WO2018141065A1 - Structures supportées pneumatiquement à couches multiples - Google Patents

Structures supportées pneumatiquement à couches multiples Download PDF

Info

Publication number
WO2018141065A1
WO2018141065A1 PCT/CA2018/050120 CA2018050120W WO2018141065A1 WO 2018141065 A1 WO2018141065 A1 WO 2018141065A1 CA 2018050120 W CA2018050120 W CA 2018050120W WO 2018141065 A1 WO2018141065 A1 WO 2018141065A1
Authority
WO
WIPO (PCT)
Prior art keywords
layer
air
beams
air beams
strap
Prior art date
Application number
PCT/CA2018/050120
Other languages
English (en)
Inventor
Harold A. Warner
Stanislaw Lukasiewicz
John Charles Stratton
Original Assignee
Dynamic Shelters Inc.
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dynamic Shelters Inc. filed Critical Dynamic Shelters Inc.
Priority to US16/483,144 priority Critical patent/US20190376310A1/en
Priority to CA3007896A priority patent/CA3007896C/fr
Publication of WO2018141065A1 publication Critical patent/WO2018141065A1/fr

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/005Girders or columns that are rollable, collapsible or otherwise adjustable in length or height
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H15/00Tents or canopies, in general
    • E04H15/20Tents or canopies, in general inflatable, e.g. shaped, strengthened or supported by fluid pressure
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/02Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces
    • E04C3/28Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of materials not covered by groups E04C3/04 - E04C3/20
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/38Arched girders or portal frames
    • E04C3/46Arched girders or portal frames of materials not covered by groups E04C3/40 - E04C3/44; of a combination of two or more materials
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H15/00Tents or canopies, in general
    • E04H15/32Parts, components, construction details, accessories, interior equipment, specially adapted for tents, e.g. guy-line equipment, skirts, thresholds
    • E04H15/34Supporting means, e.g. frames
    • E04H15/36Supporting means, e.g. frames arch-shaped type
    • E04H15/38Supporting means, e.g. frames arch-shaped type expansible, e.g. extensible in a fan type manner
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H15/00Tents or canopies, in general
    • E04H15/32Parts, components, construction details, accessories, interior equipment, specially adapted for tents, e.g. guy-line equipment, skirts, thresholds
    • E04H15/34Supporting means, e.g. frames
    • E04H15/44Supporting means, e.g. frames collapsible, e.g. breakdown type
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H9/00Buildings, groups of buildings or shelters adapted to withstand or provide protection against abnormal external influences, e.g. war-like action, earthquake or extreme climate
    • E04H9/04Buildings, groups of buildings or shelters adapted to withstand or provide protection against abnormal external influences, e.g. war-like action, earthquake or extreme climate against air-raid or other war-like actions
    • E04H9/06Structures arranged in or forming part of buildings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H9/00Buildings, groups of buildings or shelters adapted to withstand or provide protection against abnormal external influences, e.g. war-like action, earthquake or extreme climate
    • E04H9/04Buildings, groups of buildings or shelters adapted to withstand or provide protection against abnormal external influences, e.g. war-like action, earthquake or extreme climate against air-raid or other war-like actions
    • E04H9/10Independent shelters; Arrangement of independent splinter-proof walls
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H15/00Tents or canopies, in general
    • E04H15/20Tents or canopies, in general inflatable, e.g. shaped, strengthened or supported by fluid pressure
    • E04H2015/201Tents or canopies, in general inflatable, e.g. shaped, strengthened or supported by fluid pressure with inflatable tubular framework, with or without tent cover
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H15/00Tents or canopies, in general
    • E04H15/20Tents or canopies, in general inflatable, e.g. shaped, strengthened or supported by fluid pressure
    • E04H2015/202Tents or canopies, in general inflatable, e.g. shaped, strengthened or supported by fluid pressure with inflatable panels, without inflatable tubular framework
    • E04H2015/204Tents or canopies, in general inflatable, e.g. shaped, strengthened or supported by fluid pressure with inflatable panels, without inflatable tubular framework made from contiguous inflatable tubes

