WO2016065478A1 - Chargement dynamique et fracturation thermique de formations d'hydrocarbures - Google Patents

Chargement dynamique et fracturation thermique de formations d'hydrocarbures Download PDF

Info

Publication number
WO2016065478A1
WO2016065478A1 PCT/CA2015/051106 CA2015051106W WO2016065478A1 WO 2016065478 A1 WO2016065478 A1 WO 2016065478A1 CA 2015051106 W CA2015051106 W CA 2015051106W WO 2016065478 A1 WO2016065478 A1 WO 2016065478A1
Authority
WO
WIPO (PCT)
Prior art keywords
cavity
wellbore
bladder
vent
oxidant
Prior art date
Application number
PCT/CA2015/051106
Other languages
English (en)
Inventor
Fred Schneider
Original Assignee
Resource Innovations Inc.
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Resource Innovations Inc. filed Critical Resource Innovations Inc.
Publication of WO2016065478A1 publication Critical patent/WO2016065478A1/fr

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/25Methods for stimulating production
    • E21B43/26Methods for stimulating production by forming crevices or fractures
    • E21B43/2605Methods for stimulating production by forming crevices or fractures using gas or liquefied gas
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/25Methods for stimulating production
    • E21B43/26Methods for stimulating production by forming crevices or fractures
    • E21B43/263Methods for stimulating production by forming crevices or fractures using explosives
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/30Specific pattern of wells, e.g. optimising the spacing of wells
    • E21B43/305Specific pattern of wells, e.g. optimising the spacing of wells comprising at least one inclined or horizontal well

Definitions

  • Unconventional hydrocarbons are hydrocarbons that come from subterranean rock formations, or reservoirs, that were previously deemed unproductive and uneconomic. Due to recent technological innovations and an abundant in-place supply, unconventional hydrocarbons have emerged as the potential energy resource of the future. Shale rock and/or tight rock are examples of unconventional hydrocarbon sources which are currently being exploited for the recovery of hydrocarbons as a reliable, affordable, energy source. Relatively large reserves of hydrocarbon resources trapped in tight formations or between non-permeable laminations have become more accessible over the past decade based on the combining of two established technologies: multistage hydraulic fracturing and horizontal drilling. Historical processes to fracture rock include using dynamite, freezing, perforating explosives, pressurized water and other fluids that can hydraulically fracture.
  • Hydraulic fracturing is a process used in most unconventional hydrocarbon wells.
  • Large amounts of fracturing fluids including water, sand or proppants, and chemicals, are pumped underground through a wellbore and delivered to a hydrocarbon- bearing subterranean rock formation, to hydraulically break apart the rock for release of the hydrocarbons contained inside and provide fluid pathways to promote gravity drainage.
  • fracturing fluids including water, sand or proppants, and chemicals
  • Each well can utilize multi-stage hydraulic fracturing spaced along the entire length of the horizontal well, each stage requiring large volumes of water.
  • multi-stage fracturing technology has brought enormous resource into the economically recoverable categories.
  • the processes are expensive and have raised environmental concerns, not the least of which is the consumption of and subsequent sequestration of large volumes of surface water.
  • Cryogenic fracturing involves replacing some or all of the water component of typical fracturing fluids with nitrogen. While nitrogen can be stored and transported as a liquid at ambient temperatures, the vaporization of nitrogen during the fracking process creates an auto-refrigeration affect that lowers reservoir temperatures. This has a number of negative effects on post fracking production including:
  • paraffin molecules have a tendency to flocculate and adhere to solid surfaces.
  • Figure 1 is a representative drawing of prior art multi-stage hydraulic fracturing methods
  • Figures 2 to 7 illustrate steps in an embodiment of the method described herein.
