WO2017118147A1 - 应用于光纤配线网络的智能odn设备管理系统及方法 - Google Patents

应用于光纤配线网络的智能odn设备管理系统及方法 Download PDF

Info

Publication number
WO2017118147A1
WO2017118147A1 PCT/CN2016/102810 CN2016102810W WO2017118147A1 WO 2017118147 A1 WO2017118147 A1 WO 2017118147A1 CN 2016102810 W CN2016102810 W CN 2016102810W WO 2017118147 A1 WO2017118147 A1 WO 2017118147A1
Authority
WO
WIPO (PCT)
Prior art keywords
intelligent
odn device
smart
mobile terminal
fiber
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Ceased
Application number
PCT/CN2016/102810
Other languages
English (en)
French (fr)
Inventor
朱丽丽
肜云
王欣
李岱峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fiberhome Telecommunication Technologies Co Ltd
Original Assignee
Fiberhome Telecommunication Technologies Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fiberhome Telecommunication Technologies Co Ltd filed Critical Fiberhome Telecommunication Technologies Co Ltd
Publication of WO2017118147A1 publication Critical patent/WO2017118147A1/zh
Anticipated expiration legal-status Critical
Ceased legal-status Critical Current

Links

Images

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L41/00Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
    • H04L41/04Network management architectures or arrangements
    • H04L41/044Network management architectures or arrangements comprising hierarchical management structures
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04NPICTORIAL COMMUNICATION, e.g. TELEVISION
    • H04N7/00Television systems
    • H04N7/18Closed-circuit television [CCTV] systems, i.e. systems in which the video signal is not broadcast

