WO2016155481A1 - Procédé, appareil et système de transmission de données d'utilisateur, et support de stockage informatique - Google Patents

Procédé, appareil et système de transmission de données d'utilisateur, et support de stockage informatique Download PDF

Info

Publication number
WO2016155481A1
WO2016155481A1 PCT/CN2016/076175 CN2016076175W WO2016155481A1 WO 2016155481 A1 WO2016155481 A1 WO 2016155481A1 CN 2016076175 W CN2016076175 W CN 2016076175W WO 2016155481 A1 WO2016155481 A1 WO 2016155481A1
Authority
WO
WIPO (PCT)
Prior art keywords
message
base station
protocol information
senb
tunneling protocol
Prior art date
Application number
PCT/CN2016/076175
Other languages
English (en)
Chinese (zh)
Inventor
吴蕴璐
高音
Original Assignee
中兴通讯股份有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 中兴通讯股份有限公司 filed Critical 中兴通讯股份有限公司
Publication of WO2016155481A1 publication Critical patent/WO2016155481A1/fr

Links

Images

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W72/00Local resource management
    • H04W72/04Wireless resource allocation
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W28/00Network traffic management; Network resource management
    • H04W28/02Traffic management, e.g. flow control or congestion control

Definitions

  • the present invention relates to the field of communications, and in particular to a method, an apparatus, a system, and a computer storage medium for transmitting and processing user data.
  • the macro base station provides access services for the user equipment (User Equipment, UE for short) as the only access side network element.
  • UE User Equipment
  • 3rd Generation Partnership Project 3rd Generation Partnership Project
  • LPN Low Power Node
  • the supplement of the station provides access services for the UE.
  • the LPN features low-cost, low-power, and easy-to-deploy. It can include hotspot deployment and enhanced coverage.
  • the LPN may also be referred to as a small base station, which may include, but is not limited to, a Home evolved NodeB (HeNB), a pico base station (Pico), and a Radio Remote Unit (RRU). Radio Remote Head (RRH) and Relay Node (RN).
  • HeNB Home evolved NodeB
  • Pico pico base station
  • RRU Radio Remote Unit
  • RRH Radio Remote Head
  • RN Relay Node
  • FIG. 1 is a schematic diagram of a dual connectivity architecture according to the related art. As shown in FIG.
  • a UE maintains a connection with at least two base stations and uses radio resources under two base stations, so that radio resource aggregation across nodes can be implemented.
  • This architecture is usually called a dual connectivity architecture.
  • the two base stations connected to the UE have a certain management control capability and are generally referred to as a primary eNB (referred to as a MeNB), and the other base station is referred to as a secondary eNB (SeNB).
  • the dual connection can be implemented through the SeNB adding procedure.
  • the SeNB can perform a series of management, for example, SeNB modification, SeNB deletion, and SeNB modification.
  • the MeNB can connect to the Mobility Management Entity (MME) through the S1-MME, and the MeNB and the SeNB are connected through X2-C.
  • MME Mobility Management Entity
  • the MeNB can connect to the Serving Gateway (S-GW) through the S1-U, and the SeNB does not participate in data transmission to the user plane.
  • S-GW Serving Gateway
  • the MeNB can connect to the S-GW through the S1-U, and the MeNB can connect to the SeNB through the X2-U.
  • the SeNB can connect to the S-GW through the S1-U, and the MeNB does not participate in data transmission to the user plane.
  • FIG. 2 is a schematic diagram of a user plane data protocol stack of LTE according to the related art.
  • the downlink data received from the core network through the user-level GPRS Tunneling Protocol for the User Plane (GTP-U) can be aggregated by packet data after being unpacked.
  • Packet Data Convergence Protocol (PDCP) sub-layer, Radio Link Control (RLC) protocol sub-layer, Medium Access Control (MAC) protocol sub-layer and physical layer (PHY) is sent to the user equipment (User Equipment, UE for short); the uplink data is transmitted in the opposite direction to the downlink data.
  • FIG. 3 is a schematic diagram of a split mode 1 of a user plane according to the related art.
  • FIG. 3 is a schematic diagram of a split mode 1 of a user plane according to the related art.
  • FIG. 4 is a schematic diagram of a split mode 2 of a user plane according to the related art.
  • 3GPP discusses the splitting mode of two user planes: one is 1A, and the bearer user plane of the UE on the MeNB and the SeNB is directly connected to the S-GW, as shown in Figure 3; One is 3C, and the MeNB performs a shunt anchor point.
  • the data is shunted between the PDCP layer and the RLC layer, and sent to the MeNB and the SeNB for transmission, as shown in FIG. 4 .
  • FIG. 5 is a flowchart of adding a first SeNB to a UE for a dual connectivity user plane architecture 1A according to the related art based on an existing dual connectivity network architecture. As shown in FIG. 5, the process may include the following processing steps:
  • the MeNB reports a measurement report, and the MeNB can determine, according to the measurement report, the SeNB adding procedure for the UE.
  • the MeNB may send a SeNB Addition Request (SeNB Addition Request) message to the SeNB, where the SeNB Add Request message carries the GTP information of the S-GW end of the S1 transport bearer.
  • the GTP information may include: a transport layer address and a GTP tunnel endpoint identifier TEID.
  • Step S504 The SeNB returns a SeNB Addition Request Acknowledge message to the MeNB, where the SeNB adds the GTP information of the SeNB end carrying the S1 transport bearer in the request acknowledgement message, the GTP information of the SeNB end carried by the downlink data carried by the bearer, and the bearer.
  • the uplink data is forwarded to the GTP information of the SeNB side.
  • Step S506 The MeNB initiates an RRC reconfiguration complete message process to the UE, and after the UE reconfiguration is completed, the MeNB sends a SeNB Reconfiguration Complete message to the SeNB.
  • Step S508 The MeNB sends an E-RAB Modification Indication (E-RAB Modification Indication) message to the MME, where the GTP information of the MeNB end carrying the S1 transport bearer carrying the bearer on the MeNB is carried in the E-RAB modification indication message.
  • E-RAB Modification Indication E-RAB Modification Indication
  • the GTP information includes: a transport layer address and a GTP tunnel endpoint identifier TEID.
  • Step S510 The MME returns an E-RAB Modification Indication Confirm message to the MeNB.
  • FIG. 6 is a flowchart of the UE based on the existing dual-connection network architecture.
  • the MeNB of the UE is unchanged, and the UE moves between the SeNBs.
  • the process may include the following processing steps:
  • the MeNB reports the measurement report to the MeNB, and the MeNB can determine, according to the measurement report, the SeNB change procedure for the UE.
  • the MeNB sends an SeNB Add Request message to the target SeNB2, where the SeNB adds the GTP information of the S-GW end carrying the S1 transport bearer in the request message.
  • the GTP information may include: a transport layer address and a GTP tunnel endpoint identifier TEID.
  • Step S604 The target SeNB2 returns an SeNB Add Request Acknowledgment message to the MeNB, where the SeNB adds the GTP information of the SeNB end including the S1 transport bearer in the request acknowledgement message, the GTP information of the SeNB end carried by the downlink data of the bearer, and the SeNB of the uplink data carried by the bearer. GTP information on the side.
  • Step S606 The MeNB sends an SeNB Release Request message to the source SeNB1 to release the source SeNB1.
  • Step S608 The MeNB initiates an RRC reconfiguration message procedure to the UE, and after the UE reconfiguration is completed, the MeNB sends an SeNB reconfiguration complete message to the target SeNB2.
  • Step S610 The MeNB sends an E-RAB modification indication message to the MME, where the GTP information of the MeNB end including the S1 transmission bearer of the bearer remaining on the MeNB in the E-RAB modification indication message further includes modifying the bearer to the target SeNB2.
  • S1 transmits the GTP information of the target SeNB2 end of the bearer.
  • the GTP information may include: a transport layer address and a GTP tunnel endpoint identifier TEID.
  • Step S612 The MME returns an E-RAB modification indication acknowledgement message to the MeNB.
  • the MeNB needs to add a new SeNB to the UE or replace it with the SeNB served by the UE.
