WO2018159679A1 - 生産ラインの制御システム及び作業設定装置 - Google Patents

生産ラインの制御システム及び作業設定装置 Download PDF

Info

Publication number
WO2018159679A1
WO2018159679A1 PCT/JP2018/007509 JP2018007509W WO2018159679A1 WO 2018159679 A1 WO2018159679 A1 WO 2018159679A1 JP 2018007509 W JP2018007509 W JP 2018007509W WO 2018159679 A1 WO2018159679 A1 WO 2018159679A1
Authority
WO
WIPO (PCT)
Prior art keywords
work
worker
production line
control system
group
Prior art date
Application number
PCT/JP2018/007509
Other languages
English (en)
French (fr)
Inventor
祐治 中川
紀男 川西
伊藤 達夫
Original Assignee
株式会社イシダ
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社イシダ filed Critical 株式会社イシダ
Publication of WO2018159679A1 publication Critical patent/WO2018159679A1/ja

Links

Images

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/418Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM]
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/04Manufacturing
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/30Computing systems specially adapted for manufacturing

Definitions

  • the present invention relates to a production line control system and a work setting device.
  • Patent Document 1 As a conventional production line control system, for example, the one described in Patent Document 1 is known.
  • the control system described in Patent Document 1 stores requested work information received by receiving work information from an apparatus, means for judging work item contents, and means for judging each worker's current status with specific items; Evaluation storage means for expressing and storing it with evaluation numbers, evaluation storage means for adding a weight based on the contents of the generated work to each evaluation item and storing the work, and prioritizing work instruction information according to the condition result of the evaluation storage Work instruction means for outputting to a person.
  • the operator is instructed from the work with high priority. Therefore, in the conventional control system, for example, when the first to third work is generated from the highest priority, the work is instructed to the worker in order from the first work.
  • the work place of the first work is close to the work place of the third work, the second work is instructed after the first work, and then the third work is instructed. Not efficient.
  • An object of one aspect of the present invention is to provide a production line control system and a work setting device capable of improving work efficiency.
  • a production line control system is a production line control system including a plurality of processes, and requests work corresponding to work generated in at least some of the plurality of processes.
  • a receiving unit that receives the signal, and a control unit that sets work for a worker registered in advance based on the work request signal received by the receiving unit and outputs information instructing the worker to perform the work.
  • the control unit outputs information for instructing the worker to perform other work related to the one work together with the one work.
  • the control unit outputs information instructing the worker to perform other work related to the one work together with the one work.
  • the control unit outputs information indicating one work and another work related to the work place and the work content simultaneously with the one work.
  • the worker can efficiently perform one work and another work. Therefore, work efficiency can be improved in the production line control system.
  • other work may be set based on at least one of a factor related to the work itself and a factor related to the work environment.
  • factors related to the work itself for example, the priority of the work, the work content, and the like can be cited.
  • a factor related to the work environment for example, a work place can be cited.
  • control unit may set other work based on the proficiency level of the worker. For example, even if a worker with a low level of proficiency is simultaneously instructed to perform a task that requires a high level of skill, the task cannot be performed or the task takes time, so that the work efficiency decreases. Therefore, in the control system of the production line, it is possible to instruct work according to the ability of the worker by setting other work according to the skill level of the worker. Therefore, work efficiency can be improved in the production line control system.
  • a storage unit that associates and stores work is provided, and the control unit acquires other work related to the one work from the storage unit, and instructs the worker to perform the one work and the other work. Information may be output.
  • work can be acquired appropriately, and an operator can be instruct
  • a work setting device receives a work request signal for requesting correspondence of work that has occurred in at least a part of a plurality of processes in a production line, and the receiver receives the work request signal.
  • a control unit configured to combine a plurality of related works from the work based on the work request signal and set as one work group.
  • a plurality of related works are combined and set as one work group.
  • the control unit sets one work related to the work place and the work content and another work as a work group.
  • control unit may set a work group based on at least one of a factor related to the work itself and a factor related to the work environment. Accordingly, the work setting device can appropriately set a work group in which related works are combined. Therefore, in the work setting device, work efficiency can be further improved.
  • control unit may set a work group based on the proficiency level of the worker. For example, when creating a work group that combines work that requires high skills, if the proficiency level of the worker who can perform the work is low, the worker cannot perform the work or takes time. Therefore, the work efficiency is reduced. Therefore, the work setting device can set a work group according to the ability of the worker by setting the work group according to the proficiency level of the worker. Therefore, in the work setting device, work efficiency can be improved.
  • control unit may set a priority for the work group. In this configuration, since the priority of the work group is set, it is possible to cope with highly urgent work.
  • FIG. 1 is a diagram schematically showing a production line.
  • FIG. 2 is a diagram illustrating a production line control system according to an embodiment.
  • FIG. 3 is a diagram illustrating an example of data stored in the work database.
  • FIG. 4 is a diagram illustrating an example of setting a work group.
  • FIG. 5 is a diagram illustrating an example of data stored in the worker database.
  • FIG. 6 is a diagram illustrating an example of a screen displayed on the display device.
  • the production line control system 1 controls the production line 100 shown in FIG.
  • a line for producing food (confectionery etc.) will be described as an example of the production line 100.
  • the production line 100 includes a main line L and a plurality of (here, three) branch lines L1, L2, and L3 branching from the main line L.
  • the main line L is provided with a process P.
  • the process P for example, the food is processed.
