transfer of equipment belonging to a responsible person or department to another responsible person or department, and the status of the asset, such as whether the asset is in inventory or repair status, etc. .
  • the AMS system is mainly used for asset allocation information, such as asset allocation model information, physical status, maintenance information, etc.
  • an embodiment of the present disclosure provides a device account management method, which is suitable for the system shown in FIG. 1.
  • the method includes the following steps:
  • the BPM system receives the first trigger instruction, it sends business approval information to the enterprise resource planning ERP system; the first trigger instruction is used to indicate that the equipment asset plan in the business approval information is feasible;
  • the ERP system creates and sends equipment asset information to the fixed asset management AMS system according to the received business approval information, where the equipment asset information includes equipment storage information and usage information, and the usage information includes usage department information and user information;
  • the AMS system judges whether the equipment asset information is consistent with the preset information
  • the AMS system updates the stored equipment asset list.
  • the embodiment of the present disclosure may establish business approval information through the BPM system.
  • the business approval information here can be the information needed by the BPM system to establish a business process.
  • business approval information can be considered asset change information, such as asset purchase information, asset transfer information, asset retirement information, etc., where asset transfer information can include asset application information, asset recovery information, and so on.
  • the business process management system receives the input business approval information; the business process management system receives the first trigger instructions respectively inputted by at least two management roles for the business approval information; wherein, the management role includes at least The management user of the enterprise resource planning system and the management user of the fixed asset management system.
  • the BPM system can receive the business approval information entered by the user, and the user here can be the administrator of the BPM system.
  • the BPM system can print the business approval information and manually pass it to the managers of the ERP system and the AMS system.
  • the managers of the ERP system and AMS system can evaluate the equipment asset plan in the business approval information, that is, determine whether the equipment asset plan is feasible. For example, if the equipment asset plan is within the scope of the financial budget and within the actual needs of the business, Then the equipment asset plan can be considered feasible. Of course, if the equipment asset plan is not within the scope of the financial budget or is not within the actual needs of the business, it can be considered that the embodiment of the equipment asset plan is not feasible.
  • a communication interface can be added to the BPM system.
  • an audit option is added to the BPM system.
  • the audit option can be considered as a control, which can be set in the input interface of business approval information or in a separate interface.
  • the review option may have a drop-down list.
  • the review option may have a second-level menu, the first-level menu may be a list of names of managers of the AMS system, and the second-level menu may be a list of names of managers of the ERP system.
  • the BPM system can display the review option when it receives the input of the management personnel for the business approval information to complete the operation.
  • the manager of the BPM system can enter the manager of the AMS system to be reviewed in the review option.
  • the manager of the AMS system reviews the business approval information. If it is determined that the equipment asset plan is feasible, they can enter the first trigger instruction to indicate that the equipment asset plan in the business approval information is feasible.
  • the review option can jump to the list of managers of the ERP system, and the managers of the BPM system can select the managers of the ERP system who input the approval information of the business to be reviewed.
  • the manager of the ERP system determines that the equipment asset plan is feasible, he can also input the first trigger instruction to indicate that the equipment asset plan in the business approval information is feasible.
  • the BPM system can set an interface for outputting the first trigger instruction, such as an "OK" button. When the BPM system detects that there is an operation that triggers the "OK” button, it can be regarded as inputting the first trigger instruction.
  • the business approval information established by the BPM system may need to be reviewed by more managers, so each manager can input the first trigger instruction to the BPM system, that is, the BPM system receives at least two management roles for business approval information respectively The first trigger command entered.
  • the management role includes at least the management user of the ERP system and the management user of the AMS system.
  • the BPM system determines that the equipment asset plan in the input business approval information is feasible, it can send the business approval information to the ERP system to ensure the consistency of the information and avoid errors that may be caused by manual entry, as shown in Figure 3.
  • the ERP system can create and send equipment asset information to the AMS system based on the business approval information, where the equipment asset information includes equipment storage information and usage information, and the usage information includes usage department information and user information.
  • the business approval information can include equipment asset information
  • the BPM system can send the equipment asset information included in the business approval information to the ERP system, so that the ERP system can use the information from the BPM system as equipment asset information.
  • the ERP system can also establish specific equipment asset information based on the business approval information. For example, if the equipment indicated in the business approval information is purchased, it can be considered that the equipment is not in inventory. If the business approval information indicates that the equipment is purchased For inventory, the equipment storage information included in the equipment asset information established by the ERP system can be inventory.
  • the equipment indicated in the business approval information is purchased, it can be considered that the equipment is not in inventory. If the business approval information indicates that the equipment is purchased for use by new employees, then the equipment asset information established by the ERP system
  • the included equipment storage information may be non-inventory, and the usage information may include department information of the new employee and information of the new employee.
  • the equipment asset information created by the ERP system can also include information such as the unique identifier of the asset, the person responsible for the ownership of the asset, the value of the asset, the cost of the asset, and the status of the asset, which are not listed here.
  • the ERP system can send the equipment asset information to the AMS system to realize asset management through the AMS system.
  • the sending status of the equipment asset information sent by the ERP system needs to be converted to the process status when displayed in the AMS system, so that the AMS system administrator can identify and match the physical operation status, that is, create , Distribution, recycling, scrapping, etc. Specifically, it can be judged by the unique identifier of the asset.
  • the fixed asset management system determines that the equipment asset information is inconsistent with the preset information, it sends a first response message to the enterprise resource planning system, where the first response message is configured to indicate the enterprise resource
  • the planning system reconfirms whether the equipment asset information is correct; the enterprise resource planning system resends the equipment asset information to the fixed asset management system.
  • the AMS system receives the equipment asset information, and first determines whether the equipment asset information is correct. For example, the establishment of business approval information is based on, for example, that department A needs new equipment, but after the new equipment is purchased, it is found that department A no longer needs the new equipment. In this case, the use information in the equipment asset information created by the managers of the ERP system is still department A. At that time, because the AMS system is physical equipment management, it is known that department A no longer has this requirement, then the AMS system can determine the location of the ERP system. The device asset information created is incorrect. Specifically, if the AMS system finds changes in equipment asset information, it can modify and save the information as preset information.
  • the AMS system When the AMS system receives equipment asset information from the ERP system, it can determine whether the equipment asset information is consistent with the asset information related to the equipment in the preset information. If they are not consistent, the AMS system can send a first response message to the ERP system. The first response message is used to instruct the ERP system to reconfirm whether the equipment asset information is correct. When the ERP system receives the first response message, it can be considered that the equipment asset information may be wrong. After checking and correcting the wrong equipment asset information, the equipment asset information can be resent to the AMS system, so that the equipment asset information saved by the ERP system and the AMS system is Consistent, which improves the accuracy of data and facilitates maintenance.
  • the AMS system determines that the equipment asset information from the ERP system is consistent with the preset information, the AMS system can update the stored equipment asset list according to the received equipment asset information.
  • the fixed asset management system when the fixed asset management system determines that the equipment asset information is consistent with the preset information, it updates the stored equipment asset list, including:
  • the fixed asset management system determines whether the equipment indicated by the equipment asset information is in the fixed asset management system
  • a new equipment asset list is generated, and the status of the equipment indicated by the equipment asset information in the new equipment asset list is set to the created state;
  • the user indicated by the user information is a non-stock user, set the status of the device indicated by the device asset information in the new device asset list to the issued status;
  • the status of the equipment indicated by the equipment asset information in the new equipment asset list is set to a scrapped state.
  • the AMS system can first determine whether the equipment indicated by the equipment asset information is in the AMS system. If the equipment indicated by the equipment asset information does not exist in the AMS system, it can be considered that the equipment may be newly purchased equipment. The system can generate a new equipment asset list. It can also be considered that the AMS system newly adds the asset information of the equipment to the stored equipment asset list, thereby generating a new equipment asset list.
  • the status of the newly added equipment can be set for later management. For example, if the device indicated by the device asset information does not exist in the AMS system, the status of the device in the new device asset list can be set to the created status.
  • the equipment may be inventory, may be allocated, or may be scrapped or transferred, then the AMS system can continue to determine the user information in the equipment asset information. Whether the indicated user is a non-stock user, if the user indicated by the user information is a non-stock user, then the device can be considered to have been issued, and then the status of the device in the new device asset list can be set to the issued state .
  • the device may be recycled.
  • the device can be considered to be recycled.
  • the AMS system can include the device in the new device asset list The status is set to recycling status.
  • the AMS system can continue to determine whether the number of devices indicated by the device asset information is less than the number of devices in the AMS system. If the number of the equipment is less than the number of the equipment in the AMS system, the equipment can be considered as scrapped, and the status of the equipment in the new equipment asset list can be set to the scrapped state. If the number of equipment indicated by the equipment asset information is greater than the number of equipment in the AMS system, a new equipment asset list is generated. It can be considered that the equipment asset information sent by the ERP system is inconsistent with the preset information. At this time, the AMS system can Send the first response message to the BPM system.
  • equipment asset information can also include asset attribute information, such as the unique identifier of the asset, the person responsible for the asset, the value of the asset, the cost of the asset, the state of the asset, the purpose of the asset, the location of the asset, and the asset Model configuration, asset deployment information, asset maintenance information, etc.
  • the AMS system can also manage the equipment asset information, that is, increase the deployment record of the equipment.
  • the management of equipment asset information by the AMS system can also include the purpose of the asset, the use location of the asset, the model configuration of the asset, the deployment information of the asset, the maintenance information of the asset, etc., here are no more examples.
  • the BPM system, the ERP system, and the AMS system can communicate with each other in pairs to perform data interaction, thereby reducing manual checking, and maintaining the consistency of information, ensuring the correctness of asset management, and improving management efficiency .
  • the ERP system can also maintain daily equipment asset information.
  • the ERP system may periodically or manually modify part of the equipment asset information, such as the status of the equipment.
  • the ERP system receives a modification operation instruction for the equipment asset information, it can instruct the AMS system to also modify part of the equipment asset information to ensure the consistency of the information and reduce the manual verification process.
  • the ERP system can add a judging module.
  • the judging module detects that the ERP system has modified the equipment asset information, such as the first information (the person responsible for the asset ownership), it can determine that the modification operation is for the equipment. It is, for example, a "issue” operation or an "update” operation, which is sent to the AMS system to carry the information of the "issue” or “update” operation.
  • the AMS system receives the information carrying the "issue” or "update” operation, and can judge the correctness of the information.
  • the AMS system determines that the information is correct, it can update the relevant information, such as supplementing and perfecting the model of the device, the date of deployment of the device, the purpose of the device, and the receipt or return certificate of the device, etc.; and if the AMS system determines the information If there is an error, the information can be exported and fed back to the management personnel of the ERP system for confirmation.
  • the AMS system can also analyze the managed equipment assets and allocate assets, as shown in Figure 4.
  • Asset report analysis provides a statistical table of assets by state and type, a statistical table of inventory assets by configuration, etc., so that asset managers can fully grasp the asset situation and optimize asset resource allocation and asset maintenance.
  • Allocation of assets such as asset borrowing management, because the asset finance department that is frequently borrowed and returned such as electronic equipment does not need to be repeatedly managed, it can be directly transferred to the AMS system for direct operation records, which are included in the loan asset list for return processing. All borrowing records of assets are traversed in the borrowing record query tab, which is convenient for management and maintenance.
  • the present disclosure considers that it is possible that the AMS system may allocate the equipment in stock first, and then replenish the stock later. For example, if a piece of equipment is urgently needed and it is too late to go through the process from the BPM system, the AMS system can first call the equipment in stock for emergency. In this case, that is, if the physical asset has pre-allocation, recovery, transfer and other actions, the AMS system can pre-operate the physical asset first, and then inform the BPM system to subsequently establish the business process about the device to ensure that the BPM system, The information of the ERP system and the AMS system are consistent.
  • the AMS system may also receive a pre-operation instruction for the first device, and the pre-operation indicated by the pre-operation instruction includes a pre-transfer operation, a pre-warehouse operation, or a pre-issuance operation.
  • the AMS system can add the first device to the pre-operation asset list according to the pre-operation instruction, and update the device asset information of the first device. For example, the AMS system pre-marks the status of the physical assets in the AMS system and temporarily records the allocation, recovery, transfer, and receipt or return of vouchers.
  • the AMS system may also send the pre-operational asset list to the BPM system, and the BPM system creates business approval information based on the pre-operational asset list.
  • the BPM system after receiving the first operation instruction for the business approval information, sends the business approval information to the ERP system.
  • the ERP system creates equipment asset information based on the received business approval information and sends it to the AMS system.
  • the AMS system After the AMS system receives the equipment asset information, it updates the equipment asset information according to the pre-operation temporary records to form the final equipment asset list.
  • the ERP system first sends the equipment asset operation information to the AMS system, the AMS system can directly update the equipment asset information corresponding to the equipment asset operation information without pre-operation, thereby improving the real-time data.
  • the embodiment of the present disclosure adds the pre-operation function of the AMS system, that is, when the ERP system sends equipment asset operation information, if the physical assets have pre-arrangement, recovery, transfer and other requirements, the AMS system will pre-operate in the AMS system in advance. After the system sends the equipment asset information, the equipment asset information is updated, thereby improving the real-time data.
  • the pre-operation function added by the AMS system is mainly used to realize inventory management and ledger management.
  • the embodiments of the present disclosure are directed to the inventory asset list, and the inventory assets can be inquired, pre-issued, loaned, and maintained. For example, perform query, pre-transfer, pre-maintenance and pre-recycling operations on assets in the stored asset information list.
  • the query, pre-transfer, pre-maintenance, and pre-recycling operations can be performed on a single asset information or multiple asset information, that is, performed in batches.
  • the asset will disappear from the issued asset list and appear in the pre-operated asset list, and at the same time add a pre-received item to the usage information of equipment asset information recording.
  • the stored employee information list can be used to query the personnel information and all the personnel's asset information that has been issued, borrowed, and is under repair, and is used for asset processing during personnel transfer.
  • managers can perform maintenance operations on asset information. For example, click on the "Maintenance" control to pop up the maintenance window, select the maintenance option, enter the reason for the maintenance, and confirm the maintenance to complete the maintenance.
  • the asset changes from the "issued” state to the "maintenance” state, that is, it disappears from the issued asset list and appears in the maintenance asset list.
  • a maintenance reason is added to the maintenance information in the equipment asset information.
  • select the record option and enter The record can be completed by confirming the corresponding configuration information change and other records.
  • the asset is still in the "issued” state, and a record is added to the maintenance information in the asset details.
  • the ASM system may also send asset maintenance information to the BPM system, where the asset maintenance information is used to indicate the reason for the asset retirement.
  • the BPM system can review the reported asset retirement business based on the asset maintenance information. That is, the asset maintenance information of the AMS system is used as the identification reason for the asset retirement process, which does not require manual verification, which simplifies the process.
  • adding maintenance reasons and maintenance content to the asset maintenance information can facilitate the asset maintainer to fully grasp the asset maintenance situation, and more reasonably judge the asset's subsequent maintenance plan.
  • the AMS system can also send asset inventory data to the BPM system, so that the BPM system can generate an asset inventory form based on the asset inventory data, and approve business approval information based on the asset inventory form.
  • the terminal equipment installed with the inventory app is based on the database account in the AMS system and uploads the inventory data to the AMS system database.
  • the asset manager can enter the task name, inventory personnel, and inventory planning time as needed, and select inventory asset customization to create an inventory task. After the inventory task is turned on, the inventory task can be tracked through the inventory progress, and the details of the inventory task can also be viewed Inventory information, including inventory profit, the number of assets at a loss, and problems in asset inventory.
  • the AMS system can automatically generate an inventory report containing the book quantity, physical quantity, inventory deficit quantity, and inventory profit quantity according to the content input by the asset manager.
  • the BPM system can obtain the inventory report of the AMS system, and automatically generate a form according to the inventory report to complete the business process review.
  • the BPM system, ERP system, and AMS system involved in the device ledger management method in the embodiments of the present disclosure can communicate with each other, that is, information interaction can be realized, thereby avoiding the need for manual verification due to independent work. , Try to avoid the error rate of manual checking, which is easy to manage.
  • the BPM system, ERP system, and AMS system in the embodiments of the present disclosure coordinate work and maintain the consistency of information, realize real-time sharing of asset data, improve cross-organizational business collaboration capabilities, and improve management efficiency.
  • embodiments of the present disclosure provide a computer-readable non-volatile storage medium.
  • the computer-readable non-volatile storage medium stores computer-executable instructions. Implement any of the above-mentioned device account management methods provided by the embodiments of the present disclosure.
  • an embodiment of the present disclosure provides a terminal device, as shown in FIG. 6, including: a memory 01 and a processor 02;
  • Memory 01 used to store program instructions
  • the processor 02 is configured to call the program instructions stored in the memory 01, and execute any of the foregoing device account management methods provided in the embodiments of the present disclosure according to the obtained program.
  • the processor may also be a controller.
  • the processor is configured to support the terminal device to execute the functions involved in any of the foregoing device account management methods provided in the embodiments of the present disclosure.
  • the memory is used for coupling with the processor, and it stores the necessary program instructions and data of the terminal device.
  • processors involved in the embodiments of the present disclosure may be central processing units (CPU), general-purpose processors, digital signal processors (digital signal processors, DSP), and application-specific integrated circuits (application-specific integrated circuits). integrated circuit, ASIC), field programmable gate array (FPGA) or other programmable logic devices, transistor logic devices, hardware components, or any combination thereof. It can implement or execute various exemplary logical blocks, modules, and circuits described in conjunction with the present disclosure.
  • the processor may also be a combination of computing functions, for example, a combination of one or more microprocessors, a combination of a DSP and a microprocessor, and so on.
  • the memory may be integrated in the processor, or may be provided separately from the processor.
  • the embodiments of the present disclosure also provide a computer program product, which is used to store a computer program, and the computer program is used to execute the method involved in the foregoing method embodiment.
  • the embodiments of the present disclosure provide a chip, which includes a processor, and is used to support a terminal device to implement the functions related to the aforementioned terminal device.
  • the chip further includes a memory, and the memory is used to store necessary program instructions and data of the terminal device.
  • the embodiments of the present disclosure may be provided as methods, systems, or computer program products. Therefore, the embodiments of the present disclosure may adopt the form of a complete hardware embodiment, a complete software embodiment, or an embodiment combining software and hardware. Moreover, the embodiments of the present disclosure may adopt the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) containing computer-usable program codes.
  • computer-usable storage media including but not limited to disk storage, CD-ROM, optical storage, etc.
  • These computer program instructions can be provided to the processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing equipment to generate a machine, so that the instructions executed by the processor of the computer or other programmable data processing equipment can be generated It is a device that realizes the functions specified in one process or multiple processes in the flowchart and/or one block or multiple blocks in the block diagram.
  • These computer program instructions can also be stored in a computer-readable memory that can guide a computer or other programmable data processing equipment to work in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture including the instruction device.
  • the device implements the functions specified in one process or multiple processes in the flowchart and/or one block or multiple blocks in the block diagram.
  • These computer program instructions can also be loaded on a computer or other programmable data processing equipment, so that a series of operation steps are executed on the computer or other programmable equipment to produce computer-implemented processing, so as to execute on the computer or other programmable equipment.
  • the instructions provide steps for implementing functions specified in a flow or multiple flows in the flowchart and/or a block or multiple blocks in the block diagram.