  • the S1 user plane data is sent by the S-GW to the MeNB and the SeNB respectively, that is, the anchor point of the S1 user plane is located in the core network element S-GW.
  • the MeNB needs to initiate a path update (path update).
  • the process updates the S1 bearer information.
  • SeNB is a small base.
  • the SeNB adds/changes each time, the core network element needs to participate in the interaction, which will result in Larger core network signaling load and delay in the SeNB management process.
  • the embodiment of the invention provides a method, a device, a system and a computer storage medium for processing a user data, so as to at least solve the double-connection architecture adopted by the related technology, the core network signaling load and the SeNB management process have a large delay. technical problem.
  • a method of processing user data is provided.
  • a method for transmitting user data is implemented by a mobility anchor between a primary base station and a secondary base station, where the method includes: during a process of adding or changing a secondary base station, the mobility anchor sends the first universal to the secondary base station.
  • Packet radio service (GPRS) tunneling protocol information wherein the first GPRS tunneling protocol information is GPRS tunneling protocol information of the S1 transmission bearer allocated by the mobility anchor for the secondary base station; and/or, the mobility anchor sends the second GPRS to the primary base station Tunneling protocol information, where the second GPRS tunneling protocol information is GPRS tunneling protocol information of the S1 transport bearer allocated by the mobility anchor to the serving gateway.
  • GPRS Packet radio service
  • the method further includes: the mobility anchor receiving the SeNB adding request message from the primary base station, where the SeNB adding the request message carries the third GPRS tunneling protocol Information, the third GPRS tunneling protocol information is the GPRS tunneling protocol information of the S-GW (S-GW) end of the S1 transmission bearer; the mobile anchor point stores the third GPRS tunneling protocol information, which is used between the subsequent mobility anchor point and the S-GW.
  • the mobility anchor receiving the SeNB adding request message from the primary base station, where the SeNB adding the request message carries the third GPRS tunneling protocol Information, the third GPRS tunneling protocol information is the GPRS tunneling protocol information of the S-GW (S-GW) end of the S1 transmission bearer; the mobile anchor point stores the third GPRS tunneling protocol information, which is used between the subsequent mobility anchor point and the S-GW.
  • S-GW S-GW
  • the method further includes: the mobility anchor receiving the SeNB adding request acknowledgement message from the secondary base station, where the SeNB adds the request acknowledgement message carrying the fourth GPRS
  • the tunneling protocol information, the fourth GPRS tunneling protocol information is the GPRS tunneling protocol information of the SeNB end of the S1 transmission bearer, and the mobility anchor point stores the fourth GPRS tunneling protocol information, which is used for the user plane data transmission between the subsequent mobility anchor point and the SeNB.
  • the sending, by the mobility anchor, the first GPRS tunneling protocol information to the secondary base station includes: when the SeNB addition request message exchanged between the primary base station and the secondary base station is not encapsulated in the X2 message transmission message, the mobility anchor will use the first GPRS tunneling protocol.
  • the information is added in the SeNB Add Request message and the SeNB Add Request message is sent to the secondary base station; or, when the SeNB Add Request message exchanged between the primary base station and the secondary base station is encapsulated in the X2 message transmission message, the mobility anchor will be the first GPRS.
  • Tunneling protocol information is added in the X2 message transmission message except for the SeNB add request And sending the X2 message transmission message to the secondary base station in the remaining part of the message; or, when the SeNB addition request message exchanged between the primary base station and the secondary base station is encapsulated in the X2 message transmission message, the mobility anchor will be the first GPRS.
  • the tunneling protocol information is added in the SeNB Add Request message in the X2 message transmission message and the X2 message transmission message is sent to the secondary base station.
  • the sending, by the mobility anchor, the second GPRS tunneling protocol information to the primary base station comprises: when the SeNB addition request acknowledgement message exchanged between the primary base station and the secondary base station is not encapsulated in the X2 message transmission message, the mobility anchor will use the second GPRS tunnel.
  • the protocol information is added in the SeNB Add Request Acknowledgement message and the SeNB Add Request Acknowledgement message is sent to the primary base station; or, when the SeNB Add Request Acknowledgement message exchanged between the primary base station and the secondary base station is encapsulated in the X2 message transmission message, the mobility anchor point is Adding the second GPRS tunneling protocol information in the remaining part of the X2 message transmission message except the SeNB adding the request confirmation message and transmitting the X2 message transmission message to the primary base station; or the SeNB interacting between the primary base station and the secondary base station.
  • the mobility anchor adds the second GPRS tunneling protocol information to the SeNB Add Request Acknowledgement message in the X2 message transmission message and transmits the X2 message transmission message to the primary base station.
  • the method further includes: the primary base station sending an evolved radio access bearer (E-RAB) modification indication message to the mobility management entity (MME), where The -RAB modification indication message carries the second GPRS tunneling protocol information.
  • E-RAB evolved radio access bearer
  • the method further includes: comparing, by the primary base station, the second GPRS tunneling protocol information acquired in the process of adding the target secondary base station, and the process of adding the source secondary base station Whether the information of the second GPRS tunneling protocol obtained is consistent; if the comparison result is consistent, the primary base station stops sending the E-RAB modification indication message to the MME.
  • the GPRS tunneling protocol information includes: a transport layer address and a GPRS tunneling protocol tunnel endpoint identifier TEID.
  • a transmission processing apparatus for user data is also provided.
  • a transmission processing apparatus for user data is applied to a mobility anchor point, where a mobility anchor point is located between a primary base station and a secondary base station, and the apparatus includes: a sending module, configured to be added or changed in the secondary base station Transmitting, by the secondary base station, first GPRS tunneling protocol information, where the first GPRS tunneling protocol information is GPRS tunneling protocol information of the S1 transmission bearer allocated by the mobility anchor point to the secondary base station; and/or, sending the second GPRS tunnel to the primary base station The protocol information, where the second GPRS tunneling protocol information is GPRS tunneling protocol information of the S1 transport bearer allocated by the mobility anchor to the serving gateway.
  • the foregoing apparatus further includes: a first receiving module, configured to receive an SeNB addition request message from the primary base station, where the SeNB addition request message carries third GPRS tunneling protocol information, and the third GPRS tunneling protocol information is S1 Transmitting the GPRS tunneling protocol information of the S-GW end of the bearer; the first storage module is set to save The third GPRS tunnel protocol information is stored for the user plane data transmission between the subsequent mobility anchor point and the S-GW.
  • a first receiving module configured to receive an SeNB addition request message from the primary base station, where the SeNB addition request message carries third GPRS tunneling protocol information, and the third GPRS tunneling protocol information is S1 Transmitting the GPRS tunneling protocol information of the S-GW end of the bearer
  • the first storage module is set to save The third GPRS tunnel protocol information is stored for the user plane data transmission between the subsequent mobility anchor point and the S-GW.
