WO2016189676A1 - 系統機器の導入支援装置及び方法 - Google Patents

系統機器の導入支援装置及び方法 Download PDF

Info

Publication number
WO2016189676A1
WO2016189676A1 PCT/JP2015/065166 JP2015065166W WO2016189676A1 WO 2016189676 A1 WO2016189676 A1 WO 2016189676A1 JP 2015065166 W JP2015065166 W JP 2015065166W WO 2016189676 A1 WO2016189676 A1 WO 2016189676A1
Authority
WO
WIPO (PCT)
Prior art keywords
introduction
power
system equipment
bus
information
Prior art date
Application number
PCT/JP2015/065166
Other languages
English (en)
French (fr)
Inventor
ルイス エフライン エドアルド タマヨ
加藤 修治
伸也 大原
井上 重徳
徹 吉原
Original Assignee
株式会社日立製作所
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社日立製作所 filed Critical 株式会社日立製作所
Priority to PCT/JP2015/065166 priority Critical patent/WO2016189676A1/ja
Priority to JP2017520143A priority patent/JP6596490B2/ja
Priority to US15/576,949 priority patent/US10243365B2/en
Publication of WO2016189676A1 publication Critical patent/WO2016189676A1/ja

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • H02J13/00006Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment
    • H02J13/00016Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment using a wired telecommunication network or a data transmission bus
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B13/00Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion
    • G05B13/02Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric
    • G05B13/0205Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric not using a model or a simulator of the controlled system
    • G05B13/021Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric not using a model or a simulator of the controlled system in which a variable is automatically adjusted to optimise the performance
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • H02J13/00001Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by the display of information or by user interaction, e.g. supervisory control and data acquisition systems [SCADA] or graphical user interfaces [GUI]
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • H02J13/00032Systems characterised by the controlled or operated power network elements or equipment, the power network elements or equipment not otherwise provided for
    • H02J13/00034Systems characterised by the controlled or operated power network elements or equipment, the power network elements or equipment not otherwise provided for the elements or equipment being or involving an electric power substation
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/007Arrangements for selectively connecting the load or loads to one or several among a plurality of power lines or power sources
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/10Constant-current supply systems
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/28Arrangements for balancing of the load in a network by storage of energy
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2203/00Indexing scheme relating to details of circuit arrangements for AC mains or AC distribution networks
    • H02J2203/20Simulating, e g planning, reliability check, modelling or computer assisted design [CAD]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/40Display of information, e.g. of data or controls
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S40/00Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them
    • Y04S40/12Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment
    • Y04S40/124Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment using wired telecommunication networks or data transmission busses
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S40/00Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them
    • Y04S40/20Information technology specific aspects, e.g. CAD, simulation, modelling, system security

