WO2016136860A1 - 電力変換装置、電力管理システム及び電力変換方法 - Google Patents

電力変換装置、電力管理システム及び電力変換方法 Download PDF

Info

Publication number
WO2016136860A1
WO2016136860A1 PCT/JP2016/055569 JP2016055569W WO2016136860A1 WO 2016136860 A1 WO2016136860 A1 WO 2016136860A1 JP 2016055569 W JP2016055569 W JP 2016055569W WO 2016136860 A1 WO2016136860 A1 WO 2016136860A1
Authority
WO
WIPO (PCT)
Prior art keywords
power
output
suppression
power source
distributed power
Prior art date
Application number
PCT/JP2016/055569
Other languages
English (en)
French (fr)
Inventor
雅博 馬場
哲也 竹中
勇輝 鈴木
Original Assignee
京セラ株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from JP2015035911A external-priority patent/JP6480212B2/ja
Priority claimed from JP2015035086A external-priority patent/JP6359472B2/ja
Application filed by 京セラ株式会社 filed Critical 京セラ株式会社
Priority to EP16755604.2A priority Critical patent/EP3264556A4/en
Priority to US15/553,340 priority patent/US10666165B2/en
Publication of WO2016136860A1 publication Critical patent/WO2016136860A1/ja

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/003Load forecast, e.g. methods or systems for forecasting future load demand
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05FSYSTEMS FOR REGULATING ELECTRIC OR MAGNETIC VARIABLES
    • G05F1/00Automatic systems in which deviations of an electric quantity from one or more predetermined values are detected at the output of the system and fed back to a device within the system to restore the detected quantity to its predetermined value or values, i.e. retroactive systems
    • G05F1/66Regulating electric power
    • G05F1/67Regulating electric power to the maximum power available from a generator, e.g. from solar cell
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/28Arrangements for balancing of the load in a network by storage of energy
    • H02J3/32Arrangements for balancing of the load in a network by storage of energy using batteries with converting means
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/38Arrangements for parallely feeding a single network by two or more generators, converters or transformers
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/38Arrangements for parallely feeding a single network by two or more generators, converters or transformers
    • H02J3/381Dispersed generators
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/38Arrangements for parallely feeding a single network by two or more generators, converters or transformers
    • H02J3/46Controlling of the sharing of output between the generators, converters, or transformers
    • H02J3/466Scheduling the operation of the generators, e.g. connecting or disconnecting generators to meet a given demand
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J7/00Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
    • H02J7/007Regulation of charging or discharging current or voltage
    • H02J7/0071Regulation of charging or discharging current or voltage with a programmable schedule
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J7/00Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
    • H02J7/34Parallel operation in networks using both storage and other dc sources, e.g. providing buffering
    • H02J7/35Parallel operation in networks using both storage and other dc sources, e.g. providing buffering with light sensitive cells
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02MAPPARATUS FOR CONVERSION BETWEEN AC AND AC, BETWEEN AC AND DC, OR BETWEEN DC AND DC, AND FOR USE WITH MAINS OR SIMILAR POWER SUPPLY SYSTEMS; CONVERSION OF DC OR AC INPUT POWER INTO SURGE OUTPUT POWER; CONTROL OR REGULATION THEREOF
    • H02M11/00Power conversion systems not covered by the preceding groups
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02MAPPARATUS FOR CONVERSION BETWEEN AC AND AC, BETWEEN AC AND DC, OR BETWEEN DC AND DC, AND FOR USE WITH MAINS OR SIMILAR POWER SUPPLY SYSTEMS; CONVERSION OF DC OR AC INPUT POWER INTO SURGE OUTPUT POWER; CONTROL OR REGULATION THEREOF
    • H02M7/00Conversion of ac power input into dc power output; Conversion of dc power input into ac power output
    • H02M7/42Conversion of dc power input into ac power output without possibility of reversal
    • H02M7/44Conversion of dc power input into ac power output without possibility of reversal by static converters
    • H02M7/48Conversion of dc power input into ac power output without possibility of reversal by static converters using discharge tubes with control electrode or semiconductor devices with control electrode
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F03MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
    • F03DWIND MOTORS
    • F03D7/00Controlling wind motors 
    • F03D7/02Controlling wind motors  the wind motors having rotation axis substantially parallel to the air flow entering the rotor
    • F03D7/028Controlling wind motors  the wind motors having rotation axis substantially parallel to the air flow entering the rotor controlling wind motor output power
    • F03D7/0284Controlling wind motors  the wind motors having rotation axis substantially parallel to the air flow entering the rotor controlling wind motor output power in relation to the state of the electric grid
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2207/00Indexing scheme relating to details of circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
    • H02J2207/20Charging or discharging characterised by the power electronics converter
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2300/00Systems for supplying or distributing electric power characterised by decentralized, dispersed, or local generation
    • H02J2300/20The dispersed energy generation being of renewable origin
    • H02J2300/22The renewable source being solar energy
    • H02J2300/24The renewable source being solar energy of photovoltaic origin
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/38Arrangements for parallely feeding a single network by two or more generators, converters or transformers
    • H02J3/388Islanding, i.e. disconnection of local power supply from the network
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02MAPPARATUS FOR CONVERSION BETWEEN AC AND AC, BETWEEN AC AND DC, OR BETWEEN DC AND DC, AND FOR USE WITH MAINS OR SIMILAR POWER SUPPLY SYSTEMS; CONVERSION OF DC OR AC INPUT POWER INTO SURGE OUTPUT POWER; CONTROL OR REGULATION THEREOF
    • H02M1/00Details of apparatus for conversion
    • H02M1/0003Details of control, feedback or regulation circuits
    • H02M1/0016Control circuits providing compensation of output voltage deviations using feedforward of disturbance parameters
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/50Photovoltaic [PV] energy
    • Y02E10/56Power conversion systems, e.g. maximum power point trackers
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/76Power conversion electric or electronic aspects
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E70/00Other energy conversion or management systems reducing GHG emissions
    • Y02E70/30Systems combining energy storage with energy generation of non-fossil origin
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Definitions

