WO2018231069A1 - Temporary tunnel - Google Patents

Temporary tunnel Download PDF

Info

Publication number
WO2018231069A1
WO2018231069A1 PCT/NO2018/050161 NO2018050161W WO2018231069A1 WO 2018231069 A1 WO2018231069 A1 WO 2018231069A1 NO 2018050161 W NO2018050161 W NO 2018050161W WO 2018231069 A1 WO2018231069 A1 WO 2018231069A1
Authority
WO
WIPO (PCT)
Prior art keywords
dome
tunnel
elongated
temporary
temporary tunnel
Prior art date
Application number
PCT/NO2018/050161
Other languages
French (fr)
Inventor
Jens Olav Myklebust
Knut Victor PEDERSEN
Original Assignee
Roadcap As
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Roadcap As filed Critical Roadcap As
Publication of WO2018231069A1 publication Critical patent/WO2018231069A1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01FADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
    • E01F7/00Devices affording protection against snow, sand drifts, side-wind effects, snowslides, avalanches or falling rocks; Anti-dazzle arrangements ; Sight-screens for roads, e.g. to mask accident site
    • E01F7/04Devices affording protection against snowslides, avalanches or falling rocks, e.g. avalanche preventing structures, galleries
    • E01F7/045Devices specially adapted for protecting against falling rocks, e.g. galleries, nets, rock traps

Definitions

  • Such a construction is light enough to be transported by standard vehicles, and the costs involved is competitive relative to hillside securement or tunnel constructions made of concrete.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Lining And Supports For Tunnels (AREA)
  • Inorganic Insulating Materials (AREA)
  • Types And Forms Of Lifts (AREA)

Abstract

The invention relates to a temporary tunnel for shielding a road from falling hill side rocks. The tunnel comprises an elongated, open ended sheet metal dome (1) combined with a metal wire mesh (5) covering said dome (1), said wire mesh (5) being designed and dimensioned to catch and hamper larger rocks to penetrate said elongated sheet metal dome (1),said metal dome (1) comprising a plurality of hinged connections (B) pivotally connecting a part of the metal dome (1) so that the part of the elongated sheet metal dome (6a, 6b, 6c) is adapted to be folded. The invention also relates to a method for installing the temporary tunnel on a ground or road to be shielded.

