WO2020054052A1 - 熱源装置および冷凍サイクル装置 - Google Patents

熱源装置および冷凍サイクル装置 Download PDF

Info

Publication number
WO2020054052A1
WO2020054052A1 PCT/JP2018/034160 JP2018034160W WO2020054052A1 WO 2020054052 A1 WO2020054052 A1 WO 2020054052A1 JP 2018034160 W JP2018034160 W JP 2018034160W WO 2020054052 A1 WO2020054052 A1 WO 2020054052A1
Authority
WO
WIPO (PCT)
Prior art keywords
pressure
heat source
source device
bypass
compression chamber
Prior art date
Application number
PCT/JP2018/034160
Other languages
English (en)
French (fr)
Inventor
伊藤 健
慎一 浅井
Original Assignee
三菱電機株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 三菱電機株式会社 filed Critical 三菱電機株式会社
Priority to JP2020546650A priority Critical patent/JP6942265B2/ja
Priority to PCT/JP2018/034160 priority patent/WO2020054052A1/ja
Priority to CN201880097180.6A priority patent/CN112654823B/zh
Publication of WO2020054052A1 publication Critical patent/WO2020054052A1/ja

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B1/00Compression machines, plants or systems with non-reversible cycle

Definitions

  • the present invention relates to a heat source device having a screw compressor and a refrigeration cycle device.
  • Patent Document 1 a heat source device having a screw compressor has been known (for example, see Patent Document 1).
  • Patent Literature 1 the opening degree of the electronic expansion valve is controlled when the heat source device is started.
  • Patent Document 1 the opening degree of the electronic expansion valve is controlled to attain stable operation from the start of the heat source device.
  • Patent Literature 1 since the heat source device is stabilized while circulating a large amount of refrigerant, a long time may be required after the start of the heat source device until the heat source device is stabilized.
  • the present invention has been made in view of the above-described problems, and has as its object to provide a heat source device that can shorten the time from when the heat source device is activated to when the heat source device is stabilized. .
  • a heat source device includes a screw rotor, a casing accommodating the screw rotor and forming a compression chamber together with the screw rotor, a first pressure section of the compression chamber, and a second pressure section having a pressure lower than the first pressure section.
  • a screw compressor having a bypass unit for connecting to the pressure unit, a suction sensor for detecting the temperature or the degree of superheat of the refrigerant sucked by the screw compressor, and a set time after the screw compressor is started
  • a control device that executes control to connect the bypass unit before and when the detection result of the inhalation sensor is higher than the first set value.
  • the heat source device when the set time has elapsed since the start of the screw compressor, and when the detection result of the suction sensor is higher than the first set value, the medium pressure part and the low pressure part of the compression chamber And the compression ratio is reduced to stabilize the operation of the heat source device. Therefore, according to the heat source device of the present invention, the time from when the heat source device is activated to when the heat source device is stabilized can be shortened.
  • FIG. 2 is a diagram illustrating an example of a refrigeration cycle apparatus according to Embodiment 1 of the present invention. It is a figure which shows an example of the screw compressor of FIG.
  • FIG. 3 is a diagram illustrating an example of a suction process of a compression chamber of the screw compressor illustrated in FIG. 2.
  • FIG. 3 is a diagram illustrating an example of a compression process of a compression chamber of the screw compressor illustrated in FIG. 2.
  • FIG. 3 is a diagram illustrating an example of a discharge process of a compression chamber of the screw compressor illustrated in FIG. 2.
  • FIG. 3 is a diagram illustrating an example when a slide valve of the screw compressor illustrated in FIG. 2 is at a first position.
  • FIG. 7 is a diagram illustrating an example when the slide valve illustrated in FIG.
  • FIG. 7 is a diagram illustrating an example when the slide valve illustrated in FIG. 6 is at a third position.
  • FIG. 7 is a diagram illustrating a relationship between the slide valve and a bypass opening when the slide valve illustrated in FIG. 6 is at a first position.
  • FIG. 7 is a diagram illustrating a relationship between the slide valve and a bypass opening when the slide valve illustrated in FIG. 6 is at a second position.
  • FIG. 7 is a diagram illustrating a relationship between the slide valve and a bypass opening when the slide valve illustrated in FIG. 6 is at a third position.
  • FIG. 7 is a diagram illustrating an operation of the refrigeration cycle device when the slide valve illustrated in FIG. 6 is at a first position.
  • FIG. 7 is a diagram for explaining the operation of the refrigeration cycle device when the slide valve shown in FIG. 6 is at a second position.
  • FIG. 7 is a diagram illustrating the operation of the refrigeration cycle device when the slide valve illustrated in FIG. 6 is at a third position.
  • FIG. 2 is a diagram illustrating an example of control at the time of starting the refrigeration cycle device illustrated in FIG. 1.
  • FIG. 9 is a diagram illustrating a first modification of the first embodiment.
  • FIG. 9 is a diagram illustrating an example of control at the time of starting the refrigeration cycle device according to the first modification of the first embodiment. It is a figure which shows an example of the screw compressor which concerns on Embodiment 2 of this invention.
  • FIG. 13 is a diagram illustrating an example of control at the time of starting the refrigeration cycle device according to the second embodiment. It is a figure which shows an example of the screw compressor concerning Embodiment 3 of this invention.
  • FIG. 1 is a diagram illustrating an example of a refrigeration cycle apparatus according to Embodiment 1 of the present invention.
  • the refrigeration cycle apparatus 100 according to the present embodiment is applied to a refrigeration apparatus that cools a cooling space such as a warehouse.
  • the refrigeration cycle apparatus 100 can be applied to an air conditioner that performs air conditioning of a building or the like.
  • the refrigeration cycle device 100 includes a heat source device 200 and a load device 400.
  • the heat source device 200 is provided outside the cooling space and supplies heat to the load device 400.
  • the heat source device 200 is provided, for example, outdoors, but may be provided in a machine room or the like.
  • the load device 400 is provided inside the cooling space and cools the cooling space.
  • the load device 400 includes an expansion valve 105, a load-side heat exchanger 106, and a load-side blower (not shown).
  • the expansion valve 105 is for expanding the refrigerant.
  • the expansion valve 105 is, for example, an electronic expansion valve whose opening can be adjusted, but may be a capillary tube whose opening cannot be adjusted.
  • the expansion valve 105 may be provided outside the load device 400.
  • the load side heat exchanger 106 exchanges air with a refrigerant.
  • the load side heat exchanger 106 is a fin tube type heat exchanger formed of fins and tubes.
  • the load-side heat exchanger 106 may be a plate-type heat exchanger that exchanges heat between a refrigerant and a heat medium such as water.
  • the load side heat exchanger 106 of this embodiment functions as an evaporator for evaporating the refrigerant.
  • the load-side blower (not shown) blows air to the load-side heat exchanger 106.
  • the load-side blower (not shown) blows air, the air that has exchanged heat with the load-side heat exchanger 106 is blown into the cooling space.
  • the heat source device 200 has the screw compressor 102 and the heat source side heat exchanger 104.
  • the screw compressor 102 compresses a refrigerant.
  • the screw compressor 102 according to this embodiment is a two-stage single screw compressor and includes a screw rotor 3a, a high-pressure screw rotor 3b, and a motor 103.
  • the motor 103 operates by being supplied with power from a power supply source (not shown) to the motor 103 via the inverter 101. When the motor 103 operates, the screw rotor 3a and the high-pressure screw rotor 3b connected to the motor 103 rotate, and the refrigerant is compressed.
  • the heat source side heat exchanger 104 is a fin-tube heat exchanger formed of fins and tubes.
  • the heat source side heat exchanger 104 may be a plate-type heat exchanger that exchanges heat between a refrigerant and a heat medium such as water.
  • the heat source side heat exchanger 104 of this embodiment functions as a condenser for condensing the refrigerant.
  • the heat source side blower (not shown) blows air to the heat source side heat exchanger 104. When the heat source-side blower (not shown) blows air, heat exchange in the heat source-side heat exchanger 104 is promoted.
  • the heat source device 200 includes a control device 110 and sensors.
  • the control device 110 may be provided outside the heat source device 200, and may be provided, for example, inside the load device 400.
  • the control device 110 is formed by a microcomputer or the like including a CPU, a RAM for storing various data, and a ROM (neither is shown) for storing a program for performing operation control and the like.
  • the control device 110 controls the entire refrigeration cycle device 100.
  • the control device 110 controls, for example, the expansion valve 105, the screw compressor 102, and the like.
  • the sensors included in the heat source device 200 include a suction temperature sensor that detects the temperature of the refrigerant drawn into the screw compressor 102, a suction pressure sensor that detects the pressure of the refrigerant drawn into the screw compressor 102, and the screw compressor 102.
  • the suction temperature sensor or the suction pressure sensor corresponds to the “suction sensor” in this embodiment.
  • the degree of superheat of the refrigerant sucked by the screw compressor 102 is calculated, for example, from the temperature detected by the suction temperature sensor and the saturated gas temperature calculated from the pressure detected by the suction pressure sensor.
  • the refrigerant circuit 109 is formed by connecting the heat source device 200 and the load device 400 with a refrigerant pipe.
  • the refrigerant circuit 109 is formed by connecting the screw compressor 102, the heat source-side heat exchanger 104, the expansion valve 105, and the load-side heat exchanger 106 via refrigerant piping, and circulates the refrigerant.
  • the high-temperature and high-pressure refrigerant compressed by the screw compressor 102 radiates heat while condensing in the heat source side heat exchanger 104.
  • the refrigerant condensed in the heat source side heat exchanger 104 expands in the expansion valve 105.
  • the refrigerant expanded by the expansion valve 105 absorbs heat from the air while evaporating in the load side heat exchanger 106, and cools the air.
  • the refrigerant evaporated in the load side heat exchanger 106 is sucked into the screw compressor 102 and is compressed again.
  • FIG. 2 is a diagram illustrating an example of the screw compressor illustrated in FIG. 1.
  • a motor 103, a screw rotor 3a, a high-pressure screw rotor 3b, a screw shaft 4, a gate rotor 6a, and a high-pressure gate rotor 6b are provided inside a cylindrical casing 10 forming the screw compressor 102.
  • a partition (not shown) is provided inside the casing 1 to partition the low-pressure side and the high-pressure side. The refrigerant compressed in the low-pressure compression section having the screw rotor 3a is discharged to the intermediate chamber 11.
  • the refrigerant in the intermediate chamber 11 is compressed by a high-pressure compressor having a high-pressure screw rotor 3b, and is discharged from a discharge port (not shown) provided in the casing 10.
  • the motor 103 has a stator 2a fixed inside the casing 1 and a motor rotor 2b provided inside the stator 2a.
  • the screw rotor 3a, the high-pressure screw rotor 3b, and the motor rotor 2b are provided on the same axis.
  • the screw rotor 3a, the high-pressure screw rotor 3b, and the motor rotor 2b are connected by a screw shaft 4.
  • a plurality of spiral compression grooves forming the compression chamber 5a are formed on the outer peripheral surface of the screw rotor 3a, and a plurality of spiral compression grooves forming the high-pressure compression chamber 5b are formed on the outer peripheral surface of the high-pressure screw rotor 3b.
  • a compression groove is formed.
  • the gate rotor 6a has a plurality of teeth that mesh with compression grooves formed on the outer peripheral surface of the screw rotor 3a.
  • the high-pressure gate rotor 6b has a plurality of teeth that mesh with compression grooves formed on the outer peripheral surface of the high-pressure screw rotor 3b.
  • the compression chamber 5a is formed by the inner peripheral surface of the casing 10, the screw rotor 3a, the gate rotor 6a, and the like.
  • the high-pressure compression chamber 5b is formed by the inner peripheral surface of the casing 10, the high-pressure screw rotor 3b, the high-pressure gate rotor 6b, and the like.
  • the screw rotor 3a and the high-pressure screw rotor 3b are driven to rotate by the rotation of the motor rotor 2b.
  • the teeth of the gate rotor 6a relatively move inside the compression groove of the screw rotor 3a.
  • the teeth of the high-pressure gate rotor 6b relatively move inside the compression groove of the high-pressure screw rotor 3b.
  • FIG. 3 is a diagram illustrating an example of a suction process of a compression chamber of the screw compressor illustrated in FIG. 2.
  • FIG. 4 is a diagram illustrating an example of a compression process of a compression chamber of the screw compressor illustrated in FIG. 2.
  • FIG. 5 is a diagram illustrating an example of a discharge process of a compression chamber of the screw compressor illustrated in FIG. 2. 3 to 5, the compression process will be described by focusing on the compression chamber 5a indicated by hatching of dots.