Definitions

  • the present invention relates to a system device installation support apparatus and method for determining an introduction point of a system device connected to a power system.
  • FACTS Flexible AC Transmission System
  • storage batteries can alleviate the adverse effects on power quality degradation and stable supply.
  • FACTS Flexible AC Transmission System
  • the addition of transmission lines is expensive and takes several years to complete.
  • the installation of FACTS equipment and storage batteries is cheaper than the addition of transmission lines and has little impact on the environment.
  • Non-Patent Document 1 Electric power companies, TSO (Transmission Systems Operator), and DSO (Distribution Systems Operator) install and install FACTS devices and storage batteries based on detailed information on the power system, such as device operation information and the magnitude of power demand. The capacity can be determined (Non-Patent Document 1).
  • Non-Patent Document 2 discloses a method for evaluating the stability of an electric power system using indices of “net-ability” and “entropy degree” based on a complex network theory.
  • the stability of the power system can be evaluated with a small amount of information, instead of the conventional calculation method that requires information on a large number of power systems. Only a method for evaluating the stability of the electric power system is mentioned, and a method for evaluating the installation location and the installed capacity of FACTS equipment and storage batteries is not mentioned.
  • the present invention provides an apparatus for supporting introduction of a system device for obtaining an introduction point of a system device to be connected to an electric power system, based on predetermined system information and information on a system device to be introduced.
  • a feature is provided that includes a calculation unit that obtains a characteristic of the power system that affects the introduction of the device and obtains an introduction point of the system device from a predetermined evaluation index related to the feature of the power system.
  • the degree of influence on a system generated at the time of introduction is evaluated with a predetermined index. This makes it possible to support the optimal introduction of devices.
  • the example of a calculation flowchart for specifying the point candidate for introducing the device which absorbs or supplies electric power is shown.
  • the power system before introducing the device which absorbs or supplies electric power, and the conceptual diagram of selection of the device to introduce are shown.
  • the conceptual diagram of the electric power system after introducing the device which absorbs or supplies electric power is shown.
  • the example of a calculation hardware structure in the Example of this invention is shown.
  • the example of the calculation algorithm for specifying the point candidate for introducing the device which absorbs or supplies electric power in the Example of this invention is shown.
  • the example of calculation data for specifying the point candidate for introducing the device which absorbs or supplies electric power in the Example of this invention is shown.
  • 3 shows an example user interface in an embodiment of the present invention.
  • the conceptual diagram of the influence on the impedance of the power transmission and distribution line by the device introduction to a bus-bar in the Example of this invention is shown.
  • bath with only one bus type is shown.
  • calculation flowchart 100 for identifying a point candidate for introduction of a device for absorbing or supplying power according to the present invention and the effects thereof will be described.
  • calculation hardware 400 the calculation algorithm 500 of the embodiment
  • the calculation data format 600 will be described, and finally an implementation example of the user interface 700 will be described.
  • FIG. 1 is a calculation flowchart example for specifying point candidates for introducing a device for absorbing or supplying power according to the present invention.
  • 1 includes a device selection module 110, a device feature selection module 120, an index selection module 130, an index ranking calculation module 140, and an introduction point candidate combination module 150 based on the index.
  • processing contents in each module will be described.
  • FIG. 2 is a conceptual diagram of selection of a power system before introducing a device that absorbs or supplies power and a device to be introduced.
  • FIG. 2 includes a generator bus 200, a substation bus 210, a load bus 220, a transmission line 230, a device list 240 that absorbs or supplies power, and a device 250 that is included in the device list 240 that absorbs or supplies power. Is done.
  • the classification of the device 250 that absorbs or supplies power such as a storage battery or a FACTS device, is indicated by a number.
  • the number is not limited in practice.
  • Based on the complex network theory as shown in FIG. 2, in order to consider all the power flows flowing through the transmission line, information on the bus type of the generator bus, the substation bus, and the load bus is used.
  • the bus 900 having only one bus type changes to a bus 920 having a plurality of bus types.
  • the device selection module 110 selects the devices 250 that absorb or supply power one by one, and identifies point candidates for introducing the devices based on the operation flowchart 100. A specific calculation algorithm for the point candidate will be described later.
  • FIG. 3 is a conceptual diagram of an electric power system after introducing a device that absorbs or supplies electric power.
  • the three devices 250 in the device list 240 that absorbs or supplies power are introduced as a substation bus 300, a load bus 310, and a bus-to-bus 320, respectively.
  • FIG. 4 shows an example of the arithmetic hardware configuration in the embodiment of the present invention.
  • the arithmetic hardware 400 introduces a device comprising a device selection module 411, a device feature selection module 412, an index selection module 413, an index ranking calculation module 414, and an introduction point candidate combination module 415 based on the index.
  • Device 410 for identifying a point candidate to perform arithmetic processing unit 420, system memory 430, disk storage device 440, operating system 451, data 452, application 453, module 454, input / output interface 460, network interface 470, remote computer 480 and a communication bus 490.
  • the arithmetic processing unit 420 realizes a function for reading and executing a calculation for specifying a point candidate for introducing a device into the system memory 430 from the device 410 for specifying a point candidate for introducing the device. Furthermore, the program for realizing the functions of the present invention can be read from another storage medium or downloaded from another device via a network.
