WO2018193703A1 - 漏洩電流算出装置および漏洩電流算出方法 - Google Patents
漏洩電流算出装置および漏洩電流算出方法 Download PDFInfo
- Publication number
- WO2018193703A1 WO2018193703A1 PCT/JP2018/005804 JP2018005804W WO2018193703A1 WO 2018193703 A1 WO2018193703 A1 WO 2018193703A1 JP 2018005804 W JP2018005804 W JP 2018005804W WO 2018193703 A1 WO2018193703 A1 WO 2018193703A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- leakage current
- ground
- phase
- voltage
- inverter
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Ceased
Links
Images
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R31/00—Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
- G01R31/50—Testing of electric apparatus, lines, cables or components for short-circuits, continuity, leakage current or incorrect line connections
- G01R31/52—Testing for short-circuits, leakage current or ground faults
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R19/00—Arrangements for measuring currents or voltages or for indicating presence or sign thereof
- G01R19/25—Arrangements for measuring currents or voltages or for indicating presence or sign thereof using digital measurement techniques
- G01R19/2513—Arrangements for monitoring electric power systems, e.g. power lines or loads; Logging
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R19/00—Arrangements for measuring currents or voltages or for indicating presence or sign thereof
- G01R19/25—Arrangements for measuring currents or voltages or for indicating presence or sign thereof using digital measurement techniques
- G01R19/252—Arrangements for measuring currents or voltages or for indicating presence or sign thereof using digital measurement techniques using analogue/digital converters of the type with conversion of voltage or current into frequency and measuring of this frequency
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R25/00—Arrangements for measuring phase angle between a voltage and a current or between voltages or currents
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R27/00—Arrangements for measuring resistance, reactance, impedance, or electric characteristics derived therefrom
- G01R27/02—Measuring real or complex resistance, reactance, impedance, or other two-pole characteristics derived therefrom, e.g. time constant
- G01R27/025—Measuring very high resistances, e.g. isolation resistances, i.e. megohm-meters
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R31/00—Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
- G01R31/40—Testing power supplies
- G01R31/42—AC power supplies
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02H—EMERGENCY PROTECTIVE CIRCUIT ARRANGEMENTS
- H02H3/00—Emergency protective circuit arrangements for automatic disconnection directly responsive to an undesired change from normal electric working condition with or without subsequent reconnection ; integrated protection
- H02H3/16—Emergency protective circuit arrangements for automatic disconnection directly responsive to an undesired change from normal electric working condition with or without subsequent reconnection ; integrated protection responsive to fault current to earth, frame or mass
- H02H3/162—Emergency protective circuit arrangements for automatic disconnection directly responsive to an undesired change from normal electric working condition with or without subsequent reconnection ; integrated protection responsive to fault current to earth, frame or mass for AC systems
- H02H3/165—Emergency protective circuit arrangements for automatic disconnection directly responsive to an undesired change from normal electric working condition with or without subsequent reconnection ; integrated protection responsive to fault current to earth, frame or mass for AC systems for three-phase systems
Definitions
- the present invention relates to a leakage current calculation device and a leakage current calculation method for calculating leakage current.
- Non-Patent Document 1 Examples of techniques for calculating a leakage current in a load such as a three-phase motor are disclosed in Non-Patent Document 1 and Patent Document 1, respectively.
- the technology of Non-Patent Document 1 is for accurately measuring the leakage current corresponding to the ground insulation resistance in equipment where an inverter is not used for driving a load such as a three-phase motor.
- the technique of Patent Document 1 is for accurately measuring the leakage current corresponding to the ground insulation resistance in a facility in which an inverter is used for driving a load.
- Non-Patent Document 1 and Patent Document 1 conventionally, the configuration of a device that calculates a leakage current corresponding to ground insulation resistance differs depending on the presence or absence of an inverter. Therefore, the prior art has a problem that it is necessary to use a leakage current calculation device depending on whether or not an inverter is used for the equipment. The prior art further has a problem that when a new inverter is added to equipment that does not use the inverter for the purpose of energy saving, the leakage current calculation device needs to be changed accordingly.
- the present invention has been made to solve the above-described problems. And the objective is to provide the leakage current calculation apparatus and the leakage current calculation method which can calculate the leakage current for ground insulation resistance accurately irrespective of the presence or absence of an inverter.
- a leakage current calculation apparatus provides at least one of line voltages in a three-phase AC commercial power system in which one of three different phases is grounded.
- a voltage measuring unit for measuring the voltage, and a ground voltage calculating unit for calculating a ground voltage between a neutral point of the commercial power system and the ground from the at least one line voltage measured by the voltage measuring unit;
- a leakage current measuring unit that measures a leakage current flowing between the load connected to the commercial power system and the ground, and a frequency component synchronized with the system frequency of the commercial power system is extracted from the measured leakage current
- An insertion determination unit that determines whether the load is inserted, and the system frequency component that flows between the load and the ground through a ground insulation resistance based on a calculation procedure according to a determination result of the insertion determination
- a leakage current calculation method provides at least one of line voltages in a three-phase AC commercial power system in which one of three different phases is grounded.
- a voltage measurement step for measuring the voltage a ground voltage calculation step for calculating a ground voltage between a neutral point and the ground of the commercial power system from the measured line voltage, and the commercial power
- a leakage current measuring step for measuring a leakage current flowing between the load connected to the system and the ground, and a frequency component extraction for extracting a frequency component synchronized with the system frequency of the commercial power system from the measured leakage current
- a phase difference determination step for determining a phase difference between the calculated ground voltage and the extracted frequency component, and an inverter is inserted between the commercial power system and the load.
- An insertion determination step for determining whether or not to the ground, and a ground for the system frequency flowing between the load and the ground through a ground insulation resistance of the load based on a calculation procedure according to a determination result of the insertion determination step
- a leakage current calculating step for calculating a leakage current corresponding to the insulation resistance.
- the leakage current corresponding to the ground insulation resistance can be accurately calculated regardless of the presence or absence of the inverter.
- FIG. 5 is a flowchart showing a flow of a series of processes for the leakage current calculation apparatus according to the first embodiment of the present invention to calculate a ground insulation resistance leakage current based on a calculation procedure corresponding to presence / absence of inverter insertion and frequency matching / mismatching. .
- the leakage current calculation apparatus has a principle for calculating a leakage current synchronized with the system frequency of the commercial power system when the system frequency of the commercial power system matches the operation frequency of the inverter. It is a figure explaining.
- Embodiment 1 of this invention when a system frequency and an operation frequency correspond, it is a figure explaining the principle which the end point at the time of carrying out the vector description of the extracted leakage current rotates. It is a figure explaining the 1st method for calculating the earth insulation resistance part leakage current in Embodiment 1 of the present invention. It is a figure explaining the 2nd method for calculating the earth insulation resistance part leakage current in Embodiment 1 of the present invention.
- Embodiment 1 of this invention It is a figure explaining the least squares method of the circle in Embodiment 1 of this invention. It is a figure explaining the 3rd method for calculating the earth insulation resistance part leakage current in Embodiment 1 of the present invention. It is a schematic system diagram which shows the structural example to which the leakage current calculation apparatus which concerns on Embodiment 2 of this invention is applied. It is a figure which shows an example of the time transition of the calculated value of the earth insulation resistance part leakage current or earth insulation resistance for every three-phase motor in Embodiment 2 of this invention.
- Embodiment 1 Embodiment 1 according to the present invention will be described below with reference to FIGS.
- FIG. 2 is a schematic system diagram illustrating a first configuration example to which the leakage current calculation apparatus 1 according to the first embodiment of the present invention is applied.
- the leakage current calculation device 1 is configured to monitor a three-phase motor 5 (load) that drives the commercial power system 2 as a power source.
- the commercial power system 2 is a three-phase AC type AC power source in which the S phase is grounded to the ground E among different three phases (R phase, S phase, T phase). These three phases are respectively connected to the input side of the three-phase motor 5 via R line, S line, and T line.
- the three-phase motor 5 operates using the voltage supplied from the commercial power system 2.
- a zero-phase current transformer 4 surrounding the R line, S line, and T line is provided.
- the zero-phase current transformer 4 measures a three-phase combined ground zero-phase current I 0 that flows between the commercial power system 2 and the three-phase motor 5. As will be described in detail later, this zero-phase current I0 is equal to a leakage current flowing between the three-phase motor 5 and the ground E.
- FIG. 3 is a schematic system diagram showing a second configuration example to which the leakage current calculation apparatus 1 according to the first embodiment of the present invention is applied.
- the leakage current calculation device 1 is configured to monitor a three-phase motor 5 (load) driven by an inverter 3 that uses a commercial power system 2 as a power source.
- the commercial power system 2 is a three-phase AC type AC power source in which the S phase is grounded to the ground E among different three phases (R phase, S phase, T phase). These three phases are respectively connected to the input side of the inverter 3 via R line, S line, and T line.
- the inverter 3 generates a predetermined control voltage from the three-phase power supplied from the commercial power system 2 and corresponds to the three phases (U phase, V phase, W phase) on the output side (U line, V line). , W line) to the three-phase motor 5 respectively.
- the three-phase motor 5 is connected to the output side of the inverter 3 and operates using each supplied control voltage.
- a zero-phase current transformer 4 surrounding the U line, the V line, and the W line is provided.
- the zero-phase current transformer 4 measures a three-phase synthesized ground zero-phase current I 0 that flows between the inverter 3 and the three-phase motor 5. As will be described in detail later, this zero-phase current I0 is equal to a leakage current flowing between the three-phase motor 5 and the ground E.
- the inverter 3 is not inserted between the commercial power system 2 and the three-phase motor 5.
- the inverter 3 is inserted between the commercial power system 2 and the three-phase motor 5.
- the leakage current calculation device 1 can be applied to a configuration in which the inverter 3 is inserted or a configuration in which the inverter 3 is not inserted.
- FIG. 1 is a block diagram showing a main configuration of a leakage current calculation apparatus according to Embodiment 1 of the present invention.
- the leakage current calculation device 1 includes a voltage measurement unit 11, a leakage current measurement unit 12, a ground voltage calculation unit 13, a frequency component extraction unit 14, a phase difference calculation unit 15 (phase difference determination unit), and an insertion.
- Determination unit 16 circle center calculation unit 17, resistance leakage current calculation unit 18 (leakage current calculation unit), insulation resistance calculation unit 19, insulation failure determination unit 20 (insulation deterioration load specifying unit, insulation deterioration determination unit), and output
- the unit 21 is provided.
- the voltage measuring unit 11 measures at least one of the line voltages of the commercial power system 2. In the configuration shown in FIG. 2, the voltage measurement unit 11 measures the line voltage on the output side of the commercial power system 2. In the configuration shown in FIG. 3, the voltage measurement unit 11 measures the line voltage on the input side of the inverter 3. In this embodiment, the line voltage between the R phase and the S phase is measured in both cases of the configuration of FIG. 2 and the configuration of FIG.
- the line voltage to be measured is not limited to this and may be any line voltage.
- the voltage measurement unit 11 may measure a voltage between the R phase and the T phase, or a voltage between the T phase and the S phase.
- the voltage measurement unit 11 may have a low-pass filter or a band-pass filter for removing high frequency components from the measured voltage or extracting system frequency components.
- the ground voltage calculation unit 13 calculates the ground voltage between the neutral point of the commercial power system 2 and the ground E from at least one of the line voltages measured by the voltage measurement unit 11. In the present embodiment, the ground voltage is calculated from the line voltage between RS.
- the leakage current measuring unit 12 measures a leakage current (zero-phase current) flowing between the three-phase motor 5 and the ground E through the zero-phase current transformer 4.
- the leakage current measuring unit 12 may have a low-pass filter or a band-pass filter for removing a high frequency component from the measured leakage current or extracting a system frequency component.
- the frequency component extraction unit 14 extracts at least one frequency component including a frequency component synchronized with the system frequency of the commercial power system 2 (that is, a frequency component having the same frequency as the system frequency) from the measured leakage current.
- a frequency component synchronized with the system frequency of the commercial power system 2 that is, a frequency component having the same frequency as the system frequency
- the phase difference calculation unit 15 calculates the phase difference between the measured line voltage or the calculated ground voltage and the extracted frequency component of the system frequency.
- the calculation of the phase difference is performed by, for example, arithmetic processing. Instead, the phase difference may be determined by measuring the phase difference using a predetermined measurement circuit.
- the insertion determination unit 16 determines whether or not the inverter 3 is inserted between the commercial power system 2 and the three-phase motor 5. In the present embodiment, the insertion determination unit 16 determines whether or not the inverter 3 is inserted based on at least one frequency component extracted from the leakage current by the frequency component extraction unit 14. Details of the determination will be described later.
- the circle center calculation unit 17 calculates the center point of a circle drawn by each point specified by the frequency component of the system frequency calculated at at least three different time points and the determined phase difference.
- the resistance-divided leakage current calculation unit 18 is a current flowing between the three-phase motor 5 and the ground E through the ground insulation resistance of the three-phase motor 5 (the ground insulation resistance component corresponding to the system frequency). Leakage current) is calculated.
- the insulation resistance calculation unit 19 calculates the ground insulation resistance of the three-phase motor 5 using the calculated ground insulation resistance leakage current corresponding to the system frequency and the measured line voltage or the calculated ground voltage. .
- the insulation resistance calculator 19 uses the line voltage when the inverter 3 is not inserted, and uses the ground voltage when it is inserted.
- the insulation failure determination unit 20 determines the presence or absence of insulation failure of the three-phase motor 5 on the basis of the leakage current or the ground insulation resistance corresponding to the calculated system frequency.
- the output unit 21 outputs the determination result of the insulation failure to the outside of the leakage current calculation device 1 in a desired form. This output is performed as, for example, screen display, communication output, or contact signal output.
- the leakage current calculation device 1 uses the value measured by the voltage measurement unit 11 as the line voltage, and uses the value measured by the current measurement unit 12 as the leakage current.
- the leakage current calculation device 1 further calculates the leakage current I0r for the resistance by using the method disclosed in Non-Patent Document 1 or the method disclosed in Japanese Patent Laid-Open No. 2013-195023.
- FIG. 4 illustrates the principle for calculating the ground voltage of the commercial power system 2 when the inverter 3 is inserted between the commercial power system 2 and the three-phase motor 5 in the first embodiment of the present invention.
- FIG. 4 In order to calculate the ground insulation resistance of the three-phase motor 5 connected to the commercial power system 2 via the inverter 3, the leakage current calculation device 1 of the present embodiment has a voltage applied to the ground insulation resistance of the three-phase motor 5 ( Calculate the ground voltage). This ground voltage calculation method will be described below with reference to FIG.
- the ground voltage applied to the ground insulation resistance of the three-phase motor 5 is equal to the voltage between the neutral point (N phase) of the commercial power system 2 and the ground E.
- the S phase (S line) is grounded as shown in FIG. Since the voltage of the S phase with respect to the neutral point is the system voltage Vs between the N phase and the S phase, the voltage between the N phase and the ground E is 180 ° in phase with the system voltage Vs. The voltage Vs is 180 °.
- the potential of the neutral point N of the inverter 3 is equal to the potential of the neutral point N of the commercial power system 2. Therefore, the voltage between the neutral point N of the inverter 3 and the ground E is also equal to the ground voltage Vs ⁇ 180 ° of the commercial power system 2.