  • FIG. 3 shows the state of the compression chamber 5a during the suction stroke. When the screw rotor 3a rotates in the direction of the solid arrow, the volume of the compression chamber 5a is reduced as shown in FIG.
  • the compression chamber 5a communicates with the discharge section 12, as shown in FIG.
  • the high-pressure refrigerant compressed in the compression chamber 5a is discharged from the discharge unit 12.
  • the refrigerant discharged from the discharge unit 12 is sucked into the high-pressure compression chamber 5b and is further compressed.
  • the high-pressure compression chamber 5b compresses the refrigerant similarly to the compression chamber 5a, the description is omitted.
  • FIG. 6 is a view showing an example when the slide valve of the screw compressor shown in FIG. 2 is at the first position.
  • FIG. 7 is a diagram illustrating an example when the slide valve illustrated in FIG. 6 is at the second position.
  • FIG. 8 is a diagram illustrating an example when the slide valve illustrated in FIG. 6 is at the third position.
  • FIG. 9 is a diagram illustrating a relationship between the slide valve and the bypass opening when the slide valve illustrated in FIG. 6 is at the first position.
  • FIG. 10 is a diagram illustrating a relationship between the slide valve and the bypass opening when the slide valve illustrated in FIG. 6 is at the second position.
  • FIG. 11 is a diagram illustrating a relationship between the slide valve and the bypass opening when the slide valve illustrated in FIG. 6 is at the third position.
  • FIG. 12 is a view for explaining the operation of the refrigeration cycle apparatus when the slide valve shown in FIG. 6 is at the first position.
  • FIG. 13 is a diagram illustrating the operation of the refrigeration cycle device when the slide valve illustrated in FIG. 6 is at the second position.
  • FIG. 14 is a diagram illustrating the operation of the refrigeration cycle device when the slide valve illustrated in FIG. 6 is at the third position.
  • the screw compressor 102 has a slide valve 7.
  • the slide valve 7 operates during a transient operation or the like.
  • the slide valve 7 is slidably provided inside the casing 10.
  • the slide valve 7 is connected to a driving device 9 such as a piston via a connecting rod 8.
  • the driving device 9 uses, for example, a piston driven by gas pressure or hydraulic pressure, but may be driven by a motor or the like.
  • the slide valve 7 slides in the rotation axis direction of the screw rotor 3a.
  • the slide valve 7 forms a part of the compression chamber 5a together with the inner peripheral surface of the casing 10. That is, as shown in FIGS. 9 to 11, the casing 10 has the bypass opening 70 formed therein.
  • the bypass opening 70 is a hole formed in the casing 10 so as to connect an intermediate pressure part of the compression chamber 5a at a medium pressure and a low pressure part of the compression chamber 5a at a low pressure.
  • the low-pressure part communicates with the suction part in which the compression chamber 5a sucks the refrigerant, and the medium-pressure part and the low-pressure part communicate with each other, so that the suction volume is reduced.
  • the opening area of the bypass opening 70 is adjusted.
  • the suction volume at which the compression chamber 5a sucks the refrigerant is adjusted.
  • the two slide valves 7 are slid at the same time, but the number of the slide valves 7 may be one. The number of the slide valves 7 may be three or more.
  • the bypass opening 70 corresponds to the “bypass section” of this embodiment, and the slide valve 7 corresponds to the “adjustment section” of this embodiment. It should be noted that the bypass opening 70 only needs to be formed so as to connect the first pressure section and the second pressure section having a lower pressure than the first pressure section. The pressure ratio can be reduced by communicating the high pressure portion and the low pressure portion.
  • the slide valve 7 of this embodiment moves to three positions, a first position shown in FIG. 6, a second position shown in FIG. 7, and a third position shown in FIG.
  • the slide valve 7 covers most of the bypass opening 70 as shown in FIG. 9, and ideally completely closes the bypass opening 70.
  • the slide valve 7 opens most of the bypass opening 70 at the second position shown in FIG. 7, as shown in FIG. By providing the slide valve 7 at the second position, the suction volume of the compression chamber 5a is smaller than when the slide valve 7 is provided at the first position. As the suction volume of the compression chamber 5a decreases, the compression ratio of the compression chamber 5a decreases as shown in FIG.
  • the slide valve 7 opens a middle part of the bypass opening 70 as shown in FIG. Since the slide valve 7 is provided at the second position, the suction volume of the compression chamber 5a is smaller than when the slide valve 7 is provided at the first position, and the slide valve 7 is at the third position.
  • the suction volume of the compression chamber 5a is larger than that provided when That is, in the example of this embodiment, since the slide valve 7 is provided at the second position, the suction volume of the compression chamber 5a becomes medium. Since the suction volume of the compression chamber 5a is medium, the compression ratio of the compression chamber 5a is medium as shown in FIG.
  • the slide valve 7 is not limited to the one that moves to three positions, and may be one that moves to two positions.
  • the slide valve 7 may move at four or more positions. That is, it is only necessary that the suction volume can be changed by moving the slide valve 7. It should be noted that the slide valve 7 is normally at the first position where the suction volume is maximized during steady operation.
  • FIG. 15 is a diagram showing an example of control at the time of starting the refrigeration cycle apparatus shown in FIG. That is, the refrigeration cycle apparatus 100 according to the present embodiment executes the control of FIG. 15 after startup until the set time has elapsed, and shifts to the normal control after the set time has elapsed.
  • the control shown in FIG. This is because when the amount of the refrigerant sealed in the refrigeration cycle apparatus 100 is large, it may take a long time until the state of the refrigerant in the refrigerant circuit is stabilized.
  • the refrigeration cycle apparatus 100 of this embodiment performs control of the slide valve 7 at the time of startup by using suction SH, which is the degree of superheating of the refrigerant drawn by the screw compressor 102.
  • the refrigeration cycle apparatus 100 according to the example of this embodiment has three threshold values, a threshold value A, a threshold value B, and a threshold value C.
  • the threshold value A, the threshold value B, and the threshold value C are set in advance, and are stored in the control device 110, for example.
  • the relationship between the three thresholds is threshold A> threshold B> threshold C.
  • step S1 of FIG. 15 it is determined whether or not suction SH is higher than threshold value A.
  • the process proceeds to step S4. If the suction SH is higher than the threshold value A in step S1, it is determined that the operation is a transient operation, and the process proceeds to step S2.
  • step S2 the slide valve 7 is at the second position shown in FIG. If the suction SH is higher than the threshold A in step S3, the process returns to step S2. When the suction SH becomes equal to or smaller than the threshold value A in step S3, the process proceeds to step S4.
  • step S4 it is determined whether the suction SH is higher than a threshold value B. If the suction SH is equal to or smaller than the threshold B in step S4, the process proceeds to step S7. When the suction SH is higher than the threshold value B in step S4, the process proceeds to step S5. In step S5, the slide valve 7 comes to the third position shown in FIG. In step S6, it is determined whether suction SH is higher than threshold value C. If the suction SH is higher than the threshold value C in step S6, the process returns to step S5. When the suction SH becomes equal to or less than the threshold value C in step S6, the process proceeds to step S7. In step S7, the slide valve 7 comes to the first position shown in FIG. 9, and returns to step S1.
  • the position of the slide valve 7 is adjusted to reduce the compression volume of the screw compressor 102.
  • the temperature of the refrigerant discharged from the screw compressor 102 can be reduced.
  • seizure of the screw rotor 3a and the high-pressure screw rotor 3b can be suppressed.
  • the cooling target can reach the target temperature in a short time after the activation of heat source device 200.
  • the slide valve 7 is located at the first position during the steady operation, and the second position where the suction volume is smaller during the transient operation, or the suction volume is smaller than the second position.
  • the slide valve is moved to a third position which is larger and has a smaller suction volume than the first position.
  • the screw compressor 102 of this embodiment is a two-stage screw compressor, and adjusts the position of the slide valve 7 to increase the compression volume of the compression chamber 5a when the intake gas temperature at startup is high.
  • the compression volume of the high-pressure compression chamber 5b is not changed.
  • the intermediate pressure which is the pressure of the intermediate chamber 11 shown in FIG. 2
  • the compression ratio of the low-pressure compression section having the screw rotor 3a is low
  • the compression ratio of the high-pressure compression section having the high-pressure screw rotor 3b is high.
  • the compression ratio of the low-pressure compression section decreases.
  • the intake gas temperature of the high-pressure compression section decreases, and the discharge temperature of the high-pressure compression section decreases.
  • the intermediate chamber 11 is configured to perform injection, when the discharge temperature of the low-pressure compression section is small, the liquid is supplied to the intermediate chamber 11 so that the discharge temperature of the high-pressure compression section falls within a preset range. Injection should be performed. By performing liquid injection into the intermediate chamber 11, it is possible to suppress an increase in the degree of suction superheat of the high-pressure compression section and to keep the discharge temperature of the high-pressure compression section within a set range.
  • the injection into the intermediate chamber 11 can be performed, for example, by a refrigerant used for supercooling in an economizer, oil separated and cooled by an oil separator, or the like, as long as it can lower the discharge temperature of the high-pressure compression unit. Good.
  • the heat source device 200 of this embodiment includes the screw rotor 3a, the casing 10 that houses the screw rotor 3a and forms the compression chamber 5a together with the screw rotor 3a, and the first pressure of the compression chamber 5a.
  • Compressor having a bypass unit connecting the pressure unit and a second pressure unit having a pressure lower than the first pressure unit, and suction detecting the temperature or the degree of superheat of the refrigerant drawn by the screw compressor 102
  • the operation of the heat source device 200 is stabilized by reducing the compression ratio of the compression chamber 5a by connecting the bypass portion.
  • the time until the operation of the heat source device 200 is stabilized can be shortened.
  • the compression ratio of the compression chamber 5a is reduced until the set time elapses after the activation of the heat source device 200 as compared with the case of the normal control.
  • the slide valve 7 is moved so that the bypass opening 70 is maximized until the set time elapses, and the compression ratio of the compression chamber 5a is maximized. Make it smaller.
  • the cooling target can reach the target temperature in a short time after the activation of heat source device 200.
  • the control device 110 executes control to connect the bypass unit regardless of the detection result of the suction sensor.
  • the compression ratio is unconditionally reduced, so that the start of the heat source device 200 can be stabilized.
  • the heat source device 200 of this embodiment includes a screw rotor 3a, a casing 10 that houses the screw rotor 3a and forms a compression chamber 5a together with the screw rotor 3a, a first pressure section of the compression chamber 5a, Before the first time t1 elapses after the screw compressor 102 is activated, the screw compressor 102 includes a bypass unit that connects the second pressure unit having a pressure lower than the first pressure unit. And a control device 110 that executes control for communicating the bypass unit. When the heat source device 200 is started, the compression ratio is unconditionally reduced, so that the start of the heat source device 200 can be stabilized.
  • the heat source device 200 is provided with a plurality of bypass portions. Further, for example, the heat source device 200 is provided with an even number of bypass portions. Further, for example, in the heat source device 200, a pair of bypass portions are provided at positions that are line-symmetric with respect to the screw rotor 3a. With a configuration in which a plurality of bypass portions are provided, the adjustment amount of the compression ratio can be increased. In addition, by adopting a configuration in which a plurality of bypass portions are provided, it is possible to finely adjust the compression ratio in a plurality of stages, for example. Further, by simultaneously controlling the pair of bypass portions, the behavior of the compression chamber 5a is stabilized.
  • the heat source device 200 is further provided with an adjustment unit that is provided in the bypass unit and adjusts the compression ratio of the compression chamber 5a.
  • the adjustment unit that is provided in the bypass unit and adjusts the compression ratio of the compression chamber 5a.
  • the control device 110 controls the adjustment unit to set the compression ratio to the first compression ratio