  • FIG. 5 shows an example of a calculation algorithm for specifying point candidates for introducing a device that absorbs or supplies power in the embodiment of the present invention.
  • FIG. 5 shows a flowchart of the calculation algorithm 500.
  • the device selection calculation unit 510 selects a device that absorbs or supplies power.
  • a FACTS device is selected
  • the affected transmission line and bus features are selected by the FACTS device selected by the device selection calculation unit 510.
  • the impedance of the transmission line is selected
  • an index selection calculation unit 530 selects an index related to the characteristics of the power transmission line and the busbar selected by the device feature calculation unit 520.
  • INA Increased Net-Ability
  • AI Average-Impedance
  • INA when a FACTS device is connected to the bus i is obtained by a power of 1.
  • NA Net-Ability of the power system
  • subscripts 0 and i mean before and after connecting the FACTS device to the bus i.
  • Net-Ability is shown in Non-Patent Document 2 and is obtained from Equation 2.
  • N G is the generator bus number
  • N D is load bus number
  • G is the set of all generator bus of the electric power system
  • D is the set of all load bus of the power system
  • g is the generator bus
  • D is a load bus
  • C gd is a transmission capacity from the generator bus g to the load bus d
  • ⁇ gd is an equivalent impedance between the generator bus g and the load bus d.
  • the above-mentioned Net-Ability is an index that expresses the average transmittable capacity between the generator group and the load group in the power system based on the network theory.
  • FIG. 8 is a conceptual diagram of the influence on the impedance of the power transmission / distribution line by introducing the device into the bus in the embodiment of the present invention.
  • the transmission line impedance 810 before the introduction of the device changes (becomes smaller) like the transmission line impedance 820 after the introduction of the device.
  • the INA is calculated for all the busbars where the device can be introduced, and the busbar having the largest INA becomes a device introduction point candidate.
  • Equation (3) Each symbol in Equation (3) indicates that L is a set of all transmission lines of the power system, l is a transmission line, P l max is the maximum transmission power of the transmission line l, and f l gd is power transmission from the generator bus g to the load bus d
  • ⁇ gd is shown in Non-Patent Document 2 and is obtained from Equation 4.
  • Equation 4 Each symbol in Equation 4 is such that Z gg is the driving point impedance of the generator bus g, Z gd is the transfer impedance of the generator bus g and the load bus d, and Z dd is the driving point impedance of the load bus d.
  • the AI i of the bus i is obtained from Equation 5.
  • N G is the generator bus number
  • G is the set of all generator bus of the electric power system
  • g denotes a generator bus.
  • Equation 6 Each symbol of Equation 6 indicates that Z gg is the driving point impedance of the generator bus g, Z gi is the transfer impedance of the generator bus g and the load bus i, and Z ii is the driving point impedance of the load bus i.
  • AI i is the average of equivalent impedances between bus i and all generators in the power grid. More AI i is higher bus is prone bus unstable voltage drop is large, a bus with the highest AI i, the introduction candidate point of absorbing or supplying device power.
  • the index ranking calculation unit 540 calculates the index selected by the index selection calculation unit 530 by the index calculation unit 541 and stores the result in the result storage unit 542 for ranking.
  • the all index calculation end determination unit 550 determines whether the ranking has been completed. If the ranking has been completed for all indexes, the end determination is performed by the all feature calculation end determination unit 560, and if not, the process returns to the index ranking calculation unit 540 again.
  • the all feature calculation end determination unit 560 and the all device calculation end determination unit 570 also perform the same end determination as described above. If the end determination is made by the end determination of all device calculation end determination unit 570, the combination of all rankings is combined in the point candidate combination calculation unit 580 for introduction based on the index to absorb or supply power. Find point candidates to install the device.
  • the index ranking calculation unit 540 calculates INA and AI for all buses, and obtains the ranking of each index.
  • a point candidate for introducing a FACTS device can be obtained by combining the rankings of INA and AI in the point candidate combination calculation unit 580 for introduction based on the index. In this way, by introducing a device to find a candidate point, the average transmission capacity between the generator group and the load group in the power system is increased, and the voltage drop of the bus is further reduced and the stability is high. Control becomes possible.
  • FIG. 6 is an example of a calculation data format 600 used for the calculation algorithm 500.
  • 6 includes a transmission line data format 610, a bus data format 620, and a device data format 630 that absorbs or supplies power.
  • the transmission line data format 610 stores a transmission line number, bus numbers at both ends of the transmission line, transmission line impedance, and maximum transmission power.
  • the bus data format 620 stores the bus type of the power plant bus, the substation bus, and the load bus.
  • the device 630 that absorbs or supplies electric power stores device types such as FACTS equipment, storage batteries, and solar power generation.
  • FIG. 7 is an example of a display unit (hereinafter referred to as a user interface) in the embodiment of the present invention.
  • the user interface example 700 includes a “menu” tab 710, a “home” tab 711, a “project” tab 712, a “tool” tab 713, a “setting” tab 714.
  • “Help” tab 715 data interface area 720, “save project” button 721, “new project” button 722, “power system information” input interface 723, “reference” button 724, “device information” input interface 725, “database” “Select from” button 726, "Installation point candidate" input interface 727, "Download” button 728, Power system / device display area 730, "Update” button 731, “Execute” button 732, “Zoom in” button 733, “Zoom out” ”Button 734, numerical value change icon 735, power system initial state display area 740, device selection area 750 to be introduced, and power system display area 760 after device introduction.
  • the user inputs information necessary for calculation to the “power system information” input interface 723 and the “device information” input interface 725, operates the device selection area 750 to be installed, selects the device to be installed, By calculating by pressing the “execute” button 732, the calculation result can be displayed in the power system display area 760 after the device introduction.