Definitions

  • the present disclosure generally relates to protective structures.
  • protective structures that comprises one or two layers with each layer comprising a plurality of inflatable air beams that are configured to be laterally abutting and where the two layers form at least an inner layer and an outer layer of the structure.
  • Blast waves can also be transmitted from outside a structure to inside the structure as a shock wave, which can also cause injuries to the structure's occupants.
  • protective structures that are made with a layer of air beams can reduce the potential for primary, secondary, and tertiary injuries to occupants.
  • the potential for primary and tertiary injuries is reduced by partial mitigation of blast-pulse transmission to the interior of the structure.
  • the possibility of secondary injury is also reduced in comparison to a rigid building that may lose structural integrity and have surfaces fragment or tear away, which can create further hazards.
  • the desirable flexible properties of the air beams may also limit the ability to make pneumatically-supported protective structures beyond a given size, which may limit the applications of such protective structures. Furthermore, even the flexible properties of the air beams does allow some transmission of a shock wave into the interior of the protective structures.
  • SUMMARY Embodiments of the present disclosure relate to a structure that comprises at least one layer of air beams that define an interior space of the structure wherein laterally adjacent air beams are configured to abut each other.
  • Some embodiments of the present disclosure relate to a structure that comprises at least a first layer of a plurality of air beams and a second layer of a second plurality of air beams, wherein the second layer is positioned adjacent and interior to the first layer for defining an interior space of the structure.
  • the Factor of Safety is commonly set quite high - typically between 5 and 7 for fabric as compared to about 2 for structural steel.
  • the stress-strain characteristics of fabrics are both nonlinear, and characterized by several discrete loading regimes, in each of which the average modulus of elasticity is significantly different. Therefore, in an effort to avoid troublesome loading regions, the FoS is usually set high.
  • the designer can no longer continue increasing the diameter of the air beams.
  • the size of the intended structure increases using two or more layers of air beams may be suitable alternative to larger diameter air beams when one or more constraints prevent increasing the diameter any further. This is primarily due to the fact that the primary constraint on using two or more layers of air beams is that it requires twice the material of an equivalent single-layer structure.
  • Constructing a protective structure with at least two layers of air beams may provide a stiffer structure as compared to a structure that is constructed from a single layer of air beams.
  • a stiffer structure can be built to larger dimensions with larger interior spaces. These interior spaces may be sufficiently large to enclose an already constructed building or structure.
  • the protective structures when the protective structures have at least two layers of air beams and the air beams within each layer are laterally abutting each other, the protective structure can defeat the transmission of a shock wave through the at least two layers. Defeating the transmission of a shock wave may reduce the primary, secondary and tertiary injuries that can occur when a shock wave is transmitted inside a structure.
  • FIG. 1 is an isometric view of one embodiment of the present disclosure that relates to a structure
  • FIG. 2 is a series of different views of the structure shown in FIG. 1: FIG. 2A is a front elevation, midline, cross-sectional view of the structure shown in FIG. 1; FIG. 2B is a top plan view of a section of the structure shown in FIG. 2A; FIG. 2C is a bottom plan view of the section shown in FIG. 2B; and FIG. 2D is a side-elevation view of the section shown in FIG. 2B;
  • FIG. 3 is a schematic illustration of embodiments of the present disclosure that relate to various configurations of air beams: FIG. 3A shows a first configuration; FIG. 3B shows a second configuration; FIG. 3C shows a third configuration; and FIG. 3D shows a fourth configuration;
  • FIG. 4 is a schematic illustration of embodiments of the present disclosure that relate to various further configurations of air beams: FIG. 4A shows the first configuration; FIG. 4B shows the second configuration; FIG. 4C shows a variation of the second configuration; FIG. 4D shows another variation of the second configuration; FIG. 4E shows a variation of the fourth configuration; FIG. 4F shows another variation of the second configuration; FIG. 4G shows another variation of the fourth configuration; and FIG. 4H shows another variation of the second configuration;
  • FIG. 5 shows an example of a shock-tube assembly and example configurations of target samples tested therein:
  • FIG. 5A is a side elevation, midline schematic of a shock- tube assembly that was used for acquiring data from a target sample;
  • FIG. 5B is a top plan schematic of the example configurations of air beams and flys that were used as target samples within the shock-tube assembly;
  • FIG. 6 is a line graph that shows an example of overpressure vs. time data that was captured within a shock-tube assembly without a target sample
  • FIG. 7 is a line graph that shows an example of overpressure vs. time data that was acquired at a second sensor and a third sensor within the shock-tube assembly when a test-sample was present;
  • FIG. 8 is a line graph that shows an example of overpressure vs. time data that was acquired at a second sensor and a third sensor within the shock-tube assembly when a different test-sample was present;
  • FIG. 9 is a line graph that shows an example of overpressure vs. time data that was acquired at a second sensor and a third sensor within the shock-tube assembly when a different test-sample was present;
  • FIG. 10 is a line graph that shows an example of overpressure vs. time data that was acquired at a second sensor and a third sensor within the shock-tube assembly when a different test-sample was present