  • the foregoing apparatus further includes: a second receiving module, configured to receive an SeNB add request acknowledgement message from the secondary base station, where the SeNB adds a request acknowledgement message carrying fourth GPRS tunneling protocol information, and the fourth GPRS tunneling protocol information It is the GPRS tunneling protocol information of the SeNB end of the S1 transmission bearer; the second storage module is configured to store the fourth GPRS tunneling protocol information, which is used for data transmission of the user plane between the subsequent mobility anchor point and the SeNB.
  • a second receiving module configured to receive an SeNB add request acknowledgement message from the secondary base station, where the SeNB adds a request acknowledgement message carrying fourth GPRS tunneling protocol information, and the fourth GPRS tunneling protocol information It is the GPRS tunneling protocol information of the SeNB end of the S1 transmission bearer
  • the second storage module is configured to store the fourth GPRS tunneling protocol information, which is used for data transmission of the user plane between the subsequent mobility anchor point and the SeNB.
  • the sending module is configured to add the first GPRS tunneling protocol information in the SeNB adding request message and add the request message to the SeNB when the SeNB adding request message exchanged between the primary base station and the secondary base station is not encapsulated in the X2 message transmission message. Transmitted to the secondary base station; or, when the SeNB addition request message exchanged between the primary base station and the secondary base station is encapsulated in the X2 message transmission message, the first GPRS tunneling protocol information is added in the X2 message transmission message except the SeNB addition request message.
  • the SeNB in the message adds a request message and sends an X2 message transmission message to the secondary base station.
  • the sending module is further configured to add the second GPRS tunneling protocol information in the SeNB adding request acknowledgement message and add the SeNB when the SeNB add request acknowledgement message exchanged between the primary base station and the secondary base station is not the encapsulated X2 message transmission message.
  • the request acknowledgement message is sent to the secondary base station; or, when the SeNB add request acknowledgement message exchanged between the primary base station and the secondary base station is encapsulated in the X2 message transmission message, the second GPRS tunneling protocol information is added in the X2 message transmission message except the SeNB addition request.
  • the SeNB And sending the X2 message transmission message to the secondary base station in the remaining part of the message; or, when the SeNB adding the request confirmation message exchanged between the primary base station and the secondary base station is encapsulated in the X2 message transmission message, the second GPRS tunneling protocol is used.
  • the information is added in the SeNB Add Request Acknowledgement message in the X2 message transmission message and the X2 message transmission message is transmitted to the primary base station.
  • the GPRS tunneling protocol information includes: a transport layer address and a GPRS tunneling protocol tunnel endpoint identifier TEID.
  • a transmission processing system for user data is also provided.
  • a transmission processing system for user data includes: a primary base station, a secondary base station, and a mobility anchor point between the primary base station and the secondary base station; and a mobility anchor point, which is set in the process of adding or changing the secondary base station,
  • the secondary base station sends the first GPRS tunneling protocol information, where the first GPRS tunneling protocol information is the GPRS tunneling protocol information of the S1 transmission bearer allocated by the mobility anchor point to the secondary base station; and/or, the second GPRS tunneling protocol information is sent to the primary base station.
  • the second GPRS tunneling protocol information is GPRS tunneling protocol information of the S1 transport bearer allocated by the mobility anchor to the serving gateway.
  • the mobility anchor is further configured to receive a secondary base station SeNB addition request message from the primary base station,
  • the SeNB addition request message carries the third GPRS tunneling protocol information, where the third GPRS tunneling protocol information is the GPRS tunneling protocol information of the serving gateway S-GW end of the S1 transmission bearer, and the third GPRS tunneling protocol information is stored for subsequent User plane data transmission between the mobility anchor and the S-GW.
  • the mobility anchor is further configured to receive an SeNB add request acknowledgement message from the secondary base station, where the SeNB add request acknowledgement message carries the fourth GPRS tunnel protocol information, and the fourth GPRS tunnel protocol information is the S1 transport bearer.
  • the primary base station is configured to send the evolved radio access bearer E-RAB modification indication message to the mobility management entity MME, where the E-RAB modification indication message carries the second GPRS tunneling protocol information.
  • the primary base station is further configured to compare whether the second GPRS tunneling protocol information acquired in the process of adding the target secondary base station is consistent with the second GPRS tunneling protocol information acquired in the process of adding the source secondary base station, and If the comparison result is consistent, the sending of the E-RAB modification indication message to the MME is stopped.
  • a computer storage medium storing computer-executable instructions for transmitting a user data transmission processing method according to the above claims is provided.
  • the mobile anchor point is used to send, to the secondary base station, the first GPRS tunnel protocol information of the mobile anchor point for the secondary base station transmission bearer, and the second base station sends the mobile anchor point to the second set of the S1 transmission bearer allocated by the serving gateway.
  • the method of the GPRS tunneling protocol information thereby solving the technical problem that the core network signaling load is large due to the participation of the core network element in the process of adding or changing the secondary base station, and the secondary base station management process has a long delay.
  • the core network signaling burden is alleviated and the delay for secondary base station management is reduced.
  • FIG. 1 is a schematic diagram of a dual connectivity architecture according to the related art
  • FIG. 2 is a schematic diagram of a user plane data protocol stack of LTE according to the related art
  • FIG. 3 is a schematic diagram of a split mode 1 of a user plane according to the related art
  • FIG. 4 is a schematic diagram of a split mode 2 of a user plane according to the related art
  • FIG. 5 is a network architecture based on an existing dual connectivity according to the related art, for a dual connectivity user plane architecture 1A, A flow chart of adding, by the MeNB, the first SeNB to the UE;
  • FIG. 6 is a flowchart of a dual-connected network architecture according to the related art.
  • a MeNB of a UE is unchanged, and a UE moves between SeNBs;
  • FIG. 7 is a flowchart of a method of processing user data transmission according to an embodiment of the present invention.
  • FIG. 8 is a schematic diagram of a scenario in which a first SeNB is added by a MeNB to a UE according to a preferred embodiment of the present invention
  • FIG. 9 is a flowchart of adding a first SeNB to a UE by an MeNB according to a preferred embodiment of the present invention.
  • FIG. 10 is a flowchart of adding a first SeNB by a MeNB to a UE according to a preferred embodiment 2 of the present invention
  • FIG. 11 is a schematic diagram of a scenario in which a MeNB of a UE is unchanged and a UE moves between SeNBs according to a preferred embodiment of the present invention
  • FIG. 12 is a flowchart of a UE's MeNB being unchanged and a UE moving between SeNBs according to a preferred embodiment of the present invention
  • FIG. 13 is a flowchart of a UE's MeNB being unchanged and a UE moving between SeNBs according to a preferred embodiment of the present invention
  • FIG. 14 is a structural block diagram of a transmission processing apparatus for user data according to an embodiment of the present invention.
