WO2020091299A1 - Système d'alimentation en air pour navire de région polaire - Google Patents

Système d'alimentation en air pour navire de région polaire Download PDF

Info

Publication number
WO2020091299A1
WO2020091299A1 PCT/KR2019/014004 KR2019014004W WO2020091299A1 WO 2020091299 A1 WO2020091299 A1 WO 2020091299A1 KR 2019014004 W KR2019014004 W KR 2019014004W WO 2020091299 A1 WO2020091299 A1 WO 2020091299A1
Authority
WO
WIPO (PCT)
Prior art keywords
air
engine
room
discharged
exhaust gas
Prior art date
Application number
PCT/KR2019/014004
Other languages
English (en)
Korean (ko)
Inventor
최철환
이영국
유형진
황인성
정용진
Original Assignee
대우조선해양 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 대우조선해양 주식회사 filed Critical 대우조선해양 주식회사
Priority to CN201980071547.1A priority Critical patent/CN112930300B/zh
Publication of WO2020091299A1 publication Critical patent/WO2020091299A1/fr

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63JAUXILIARIES ON VESSELS
    • B63J2/00Arrangements of ventilation, heating, cooling, or air-conditioning
    • B63J2/02Ventilation; Air-conditioning
    • B63J2/06Ventilation; Air-conditioning of engine rooms
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63HMARINE PROPULSION OR STEERING
    • B63H21/00Use of propulsion power plant or units on vessels
    • B63H21/12Use of propulsion power plant or units on vessels the vessels being motor-driven
    • B63H21/14Use of propulsion power plant or units on vessels the vessels being motor-driven relating to internal-combustion engines
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63JAUXILIARIES ON VESSELS
    • B63J2/00Arrangements of ventilation, heating, cooling, or air-conditioning
    • B63J2/12Heating; Cooling
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01PCOOLING OF MACHINES OR ENGINES IN GENERAL; COOLING OF INTERNAL-COMBUSTION ENGINES
    • F01P5/00Pumping cooling-air or liquid coolants
    • F01P5/02Pumping cooling-air; Arrangements of cooling-air pumps, e.g. fans or blowers
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F02COMBUSTION ENGINES; HOT-GAS OR COMBUSTION-PRODUCT ENGINE PLANTS
    • F02BINTERNAL-COMBUSTION PISTON ENGINES; COMBUSTION ENGINES IN GENERAL
    • F02B39/00Component parts, details, or accessories relating to, driven charging or scavenging pumps, not provided for in groups F02B33/00 - F02B37/00
    • F02B39/02Drives of pumps; Varying pump drive gear ratio
    • F02B39/08Non-mechanical drives, e.g. fluid drives having variable gear ratio
    • F02B39/10Non-mechanical drives, e.g. fluid drives having variable gear ratio electric
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F02COMBUSTION ENGINES; HOT-GAS OR COMBUSTION-PRODUCT ENGINE PLANTS
    • F02MSUPPLYING COMBUSTION ENGINES IN GENERAL WITH COMBUSTIBLE MIXTURES OR CONSTITUENTS THEREOF
    • F02M31/00Apparatus for thermally treating combustion-air, fuel, or fuel-air mixture
    • F02M31/02Apparatus for thermally treating combustion-air, fuel, or fuel-air mixture for heating
    • F02M31/04Apparatus for thermally treating combustion-air, fuel, or fuel-air mixture for heating combustion-air or fuel-air mixture
    • F02M31/06Apparatus for thermally treating combustion-air, fuel, or fuel-air mixture for heating combustion-air or fuel-air mixture by hot gases, e.g. by mixing cold and hot air
    • F02M31/08Apparatus for thermally treating combustion-air, fuel, or fuel-air mixture for heating combustion-air or fuel-air mixture by hot gases, e.g. by mixing cold and hot air the gases being exhaust gases
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F12/00Use of energy recovery systems in air conditioning, ventilation or screening
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F12/00Use of energy recovery systems in air conditioning, ventilation or screening
    • F24F12/001Use of energy recovery systems in air conditioning, ventilation or screening with heat-exchange between supplied and exhausted air
    • F24F12/006Use of energy recovery systems in air conditioning, ventilation or screening with heat-exchange between supplied and exhausted air using an air-to-air heat exchanger
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F7/00Ventilation
    • F24F7/007Ventilation with forced flow
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63JAUXILIARIES ON VESSELS
    • B63J2/00Arrangements of ventilation, heating, cooling, or air-conditioning
    • B63J2/12Heating; Cooling
    • B63J2002/125Heating; Cooling making use of waste energy
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T70/00Maritime or waterways transport