- the U-phase ground voltage Eu is obtained by adding Vs ° 180 ° to the voltage Vu between the N-phase and the U-phase.
- the V-phase ground voltage Ev is obtained by adding Vs ⁇ 180 ° to the voltage Vv between the N-phase and the V-phase.
- the RS line voltage is a vector sum of the voltage Vr between the neutral point (N phase) and the R phase and the ground voltage Vs.
- the ground voltage calculation unit 13 can calculate the system voltage Vs of the commercial power system 2 by dividing the measured RS line voltage by ⁇ 3.
- the system voltage Vs and the ground voltage Vs ⁇ 180 ° are voltages whose effective values are equal to each other and whose phases are shifted from each other by 180 °. Therefore, the ground voltage calculation unit 13 can calculate the ground voltage Vs ⁇ 180 ° by shifting the phase of the calculated system voltage Vs by 180 °.
- FIG. 5 is a diagram illustrating a leakage current that flows between the three-phase motor 5 and the ground E when the inverter 3 is inserted in the first embodiment of the present invention.
- the ground insulation resistance and ground stray capacitance of the three-phase motor 5 are impedance components between the wiring or coil of the three-phase motor 5 and the ground E. These are connected in parallel to each other. Therefore, as shown in FIG. 5A, the ground insulation resistance Ru and the ground floating capacitance Cu between the U phase and the ground E on the output side of the inverter 3 are both between the U phase and the ground E. It is a component constituting the impedance Zu between them.
- ground insulation resistance Rv and the ground stray capacitance Cv between the V phase and the ground E are components that constitute the impedance Zv between the V phase and the ground E.
- ground insulation resistance Rw and the ground stray capacitance Cw between the W phase and the ground E are components that constitute the impedance Zw between the W phase and the ground E.
- leakage current flows through each phase on the output side of the inverter 3. Specifically, the leakage current Iu flows through the U phase, the leakage current Iv flows through the V phase, and the leakage current Iw flows through the W phase.
- the leakage current I0 As described above, the zero-phase current I 0 measured through the zero-phase current transformer 4 is equal to the leakage current flowing through the combined impedance of the three-phase motor 5. Therefore, in the following, the leakage current may be referred to as leakage current I0.
- FIG. 6 is a diagram illustrating the ground insulation resistance between the three-phase motor 5 and the ground E when the inverter 3 is inserted in the first embodiment of the present invention.
- the ground voltage Vs ⁇ 180 ° is applied to each phase (U, V, W) on the output side of the inverter 3 in the same phase.
- the ground combined impedance Z0 includes the ground insulation resistance and the ground stray capacitance of the three-phase motor 5 connected in parallel with each other as components. Therefore, the current I0r flowing through the ground insulation resistance in Z0 is I0 ⁇ cos ⁇ , where ⁇ is the phase difference between the zero-phase current I0 and the ground voltage Vs ⁇ 180 °. On the other hand, the current I0c flowing through the ground stray capacitance in Z0 is I0 ⁇ sin ⁇ .
- FIG. 7 shows a series of processes for the leakage current calculation apparatus 1 according to the first embodiment of the present invention to calculate the leakage current for the ground insulation resistance based on the calculation procedure corresponding to the presence / absence of inverter insertion and the frequency match / mismatch. It is a flowchart which shows a flow.
- step S1 the voltage measurement unit 11 measures a line voltage between the R phase and the S phase.
- step S2 the ground voltage calculation unit 13 calculates the ground voltage based on the measured line voltage.
- step S ⁇ b> 3 the leakage current measuring unit measures the leakage current through the zero-phase current transformer 4.
- step S4 the frequency component extraction unit 14 extracts at least one frequency component including the frequency component of the system frequency from the measured leakage current.
- the frequency component extraction unit 14 extracts only the frequency component of the system frequency of the commercial power system 2 from the leakage current.
- the frequency component of the system frequency, the frequency component of the operating frequency, and the frequency component of the integer multiple of the operating frequency are extracted.
- FFT Fast Fourier
- step S6 to step S10 the insertion determination unit 16 automatically determines the calculation procedure corresponding to the presence or absence of the inverter and the frequency match / mismatch.
- the insertion determination unit 16 inputs, for example, from the outside of the leakage current calculation device 1 (inverter insertion presence / absence and frequency match / mismatch). No input of information specifying the calculation procedure corresponding to is required. Therefore, it is possible to determine the calculation procedure corresponding to the presence / absence of the inverter insertion and the frequency coincidence / non-coincidence without taking the trouble of the user of the leakage current calculation apparatus 1.
- the insertion determination unit 16 can also determine the calculation procedure corresponding to the presence / absence of the inverter insertion and the frequency match / mismatch based on the input from the outside of the leakage current calculation device 1. Also in this case, the leakage current calculation device 1 can accurately determine the calculation procedure corresponding to the presence / absence of the inverter insertion and the frequency match / mismatch.
- step S6 the resistance leakage current calculation unit 18 determines whether or not there is a change in the leakage current I0 measured at an arbitrary time and the calculated phase difference ⁇ . In the case of NO in step S6, in step S7, the resistance leakage current calculation unit 18 selects a calculation procedure corresponding to inverter insertion and frequency matching for calculating the leakage current for the ground insulation resistance.
- step S8 the insertion determining unit 16 determines the presence / absence of a frequency other than an integer multiple of the system frequency. In the case of NO in step S8, the insertion determining unit 16 selects a calculation procedure corresponding to the absence of inverter insertion for calculating the leakage current corresponding to the ground insulation resistance in step S9.
- the system frequency is 60 Hz, for example, when each frequency component of 60 Hz, 120 Hz, and 180 Hz is extracted, the insertion determination unit 16 selects a calculation procedure corresponding to the absence of inverter insertion.
- the frequency extracted in this case is not limited to three, and other frequencies such as 240 Hz, 300 Hz,.
- the insertion determination unit 16 selects a calculation procedure corresponding to the presence of inverter insertion and frequency mismatch for calculating the leakage current corresponding to the ground insulation resistance in S10. For example, when each frequency component of 50 Hz, 60 Hz, 100 Hz, 120 Hz, 150 Hz, and 180 Hz is extracted, the insertion determination unit 16 selects a calculation procedure corresponding to the presence of inverter insertion and frequency mismatch.
- step S11 the resistance leakage current calculation unit 18 calculates the leakage current corresponding to the ground insulation resistance based on the calculation procedure selected in any of steps S7, S9, or S10.
- step S12 the insulation failure determination unit 20 calculates the ground insulation resistance of the three-phase motor 5 based on the calculated ground insulation resistance leakage current.
- I0R is a leakage current corresponding to the ground insulation resistance.
- I0 is a frequency component extracted from the leakage current.
- ⁇ is a phase difference.
- the resistance leakage current calculation unit 18 can accurately calculate the leakage current corresponding to the ground insulation resistance when the inverter 3 is not inserted by selecting this equation in step S9.
- the insulation failure determination unit 20 calculates the ground insulation resistance of the three-phase motor 5 by dividing the RS line voltage by the leakage current corresponding to the ground insulation resistance. Thereby, the ground insulation resistance when the inverter 3 is not inserted can be accurately calculated.
- FIG. 8 (A) of FIG. 8 is a figure explaining the principle for the leakage current calculation apparatus 1 which concerns on Embodiment 1 of this invention to calculate the leakage current synchronized with the system frequency of the commercial power system 2.
- FIG. 1 A of FIG. 8 is a figure explaining the principle for the leakage current calculation apparatus 1 which concerns on Embodiment 1 of this invention to calculate the leakage current synchronized with the system frequency of the commercial power system 2.
- the leakage current I0 measured by the leakage current measuring unit 12 includes a component (I0_sys) synchronized with the system frequency of the commercial power system 2 and a component (I0_inv) synchronized with the operation frequency of the inverter 3.
- I0_sys a component synchronized with the system frequency of the commercial power system 2
- I0_inv a component synchronized with the operation frequency of the inverter 3.
- the frequency (system frequency) of the voltage that the commercial power system 2 supplies to the inverter 3 is 60 Hz
- the frequency (operation frequency) of the voltage that the inverter 3 drives the three-phase motor 5 is 50 Hz. is there. That is, both frequency settings are different from each other.
- the system frequency component extraction unit 14 extracts only the leakage current I0_sys of the system frequency component from the measured leakage current I0 by executing a calculation process that extracts a leakage current having the same frequency as the system frequency. . Since the system frequency and the operation frequency are different, in this extraction process, the component synchronized with the system frequency is extracted, but the component synchronized with the operation frequency is not extracted. Thereby, the extracted leakage current I0_sys does not include the leakage current I0_inv synchronized with the operation frequency component of the inverter 3.
- the impedance between the three-phase motor 5 and the ground E includes both ground insulation resistance and ground stray capacitance.
- the phase of the measured leakage current I0 is shifted from the phase of the ground voltage Vs ⁇ 180 ° due to the influence of the ground stray capacitance. . Therefore, the phase difference ⁇ of the leakage current I0_sys extracted from the leakage current I0 is also shifted from the phase of the ground voltage Vs ⁇ 180 °.
- the leakage current component extracted from the leakage current I0 includes only the leakage current I0_sys. Therefore, the phase difference ⁇ between the ground voltage VsV180 ° and the leakage current component (I0_sys itself) is always equal regardless of the time of measurement.
- a vector connecting the origin of the plane coordinate system and the point where the end point P0 is projected on the vertical axis of the plane coordinate system corresponds to the capacity leakage current I0C_sys of the system frequency component with high accuracy. That is, the value of this projection point is the effective value of I0C_sys.
- the leakage current calculation device 1 extracts a component synchronized with the system frequency from the measured leakage current I0.
- the leakage current I0_sys for the system frequency can be calculated with high accuracy.
- the ground insulation resistance of the three-phase motor 5 can be accurately calculated by using the ground voltage Vs ⁇ 180 ° and the leakage current I0R_sys.
- the resistance leakage current calculation unit 18 calculates the ground insulation resistance leakage current based on a series of calculation procedures described below. .
- FIG. 8B shows the system frequency of the commercial power system 2 when the leakage current calculation apparatus 1 according to Embodiment 1 of the present invention matches the system frequency of the commercial power system 2 and the operating frequency of the inverter 3. It is a figure explaining the principle for calculating the leakage current which synchronizes with.
- the leakage current I0 measured by the leakage current measuring unit 12 includes a component (I0_sys) synchronized with the system frequency of the commercial power system 2 ) And a component (I0_inv) synchronized with the operating frequency of the inverter 3 is included.
- I0_sys a component synchronized with the system frequency of the commercial power system 2
- I0_inv a component synchronized with the operating frequency of the inverter 3
- the end point when the leakage current I0 is expressed as a vector is not fixed to one point, The position changes at each measurement time. This is because the leakage current extracted by the frequency component extraction unit 14 includes both the leakage current I0_sys for the system frequency and the leakage current I0_inv for the operating frequency.
- the frequency component extraction unit 14 cannot distinguish between a component synchronized with the system frequency included in the leakage current I0 and a component synchronized with the operation frequency. Therefore, when the frequency component extraction unit 14 executes a process of extracting a component synchronized with the system frequency from the leakage current I0, as a result, the leakage current I0_sys synchronized with the system frequency and the leakage current I0_inv synchronized with the operation frequency are mixed. The leakage current I0_mix is extracted.
- the vector drawn in the plane coordinate system is a combined vector (I0_mix vector) of the I0_sys vector and the I0_inv vector.
- I0_mix vector the vector drawn in the plane coordinate system
- the position of the end point of this composite vector is determined at each measurement time point, such as point P1 (specific point), point P2 (specific point), and point P3 (specific point) due to the influence of I0_inv. Change. Specifically, as shown in FIG. 8B, this change occurs so that each end point draws a circle 81.
- FIG. 9 is a diagram for explaining the principle of rotation of the end point when the extracted frequency component is represented in vector when the system frequency and the operating frequency match in the first embodiment of the present invention.
- the system frequency and the operating frequency are slightly different from each other even if they are set to the same value. For example, even when each is set to 60 Hz, the system frequency is 60.00 Hz, while the operating frequency is 60.01 Hz, so that there is a slight deviation from each other. Due to this frequency shift, as shown in FIG. 9A, the waveform 91 of I0_sys and the waveform 92 of I0_inv are slightly shifted from each other as the measurement time point gradually changes to P1, P2, and P3. go.
- the leakage current I0_mix extracted from the leakage current I0 includes the leakage current I0_sys for the system frequency and the leakage current I0_inv for the operation frequency.
- the determined phase difference ⁇ is a phase difference between the ground voltage Vs ⁇ 180 ° and the leakage current I0_mix
- a shift occurs between the waveform of I0_sys and the waveform of I0_inv included in the leakage current I0_inv.
- the value of the phase difference ⁇ shifts with time.
- the position of the end point when the leakage current I0_mix is expressed in vector also changes with time.
- the positions of the end points (specific points) P1 to P3 of the leakage current I0 change corresponding to the waveform shifts of P1 to P3 in FIG.
- the end point of I0_mix draws a circle 93 with time as shown in FIG. That is, P1 to P3 are plotted on the circle 93 in principle.
- the end point of I0_sys matches the center point 94 of the circle 93. Therefore, the leakage current calculation apparatus 1 according to the present embodiment calculates the center point 94, and further projects the center point 94 on the horizontal axis and the vertical axis of the plane coordinate axis, thereby calculating I0R_sys and I0C_inv with high accuracy.
- FIG. 10 is a diagram for explaining a first method for calculating a ground insulation resistance leakage current when the system frequency and the operating frequency match in the first embodiment of the present invention.
- the frequency component extraction unit 14 extracts I0_mix at three different time points.
- the phase difference calculation unit 15 calculates the phase difference ⁇ at three different time points.
- the circle center calculation unit 17 calculates points P1 to P3 which are end points when each I0_mix is represented in vector based on the leakage current I0_mix and the phase difference ⁇ determined at the three time points.
- the circle center calculation unit 17 calculates the outer center of the triangle 101 that apexes the circle 102 instead of directly calculating the circle 102 passing through these points P1 to P3. This outer center coincides with the center point 103 of the circle 102 circumscribing the triangle 101. As described above, in the example of FIG. 10, the circle center calculation unit 17 can calculate the center point 103 of the circle 102 passing through these points by calculating the outer center of the triangle 101 that apexes P1 to P3. .
- the circle center calculation unit 17 outputs the calculated center point 103 to the resistance leakage current calculation unit 18.
- vectors starting from the origin of the plane coordinate system and having the center point 103 as the end point are the leakage current I0_sys for the system frequency in the leakage current I0_mix extracted from the leakage current leakage current I0, and the like. Don't be. Therefore, the resistance component leakage current calculation unit 18 can calculate the leakage current I0R_sys corresponding to the ground insulation resistance out of the leakage current I0_sys corresponding to the system frequency by projecting the calculated center point 103 on the horizontal axis.
- the resistance leakage current calculation unit 18 outputs the calculated I0R_sys to the insulation resistance calculation unit 19.
- the insulation resistance calculation unit 19 calculates the ground insulation resistance of the three-phase motor 5 using the leakage current I0R_sys and the ground voltage Vs ⁇ 180 °.