Definitions

  • the present invention relates to the field of communication technologies, and in particular, to an intelligent ODN device management system and method applied to an optical fiber distribution network.
  • the current common method is that the construction personnel cooperate with the smart phone to perform the operation of inserting and removing the optical fiber in the field, and complete the port fiber jump operation of the ODN device, but in practical applications, the method has the following disadvantages. :
  • the technical problem to be solved by the present invention is to provide an intelligent ODN equipment management system applied to an optical fiber distribution network with high work efficiency, remote monitoring, low labor cost and high accuracy. And methods.
  • the technical solution adopted by the present invention is to provide an intelligent ODN device management system applied to an optical fiber distribution network, including an intelligent ODN device management module, an intelligent ODN device, and an intelligent mobile terminal.
  • the smart ODN device management module communicates with the smart ODN device through an active cable, and transmits a control command to the smart mobile terminal through a wireless network by using a monitoring host and a video server, where the monitoring host and the video server receive and display the Location, live video and operational information of the intelligent mobile terminal;
  • the smart ODN device communicates with the smart mobile terminal through a wireless network, and is used for collecting, storing, and uploading optical fiber label information, monitoring fiber port status, and fiber port positioning guidance;
  • the smart mobile terminal parses the construction work order downloaded from the smart ODN device management module into an operation command identifiable by the smart ODN device, and sends the operation command to the smart ODN device according to the fiber port of the smart ODN device.
  • the operation guide prompts that the operation is performed on the target intelligent ODN device to perform the fiber jump operation.
  • the smart ODN device management module performs a return receipt, and reports the operation result and the alarm information.
  • the smart ODN device management module includes:
  • the device management unit directly manages the smart ODN device through an active cable, and indirectly manages the smart ODN device through a wireless network;
  • the work order management unit performs overall planning on the fiber jumper to form the construction work order for downloading by the smart mobile terminal;
  • An optical path management unit that manages a walking path of the smart mobile terminal
  • the alarm management unit receives the alarm information and reports the alarm information to the intelligent ODN device management module;
  • the resource inspection unit receives processing data of the fiber jump operation uploaded by the smart mobile terminal
  • a remote monitoring unit that utilizes the monitoring host and the video server to move the smart mobile Remote monitoring of terminal location, live video and operational information.
  • the smart mobile terminal includes:
  • a wireless communication unit that performs information interaction with a wireless communication network device
  • a mobile station control unit connected to the wireless communication unit, by which the walking route of the smart mobile terminal and the landmark point of the target intelligent ODN device can be preset;
  • a motion execution unit configured to control the smart mobile terminal to perform movement, and perform a fiber jump operation on the target intelligent ODN device
  • Navigating a positioning unit processing the location and navigation information of the smart mobile terminal, and transmitting the processed data to the intelligent ODN device management module in real time;
  • a visual processing unit connected to the mobile station control unit, for detecting a landmark point and an obstacle of the target intelligent ODN device
  • the intelligent terminal management unit is configured to manage the smart ODN device, and upload the operation result and related alarm information to the smart ODN device management module.
  • the motion execution unit includes:
  • a motion control subunit receives a program sent by the program control subunit, and performs algorithm operation control on the path and the motor linkage;
  • a motor driving subunit comprising a servo or stepping motor and a motor driver, for driving the smart mobile terminal to move to a designated position
  • the field operation subunit receives an instruction sent by the intelligent terminal management unit, and performs an optical fiber jump operation between the smart ODN device in the rack or the rack according to the instruction.
  • the intelligent terminal management unit includes:
  • a work order management sub-unit which converts the construction work order downloaded by the smart terminal management unit from the smart ODN device management module into an operation command that can be recognized by the smart ODN device, and sends the operation command to the smart ODN device;
  • a construction management subunit after the operation execution unit completes the on-site operation, collecting the fiber port information of the smart ODN device and the corresponding fiber optic electronic tag information, and analyzing the result, and uploading the operation result to the intelligent ODN device management module;
  • the alarm management sub-unit reports the alarm information to the intelligent ODN device management module
  • the camera processing sub-unit performs camera processing on the rack, sub-frame and port status of the smart ODN device, and uploads the status to the smart ODN device management module.
  • the smart mobile terminal After completing the construction task, the smart mobile terminal returns to the charging station for charging.
  • the smart ODN device is an intelligent fiber distribution device, such as an intelligent fiber distribution frame, an intelligent optical cable transfer box, and an intelligent optical fiber cable dividing box.
  • the smart mobile terminal is an intelligent robot.
  • the invention also provides an intelligent ODN device management method applied to a fiber distribution network, comprising the following steps:
  • the construction work order is downloaded, and the construction work order is converted into an operation command recognizable by the intelligent ODN device and sent to the intelligent ODN device;
  • the smart mobile terminal moves to the intelligent ODN device to perform a fiber jump operation
  • the smart mobile terminal After the fiber jumper operation is completed, the smart mobile terminal performs a return receipt and reports the operation result and the alarm information.
  • the smart mobile terminal After completing the construction task, the smart mobile terminal returns to the charging station for charging.
  • the invention controls the intelligent mobile terminal to perform the fiber jump operation on the intelligent ODN device by remotely, and has the advantages of simple, flexible and low cost, can meet the all-weather work requirement, and can reduce the transition time and labor of the maintenance personnel or the on-site construction personnel. Strength, improve work efficiency;
  • the multi-angle monitoring is realized by the mobile monitoring of the intelligent mobile terminal, and the intelligent mobile terminal does not need to rest when the energy is sufficient, and is suitable for the environment with high repeatability, can improve the accuracy of the manual operation, and can return after the construction task is completed. Charge to the charging station.
  • FIG. 1 is a schematic structural diagram of an intelligent ODN device management system applied to an optical fiber distribution network according to the present invention