Definitions

  • the present invention is applied to a polar vessel operating in a polar region, and in an air supply system for heating and supplying low-temperature outside air in a polar environment to a ship's air demand, a simple configuration can be operated at low cost and high energy efficiency. It relates to an air supply system of a dragon ship.
  • the air used in the air conditioning system of a general polar ship was heated by an electric heater or a thermal oil system to a temperature suitable for an engine room.
  • the air supply system of a general polar ship obtains low-temperature air to be supplied to the engine room 1 from the outside air, and uses an electric or thermal oil as a heat source for the engine room air heater unit 4 ) Is heated to the required temperature in the engine room 1, and then supplied to the engine room 1 using the supply fan unit 5.
  • the air heated by the engine room air heater unit 4 uses a supply fan unit 5 to provide machine rooms other than the engine room 1 (machinery room 2) and a pod room (POD room). , 3) In order to prevent each equipment from freezing in a polar environment such as, heated air may be supplied to a required air source.
  • the air supply system of a typical polar vessel the combustion air required for the combustion of the fuel to be supplied to the engine 6, for energy saving (energy saving), without inhaling and heating the outside air It is configured to supply directly.
  • a filter unit (9) for removing foreign substances contained in the intake air, and a silencer (10) for removing noise generated by air flow ) And a start-up damper 11 for controlling the flow direction of air are installed, and the configuration is rather complicated.
  • the engine air intake duct 8 is connected from the air intake chamber 7 to the engine 6 so that the intake air is supplied to the engine 6, which is made of SUS material to withstand the cryogenic air temperature of the polar environment. It is installed with ducts.
  • the SUS duct 8 is connected to the engine 6 from the downstream of the filter unit 9 described above.
  • the filter unit 9 is installed upstream of the SUS duct 8, when impurities are introduced into the duct 8 during the installation process of the SUS duct 8, due to the nature of the SUS duct 8, on-site correction during actual operation This is impossible, and if damage occurs, new orders are required.
  • the present invention is to solve the above problems, in the air supply system of a polar ship, while applying the elements necessary for the system equipment configuration to a minimum, the air supply system of a polar ship that can provide the air of the appropriate temperature It aims to provide.
  • the engine room in which the engine is installed; An air intake chamber that sucks combustion air to be supplied to the engine and external air to be supplied to the engine room; An air heater that heats the outside air by exchanging exhaust gas discharged from the engine with outside air sucked into the air intake chamber; And a fan room in which one or more fans for supplying air heated by the air heater to an air demand source including the engine and the engine room are respectively installed.
  • the fan room includes the heated air for combustion of the engine.
  • An engine supply fan supplying air; An engine room supply fan supplying the heated air to air conditioning of the engine room; And a supply fan for supplying the heated air to other demand sources on board the ship.
  • the machine room in which the high temperature air supplied from the fan room to the engine room and the air discharged from the engine room to the outside may be further included.
  • the air mixing chamber is installed adjacent to the fan room, and the air heated in the air heater and air discharged from the engine room are mixed to move to the fan room.
  • a fan room circulation damper that allows air discharged from the engine room to flow into the fan room;
  • a mixing chamber circulation damper allowing air discharged from the engine room to flow into an air mixing chamber mixed with air heated in the air heater;
  • a closed damper that allows air discharged from the engine room to be discharged to the outside.
  • a first exhaust gas control damper to allow exhaust gas discharged from the engine to be supplied to the air heater;
  • a second exhaust gas control damper configured to allow exhaust gas discharged from the engine not to be supplied to the air heater but to pass through the machine room and be discharged to the outside.
  • the exhaust gas control damper to allow the low-temperature exhaust gas discharged after heat exchange from the air heater passes through the air mixing chamber and is discharged to the outside.
  • the engine room damper to allow air to be discharged from the engine room to the machine room may further include a.
  • the air supply system of the polar vessel according to the present invention can supply the hot air at a temperature required by the air demander with minimal equipment configuration, it takes up less installation space than the conventional art and installs the system. And maintenance costs.
  • the filter unit and silencer can be deleted, and it is not necessary to install a SUS duct that is difficult to maintain.
  • cryogenic outside air can be prevented from being directly supplied into the hull, damage to various equipment and devices such as an engine can be prevented and start-up can be smoothly performed.
  • the capacity can be reduced and energy efficiency of the ship can be increased compared to a conventional heat oil heater system.
  • FIG. 1 is a configuration diagram briefly showing an air supply system of a general polar vessel.
  • Figure 2 is a schematic view showing the air supply system of a polar vessel according to an embodiment of the present invention.
  • the air supply system of the polar vessel includes an air intake chamber 500 that intakes outside air to supply air required to the vessel during operation of the polar vessel; An air heater 610 for heating low-temperature air sucked into the air intake chamber 500; And a fan room 700 in which one or more fans for supplying hot air heated by the air heater 610 to an air demand destination are installed. And exhaust gas that supplies high-temperature exhaust gas discharged from the engine 110 to the air heater 610 and discharges low-temperature exhaust gas whose temperature is lowered by heat exchange while heating the low-temperature air in the air heater 610 to the outside. Gas line (EL).