- the center point 103 is calculated using only the three points P1 to P3. That is, in order to calculate I0R_sys, it suffices to measure the leakage current I0 at three different time points, so that I0R_sys can be calculated at high speed.
- FIG. 11 is a diagram for explaining a second method for calculating the ground insulation resistance leakage current when the system frequency and the operation frequency match in the first embodiment of the present invention.
- the frequency component extraction unit 14 extracts I0_mix at four or more different time points.
- the phase difference calculation unit 15 calculates the phase difference ⁇ at four or more different time points.
- the circle center calculation unit 17 calculates the equation of the circle 111 that passes through these points Pn. Then, the center point 112 of the circle 111 is calculated using this equation. In the example of FIG. 11, the circle center calculation unit 17 calculates the equation of the circle 111 by the least square method of the circle using the calculated points Pn. More specific description will be given below.
- FIG. 12 is a diagram for explaining the least square method of a circle according to the first embodiment of the present invention.
- each point Pn is calculated as a point P1 (x1, y1), a point P2 (x2, y2), a point P3 (x3, y3), a point P4 (x4, y4),.
- the calculation of the leakage current I0_sys for the ground insulation resistance based on the center point 112 and the calculation of the ground insulation resistance of the three-phase motor 5 based on the leakage current I0_sys and the ground voltage Vs ⁇ 180 ° are the same as the above-described example.
- the center point 112 of the circle 111 can be calculated with higher accuracy. Therefore, the leakage current I0_sys and the ground insulation resistance can be calculated with higher accuracy.
- FIG. 11B shows an example of the actual calculation result of I0_sys.
- the center point 112 determined from this equation is projected on the horizontal axis, the value is 4.4 mA, and thus 4.4 mA is calculated as I0R_sys.
- the ground insulation resistance of the three-phase motor 5 calculated using 4.4 mA of I0_sys is 26.9 k ⁇ , which also agrees well with the theoretical value of 27 k ⁇ .
- FIG. 13 is a diagram illustrating a third method for calculating the ground insulation resistance leakage current when the system frequency and the operation frequency match in Embodiment 1 of the present invention.
- the frequency component extraction unit 14 does not directly calculate the center point of the circle, but instead, the minimum value of the leakage current corresponding to the ground insulation resistance at I0_mix and the value of I0_mix within a certain time. Of these, the maximum value of the leakage current corresponding to the ground insulation resistance is calculated, and the intermediate value thereof is calculated as I0R_sys.
- the frequency component extraction unit 14 extracts I0_mix at each time point within a fixed time (preferably a long time of 60 seconds or longer), that is, until a point equal to or greater than one circle is calculated.
- the phase difference calculation unit 15 calculates the phase difference ⁇ at each time point until points equal to or more than one circle are calculated.
- the circle center calculation unit 17 does not calculate the center of the circle.
- the insulation resistance calculation unit 19 executes the calculation of I0R_mix at each time point over a long time (60 seconds or more).
- the value of I0R_mix coincides with the value on the horizontal axis at the point where the end point when I0_mix is expressed in vector is projected on the horizontal axis. Since the end point draws a circle as described above, a point obtained by projecting the end point on the horizontal axis is always in a line obtained by projecting the entire circle on the horizontal axis. Therefore, the calculated minimum value 131 and the maximum value 132 corresponding to the end of the line are naturally determined in the calculated I0R_mix.
- the intermediate value 132 between the minimum value 131 and the maximum value 132 corresponds to the center point of the circle. To do. As described above, since the value obtained by projecting the center point of the circle on the horizontal axis corresponds to I0R_sys, the resistance leakage current calculation unit 18 can calculate I0R_sys by calculating the intermediate value 132.
- I0R_sys can be obtained by simple calculation.
- FIG. 13B shows an example of the actual calculation result of I0R_sys by the third method.
- 4.3 mA was calculated as the intermediate value 132, that is, I0R_sys.
- the ground insulation resistance of the three-phase motor 5 calculated using I0R_sys of 4.3 mA is 27.1 k ⁇ , which is in good agreement with the theoretical value of 27 k ⁇ .
- the leakage current calculation device 1 determines whether or not the inverter 3 is inserted between the commercial power system 2 and the three-phase motor 5.
- the leakage current calculation device 1 further leaks the ground insulation resistance component leakage current corresponding to the system frequency flowing between the three phase motor 5 and the ground E through the ground insulation resistance of the three phase motor 5 based on the calculation procedure according to the determination result. Is calculated.
- the leakage current calculation device 1 calculates a leakage current corresponding to the ground insulation resistance based on a calculation procedure corresponding to the inverter 3.
- the leakage current calculation device 1 when the inverter 3 is inserted, the leakage current corresponding to the ground insulation resistance is calculated based on the calculation procedure corresponding to the inverter 3. Therefore, whether or not the equipment has the inverter 3, the leakage current calculation device 1 is sufficient for calculating the leakage current corresponding to the ground insulation resistance. In other words, in addition to the leakage current calculation device 1, a device for measuring the leakage current corresponding to the ground insulation resistance is unnecessary. Therefore, the leakage current calculation apparatus 1 according to the present embodiment can accurately calculate the leakage current for the ground insulation resistance regardless of the presence or absence of the inverter.
- Embodiment 2 according to the present invention will be described below with reference to FIGS.
- Each member common to Embodiment 1 described above is denoted by the same reference numeral, and detailed description thereof is omitted.
- FIG. 14 is a schematic system diagram illustrating a configuration example to which the leakage current calculation apparatus 1 according to the second embodiment of the present invention is applied.
- the configuration of the leakage current calculation device 1 is basically the same as that of the first embodiment.
- one leakage current calculation device 1 can be configured to monitor each of the plurality of three-phase motors 5a and 5b.
- the three-phase motors 5a and 5b are driven by inverters 3a and 3b, respectively.
- the input sides of the inverters 3a and 3b are both connected to the common commercial power system 2.
- the output side of the inverter 3a is connected to the three-phase motor 5a, while the output side of the inverter 3b is connected to the three-phase motor 5b.
- a zero-phase current transformer 4a is disposed between the inverter 3a and the three-phase motor 5a, while a zero-phase current transformer 4b is disposed between the inverter 3b and the three-phase motor 5b.
- These zero-phase current transformers 4 a and 4 b are both connected to the leakage current measuring unit 12 of the leakage current calculating device 1.
- the leakage current calculation device 1 calculates a ground insulation resistance leakage current and a ground insulation resistance corresponding to each of the three-phase motors 5a and 5b. The procedure will be described below.
- the voltage measuring unit 11 measures at least one of the line voltages on the input side of any one of the plurality of inverters 3a and 3b. Since the input sides of the inverters 3a and 3b are connected to the common commercial power system 2, for example, the voltage Vrs between the R phase and the S phase of the inverter 3a is between the R phase and the S phase of the inverter 3b. It is completely equal to the voltage Vrs. As described above, in the present embodiment, the voltage Vrs needs to be measured only at one place, so that the configuration of the leakage current calculation apparatus 1 can be further simplified.
- the ground voltage calculation unit 13 calculates the ground voltage Vs ⁇ 180 ° based on the voltage Rs measured from the input side of the inverter 3a. Since voltage Vrs is common to inverters 3a and 3b, leakage current calculation device 1 uses voltage Vs ⁇ ⁇ 180 ° as a ground voltage common to three-phase motor 5a and three-phase motor 5b in the following processing.
- the leakage current measuring unit 12 measures the leakage current of the three-phase motor 5a through the zero-phase current transformer 4a, and measures the leakage current of the three-phase motor 5b through the zero-phase current transformer 4b. That is, the leakage current calculation device 1 includes one leakage current measuring unit 12 that is common to the three-phase motors 5a and 5b.
- the leakage current calculation device 1 may include a plurality of leakage current measuring units 12a and 12b corresponding to the three-phase motors 5a and 5b, respectively.
- the leakage current measuring unit 12a is connected to the zero-phase current transformer 4a
- the leakage current measuring unit 12b is connected to the zero-phase current transformer 4b.
- the leakage current measurement unit 12a measures the leakage current of the three-phase motor 5a through the zero-phase current transformer 4a
- the leakage current measurement unit 12b calculates the leakage current of the three-phase motor 5b through the zero-phase current transformer 4b. measure.
- the frequency component extraction unit 14 extracts a frequency component corresponding to the three-phase motor 5a from the leakage current of the three-phase motor 5a.
- the frequency component corresponding to the three-phase motor 5b is extracted from the leakage current of the three-phase motor 5b.
- the phase difference calculation unit 15 calculates the phase difference between the calculated ground voltage and the frequency component of the three-phase motor 5a. Furthermore, the phase difference between the calculated ground voltage and the frequency component of the three-phase motor 5b is calculated.
- the resistance leakage current calculation unit 18 calculates a ground insulation resistance leakage current of the three-phase motor 5a based on the center point of the circle corresponding to the three-phase motor 5a. Further, the leakage current corresponding to the ground insulation resistance of the three-phase motor 5b is calculated based on the center point of the circle corresponding to the three-phase motor 5b.
- the insulation resistance calculation unit 19 calculates the ground insulation resistance of the three-phase motor 5a from the ground voltage Vs ⁇ 180 ° and the leakage current corresponding to the ground insulation resistance of the three-phase motor 5a. Further, the ground insulation resistance of the three-phase motor 5b is calculated from the ground voltage Vs ⁇ 180 ° and the leakage current corresponding to the ground insulation resistance of the three-phase motor 5b.
- FIG. 15 is a diagram illustrating an example of a temporal transition of the ground insulation resistance-divided leakage current or the calculated value of the ground insulation resistance for each of the three-phase motors 5 according to the second embodiment of the present invention.
- (A) of FIG. 15 shows the time transition of each earth insulation resistance part leakage current of each of the three-phase motors 5a and 5b.
- Ch1 corresponds to the three-phase motor 5a
- Ch2 corresponds to the three-phase motor 5a.
- (b) of FIG. 15 shows the time transition of the ground insulation resistance of each of the three-phase motors 5a and 5b.
- Ch1 corresponds to the three-phase motor 5a
- Ch2 corresponds to the three-phase motor 5a.
- the three-phase motors 5a and 5b have different temporal changes in the ground insulation resistance-divided leakage current or the ground insulation resistance, respectively.
- the leakage current calculation device 1 can appropriately identify the three-phase motor 5 that has undergone insulation degradation by comparing values with each other or by comparing each value with a predetermined threshold value.
- the insulation failure determination unit 20 compares the ground insulation resistance leakage current corresponding to the system frequency of the three-phase motor 5a with the ground insulation resistance leakage current corresponding to the system frequency of the three-phase motor 5b to thereby compare the three-phase motor.
- the degree of insulation deterioration in 5a and 5b can be respectively determined. For example, in the example of FIG. 15A, the ground insulation resistance leakage current corresponding to the system frequency of the three-phase motor 5a at a certain time and the ground insulation resistance leakage current corresponding to the system frequency of the three-phase motor 5b at the same time. A large degree of deviation 151 occurs between the two. If the insulation failure determination unit 20 detects the divergence degree 151, the insulation failure determination unit 20 determines that the three-phase motor 5a having a larger leakage current to the ground insulation resistance has deteriorated the insulation.
- the insulation failure determination unit 20 may identify the three-phase motor 5 in which the corresponding ground insulation resistance leakage current exceeds a specified threshold as the three-phase motor 5a that has undergone insulation deterioration. it can. For example, in (a) of FIG. 15, since the threshold 152 is exceeded after a time when there is a leakage current to the ground insulation resistance of the three-phase motor 5a, the insulation failure determination unit 20 determines that the three-phase motor 5a is insulated after this time. It is possible to identify that it has deteriorated.
- the determination using the above-described divergence or threshold is performed not only on the ground insulation resistance leakage current but also on the ground insulation resistance of the three-phase motors 5a and 5b as shown in FIG. 15B. be able to.
- a large divergence 153 occurs between the ground insulation resistance of the three-phase motor 5a at a certain time point and the ground insulation resistance of the three-phase motor 5b at the same time point. If the insulation failure determination unit 20 detects the degree of divergence 153, the insulation failure determination unit 20 determines that the three-phase motor 5a having a smaller ground insulation resistance has deteriorated insulation. Further, in FIG. 15B, since the ground insulation resistance of the three-phase motor 5a is below the threshold value 154 after the point in time, the insulation failure determination unit 20 causes the three-phase motor 5a to undergo insulation deterioration after this point. Can be identified.
- the leakage current calculation device 1 includes a plurality of leakage current measuring units 12, the leakage current measuring unit 12 for measuring the leakage current of the three-phase motor 5 that is not a monitoring target is not necessary.
- the leakage current calculation device 1 having such an unnecessary leakage current measurement unit 12 leads to a wasteful cost increase of the leakage current calculation device 1.
- each leakage current measuring unit 12 may be an extension unit for measuring the leakage current.
- the leakage current calculation device 1 can be equipped with the required number of leakage current measurement units 12 or the leakage current measurement unit 12 that is no longer needed can be removed from the leakage current calculation device 1. In addition, the cost of the leakage current calculation device 1 can be suppressed.
- a technique disclosed in JP2013-181813 may be used.
- the leakage current calculation apparatus provides at least one of line voltages in a three-phase AC commercial power system in which one of three different phases is grounded.
- a voltage measuring unit for measuring the voltage, and a ground voltage calculating unit for calculating a ground voltage between a neutral point of the commercial power system and the ground from the at least one line voltage measured by the voltage measuring unit;
- a leakage current measuring unit that measures a leakage current flowing between the load connected to the commercial power system and the ground, and a frequency component synchronized with the system frequency of the commercial power system is extracted from the measured leakage current
- An inverter is inserted between the commercial power system and the load, a frequency component extraction unit that performs the phase difference determination unit that determines a phase difference between the calculated ground voltage and the extracted frequency component.
- a leakage current calculation unit for calculating a leakage current corresponding to the ground insulation resistance.
- the leakage current calculation device determines whether an inverter is inserted between the commercial power system and the load.
- the leakage current calculation device further calculates a ground insulation resistance-divided leakage current corresponding to the system frequency that flows between the load and the ground through the ground insulation resistance of the load, based on a calculation procedure according to the determination result. Specifically, when the inverter is not inserted, the leakage current calculation device calculates a leakage current corresponding to the ground insulation resistance based on a calculation procedure corresponding to the inverter. On the other hand, when the inverter is inserted, the leakage current corresponding to the ground insulation resistance is calculated based on the calculation procedure corresponding to the inverter.
- a leakage current calculation device is sufficient for calculating the leakage current corresponding to the ground insulation resistance. In other words, in addition to the leakage current calculation device, a device for measuring the leakage current corresponding to the ground insulation resistance is unnecessary.
- the leakage current calculation apparatus can accurately calculate the leakage current for the ground insulation resistance regardless of the presence or absence of the inverter.
- the leakage current calculation apparatus is the aspect 1, wherein the insertion determination unit determines whether or not the inverter is inserted based on an input from the outside of the leakage current calculation apparatus. It is a feature.
- the leakage current calculation apparatus is characterized in that, in aspect 1, the insertion determination unit automatically determines whether or not the inverter is inserted.