  • the controller controls the adjustment unit to set the compression ratio to the second compression ratio smaller than the first compression ratio.
  • the bypass unit has a bypass opening 70 formed in the casing 10 so as to connect the first pressure unit and the second pressure unit, and the adjustment unit covers the bypass opening 70 and A first position in which the first pressure unit is not in communication with the second pressure unit, and a second position in which the first pressure unit is in communication with the second pressure unit without covering at least a portion of the bypass opening 70.
  • a slide valve 7 that slides between and.
  • the screw compressor 102 is a two-stage screw having a partition that partitions a low-pressure side that houses the compression chamber 5a and a high-pressure side that houses a high-pressure compression chamber 5b that compresses the refrigerant compressed in the compression chamber 5a. It is a compressor.
  • control for adjusting the compression ratio on the low pressure side and control for adjusting the discharge timing on the high pressure side can be performed. Can be stabilized. Further, the cooling target can reach the target temperature in a short time after the activation of the heat source device 200.
  • the second pressure part is a part in which the compression chamber 5a communicates with a suction part for sucking the refrigerant.
  • the structure that connects the suction part and the part with a higher pressure than the suction part is a structure that adjusts the suction volume, so the behavior of the compression process is stabilized compared to the structure that connects the compression chambers in the compression process. can do.
  • the refrigeration cycle device 100 includes a heat source device 200 and a load device 400 connected to the heat source device 200.
  • the effect of the heat source device 200 of this embodiment is remarkable when applied to a cooling warehouse or the like in which the length of a pipe connected to the load device 400 is long. This is because when the amount of the refrigerant stored in the refrigeration cycle apparatus 100 is large, it is difficult to stabilize the state of the refrigerant after the refrigeration cycle apparatus 100 is started, and it takes a long time. In an area with a high temperature or an article with a high temperature, the temperature of the refrigerant stored in the refrigerant pipe becomes high when the refrigeration cycle apparatus 100 is stopped, so that the effect of the heat source device 200 of this embodiment becomes more remarkable. .
  • This embodiment is not limited to the above-described embodiment.
  • this embodiment can be applied to a two-stage twin screw compressor, a single-stage single screw compressor, a single-stage twin screw compressor, and the like. it can. That is, this embodiment can be applied to a device that can adjust the compression ratio of the compression unit.
  • the slide valve 7 is controlled using the suction SH at the time of startup.
  • the control of the slide valve 7 is performed using the suction gas temperature instead of the suction SH. May be performed.
  • the slide valve 7 at the time of starting may be controlled using the suction SH and the suction gas temperature.
  • FIG. 16 is a diagram illustrating a first modification of the first embodiment.
  • FIG. 17 is a diagram illustrating an example of control at the time of starting the refrigeration cycle device according to the first modification of the first embodiment.
  • the control of the slide valve 7 is performed at the time of startup by using the low pressure and the intake gas temperature.
  • the refrigeration cycle device 100 according to the example of this embodiment has three threshold values, a threshold value D, a threshold value E, and a threshold value F.
  • the threshold value D, the threshold value E, and the threshold value F are set in advance, and are stored in the control device 110, for example.
  • the relationship between the three threshold values is threshold value D> threshold value E> threshold value F.
  • the threshold value D, the threshold value E, and the threshold value F are values determined by the intake gas temperature and the low pressure.
  • the higher the low pressure the higher the suction gas temperature. Therefore, as the low pressure increases, the temperature of the discharge gas also increases, and the possibility that the screw rotor 3a and the high pressure screw rotor 3b seize is increased.
  • the low pressure is high, it is necessary to lower the upper limit of the suction SH. Therefore, by controlling the slide valve 7 using the relationship between the intake gas temperature and the low pressure, the slide valve 7 is operated as the first position when the low pressure is low as compared with the first embodiment.
  • the range that can be expanded By expanding the range in which the slide valve 7 can be operated as the first position, the efficiency of the refrigeration cycle apparatus 100 is improved, and the object to be cooled can be efficiently cooled.
  • step S21 in FIG. 17 it is compared whether the intake gas temperature is higher than a threshold value D. If the intake gas temperature is equal to or lower than the threshold value D in step S21, the process proceeds to step S24.
  • the intake gas temperature is higher than the threshold value D in step S21, it is determined that the operation is a transient operation, and the process proceeds to step S22.
  • step S22 the slide valve 7 comes to the second position shown in FIG. If the intake gas temperature is higher than the threshold value D in step S23, the process returns to step S22.
  • the intake gas temperature becomes equal to or lower than the threshold value D in step S23 the process proceeds to step S24.
  • step S24 it is determined whether the intake gas temperature is higher than a threshold value E. If the intake gas temperature is equal to or lower than the threshold value E in step S24, the process proceeds to step S27. If the intake gas temperature is higher than the threshold value E in step S24, the process proceeds to step S25. In step S25, the slide valve 7 comes to the third position shown in FIG. In step S26, it is determined whether the intake gas temperature is higher than a threshold value F. If the intake gas temperature is higher than the threshold value F in step S26, the process returns to step S25. When the intake gas temperature becomes equal to or lower than the threshold value F in step S26, the process proceeds to step S27. In step S27, the slide valve 7 comes to the first position shown in FIG. 9, and returns to step S21.
  • the suction volume of the compression chamber 5a is reduced before the control of FIG. That is, during the preparation time up to the first time t1 after the start of the refrigeration cycle apparatus 100, the suction volume of the compression chamber 5a is set small regardless of the size of the suction SH. Then, the refrigeration cycle apparatus 100 executes the control of FIG. 15 after the preparation time has elapsed and until the set time has elapsed. As in Modification Example 2, after the refrigeration cycle apparatus 100 is started, the suction volume of the compression chamber 5a is unconditionally reduced until the preparation time elapses, so that the screw rotor 3a and the high-pressure screw rotor 3b are seized. And the like can be further reduced. Note that the preparation time is shorter than the set time. For example, when the set time is several tens of minutes, the preparation time is shorter than several minutes.
  • FIG. 18 is a diagram illustrating an example of a screw compressor according to Embodiment 2 of the present invention.
  • FIG. 19 is a diagram illustrating an example of control at the time of starting the refrigeration cycle device according to the second embodiment.
  • the screw compressor 102 according to this embodiment includes a first driving device 90a, a first connecting rod 80a, a first slide valve 70a, a second driving device 90b, a second connecting rod 80b, and a second driving rod 90a.
  • the slide valve 70b that is, in the first embodiment, two slide valves 7 slide simultaneously, and in the second embodiment, each of the first slide valve 70a and the second slide valve 70b slides independently. Is what you do.
  • step S11 in FIG. 19 it is determined whether the suction SH is higher than the threshold value A. If the suction SH is equal to or smaller than the threshold A in step S11, the process proceeds to step S14. When the suction SH is higher than the threshold A in step S11, it is determined that the operation is a transient operation, and the process proceeds to step S12. In step S12, the first slide valve 70a and the second slide valve 70b are in the second position shown in FIG. If the suction SH is higher than the threshold A in step S13, the process returns to step S12. When the suction SH becomes equal to or smaller than the threshold value A in step S13, the process proceeds to step S14.
  • step S14 it is determined whether suction SH is higher than threshold value B or not. If the suction SH is equal to or smaller than the threshold B in step S14, the process proceeds to step S17. When the suction SH is higher than the threshold value B in step S14, the process proceeds to step S15. In step S15, one of the first slide valve 70a and the second slide valve 70b becomes the first position shown in FIG. 9, and the other does not move from the second position shown in FIG. In step S16, it is determined whether suction SH is higher than threshold value C. If the suction SH is higher than the threshold value C in step S16, the process returns to step S15. When the suction SH becomes equal to or less than the threshold value C in step S16, the process proceeds to step S7. In step S7, the first slide valve 70a and the second slide valve 70b are in the first position shown in FIG. 9, and return to step S11.
  • each of the first slide valve 70a and the second slide valve 70b is configured to slide, so that the first slide valve 70a and the second slide valve 70b Can be moved to the first position and the second position, so that the suction volume of the compression chamber 5a can be adjusted in three stages. That is, the first embodiment has a complicated mechanism that can adjust the position of each of the slide valves 7 in three stages, whereas the second embodiment has a first mechanism of the first slide valve 70a and the second slide valve 70b. A simple mechanism for adjusting the position in two steps can be provided.
  • first slide valve 70a and the second slide valve 70b according to the second embodiment are configured to slide in a plurality of stages, so that the suction volume of the compression chamber 5a can be finely controlled.
  • each of the first slide valve 70a and the second slide valve 70b can be located at the first position shown in FIG. 9, the second position shown in FIG. 10, and the third position shown in FIG. With this configuration, the suction volume can be adjusted in five or more steps.
  • the combination of the first slide valve 70a and the second slide valve 70b corresponds to the second position and the second position, the second position and the third position, the third position and the third position, There are five stages: a third position and a first position, and a first position and a first position.
  • the adjustment amount adjusted by the first slide valve 70a may be different from the adjustment amount adjusted by the second slide valve 70b. Since the cooling capacity can be finely adjusted by finely adjusting the suction volume of the compression chamber 5a, the pull-down operation time can be shortened.
  • FIG. 20 is a diagram illustrating an example of the screw compressor according to Embodiment 3 of the present invention.
  • the screw compressor 102 of this embodiment has a connection pipe 170 and a bypass valve 172.
  • the connection pipe 170 corresponds to the “bypass section” of this embodiment, and the bypass valve 172 corresponds to the “adjustment section” of this embodiment.
  • connection pipe 170 connects the medium pressure part of the compression chamber 5a at a medium pressure and the suction part of the compression chamber 5a at a low pressure.
  • the connection pipe 170 only needs to connect the first pressure section of the compression chamber 5a and the second pressure section having a lower pressure than the first pressure section.
  • the bypass valve 172 is provided on the connection pipe 170 and adjusts the flow rate of the refrigerant flowing through the connection pipe 170. By adjusting the opening of the bypass valve 172, the suction volume of the compression chamber 5a can be adjusted. That is, when the opening degree of the bypass valve 172 is increased, the suction volume of the compression chamber 5a decreases.
  • the bypass unit has the connection pipe 170 connecting the first pressure unit and the second pressure unit, and the adjustment unit is provided in the connection pipe 170. It has a bypass valve 172 for adjusting the flow of the refrigerant flowing through the connection pipe 170. With the configuration including the connection pipe 170 and the bypass valve 172, the degree of freedom in adjusting the compression ratio is improved. Further, this embodiment can be applied to a screw compressor having an internal volume ratio variable mechanism in which the suction volume is fixed.
  • the present invention is not limited to the above embodiment, and can be variously modified within the scope of the present invention. That is, the configuration of the above-described embodiment may be appropriately improved, or at least a part thereof may be replaced with another configuration. Furthermore, the constituent elements whose arrangement is not particularly limited are not limited to the arrangement disclosed in the embodiment, and can be arranged at a position where the function can be achieved.
  • Embodiment 1 or Embodiment 2 can be combined with Embodiment 3. That is, the screw compressor has a configuration in which the suction volume of the compression chamber 5a is adjusted by the slide valve 7 and a configuration in which the suction volume of the compression chamber 5a is adjusted by the connection pipe 170 and the bypass valve 172. Is also good.