  • the present invention relates to a power conversion device that converts DC power into AC power, a power management system including the power conversion device, and a power conversion method.
  • a power conversion device connected to a distributed power source that outputs DC power is known.
  • the power conversion device includes a DC converter (DC / DC converter) that converts a voltage of DC power input from a distributed power source, and an inverter that converts DC power input from the DC converter into AC power (for example, a patent). Reference 1).
  • the power conversion apparatus when the power conversion apparatus receives a message for instructing suppression of the output of the distributed power supply (hereinafter, output suppression message), the power conversion apparatus must suppress the output of the distributed power source to be equal to or less than the suppression power threshold determined by the output suppression message.
  • output suppression message a message for instructing suppression of the output of the distributed power supply
  • the power conversion device converts the DC power input from the distributed power source into AC power, and the output of the distributed power source below a suppression power threshold value indicating a suppression level of the output of the distributed power source.
  • a control unit for suppressing The control unit is configured to reduce the output of the distributed power source when the output of the distributed power source is lower than the suppression power threshold in the aggregation period included in the suppression period in which the output of the distributed power source should be suppressed. Control is performed to increase the output of the distributed power supply so as to exceed the power threshold.
  • a power management system includes: a power conversion device that converts DC power input from a distributed power source into AC power; and a power level of the distributed power source that is less than or equal to a suppression power threshold that indicates a degree of suppression of the output of the distributed power source.
  • a control unit for suppressing output The control unit is configured to reduce the output of the distributed power source when the output of the distributed power source is lower than the suppression power threshold in the aggregation period included in the suppression period in which the output of the distributed power source should be suppressed. Control is performed to increase the output of the distributed power supply so as to exceed the power threshold.
  • the power conversion device converts DC power input from the distributed power source into AC power, converts DC power input from the storage battery into AC power, and outputs the AC power to the storage battery.
  • An inverter that converts AC power into DC power
  • a control unit that suppresses the output of the distributed power source below a suppression power threshold value indicating a degree of suppression of the output of the distributed power source.
  • the control unit when charging the storage battery with the output of the distributed power source, the output of the distributed power source exceeds the suppression power threshold value In this way, control is performed to increase the output of the distributed power source.
  • the power management system converts DC power input from the distributed power source into AC power, converts DC power input from the storage battery into AC power, and outputs the AC power to the storage battery.
  • a power conversion device that converts AC power into DC power, and a control unit that suppresses the output of the distributed power source below a suppression power threshold that indicates a degree of suppression of the output of the distributed power source.
  • the control unit when charging the storage battery with the output of the distributed power source, the output of the distributed power source exceeds the suppression power threshold value In this way, control is performed to increase the output of the distributed power source.
  • the power conversion method converts DC power input from a distributed power source into AC power, converts DC power input from a storage battery into AC power, and outputs the AC power to the storage battery.
  • a step of converting AC power into DC power a step of suppressing the output of the distributed power source below a suppression power threshold value indicating a degree of suppression of the output of the distributed power source, and a suppression period in which the output of the distributed power source should be suppressed
  • FIG. 1 is a diagram illustrating a power management system 1 according to the embodiment.
  • FIG. 2 is a diagram illustrating the PCS 130 according to the embodiment.
  • FIG. 3 is a diagram for explaining the control according to the embodiment.
  • FIG. 4 is a diagram for explaining the control according to the embodiment.
  • FIG. 5 is a flowchart illustrating a control method according to the embodiment.
  • FIG. 6 is a diagram for explaining control according to another embodiment.
  • FIG. 7 is a diagram for explaining control according to another embodiment.
  • FIG. 8 is a flowchart showing a control method according to another embodiment.
  • FIG. 9 is a diagram for explaining control according to another embodiment.
  • FIG. 10 is a diagram for explaining control according to another embodiment.
  • FIG. 11 is a diagram illustrating a power management system 1 according to another embodiment.
  • FIG. 12 is a diagram illustrating a PCS 130 according to another embodiment.
  • the power conversion device includes an inverter that converts DC power input from a distributed power source into AC power, and a control that suppresses the output of the distributed power source below a suppression power threshold that indicates a degree of suppression of the output of the distributed power source. And when the output of the distributed power source falls below the suppression power threshold in the aggregation period included in the suppression period in which the output of the distributed power source should be suppressed by the output suppression message. In addition, control is performed to increase the output of the distributed power supply so that the output of the distributed power supply exceeds the suppression power threshold.
  • control unit performs control to increase the output of the distributed power source so that the output of the distributed power source exceeds the suppression power threshold when there is a period in which the output of the distributed power source falls below the suppression power threshold during the aggregation period. Do. Therefore, even if a situation in which the output of the distributed power source inevitably becomes smaller than the suppression power threshold value due to a predetermined factor such as insufficient solar radiation, the output of the distributed power source is set so that the output of the distributed power source exceeds the suppression power threshold value. By increasing, a user's disadvantage can be reduced.
  • FIG. 1 is a diagram illustrating a power management system 1 according to the embodiment.
  • the power management system 1 includes a customer facility 100, an external server 400, and a recording device 500.
  • the customer facility 100 has an EMS 200, and the EMS 200 communicates with the external server 400 and the recording device 500 via the network 300.
  • the customer facility 100 includes a solar battery 110, a storage battery 120, a PCS 130, a distribution board 140, and a load 150. Further, the customer facility 100 includes an EMS 200 and a remote controller 210.
  • the solar cell 110 is a device that generates power in response to light reception.
  • the solar cell 110 outputs the generated DC power.
  • the amount of power generated by the solar cell 110 changes according to the amount of solar radiation irradiated on the solar cell 110.
  • the solar cell 110 is an example of a distributed power source that should operate according to an output suppression message described later.
  • Storage battery 120 is a device that stores electric power.
  • the storage battery 120 outputs the accumulated DC power. It should be noted that in the embodiment, the storage battery 120 does not need to operate according to the output suppression message described below.
  • the PCS 130 is an example of a power converter (PCS; Power Conditioning System) that converts DC power into AC power.
  • the PCS 130 is connected to the main power line 10 ⁇ / b> L (here, the main power line 10 ⁇ / b> LA and the main power line 10 ⁇ / b> LB) connected to the power system 10, and is connected to both the solar battery 110 and the storage battery 120.
  • the main power line 10LA is a power line that connects the power system 10 and the PCS 130
  • the main power line 10LB is a power line that connects the PCS 130 and the distribution board 140.
  • the PCS 130 converts DC power input from the solar battery 110 into AC power, and also converts DC power input from the storage battery 120 into AC power. Further, the PCS 130 converts AC power supplied from the power system 10 into DC power.
  • Distribution board 140 is connected to main power line 10L (here main power line 10LB). Distribution board 140 branches main power line 10LB into a plurality of power lines, and distributes power to devices (here, load 150 and EMS 200) connected to the plurality of power lines.
  • devices here, load 150 and EMS 200
  • the load 150 is a device that consumes power supplied through the power line.
  • the load 150 includes devices such as a refrigerator, lighting, an air conditioner, and a television.
  • the load 150 may be a single device or may include a plurality of devices.
  • the EMS 200 is an apparatus (EMS; Energy Management System) that manages power information indicating power supplied from the power system 10 to the customer facility 100.
  • the EMS 200 may manage the power generation amount of the solar battery 110, the charge amount of the storage battery 120, and the discharge amount of the storage battery 120.
  • the EMS 200 is connected to the remote controller 210 and the network 300.
  • the EMS 200 receives a power suppression message described later from the external server 400 and notifies the remote controller 210 of the power suppression message.
  • the EMS 200 receives a later-described plan table (calendar) from the external server 400 and notifies the remote controller 210 of a power suppression message based on the plan table (calendar).
  • the remote controller 210 is attached to the PCS 130 and notifies the PCS 130 of various messages for operating the PCS 130. For example, the remote controller 210 notifies the PCS 130 of a power suppression message received from the EMS 200.
  • the network 300 is a communication network that connects the EMS 200, the external server 400, and the recording device 500.
  • the network 300 may be the Internet.
  • the network 300 may include a mobile communication network.
  • the external server 400 notifies an output suppression message that is a message instructing suppression of the output of the distributed power source (here, the solar battery 110).
  • the external server 400 may manage a plan table (calendar) including the date and time when the output of the distributed power source should be suppressed as the entire power system 10.
  • the external server 400 notifies the output suppression message based on such a plan table (calendar).
  • the external server 400 may notify the EMS 200 of such a plan table (calendar).
  • the output suppression message and the plan table include information indicating the degree of suppression of the output of the distributed power source (here, the solar battery 110) (for example, the output suppression power threshold).
  • the degree of suppression may be represented by an absolute value (for example, OO kW) of the output of the distributed power source (here, solar cell 110).
  • the degree of suppression may be represented by a relative value (for example, a decrease in OO kW) of the output of the distributed power source (here, solar cell 110).