- the leakage current calculation apparatus is the aspect 3, wherein the leakage current measured at an arbitrary time and the determined change in the phase difference and the frequency component extracted from the leakage current are measured. Based on this, it is determined whether or not the inverter is inserted.
- the leakage current calculation method provides at least one of line voltages in a three-phase AC commercial power system in which one of three different phases is grounded.
- a voltage measurement step for measuring the voltage a ground voltage calculation step for calculating a ground voltage between a neutral point and the ground of the commercial power system from the measured line voltage, and the commercial power
- a leakage current measuring step for measuring a leakage current flowing between the load connected to the system and the ground, and a frequency component extraction for extracting a frequency component synchronized with the system frequency of the commercial power system from the measured leakage current
- a phase difference determination step for determining a phase difference between the calculated ground voltage and the extracted frequency component, and an inverter is inserted between the commercial power system and the load.
- An insertion determination step for determining whether or not to the ground, and a ground for the system frequency flowing between the load and the ground through a ground insulation resistance of the load based on a calculation procedure according to a determination result of the insertion determination step
- a leakage current calculating step for calculating a leakage current corresponding to the insulation resistance.
- the leakage current corresponding to the ground insulation resistance can be accurately calculated regardless of the presence or absence of the inverter.
Landscapes
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Engineering & Computer Science (AREA)
- Power Engineering (AREA)
- Testing Of Short-Circuits, Discontinuities, Leakage, Or Incorrect Line Connections (AREA)
- Emergency Protection Circuit Devices (AREA)
- Tests Of Circuit Breakers, Generators, And Electric Motors (AREA)
Abstract
インバータの有無に関わらず対地絶縁抵抗分の漏洩電流を精度良く算出する挿入判定部(16)は、商用電力系統(2)と三相モーター(5)との間にインバータ(3)が挿入されているか否かを判定する。抵抗分漏洩電流算出部(18)は、判定結果に応じた算出手順に基づき、対地絶縁抵抗分漏洩電流を算出する。
Description
本発明は、漏洩電流を算出する漏洩電流算出装置および漏洩電流算出方法に関する。
三相モーターなどの負荷における漏洩電流を算出する技術の例が、非特許文献1および特許文献1にそれぞれ開示されている。非特許文献1の技術は、三相モーターなどの負荷の駆動にインバータが使用されない設備において、対地絶縁抵抗分の漏洩電流を精度良く計測するためのものである。一方、特許文献1の技術は、負荷の駆動にインバータが使用される設備において、対地絶縁抵抗分の漏洩電流を精度良く計測するためのものである。
大崎栄吉、「電気現場のトラブル徹底検証」、新電気、オーム社、2000年2月、2000年2月号、p.46~51
非特許文献1および特許文献1に示すように、従来、対地絶縁抵抗分の漏洩電流を算出する装置の構成は、インバータの有無に応じて異なる。したがって従来技術には、設備にインバータを使用するか否かに応じて、漏洩電流の算出装置を使い分ける必要があるという課題がある。従来技術には、さらに、インバータが使用されない設備に、省エネルギーなどを目的としてインバータを新たに追加する場合、それに応じて漏洩電流の算出装置を変更する必要があるという課題もある。
本発明は前記の課題を解決するためになされたものである。そして、その目的は、インバータの有無に関わらず対地絶縁抵抗分の漏洩電流を精度良く算出することができる漏洩電流算出装置および漏洩電流算出方法を提供することにある。
本発明の一態様に係る漏洩電流算出装置は、前記の課題を解決するために、異なる三相のうちいずれかが接地されている三相交流式の商用電力系統における線間電圧のうち少なくともいずれかを計測する電圧計測部と、前記電圧計測部によって計測された前記少なくともいずれかの線間電圧から、前記商用電力系統の中性点と大地と間の対地電圧を算出する対地電圧算出部と、前記商用電力系統に接続される負荷と前記大地との間を流れる漏洩電流を計測する漏洩電流計測部と、計測された漏洩電流から、前記商用電力系統の系統周波数に同期する周波数成分を抽出する周波数成分抽出部と、算出された前記対地電圧と、抽出された前記周波数成分との位相差を決定する位相差決定部と、前記商用電力系統と前記負荷との間にインバータが挿入されているか否かを判定する挿入判定部と、前記挿入判定部の判定結果に応じた算出手順に基づき、前記負荷と前記大地との間を前記負荷の対地絶縁抵抗を通じて流れる前記系統周波数分の対地絶縁抵抗分漏洩電流を算出する漏洩電流算出部とを備えていることを特徴としている。
本発明の一態様に係る漏洩電流算出方法は、前記の課題を解決するために、異なる三相のうちいずれかが接地されている三相交流式の商用電力系統における線間電圧のうち少なくともいずれかを計測する電圧計測工程と、計測された前記少なくともいずれかの線間電圧から、前記商用電力系統の中性点と大地との間の対地電圧を算出する対地電圧算出工程と、前記商用電力系統に接続される負荷と前記大地との間を流れる漏洩電流を計測する漏洩電流計測工程と、計測された漏洩電流から、前記商用電力系統の系統周波数に同期する周波数成分を抽出する周波数成分抽出工程と、算出された前記対地電圧と、抽出された前記周波数成分との位相差を決定する位相差決定工程と、前記商用電力系統と前記負荷との間にインバータが挿入されているか否かを判定する挿入判定工程と、前記挿入判定工程の判定結果に応じた算出手順に基づき、前記負荷と前記大地との間を前記負荷の対地絶縁抵抗を通じて流れる前記系統周波数分の対地絶縁抵抗分漏洩電流を算出する漏洩電流算出工程とを有することを特徴としている。
本発明によれば、インバータの有無に関わらず対地絶縁抵抗分の漏洩電流を精度良く算出することができる。
〔実施形態1〕
図1~図13を参照して、本発明に係る実施形態1について以下に説明する。
図1~図13を参照して、本発明に係る実施形態1について以下に説明する。
(第1構成例)
図2は、本発明の実施形態1に係る漏洩電流算出装置1を適用した第1構成例を示す概略系統図である。この図に示す例では、漏洩電流算出装置1は、商用電力系統2を電源として駆動する三相モーター5(負荷)を監視するように構成されている。
図2は、本発明の実施形態1に係る漏洩電流算出装置1を適用した第1構成例を示す概略系統図である。この図に示す例では、漏洩電流算出装置1は、商用電力系統2を電源として駆動する三相モーター5(負荷)を監視するように構成されている。
商用電力系統2は、異なる三相(R相、S相、T相)のうちS相が大地Eに接地されている三相交流式の交流電源である。これらの三相は、R線、S線、およびT線を介して、三相モーター5の入力側にそれぞれ接続されている。三相モーター5は商用電力系統2から供給された電圧を用いて動作する。
商用電力系統2と三相モーター5との間には、R線、S線、およびT線を取り囲む零相変流器4が設けられている。零相変流器4は、商用電力系統2と三相モーター5との間を流れる三相の合成された対地零相電流I0を計測する。詳しくは後述するが、この零相電流I0は、三相モーター5と大地Eとの間を流れる漏洩電流に等しい。
(第2構成例)
図3は、本発明の実施形態1に係る漏洩電流算出装置1を適用した第2構成例を示す概略系統図である。この図に示す例では、漏洩電流算出装置1は、商用電力系統2を電源とするインバータ3によって駆動される三相モーター5(負荷)を監視するように構成されている。
図3は、本発明の実施形態1に係る漏洩電流算出装置1を適用した第2構成例を示す概略系統図である。この図に示す例では、漏洩電流算出装置1は、商用電力系統2を電源とするインバータ3によって駆動される三相モーター5(負荷)を監視するように構成されている。
商用電力系統2は、異なる三相(R相、S相、T相)のうちS相が大地Eに接地されている三相交流式の交流電源である。これらの三相は、R線、S線、およびT線を介して、インバータ3の入力側にそれぞれ接続されている。
インバータ3は、商用電力系統2から供給される三相の電力から所定の制御電圧を生成し、出力側の三相(U相、V相、W相)に対応する三線(U線、V線、W線)を通じてそれぞれ三相モーター5に対して出力する。三相モーター5はインバータ3の出力側に接続されており、供給された各制御電圧を用いて動作する。
インバータ3と三相モーター5との間には、U線、V線、およびW線を取り囲む零相変流器4が設けられている。零相変流器4は、インバータ3と三相モーター5との間を流れる三相の合成された対地零相電流I0を計測する。詳しくは後述するが、この零相電流I0は、三相モーター5と大地Eとの間を流れる漏洩電流に等しい。
図2に示す構成では、商用電力系統2と三相モーター5との間にインバータ3が挿入されていない。一方、図3に示す構成では、商用電力系統2と三相モーター5との間にインバータ3が挿入されている。漏洩電流算出装置1は、インバータ3が挿入されている構成にも挿入されていない構成にも、適用可能である。
(漏洩電流算出装置1の構成)
図1は、本発明の実施形態1に係る漏洩電流算出装置の要部構成を示すブロック図である。この図に示すように、漏洩電流算出装置1は、電圧計測部11、漏洩電流計測部12、対地電圧算出部13、周波数成分抽出部14、位相差算出部15(位相差決定部)、挿入判定部16、円中心算出部17、抵抗分漏洩電流算出部18(漏洩電流算出部)、絶縁抵抗算出部19、絶縁不良判定部20(絶縁劣化負荷特定部、絶縁劣化判定部)、および出力部21を備えている。
図1は、本発明の実施形態1に係る漏洩電流算出装置の要部構成を示すブロック図である。この図に示すように、漏洩電流算出装置1は、電圧計測部11、漏洩電流計測部12、対地電圧算出部13、周波数成分抽出部14、位相差算出部15(位相差決定部)、挿入判定部16、円中心算出部17、抵抗分漏洩電流算出部18(漏洩電流算出部)、絶縁抵抗算出部19、絶縁不良判定部20(絶縁劣化負荷特定部、絶縁劣化判定部)、および出力部21を備えている。
電圧計測部11は、商用電力系統2の線間電圧のうち少なくともいずれかを計測する。図2に示す構成では、電圧計測部11は、商用電力系統2の出力側における線間電圧を計測する。図3に示す構成では、電圧計測部11は、インバータ3の入力側における線間電圧を計測する。本実施形態では、図2の構成および図3の構成のいずれの場合も、R相とS相との間の線間電圧が計測される。なお、計測対象の線間電圧はこれに限らず、任意の線間電圧であればよい。たとえば電圧計測部11は、R相とT相との間の電圧、または、T相とS相との間の電圧を計測してもよい。なお、電圧計測部11は、計測した電圧から高周波数成分を除去したり系統周波数成分を抽出したりするためのローパスフィルタまたはバンドパスフィルタを有していても良い。
対地電圧算出部13は、電圧計測部11によって計測された線間電圧のうち少なくともいずれかから、商用電力系統2の中性点と大地Eと間の対地電圧を算出する。本実施形態では、R-S間の線間電圧から対地電圧が算出される。
漏洩電流計測部12は、三相モーター5と大地Eとの間を流れる漏洩電流(零相電流)を、零相変流器4を通じて計測する。漏洩電流計測部12は、計測された漏洩電流から高周波数成分を除去したり系統周波数成分を抽出したりするためのローパスフィルタまたはバンドパスフィルタを有していても良い。
周波数成分抽出部14は、計測された漏洩電流から、商用電力系統2の系統周波数に同期する周波数成分(すなわち系統周波数と同一の周波数の周波数成分)を含む少なくとも1つの周波数成分を抽出する。この抽出処理には、たとえばDFTまたはFFTなどを用いても良い。
位相差算出部15は、計測された線間電圧または算出された対地電圧と、抽出された系統周波数の周波数成分との位相差を算出する。位相差の算出はたとえば演算処理によって行われるが、その代わりに、所定の計測回路を用いて位相差を計測することによって位相差を決定しても良い。
挿入判定部16は、商用電力系統2と三相モーター5との間にインバータ3が挿入されているか否かを判定する。本実施形態では、挿入判定部16は、周波数成分抽出部14によって漏洩電流から抽出された少なくとも1つの周波数成分に基づき、インバータ3挿入の有無を判定する。判定の詳細は後述する。
円中心算出部17は、少なくとも3つの異なる時点において算出された系統周波数の周波数成分および決定された位相差とによって特定される各点が描く円の中心点を算出する。
抵抗分漏洩電流算出部18は、算出された円の中心点に基づき、三相モーター5と大地Eとの間を三相モーター5の対地絶縁抵抗を通じて流れる電流(系統周波数分の対地絶縁抵抗分漏洩電流)を算出する。
絶縁抵抗算出部19は、算出された系統周波数分の対地絶縁抵抗分漏洩電流と、計測された線間電圧または算出された対地電圧とを用いて、三相モーター5の対地絶縁抵抗を算出する。絶縁抵抗算出部19は、インバータ3が挿入されない場合は線間電圧を用い、挿入される場合は対地電圧を用いる。
絶縁不良判定部20は、算出された系統周波数分の対地絶縁抵抗分漏洩電流または対地絶縁抵抗に基づき、三相モーター5の絶縁不良の有無を判定する。
出力部21は、絶縁不良の判定結果を、所望の形態で漏洩電流算出装置1の外部に出力する。この出力は、たとえば画面表示、通信出力、または接点信号出力として行われる。
(第1構成における線間電圧、漏洩電流および対地絶縁抵抗の算出)