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Human Computer Interaction (AREA)
  • Computer Vision & Pattern Recognition (AREA)
  • Artificial Intelligence (AREA)
  • Health & Medical Sciences (AREA)
  • Evolutionary Computation (AREA)
  • Medical Informatics (AREA)
  • Software Systems (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Automation & Control Theory (AREA)
  • Supply And Distribution Of Alternating Current (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

従来、再生可能エネルギー電源の増加に伴うインピーダンスや送電容量の変化に対応したFACTS機器や蓄電池を含むデバイスの最適な導入支援が出来ていなかった。そこで本課題を解決する為に本発明は、電力系統に接続する系統機器の導入地点を求める系統機器の導入支援装置において、所定の系統情報及び導入予定の系統機器の情報に基づいて、前記系統機器の導入時に影響を与える前記電力系統の特徴を求め、前記電力系統の特徴に関連する所定の評価指標から、前記系統機器の導入地点を求める演算部を備えることを特徴とする。

Description

系統機器の導入支援装置及び方法
 本発明は、電力系統に接続する系統機器の導入地点を決定する系統機器の設置支援装置及び方法に関する。
 従来、電力システムでは、火力発電など化石燃料を用いた発電方法を中心に電力を供給していたが、近年、気候変動やエネルギーセキュリティの観点から、分散型電源や再生可能エネルギー電源が増加している。しかし、再生可能エネルギー電源の出力は気候に強く依存し、変化しやすい。このため、再生可能エネルギー電源の増加によって、電力品質の低下や安定供給への悪影響が懸念される。
 これらの問題に対して、FACTS(Flexible AC Transmission System)機器や蓄電池などを含む系統機器(以下、デバイスと表記する)の導入により、電力品質の低下や安定供給への悪影響を緩和することができる。送電線の増設は、費用が高く、増設期間に数年を要する。一方、FACTS機器や蓄電池の設置は、送電線増設に比べ安価であり、環境への影響も少ない。
 電力会社やTSO(Transmission Systems Operator)、DSO(Distribution Systems Operator)は、機器の運用情報や電力需要の大きさなど、電力系統の詳細な情報を基に、FACTS機器や蓄電池などの設置場所や導入容量を決定することができる(非特許文献1)。
 また、複雑ネットワーク理論を基に、「net-ability」と「entropy degree」という指標を用いて、電力系統の安定度を評価する手法が非特許文献2で示されている。
W.Zhang、F.Li、and L. M.Tolbert、Optimal allocation of shunt dynamic var source SVC and STATCOM、A survey、in Proc. 2006 7th IEEE International Conference on Advances in Power System Control、Operation and Management(APSCOM).
e.Bompard、R.Napoli、and F.Xue、Extended topological approach for the assessment of structural vulnerability in transmission networks、IET Gener.Transm.Distrib.、vol.4、No.6、pp.716-724、2010.
 しかし、電力系統の詳細な情報は電力会社やTSO、DSOにより所有されており、一般には公開されていない。このため、上記以外の機関では、再生可能エネルギー電源の増加に伴う悪影響、およびFACTS機器や蓄電池などの設置場所や導入容量を評価するのに必要な電力系統の情報を得ることは困難である。
 また、複雑ネットワーク理論を用いることで、多くの電力系統の情報を必要とする従来の計算方法に代わって、少ない情報で、電力系統の安定度を評価できるが、非特許文献2では、既存の電力系統の安定度を評価する手法のみ言及されており、FACTS機器や蓄電池などの設置場所や導入容量を評価する方法については言及されていない。
 以上より、再生可能エネルギー電源の増加に伴うインピーダンスや送電容量の変化に対応したFACTS機器や蓄電池を含むデバイスの最適な導入支援が出来ていなかった。
 そこで上記課題を解決する為に本発明は、電力系統に接続する系統機器の導入地点を求める系統機器の導入支援装置において、所定の系統情報及び導入予定の系統機器の情報に基づいて、前記系統機器の導入時に影響を与える前記電力系統の特徴を求め、前記電力系統の特徴に関連する所定の評価指標から、前記系統機器の導入地点を求める演算部を備えることを特徴とする。
 本発明によると、再生可能エネルギー電源の増加に伴うインピーダンスや送電容量の変化に対応したFACTS機器や蓄電池を含むデバイスの導入地点について、導入時に生ずる系統への影響度を所定の指標で評価することでデバイスの最適な導入支援が可能となる。
電力を吸収あるいは供給するデバイスを導入するための地点候補を特定するための演算フローチャート例を示す。 電力を吸収あるいは供給するデバイスを導入する前の電力系統と、導入するデバイスの選択の概念図を示す。 電力を吸収あるいは供給するデバイスを導入した後の電力系統の概念図を示す。 本発明の実施例における、演算ハードウェア構成例を示す。 本発明の実施例における、電力を吸収あるいは供給するデバイスを導入するための地点候補を特定するための演算アルゴリズム例を示す。 本発明の実施例における、電力を吸収あるいは供給するデバイスを導入するための地点候補を特定するための演算データ例を示す。 本発明の実施例における、ユーザインターフェース例を示す。 本発明の実施例における、母線へのデバイス導入による送配電線のインピーダンスへの影響の概念図を示す。 本発明の実施例における、デバイスの導入による、一つのみ母線種別を持つバスの複数の母線種別を持つバスへの変化の概念図を示す。
 以下、本発明の実施形態を図面ともに説明する。なお、以下の実施例は本発明の一形態を示すものであり、本発明は要旨を逸脱しない限り、他の形態を含むものである。
 実施例では、図1~図9を用いて本発明の実施形態を説明する。
 まず、本発明による電力を吸収あるいは供給する装置の導入のための地点候補を特定するための演算フローチャート100の方式例および効果について説明し、次に実施例の演算ハードウェア400、演算アルゴリズム500、演算データフォーマット600について説明し、最後にユーザインターフェース700の実装例について説明する。