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Mechanical Engineering (AREA)
  • Thermal Sciences (AREA)
  • General Engineering & Computer Science (AREA)
  • Applications Or Details Of Rotary Compressors (AREA)

Abstract

熱源装置は、スクリューロータと、スクリューロータを収容しスクリューロータとともに圧縮室を形成するケーシングと、圧縮室の第1の圧力部と第1の圧力部よりも低い圧力の第2の圧力部とを接続するバイパス部と、を備えたスクリュー圧縮機と、スクリュー圧縮機が吸入する冷媒の温度または過熱度を検出する吸入センサと、スクリュー圧縮機が起動してから設定時間が経過する前、且つ吸入センサの検出結果が第1の設定値よりも高いときに、バイパス部を連通させる制御を実行する制御装置と、を備えたものである。

Description

熱源装置および冷凍サイクル装置
 この発明は、スクリュー圧縮機を有する熱源装置および冷凍サイクル装置に関するものである。
 従来から、スクリュー圧縮機を有する熱源装置が知られている(例えば、特許文献1参照)。特許文献1では、熱源装置の起動時に、電子膨張弁の開度の制御を行っている。
特開2007-85615号公報
 特許文献1では、電子膨張弁の開度を制御して、熱源装置の起動時から安定運転に到達させている。特許文献1では、多量の冷媒を循環させながら、熱源装置を安定化させているため、熱源装置を起動してから熱源装置が安定化するまでに長時間を必要とする場合がある。
 この発明は、上記のような課題を鑑みてなされたもので、熱源装置を起動してから熱源装置が安定化するまでの時間を短時間化することができる熱源装置を得ることを目的とする。
 この発明に係る熱源装置は、スクリューロータと、スクリューロータを収容しスクリューロータとともに圧縮室を形成するケーシングと、圧縮室の第1の圧力部と第1の圧力部よりも低い圧力の第2の圧力部とを接続するバイパス部と、を備えたスクリュー圧縮機と、スクリュー圧縮機が吸入する冷媒の温度または過熱度を検出する吸入センサと、スクリュー圧縮機が起動してから設定時間が経過する前、且つ吸入センサの検出結果が第1の設定値よりも高いときに、バイパス部を連通させる制御を実行する制御装置と、を備えたものである。
 この発明の熱源装置は、スクリュー圧縮機が起動してから設定時間が経過する前、且つ吸入センサの検出結果が第1の設定値よりも高いときに、圧縮室の中圧部と低圧部とを接続して圧縮比を小さくすることで、熱源装置の動作を安定させている。したがって、この発明の熱源装置によれば、熱源装置を起動してから熱源装置が安定化するまでの時間を短時間化することができる。
この発明の実施の形態1に係る冷凍サイクル装置の一例を示す図である。 図1に記載のスクリュー圧縮機の一例を示す図である。 図2に記載のスクリュー圧縮機の圧縮室の吸入工程の一例を示す図である。 図2に記載のスクリュー圧縮機の圧縮室の圧縮工程の一例を示す図である。 図2に記載のスクリュー圧縮機の圧縮室の吐出工程の一例を示す図である。 図2に記載のスクリュー圧縮機のスライドバルブが第1の位置にあるときの一例を示す図である。 図6に記載のスライドバルブが第2の位置にあるときの一例を示す図である。 図6に記載のスライドバルブが第3の位置にあるときの一例を示す図である。 図6に記載のスライドバルブが第1の位置にあるときの、スライドバルブとバイパス開口部との関係を示す図である。 図6に記載のスライドバルブが第2の位置にあるときの、スライドバルブとバイパス開口部との関係を示す図である。 図6に記載のスライドバルブが第3の位置にあるときの、スライドバルブとバイパス開口部との関係を示す図である。 図6に記載のスライドバルブが第1の位置にあるときの、冷凍サイクル装置の動作を説明する図である。 図6に記載のスライドバルブが第2の位置にあるときの、冷凍サイクル装置の動作を説明する図である。 図6に記載のスライドバルブが第3の位置にあるときの、冷凍サイクル装置の動作を説明する図である。 図1に記載の冷凍サイクル装置の起動時の制御の一例を示す図である。 実施の形態1の変形例1を示す図である。 実施の形態1の変形例1の冷凍サイクル装置の起動時の制御の一例を示す図である。 この発明の実施の形態2に係るスクリュー圧縮機の一例を示す図である。 実施の形態2の冷凍サイクル装置の起動時の制御の一例を示す図である。 この発明の実施の形態3に係るスクリュー圧縮機の一例を示す図である。
 以下、図面を参照して、この発明の実施の形態について説明する。なお、各図中、同一または相当する部分には、同一符号を付して、その説明を適宜省略または簡略化する。また、各図に記載の構成について、その形状、大きさおよび配置等は、この発明の範囲内で適宜変更することができる。
実施の形態1.
[冷凍サイクル装置]
 図1は、この発明の実施の形態1に係る冷凍サイクル装置の一例を示す図である。この実施の形態の冷凍サイクル装置100は、倉庫等の冷却空間を冷却する冷凍装置に適用されるものである。なお、冷凍サイクル装置100は、ビル等の空調を行う空気調和装置に適用することができる。冷凍サイクル装置100は、熱源装置200と負荷装置400とを有している。熱源装置200は、冷却空間の外部に設けられ、負荷装置400に熱を供給するものである。熱源装置200は、例えば屋外に設けられるが、機械室等に設けられてもよい。負荷装置400は、冷却空間の内部に設けられ、冷却空間を冷却するものである。負荷装置400は、膨張弁105と負荷側熱交換器106と負荷側送風機(図示を省略)を有している。膨張弁105は、冷媒を膨張させるものである。膨張弁105は、例えば開度を調整することができる電子式膨張弁であるが、開度を調整することができない毛細管であってもよい。なお、膨張弁105は、負荷装置400の外部に設けられてもよい。負荷側熱交換器106は、空気を冷媒と熱交換させるものである。負荷側熱交換器106は、フィンおよびチューブで形成されたフィンチューブ式の熱交換器である。負荷側熱交換器106は、冷媒と水等の熱媒体を熱交換させるプレート式の熱交換器等であってもよい。この実施の形態の負荷側熱交換器106は、冷媒を蒸発させる蒸発器として機能する。負荷側送風機(図示を省略)は、負荷側熱交換器106に空気を送風するものである。負荷側送風機(図示を省略)が送風を行うことで、負荷側熱交換器106と熱交換した空気が、冷却空間に吹き出される。
 熱源装置200は、スクリュー圧縮機102と熱源側熱交換器104とを有している。スクリュー圧縮機102は、冷媒を圧縮するものである。この実施の形態の例のスクリュー圧縮機102は、二段シングルスクリュー圧縮機であり、スクリューロータ3aと高圧スクリューロータ3bとモータ103と有している。電力供給源(図示せず)からインバータ101を介してモータ103へ電力供給されることによって、モータ103が動作する。モータ103が動作することで、モータ103と接続されたスクリューロータ3aおよび高圧スクリューロータ3bが回転し、冷媒が圧縮される。熱源側熱交換器104は、フィンおよびチューブで形成されたフィンチューブ式の熱交換器である。熱源側熱交換器104は、冷媒と水等の熱媒体を熱交換させるプレート式の熱交換器等であってもよい。この実施の形態の熱源側熱交換器104は、冷媒を凝縮させる凝縮器として機能する。熱源側送風機(図示を省略)は、熱源側熱交換器104に空気を送風するものである。熱源側送風機(図示を省略)が送風を行うことで、熱源側熱交換器104での熱交換が促進される。また、熱源装置200は、制御装置110およびセンサ類を有している。制御装置110は、熱源装置200の外部に設けられていてもよく、例えば負荷装置400の内部等に設けることができる。制御装置110は、CPUと、各種データを記憶するRAMと、運転制御を行うためのプログラム等を記憶するROM(何れも図示せず)とを備えたマイクロコンピュータなどで形成されている。制御装置110は、冷凍サイクル装置100の全体の制御を行うものである。制御装置110は、例えば、膨張弁105、スクリュー圧縮機102等の制御を行う。熱源装置200が備えるセンサ類は、スクリュー圧縮機102に吸入される冷媒の温度を検出する吸入温度センサ、スクリュー圧縮機102に吸入される冷媒の圧力を検出する吸入圧力センサ、スクリュー圧縮機102が吐出する冷媒の温度を検出する吐出温度センサ、スクリュー圧縮機102が吐出する冷媒の圧力を検出する吐出圧力センサ等を有している。なお、吸入温度センサまたは吸入圧力センサは、この実施の形態の「吸入センサ」に相当するものである。スクリュー圧縮機102が吸入する冷媒の過熱度は、例えば、吸入温度センサが検出した温度と吸入圧力センサが検出した圧力から算出される飽和ガス温度とから算出される。
[冷媒回路]
 熱源装置200と負荷装置400とが冷媒配管で接続されることで、冷媒回路109が形成される。冷媒回路109は、スクリュー圧縮機102と熱源側熱交換器104と膨張弁105と負荷側熱交換器106とが冷媒配管で接続されることで形成され、冷媒が循環するものである。スクリュー圧縮機102で圧縮された高温高圧の冷媒は、熱源側熱交換器104で凝縮しながら放熱する。熱源側熱交換器104で凝縮した冷媒は、膨張弁105で膨張する。膨張弁105で膨張した冷媒は、負荷側熱交換器106で蒸発しながら空気から吸熱し、空気を冷却する。負荷側熱交換器106で蒸発した冷媒は、スクリュー圧縮機102に吸入され、再び圧縮される。
[スクリュー圧縮機]