  • the food processed in the process P is conveyed to the branch lines L1 to L3.
  • the food is conveyed by, for example, a belt conveyor. There may be a further step before the step P.
  • the branch line L1 includes, for example, a plurality of (here, six) processes P11 to P16.
  • process P11 combination weighing of food is performed by a combination weighing device.
  • Step P12 the food measured by the combination weighing device is packaged by the packaging device.
  • step P13 the packaging state of the package is inspected by the packaging inspection device.
  • step P14 the weight of the food is inspected by the weighing device.
  • step P15 the presence or absence of foreign matter is inspected by the foreign matter inspection device.
  • the package is packed by the packing device.
  • the branch lines L2 and L3 have a plurality of processes P21 to P26 and P31 to P36, similarly to the branch line L1.
  • the work request signal may include information for identifying work that needs to be handled, information for identifying a process (device) in which the work has occurred, time when the work (trouble or the like) has occurred, and the like.
  • An apparatus provided in each of the processes P, P11 to P16, P21 to P26, and P31 to P36 includes a generation unit (not shown) that generates a work request signal and a transmission unit (not shown) that transmits the work request signal. .
  • the production line control system 1 includes a receiving unit 3, a control device (control unit) 5, and a display device 7.
  • the receiving unit 3 receives a work request signal for requesting correspondence of work that has occurred in at least some of the processes P, P11 to P16, P21 to P26, and P31 to P36.
  • the receiving unit 3 may receive the work request signal by a cable or the like, or may receive the work request signal wirelessly.
  • radio waves, infrared rays, or light may be employed as the transmission medium.
  • the receiving unit 3 outputs the received work request signal to the control device 5.
  • the control device 5 controls the production line 100 in an integrated manner.
  • the control device 5 manages status information and operation information of various devices provided in the production line 100.
  • the control device 5 includes a CPU (Central Processing Unit), a ROM (Read Only Memory), a RAM (Random Access Memory), and the like.
  • the control device 5 has a conceptual part that executes various control processes in the control system 1.
  • the conceptual part can be configured as software that is executed by the CPU after a program stored in the ROM is loaded onto the RAM, for example.
  • the control device 5 sets work for a worker registered in advance based on the work request signal received by the receiving unit 3, and outputs information instructing the worker to perform work.
  • the control device 5 receives the work request signal output from the receiving unit 3, the control device 5 acquires work or the like that needs to be handled based on the work request signal.
  • the control device 5 sets priorities in a plurality of operations when a plurality of operations are occurring.
  • Control device 5 sets priority based on urgency, time, etc. For example, when the work that is occurring is a trouble, the control device 5 increases the priority. Further, in the case where the generated work is supply of a member necessary for production, the control device 5 increases the priority when the time until the member is consumed is short. That is, the control device 5 sets the priority higher based on the magnitude of the influence on the productivity of the production line 100. Specifically, as shown in FIG. 3, the work that can occur in the production line 100 has a weighting coefficient (numerical value) for setting a priority for each work in the work DB (database) 9 in advance. Is set. The control device 5 sets the priority of work based on the weighting coefficient.
  • the control device 5 sets a single work group (work group) by combining a plurality of related works from a plurality of works when a plurality of works are occurring.
  • the control device 5 sets a work group based on at least one of a factor related to the work itself and a factor related to the work environment.
  • factors of the work itself for example, the priority of the work and the content of the work can be cited.
  • a working place can be cited.
  • a task group may include two or more tasks including one task and other tasks associated with one task.
  • the factors for setting the work group may include not only factors relating to the work itself and factors relating to the work environment, but also other factors. Further, the factors relating to the work itself and the factors relating to the work environment are not limited to the above-described work priority, work content, and work place, but may include other matters.
  • a first operation for replacing the film in step P12 For example, a first operation for replacing the film in step P12, a second operation for replenishing the packaging box in step P36, a third operation for replacing the film in step P22, and a fourth operation for replenishing the packaging box in step P26.
  • the generated form will be described as an example.
  • the control device 5 sets priorities in descending order in the order of the first work, the second work, the third work, and the fourth work. In such a state, the control device 5 sets the first work and the third work as the first work group, and sets the second work and the fourth work as the second work group.
  • the control device 5 acquires the work location and the work content from the information specifying the process in which the work included in the work request signal has occurred. As shown in FIG. 1, the process P12 in which the first work has occurred and the process P22 in which the third work has occurred are close to the work place and have the same (similar) work contents. For this reason, the control device 5 sets the first work group as being related to the first work and the third work. Further, the process P36 in which the second work has occurred and the process P26 in which the fourth work has occurred are close in work place and have the same work contents. Therefore, the control device 5 sets the second work group as being related to the second work and the fourth work.
  • the control device 5 sets the priority for the set work group.
  • the control device 5 sets the priority for the work group based on the priority of the work included in the set work group. Specifically, in the example shown in FIG. 4, the first work group includes the first work having the highest priority among the work currently occurring. Therefore, the control device 5 sets the priority of the first work group higher than that of the second work group. The priority of each work in the work group is maintained. That is, in the example shown in FIG. 4, in the first work group, the priority of the first work is higher than that of the third work, and in the second work group, the priority of the second work is higher than that of the fourth work. high.
  • the control device 5 may set a work group based on the proficiency level of the worker (such as years of experience).
  • the control apparatus 5 acquires the worker who can work, and sets a work group according to a worker's proficiency level.