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Strategic Management (AREA)
  • Economics (AREA)
  • Tourism & Hospitality (AREA)
  • Marketing (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Educational Administration (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Game Theory and Decision Science (AREA)
  • Development Economics (AREA)
  • Data Mining & Analysis (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

An equipment ledger management method and system. The method comprises: upon receiving a first trigger instruction, a BPM system sending service examination and approval information to an ERP system, the first trigger instruction indicating that an equipment asset plan in the service examination and approval information is feasible (S201); the ERP system creating equipment asset information according to the received service examination and approval information, and sending same to an AMS, wherein the equipment asset information comprises warehousing information and usage information associated with equipment, and the usage information comprises department information and user information associated with usage of the equipment (S202); the AMS determining whether the equipment asset information is consistent with preset information (S203); and if the AMS determines that the equipment asset information is consistent with the preset information, updating a stored equipment asset list (S204).

Description

设备台账管理方法和系统Equipment account management method and system
相关申请的交叉引用Cross references to related applications
本申请要求在2019年06月03日提交中国专利局、申请号为201910476717.6、申请名称为“一种设备台账管理方法和系统”的中国专利申请的优先权,其全部内容通过引用结合在本申请中。This application claims the priority of a Chinese patent application filed with the Chinese Patent Office on June 3, 2019, the application number is 201910476717.6, and the application name is "A method and system for managing an equipment ledger", the entire content of which is incorporated herein by reference Applying.
技术领域Technical field
本公开涉及台账管理技术领域,特别涉及一种设备台账管理方法和系统。The present disclosure relates to the technical field of ledger management, and in particular to a method and system for device ledger management.
背景技术Background technique
资产管理是掌握企业设备资产状况,反应企业设备系统拥有量及其分布变动情况的主要资料。资产管理通常包括财务管理、设备管理等,当前财务管理主要是依靠企业资源计划(Enterprise Resource Planning,ERP)系统,设备管理主要是依靠固定资产管理(Assets Management System,AMS)系统。Asset management is the main data to grasp the status of enterprise equipment assets and reflect the changes in the amount of enterprise equipment system ownership and its distribution. Asset management usually includes financial management, equipment management, etc. The current financial management mainly relies on the Enterprise Resource Planning (ERP) system, and the equipment management mainly relies on the Assets Management System (AMS) system.
但是ERP系统和AMS系统各自工作,针对同一资产的信息有时需要在不同的系统重复进行人工录入,重复工作率高。另外,ERP系统和AMS系统之间主要是通过人工核对,管理不及时;且,在中间环节可能存在资产转移,由于人工核对出错率较高,容易造成不同的系统中,相同信息的不一致。However, the ERP system and the AMS system work separately, and the information for the same asset sometimes needs to be manually entered in different systems, resulting in a high repetitive work rate. In addition, the ERP system and the AMS system are mainly manually checked, and management is not timely; and there may be asset transfers in the intermediate links. Due to the high error rate of manual checking, it is easy to cause inconsistencies in the same information in different systems.
可见,目前的资产管理,各个系统独立工作,资产管理不及时且准确性较低。It can be seen that in current asset management, each system works independently, and asset management is not timely and accurate.
发明内容Summary of the invention
本公开实施例提供一种设备台账管理方法和系统,具体方案如下:The embodiments of the present disclosure provide a device account management method and system, and the specific solutions are as follows:
第一方面,本公开实施例提供了一种设备台账管理方法,该方法包括:In the first aspect, an embodiment of the present disclosure provides a device account management method, which includes:
业务流程管理系统在接收到第一触发指令时,向企业资源计划系统发送业务审批信息;所述第一触发指令用于指示所述业务审批信息中的设备资产 计划可行;When the business process management system receives the first trigger instruction, it sends business approval information to the enterprise resource planning system; the first trigger instruction is used to indicate that the equipment asset plan in the business approval information is feasible;
所述企业资源计划系统根据接收的所述业务审批信息,创建并向固定资产管理系统发送设备资产信息,其中,所述设备资产信息包括设备入库信息以及使用信息,所述使用信息包括使用部门信息以及用户信息;The enterprise resource planning system creates and sends equipment asset information to the fixed asset management system according to the received business approval information, where the equipment asset information includes equipment storage information and usage information, and the usage information includes the department of use Information and user information;
所述固定资产管理系统判断所述设备资产信息与预设信息是否一致;The fixed asset management system judges whether the equipment asset information is consistent with preset information;
所述固定资产管理系统在确定所述设备资产信息与所述预设信息一致时,则更新所存储的设备资产列表。When the fixed asset management system determines that the equipment asset information is consistent with the preset information, it updates the stored equipment asset list.
可选地,在本公开实施例提供的设备台账管理方法中,还包括:Optionally, the device account management method provided by the embodiment of the present disclosure further includes:
所述业务流程管理系统接收输入的所述业务审批信息;The business process management system receives the input business approval information;
所述业务流程管理系统接收至少两个管理角色针对所述业务审批信息分别输入的所述第一触发指令;其中,所述管理角色至少包括所述企业资源计划系统的管理用户和所述固定资产管理系统的管理用户。The business process management system receives the first trigger instructions input by at least two management roles for the business approval information respectively; wherein, the management role includes at least a management user of the enterprise resource planning system and the fixed asset Administrative users of the management system.
可选地,在本公开实施例提供的设备台账管理方法中,还包括:Optionally, the device account management method provided by the embodiment of the present disclosure further includes:
若所述固定资产管理系统确定所述设备资产信息与所述预设信息不一致,则向所述企业资源计划系统发送第一响应消息,其中,所述第一响应消息用于指示所述企业资源计划系统重新确认所述设备资产信息是否正确;If the fixed asset management system determines that the equipment asset information is inconsistent with the preset information, it sends a first response message to the enterprise resource planning system, where the first response message is used to indicate the enterprise resource The planning system reconfirms whether the equipment asset information is correct;
所述企业资源计划系统向所述固定资产管理系统重新发送所述设备资产信息。The enterprise resource planning system resends the equipment asset information to the fixed asset management system.
可选地,在本公开实施例提供的设备台账管理方法中,所述固定资产管理系统在确定所述设备资产信息与所述预设信息一致时,则更新所存储的设备资产列表,包括:Optionally, in the device ledger management method provided by the embodiment of the present disclosure, when the fixed asset management system determines that the device asset information is consistent with the preset information, it updates the stored device asset list, including :
所述固定资产管理系统判断所述设备资产信息所指示的设备是否在所述固定资产管理系统中;The fixed asset management system judges whether the equipment indicated by the equipment asset information is in the fixed asset management system;
若不存在,则生成新的设备资产列表,且将所述设备资产信息所指示的设备在所述新的设备资产列表中的状态设置为创建状态;If it does not exist, generate a new equipment asset list, and set the status of the equipment indicated by the equipment asset information in the new equipment asset list to the creation status;
若所述设备资产信息所指示的设备在所述固定资产管理系统中存在,则判断所述设备资产信息中的用户信息所指示的用户是否是非库存用户;If the equipment indicated by the equipment asset information exists in the fixed asset management system, determining whether the user indicated by the user information in the equipment asset information is a non-stock user;
若所述用户信息所指示的用户是非库存用户,则将所述设备资产信息所指示的设备在所述新的设备资产列表中的状态设置为发放状态;If the user indicated by the user information is a non-inventory user, setting the status of the device indicated by the device asset information in the new device asset list to the issuing status;
若所述用户信息所指示的用户是库存用户,则判断所述设备资产信息所指示的设备的数量是否小于所述固定资产管理系统中该设备的数量;If the user indicated by the user information is an inventory user, determining whether the quantity of equipment indicated by the equipment asset information is less than the quantity of the equipment in the fixed asset management system;
若所述设备资产信息所指示的设备的数量大于或等于所述固定资产管理系统中该设备的数量则生成新的设备资产列表,则将所述设备资产信息所指示的设备在所述新的设备资产列表中的状态设置为回收状态;If the quantity of equipment indicated by the equipment asset information is greater than or equal to the quantity of the equipment in the fixed asset management system, a new equipment asset list is generated, and the equipment indicated by the equipment asset information is listed in the new equipment asset list. The status in the equipment asset list is set to recycling status;
若所述设备资产信息所指示的设备的数量小于所述固定资产管理系统中该设备的数量,则将所述设备资产信息所指示的设备在所述新的设备资产列表中的状态设置为报废状态。If the quantity of equipment indicated by the equipment asset information is less than the quantity of the equipment in the fixed asset management system, the status of the equipment indicated by the equipment asset information in the new equipment asset list is set to scrap status.
可选地,在本公开实施例提供的设备台账管理方法中,还包括:Optionally, the device account management method provided by the embodiment of the present disclosure further includes:
所述固定资产管理系统接收针对第一设备进行的预操作指令,所述预操作指令所指示的预操作包括预转移操作、预入库操作或预发放操作;The fixed asset management system receives a pre-operation instruction for the first device, and the pre-operation indicated by the pre-operation instruction includes a pre-transfer operation, a pre-warehouse operation, or a pre-issuance operation;
所述固定资产管理系统根据所述预操作指令将所述第一设备添加到预操作资产列表中,并更新所述第一设备的设备资产信息。The fixed asset management system adds the first device to the pre-operation asset list according to the pre-operation instruction, and updates the equipment asset information of the first device.
可选地,在本公开实施例提供的设备台账管理方法中,还包括:Optionally, the device account management method provided by the embodiment of the present disclosure further includes:
所述固定资产管理系统将所述预操作资产列表发送给所述业务流程管理系统;The fixed asset management system sends the pre-operational asset list to the business process management system;
所述业务流程管理系统根据所述预操作资产列表中的设备资产信息创建业务审批信息。The business process management system creates business approval information according to the equipment asset information in the pre-operational asset list.
可选地,在本公开实施例提供的设备台账管理方法中,还包括:Optionally, the device account management method provided by the embodiment of the present disclosure further includes:
所述固定资产管理系统向所述业务流程管理系统发送资产维保信息,其中,所述资产维保信息用于指示资产报废原因;The fixed asset management system sends asset maintenance information to the business process management system, where the asset maintenance information is used to indicate the reason for the asset retirement;
所述业务流程管理系统根据所述资产维保信息对上报的资产报废业务进行审核。The business process management system reviews the reported asset retirement business according to the asset maintenance information.
可选地,在本公开实施例提供的设备台账管理方法中,还包括:Optionally, the device account management method provided by the embodiment of the present disclosure further includes:
所述固定资产管理系统向所述业务流程管理系统发送资产盘点数据;The fixed asset management system sends asset inventory data to the business process management system;
所述业务流程管理系统根据所述资产盘点数据生成资产盘点表单;The business process management system generates an asset inventory form according to the asset inventory data;
所述业务流程管理系统根据所述资产盘点表单对所述业务审批信息进行审批。The business process management system approves the business approval information according to the asset inventory form.
第二方面,提供了一种设备台账管理系统,该设备台账管理系统包括业务流程管理系统、企业资源计划系统和固定资产管理系统;其中,In the second aspect, an equipment ledger management system is provided. The equipment ledger management system includes a business process management system, an enterprise resource planning system, and a fixed asset management system; among them,
所述业务流程管理系统,被配置为在接收到第一触发指令时,向企业资源计划系统发送业务审批信息;所述第一触发指令用于指示所述业务审批信息中的设备资产计划可行;The business process management system is configured to send business approval information to an enterprise resource planning system when receiving a first trigger instruction; the first trigger instruction is used to indicate that the equipment asset plan in the business approval information is feasible;
所述企业资源计划系统,被配置为根据接收的所述业务审批信息,创建并向固定资产管理系统发送设备资产信息,其中,所述设备资产信息包括设备入库信息以及使用信息,所述使用信息包括使用部门信息以及用户信息;The enterprise resource planning system is configured to create and send equipment asset information to the fixed asset management system according to the received business approval information, where the equipment asset information includes equipment inventory information and usage information, and the use Information includes user information and user information;
所述固定资产管理系统,被配置为判断所述设备资产信息与预设信息是否一致,且在确定所述设备资产信息与所述预设信息一致时,更新所存储的设备资产列表。The fixed asset management system is configured to determine whether the equipment asset information is consistent with preset information, and when it is determined that the equipment asset information is consistent with the preset information, update the stored equipment asset list.
可选地,在本公开实施例提供的设备台账管理系统中,所述业务流程管理系统还被配置为:Optionally, in the device ledger management system provided by the embodiment of the present disclosure, the business process management system is further configured to:
