Prior art keywords
current
employee
day
time
preset
Prior art date
Application number
PCT/CN2017/113126
Other languages
French (fr)
Chinese (zh)
Inventor
陈钦鹏
Original Assignee
齐心商用设备(深圳)有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 齐心商用设备(深圳)有限公司 filed Critical 齐心商用设备(深圳)有限公司
Priority to CN201780036366.6A priority Critical patent/CN109416848A/en
Priority to PCT/CN2017/113126 priority patent/WO2019100383A1/en
Publication of WO2019100383A1 publication Critical patent/WO2019100383A1/en

Links

Classifications

    • GPHYSICS
    • G07CHECKING-DEVICES
    • G07CTIME OR ATTENDANCE REGISTERS; REGISTERING OR INDICATING THE WORKING OF MACHINES; GENERATING RANDOM NUMBERS; VOTING OR LOTTERY APPARATUS; ARRANGEMENTS, SYSTEMS OR APPARATUS FOR CHECKING NOT PROVIDED FOR ELSEWHERE
    • G07C1/00Registering, indicating or recording the time of events or elapsed time, e.g. time-recorders for work people
    • G07C1/10Registering, indicating or recording the time of events or elapsed time, e.g. time-recorders for work people together with the recording, indicating or registering of other data, e.g. of signs of identity
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/109Time management, e.g. calendars, reminders, meetings or time accounting
    • G06Q10/1091Recording time for administrative or management purposes

Definitions

  • the main object of the present invention is to solve the technical problem of manually counting employee's attendance data according to the data derived from the attendance machine, which is time-consuming and laborious, and has low data accuracy.
  • the calculating unit is configured to add “1” to the number of late arrivals of the employee calculated on the previous working day of the current month if the work is late on the current day, and calculate the current accumulated number of late arrivals of the employee in the current month;
  • the following units of the first execution module respectively perform the following related operations:
  • the acknowledgment prompting unit is configured to: when the employee currently accumulates overtime days in the current month exceeds a preset number of days, and/or the current accumulated overtime time exceeds a preset time in the current month, generating the current accumulated value of the employee in the current month. The number of overtime days, and/or the current cumulative overtime hours of this month;
  • the commendation prompt information is sent to the smart terminal side of the corresponding employee and the smart terminal side of the preset high-level manager.
  • FIG. 1 is a schematic diagram of functional modules of a first embodiment of the attendance machine of the present invention
  • FIG. 2 is a schematic diagram of a refinement function module of the execution module of FIG.
  • the attendance machine 100 includes: a determination module 110 and an execution module 120.
  • the execution module includes: a determination unit 121, a comparison unit 122, a calculation unit 123, a first comparison unit 124, and a first calculation unit 125.
  • the determining module 110 is configured to, for each natural day, when the time reaches the preset time point, determine the date type of the current day according to the preset working date schedule, and the date type includes a working day and a rest day.
  • the alarm unit 127 is configured to generate alarm prompt information that carries the current total number of late and early departures of the current month when the total number of late arrivals and early departures of the employee exceeds a preset threshold.
  • the sending unit 128 is configured to send the alarm prompt information to the smart terminal side of the corresponding employee.
  • the statistical time period is later than the off-duty punch time period, and may be set to: 23:30 to 24:00.
  • the method for attendance processing provided by the above embodiments can automatically calculate the current cumulative number of late arrivals and early departures for each employee of the daily basis according to the punching time, without manually counting each employee according to the daily punching time of each employee. Attendance data per month, saving labor costs and ensuring the accuracy of attendance data.

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • General Physics & Mathematics (AREA)
  • Physics & Mathematics (AREA)
  • Marketing (AREA)
  • Data Mining & Analysis (AREA)
  • Economics (AREA)
  • Educational Administration (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Tourism & Hospitality (AREA)
  • General Business, Economics & Management (AREA)
  • Theoretical Computer Science (AREA)
  • Time Recorders, Dirve Recorders, Access Control (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

A method for attendance processing and an attendance machine. The method for attendance processing comprises: determining a date type of a current day according to a work date schedule when the time reaches a preset time point, the following operations being executed on a work day: upon receiving a card punching instruction that is inputted by an employee, determining a time period type of the current time point (S10); if the current time point is in an on-duty card punching time period, comparing the current time point with a preset on-duty time point, and determining whether the employee is late for work on the current day according to the comparison result (S20); if the employee is late for work on the current day, calculating the current cumulative number of times the employee was late in the current month (S30); if the current time point is in an off-duty card punching time period, comparing the current time point with a preset off-duty time point, and determining whether the employee is leaving early on the current day according to the comparison result (S40); if the employee is leaving early, calculating the current cumulative number of times the employee has left early in the current month (S50). The attendance machine and the method for attendance processing do not require the attendance data of each employee each month to be manually counted according to the card punching time of each employee every day, thereby saving labor costs and ensuring the accuracy of attendance data.