Description

TEMPORARY TUNNEL
The present invention relates to a temporary tunnel for shielding a road from falling hillside rocks. In many mountainous countries, like Norway and
Switzerland, the roads are often subjected to falling rocks and landslide. Most of such incidents are minor, but still of an extent that can cause personal injury and loss of life if they hit a vehicle.
Technical Field
The present solutions to avoid injuries is to secure the rock itself from falling out. This is done by clearing loose rocks and secure larger areas by a steel net or a steel mesh combined with wire mesh fences. This is work that needs to be carried out at height in difficult and little accessible terrain. It is very costly, the road need to be closed for traffic and not least, such work is very hazardous and risky for persons. In addition, long time is often passing before such work is decided and commenced, and also takes a long time to carry out. Even after a professional work is finished, there are still no guarantees against falling rocks or ice blocks.
The present invention seeks to avoid all this by using a temporary tunnel that can promptly and easily be deployed where the risk for falling rocks and landslide is prevalent. This means that a shield above the traffic is created instead of attempting to secure the entire hillside. A temporary tunnel section will be possible to manufacture within a few weeks, alternatively be stored at districts having high risk for falling rocks and landslide in order to be promptly deployed when needed.
Moreover, within existing tunnels, there is often a need for protection against loose rocks, and sometimes also a need for extending existing tunnel mouths or outlets. The present solutions for securing tunnels are time demanding and the traffic is severely affected. By the new temporary tunnel, the mouth of the tunnel and the tunnel itself can be rapidly secured.
Still another area of use of such a temporary tunnel, is to secure areas where construction activity takes place over or adjacent to heavy traffic road, bridge construction etc. Then it will be possible to let the traffic pass safely and unobstructed while construction takes place.
To make tunnels through rocks is a well known art that traditionally has included both drilling and blasting in the rock in order to make a tunnel. However, as far as we are aware of, a temporary tunnel for shielding a road from falling hill side rocks and landslides, has previously not been proposed.
Summary of invention According to the present invention, a temporary tunnel of the introductory said nature is provided, which is distinguished in that the tunnel comprises an elongated, open ended sheet metal dome combined with a metal wire mesh covering the dome, which wire mesh being designed and dimensioned to catch and hamper larger rocks to penetrate the elongated sheet metal dome said metal dome (1 ) comprising a plurality of hinged connections (B) pivotally connecting a part of the metal dome (1 ) so that the part of the elongated sheet metal dome (6a, 6b , 6c) is adapted to be folded.
In one embodiment the sheet metal comprises corrugated plates.
Preferably, the tunnel is being prefabricated in a factory and subsequently transported to the site for being deployed and erected there.
Normally the elongated open ended sheet metal dome is to be unfolded along a longitudinal top line of the dome. In one embodiment, the dome includes nested and folded elongated dome elements, which dome elements being exposed when the dome construction is being unfolded. Preferably, the dome elements comprises three elongated dome elements folded into a triangular cross section internally of and in top of the elongated dome construction.
Preferably, the three elongated dome elements hare hinged together in the longitudinal direction thereof.
Further, the elongated dome construction is erected by means of powered extendable means, such as a hydraulic cylinder. The powered extendable means are acting vertically and horizontally to elevate and unfold the three elongated dome elements and to widen out the road contacting parts of the dome construction in order to widely open the tunnel cross section. The hinged connections (B) can further have locking means to lock the dome elements (6a, 6b, 6c) in position.
The invention further relates to a method for installing a temporary tunnel according to any one of the claims 1 -1 1 , the method comprising the following steps
a) Transporting the temporary tunnel in a folded position to the road to be shielded, by retracting a part (6a, 6b, 6c) of the metal sheet dome into the inside of the tunnel,
b) Unfolding the temporary tunnel at the road to be shielded to an unfolded position where the entire metal sheet dome (1 ) is exposed through the entire periphery (3, 6a, 6b, 6c, 3) of the metal sheet dome (1 ).
In the folded position the remaining part that is not retracted inside the metal dome, constituting the exposed surface to the surroundings In the unfolded position it is the entire periphery or the metal dome that constituting the exposed surface to the surroundings.
Brief description of drawings Other and further objects, features and advantages will appear from the following description of preferred embodiments of the invention, which is given for the purpose of the description, and given in context with the appended drawings where: Fig. 1 shows in perspective schematic view a temporary tunnel according to the present invention being transported on a lorry,
Fig. 2 shows a schematic elevation view of the lorry and tunnel shown in fig. 1 ,
Fig. 3 shows a schematic rear view of the open-ended tunnel and lorry,
Fig. 4 shows in perspective schematic view the tunnel unloaded from the lorry and deployed on the ground,