接收输入的所述业务审批信息;Receiving the input business approval information;
接收至少两个管理角色针对所述业务审批信息分别输入的所述第一触发指令;其中,所述管理角色至少包括所述企业资源计划系统的管理用户和所述固定资产管理系统的管理用户。Receive the first trigger instruction input by at least two management roles for the business approval information respectively; wherein, the management role includes at least a management user of the enterprise resource planning system and a management user of the fixed asset management system.
可选地,在本公开实施例提供的设备台账管理系统中,所述固定资产管理系统,还被配置为若确定所述设备资产信息与所述预设信息不一致,则向所述企业资源计划系统发送第一响应消息,其中,所述第一响应消息用于指示所述企业资源计划系统重新确认所述设备资产信息是否正确;Optionally, in the equipment ledger management system provided by the embodiment of the present disclosure, the fixed asset management system is further configured to report to the enterprise resource if it is determined that the equipment asset information is inconsistent with the preset information The planning system sends a first response message, where the first response message is used to instruct the enterprise resource planning system to reconfirm whether the equipment asset information is correct;
所述企业资源计划系统,还被配置为向所述固定资产管理系统重新发送所述设备资产信息。The enterprise resource planning system is further configured to resend the equipment asset information to the fixed asset management system.
可选地,在本公开实施例提供的设备台账管理系统中,所述固定资产管 理具体被配置为:Optionally, in the device ledger management system provided by the embodiment of the present disclosure, the fixed asset management is specifically configured as:
判断所述设备资产信息所指示的设备是否在所述固定资产管理系统中;Judging whether the equipment indicated by the equipment asset information is in the fixed asset management system;
若不存在,则生成新的设备资产列表,且将所述设备资产信息所指示的设备在所述新的设备资产列表中的状态设置为创建状态;If it does not exist, generate a new equipment asset list, and set the status of the equipment indicated by the equipment asset information in the new equipment asset list to the creation status;
若所述设备资产信息所指示的设备在所述固定资产管理系统中存在,则判断所述设备资产信息中的用户信息所指示的用户是否是非库存用户;If the equipment indicated by the equipment asset information exists in the fixed asset management system, determining whether the user indicated by the user information in the equipment asset information is a non-stock user;
若所述用户信息所指示的用户是非库存用户,则将所述设备资产信息所指示的设备在所述新的设备资产列表中的状态设置为发放状态;If the user indicated by the user information is a non-inventory user, setting the status of the device indicated by the device asset information in the new device asset list to the issuing status;
若所述用户信息所指示的用户是库存用户,则判断所述设备资产信息所指示的设备的数量是否小于所述固定资产管理系统中该设备的数量;If the user indicated by the user information is an inventory user, determining whether the quantity of equipment indicated by the equipment asset information is less than the quantity of the equipment in the fixed asset management system;
若所述设备资产信息所指示的设备的数量大于或等于所述固定资产管理系统中该设备的数量则生成新的设备资产列表,则将所述设备资产信息所指示的设备在所述新的设备资产列表中的状态设置为回收状态;If the quantity of equipment indicated by the equipment asset information is greater than or equal to the quantity of the equipment in the fixed asset management system, a new equipment asset list is generated, and the equipment indicated by the equipment asset information is listed in the new equipment asset list. The status in the equipment asset list is set to recycling status;
若所述设备资产信息所指示的设备的数量小于所述固定资产管理系统中该设备的数量,则将所述设备资产信息所指示的设备在所述新的设备资产列表中的状态设置为报废状态。If the quantity of equipment indicated by the equipment asset information is less than the quantity of the equipment in the fixed asset management system, the status of the equipment indicated by the equipment asset information in the new equipment asset list is set to scrap status.
可选地,在本公开实施例提供的设备台账管理系统中,所述固定资产管理系统还被配置为:Optionally, in the device ledger management system provided by the embodiment of the present disclosure, the fixed asset management system is further configured to:
接收针对第一设备进行的预操作指令,所述预操作指令所指示的预操作包括预转移操作、预入库操作或预发放操作;Receiving a pre-operation instruction for the first device, where the pre-operation indicated by the pre-operation instruction includes a pre-transfer operation, a pre-stocking operation, or a pre-issuing operation;
根据所述预操作指令将所述第一设备添加到预操作资产列表中,并更新所述第一设备的设备资产信息。Add the first device to the pre-operation asset list according to the pre-operation instruction, and update the device asset information of the first device.
可选地,在本公开实施例提供的设备台账管理系统中,所述固定资产管理系统,还被配置为将所述预操作资产列表发送给所述业务流程管理系统;Optionally, in the device ledger management system provided by the embodiment of the present disclosure, the fixed asset management system is further configured to send the pre-operational asset list to the business process management system;
所述业务流程管理系统,还被配置为根据所述预操作资产列表中的设备资产信息创建业务审批信息。The business process management system is further configured to create business approval information based on the equipment asset information in the pre-operational asset list.
可选地,在本公开实施例提供的设备台账管理系统中,所述固定资产管 理系统,还被配置为向所述业务流程管理系统发送资产维保信息,其中,所述资产维保信息用于指示资产报废原因;Optionally, in the equipment ledger management system provided by the embodiment of the present disclosure, the fixed asset management system is further configured to send asset maintenance information to the business process management system, wherein the asset maintenance information Used to indicate the reason for asset retirement;
所述业务流程管理系统,还被配置为根据所述资产维保信息对上报的资产报废业务进行审核。The business process management system is further configured to review the reported asset retirement business according to the asset maintenance information.
可选地,在本公开实施例提供的设备台账管理系统中,所述固定资产管理系统,还被配置为向所述业务流程管理系统发送资产盘点数据;Optionally, in the equipment ledger management system provided by the embodiment of the present disclosure, the fixed asset management system is further configured to send asset inventory data to the business process management system;
所述业务流程管理系统,还被配置为根据所述资产盘点数据生成资产盘点表单;The business process management system is further configured to generate an asset inventory form according to the asset inventory data;
所述业务流程管理系统,还被配置为所述资产盘点表单对所述业务审批信息进行审批。The business process management system is also configured to approve the business approval information on the asset inventory form.
第三方面,提供了一种计算机可读的非易失性存储介质,所述计算机可读的非易失性存储介质存储有计算机可执行指令,所述计算机指令被处理器执行时实现本公开实施例提供的上述任一种设备台账管理方法。In a third aspect, a computer-readable non-volatile storage medium is provided, and the computer-readable non-volatile storage medium stores computer-executable instructions, which when executed by a processor realizes the present disclosure Any of the foregoing device account management methods provided by the embodiment.
第四方面,提供了一种终端设备,其中,包括:存储器和处理器;In a fourth aspect, a terminal device is provided, which includes: a memory and a processor;
所述存储器,用于存储程序指令;The memory is used to store program instructions;
所述处理器,用于调用所述存储器中存储的所述程序指令,按照获得的程序执行本公开实施例提供的上述任一种设备台账管理方法。The processor is configured to call the program instructions stored in the memory, and execute any of the foregoing device account management methods provided in the embodiments of the present disclosure according to the obtained program.
附图说明Description of the drawings
图1为本公开实施例提供的设备台账管理系统的结构示意图;FIG. 1 is a schematic structural diagram of an equipment ledger management system provided by an embodiment of the disclosure;
图2为本公开实施例提供的设备台账管理方法的流程图;FIG. 2 is a flowchart of a method for device account management provided by an embodiment of the disclosure;
图3为本公开实施例提供的设备台账管理系统的信息交互的示意图;3 is a schematic diagram of information interaction of the equipment ledger management system provided by an embodiment of the disclosure;
图4为本公开实施例提供的设备台账管理系统的信息交互的示意图;4 is a schematic diagram of information interaction of the equipment ledger management system provided by an embodiment of the disclosure;
图5为本公开实施例提供的AMS系统的功能模块示意图;5 is a schematic diagram of functional modules of the AMS system provided by the embodiments of the disclosure;
图6为本公开实施例提供的终端设备的结构示意图。Fig. 6 is a schematic structural diagram of a terminal device provided by an embodiment of the disclosure.
具体实施方式Detailed ways
为使本公开的目的、技术方案和优点更加清楚明白,下面将结合本公开实施例中的附图,对本公开实施例中的技术方案进行清楚、完整地描述。In order to make the objectives, technical solutions, and advantages of the present disclosure clearer, the technical solutions in the embodiments of the present disclosure will be described clearly and completely in conjunction with the accompanying drawings in the embodiments of the present disclosure.
目前,企业资源计划(ERP)系统和AMS系统各自工作,均需要重复进行人工录入设备的资产信息,重复工作率高,且二者之间的数据主要是通过人工核对,出错率较高。At present, the enterprise resource planning (ERP) system and the AMS system both need to manually enter the asset information of the equipment repeatedly, and the repetitive work rate is high, and the data between the two are mainly manually checked, and the error rate is high.
鉴于此,本公开实施例提供了一种设备台账管理方法,该方法所涉及的业务流程管理(Business Process Management,BPM)系统、ERP系统以及AMS系统之间可以互相通信,即可以实现信息的交互,从而避免了由于各自独立工作需要人工核对的情况,尽量避免人工核对的出错率,便于管理。In view of this, the embodiments of the present disclosure provide a device ledger management method. The business process management (BPM) system, ERP system, and AMS system involved in the method can communicate with each other, that is, information can be realized. Interaction, so as to avoid the need for manual verification due to their independent work, try to avoid the error rate of manual verification, and facilitate management.
下面结合附图,对本公开实施例提供的设备台账管理方法及系统的具体实施方式进行详细地说明。The specific implementation of the device account management method and system provided by the embodiments of the present disclosure will be described in detail below with reference to the accompanying drawings.
请参见图1,本公开实施例提供了一种设备台账管理系统,该系统包括BPM系统、BRP系统和AMS系统,其中,BPM系统、BRP系统和AMS系统两两之间均可以进行通信。Referring to FIG. 1, an embodiment of the present disclosure provides an equipment ledger management system. The system includes a BPM system, a BRP system, and an AMS system. The BPM system, the BRP system, and the AMS system can all communicate with each other.
BPM系统可以根据用户输入的信息配置采购表单、调配表单、转移表单、报废表单等,并主要用于负责资产的采购、调配、转移、报废等流程的审核。The BPM system can configure purchase forms, deployment forms, transfer forms, scrap forms, etc. according to the information entered by users, and is mainly used for reviewing the processes of asset procurement, deployment, transfer, and scrapping.
ERP系统主要用于负责资产的创建、资产的转移,例如归属于某个责任人或者部门的设备转移到另一个负责人或部门,和资产的状态,例如该资产是库存状态,还是报修状态等。The ERP system is mainly used for the creation and transfer of assets, such as the transfer of equipment belonging to a responsible person or department to another responsible person or department, and the status of the asset, such as whether the asset is in inventory or repair status, etc. .
AMS系统主要用于负责为资产配置信息,例如为资产配置型号信息、实物状态、维保信息等。The AMS system is mainly used for asset allocation information, such as asset allocation model information, physical status, maintenance information, etc.
具体的,请参见图2,本公开实施例提供了一种设备台账管理方法,该方法适用于如图1所示的系统。该方法包括如下步骤:Specifically, please refer to FIG. 2, an embodiment of the present disclosure provides a device account management method, which is suitable for the system shown in FIG. 1. The method includes the following steps:
S201、BPM系统在接收到第一触发指令时,向企业资源计划ERP系统发送业务审批信息;第一触发指令用于指示业务审批信息中的设备资产计划可行;S201. When the BPM system receives the first trigger instruction, it sends business approval information to the enterprise resource planning ERP system; the first trigger instruction is used to indicate that the equipment asset plan in the business approval information is feasible;
S202、ERP系统根据接收的业务审批信息,创建并向固定资产管理AMS系统发送设备资产信息,其中,设备资产信息包括设备入库信息以及使用信息,使用信息包括使用部门信息以及用户信息;S202. The ERP system creates and sends equipment asset information to the fixed asset management AMS system according to the received business approval information, where the equipment asset information includes equipment storage information and usage information, and the usage information includes usage department information and user information;
S203、AMS系统判断设备资产信息与预设信息是否一致;S203. The AMS system judges whether the equipment asset information is consistent with the preset information;
S204、AMS系统在确定设备资产信息与预设信息一致时,则更新所存储的设备资产列表。S204. When determining that the equipment asset information is consistent with the preset information, the AMS system updates the stored equipment asset list.
通常,有业务需求时,例如,公司可能入职一批新员工,又例如,出于可靠性的考虑,公司可能要备用一批设备等,本公开实施例可以通过BPM系统建立业务审批信息。这里的业务审批信息可以是BPM系统建立业务流程所需要的信息。例如业务审批信息可以认为是资产变动信息,例如资产采购信息,资产转移信息、资产报废信息等,其中,资产转移信息可以包括资产申请信息,资产回收信息等。Generally, when there is a business requirement, for example, the company may hire a batch of new employees, or for reliability considerations, the company may need to reserve a batch of equipment, etc. The embodiment of the present disclosure may establish business approval information through the BPM system. The business approval information here can be the information needed by the BPM system to establish a business process. For example, business approval information can be considered asset change information, such as asset purchase information, asset transfer information, asset retirement information, etc., where asset transfer information can include asset application information, asset recovery information, and so on.