  • FIG. 2 is a structural diagram of a smart ODN device management module provided by the present invention.
  • FIG. 3 is a structural diagram of an intelligent mobile terminal provided by the present invention.
  • FIG. 4 is a structural diagram of a motion execution unit provided by the present invention.
  • FIG. 5 is a structural diagram of a smart terminal management unit provided by the present invention.
  • FIG. 6 is a flowchart of a method for managing an intelligent ODN device applied to a fiber distribution network according to the present invention.
  • An embodiment of the present invention provides an intelligent ODN device management system applied to a fiber distribution network, as shown in FIG. 1 , including an intelligent ODN device management module 1 , an intelligent ODN device 2 , and an intelligent mobile terminal 3 (an intelligent robot);
  • the intelligent ODN device management module 1 communicates with the intelligent ODN device 2 through an active cable, and the monitoring personnel use the monitoring host and the video server to transmit control commands to the smart mobile terminal 3 through the wireless network, and the monitoring host and the video server receive and display the smart mobile terminal 3. Location, live video and operational information;
  • the intelligent ODN device 2 communicates with the smart mobile terminal 3 through a wireless network, and is used for collecting, storing, and uploading optical fiber tag information, monitoring fiber port status, and fiber port positioning guidance;
  • the smart mobile terminal 3 parses the construction work order downloaded from the smart ODN device management module 1 into The intelligent ODN device 2 recognizes the operation command and sends it to the smart ODN device 2, and according to the operation guide issued by the fiber port of the smart ODN device 2, the smart mobile terminal 3 avoids the obstacle by navigation and moves to the target intelligent ODN device. 2, according to the requirements of the construction work order, the optical fiber jumper operation in the rack or the inter-rack, after the fiber jump operation is completed, the smart ODN equipment management module 1 is returned, the operation result and the alarm information are reported, and the intelligent mobile terminal 3 completes the construction task. After that, return to the charging station for charging.
  • the intelligent ODN device 2 is an intelligent fiber distribution device, such as an intelligent fiber distribution frame, a smart cable transfer box, and a smart fiber cable splitter box.
  • the intelligent ODN device management module 1 includes:
  • the device management unit 10 directly manages the intelligent ODN device 2 through an active cable, and indirectly manages the intelligent ODN device 2 through the wireless network;
  • the work order management unit 11 performs overall planning on the fiber jumper to form a construction work order for the smart mobile terminal 3 to download;
  • the optical path management unit 12 manages the walking path of the smart mobile terminal 3;
  • the alarm management unit 13 receives the alarm information and reports it to the intelligent ODN device management module 1;
  • the resource inspection unit 14 receives the processing data of the fiber jump operation uploaded by the smart mobile terminal 3;
  • the remote monitoring unit 15 remotely monitors the location, live video, and operational information of the smart mobile terminal 3 by using the monitoring host and the video server.
  • the smart mobile terminal 3 includes:
  • the wireless communication unit 31 performs information interaction with the wireless communication network device in the equipment room;
  • the mobile station control unit 32 is connected to the wireless communication unit 31, and the walking route of the smart mobile terminal 3 and the landmark point of the target intelligent ODN device 2 can be preset by the mobile station control unit 32;
  • a motion execution unit 33 configured to control the smart mobile terminal 3 to perform movement, and perform a fiber jump operation on the target smart ODN device 2;
  • the navigation and positioning unit 34 processes the location and navigation information of the intelligent mobile terminal 3, and transmits the processed data to the intelligent ODN device management module 1 in real time;
  • the visual processing unit 35 is connected to the mobile station control unit 32 for detecting the marker points and obstacles of the target intelligent ODN device 2;
  • the intelligent terminal management unit 36 is configured to manage the intelligent ODN device 2, and upload the operation result and related alarm information to the intelligent ODN device management module 1.
  • the data communication between the smart mobile terminal 3 and the intelligent ODN device management module 1 is usually established by using a wireless network, and the wireless network in the computer room is usually composed of multiple wireless communication network devices. Distributed in different locations in the equipment room, and then integrated into a whole through the cable, and finally the wireless signal is covered in the entire equipment room to form a wireless network with high-intensity signals.
  • the motion execution unit 33 includes:
  • the program control sub-unit 331 sends the prepared program with parameters
  • the motion control sub-unit 332 receives the program sent by the program control sub-unit 331 and performs algorithmic operation control on the path and the motor linkage;
  • the motor driving subunit 333 is composed of a servo or stepping motor and a motor driver for driving the smart mobile terminal 3 to move to a designated position;
  • the field operation sub-unit 334 receives the instruction issued by the intelligent terminal management unit 36, and performs an optical inter-rack or inter-rack fiber jump operation on the intelligent ODN device 2 according to the instruction.
  • the smart terminal management unit 36 includes:
  • the work order management sub-unit 361 the construction work order downloaded from the intelligent ODN device management module 1 by the intelligent terminal management unit 36 is converted into an operation command that the intelligent ODN device 2 can recognize and sent to the intelligent ODN device 2;
  • the motion execution unit 33 completes the on-site operation, collects the fiber port information of the intelligent ODN device 2 and the corresponding fiber-optic electronic tag information and analyzes the result, and uploads the operation result to the intelligent ODN device management module 1;
  • the alarm management sub-unit 363 reports the alarm information to the intelligent ODN device management module 1;
  • the camera processing sub-unit 364 performs camera processing on the rack, sub-frame and port status of the smart ODN device 2, and uploads it to the intelligent ODN device management module 1.
  • the embodiment of the invention further provides a method for managing an intelligent ODN device applied to a fiber distribution network, as shown in FIG. 6, comprising the following steps:
  • Step 101 Perform overall planning on the fiber jumper, form a construction work order, and set a walking path of the intelligent mobile terminal.
  • Step 102 Download the construction work order, and convert the construction work order into an operation command identifiable by the intelligent ODN device and send it to the intelligent ODN device.
  • Step 103 When the optical port of the smart ODN device issues an operation guide prompt, the smart mobile terminal moves to the intelligent ODN device to perform a fiber jump operation.
  • Step 104 After the fiber jumper operation is completed, the smart mobile terminal performs a return order, and reports the operation result and the alarm information.