  • FIG. 11 is a line graph that shows an example of overpressure vs. time data that was acquired at a second sensor and a third sensor within the shock-tube assembly when a different test-sample was present;
  • FIG. 12 is a line graph that shows an example of overpressure vs. time data that was acquired at a second sensor and a third sensor within the shock-tube assembly when a different test-specimen was present;
  • FIG. 13 is a line graph that shows an example of overpressure vs. time data that was acquired at a second sensor and a third sensor within the shock-tube assembly when a different test-specimen was present;
  • FIG. 14 is a bar graph that compares the peak overpressure data from the data provided in FIG. 6 through to FIG. 13;
  • FIG. 15 is an isometric view of a schematic of one example of a shear control system according to embodiments of the present disclosure.
  • FIG. 16 is an isometric view of a schematic of another example of a shear control system according to embodiments of the present disclosure.
  • FIG. 17 is an isometric view of a schematic of another example of a shear control system according to embodiments of the present disclosure.
  • FIG. 18 is an isometric view of a schematic of another example of a shear control system according to embodiments of the present disclosure
  • FIG. 19 is a dot plot that shows an example of experimental data that compares the collapse load ("breakpoint") of air beams in bending, using various shear control systems;
  • FIG. 20 is a combined side elevation view and isometric view of a schematic of an example of a connection system according to embodiments of the present disclosure
  • FIG. 21 is a top plan view of two parts of the connection system shown in FIG. 20
  • FIG. 22 is a top plan view of the connection system shown in FIG. 20;
  • FIG. 23 is a top plan view of the connection system shown in FIG. 20 for use with multiple air beams in two layers.
  • the term "about” refers to an approximately +/-10% variation from a given value. It is to be understood that such a variation is always included in any given value provided herein, whether or not it is specifically referred to.
  • Embodiments of the present disclosure relate to a structure that can be rapidly deployed proximal a site of interest.
  • the structure may at least partially protect the site of interest from an explosion.
  • the structure may be large enough to provide a large interior space with various commercial uses, industrial uses, recreational uses and combinations thereof.
  • the structure comprises multiple air beams that may also be referred to as fabric beams, pneumatic beams, pneumatic columns, pneumatic arches or pneumatic tubulars.
  • the air beams may be arranged in one or more configurations to form ribs of the structure with multiple ribs forming a frame of the structure.
  • a fly that is made of a sheet material may be incorporated into or on top of the ribs to enclose the frame.
  • connection systems may also be employed to connect the air beams to each other to form the structure and optionally to incorporate the fly.
  • the configuration of the air beams determines the type of protection the structure provides to the site of interest and the overall size that the structure can be.
  • Embodiments of the present disclosure relate to a structure that is made up of at least two layers of air beams. Each layer comprises a plurality of air beams that substantially abut a laterally adjacent air beam so that a plurality of abutting air beams within a layer form part of or all of a wall of the structure.
  • One layer of air beams forms an inner layer and one layer of air beams forms an outer layer.
  • Some embodiments of the present disclosure relate to structures with more than two layers of air beams that comprise an inner layer, an outer layer and one or more intermediate layers therebetween. Embodiments of the present disclosure will now be described by reference to
  • FIG. 1 shows one example of a structure 10.
  • the structure 10 may include one or more doors 200 to provide access to an interior space 12 of the structure 10 (shown in FIG. 2A). While FIG. 1 shows a specific arrangement of four doors 200, this is provided merely as an illustrative example and it is not intended to be limiting. For clarity, the structure 10 is shown in FIG. 1 without a fly 218, which is discussed further herein below.
  • FIG. 2A shows a midline cross-section of the structure 10 that is taken perpendicular to the longitudinal axis of the structure 10 (the direction of the longitudinal axis is shown as line X in FIG. 1).
  • the structure 10 comprises as least a first layer 10A and a second layer 10B.
  • Each layer 10A, 10B comprises one or more air beams 14, with air beams 14A forming the first layer 10A and air beams 14B forming the second layer 10B.
  • the air beams 14 are made of a fluid tight material so that a desired volume and pressure of an inflating fluid, such as air or other mixtures of gases, can be contained within each air beam 14.
  • one or more air beams 14 may extend from one side of the structure 10 to the other side to form a rib 15, which may also be referred to as an arch.
  • Multiple ribs 15 are arranged in an abutting relationship to form a frame of the structure 10 in the shape of a barrel vault.
  • multiple air beams 14, of successively smaller span may be connected with each other to enclose the open ends of the barrel vault portion of the structure 10 in a manner similar to that shown in the region of rib 15.
  • a first portion shown as X2 in FIG.
  • the structure 10 may be defined by one or more air beams 14 that extend away from the ground upon which the structure 10 is deployed.
  • the structure 10 may be constructed without a first portion X2.
  • the structure 10 may be tethered to the ground by various approaches, including a tethermast and/or a frag wall, as described in the Applicant's patent application WO 2011072374 entitled Tethermast and Frag Wall, the entire disclosure of which is incorporated herein by reference.
  • the rib 15 includes the first portion X2.
  • the ribs 15 are dimensioned to provide a total span (shown as Yi in FIG.