  • the control device 5 acquires a worker who can work from the worker DB 11.
  • No (number), worker, and work status are stored in the worker DB 11 in association with each other.
  • the work status is, for example, “1” when the worker is at work (a state in which work can be handled), or when the worker is not at work (in a state where work is not possible). Is indicated by “0”.
  • the control device 5 acquires a worker whose work status is “1” among workers registered in the worker DB 11 in advance, that is, a worker who is working.
  • the control device 5 sets a work group according to the acquired proficiency level of the worker. For example, when the proficiency level of the operator is low (when the years of experience are short, etc.), the control device 5 is inexperienced in the skill required for the work. Set. On the other hand, when the proficiency level of the worker is high, the control device 5 sets a work group by combining work requiring high technology. As shown in FIG. 3, in each work, a weighting coefficient is set in advance in the work DB 9 according to a required skill. The control device 5 sets a work group based on the skill level of the worker and the work weighting factor.
  • control device 5 can set a work group also by a combination of at least one of work priority, work content, and work place, and the proficiency level of the worker.
  • the work group can be set based on various factors.
  • Control device 5 sets the workers required for the work.
  • the control device 5 refers to the worker DB 11 and acquires a worker whose worker attendance status is “1”.
  • the control device 5 generates instruction information that instructs the acquired worker to handle the work.
  • the control device 5 generates instruction information for instructing correspondence of a work group including one work and another work related to the one work.
  • the control device 5 outputs instruction information for instructing the worker to deal with the work.
  • the instruction information includes a process in which the work has occurred, work contents, information indicating the worker, and the like.
  • the control device 5 outputs the generated instruction information to the display device 7.
  • the display device 7 performs display based on the instruction information output from the control device 5.
  • the display device 7 is a display (monitor), for example.
  • One or more display devices 7 are provided in the production line 100.
  • the display device 7 is arranged at a position that can be visually recognized by the operator.
  • “line state” and “work” are displayed on the display device 7.
  • “line No”, “state” of the line, “time until work occurrence”, and “work presence / absence” are displayed in correspondence with the line status.
  • the main line L is indicated by “1”
  • the branch line L1 is indicated by “2”
  • the branch line L2 is indicated by “3”
  • the branch line L3 is indicated by “4”.
  • the control device 5 outputs information instructing the worker to perform other work related to the one work together with the one work. At the same time as one work, the control device 5 outputs information instructing another work related to the one work and the work place and work contents. Thereby, the worker can efficiently perform one work and another work. Therefore, in the production line control system 1, work efficiency can be improved.
  • control device 5 sets other work based on at least one of a factor relating to the work itself and a factor relating to the work environment. Thereby, other work related to one work can be appropriately set. Therefore, the work efficiency can be further improved.
  • the control device 5 sets other work based on the proficiency level of the worker. For example, even if a worker with a low level of proficiency is simultaneously instructed to perform a task that requires a high level of skill, the task cannot be performed or the task takes time, so that the work efficiency decreases. Therefore, by setting other work according to the proficiency level of the worker, it is possible to instruct work according to the ability of the worker. Therefore, work efficiency can be improved.
  • the production line 100 has a plurality of lines L, L1 to L3 has been described.
  • the form of the production line is not limited to this.
  • the number of production lines may be one.
  • the production line 100 is provided with the main line L and a plurality of branch lines L1 to L3 branched from the main line L has been described as an example.
  • the production line may be provided with a plurality of independent lines.
  • the receiving unit 3 and the control device 5 are separately provided.
  • the receiving unit 3 and the control device 5 may be configured by a single device.
  • the display device 7 is a display
  • the display device 7 may be, for example, a mobile terminal.
  • the display device 7 is a unit that outputs the instruction information output from the control device 5
  • the instruction information output from the control device 5 may be notified to the worker by voice or the like instead of an image (video).
  • a speaker or the like that outputs sound may be installed.
  • the production line control system 1 includes the work DB 9 and the worker DB 11 has been described.
  • the work DB 9 and the worker DB 11 may be configured by one database.
  • the structure which the control apparatus 5 has may be sufficient as work DB9 and worker DB11.
  • control device 5 may output information instructing the worker to perform other work related to the one work together with the one work without setting the work group.
  • the control device 5 can output information instructing the worker to perform two or more operations.
  • the control device 5 sets a work group including one work and another work related to the one work.
  • one work and another work may be set in advance.
  • the production line control system may include a storage unit that stores work in association with each other.
  • the control device acquires other work related to one work from the storage unit, and outputs information that instructs the worker to perform the one work and the other work. Thereby, it is possible to appropriately acquire other work related to one work and instruct the worker.
  • control device 5 has been described as an example in which two related tasks are set in the task group as shown in FIG.
  • control device 5 may set a work group including three or more works.
  • the present invention is a work setting device.
  • the work setting device includes a receiving unit that receives a work request signal for requesting correspondence of work that has occurred in at least a part of a plurality of processes in a production line, and a work that is based on the work request signal received by the receiving unit.
  • a control unit configured to combine a plurality of related tasks and set as one task group.
  • the control unit of the work setting device has the same configuration as the control device 5 of the above embodiment.
  • the control unit of the work setting device sets a single work group by combining a plurality of related works.
  • the control unit sets one work related to the work place and the work content and another work as a work group.
  • work efficiency can be improved.