可选地,在本公开实施例中,业务流程管理系统接收输入的业务审批信息;业务流程管理系统接收至少两个管理角色针对业务审批信息分别输入的第一触发指令;其中,管理角色至少包括企业资源计划系统的管理用户和固定资产管理系统的管理用户。Optionally, in the embodiment of the present disclosure, the business process management system receives the input business approval information; the business process management system receives the first trigger instructions respectively inputted by at least two management roles for the business approval information; wherein, the management role includes at least The management user of the enterprise resource planning system and the management user of the fixed asset management system.
以业务审批信息为资产采购信息为例,当有需要采购资产时,BPM系统可以接收用户输入的业务审批信息,这里的用户可以是BPM系统的管理员。现有技术中,业务审批信息建立之后,BPM系统可以将该业务审批信息打印之后,人工递给ERP系统和AMS系统的管理人员。ERP系统和AMS系统的管理人员可以对业务审批信息中的设备资产计划进行评估,即确定其中的设备资产计划是否可行,例如,如果设备资产计划在财务预算范围内,且在业务实际需求内,则可以认为设备资产计划可行。当然,如果设备资产计划不在财务预算范围内,或者不在业务实际需求内,则可以认为设备资产计划本公开实施例不可行。Taking business approval information as asset purchase information as an example, when there is a need to purchase assets, the BPM system can receive the business approval information entered by the user, and the user here can be the administrator of the BPM system. In the prior art, after the business approval information is established, the BPM system can print the business approval information and manually pass it to the managers of the ERP system and the AMS system. The managers of the ERP system and AMS system can evaluate the equipment asset plan in the business approval information, that is, determine whether the equipment asset plan is feasible. For example, if the equipment asset plan is within the scope of the financial budget and within the actual needs of the business, Then the equipment asset plan can be considered feasible. Of course, if the equipment asset plan is not within the scope of the financial budget or is not within the actual needs of the business, it can be considered that the embodiment of the equipment asset plan is not feasible.
现有技术中,需要人工的传递,本公开实施例为了减少人工的参与,在BPM系统可以增加通信接口。例如,在BPM系统增加了审核选项,该审核 选项可以认为是一个控件,可以设置在业务审批信息的输入界面,也可以设置在单独的一个界面。该审核选项可以具有下拉列表,例如,该审核选项可以具有二级菜单,一级菜单可以是AMS系统的管理人员的名称列表,二级菜单可以是ERP系统的管理人员的名称列表。BPM系统在接收到管理人员针对业务审批信息的输入完成操作时,可以显示该审核选项。在可能的实施方式中,BPM系统的管理人员可以在该审核选项中输入要审核的AMS系统的管理人员。AMS系统的管理人员对该业务审批信息进行审核,如果确定设备资产计划可行,则可以输入第一触发指令,用于指示该业务审批信息中的设备资产计划可行。此时,审核选项可以跳转到ERP系统的管理人员的列表,BPM系统的管理人员可以选择输入待审核业务审批信息的ERP系统的管理人员。当ERP系统的管理人员确定设备资产计划可行,则同样可以输入第一触发指令,用于指示该业务审批信息中的设备资产计划可行。需要说明的是,BPM系统可以设置输出第一触发指令的接口,例如,“确定”按钮等,当BPM系统检测到存在触发“确定”按钮的操作,则可以认为是输入第一触发指令。In the prior art, manual transmission is required. In the embodiment of the present disclosure, in order to reduce manual participation, a communication interface can be added to the BPM system. For example, an audit option is added to the BPM system. The audit option can be considered as a control, which can be set in the input interface of business approval information or in a separate interface. The review option may have a drop-down list. For example, the review option may have a second-level menu, the first-level menu may be a list of names of managers of the AMS system, and the second-level menu may be a list of names of managers of the ERP system. The BPM system can display the review option when it receives the input of the management personnel for the business approval information to complete the operation. In a possible implementation manner, the manager of the BPM system can enter the manager of the AMS system to be reviewed in the review option. The manager of the AMS system reviews the business approval information. If it is determined that the equipment asset plan is feasible, they can enter the first trigger instruction to indicate that the equipment asset plan in the business approval information is feasible. At this time, the review option can jump to the list of managers of the ERP system, and the managers of the BPM system can select the managers of the ERP system who input the approval information of the business to be reviewed. When the manager of the ERP system determines that the equipment asset plan is feasible, he can also input the first trigger instruction to indicate that the equipment asset plan in the business approval information is feasible. It should be noted that the BPM system can set an interface for outputting the first trigger instruction, such as an "OK" button. When the BPM system detects that there is an operation that triggers the "OK" button, it can be regarded as inputting the first trigger instruction.
当然,BPM系统所建立的业务审批信息可能还需要更多的管理人员审核,那么每一个管理人员都可以向BPM系统输入第一触发指令,即BPM系统接收至少两个管理角色针对业务审批信息分别输入的第一触发指令。其中,管理角色至少包括ERP系统的管理用户和AMS系统的管理用户。Of course, the business approval information established by the BPM system may need to be reviewed by more managers, so each manager can input the first trigger instruction to the BPM system, that is, the BPM system receives at least two management roles for business approval information respectively The first trigger command entered. Among them, the management role includes at least the management user of the ERP system and the management user of the AMS system.
当BPM系统确定输入的业务审批信息中的设备资产计划可行,则可以向ERP系统发送该业务审批信息,以保证信息的一致,避免了人工录入可能导致的错误,如图3所示。When the BPM system determines that the equipment asset plan in the input business approval information is feasible, it can send the business approval information to the ERP system to ensure the consistency of the information and avoid errors that may be caused by manual entry, as shown in Figure 3.
请参见图3,ERP系统可以根据该业务审批信息,创建并向AMS系统发送设备资产信息,其中,该设备资产信息包括设备入库信息以及使用信息,该使用信息包括使用部门信息以及用户信息。需要说明的是,业务审批信息可以包括设备资产信息,BPM系统可以向ERP系统发送业务审批信息所包括的设备资产信息,这样ERP系统就可以将来自BPM系统的信息作为设备资产信息。当然,ERP系统也可以根据业务审批信息建立具体的设备资产信息, 例如,如果业务审批信息中指示的设备是采购,那么可以认为该设备是库存中没有的,如果业务审批信息指示该设备采购后用于库存,那么ERP系统所建立的设备资产信息包括的设备入库信息可以是库存。又例如,如果业务审批信息中指示的设备是采购,那么可以认为该设备是库存中没有的,如果业务审批信息指示该设备采购后用于为新员工使用,那么ERP系统所建立的设备资产信息包括的设备入库信息可以是非库存,使用信息可以包括该新员工所在部门信息以及该新员工信息。Referring to Figure 3, the ERP system can create and send equipment asset information to the AMS system based on the business approval information, where the equipment asset information includes equipment storage information and usage information, and the usage information includes usage department information and user information. It should be noted that the business approval information can include equipment asset information, and the BPM system can send the equipment asset information included in the business approval information to the ERP system, so that the ERP system can use the information from the BPM system as equipment asset information. Of course, the ERP system can also establish specific equipment asset information based on the business approval information. For example, if the equipment indicated in the business approval information is purchased, it can be considered that the equipment is not in inventory. If the business approval information indicates that the equipment is purchased For inventory, the equipment storage information included in the equipment asset information established by the ERP system can be inventory. For another example, if the equipment indicated in the business approval information is purchased, it can be considered that the equipment is not in inventory. If the business approval information indicates that the equipment is purchased for use by new employees, then the equipment asset information established by the ERP system The included equipment storage information may be non-inventory, and the usage information may include department information of the new employee and information of the new employee.
ERP系统创建的设备资产信息还可以包括资产的唯一标识符、资产归属的责任人、资产的价值、资产的成本、资产的状态等信息,这里就不一一列举了。ERP系统创建设备资产信息之后,可以将该设备资产信息发送给AMS系统,以通过AMS系统实现资产的管理。The equipment asset information created by the ERP system can also include information such as the unique identifier of the asset, the person responsible for the ownership of the asset, the value of the asset, the cost of the asset, and the status of the asset, which are not listed here. After the ERP system creates equipment asset information, it can send the equipment asset information to the AMS system to realize asset management through the AMS system.
需要说明的是,这种情况下,ERP系统发送过来的设备资产信息的发送状态在AMS系统中显示时需转换为过程状态,以便于AMS系统的管理员识别与匹配该实物操作状态,即创建、发放、回收、报废等。具体的,可以通过资产的唯一标识符判断。It should be noted that in this case, the sending status of the equipment asset information sent by the ERP system needs to be converted to the process status when displayed in the AMS system, so that the AMS system administrator can identify and match the physical operation status, that is, create , Distribution, recycling, scrapping, etc. Specifically, it can be judged by the unique identifier of the asset.
可选地,在本公开实施例中,若固定资产管理系统确定设备资产信息与预设信息不一致,则向企业资源计划系统发送第一响应消息,其中,第一响应消息被配置为指示企业资源计划系统重新确认设备资产信息是否正确;企业资源计划系统向固定资产管理系统重新发送设备资产信息。Optionally, in the embodiment of the present disclosure, if the fixed asset management system determines that the equipment asset information is inconsistent with the preset information, it sends a first response message to the enterprise resource planning system, where the first response message is configured to indicate the enterprise resource The planning system reconfirms whether the equipment asset information is correct; the enterprise resource planning system resends the equipment asset information to the fixed asset management system.
具体的,AMS系统接收到该设备资产信息,首先判断该设备资产信息对不对。例如,业务审批信息的建立是基于例如部门A需要新设备,但是在新设备采购回来之后,发现部门A已经没有需要该新设备的需求了。这种情况下,ERP系统的管理人员创建的设备资产信息中的使用信息还是部门A,当时AMS系统由于是实体设备管理,所以知晓部门A已经没有此需求了,那么AMS系统可以确定ERP系统所创建的该设备资产信息不对。具体的,AMS系统如果发现设备资产信息有变动,可以修改并保存该信息作为预设信息。当AMS系统接收来自ERP系统的设备资产信息时,可以判断该设备资产信 息与预设信息中与该设备相关的资产信息是否一致,如果不一致,则AMS系统可以向ERP系统发送第一响应消息,该第一响应消息用于指示ERP系统重新确认设备资产信息是否正确。ERP系统接收到第一响应消息,则可以认为设备资产信息可能有误,核对更正错误的设备资产信息后,可以向AMS系统重新发送设备资产信息,这样ERP系统和AMS系统保存的设备资产信息是一致的,提高了数据的准确度,便于维护。Specifically, the AMS system receives the equipment asset information, and first determines whether the equipment asset information is correct. For example, the establishment of business approval information is based on, for example, that department A needs new equipment, but after the new equipment is purchased, it is found that department A no longer needs the new equipment. In this case, the use information in the equipment asset information created by the managers of the ERP system is still department A. At that time, because the AMS system is physical equipment management, it is known that department A no longer has this requirement, then the AMS system can determine the location of the ERP system. The device asset information created is incorrect. Specifically, if the AMS system finds changes in equipment asset information, it can modify and save the information as preset information. When the AMS system receives equipment asset information from the ERP system, it can determine whether the equipment asset information is consistent with the asset information related to the equipment in the preset information. If they are not consistent, the AMS system can send a first response message to the ERP system. The first response message is used to instruct the ERP system to reconfirm whether the equipment asset information is correct. When the ERP system receives the first response message, it can be considered that the equipment asset information may be wrong. After checking and correcting the wrong equipment asset information, the equipment asset information can be resent to the AMS system, so that the equipment asset information saved by the ERP system and the AMS system is Consistent, which improves the accuracy of data and facilitates maintenance.
如果AMS系统确定来自ERP系统的设备资产信息与预设信息一致,AMS系统可以根据所接收的设备资产信息对所存储的设备资产列表进行更新。If the AMS system determines that the equipment asset information from the ERP system is consistent with the preset information, the AMS system can update the stored equipment asset list according to the received equipment asset information.
可选地,在本公开实施例中,固定资产管理系统在确定设备资产信息与预设信息一致时,则更新所存储的设备资产列表,包括:Optionally, in the embodiment of the present disclosure, when the fixed asset management system determines that the equipment asset information is consistent with the preset information, it updates the stored equipment asset list, including:
固定资产管理系统判断设备资产信息所指示的设备是否在固定资产管理系统中;The fixed asset management system determines whether the equipment indicated by the equipment asset information is in the fixed asset management system;
若不存在,则生成新的设备资产列表,且将设备资产信息所指示的设备在新的设备资产列表中的状态设置为创建状态;If it does not exist, a new equipment asset list is generated, and the status of the equipment indicated by the equipment asset information in the new equipment asset list is set to the created state;
若设备资产信息所指示的设备在固定资产管理系统中存在,则判断设备资产信息中的用户信息所指示的用户是否是非库存用户;If the equipment indicated by the equipment asset information exists in the fixed asset management system, determine whether the user indicated by the user information in the equipment asset information is a non-stock user;
若用户信息所指示的用户是非库存用户,则将设备资产信息所指示的设备在新的设备资产列表中的状态设置为发放状态;If the user indicated by the user information is a non-stock user, set the status of the device indicated by the device asset information in the new device asset list to the issued status;
若用户信息所指示的用户是库存用户,则判断设备资产信息所指示的设备的数量是否小于固定资产管理系统中该设备的数量;If the user indicated by the user information is an inventory user, determine whether the quantity of equipment indicated by the equipment asset information is less than the quantity of the equipment in the fixed asset management system;