  • the ribs 15 are dimensioned to provide a span that is selected from a group of about 175 meters, about 150 meters, about 125 meters, about 100 meters or less. In some embodiments of the present disclosure the ribs 15 are dimensioned to provide a span that is between about 35 meters to about 125 meters. In some embodiments the total span may be smaller or larger than the range provided above.
  • the peak height (shown as Xi in FIG. 2A) of the structure 10 may fall between a range of 2 and 100 meters. In some embodiments the peak height may be smaller or larger than the range provided above.
  • the structure 10 may define a large enough interior space 12 so that another building or structure will fit therein. In this fashion, the structure 10 could be deployed about an existing building, either as a temporary protective -structure or as a longer-term protective structure or for providing a large enough interior space 12 so that various commercial, industrial and/or recreation activities can occur therein.
  • the structure 10 is constructed with at least two layers 10A, 10B, the ribs 15 are sufficiently stiff enough to support the large spans.
  • the at least two layers 10A, 10B provide further protection from blast waves and transmitted pressure waves when compared to when similar structures are constructed of a single layer of air beams and subjected to similar blast waves.
  • the air beams 14 within and among the layers 10A, 10B may be similar to each other, or not.
  • the air beams 14A, 14B can be filled with a fluid, such as air, to a range of desired pressures.
  • An air beam 14 may have a diameter between about 0.01 meters and about 2.5 meters or other broader ranges.
  • FIG. 2B and FIG. 2C there are three air beams 14 A with each air beam in an abutting relationship with a laterally adjacent air beam 14A of the first layer 10A. While in an abutting relationship with a laterally adjacent air beam, there is substantially no gap between the adjacent air beams.
  • the laterally -adjacent air beams may be direct contact with each other and they may be physically coupled together by a connection system, or not. In other embodiments of the present disclosure there may be a gap so that there is no contact between laterally -adjacent air beams when the air beams are static.
  • FIG. 2A shows the first layer 10A as an outer layer and the second layer 10B as being an inner layer, which may also be referred to as an interior layer.
  • the second layer 10B may define the dimensions of the interior space 12.
  • FIG. 3 shows a cross-sectional, top plan view of a number of different configurations of air beams 14 that may be useful in making the ribs 15 of the structure 10.
  • the structure 10 may comprise ribs 15 of the same configuration or the ribs 15 may be of different configurations.
  • FIG. 3A shows a first configuration with a single air beam 14 with a diameter of about 0.8 meters.
  • FIG. 3B shows a second configuration of air beams with a first layer 10A that includes two air beams 14 A and a second layer 10B with two air beams 14B, the air beams 14 in the second configuration have a diameter of about 0.4 meters.
  • FIG. 3C shows a third configuration of air beams with a first layer 10A with a single air beam 14A and a second layer 10B with a single air beam 14B. The air beams 14 in the third configuration have a diameter of about 0.8 meters.
  • FIG. 3D shows a fourth configuration of air beams that includes a first layer 10A, a second layer 10B and an intermediate layer IOC, each layer in the configuration has a single air beam with a diameter of about 0.8 meters.
  • the air beams 14A of the first layer 10A are substantially aligned centrally with the air beams 10B of the second layer 10B.
  • aligned centrally refers to the relative position of an air beam in one layer compared to one or more air beams in another layer.
  • the aligned centrally means that the center point of an air beam of one layers is aligned with the center point of an air beam in another layer so that if a straight line was drawn that extends from the center point of one of the air beams being referred to - where the line extends substantially orthogonal to the respective layer of the air beam being referred to - that line may also extend through the center point of an air beam in another layer (see line Zl in FIG. 4B).
  • FIG. 4 shows a top plan view of a number of different configurations of air beams 14 that also may be useful in making ribs 15 of the structure 10.
  • FIG. 4A shows the first configuration of FIG. 3 A.
  • FIG. 4B shows the second configuration with a first layer 10A and a second layer 10B, wherein the air beams 14A of the first layer 10A are substantially aligned with the air beams 10B of the second layer 10B.
  • FIG.4C shows a fifth configuration of air beams 14 with a single air beam 14A from the first layer 10A for every two air beams 14B of the second layer 10B with the air beam 14A aligned offset and in between the two air beams 14B.
  • aligned offset refers to a central point of an air beam in one layer being offset relative to the central point in an air beam in an immediately adjacent layer. If a straight line was drawn that extends from the center point of one of the air beams being referred to - where the line extends substantially orthogonal to the respective layer of the air beam being referred to - that line will not extend through the center point of an air beam in the immediately adjacent layer (see line Z2 in FIG. 4C).
  • FIG. 4D shows a sixth configuration with a single air beam 14B from the second layer 10B for every two air beams 14A of the first layer 10A.
  • the single air beam 14B is aligned approximately in between the two air beams 14A of the first layer 10A.
  • FIG. 4E shows a seventh configuration with an intermediate layer IOC that is made up of a single air beam 14C that is positioned in the middle of and aligned approximately in between the two air beams 14A of the first layer 10A and two air beams 14B of the second layer 10B.
  • FIG. 4F shows an eighth configuration with two air beams 14 A of the first layer
  • 10A is aligned approximately in between and three air beams 14B of the second layer 10B.