  • EL Gas line
  • the air intake chamber 500 includes a water catcher 410 for separating and removing moisture mixed with the inhaled air; And a process of separating and removing moisture from the air and / or a duct heater 420 that prevents moisture removed and separated from the air from freezing in the moisture eliminator 410 or maintains the temperature of the air in the air intake chamber 500. Can be installed.
  • the air heater 610 heats the high-temperature exhaust gas discharged from the engine 110 and the low-temperature air from which foreign substances are removed while passing through the moisture eliminator 410 to heat the low-temperature air, and the high-temperature exhaust gas Let cool.
  • the low temperature air temperature sucked into the air intake chamber 500 may be about -52 ° C
  • the high temperature air temperature heated by the high temperature exhaust gas in the air heater 610 may be about 5 ° C. Can be.
  • the air intake chamber 500 and the air heater 610 of this embodiment as shown in Figure 2, the air sucked into the air intake chamber 500 is below the air intake chamber 500 and the air intake chamber 500 It moves to the lower space by the first valve (not shown in the figure) that controls the opening and closing of the space, and opens and closes the lower space of the air intake chamber 500 and the low temperature side inlet of the air heater 610 (no drawing). It is introduced into the low temperature side inlet of the air heater 610 by a second valve (not shown) that controls the state.
  • the low temperature side inlet through which the low temperature outside air is supplied to the air heater 610 is provided below the air heater 610, and the high temperature air heated in the air heater 610 is discharged.
  • the side outlet is provided on the top of the air heater 610, the low temperature side inlet communicates with the space below the air intake chamber 500, and the high temperature side outlet can be provided in communication with the air mixing chamber 600 described below. .
  • the exhaust gas line EL of this embodiment includes: a first exhaust gas line EL1 that supplies high-temperature exhaust gas discharged from the engine 110 to the air heater 610; And a second exhaust gas line EL2 that discharges hot exhaust gas discharged from the engine 110 to the outside without supplying it to the air heater 610.
  • the high-temperature exhaust gas discharged from the engine 110 along the exhaust gas line EL is supplied to the air heater 610 along the first exhaust gas line EL1, and discharged after heat exchange from the air heater 610
  • the low temperature exhaust gas is joined to the exhaust gas flow discharged to the outside along the second exhaust gas line EL2 that discharges the high temperature exhaust gas discharged from the engine 100 to the outside and is discharged to the outside.
  • the first exhaust gas line EL1 may be installed with an exhaust gas control damper 230 that controls flow so that low-temperature exhaust gas discharged after heat exchange from the air heater 610 is discharged to the outside.
  • Exhaust gas line (EL) of the present embodiment the first exhaust gas control damper 210 for controlling the flow of the exhaust gas so that the exhaust gas discharged from the engine 110 is supplied to the air heater 610; And a second exhaust gas control damper 220 that controls the flow of the exhaust gas so that the exhaust gas discharged from the engine 110 is discharged to the outside.
  • EL Exhaust gas line
  • the second exhaust gas line EL2 may be installed to penetrate the machine room 200 to be described later. That is, according to the present embodiment, if necessary, a part of the exhaust gas discharged from the engine 110 is discharged to the outside through the second exhaust gas line EL2, but to the outside along the second exhaust gas line EL2 As the exhaust gas discharged passes through the machine room 200, heat is deprived and then discharged to the outside. That is, the exhaust gas flowing along the second exhaust gas line EL2 lowers the temperature while heating the air in the machine room 200, and the air in the machine room 200 flows along the second exhaust gas line EL2 Can be heated by the exhaust gas.
  • one or more fans are installed to supply heated hot air to an air demand destination that requires hot air.
  • the air demand destination includes: an engine 110 for generating propulsion energy of a ship or electric power required by the ship; An engine room 100 in which the engine 110 is disposed; A machine room 200 in which various devices or equipment necessary for the operation of the ship are arranged; And a pod room (POD room 300) disposed adjacent to the engine room 100.
  • an engine 110 for generating propulsion energy of a ship or electric power required by the ship An engine room 100 in which the engine 110 is disposed; A machine room 200 in which various devices or equipment necessary for the operation of the ship are arranged; And a pod room (POD room 300) disposed adjacent to the engine room 100.
  • the fan room 700 of the present embodiment includes an engine supply fan 720 that supplies hot air to the engine 110; An engine room supply fan 710 that supplies hot air to the machine room 200 including the engine room 100; And other demand-supply supply fans 730 that supply high-temperature air to other air-supply destinations, such as the pod room 300, as an example.
  • the high-temperature air supplied to the engine 110 by the engine supply fan 720 may be used as combustion air of the engine 110.
  • the air sucked into the air intake chamber 500 and heated by the air heater 610 is supplied to the combustion air of the engine 110, the combustion air as shown in FIG. It is not necessary to install the filter unit 9, the silencer 10, and the startup damper 11, which were installed to supply the gas without heating. Therefore, it is not necessary to provide the SUS damper 8 for conveying the cryogenic air, so the configuration of the equipment is simplified and maintenance is easy. In addition, since there is no need to take risks, such as causing damage to the engine 110 due to the introduction of foreign substances in the installation process of the SUS damper 8, production efficiency can be improved and installation and maintenance costs can be reduced. .