 図1は本発明による電力を吸収あるいは供給するデバイスを導入するための地点候補を特定するための演算フローチャート例である。
 図1は、デバイスの選択モジュール110、デバイスの特徴の選択モジュール120、指標の選択モジュール130、指標ランキングの計算モジュール140、指標に基づく導入地点候補の組み合わせモジュール150から構成される。以下、各モジュールでの処理内容について説明する。
 図2は、電力を吸収あるいは供給するデバイスを導入する前の電力系統と、導入するデバイスの選択の概念図である。
 図2は、発電機母線200、変電所母線210、負荷母線220、送電線230、電力を吸収あるいは供給するデバイス一覧240と、電力を吸収あるいは供給するデバイス一覧240内に含まれるデバイス250から構成される。図2では、蓄電池やFACTS機器など、電力を吸収あるいは供給するデバイス250の分類について、番号で表記している。また、図2では、電力を吸収あるいは供給するデバイス一覧240の中は3種類のデバイス250のみであるが、実際にはその数に制限は無い。複雑ネットワーク理論に基づいて、図2に示すように、送電線に流れるすべての電力潮流を考慮するために、発電機母線・変電所母線・負荷母線の母線種別の情報を用いる。
 ここで図9に示すように、デバイスの導入910によって、一つのみ母線種別を持つバス900は複数の母線種別を持つバス920に変化する。
 デバイスの選択モジュール110によって、電力を吸収あるいは供給するデバイス250を一つずつ選択し、演算フローチャート100に基づいて、デバイスを導入するための地点候補を特定する。尚、地点候補の特定の演算アルゴリズムについては後述する。
 図3は、電力を吸収あるいは供給するデバイスを導入した後の電力系統の概念図である。
 演算フローチャート100の結果の一例として、電力を吸収あるいは供給するデバイス一覧240内の3つのデバイス250は、それぞれ変電所母線300、負荷母線310、母線間320のように導入される。
 図4は本発明の実施例における演算ハードウェア構成例である。
 演算ハードウェア400は、デバイスの選択モジュール411、デバイスの特徴の選択モジュール412、指標の選択モジュール413、指標ランキングの計算モジュール414、指標に基づく導入地点候補の組み合わせモジュール415から構成されるデバイスを導入するための地点候補を特定するデバイス410と、演算処理装置420、システムメモリ430、ディスク記憶装置440、オペレーティングシステム451、データ452、アプリケーション453、モジュール454、入出力インターフェース460、ネットワークインターフェース470、リモートコンピュータ480、通信バス490から構成される。演算処理装置420は、デバイスを導入するための地点候補を特定するデバイス410から、システムメモリ430へデバイスを導入するための地点候補を特定する演算を読みこみ実行するための機能を実現する。さらに、本発明の機能を実現するためのプログラムは、他の記憶媒体から読み込まれるか、またはネットワークを介して他の機器からダウンロードできる。
 図5は本発明の実施例における、電力を吸収あるいは供給するデバイスを導入するための地点候補を特定するための演算アルゴリズム例である。
 図5は演算アルゴリズム500のフローチャートを示したものであり、演算開始501、演算終了502、デバイスの選択演算部510、デバイスの特徴の選択演算部520、指標の選択演算部530、指標ランキングの演算部540、全指標演算終了判定部550、全特徴演算終了判定部560、全デバイス演算終了判定部570、指標に基づく導入のための地点候補の組み合わせ演算部580から構成される。
 以下では、例として、演算アルゴリズム500に基づいて、電力を吸収あるいは供給するデバイスとして、FACTS機器を導入するための地点候補を特定する手法について説明する。
 まず、デバイスの選択演算部510で電力を吸収あるいは供給するデバイスが選択される。本例では、FACTS機器が選択される
 次に、デバイスの特徴の演算部520で、デバイスの選択演算部510で選択されたFACTS機器によって、影響を受ける送電線と母線の特徴が選択される。本例では、送電線のインピーダンスが選択される
 次に、指標の選択演算部530で、デバイスの特徴の演算部520で選択された送電線と母線の特徴に関連する指標が選択される。本例では、電力系統の全体的な指標として、Increased Net-Ability(INA)が選択され、局所的な指標として、Average-Impedance(AI)が選択されたとする。
 まず、INAについて説明する。母線iにFACTS機器を接続した場合のINAiは 数1で求められる。
Figure JPOXMLDOC01-appb-M000001
 数1において、NAは電力系統のNet-Abilityであり、添字の0とiは、母線iにFACTS機器を接続する前と接続した後を、それぞれ意味する。
 Net-Abilityについては非特許文献2で示されており、数2より求められる。
Figure JPOXMLDOC01-appb-M000002
 数2の各記号は、Nは発電機母線数、Nは負荷母線数、Gは電力系統の全発電機母線の集合、Dは電力系統の全負荷母線の集合、gは発電機母線、dは負荷母線、Cgdは発電機母線gから負荷母線dへの送電容量、Δgdは発電機母線gと負荷母線dの間の等価インピーダンスを示す。
 また、上記のNet-Abilityは、電力システム内の発電機群と負荷群の間の平均送電可能容量を、ネットワーク理論に基づいて表現した指標である。
 図8は、本発明の実施例における、母線へのデバイス導入による送配電線のインピーダンスへの影響の概念図である。母線800にデバイス830を導入することにより、デバイス導入前の送電線インピーダンス810が、デバイス導入後の送電線インピーダンス820のように変化する(小さくなる)。
 送電線のインピーダンスが減少すると、Net-Abilityはより大きな値を取る。デバイスの導入可能な全ての母線について、INAを計算し、INAが最も大きくなった母線が、デバイスの導入地点候補となる。
 Cgdについては非特許文献2で示されており、数3より求められる。
Figure JPOXMLDOC01-appb-M000003
 数3の各記号は、Lは電力系統の全送電線の集合、lは送電線、P maxは送電線lの最大送電電力、f gdは発電機母線gから負荷母線dへの送電における送電線lの潮流分流係数を示す。
 Δgdについては非特許文献2で示されており、数4より求められる。
Figure JPOXMLDOC01-appb-M000004
 数4の各記号は、Zggは発電機母線gの駆動点インピーダンス、Zgdは発電機母線gと負荷母線dの伝達インピーダンス、Zddは負荷母線dの駆動点インピーダンスを示す。
 次に、AIについて説明する。母線iのAIは数5より求められる。
Figure JPOXMLDOC01-appb-M000005
 数5の各記号は、Nは発電機母線数、Gは電力系統の全発電機母線の集合、gは発電機母線を示す。
 Δgiについては、数6より求められる。