若设备资产信息所指示的设备的数量大于或等于固定资产管理系统中该设备的数量则生成新的设备资产列表,则将设备资产信息所指示的设备在新的设备资产列表中的状态设置为回收状态;If the number of equipment indicated by the equipment asset information is greater than or equal to the number of the equipment in the fixed asset management system, a new equipment asset list is generated, and the status of the equipment indicated by the equipment asset information in the new equipment asset list is set to Recycling status
若设备资产信息所指示的设备的数量小于固定资产管理系统中该设备的数量,则将设备资产信息所指示的设备在新的设备资产列表中的状态设置为报废状态。If the quantity of the equipment indicated by the equipment asset information is less than the quantity of the equipment in the fixed asset management system, the status of the equipment indicated by the equipment asset information in the new equipment asset list is set to a scrapped state.
具体的,AMS系统首先可以判断该设备资产信息所指示的设备是否在 AMS系统中,如果该设备资产信息所指示的设备不存在于AMS系统,那么可以认为该设备可能是新采购的设备,AMS系统可以生成新的设备资产列表。也可以认为AMS系统在已存储的设备资产列表中新增加了该设备的资产信息,从而生成新的设备资产列表。Specifically, the AMS system can first determine whether the equipment indicated by the equipment asset information is in the AMS system. If the equipment indicated by the equipment asset information does not exist in the AMS system, it can be considered that the equipment may be newly purchased equipment. The system can generate a new equipment asset list. It can also be considered that the AMS system newly adds the asset information of the equipment to the stored equipment asset list, thereby generating a new equipment asset list.
AMS系统生成新的设备资产列表时,可以设置新增加设备的状态,便于后期管理。例如,如果该设备资产信息所指示的设备在AMS系统中不存在,则可以将该设备在新的设备资产列表中的状态设置为创建状态。When the AMS system generates a new equipment asset list, the status of the newly added equipment can be set for later management. For example, if the device indicated by the device asset information does not exist in the AMS system, the status of the device in the new device asset list can be set to the created status.
如果该设备资产信息所指示的设备在AMS系统中存在,那么该设备可能是库存,也可能被分配了出去,也可能是报废或者转移,那么AMS系统可以继续判断设备资产信息中的用户信息所指示的用户是否是非库存用户,如果该若用户信息所指示的用户是非库存用户,那么可以认为该设备已经被发放了,此时可以将该设备在新的设备资产列表中的状态设置为发放状态。If the equipment indicated by the equipment asset information exists in the AMS system, the equipment may be inventory, may be allocated, or may be scrapped or transferred, then the AMS system can continue to determine the user information in the equipment asset information. Whether the indicated user is a non-stock user, if the user indicated by the user information is a non-stock user, then the device can be considered to have been issued, and then the status of the device in the new device asset list can be set to the issued state .
而如果用户信息所指示的用户是库存用户,那么该设备可能被回收,在这种情况下,则可以认为该设备被回收了,此时,AMS系统可以将该设备在新的设备资产列表中的状态设置为回收状态。If the user indicated by the user information is a stock user, then the device may be recycled. In this case, the device can be considered to be recycled. At this time, the AMS system can include the device in the new device asset list The status is set to recycling status.
进一步的,AMS系统可以继续判断该设备资产信息所指示的设备的数量是否小于AMS系统中该设备的数量。如果该设备的数量小于AMS系统中该设备的数量,则可以认为该设备报废了,则可以将该设备在新的设备资产列表中的状态设置为报废状态。而如果该设备资产信息所指示的设备的数量大于AMS系统中该设备的数量则生成新的设备资产列表,则可以认为ERP系统发送的设备资产信息与预设信息不一致,此时,AMS系统可以向BPM系统发送第一响应消息。Further, the AMS system can continue to determine whether the number of devices indicated by the device asset information is less than the number of devices in the AMS system. If the number of the equipment is less than the number of the equipment in the AMS system, the equipment can be considered as scrapped, and the status of the equipment in the new equipment asset list can be set to the scrapped state. If the number of equipment indicated by the equipment asset information is greater than the number of equipment in the AMS system, a new equipment asset list is generated. It can be considered that the equipment asset information sent by the ERP system is inconsistent with the preset information. At this time, the AMS system can Send the first response message to the BPM system.
以上列举了AMS系统在生成新的设备资产列表时可能存在的几种情况。实际中,设备资产信息还可以包括资产的属信息,例如,资产的唯一标识符、资产归属的责任人、资产的价值、资产的成本、资产的状态、资产的用途、资产的使用位置、资产的型号配置、资产的调配信息、资产的维保信息等。The above enumerates several situations that may exist when the AMS system generates a new equipment asset list. In practice, equipment asset information can also include asset attribute information, such as the unique identifier of the asset, the person responsible for the asset, the value of the asset, the cost of the asset, the state of the asset, the purpose of the asset, the location of the asset, and the asset Model configuration, asset deployment information, asset maintenance information, etc.
同时,当设备资产信息发生变化时,例如,设备资产信息指示该设备归 属的负责人发生了变化,那么AMS系统还可以对设备资产信息进行管理,即增加该设备的调配记录等。当然,AMS系统对设备资产信息的管理还可以包括资产的用途、资产的使用位置、资产的型号配置、资产的调配信息、资产的维保信息等,这里不再一一举例。At the same time, when the equipment asset information changes, for example, the equipment asset information indicates that the person in charge of the equipment has changed, then the AMS system can also manage the equipment asset information, that is, increase the deployment record of the equipment. Of course, the management of equipment asset information by the AMS system can also include the purpose of the asset, the use location of the asset, the model configuration of the asset, the deployment information of the asset, the maintenance information of the asset, etc., here are no more examples.
如上仅以基于资产采购流程建立业务审批信息,在实际中,基于资产申请流程、资产转移流程、资产回收流程、资产报废流程等建立业务审批信息的过程,类似资产采购流程建立业务审批信息,如图4所示,这里不再赘述。As above, only the business approval information is established based on the asset procurement process. In practice, the process of establishing business approval information based on the asset application process, asset transfer process, asset recovery process, asset retirement process, etc., is similar to the asset procurement process to establish business approval information, such as As shown in Figure 4, it will not be repeated here.
本公开实施例中,BPM系统、ERP系统以及AMS系统之间两两可以互相通信,进行数据的交互,从而减少人工核对,并保持信息的一致,保证了资产管理的正确性,提高了管理效率。In the embodiments of the present disclosure, the BPM system, the ERP system, and the AMS system can communicate with each other in pairs to perform data interaction, thereby reducing manual checking, and maintaining the consistency of information, ensuring the correctness of asset management, and improving management efficiency .
下面结合图4和图5,具体介绍本公开实施例提供的设备台账管理系统的工作流程以及实现的功能。In the following, with reference to FIG. 4 and FIG. 5, the workflow and realized functions of the device ledger management system provided by the embodiments of the present disclosure will be specifically introduced.
在实际使用中,ERP系统也可以对日常设备资产信息进行维护,例如,ERP系统可能会定期或手动修改设备资产信息中的部分信息,例如,设备的状态等。当ERP系统接收到针对设备资产信息的修改操作指令,则可以指示AMS系统也修改该设备资产信息中的部分信息,以保证信息的一致,减少了人工核对的流程。In actual use, the ERP system can also maintain daily equipment asset information. For example, the ERP system may periodically or manually modify part of the equipment asset information, such as the status of the equipment. When the ERP system receives a modification operation instruction for the equipment asset information, it can instruct the AMS system to also modify part of the equipment asset information to ensure the consistency of the information and reduce the manual verification process.
在具体实施时,ERP系统可以增加判断模块,该判断模块在检测到ERP系统针对设备资产信息中的例如第一信息(资产归属的责任人)的修改操作时,可以判断此修改操作是针对设备的是例如“发放”操作或“更新”操作,从而发送给AMS系统携带“发放”或“更新”操作的信息。AMS系统接收到携带“发放”或“更新”操作的信息,可以对该信息的正确性进行判断。如果AMS系统确定该信息正确,则可以更新相关信息,例如补充完善该设备的型号、该设备的调配日期、该设备的用途,以及该设备的领取或退还凭证等;而如果AMS系统确定该信息错误,则可以导出该信息,并反馈给ERP系统的管理人员确认。In specific implementation, the ERP system can add a judging module. When the judging module detects that the ERP system has modified the equipment asset information, such as the first information (the person responsible for the asset ownership), it can determine that the modification operation is for the equipment. It is, for example, a "issue" operation or an "update" operation, which is sent to the AMS system to carry the information of the "issue" or "update" operation. The AMS system receives the information carrying the "issue" or "update" operation, and can judge the correctness of the information. If the AMS system determines that the information is correct, it can update the relevant information, such as supplementing and perfecting the model of the device, the date of deployment of the device, the purpose of the device, and the receipt or return certificate of the device, etc.; and if the AMS system determines the information If there is an error, the information can be exported and fed back to the management personnel of the ERP system for confirmation.
AMS系统作为实体设备的管理系统,还可以对所管理的设备资产进行分 析,对资产进行调配等,如图4所示。资产报表分析提供了资产按状态按类型的数量统计表,库存资产按配置的数量统计表等,方便资产管理员全面掌握资产情况,优化资产资源调配和资产维护。对资产进行调配,例如资产借用管理,因对于诸如电子设备的频繁借用归还的资产财务部并不需要重复管理,直接交由AMS系统直接操作记录即可,包含在外借资产清单中归还处理,在借用记录查询选项卡中遍历资产的所有借用记录,便于管理维护。As a management system for physical equipment, the AMS system can also analyze the managed equipment assets and allocate assets, as shown in Figure 4. Asset report analysis provides a statistical table of assets by state and type, a statistical table of inventory assets by configuration, etc., so that asset managers can fully grasp the asset situation and optimize asset resource allocation and asset maintenance. Allocation of assets, such as asset borrowing management, because the asset finance department that is frequently borrowed and returned such as electronic equipment does not need to be repeatedly managed, it can be directly transferred to the AMS system for direct operation records, which are included in the loan asset list for return processing. All borrowing records of assets are traversed in the borrowing record query tab, which is convenient for management and maintenance.
进一步的,本公开考虑到,有可能AMS系统可能先将库存的设备分配出去,后续再补充库存。例如,现急需一台设备,从BPM系统走流程来不及了,此时AMS系统就可以先调用库存的设备应急。在这种情况下,即如果资产实物有预先的调配、回收、转移等动作,AMS系统可以先对资产实物进行预操作,之后告知BPM系统后续建立关于该设备的业务流程,以保证BPM系统、ERP系统以及AMS系统三者的信息的一致。Further, the present disclosure considers that it is possible that the AMS system may allocate the equipment in stock first, and then replenish the stock later. For example, if a piece of equipment is urgently needed and it is too late to go through the process from the BPM system, the AMS system can first call the equipment in stock for emergency. In this case, that is, if the physical asset has pre-allocation, recovery, transfer and other actions, the AMS system can pre-operate the physical asset first, and then inform the BPM system to subsequently establish the business process about the device to ensure that the BPM system, The information of the ERP system and the AMS system are consistent.
可选地,在本公开实施例中,AMS系统还可以接收针对第一设备进行的预操作指令,该预操作指令所指示的预操作包括预转移操作、预入库操作或预发放操作,之后AMS系统可以根据该预操作指令将第一设备添加到预操作资产列表中,并更新第一设备的设备资产信息。例如,AMS系统预先在AMS系统中标记资产实物的状态并临时记录调配、回收、转移,以及领取或退还凭证。Optionally, in an embodiment of the present disclosure, the AMS system may also receive a pre-operation instruction for the first device, and the pre-operation indicated by the pre-operation instruction includes a pre-transfer operation, a pre-warehouse operation, or a pre-issuance operation. The AMS system can add the first device to the pre-operation asset list according to the pre-operation instruction, and update the device asset information of the first device. For example, the AMS system pre-marks the status of the physical assets in the AMS system and temporarily records the allocation, recovery, transfer, and receipt or return of vouchers.
可选地,在本公开实施例中,AMS系统还可以将预操作资产列表发送给BPM系统,BPM系统根据该预操作资产列表创建业务审批信息。Optionally, in the embodiment of the present disclosure, the AMS system may also send the pre-operational asset list to the BPM system, and the BPM system creates business approval information based on the pre-operational asset list.
可选地,在本公开实施例中,BPM系统在接收到针对该业务审批信息的第一操作指令之后,将该业务审批信息发送给ERP系统。ERP系统根据接收的业务审批信息创建设备资产信息后,发送给AMS系统。AMS系统接收到设备资产信息后,根据预操作的临时记录对设备资产信息进行更新,形成最终的设备资产列表。当然如果ERP系统先向AMS系统发送设备资产操作信息,那么AMS系统可以直接对设备资产操作信息所对应的设备资产信息进行更新处理,无需进行预操作,从而提高数据实时性。Optionally, in the embodiment of the present disclosure, after receiving the first operation instruction for the business approval information, the BPM system sends the business approval information to the ERP system. The ERP system creates equipment asset information based on the received business approval information and sends it to the AMS system. After the AMS system receives the equipment asset information, it updates the equipment asset information according to the pre-operation temporary records to form the final equipment asset list. Of course, if the ERP system first sends the equipment asset operation information to the AMS system, the AMS system can directly update the equipment asset information corresponding to the equipment asset operation information without pre-operation, thereby improving the real-time data.
本公开实施例增加了AMS系统预操作功能,即在ERP系统发送设备资产操作信息时,如果资产实物有预先的调配、回收、转移等需求,则AMS系统预先在AMS系统进行预操作,待ERP系统发送传过来后设备资产信息后,再对设备资产信息进行更新处理,从而提高数据实时性。The embodiment of the present disclosure adds the pre-operation function of the AMS system, that is, when the ERP system sends equipment asset operation information, if the physical assets have pre-arrangement, recovery, transfer and other requirements, the AMS system will pre-operate in the AMS system in advance. After the system sends the equipment asset information, the equipment asset information is updated, thereby improving the real-time data.