  • Figure 15 is a block diagram showing the structure of a transmission processing device for user data according to a preferred embodiment of the present invention.
  • 16 is a block diagram showing the structure of a transmission processing system of user data according to an embodiment of the present invention.
  • FIG. 7 is a flowchart of a method of processing user data transmission according to an embodiment of the present invention. As shown in FIG. 7, the method may include the following processing steps:
  • Step S702 During the addition or modification of the secondary base station, the mobility anchor sends the first general packet radio service (GPRS) tunnel protocol information to the secondary base station, where the first GPRS tunnel protocol information is allocated by the mobility anchor point to the secondary base station.
  • S1 transmits the GPRS tunneling protocol information of the bearer; and/or, the mobility anchor sends the second GPRS tunneling protocol information to the primary base station, wherein the second GPRS tunneling protocol information is the GPRS tunnel of the S1 transmission bearer allocated by the mobility anchor to the serving gateway.
  • Agreement information is the first general packet radio service (GPRS) tunnel protocol information to the secondary base station, where the first GPRS tunnel protocol information is allocated by the mobility anchor point to the secondary base station.
  • the core network signaling load and the SeNB management process have a large delay.
  • the mobile anchor point uses the method shown in FIG. 7, the mobile anchor point transmits the first GPRS tunnel protocol information of the mobile anchor point to the secondary base station transmission bearer by the mobility anchor point, and sends the mobile anchor point to the primary base station to transmit the S1 transmission bearer allocated to the serving gateway.
  • the second GPRS tunneling protocol information thereby solving the technical problem that the core network signaling load is large due to the participation of the core network element in the process of adding or changing the secondary base station, and the delay of the secondary base station management process is long. Thereby, the core network signaling burden is reduced, and the delay for the secondary base station management is reduced.
  • the GPRS tunneling protocol information may include: a transport layer address and a GPRS tunneling protocol tunnel endpoint identifier TEID.
  • the following operations may be included in the step S702:
  • Step S1 The mobility anchor receives the SeNB addition request message from the primary base station, where the SeNB addition request message carries the third GPRS tunneling protocol information, and the third GPRS tunneling protocol information is the serving gateway of the S1 transmission bearer (S-GW) GPRS tunneling protocol information;
  • S-GW S1 transmission bearer
  • Step S2 The mobile anchor point stores the third GPRS tunneling protocol information, which is used for data transmission of the user plane between the subsequent mobility anchor point and the S-GW.
  • step S702 the following steps may be further included in the step S702:
  • Step S3 The mobility anchor receives the SeNB addition request acknowledgement message from the secondary base station, where the SeNB adds the request acknowledgement message carrying the fourth GPRS tunneling protocol information, and the fourth GPRS tunneling protocol information is the GPRS tunnel of the SeNB end of the S1 transport bearer. Agreement information;
  • Step S4 The mobility anchor stores fourth GPRS tunneling protocol information, which is used for data transmission of user planes between the subsequent mobility anchor point and the SeNB.
  • the sending, by the mobility anchor, the first GPRS tunneling protocol information to the secondary base station may include one of the following modes:
  • the mobile anchor sending the second GPRS tunneling protocol information to the primary base station may include one of the following ways:
  • the following operations may also be included in the step S702:
  • Step S5 The primary base station sends an evolved radio access bearer (E-RAB) modification indication message to the mobility management entity (MME), where the E-RAB modification indication message carries the second GPRS tunnel protocol information.
  • E-RAB evolved radio access bearer
  • step S702 the following steps may be further included in the step S702:
  • Step S6 The primary base station compares whether the second GPRS tunneling protocol information acquired in the process of adding the target secondary base station is consistent with the second GPRS tunneling protocol information acquired in the process of adding the source secondary base station; if the comparison result is consistent, then The primary base station stops sending an E-RAB modification indication message to the MME.
  • FIG. 8 is a schematic diagram of a scenario in which a MeNB adds a first SeNB to a UE according to a preferred embodiment of the present invention.
  • the SeNB may be connected to the MeNB through a mobility anchor, where the X2-C interface is connected to the MeNB via a mobility anchor, and the X2-U optionally terminates at the mobility anchor.
  • the SeNB is connected to the EPC through the mobility anchor point, specifically, the S1-U passes the mobility anchor point to the S-GW.
  • FIG. 9 is a flowchart of adding a first SeNB to a UE by an MeNB according to a preferred embodiment of the present invention. As shown in FIG. 9, the process may include the following processing steps:
  • Step S902 During the mobile process of the UE, if the UE moves to the SeNB and detects the SeNB cell, the MeNB reports a measurement report, and the MeNB may determine, according to the measurement report, the SeNB adding procedure for the UE.
  • the MeNB sends an SeNB Add Request message to the mobility anchor, where the SeNB adds the GTP information of the S-GW end carrying the S1 transport bearer in the request message.
  • the GTP information may include: a transport layer address and a GTP tunnel endpoint identifier TEID.
  • Step S904 The mobility anchor forwards the SeNB Add Request message to the SeNB.
  • the mobile anchor carries the GTP information of the S1 transport bearer allocated by the mobility anchor end for the SeNB, in addition to the GTP information of the S-GW end of the S1 transport bearer.
  • the GTP information may include: a transport layer address and a GTP tunnel endpoint identifier TEID.
  • Step S906 The SeNB sends an SeNB Add Request Acknowledgement message to the mobility anchor, where the SeNB adds the GTP information of the SeNB end carrying the S1 transport bearer in the request acknowledgement message, the GTP information of the SeNB end carried by the downlink data carried by the bearer, and the uplink data preamble of the bearer. GTP information of the SeNB side.
  • Step S908 The mobility anchor forwards the SeNB Add Request Acknowledgement message to the MeNB.
  • the mobile anchor station carries the GTP information of the SeNB end of the S1 transmission bearer, the GTP information of the SeNB end of the downlink data transmitted by the bearer, and the GTP information of the SeNB end of the uplink data carried by the bearer in the forwarded SeNB addition request acknowledgement message.
  • the GTP information may include: a transport layer address and a GTP tunnel endpoint identifier TEID.
  • Steps S910-S912 The MeNB initiates an RRC reconfiguration message procedure to the UE, and after the UE reconfiguration is completed, the MeNB sends an SeNB reconfiguration complete message to the SeNB.
  • the SeNB reconfiguration complete message needs to be forwarded by the mobility anchor.
  • Step S914 The MeNB sends an E-RAB modification indication message to the MME, where the E-RAB modification indication message includes the GTP information of the MeNB end including the S1 transmission bearer of the bearer reserved on the MeNB, and further includes modifying the bearer to the SeNB.
  • the GTP information may include: a transport layer address and a GTP tunnel endpoint identifier TEID.
  • Step S916 The MME returns an E-RAB modification indication acknowledgement message to the MeNB.
  • the MeNB adds the first SeNB to the UE.
  • the SeNB may be connected to the MeNB through a mobility anchor, where the X2-C interface is connected to the MeNB via a mobility anchor, and the X2-U optionally terminates at the mobility anchor.
  • the SeNB is connected to the EPC through the mobility anchor point, specifically, the S1-U passes the mobility anchor point to the S-GW.
  • FIG. 10 is a flowchart of adding a first SeNB to a UE by an MeNB according to a preferred embodiment 2 of the present invention. As shown in FIG. 10, the process may include the following processing steps:
  • the MeNB reports a measurement report to the MeNB, and the MeNB may determine, according to the measurement report, the SeNB adding procedure for the UE.
  • the MeNB encapsulates the SeNB Add Request message in the X2 MESSAGE TRANSFER message, and adds the identifier of the source MeNB and the identifier of the target SeNB as the routing information in the X2 message transmission message.
  • the MeNB sends the X2 message transmission message to the mobility anchor.
  • the SeNB adds the GPRS tunneling protocol information (ie, GTP information) of the S-GW end carrying the S1 transport bearer in the request message.
  • GTP information may include: a transport layer address and a GTP tunnel endpoint identifier TEID.
  • Step S1004 The mobility anchor sends the X2 message transmission message encapsulating the SeNB addition request message in step S1002 to the target SeNB based on the target SeNB identifier carried in the X2 message transmission message in step S02.
  • the mobility anchor may also include GTP information of the S1 transport bearer allocated by the mobility anchor end for the SeNB in the X2 message transmission message.
  • the GTP information may include: a transport layer address and a GTP tunnel endpoint identifier TEID.
  • Step S1006 The SeNB encapsulates the SeNB addition confirmation message into the X2 message transmission message, and in the X2 message.
  • the identifier of the active SeNB and the identifier of the target MeNB are carried in the transport message as routing information.
  • the SeNB sends the X2 message transmission message to the mobility anchor.
  • the SeNB adds the acknowledgment message, which may include: the GTP information of the SeNB end of the S1 transmission bearer, the GTP information of the SeNB end of the bearer downlink data, and the GTP information of the SeNB end of the bearer uplink data.
  • the GTP information may include: a transport layer address and a GTP tunnel endpoint identifier TEID.
  • Step S1008 The mobility anchor sends the X2 message transmission message encapsulating the SeNB add confirmation message in step S1006 to the target MeNB based on the target MeNB identifier carried in the X2 message transmission message in step S1006.
  • the mobility anchor may also include GTP information of the S1 transport bearer allocated by the mobile anchor point for the S-GW in the X2 message transmission message.
  • the GTP information may include: a transport layer address and a GTP tunnel endpoint identifier TEID.
  • Steps S1010-S1012 The MeNB initiates an RRC reconfiguration message to the UE, and after the UE reconfiguration is completed, the MeNB encapsulates the SeNB reconfiguration complete message in the X2 message transmission message, and adds the identifier of the source MeNB to the X2 message transmission message.
  • the identity of the target SeNB is used as routing information.
  • the MeNB sends the X2 message transmission message to the mobility anchor.
  • the mobility anchor sends the X2 message transmission message encapsulating the SeNB reconfiguration complete message to the target SeNB based on the target SeNB identifier carried in the X2 message transmission message.
  • Step S1014 The MeNB sends an E-RAB modification indication message to the MME.
  • the GTP information of the M1 end of the S1 transport bearer including the bearer reserved on the MeNB in the E-RAB modification indication message, and the GTP of the S1 transport bearer allocated to the S-GW by the mobility anchor end of the bearer on the SeNB information.
  • the GTP information may include: a transport layer address and a GTP tunnel endpoint identifier TEID.
  • Step S1016 The MME replies to the MeNB with an E-RAB modification indication acknowledgement message.
  • FIG. 11 is a schematic diagram of a scenario in which a UE's MeNB is unchanged and a UE moves between SeNBs according to a preferred embodiment of the present invention. As shown in FIG. 11, the UE moves from the coverage area of the source SeNB1 to the coverage area of the target SeNB2.
  • the source SeNB1 may be connected to the MeNB through a mobility anchor, wherein the X2-C interface is connected to the MeNB via a mobility anchor, and the X2-U optionally terminates at the mobility anchor.
  • the source SeNB1 is connected to the EPC through the mobility anchor point, specifically, the S1-U passes the mobility anchor point to the S-GW.
  • the target SeNB2 may be connected to the MeNB through a mobility anchor, wherein the X2-C interface is connected to the MeNB via a mobility anchor, and the X2-U optionally terminates at the mobility anchor.
  • the target SeNB2 may be connected to the EPC through a mobility anchor, specifically referring to the S1-U passing the mobility anchor to the S-GW.
  • FIG. 12 is a flowchart of a UE's MeNB unchanged and a UE moving between SeNBs according to a preferred embodiment of the present invention. As shown in FIG. 12, the process may include the following processing steps:
  • the MeNB may report the measurement report to the MeNB, and the MeNB may determine to perform the SeNB change procedure for the UE according to the measurement report.
  • the MeNB sends an SeNB Add Request message to the mobility anchor, where the SeNB adds the GTP information of the S-GW end carrying the S1 transport bearer in the request message.
  • the GTP information may include: a transport layer address and a GTP tunnel endpoint identifier TEID.
  • Step S1204 The mobility anchor forwards the SeNB Add Request message to the target SeNB2.
  • the mobile anchor carries the GTP information of the S1 transport bearer allocated by the mobility anchor end for the SeNB, in addition to the GTP information of the S-GW end carrying the S1 transport bearer.
  • the GTP information may include: a transport layer address and a GTP tunnel endpoint identifier TEID.
  • Step S1206 The target SeNB2 sends an SeNB Add Request Acknowledgement message to the mobility anchor, where the SeNB Add Request Acknowledgement message may include: GTP information of the SeNB end of the S1 transport bearer, GTP information of the SeNB end carried by the downlink data of the bearer, and uplink of the bearer. GTP information of the SeNB side forwarded by the data.
  • Step S1208 The mobility anchor forwards the SeNB Add Request Acknowledgement message to the MeNB.
  • the mobile anchor may carry the GTP information of the SeNB end carrying the S1 transport bearer, the GTP information of the SeNB end carried by the downlink data carried by the bearer, and the GTP information of the SeNB end transmitted by the uplink data of the bearer in the forwarded SeNB addition request acknowledgement message.
  • the GTP information may include: a transport layer address and a GTP tunnel endpoint identifier TEID.
  • Steps S1210-S1212 The MeNB sends an SeNB release request message to the source SeNB1 to release the source SeNB1.
  • the SeNB release request message needs to be forwarded by the mobility anchor.
  • Steps S1214-S1216 The MeNB initiates an RRC reconfiguration message procedure to the UE, and after the UE reconfiguration is completed, the MeNB sends an SeNB reconfiguration complete message to the target SeNB2.
  • the SeNB reconfiguration complete message needs to be forwarded by the mobility anchor.
  • Step S1218 The MeNB compares the GTP information of the S1 transport bearer allocated by the mobility anchor end to the S-GW in the step S1208, and the S1 transport bearer allocated to the S-GW by the mobile anchor point acquired at the time of adding the source SeNB1.
  • the GTP information if the comparison results of the two are consistent, indicates that the mobility anchor point has not changed, so there is no need to send the E-RAB modification procedure to the MME afterwards.
  • the applicable scenario of the preferred embodiment is that the MeNB of the UE is unchanged, and the UE moves between the SeNBs. As shown in FIG. 11 above, the UE moves from the coverage area of the source SeNB1 to the coverage area of the target SeNB2.
  • Source SeNB1 can be moved
  • the anchor is connected to the MeNB, wherein the X2-C interface is connected to the MeNB via a mobility anchor, and the X2-U optionally terminates at the mobility anchor.
  • the source SeNB1 may be connected to the EPC through a mobility anchor, specifically referring to the S1-U passing the mobility anchor to the S-GW.
  • the target SeNB2 may be connected to the MeNB through a mobility anchor, wherein the X2-C interface is connected to the MeNB via a mobility anchor, and the X2-U optionally terminates at the mobility anchor.
  • the target SeNB2 is connected to the EPC through the mobility anchor point, specifically, the S1-U passes the mobility anchor point to the S-GW.
  • FIG. 13 is a flowchart of a UE's MeNB being unchanged and a UE moving between SeNBs according to a preferred embodiment 2 of the present invention. As shown in FIG. 13, the process may include the following processing steps:
  • Step S1302 During the mobile process of the UE, if the UE moves from the source SeNB1 to the target SeNB2 and detects the target SeNB2 cell, the MeNB reports a measurement report, and the MeNB may determine, according to the measurement report, the SeNB change procedure for the UE.
  • the MeNB encapsulates the SeNB addition request message in the X2 message transmission message, and adds the identifier of the source MeNB and the identifier of the target SeNB2 as the routing information in the X2 message transmission message.
  • the MeNB sends the X2 message transmission message to the mobility anchor.
  • the SeNB adds the GTP information of the S-GW end carrying the S1 transport bearer in the request message.
  • the GTP information may include: a transport layer address and a GTP tunnel endpoint identifier TEID.
  • Step S1304 The mobility anchor sends the X2 message transmission message encapsulating the SeNB addition request message in step S1302 to the target SeNB2 based on the target SeNB2 identifier carried in the X2 message transmission message in step S02.
  • the mobility anchor may also include GTP information of the S1 transport bearer allocated by the mobility anchor end for the SeNB in the X2 message transmission message.
  • the GTP information may include: a transport layer address and a GTP tunnel endpoint identifier TEID.
  • Step S1306 The target SeNB2 encapsulates the SeNB addition confirmation message into the X2 message transmission message, and carries the identifier of the target SeNB2 and the identifier of the target MeNB as the routing information in the X2 message transmission message.
  • the target SeNB2 transmits the X2 message transmission message to the mobility anchor.
  • the SeNB adds the acknowledgment message, which may include: the GTP information of the SeNB end of the S1 transmission bearer, the GTP information of the SeNB end of the downlink data carried by the bearer, and the GTP information of the SeNB end of the bearer uplink data.
  • the GTP information may include: a transport layer address and a GTP tunnel endpoint identifier TEID.
  • Step S1308 The mobility anchor sends the X2 message transmission message encapsulating the SeNB add confirmation message in step S1306 to the target MeNB based on the target MeNB identifier carried in the X2 message transmission message in step S1306.
  • the mobility anchor may also include GTP information of the S1 transport bearer allocated by the mobile anchor point for the S-GW in the X2 message transmission message.
  • the GTP information may include: a transport layer address and a GTP tunnel endpoint identifier TEID.
  • Steps S1310-S1312 The MeNB encapsulates the SeNB release request message in the X2 message transmission message, and adds the identifier of the source MeNB and the identifier of the source SeNB1 as the routing information in the X2 message transmission message.
  • the MeNB sends the X2 message transmission message to the mobility anchor.
  • the mobility anchor is based on the source SeNB1 identifier carried in the X2 message transmission message,
  • the X2 message transmission message encapsulating the SeNB release request message is sent to the source SeNB1.
  • Steps S1314-S1316 The MeNB initiates an RRC reconfiguration message to the UE, and after the UE reconfiguration is completed, the MeNB encapsulates the SeNB reconfiguration complete message in the X2 message transmission message, and adds the identifier of the source MeNB to the X2 message transmission message.
  • the identity of the target SeNB2 is used as routing information.
  • the MeNB sends the X2 message transmission message to the mobility anchor.
  • the mobility anchor sends the X2 message transmission message encapsulating the SeNB reconfiguration complete message to the target SeNB2 based on the target SeNB2 identifier carried in the X2 message transmission message.
  • Step S1318 The MeNB compares the GTP information of the S1 transport bearer allocated by the mobility anchor end to the S-GW in the step S1308, and the S1 transport bearer allocated to the S-GW by the mobile anchor point acquired at the time of adding the source SeNB1.
  • the GTP information if the comparison result of the two is consistent, indicates that the mobility anchor point has not changed, so there is no need to send the E-RAB modification procedure to the MME afterwards.
  • FIG. 14 is a block diagram showing the structure of a transmission processing device for user data according to an embodiment of the present invention. As shown in FIG. 14 , it is applied to a mobility anchor point, where the mobility anchor point is located between the primary base station and the secondary base station, and the transmission processing device of the user data may include: the sending module 10, configured to be added or changed in the secondary base station.
  • the second base station Transmitting, by the second base station, the first GPRS tunneling protocol information, where the first GPRS tunneling protocol information is GPRS tunneling protocol information of the S1 transmission bearer allocated by the mobility anchor point to the secondary base station; and/or sending the second GPRS to the primary base station Tunneling protocol information, where the second GPRS tunneling protocol information is GPRS tunneling protocol information of the S1 transport bearer allocated by the mobility anchor to the serving gateway.
  • the GPRS tunneling protocol information may include, but is not limited to, a transport layer address and a GPRS Tunneling Protocol Tunnel Endpoint Identity TEID.
  • the foregoing apparatus may further include: a first receiving module 20, configured to receive an SeNB addition request message from the primary base station, where the SeNB addition request message carries third GPRS tunneling protocol information,
  • the third GPRS tunneling protocol information is the GPRS tunneling protocol information of the S-GW end of the S1 transmission bearer;
  • the first storage module 30 is configured to store the third GPRS tunneling protocol information, and is used for the user between the subsequent mobility anchor point and the S-GW.
  • Surface data transmission is configured to transmit the SeNB addition request message from the primary base station, where the SeNB addition request message carries third GPRS tunneling protocol information,
  • the third GPRS tunneling protocol information is the GPRS tunneling protocol information of the S-GW end of the S1 transmission bearer
  • the first storage module 30 is configured to store the third GPRS tunneling protocol information, and is used for the user between the subsequent mobility anchor point and the S-GW.
  • the foregoing apparatus may further include: a second receiving module 40, configured to receive a SeNB addition request acknowledgement message from the secondary base station, where the SeNB adds a request acknowledgement message carrying the fourth GPRS tunneling protocol.
  • the information, the fourth GPRS tunneling protocol information is the GPRS tunneling protocol information of the SeNB end of the S1 transmission bearer
  • the second storage module 50 is configured to store the fourth GPRS tunneling protocol information, which is used for the user plane data between the subsequent mobility anchor point and the SeNB. transmission.
  • the sending module 10 is configured to add the first GPRS tunneling protocol information to the SeNB adding request message when the SeNB adding request message exchanged between the primary base station and the secondary base station is not encapsulated in the X2 message transmission message. And sending the SeNB addition request message to the secondary base station; or, when the SeNB addition request message exchanged between the primary base station and the secondary base station is encapsulated in the X2 message transmission message, adding the first GPRS tunneling protocol information to the X2 message transmission message.
  • the SeNB adds the remaining part of the message except the request message and sends the X2 message transmission message to the secondary base station; or, when the SeNB addition request message exchanged between the primary base station and the secondary base station is encapsulated in the X2 message transmission message, the first GPRS tunnel is used.
  • the protocol information is added in the SeNB Add Request message in the X2 message transmission message and the X2 message transmission message is transmitted to the secondary base station.