  • Figure 2 is a representative drawing of an embodiment of a first step of the method, illustrating the drilling of a horizontal wellbore and a vertical wellbore in fluid communication with the horizontal wellbore;
  • Figure 3 is a representative drawing of an embodiment of a next step of the method, illustrating a surface liquid storage tank associated with the vertical wellbore, and the low pressure injection and propagation of a fuel, such as CH 4 , and an oxidant, such as O2, into the horizontal wellbore and into the formation;
  • a fuel such as CH 4
  • an oxidant such as O2
  • Figure 4 is a representative drawing of an embodiment of a next step of the method, illustrating high pressure injection and propagation of CH 4 and O2 along the wellbore and into the formation;
  • Figure 5 is a representative drawing of an embodiment of a next step of the method, illustrating the injection of a pyrophoric gas (accelerant) for ignition of the CH 4 and O2 mixture;
  • Figure 6 is a representative drawing of an embodiment of the next step of the method, illustrating ignition of the CH 4 and O2 mixture, and thermal and gaseous expansion;
  • Figure 7 is a representative drawing of the result of practicing the embodiment of the method described in Figures 2 to 6, illustrating the fracturing of the entire hydrocarbon formation;
  • Figure 8 is a representative drawing of an alternate embodiment of the method illustrating a sump reamed or created about a vertical wellbore for fluidly communicating with the horizontal wellbore;
  • Figure 9 is a representative drawing of an alternate embodiment, illustrating a vertical combustion cavity created below the wellbore for delivering fuel and an oxidant to the formation for ignition therein;
  • Figure 10 is a representative drawing of the embodiment of Fig. 9, illustrating an optional sacrificial liner or bladder for oxygen or fuel isolation with an associated vent valve or rupture mechanism;
  • Figures 1 1 A and 1 1 B are a representative drawing of the steps involved in an embodiment of the method described herein;
  • Figure 12 is a representative drawing of an embodiment illustrating a sump for fluidly connecting a vertical wellbore and a horizontal wellbore, and injection of the fuel gas, oxidant and pyrophoric gas through the horizontal wellbore;
  • Figure 13 is a representative drawing of an embodiment of the method for dynamic loading and thermal fracturing about a slanted wellbore.
  • Figure 14 is a graph showing the pressure and temperature near a subterranean cavity at the bottom of a vertical wellbore substantially similar to the embodiment illustrated in Figure 9, during a small-scale test of the initiation of rapid combustion using a pyrophoric gas as illustrated in Figure 5.
  • the combustion reaction generates heat and gas, which may cause a pressure/shock wave in the cavity, and consequent fracturing of the subterranean formation.
  • the method can fracture an entire formation in one event, reduces water consumption as compared to hydraulic fracturing, and can generate heat that increases production.
  • a method for creating fractures in a subterranean formation adjacent a cavity comprising: a. injecting a gaseous oxidant into the cavity to mix with a hydrocarbon fuel in the cavity, and b. introducing a pyrophoric gas into the cavity to initiate an auto-ignition reaction that initiates combustion of the oxidant and fuel, said combustion causing shock waves to travel along the cavity and form fractures in the subterranean formation adjacent to the cavity.
  • the cavity may be an uncased section of a horizontal wellbore, an uncased section of a vertical wellbore, or a combustion cavity created by mechanically reaming a wellbore to increase its volume.
  • the hydrocarbon fuel or portion thereof is injected into the cavity. In other embodiments the hydrocarbon fuel pre-exists in the cavity. [0027] In one embodiment, one of the gaseous oxidant or the hydrocarbon fuel is injected into a bladder disposed in the cavity, and the other of the gaseous oxidant or the hydrocarbon fuel is disposed in the cavity about the bladder. In a preferred embodiment the gaseous oxidant is disposed inside the bladder and the hydrocarbon fuel is on the outside of the bladder. In embodiments using a bladder the hydrocarbon fuel may be a liquid and in some embodiments the liquid may further comprise a proppant.
  • a first end of the cavity extends from a first cased wellbore, and method further comprises: a. providing a vent at a second end of the cavity; b. before initiating the auto-ignition reaction, temporarily isolating the vent from the cavity; and c. opening fluid communication between the vent and the cavity.
  • the temporary isolating of the vent may be by applying a hydraulic head to the cavity.
  • a moveable plug is positioned between the cavity and the vent and the hydraulic head is applied in the vent well uphole of the movable plug.
  • the pyrophoric gas is silane.
  • a method for creating fractures in a subterranean formation adjacent a cavity comprising the steps of: a. injecting a gaseous oxidant into the cavity to mix with a hydrocarbon fuel gas in the cavity, to form a combustible mixture; and b. introducing a pyrophoric gas into the cavity to initiate an auto-ignition reaction with the oxidant, which further causes combustion of the combustible mixture, said combustion causing Shock waves to travel through the formation and form fractures in the formation adjacent to the cavity.
  • the cavity may be an uncased section of a horizontal wellbore, an uncased section of a vertical wellbore, or a combustion cavity created by mechanically reaming a wellbore to increase its volume.
  • the hydrocarbon fuel or portion thereof is injected into the cavity. In other embodiments the hydrocarbon fuel pre-exists in the cavity.