 図2は、図1に記載のスクリュー圧縮機の一例を示す図である。図2に示すように、スクリュー圧縮機102を形成する筒状のケーシング10の内部に、モータ103とスクリューロータ3aと高圧スクリューロータ3bとスクリュー軸4とゲートロータ6aと高圧ゲートロータ6bと備えている。また、ケーシング1の内部には、低圧側と高圧側とを仕切る隔壁(図示せず)が設けられている。スクリューロータ3aを有する低圧圧縮部で圧縮された冷媒は、中間室11に吐出される。中間室11の冷媒は、高圧スクリューロータ3bを有する高圧圧縮部で圧縮され、ケーシング10に設けられた吐出口(図示を省略)から吐出される。モータ103は、ケーシング1の内部に固定されたステータ2aとステータ2aの内側に設けられたモータロータ2bとを有している。スクリューロータ3aおよび高圧スクリューロータ3bとモータロータ2bとは、互いに同一軸線上に設けられている。スクリューロータ3aおよび高圧スクリューロータ3bとモータロータ2bとは、スクリュー軸4で接続されている。スクリューロータ3aの外周面には、圧縮室5aを形成する複数の螺旋状の圧縮溝が形成されており、高圧スクリューロータ3bの外周面には、高圧圧縮室5bを形成する複数の螺旋状の圧縮溝が形成されている。ゲートロータ6aは、スクリューロータ3aの外周面に形成された圧縮溝と噛み合わされる複数の歯を有している。高圧ゲートロータ6bは、高圧スクリューロータ3bの外周面に形成された圧縮溝と噛み合わされる複数の歯を有している。圧縮室5aは、ケーシング10の内周面、スクリューロータ3a、およびゲートロータ6aなどで形成される。高圧圧縮室5bは、ケーシング10の内周面、高圧スクリューロータ3b、および高圧ゲートロータ6bなどで形成される。スクリューロータ3aおよび高圧スクリューロータ3bは、モータロータ2bが回転することで、回転駆動される。スクリューロータ3aが回転することで、ゲートロータ6aの歯がスクリューロータ3aの圧縮溝の内側を相対的に移動する。高圧スクリューロータ3bが回転することで、高圧ゲートロータ6bの歯が高圧スクリューロータ3bの圧縮溝の内側を相対的に移動する。上記の動作によって、圧縮室5aおよび高圧圧縮室5bのそれぞれは、吸入行程、圧縮行程および吐出行程を一サイクルとして、このサイクルを繰り返す。
[スクリュー圧縮機の動作]
 図3は、図2に記載のスクリュー圧縮機の圧縮室の吸入工程の一例を示す図である。図4は、図2に記載のスクリュー圧縮機の圧縮室の圧縮工程の一例を示す図である。図5は、図2に記載のスクリュー圧縮機の圧縮室の吐出工程の一例を示す図である。図3~図5では、ドットのハッチングで示した圧縮室5aに着目して、圧縮工程を説明する。図3は、吸入行程における圧縮室5aの状態を示している。スクリューロータ3aが実線矢印の方向に回転すると、図4に示すように圧縮室5aの容積が縮小する。さらに、スクリューロータ3aが回転すると、図5に示すように、圧縮室5aが吐出部12と連通する。圧縮室5aで圧縮された高圧の冷媒は、吐出部12から吐出される。吐出部12から吐出された冷媒は、高圧圧縮室5bに吸入されて、更に圧縮される。なお、高圧圧縮室5bは、圧縮室5aと同様に冷媒を圧縮するため、説明を省略する。
 図6は、図2に記載のスクリュー圧縮機のスライドバルブが第1の位置にあるときの一例を示す図である。図7は、図6に記載のスライドバルブが第2の位置にあるときの一例を示す図である。図8は、図6に記載のスライドバルブが第3の位置にあるときの一例を示す図である。図9は、図6に記載のスライドバルブが第1の位置にあるときの、スライドバルブとバイパス開口部との関係を示す図である。図10は、図6に記載のスライドバルブが第2の位置にあるときの、スライドバルブとバイパス開口部との関係を示す図である。図11は、図6に記載のスライドバルブが第3の位置にあるときの、スライドバルブとバイパス開口部との関係を示す図である。図12は、図6に記載のスライドバルブが第1の位置にあるときの、冷凍サイクル装置の動作を説明する図である。図13は、図6に記載のスライドバルブが第2の位置にあるときの、冷凍サイクル装置の動作を説明する図である。図14は、図6に記載のスライドバルブが第3の位置にあるときの、冷凍サイクル装置の動作を説明する図である。図6~図8に示すように、スクリュー圧縮機102は、スライドバルブ7を有している。スライドバルブ7は、過渡運転時等に動作するものである。スライドバルブ7は、ケーシング10の内部にスライド自在に設けられている。スライドバルブ7は、連結棒8を介してピストンなどの駆動装置9に接続されている。駆動装置9は、例えば、ガス圧または油圧で駆動するピストンを利用したものであるが、モータ等で駆動するものであってもよい。駆動装置9を駆動することにより、スライドバルブ7は、スクリューロータ3aの回転軸方向にスライド移動する。スライドバルブ7は、ケーシング10の内周面とともに、圧縮室5aの一部分を形成している。すなわち、図9~図11に示すように、ケーシング10には、バイパス開口部70が形成されている。バイパス開口部70は、圧縮室5aの中圧となる中圧部と、圧縮室5aの低圧となる低圧部と、を繋ぐように、ケーシング10に形成された穴である。低圧部は、圧縮室5aが冷媒を吸入する吸入部と連通しており、中圧部と低圧部とが連通することで、吸入容積が小さくなる。スライドバルブ7が、軸方向に沿って移動することで、バイパス開口部70の開口面積が調整される。バイパス開口部70の開口面積を調整することで、圧縮室5aが冷媒を吸入する吸入容積が調整される。なお、この実施の形態のスライドバルブ7は、2個のスライドバルブ7が同時にスライド移動するようになっているが、スライドバルブ7は1個であってもよい。スライドバルブ7は3個以上であってもよい。バイパス開口部70は、この実施の形態の「バイパス部」に相当するものであり、スライドバルブ7は、この実施の形態の「調整部」に相当するものである。なお、バイパス開口部70は、第1の圧力部と第1の圧力部よりも低い圧力の第2の圧力部とを繋ぐように形成されたものであればよい。圧力が高い部分と圧力が低い部分とを連通することで圧力比を小さくすることができる。
 この実施の形態のスライドバルブ7は、図6に示す第1の位置、図7に示す第2の位置、図8に示す第3の位置の3つの位置に移動する。スライドバルブ7は、図6に示す第1の位置では、図9に示すように、バイパス開口部70の大部分を覆い、理想的にはバイパス開口部70を完全に塞ぐ。スライドバルブ7が第1の位置に設けられることで、圧縮室5aの吸入容積が最大となる。圧縮室5aの吸入容積が最大となることで、図12に示すように、圧縮室5aによる圧縮比が最大となる。
 スライドバルブ7は、図7に示す第2の位置では、図10に示すように、バイパス開口部70の大部分を開口させる。スライドバルブ7が第2の位置に設けられることで、スライドバルブ7が第1の位置に設けられたときと比較して、圧縮室5aの吸入容積が小さくなる。圧縮室5aの吸入容積が小さくなることで、図13に示すように、圧縮室5aによる圧縮比が小さくなる。
 スライドバルブ7は、図8に示す第3の位置では、図11に示すように、バイパス開口部70の中程度を開口させる。スライドバルブ7が第2の位置に設けられることで、スライドバルブ7が第1の位置に設けられたときと比較して圧縮室5aの吸入容積が小さくなり、且つスライドバルブ7が第3の位置に設けられたときと比較して圧縮室5aの吸入容積が大きくなる。すなわち、この実施の形態の例では、スライドバルブ7が第2の位置に設けられることで、圧縮室5aの吸入容積が中程度となる。圧縮室5aの吸入容積が中程度となることで、図14に示すように、圧縮室5aによる圧縮比が中程度となる。なお、スライドバルブ7は、3つの位置に移動するものに限定されず、2つの位置を移動するものであってもよい。スライドバルブ7は、4つ以上の位置を移動するものであってもよい。つまり、スライドバルブ7を移動させることで、吸入容積を変化させることができるようになっていればよい。なお、スライドバルブ7は、定常運転時には、通常、吸入容積が最大になる第1の位置となる。
 図15は、図1に記載の冷凍サイクル装置の起動時の制御の一例を示す図である。すなわち、この実施の形態の冷凍サイクル装置100は、起動後、設定時間が経過までは、図15の制御を実行し、設定時間が経過した後は、通常制御に移行する。なお、冷凍サイクル装置100が冷凍装置に適用されるときは、配管の長さによるが、数十分程度、図15の制御を実行する。冷凍サイクル装置100に封入された冷媒の量が多いときは、冷媒回路の冷媒の状態が安定するまでに長時間を必要とする場合があるためである。例えば、気温が高い地域または気温が高い時期等に、冷凍サイクル装置100の動作を長時間停止したときは、低圧の冷媒の状態が安定するまでに長時間を必要とする。低圧の配管に封入され、温められた冷媒の量が多くなるためである。この実施の形態の冷凍サイクル装置100は、起動時に、スクリュー圧縮機102が吸入する冷媒の過熱度である吸込SHを利用して、スライドバルブ7の制御を実行する。この実施の形態の例の冷凍サイクル装置100は、閾値A、閾値B、閾値Cの3つの閾値を有している。閾値A、閾値B、閾値Cは、予め設定されており、例えば、制御装置110に記憶されている。3つの閾値の関係性は、閾値A>閾値B>閾値Cとなっている。閾値A>閾値B>閾値Cとすることで、ハンチングを抑制することができる。
 図15のステップS1にて、吸込SHが閾値Aよりも高いか否かを比較する。ステップS1にて吸込SHが閾値A以下であるときは、ステップS4に進む。ステップS1にて吸込SHが閾値Aよりも高いときは、過渡運転と判断し、ステップS2に進む。ステップS2にて、スライドバルブ7は図10に示す第2の位置となる。ステップS3にて吸込SHが閾値Aよりも高いときは、ステップS2に戻る。ステップS3にて吸込SHが閾値A以下となると、ステップS4に進む。
 ステップS4にて、吸込SHが閾値Bよりも高いか否かを比較する。ステップS4にて吸込SHが閾値B以下であるときは、ステップS7に進む。ステップS4にて吸込SHが閾値Bよりも高いときは、ステップS5に進む。ステップS5にて、スライドバルブ7は図11に示す第3の位置となる。ステップS6にて、吸込SHが閾値Cよりも高いか否かを比較する。ステップS6にて吸込SHが閾値Cよりも高いときは、ステップS5に戻る。ステップS6にて吸込SHが閾値C以下となると、ステップS7に進む。ステップS7にて、スライドバルブ7は図9に示す第1の位置となり、ステップS1に戻る。