漏洩電流算出装置1は、インバータ3が挿入されていない場合、電圧計測部11で計測した値を線間電圧として使用し、電流計測部12で計測した値を漏洩電流として使用する。漏洩電流算出装置1は、さらに、抵抗分の漏洩電流I0rを、非特許文献1に開示される方法または特開2013-195023号公報に開示される方法を用いて算出する。漏洩電流算出装置1は、算出した線間電圧Vrsと抵抗分の漏洩電流I0rを用いることによって、対地絶縁抵抗R0=Vrs÷I0rで算出することができる。
漏洩電流算出装置1は、インバータ3が挿入されていない場合、電圧計測部11で計測した値を線間電圧として使用し、電流計測部12で計測した値を漏洩電流として使用する。漏洩電流算出装置1は、さらに、抵抗分の漏洩電流I0rを、非特許文献1に開示される方法または特開2013-195023号公報に開示される方法を用いて算出する。漏洩電流算出装置1は、算出した線間電圧Vrsと抵抗分の漏洩電流I0rを用いることによって、対地絶縁抵抗R0=Vrs÷I0rで算出することができる。
(第2構成における対地電圧の算出)
図4は、本発明の実施形態1における、商用電力系統2と三相モーター5との間にインバータ3が挿入されている場合に商用電力系統2の対地電圧を算出するための原理を説明する図である。本実施形態の漏洩電流算出装置1は、インバータ3を介して商用電力系統2に接続される三相モーター5の対地絶縁抵抗を算出するために、三相モーター5の対地絶縁抵抗にかかる電圧(対地電圧)を算出する。この対地電圧の算出方法について、図4を参照して以下に説明する。
図4は、本発明の実施形態1における、商用電力系統2と三相モーター5との間にインバータ3が挿入されている場合に商用電力系統2の対地電圧を算出するための原理を説明する図である。本実施形態の漏洩電流算出装置1は、インバータ3を介して商用電力系統2に接続される三相モーター5の対地絶縁抵抗を算出するために、三相モーター5の対地絶縁抵抗にかかる電圧(対地電圧)を算出する。この対地電圧の算出方法について、図4を参照して以下に説明する。
三相モーター5の対地絶縁抵抗にかかる対地電圧は、商用電力系統2の中性点(N相)と、大地Eとの間の電圧に等しい。商用電力系統2では、図4の(a)に示すように、S相(S線)が接地されている。中性点を基準にしたS相の電圧は、N相とS相との間の系統電圧Vsであるため、N相と大地Eとの間の電圧は、系統電圧Vsと位相が180°反転した電圧Vs∠180°である。
一方、図4の(b)に示すように、インバータ3の中性点Nの電位は、商用電力系統2の中性点Nの電位に等しい。そのため、インバータ3の中性点Nと、大地Eとの間の電圧も、商用電力系統2の対地電圧Vs∠180°に等しい。また、図4の(b)に示すように、U相の対地電圧Euは、N相とU相との間の電圧Vuに、Vs∠180°を加えたものである。V相の対地電圧Evは、N相とV相との間の電圧Vvに、Vs∠180°を加えたものである。W相の対地電圧Ewは、N相とW相との間の電圧Vwに、Vs∠180°を加えたものである。すなわち、Eu=Vu+Vs∠180°、Ev=Vv+Vs∠180°、およびEw=Vw+Vs∠180°である。
ここで、U相の電圧Vu、V相の電圧Vv、およびW相の電圧Vwは、互いに位相が120°ずれているので、各相の電圧をすべて合算するとゼロになる特性を有している。すなわち、Vu+Vv+Vw=0である。そのため、電圧Vs∠180°が、三相モーター5の対地絶縁抵抗にかかる、商用電力系統2の系統周波数分の対地電圧である。
図4の(a)に示すように、R-S線間電圧は、中性点(N相)とR相との間の電圧Vrと、対地電圧Vsとのベクトル和である。対地電圧算出部13は、計測されたR-S線間電圧を√3で除算することによって、商用電力系統2の系統電圧Vsを算出することができる。系統電圧Vsと、対地電圧Vs∠180°とは、互いに実効値が等しく、かつ、互いに位相が180°ずれた電圧である。そのため対地電圧算出部13は、算出された系統電圧Vsの位相を180°ずらすことによって、対地電圧Vs∠180°を算出することができる。
(第2構成における漏洩電流)
図5は、本発明の実施形態1における、インバータ3が挿入されている場合に三相モーター5と大地Eとの間を流れる漏洩電流を説明する図である。
図5は、本発明の実施形態1における、インバータ3が挿入されている場合に三相モーター5と大地Eとの間を流れる漏洩電流を説明する図である。
三相モーター5の対地絶縁抵抗および対地浮遊容量は、三相モーター5の配線またはコイルと大地Eとの間にあるインピーダンス成分である。これらは互いに並列接続されている関係にある。したがって、図5の(a)に示すように、インバータ3の出力側におけるU相と大地Eとの間にある対地絶縁抵抗Ruおよび対地浮遊容量Cuは、いずれも、U相と大地Eとの間にあるインピーダンスZuを構成する成分である。
同様に、V相と大地Eとの間にある対地絶縁抵抗Rvおよび対地浮遊容量Cvは、いずれも、V相と大地Eとの間にあるインピーダンスZvを構成する成分である。また、W相と大地Eとの間にある対地絶縁抵抗Rwおよび対地浮遊容量Cwは、いずれも、W相と大地Eとの間にあるインピーダンスZwを構成する成分である。
図5の(b)に示すように、インバータ3の出力側において、各相を通ってそれぞれ漏洩電流が流れる。具体的には、U相を通って漏洩電流Iuが流れ、V相を通って漏洩電流Ivが流れ、W相を通って漏洩電流Iwが流れる。インバータ3bの出力側を流れる零相電流I0は、各相の漏洩電流の総和に等しい。したがって、I0=Iu+Iv+Iwである。
系統周波数成分に着目すると、インバータ3の出力側における各相(U、V、W)には対地電圧Vs∠180°が同位相にかかる。そのため、Iu=Vs∠180°÷Zu、Iv=Vs∠180°÷Zu、Iv=Vs∠180°÷Zuである。したがって、I0=Vs∠180°÷(1÷Zu+1÷Zv+1÷Zw)である。
以上のように、零相変流器4を通じて計測される零相電流I0は、三相モーター5の合成インピーダンスを通じて流れる漏洩電流に等しい。そのため以下では、漏洩電流を漏洩電流I0と表記する場合もある。
(第2構成における対地絶縁抵抗)
図6は、本発明の実施形態1における、インバータ3が挿入されている場合に三相モーター5と大地Eとの間の対地絶縁抵抗を説明する図である。
図6は、本発明の実施形態1における、インバータ3が挿入されている場合に三相モーター5と大地Eとの間の対地絶縁抵抗を説明する図である。
系統周波数成分に着目すると、インバータ3の出力側における各相(U、V、W)には対地電圧Vs∠180°が同位相にかかる。このことは、対地電圧Vs∠180°がかかる共通の母線にZu、Zv、およびZwが並列接続されていることに等しいと見なせる。そのため、三相モーター5と大地Eとの間の合成インピーダンスをZ0とすると、1÷Z0=1÷Zu+1÷Zv+1÷Zwである。この式を変形するとI0=Vs∠180°÷Z0となり、したがってZ0=Vs∠180°÷I0である。
対地合成インピーダンスZ0は、互いに並列接続される三相モーター5の対地絶縁抵抗および対地浮遊容量を、それぞれ成分として含んでいる。そのため、Z0のうち対地絶縁抵抗を通じて流れる電流I0rは、零相電流I0と対地電圧Vs∠180°との位相差をθとすると、I0×cosθである。一方、Z0のうち対地浮遊容量を通じて流れる電流I0cは、I0×sinθである。
これにより、三相モーター5の対地絶縁抵抗R0は、R0=Vs∠180°÷I0rによって算出される。一方、三相モーター5の対地浮遊容量の容量性リアクタンスC0は、C0=Vs∠180°÷I0cによって算出される。
(処理フロー)
図7は、本発明の実施形態1に係る漏洩電流算出装置1が、インバータ挿入有無および周波数一致/不一致に対応する算出手順に基づき対地絶縁抵抗分の漏洩電流を算出するための一連の処理の流れを示すフローチャートである。
図7は、本発明の実施形態1に係る漏洩電流算出装置1が、インバータ挿入有無および周波数一致/不一致に対応する算出手順に基づき対地絶縁抵抗分の漏洩電流を算出するための一連の処理の流れを示すフローチャートである。
ステップS1において、電圧計測部11は、R相とS相との間の線間電圧を計測する。ステップS2において、対地電圧算出部13は、計測された線間電圧に基づき、対地電圧を算出する。ステップS3において、漏洩電流計測部は、零相変流器4を通じて漏洩電流を計測する。ステップS4において、周波数成分抽出部14は、系統周波数の周波数成分を含む少なくとも1つの周波数成分を、計測された漏洩電流から抽出する。周波数成分抽出部14は、インバータ3が挿入されていない場合、商用電力系統2の系統周波数の周波数成分のみを漏洩電流から抽出する。一方、インバータ3が挿入されている場合、系統周波数の周波数成分と、運転周波数の周波数成分と、運転周波数の整数倍の周波数の周波数成分とを抽出する。これらの抽出処理には、たとえばFFTまたはDFTが用いられる。
ステップS6~ステップS10において、挿入判定部16は、インバータ挿入有無および周波数一致/不一致に対応する算出手順を自動的に判定する。言い換えると、挿入判定部16は、インバータ挿入有無および周波数一致/不一致に対応する算出手順を判定するために、漏洩電流算出装置1の外部からのたとえばユーザによる入力(インバータ挿入有無および周波数一致/不一致に対応する算出手順を指定する情報の入力)を必要としない。したがって、漏洩電流算出装置1のユーザの手間を掛けさせることなく、インバータ挿入有無および周波数一致/不一致に対応する算出手順を判定できる。なお、挿入判定部16は、インバータ挿入有無および周波数一致/不一致に対応する算出手順を、漏洩電流算出装置1の外部からの入力に基づき判定することもできる。この場合も、漏洩電流算出装置1は、インバータ挿入有無および周波数一致/不一致に対応する算出手順を正確に判定できる。
ステップS6において、抵抗分漏洩電流算出部18は、任意の時点において計測された漏洩電流I0および算出された位相差θの変化の有無を判定する。ステップS6においてNOの場合、ステップS7において、抵抗分漏洩電流算出部18は、対地絶縁抵抗分の漏洩電流を算出するための、インバータ挿入有および周波数一致に対応する算出手順を選択する。
ステップS6においてYESの場合、ステップS8において、挿入判定部16は、系統周波数の整数倍の周波数以外の周波数の有無を判定する。ステップS8においてNOの場合、挿入判定部16は、ステップS9において、対地絶縁抵抗分の漏洩電流を算出するための、インバータ挿入無に対応する算出手順を選択する。系統周波数が60Hzの場合、挿入判定部16は、たとえば、60Hz、120Hz、および180Hzの各周波数成分が抽出された場合、インバータ挿入無に対応する算出手順を選択する。この場合に抽出される周波数はこれらに3つに限らず、たとえば240Hz、300Hz、・・・などの他の周波数もさらに抽出され得る。一方、ステップS8においてYESの場合、挿入判定部16は、S10において、対地絶縁抵抗分の漏洩電流を算出するための、インバータ挿入有および周波数不一致に対応する算出手順を選択する。挿入判定部16は、たとえば、50Hz、60Hz、100Hz、120Hz、150Hz、および180Hzの各周波数成分が抽出された場合、インバータ挿入有および周波数不一致に対応する算出手順を選択する。
ステップS11において、抵抗分漏洩電流算出部18は、ステップS7、S9、またはS10のいずれかにおいて選択された算出手順に基づき対地絶縁抵抗分の漏洩電流を算出する。ステップS12において、絶縁不良判定部20は、算出された対地絶縁抵抗分漏洩電流に基づき、三相モーター5の対地絶縁抵抗を算出する。
(インバータ3挿入無の場合の算出手順)
インバータ3が挿入されていない場合に選択される、対地絶縁抵抗分の漏洩電流の算出手順は、I0R=I0×(cosθ+1÷√3×sinθ)の関係式に基づいた算出手順である。この式において、I0Rは、対地絶縁抵抗分の漏洩電流である。I0は、漏洩電流から抽出された周波数成分である。θは、位相差である。抵抗分漏洩電流算出部18は、ステップS9においてこの式を選択することによって、インバータ3が挿入されていない場合に、対地絶縁抵抗分の漏洩電流を正確に算出できる。絶縁不良判定部20は、R-S線間電圧を対地絶縁抵抗分の漏洩電流で除算することによって、三相モーター5の対地絶縁抵抗を算出する。これにより、インバータ3が挿入されていない場合の対地絶縁抵抗を正確に算出できる。
インバータ3が挿入されていない場合に選択される、対地絶縁抵抗分の漏洩電流の算出手順は、I0R=I0×(cosθ+1÷√3×sinθ)の関係式に基づいた算出手順である。この式において、I0Rは、対地絶縁抵抗分の漏洩電流である。I0は、漏洩電流から抽出された周波数成分である。θは、位相差である。抵抗分漏洩電流算出部18は、ステップS9においてこの式を選択することによって、インバータ3が挿入されていない場合に、対地絶縁抵抗分の漏洩電流を正確に算出できる。絶縁不良判定部20は、R-S線間電圧を対地絶縁抵抗分の漏洩電流で除算することによって、三相モーター5の対地絶縁抵抗を算出する。これにより、インバータ3が挿入されていない場合の対地絶縁抵抗を正確に算出できる。
(インバータ3挿入有かつ周波数不一致の場合の算出手順)
インバータ3が挿入されており、かつ、系統周波数と運転周波数とが一致しない場合に選択される、対地絶縁抵抗分の漏洩電流の算出手順は、たとえば以下の通りである。
インバータ3が挿入されており、かつ、系統周波数と運転周波数とが一致しない場合に選択される、対地絶縁抵抗分の漏洩電流の算出手順は、たとえば以下の通りである。
図8の(a)は、本発明の実施形態1に係る漏洩電流算出装置1が、商用電力系統2の系統周波数に同期する漏洩電流を算出するための原理を説明する図である。
漏洩電流計測部12によって計測される漏洩電流I0には、商用電力系統2の系統周波数に同期する成分(I0_sys)と、インバータ3の運転周波数に同期する成分(I0_inv)とが含まれている。三相モーター5の対地絶縁抵抗を算出するためには、漏洩電流I0から、系統周波数に同期する漏洩電流成分である漏洩電流I0_sysのみを抽出する必要がある。
図8の(a)では、商用電力系統2がインバータ3に供給する電圧の周波数(系統周波数)は60Hzであり、インバータ3が三相モーター5を駆動する電圧の周波数(運転周波数)は50Hzである。すなわち、両者の周波数設定は互いに異なっている。
この場合、系統周波数成分抽出部14は、系統周波数と同じ周波数を有する漏洩電流を抽出する演算処理を実行することによって、計測された漏洩電流I0から、系統周波数成分の漏洩電流I0_sysのみを抽出する。系統周波数と運転周波数とが異なるので、この抽出処理では、系統周波数に同期する成分は抽出されるが、運転周波数に同期する成分は抽出されない。これにより、抽出された漏洩電流I0_sysには、インバータ3の運転周波数成分に同期する漏洩電流I0_invは含まれない。
三相モーター5と大地Eとの間のインピーダンスには、対地絶縁抵抗および対地浮遊容量の双方が含まれる。対地電圧Vs∠180°が対地絶縁抵抗および対地浮遊容量の双方にかかることによって、計測される漏洩電流I0の位相は、対地浮遊容量の影響により対地電圧Vs∠180°の位相からずれることになる。したがって、漏洩電流I0から抽出される漏洩電流I0_sysの位相差θも、対地電圧Vs∠180°の位相からずれている。
図8の(a)に示すように、系統周波数と運転周波数とが異なる場合、漏洩電流I0から抽出される漏洩電流成分には、漏洩電流I0_sysのみが含まれている。そのため、対地電圧Vs∠180°と漏洩電流成分(I0_sysそのもの)との位相差θは、計測の時点に関わらず常に等しい。
したがって、図8の(a)に示すように、平面座標系における原点を始点とし、この平面座標系の横軸に対して位相差θの角度を設けて漏洩電流I0_sysのベクトルを描くと、このベクトルの終点P0は、漏洩電流I0_sysが抽出された時点に関わらず常に同じ点に集中する。これにより、平面座標系の原点と、終点P0を平面座標系の横軸に投影させた点とを結ぶベクトルは、系統周波数成分の抵抗分漏洩電流I0R_sysに精度良く対応する。すなわち、この投影点の値は、I0R_sysの実効値である。一方、平面座標系の原点と、終点P0を平面座標系の縦軸に投影させた点とを結ぶベクトルは、系統周波数成分の容量分漏洩電流I0C_sysに精度良く対応する。すなわち、この投影点の値は、I0C_sysの実効値である。
以上のように、漏洩電流算出装置1は、商用電力系統2の系統周波数とインバータ3の運転周波数とが異なる場合、計測された漏洩電流I0から、系統周波数に同期する成分を抽出することによって、系統周波数分の漏洩電流I0_sysを精度良く算出することができる。この結果、対地電圧Vs∠180°と、漏洩電流I0R_sysとを用いることによって、三相モーター5の対地絶縁抵抗を精度良く算出することもできる。