Landscapes

  • Engineering & Computer Science (AREA)
  • Signal Processing (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Multimedia (AREA)
  • Selective Calling Equipment (AREA)
  • Optical Communication System (AREA)
  • Telephonic Communication Services (AREA)
  • Data Exchanges In Wide-Area Networks (AREA)

Abstract

本发明公开了一种应用于光纤配线网络的智能ODN设备管理系统及方法,该方法包括:对光纤跳接进行总体规划,形成施工工单,设置好智能移动终端的行走路径;下载施工工单,将施工工单转换为智能ODN设备可识别的操作命令并下发给智能ODN设备;当智能ODN设备的光纤端口发出操作指引提示时,智能移动终端移动到智能ODN设备处进行光纤跳接操作;操作完成后,智能移动终端上报操作结果及告警信息。本发明通过远程方式控制智能移动终端对智能ODN设备进行光纤跳接操作,简单、灵活且成本低,减轻了人员转场奔波时间和劳动强度,提高了工作效率;通过移动监护实现了多角度监护,智能移动终端在能量充足时无需休息,适合重复性高的环境,提高了人工操作的准确率。

Description

应用于光纤配线网络的智能ODN设备管理系统及方法 技术领域
本发明涉及通信技术领域,具体涉及应用于光纤配线网络的智能ODN设备管理系统及方法。
背景技术
在智能化的光纤配线网络中,目前常用的方式是施工人员配合智能手机来执行现场插拔光纤的操作,完成ODN设备的端口光纤跳接工作,但是在实际应用中,该方法存在如下缺点:
(1)维护人员或现场施工人员转场奔波时间较长,劳动强度较大,导致工作效率较低;
(2)安防视频系统的摄像头安装数量较少且安装位置不合理,不能达到远程监控的要求,但是,如果大量安装摄像头,则系统造价大,维护费用高;
(3)需要人工操作,人力资源成本大,而且很难满足全天候工作需求;
(4)机房环境相对较差,如辐射大、噪声大、环境温度较高等,而且由于工作的高度重复性,易使人产生厌烦心理,导致现场操作工作有时不到位,准确率降低,危险工作时还有可能造成人员伤亡。
有鉴于此,急需提供一种工作效率高、可远程监控、人力成本较低、准确率较高的应用于光纤配线网络的智能ODN设备管理系统及方法。
发明内容
本发明所要解决的技术问题是提供一种工作效率高、可远程监控、人力成本较低、准确率较高的应用于光纤配线网络的智能ODN设备管理系统 及方法。
为了解决上述技术问题,本发明所采用的技术方案是提供一种应用于光纤配线网络的智能ODN设备管理系统,包括智能ODN设备管理模块、智能ODN设备和智能移动终端,
所述智能ODN设备管理模块通过有源电缆与所述智能ODN设备通信,利用监控主机和视频服务器通过无线网络向所述智能移动终端传输控制指令,所述监控主机和视频服务器接收并显示所述智能移动终端的位置、现场视频和运行信息;
所述智能ODN设备通过无线网络与所述智能移动终端通信,用于采集、存储和上传光纤电子标签信息、监控光纤端口状态以及光纤端口定位指引;
所述智能移动终端将从所述智能ODN设备管理模块下载的施工工单解析为所述智能ODN设备可识别的操作命令并下发给所述智能ODN设备,根据所述智能ODN设备的光纤端口发出的操作指引提示,移动到目标智能ODN设备处进行光纤跳接操作,光纤跳接操作完成后,向所述智能ODN设备管理模块进行回单,上报操作结果及告警信息。
在上述技术方案中,所述智能ODN设备管理模块包括:
设备管理单元,通过有源电缆对所述智能ODN设备进行直接管理,通过无线网络对所述智能ODN设备进行间接管理;
工单管理单元,对光纤跳接进行总体规划,形成所述施工工单,供所述智能移动终端下载;
光路管理单元,对所述智能移动终端的行走路径进行管理;
告警管理单元,接收所述告警信息并上报给所述智能ODN设备管理模块;
资源巡检单元,接收所述智能移动终端上传的光纤跳接操作的处理数据;
远程监控单元,利用所述监控主机和所述视频服务器对所述智能移动 终端的位置、现场视频和运行信息进行远程监控。
在上述技术方案中,所述智能移动终端包括:
无线通信单元,与无线通信网络设备之间进行信息交互;
移动站控制单元,与所述无线通信单元连接,通过所述移动站控制单元可预先设定好所述智能移动终端的行走路线以及目标智能ODN设备的标志点;
运动执行单元,用于控制所述智能移动终端进行移动,以及对目标智能ODN设备进行光纤跳接操作;
导航定位单元,对所述智能移动终端的位置及导航信息进行处理,将处理后的数据实时传输到所述智能ODN设备管理模块;
视觉处理单元,与所述移动站控制单元连接,用于检测目标智能ODN设备的标志点及障碍物;
智能终端管理单元,用于管理所述智能ODN设备,并将操作结果及相关告警信息上传给所述智能ODN设备管理模块。
在上述技术方案中,所述运动执行单元包括:
程序控制子单元,将编写好的带有参数的程序发送出去;
运动控制子单元,接收所述程序控制子单元下发的程序,并对路径和电机联动进行算法运算控制;
电机驱动子单元,由伺服或步进电机以及电机驱动器组成,用于驱动所述智能移动终端移动到指定位置;
现场操作子单元,接收所述智能终端管理单元下发的指令,并根据指令对所述智能ODN设备进行架内或架间的光纤跳接操作。
在上述技术方案中,所述智能终端管理单元包括:
工单管理子单元,将所述智能终端管理单元从所述智能ODN设备管理模块下载的所述施工工单转换为所述智能ODN设备可以识别的操作命令并下发给所述智能ODN设备;
施工管理子单元,所述运动执行单元完成现场操作后,采集所述智能ODN设备的光纤端口信息及对应的光纤电子标签信息并进行分析,将操作结果上传给所述智能ODN设备管理模块;
告警管理子单元,将告警信息上报给所述智能ODN设备管理模块;
摄像处理子单元,对所述智能ODN设备的机架、子框和端口状态进行摄像处理,并上传给所述智能ODN设备管理模块。
在上述技术方案中,所述智能移动终端完成施工任务后,返回至充电站进行充电。