  • the cavity is isolated from a cased wellbore in fluid communication with the cavity. This isolation may be, for example, with a packer assembly.
  • the method further comprises a. providing a vent to the cavity; and b. isolating the vent from the cavity before initiating the auto-ignition reaction.
  • the method of claim 16 wherein the isolating of the vent comprises applying a hydraulic head to the cavity.
  • the method may further comprise placing a moveable plug between the cavity and the vent and applying the hydraulic head in the vent uphole of the movable plug.
  • the pyrophoric gas is silane.
  • a method for creating fractures in a subterranean formation adjacent a cavity comprising the steps of: a. installing a bladder into the cavity; b. injecting a gaseous oxidant into the bladder and providing a hydrocarbon fuel in the cavity outside of the bladder, or c. injecting a hydrocarbon fuel into the bladder and injecting a gaseous oxidant into the cavity outside of the bladder; and d.
  • the cavity may be an uncased section of a horizontal wellbore, an uncased section of a vertical wellbore, or a combustion cavity created by mechanically reaming a wellbore to increase its volume.
  • the hydrocarbon fuel is a liquid.
  • the method further comprises adding a proppant to the cavity.
  • the bladder has a frangible section that releases the gaseous contents of the bladder into the cavity when the pressure differential between the inside of the bladder and the surrounding cavity exceeds a predetermined value.
  • the cavity is isolated from a cased wellbore in fluid communication with the cavity. This isolation may be accomplished, for example by using a packer assembly.
  • the method may further comprise: a. providing a vent to the cavity and b. isolating the vent from the cavity before initiating the auto-ignition reaction.
  • the step of isolating of the vent may be by applying a hydraulic head to the cavity.
  • a moveable plug is positioned between the cavity and the vent and the hydraulic head is applied in the vent uphole of the movable plug.
  • the pyrophoric gas is silane.
  • prior art fracturing techniques involved multi-staged fracturing along a horizontal wellbore 10.
  • the multi-staged fracturing would typically begin at a toe of the horizontal wellbore, wherein a first section of the wellbore would be isolated and fractured by the injection of high pressured fracturing fluid, mainly comprising of water and other components such as proppants, chemicals and the like.
  • the cavity is an uncased (openhole) portion of a wellbore, such as the uncased portion of a vertical wellbore or a deviated wellbore such as a horizontal or slanted wellbore.
  • the cavity is a combustion cavity reamed or otherwise created within the formation about a downhole end of a wellbore.
  • the cavity is a naturally-occurring cavity. While preferred methods contemplate that the cavity is entirely within the hydrocarbon-containing formation to be fractured, in some embodiments the cavity is partially within or close to that formation.
  • the method uses a combustion reaction to generate heat and gas in the cavity, thereby increasing both temperature and pressure in the cavity.
  • the pressure is increased to a pressure that is in excess of the fracture pressure of the formation.
  • the dynamic loading fracturing method described herein comprises the injection and propagation of a hydrocarbon fuel and a gaseous oxidant into a cavity disposed in a hydrocarbon formation, and then causing the fuel and oxidant to react or combust within the cavity and optionally within the formation itself, to create a thermal expansion gas event with sufficient energy to fracture the targeted geological structure.
  • the rapid thermal gaseous expansion of the reactants creates a pressure or shock wave that impacts the geologic structure to create fractures within the affected area.
  • the pressure wave can either be totally absorbed within the formation or through surface venting via an associated wellbore, or by other means.
  • a vertical well installed at the toe of a horizontal wellbore can be incorporated into the design, wherein the downhole reservoir pressure would be limited to the pressure needed to overcome annulus water head pressure.
  • the combustion reaction contemplated herein is the combustion of a hydrocarbon fuel and an oxidizing agent.
  • the hydrocarbon fuel may be a liquid or a gas. Different hydrocarbon fuels can be used, according to their chemical properties and depending on the properties of the formation. As examples, CH 4 (methane), C2H8 (ethane), natural gas and diesel may be used. C2H8 (ethane) may be preferred over CH 4 (methane) when there is a need for more thermal energy to enhance the fracking process.
  • the hydrocarbon fuel gas can be injected from the surface. In alternative embodiments, or in addition, the hydrocarbon fuel gas may not be injected from the surface, as hydrocarbons from the formation can be sourced directly therefrom, most effectively, natural gas.
  • the oxidizing agent may be a compound that contains oxygen, and includes O2 gas, air, oxygen enriched air, or other oxygen containing compounds (e.g., N2O).