Landscapes

  • Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Physics & Mathematics (AREA)
  • Tourism & Hospitality (AREA)
  • General Business, Economics & Management (AREA)
  • Marketing (AREA)
  • Primary Health Care (AREA)
  • Strategic Management (AREA)
  • General Health & Medical Sciences (AREA)
  • Economics (AREA)
  • Human Resources & Organizations (AREA)
  • Health & Medical Sciences (AREA)
  • Theoretical Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Quality & Reliability (AREA)
  • Automation & Control Theory (AREA)
  • General Factory Administration (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

生産ラインの制御システム1は、複数の工程のうちの少なくとも一部の工程において発生した作業の対応を要求する作業要求信号を受信する受信部3と、受信部3において受信した作業要求信号に基づいて、予め登録される作業者に対する作業を設定し、当該作業者に作業を指示する情報を出力する制御部5と、を備え、制御部5は、一の作業と共に当該一の作業に関連する他の作業を作業者に指示する情報を出力する。

Description

生産ラインの制御システム及び作業設定装置
 本発明は、生産ラインの制御システム及び作業設定装置に関する。
 従来の生産ラインの制御システムとして、例えば、特許文献1に記載されたものが知られている。特許文献1に記載の制御システムは、装置からの作業情報を受け付けて受け付けた要求作業情報を記憶し、作業項目内容を判断する手段と各作業者の現在状況を特定の項目で判断する手段とそれを評価数字で表し記憶する評価記憶手段と、各評価項目に発生作業内容に基づいた重み付けを付加し記憶する評価記憶手段と、その評価記憶の条件結果により作業指示情報に優先順位を付け作業者へ出力する作業指示手段と、を備える。
特開2006-163889号公報
 従来の制御システムでは、優先順位の高い作業から作業者に指示する。そのため、従来の制御システムでは、例えば、優先度が高い順から第1~第3の作業が発生している場合、第1の作業から順番に作業者に作業を指示する。ここで、生産ラインが設けられる広大な工場等では、移動に時間と手間を要する。そのため、例えば、第1の作業の作業場所と第3の作業の作業場所とが近い場合、第1の作業の後に第2の作業を指示し、その後に第3の作業の指示を行うことは効率的ではない。
 本発明の一側面は、作業の効率化を図れる生産ラインの制御システム及び作業設定装置の提供を目的とする。
 本発明の一側面に係る生産ラインの制御システムは、複数の工程を含む生産ラインの制御システムであって、複数の工程のうちの少なくとも一部の工程において発生した作業の対応を要求する作業要求信号を受信する受信部と、受信部において受信した作業要求信号に基づいて、予め登録される作業者に対する作業を設定し、当該作業者に作業を指示する情報を出力する制御部と、を備え、制御部は、一の作業と共に当該一の作業に関連する他の作業を作業者に指示する情報を出力する。
 本発明の一側面に係る生産ラインの制御システムでは、制御部は、一の作業と共に当該一の作業に関連する他の作業を作業者に指示する情報を出力する。例えば、制御部は、一の作業と同時に、一の作業と作業場所や作業内容について関連する他の作業を指示する情報を出力する。これにより、作業者は、一の作業と他の作業とを効率良く行うことが可能となる。したがって、生産ラインの制御システムでは、作業の効率化を図ることができる。
 一実施形態においては、作業自体に係る要因及び作業環境に係る要因の少なくとも一つに基づいて、他の作業を設定してもよい。作業自体に係る要因としては、例えば、作業の優先度及び作業内容等が挙げられる。作業環境に係る要因としては、例えば、作業場所が挙げられる。これにより、一の作業に関連する他の作業を適切に設定できる。したがって、生産ラインの制御システムでは、作業の効率化をより一層図ることができる。
 一実施形態においては、制御部は、作業者の習熟度に基づいて、他の作業を設定してもよい。例えば、習熟度の低い作業者に対して、高い技量を必要とする作業を同時に指示したとしても、作業を行えなかったり作業に時間を要したりするため、逆に作業効率が低下する。そのため、生産ラインの制御システムでは、作業者の習熟度に応じて他の作業を設定することにより、作業者の能力に応じた作業を指示できる。したがって、生産ラインの制御システムでは、作業の効率化を図ることができる。
 一実施形態においては、作業を関連付けて記憶する記憶部を備え、制御部は、一の作業に関連する他の作業を記憶部から取得し、一の作業及び他の作業を作業者に指示する情報を出力してもよい。これにより、生産ラインの制御システムでは、一の作業に関連する他の作業を適切に取得して、作業者に指示することができる。
 本発明の一側面に係る作業設定装置は、生産ラインにおける複数の工程のうちの少なくとも一部の工程において発生した作業の対応を要求する作業要求信号を受信する受信部と、受信部において受信した作業要求信号に基づく作業の中から、関連する複数の作業を組み合わせて一つの作業群として設定する制御部と、を備える。