在上述技术方案中,所述智能ODN设备为智能化的光纤配线设备,例如智能光纤配线架、智能光缆交接箱和智能光缆分纤箱。
在上述技术方案中,所述智能移动终端为智能机器人。
本发明还提供了一种应用于光纤配线网络的智能ODN设备管理方法,包括以下步骤:
对光纤跳接进行总体规划,形成施工工单,并设置好智能移动终端的行走路径;
下载施工工单,将该施工工单转换为智能ODN设备可识别的操作命令并下发给智能ODN设备;
当智能ODN设备的光纤端口发出操作指引提示时,智能移动终端移动到智能ODN设备处进行光纤跳接操作;
光纤跳接操作完成后,智能移动终端进行回单,上报操作结果及告警信息。
在上述技术方案中,所述智能移动终端完成施工任务后,返回至充电站进行充电。
本发明通过远程方式控制智能移动终端对智能ODN设备进行光纤跳接操作,具有简单、灵活且成本较低的优点,能满足全天候工作需求,可以减轻维护人员或现场施工人员转场奔波时间和劳动强度,提高了工作效率; 通过智能移动终端的移动监护,实现了多角度监护,而且该智能移动终端在能量充足时不需要休息,适合重复性高的环境,能提高人工操作的准确率,施工任务完成后,还可以返回至充电站充电。
附图说明
图1为本发明提供的一种应用于光纤配线网络的智能ODN设备管理系统结构示意图;
图2为本发明提供的智能ODN设备管理模块的结构图;
图3为本发明提供的智能移动终端的结构图;
图4为本发明提供的运动执行单元的结构图;
图5为本发明提供的智能终端管理单元的结构图;
图6为本发明提供的一种应用于光纤配线网络的智能ODN设备管理方法流程图。
具体实施方式
下面结合说明书附图和具体实施方式对本发明做出详细的说明。
本发明实施例提供了一种应用于光纤配线网络的智能ODN设备管理系统,如图1所示,包括智能ODN设备管理模块1、智能ODN设备2和智能移动终端3(智能机器人);
智能ODN设备管理模块1通过有源电缆与智能ODN设备2通信,监控人员利用监控主机和视频服务器通过无线网络向智能移动终端3传输控制指令,监控主机和视频服务器接收并显示智能移动终端3的位置、现场视频和运行信息;
智能ODN设备2通过无线网络与智能移动终端3通信,用于采集、存储和上传光纤电子标签信息、监控光纤端口状态以及光纤端口定位指引;
智能移动终端3将从智能ODN设备管理模块1下载的施工工单解析为 智能ODN设备2可识别的操作命令并下发给智能ODN设备2,根据智能ODN设备2的光纤端口发出的操作指引提示,智能移动终端3通过导航定位避开障碍物,移动到目标智能ODN设备2处根据施工工单需求进行架内或架间光纤跳接操作,光纤跳接操作完成后,向智能ODN设备管理模块1进行回单,上报操作结果及告警信息,智能移动终端3完成施工任务后,返回至充电站进行充电。
智能ODN设备2为智能化的光纤配线设备,例如智能光纤配线架、智能光缆交接箱和智能光缆分纤箱。
如图2所示,智能ODN设备管理模块1包括:
设备管理单元10,通过有源电缆对智能ODN设备2进行直接管理,通过无线网络对智能ODN设备2进行间接管理;
工单管理单元11,对光纤跳接进行总体规划,形成施工工单,供智能移动终端3下载;
光路管理单元12,对智能移动终端3的行走路径进行管理;
告警管理单元13,接收告警信息并上报给智能ODN设备管理模块1;
资源巡检单元14,接收智能移动终端3上传的光纤跳接操作的处理数据;
远程监控单元15,利用监控主机和视频服务器对智能移动终端3的位置、现场视频和运行信息进行远程监控。
如图3所示,智能移动终端3包括:
无线通信单元31,与机房内的无线通信网络设备之间进行信息交互;
移动站控制单元32,与无线通信单元31连接,通过移动站控制单元32可预先设定好智能移动终端3的行走路线以及目标智能ODN设备2的标志点;
运动执行单元33,用于控制智能移动终端3进行移动,以及对目标智能ODN设备2进行光纤跳接操作;
导航定位单元34,对智能移动终端3的位置及导航信息进行处理,将处理后的数据实时传输到智能ODN设备管理模块1;
视觉处理单元35,与移动站控制单元32连接,用于检测目标智能ODN设备2的标志点及障碍物;
智能终端管理单元36,用于管理智能ODN设备2,并将操作结果及相关告警信息上传给智能ODN设备管理模块1。
为了方便智能移动终端3的移动不受线路的限制,通常利用无线网络建立智能移动终端3与智能ODN设备管理模块1之间的数据通信,计算机机房内无线网络通常由多个无线通信网络设备组成,分布在机房的不同位置,再通过线缆组成一个整体,最终将无线信号覆盖在整个机房内,形成一张高强度信号的无线网络。
如图4所示,运动执行单元33包括:
程序控制子单元331,将编写好的带有参数的程序发送出去;
运动控制子单元332,接收程序控制子单元331下发的程序,并对路径和电机联动进行算法运算控制;
电机驱动子单元333,由伺服或步进电机以及电机驱动器组成,用于驱动智能移动终端3移动到指定位置;
现场操作子单元334,接收智能终端管理单元36下发的指令,并根据指令对智能ODN设备2进行架内或架间的光纤跳接操作。
如图5所示,智能终端管理单元36包括:
工单管理子单元361,将智能终端管理单元36从智能ODN设备管理模块1下载的施工工单转换为智能ODN设备2可以识别的操作命令并下发给智能ODN设备2;
施工管理子单元362,运动执行单元33完成现场操作后,采集智能ODN设备2的光纤端口信息及对应的光纤电子标签信息并进行分析,将操作结果上传给智能ODN设备管理模块1;
告警管理子单元363,将告警信息上报给智能ODN设备管理模块1;
摄像处理子单元364,对智能ODN设备2的机架、子框和端口状态进行摄像处理,并上传给智能ODN设备管理模块1。
本发明实施例还提供了一种应用于光纤配线网络的智能ODN设备管理方法,如图6所示,包括以下步骤:
步骤101:对光纤跳接进行总体规划,形成施工工单,并设置好智能移动终端的行走路径。
步骤102:下载施工工单,将该施工工单转换为智能ODN设备可识别的操作命令并下发给智能ODN设备。
步骤103:当智能ODN设备的光纤端口发出操作指引提示时,智能移动终端移动到智能ODN设备处进行光纤跳接操作。
步骤104:光纤跳接操作完成后,智能移动终端进行回单,上报操作结果及告警信息。
本发明不局限于上述最佳实施方式,任何人应该得知在本发明的启示下作出的结构变化,凡是与本发明具有相同或相近的技术方案,均落入本发明的保护范围之内。