  • the degree of suppression may be represented by an output suppression ratio (for example, OO%) of the distributed power source (here, solar cell 110).
  • the suppression ratio is preferably a ratio with respect to an output (hereinafter referred to as “equipment certified output”) certified as an output capability of the PCS that controls the distributed power supply when the distributed power supply is installed in the customer facility 100.
  • equipment certified output an output certified output certified as an output capability of the PCS that controls the distributed power supply when the distributed power supply is installed in the customer facility 100.
  • the facility certified output is the smaller output capability of these output capabilities.
  • the facility authorization output is the sum of the output capacities of the plurality of PCSs.
  • the recording device 500 is a device that records various types of information. Specifically, the recording device 500 records a verification record for verifying whether or not the suppression of the output of the distributed power source is correctly executed according to the output suppression message.
  • the verification record is an integrated value of the output of the distributed power source in the aggregation period (for example, 30 minutes) included in the suppression period in which the output of the distributed power source should be suppressed by the output suppression message. In such a case, it suffices if the output of the distributed power source is correctly suppressed in the verification record totaled for each total period.
  • FIG. 2 is a diagram illustrating the PCS 130 according to the embodiment.
  • the PCS 130 is connected to a power line 11L connected to the main power line 10LA and a power line 12L connected to the main power line 10LB. Furthermore, a power line 13L that connects the power line 11L and the power line 12L is provided. The power line 13L is connected to the power line 11L on the main power line 10LA side from the switch 11SW, and is connected to the power line 12L on the main power line 10LB side from the switch 12SW.
  • the power line 11L is a power line connecting the power system 10 and the inverter 133.
  • the power line 11L may be a power line that constitutes a part of the main power line 10LA, or may be a power line that branches from the main power line 10LA.
  • the power line 12L is a power line that connects the inverter 133 and the distribution board 140 (load 150).
  • the power line 12L may be a power line that constitutes a part of the main power line 10LB, or may be a power line that branches from the main power line 10LB.
  • the PCS 130 includes a switch 11SW provided on the power line 11L, a switch 12SW provided on the power line 12L, and a switch 13SW provided on the power line 13L.
  • the switch 11SW is controlled to be closed in a connected operation state in which the PCS 130 is connected to the power system 10. On the other hand, the switch 11SW is controlled to be in an open state in the self-sustaining operation state where the PCS 130 is disconnected from the power system 10.
  • the switch 12SW is controlled to be in an open state in the connected operation state in which the PCS 130 is connected to the power system 10.
  • the switch 11SW is controlled to be in a closed state in the self-sustaining operation state where the PCS 130 is disconnected from the power system 10.
  • the switch 13SW is controlled to be closed in a connected operation state in which the distribution board 140 (load 150) is connected to the power system 10. Similarly, the switch 13SW is controlled to be in a closed state in the connected operation state in which the PCS 130 is connected to the power system 10. On the other hand, the switch 13SW is controlled to be in the open state in the self-sustaining operation state where the distribution board 140 (load 150) is disconnected from the power system 10. Similarly, the switch 13SW is controlled to be in the open state in the self-sustaining operation state where the PCS 130 is disconnected from the power system 10.
  • both the PCS 130 and the distribution board 140 (load 150) are connected to the power system 10. Therefore, in such a connected operation state, the switch 11SW and the switch 13SW are controlled to be closed, and the switch 12SW is controlled to be open.
  • both the PCS 130 and the distribution board 140 (load 150) are not connected to the power system 10. Accordingly, in such a self-sustaining operation state, the switch 11SW and the switch 13SW are controlled to be in an open state, and the switch 12SW is controlled to be in a closed state.
  • the PCS 130 includes a DC / DC converter 131, a DC / DC converter 132, an inverter 133, a control unit 134, and a communication unit 135.
  • the DC / DC converter 131 is a first DC converter that converts the voltage of DC power input from the solar battery 110.
  • the DC / DC converter 131 may perform step-up conversion on the DC power voltage or step-down conversion on the DC power voltage.
  • DC / DC converter 132 is a second DC converter that converts the voltage of DC power input from storage battery 120. Furthermore, the DC / DC converter 132 converts the voltage of the DC power input from the inverter 133. The DC / DC converter 132 may perform step-up conversion on the voltage of DC power or may perform step-down conversion on the voltage of DC power.
  • the operation of outputting DC power from the storage battery 120 to the DC / DC converter 132 is discharging of the storage battery 120. It should be noted that the operation of outputting DC power from the DC / DC converter 132 to the storage battery 120 is charging of the storage battery 120.
  • the inverter 133 converts the DC power input from the DC / DC converter 131 and the DC power input from the DC / DC converter 132 into AC power. Further, the inverter 133 converts AC power supplied from the power system 10 into DC power.
  • the control unit 134 controls the PCS 130.
  • the control unit 134 controls the power generation amount of the solar cell 110.
  • the control unit 134 controls the output of the solar cell 110 so that the output of the solar cell 110 approaches the target power (for example, MPPT (Maximum Power Point Tracking).
  • MPPT Maximum Power Point Tracking
  • the control unit 134 controls the charge amount and the discharge amount of the storage battery 120. To do.
  • the control unit 134 suppresses the output of the solar cell 110 according to the output suppression message or the plan table (calendar).
  • the suppression degree may be represented by an absolute value (for example, OO kW) of the output of the solar cell 110.
  • the degree of suppression may be represented by a relative value of the output of the solar cell 110 (for example, a decrease in OO kW).
  • the suppression degree may be represented by the suppression ratio (for example, (circle)%) of the output of the solar cell 110.
  • the control unit 134 has a period (hereinafter, an output shortage period) in which the output of the solar cell 110 falls below the suppression power threshold in the aggregation period included in the suppression period in which the output of the solar cell 110 should be suppressed.
  • control is performed to increase the output of the solar cell 110 so that the output of the solar cell 110 exceeds the suppression power threshold. That is, in the control, the control unit 134 temporarily increases the output of the solar cell 110 in order to compensate for the output of the solar cell 110 that decreases below the suppression power threshold during the output shortage period.
  • the suppression period is specified based on the output suppression message or the plan table (calendar).
  • the output shortage period is a period during which the output of the solar cell 110 inevitably becomes smaller than the suppression power threshold due to a predetermined factor.
  • the predetermined factor is, for example, insufficient solar radiation.
  • control unit 134 performs control so that the integrated value of the output of the solar battery 110 does not exceed the integrated value of the suppression power threshold during the counting period. In other words, the control unit 134 performs control so that the average value of the output of the solar cell 110 does not exceed the average value of the suppression power threshold during the counting period. Accordingly, it should be noted that the suppression of the output of the solar cell 110 is correctly executed in the verification records totaled for each total period.
  • control unit 134 controls the output of the solar cell 110 so that the output of the solar cell 110 approaches the target power (MPPT method). It should be noted that the control unit 134 sets the suppression power threshold value to the target power during the suppression period and sets the maximum power to the target power outside the suppression period. However, it should be noted that the control unit 134 sets a value higher than the suppression power threshold value as the target power when performing control even during the suppression period.
  • the control unit 134 outputs a verification record for verifying whether or not the suppression of the output of the solar cell 110 is correctly executed according to the output suppression message.
  • the verification record is an integrated value of the output of the solar cell 110 in the counting period (for example, 30 minutes) included in the suppression period.
  • the control unit 134 aggregates the integrated value of the output power of the solar battery 110 for each aggregation period (for example, 30 minutes), and outputs the integrated value aggregated for each aggregation period as a verification record.
  • the communication unit 135 communicates with the remote controller 210. For example, the communication unit 135 receives an output suppression message notified from the external server 400. The communication unit 135 transmits the verification record output from the control unit 134 to the recording device 500.
  • FIG. 3 illustrates a case where an output suppression message is notified at time t0 and an output suppression release message is notified at time t2.
  • the output suppression release message is a message for instructing cancellation of output suppression of the solar battery 110.
  • the output suppression message is a message instructing to suppress the output of the solar battery 110 to W1 or less.
  • the suppression power threshold gradually decreases at a predetermined decrease rate from time t0 to time t1. Since the output suppression message is transmitted to a plurality of PCSs all at once, a decreasing rate is determined in advance in order to suppress a rapid decrease in the reverse power flow to the power system 10. On the other hand, after time t2, the suppression power threshold gradually increases at a predetermined increase rate. Since the output suppression release message is transmitted to a plurality of PCSs all at once, an increase rate is determined in advance in order to prevent the reverse power flow to the power system 10 from rapidly decreasing.
  • the PCS 130 performs control to increase the output of the solar cell 110 so that the output of the solar cell 110 exceeds the suppression power threshold.
  • the integrated value (area S2) of the output of the solar cell 110 exceeding the suppression power threshold does not exceed the integrated value (area S1) of the output of the solar cell 110 that is below the suppression power threshold during the output shortage period. It is.
  • FIG. 5 is a flowchart illustrating a control method according to the embodiment.
  • step S10 the PCS 130 receives the output suppression message.
  • step S11 the PCS 130 suppresses the output of the solar cell 110 according to the output suppression message.
  • the PCS 130 performs control to increase the output of the solar cell 110 so that the output of the solar cell 110 exceeds the suppression power threshold. Details of the control are as described above.