 本発明の一側面に係る作業設定装置では、関連する複数の作業を組み合わせて一つの作業群として設定する。例えば、制御部は、作業場所や作業内容について関連する一の作業と他の作業とを作業群として設定する。このように、関連する作業を組み合わせることにより、作業を効率良く行わせることが可能となる。したがって、作業設定装置では、作業の効率化を図ることができる。
 一実施形態においては、制御部は、作業自体に係る要因及び作業環境に係る要因の少なくとも一つに基づいて作業群を設定してもよい。これにより、作業設定装置では、関連する作業を組み合わせた作業群を適切に設定できる。したがって、作業設定装置では、作業の効率化をより一層図ることができる。
 一実施形態においては、制御部は、作業者の習熟度に基づいて、作業群を設定してもよい。例えば、高い技量を必要とする作業が組み合わされた作業群を作成した場合において、作業を行える作業者の習熟度が低い場合には、作業者が作業を行えなかったり作業に時間を要したりするため、逆に作業効率が低下する。そのため、作業設定装置では、作業者の習熟度に応じて作業群を設定することにより、作業者の能力に応じた作業群を設定できる。したがって、作業設定装置では、作業の効率化を図ることができる。
 一実施形態においては、制御部は、作業群について優先度を設定してもよい。この構成では、作業群の優先度が設定されるため、緊急性の高い作業にも対応することが可能となる。
 本発明の一側面によれば、作業の効率化が図れる。
図1は、生産ラインを模式的に示す図である。 図2は、一実施形態に係る生産ラインの制御システムを示す図である。 図3は、作業データベースに格納されるデータの一例を示す図である。 図4は、作業群の設定の一例を示す図である。 図5は、作業者データベースに格納されるデータの一例を示す図である。 図6は、表示装置に表示される画面の一例を示す図である。
 以下、添付図面を参照して、本発明の好適な実施形態について詳細に説明する。なお、図面の説明において同一又は相当要素には同一符号を付し、重複する説明は省略する。
 本実施形態に係る生産ラインの制御システム1は、図1に示される生産ライン100を制御する。本実施形態では、生産ライン100として、食品(菓子等)を生産するラインを一例として説明する。図1に示されるように、生産ライン100は、主ラインLと、主ラインLから分岐する複数(ここでは3本)の分岐ラインL1,L2,L3を有する。主ラインLには、工程Pが設けられる。工程Pにおいては、例えば、食品に処理が施される。工程Pにおいて処理された食品は、各分岐ラインL1~L3に搬送される。食品は、例えば、ベルトコンベアにより搬送される。なお、工程Pの前に更に工程があってもよい。
 本実施形態では、分岐ラインL1~L3においては、同様の工程が行われる。分岐ラインL1は、例えば、複数(ここでは6個)の工程P11~P16を有する。工程P11では、組合せ計量装置によって、食品の組合せ計量を行う。工程P12では、包装装置によって、組合せ計量装置により計量された食品を包装する。工程P13では、包装検査装置によって、包装物の包装状態を検査する。工程P14では、計量装置によって、食品の重量を検査する。工程P15では、異物検査装置によって、異物混入の有無を検査する。工程P16では、梱包装置によって、包装物を梱包する。分岐ラインL2,L3は、分岐ラインL1と同様に、複数の工程P21~P26,P31~P36を有する。
 生産ライン100においては、各工程に設けられる装置等のメンテナンスを行う作業、生産に必要な部材(材料)を供給(補充、交換)する作業、及び、生産工程において発生したトラブルに対応する作業等が発生する。例えば、工程P12では、食品を包装するフィルムを交換する作業が発生する。各工程P,P11~P16,P21~P26,P31~P36設けられる装置は、作業が発生した場合、発生した作業の対応を要求する作業要求信号を生成し、作業要求信号を後述の受信部3に送信する。作業要求信号には、対応が必要な作業を特定する情報、作業が発生した工程(装置)を特定する情報、及び、作業(トラブル等)が発生した時間等が含まれ得る。各工程P,P11~P16,P21~P26,P31~P36設けられる装置は、作業要求信号を生成する生成部(図示省略)と、作業要求信号を送信する送信部(図示省略)と、を備える。
 図2に示されるように、生産ラインの制御システム1は、受信部3と、制御装置(制御部)5と、表示装置7と、を備える。
 受信部3は、複数の工程P,P11~P16,P21~P26,P31~P36のうちの少なくとも一部の工程において発生した作業の対応を要求する作業要求信号を受信する。受信部3は、ケーブル等による有線で作業要求信号を受信してもよいし、無線で作業要求信号を受信してもよい。受信部3による受信を無線で行う場合、伝送媒体としては、電波、赤外線又は光を採用してもよい。受信部3は、受信した作業要求信号を制御装置5に出力する。
 制御装置5は、生産ライン100を統括的に制御する。制御装置5は、生産ライン100に設けられる各種装置のステータス情報及び稼働情報を管理する。制御装置5は、CPU(Central Processing Unit)、ROM(Read Only Memory)、RAM(Random Access Memory)等で構成される。制御装置5は、制御システム1における各種制御処理を実行する概念的な部分を有する。概念的な部分は、例えばROMに格納されるプログラムがRAM上にロードされてCPUで実行されるソフトウェアとして構成することができる。
 制御装置5は、受信部3において受信した作業要求信号に基づいて、予め登録される作業者に対する作業を設定し、当該作業者に作業を指示する情報を出力する。制御装置5は、受信部3から出力された作業要求信号を受け取ると、作業要求信号に基づいて、対応が必要な作業等を取得する。制御装置5は、複数の作業が発生している場合、複数の作業において優先度を設定する。