  • the hydrocarbon fuel and oxidizing agent are preferably present in the cavity at an approximately stoichiometric ratio, however depending on the reservoir conditions, in some embodiments a rich or lean mixture may be used. Because some embodiments of the methods contemplate using a hydrocarbon fuel that already exists in the formation, the amount of hydrocarbon fuel and oxidizing agent that is/are injected into the cavity will be determined by taking into account the amount and type of pre-existing hydrocarbon fuel. If the combustion reaction is between CH 4 (methane) and O2 (oxygen), for example, the mass ratio of methane:oxygen in the cavity may be approximately 4: 1 assuming the reaction proceeds as follows:
  • This mass ratio may be achieved by injection of these gases into the cavity in a 4: 1 ratio, or by reducing the amount of methane/increasing the amount of O2 injected, after taking into consideration any pre-existing methane that is in the cavity.
  • the combustion reaction between the hydrocarbon fuel gas and the oxidant may be initiated by use of a pyrophoric gas.
  • a pyrophoric gas ignites spontaneously in air at or below 54 °C (130 °F).
  • Exemplary pyrophoric gases potentially useful for the methods described herein are silane, diborane, arsine and phosphine.
  • Silane is a preferred pyrophoric gas contemplated for use herein, and it may auto-ignite via the following reaction:
  • Applicant contemplates at least two general embodiments for initiating the combustion reaction by auto-ignition of the pyrophoric gas.
  • the cavity is filled with a mixture of a gaseous hydrocarbon fuel and the gaseous oxidant.
  • the pyrophoric gas is then added to the mixture in the cavity, alone or in combination with a slug of oxygen, wherein it will auto-ignite. Injection of silane concomitantly with a slug of oxygen leads to a more reliable auto-ignition, however this is not always necessary.
  • a bladder is inserted into the cavity, and the bladder may be filled with either the hydrocarbon fuel (gaseous or liquid) or with the gaseous oxidant; the cavity surrounding the bladder is filled with either the gaseous oxidant, or the hydrocarbon fuel (gaseous or liquid), respectively.
  • the pyrophoric gas is then added to the cavity alone or in combination with a slug of oxygen, wherein it will auto-ignite causing the bladder to rupture and release its contents for the combustion reaction to proceed.
  • a slug of oxygen In this embodiment there is less risk that the combustion reaction between the hydrocarbon fuel and the gaseous oxidant will initiate before the pyrophoric gas is added, leading to better control of the fracturing process.
  • re-treatment of the same cavity is difficult using this method, as a second bladder would need to be installed in the cavity.
  • Some embodiments of the method further contemplate the use of a pressure control mechanism to limit the pressure in the cavity and formation resulting from the combustion reaction.
  • the pressure control means assists in ensuring that the pressure in the cavity does not exceed a predetermined level which would damage the cavity (e.g., wellbore) or the formation, which would be unsafe, or which would lead to otherwise unpredictable results.
  • the pressure control means also assists in ensuring that a selected predetermined pressure, optimal for fracturing, is attained in the cavity.
  • the pressure control means may be, for example, a column of dampening fluid, a mechanical pressure release valve, a bridge plug, a wiper plug, a packer, or some combination of the above, that is fluidly connected to the cavity, and which can absorb some of the pressure generated therein by the combustion reaction.
  • FIG. 2 An embodiment of the dynamic loading and thermal fracturing method is now described with reference to Figs. 2 to 7. As shown, this embodiment comprises drilling a first wellbore having a wellhead 75, an upper section 70 comprising casing 25 cemented into the wellbore, and a lower uncased horizontal section 10, such as an openhole wellbore.
  • a second vertical cased wellbore 20 is drilled near a toe 30 of the horizontal section 10, and fluidly connected thereto; or in an embodiment the vertical wellbore 20 can be drilled to intersect the toe 30.
  • the vertical wellbore 20 creates a directional path for any fluids that are injected into the horizontal section 10, and further serves as a vent.
  • a surface liquid storage container or tank 40 can be fluidly connected to the vertical wellbore 20, and this section of the wellbore can be isolated from the horizontal section 10 by, for example a packer or a sacrificial plug 50, which can be positioned in the vertical wellbore 20 adjacent toe 30 of the horizontal section 10.
  • Two conveyance strings 60 and 62 such as coiled tubing strings, can be run into the vertical section 70 of the first wellbore to about the heel 80 of the horizontal section 10.
  • Packers 85 are set in the annulus between the casing and the conveyance strings, thus isolating the vertical section 70 from the horizontal section 10 of the wellbore.