具体的,AMS系统增加的预操作功能,主要用于实现库存管理和台账管理。本公开实施例针对库存资产列表,可以对在库资产进行查询、预发、外借、维保操作。例如,对已存储的资产信息列表中的资产进行查询、预转移、预维保和预回收操作。其中,查询、预转移、预维保和预回收操作可以是对单个资产信息进行,也可以是多个资产信息进行,即批量进行。如果针对某一资产从“已发”状态变为“预收”状态,那么该资产即从已发资产列表中消失,在预操作资产列表中出现,同时在设备资产信息的使用信息中增加一条预收记录。又例如,已存储的员工信息列表,可以查询人员信息和人员所有的已发、借用、在修状态的资产信息,用于人员调动时的资产处理。又例如,针对资产维修,管理人员可以对资产信息进行维保操作,例如点击“维保”控件弹出维保窗口,选择维修选项,输入维修原因,确认后即可完成维修,此时被维保资产从“已发”状态变为“维修”状态,即从已发资产列表中消失,在维修资产列表中出现,同时设备资产信息中维修信息里增加一条维修原因,另外,选择记录选项,输入相应配置信息变更等记录确认即可完成记录,此时本条资产仍为“已发”状态,同时资产详细信息中维修信息里增加一条记录。Specifically, the pre-operation function added by the AMS system is mainly used to realize inventory management and ledger management. The embodiments of the present disclosure are directed to the inventory asset list, and the inventory assets can be inquired, pre-issued, loaned, and maintained. For example, perform query, pre-transfer, pre-maintenance and pre-recycling operations on assets in the stored asset information list. Among them, the query, pre-transfer, pre-maintenance, and pre-recycling operations can be performed on a single asset information or multiple asset information, that is, performed in batches. If an asset is changed from the "issued" status to the "pre-received" status, the asset will disappear from the issued asset list and appear in the pre-operated asset list, and at the same time add a pre-received item to the usage information of equipment asset information recording. For another example, the stored employee information list can be used to query the personnel information and all the personnel's asset information that has been issued, borrowed, and is under repair, and is used for asset processing during personnel transfer. For another example, for asset maintenance, managers can perform maintenance operations on asset information. For example, click on the "Maintenance" control to pop up the maintenance window, select the maintenance option, enter the reason for the maintenance, and confirm the maintenance to complete the maintenance. The asset changes from the "issued" state to the "maintenance" state, that is, it disappears from the issued asset list and appears in the maintenance asset list. At the same time, a maintenance reason is added to the maintenance information in the equipment asset information. In addition, select the record option and enter The record can be completed by confirming the corresponding configuration information change and other records. At this time, the asset is still in the "issued" state, and a record is added to the maintenance information in the asset details.
可选地,在本公开实施例中,ASM系统还可以向BPM系统发送资产维保信息,其中,资产维保信息用于指示资产报废原因。BPM系统可以根据该资产维保信息对上报的资产报废业务进行审核。即将AMS系统的资产维保信息作为资产报废流程的鉴定原因,不需要人工再核实,简化了流程。另外,在资产的维保信息里添加维修原因和维修内容,可以方便资产维护员全面掌握资产维保情况,更加合理的判断资产后续的维保方案。Optionally, in the embodiment of the present disclosure, the ASM system may also send asset maintenance information to the BPM system, where the asset maintenance information is used to indicate the reason for the asset retirement. The BPM system can review the reported asset retirement business based on the asset maintenance information. That is, the asset maintenance information of the AMS system is used as the identification reason for the asset retirement process, which does not require manual verification, which simplifies the process. In addition, adding maintenance reasons and maintenance content to the asset maintenance information can facilitate the asset maintainer to fully grasp the asset maintenance situation, and more reasonably judge the asset's subsequent maintenance plan.
可选地,在本公开实施例中,AMS系统还可以向BPM系统发送资产盘 点数据,从而,BPM系统可以根据资产盘点数据生成资产盘点表单,并根据资产盘点表单对业务审批信息进行审批。例如,安装盘点APP的终端设备以AMS系统中的数据库台账为基准,将盘点数据上传到AMS系统数据库。例如,资产管理员可按需输入任务名称、盘点人员、盘点计划时间,选择盘点资产定制化创建盘点任务,开启盘点任务后,通过盘点进度对盘点任务进行跟踪,另外还可以查看盘点任务的详细盘点信息,包括盘盈、盘亏资产数量与资产盘点中存在的问题。AMS系统可以根据资产管理员输入的内容自动生成包含账面数量、实物数量、盘亏数量和盘盈数量的盘点报告。BPM系统可获取AMS系统的盘点报告,并根据盘点报告自动生成表单完成业务流程审核。Optionally, in the embodiment of the present disclosure, the AMS system can also send asset inventory data to the BPM system, so that the BPM system can generate an asset inventory form based on the asset inventory data, and approve business approval information based on the asset inventory form. For example, the terminal equipment installed with the inventory app is based on the database account in the AMS system and uploads the inventory data to the AMS system database. For example, the asset manager can enter the task name, inventory personnel, and inventory planning time as needed, and select inventory asset customization to create an inventory task. After the inventory task is turned on, the inventory task can be tracked through the inventory progress, and the details of the inventory task can also be viewed Inventory information, including inventory profit, the number of assets at a loss, and problems in asset inventory. The AMS system can automatically generate an inventory report containing the book quantity, physical quantity, inventory deficit quantity, and inventory profit quantity according to the content input by the asset manager. The BPM system can obtain the inventory report of the AMS system, and automatically generate a form according to the inventory report to complete the business process review.
综上,本公开实施例中的设备台账管理方法所涉及的BPM系统、ERP系统以及AMS系统之间可以互相通信,即可以实现信息的交互,从而避免了由于各自独立工作需要人工核对的情况,尽量避免人工核对的出错率,便于管理。In summary, the BPM system, ERP system, and AMS system involved in the device ledger management method in the embodiments of the present disclosure can communicate with each other, that is, information interaction can be realized, thereby avoiding the need for manual verification due to independent work. , Try to avoid the error rate of manual checking, which is easy to manage.
本公开实施例中的BPM系统、ERP系统以及AMS系统协调工作,并保持信息的一致,实现资产数据实时共享,提升了跨组织业务协作能力,提高了管理效率。The BPM system, ERP system, and AMS system in the embodiments of the present disclosure coordinate work and maintain the consistency of information, realize real-time sharing of asset data, improve cross-organizational business collaboration capabilities, and improve management efficiency.
基于同一发明构思,本公开实施例提供了一种计算机可读的非易失性存储介质,计算机可读的非易失性存储介质存储有计算机可执行指令,所述计算机指令被处理器执行时实现本公开实施例提供的上述任一种设备台账管理方法。Based on the same inventive concept, embodiments of the present disclosure provide a computer-readable non-volatile storage medium. The computer-readable non-volatile storage medium stores computer-executable instructions. Implement any of the above-mentioned device account management methods provided by the embodiments of the present disclosure.
基于同一发明构思,本公开实施例提供了一种终端设备,如图6所示,包括:存储器01和处理器02;Based on the same inventive concept, an embodiment of the present disclosure provides a terminal device, as shown in FIG. 6, including: a memory 01 and a processor 02;
存储器01,用于存储程序指令; Memory 01, used to store program instructions;
处理器02,用于调用存储器01中存储的所述程序指令,按照获得的程序执行本公开实施例提供的上述任一种设备台账管理方法。The processor 02 is configured to call the program instructions stored in the memory 01, and execute any of the foregoing device account management methods provided in the embodiments of the present disclosure according to the obtained program.
在具体实施时,处理器也可以为控制器。所述处理器被配置为支持终端设备执行本公开实施例提供的上述任一种设备台账管理方法所涉及的功能。 存储器用于与处理器耦合,其保存终端设备必要的程序指令和数据。In specific implementation, the processor may also be a controller. The processor is configured to support the terminal device to execute the functions involved in any of the foregoing device account management methods provided in the embodiments of the present disclosure. The memory is used for coupling with the processor, and it stores the necessary program instructions and data of the terminal device.
本申请实施例中,终端设备所涉及的与本公开实施例提供的技术方案相关的概念,解释和详细说明及其他步骤请参见前述方法或其他实施例中关于这些内容的描述,此处不做赘述。In the embodiments of the present application, for the concepts related to the technical solutions provided by the embodiments of the present disclosure, explanations, detailed descriptions and other steps involved in the terminal equipment, please refer to the descriptions of these contents in the foregoing method or other embodiments, which are not described here Repeat.
需要说明的是,本公开实施例上述涉及的处理器可以是中央处理器(central processing unit,CPU),通用处理器,数字信号处理器(digital signal processor,DSP),专用集成电路(application-specific integrated circuit,ASIC),现场可编程门阵列(field programmable gate array,FPGA)或者其他可编程逻辑器件、晶体管逻辑器件、硬件部件或者其任意组合。其可以实现或执行结合本公开内容所描述的各种示例性的逻辑方框,模块和电路。处理器也可以是实现计算功能的组合,例如包含一个或多个微处理器组合,DSP和微处理器的组合等等。其中,所述存储器可以集成在所述处理器中,也可以与所述处理器分开设置。It should be noted that the above-mentioned processors involved in the embodiments of the present disclosure may be central processing units (CPU), general-purpose processors, digital signal processors (digital signal processors, DSP), and application-specific integrated circuits (application-specific integrated circuits). integrated circuit, ASIC), field programmable gate array (FPGA) or other programmable logic devices, transistor logic devices, hardware components, or any combination thereof. It can implement or execute various exemplary logical blocks, modules, and circuits described in conjunction with the present disclosure. The processor may also be a combination of computing functions, for example, a combination of one or more microprocessors, a combination of a DSP and a microprocessor, and so on. Wherein, the memory may be integrated in the processor, or may be provided separately from the processor.
本公开实施例还提供一种计算机程序产品,用于存储计算机程序,该计算机程序用于执行上述方法实施例中涉及的方法。The embodiments of the present disclosure also provide a computer program product, which is used to store a computer program, and the computer program is used to execute the method involved in the foregoing method embodiment.
本公开实施例提供了一种芯片,该芯片包括处理器,用于支持终端设备实现前述终端设备所涉及的功能。在一种可能的设计中,所述芯片还包括存储器,所述存储器,用于保存终端设备必要的程序指令和数据。The embodiments of the present disclosure provide a chip, which includes a processor, and is used to support a terminal device to implement the functions related to the aforementioned terminal device. In a possible design, the chip further includes a memory, and the memory is used to store necessary program instructions and data of the terminal device.
本领域内的技术人员应明白,本公开实施例可提供为方法、系统、或计算机程序产品。因此,本公开实施例可采用完全硬件实施例、完全软件实施例、或结合软件和硬件方面的实施例的形式。而且,本公开实施例可采用在一个或多个其中包含有计算机可用程序代码的计算机可用存储介质(包括但不限于磁盘存储器、CD-ROM、光学存储器等)上实施的计算机程序产品的形式。Those skilled in the art should understand that the embodiments of the present disclosure may be provided as methods, systems, or computer program products. Therefore, the embodiments of the present disclosure may adopt the form of a complete hardware embodiment, a complete software embodiment, or an embodiment combining software and hardware. Moreover, the embodiments of the present disclosure may adopt the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) containing computer-usable program codes.
本公开实施例是参照根据本公开实施例的方法、设备(系统)、和计算机程序产品的流程图和/或方框图来描述的。应理解可由计算机程序指令实现流程图和/或方框图中的每一流程和/或方框、以及流程图和/或方框图中 的流程和/或方框的结合。可提供这些计算机程序指令到通用计算机、专用计算机、嵌入式处理机或其他可编程数据处理设备的处理器以产生一个机器,使得通过计算机或其他可编程数据处理设备的处理器执行的指令产生用于实现在流程图一个流程或多个流程和/或方框图一个方框或多个方框中指定的功能的装置。The embodiments of the present disclosure are described with reference to flowcharts and/or block diagrams of methods, devices (systems), and computer program products according to the embodiments of the present disclosure. It should be understood that each process and/or block in the flowchart and/or block diagram, and the combination of processes and/or blocks in the flowchart and/or block diagram can be realized by computer program instructions. These computer program instructions can be provided to the processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing equipment to generate a machine, so that the instructions executed by the processor of the computer or other programmable data processing equipment can be generated It is a device that realizes the functions specified in one process or multiple processes in the flowchart and/or one block or multiple blocks in the block diagram.
这些计算机程序指令也可存储在能引导计算机或其他可编程数据处理设备以特定方式工作的计算机可读存储器中,使得存储在该计算机可读存储器中的指令产生包括指令装置的制造品,该指令装置实现在流程图一个流程或多个流程和/或方框图一个方框或多个方框中指定的功能。These computer program instructions can also be stored in a computer-readable memory that can guide a computer or other programmable data processing equipment to work in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture including the instruction device. The device implements the functions specified in one process or multiple processes in the flowchart and/or one block or multiple blocks in the block diagram.
这些计算机程序指令也可装载到计算机或其他可编程数据处理设备上,使得在计算机或其他可编程设备上执行一系列操作步骤以产生计算机实现的处理,从而在计算机或其他可编程设备上执行的指令提供用于实现在流程图一个流程或多个流程和/或方框图一个方框或多个方框中指定的功能的步骤。These computer program instructions can also be loaded on a computer or other programmable data processing equipment, so that a series of operation steps are executed on the computer or other programmable equipment to produce computer-implemented processing, so as to execute on the computer or other programmable equipment. The instructions provide steps for implementing functions specified in a flow or multiple flows in the flowchart and/or a block or multiple blocks in the block diagram.