(インバータ3が挿入有かつ周波数一致の場合の算出手順)
インバータ3が挿入されており、かつ、系統周波数と運転周波数とが一致する場合、抵抗分漏洩電流算出部18は、以下に説明する一連の算出手順に基づき、対地絶縁抵抗分漏洩電流を算出する。
インバータ3が挿入されており、かつ、系統周波数と運転周波数とが一致する場合、抵抗分漏洩電流算出部18は、以下に説明する一連の算出手順に基づき、対地絶縁抵抗分漏洩電流を算出する。
(漏洩電流の算出原理)
図8の(b)は、本発明の実施形態1に係る漏洩電流算出装置1が、商用電力系統2の系統周波数とインバータ3の運転周波数とが一致する場合に、商用電力系統2の系統周波数に同期する漏洩電流を算出するための原理を説明する図である。
図8の(b)は、本発明の実施形態1に係る漏洩電流算出装置1が、商用電力系統2の系統周波数とインバータ3の運転周波数とが一致する場合に、商用電力系統2の系統周波数に同期する漏洩電流を算出するための原理を説明する図である。
商用電力系統2と三相モーター5との間にインバータ3が挿入されている場合、漏洩電流計測部12によって計測される漏洩電流I0には、商用電力系統2の系統周波数に同期する成分(I0_sys)と、インバータ3の運転周波数に同期する成分(I0_inv)とが含まれている。三相モーター5の対地絶縁抵抗を算出するためには、漏洩電流I0から、系統周波数に同期する周波数成分である漏洩電流I0_sysのみを抽出する必要がある。図8の(b)に示すように、商用電力系統2の系統周波数と、インバータ3の運転周波数とが一致する場合には、漏洩電流I0をベクトル表記した際の終点が、一点に定まらず、計測時点ごとにその位置が変化する。これは、周波数成分抽出部14によって抽出される漏洩電流に、系統周波数分の漏洩電流I0_sysと、運転周波数分の漏洩電流I0_invとの両方が含まれているためである。
系統周波数と運転周波数との設定が一致する場合、周波数成分抽出部14は、漏洩電流I0に含まれる系統周波数に同期する成分および運転周波数に同期する成分とを区別することができない。そのため、周波数成分抽出部14が漏洩電流I0から系統周波数に同期する成分を抽出する処理を実行すると、結果として、系統周波数に同期する漏洩電流I0_sysと、運転周波数に同期する漏洩電流I0_invとが混合された漏洩電流I0_mixが抽出される。
この場合、図8の(b)に示すように、平面座標系に描かれるベクトルは、I0_sysのベクトルと、I0_invのベクトルとの合成ベクトル(I0_mixのベクトル)である。詳しくは後述するが、この合成ベクトルの終点の位置は、I0_invの影響により、点P1(特定点)、点P2(特定点)、および点P3(特定点)などのように、計測時点ごとに変化する。具体的には、図8の(b)に示すように、この変化は各終点が円81を描くように発生する。
したがって、系統周波数と運転周波数とが一致する場合は、図8の(a)とは異なりベクトルの終点が一点に定まらないので、この終点に基づき系統周波数成分の抵抗分漏洩電流I0R_sysを精度良く算出することはできない。言い換えると、終点に基づきI0R_sysを算出したとしても、その値は計測時点ごとに変動するので、正確な値を特定することができない。
(円を描く理由)
図9は、本発明の実施形態1において、系統周波数と運転周波数とが一致する場合に、抽出された周波数成分をベクトル表記した際の終点が回転する原理を説明する図である。
図9は、本発明の実施形態1において、系統周波数と運転周波数とが一致する場合に、抽出された周波数成分をベクトル表記した際の終点が回転する原理を説明する図である。
系統周波数と運転周波数とは、仮に同一の値に設定されていたとしても、厳密には互いにわずかに異なっている。たとえば、それぞれが60Hzに設定された場合でも、系統周波数が60.00Hzであり、一方、運転周波数が60.01Hzである、というように、互いにわずかにずれが生ずる。この周波数のずれによって、図9の(a)に示すように、I0_sysの波形91と、I0_invの波形92とが、計測時点がP1、P2、P3と徐々に変化するにつれ、少しずつ互いにずれてゆく。
上述したように、系統周波数と運転周波数とが一致する場合、漏洩電流I0から抽出された漏洩電流I0_mixには、系統周波数分の漏洩電流I0_sysと、運転周波数分の漏洩電流I0_invとが含まれている。この場合、決定される位相差θは、対地電圧Vs∠180°と、漏洩電流I0_mixとの位相差であるため、漏洩電流I0_invに含まれるI0_sysの波形とI0_invの波形との間にずれが生じることによって、位相差θの値が時間とも共にずれてゆく。これにより、漏洩電流I0_mixをベクトル表記した際の終点の位置が、時間とも変化する。たとえば、図9の(a)のP1~P3の波形のずれに対応して、漏洩電流I0の終点(特定点)P1~P3の位置が変化する。この変化によって、位相差θが時間的に変化することに伴い、I0_mixの終点は図9の(b)に示すように時間と共に円93を描く。すなわち、P1~P3は原理的に円93上にプロットされる。
I0_sysの終点は、円93の中心点94に一致する。そのため、本実施形態の漏洩電流算出装置1は、この中心点94を算出し、さらに中心点94を平面座標軸の横軸および縦軸にそれぞれ投影することによって、I0R_sysおよびI0C_invを精度良く算出する。
漏洩電流I0_mixの終点が描く円の中心点を算出する方法は様々ある。以下では、そのうち3つの方法をそれぞれ説明する。
(第1の手法)
図10は、本発明の実施形態1における、系統周波数と運転周波数とが一致する場合に対地絶縁抵抗分漏洩電流を算出するための第1の方法を説明する図である。
図10は、本発明の実施形態1における、系統周波数と運転周波数とが一致する場合に対地絶縁抵抗分漏洩電流を算出するための第1の方法を説明する図である。
図10の例では、周波数成分抽出部14は、3つの異なる時点において、I0_mixを抽出する。同様に、位相差算出部15は、3つの異なる時点において、位相差θを算出する。これにより円中心算出部17は、3つの時点において決定された漏洩電流I0_mixおよび位相差θとに基づき、各I0_mixをベクトル表記した際の終点である点P1~P3を算出する。
円中心算出部17は、これらの点P1~P3を通る円102を直接算出する代わりに、これらを頂点する三角形101の外心を算出する。この外心は、三角形101に外接する円102の中心点103に一致する。このように図10の例では、円中心算出部17は、P1~P3を頂点する三角形101の外心を算出することによって、これらの点を通る円102の中心点103を算出することができる。
円中心算出部17は、算出した中心点103を抵抗分漏洩電流算出部18に出力する。図10に示すように、平面座標系の原点を始点とし、中心点103を終点とするベクトルは、漏洩電流漏洩電流I0から抽出された漏洩電流I0_mixのうちの系統周波数分の漏洩電流I0_sysに他ならない。そこで抵抗分漏洩電流算出部18は、算出された中心点103を横軸に投影することによって、系統周波数分の漏洩電流I0_sysのうちの対地絶縁抵抗分の漏洩電流I0R_sysを算出することができる。
抵抗分漏洩電流算出部18は、算出したI0R_sysを絶縁抵抗算出部19に出力する。絶縁抵抗算出部19は、漏洩電流I0R_sysおよび対地電圧Vs∠180°を用いて、三相モーター5の対地絶縁抵抗を算出する。
この方法では、3つの点P1~P3のみを用いて、中心点103が算出される。すなわち、I0R_sysを算出するためには、漏洩電流I0を3つの異なる時点において計測すれば足りるので、I0R_sysを高速に算出することができる。
(第2の方法)
図11は、本発明の実施形態1における、系統周波数と運転周波数とが一致する場合に対地絶縁抵抗分漏洩電流を算出するための第2の方法を説明する図である。
図11は、本発明の実施形態1における、系統周波数と運転周波数とが一致する場合に対地絶縁抵抗分漏洩電流を算出するための第2の方法を説明する図である。
図11の例では、周波数成分抽出部14は、4つ以上の異なる時点において、I0_mixを抽出する。同様に、位相差算出部15は、4つ以上の異なる時点において、位相差θを算出する。これにより円中心算出部17は、4つ以上の時点において決定された漏洩電流I0_mixおよび位相差θとに基づき、各I0_mixをベクトル表記した際の終点である各点Pn(n=1、2、3、4、・・・)を算出する。
円中心算出部17は、これらの各点Pnを通る円111の方程式を算出する。そして、この方程式を用いて、円111の中心点112を算出する。図11の例では、円中心算出部17は、算出された各点Pnを用いた円の最小二乗法によって、円111の方程式を算出する。以下、より具体的に説明する。
図12は、本発明の実施形態1における円の最小二乗法を説明する図である。この図に示すように、各点Pnが、点P1(x1,y1)、点P2(x2,y2)、点P3(x3,y3)、点P4(x4,y4)、・・・として算出されたとする。本実施形態では、これらの点に近似する円111の方程式を(x-a)2×(y-b)2=r2とし、これらの点と、(x-a)2×(y-b)2=r2との誤差の二乗和Eが最小となるような係数a、b、およびrを、最小二乗法によって算出する。
誤差Eは、E=Σ((x-a)2×(y-b)2=r2)によって規定される。ただし、この式を用いて誤差Eを算出しようとすると、a、b、およびrがいずれも4次関数となるので、計算が非常に複雑になる。そこでまず、a、b、およびrを、次のように媒介変数A、B、およびCに置き換えた関係式を得る。
E=Σ(x2+y2+Ax+By+C)
ここで、A=-2a、B=-2b、C=a2+b2-r2である。この関係式を偏微分すると、次の式が得られる。
これらの式を行列演算によって解くと、次の行列式が得られる。
この行列式を展開すると、次の行列式が得られる。
この行列式を解くことによって、媒介変数A、B、およびCが決定される。決定した媒介変数A、B、およびCを、上述した関係式に代入することによって、係数a、b、およびrを決定することができる。これにより円111の方程式が算出されるので、これを用いて中心点112を算出する。中心点112に基づく対地絶縁抵抗分の漏洩電流I0_sysの算出、ならびに漏洩電流I0_sysおよび対地電圧Vs∠180°に基づく三相モーター5の対地絶縁抵抗の算出は、上述した例と変わりない。
ここで、A=-2a、B=-2b、C=a2+b2-r2である。この関係式を偏微分すると、次の式が得られる。
この方法では、円11の算出に円の最小二乗法が用いられるので、円111の中心点112をより精度良く算出することができる。したがって、漏洩電流I0_sysおよび対地絶縁抵抗を、より精度良く算出することができる。
図11の(b)に、I0_sysの実際の算出結果の一例を示す。この例では、円111の方程式として、(x-0.0044)2+(y-0.0133)2=0.00392が算出された。この方程式から決定される中心点112を横軸に投影すると、値は4.4mAとなり、そのためI0R_sysとして4.4mAが算出された。この算出に用いた三相モーター5におけるI0_sysの理論値は4.3mAであるので、算出結果が理論値によく一致したことが分かる。また、4.4mAのI0_sysを用いて算出された三相モーター5の対地絶縁抵抗は26.9kΩであり、これも理論値の27kΩによく一致する。
(第3の方法)
図13は、本発明の実施形態1における、系統周波数と運転周波数とが一致する場合に対地絶縁抵抗分漏洩電流を算出するための第3の方法を説明する図である。
図13は、本発明の実施形態1における、系統周波数と運転周波数とが一致する場合に対地絶縁抵抗分漏洩電流を算出するための第3の方法を説明する図である。
図13の例では、周波数成分抽出部14は、円の中心点を直接算出するのではなく、その代わりに、一定時間内における、I0_mixにおける対地絶縁抵抗分の漏洩電流の最小値と、I0_mixのうち対地絶縁抵抗分の漏洩電流の最大値とを算出し、これらの中間値を、I0R_sysとして算出する。
この方法では、周波数成分抽出部14は、一定時間内(60秒以上の長時間が望ましい)に亘る各時点において、すなわち円一周分以上の点が算出されるまで、I0_mixを抽出する。同様に、位相差算出部15は、円一周分以上の点が算出されるまで、各時点において位相差θを算出する。この方法では、円中心算出部17は円の中心を算出しない。その代わりに、絶縁抵抗算出部19が、各時点において得られた漏洩電流I0_mixおよび位相差θを用いて、各時点における漏洩電流I0_mixのうちの対地絶縁抵抗分の漏洩電流I0R_mixを算出する。これは、I0_mixにcosθを乗算することによって得られる。すなわち、I0R_mix=I0_mix×cosθである。
絶縁抵抗算出部19は、I0R_mixの算出を、長時間(60秒以上)に亘る各時点において実行する。I0R_mixの値は、I0_mixをベクトル表記した際の終点を横軸に投影した点における横軸の値に一致する。この終点は上述したように円を描くので、終点を横軸に投影した点は、円全体を横軸に投影して得られる線の中に必ずある。したがって、算出されるI0R_mixには、線の端部のそれぞれ対応する最小値131および最大値132が自ずと定まる。
この最小値131と最大値132は、それぞれI0_mixの終点が描く円における横軸方向における各端部に対応するので、最小値131と最大値132との中間値132は、円の中心点に対応する。上述したように、円の中心点を横軸に投影した値はI0R_sysに対応するので、抵抗分漏洩電流算出部18は、中間値132を算出することによって、I0R_sysを算出することができる。
なお、I0R_sysおよび対地電圧Vs∠180°に基づく三相モーター5の対地絶縁抵抗の算出は、上述した例と変わりない。
この方法では、I0R_sysの算出のために複雑な方程式を用いて円の中心を求める必要がないので、簡単な計算によってI0R_sysを得ることができる。
図13の(b)に、第3の方法によるI0R_sysの実際の算出結果の一例を示す。この例では、中間値132として、すなわちI0R_sysとして、4.3mAが算出された。4.3mAのI0R_sysを用いて算出された三相モーター5の対地絶縁抵抗は27.1kΩであり、これは理論値の27kΩによく一致する。
(本実施形態の利点)
以上のように、漏洩電流算出装置1は、商用電力系統2と三相モーター5との間にインバータ3が挿入されているか否かを判定する。漏洩電流算出装置1は、さらに、判定結果に応じた算出手順に基づき、三相モーター5と大地Eとの間を三相モーター5の対地絶縁抵抗を通じて流れる系統周波数分の対地絶縁抵抗分漏洩電流を算出する。詳細には、漏洩電流算出装置1は、インバータ3が挿入されていない場合、それに応じた算出手順に基づき対地絶縁抵抗分の漏洩電流を算出する。一方、インバータ3が挿入されている場合、それに応じた算出手順に基づき対地絶縁抵抗分の漏洩電流を算出する。したがって、設備にインバータ3がある場合も、ない場合も、対地絶縁抵抗分の漏洩電流の算出には漏洩電流算出装置1があれば十分である。言い換えると、漏洩電流算出装置1の他に、対地絶縁抵抗分の漏洩電流を計測するための装置は不要である。したがって本実施形態に係る漏洩電流算出装置1は、インバータの有無に関わらず対地絶縁抵抗分の漏洩電流を精度良く算出できる。
以上のように、漏洩電流算出装置1は、商用電力系統2と三相モーター5との間にインバータ3が挿入されているか否かを判定する。漏洩電流算出装置1は、さらに、判定結果に応じた算出手順に基づき、三相モーター5と大地Eとの間を三相モーター5の対地絶縁抵抗を通じて流れる系統周波数分の対地絶縁抵抗分漏洩電流を算出する。詳細には、漏洩電流算出装置1は、インバータ3が挿入されていない場合、それに応じた算出手順に基づき対地絶縁抵抗分の漏洩電流を算出する。一方、インバータ3が挿入されている場合、それに応じた算出手順に基づき対地絶縁抵抗分の漏洩電流を算出する。したがって、設備にインバータ3がある場合も、ない場合も、対地絶縁抵抗分の漏洩電流の算出には漏洩電流算出装置1があれば十分である。言い換えると、漏洩電流算出装置1の他に、対地絶縁抵抗分の漏洩電流を計測するための装置は不要である。したがって本実施形態に係る漏洩電流算出装置1は、インバータの有無に関わらず対地絶縁抵抗分の漏洩電流を精度良く算出できる。
〔実施形態2〕