Claims (10)

  1. 应用于光纤配线网络的智能ODN设备管理系统,其特征在于,包括智能ODN设备管理模块、智能ODN设备和智能移动终端,
    所述智能ODN设备管理模块通过有源电缆与所述智能ODN设备通信,利用监控主机和视频服务器通过无线网络向所述智能移动终端传输控制指令,所述监控主机和视频服务器接收并显示所述智能移动终端的位置、现场视频和运行信息;
    所述智能ODN设备通过无线网络与所述智能移动终端通信,用于采集、存储和上传光纤电子标签信息、监控光纤端口状态以及光纤端口定位指引;
    所述智能移动终端将从所述智能ODN设备管理模块下载的施工工单解析为所述智能ODN设备可识别的操作命令并下发给所述智能ODN设备,根据所述智能ODN设备的光纤端口发出的操作指引提示,移动到目标智能ODN设备处进行光纤跳接操作,光纤跳接操作完成后,向所述智能ODN设备管理模块进行回单,上报操作结果及告警信息。
  2. 如权利要求1所述的系统,其特征在于,所述智能ODN设备管理模块包括:
    设备管理单元,通过有源电缆对所述智能ODN设备进行直接管理,通过无线网络对所述智能ODN设备进行间接管理;
    工单管理单元,对光纤跳接进行总体规划,形成所述施工工单,供所述智能移动终端下载;
    光路管理单元,对所述智能移动终端的行走路径进行管理;
    告警管理单元,接收所述告警信息并上报给所述智能ODN设备管理模块;
    资源巡检单元,接收所述智能移动终端上传的光纤跳接操作的处理数据;
    远程监控单元,利用所述监控主机和所述视频服务器对所述智能移动终端的位置、现场视频和运行信息进行远程监控。
  3. 如权利要求1所述的系统,其特征在于,所述智能移动终端包括:
    无线通信单元,与无线通信网络设备之间进行信息交互;
    移动站控制单元,与所述无线通信单元连接,通过所述移动站控制单元可预先设定好所述智能移动终端的行走路线以及目标智能ODN设备的标志点;
    运动执行单元,用于控制所述智能移动终端进行移动,以及对目标智能ODN设备进行光纤跳接操作;
    导航定位单元,对所述智能移动终端的位置及导航信息进行处理,将处理后的数据实时传输到所述智能ODN设备管理模块;
    视觉处理单元,与所述移动站控制单元连接,用于检测目标智能ODN设备的标志点及障碍物;
    智能终端管理单元,用于管理所述智能ODN设备,并将操作结果及相关告警信息上传给所述智能ODN设备管理模块。
  4. 如权利要求3所述的系统,其特征在于,所述运动执行单元包括:
    程序控制子单元,将编写好的带有参数的程序发送出去;
    运动控制子单元,接收所述程序控制子单元下发的程序,并对路径和电机联动进行算法运算控制;
    电机驱动子单元,由伺服或步进电机以及电机驱动器组成,用于驱动所述智能移动终端移动到指定位置;
    现场操作子单元,接收所述智能终端管理单元下发的指令,并根据指令对所述智能ODN设备进行架内或架间的光纤跳接操作。
  5. 如权利要求3所述的系统,其特征在于,所述智能终端管理单元包括:
    工单管理子单元,将所述智能终端管理单元从所述智能ODN设备管理模块下载的所述施工工单转换为所述智能ODN设备可以识别的操作命令并下发给所述智能ODN设备;
    施工管理子单元,所述运动执行单元完成现场操作后,采集所述智能ODN设备的光纤端口信息及对应的光纤电子标签信息并进行分析,将操作结果上传给所述智能ODN设备管理模块;
    告警管理子单元,将告警信息上报给所述智能ODN设备管理模块;
    摄像处理子单元,对所述智能ODN设备的机架、子框和端口状态进行摄像处理,并上传给所述智能ODN设备管理模块。
  6. 如权利要求1所述的系统,其特征在于,所述智能移动终端完成施工任务后,返回至充电站进行充电。
  7. 如权利要求1所述的系统,其特征在于,所述智能ODN设备为智能化的光纤配线设备,例如智能光纤配线架、智能光缆交接箱和智能光缆分纤箱。
  8. 如权利要求1所述的系统,其特征在于,所述智能移动终端为智能机器人。
  9. 应用于光纤配线网络的智能ODN设备管理方法,其特征在于,包括以下步骤:
    对光纤跳接进行总体规划,形成施工工单,并设置好智能移动终端的行走路径;
    下载施工工单,将该施工工单转换为智能ODN设备可识别的操作命令并下发给智能ODN设备;
    当智能ODN设备的光纤端口发出操作指引提示时,智能移动终端移动到智能ODN设备处进行光纤跳接操作;
    光纤跳接操作完成后,智能移动终端进行回单,上报操作结果及告警信息。
  10. 如权利要求8所述的方法,其特征在于,所述智能移动终端完成施工任务后,返回至充电站进行充电。
PCT/CN2016/102810 2016-01-06 2016-10-21 应用于光纤配线网络的智能odn设备管理系统及方法 Ceased WO2017118147A1 (zh)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201610005826.6 2016-01-06
CN201610005826.6A CN105634815B (zh) 2016-01-06 2016-01-06 应用于光纤配线网络的智能odn设备管理系统及方法