  • step S12 the PCS 130 counts the integrated value of the output power of the solar battery 110 every counting period (for example, 30 minutes), and outputs the integrated value counted for each counting period as a verification record.
  • the verification record is recorded in the recording device 500.
  • the PCS 130 controls to increase the output of the solar cell 110 so that the output of the solar cell 110 exceeds the suppression power threshold when there is a period in which the output of the solar cell 110 falls below the suppression power threshold during the aggregation period. I do. Therefore, even if a situation occurs in which the output of the solar cell 110 inevitably becomes smaller than the suppression power threshold due to a predetermined factor such as insufficient solar radiation, the output of the solar cell 110 exceeds the suppression power threshold. By increasing the output, the user's disadvantage can be reduced.
  • the output suppression message is a message for suppressing the reverse power flow to the power system side, and therefore, the reverse power flow to the power system side may be suppressed according to the output suppression message.
  • a power conversion device that converts not only the DC power input from the above-described distributed power supply but also the DC power input from the storage battery into AC power.
  • a power conversion device converts DC power input from a distributed power source into AC power, converts DC power input from a storage battery into AC power, and is output to the storage battery.
  • An inverter that converts AC power into electric power, and a control unit that suppresses the output of the distributed power source below a suppression power threshold that indicates a degree of suppression of the output of the distributed power source, and the control unit outputs the output of the distributed power source. Control for increasing the output of the distributed power source so that the output of the distributed power source exceeds the suppression power threshold when the storage battery is charged with the output of the distributed power source in the counting period included in the suppression period to be suppressed I do.
  • control unit performs control to increase the output of the distributed power source so that the output of the distributed power source exceeds the suppression power threshold when the storage battery is charged by the output of the distributed power source during the counting period. Therefore, in the sense of reverse power flow to the power system, the situation where the output of the distributed power source is excessively suppressed even though the output of the power conversion device is decreased due to charging of the storage battery is suppressed, and the user's The disadvantage can be reduced.
  • the output of the solar battery 110 is Control is performed to increase the output of the solar cell 110 so as to exceed the suppression power threshold.
  • the output of the PCS 130 decreases due to the charging of the storage battery 120.
  • the suppression period is specified based on the output suppression message or the plan table (calendar).
  • control unit 134 performs control so that the integrated value of the output of the solar battery 110 exceeding the suppression power threshold does not exceed the charge amount of the storage battery 120 during the counting period. Accordingly, it should be noted that the suppression of the output of the solar cell 110 is correctly executed in the sense of the reverse power flow to the power system 10.
  • control unit 134 may perform control before charging the storage battery 120. In such a case, the control unit 134 performs control based on the chargeable amount of the storage battery 120. However, it should be noted that the control unit 134 performs control so that the integrated value of the output of the solar battery 110 exceeding the suppression power threshold does not exceed the chargeable amount.
  • control unit 134 may perform control after charging the storage battery 120. In such a case, the control unit 134 performs control based on the stored amount of the storage battery 120. However, it should be noted that the control unit 134 performs control so that the integrated value of the output of the solar cell 110 exceeding the suppression power threshold does not exceed the stored amount.
  • control unit 134 controls the output of the solar cell 110 so that the output of the solar cell 110 approaches the target power (MPPT method). It should be noted that the control unit 134 sets the suppression power threshold value to the target power during the suppression period and sets the maximum power to the target power outside the suppression period. However, it should be noted that the control unit 134 sets a value higher than the suppression power threshold value as the target power when performing control even during the suppression period.
  • the control unit 134 outputs a verification record for verifying whether or not the suppression of the output of the solar cell 110 is correctly executed according to the output suppression message.
  • the verification record is an integrated value of the output of the PCS 130 (inverter 133) in the aggregation period (for example, 30 minutes) included in the suppression period.
  • the control unit 134 aggregates the integrated value of the output power of the PCS 130 (inverter 133) every counting period (for example, 30 minutes), and outputs the integrated value totaled for each counting period as a verification record.
  • the communication unit 135 communicates with the remote controller 210. For example, the communication unit 135 receives an output suppression message notified from the external server 400. The communication unit 135 transmits the verification record output from the control unit 134 to the recording device 500.
  • the output suppression release message is a message for instructing cancellation of output suppression of the solar battery 110.
  • the output suppression message is a message instructing to suppress the output of the solar battery 110 to W1 or less.
  • the suppression power threshold gradually decreases at a predetermined decrease rate from time t0 to time t1. Since the output suppression message is transmitted to a plurality of PCSs all at once, a decreasing rate is determined in advance in order to suppress a rapid decrease in the reverse power flow to the power system 10. On the other hand, after time t2, the suppression power threshold gradually increases at a predetermined increase rate. Since the output suppression release message is transmitted to a plurality of PCSs all at once, an increase rate is determined in advance in order to prevent the reverse power flow to the power system 10 from rapidly decreasing.
  • the storage battery 120 is charged during the counting period from time t X to time t X + 1 .
  • the output (power that can be generated) of the solar cell 110 is, for example, above the suppression power threshold over the entire counting period.
  • the PCS 130 performs control to increase the output of the solar cell 110 so that the output of the solar cell 110 exceeds the suppression power threshold.
  • the integrated value (area S2) of the output of the solar battery 110 exceeding the suppression power threshold does not exceed the charge amount (area S1) of the storage battery 120.
  • FIG. 7 illustrates a case where control is performed before the storage battery 120 is charged. Therefore, the charge amount (area S1) of the storage battery 120 is the chargeable amount of the storage battery 120.
  • FIG. 8 is a flowchart showing a control method according to another embodiment.
  • step S10 the PCS 130 receives the output suppression message.
  • step S11 the PCS 130 suppresses the output of the solar cell 110 according to the output suppression message.
  • the PCS 130 performs control to increase the output of the solar cell 110 so that the output of the solar cell 110 exceeds the suppression power threshold. Details of the control are as described above.
  • step S12 the PCS 130 counts the integrated value of the output power of the PCS 130 (inverter 133) every counting period (for example, 30 minutes), and outputs the integrated value counted for each counting period as a verification record.
  • the verification record is recorded in the recording device 500.
  • the PCS 130 controls to increase the output of the solar cell 110 so that the output of the solar cell 110 exceeds the suppression power threshold when the storage battery 120 is charged by the output of the solar cell 110 during the counting period. I do. Therefore, in the sense of reverse power flow to the power system, the situation where the output of the solar battery 110 is excessively suppressed despite the decrease in the output of the PCS 130 due to the charging of the storage battery 120 is suppressed, and the user's The disadvantage can be reduced.
  • the period (henceforth an excess period) in which the output of the solar cell 110 continuously exceeds the suppression power threshold is a predetermined period (for example, 5 minutes). It is as follows. Specifically, as shown in FIG. 9, the PCS 130 (the control unit 134) is predetermined even when the output (power that can be generated) of the solar cell 110 exceeds the suppression power threshold for a long time. Correction control is performed so that the excess period does not exceed the specified period. Thereby, the influence of reverse power flow on the power system 10 is reduced.
  • the excess amount of the output of the distributed power source with respect to the suppression power threshold is equal to or less than a predetermined amount (for example, suppression power threshold + 5%).
  • a predetermined amount for example, suppression power threshold + 5%.
  • the customer facility 100 does not have the EMS 200 and the remote controller 210 as shown in FIG.
  • the PCS 130 (communication unit 135) is directly connected to the network 300, and communicates with the external server 400 and the recording device 500. Accordingly, the PCS 130 (communication unit 135) transmits the verification record output from the control unit 134 to the recording apparatus 500 without passing through the remote controller 210 and the EMS 200.
  • the PCS 130 includes a recording unit 136 as shown in FIG. Similar to the recording device 500, the recording unit 136 records a verification record for verifying whether or not the suppression of the output of the distributed power source is correctly executed according to the output suppression message. In such a case, it should be noted that the recording unit 136 records the verification record output from the control unit 134.
  • the power management system 1 may not include the recording device 500.
  • the PCS 130 connected to the solar battery 110 and the storage battery 120 is illustrated, but the embodiment is not limited thereto.
  • the PCS 130 may not be connected to the storage battery 120 but may be connected only to the solar battery 110.
  • the solar battery 110 is illustrated as a distributed power source that should operate according to the output suppression message.
  • the distributed power source is not limited to this.
  • the distributed power source may be a device that generates electric power using natural energy such as wind power or geothermal heat.
  • the distributed power source may be a fuel cell that generates electric power using fuel gas.
  • control unit 134 controls the PCS 130.
  • the control unit 134 may control the PCS 130 according to an instruction from the EMS 200 or the remote controller 210. That is, a control unit (a functional block having the same function as the control unit 134) that suppresses the output of the distributed power source below a suppression power threshold determined by the output suppression message may be provided in the EMS 200 or the remote controller 210.
  • a recording unit 136 for recording a verification record is provided in the PCS 130.
  • the recording unit 136 that records the verification record may be provided in the EMS 200 or the remote controller 210.