Description

\¥0 2019/100383 ?€1^2017/113126  \¥0 2019/100383 ?€1^2017/113126
考勤机、 考勤处理的方法 Attendance machine, attendance processing method
技术领域  Technical field
[0001] 本发明涉及考勤机技术领域, 尤其涉及一种考勤机、 考勤处理的方法。  [0001] The present invention relates to the technical field of attendance machines, and in particular, to an attendance machine and a method for attendance processing.
背景技术  Background technique
[0002] 近年来, 考勤机的应用越来越广泛, 一般的正规公司设有考勤机, 用于记录员 工出勤情况。  [0002] In recent years, the application of attendance machines has become more and more extensive. The general formal company has an attendance machine for recording employee attendance.
[0003] 然而现有中的考勤机只是简单地记录员工每次打卡日期和时间, 考勤工作人员 需要根据考勤机导出的每个员工的打卡日期和时间, 人工统计每位员工每个月 的出勤天数, 迟到次数、 早退次数等考勤数据。  [0003] However, the existing attendance machine simply records the date and time of each punching of the employee, and the attendance staff needs to check the date and time of each employee according to the attendance machine, and manually count the attendance of each employee per month. Attendance data such as the number of days, the number of late arrivals, and the number of early departures.
[0004] 上述这种根据考勤机导出的数据人工统计员工的考勤数据, 费时费力、 数据准 确性低。  [0004] The above-mentioned data based on the data derived by the attendance machine manually counts the attendance data of the employee, which is time consuming and laborious, and the data accuracy is low.
技术问题  technical problem
[0005] 本发明的主要目的在于解决现有技术根据考勤机导出的数据人工统计员工的考 勤数据, 费时费力、 数据准确性低的技术问题。  [0005] The main object of the present invention is to solve the technical problem of manually counting employee's attendance data according to the data derived from the attendance machine, which is time-consuming and laborious, and has low data accuracy.
问题的解决方案  Problem solution
技术解决方案  Technical solution
[0006] 为实现上述目的, 本发明提供一种考勤机, 所述考勤机包括: 判断模块和执行 模块; 所述执行模块包括: 判断单元、 比较单元、 计算单元、 第一比较单元、 第一计算单元;  [0006] In order to achieve the above object, the present invention provides an attendance machine, the attendance machine includes: a determination module and an execution module; the execution module includes: a determination unit, a comparison unit, a calculation unit, a first comparison unit, and a first Computing unit
[0007] 所述判断模块, 用于针对每个自然日, 当时间到达预设时间点, 则根据预设的 工作日期安排表, 判断当日的日期类型, 日期类型包括工作日和休息日;  [0007] the judging module is configured to, for each natural day, when the time reaches the preset time point, determine the date type of the current day according to the preset work date schedule, and the date type includes a working day and a rest day;
[0008] 若当日是工作日, 所述执行模块的如下单元分别执行如下相关操作:  [0008] If the current day is a working day, the following units of the execution module respectively perform the following related operations:
[0009] 所述判断单元, 用于在接收到员工输入的打卡指令时, 判断当前时间点所处时 间段类型, 所述时间段类型包括: 上班打卡时间段和下班打卡时间段;  [0009] the determining unit is configured to determine, according to the punching instruction input by the employee, the type of the time zone at which the current time point is located, where the time segment type includes: a working time punching time period and an off work punching time period;
[0010] 所述比较单元, 用于若当前时间点处于上班打卡时间段, 则将当前时间点与预 设的上班时间点进行比较, 根据比较结果判断所述员工当日上班是否迟到; \¥0 2019/100383 卩(:17(:\2017/113126 [0010] the comparing unit is configured to compare the current time point with a preset working time point if the current time point is in the working time period, and determine, according to the comparison result, whether the employee is late for work on the same day; \¥0 2019/100383 卩(:17(:\2017/113126
[0011] 所述计算单元, 用于若当日上班迟到, 则在本月前一工作日累计计算的所述员 工迟到次数上加“1”, 计算出所述员工本月当前累计迟到次数; [0011] The calculating unit is configured to add “1” to the number of late arrivals of the employee calculated on the previous working day of the current month if the work is late on the current day, and calculate the current accumulated number of late arrivals of the employee in the current month;
[0012] 所述第一比较单元, 用于若当前时间点处于下班打卡时间段, 则将当前时间点 与预设的下班时间点进行比较, 根据比较结果判断所述员工当日下班是否早退  [0012] the first comparing unit is configured to compare the current time point with the preset working time point if the current time point is in the off-duty punching time period, and determine, according to the comparison result, whether the employee leaves the work early on or off.
[0013] 所述第一计算单元, 用于若当日下班早退, 则在本月前一工作日累计计算的所 述员工早退次数上加“1”, 计算出所述员工本月当前累计早退次数。 [0013] The first calculating unit is configured to add “1” to the number of early retirements of the employee calculated on the previous working day of the current month if the employee leaves work early and leave early, and calculates the current cumulative number of early withdrawals of the employee this month. .
[0014] 优选地, 所述执行模块还包括: 第二计算单元, 告警单元、 发送单元;  [0014] Preferably, the execution module further includes: a second calculating unit, an alarm unit, and a sending unit;
[0015] 若当日是工作日, 所述执行模块的如下单元分别执行如下相关操作:  [0015] If the current day is a working day, the following units of the execution module respectively perform the following related operations:
[0016] 第二计算单元, 用于在预设的统计时间段内, 计算所述员工本月当前迟到与早 退总次数, 以及正常出勤次数;  [0016] a second calculating unit, configured to calculate, in a preset statistical time period, a total number of current late arrivals and departures of the employee, and a normal number of attendances;
[0017] 告警单元, 用于当所述员工本月当前迟到与早退总次数超过预设阈值, 则生成 携带所述本月当前迟到与早退总次数的告警提示信息;  [0017] an alarm unit, configured to generate an alarm prompt message carrying the total number of current late and early departures of the current month when the total number of late arrivals and early departures of the employee exceeds a preset threshold.
[0018] 发送单元, 用于将所述告警提示信息发送至对应员工的智能终端侧。  [0018] The sending unit is configured to send the alert prompt information to the smart terminal side of the corresponding employee.
[0019] 优选地, 所述的考勤机还包括: 第一执行模块; 所述第一执行模块包括: 次序 判断单元、 记录单元、 加班计算单元;  [0019] Preferably, the attendance machine further includes: a first execution module; the first execution module includes: an order determination unit, a recording unit, and an overtime calculation unit;
[0020] 若当日是休息日, 所述第一执行模块的如下单元分别执行如下相关操作: [0020] If the current day is a rest day, the following units of the first execution module respectively perform the following related operations:
[0021] 所述次序判断单元, 用于在接收到员工输入的打卡指令时, 判断所述员工本次 打卡的次序; [0021] the order determining unit is configured to determine, when receiving the punching instruction input by the employee, the order of the employee to punch the card;
[0022] 所述记录单元, 用于当本次打卡为当日首次打卡, 记录当日的日期和首次打卡 时间点; 以及当本次打卡为当日第二次打卡, 则记录第二次打卡时间点;  [0022] the recording unit is configured to record the date of the current day and the first time of the card punching when the card is punched for the first time on the current day; and record the time of the second punching time when the card punching is the second time punching on the current day;
[0023] 所述加班计算单元, 用于在预设的第一统计时间段内, 根据所述员工的首次打 卡时间点和第二次打卡时间点, 计算所述员工当日的工作时间, 定义所述工作 时间为所述员工当日的加班时间。  [0023] the overtime calculation unit is configured to calculate, according to the first time stamping time point and the second punching time point of the employee, a working time of the employee on the current day in a preset first statistical time period, The working time is the overtime time of the employee on the day.
[0024] 优选地, 所述第一执行模块还包括: 累计计算单元、 表扬提示单元、 信息发送 单元;  [0024] Preferably, the first execution module further includes: an accumulation calculation unit, a praise prompting unit, and an information sending unit;