Fig. 5 shows a schematic rear view of the open-ended tunnel shown in fig. 4, Fig. 6 shows in perspective schematic view the tunnel according to fig. 5 where each pair of ground contacting supports are fully brought apart and the tunnel is prepared for next steps in order to be expanded to full scale tunnel profile, Fig. 7 shows a schematic rear view of the fig. 6 situation,
Fig. 8 shows in perspective view the first step of tunnel expansion into full profile tunnel,
Fig. 9 shows a schematic rear view of the fig. 8 situation,
Fig. 10 shows in perspective view the second step of tunnel expansion into full profile tunnel,
Fig. 1 1 shows a schematic rear view of the fig. 10 situation,
Fig. 12 shows a schematic rear view the third and final step of tunnel expansion into full profile tunnel, where all tools are removed,
Fig. 13 shows an enlarged detail of the metal wire mesh externally covering the sheet metal tunnel roof,
Fig. 14 shows in perspective view the third and final step of the tunnel expansion into full profile tunnel, and ready to be fixed to the ground and subsequent traffic use. Fig. 15 shows the deployed temporary tunnel being used by two meeting lorries, Fig. 16 shows a top and elevation view of same as in fig. 15, and
Fig. 17 shows an end view of two meeting lorries in a tunnel according to the present invention.
Detailed description of the invention
The folded position is the position where a part of the tunnel is retracted at the inside of the tunnel. Only the remaining part of the tunnel is thus exposed to the surroundings. The tunnel has in this position reduced cross section viewed from an open end of the tunnel. Figure 1 -7 shows the tunnel in this position.
The unfolded position is the position of the temporary tunnel where the entire tunnel is exposed to the surroundings. The cross section of the open end of the tunnel is thus larger than in the folded position. Figure 9-17 shows this position.
By the wording exposed to the surroundings is meant the outer surface of the tunnel adapted to be exposed to falling rocks or elements etc.
Reference is first made to fig. 1 and 2 showing a temporary tunnel section 1 according to the present invention being transported on a lorry 2. The tunnel section 1 takes form of an elongated dome. The most easy and rapid solution to set up a temporary tunnel, is to transport tunnel sections 1 in one piece and have them installed at location and have them supported directly on the existing roadbed and have them immobilized by securely fixation to the ground. The tunnel section profile needs to be less than the smallest existing tunnel (if any) profile on the road in question. Hence, it is conceivable to make a temporary tunnel according to the present invention in its simplest embodiment (as defined in claim 1 ) as a sturdy tunnel construction in one piece.
If the above is not acceptable or possible, then the temporary tunnel
construction needs to be foldable such that the temporary tunnel construction can be transported through the same tunnel profile. Hence, a little more complicated embodiment will be of a foldable construction in order to reduce the cross-section area of the tunnel profile to enable passage through existing road tunnels. The thought is that the temporary tunnel sections are transported during nighttime to final destination and be ready to be installed the following morning and instantly be prepared for traffic through the temporary tunnel. This folded position also makes the tunnel easier to transport on the lorry 2. As shown in fig. 1 and 2, the tunnel section 1 construction is made up by steel profiles 3 and corrugated sheet metal plates 4 and covered by heavy gauge steel wire mesh 5 or nets fixed externally of the sheet metal plates 4. The net 5 is to secure that larger stones or rocks do not pass through the steel plates, and the steel construction ensures sufficient capacity by taking up deformation energy higher than those values used for hillside securement today. The criteria of dimensions is to ensure that vehicles inside the tunnel are not hit by stones, and provide for full safety against personal injury, even if large deformation damage on the tunnel itself is accepted. As indicated in fig. 12, the profile shows what is called a T8.5 tunnel. The hatched inner rectangle shows areas that are dedicated for vehicles. It is to be observed the large spare areas that are dedicated for deformation zones without entering into the vehicles area. A still larger zone is available if one can imagine deformations all the way to where people in a vehicle normally are located.
The solution with an optimal steel construction covered with a sturdy heavy gauge steel wire net will therefore be able to absorb large amounts of energy without collapsing. Each section is connected by steel wire in the longitudinal direction of the tunnel section such that the forces are distributed over a large area.
Such a construction is light enough to be transported by standard vehicles, and the costs involved is competitive relative to hillside securement or tunnel constructions made of concrete.
Deformed parts of a tunnel can be repaired with specially designed hydraulic repair tools to be operated inside the tunnel walls. In case of severe damages, complete tunnel sections can be replaced. In order to fold the tunnel construction, each tunnel section needs to be designed as an articulated mechanism that is secured by bolts when it is unfolded. These bolts are spring loaded, such that they automatically snap into engagement when they are positioned. This also entails a quick installation method without any elevated work in the tunnel space.
With reference to fig. 3, a schematic rear view of the open ended tunnel and lorry trailer 2a is shown. The temporary tunnel dome includes nested and folded elongated dome elements 6a, 6b, 6c. These dome elements 6a, 6b, 6c will be exposed when the dome construction is being unfolded.