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Sustainable Development (AREA)
  • Sustainable Energy (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • General Physics & Mathematics (AREA)
  • Radar, Positioning & Navigation (AREA)
  • Automation & Control Theory (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

 PCSは、集計期間において、太陽電池の出力が抑制電力閾値を下回る期間が存在する場合に、太陽電池の出力が抑制電力閾値を超えるように太陽電池の出力を増大する制御を行う。

Description

電力変換装置、電力管理システム及び電力変換方法
 本発明は、DC電力をAC電力に変換する電力変換装置、電力変換装置を備える電力管理システム及び電力変換方法に関する。
 DC電力を出力する分散電源に接続された電力変換装置(パワーコンディショナ)が知られている。電力変換装置は、分散電源から入力されるDC電力の電圧を変換する直流コンバータ(DC/DCコンバータ)と、直流コンバータから入力されるDC電力をAC電力に変換するインバータとを備える(例えば、特許文献1)。
 ここで、電力変換装置は、分散電源の出力の抑制を指示するメッセージ(以下、出力抑制メッセージ)を受信すると、出力抑制メッセージによって定まる抑制電力閾値以下に分散電源の出力を抑制しなければならない。
特開2014-171359号公報
 1つの特徴によれば、電力変換装置は、分散電源から入力されるDC電力をAC電力に変換するインバータと、前記分散電源の出力の抑制度合いを示す抑制電力閾値以下に前記分散電源の出力を抑制する制御部とを備える。前記制御部は、前記分散電源の出力を抑制すべき抑制期間に含まれる集計期間において、前記分散電源の出力が前記抑制電力閾値を下回る期間が存在する場合に、前記分散電源の出力が前記抑制電力閾値を超えるように前記分散電源の出力を増大する制御を行う。
 1つの特徴によれば、電力管理システムは、分散電源から入力されるDC電力をAC電力に変換する電力変換装置と、前記分散電源の出力の抑制度合いを示す抑制電力閾値以下に前記分散電源の出力を抑制する制御部とを備える。前記制御部は、前記分散電源の出力を抑制すべき抑制期間に含まれる集計期間において、前記分散電源の出力が前記抑制電力閾値を下回る期間が存在する場合に、前記分散電源の出力が前記抑制電力閾値を超えるように前記分散電源の出力を増大する制御を行う。
 1つの特徴によれば、電力変換装置は、分散電源から入力されるDC電力をAC電力に変換するとともに、蓄電池から入力されるDC電力をAC電力に変換し、かつ、前記蓄電池に出力されるDC電力にAC電力を変換するインバータと、前記分散電源の出力の抑制度合いを示す抑制電力閾値以下に前記分散電源の出力を抑制する制御部とを備える。前記制御部は、前記分散電源の出力を抑制すべき抑制期間に含まれる集計期間において、前記分散電源の出力によって前記蓄電池の充電を行う場合に、前記分散電源の出力が前記抑制電力閾値を超えるように前記分散電源の出力を増大する制御を行う。
 1つの特徴によれば、電力管理システムは、分散電源から入力されるDC電力をAC電力に変換するとともに、蓄電池から入力されるDC電力をAC電力に変換し、かつ、前記蓄電池に出力されるDC電力にAC電力を変換する電力変換装置と、前記分散電源の出力の抑制度合いを示す抑制電力閾値以下に前記分散電源の出力を抑制する制御部とを備える。前記制御部は、前記分散電源の出力を抑制すべき抑制期間に含まれる集計期間において、前記分散電源の出力によって前記蓄電池の充電を行う場合に、前記分散電源の出力が前記抑制電力閾値を超えるように前記分散電源の出力を増大する制御を行う。
 1つの特徴によれば、電力変換方法は、分散電源から入力されるDC電力をAC電力に変換するとともに、蓄電池から入力されるDC電力をAC電力に変換し、かつ、前記蓄電池に出力されるDC電力にAC電力を変換するステップと、前記分散電源の出力の抑制度合いを示す抑制電力閾値以下に前記分散電源の出力を抑制するステップと、前記分散電源の出力を抑制すべき抑制期間に含まれる集計期間において、前記分散電源の出力によって前記蓄電池の充電を行う場合に、前記分散電源の出力が前記抑制電力閾値を超えるように前記分散電源の出力を増大する制御を行うステップとを備える。
図1は、実施形態に係る電力管理システム1を示す図である。 図2は、実施形態に係るPCS130を示す図である。 図3は、実施形態に係る制御を説明するための図である。 図4は、実施形態に係る制御を説明するための図である。 図5は、実施形態に係る制御方法を示すフロー図である。 図6は、他の実施形態に係る制御を説明するための図である。 図7は、他の実施形態に係る制御を説明するための図である。 図8は、他の実施形態に係る制御方法を示すフロー図である。 図9は、他の実施形態に係る制御を説明するための図である。 図10は、他の実施形態に係る制御を説明するための図である。 図11は、他の実施形態に係る電力管理システム1を示す図である。 図12は、他の実施形態に係るPCS130を示す図である。
 以下において、実施形態について図面を参照しながら説明する。なお、以下の図面の記載において、同一又は類似の部分には、同一又は類似の符号を付している。
 ただし、図面は模式的なものであり、各寸法の比率などは現実のものとは異なることに留意すべきである。従って、具体的な寸法などは以下の説明を参酌して判断すべきである。また、図面相互間においても互いの寸法の関係や比率が異なる部分が含まれていることは勿論である。
 [実施形態の概要]
 上述した従来技術では、出力抑制メッセージを受信した後において、所定要因によって分散電源の出力が必然的に抑制電力閾値よりも小さくなってしまう事態が考えられる。例えば、分散電源が太陽電池装置である場合には、所定要因として日射量不足が考えられる。或いは、分散電源が風力発電装置である場合には、所定要因として風量不足が考えられる。このような事態は、ユーザにとって著しく不利益である。
 実施形態に係る電力変換装置は、分散電源から入力されるDC電力をAC電力に変換するインバータと、前記分散電源の出力の抑制度合いを示す抑制電力閾値以下に前記分散電源の出力を抑制する制御部とを備え、前記制御部は、前記出力抑制メッセージによって前記分散電源の出力を抑制すべき抑制期間に含まれる集計期間において、前記分散電源の出力が前記抑制電力閾値を下回る期間が存在する場合に、前記分散電源の出力が前記抑制電力閾値を超えるように前記分散電源の出力を増大する制御を行う。
 実施形態では、制御部は、集計期間において、分散電源の出力が抑制電力閾値を下回る期間が存在する場合に、分散電源の出力が抑制電力閾値を超えるように分散電源の出力を増大する制御を行う。従って、日射量不足などの所定要因によって分散電源の出力が必然的に抑制電力閾値よりも小さくなってしまう事態が生じても、分散電源の出力が抑制電力閾値を超えるように分散電源の出力を増大することによって、ユーザの不利益を軽減することができる。
 [実施形態]
 以下において、実施形態に係る電力管理システムについて説明する。図1は、実施形態に係る電力管理システム1を示す図である。
 図1に示すように、電力管理システム1は、需要家施設100と、外部サーバ400と、記録装置500とを有する。需要家施設100は、EMS200を有しており、EMS200は、ネットワーク300を介して、外部サーバ400及び記録装置500と通信を行う。
 需要家施設100は、太陽電池110と、蓄電池120と、PCS130と、分電盤140と、負荷150とを有する。さらに、需要家施設100は、EMS200及びリモートコントローラ210とを有する。
 太陽電池110は、受光に応じて発電を行う装置である。太陽電池110は、発電されたDC電力を出力する。太陽電池110の発電量は、太陽電池110に照射される日射量に応じて変化する。太陽電池110は、後述する出力抑制メッセージに従って動作すべき分散電源の一例である。
 蓄電池120は、電力を蓄積する装置である。蓄電池120は、蓄積されたDC電力を出力する。実施形態では、蓄電池120は、後述する出力抑制メッセージに従って動作する必要がないことに留意すべきである。
 PCS130は、DC電力をAC電力に変換する電力変換装置(PCS;Power Conditioning System)の一例である。実施形態では、PCS130は、電力系統10に接続された主幹電力線10L(ここでは、主幹電力線10LA及び主幹電力線10LB)に接続されるとともに、太陽電池110及び蓄電池120の双方に接続される。主幹電力線10LAは、電力系統10とPCS130とを接続する電力線であり、主幹電力線10LBは、PCS130と分電盤140とを接続する電力線である。
 ここで、PCS130は、太陽電池110から入力されるDC電力をAC電力に変換するとともに、蓄電池120から入力されるDC電力をAC電力に変換する。さらに、PCS130は、電力系統10から供給されるAC電力をDC電力に変換する。
 分電盤140は、主幹電力線10L(ここでは、主幹電力線10LB)に接続される。分電盤140は、主幹電力線10LBを複数の電力線に分岐するとともに、複数の電力線に接続された機器(ここでは、負荷150及びEMS200)に電力を分配する。
 負荷150は、電力線を介して供給される電力を消費する装置である。例えば、負荷150は、冷蔵庫、照明、エアコン、テレビなどの装置を含む。負荷150は、単数の装置であってもよく、複数の装置を含んでもよい。
 EMS200は、電力系統10から需要家施設100に供給される電力を示す電力情報を管理する装置(EMS;Energy Management System)である。EMS200は、太陽電池110の発電量、蓄電池120の充電量及び蓄電池120の放電量を管理してもよい。
 実施形態では、EMS200は、リモートコントローラ210及びネットワーク300に接続される。例えば、EMS200は、後述する電力抑制メッセージを外部サーバ400から受信し、電力抑制メッセージをリモートコントローラ210に通知する。或いは、EMS200は、後述する計画表(カレンダー)を外部サーバ400から受信し、計画表(カレンダー)に基づいて、電力抑制メッセージをリモートコントローラ210に通知する。
 リモートコントローラ210は、PCS130に併設されており、PCS130を操作するための各種メッセージをPCS130に通知する。例えば、リモートコントローラ210は、EMS200から受信する電力抑制メッセージをPCS130に通知する。
 ネットワーク300は、EMS200、外部サーバ400及び記録装置500を接続する通信網である。ネットワーク300は、インターネットであってもよい。ネットワーク300は、移動体通信網を含んでもよい。
 外部サーバ400は、分散電源(ここでは、太陽電池110)の出力の抑制を指示するメッセージである出力抑制メッセージを通知する。ここで、外部サーバ400は、電力系統10の全体として、分散電源の出力を抑制すべき日時を含む計画表(カレンダー)を管理していてもよい。外部サーバ400は、このような計画表(カレンダー)に基づいて、出力抑制メッセージを通知する。或いは、外部サーバ400は、このような計画表(カレンダー)をEMS200に通知してもよい。
 ここで、出力抑制メッセージ及び計画表(カレンダー)は、分散電源(ここでは、太陽電池110)の出力の抑制度合い(例えば、出力抑制電力閾値)を示す情報を含む。抑制度合いは、分散電源(ここでは、太陽電池110)の出力の絶対値(例えば、○○kW)で表されてもよい。或いは、抑制度合いは、分散電源(ここでは、太陽電池110)の出力の相対値(例えば、○○kWの減少)で表されてもよい。或いは、抑制度合いは、分散電源(ここでは、太陽電池110)の出力の抑制割合(例えば、○○%)で表されてもよい。抑制割合とは、需要家施設100に分散電源を設置する際に、分散電源を制御するPCSの出力能力として認定を受けた出力(以下、設備認定出力)に対する割合であることが好ましい。分散電源の出力能力とPCSの出力能力とが異なる場合には、設備認定出力は、これらの出力能力のうち、小さい方の出力能力である。複数のPCSが設置されるケースにおいては、設備認定出力は、複数のPCSの出力能力の合計である。