Figure JPOXMLDOC01-appb-M000006
 数6の各記号は、Zggは発電機母線gの駆動点インピーダンス、Zgiは発電機母線gと負荷母線iの伝達インピーダンス、Ziiは負荷母線iの駆動点インピーダンスを示す。
 AIは、バスiと電力系統の全ての発電機の間の等価インピーダンスの平均である。AIが高いバスほど、電圧降下が大きく不安定になりやすいバスであり、最も高いAIを持つバスが、電力を吸収あるいは供給するデバイスの導入候補地点となる。
 次に、指標ランキングの演算部540で、指標の選択演算部530で選択された指標について、指標計算部541で計算し、その結果を結果格納部542に格納し、ランキングする。全ての指標について、ランキングが終わったかどうかを、全指標演算終了判定部550で判定する。全ての指標についてランキングが終わっている場合には、全特徴演算終了判定部560により終了判定を行い、そうでないならば、再び指標ランキングの演算部540に戻る。全特徴演算終了判定部560、全デバイス演算終了判定部570についても、上記と同様の終了判定を行う。全デバイス演算終了判定部570の終了判定で、終了の判定が出たならば、指標に基づく導入のための地点候補の組み合わせ演算部580にて、全ランキングを組み合わせて、電力を吸収あるいは供給するデバイスを導入するための地点候補を求める。
 本例では、INAとAIを基にした導入のための地点候補の特定方法について説明する。
 指標ランキングの演算部540で、全母線について、INAとAIを計算し、それぞれの指標のランキングを求める。次に、指標に基づく導入のための地点候補の組み合わせ演算部580で、INAとAIのランキングを組み合わせることで、FACTS機器を導入するための地点候補を求めることができる。このように候補地点を求めてデバイスを導入することで、電力システム内の発電機群と負荷群の間の平均送電可能容量をより大きくし、かつバスの電圧降下をより小さくした安定性の高い制御が可能となる。
 図6は、演算アルゴリズム500に用いる演算データフォーマット600の一例である。
 図6は、送電線データフォーマット610、母線データフォーマット620、電力を吸収あるいは供給するデバイスのデータフォーマット630から構成される。
 送電線データフォーマット610には、送電線番号、送電線の両端の母線番号、送電線インピーダンス、送電最大電力を格納する。母線データフォーマット620には、発電所母線・変電所母線・負荷母線の母線種別を格納する。電力を吸収あるいは供給するデバイス630には、FACTS機器、蓄電池、太陽光発電などのデバイスの種類を格納する。
 図7は、本発明の実施例における、表示部(以下、ユーザインターフェース)の一例である。
 ユーザインターフェース例700は、「メニュー」タブ710、「ホーム」タブ711、「プロジェクト」タブ712、「ツール」タブ713、「設定」タブ714.「ヘルプ」タブ715、データインターフェースエリア720、「プロジェクト保存」ボタン721、「新しいプロジェクト」ボタン722、「電力系統情報」入力インターフェース723、「参照」ボタン724、「デバイス情報」入力インターフェース725、「データベースから選択」ボタン726、「導入地点候補」入力インターフェース727、「ダウンロード」ボタン728、電力系統・デバイス表示エリア730、「アップデート」ボタン731、「実行」ボタン732、「ズームイン」ボタン733、「ズームアウト」ボタン734、数値変更アイコン735、電力系統初期状態表示エリア740、導入するデバイス選択エリア750、デバイス導入後の電力系統表示エリア760から構成される。
 ユーザは、「電力系統情報」入力インターフェース723と「デバイス情報」入力インターフェース725に、それぞれ計算に必要な情報を入力し、導入するデバイス選択エリア750を操作して、導入するデバイスを選択し、「実行」ボタン732を押して計算することで、その計算結果をデバイス導入後の電力系統表示エリア760に表示させることができる。
100 演算フローチャート
110 デバイスの選択モジュール
120 デバイスの特徴の選択モジュール
130 指標の選択モジュール
140 指標ランキングの計算モジュール
150 指標に基づく導入地点候補の組み合わせモジュール
200 発電機母線
210 変電所母線
220 負荷母線
230 送電線
240 電力を吸収あるいは供給するデバイス一覧
250 電力を吸収あるいは供給するデバイス
300 変電所母線に設置された電力を吸収あるいは供給するデバイス
310 負荷母線に設置された電力を吸収あるいは供給するデバイス
320 母線間に設置された電力を吸収あるいは供給するデバイス
400 演算ハードウェア
410 デバイスを導入するための地点候補を特定するデバイス
411 デバイスの選択モジュール
412 デバイスの特徴の選択モジュール
413 指標の選択モジュール
414 指標ランキングの計算モジュール
415 指標に基づく導入地点候補の組み合わせモジュール
420 演算処理装置
430 システムメモリ
440 ディスク記憶装置
451 オペレーティングシステム
452 データ
453 アプリケーション
454 モジュール
460 入出力インターフェース
470 ネットワークインターフェース
480 リモートコンピュータ
490 通信バス
500 演算アルゴリズム
501 演算開始
502 演算終了
510 デバイスの選択演算部
520 デバイスの特徴の選択演算部
530 指標の選択演算部
540 指標ランキングの演算部
541 指標計算部
542 結果格納部
550 全指標演算終了判定部
560 全特徴演算終了判定部
570 全デバイス演算終了判定部
580 指標に基づく導入のための地点候補の組み合わせ演算部
600 演算データフォーマット例
610 送電線データフォーマット
620 母線データフォーマット
630 電力を吸収あるいは供給するデバイスのデータフォーマット
700 ユーザインターフェース例
710 「メニュー」タブ
711 「ホーム」タブ
712 「プロジェクト」タブ
713 「ツール」タブ
714 「設定」タブ
715 「ヘルプ」タブ
720 データインターフェースエリア
721 「プロジェクト保存」ボタン
722 「新しいプロジェクト」ボタン
723 「電力系統情報」入力インターフェース
724 「参照」ボタン
725 「デバイス情報」入力インターフェース
726 「データベースから選択」ボタン
727 「導入地点候補」入力インターフェース
728 「ダウンロード」ボタン
730 電力系統・デバイス表示エリア730
731 「アップデート」ボタン
732 「実行」ボタン
733 「ズームイン」ボタン
734 「ズームアウト」ボタン
735 数値変更アイコン
740 電力系統初期状態表示エリア
750 導入するデバイス選択エリア
760 デバイス導入後の電力系統表示エリア
800 送電線に接続されるバス
810 デバイス導入前の送電線のインピーダンス
820 デバイス導入後の送電線のインピーダンス
830 デバイスが導入されたバス
900 一つのみ母線種別を持つバス
910 デバイスが導入されたバス
920 複数の母線種別を持つバス