 上記のように、この実施の形態の冷凍サイクル装置100は、起動時に吸入ガス温度が高いときは、スライドバルブ7の位置を調整して、スクリュー圧縮機102の圧縮容積を小さくする。起動時の吸入ガス温度が高いときに、スクリュー圧縮機102の圧縮容積を小さくすることで、スクリュー圧縮機102から吐出される冷媒の温度を低下させることができる。スクリュー圧縮機102から吐出される冷媒の温度を低下させることで、スクリューロータ3a、高圧スクリューロータ3bの焼き付き等を抑制することができる。さらに、この実施の形態によれば、熱源装置200の起動後、短時間で、冷却対象を目標温度に到達させることができる。
 また、この実施の形態では、定常運転時はスライドバルブ7が第1の位置に位置しており、過渡運転時は吸入容積が小さくなる第2の位置、もしくは第2の位置よりも吸入容積が大きく且つ第1の位置よりも吸入容積が小さい第3の位置にスライドバルブが移動にする。吸入容積を段階的に調整することで、冷却能力を段階的に向上させることができるため、プルダウンの運転時間を短時間化することができる。
 例えば、この実施の形態の例のスクリュー圧縮機102は、二段スクリュー圧縮機であり、起動時の吸入ガス温度が高いときに、スライドバルブ7の位置を調整して圧縮室5aの圧縮容積を小さくし、高圧圧縮室5bの圧縮容積は変更しない。高圧圧縮室5bの圧縮容積を変更せずに、圧縮室5aの圧縮容積を小さくすることで、図2に示す中間室11の圧力である中間圧は、図13に示すように、低下する。すなわち、スクリューロータ3aを有する低圧圧縮部の圧縮比が低くなり、高圧スクリューロータ3bを有する高圧圧縮部の圧縮比が高くなる。低圧圧縮部の圧縮比が低くなることで、低圧圧縮部の吐出温度は低下する。これにより高圧圧縮部の吸入ガス温度は低下し、高圧圧縮部の吐出温度が低下する。なお、中間室11にインジェクションを行う構成を有する場合は、低圧圧縮部の吐出温度の低下が小さい場合、高圧圧縮部の吐出温度が予め設定された設定範囲内に収まるよう、中間室11に液インジェクションを行うとよい。中間室11への液インジェクションを行うことで、高圧圧縮部の吸入過熱度の上昇を抑制し、かつ高圧圧縮部の吐出温度を設定範囲内とすることができる。なお、中間室11へのインジェクションは、例えば、エコノマイザでの過冷却に用いた冷媒、油分離器で分離して冷却した油等、高圧圧縮部の吐出温度を低下させることができるものであればよい。
 上記のように、この実施の形態の例の熱源装置200は、スクリューロータ3aと、スクリューロータ3aを収容しスクリューロータ3aとともに圧縮室5aを形成するケーシング10と、圧縮室5aの第1の圧力部と第1の圧力部よりも低い圧力の第2の圧力部とを接続するバイパス部とを備えたスクリュー圧縮機102と、スクリュー圧縮機102が吸入する冷媒の温度または過熱度を検出する吸入センサと、スクリュー圧縮機102が起動してから設定時間が経過する前、且つ吸入センサの検出結果が第1の設定値よりも高いときに、バイパス部を連通させる制御を実行する制御装置110とを備えたものである。この実施の形態によれば、熱源装置200を起動後に、バイパス部を連通させて圧縮室5aの圧縮比を小さくすることで、熱源装置200の動作を安定化させているため、熱源装置200を起動後、熱源装置200の動作が安定化するまでの時間を短時間化することができる。この実施の形態の例では、熱源装置200の起動後、設定時間が経過までは、通常制御のときと比較して、圧縮室5aの圧縮比を小さくする。例えば、この実施の形態の例では、熱源装置200の起動後、設定時間が経過までは、バイパス開口部70が最も大きくなるようにスライドバルブ7を移動させて、圧縮室5aの圧縮比を最も小さくする。さらに、この実施の形態によれば、熱源装置200の起動後の熱源装置200の動作の安定化を確実化することができる。さらに、この実施の形態によれば、熱源装置200の起動後、短時間で、冷却対象を目標温度に到達させることができる。
 例えば、制御装置110は、設定時間が経過する前の第1時刻t1が経過する前は、吸入センサの検出結果にかかわらず、バイパス部を連通させる制御を実行する。熱源装置200の起動時に、無条件で、圧縮比を小さくしておくことで、熱源装置200の起動を安定化させることができる。なお、この実施の形態の熱源装置200は、スクリューロータ3aと、スクリューロータ3aを収容し該スクリューロータ3aとともに圧縮室5aを形成するケーシング10と、圧縮室5aの第1の圧力部と該第1の圧力部よりも低い圧力の第2の圧力部とを接続するバイパス部と、を備えたスクリュー圧縮機102と、スクリュー圧縮機102が起動してから第1時刻t1が経過する前は、バイパス部を連通させる制御を実行する制御装置110と、を備えたものであってもよい。熱源装置200の起動時に、無条件で、圧縮比を小さくしておくことで、熱源装置200の起動を安定化させることができる。
 また、例えば、熱源装置200は、バイパス部が複数個設けられたものである。また、例えば、熱源装置200は、バイパス部が偶数個設けられたものである。また、例えば、熱源装置200は、一対のバイパス部が、スクリューロータ3aを挟んで線対称となる位置に設けられたものである。バイパス部が複数個設けられた構成とすることで、圧縮比の調整量を大きくすることができる。また、バイパス部が複数個設けられた構成とすることで、圧縮比の調整量を例えば複数段階等の細やかなものとすることができる。また、一対のバイパス部を同時に制御することによって、圧縮室5aの挙動が安定化する。
 また、例えば、熱源装置200は、バイパス部に設けられ、圧縮室5aの圧縮比を調整する調整部をさらに備えたものである。圧縮室5aの圧縮比を調整できる構成とすることで、熱源装置200の起動を更に安定化させることができる。また、熱源装置200の起動後、短時間で、冷却対象を目標温度に到達させることができる。
 また、例えば、制御装置110は、吸入センサの検出結果が第1の設定値よりも高い第2の設定値のときに、圧縮比を第1の圧縮比とするように調整部を制御し、吸入センサの検出結果が第1の設定値よりも高く且つ第2の設定値よりも低いときに、圧縮比を第1の圧縮比よりも小さい第2の圧縮比とするように調整部を制御する。吸入センサの検出結果に応じて、圧縮比を調整する構成とすることで、熱源装置200の起動後、短時間で、冷却対象を目標温度に到達させることができる。
 また、例えば、バイパス部は、第1の圧力部と第2の圧力部とを繋ぐようにケーシング10に形成されたバイパス開口部70を有し、調整部は、バイパス開口部70を覆って第1の圧力部と第2の圧力部とを連通させない第1の位置と、バイパス開口部70の少なくとも一部分を覆わずに第1の圧力部と第2の圧力部とを連通させる第2の位置と、をスライド移動するスライドバルブ7を有するものである。スライドバルブ7を利用して、圧縮比を調整する構成とすることで、圧縮比を低下させないで運転を行うときに不要となる死容積を低減することができる。
 また、例えば、スクリュー圧縮機102は、圧縮室5aを収容した低圧側と、圧縮室5aで圧縮された冷媒を圧縮する高圧圧縮室5bを収容した高圧側と、を仕切る隔壁を有する二段スクリュー圧縮機である。スクリュー圧縮機102が二段スクリュー圧縮機であるときは、低圧側で圧縮比を調整する制御を実行し、高圧側で吐出タイミングを調整する制御を実行することができるため、起動時の制御を安定化させることができる。さらに、熱源装置200の起動後、短時間で、冷却対象を目標温度に到達させることができる。
 また、例えば、第2の圧力部は、圧縮室5aが冷媒を吸入する吸入部と連通するものである。吸入部と吸入部よりも高い圧力の部分とを連通する構造は、吸入容積を調整する構造となるため、圧縮過程の圧縮室同士を連通する構造と比較して、圧縮工程の挙動を安定化することができる。
 また、たとえば、冷凍サイクル装置100は、熱源装置200と、熱源装置200と接続された負荷装置400と、を有するものである。この実施の形態の熱源装置200は、負荷装置400と接続する配管長が長くなる冷却倉庫等に適用されたときに効果が顕著となる。冷凍サイクル装置100に貯留された冷媒の量が多いときは、冷凍サイクル装置100の起動後に、冷媒の状態を安定化させるのが困難であり且つ長時間を必要とするためである。なお、気温が高い地域または気温が高い記事は、冷凍サイクル装置100の停止時に、冷媒配管に貯留された冷媒の温度が高くなるため、この実施の形態の熱源装置200による効果が更に顕著となる。
 なお、この実施の形態は、上記で説明したものに限定されない。
 例えば、上記では、二段シングルスクリュー圧縮機に関する説明を行ったが、この実施の形態は、二段ツインスクリュー圧縮機、単段シングルスクリュー圧縮機、単段ツインスクリュー圧縮機等に適用することができる。つまり、この実施の形態は、圧縮部の圧縮比を調整できるものに適用することができる。
 また、例えば、上記では、起動時に、吸込SHを利用して、スライドバルブ7の制御を実行する例について説明したが、吸込SHに変えて、吸入ガス温度を利用して、スライドバルブ7の制御を行ってもよい。また、吸込SHと吸入ガス温度とを利用して、起動時のスライドバルブ7の制御を行ってもよい。
[変形例1]
 また、例えば、図16は、実施の形態1の変形例1を示す図である。図17は、実施の形態1の変形例1の冷凍サイクル装置の起動時の制御の一例を示す図である。図16および図17に示すように、変形例1は、起動時に、低圧圧力と吸入ガス温度とを利用して、スライドバルブ7の制御を実行する。この実施の形態の例の冷凍サイクル装置100は、閾値D、閾値E、閾値Fの3つの閾値を有している。閾値D、閾値E、閾値Fは、予め設定されており、例えば、制御装置110に記憶されている。3つの閾値の関係性は、閾値D>閾値E>閾値Fとなっている。閾値D>閾値E>閾値Fとすることで、ハンチングを抑制することができる。