 制御装置5は、緊急性、時間等に基づいて優先度を設定する。制御装置5は、例えば、発生している作業がトラブルである場合には、優先度を高くする。また、制御装置5は、発生している作業が生産に必要な部材の供給である場合において、部材が消耗するまでの時間が短い場合には、優先度を高くする。すなわち、制御装置5は、生産ライン100の生産性への影響の大きさに基づいて、優先度を高く設定する。具体的には、生産ライン100において発生し得る作業には、図3に示されるように、作業DB(データベース)9において、作業毎に、優先度を設定するための重み付け係数(数値)が予め設定される。制御装置5は、重み付け係数に基づいて、作業の優先度を設定する。
 制御装置5は、複数の作業が発生している場合、複数の作業の中から、関連する複数の作業を組み合わせて一つの作業群(作業グループ)として設定する。本実施形態では、制御装置5は、作業自体に係る要因及び作業環境に係る要因の少なくとも一つに基づいて、作業群を設定する。作業自体の要因としては、例えば、作業の優先度及び作業内容等が挙げられる。作業環境の要因としては、例えば、作業場所が挙げられる。作業群には、一の作業及び一の作業に関連する他の作業を含む2以上の作業を含み得る。なお、作業群を設定するための要因には、作業自体に係る要因及び作業環境に係る要因だけでなく、他の要因が含まれていてもよい。また、作業自体に係る要因及び作業環境に係る要因としては、上記の作業の優先度、作業内容及び作業場所に限定されず、他の事項が含まれていてもよい。
 例えば、工程P12においてフィルムを交換する第1作業、工程P36において梱包箱を補充する第2作業、工程P22においてフィルムを交換する第3作業、及び、工程P26において梱包箱を補充する第4作業が発生している形態を一例に説明する。制御装置5は、図4に示されるように、第1作業、第2作業、第3作業及び第4作業の順番で、優先度を高い順から設定したとする。このような状態において、制御装置5は、第1作業及び第3作業を第1作業群として設定し、第2作業及び第4作業を第2作業群として設定する。
 詳細には、制御装置5は、作業要求信号に含まれる作業が発生した工程を特定する情報から、作業場所及び作業内容を取得する。図1に示されるように、第1作業が発生した工程P12と第3作業が発生した工程P22とは、作業場所が近いと共に、作業内容が一致(類似)している。そのため、制御装置5は、第1作業と第3作業とに関連性があるとして、第1作業群に設定する。また、第2作業が発生した工程P36と第4作業が発生した工程P26とは、作業場所が近いと共に、作業内容が一致している。そのため、制御装置5は、第2作業と第4作業とに関連性があるとして、第2作業群に設定する。
 制御装置5は、設定した作業群についても、優先度を設定する。制御装置5は、設定した作業群に含まれる作業の優先度に基づいて、作業群に優先度を設定する。具体的には、図4に示される例では、第1作業群の中に、現在発生している作業の中で最も優先度が高い第1作業が含まれている。そのため、制御装置5は、第1作業群の優先度を、第2作業群よりも高く設定する。なお、作業群内の各作業の優先度は維持される。すなわち、図4に示される例では、第1作業群においては、第1作業の優先度が第3作業よりも高く、第2作業群においては、第2作業の優先度が第4作業よりも高い。
 制御装置5は、作業者の習熟度(経験年数等)に基づいて、作業群を設定してもよい。詳細には、制御装置5は、作業可能な作業者を取得し、作業者の習熟度に応じて作業群を設定する。制御装置5は、作業者DB11から、作業可能な作業者を取得する。図5に示されるように、作業者DB11には、No(ナンバー)と、作業者と、勤務状態と、が対応付けられて格納される。勤務状態は、例えば、作業者が出勤している(作業対応が可能な状態である)場合には「1」、作業者が出勤していない(作業対応が不可能な状態である)場合には「0」で示される。
 制御装置5は、作業者DB11に予め登録される作業者のうち、勤務状態が「1」の作業者、すなわち出勤している作業者を取得する。制御装置5は、取得した作業者の習熟度に応じて、作業群を設定する。例えば、制御装置5は、作業者の習熟度が低い場合(経験年数が短い場合等)には、作業に必要な技量が未熟であるため、高い技術を必要としない作業を組み合わせて作業群を設定する。一方、制御装置5は、作業者の習熟度が高い場合には、高い技術を必要とする作業を組み合わせて作業群を設定する。各作業には、図3に示されるように、作業DB9において、必要な技量に応じて、重み付け係数が予め設定されている。制御装置5は、作業者の習熟度と作業の重み付け係数とに基づいて、作業群を設定する。
 なお、制御装置5は、作業の優先度、作業内容、及び作業場所の少なくとも一つと、作業者の習熟度との組み合わせによっても、作業群を設定することができる。作業群は、種々の要因に基づいて、設定することができる。
 制御装置5は、作業に必要な作業者を設定する。制御装置5は、作業者DB11を参照し、作業者の出勤状態が「1」である作業者を取得する。制御装置5は、取得した作業者に作業の対応を指示する指示情報を生成する。詳細には、制御装置5は、一の作業と共に当該一の作業に関連する他の作業を含む作業群の対応を指示する指示情報を生成する。制御装置5は、作業者の習熟度に基づいて作業群を設定した場合には、当該作業者に対して作業の対応を指示する指示情報を出力する。指示情報には、作業が発生した工程、作業内容、及び、作業者を示す情報等が含まれる。制御装置5は、生成した指示情報を表示装置7に出力する。
 表示装置7は、制御装置5から出力された指示情報に基づく表示を行う。表示装置7は、例えば、ディスプレイ(モニタ)である。表示装置7は、生産ライン100において一又は複数設けられる。表示装置7は、作業者が視認可能な位置に配置される。