Claims (10)

  1.  電力系統に接続する系統機器の導入地点を求める系統機器の導入支援装置において、
     所定の系統情報及び導入予定の系統機器の情報に基づいて、前記系統機器の導入時に影響を与える前記電力系統の特徴を求め、前記電力系統の特徴に関連する所定の評価指標から、前記系統機器の導入地点を求める演算部を備える系統機器の導入支援装置。
  2.  請求項1に記載の系統機器の導入支援装置において
     前記所定の評価指標には、ネットワーク理論に基づく、発電機群と負荷群間の平均送電可能容量に関する評価指標、又はバスと発電機群間の等価インピーダンスの平均値に関する評価指標の内少なくとも一つを含むことを特徴とする系統機器の導入支援装置。
  3.  請求項1に記載の系統機器の導入支援装置において
     前記演算部は、複数の前記系統機器、複数の前記電力系統の特徴、及び複数の前記評価指標について、繰り返し計算することを特徴とする系統機器の導入支援装置。
  4.  請求項3に記載の系統機器の導入支援装置において
     前記演算部は、前記繰り返し計算により算出した結果をランキング化し、最も評価値が高くなる導入地点を求めることを特徴とする系統機器の導入支援装置。
  5.  請求項1に記載の系統機器の導入支援装置において
     前記電力系統の特徴には、送電線及び母線のインピーダンス又は最大送電電力を含むことを特徴とする系統機器の導入支援装置。
  6.  請求項1に記載の系統機器の導入支援装置において、
     前記系統情報には、送電線インピーダンスに関する情報、電力系統トポロジーに関する情報、及び負荷母線と変電所母線と発電所母線とを含む母線分類情報を含むことを特徴とする系統機器の導入支援装置。
  7.  請求項1に記載の系統機器の導入支援装置において、
     前記系統機器には、FACTS機器、蓄電池、又は太陽光発電の内少なくとも一つを含むことを特徴とする系統機器の導入支援装置。
  8.  請求項1に記載の系統機器の導入支援装置は、
     前記導入地点を表示する表示部を更に備え、
     前記表示部は、前記系統情報、前記系統機器の情報、及び前記系統機器の種類に応じた導入個数を入力すると、前記演算部で計算された前記系統機器の導入後の電力系統図を表示することを特徴とする系統機器の導入支援装置。
  9.  電力系統に接続する系統機器の導入地点を求める系統機器の導入支援方法において、
     所定の系統情報及び導入予定の系統機器の情報に基づいて、前記系統機器の導入時に影響を与える前記電力系統の特徴を求め、前記電力系統の特徴に関連する所定の評価指標から、前記系統機器の導入地点を求めることを特徴とする系統機器の導入支援方法。
  10.  請求項9に記載の系統機器の導入支援方法において
     前記所定の評価指標には、ネットワーク理論に基づく、発電機群と負荷群間の平均送電可能容量に関する評価指標、又はバスと発電機群間の等価インピーダンスの平均値に関する評価指標の内少なくとも一つを含むことを特徴とする系統機器の導入支援方法。
PCT/JP2015/065166 2015-05-27 2015-05-27 系統機器の導入支援装置及び方法 WO2016189676A1 (ja)

Priority Applications (3)

Application Number Priority Date Filing Date Title
PCT/JP2015/065166 WO2016189676A1 (ja) 2015-05-27 2015-05-27 系統機器の導入支援装置及び方法
JP2017520143A JP6596490B2 (ja) 2015-05-27 2015-05-27 系統機器の導入支援装置及び方法
US15/576,949 US10243365B2 (en) 2015-05-27 2015-05-27 Power system equipment introduction assistance device and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/JP2015/065166 WO2016189676A1 (ja) 2015-05-27 2015-05-27 系統機器の導入支援装置及び方法