図14および図15を参照して、本発明に係る実施形態2を以下に説明する。上述した実施形態1と共通する各部材には同じ符号を付し、詳細な説明を省略する。
図14および図15を参照して、本発明に係る実施形態2を以下に説明する。上述した実施形態1と共通する各部材には同じ符号を付し、詳細な説明を省略する。
(概略構成)
図14は、本発明の実施形態2に係る漏洩電流算出装置1が適用される構成例を示す概略系統図である。本実施形態では、漏洩電流算出装置1の構成は、実施形態1と基本的に同一である。ただし本実施形態では、図14に示すように、1台の漏洩電流算出装置1は、複数の三相モーター5aおよび5bのそれぞれを監視するように構成できる。
図14は、本発明の実施形態2に係る漏洩電流算出装置1が適用される構成例を示す概略系統図である。本実施形態では、漏洩電流算出装置1の構成は、実施形態1と基本的に同一である。ただし本実施形態では、図14に示すように、1台の漏洩電流算出装置1は、複数の三相モーター5aおよび5bのそれぞれを監視するように構成できる。
三相モーター5aおよび5bは、それぞれインバータ3aおよび3bによって駆動される。インバータ3aおよび3bのそれぞれの入力側は、いずれも、共通の商用電力系統2に接続されている。インバータ3aの出力側は三相モーター5aに接続され、一方、インバータ3bの出力側は三相モーター5bに接続されている。
また、インバータ3aと三相モーター5aとの間に零相変流器4aが配置されており、一方、インバータ3bと三相モーター5bとの間に零相変流器4bが配置されている。これらの零相変流器4aおよび4bは、いずれも、漏洩電流算出装置1の漏洩電流計測部12に接続されている。
(算出手順)
本実施形態では、漏洩電流算出装置1は、三相モーター5aおよび5bのそれぞれに対応する対地絶縁抵抗分漏洩電流および対地絶縁抵抗を算出する。その手順について、以下に説明する。
本実施形態では、漏洩電流算出装置1は、三相モーター5aおよび5bのそれぞれに対応する対地絶縁抵抗分漏洩電流および対地絶縁抵抗を算出する。その手順について、以下に説明する。
電圧計測部11は、複数のインバータ3aおよび3bのうちいずれかの入力側における線間電圧のうち少なくともいずれかを計測する。各インバータ3aおよび3bの入力側は共通の商用電力系統2に接続されているので、たとえばインバータ3aのR相とS相との間の電圧Vrsは、インバータ3bのR相とS相と間の電圧Vrsと完全に等しい。このように本実施形態では、電圧Vrsを一カ所のみで計測すればよいので、漏洩電流算出装置1の構成をより簡素にすることができる。
対地電圧算出部13は、インバータ3aの入力側から計測された電圧Rsに基づき、対地電圧Vs∠180°を算出する。電圧Vrsがインバータ3aおよび3bに共通していることから、漏洩電流算出装置1は、電圧Vs∠180°を三相モーター5aおよび三相モーター5bに共通する対地電圧として、以下の処理で用いる。
漏洩電流計測部12は、零相変流器4aを通じて三相モーター5aの漏洩電流を計測すると共に、零相変流器4bを通じて三相モーター5bの漏洩電流を計測する。すなわち漏洩電流算出装置1は、三相モーター5aおよび5bに対して共通する1つの漏洩電流計測部12を備えている。
なお、漏洩電流算出装置1は、各三相モーター5aおよび5bのそれぞれに対応する複数の漏洩電流計測部12aおよび12bを備えていても良い。この構成、漏洩電流計測部12aが零相変流器4a接続され、一方、漏洩電流計測部12bが、零相変流器4bに接続されている。そして、漏洩電流計測部12aが零相変流器4aを通じて三相モーター5aの漏洩電流を計測し、一方、漏洩電流計測部12bが、零相変流器4bを通じて三相モーター5bの漏洩電流を計測する。
周波数成分抽出部14は、三相モーター5aの漏洩電流から、三相モーター5aに対応する周波数成分を抽出する。一方、三相モーター5bの漏洩電流から、三相モーター5bに対応する周波数成分を抽出する。
位相差算出部15は、算出された対地電圧と、三相モーター5aの周波数成分との間の位相差を算出する。さらに、算出された対地電圧と、三相モーター5bの周波数成分との間の位相差を算出する。
抵抗分漏洩電流算出部18は、三相モーター5aに対応する円の中心点に基づき、三相モーター5aの対地絶縁抵抗分漏洩電流を算出する。また、三相モーター5bに対応する円の中心点に基づき、三相モーター5bの対地絶縁抵抗分漏洩電流を算出する。
絶縁抵抗算出部19は、対地電圧Vs∠180°と、三相モーター5aの対地絶縁抵抗分漏洩電流とから、三相モーター5aの対地絶縁抵抗を算出する。また、対地電圧Vs∠180°と、三相モーター5bの対地絶縁抵抗分漏洩電流とから、三相モーター5bの対地絶縁抵抗を算出する。
図15は、本発明の実施形態2における三相モーター5ごとの対地絶縁抵抗分漏洩電流または対地絶縁抵抗の算出値の時間的推移の一例を示す図である。図15の(a)は、三相モーター5aおよび5bのそれぞれの対地絶縁抵抗分漏洩電流の時間的推移を示す。図中、Ch1が三相モーター5aに対応し、Ch2が三相モーター5aに対応する。一方、図15の(b)は、三相モーター5aおよび5bのそれぞれの対地絶縁抵抗の時間的推移を示す。図中、Ch1が三相モーター5aに対応し、Ch2が三相モーター5aに対応する。これらの図では、対地絶縁抵抗分漏洩電流または対地絶縁抵抗の時間的変化が三相モーター5aと5bとでそれぞれ異なっている。漏洩電流算出装置1は、相互の値を比較したり、あるいはそれぞれの値を所定の閾値と比較したりすることによって、絶縁劣化している三相モーター5を適宜特定することができる。
(乖離度合いに基づく判定)
絶縁不良判定部20は、三相モーター5aの系統周波数分の対地絶縁抵抗分漏洩電流と、三相モーター5bの系統周波数分の対地絶縁抵抗分漏洩電流とを互いに比較することによって、三相モーター5aおよび5bにおける絶縁劣化の度合いをそれぞれ判定することができる。たとえば、図15の(a)の例では、ある時点における三相モーター5aの系統周波数分の対地絶縁抵抗分漏洩電流と、同じ時点における三相モーター5bの系統周波数分の対地絶縁抵抗分漏洩電流との間に、大きな乖離度151が生じている。絶縁不良判定部20は、この乖離度151を検出した場合、より対地絶縁抵抗分漏洩電流の大きい三相モーター5aの方が、絶縁劣化していると判定する。
絶縁不良判定部20は、三相モーター5aの系統周波数分の対地絶縁抵抗分漏洩電流と、三相モーター5bの系統周波数分の対地絶縁抵抗分漏洩電流とを互いに比較することによって、三相モーター5aおよび5bにおける絶縁劣化の度合いをそれぞれ判定することができる。たとえば、図15の(a)の例では、ある時点における三相モーター5aの系統周波数分の対地絶縁抵抗分漏洩電流と、同じ時点における三相モーター5bの系統周波数分の対地絶縁抵抗分漏洩電流との間に、大きな乖離度151が生じている。絶縁不良判定部20は、この乖離度151を検出した場合、より対地絶縁抵抗分漏洩電流の大きい三相モーター5aの方が、絶縁劣化していると判定する。
(閾値に基づく判定)
絶縁不良判定部20は、三相モーター5aおよび5bのうち、対応する対地絶縁抵抗分漏洩電流が規定の閾値を上回る三相モーター5を、絶縁劣化している三相モーター5aとして特定することもできる。たとえば図15の(a)では、三相モーター5aの対地絶縁抵抗分漏洩電流がある時点以降では閾値152を上回っているので、絶縁不良判定部20は、この時点以降、三相モーター5aが絶縁劣化していることを特定することができる。
絶縁不良判定部20は、三相モーター5aおよび5bのうち、対応する対地絶縁抵抗分漏洩電流が規定の閾値を上回る三相モーター5を、絶縁劣化している三相モーター5aとして特定することもできる。たとえば図15の(a)では、三相モーター5aの対地絶縁抵抗分漏洩電流がある時点以降では閾値152を上回っているので、絶縁不良判定部20は、この時点以降、三相モーター5aが絶縁劣化していることを特定することができる。
なお、上述した乖離度または閾値を用いた判定は、対地絶縁抵抗分漏洩電流のみならず、図15の(b)に示すように、三相モーター5aおよび5bの対地絶縁抵抗を対象としても行うことができる。たとえば、図15の(b)では、ある時点における三相モーター5aの対地絶縁抵抗と、同じ時点における三相モーター5bの対地絶縁抵抗との間に、大きな乖離度153が生じている。絶縁不良判定部20は、この乖離度153を検出した場合、より対地絶縁抵抗の小さい三相モーター5aの方が、絶縁劣化していると判定する。また、図15の(b)では、三相モーター5aの対地絶縁抵抗がある時点以降では閾値154を下回っているので、絶縁不良判定部20は、この時点以降、三相モーター5aが絶縁劣化していることを特定することができる。
(変形例)
漏洩電流算出装置1が複数の漏洩電流計測部12を備えている構成では、監視対象としない三相モーター5の漏洩電流を計測するための漏洩電流計測部12は不要である。漏洩電流算出装置1がこのような不要な漏洩電流計測部12を備えていることは、漏洩電流算出装置1の無駄なコストアップに繋がる。
漏洩電流算出装置1が複数の漏洩電流計測部12を備えている構成では、監視対象としない三相モーター5の漏洩電流を計測するための漏洩電流計測部12は不要である。漏洩電流算出装置1がこのような不要な漏洩電流計測部12を備えていることは、漏洩電流算出装置1の無駄なコストアップに繋がる。
これを防ぐために、各漏洩電流計測部12は、漏洩電流を計測するための増設ユニットであってもよい。この場合、漏洩電流算出装置1には、必要な数だけの漏洩電流計測部12を搭載したり、あるいは不要となった漏洩電流計測部12を漏洩電流算出装置1から取り外したりすることができるので、漏洩電流算出装置1のコストを抑えることができる。なお、漏洩電流計測部12をこのような増設ユニットとして実現するためには、たとえば特開2013-181813に開示される技術を用いればよい。
(まとめ)
本発明の態様1に係る漏洩電流算出装置は、前記の課題を解決するために、異なる三相のうちいずれかが接地されている三相交流式の商用電力系統における線間電圧のうち少なくともいずれかを計測する電圧計測部と、前記電圧計測部によって計測された前記少なくともいずれかの線間電圧から、前記商用電力系統の中性点と大地と間の対地電圧を算出する対地電圧算出部と、前記商用電力系統に接続される負荷と前記大地との間を流れる漏洩電流を計測する漏洩電流計測部と、計測された漏洩電流から、前記商用電力系統の系統周波数に同期する周波数成分を抽出する周波数成分抽出部と、算出された前記対地電圧と、抽出された前記周波数成分との位相差を決定する位相差決定部と、前記商用電力系統と前記負荷との間にインバータが挿入されているか否かを判定する挿入判定部と、前記挿入判定部の判定結果に応じた算出手順に基づき、前記負荷と前記大地との間を前記負荷の対地絶縁抵抗を通じて流れる前記系統周波数分の対地絶縁抵抗分漏洩電流を算出する漏洩電流算出部とを備えていることを特徴としている。
本発明の態様1に係る漏洩電流算出装置は、前記の課題を解決するために、異なる三相のうちいずれかが接地されている三相交流式の商用電力系統における線間電圧のうち少なくともいずれかを計測する電圧計測部と、前記電圧計測部によって計測された前記少なくともいずれかの線間電圧から、前記商用電力系統の中性点と大地と間の対地電圧を算出する対地電圧算出部と、前記商用電力系統に接続される負荷と前記大地との間を流れる漏洩電流を計測する漏洩電流計測部と、計測された漏洩電流から、前記商用電力系統の系統周波数に同期する周波数成分を抽出する周波数成分抽出部と、算出された前記対地電圧と、抽出された前記周波数成分との位相差を決定する位相差決定部と、前記商用電力系統と前記負荷との間にインバータが挿入されているか否かを判定する挿入判定部と、前記挿入判定部の判定結果に応じた算出手順に基づき、前記負荷と前記大地との間を前記負荷の対地絶縁抵抗を通じて流れる前記系統周波数分の対地絶縁抵抗分漏洩電流を算出する漏洩電流算出部とを備えていることを特徴としている。
前記の構成によれば、漏洩電流算出装置は、商用電力系統と負荷との間にインバータが挿入されているか否かを判定する。漏洩電流算出装置は、さらに、判定結果に応じた算出手順に基づき、負荷と大地との間を負荷の対地絶縁抵抗を通じて流れる前記系統周波数分の対地絶縁抵抗分漏洩電流を算出する。詳細には、漏洩電流算出装置は、インバータが挿入されていない場合、それに応じた算出手順に基づき対地絶縁抵抗分の漏洩電流を算出する。一方、インバータが挿入されている場合、それに応じた算出手順に基づき対地絶縁抵抗分の漏洩電流を算出する。したがって、設備にインバータがある場合も、ない場合も、対地絶縁抵抗分の漏洩電流の算出には漏洩電流算出装置があれば十分である。言い換えると、漏洩電流算出装置の他に、対地絶縁抵抗分の漏洩電流を計測するための装置は不要である。
以上のように、本発明の態様1に係る漏洩電流算出装置は、インバータの有無に関わらず対地絶縁抵抗分の漏洩電流を精度良く算出できる。
本発明の態様2に係る漏洩電流算出装置は、態様1において、前記挿入判定部は、前記インバータが挿入されているか否かを、前記漏洩電流算出装置の外部からの入力に基づき判定することを特徴としている。
前記の構成によれば、インバータが挿入されているか否かを正確に判定できる。
本発明の態様3に係る漏洩電流算出装置は、態様1において、前記挿入判定部は、前記インバータが挿入されているか否かを自動的に判定することを特徴としている。
前記の構成によれば、漏洩電流算出装置のユーザの手間を掛けさせることなく、インバータが挿入されているか否かを判定できる。
本発明の態様4に係る漏洩電流算出装置は、態様3において、任意の時間において計測された前記漏洩電流および決定された前記位相差の変化と、前記漏洩電流から抽出された前記周波数成分とに基づき、前記インバータが挿入されているか否かを判定することを特徴としている。
前記の構成によれば、インバータが挿入されているか否かを正確に判定できる。
本発明の態様5に係る漏洩電流算出方法は、前記の課題を解決するために、異なる三相のうちいずれかが接地されている三相交流式の商用電力系統における線間電圧のうち少なくともいずれかを計測する電圧計測工程と、計測された前記少なくともいずれかの線間電圧から、前記商用電力系統の中性点と大地との間の対地電圧を算出する対地電圧算出工程と、前記商用電力系統に接続される負荷と前記大地との間を流れる漏洩電流を計測する漏洩電流計測工程と、計測された漏洩電流から、前記商用電力系統の系統周波数に同期する周波数成分を抽出する周波数成分抽出工程と、算出された前記対地電圧と、抽出された前記周波数成分との位相差を決定する位相差決定工程と、前記商用電力系統と前記負荷との間にインバータが挿入されているか否かを判定する挿入判定工程と、前記挿入判定工程の判定結果に応じた算出手順に基づき、前記負荷と前記大地との間を前記負荷の対地絶縁抵抗を通じて流れる前記系統周波数分の対地絶縁抵抗分漏洩電流を算出する漏洩電流算出工程とを有することを特徴としている。
前記の構成によれば、インバータの有無に関わらず対地絶縁抵抗分の漏洩電流を精度良く算出することができる。
本発明は上述した各実施形態に限定されるものではなく、請求項に示した範囲で種々の変更が可能である。異なる実施形態にそれぞれ開示された技術的手段を適宜組み合わせて得られる実施形態も、本発明の技術的範囲に含まれる。各実施形態にそれぞれ開示された技術的手段を組み合わせることによって、新しい技術的特徴を形成することもできる。
11 電圧計測部
12 漏洩電流計測部
13 対地電圧算出部
14 周波数成分抽出部
15 位相差算出部(位相差決定部)
16 挿入判定部
17 円中心算出部
18 抵抗分漏洩電流算出部(漏洩電流算出部)
19 対地絶縁抵抗算出部
20 絶縁劣化判定部(絶縁劣化負荷特定部、絶縁劣化判定部)
21 出力部
12 漏洩電流計測部
13 対地電圧算出部
14 周波数成分抽出部
15 位相差算出部(位相差決定部)
16 挿入判定部
17 円中心算出部
18 抵抗分漏洩電流算出部(漏洩電流算出部)
19 対地絶縁抵抗算出部
20 絶縁劣化判定部(絶縁劣化負荷特定部、絶縁劣化判定部)
21 出力部
Claims (5)
- 異なる三相のうちいずれかが接地されている三相交流式の商用電力系統における線間電圧のうち少なくともいずれかを計測する電圧計測部と、
前記電圧計測部によって計測された前記少なくともいずれかの線間電圧から、前記商用電力系統の中性点と大地と間の対地電圧を算出する対地電圧算出部と、
前記商用電力系統に接続される負荷と前記大地との間を流れる漏洩電流を計測する漏洩電流計測部と、
計測された前記漏洩電流から、前記商用電力系統の系統周波数に同期する周波数成分を抽出する周波数成分抽出部と、