  • the sending module 10 is further configured to add the second GPRS tunneling protocol information in the SeNB addition request acknowledgement message when the SeNB add request acknowledgement message exchanged between the primary base station and the secondary base station is not the encapsulated X2 message transmission message, and the SeNB Adding a request confirmation message to the secondary base station; or, when the SeNB addition request acknowledgement message exchanged between the primary base station and the secondary base station is encapsulated in the X2 message transmission message, adding the second GPRS tunneling protocol information to the X2 message transmission message except the SeNB adds Requesting the rest of the message other than the acknowledgement message and transmitting the X2 message transmission message to the secondary base station; or, when the SeNB adding the request confirmation message exchanged between the primary base station and the secondary base station is encapsulated in the X2 message transmission message, the second GPRS tunnel is The protocol information is added in the SeNB Add Request Acknowledgement message in the X2 message transmission message and transmits the X2 message transmission message to the primary base base
  • the transmission processing system of the user data may include: a primary base station 1, a secondary base station 2, and a mobility anchor point 3 between the primary base station 1 and the secondary base station 2; and a mobility anchor point 3, which is set at the secondary base station.
  • the first GPRS tunneling protocol information is sent to the secondary base station, where the first GPRS tunneling protocol information is the GPRS tunneling protocol information of the S1 transport bearer allocated by the mobile anchor point to the secondary base station; and/or to the primary
  • the base station sends the second GPRS tunneling protocol information, where the second GPRS tunneling protocol information is the GPRS tunneling protocol information of the S1 transmission bearer allocated by the mobility anchor to the serving gateway.
  • the mobility anchor point 3 is further configured to receive the secondary base station SeNB addition request message from the primary base station, where the SeNB addition request message carries the third GPRS tunneling protocol information, and the third GPRS tunneling protocol information is the S1 transmission bearer.
  • the GPRS tunneling protocol information of the serving gateway S-GW and the third GPRS tunneling protocol information are used for subsequent user plane data transmission between the mobility anchor point and the S-GW.
  • the mobility anchor 3 is further configured to receive an SeNB addition request acknowledgement message from the secondary base station, where the SeNB addition request acknowledgement message carries the fourth GPRS tunnel protocol information, and the fourth GPRS tunnel protocol information is the S1 transport bearer.
  • the GPRS tunneling protocol information of the SeNB side; and the fourth GPRS tunneling protocol information is stored for the user plane data transmission between the subsequent mobility anchor point and the SeNB.
  • the primary base station 1 is configured to send an evolved radio access bearer E-RAB modification indication message to the mobility management entity MME, where the E-RAB modification indication message carries the second GPRS tunneling protocol information.
  • the primary base station 1 is further configured to compare whether the second GPRS tunneling protocol information acquired in the process of adding the target secondary base station is consistent with the second GPRS tunneling protocol information acquired in the process of adding the source secondary base station, and If the comparison result is consistent, the sending of the E-RAB modification indication message to the MME is stopped.
  • the disclosed client may be implemented in other manners.
  • the device embodiments described above are merely illustrative.
  • the division of the unit is only a logical function division.
  • multiple units or components may be combined or may be Integrate into another system, or some features can be ignored or not executed.
  • the mutual coupling or direct coupling or communication connection shown or discussed may be an indirect coupling or communication connection through some interface, unit or module, and may be electrical or otherwise.
  • the units described as separate components may or may not be physically separated, and the components displayed as units may or may not be physical units, that is, may be located in one place, or may be distributed to multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of the embodiment.
  • each functional unit in each embodiment of the present invention may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit.
  • the above integrated unit can be implemented in the form of hardware or in the form of a software functional unit.
  • the integrated unit if implemented in the form of a software functional unit and sold or used as a standalone product, may be stored in a computer readable storage medium.
  • the technical solution of the present invention which is essential or contributes to the prior art, or all or part of the technical solution, may be embodied in the form of a software product stored in a storage medium.
  • a number of instructions are included to cause a computer device (which may be a personal computer, server or network device, etc.) to perform all or part of the steps of the methods described in various embodiments of the present invention.
  • the foregoing storage medium includes: a U disk, a Read-Only Memory (ROM), a Random Access Memory (RAM), a removable hard disk, a magnetic disk, or an optical disk, and the like. .
  • the embodiment of the invention further provides a computer storage medium, wherein the computer storage medium stores computer executable instructions, and the computer executable instructions are used in the transmission processing method of the user data according to the above claims.
  • the disclosed apparatus and method may be implemented in other manners.
  • the device embodiments described above are merely illustrative, for example, the division of the units, For the division of only one logical function, the actual implementation may have another division manner, such as: multiple units or components may be combined, or may be integrated into another system, or some features may be ignored or not executed.
  • the coupling, or direct coupling, or communication connection of the components shown or discussed may be indirect coupling or communication connection through some interfaces, devices or units, and may be electrical, mechanical or other forms. of.
  • the units described above as separate components may or may not be physically separated, and the components displayed as the unit may or may not be physical units, that is, may be located in one place or distributed to multiple network units; Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of the embodiment.
  • each functional unit in each embodiment of the present invention may be integrated into one processing unit, or each unit may be separately used as one unit, or two or more units may be integrated into one unit;
  • the unit can be implemented in the form of hardware or in the form of hardware plus software functional units.
  • the foregoing program may be stored in a computer readable storage medium, and the program is executed when executed.
  • the foregoing storage medium includes: a mobile storage device, a random access memory (RAM), a read-only memory (ROM), a magnetic disk, or an optical disk.
  • RAM random access memory
  • ROM read-only memory
  • magnetic disk or an optical disk.
  • optical disk A medium that can store program code.
  • the above-described integrated unit of the present invention may be stored in a computer readable storage medium if it is implemented in the form of a software function module and sold or used as a standalone product.
  • the technical solution of the embodiments of the present invention may be embodied in the form of a software product in essence or in the form of a software product, which is stored in a storage medium and includes a plurality of instructions for making
  • a computer device which may be a personal computer, server, or network device, etc.
  • the foregoing storage medium includes various media that can store program codes, such as a mobile storage device, a RAM, a ROM, a magnetic disk, or an optical disk.
  • the method, device, system, and computer storage medium for processing user data provided by the embodiments of the present invention have the following beneficial effects: the problem that the core network element participates in the interaction due to the addition or modification process of the secondary base station is solved.
  • the core network signaling load is large, and the secondary base station management process has a long delay and other technical problems.
  • the core network signaling burden is reduced, and the delay for the secondary base station management is reduced.