Publications (1)

Publication Number Publication Date
WO2017118147A1 true WO2017118147A1 (zh) 2017-07-13

Family

ID=56049353

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2016/102810 Ceased WO2017118147A1 (zh) 2016-01-06 2016-10-21 应用于光纤配线网络的智能odn设备管理系统及方法

Country Status (2)

Country Link
CN (1) CN105634815B (zh)
WO (1) WO2017118147A1 (zh)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107909131A (zh) * 2017-12-14 2018-04-13 翼石电子股份有限公司 智能odn设备及纤芯的自动化管控方法
CN109391333A (zh) * 2017-08-02 2019-02-26 中兴通讯股份有限公司 一种无源智能odn设备和管理系统
CN109412858A (zh) * 2018-11-14 2019-03-01 烽火通信科技股份有限公司 一种光分配网络的管理方法、智能移动终端及管理系统
CN111404720A (zh) * 2020-01-28 2020-07-10 丁军 光路自动配置方法、装置、设备及存储介质
CN112188319A (zh) * 2020-08-18 2021-01-05 优刻得科技股份有限公司 一种光纤配线架的数据处理方法及后端监控平台
CN113973240A (zh) * 2020-07-24 2022-01-25 中国电信股份有限公司 光纤资源管理方法、系统和存储介质
CN116582180A (zh) * 2023-07-14 2023-08-11 北京瑞祺皓迪技术股份有限公司 光纤配线机器人的任务执行方法、装置、电子设备及介质
CN117592630A (zh) * 2023-11-21 2024-02-23 中交城乡建设规划设计研究院有限公司 基于分布式光纤光栅的管网数据智能采集系统

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105634815B (zh) * 2016-01-06 2019-06-25 烽火通信科技股份有限公司 应用于光纤配线网络的智能odn设备管理系统及方法
CN107027125B (zh) * 2017-03-09 2019-12-03 烽火通信科技股份有限公司 用于室外场景的无线管理系统及设备
CN106936634B (zh) * 2017-03-09 2019-09-27 烽火通信科技股份有限公司 用于有源场景的无线管理系统及设备
CN107241658A (zh) * 2017-06-30 2017-10-10 江苏通鼎宽带有限公司 用于数字配线架的交互铭牌及数字配线架
CN109068200A (zh) * 2018-09-03 2018-12-21 北京瑞祺皓迪技术股份有限公司 一种自动光纤交换机
CN116652988B (zh) * 2023-07-28 2023-10-27 江苏泽宇智能电力股份有限公司 智能光纤配线机器人及其控制方法

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102739310A (zh) * 2012-06-15 2012-10-17 华为技术有限公司 控制智能光配线网络设备的方法、装置和系统
CN103634152A (zh) * 2013-12-12 2014-03-12 烽火通信科技股份有限公司 一种智能光配线设备的网管系统及其实现方法
CN104914536A (zh) * 2015-06-04 2015-09-16 南京丰泰通信技术股份有限公司 一种适用于远程控制的滑动型智能光纤配线箱
CN105634815A (zh) * 2016-01-06 2016-06-01 烽火通信科技股份有限公司 应用于光纤配线网络的智能odn设备管理系统及方法

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102355052A (zh) * 2011-07-30 2012-02-15 山东电力研究院 基于变电站智能机器人巡检系统及其变电站操作监护方法
CN104301143A (zh) * 2014-10-14 2015-01-21 烽火通信科技股份有限公司 一种不同场景的odn网络管理方法