[0025] 若当日是休息日, 所述第一执行模块的如下单元分别执行如下相关操作: [0025] If the current day is a rest day, the following units of the first execution module respectively perform the following related operations:
[0026] 所述累计计算单元, 用于在预设的第二统计时间段内, 计算所述员工本月当前 \¥0 2019/100383 卩(:17(:\2017/113126 累计加班天数, 以及本月当前累计加班时间; [0026] the cumulative calculation unit is configured to calculate the current current month of the employee in a preset second statistical time period \¥0 2019/100383 卩(:17(:\2017/113126 accumulated overtime days, and the current accumulated overtime hours this month;
[0027] 所述表扬提示单元, 用于当所述员工本月当前累计加班天数超过预设天数、 和 /或本月当前累计加班时间超过预设时间, 则生成携带所述员工本月当前累计加 班天数, 和/或本月当前累计加班时间的表扬提示信息;  [0027] the acknowledgment prompting unit is configured to: when the employee currently accumulates overtime days in the current month exceeds a preset number of days, and/or the current accumulated overtime time exceeds a preset time in the current month, generating the current accumulated value of the employee in the current month. The number of overtime days, and/or the current cumulative overtime hours of this month;
[0028] 所述信息发送单元, 用于将所述表扬提示信息发送至对应员工的智能终端侧和 预设的高层管理者的智能终端侧。  [0028] The information sending unit is configured to send the commendation prompt information to the smart terminal side of the corresponding employee and the smart terminal side of the preset high-level manager.
[0029] 优选地, 所述的考勤机还包括:  [0029] Preferably, the attendance machine further includes:
[0030] 更新模块, 用于根据接收到的工作日调整指令, 对预设的相应月份的工作曰期 安排表进行更新。  [0030] an update module, configured to update a preset work schedule of the corresponding month according to the received workday adjustment instruction.
[0031]  [0031]
[0032] 此外, 为实现上述目的, 本发明还提供一种考勤处理的方法, 所述考勤处理的 方法包括:  [0032] In addition, in order to achieve the above object, the present invention further provides a method for attendance processing, where the method for attendance processing includes:
[0033] 针对每个自然日, 当时间到达预设时间点, 则根据预设的工作日期安排表, 判 断当日的日期类型, 日期类型包括工作日和休息日;  [0033] For each natural day, when the time reaches the preset time point, the date type of the current day is determined according to the preset work date schedule, and the date type includes a working day and a rest day;
[0034] 若当日是工作日, 则在当日执行如下操作:  [0034] If the current day is a working day, the following operations are performed on the same day:
[0035] 在接收到员工输入的打卡指令时, 判断当前时间点所处时间段类型, 所述时间 段类型包括: 上班打卡时间段和下班打卡时间段;  [0035] When receiving the punching instruction input by the employee, determining the type of the time zone at the current time point, the time segment type includes: a working time punching time period and an off work punching time period;
[0036] 若当前时间点处于上班打卡时间段, 则将当前时间点与预设的上班时间点进行 比较, 根据比较结果判断所述员工当日上班是否迟到;  [0036] if the current time point is in the working time period, the current time point is compared with the preset working time point, and according to the comparison result, it is determined whether the employee is late for work on the same day;
[0037] 若当日上班迟到, 则在本月前一工作日累计计算的所述员工迟到次数上加“1” [0037] If the work is late on the day, the "1" is added to the employee's late arrival count calculated on the previous working day of the current month.
, 计算出所述员工本月当前累计迟到次数; Calculating the current cumulative number of late arrivals of the employee this month;
[0038] 若当前时间点处于下班打卡时间段, 则将当前时间点与预设的下班时间点进行 比较, 根据比较结果判断所述员工当日下班是否早退;  [0038] if the current time point is in the off-duty punch time period, comparing the current time point with the preset work time point, and determining, according to the comparison result, whether the employee leaves the work early on or off;
[0039] 若当日下班早退, 则在本月前一工作日累计计算的所述员工早退次数上加“1” [0039] If the employee leaves early for work on the same day, the number of early withdrawals of the employee calculated on the previous working day of the current month is increased by "1".
, 计算出所述员工本月当前累计早退次数。 Calculate the current cumulative number of early retirements for the employee this month.
[0040] 优选地, 所述的考勤处理的方法, 若当日是工作日, 则当日执行的操作还包括 [0041] 在预设的统计时间段内, 计算所述员工本月当前迟到与早退总次数, 以及正常 \¥0 2019/100383 卩(:17(:\2017/113126 出勤次数; [0040] Preferably, the method for attendance processing, if the current day is a working day, the operation performed on the current day further includes [0041] calculating, in the preset statistical time period, the current late and early withdrawal of the employee Number of times, as well as normal \¥0 2019/100383 卩(:17(:\2017/113126 attendance times;
[0042] 当所述员工本月当前迟到与早退总次数超过预设阈值, 则生成携带所述本月当 前迟到与早退总次数的告警提示信息;  [0042] when the total number of current late arrivals and early departures of the employee exceeds a preset threshold, generating alarm prompt information carrying the total number of late arrivals and early departures of the current month;
[0043] 将所述告警提示信息发送至对应员工的智能终端侧。  [0043] sending the alarm prompt information to the smart terminal side of the corresponding employee.
[0044] 优选地, 所述针对每个自然日, 当时间到达预设的时间点, 则根据预设的工作 日期安排表, 判断当日的日期类型之后还包括:  [0044] Preferably, for each natural day, when the time reaches a preset time point, the table is determined according to the preset work date, and the date type of the current day is further included:
[0045] 若当日是休息日, 在当日执行如下操作:  [0045] If the day is a rest day, perform the following operations on the same day:
[0046] 在接收到员工输入的打卡指令时, 判断所述员工本次打卡的次序;  [0046] when receiving the punching instruction input by the employee, determining the order of the employee to punch the card this time;
[0047] 当本次打卡为当日首次打卡, 记录当日的日期和首次打卡时间点;  [0047] When the card is punched for the first time on the day, the date of the day and the time of the first card are recorded;
[0048] 当本次打卡为当日第二次打卡, 则记录第二次打卡时间点;  [0048] When the punch is the second time of the day, the second time of the punch is recorded;
[0049] 在预设的第一统计时间段内, 根据所述员工的首次打卡时间点和第二次打卡时 间点, 计算所述员工当日的工作时间, 定义所述工作时间为所述员工当日的加 班时间。  [0049] calculating, in the preset first statistical period, the working time of the employee on the current day according to the first time of the employee and the time of the second punching, and defining the working time as the day of the employee Overtime hours.
[0050] 优选地, 所述的考勤处理的方法, 若当日是休息日, 当日执行的操作还包括: [0051] 在预设的第二统计时间段内, 计算所述员工本月当前累计加班天数, 以及本月 当前累计加班时间;  [0050] Preferably, the method for attendance processing, if the current day is a rest day, the operation performed on the current day further includes: [0051] calculating, in the preset second statistical time period, the current accumulated overtime of the employee this month The number of days, and the current accumulated overtime hours of the month;
[0052] 当所述员工本月当前累计加班天数超过预设天数、 和/或本月当前累计加班时 间超过预设时间, 则生成携带所述员工本月当前累计加班天数, 和/或本月当前 累计加班时间的表扬提示信息;  [0052] when the employee currently accumulates overtime days in the current month exceeds the preset number of days, and/or the current accumulated overtime time exceeds the preset time, generating the current accumulated overtime days of the employee in the current month, and/or the current month The current reminder information of accumulated overtime hours;
[0053] 将所述表扬提示信息发送至对应员工的智能终端侧和预设的高层管理者的智能 终端侧。  [0053] The commendation prompt information is sent to the smart terminal side of the corresponding employee and the smart terminal side of the preset high-level manager.
[0054] 优选地, 所述的考勤处理的方法还包括:  [0054] Preferably, the method for attendance processing further includes:
[0055] 根据接收到的工作日调整指令, 对预设的相应月份的工作日期安排表进行更新  [0055] updating the work date schedule of the preset corresponding month according to the received workday adjustment instruction
发明的有益效果 Advantageous effects of the invention
有益效果  Beneficial effect
[0056] 本发明所提供的考勤机、 考勤处理的方法, 根据打卡时间自动计算每日每个员 工的本月当前累计迟到次数和早退次数, 无需根据每个员工每天的打卡时间人 \¥0 2019/100383 卩(:17(:\2017/113126 工统计每个员工每个月的考勤数据, 从而节约人工成本, 并确保了考勤数据的 准确性。 [0056] The attendance machine and the attendance processing method provided by the invention automatically calculate the current accumulated late arrival times and the number of early departures of each employee of the current day according to the punching time, without the need for the daily punching time of each employee. \¥0 2019/100383 卩(:17(:\2017/113126) Statistics of each employee's attendance data per month, saving labor costs and ensuring the accuracy of attendance data.
对附图的简要说明  Brief description of the drawing
附图说明  DRAWINGS
[0057] 图 1为本发明的考勤机第一实施例的功能模块示意图;  1 is a schematic diagram of functional modules of a first embodiment of an attendance machine of the present invention;
[0058] 图 2为图 1中的执行模块的细化功能模块示意图;  2 is a schematic diagram of a refinement function module of the execution module in FIG. 1;
[0059] 图 3为本发明第一实施例的另一功能模块示意图;  3 is a schematic diagram of another functional module according to a first embodiment of the present invention;
[0060] 图 4为图 1中的执行模块又一细化功能模块示意图;  4 is a schematic diagram of another refinement function module of the execution module in FIG. 1;
[0061] 图 5为本发明的考勤机第三实施例的功能模块示意图;  5 is a schematic diagram of functional modules of a third embodiment of the attendance machine of the present invention;
[0062] 图 6为图 5中的第一执行模块的细化功能模块示意图;  6 is a schematic diagram of a refinement function module of the first execution module in FIG. 5;
[0063] 图 7为图 5中的第一执行模块的又一细化功能模块示意图;  7 is a schematic diagram of another refinement function module of the first execution module in FIG. 5;
[0064] 图 8为本发明的考勤处理的方法第一实施例的流程示意图。  8 is a schematic flow chart of a first embodiment of a method for attendance processing according to the present invention.
[0065]  [0065]
[0066] 本发明目的的实现、 功能特点及优点将结合实施例, 参照附图做进一步说明。  The implementation, functional features, and advantages of the present invention will be further described with reference to the accompanying drawings.
实施该发明的最佳实施例  BEST MODE FOR CARRYING OUT THE INVENTION
本发明的最佳实施方式  BEST MODE FOR CARRYING OUT THE INVENTION
[0067] 以下结合说明书附图对本发明的优选实施例进行说明, 应当理解, 此处所描述 的优选实施例仅用于说明和解释本发明, 并不用于限定本发明, 并且在不冲突 的情况下, 本发明中的实施例及实施例中的特征可以相互组合。  The preferred embodiments of the present invention are described with reference to the accompanying drawings, and the preferred embodiments described herein are only to illustrate and explain the invention, and not to limit the invention, and The features of the embodiments and the embodiments of the present invention may be combined with each other.
[0068]  [0068]
[0069] 本发明提供一种考勤机。 参照图 1和图 2, 图 1为本发明的考勤机第一实施例的 功能模块示意图; 图 2为图 1中的执行模块的细化功能模块示意图。 在一实施例 中, 所述考勤机 100包括: 判断模块 110和执行模块 120; 所述执行模块包括: 判 断单元 121、 比较单元 122、 计算单元 123、 第一比较单元 124、 第一计算单元 125 。 其中, 所述判断模块 110, 用于针对每个自然日, 当时间到达预设时间点, 则 根据预设的工作日期安排表, 判断当日的日期类型, 日期类型包括工作日和休 息日。 若当日是工作日, 所述执行模块 120的如下单元分别执行如下相关操作: 所述判断单元 121, 用于在接收到员工输入的打卡指令时, 判断当前时间点所处 \¥0 2019/100383 卩(:17(:\2017/113126 时间段类型, 所述时间段类型包括: 上班打卡时间段和下班打卡时间段。 所述 比较单元 122, 用于若当前时间点处于上班打卡时间段, 则将当前时间点与预设 的上班时间点进行比较, 根据比较结果判断所述员工当日上班是否迟到。 所述 计算单元 123 , 用于若当日上班迟到, 则在本月前一工作日累计计算的所述员工 迟到次数上加“1”, 计算出所述员工本月当前累计迟到次数。 所述第一比较单元 1 24, 用于若当前时间点处于下班打卡时间段, 则将当前时间点与预设的下班时 间点进行比较, 根据比较结果判断所述员工当日下班是否早退。 所述第一计算 单元 125 , 用于若当日下班早退, 则在本月前一工作日累计计算的所述员工早退 次数上加“1”, 计算出所述员工本月当前累计早退次数。 [0069] The present invention provides an attendance machine. 1 and FIG. 2, FIG. 1 is a schematic diagram of functional modules of a first embodiment of the attendance machine of the present invention; FIG. 2 is a schematic diagram of a refinement function module of the execution module of FIG. In an embodiment, the attendance machine 100 includes: a determination module 110 and an execution module 120. The execution module includes: a determination unit 121, a comparison unit 122, a calculation unit 123, a first comparison unit 124, and a first calculation unit 125. . The determining module 110 is configured to, for each natural day, when the time reaches the preset time point, determine the date type of the current day according to the preset working date schedule, and the date type includes a working day and a rest day. If the current day is a working day, the following units of the execution module 120 respectively perform the following related operations: the determining unit 121 is configured to determine that the current time point is located when receiving the punching instruction input by the employee \¥0 2019/100383 卩(:17(:\2017/113126 time period type, the time period type includes: a working punch time period and an off work punch time period. The comparing unit 122 is configured to be in the current time point The working time period is compared with the preset working time point, and the employee is judged whether the employee is late for work on the same day according to the comparison result. The calculating unit 123 is configured to use the current day before the work is late. Adding "1" to the employee's late arrival count calculated on a working day, and calculating the current cumulative number of late arrivals of the employee this month. The first comparison unit 1 24 is configured to be in the off-duty time zone if the current time point is And comparing the current time point with the preset work time point, and determining, according to the comparison result, whether the employee leaves early or not to leave early. The first calculating unit 125 is configured to use the work day before the work, and the work day before the month. The cumulative number of early withdrawals of the employee is added by “1”, and the current accumulated number of early departures of the employee this month is calculated.
[0070] 本实施例中, 工作日的下班打卡时间段晚于上班打卡时间段, 例如: 上班打卡 时间段可设置为 7:00至 12:00; 下班打卡时间段可设置为 14: 00至 19:00。  [0070] In this embodiment, the working day punching time period is later than the working punch time period, for example: the working punch time period can be set from 7:00 to 12:00; the off work punch time period can be set to 14: 00 to 19:00.
[0071] 参见图 3, 图 3为本发明第一实施例的另一功能模块示意图。 上述第一实施例中 所述考勤机 100还包括: 更新模块 130。 所述更新模块 130, 用于根据接收到的工 作曰调整指令, 对预设的相应月份的工作日期安排表进行更新。  [0071] Referring to FIG. 3, FIG. 3 is a schematic diagram of another functional module according to a first embodiment of the present invention. The attendance machine 100 in the above first embodiment further includes: an update module 130. The update module 130 is configured to update the work date schedule of the preset corresponding month according to the received work adjustment instruction.