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Mobile Radio Communication Systems (AREA)

Abstract

L'invention concerne un procédé, un appareil et un système de transmission de données d'utilisateur, et un support de stockage informatique. Ledit procédé comprend les étapes suivantes : un point d'ancrage de mobilité envoie des premières informations de protocole de tunnel de service général de radiocommunication par paquets (GPRS) à une station de base secondaire, les premières informations de protocole de tunnel GPRS étant des informations de protocole de tunnel GPRS d'un support de transmission S1 alloué par le point d'ancrage de mobilité à la station de base secondaire ; et/ou le point d'ancrage de mobilité envoie des secondes informations de protocole de tunnel GPRS à une station de base primaire, les secondes informations de protocole de tunnel GPRS étant des informations de protocole de tunnel GPRS du support de transmission S1 alloué par le point d'ancrage de mobilité à une passerelle de service. La présente invention résout le problème technique posé par une grande charge de signalisation de réseau central et un retard considérable d'un processus de gestion SeNB dans une architecture à double connexion utilisée dans l'art associé.
PCT/CN2016/076175 2015-04-01 2016-03-11 Procédé, appareil et système de transmission de données d'utilisateur, et support de stockage informatique WO2016155481A1 (fr)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201510152946.4 2015-04-01
CN201510152946.4A CN106162732A (zh) 2015-04-01 2015-04-01 用户数据的传输处理方法、装置及系统

Publications (1)

Publication Number Publication Date
WO2016155481A1 true WO2016155481A1 (fr) 2016-10-06

Family

ID=57004718

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2016/076175 WO2016155481A1 (fr) 2015-04-01 2016-03-11 Procédé, appareil et système de transmission de données d'utilisateur, et support de stockage informatique

Country Status (2)

Country Link
CN (1) CN106162732A (fr)
WO (1) WO2016155481A1 (fr)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108207010B (zh) * 2016-12-20 2022-07-26 中兴通讯股份有限公司 一种无线链路管理的方法及装置、系统
EP3563624A4 (fr) 2016-12-27 2020-08-05 Nokia Solutions And Networks System Technology (Beijing) Co., Ltd. Procédé d'établissement de connectivité multiple, système de communication, équipement d'utilisateur et point d'accès
CN110972335B (zh) * 2018-09-29 2022-04-12 华为技术有限公司 一种模式切换方法、数据流分流方法及装置
EP3925279A1 (fr) * 2019-02-14 2021-12-22 Nokia Solutions and Networks Oy Procédés et appareil pour gestion de transfert optimisé entre systèmes

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103327475A (zh) * 2012-03-21 2013-09-25 电信科学技术研究院 一种小区切换的寻址方法以及寻址装置
CN104054388A (zh) * 2013-12-19 2014-09-17 华为技术有限公司 一种载波聚合的实现方法和装置及系统
WO2015037926A1 (fr) * 2013-09-11 2015-03-19 Samsung Electronics Co., Ltd. Procédé et système de communication sécurisée pour une transmission entre enb

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104349374A (zh) * 2013-08-02 2015-02-11 北京三星通信技术研究有限公司 异构通信系统中保持业务连续性的方法
US20150043492A1 (en) * 2013-08-12 2015-02-12 Electronics And Telecommunications Research Institute Method for providing dual connectivity in wireless communication system

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103327475A (zh) * 2012-03-21 2013-09-25 电信科学技术研究院 一种小区切换的寻址方法以及寻址装置
WO2015037926A1 (fr) * 2013-09-11 2015-03-19 Samsung Electronics Co., Ltd. Procédé et système de communication sécurisée pour une transmission entre enb
CN104054388A (zh) * 2013-12-19 2014-09-17 华为技术有限公司 一种载波聚合的实现方法和装置及系统

Also Published As

Publication number Publication date
CN106162732A (zh) 2016-11-23

Similar Documents

Publication Publication Date Title
US11477712B2 (en) Maintaining communication and signaling interfaces through a network role transition
US9794851B2 (en) Handover with mobile relays
WO2018188613A1 (fr) Procédé de gestion de mobilité, dispositif de réseau d'accès et dispositif terminal
KR102206431B1 (ko) 다수의 E-NodeB들과 사용자 단말 간에 동시 접속을 제공하기 위한 방법 및 시스템
US10595239B2 (en) Data transmission method and device
EP3035735B1 (fr) Procédé de transfert, station de base maître et station de base esclave
WO2017118225A1 (fr) Procédé de mise en œuvre d'une reconfiguration dans une connectivité double, et station de base de desserte maître et station de base de desserte secondaire
EP2934044B1 (fr) Procédé et appareil destinés à transférer un support dans un réseau multicouche
EP3267724A1 (fr) Procédé de transmission de données destiné à être utilisé pendant le transfert d'une station de base, dispositif d'utilisateur et station de base, et support de stockage
WO2016188360A1 (fr) Procédé et système de commutation de système à double connexion prenant en charge un groupe fermé d'abonnés
WO2015161575A1 (fr) Procédé, station de base, entité de gestion mobile, et système de notification d'emplacement de terminal utilisateur
JP6290413B2 (ja) 接続管理方法及びアクセスネットワークエレメント
WO2016155481A1 (fr) Procédé, appareil et système de transmission de données d'utilisateur, et support de stockage informatique
WO2021185350A1 (fr) Procédé de communication, dispositif de réseau d'accès, dispositif terminal et dispositif de réseau fédérateur
WO2020078220A1 (fr) Procédé et appareil de traitement de données et dispositif de réseau
WO2016107144A1 (fr) Procédé, dispositif et système pour mettre à jour un chemin côté utilisateur
WO2016177102A1 (fr) Procédé et dispositif de traitement de valeur de temporisateur, et support de stockage informatique
WO2024031289A1 (fr) Procédé de communication pour nœud de réseau, procédé de communication pour nœud mobile, nœud mobile et dispositif donneur
CN106034363B (zh) 一种数据转发方法及移动锚点
WO2014205838A1 (fr) Procédé de transfert de données, équipement de nœud relais et système de réseau
Woo et al. Micro mobility management for dual connectivity in LTE HetNets
WO2016101468A1 (fr) Procédé et dispositif de gestion de mobilité
WO2024016141A1 (fr) Procédé d'établissement de tunnel informatique et appareil associé
TW202420855A (zh) 數據傳輸的方法和裝置

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 16771236

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 16771236

Country of ref document: EP

Kind code of ref document: A1