Claims (18)

  1. 一种设备台账管理方法,其中,包括:An equipment account management method, which includes:
    业务流程管理系统在接收到第一触发指令时,向企业资源计划系统发送业务审批信息;所述第一触发指令用于指示所述业务审批信息中的设备资产计划可行;When the business process management system receives the first trigger instruction, it sends business approval information to the enterprise resource planning system; the first trigger instruction is used to indicate that the equipment asset plan in the business approval information is feasible;
    所述企业资源计划系统根据接收的所述业务审批信息,创建并向固定资产管理系统发送设备资产信息,其中,所述设备资产信息包括设备入库信息以及使用信息,所述使用信息包括使用部门信息以及用户信息;The enterprise resource planning system creates and sends equipment asset information to the fixed asset management system according to the received business approval information, where the equipment asset information includes equipment storage information and usage information, and the usage information includes the department of use Information and user information;
    所述固定资产管理系统判断所述设备资产信息与预设信息是否一致;The fixed asset management system judges whether the equipment asset information is consistent with preset information;
    所述固定资产管理系统在确定所述设备资产信息与所述预设信息一致时,则更新所存储的设备资产列表。When the fixed asset management system determines that the equipment asset information is consistent with the preset information, it updates the stored equipment asset list.
  2. 如权利要求1所述的设备台账管理方法,其中,还包括:The device account management method according to claim 1, further comprising:
    所述业务流程管理系统接收输入的所述业务审批信息;The business process management system receives the input business approval information;
    所述业务流程管理系统接收至少两个管理角色针对所述业务审批信息分别输入的所述第一触发指令;其中,所述管理角色至少包括所述企业资源计划系统的管理用户和所述固定资产管理系统的管理用户。The business process management system receives the first trigger instructions input by at least two management roles for the business approval information respectively; wherein, the management role includes at least a management user of the enterprise resource planning system and the fixed asset Administrative users of the management system.
  3. 如权利要求2所述的设备台账管理方法,其中,还包括:The device account management method according to claim 2, further comprising:
    若所述固定资产管理系统确定所述设备资产信息与所述预设信息不一致,则向所述企业资源计划系统发送第一响应消息,其中,所述第一响应消息用于指示所述企业资源计划系统重新确认所述设备资产信息是否正确;If the fixed asset management system determines that the equipment asset information is inconsistent with the preset information, it sends a first response message to the enterprise resource planning system, where the first response message is used to indicate the enterprise resource The planning system reconfirms whether the equipment asset information is correct;
    所述企业资源计划系统向所述固定资产管理系统重新发送所述设备资产信息。The enterprise resource planning system resends the equipment asset information to the fixed asset management system.
  4. 如权利要求1所述的设备台账管理方法,其中,The device account management method according to claim 1, wherein:
    所述固定资产管理系统在确定所述设备资产信息与所述预设信息一致时,则更新所存储的设备资产列表,包括:When the fixed asset management system determines that the equipment asset information is consistent with the preset information, updating the stored equipment asset list includes:
    所述固定资产管理系统判断所述设备资产信息所指示的设备是否在所述 固定资产管理系统中;The fixed asset management system judges whether the equipment indicated by the equipment asset information is in the fixed asset management system;
    若不存在,则生成新的设备资产列表,且将所述设备资产信息所指示的设备在所述新的设备资产列表中的状态设置为创建状态;If it does not exist, generate a new equipment asset list, and set the status of the equipment indicated by the equipment asset information in the new equipment asset list to the creation status;
    若所述设备资产信息所指示的设备在所述固定资产管理系统中存在,则判断所述设备资产信息中的用户信息所指示的用户是否是非库存用户;If the equipment indicated by the equipment asset information exists in the fixed asset management system, determining whether the user indicated by the user information in the equipment asset information is a non-stock user;
    若所述用户信息所指示的用户是非库存用户,则将所述设备资产信息所指示的设备在所述新的设备资产列表中的状态设置为发放状态;If the user indicated by the user information is a non-inventory user, setting the status of the device indicated by the device asset information in the new device asset list to the issuing status;
    若所述用户信息所指示的用户是库存用户,则判断所述设备资产信息所指示的设备的数量是否小于所述固定资产管理系统中该设备的数量;If the user indicated by the user information is an inventory user, determining whether the quantity of equipment indicated by the equipment asset information is less than the quantity of the equipment in the fixed asset management system;
    若所述设备资产信息所指示的设备的数量大于或等于所述固定资产管理系统中该设备的数量则生成新的设备资产列表,则将所述设备资产信息所指示的设备在所述新的设备资产列表中的状态设置为回收状态;If the quantity of equipment indicated by the equipment asset information is greater than or equal to the quantity of the equipment in the fixed asset management system, a new equipment asset list is generated, and the equipment indicated by the equipment asset information is listed in the new equipment asset list. The status in the equipment asset list is set to recycling status;
    若所述设备资产信息所指示的设备的数量小于所述固定资产管理系统中该设备的数量,则将所述设备资产信息所指示的设备在所述新的设备资产列表中的状态设置为报废状态。If the quantity of equipment indicated by the equipment asset information is less than the quantity of the equipment in the fixed asset management system, the status of the equipment indicated by the equipment asset information in the new equipment asset list is set to scrap status.
  5. 如权利要求1-4任一所述的设备台账管理方法,其中,还包括:The device account management method according to any one of claims 1 to 4, further comprising:
    所述固定资产管理系统接收针对第一设备进行的预操作指令,所述预操作指令所指示的预操作包括预转移操作、预入库操作或预发放操作;The fixed asset management system receives a pre-operation instruction for the first device, and the pre-operation indicated by the pre-operation instruction includes a pre-transfer operation, a pre-warehouse operation, or a pre-issuance operation;
    所述固定资产管理系统根据所述预操作指令将所述第一设备添加到预操作资产列表中,并更新所述第一设备的设备资产信息。The fixed asset management system adds the first device to the pre-operation asset list according to the pre-operation instruction, and updates the equipment asset information of the first device.
  6. 如权利要求5所述的设备台账管理方法,其中,还包括:The device account management method according to claim 5, further comprising:
    所述固定资产管理系统将所述预操作资产列表发送给所述业务流程管理系统;The fixed asset management system sends the pre-operational asset list to the business process management system;
    所述业务流程管理系统根据所述预操作资产列表中的设备资产信息创建业务审批信息。The business process management system creates business approval information according to the equipment asset information in the pre-operational asset list.
  7. 如权利要求5所述的设备台账管理方法,其中,还包括:The device account management method according to claim 5, further comprising:
    所述固定资产管理系统向所述业务流程管理系统发送资产维保信息,其 中,所述资产维保信息被配置为指示资产报废原因;The fixed asset management system sends asset maintenance information to the business process management system, where the asset maintenance information is configured to indicate the reason for asset retirement;
    所述业务流程管理系统根据所述资产维保信息对上报的资产报废业务进行审核。The business process management system reviews the reported asset retirement business according to the asset maintenance information.
  8. 如权利要求5所述的设备台账管理方法,其中,还包括:The device account management method according to claim 5, further comprising:
    所述固定资产管理系统向所述业务流程管理系统发送资产盘点数据;The fixed asset management system sends asset inventory data to the business process management system;
    所述业务流程管理系统根据所述资产盘点数据生成资产盘点表单;The business process management system generates an asset inventory form according to the asset inventory data;
    所述业务流程管理系统根据所述资产盘点表单对所述业务审批信息进行审批。The business process management system approves the business approval information according to the asset inventory form.
  9. 一种设备台账管理系统,其中,包括:业务流程管理系统、企业资源计划系统和固定资产管理系统;其中,An equipment ledger management system, which includes: business process management system, enterprise resource planning system, and fixed asset management system; among them,
    所述业务流程管理系统,被配置为在接收到第一触发指令时,向企业资源计划系统发送业务审批信息;所述第一触发指令用于指示所述业务审批信息中的设备资产计划可行;The business process management system is configured to send business approval information to an enterprise resource planning system when receiving a first trigger instruction; the first trigger instruction is used to indicate that the equipment asset plan in the business approval information is feasible;
    所述企业资源计划系统,被配置为根据接收的所述业务审批信息,创建并向固定资产管理系统发送设备资产信息,其中,所述设备资产信息包括设备入库信息以及使用信息,所述使用信息包括使用部门信息以及用户信息;The enterprise resource planning system is configured to create and send equipment asset information to the fixed asset management system according to the received business approval information, where the equipment asset information includes equipment inventory information and usage information, and the use Information includes user information and user information;
    所述固定资产管理系统,被配置为判断所述设备资产信息与预设信息是否一致,且在确定所述设备资产信息与所述预设信息一致时,更新所存储的设备资产列表。The fixed asset management system is configured to determine whether the equipment asset information is consistent with preset information, and when it is determined that the equipment asset information is consistent with the preset information, update the stored equipment asset list.
  10. 如权利要求9所述的设备台账管理系统,其中,所述业务流程管理系统还被配置为:9. The equipment ledger management system according to claim 9, wherein the business process management system is further configured to:
    接收输入的所述业务审批信息;Receiving the input business approval information;
    接收至少两个管理角色针对所述业务审批信息分别输入的所述第一触发指令;其中,所述管理角色至少包括所述企业资源计划系统的管理用户和所述固定资产管理系统的管理用户。Receive the first trigger instruction input by at least two management roles for the business approval information respectively; wherein, the management role includes at least a management user of the enterprise resource planning system and a management user of the fixed asset management system.
  11. 如权利要求10所述的设备台账管理系统,其中,The equipment ledger management system according to claim 10, wherein:
    所述固定资产管理系统,还被配置为若确定所述设备资产信息与所述预 设信息不一致,则向所述企业资源计划系统发送第一响应消息,其中,所述第一响应消息用于指示所述企业资源计划系统重新确认所述设备资产信息是否正确;The fixed asset management system is further configured to send a first response message to the enterprise resource planning system if it is determined that the equipment asset information is inconsistent with the preset information, wherein the first response message is used for Instruct the enterprise resource planning system to reconfirm whether the equipment asset information is correct;
    所述企业资源计划系统,还被配置为向所述固定资产管理系统重新发送所述设备资产信息。The enterprise resource planning system is further configured to resend the equipment asset information to the fixed asset management system.
  12. 如权利要求9所述的设备台账管理系统,其中,所述固定资产管理具体被配置为:The equipment ledger management system according to claim 9, wherein the fixed asset management is specifically configured as:
    判断所述设备资产信息所指示的设备是否在所述固定资产管理系统中;Judging whether the equipment indicated by the equipment asset information is in the fixed asset management system;
    若不存在,则生成新的设备资产列表,且将所述设备资产信息所指示的设备在所述新的设备资产列表中的状态设置为创建状态;If it does not exist, generate a new equipment asset list, and set the status of the equipment indicated by the equipment asset information in the new equipment asset list to the creation status;
    若所述设备资产信息所指示的设备在所述固定资产管理系统中存在,则判断所述设备资产信息中的用户信息所指示的用户是否是非库存用户;If the equipment indicated by the equipment asset information exists in the fixed asset management system, determining whether the user indicated by the user information in the equipment asset information is a non-stock user;
    若所述用户信息所指示的用户是非库存用户,则将所述设备资产信息所指示的设备在所述新的设备资产列表中的状态设置为发放状态;If the user indicated by the user information is a non-inventory user, setting the status of the device indicated by the device asset information in the new device asset list to the issuing status;
    若所述用户信息所指示的用户是库存用户,则判断所述设备资产信息所指示的设备的数量是否小于所述固定资产管理系统中该设备的数量;If the user indicated by the user information is an inventory user, determining whether the quantity of equipment indicated by the equipment asset information is less than the quantity of the equipment in the fixed asset management system;
    若所述设备资产信息所指示的设备的数量大于或等于所述固定资产管理系统中该设备的数量则生成新的设备资产列表,则将所述设备资产信息所指示的设备在所述新的设备资产列表中的状态设置为回收状态;If the quantity of equipment indicated by the equipment asset information is greater than or equal to the quantity of the equipment in the fixed asset management system, a new equipment asset list is generated, and the equipment indicated by the equipment asset information is listed in the new equipment asset list. The status in the equipment asset list is set to recycling status;
    若所述设备资产信息所指示的设备的数量小于所述固定资产管理系统中该设备的数量,则将所述设备资产信息所指示的设备在所述新的设备资产列表中的状态设置为报废状态。If the quantity of equipment indicated by the equipment asset information is less than the quantity of the equipment in the fixed asset management system, the status of the equipment indicated by the equipment asset information in the new equipment asset list is set to scrap status.
  13. 如权利要求9-12任一所述的设备台账管理系统,其中,所述固定资产管理系统还被配置为:The equipment ledger management system according to any one of claims 9-12, wherein the fixed asset management system is further configured to:
    接收针对第一设备进行的预操作指令,所述预操作指令所指示的预操作包括预转移操作、预入库操作或预发放操作;Receiving a pre-operation instruction for the first device, where the pre-operation indicated by the pre-operation instruction includes a pre-transfer operation, a pre-stocking operation, or a pre-issuing operation;
    根据所述预操作指令将所述第一设备添加到预操作资产列表中,并更新 所述第一设备的设备资产信息。Add the first device to the pre-operation asset list according to the pre-operation instruction, and update the device asset information of the first device.
  14. 如权利要求13所述的设备台账管理系统,其中,The equipment account management system according to claim 13, wherein:
    所述固定资产管理系统,还被配置为将所述预操作资产列表发送给所述业务流程管理系统;The fixed asset management system is further configured to send the pre-operational asset list to the business process management system;
    所述业务流程管理系统,还被配置为根据所述预操作资产列表中的设备资产信息创建业务审批信息。The business process management system is further configured to create business approval information based on the equipment asset information in the pre-operational asset list.
  15. 如权利要求13所述的设备台账管理系统,其中,The equipment account management system according to claim 13, wherein:
    所述固定资产管理系统,还被配置为向所述业务流程管理系统发送资产维保信息,其中,所述资产维保信息被配置为指示资产报废原因;The fixed asset management system is further configured to send asset maintenance information to the business process management system, wherein the asset maintenance information is configured to indicate a reason for asset retirement;
    所述业务流程管理系统,还被配置为根据所述资产维保信息对上报的资产报废业务进行审核。The business process management system is further configured to review the reported asset retirement business according to the asset maintenance information.
  16. 如权利要求13所述的设备台账管理系统,其中,所述固定资产管理系统,还被配置为向所述业务流程管理系统发送资产盘点数据;The equipment ledger management system according to claim 13, wherein the fixed asset management system is further configured to send asset inventory data to the business process management system;
    所述业务流程管理系统,还被配置为根据所述资产盘点数据生成资产盘点表单;The business process management system is further configured to generate an asset inventory form according to the asset inventory data;
    所述业务流程管理系统,还被配置为所述资产盘点表单对所述业务审批信息进行审批。The business process management system is also configured to approve the business approval information on the asset inventory form.
  17. 一种计算机可读的非易失性存储介质,其中,所述计算机可读的非易失性存储介质存储有计算机可执行指令,所述计算机指令被处理器执行时实现权利要求1-8任一项所述的设备台账管理方法。A computer-readable non-volatile storage medium, wherein the computer-readable non-volatile storage medium stores computer-executable instructions which, when executed by a processor, implement any of claims 1-8 A method for the management of equipment accounts.
  18. 一种终端设备,其中,包括:存储器和处理器;A terminal device, which includes: a memory and a processor;
    所述存储器,用于存储程序指令;The memory is used to store program instructions;
    所述处理器,用于调用所述存储器中存储的所述程序指令,按照获得的程序执行权利要求1-8任一项所述的设备台账管理方法。The processor is configured to call the program instructions stored in the memory, and execute the device account management method according to any one of claims 1-8 according to the obtained program.
PCT/CN2020/091377 2019-06-03 2020-05-20 Equipment ledger management method and system WO2020244387A1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201910476717.6 2019-06-03
CN201910476717.6A CN110175822B (en) 2019-06-03 2019-06-03 Equipment standing book management method and system