 図16に示すように、閾値D、閾値E、閾値Fは、吸入ガス温度と低圧圧力とによって決まる値である。吸込SHが同一の場合、低圧圧力が高いほど吸入ガス温度は高くなる。
したがって、低圧圧力が高くなると吐出ガス温度も高くなり、スクリューロータ3a、高圧スクリューロータ3bが焼き付くおそれが大きくなる。低圧圧力が高い場合は、吸込SHの上限を下げる必要がある。そこで、吸入ガス温度と低圧圧力との関係を利用して、スライドバルブ7を制御することで、実施の形態1と比較して、低圧が低いときにスライドバルブ7を第1の位置として運転することができる範囲が拡大する。スライドバルブ7を第1の位置として運転することができる範囲が拡大することで、冷凍サイクル装置100の効率が向上し、冷却対象を効率よく冷却することができる。
 次に変形例1の動作について説明する。図17のステップS21にて、吸入ガス温度が閾値Dよりも高いか否かを比較する。ステップS21にて吸入ガス温度が閾値D以下であるときは、ステップS24に進む。ステップS21にて吸入ガス温度が閾値Dよりも高いときは、過渡運転と判断し、ステップS22に進む。ステップS22にて、スライドバルブ7は図10に示す第2の位置となる。ステップS23にて吸入ガス温度が閾値Dよりも高いときは、ステップS22に戻る。ステップS23にて吸入ガス温度が閾値D以下となると、ステップS24に進む。
 ステップS24にて、吸入ガス温度が閾値Eよりも高いか否かを比較する。ステップS24にて吸入ガス温度が閾値E以下であるときは、ステップS27に進む。ステップS24にて吸入ガス温度が閾値Eよりも高いときは、ステップS25に進む。ステップS25にて、スライドバルブ7は図11に示す第3の位置となる。ステップS26にて、吸入ガス温度が閾値Fよりも高いか否かを比較する。ステップS26にて吸入ガス温度が閾値Fよりも高いときは、ステップS25に戻る。ステップS26にて吸入ガス温度が閾値F以下となると、ステップS27に進む。ステップS27にて、スライドバルブ7は図9に示す第1の位置となり、ステップS21に戻る。
[変形例2]
 また、例えば、変形例2の冷凍サイクル装置100は、起動後、図15の制御を実行する前に、圧縮室5aの吸入容積を小さくしておく。つまり、冷凍サイクル装置100の起動後の第1時刻t1までの準備時間は、吸込SHの大きさにかかわらず圧縮室5aの吸入容積を小さくしておく。そして、冷凍サイクル装置100は、準備時間が経過した後であって設定時間が経過までは、図15の制御を実行する。変形例2のように、冷凍サイクル装置100の起動後、準備時間が経過するまでは、無条件で圧縮室5aの吸入容積を小さくしておくことで、スクリューロータ3a、高圧スクリューロータ3bの焼き付き等のおそれを更に低減することができる。なお、準備時間は、設定時間と比較して短い時間であり、例えば設定時間が数十分であるときは、準備時間は数分よりも短い時間である。
実施の形態2.
 図18は、この発明の実施の形態2に係るスクリュー圧縮機の一例を示す図である。図19は、実施の形態2の冷凍サイクル装置の起動時の制御の一例を示す図である。なお、図18において、図6と同一の構成については、同一の符号を付して、説明を省略しまたは簡略化する。この実施の形態の例のスクリュー圧縮機102は、第1の駆動装置90aと第1の連結棒80aと第1のスライドバルブ70aと第2の駆動装置90bと第2の連結棒80bと第2のスライドバルブ70bとを有している。すなわち、実施の形態1は、2個のスライドバルブ7が同時にスライド移動するものであり、実施の形態2は、第1のスライドバルブ70aと第2のスライドバルブ70bのそれぞれが独立してスライド移動するものである。
 次に、実施の形態2のスクリュー圧縮機102の動作について説明する。図19のステップS11にて、吸込SHが閾値Aよりも高いか否かを比較する。ステップS11にて吸込SHが閾値A以下であるときは、ステップS14に進む。ステップS11にて吸込SHが閾値Aよりも高いときは、過渡運転と判断し、ステップS12に進む。ステップS12にて、第1のスライドバルブ70aおよび第2のスライドバルブ70bは図10に示す第2の位置となる。ステップS13にて吸込SHが閾値Aよりも高いときは、ステップS12に戻る。ステップS13にて吸込SHが閾値A以下となると、ステップS14に進む。
 ステップS14にて、吸込SHが閾値Bよりも高いか否かを比較する。ステップS14にて吸込SHが閾値B以下であるときは、ステップS17に進む。ステップS14にて吸込SHが閾値Bよりも高いときは、ステップS15に進む。ステップS15にて、第1のスライドバルブ70aおよび第2のスライドバルブ70bの一方は図9に示す第1の位置となり、他方は図10に示す第2の位置から移動しない。ステップS16にて、吸込SHが閾値Cよりも高いか否かを比較する。ステップS16にて吸込SHが閾値Cよりも高いときは、ステップS15に戻る。ステップS16にて吸込SHが閾値C以下となると、ステップS7に進む。ステップS7にて、第1のスライドバルブ70aおよび第2のスライドバルブ70bは図9に示す第1の位置となり、ステップS11に戻る。
 上記のように、実施の形態2によれば、第1のスライドバルブ70aおよび第2のスライドバルブ70bのそれぞれがスライド移動する構成であるため、第1のスライドバルブ70aおよび第2のスライドバルブ70bのそれぞれを、第1の位置と第2の位置とに移動することができる構成とすることで、圧縮室5aの吸入容積を三段階に調整することができる。つまり、実施の形態1は、スライドバルブ7のそれぞれを三段階に位置調整できる複雑な機構としてあるのに対して、実施の形態2は、第1のスライドバルブ70aおよび第2のスライドバルブ70bのそれぞれを二段階に位置調整するシンプルな機構とすることができる。
 なお、この実施の形態は、上記で説明したものに限定されない。例えば、実施の形態2の第1のスライドバルブ70aおよび第2のスライドバルブ70bのそれぞれが複数の段階にスライド移動する構成とすることで、圧縮室5aの吸入容積を細やかに制御することができる。例えば、第1のスライドバルブ70aおよび第2のスライドバルブ70bのそれぞれが、図9に示す第1の位置、図10に示す第2の位置、図11に示す第3の位置に位置できるように構成すれば、5段階以上に吸入容積を調整することができる。すなわち、第1のスライドバルブ70aと第2のスライドバルブ70bとの組合せが、第2の位置と第2の位置、第2の位置と第3の位置、第3の位置と第3の位置、第3の位置と第1の位置、第1の位置と第1の位置、の5段階である。第1のスライドバルブ70aが調整する調整量と第2のスライドバルブ70bが調整する調整量とを異ならせてもよい。圧縮室5aの吸入容積を細やかに調整することで、冷却能力を細やかに調整することができるため、プルダウンの運転時間を短時間化することができる。
実施の形態3.
 図20は、この発明の実施の形態3に係るスクリュー圧縮機の一例を示す図である。なお、図20において、図1と同一の構成については、同一の符号を付して、説明を省略しまたは簡略化する。この実施の形態のスクリュー圧縮機102は、接続配管170とバイパス弁172とを有している。接続配管170は、この実施の形態の「バイパス部」に相当するものであり、バイパス弁172は、この実施の形態の「調整部」に相当するものである。
 接続配管170は、圧縮室5aの中圧となる中圧部と圧縮室5aの低圧となる吸入部とを繋ぐものである。なお、接続配管170は、圧縮室5aの第1の圧力部と該第1の圧力部よりも低い圧力の第2の圧力部とを接続するものであればよい。バイパス弁172は、接続配管170に設けられ、接続配管170に流れる冷媒の流量を調整するものである。バイパス弁172の開度を調整することで、圧縮室5aの吸入容積を調整することができる。すなわち、バイパス弁172の開度を大きくすると、圧縮室5aの吸入容積が小さくなる。
 上記のように、この実施の形態のスクリュー圧縮機102では、バイパス部は、第1の圧力部と第2の圧力部とを繋ぐ接続配管170を有し、調整部は、接続配管170に設けられて接続配管170に流れる冷媒の流れを調整するバイパス弁172を有するものである。接続配管170とバイパス弁172とを有する構成とすることで、圧縮比の調整の自由度が向上する。また、この実施の形態は、吸入容積が固定となる内部容積比可変機構を備えたスクリュー圧縮機に適用することができる。
 この発明は、上記の実施の形態に限定されるものではなく、この発明の範囲内で種々に改変することができる。すなわち、上記の実施の形態の構成を適宜改良してもよく、また、少なくとも一部を他の構成に代替させてもよい。さらに、その配置について特に限定のない構成要件は、実施の形態で開示した配置に限らず、その機能を達成できる位置に配置することができる。
 例えば、実施の形態1または実施の形態2と、実施の形態3とを組み合わせることができる。すなわち、スクリュー圧縮機は、スライドバルブ7によって圧縮室5aの吸入容積を調整する構成と、接続配管170とバイパス弁172とによって圧縮室5aの吸入容積を調整する構成と、を有するものであってもよい。
 1 ケーシング、2a ステータ、2b モータロータ、3a スクリューロータ、3b 高圧スクリューロータ、4 スクリュー軸、5a 圧縮室、5b 高圧圧縮室、6a ゲートロータ、6b 高圧ゲートロータ、7 スライドバルブ、8 連結棒、9 駆動装置、10 ケーシング、11 中間室、12 吐出部、70 バイパス開口部、70a 第1のスライドバルブ、70b 第2のスライドバルブ、80a 第1の連結棒、80b 第2の連結棒、90a 第1の駆動装置、90b 第2の駆動装置、100 冷凍サイクル装置、101 インバータ、102 スクリュー圧縮機、103 モータ、104 熱源側熱交換器、105 膨張弁、106 負荷側熱交換器、109 冷媒回路、110 制御装置、170 接続配管、172 バイパス弁、200 熱源装置、400 負荷装置。