  • the hot air is supplied to the engine room 100 by the engine room supply fan 710.
  • hot air may be supplied to the machine room 200 by the engine room supply fan 710.
  • a fan that supplies high-temperature air to the engine room 100 it is illustrated as an example that the high-temperature air is transferred to the engine room 100 and the machine room 200 by the engine room supply fan 710, but a fan that supplies high-temperature air to the engine room 100 And it may be provided with a fan for supplying hot air to the machine room 200, respectively.
  • the temperature in the engine room 100 and the machine room 200 is operated smoothly, and the engine 110 is operated by a polar environment. It can prevent problems such as freezing or damage of equipment / devices.
  • High temperature air may also be supplied to the pod room 300, and air discharged from the pod room 300 may be discharged to the outside.
  • Air discharged from the pod room 300 may be discharged to the outside through the machine room 200 or may be joined to circulating air, which will be described later, or may be discharged to the outside, through a gas valve unit room 400, which will be described later.
  • the flow of air discharged from the pod room 300 is illustrated as, for example, the pod room discharge line PL1, and the flow of air discharged to the outside through the gas valve unit room 400 is an air discharge line ( PL2) for example.
  • the gas valve unit room 400 is provided with a valve unit (not shown) for discharging various gases generated from a vessel for the purpose of safe operation such as pressure control.
  • the gas valve unit room 400 is provided with an exhaust fan 410 that exhausts air introduced into the gas valve unit room 400 to the outside.
  • control of emission of waste gas generated from a gas combustion unit (GCU), an engine 110, an auxiliary boiler (not shown) for the purpose of generating steam, etc. can be.
  • the engine room damper 120 for controlling air discharge from the engine room 100 is further installed.
  • the air discharged from the engine room 100 through the engine room damper 120 passes through the machine room 200 and flows into the air mixing room 600 and / or the fan room 700, which will be described later, to the fan room 700.
  • the engine room 100, the engine 110, the machine room 200, and the pod room 300 may be supplied back to the air demand source by one or more installed fans 710, 720, and 730.
  • the air discharged from the engine room 100 may be discharged to the outside without being circulated.
  • the fan room circulation damper 130 for controlling the flow of air so that the air discharged from the engine room 100 flows into the fan room 700;
  • a mixing chamber circulation damper 140 for controlling the flow of air so that the air discharged from the engine room 100 flows into the air mixing chamber 600;
  • closed damper 150 for controlling the external discharge of air discharged from the engine room 100; may be further installed.
  • the air mixing chamber 600 for mixing the hot air heated in the air heater 610 and the circulating air introduced through the mixing chamber circulation damper 140 may further include a.
  • Air and air discharged from the pod room 300 are mixed and flow into the fan room 700.
  • the temperature of the air supplied from the air mixing chamber 600 to the air consumer through the fan room 700 may be about 5 ° C or higher.
  • the air discharged from the engine room 100 may be discharged to about 12.5 ° C by increasing the temperature due to heat generated by operating various equipment such as the engine 110 installed in the engine room 100.
  • the air flowing into the fan room 700 or the air mixing room 600 from the machine room 200 may be discharged to about 17.5 ° C. by raising the temperature due to heat generated from various devices installed in the machine room 200.
  • the air heated from the air heater 610 and the air introduced through the mixing chamber circulation damper 140 are mixed in the air mixing chamber 600 and introduced into the fan room 700 as an example, Only air heated in the air heater 610 may be introduced into the fan room 700, or only air introduced by the mixing chamber circulation damper 140 may be introduced.
  • the air supplied from the fan room 700 to the air demand destination may be air introduced from the air mixing chamber 600 or circulated air introduced by the fan room circulation damper 130.
  • the first exhaust gas line (EL1) is connected to the exhaust gas control damper 230 from the air heater 610 and provides a movement path of the exhaust gas discharged after heat exchange from the air heater 610, the air mixing chamber (600) ), The air of the air mixing chamber 600 can be further heated by using the heat of the exhaust gas discharged from the air heater 610.
  • the air sucked into the air intake chamber 500 is heated by using the exhaust gas discharged from the engine 110 by the air heater 610, and then the engine 110 is used by using a fan.
  • the air for combustion, engine room 100 and machine room 200 to various air demands, and inhaling the air for combustion of the engine 110 and air conditioning air to be supplied to the engine room 100, etc. Even without a separate system, energy can be saved, configuration is simplified, and thus, initial installation costs and operation and maintenance costs can be reduced.
  • the air required for the engine start system is not required to directly use cryogenic outside air, there is no need to provide an SUS duct, and the engine supply fan 720 and the SS400 duct can be configured to simplify configuration and reduce costs. There is no risk of engine damage due to impurities being mixed in the installation stage of the SUS duct, production efficiency is improved, and management becomes easy.
  • the present invention is not limited to the above embodiments, and can be variously modified or modified within a range not departing from the technical gist of the present invention, which is apparent to those skilled in the art to which the present invention pertains. It is done.