Publications (1)

Publication Number Publication Date
WO2020244387A1 true WO2020244387A1 (en) 2020-12-10

Family

ID=67697814

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2020/091377 WO2020244387A1 (en) 2019-06-03 2020-05-20 Equipment ledger management method and system

Country Status (2)

Country Link
CN (1) CN110175822B (en)
WO (1) WO2020244387A1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112612842A (en) * 2020-12-30 2021-04-06 南方电网深圳数字电网研究院有限公司 Standing book information input method and device, electronic equipment and storage medium
CN115018424A (en) * 2022-06-28 2022-09-06 山东中创软件商用中间件股份有限公司 Fixed asset management system, method, device and medium based on warehouse management
CN117216592A (en) * 2023-11-07 2023-12-12 青岛港国际股份有限公司 Idle analysis system and analysis method for assets

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110175822B (en) * 2019-06-03 2022-05-06 京东方科技集团股份有限公司 Equipment standing book management method and system
CN111144774B (en) * 2019-12-30 2022-04-15 珠海格力电器股份有限公司 Fixed asset management method and device, storage medium and computer equipment
CN111833024A (en) * 2020-07-20 2020-10-27 北京百度网讯科技有限公司 Method, apparatus, device and storage medium for outputting information
CN114004602A (en) * 2021-11-12 2022-02-01 国网天津市电力公司 Quantitative management method and device for practical training equipment
CN117294673B (en) * 2023-11-16 2024-02-23 深圳万物安全科技有限公司 Data resource processing method, data resource processing device and storage medium

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20040128208A1 (en) * 2002-12-25 2004-07-01 Tsai Ming Fang Procurement management system and method
CN104200245A (en) * 2014-08-10 2014-12-10 国家电网公司 Quick checking method for life cycle asset of power asset
CN105335830A (en) * 2015-12-03 2016-02-17 国网天津市电力公司 Local deepening application research method used after ERP centralized deployment
CN106886867A (en) * 2015-12-16 2017-06-23 天脉聚源(北京)科技有限公司 A kind of assets automatic identification matching process and system
CN110175822A (en) * 2019-06-03 2019-08-27 京东方科技集团股份有限公司 A kind of equipment account management method and system

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002163106A (en) * 2000-11-24 2002-06-07 Mitsui Mining & Smelting Co Ltd Basic business integrated application system, basic business support method, and computer readable storage medium storing program executing the method on computer
JP2010257384A (en) * 2009-04-28 2010-11-11 Yasushi Takeishi Asset management system and its method
CN102024188A (en) * 2009-09-17 2011-04-20 国电浙江北仑第三发电有限公司 Equipment accounting management module of EAM system of power plant
CN102938129A (en) * 2012-10-31 2013-02-20 国家电网公司 Routing management method of electricity information machine accounts
CN104850968A (en) * 2015-06-15 2015-08-19 中冶赛迪电气技术有限公司 Equipment asset operation and maintenance management system for iron and steel enterprises
CN105160458A (en) * 2015-08-12 2015-12-16 中国南方电网有限责任公司 Information processing system and method supporting seven-dimensional ledger equipment management
CN107798642A (en) * 2016-08-30 2018-03-13 威海兴达信息科技有限公司 A kind of Managerial System of Medical Equipment
CN107590542B (en) * 2017-08-11 2020-09-04 珠海金山网络游戏科技有限公司 Mobile equipment allocation and management method and device based on screen locking application

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20040128208A1 (en) * 2002-12-25 2004-07-01 Tsai Ming Fang Procurement management system and method
CN104200245A (en) * 2014-08-10 2014-12-10 国家电网公司 Quick checking method for life cycle asset of power asset
CN105335830A (en) * 2015-12-03 2016-02-17 国网天津市电力公司 Local deepening application research method used after ERP centralized deployment
CN106886867A (en) * 2015-12-16 2017-06-23 天脉聚源(北京)科技有限公司 A kind of assets automatic identification matching process and system
CN110175822A (en) * 2019-06-03 2019-08-27 京东方科技集团股份有限公司 A kind of equipment account management method and system

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112612842A (en) * 2020-12-30 2021-04-06 南方电网深圳数字电网研究院有限公司 Standing book information input method and device, electronic equipment and storage medium
CN115018424A (en) * 2022-06-28 2022-09-06 山东中创软件商用中间件股份有限公司 Fixed asset management system, method, device and medium based on warehouse management
CN117216592A (en) * 2023-11-07 2023-12-12 青岛港国际股份有限公司 Idle analysis system and analysis method for assets

Also Published As

Publication number Publication date
CN110175822B (en) 2022-05-06
CN110175822A (en) 2019-08-27

Similar Documents

Publication Publication Date Title
WO2020244387A1 (en) Equipment ledger management method and system
US9904898B2 (en) Distributed order orchestration system with rules engine
US10061464B2 (en) Distributed order orchestration system with rollback checkpoints for adjusting long running order management fulfillment processes
US9269075B2 (en) Distributed order orchestration system for adjusting long running order management fulfillment processes with delta attributes
US8793262B2 (en) Correlating and mapping original orders with new orders for adjusting long running order management fulfillment processes
US20110218921A1 (en) Notify/inquire fulfillment systems before processing change requests for adjusting long running order management fulfillment processes in a distributed order orchestration system
JP6435044B2 (en) Performance management of construction projects
US6819967B2 (en) Relational database for producing bill-of-materials from planning information
US10789562B2 (en) Compensation patterns for adjusting long running order management fulfillment processes in an distributed order orchestration system
US20110218925A1 (en) Change management framework in distributed order orchestration system
US20140095246A1 (en) Supply chain financial orchestration system that orchestrates supply chain events
KR20030007521A (en) Method and device for handling cost apportionment
CN112199735A (en) Vertical e-commerce transaction platform based on block chain
US20030101085A1 (en) Method and system for vendor communication
US20030055697A1 (en) Systems and methods to facilitate migration of a process via a process migration template
US10395205B2 (en) Cost of change for adjusting long running order management fulfillment processes for a distributed order orchestration system
CN110992158A (en) Financial voucher management system
US20150310390A1 (en) Aggregation and workflow engines for managing project information
US20240176602A1 (en) Dependency management in software development
US8234649B2 (en) Composite system to integrate process systems using secondarily created process objects for local database operations and inter process system communications
US20110218926A1 (en) Saving order process state for adjusting long running order management fulfillment processes in a distributed order orchestration system
US20150046355A1 (en) Integrated temporary labor provisioning and monitoring
US8863132B2 (en) Using abstraction layers to facilitate communication between systems
CN110866813A (en) Intelligent accounting system for managing accountants
CN110599130A (en) Third party authentication management method based on BPM, storage medium and electronic equipment

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 20817743

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 20817743

Country of ref document: EP

Kind code of ref document: A1

122 Ep: pct application non-entry in european phase

Ref document number: 20817743

Country of ref document: EP

Kind code of ref document: A1