Claims (13)

  1.  スクリューロータと、前記スクリューロータを収容し該スクリューロータとともに圧縮室を形成するケーシングと、前記圧縮室の第1の圧力部と該第1の圧力部よりも低い圧力の第2の圧力部とを接続するバイパス部と、を備えたスクリュー圧縮機と、
     前記スクリュー圧縮機が吸入する冷媒の温度または過熱度を検出する吸入センサと、
     前記スクリュー圧縮機が起動してから設定時間が経過する前、且つ前記吸入センサの検出結果が第1の設定値よりも高いときに、前記バイパス部を連通させる制御を実行する制御装置と、を備えた、
     熱源装置。
  2.  前記制御装置は、前記設定時間が経過する前の第1時刻が経過する前は、前記吸入センサの検出結果にかかわらず、前記バイパス部を連通させる制御を実行する、
     請求項1に記載の熱源装置。
  3.  前記バイパス部が複数個設けられた、
     請求項1または請求項2に記載の熱源装置。
  4.  前記バイパス部が偶数個設けられた、
     請求項3に記載の熱源装置。
  5.  一対の前記バイパス部が、前記スクリューロータを挟んで線対称となる位置に設けられた、
     請求項3または請求項4に記載の熱源装置。
  6.  前記バイパス部に設けられ、前記圧縮室の圧縮比を調整する調整部をさらに備えた、
     請求項1~請求項5の何れか一項に記載の熱源装置。
  7.  前記制御装置は、前記吸入センサの検出結果が前記第1の設定値よりも高い第2の設定値のときに、前記圧縮比を第1の圧縮比とするように前記調整部を制御し、前記吸入センサの検出結果が前記第1の設定値よりも高く且つ前記第2の設定値よりも低いときに、前記圧縮比を第1の圧縮比よりも小さい第2の圧縮比とするように前記調整部を制御する、
     請求項6に記載の熱源装置。
  8.  前記バイパス部は、前記第1の圧力部と前記第2の圧力部とを繋ぐように前記ケーシングに形成されたバイパス開口部を有し、
     前記調整部は、前記バイパス開口部を覆って前記第1の圧力部と前記第2の圧力部とを連通させない第1の位置と、前記バイパス開口部の少なくとも一部分を覆わずに前記第1の圧力部と前記第2の圧力部とを連通させる第2の位置と、をスライド移動するスライドバルブを有する、
     請求項6または請求項7に記載の熱源装置。
  9.  前記バイパス部は、前記第1の圧力部と前記第2の圧力部とを繋ぐ接続配管を有し、
     前記調整部は、前記接続配管に設けられて該接続配管に流れる冷媒の流れを調整するバイパス弁を有する、
     請求項6~請求項8の何れか一項に記載の熱源装置。
  10.  前記スクリュー圧縮機は、前記圧縮室を収容した低圧側と、前記圧縮室で圧縮された冷媒を圧縮する高圧圧縮室を収容した高圧側と、を仕切る隔壁を有する、
     請求項1~請求項9の何れか一項に記載の熱源装置。
  11.  前記第2の圧力部は、前記圧縮室が冷媒を吸入する吸入部と連通する、
     請求項1~請求項10の何れか一項に記載の熱源装置。
  12.  スクリューロータと、前記スクリューロータを収容し該スクリューロータとともに圧縮室を形成するケーシングと、前記圧縮室の第1の圧力部と該第1の圧力部よりも低い圧力の第2の圧力部とを接続するバイパス部と、を備えたスクリュー圧縮機と、
     前記スクリュー圧縮機が起動してから第1時刻が経過する前は、前記バイパス部を連通させる制御を実行する制御装置と、を備えた、
     熱源装置。
  13.  請求項1~請求項12の何れか一項に記載の熱源装置と、
     前記熱源装置と接続された負荷装置と、を有する、
     冷凍サイクル装置。
PCT/JP2018/034160 2018-09-14 2018-09-14 熱源装置および冷凍サイクル装置 WO2020054052A1 (ja)

Priority Applications (3)

Application Number Priority Date Filing Date Title
JP2020546650A JP6942265B2 (ja) 2018-09-14 2018-09-14 熱源装置および冷凍サイクル装置
PCT/JP2018/034160 WO2020054052A1 (ja) 2018-09-14 2018-09-14 熱源装置および冷凍サイクル装置
CN201880097180.6A CN112654823B (zh) 2018-09-14 2018-09-14 热源装置以及制冷循环装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/JP2018/034160 WO2020054052A1 (ja) 2018-09-14 2018-09-14 熱源装置および冷凍サイクル装置

Publications (1)

Publication Number Publication Date
WO2020054052A1 true WO2020054052A1 (ja) 2020-03-19

Family

ID=69777184

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2018/034160 WO2020054052A1 (ja) 2018-09-14 2018-09-14 熱源装置および冷凍サイクル装置

Country Status (3)

Country Link
JP (1) JP6942265B2 (ja)
CN (1) CN112654823B (ja)
WO (1) WO2020054052A1 (ja)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004205163A (ja) * 2002-12-26 2004-07-22 Daikin Ind Ltd 冷凍装置
JP2004251513A (ja) * 2003-02-19 2004-09-09 Sanyo Electric Co Ltd 冷媒サイクル装置
JP2013224757A (ja) * 2012-04-20 2013-10-31 Daikin Industries Ltd 冷凍装置
WO2017094057A1 (ja) * 2015-11-30 2017-06-08 三菱電機株式会社 シングルスクリュー圧縮機および冷凍サイクル装置

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1171291A (en) * 1965-10-12 1969-11-19 Svenska Rotor Maskiner Ab Screw Rotor Machines
CN2127780Y (zh) * 1992-07-16 1993-03-03 沈太福 新型螺杆式制冷压缩机
JP5045524B2 (ja) * 2008-03-31 2012-10-10 ダイキン工業株式会社 冷凍装置
US8984902B2 (en) * 2010-07-20 2015-03-24 General Electric Company System to control external condensation on a refrigerator
JP2013092091A (ja) * 2011-10-25 2013-05-16 Mitsubishi Electric Corp 二段スクリュー圧縮機
JP2013238135A (ja) * 2012-05-14 2013-11-28 Mitsubishi Electric Corp スクリュー圧縮機
CN104564636B (zh) * 2014-12-31 2017-07-28 郑州宇通客车股份有限公司 一种可变排量汽车空调压缩机系统及控制方法

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004205163A (ja) * 2002-12-26 2004-07-22 Daikin Ind Ltd 冷凍装置
JP2004251513A (ja) * 2003-02-19 2004-09-09 Sanyo Electric Co Ltd 冷媒サイクル装置
JP2013224757A (ja) * 2012-04-20 2013-10-31 Daikin Industries Ltd 冷凍装置
WO2017094057A1 (ja) * 2015-11-30 2017-06-08 三菱電機株式会社 シングルスクリュー圧縮機および冷凍サイクル装置

Also Published As

Publication number Publication date
CN112654823B (zh) 2022-12-27
JP6942265B2 (ja) 2021-09-29
CN112654823A (zh) 2021-04-13
JPWO2020054052A1 (ja) 2021-05-13

Similar Documents

Publication Publication Date Title
EP1726893B1 (en) Refrigerant cycle apparatus
US6672090B1 (en) Refrigeration control
JP4946840B2 (ja) 冷凍装置
JP2008190377A (ja) 多段圧縮機
JP2009127902A (ja) 冷凍装置及び圧縮機
KR20070067121A (ko) 냉동장치
JP2007263440A (ja) 空気調和装置
WO2009147826A1 (ja) 冷凍サイクル装置
JP5786481B2 (ja) 冷凍装置
CN111322240A (zh) 旋转式压缩机和具有其的制冷系统
JP2006097636A (ja) 容積型膨張機
JP4140642B2 (ja) 冷凍装置
WO2020054052A1 (ja) 熱源装置および冷凍サイクル装置
JP5971633B2 (ja) 冷凍サイクル装置
JP2014142158A (ja) 冷凍サイクル装置
JP6193555B2 (ja) 冷凍サイクル装置
JP4581795B2 (ja) 冷凍装置
JP2014149103A (ja) 冷凍サイクル装置
JP6038408B2 (ja) 冷凍装置
KR200300275Y1 (ko) 냉동시스템
WO2023140249A1 (ja) 冷凍サイクル装置
KR20010076895A (ko) 냉장고 및 그 운전제어방법
JP4779609B2 (ja) 冷凍装置
JP2007298207A (ja) 冷凍サイクル装置およびその制御法
KR20050074133A (ko) 멀티형 공기조화기 및 그 제어방법

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 18933239

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 2020546650

Country of ref document: JP

Kind code of ref document: A

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 18933239

Country of ref document: EP

Kind code of ref document: A1