Publications (1)

Publication Number Publication Date
WO2016189676A1 true WO2016189676A1 (ja) 2016-12-01

Family

ID=57393078

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2015/065166 WO2016189676A1 (ja) 2015-05-27 2015-05-27 系統機器の導入支援装置及び方法

Country Status (3)

Country Link
US (1) US10243365B2 (ja)
JP (1) JP6596490B2 (ja)
WO (1) WO2016189676A1 (ja)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2024009536A1 (ja) * 2022-07-08 2024-01-11 株式会社日立製作所 情報処理装置

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006296030A (ja) * 2005-04-07 2006-10-26 Kansai Electric Power Co Inc:The 電圧調整装置の設置位置を最適化する方法およびそのプログラム
JP2013074696A (ja) * 2011-09-27 2013-04-22 Hiroshima Univ 電力系統電圧制御システムおよび電力系統電圧制御方法

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004088978A (ja) * 2002-08-29 2004-03-18 Toshiba Corp 配電系統電力品質判定装置およびプログラム
JP3945697B2 (ja) * 2002-10-03 2007-07-18 株式会社日立製作所 最適配電系統の作成方法及び装置
DE10316424A1 (de) * 2003-04-09 2004-10-21 Abb Patent Gmbh Verfahren und System zur systematischen Evaluation von Bewertungskenngrössen technischer Betriebsmittel
US8249763B2 (en) * 2006-03-20 2012-08-21 General Electric Company Method and computer software code for uncoupling power control of a distributed powered system from coupled power settings
JP2008072791A (ja) * 2006-09-12 2008-03-27 Toshiba Corp 計測器設置位置の決定装置、決定方法及び決定用プログラム
US20120022713A1 (en) * 2010-01-14 2012-01-26 Deaver Sr Brian J Power Flow Simulation System, Method and Device
US9335748B2 (en) * 2010-07-09 2016-05-10 Emerson Process Management Power & Water Solutions, Inc. Energy management system

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006296030A (ja) * 2005-04-07 2006-10-26 Kansai Electric Power Co Inc:The 電圧調整装置の設置位置を最適化する方法およびそのプログラム
JP2013074696A (ja) * 2011-09-27 2013-04-22 Hiroshima Univ 電力系統電圧制御システムおよび電力系統電圧制御方法

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2024009536A1 (ja) * 2022-07-08 2024-01-11 株式会社日立製作所 情報処理装置

Also Published As

Publication number Publication date
JPWO2016189676A1 (ja) 2018-03-01
JP6596490B2 (ja) 2019-10-23
US10243365B2 (en) 2019-03-26
US20180159329A1 (en) 2018-06-07

Similar Documents

Publication Publication Date Title
Wang et al. Optimal siting and sizing of soft open points in active electrical distribution networks
Ouali et al. An improved backward/forward sweep power flow method based on a new network information organization for radial distribution systems
Gbadamosi et al. Reliability assessment of composite generation and transmission expansion planning incorporating renewable energy sources
US20160043548A1 (en) Rolling stochastic optimization based operation of distributed energy systems with energy storage systems and renewable energy resources
Mohamed et al. Optimal scheduling of reconfigurable grids considering dynamic line rating constraint
US20150261892A1 (en) Integrated optimal placement, sizing, and operation of energy storage devices in electric distribution networks
CN110826800B (zh) 光伏电站布局方法和装置
Akbari et al. Convex probabilistic allocation of wind generation in smart distribution networks
Wu et al. A method to identify weak points of interconnection of renewable energy resources
JP2012034514A (ja) 出力配分制御装置
Geth et al. Balanced and unbalanced inverter strategies in battery storage systems for low‐voltage grid support
JP2012083989A (ja) 発電システム設計装置、発電システム設計方法、及びプログラム
Yacar et al. Storage allocation and investment optimisation for transmission‐constrained networks considering losses and high renewable penetration
Habibi et al. Assessment of energy storage systems as a reserve provider in stochastic network constrained unit commitment
US20140180663A1 (en) System and Method For Accelerated Assessment of Operational Uncertainties In Electrical Power Distribution Systems
Tiwari et al. Optimal micro-PMUs placement with channel limits using dynamically controlled Taguchi binary particle swarm optimization
JP2008086152A (ja) 作業系統の生成方法、停電作業計画方法、作業系統生成システム、停電作業計画システム、及びプログラム
Alkaabi et al. Adaptive planning approach for customer DG installations in smart distribution networks
Worighi et al. Modeling a smart grid using objects interaction
JP6596490B2 (ja) 系統機器の導入支援装置及び方法
Wu et al. Optimal black start strategy for microgrids considering the uncertainty using a data‐driven chance constrained approach
CN115136438A (zh) 分布资源管理装置和分布资源管理方法
Xue et al. Structural evaluation for distribution networks with distributed generation based on complex network
Gupta et al. Comparison of deterministic and probabilistic radial distribution systems load flow
Syllignakis et al. A PSO optimal power flow (OPF) method for autonomous power systems interconnected with HVDC technology

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 15893310

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 2017520143

Country of ref document: JP

Kind code of ref document: A

WWE Wipo information: entry into national phase

Ref document number: 15576949

Country of ref document: US

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 15893310

Country of ref document: EP

Kind code of ref document: A1