[0072] 进一步地, 本发明提出所述考勤机的第二实施例, 参见图 4, 图 4为图 1中的执 行模块又一细化功能模块示意图。 本第二实施例在上述第一实施例上进行了改 进, 改进之处在于, 所述执行模块 120还包括: 第二计算单元 126, 告警单元 127 、 发送单元 128。 其中, 若当日是工作日, 所述执行模块的如下单元分别执行如 下相关操作: 所述第二计算单元 126 , 用于在预设的统计时间段内, 计算所述员 工本月当前迟到与早退总次数, 以及正常出勤次数。 所述告警单元 127 , 用于当 所述员工本月当前迟到与早退总次数超过预设阈值, 则生成携带所述本月当前 迟到与早退总次数的告警提示信息。 所述发送单元 128 , 用于将所述告警提示信 息发送至对应员工的智能终端侧。 本实施例中, 所述统计时间段晚于所述下班 打卡时间段, 如可以设置为: 23:30至 24:00。  [0072] Further, the present invention provides a second embodiment of the attendance machine, see FIG. 4, and FIG. 4 is a schematic diagram of another refinement function module of the execution module in FIG. The second embodiment is improved on the first embodiment described above. The improvement module further includes: a second calculating unit 126, an alarm unit 127, and a sending unit 128. If the current day is a working day, the following units of the execution module respectively perform the following related operations: the second calculating unit 126 is configured to calculate, in a preset statistical time period, that the employee is currently late and early in the current month. The total number of times, as well as the number of normal attendances. The alarm unit 127 is configured to generate alarm prompt information that carries the current total number of late and early departures of the current month when the total number of late arrivals and early departures of the employee exceeds a preset threshold. The sending unit 128 is configured to send the alarm prompt information to the smart terminal side of the corresponding employee. In this embodiment, the statistical time period is later than the off-duty punch time period, and may be set to: 23:30 to 24:00.
[0073] 进一步地, 本发明提出所述考勤机的第三实施例, 参见图 5、 图 6, 图 5为本发 明的考勤机第三实施例的功能模块示意图; 图 6为图 5中的第一执行模块的细化 功能模块示意图。 本第三实施例在上述第一实施例上进行了改进, 改进之处在 于所述考勤机 100还包括: 第一执行模块 130; 其中, 所述第一执行模块 140包括 \¥0 2019/100383 卩(:17(:\2017/113126 [0073] Further, the present invention provides a third embodiment of the attendance machine, see FIG. 5, FIG. 6, FIG. 5 is a schematic diagram of a functional module of the third embodiment of the attendance machine of the present invention; FIG. Schematic diagram of the refinement function module of the first execution module. The third embodiment is improved in the above-mentioned first embodiment. The improvement is that the attendance machine 100 further includes: a first execution module 130; wherein the first execution module 140 includes \¥0 2019/100383 卩(:17(:\2017/113126
: 次序判断单元 141、 记录单元 142、 加班计算单元 143。 本实施例中, 若当曰是 休息日, 所述第一执行模块 140的如下单元分别执行如下相关操作: 所述次序判 断单元 141, 用于在接收到员工输入的打卡指令时, 判断所述员工本次打卡的次 序。 所述记录单元 142, 用于当本次打卡为当日首次打卡, 记录当日的日期和首 次打卡时间点; 以及当本次打卡为当日第二次打卡, 则记录第二次打卡时间点 。 所述加班计算单元 143 , 用于在预设的第一统计时间段内, 根据所述员工的首 次打卡时间点和第二次打卡时间点, 计算所述员工当日的工作时间, 定义所述 工作时间为所述员工当日的加班时间。 其中, 所述第一统计时间段应当设置在 当日快结束的时间段, 如可以设置为 23:30至 23:40。 : Order determination unit 141, recording unit 142, overtime calculation unit 143. In this embodiment, if the 曰 is the rest day, the following units of the first execution module 140 respectively perform the following related operations: the order determining unit 141 is configured to determine, when receiving the punching instruction input by the employee, The order of the employees to punch in this time. The recording unit 142 is configured to record the date of the current day and the first time of the punching time when the card is punched for the first time on the current day; and record the second time of the punching time when the punching is the second time of the punching on the current day. The overtime calculation unit 143 is configured to calculate the working time of the employee on the current day according to the first time of the employee and the second time of the punching time in the preset first statistical time period, and define the work time. The time is the overtime of the employee on the same day. The first statistical time period should be set to a time period that ends soon, such as 23:30 to 23:40.
[0074] 进一步地, 本发明提出所述考勤机的第四实施例, 参见图 7, 图 7为图 5中的第 一执行模块的又一细化功能模块示意图。 本第四实施例在上述第三实施例上进 行了改进, 改进之处在于所述第一执行模块 140还包括: 累计计算单元 144、 表 扬提示单元 145、 信息发送单元 146。 若当日是休息日, 所述第一执行模块 140的 如下单元分别执行如下相关操作: 所述累计计算单元 144, 用于在预设的第二统 计时间段内, 计算所述员工本月当前累计加班天数, 以及本月当前累计加班时 间。 所述表扬提示单元 145 , 用于当所述员工本月当前累计加班天数超过预设天 数、 和/或本月当前累计加班时间超过预设时间, 则生成携带所述员工本月当前 累计加班天数, 和/或本月当前累计加班时间的表扬提示信息。 所述信息发送单 元 146 , 用于将所述表扬提示信息发送至对应员工的智能终端侧和预设的高层管 理者的智能终端侧。 其中所述第二统计时间段应当晚于所述第一统计时间段, 如当所述第一统计时间段设置为 23:30至 23:40; 则所述第二统计时间段可设置为 23:40至 24:00。  Further, the present invention proposes a fourth embodiment of the attendance machine, see FIG. 7, FIG. 7 is a schematic diagram of another refinement function module of the first execution module in FIG. 5. The fourth embodiment is improved in the third embodiment described above, and the improvement is that the first execution module 140 further includes: an accumulation calculation unit 144, a recognition presentation unit 145, and an information transmission unit 146. If the current day is a rest day, the following units of the first execution module 140 respectively perform the following related operations: the cumulative calculation unit 144 is configured to calculate the current cumulative current of the employee in the preset second statistical time period. The number of overtime days, as well as the current accumulated overtime hours this month. The acknowledgment prompting unit 145 is configured to: when the employee currently accumulates overtime days exceeds the preset number of days, and/or the current accumulated overtime time exceeds the preset time, generates the current accumulated overtime days of the employee , and / or the current cumulative overtime hours of this month's praise message. The information sending unit 146 is configured to send the commendation prompt information to the smart terminal side of the corresponding employee and the smart terminal side of the preset high-level manager. The second statistical time period should be later than the first statistical time period, such as when the first statistical time period is set to 23:30 to 23:40; then the second statistical time period can be set to 23 : 40 to 24:00.
[0075] 以上实施例所提供的考勤机 100, 能够根据打卡时间自动计算每日每个员工的 本月当前累计迟到次数和早退次数, 无需根据每个员工每天的打卡时间人工统 计每个员工每个月的考勤数据, 从而节约人工成本, 并确保了考勤数据的准确 性。  [0075] The attendance machine 100 provided in the above embodiment can automatically calculate the current cumulative number of late arrivals and early departures for each employee of the day according to the punching time, without manually counting each employee per time according to the punching time of each employee. Monthly attendance data saves labor costs and ensures the accuracy of attendance data.
[0076]  [0076]
[0077] 本发明提供一种考勤处理的方法。 参见图 8 , 图 8为本发明的考勤处理的方法一 \¥0 2019/100383 卩(:17(:\2017/113126 实施例的流程示意图。 所述考勤处理的方法包括: 针对每个自然日, 当时间到 达预设时间点, 则根据预设的工作日期安排表, 判断当日的日期类型, 日期类 型包括工作日和休息日; 若当日是工作日, 则在当日执行如下操作: [0077] The present invention provides a method of attendance processing. Referring to FIG. 8, FIG. 8 is a method 1 for attendance processing according to the present invention. \¥0 2019/100383 卩(:17(:\2017/113126) The flow chart of the embodiment. The method for attendance processing includes: For each natural day, when the time reaches the preset time point, according to the preset work A date schedule, which determines the date type of the day. The date type includes weekdays and rest days. If the day is a weekday, the following operations are performed on the same day:
[0078] 步骤 310: 在接收到员工输入的打卡指令时, 判断当前时间点所处时间段类型 , 所述时间段类型包括: 上班打卡时间段和下班打卡时间段;  [0078] Step 310: When receiving the punching instruction input by the employee, determining the type of the time zone at the current time point, the time segment type includes: a working time punching time period and an off work punching time period;
[0079] 步骤 320: 若当前时间点处于上班打卡时间段, 则将当前时间点与预设的上班 时间点进行比较, 根据比较结果判断所述员工当日上班是否迟到;  [0079] Step 320: If the current time point is in the working time period, the current time point is compared with the preset working time point, and according to the comparison result, it is determined whether the employee is late for work on the same day;