  • FIG. 4G shows a ninth configuration that includes a single air beam 14A of the first layer 10A, two air beams 14C of the intermediate layer IOC and three air beams 14B of the second layer 10B.
  • the air beams 14 in this ninth configuration are all aligned approximately in between the air beams of an adjacent layer.
  • FIG. 4H shows an tenth configuration that includes three air beams 14A of the first layer 10A that are each aligned approximately in between three air beams 14B of the second layer 10B. While the description of these air beam configurations include specific dimensions of air beams 14, it is understood that these diameters are examples only and the embodiments of the present disclosure are not limited to these specific dimensions.
  • connection systems for connecting air beams 14 within a configuration of two or more layers 10 of air beams 14.
  • Some embodiments of the present disclosure relate to connection systems that act as shear control systems for controlling or reducing shear forces between air beams 14A in one layer and air beams 14B in an adjacent layer.
  • FIG. 15 shows a shear control system 1 that comprises at least one set of a strap 100 and a pocket 102.
  • the pocket 102 can be secured to the outer surface of one air beam 14A in the first layer 10A and the strap 100 can be wrapped around both air beams 14A and 14B and through the pocket 102.
  • the pockets 102 can be secured by the use of suitable adhesives and/or attachment techniques such as sonic welding, thermal polymer-welding and the like.
  • the strap 100 can be a webbing ratchet strap and the pocket 102 can be made of a vinyl fabric.
  • each set of the shear control system 1 may include more than one strap 100 and more than one pocket 102.
  • FIG. 15 shows two layers, it is understood that the shear control system 1 may be used in configurations that have more than two layers.
  • FIG. 16 shows a shear control system 2 that comprises one or more sets of a first hug strap 104, a second hug strap 106 and a length of webbing 108.
  • the first hug strap 104 is secured about the outer surface of one air beam 14A and the second hug strap 106 is secure about the outer surface of an air beam 14B in an adjacent layer 10.
  • Each hug strap 104, 106 may have a loop extension (not shown) that is positioned in the contact area between the two air beams 14A and 14B.
  • the hug straps 104, 106 can be positioned in an offset manner (as shown in FIG.
  • the hug straps 104, 106 may each have more than one extension loop positioned at each contacting surface between the layers 10 of the configuration.
  • FIG. 17 shows a shear control system 4 that comprises one or more sets of a pair of fixed point connectors 109 and bracing straps 110.
  • each of the fixed point connections 109 can be loop or circular members, such as O rings or D rings, and one of the pair of fixed point connections is secured to the outer surface of air beam 14A and the other fix point connection of the pair is secure to the outer surface of air beam 14B.
  • the bracing straps 110 are connected at opposite ends to the fixed point connection 109 that make up a pair.
  • the bracing straps 110 can have an adjustable length so that when they are shortened a tension load acts on the fixed point connections 109 to restrict or prevent movement of air beam 14A relative to air beam 14B. As shown in the non-limiting example of FIG.
  • the fixed point connection 109 can be positioned so that the bracing straps 110 are oriented in a pattern of alternating direction.
  • the number of fixed point connection 109 and bracing straps 110 utilized in this example of the shear control system can be variable based upon the length of the air beams 14 used and the number of layers 10 in a given configuration.
  • FIG. 18 shows a shear control system 5 that is similar to the system shown in FIG. 17.
  • the primary difference in the system of FIG. 18 is that there are only two sets of fixed point connections 109 and bracing straps 110 and each set is positioned near an end of the air beams 14A and 14B.
  • a shear control system that comprises paired strips of hook and loop portions of a hook and loop fastener that are secured to the outer surface of two air beams 14 and each potion extends along the entire axial length of each air beam and each portion is positioned within the contacting area so that when the two air beams 14 are brought close enough together the hook and loop portions connect to form the hook and loop fastener.
  • FIG. 20 shows a shear control system 3 that is similar to the system (Ctrl) but the paired strips of a hook portion 120A and a loop portion 120B are not continuous along the entire axial length of air beams. Rather the portions 120A and 120B are smaller lengths that do not extend the entire axial length of the air beams 14. Each air beam 14 may have multiple pairs of laterally displaced hook portions 120 A or loop portions 120B that are positioned along the length of the air beam 14.
  • FIG. 19 shows examples of experimental data obtained from four-point bending experiments where air beams with 65 cm diameters were connected into a two layer configuration using each of the shear control systems 1 through 5.
  • the bending experiments were conducted with the air beams inflated to a low pressure (1 psi) and a high pressure (2 psi).
  • the system (Ctrl) and system 3 had the highest breakpoint results (with minimal differences between the two hook and loop fastener based systems), which is an indication of the ability of these systems to restrict movement of the air beams of one layer relative to another layer.
  • FIG. 20 also shows an example of a connection system that includes the shear control system 3 and a lateral connection system that comprises straps 122 and 126 that each extend laterally from an air beam 14A in layer 10A.
  • Strap 122 can include a first portion 124A of a fastener 124, such as a hook portion 124A of a hook and loop fastener 124 and strap 126 can include a second portion 124B of the fastener, such as an associated loop portion 124B of the hook and loop fastener 124.
  • Air beam 14A also includes non-continuous hook portion 120A that are positioned axially along the length of air beam 14A.