As shown on fig. 3, the dome elements 6a, 6b, 6c comprises three elements folded into a triangular cross section internally of and in top of the elongated dome construction. The three elongated dome elements 6a, 6b, 6c are hinged together in their longitudinal direction. Even though three dome elements 6a,6b, 6c are shown in the figures, other numbers of dome elements are possible embodiments of the invention. As further shown in fig. 3, the elongated dome construction is made possible to erect by means of powered extendable means 7a, 7b, 7c, such as hydraulic cylinders. Any linear motor drive is conceivable, also pneumatic and electrically powered linear motors. Such linear motors can be inside telescoping beam structures, if not in open air. Other means for folding or unfolding the temporary tunnel than by the powered extendable means are however possible.
Other possible folding or unfolding (extendable) means could for instance be a scissor type jack.
The powered extendable means 7a, 7b, 7c are acting vertically and horizontally respectively, in order to elevate and unfold the three elongated dome elements 6a, 6b, 6c. In order to widely open up the tunnel cross section, the horizontally acting powered extendable means 7a, 7b are hinged together and used to widen out the road contacting parts 3a, 3b of the dome construction, while the vertically acting powered extendable means 7c is acting on the elongated dome elements 6a, 6b, 6c to push the triangle upwards and unfold.
Fig. 4 shows in perspective view the entire tunnel dome construction 1 unloaded from the trailer 2a of the lorry 2 (figure 3) and deployed on the ground or on a roadbed 10, which will be the normal procedure unless it is unloaded for storage at some location. The tunnel dome construction 1 is supported on the ground by the respective road contacting parts 3a, 3b, 3c, 3d, etc. to 3j. Fig. 5 shows a schematic rear view of the open ended tunnel shown in fig. 3, but with the lorry 2 and trailer 2a driven out of the tunnel dome 1 .
Fig. 6 and 7 show the tunnel dome construction where each pair of ground contacting supports 3a, 3b to 3i, 3j are fully brought apart and the tunnel dome construction 1 is prepared for next steps in order to be expanded to full scale tunnel profile. To this end, five pairs of horizontally acting powered extendable means are used, here represented by the first pair of powered extendable means 7a, 7b. As mentioned, each pair of powered extendable means 7a, 7b is hinged connected in one end, and hinged connected to respective ground contacting supports 3a, 3b to 3i, 3j in the opposite end.
Fig. 8 and 9 show the first step of tunnel dome erection into full profile tunnel dome 1 by use of five vertically acting powered extendable means, here represented by the first powered extendable means 7c. Each and every ground contacting supports 3a to 3j are firmly fixed to the ground by long rock bolts 9 driven through the road pavement and into the ground, preferably into solid rock.
Fig. 10 and 1 1 show the second step of tunnel expansion into the full profile tunnel dome. Continued use of the five vertically acting powered extendable means, represented by the first powered extendable means 7c, bring all the three elongated dome elements 6a, 6b, 6c into final position to complete the tunnel dome. The three hinged elongated tunnel sections 6a, 6b, 6c are locked together in this position by means of respective spring loaded lugs or bolts B that are snapped into engagement with holes or recesses.
Fig. 12 and 14 show the third and final step of tunnel expansion into full profile tunnel dome, where all tools are removed, and ready to for subsequent traffic use. As previously mentioned, and indicated in fig. 12, the profile shows what is called a T8.5 tunnel. The hatched inner rectangle R shows areas that are dedicated for vehicles. It is to be observed here the large spare areas Αι , A2, A3 that are dedicated for deformation zones without entering into the vehicles area R. A still larger zone is available if one can imagine deformations all the way to where people in a vehicle normally are located.
Fig. 13 shows two enlarged detail areas of the tunnel dome 1 . The upper one indicates the corrugated sheet metal plates P, while the lower one indicates the metal wire mesh M externally covering the sheet metal tunnel roof. Without being a limitation, a typical total length of the proposed tunnel, is 12 meter and 3 meter between each steel profiles 3.
Fig. 15 shows the deployed temporary tunnel being used by two meeting lorries, while fig. 16 shows a top and elevation view of same as in fig. 15, and fig. 17 shows an end view of two meeting lorries in a tunnel according to the present invention.
A procedure of installation is as follows:
1 . The tunnel section 1 is transported in folded position by lorry 2 having a low trailer 2a and height adjustable air suspension.
2. When the section 1 is in position, all the horizontal bottom beams 7a-7j are hydraulically telescoped to full width while the section 1 is still on the trailer 2a.
3. The section 1 is then put down on the ground, or roadbed, by descending the trailer 2a by operating the air suspension. Then the trailer 2a is removed.
4. Rock bolts 9 are installed through foot supports 3a-3j of the steel profiles 3. If the road describes a curb, the horizontal bottom beams 7a-7j can be used to force the tunnel section construction into a bend. Then temporary rock bolts need to be temporary installed in center.
5. The vertical hydraulic telescoping cylinders 7c then unfolds the three
elongated tunnel sections 6a, 6b, 6c until all the bolts has snapped into engagement by spring force.
6. Then the outer bolts of the horizontal telescopic bottom beam 7a-7j are released, such that these can be retracted hydraulically. The vertical telescopic cylinders are retracted and a lorry is driven in to remove these.
7. Now, next section is made ready for. This section is driven through the first section and is unfolded in the same way. Then the sections are interconnected by through running steel wires that are tied in.
There is no limit how long such a tunnel can be made.