[0080] 步骤 330: 若当日上班迟到, 则在本月前一工作日累计计算的所述员工迟到次 数上加“1”, 计算出所述员工本月当前累计迟到次数;  [0080] Step 330: If the work is late on the day, add “1” to the number of late arrivals of the employee calculated on the previous working day of the current month, and calculate the current accumulated number of late arrivals of the employee this month;
[0081] 步骤 340: 若当前时间点处于下班打卡时间段, 则将当前时间点与预设的下班 时间点进行比较, 根据比较结果判断所述员工当日下班是否早退;  [0081] Step 340: If the current time point is in the off-duty punch time period, compare the current time point with the preset work time point, and determine, according to the comparison result, whether the employee leaves the work early on or off;
[0082] 步骤 350: 若当日下班早退, 则在本月前一工作日累计计算的所述员工早退次 数上加“1”, 计算出所述员工本月当前累计早退次数。  [0082] Step 350: If the employee leaves early for work on the current day, add “1” to the number of early withdrawals of the employee calculated on the previous working day of the current month, and calculate the current cumulative number of early departures of the employee this month.
[0083] 本实施例中, 工作日的下班打卡时间段晚于上班打卡时间段, 例如: 上班打卡 时间段可设置为 7:00至 12:00; 下班打卡时间段可设置为 14: 00至 19:00。  [0083] In this embodiment, the working day punching time period is later than the working punch time period, for example: the working punch time period can be set from 7:00 to 12:00; the off work punch time period can be set to 14: 00 to 19:00.
[0084] 上述第一实施例中, 所述考勤处理的方法还包括如下处理: 根据接收到的工作 曰调整指令, 对预设的相应月份的工作日期安排表进行更新。  [0084] In the above first embodiment, the method for attendance processing further includes the following processing: updating the working date schedule of the preset corresponding month according to the received work adjustment instruction.
[0085] 进一步地, 本发明提出所述考勤处理的方法第二实施例。 本第二实施例在上述 第一实施例上进行了改进, 改进之处在于若当日是工作日, 则当日执行的操作 还包括如下处理: 在预设的统计时间段内, 计算所述员工本月当前迟到与早退 总次数, 以及正常出勤次数; 当所述员工本月当前迟到与早退总次数超过预设 阈值, 则生成携带所述本月当前迟到与早退总次数的告警提示信息; 将所述告 警提示信息发送至对应员工的智能终端侧。 本实施例中, 所述统计时间段晚于 所述下班打卡时间段, 如可以设置为: 23:30至 24:00。  [0085] Further, the present invention proposes a second embodiment of the method for attendance processing. The second embodiment is improved in the above first embodiment. The improvement is that if the current day is a working day, the operation performed on the current day further includes the following processing: calculating the employee's book within a preset statistical time period. The current number of late arrivals and early departures, and the number of normal attendances; when the total number of current late arrivals and early departures of the employee exceeds a preset threshold, the alarm prompt information carrying the current number of late arrivals and early departures of the current month is generated; The alarm prompt information is sent to the smart terminal side of the corresponding employee. In this embodiment, the statistical time period is later than the off-duty punch time period, and may be set to: 23:30 to 24:00.
[0086] 进一步地, 本发明提出所述考勤处理的方法第三实施例。 参见图 9 , 图 9为本发 明的考勤处理的方法第三实施例的流程示意图。 第三实施例在上述第一实施例 上进行了改进, 改进之处在于所述针对每个自然日, 当时间到达预设的时间点 , 则根据预设的工作日期安排表, 判断当日的日期类型之后, 若当日是休息日 \¥0 2019/100383 卩(:17(:\2017/113126 [0086] Further, the present invention proposes a third embodiment of the method for attendance processing. Referring to FIG. 9, FIG. 9 is a schematic flowchart diagram of a third embodiment of a method for attendance processing according to the present invention. The third embodiment is improved on the first embodiment described above, and the improvement is that, for each natural day, when the time reaches the preset time point, the date is determined according to the preset work date, and the date of the current day is determined. After the type, if the day is a day off \¥0 2019/100383 卩(:17(:\2017/113126
, 在当日执行如下操作: 在接收到员工输入的打卡指令时, 判断所述员工本次 打卡的次序。 当本次打卡为当日首次打卡, 记录当日的日期和首次打卡时间点 。 当本次打卡为当日第二次打卡, 则记录第二次打卡时间点。 在预设的第一统 计时间段内, 根据所述员工的首次打卡时间点和第二次打卡时间点, 计算所述 员工当日的工作时间, 定义所述工作时间为所述员工当日的加班时间。 其中, 所述第一统计时间段应当设置在当日快结束的时间段, 如可以设置为 23:30至 23: 40。 On the same day, the following operations are performed: When receiving the punching instruction input by the employee, the order of the employee's current punching is determined. When this card is punched for the first time on the same day, record the date of the day and the time of the first punch. When the punch is the second time on the day, the second check-in time is recorded. Calculating, according to the first time stamping time point and the second punching time point of the employee, the working time of the employee on the current day, and defining the working time as the overtime time of the employee on the current day. . The first statistical time period should be set to a time period that ends soon, for example, it can be set to 23:30 to 23:40.
[0087] 进一步地, 本发明提出所述考勤处理的方法第四实施例。 本第四实施例在上述 第三实施例上进行了改进, 改进之处在于若当日是休息日, 当日执行的操作还 包括如下处理: 在预设的第二统计时间段内, 计算所述员工本月当前累计加班 天数, 以及本月当前累计加班时间; 当所述员工本月当前累计加班天数超过预 设天数、 和/或本月当前累计加班时间超过预设时间, 则生成携带所述员工本月 当前累计加班天数, 和/或本月当前累计加班时间的表扬提示信息; 将所述表扬 提示信息发送至对应员工的智能终端侧和预设的高层管理者的智能终端侧。 其 中所述第二统计时间段应当晚于所述第一统计时间段, 如当所述第一统计时间 段设置为 23:30至 23:40; 则所述第二统计时间段可设置为 23:40至 24:00。  [0087] Further, the present invention proposes a fourth embodiment of the method for attendance processing. The fourth embodiment is improved in the above third embodiment. The improvement is that if the current day is a rest day, the operation performed on the current day further includes the following processing: calculating the employee in the preset second statistical time period. The current accumulated overtime days in this month, and the current accumulated overtime hours of the current month; when the employee's current accumulated overtime days exceeds the preset number of days, and/or the current accumulated overtime hours exceed the preset time, the employee is generated. The current accumulated overtime days of the month, and/or the current accumulated overtime hours of the current month, and the praise information is sent to the smart terminal side of the corresponding employee and the smart terminal side of the preset high-level manager. The second statistical time period should be later than the first statistical time period, such as when the first statistical time period is set to 23:30 to 23:40; then the second statistical time period can be set to 23 : 40 to 24:00.
[0088] 以上实施例所提供的考勤处理的方法, 能够根据打卡时间自动计算每日每个员 工的本月当前累计迟到次数和早退次数, 无需根据每个员工每天的打卡时间人 工统计每个员工每个月的考勤数据, 从而节约人工成本, 并确保了考勤数据的 准确性。  [0088] The method for attendance processing provided by the above embodiments can automatically calculate the current cumulative number of late arrivals and early departures for each employee of the daily basis according to the punching time, without manually counting each employee according to the daily punching time of each employee. Attendance data per month, saving labor costs and ensuring the accuracy of attendance data.
[0089]  [0089]
[0090] 以上仅为本发明的优选实施例, 并非因此限制本发明的专利范围, 凡是利用本 发明说明书及附图内容所作的等效结构或等效流程变换, 或直接或间接运用在 其他相关的技术领域, 均同理包括在本发明的专利保护范围内。  The above are only the preferred embodiments of the present invention, and are not intended to limit the scope of the invention, and the equivalent structure or equivalent process transformations made by the description of the invention and the drawings are directly or indirectly applied to other related The technical field is equally included in the scope of patent protection of the present invention.