 記録装置500は、各種情報を記録する装置である。具体的には、記録装置500は、出力抑制メッセージに従って分散電源の出力の抑制が正しく実行されたか否かを検証するための検証記録を記録する。検証記録は、出力抑制メッセージによって分散電源の出力を抑制すべき抑制期間に含まれる集計期間(例えば、30分)における分散電源の出力の積算値である。このようなケースにおいて、集計期間毎に集計された検証記録において、分散電源の出力の抑制が正しく実行されていればよい。
 (電力変換装置)
 以下において、実施形態に係る電力変換装置について説明する。図2は、実施形態に係るPCS130を示す図である。
 図2に示すように、PCS130は、主幹電力線10LAに接続された電力線11L及び主幹電力線10LBに接続された電力線12Lに接続される。さらに、電力線11Lと電力線12Lとを接続する電力線13Lが設けられる。電力線13Lは、スイッチ11SWよりも主幹電力線10LA側において電力線11Lに接続されており、スイッチ12SWよりも主幹電力線10LB側において電力線12Lに接続される。
 電力線11Lは、電力系統10とインバータ133とを接続する電力線である。電力線11Lは、主幹電力線10LAの一部を構成する電力線であってもよく、主幹電力線10LAから分岐する電力線であってもよい。電力線12Lは、インバータ133と分電盤140(負荷150)とを接続する電力線である。電力線12Lは、主幹電力線10LBの一部を構成する電力線であってもよく、主幹電力線10LBから分岐する電力線であってもよい。
 PCS130は、電力線11L上に設けられるスイッチ11SWと、電力線12L上に設けられるスイッチ12SWと、電力線13L上に設けられるスイッチ13SWとを有する。
 スイッチ11SWは、電力系統10にPCS130が連系された連系運転状態において閉状態に制御される。一方で、スイッチ11SWは、電力系統10からPCS130が解列された自立運転状態において開状態に制御される。
 スイッチ12SWは、電力系統10にPCS130が連系された連系運転状態において開状態に制御される。一方で、スイッチ11SWは、電力系統10からPCS130が解列された自立運転状態において閉状態に制御される。
 スイッチ13SWは、電力系統10に分電盤140(負荷150)が連系された連系運転状態において閉状態に制御される。同様に、スイッチ13SWは、電力系統10にPCS130が連系された連系運転状態において閉状態に制御される。一方で、スイッチ13SWは、電力系統10から分電盤140(負荷150)が解列された自立運転状態において開状態に制御される。同様に、スイッチ13SWは、電力系統10からPCS130が解列された自立運転状態において開状態に制御される。
 一般的には、需要家施設100が電力系統10に連系された連系運転状態においては、PCS130及び分電盤140(負荷150)の双方が電力系統10に接続される。従って、このような連系運転状態において、スイッチ11SW及びスイッチ13SWは閉状態に制御され、スイッチ12SWは開状態に制御される。一方で、一般的には、需要家施設100が電力系統10から解列された自立運転状態においては、PCS130及び分電盤140(負荷150)の双方が電力系統10に接続されない。従って、このような自立運転状態において、スイッチ11SW及びスイッチ13SWは開状態に制御され、スイッチ12SWは閉状態に制御される。
 図2に示すように、PCS130は、DC/DCコンバータ131と、DC/DCコンバータ132と、インバータ133と、制御部134と、通信部135とを有する。
 DC/DCコンバータ131は、太陽電池110から入力されるDC電力の電圧を変換する第1直流コンバータである。DC/DCコンバータ131は、DC電力の電圧を昇圧変換してもよく、DC電力の電圧を降圧変換してもよい。
 DC/DCコンバータ132は、蓄電池120から入力されるDC電力の電圧を変換する第2直流コンバータである。さらには、DC/DCコンバータ132は、インバータ133から入力されるDC電力の電圧を変換する。DC/DCコンバータ132は、DC電力の電圧を昇圧変換してもよく、DC電力の電圧を降圧変換してもよい。
 ここで、蓄電池120からDC/DCコンバータ132にDC電力を出力する動作は、蓄電池120の放電であることに留意すべきである。DC/DCコンバータ132から蓄電池120にDC電力を出力する動作は、蓄電池120の充電であることに留意すべきである。
 インバータ133は、DC/DCコンバータ131から入力されるDC電力及びDC/DCコンバータ132から入力されるDC電力をAC電力に変換する。さらに、インバータ133は、電力系統10から供給されるAC電力をDC電力に変換する。
 制御部134は、PCS130を制御する。第1に、制御部134は、太陽電池110の発電量を制御する。詳細には、制御部134は、太陽電池110の出力を目標電力に近づけるように太陽電池110の出力を制御する(例えば、MPPT(Maximum Power Point Tracking)。これによって、太陽電池110の動作点(動作点電圧値及び電力値によって定まる点、又は、動作点電圧値と電流値とによって定まる点)が最適化される。第2に、制御部134は、蓄電池120の充電量及び放電量を制御する。
 ここで、制御部134は、出力抑制メッセージ又は計画表(カレンダー)に従って太陽電池110の出力を抑制する。上述したように、抑制度合いは、太陽電池110の出力の絶対値(例えば、○○kW)で表されてもよい。或いは、抑制度合いは、太陽電池110の出力の相対値(例えば、○○kWの減少)で表されてもよい。或いは、抑制度合いは、太陽電池110の出力の抑制割合(例えば、○○%)で表されてもよい。
 実施形態において、制御部134は、太陽電池110の出力を抑制すべき抑制期間に含まれる集計期間において、太陽電池110の出力が抑制電力閾値を下回る期間(以下、出力不足期間)が存在する場合に、太陽電池110の出力が抑制電力閾値を超えるように太陽電池110の出力を増大する制御を行う。すなわち、制御部134は、制御において、出力不足期間において抑制電力閾値よりも減少する太陽電池110の出力を補償するために、太陽電池110の出力を一時的に増大する。抑制期間は、出力抑制メッセージ又は計画表(カレンダー)に基づいて特定される。
 ここで、出力不足期間は、所定要因によって太陽電池110の出力が必然的に抑制電力閾値よりも小さくなってしまう期間である。所定要因は、例えば、日射量不足である。
 実施形態において、制御部134は、集計期間において、太陽電池110の出力の積算値が抑制電力閾値の積算値を超えないように制御を行う。言い換えると、制御部134は、集計期間において、太陽電池110の出力の平均値が抑制電力閾値の平均値を超えないように制御を行う。これによって、集計期間毎に集計された検証記録において、太陽電池110の出力の抑制が正しく実行されることに留意すべきである。
 ここで、制御部134は、上述したように、太陽電池110の出力を目標電力に近づけるように太陽電池110の出力を制御する(MPPT法)。制御部134は、抑制期間において抑制電力閾値を目標電力に設定するとともに、抑制期間外において最大電力を目標電力に設定することに留意すべきである。但し、制御部134は、抑制期間であっても制御を行う場合には、抑制電力閾値よりも高い値を目標電力に設定することに留意すべきである。
 制御部134は、出力抑制メッセージに従って太陽電池110の出力の抑制が正しく実行されたか否かを検証するための検証記録を出力する。上述したように、検証記録は、抑制期間に含まれる集計期間(例えば、30分)における太陽電池110の出力の積算値である。制御部134は、太陽電池110の出力電力の積算値を集計期間(例えば、30分)毎に集計するとともに、集計期間毎に集計された積算値を検証記録として出力する。
 通信部135は、リモートコントローラ210と通信を行う。例えば、通信部135は、外部サーバ400から通知される出力抑制メッセージを受信する。通信部135は、制御部134から出力される検証記録を記録装置500に送信する。
 (制御の一例)
 以下において、実施形態に係る制御の一例について説明する。図3及び図4は、実施形態に係る制御の一例を説明するための図である。
 第1に、抑制電力閾値について、図3を参照しながら説明する。図3では、時刻t0において出力抑制メッセージが通知されるとともに、時刻t2において出力抑制解除メッセージが通知されるケースを例示している。出力抑制解除メッセージは、太陽電池110の出力の抑制解除を指示するメッセージである。ここで、出力抑制メッセージは、太陽電池110の出力をW1以下に抑制するように指示するメッセージである。
 このようなケースにおいて、時刻t0から時刻t1までの間において、予め定められた減少速度で抑制電力閾値が徐々に減少する。出力抑制メッセージは、複数のPCSに対して一斉に送信されるため、電力系統10への逆潮流量が急激に減少することを抑制するために、減少速度が予め定められている。一方で、時刻t2以降において、予め定められた増大速度で抑制電力閾値が徐々に増大する。出力抑制解除メッセージは、複数のPCSに対して一斉に送信されるため、電力系統10への逆潮流量が急激に減少することを抑制するために、増大速度が予め定められている。
 第2に、制御について、図4を参照しながら説明する。図4では、時刻tから時刻tX+1までの間の集計期間において、太陽電池110の出力(発電可能電力)が抑制電力閾値を下回る期間(出力不足期間)が存在する。太陽電池110の出力(発電可能電力)は、例えば、一時的な日射量不足によって減少するが、出力不足期間以外においては、抑制電力閾値を上回っている。
 このようなケースにおいて、PCS130は、太陽電池110の出力が抑制電力閾値を超えるように太陽電池110の出力を増大する制御を行う。但し、抑制電力閾値を超える太陽電池110の出力の積算値(面積S2)は、出力不足期間において抑制電力閾値を下回る太陽電池110の出力の積算値(面積S1)を超えないことに留意すべきである。
 (制御方法)
 以下において、実施形態に係る制御方法について説明する。図5は、実施形態に係る制御方法を示すフロー図である。
 図5に示すように、ステップS10において、PCS130は、出力抑制メッセージを受信する。
 ステップS11において、PCS130は、出力抑制メッセージに従って太陽電池110の出力を抑制する。ここで、抑制期間に含まれる集計期間において出力不足期間が存在する場合に、PCS130は、太陽電池110の出力が抑制電力閾値を超えるように太陽電池110の出力を増大する制御を行う。制御の詳細については、上述した通りである。
 ステップS12において、PCS130は、太陽電池110の出力電力の積算値を集計期間(例えば、30分)毎に集計するとともに、集計期間毎に集計された積算値を検証記録として出力する。検証記録は、記録装置500に記録される。
 (作用及び効果)
 実施形態では、PCS130は、集計期間において太陽電池110の出力が抑制電力閾値を下回る期間が存在する場合に、太陽電池110の出力が抑制電力閾値を超えるように太陽電池110の出力を増大する制御を行う。従って、日射量不足などの所定要因によって太陽電池110の出力が必然的に抑制電力閾値よりも小さくなってしまう事態が生じても、太陽電池110の出力が抑制電力閾値を超えるように太陽電池110の出力を増大することによって、ユーザの不利益を軽減することができる。
 [他の実施形態]
 以下において、他の実施形態について説明する。以下においては、上述した実施形態に対する差異について説明する。
 [他の実施形態の概要]