  • Air beam 14B has loop portionsl20B that are positioned axially along the length of the air beam 14B and positioned to mate with the hook portions 120A of air beam 14A.
  • FIG. 21 also shows the components of the connection system on each of air beam 14A and air beam 14B. The person skilled in the art will appreciate that FIG. 21 is not limiting and the hook portions 120 A, 124A and the straps 122 and 126 can be part of air beam 14B and the loop portions 120B, 124B can be part of the air beam 14B.
  • FIG. 22 shows how the hook portion 120A can be positioned proximal to the loop portion 120B to mate and form a complete (fastened) hook and loop fastener 120 (as shown within the hash lined circle of FIG. 22).
  • FIG. 22 also shows one example arrangement whereby the strap 122 of one air beam 14A can be positioned around an outer portion of air beam 14B and the strap 126 can also be positioned around the outer portion of air bean 14B so that hook portion 124A can mate with loop portion 124B to make a complete (fastened) hook and loop fastener 124 (as shown within the hash lined circle in FIG. 22).
  • the drawings show the straps 122 and 126 as extending from air beams 14A and the air beam 14B as including the fasteners 120B but this is but one example that may provide easier access to the straps 122 and 126 for mating the fasteners to make the completed hook and loop fasteners 124.
  • the straps 122 and 126 may extend laterally from the air beam 14B and the air beam 14A may include fastener portion 120B.
  • FIG. 23 shows one example of the connection system used to interconnect multiple air beams 14A of one layer with air beams 14B of another layer by using the portions of the hook and loop fasteners 120, 124 described herein above to restrict or reduce shear between layers of air beams and to provide a configuration with any gap between laterally adjacent air beams of one layer.
  • FIG. 23 shows a configuration where the layers are aligned offset
  • the person skilled in the art will appreciate that the positioning of the hook portions 120A, 124A and the loop portions 120B, 124B can be adjusted so that the air beams of the two (or more) layers are aligned centrally.
  • the positioning of the hook portions 120A, 124A and the loop portions 120B, 124B can be adjusted so that the air beams of the two (or more) layers are aligned centrally.
  • there can be increases in the structural strength of the structure which means that larger spans can be contemplated.
  • there may be improved blast-related properties e.g. a further attenuation of any transmitted pressure through the layers of air beams
  • this may be because the respective air beams are in a somewhat nested position relative to each other. Examples
  • the inventors performed an initial analysis that illustrates the benefit of a multilayer configuration of air beams 14. This analysis was based on comparing the first configuration (FIG. 3A) and the second configuration (FIG. 3B). This is a useful comparison, because it allows a comparison of stiffness and load-bearing properties on the basis of the same width, depth, and area of wall section (as shown by the dotted squares shown in FIG. 3A and FIG. 3B).
  • Table 1 provides theoretical stiffness properties and predicted span length of the first, second, third and fourth configurations of air beams.
  • Testing focused on four-point flexural tests to determine the overall structural response of an air beam within each of the first, second, third and fourth configurations to a bending load, and to determine an appropriate value for the modulus of elasticity, E (also known as Young's Modulus).
  • Load was applied continuously using a winch system with the load measured by a load cell and the displacement was measured by a draw-wire sensor attached to the bottom of the air-beam configuration being tested.
  • the load and displacement data were recorded using a computer data-acquisition system.
  • Load was applied to the air-beam configuration being tested through two 30 cm (12") wide load straps that were draped over the air-beam configuration and attached to an aluminum frame hanging below the configuration.
  • the straps were located at about 1/3 of the span of the air-beam configuration for the majority of the tests. For this series of tests the span between the supports was about 4.65 m (load strap spacing 1.55 m for 1/3 span loading).
  • a number of tests were also performed with the straps near the center of the configuration (strap spacing 66 cm (26")).
  • the air-beam configurations were supported by yokes that matched the curvature of the air beams within the configurations to minimize any deformation of the air beams at the supports.
  • the yokes were hinged and set on casters to allow for rotation and horizontal displacement as the configuration bent under the influence of the load.
  • Table 2 summarizes experimental results from four-point bending tests on single layers of air beams and on double layers of air beams to assess structural properties of the air beam layers.
  • Table 2 A summary of experimental results from four-point bending tests performed on single layers of air beams with diameters of 50 cm, 65 cm and 80 cm and on double layers of air beams with each layer having air beams with diameters of 50 cm or 65 cm.
  • Fc represents the mean collapse load of each configuration of air beams.
  • the dual-layer configurations tested both show substantially higher Fc values as compared to the single-layers made up of air beams with the single layers.
  • Table 3 A summary of calculated span lengths for the first, third and fourth configuration of air beams.
  • a blast tube 200 is a type of shock tube, an example of which is shown in FIG. 5A.
  • the blast tube 200 comprises a driver section 202 in which an explosive event 204 is triggered.
  • the pressure wave which may also be referred to as a blast wave, shock wave or a blast pulse, generated by the explosive event 204 travels through a transition section 206 and into a driven section 208.
  • the driven section 208 includes an upstream wall -mounted pressure sensor 210 and a front pressure-sensor 212. Adjacent the front pressure-sensor 212 is positioned a test sample 216 that may include a fly 218. Behind the test sample is a rear pressure-sensor 214.
  • the pressure sensors 212, 214 were disc-type pressure sensors.