Claims

\¥0 2019/100383 ?€1^2017/113126 权利要求书 \¥0 2019/100383 ?€1^2017/113126 Claims
[权利要求 1] 一种考勤机, 其特征在于, 所述考勤机包括: 判断模块和执行模块; 所述执行模块包括: 判断单元、 比较单元、 计算单元、 第一比较单元 、 第一计算单元;  [Attachment 1] An attendance machine, wherein the attendance machine comprises: a judgment module and an execution module; the execution module includes: a judgment unit, a comparison unit, a calculation unit, a first comparison unit, and a first calculation unit ;
所述判断模块, 用于针对每个自然日, 当时间到达预设时间点, 则根 据预设的工作日期安排表, 判断当日的日期类型, 日期类型包括工作 日和休息日;  The judging module is configured to, for each natural day, when the time reaches the preset time point, determine the date type of the current day according to the preset work date schedule, and the date type includes a working day and a rest day;
若当日是工作日, 所述执行模块的如下单元分别执行如下相关操作: 所述判断单元, 用于在接收到员工输入的打卡指令时, 判断当前时间 点所处时间段类型, 所述时间段类型包括: 上班打卡时间段和下班打 卡时间段;  If the current day is a working day, the following units of the execution module respectively perform the following related operations: the determining unit is configured to determine, according to the punching instruction input by the employee, the type of the time segment at the current time point, the time period Types include: the time period for punching in work and the time period for punching off work;
所述比较单元, 用于若当前时间点处于上班打卡时间段, 则将当前时 间点与预设的上班时间点进行比较, 根据比较结果判断所述员工当日 上班是否迟到;  The comparing unit is configured to compare the current time point with a preset working time point if the current time point is in the working time period, and determine, according to the comparison result, whether the employee is late for work on the same day;
所述计算单元, 用于若当日上班迟到, 则在本月前一工作日累计计算 的所述员工迟到次数上加“1”, 计算出所述员工本月当前累计迟到次 数;  The calculating unit is configured to add “1” to the number of late arrivals of the employee calculated on the previous working day of the current month if the work is late on the current day, and calculate the current accumulated number of late arrivals of the employee in the current month;
所述第一比较单元, 用于若当前时间点处于下班打卡时间段, 则将当 前时间点与预设的下班时间点进行比较, 根据比较结果判断所述员工 当日下班是否早退;  The first comparing unit is configured to compare the current time point with the preset working time point if the current time point is in the off-duty punching time period, and determine, according to the comparison result, whether the employee leaves the work early on or off;
所述第一计算单元, 用于若当日下班早退, 则在本月前一工作日累计 计算的所述员工早退次数上加“1”, 计算出所述员工本月当前累计早 退次数。  The first calculating unit is configured to add “1” to the number of early departures of the employee calculated on the previous working day of the current month if the employee leaves work early and leave early, and calculates the current cumulative number of early departures of the employee this month.
[权利要求 2] 根据权利要求 1所述的考勤机, 其特征在于, 所述执行模块还包括: 第二计算单元, 告警单元、 发送单元;  [Claim 2] The attendance machine according to claim 1, wherein the execution module further comprises: a second calculation unit, an alarm unit, and a sending unit;
若当日是工作日, 所述执行模块的如下单元分别执行如下相关操作: 第二计算单元, 用于在预设的统计时间段内, 计算所述员工本月当前 迟到与早退总次数, 以及正常出勤次数; \¥0 2019/100383 卩(:17(:\2017/113126 告警单元, 用于当所述员工本月当前迟到与早退总次数超过预设阈值 , 则生成携带所述本月当前迟到与早退总次数的告警提示信息; 发送单元, 用于将所述告警提示信息发送至对应员工的智能终端侧。 If the current day is a working day, the following units of the execution module perform the following related operations: The second calculating unit is configured to calculate the total number of late and early departures of the employee in the current statistical period, and normal Number of attendances; \¥0 2019/100383 卩(:17(:\2017/113126 alarm unit, used to generate the current late and early departure of the current month when the total number of late arrivals and early departures of the employee exceeds the preset threshold this month. The alarm information of the number of times; the sending unit is configured to send the alarm prompt information to the smart terminal side of the corresponding employee.
[权利要求 3] 根据权利要求 1所述的考勤机, 其特征在于, 还包括: 第一执行模块 ; 所述第一执行模块包括: 次序判断单元、 记录单元、 加班计算单元 若当日是休息日, 所述第一执行模块的如下单元分别执行如下相关操 作:  [Claim 3] The attendance machine according to claim 1, further comprising: a first execution module; the first execution module comprising: a sequence determination unit, a recording unit, and an overtime calculation unit, if the day is a rest day The following units of the first execution module respectively perform the following related operations:
所述次序判断单元, 用于在接收到员工输入的打卡指令时, 判断所述 员工本次打卡的次序;  The order determining unit is configured to determine, when receiving the punching instruction input by the employee, the order of the employee to punch the card;
所述记录单元, 用于当本次打卡为当日首次打卡, 记录当日的日期和 首次打卡时间点; 以及当本次打卡为当日第二次打卡, 则记录第二次 打卡时间点;  The recording unit is configured to record the date of the current day and the first time of the punching time when the card is punched for the first time on the current day; and record the time of the second punching time when the punching is the second time of the punching on the current day;
所述加班计算单元, 用于在预设的第一统计时间段内, 根据所述员工 的首次打卡时间点和第二次打卡时间点, 计算所述员工当日的工作时 间, 定义所述工作时间为所述员工当日的加班时间。  The overtime calculation unit is configured to calculate a working time of the employee on the current day according to the first time of the employee and the second time of the punching time in the preset first statistical time period, and define the working time of the employee The overtime time for the employee on the day.
[权利要求 4] 根据权利要求 3所述的考勤机, 其特征在于, 所述第一执行模块还包 括: 累计计算单元、 表扬提示单元、 信息发送单元;  The attendance machine according to claim 3, wherein the first execution module further comprises: an accumulation calculation unit, a praise presentation unit, and an information transmission unit;
若当日是休息日, 所述第一执行模块的如下单元分别执行如下相关操 作:  If the current day is a rest day, the following units of the first execution module perform the following related operations:
所述累计计算单元, 用于在预设的第二统计时间段内, 计算所述员工 本月当前累计加班天数, 以及本月当前累计加班时间;  The cumulative calculation unit is configured to calculate, in a preset second statistical time period, the current accumulated overtime hours of the employee in the current month, and the current accumulated overtime time of the current month;
所述表扬提示单元, 用于当所述员工本月当前累计加班天数超过预设 天数、 和/或本月当前累计加班时间超过预设时间, 则生成携带所述 员工本月当前累计加班天数, 和/或本月当前累计加班时间的表扬提 示信息;  The acknowledgment prompting unit is configured to: when the employee currently accumulates overtime days exceeds the preset number of days, and/or the current accumulated overtime time exceeds the preset time, generates the current accumulated overtime days of the employee. And/or the current praise information for the accumulated overtime hours of the current month;
所述信息发送单元, 用于将所述表扬提示信息发送至对应员工的智能 终端侧和预设的高层管理者的智能终端侧。 \¥0 2019/100383 卩(:17(:\2017/113126 The information sending unit is configured to send the commendation prompt information to the smart terminal side of the corresponding employee and the smart terminal side of the preset high-level manager. \¥0 2019/100383 卩(:17(:\2017/113126
[权利要求 5] 根据权利要求 1至 4任一项所述的考勤机, 其特征在于, 还包括: 更新模块, 用于根据接收到的工作日调整指令, 对预设的相应月份的 工作日期安排表进行更新。 [Aspect 5] The attendance machine according to any one of claims 1 to 4, further comprising: an update module, configured to: set a working date of the corresponding corresponding month according to the received weekday adjustment instruction Schedule the table for updates.
[权利要求 6] 一种考勤处理的方法, 其特征在于, 所述考勤处理的方法包括: 针对每个自然日, 当时间到达预设时间点, 则根据预设的工作日期安 排表, 判断当日的日期类型, 日期类型包括工作日和休息日; 若当日是工作日, 则在当日执行如下操作:  [Attachment 6] A method for attendance processing, wherein the method for attendance processing includes: for each natural day, when the time reaches a preset time point, the table is determined according to a preset work date, and the current day is determined. The date type, date type includes weekdays and rest days; if the day is a business day, the following operations are performed on the same day:
在接收到员工输入的打卡指令时, 判断当前时间点所处时间段类型, 所述时间段类型包括: 上班打卡时间段和下班打卡时间段; 若当前时间点处于上班打卡时间段, 则将当前时间点与预设的上班时 间点进行比较, 根据比较结果判断所述员工当日上班是否迟到; 若当日上班迟到, 则在本月前一工作日累计计算的所述员工迟到次数 上加“1”, 计算出所述员工本月当前累计迟到次数; 若当前时间点处于下班打卡时间段, 则将当前时间点与预设的下班时 间点进行比较, 根据比较结果判断所述员工当日下班是否早退; 若当日下班早退, 则在本月前一工作日累计计算的所述员工早退次数 上加“1”, 计算出所述员工本月当前累计早退次数。  When receiving the punching instruction input by the employee, determining the type of the time zone at the current time point, the time segment type includes: a working punching time period and an off-duty punching time period; if the current time point is in the working punching time period, the current time point is The time point is compared with the preset working time point, and according to the comparison result, it is judged whether the employee is late for work on the same day; if the work is late on the current day, the employee's late arrival count calculated by the previous working day of the month is added with "1". Calculating the current accumulated number of late arrivals of the employee in the current month; if the current time point is in the off-duty punching time period, comparing the current time point with the preset working time point, and judging whether the employee leaves the work early on or off according to the comparison result; If you leave early on the day, add “1” to the number of early withdrawals of the employee calculated on the previous working day of the previous month, and calculate the current cumulative number of early withdrawals of the employee this month.
[权利要求 7] 根据权利要求 6所述的考勤处理的方法, 其特征在于, 若当日是工作 日, 则当日执行的操作还包括:  [Claim 7] The method of attendance processing according to claim 6, wherein if the current day is a working day, the operation performed on the current day further includes:
在预设的统计时间段内, 计算所述员工本月当前迟到与早退总次数, 以及正常出勤次数;  Calculate the total number of late and early departures of the employee in the current statistical period, and the number of normal attendances;
当所述员工本月当前迟到与早退总次数超过预设阈值, 则生成携带所 述本月当前迟到与早退总次数的告警提示信息; 将所述告警提示信息发送至对应员工的智能终端侧。  When the total number of late arrivals and early departures of the employee exceeds a preset threshold value, the alarm prompt information carrying the current total number of late arrivals and early departures of the current month is generated; and the alarm prompt information is sent to the smart terminal side of the corresponding employee.
[权利要求 8] 根据权利要求 6所述的考勤处理的方法, 其特征在于, 所述针对每个 自然日, 当时间到达预设的时间点, 贝帳据预设的工作日期安排表, 判断当日的日期类型之后还包括:  [Attachment 8] The method for attendance processing according to claim 6, wherein, for each natural day, when the time reaches a preset time point, the bill is determined according to a preset work date schedule. After the date type of the day, it also includes:
若当日是休息日, 在当日执行如下操作: \¥0 2019/100383 卩(:17(:\2017/113126 在接收到员工输入的打卡指令时, 判断所述员工本次打卡的次序; 当本次打卡为当日首次打卡, 记录当日的日期和首次打卡时间点; 当本次打卡为当日第二次打卡, 则记录第二次打卡时间点; 在预设的第一统计时间段内, 根据所述员工的首次打卡时间点和第二 次打卡时间点, 计算所述员工当日的工作时间, 定义所述工作时间为 所述员工当日的加班时间。 If the day is a rest day, do the following on the day: \¥0 2019/100383 卩(:17(:\2017/113126) When receiving the punching instruction input by the employee, judge the order of the employee's current punching; When the punching is the first time of the day, record the date of the day and The first time of the punching time; when the punching is the second punching on the current day, the second punching time point is recorded; in the preset first statistical time period, according to the employee's first punching time point and the second punching time At the time point, the working time of the employee on the current day is calculated, and the working time is defined as the overtime time of the employee on the current day.
[权利要求 9] 根据权利要求 8所述的考勤处理的方法, 其特征在于, 若当日是休息 日, 当日执行的操作还包括:  [Claim 9] The method of attendance processing according to claim 8, wherein if the current day is a rest day, the operation performed on the current day further includes:
在预设的第二统计时间段内, 计算所述员工本月当前累计加班天数, 以及本月当前累计加班时间;  Calculating the current accumulated overtime days of the employee this month and the current accumulated overtime hours of the current month in the preset second statistical time period;
当所述员工本月当前累计加班天数超过预设天数、 和/或本月当前累 计加班时间超过预设时间, 则生成携带所述员工本月当前累计加班天 数, 和/或本月当前累计加班时间的表扬提示信息; 将所述表扬提示信息发送至对应员工的智能终端侧和预设的高层管理 者的智能终端侧。  When the employee's current accumulated overtime days exceeds the preset number of days, and/or the current accumulated overtime time exceeds the preset time, the current accumulated overtime days of the employee are generated, and/or the current accumulated overtime of the current month. The praise information of the time is sent to the smart terminal side of the corresponding employee and the smart terminal side of the preset high-level manager.
[权利要求 10] 根据权利要求 6至 9任一项所述的考勤处理的方法, 其特征在于, 还包 括:  [Claim 10] The method of attendance processing according to any one of claims 6 to 9, further comprising:
根据接收到的工作日调整指令, 对预设的相应月份的工作日期安排表 进行更新。  The work date schedule of the corresponding corresponding month is updated according to the received workday adjustment instruction.
PCT/CN2017/113126 2017-11-27 2017-11-27 Attendance machine and method for attendance processing WO2019100383A1 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201780036366.6A CN109416848A (en) 2017-11-27 2017-11-27 The method that attendance recorder, attendance are handled
PCT/CN2017/113126 WO2019100383A1 (en) 2017-11-27 2017-11-27 Attendance machine and method for attendance processing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/CN2017/113126 WO2019100383A1 (en) 2017-11-27 2017-11-27 Attendance machine and method for attendance processing