 図6に示されるように、表示装置7には、例えば、「ラインの状態」と、「作業」と、が表示される。ラインの状態には、例えば、「ラインNo」と、ラインの「状態」と、「作業発生までの時間」と、「作業有無」と、が対応して表示される。図6に示される例では、「ラインNo」において、主ラインLは「1」、分岐ラインL1は「2」、分岐ラインL2は「3」、分岐ラインL3は「4」で示される。
 作業には、「ラインNo」と、「作業」と、「作業者」と、が対応して表示される。図6に示す例では、作業群「1」では、ラインNo2及びNo4においてフィルム交換の作業が発生しており、作業者「0003」に作業の対応を指示することを示している。作業者を示す数字は、作業者DB11において作業者と対応付けられている数字に対応する。また、作業群「2」では、No3及びNo4において梱包材を充填する作業が発生しており、作業者「0001」に作業を指示することを示している。作業の欄においては、作業群内における優先度の高い順番で上から作業が表示されている。具体的には、作業群「1」においては、ラインNo2のフィルム交換の作業の方が、ラインNo4のフィルム交換の作業よりも優先度が高いことを示している。
 以上説明したように、本実施形態に係る生産システムの制御システム1では、制御装置5は、一の作業と共に当該一の作業に関連する他の作業を作業者に指示する情報を出力する。制御装置5は、一の作業と同時に、一の作業と作業場所や作業内容について関連する他の作業を指示する情報を出力する。これにより、作業者は、一の作業と他の作業とを効率良く行うことが可能となる。したがって、生産ラインの制御システム1では、作業の効率化を図ることができる。
 本実施形態に係る生産システムの制御システム1では、制御装置5は、作業自体に係る要因及び作業環境に係る要因の少なくとも一つに基づいて、他の作業を設定する。これにより、一の作業に関連する他の作業を適切に設定できる。したがって、作業の効率化をより一層図ることができる。
 本実施形態に係る生産システムの制御システム1では、制御装置5は、作業者の習熟度に基づいて、他の作業を設定する。例えば、習熟度の低い作業者に対して、高い技量を必要とする作業を同時に指示したとしても、作業を行えなかったり作業に時間を要したりするため、逆に作業効率が低下する。そのため、作業者の習熟度に応じて他の作業を設定することにより、作業者の能力に応じた作業を指示できる。したがって、作業の効率化を図ることができる。
 以上、本発明の実施形態について説明してきたが、本発明は必ずしも上述した実施形態に限定されるものではなく、その要旨を逸脱しない範囲で様々な変更が可能である。
 上記実施形態では、生産ライン100が複数のラインL,L1~L3を有する形態を一例に説明した。しかし、生産ラインの形態はこれに限定されない。例えば、生産ラインは、1本であってもよい。
 上記実施形態では、生産ライン100が、主ラインL及び主ラインLから分岐する複数の分岐ラインL1~L3が設けられる形態を一例に説明した。しかし、生産ラインは、独立する複数のラインが設けられていてもよい。
 上記実施形態では、受信部3及び制御装置5を別個に備える形態を一例に説明した。しかし、受信部3及び制御装置5は、1つの装置により構成されていてもよい。
 上記実施形態では、表示装置7がディスプレイである形態を一例に説明した。しかし、表示装置7は、例えば、携帯端末等であってもよい。また、上記実施形態では、制御装置5から出力された指示情報を出力する手段が表示装置7である形態を一例に説明した。しかし、制御装置5から出力された指示情報は、画像(映像)ではなく、音声等で作業者に報知されてもよい。この場合、音声を出力するスピーカー等が設置されればよい。
 上記実施形態では、生産ラインの制御システム1が作業DB9及び作業者DB11を有する形態を一例に説明した。しかし、作業DB9及び作業者DB11は1つのデータベースにより構成されていてもよい。また、作業DB9及び作業者DB11は、制御装置5が有する構成であってもよい。
 上記実施形態では、制御装置5が作業群を設定する形態を一例に説明した。しかし、制御装置5は、作業群を設定することなく、一の作業と共に当該一の作業に関連する他の作業を作業者に指示する情報を出力してもよい。制御装置5は、2以上の作業を作業者に指示する情報を出力することができる。
 上記実施形態では、制御装置5が、一の作業と共に当該一の作業に関連する他の作業を含む作業群を設定する形態を一例に説明した。しかし、一の作業と他の作業とは、予め設定されていてもよい。例えば、生産ラインの制御システムは、作業を関連付けて記憶する記憶部を備えていてもよい。この構成では、制御装置は、一の作業に関連する他の作業を記憶部から取得し、一の作業及び他の作業を作業者に指示する情報を出力する。これにより、一の作業に関連する他の作業を適切に取得して、作業者に指示することができる。
 上記実施形態では、制御装置5が、図4に示されるように、作業群において2つの関連する作業を設定する形態を一例に説明した。しかし、制御装置5は、3以上の作業を含む作業群を設定してもよい。
 別の観点では、本発明は、作業設定装置である。作業設定装置は、生産ラインにおける複数の工程のうちの少なくとも一部の工程において発生した作業の対応を要求する作業要求信号を受信する受信部と、受信部において受信した作業要求信号に基づく作業の中から、関連する複数の作業を組み合わせて一つの作業群として設定する制御部と、を備える。
 作業設定装置の制御部は、上記実施形態の制御装置5と同様の構成を有する。作業設定装置の制御部は、関連する複数の作業を組み合わせて一つの作業群として設定する。制御部は、作業場所や作業内容について関連する一の作業と他の作業とを作業群として設定する。このように、関連する作業を組み合わせることにより、作業を効率良く行わせることが可能となる。したがって、作業設定装置では、作業の効率化を図ることができる。
 1…生産ラインの制御システム、3…受信部、5…制御装置(制御部)、100…生産ライン。