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102739310A (zh) * 2012-06-15 2012-10-17 华为技术有限公司 控制智能光配线网络设备的方法、装置和系统
CN103634152A (zh) * 2013-12-12 2014-03-12 烽火通信科技股份有限公司 一种智能光配线设备的网管系统及其实现方法
CN104914536A (zh) * 2015-06-04 2015-09-16 南京丰泰通信技术股份有限公司 一种适用于远程控制的滑动型智能光纤配线箱
CN105634815A (zh) * 2016-01-06 2016-06-01 烽火通信科技股份有限公司 应用于光纤配线网络的智能odn设备管理系统及方法

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109391333A (zh) * 2017-08-02 2019-02-26 中兴通讯股份有限公司 一种无源智能odn设备和管理系统
CN107909131B (zh) * 2017-12-14 2024-06-04 翼石电子股份有限公司 智能odn设备及纤芯的自动化管控方法
CN107909131A (zh) * 2017-12-14 2018-04-13 翼石电子股份有限公司 智能odn设备及纤芯的自动化管控方法
CN109412858A (zh) * 2018-11-14 2019-03-01 烽火通信科技股份有限公司 一种光分配网络的管理方法、智能移动终端及管理系统
CN109412858B (zh) * 2018-11-14 2021-11-16 烽火通信科技股份有限公司 一种光分配网络的管理方法、智能移动终端及管理系统
CN111404720B (zh) * 2020-01-28 2022-10-04 江西电信信息产业有限公司 光路自动配置方法、装置、设备及存储介质
CN111404720A (zh) * 2020-01-28 2020-07-10 丁军 光路自动配置方法、装置、设备及存储介质
CN113973240A (zh) * 2020-07-24 2022-01-25 中国电信股份有限公司 光纤资源管理方法、系统和存储介质
CN113973240B (zh) * 2020-07-24 2024-02-20 中国电信股份有限公司 光纤资源管理方法、系统和存储介质
CN112188319B (zh) * 2020-08-18 2023-07-28 优刻得科技股份有限公司 一种光纤配线架的数据处理方法及后端监控平台
CN112188319A (zh) * 2020-08-18 2021-01-05 优刻得科技股份有限公司 一种光纤配线架的数据处理方法及后端监控平台
CN116582180A (zh) * 2023-07-14 2023-08-11 北京瑞祺皓迪技术股份有限公司 光纤配线机器人的任务执行方法、装置、电子设备及介质
CN116582180B (zh) * 2023-07-14 2023-09-26 北京瑞祺皓迪技术股份有限公司 光纤配线机器人的任务执行方法、装置、电子设备及介质
CN117592630A (zh) * 2023-11-21 2024-02-23 中交城乡建设规划设计研究院有限公司 基于分布式光纤光栅的管网数据智能采集系统
CN117592630B (zh) * 2023-11-21 2024-05-28 中交城乡建设规划设计研究院有限公司 基于分布式光纤光栅的管网数据智能采集系统

Also Published As

Publication number Publication date
CN105634815A (zh) 2016-06-01
CN105634815B (zh) 2019-06-25

Similar Documents

Publication Publication Date Title
WO2017118147A1 (zh) 应用于光纤配线网络的智能odn设备管理系统及方法
US10165232B2 (en) Method for monitoring a parking facility for motor vehicles, and drone
CN102097860A (zh) 一种变电站安全检测的智能机器人巡检系统
CN104243918A (zh) 应用蓝牙定位进行自动巡逻之机器人监控系统
US20250224712A1 (en) Robot staging area management
CN113972586B (zh) 一种高压输电线路无人机搭载激光异物清除系统及方法
CN111624994A (zh) 一种基于5g通信的机器人巡检方法
CN114434456A (zh) 一种机房巡检机器人及其巡检方法
CN113762140B (zh) 一种基于机器人的建图方法、电子设备及存储介质
CN114237225A (zh) 一种四足机器人及其智能巡检管理平台
CN116442286B (zh) 机器人作业对象定位系统、方法、装置、机器人及介质
CN119649653A (zh) 一种基于双无人机操作引导与监控的智能安全系统及方法
CN204408502U (zh) 应用蓝牙定位进行自动巡逻之机器人监控系统
CN118192469A (zh) 一种基于机器狗实现人行道巡查指挥调度方法与系统
CN201975857U (zh) 一种变电站安全检测的智能机器人巡检系统
KR100786718B1 (ko) 센서 노드의 설치 및 수거 위치를 선정하는 방법 및 장치
CN108390312A (zh) 一种架空配电线路巡检机器人作业方法
CN115661966A (zh) 一种基于增强现实的巡检系统和方法
CN116453237A (zh) 工业场景的远程巡检方法、系统及装置、设备及存储介质
CN113715015A (zh) 用于多功能、模块化、自动化装置类机器人任务调度方法
CN114610018A (zh) 一种路侧雷达引导车辆自动驾驶系统
JP6608176B2 (ja) 情報処理装置、環境情報収集方法および環境情報収集用プログラム
CN206741541U (zh) 一种工程进度跟踪监测机构
CN110989666A (zh) 一种用于线路巡检的无人机系统及其控制方法
CN111580557B (zh) 一种无人机工地动态巡逻拍摄系统及其拍摄方法

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 16883275

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 16883275

Country of ref document: EP

Kind code of ref document: A1