Claims

Patent Claims
1 .
A temporary tunnel for shielding a road from falling hill side rocks,
characterized in that said tunnel comprises an elongated, open ended sheet metal dome (1 ) combined with a metal wire mesh (5) covering said dome (1 ), said wire mesh (5) being designed and dimensioned to catch and hamper larger rocks to penetrate said elongated sheet metal dome (1 ), said metal dome (1 ) comprising a plurality of hinged connections (B) pivotally connecting a part of the metal dome (1 ) so that the part of the elongated sheet metal dome (6a, 6b , 6c) is adapted to be folded.
2.
The temporary tunnel according to claim 1 , characterized in that said sheet metal (4) comprises corrugated plates (P).
3.
The temporary tunnel according to claim 1 or 2, characterized in that said tunnel is adapted to be prefabricated in a factory and further deployed and erected on site when transported to site .
4.
The temporary tunnel according to any of the claims 3, characterized in that said elongated open-ended sheet metal dome (1 ) is unfoldable along a longitudinal top line of said dome (1 ).
5.
The temporary tunnel according to any of the claims 3-4, characterized in that said dome (1 ) includes nested and folded elongated dome elements (6a, 6b, 6c), said dome elements (6a, 6b, 6c) being exposed when said dome
construction is being unfolded.
6.
The temporary tunnel according to any of the claims 5, characterized in that said dome elements (6a, 6b, 6c) comprises three elongated dome elements folded into a triangular cross section internally of and in top of said elongated dome construction (1 ).
8.
The temporary tunnel according to any of the claims 5 or 6, characterized in that said three elongated dome elements (6a, 6b, 6c) are hinged together in the longitudinal direction thereof.
9.
The temporary tunnel according to any of the claims 1 -8, characterized in that said elongated dome construction is erected by means of powered extendable means (7a, 7b), such as a hydraulic cylinder.
10.
The temporary tunnel according to any of the claims 9, characterized in that said powered extendable means (7a, 7b) are adapted to act vertically and horizontally to elevate and unfold the three elongated dome elements (6a, 6b, 6c) and to widen out the road contacting parts (3a - 3j) of the dome
construction in order to widely open the tunnel cross section 1 1 .
The temporary tunnel according to claim 10, characterized in that hinged connections (B) having locking means to lock the dome elements in position.
1 1 .
A method for installing a temporary tunnel according to any one of the claims 1 - 10, characterized in that the method comprising the following steps
c) Transporting the temporary tunnel in a folded position to the ground or road to be shielded, by retracting a part (6a, 6b, 6c) of the metal sheet dome into the inside of the tunnel,
d) Unfolding the temporary tunnel at the ground or road to be shielded to an unfolded position where the entire metal sheet dome (1 ) is exposed through the entire periphery (3, 6a, 6b, 6c, 3) of the metal sheet dome (1 ).
PCT/NO2018/050161 2017-06-16 2018-06-15 Temporary tunnel WO2018231069A1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
NO20170994A NO343810B1 (en) 2017-06-16 2017-06-16 Temporary tunnel
NO20170994 2017-06-16

Publications (1)

Publication Number Publication Date
WO2018231069A1 true WO2018231069A1 (en) 2018-12-20

Family

ID=64659875

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/NO2018/050161 WO2018231069A1 (en) 2017-06-16 2018-06-15 Temporary tunnel

Country Status (2)