Claims (8)

  1.  複数の工程を含む生産ラインの制御システムであって、
     複数の前記工程のうちの少なくとも一部の前記工程において発生した作業の対応を要求する作業要求信号を受信する受信部と、
     前記受信部において受信した前記作業要求信号に基づいて、予め登録される作業者に対する作業を設定し、当該作業者に作業を指示する情報を出力する制御部と、を備え、
     前記制御部は、一の作業と共に当該一の作業に関連する他の作業を前記作業者に指示する情報を出力する、生産ラインの制御システム。
  2.  前記制御部は、作業自体に係る要因及び作業環境に係る要因の少なくとも一つに基づいて、前記他の作業を設定する、請求項1に記載の生産ラインの制御システム。
  3.  前記制御部は、前記作業者の習熟度に基づいて、前記他の作業を設定する、請求項1又は2に記載の生産ラインの制御システム。
  4.  作業を関連付けて記憶する記憶部を備え、
     前記制御部は、前記一の作業に関連する前記他の作業を前記記憶部から取得し、前記一の作業及び前記他の作業を前記作業者に指示する情報を出力する、請求項1に記載の生産ラインの制御システム。
  5.  生産ラインにおける複数の工程のうちの少なくとも一部の前記工程において発生した作業の対応を要求する作業要求信号を受信する受信部と、
     前記受信部において受信した前記作業要求信号に基づく作業の中から、関連する複数の作業を組み合わせて一つの作業群として設定する制御部と、を備える、作業設定装置。
  6.  前記制御部は、作業自体に係る要因及び作業環境に係る要因の少なくとも一つに基づいて前記作業群を設定する、請求項5に記載の作業設定装置。
  7.  前記制御部は、作業者の習熟度に基づいて、前記作業群を設定する、請求項5又は6に記載の作業設定装置。
  8.  前記制御部は、前記作業群について優先度を設定する、請求項5~7のいずれか一項に記載の作業設定装置。
PCT/JP2018/007509 2017-03-02 2018-02-28 生産ラインの制御システム及び作業設定装置 WO2018159679A1 (ja)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2017039464A JP2018147096A (ja) 2017-03-02 2017-03-02 生産ラインの制御システム及び作業設定装置
JP2017-039464 2017-03-02

Publications (1)

Publication Number Publication Date
WO2018159679A1 true WO2018159679A1 (ja) 2018-09-07

Family

ID=63370581

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2018/007509 WO2018159679A1 (ja) 2017-03-02 2018-02-28 生産ラインの制御システム及び作業設定装置

Country Status (2)

Country Link
JP (1) JP2018147096A (ja)
WO (1) WO2018159679A1 (ja)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006163889A (ja) * 2004-12-08 2006-06-22 Canon Inc 作業管理指示システム
JP2014036351A (ja) * 2012-08-09 2014-02-24 Mitsubishi Heavy Ind Ltd 色作成・選択プログラム及び色作成・選択装置並びにスケジューリングシステム
WO2016088266A1 (ja) * 2014-12-05 2016-06-09 富士機械製造株式会社 作業管理装置

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006163889A (ja) * 2004-12-08 2006-06-22 Canon Inc 作業管理指示システム
JP2014036351A (ja) * 2012-08-09 2014-02-24 Mitsubishi Heavy Ind Ltd 色作成・選択プログラム及び色作成・選択装置並びにスケジューリングシステム
WO2016088266A1 (ja) * 2014-12-05 2016-06-09 富士機械製造株式会社 作業管理装置

Also Published As

Publication number Publication date
JP2018147096A (ja) 2018-09-20

Similar Documents

Publication Publication Date Title
KR101644104B1 (ko) 컨테이너 터미널의 시뮬레이션 평가 시스템 및 방법
WO2022124468A1 (ko) 전자 장치 및 그의 정보 제공 방법
US20170357928A1 (en) System and method for industrial process control and automation system operator evaluation and training
WO2017168652A1 (ja) 演算装置及びプログラム
WO2018159679A1 (ja) 生産ラインの制御システム及び作業設定装置
EP4350592A2 (en) Work planning system and work planning method
AU1659300A (en) Automated system for handling palletized merchandise
WO2019058615A1 (ja) プラント監視装置および分散制御システム
US12093877B2 (en) Projection instruction device, projection instruction system, and plan data management system
EP3783547B1 (en) System and methods for reply date response and due date management in manufacturing
US20210294316A1 (en) Production line monitoring system
US11399107B2 (en) Display system
WO2018105659A1 (ja) 生産ラインの制御システム
KR20210112031A (ko) 자동화된 상품 검수 및 포장이 가능한 스마트 물류 창고 시스템
US20190196416A1 (en) System and Method for Hazardous Accident Detection and Remediation in a Facility
JP2017059108A (ja) 表示装置、管理装置、管理システム及びプログラム
CN115356497A (zh) 一种检测设备控制方法、装置、计算机设备及存储介质
CN115321067A (zh) 一种搬运机器人故障处理方法和系统
JP5080013B2 (ja) 現場プロセス状況対応作業支援システム及び現場プロセス状況対応作業支援方法
JP2007172229A (ja) 設備機器の監視装置
US20230306383A1 (en) Recycling work support system
JP7290586B2 (ja) 制御装置、制御方法、およびプログラム
KR102625512B1 (ko) 상품 분류 방법 및 장치
WO2024142385A1 (ja) 収容システム、収容方法及びプログラム
US10861120B1 (en) Dynamic routing during muster

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 18761796

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 18761796

Country of ref document: EP

Kind code of ref document: A1