算出された前記対地電圧と、抽出された前記周波数成分との位相差を決定する位相差決定部と、
前記商用電力系統と前記負荷との間にインバータが挿入されているか否かを判定する挿入判定部と、
前記挿入判定部の判定結果に応じた算出手順に基づき、前記負荷と前記大地との間を前記負荷の対地絶縁抵抗を通じて流れる前記系統周波数分の対地絶縁抵抗分漏洩電流を算出する漏洩電流算出部とを備えていることを特徴とする漏洩電流算出装置。 - 前記挿入判定部は、前記インバータが挿入されているか否かを、前記漏洩電流算出装置の外部からの入力に基づき判定することを特徴とする請求項1に記載の漏洩電流算出装置。
- 前記挿入判定部は、前記インバータが挿入されているか否かを自動的に判定することを特徴とする請求項1に記載の漏洩電流算出装置。
- 前記挿入判定部は、
任意の時間において計測された前記漏洩電流および決定された前記位相差の変化と、前記漏洩電流から抽出された前記周波数成分とに基づき、前記インバータが挿入されているか否かを判定することを特徴とする請求項3に記載の漏洩電流算出装置。 - 異なる三相のうちいずれかが接地されている三相交流式の商用電力系統における線間電圧のうち少なくともいずれかを計測する電圧計測工程と、
計測された前記少なくともいずれかの線間電圧から、前記商用電力系統の中性点と大地との間の対地電圧を算出する対地電圧算出工程と、
前記商用電力系統に接続される負荷と前記大地との間を流れる漏洩電流を計測する漏洩電流計測工程と、
計測された漏洩電流から、前記商用電力系統の系統周波数に同期する周波数成分を抽出する周波数成分抽出工程と、
算出された前記対地電圧と、抽出された前記周波数成分との位相差を決定する位相差決定工程と、
前記商用電力系統と前記負荷との間にインバータが挿入されているか否かを判定する挿入判定工程と、
前記挿入判定工程の判定結果に応じた算出手順に基づき、前記負荷と前記大地との間を前記負荷の対地絶縁抵抗を通じて流れる前記系統周波数分の対地絶縁抵抗分漏洩電流を算出する漏洩電流算出工程とを有することを特徴とする漏洩電流算出方法。
Priority Applications (4)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| DE112018002099.1T DE112018002099T5 (de) | 2017-04-21 | 2018-02-19 | Ableitstromberechnungsvorrichtung und ableitstromberechnungsverfahren |
| US16/490,599 US11009559B2 (en) | 2017-04-21 | 2018-02-19 | Leakage current calculation method |
| KR1020197024142A KR102198674B1 (ko) | 2017-04-21 | 2018-02-19 | 누설 전류 산출 장치 및 누설 전류 산출 방법 |
| CN201880015291.8A CN110352359B (zh) | 2017-04-21 | 2018-02-19 | 漏电流计算方法 |
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2017-084357 | 2017-04-21 | ||
| JP2017084357A JP6460146B2 (ja) | 2017-04-21 | 2017-04-21 | 漏洩電流算出装置および漏洩電流算出方法 |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| WO2018193703A1 true WO2018193703A1 (ja) | 2018-10-25 |
Family
ID=63856295
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| PCT/JP2018/005804 Ceased WO2018193703A1 (ja) | 2017-04-21 | 2018-02-19 | 漏洩電流算出装置および漏洩電流算出方法 |
Country Status (7)
| Country | Link |
|---|---|
| US (1) | US11009559B2 (ja) |
| JP (1) | JP6460146B2 (ja) |
| KR (1) | KR102198674B1 (ja) |
| CN (1) | CN110352359B (ja) |
| DE (1) | DE112018002099T5 (ja) |
| TW (1) | TWI671532B (ja) |
| WO (1) | WO2018193703A1 (ja) |
Families Citing this family (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP6590387B1 (ja) * | 2018-12-07 | 2019-10-16 | タナシン電機株式会社 | 漏洩電流検出装置及び対地漏洩電流検出方法 |
| DE102019105861A1 (de) * | 2019-03-07 | 2020-09-10 | Sma Solar Technology Ag | Verfahren und Vorrichtung zur näherungsweisen Bestimmung von Spannungen an einer Oberspannungsseite eines Transformators |
| US11635474B2 (en) * | 2019-09-30 | 2023-04-25 | Pass & Seymour, Inc. | Frequency dependent ground fault interrupt |
| TWI792543B (zh) * | 2021-09-07 | 2023-02-11 | 瑞昱半導體股份有限公司 | 電路的漏電檢測方法與其處理系統 |
| CN115808641B (zh) * | 2021-09-15 | 2026-03-17 | 瑞昱半导体股份有限公司 | 电路的漏电检测方法与其处理系统 |
| US12449456B2 (en) | 2022-06-08 | 2025-10-21 | Sungrow Power Supply Co., Ltd. | Inverter and method for detecting insulation impedance of inverter |
| CN114720771B (zh) * | 2022-06-08 | 2022-11-15 | 阳光电源股份有限公司 | 一种逆变器及其交流绝缘阻抗检测方法 |
| CN121978393B (zh) * | 2026-04-08 | 2026-06-19 | 浙江瑞银电子有限公司 | 一种基于双计量芯片的三相电参量测量系统及方法 |
Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2006035519A1 (ja) * | 2005-01-31 | 2006-04-06 | Ohno, Takemi | 漏洩電流遮断装置及び方法 |
| JP2011153910A (ja) * | 2010-01-27 | 2011-08-11 | Patokkusu Japan Kk | 電気機器おける漏洩電流測定装置及び測定方法 |
| JP2012251817A (ja) * | 2011-06-01 | 2012-12-20 | Mitsubishi Electric Corp | 絶縁劣化監視システム |
| JP5631444B1 (ja) * | 2013-05-27 | 2014-11-26 | タナシン電機株式会社 | 漏洩電流算出装置及び漏洩電流算出方法 |
| WO2017154271A1 (ja) * | 2016-03-09 | 2017-09-14 | オムロン株式会社 | 漏洩電流算出装置および漏洩電流算出方法 |
Family Cites Families (11)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS53100350A (en) | 1977-02-15 | 1978-09-01 | Nifco Inc | Fastener for jointing two panels |
| CN1053277C (zh) | 1995-08-28 | 2000-06-07 | 北京科锐创新电力技术有限公司 | 短路故障电流通路的检测方法及指示器 |
| KR101117870B1 (ko) * | 2000-02-17 | 2012-02-27 | 오노 다케미 | 누설전류검출장치와 방법 |
| KR100566437B1 (ko) * | 2003-11-11 | 2006-03-31 | 엘에스산전 주식회사 | 위상천이를 이용한 인버터 고장 검출 장치 및 방법 |
| KR100896091B1 (ko) * | 2007-06-28 | 2009-05-14 | 주식회사 에렐 | 대지저항성 누전전류 측정기 |
| CN102306924B (zh) | 2011-09-14 | 2013-11-20 | 黄华道 | 可定时自动检测功能完整性的漏电检测保护电路 |
| JP6064340B2 (ja) | 2012-03-01 | 2017-01-25 | オムロン株式会社 | 電力量センサおよび電力量計測システム |
| JP2013195023A (ja) | 2012-03-22 | 2013-09-30 | Marushichi Home Kk | 家屋 |
| CN103995208A (zh) * | 2014-03-31 | 2014-08-20 | 国网上海市电力公司 | 直流漏电监测报警装置 |
| KR101803132B1 (ko) | 2014-04-28 | 2017-11-29 | 엘에스산전 주식회사 | 무 변압기형 태양광 인버터의 누설전류 감시 장치 |
| JP5770903B1 (ja) | 2014-09-26 | 2015-08-26 | タナシン電機株式会社 | 漏洩電流算出装置及び漏洩電流算出方法 |
-
2017
- 2017-04-21 JP JP2017084357A patent/JP6460146B2/ja not_active Expired - Fee Related
-
2018
- 2018-02-19 CN CN201880015291.8A patent/CN110352359B/zh not_active Expired - Fee Related
- 2018-02-19 US US16/490,599 patent/US11009559B2/en active Active
- 2018-02-19 WO PCT/JP2018/005804 patent/WO2018193703A1/ja not_active Ceased
- 2018-02-19 KR KR1020197024142A patent/KR102198674B1/ko active Active
- 2018-02-19 DE DE112018002099.1T patent/DE112018002099T5/de active Pending
- 2018-02-26 TW TW107106434A patent/TWI671532B/zh not_active IP Right Cessation
Patent Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2006035519A1 (ja) * | 2005-01-31 | 2006-04-06 | Ohno, Takemi | 漏洩電流遮断装置及び方法 |
| JP2011153910A (ja) * | 2010-01-27 | 2011-08-11 | Patokkusu Japan Kk | 電気機器おける漏洩電流測定装置及び測定方法 |
| JP2012251817A (ja) * | 2011-06-01 | 2012-12-20 | Mitsubishi Electric Corp | 絶縁劣化監視システム |
| JP5631444B1 (ja) * | 2013-05-27 | 2014-11-26 | タナシン電機株式会社 | 漏洩電流算出装置及び漏洩電流算出方法 |
| WO2017154271A1 (ja) * | 2016-03-09 | 2017-09-14 | オムロン株式会社 | 漏洩電流算出装置および漏洩電流算出方法 |
Also Published As
| Publication number | Publication date |
|---|---|
| JP2018179930A (ja) | 2018-11-15 |
| CN110352359A (zh) | 2019-10-18 |
| US11009559B2 (en) | 2021-05-18 |
| DE112018002099T5 (de) | 2020-01-09 |
| KR102198674B1 (ko) | 2021-01-05 |
| TW201839413A (zh) | 2018-11-01 |
| US20200003820A1 (en) | 2020-01-02 |
| CN110352359B (zh) | 2021-05-14 |
| KR20190105080A (ko) | 2019-09-11 |
| TWI671532B (zh) | 2019-09-11 |
| JP6460146B2 (ja) | 2019-01-30 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP6460146B2 (ja) | 漏洩電流算出装置および漏洩電流算出方法 | |
| JP6477548B2 (ja) | 漏洩電流算出装置および漏洩電流算出方法 | |
| US9933487B2 (en) | System and method for detecting, localizing, and quantifying stator winding faults in AC motors | |
| US10145886B2 (en) | Leakage current calculation device and leakage current calculation method | |
| CN106133535B (zh) | 用于检测、定位和量化在三相ac电路中的过量电压降的系统和方法 | |
| KR101537682B1 (ko) | 3상 결선 검출 장치 및 동상 검출 방법 | |
| CN102624324A (zh) | 驱动故障保护 | |
| JP6540028B2 (ja) | 交流3相電路の相判別支援装置、相判別装置及び方法 | |
| CN105988055A (zh) | 电力测量仪器以及交流电路与电力测量仪器的接线状态判断方法 | |
| JP7527078B1 (ja) | 計測装置、計測方法および計測プログラム | |
| KR101977861B1 (ko) | 전동기의 고장 판단 방법 | |
| JP3714878B2 (ja) | 短絡検知器 | |
| JP5679480B2 (ja) | 間接交流メガー測定器および絶縁抵抗測定方法 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| 121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 18788524 Country of ref document: EP Kind code of ref document: A1 |
|
| ENP | Entry into the national phase |
Ref document number: 20197024142 Country of ref document: KR Kind code of ref document: A |
|
| 122 | Ep: pct application non-entry in european phase |
Ref document number: 18788524 Country of ref document: EP Kind code of ref document: A1 |