Country Link
NO (1) NO343810B1 (en)
WO (1) WO2018231069A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111321678A (en) * 2020-04-01 2020-06-23 四川省交通勘察设计研究院有限公司 Steel shed tunnel structure convenient for transportation and rapid in forming on site and construction method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4885879A (en) * 1987-02-10 1989-12-12 Plantier Jean Louis Vault structure for protection of roadways against snow
CN101666070A (en) * 2009-09-16 2010-03-10 布鲁克(成都)工程有限公司 Flexible hangar tunnel used for isolating and protecting flying rocks or falling rocks
CN102493328A (en) * 2011-11-22 2012-06-13 中国科学院水利部成都山地灾害与环境研究所 Flexible protective shed-tunnel and method for designing same
CN202945551U (en) * 2012-12-04 2013-05-22 中国水电顾问集团贵阳勘测设计研究院 Shed frame structure for protecting highway slope from falling rocks and dropping blocks
CN102758399B (en) * 2012-07-19 2014-04-02 西安建筑科技大学 Attached opening-closing protective cover of urban bridge

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH082165Y2 (en) * 1989-08-28 1996-01-24 日本鋼管ライトスチール株式会社 Joint structure of sielter using deck plate

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4885879A (en) * 1987-02-10 1989-12-12 Plantier Jean Louis Vault structure for protection of roadways against snow
CN101666070A (en) * 2009-09-16 2010-03-10 布鲁克(成都)工程有限公司 Flexible hangar tunnel used for isolating and protecting flying rocks or falling rocks
CN102493328A (en) * 2011-11-22 2012-06-13 中国科学院水利部成都山地灾害与环境研究所 Flexible protective shed-tunnel and method for designing same
CN102758399B (en) * 2012-07-19 2014-04-02 西安建筑科技大学 Attached opening-closing protective cover of urban bridge
CN202945551U (en) * 2012-12-04 2013-05-22 中国水电顾问集团贵阳勘测设计研究院 Shed frame structure for protecting highway slope from falling rocks and dropping blocks

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
24 July 2017 (2017-07-24), Retrieved from the Internet <URL:https://www.youtube.com/watch?v=BK5okrPhSyo> [retrieved on 20181122] *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111321678A (en) * 2020-04-01 2020-06-23 四川省交通勘察设计研究院有限公司 Steel shed tunnel structure convenient for transportation and rapid in forming on site and construction method
CN111321678B (en) * 2020-04-01 2024-02-09 四川省交通勘察设计研究院有限公司 Steel shed tunnel structure convenient for rapid forming on transportation site and construction method

Also Published As

Publication number Publication date
NO20170994A1 (en) 2018-12-17
NO343810B1 (en) 2019-06-11

Similar Documents

Publication Publication Date Title
DK2401436T3 (en) Safety-trailer
CN206477602U (en) Loading platform
US7971408B2 (en) Stairtower and method for erecting the same
US6763633B2 (en) Portable enclosure
US8966832B1 (en) Mobile aboveground shelter with protected anchoring
WO2018231069A1 (en) Temporary tunnel
CN108894131A (en) A kind of quickly emergency hangar tunnel equipment and implementation method
JP6849263B1 (en) How to stretch the shatterproof curing sheet above the crushed material when dismantling the building
JP4673699B2 (en) Bridge construction method, bridge superstructure and deployment device
CN112647438A (en) Can assemble fast, folding prevent falling rocks device
CN218816418U (en) Tunnel operation platform truck
JPH11229751A (en) Widening device for existing tunnel
ES1070720U (en) Stage trailer
KR102609528B1 (en) Movable prefabricated type rock crushing protection structure
CN111549644B (en) Do benefit to steel temporary bridge by oneself of quick current mediation of actual combat
CN214832041U (en) Can assemble fast, folding prevent falling rocks device
CN215672224U (en) Drilling and blasting platform frame
CN219865069U (en) Full-top temporary support device
JP3859610B2 (en) Temporary road
KR200281831Y1 (en) Rockfall prevention fence prefab
KR200285599Y1 (en) Saddle moving apparatus
JPH06129195A (en) Movable lining form
AU2008201783A1 (en) Temporary roof support device and method
CN113622940A (en) Drilling and blasting platform frame
JP2024004938A (en) Slide-type protective fence

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 18818102

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 18818102

Country of ref document: EP

Kind code of ref document: A1