  • FIG. 5B shows the configurations of air beams 14 that were tested in the blast tube 200 as test samples 216. All of the air beams 14 tested in the blast tube 200 had a diameter of about 0.6 meters.
  • Test sample 216B includes two individual air beams 14 with a fly 218, a fly 218 and a gap 213 between the two air beams, this is a further example of the first configuration.
  • the fly 218 may be made of polyvinyl chloride, polyester or a combination thereof.
  • Test sample 216B 1 is the same as test sample 216B except the fly 218 is made from an auxetic material, this is another example of the first configuration. In certain configurations where there is no gap 213 between laterally adjacent air beams 14, those laterally adjacent air beams 14 are configured to be in an abutting relationship or position.
  • Test sample 216C includes three individual air beams 14 with a fly 218 and no gap 213 between the air beams 14.
  • Test sample 216C is another example of the first configuration.
  • Test sample 216D includes three air beams 14A that are positioned adjacent the fly 218 to form the first layer 10A and three air beams 14B that form the second layer 10B.
  • Test sample 216E includes the first layer 10A of three air beams 14A, the second layer 10B of three air beams 14B and the intermediate layer IOC of three air beams 14C. All of the air beams 14 in test sample 216E are aligned centrally with adjacent air beams 14.
  • FIG. 6 through FIG. 13 show examples of overpressure data that was captured in the blast tube 200.
  • FIG. 6 shows three lines of captured data from: the upstream pressure sensor 210, shown as line 210A; the front pressure sensor 212, shown as line 212A and the rear pressure sensor 214, shown as line 214A when there is no target sample present, which may be referred to herein as a reference shot.
  • the reference shot allowed an examination of the characteristics of the blast pulse, and how the blast-pulse profile changes as the blast wave transits the length of the blast tube 200. Without a specimen in the test section, the incident pulse is undisturbed by target reflections.
  • Table 4 shows the characteristics of the reference shot. Table 4. A summary of the reference shot characteristics.
  • FIG. 7 shows the overpressure-data captured when the target sample 216B (first configuration with the gap 213) was present.
  • Line 212B shows the pressure data captured from the front pressure sensor 212 and line 214B shows the pressure data captured from the rear pressure sensor 214.
  • the line 214B shows and incident-peak pressure that represents the maximum value of blast overpressure (psig) associated with the initial shock wave caused by the explosive event 204. Subsequent pressure peaks are shown in line 214B that have higher values, but these are associated with reflections that occur when the blast wave encounters the target sample 216 (shown as reflection peaks in FIG. 7).
  • psig blast overpressure
  • FIG. 7 shows the overpressure data captured when the target sample 216B 1
  • FIG. 9 shows the overpressure data captured when the target sample 216C (first configuration with no gap) was present in the blast tube 200.
  • the transmitted pressure shown in line 214C 1 was about 67.2% lower than the incident-peak pressure shown in line 212C 1 .
  • the incident pressure in this run was higher than for others (8.10 psig vs. approximately 6.0 psig).
  • the transmitted pulse appears to have a short, finite rise time, but still retained a shock-like characteristic.
  • FIG. 10 shows the overpressure data captured from a second explosive event (shot) when the target sample 216C (first configuration with no gap) was present in the blast tube 200.
  • the transmitted pressure shown in line 214C 2 was about 46.8% lower than the incident-peak pressure shown in line 212C 2 .
  • the transmitted pulse retained a shock front.
  • FIG. 11 shows the overpressure data captured when the target sample 216D (second configuration) was present in the blast tube 200.
  • the transmitted pressure shown in line 214D 1 was about 78.5% lower than the incident-peak pressure shown in line 212D 1 .
  • the transmitted pulse did not have an associated shock front; the shock is completely absent in the transmitted pulse.
  • the maximum transmitted pressure also did not occur in the first peak of the transmitted wave.
  • FIG. 12 shows the overpressure data captured when a second explosive event
  • the transmitted pressure shown in line 214D was about 76.9% lower than the incident-peak pressure shown in line 212D.
  • FIG. 13 shows the overpressure data captured when the target sample 216E was present in the blast tube 200.
  • the transmitted pressure shown in line 214E was about 79.9% lower than the incident-peak pressure shown in line 212E.
  • the transmitted pulse did not have an associated shock front.
  • FIG. 14 shows a comparison of the peak-incident pressure data and transmitted overpressure data captured when the various target samples 216 were present within the blast tube 200.
  • the first configuration 216B with the gap 213 between laterally adjacent air beams 14 reduces the overpressure transmitted through the target sample 216 by about 30-35%. This finding is highly representative of blast resistance at full structural scale. Approximately the same degree of overpressure reduction was detected in all of the applicant's previous free-field blast studies on single-layer inflated structures with a gap between laterally adjacent inflated air beams.
  • the structure 10 is stiffer and capable of carrying a greater load than a structure 10 with a gap.
  • the structure 10 has at least two layers 10A, 10B of air beams 14 with an equivalent tube-diameter and inflation pressure, the structure 10 will be stiffer and stronger than a structure 10 with only one layer of air beams 14.
  • the configurations of air beams 14 that had at least two layers 10A, 10B fully defeated the transmission of a shock wave.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Business, Economics & Management (AREA)
  • Emergency Management (AREA)
  • Environmental & Geological Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Fluid Mechanics (AREA)
  • Tents Or Canopies (AREA)