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Ocean & Marine Engineering (AREA)
  • Central Air Conditioning (AREA)
  • Central Heating Systems (AREA)
  • Sorption Type Refrigeration Machines (AREA)
  • Separation By Low-Temperature Treatments (AREA)
  • Respiratory Apparatuses And Protective Means (AREA)
  • Exhaust Gas After Treatment (AREA)

Abstract

La présente invention concerne un système d'alimentation en air pour un navire de région polaire qui navigue dans les régions polaires, lequel système d'alimentation en air chauffe l'air extérieur à basse température d'un environnement polaire et le fournit à un emplacement sur un navire qui nécessite de l'air, et peut ainsi être actionné avec une structure simple et un rendement énergétique élevé et à faible coût.
PCT/KR2019/014004 2018-10-31 2019-10-23 Système d'alimentation en air pour navire de région polaire WO2020091299A1 (fr)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201980071547.1A CN112930300B (zh) 2018-10-31 2019-10-23 用于极地船舶的空气供应系统

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
KR1020180131626A KR102601306B1 (ko) 2018-10-31 2018-10-31 극지용 선박의 공기 공급 시스템
KR10-2018-0131626 2018-10-31

Publications (1)

Publication Number Publication Date
WO2020091299A1 true WO2020091299A1 (fr) 2020-05-07

Family

ID=70463114

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/KR2019/014004 WO2020091299A1 (fr) 2018-10-31 2019-10-23 Système d'alimentation en air pour navire de région polaire

Country Status (3)

Country Link
KR (1) KR102601306B1 (fr)
CN (1) CN112930300B (fr)
WO (1) WO2020091299A1 (fr)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102265991B1 (ko) * 2020-10-19 2021-06-17 주식회사 오리엔탈정공 극저온용 선박 크레인
KR102514086B1 (ko) * 2021-06-08 2023-03-24 대우조선해양 주식회사 엔진룸의 환기용 공기 공급 시스템 및 방법
KR102514087B1 (ko) * 2021-06-08 2023-03-24 대우조선해양 주식회사 엔진룸의 환기용 공기 공급 시스템 및 방법
KR102624233B1 (ko) * 2021-12-21 2024-01-12 한화오션 주식회사 극지용 선박의 냉각수 공급 시스템 및 방법