 上述した従来技術では、出力抑制メッセージは、電力系統側への逆潮流を抑制するためのメッセージであるため、出力抑制メッセージに従って電力系統側への逆潮流が抑制されればよい。また、上述した分散電源から入力されるDC電力だけではなく、蓄電池から入力されるDC電力をAC電力に変換する電力変換装置も知られている。
 ここで、このような電力変換装置において、出力抑制メッセージによって定まる抑制電力閾値以下に分散電源の出力が抑制されている状態で、分散電源の出力によって蓄電池の充電を行うケースを考える。このようなケースにおいて、電力系統への逆潮流という意味では、蓄電池の充電によって電力変換装置の出力が減少しているにもかかわらずに、分散電源の出力が過剰に抑制されてしまう事態が考えられる。このような事態は、ユーザにとって著しく不利益である。
 他の実施形態に係る電力変換装置は、分散電源から入力されるDC電力をAC電力に変換するとともに、蓄電池から入力されるDC電力をAC電力に変換し、かつ、前記蓄電池に出力されるDC電力にAC電力を変換するインバータと、前記分散電源の出力の抑制度合いを示す抑制電力閾値以下に前記分散電源の出力を抑制する制御部とを備え、前記制御部は、前記分散電源の出力を抑制すべき抑制期間に含まれる集計期間において、前記分散電源の出力によって前記蓄電池の充電を行う場合に、前記分散電源の出力が前記抑制電力閾値を超えるように前記分散電源の出力を増大する制御を行う。
 他の実施形態では、制御部は、集計期間において、分散電源の出力によって蓄電池の充電を行う場合に、分散電源の出力が抑制電力閾値を超えるように分散電源の出力を増大する制御を行う。従って、電力系統への逆潮流という意味では、蓄電池の充電によって電力変換装置の出力が減少しているにもかかわらずに、分散電源の出力が過剰に抑制されてしまう事態が抑制され、ユーザの不利益を軽減することができる。
 [他の実施形態の詳細]
 他の実施形態において、制御部134は、太陽電池110の出力を抑制すべき抑制期間に含まれる集計期間において、太陽電池110の出力によって蓄電池120の充電を行う場合に、太陽電池110の出力が抑制電力閾値を超えるように太陽電池110の出力を増大する制御を行う。電力系統10への逆潮流という意味では、蓄電池120の充電によってPCS130の出力が減少するため、制御部134は、蓄電池120の充電に伴う太陽電池110の出力抑制を軽減するために、太陽電池110の出力を一時的に増大する。抑制期間は、出力抑制メッセージ又は計画表(カレンダー)に基づいて特定される。
 他の実施形態において、制御部134は、集計期間において、抑制電力閾値を超える太陽電池110の出力の積算値が蓄電池120の充電量を超えないように制御を行う。これによって、電力系統10への逆潮流という意味において、太陽電池110の出力の抑制が正しく実行されることに留意すべきである。
 他の実施形態において、制御部134は、蓄電池120の充電を行う前に制御を行ってもよい。このようなケースでは、制御部134は、蓄電池120の蓄電可能量に基づいて制御を行う。但し、制御部134は、抑制電力閾値を超える太陽電池110の出力の積算値が蓄電可能量を超えないように制御を行うことに留意すべきである。
 或いは、制御部134は、蓄電池120の充電を行った後に制御を行ってもよい。このようなケースでは、制御部134は、蓄電池120の蓄電済み量に基づいて制御を行う。但し、制御部134は、抑制電力閾値を超える太陽電池110の出力の積算値が蓄電済み量を超えないように制御を行うことに留意すべきである。
 ここで、制御部134は、上述したように、太陽電池110の出力を目標電力に近づけるように太陽電池110の出力を制御する(MPPT法)。制御部134は、抑制期間において抑制電力閾値を目標電力に設定するとともに、抑制期間外において最大電力を目標電力に設定することに留意すべきである。但し、制御部134は、抑制期間であっても制御を行う場合には、抑制電力閾値よりも高い値を目標電力に設定することに留意すべきである。
 制御部134は、出力抑制メッセージに従って太陽電池110の出力の抑制が正しく実行されたか否かを検証するための検証記録を出力する。上述したように、検証記録は、抑制期間に含まれる集計期間(例えば、30分)におけるPCS130(インバータ133)の出力の積算値である。制御部134は、PCS130(インバータ133)の出力電力の積算値を集計期間(例えば、30分)毎に集計するとともに、集計期間毎に集計された積算値を検証記録として出力する。
 通信部135は、リモートコントローラ210と通信を行う。例えば、通信部135は、外部サーバ400から通知される出力抑制メッセージを受信する。通信部135は、制御部134から出力される検証記録を記録装置500に送信する。
 (制御の一例)
 以下において、他の実施形態に係る制御の一例について説明する。図6及び図7は、他の実施形態に係る制御の一例を説明するための図である。
 第1に、抑制電力閾値について、図6を参照しながら説明する。図6では、時刻t0において出力抑制メッセージが通知されるとともに、時刻t2において出力抑制解除メッセージが通知されるケースを例示している。出力抑制解除メッセージは、太陽電池110の出力の抑制解除を指示するメッセージである。ここで、出力抑制メッセージは、太陽電池110の出力をW1以下に抑制するように指示するメッセージである。
 このようなケースにおいて、時刻t0から時刻t1までの間において、予め定められた減少速度で抑制電力閾値が徐々に減少する。出力抑制メッセージは、複数のPCSに対して一斉に送信されるため、電力系統10への逆潮流量が急激に減少することを抑制するために、減少速度が予め定められている。一方で、時刻t2以降において、予め定められた増大速度で抑制電力閾値が徐々に増大する。出力抑制解除メッセージは、複数のPCSに対して一斉に送信されるため、電力系統10への逆潮流量が急激に減少することを抑制するために、増大速度が予め定められている。
 第2に、制御について、図7を参照しながら説明する。図7では、時刻tから時刻tX+1までの間の集計期間において、蓄電池120の蓄電が行われる。太陽電池110の出力(発電可能電力)は、例えば、集計期間の全体に亘って抑制電力閾値を上回っている。
 このようなケースにおいて、PCS130は、太陽電池110の出力が抑制電力閾値を超えるように太陽電池110の出力を増大する制御を行う。但し、抑制電力閾値を超える太陽電池110の出力の積算値(面積S2)が蓄電池120の充電量(面積S1)を超えないことに留意すべきである。
 図7においては、蓄電池120の充電を行う前に制御を行うケースが例示されている。従って、蓄電池120の充電量(面積S1)は、蓄電池120の蓄電可能量である。
 (制御方法)
 以下において、他の実施形態に係る制御方法について説明する。図8は、他の実施形態に係る制御方法を示すフロー図である。
 図8に示すように、ステップS10において、PCS130は、出力抑制メッセージを受信する。
 ステップS11において、PCS130は、出力抑制メッセージに従って太陽電池110の出力を抑制する。ここで、抑制期間に含まれる集計期間において出力不足期間が存在する場合に、PCS130は、太陽電池110の出力が抑制電力閾値を超えるように太陽電池110の出力を増大する制御を行う。制御の詳細については、上述した通りである。
 ステップS12において、PCS130は、PCS130(インバータ133)の出力電力の積算値を集計期間(例えば、30分)毎に集計するとともに、集計期間毎に集計された積算値を検証記録として出力する。検証記録は、記録装置500に記録される。
 (作用及び効果)
 他の実施形態では、PCS130は、集計期間において、太陽電池110の出力によって蓄電池120の充電を行う場合に、太陽電池110の出力が抑制電力閾値を超えるように太陽電池110の出力を増大する制御を行う。従って、電力系統への逆潮流という意味では、蓄電池120の充電によってPCS130の出力が減少しているにもかかわらずに、太陽電池110の出力が過剰に抑制されてしまう事態が抑制され、ユーザの不利益を軽減することができる。
 [他の実施形態]
 以下において、他の実施形態について説明する。以下においては、上述した実施形態に対する差異について説明する。
 第1に、他の実施形態では、制御において、抑制電力閾値に対して太陽電池110の出力が継続的に超過する期間(以下、超過期間)は、予め定められた期間(例えば、5分)以下である。具体的には、PCS130(制御部134)は、図9に示すように、太陽電池110の出力(発電可能電力)が長期的に抑制電力閾値を超えている場合であっても、予め定められた期間を超過期間が超えないように補正制御を行う。これによって、電力系統10に対する逆潮流などの影響が軽減される。
 第2に、制御において、抑制電力閾値に対する分散電源の出力の超過量は、予め定められた量(例えば、抑制電力閾値+5%)以下である。具体的には、PCS130(制御部134)は、図10に示すように、太陽電池110の出力(発電可能電力)が大幅に抑制電力閾値を超えている場合であっても、予め定められた量を超過量が超えないように補正制御を行う。これによって、電力系統10に対する逆潮流などの影響が軽減される。
 [他の実施形態]
 以下において、他の実施形態について説明する。以下においては、上述した実施形態に対する差異について説明する。
 他の実施形態において、需要家施設100は、図11に示すように、EMS200及びリモートコントローラ210を有していない。PCS130(通信部135)は、ネットワーク300に直接的に接続されており、外部サーバ400及び記録装置500と通信を行う。従って、PCS130(通信部135)は、リモートコントローラ210及びEMS200を経由せずに、制御部134から出力される検証記録を記録装置500に送信する。
 [他の実施形態]
 以下において、他の実施形態について説明する。以下においては、上述した実施形態に対する差異について説明する。
 他の実施形態においては、PCS130は、図12に示すように、記録部136を有する。記録部136は、記録装置500と同様に、出力抑制メッセージに従って分散電源の出力の抑制が正しく実行されたか否かを検証するための検証記録を記録する。このようなケースにおいて、記録部136は、制御部134から出力される検証記録を記録することに留意すべきである。
 他の実施形態においては、検証記録を記録する記録部136がPCS130に設けられているため、電力管理システム1は、記録装置500を有していなくてもよい。
 [その他の実施形態]
 本発明は上述した実施形態によって説明したが、この開示の一部をなす論述及び図面は、この発明を限定するものであると理解すべきではない。この開示から当業者には様々な代替実施形態、実施例及び運用技術が明らかとなろう。
 実施形態では、太陽電池110及び蓄電池120に接続されたPCS130を例示したが、実施形態はこれに限定されるものではない。PCS130は、蓄電池120に接続されておらず、太陽電池110のみに接続されていてもよい。
 実施形態では、出力抑制メッセージに従って動作すべき分散電源として太陽電池110を例示した。しかしながら、分散電源はこれに限定されるものではない。分散電源は、風力又は地熱などの自然エネルギーを利用して電力を発電する装置であってもよい。或いは、分散電源は、燃料ガスを利用して電力を生成する燃料電池であってもよい。
 実施形態では、制御部134がPCS130を制御する。このようなケースにおいて、制御部134は、EMS200又はリモートコントローラ210の指示に従ってPCS130を制御してもよい。すなわち、出力抑制メッセージによって定まる抑制電力閾値以下に分散電源の出力を抑制する制御部(制御部134と同様の機能を有する機能ブロック)は、EMS200又はリモートコントローラ210に設けられていてもよい。
 他の実施形態では、検証記録を記録する記録部136がPCS130に設けられている。しかしながら、実施形態はこれに限定されるものではない。検証記録を記録する記録部136は、EMS200又はリモートコントローラ210に設けられていてもよい。
 なお、日本国特許出願第2015-35086号(2015年2月25日出願)及び日本国特許出願第2015-35911号(2015年2月25日出願)の全内容が、参照により、本願に組み込まれている。