Abstract

La présente invention concerne, selon des modes de réalisation, une structure qui comprend au moins une couche de poutres pneumatiques qui définissent un espace intérieur de la structure, des poutres pneumatiques latéralement adjacentes étant configurées pour venir en butée latéralement l'une contre l'autre. Facultativement, la structure comprend au moins une première couche d'une pluralité de poutres pneumatiques et une seconde couche d'une seconde pluralité de poutres pneumatiques, la seconde couche étant positionnée de façon adjacente à la première couche, et à l'intérieur de celle-ci, pour définir un espace intérieur de la structure de protection. Une structure avec des poutres pneumatiques qui viennent en butée latéralement peut mieux protéger les occupants et le contenu à l'intérieur de la structure contre les effets d'une explosion. La construction d'une structure avec au moins deux couches de poutres pneumatiques peut fournir une structure plus rigide par rapport à une structure qui est construite à partir d'une seule couche de poutres pneumatiques.
PCT/CA2018/050120 2017-02-03 2018-02-02 Structures supportées pneumatiquement à couches multiples WO2018141065A1 (fr)

Priority Applications (2)

Application Number Priority Date Filing Date Title
US16/483,144 US20190376310A1 (en) 2017-02-03 2018-02-02 Multi-layered pneumatically supported structures
CA3007896A CA3007896C (fr) 2017-02-03 2018-02-02 Structures multicouches supportees de maniere pneumatique

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US201762454363P 2017-02-03 2017-02-03
US62/454,363 2017-02-03

Publications (1)

Publication Number Publication Date
WO2018141065A1 true WO2018141065A1 (fr) 2018-08-09

Family

ID=63040259

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CA2018/050120 WO2018141065A1 (fr) 2017-02-03 2018-02-02 Structures supportées pneumatiquement à couches multiples

Country Status (2)

Country Link
US (1) US20190376310A1 (fr)
WO (1) WO2018141065A1 (fr)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SK8501Y1 (sk) * 2017-02-14 2019-08-05 Zepelin S R O Nafukovací nosník a použitie tohto nafukovacieho nosníka

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA2128121A1 (fr) * 1993-07-16 1995-01-17 David S. Brookstein Montants gonflables gaines et methode de fabrication correspondante
JPH08319722A (ja) * 1995-05-24 1996-12-03 Kensetsusho Chugoku Chiho Kensetsukyoku 全天候型仮設屋根
US6453619B1 (en) * 1997-12-24 2002-09-24 Spironef Technologies Deployable and storable inflatable building
JP2015001094A (ja) * 2013-06-14 2015-01-05 株式会社スカイブルー 膜構造体

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA2128121A1 (fr) * 1993-07-16 1995-01-17 David S. Brookstein Montants gonflables gaines et methode de fabrication correspondante
JPH08319722A (ja) * 1995-05-24 1996-12-03 Kensetsusho Chugoku Chiho Kensetsukyoku 全天候型仮設屋根
US6453619B1 (en) * 1997-12-24 2002-09-24 Spironef Technologies Deployable and storable inflatable building
JP2015001094A (ja) * 2013-06-14 2015-01-05 株式会社スカイブルー 膜構造体

Also Published As

Publication number Publication date
US20190376310A1 (en) 2019-12-12

Similar Documents

Publication Publication Date Title
US8146322B2 (en) Building structure, method of making, and components
US9637946B2 (en) Air beam system for an air beam structure
Davidson et al. Explosive testing of polymer retrofit masonry walls
Parsons et al. Impact of woven fabric: Experiments and mesostructure-based continuum-level simulations
US20080257137A1 (en) Blast Mitigation Structures
US20070012168A1 (en) Modular, light weight, blast protective, check point structure
Chen et al. Experimental investigations and numerical simulations of multi-arch double-layered panels under uniform impulsive loadings
US20090308238A1 (en) Barrier system for protection against low-flying projectiles
US20050284032A1 (en) Building reinforcing method, material and structure
US20100251883A1 (en) Safety apparatus for providing protection against an explosion and vehicle comprising same
WO2018141065A1 (fr) Structures supportées pneumatiquement à couches multiples
CA3007896C (fr) Structures multicouches supportees de maniere pneumatique
Kim et al. Dynamic collapse test on eccentric reinforced concrete structures with and without seismic retrofit
Zhou et al. Experimental study of the hysteretic behavior of energy dissipation braces based on Miura origami
GB2106560A (en) A chamber to withstand pressure
US6302026B1 (en) Explosion-suppressing structure
Avgerinou et al. Full‐scale tests on used steel storage racks
Weaver et al. Blast testing of loaded cross-laminated timber structures
CN113982630B (zh) 一种隧道支护结构
US2408105A (en) Storage tank
EP3769030A1 (fr) Système de filets de câbles de protection (pcns)
US9046325B1 (en) Explosive blast frequency control shield and method
Berger et al. Blast testing of CFRP and SRP strengthened RC columns
RU2474784C1 (ru) Устройство для локализации взрывоопасных предметов
Berger et al. Blast testing of CFRP and SRP strengthened RC columns

Legal Events

Date Code Title Description
WWE Wipo information: entry into national phase

Ref document number: 3007896

Country of ref document: CA

121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 18748365

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 18748365

Country of ref document: EP

Kind code of ref document: A1