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100955041B1 (ko) * 2007-08-21 2010-04-28 삼성중공업 주식회사 폐기열을 이용한 선내 난방 장치
KR101149517B1 (ko) * 2010-04-20 2012-05-25 삼성중공업 주식회사 선박
KR20130001185U (ko) * 2011-08-12 2013-02-20 삼성중공업 주식회사 외기 도입장치
KR20160055538A (ko) * 2014-11-10 2016-05-18 대우조선해양 주식회사 극지용 선박의 공조 시스템
KR101818525B1 (ko) * 2016-10-24 2018-01-15 대우조선해양 주식회사 선박의 배기가스 회수 시스템 및 방법

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101359529B1 (ko) * 2012-04-06 2014-02-12 삼성중공업 주식회사 기관실용 절전형 통풍 시스템 및 이의 제어방법
KR20150059419A (ko) * 2013-11-22 2015-06-01 대우조선해양 주식회사 공기조화유닛 및 이를 포함하는 공기조화시스템
CN205747314U (zh) * 2016-06-28 2016-11-30 广船国际有限公司 极地船舶应急发电机室热风循环结构

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100955041B1 (ko) * 2007-08-21 2010-04-28 삼성중공업 주식회사 폐기열을 이용한 선내 난방 장치
KR101149517B1 (ko) * 2010-04-20 2012-05-25 삼성중공업 주식회사 선박
KR20130001185U (ko) * 2011-08-12 2013-02-20 삼성중공업 주식회사 외기 도입장치
KR20160055538A (ko) * 2014-11-10 2016-05-18 대우조선해양 주식회사 극지용 선박의 공조 시스템
KR101818525B1 (ko) * 2016-10-24 2018-01-15 대우조선해양 주식회사 선박의 배기가스 회수 시스템 및 방법

Also Published As

Publication number Publication date
RU2019134422A (ru) 2021-04-28
CN112930300B (zh) 2023-10-31
KR20200048943A (ko) 2020-05-08
KR102601306B1 (ko) 2023-11-13
CN112930300A (zh) 2021-06-08

Similar Documents

Publication Publication Date Title
WO2020091299A1 (fr) Système d'alimentation en air pour navire de région polaire
WO2018225922A1 (fr) Appareil de production d'énergie combinée
JP4024554B2 (ja) 燃料電池発電システム
WO2018097450A1 (fr) Système de production d'énergie à récupération parallèle utilisant du dioxyde de carbone supercritique
JP2006253020A (ja) 燃料電池発電装置及び吸排気装置
WO2017065430A1 (fr) Système de génération d'énergie au dioxyde de carbone supercritique utilisant de multiples sources de chaleur
WO2015088109A1 (fr) Appareil turbine à gaz à refroidissement par fluide supercritique
CA2112354C (fr) Systeme combine de chauffage et d'alimentation
KR20160055538A (ko) 극지용 선박의 공조 시스템
WO2015102247A1 (fr) Dispositif de refroidissement de salle de serveurs, module de filtre pour introduire de l'air extérieur et système de climatisation de centre de données les comprenant
KR101767556B1 (ko) 극지 운항 선의 기관실 공기조화 방법
WO2020091300A1 (fr) Système de climatisation pour navire navigant en région polaire
CN102767431B (zh) 带有废气再循环的燃气轮机发电装置及其运行方法
RU2654561C2 (ru) Способ воздушного охлаждения моторного отсека газоперекачивающего агрегата и напорная приточная система вентиляции для его осуществления
WO2018225923A1 (fr) Appareil de production d'énergie combinée
WO2019013420A1 (fr) Système de moteur permettant la cogénération de vapeur et d'électricité
KR101695890B1 (ko) 극지용 선박의 공조 시스템
KR101005579B1 (ko) 선박의 비상 발전기 룸용 공기 순환 장치
SE437723B (sv) Sett och anordning for drift av en vermeanleggning
WO2016148329A1 (fr) Turbodétendeur permettant la récupération de fluide qui a fui
WO2015126034A1 (fr) Dispositif de refroidissement de module d'injection d'agent de réduction et système de réduction sélective de catalyseur le comportant
CN114834624A (zh) 一种适用于极低温环境的机舱通风系统及船舶
CN214196414U (zh) 航空发动机及其预冷防冰复合系统
RU2796128C2 (ru) Система подачи воздуха для полярного судна
KR20180076919A (ko) 선박의 공조 시스템

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 19878466

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 19878466

Country of ref document: EP

Kind code of ref document: A1