Claims (18)

  1.  分散電源から入力されるDC電力をAC電力に変換するインバータと、
     前記分散電源の出力の抑制度合いを示す抑制電力閾値以下に前記分散電源の出力を抑制する制御部とを備え、
     前記制御部は、前記分散電源の出力を抑制すべき抑制期間に含まれる集計期間において、前記分散電源の出力が前記抑制電力閾値を下回る期間が存在する場合に、前記分散電源の出力が前記抑制電力閾値を超えるように前記分散電源の出力を増大する制御を行うことを特徴とする電力変換装置。
  2.  前記制御部は、前記集計期間において、前記分散電源の出力の積算値が前記抑制電力閾値の積算値を超えないように前記制御を行うことを特徴とする請求項1に記載の電力変換装置。
  3.  前記制御部は、前記集計期間において、前記分散電源の出力の平均値が前記抑制電力閾値の平均値を超えないように前記制御を行うことを特徴とする請求項1又は請求項2に記載の電力変換装置。
  4.  前記制御部は、前記分散電源の出力を目標電力に近づけるように前記分散電源の出力を制御し、
     前記制御部は、前記抑制期間において前記抑制電力閾値を前記目標電力に設定するとともに、前記抑制期間外において最大電力を前記目標電力に設定することを特徴とする請求項1乃至請求項3のいずれかに記載の電力変換装置。
  5.  前記制御において、前記抑制電力閾値に対して前記分散電源の出力が継続的に超過する期間は、予め定められた期間以下であることを特徴とする請求項1乃至請求項4のいずれかに記載の電力変換装置。
  6.  前記制御において、前記抑制電力閾値に対する前記分散電源の出力の超過量は、予め定められた量以下であることを特徴とする請求項1乃至請求項5のいずれかに記載の電力変換装置。
  7.  前記制御部は、前記集計期間における前記分散電源の出力の積算値を出力することを特徴とする請求項1乃至請求項6のいずれかに記載の電力変換装置。
  8.  分散電源から入力されるDC電力をAC電力に変換する電力変換装置と、
     前記分散電源の出力の抑制度合いを示す抑制電力閾値以下に前記分散電源の出力を抑制する制御部とを備え、
     前記制御部は、前記分散電源の出力を抑制すべき抑制期間に含まれる集計期間において、前記分散電源の出力が前記抑制電力閾値を下回る期間が存在する場合に、前記分散電源の出力が前記抑制電力閾値を超えるように前記分散電源の出力を増大する制御を行うことを特徴とする電力管理システム。
  9.  分散電源から入力されるDC電力をAC電力に変換するとともに、蓄電池から入力されるDC電力をAC電力に変換し、かつ、前記蓄電池に出力されるDC電力にAC電力を変換するインバータと、
     前記分散電源の出力の抑制度合いを示す抑制電力閾値以下に前記分散電源の出力を抑制する制御部とを備え、
     前記制御部は、前記分散電源の出力を抑制すべき抑制期間に含まれる集計期間において、前記分散電源の出力によって前記蓄電池の充電を行う場合に、前記分散電源の出力が前記抑制電力閾値を超えるように前記分散電源の出力を増大する制御を行うことを特徴とする電力変換装置。
  10.  前記制御部は、前記集計期間において、前記分散電源の出力が前記抑制電力閾値を超過する超過量の積算値が前記蓄電池の充電量を超えないように前記制御を行うことを特徴とする請求項9に記載の電力変換装置。
  11.  前記制御部は、前記蓄電池の充電を行う前に前記制御を行う場合に、前記蓄電池の蓄電可能量に基づいて前記制御を行うことを特徴とする請求項9又は請求項10に記載の電力変換装置。
  12.  前記制御部は、前記蓄電池の充電を行った後に前記制御を行う場合に、前記蓄電池の蓄電済み量に基づいて前記制御を行うことを特徴とする請求項9又は請求項10に記載の電力変換装置。
  13.  前記制御部は、前記分散電源の出力を目標電力に近づけるように前記分散電源の出力を制御し、
     前記制御部は、前記抑制期間において前記抑制電力閾値を前記目標電力に設定するとともに、前記抑制期間外において最大電力を前記目標電力に設定することを特徴とする請求項9乃至請求項12のいずれかに記載の電力変換装置。
  14.  前記制御において、前記抑制電力閾値に対して前記分散電源の出力が継続的に超過する期間は、予め定められた期間以下であることを特徴とする請求項9乃至請求項13のいずれかに記載の電力変換装置。
  15.  前記制御において、前記抑制電力閾値に対する前記分散電源の出力の超過量は、予め定められた量以下であることを特徴とする請求項9乃至請求項14のいずれかに記載の電力変換装置。
  16.  前記制御部は、前記集計期間における前記インバータの出力の積算値を出力することを請求項9乃至請求項15のいずれかに記載の電力変換装置。
  17.  分散電源から入力されるDC電力をAC電力に変換するとともに、蓄電池から入力されるDC電力をAC電力に変換し、かつ、前記蓄電池に出力されるDC電力にAC電力を変換する電力変換装置と、
     前記分散電源の出力の抑制度合いを示す抑制電力閾値以下に前記分散電源の出力を抑制する制御部とを備え、
     前記制御部は、前記分散電源の出力を抑制すべき抑制期間に含まれる集計期間において、前記分散電源の出力によって前記蓄電池の充電を行う場合に、前記分散電源の出力が前記抑制電力閾値を超えるように前記分散電源の出力を増大する制御を行うことを特徴とする電力管理システム。
  18.  分散電源から入力されるDC電力をAC電力に変換するとともに、蓄電池から入力されるDC電力をAC電力に変換し、かつ、前記蓄電池に出力されるDC電力にAC電力を変換するステップと、
     前記分散電源の出力の抑制度合いを示す抑制電力閾値以下に前記分散電源の出力を抑制するステップと、
     前記分散電源の出力を抑制すべき抑制期間に含まれる集計期間において、前記分散電源の出力によって前記蓄電池の充電を行う場合に、前記分散電源の出力が前記抑制電力閾値を超えるように前記分散電源の出力を増大する制御を行うステップとを備えることを特徴とする電力変換方法。
     
PCT/JP2016/055569 2015-02-25 2016-02-25 電力変換装置、電力管理システム及び電力変換方法 WO2016136860A1 (ja)

Priority Applications (2)

Application Number Priority Date Filing Date Title
EP16755604.2A EP3264556A4 (en) 2015-02-25 2016-02-25 DEVICE FOR CONVERTING ELECTRICAL ENERGY, SYSTEM FOR MANAGING ELECTRICAL ENERGY AND METHOD FOR CONVERTING ELECTRICAL ENERGY
US15/553,340 US10666165B2 (en) 2015-02-25 2016-02-25 Power converting apparatus, power management system, and power converting method

Applications Claiming Priority (4)

Application Number Priority Date Filing Date Title
JP2015035911A JP6480212B2 (ja) 2015-02-25 2015-02-25 電力変換装置、電力管理システム及び電力変換方法
JP2015-035911 2015-02-25
JP2015-035086 2015-02-25
JP2015035086A JP6359472B2 (ja) 2015-02-25 2015-02-25 電力変換装置及び電力管理システム

Publications (1)

Publication Number Publication Date
WO2016136860A1 true WO2016136860A1 (ja) 2016-09-01

Family

ID=56788913

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2016/055569 WO2016136860A1 (ja) 2015-02-25 2016-02-25 電力変換装置、電力管理システム及び電力変換方法

Country Status (3)

Country Link
US (1) US10666165B2 (ja)
EP (1) EP3264556A4 (ja)
WO (1) WO2016136860A1 (ja)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2020012892A1 (ja) * 2018-07-10 2020-01-16 パナソニックIpマネジメント株式会社 電力変換システム、変換回路の制御方法及びプログラム

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2012139019A (ja) * 2010-12-27 2012-07-19 Noritz Corp パワーコンディショナ
JP2014027761A (ja) * 2012-07-26 2014-02-06 Noritz Corp パワーコンディショナ
JP2014045636A (ja) * 2012-08-29 2014-03-13 Daiwa House Industry Co Ltd 電力供給システム

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
ES2392226B1 (es) * 2009-12-16 2013-10-10 Gamesa Innovation & Technology, S.L. Métodos de control de aerogeneradores para mejorar la producción de energía recuperando pérdidas de energía.
EP2757250B1 (en) * 2012-11-30 2016-04-13 Mitsubishi Heavy Industries, Ltd. Wind farm output control device and output control method
JP2014171359A (ja) 2013-03-05 2014-09-18 Sharp Corp 電力変換装置

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2012139019A (ja) * 2010-12-27 2012-07-19 Noritz Corp パワーコンディショナ
JP2014027761A (ja) * 2012-07-26 2014-02-06 Noritz Corp パワーコンディショナ
JP2014045636A (ja) * 2012-08-29 2014-03-13 Daiwa House Industry Co Ltd 電力供給システム

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See also references of EP3264556A4 *

Also Published As

Publication number Publication date
US10666165B2 (en) 2020-05-26
EP3264556A4 (en) 2019-03-27
US20180138829A1 (en) 2018-05-17
EP3264556A1 (en) 2018-01-03

Similar Documents

Publication Publication Date Title
JP6359472B2 (ja) 電力変換装置及び電力管理システム
JP4213941B2 (ja) 複数の分散電源の出力抑制方法および分散電源管理システム
JP3469228B2 (ja) 蓄電装置の充放電制御装置及び充放電制御方法並びに電力貯蔵システム
JP6480212B2 (ja) 電力変換装置、電力管理システム及び電力変換方法
US10331153B2 (en) System and method of smart energy storage in a UPS
JP4369450B2 (ja) 電力供給システム
EP3197001A1 (en) Power management system and power management method
WO2011162025A1 (ja) 直流配電システム
JP2002017044A (ja) 電力変動平滑化装置及びそれを備えた分散電源システムの制御方法
JP6568992B2 (ja) 電力管理装置、電力管理システム及び電力管理方法
US20210194262A1 (en) Charge and discharge control system, charge and discharge control method, and program
EP2592713A2 (en) Battery power supply device and power controlling method for same
WO2020161765A1 (ja) 直流給電システム
JP2009197587A (ja) 風力発電設備
JP2014230455A (ja) 発電装置
JP6793321B2 (ja) 蓄電制御システム、蓄電システム、蓄電制御装置、充放電制御装置、及び蓄電装置
JP2017121171A (ja) 蓄電池充放電システム及び系統連系システム
WO2011152512A1 (ja) 給電制御装置
JP2020523971A (ja) エネルギー貯蔵システム
JPWO2015111144A1 (ja) 電力供給システム及びこれに用いるエネルギーマネジメントシステム
WO2016136860A1 (ja) 電力変換装置、電力管理システム及び電力変換方法
JP6475515B2 (ja) 電力変換装置及び電力管理システム
US8384242B2 (en) Method for controlling interconnection system
WO2020017428A1 (ja) 電力管理サーバ、エネルギー蓄積装置及び電力管理方法
WO2021038762A1 (ja) 充放電制御装置、蓄電システムおよび充放電制御方法

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 16755604

Country of ref document: EP

Kind code of ref document: A1

REEP Request for entry into the european phase

Ref document number: 2016755604

Country of ref document: EP

WWE Wipo information: entry into national phase

Ref document number: 15553340

Country of ref document: US

NENP Non-entry into the national phase

Ref country code: DE