Publications (1)

Publication Number Publication Date
WO2019100383A1 true WO2019100383A1 (en) 2019-05-31

Family

ID=65463388

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2017/113126 WO2019100383A1 (en) 2017-11-27 2017-11-27 Attendance machine and method for attendance processing

Country Status (2)

Country Link
CN (1) CN109416848A (en)
WO (1) WO2019100383A1 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114333095A (en) * 2021-12-31 2022-04-12 新开普电子股份有限公司 Attendance checking method and attendance checking system for non-fixed shift

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101582175A (en) * 2008-05-12 2009-11-18 鸿富锦精密工业(深圳)有限公司 Attendance checking device and attendance checking method
CN104299283A (en) * 2014-09-24 2015-01-21 孙浩 Attendance management system
CN104794768A (en) * 2015-04-24 2015-07-22 凯拔(中国)科技有限公司 Attendance checking system and attendance checking method capable of regularly and automatically running attendance checking calculation
CN105205625A (en) * 2015-10-29 2015-12-30 桂林创研科技有限公司 Employee attendance checking method and system
CN106548328A (en) * 2016-11-30 2017-03-29 北京恒华伟业科技股份有限公司 Work attendance statistics system and method
CN106920288A (en) * 2015-12-25 2017-07-04 农日刚 A kind of attendance recorder

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101887539A (en) * 2009-05-14 2010-11-17 北京闻言科技有限公司 Technology for recording staff attendance based on period
CN204314954U (en) * 2015-01-06 2015-05-06 湖南工学院 A kind of classroom attendance checking system based on Internet of Things
CN105825321A (en) * 2016-03-09 2016-08-03 阿里巴巴集团控股有限公司 Work attendance processing method and device
CN106203936A (en) * 2016-06-23 2016-12-07 郭进标 A kind of Work attendance management system and method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101582175A (en) * 2008-05-12 2009-11-18 鸿富锦精密工业(深圳)有限公司 Attendance checking device and attendance checking method
CN104299283A (en) * 2014-09-24 2015-01-21 孙浩 Attendance management system
CN104794768A (en) * 2015-04-24 2015-07-22 凯拔(中国)科技有限公司 Attendance checking system and attendance checking method capable of regularly and automatically running attendance checking calculation
CN105205625A (en) * 2015-10-29 2015-12-30 桂林创研科技有限公司 Employee attendance checking method and system
CN106920288A (en) * 2015-12-25 2017-07-04 农日刚 A kind of attendance recorder
CN106548328A (en) * 2016-11-30 2017-03-29 北京恒华伟业科技股份有限公司 Work attendance statistics system and method

Also Published As

Publication number Publication date
CN109416848A (en) 2019-03-01

Similar Documents

Publication Publication Date Title
CN109670938B (en) Method and system for merging and reporting credit investigation data
CN107169744B (en) Time limit monitoring method and system for electronic work order
WO2019104982A1 (en) Comprehensive attendance management and control method, application server and computer readable storage medium
US8712882B2 (en) Predictive time entry for workforce management systems
US20200175522A1 (en) Predicting online customer service requests based on clickstream key patterns
CN109118180B (en) Salary management system
WO2019100384A1 (en) Method and device for implementing employee attendance checking
CN109522318B (en) Data quality management method and system
CN108510230A (en) A kind of trip based reminding method, device and electronic equipment
WO2019095673A1 (en) Employee training enrollment method, application server, and computer readable storage medium
WO2019100383A1 (en) Attendance machine and method for attendance processing
CN106682813A (en) User working state determining method and terminal
WO2019080424A1 (en) Customer migration method and system, computer device and storage medium
US11715070B2 (en) Predicting upcoming missed clockings and alerting workers or managers
CN109377174A (en) A kind of data statistical analysis method and device
CN102968714A (en) Bookkeeping and financial management system and method based on consumption data of integrated circuit (IC) card
WO2016101564A1 (en) Call bill processing method and device
CN107767477B (en) Information processing method and related equipment
CN116030565A (en) Data processing system and method
CN106776913B (en) Method and device for judging user home location
CN113570379A (en) Abnormal transaction group partner identification method and device
CN109523648B (en) Automatic card punching method and device, storage medium and terminal
CN113240384A (en) Salary statistical accounting method and device
CN108391283B (en) Mobile phone traffic monitoring system based on Internet
CN110889671A (en) Attendance management method, server and computer readable storage medium

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 17932693

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 17932693

Country of ref document: EP