  • the uncased (openhole) horizontal wellbore section can then be charged by injecting a fuel, such as a hydrocarbon fuel gas, for example natural gas or CH 4 , and an oxidant, such as O2 gas into the wellbore.
  • a fuel such as a hydrocarbon fuel gas, for example natural gas or CH 4
  • an oxidant such as O2 gas
  • the oxidant can be injected into the horizontal section 10 through the bore of the conveyance string 60, while the fuel can be injected into the horizontal section 10 through the bore of the conveyance string 62.
  • the hydrocarbon fuel can be spiked to a concentration well below its lower explosive limit (LEL) with air or enriched air to enhance the exothermic reaction and promote auto-ignition.
  • LEL lower explosive limit
  • the injected oxidant (O2) and fuel (CH 4 ) can mix at about the heel 80 of the horizontal section 10 and then flow along the horizontal section to towards the toe. As shown by the arrows entering the formation in Figs. 3 and 4, the fuel (CH 4 ) and oxidant (O2) can flow along the horizontal section 10 of the wellbore, and may enter into the surrounding formation and propagate or permeate through the formation using natural fissures and cracks, and/or pre-existing pores.
  • the hydrocarbon fuel gas and oxidant may be injected at approximately a stoichiometric ratio.
  • the use of an approximately stoichiometric ratio of the injected fuel and oxidant maximizes consumption or reaction of the injected O2 during subsequent ignition. That is, there is a limited amount of O2 injected into the formation, allowing for more precise control of ignition.
  • Fig. 4 illustrates the thermal gaseous expansion of propagation of the gaseous fuel and oxidant into the surrounding reservoir within the formation adjacent the horizontal section 10. The propagation may move from adjacent the heel 80 towards the toe 30.
  • the embodiments shown in Fig. 3 and 4 depict a low pressure injection followed by a higher pressure injection of the gaseous fuel and oxidant.
  • a higher pressure injection is used.
  • the pressure in the formation before the pyrophoric gas is injected i.e., before initiation of the combustion reaction
  • the pressure in the well is sufficiently high so that, on combustion, the pressure in the well will exceed fracture pressure, thereby fracturing the formation.
  • High pressure injection increases the process yield, ensuring predetermined energy release. Subsequent, secondary fracking events could be initiated within the thus created high permeability region, or alternately within depleted regions of a target reservoir by simply injecting oxygen into the fractured structure and auto-igniting.
  • the high pressure hydrocarbon fuel (CH 4 ) and oxidant (O2) injection increases the overall reservoir pressure which may cause the sacrificial bridge plug 50 in the second vertical wellbore 20 to dislodge. Accordingly, the increasing reservoir pressure acting on the bridge plug 50 can be counteracted with a head of dampening fluid 90, such as brackish water, above the bridge plug 50.
  • the head of dampening fluid 90 can further act to control any Shockwaves or pressure increases caused by the subsequent ignition of the CH 4 and O2.
  • a combustion cavity 100 can be reamed or otherwise created about the heel of the horizontal wellbore wherein the auto-ignition of the silane and subsequent ignition of the hydrocarbon fuel and the oxidant can be initiated.
  • a slug of pyrophoric gas such as silane
  • the pyrophoric gas can be introduced alone into the mixture via conduit 62, or it can be administered with additional oxygen (which is introduced via conduit 60).
  • manipulation of oxidant or hydrocarbon fuel concentrations through the use of a containment bladder can ensure maximum consumption of injected oxidant during combustion events. That is, there is a limited, targeted volume of oxidant injected into the formation to promote auto-ignition and sustain the combustion event, allowing for more precise control of ignition (see Fig. 10).
  • the injection of the pyrophoric gas and/or oxidant can be chased with a nitrogen gas purge, the inert nitrogen being injected through the bore of the conveyance string used to deliver these compounds to the wellbore.
  • the exothermic reaction creates a gas expansion front that propagates throughout the formation through existing fractures (where possible). This increases the existing network of channels within the geological structure, creating additional pathways which may release trapped hydrocarbons therein and permit them to move therethrough.
  • the reaction also cascades from about the heel 80 towards the toe 30 of the horizontal section 10, and from the horizontal section 10 radially into the surrounding formation on a vertical plane, creating further fractures.
  • the thermal and gaseous expansion cooperatively causes multiple fractures within the formation surrounding the entire length of the horizontal section 10.
  • the reservoir access created by the fractures not only improves reservoir permeability and hydrocarbon mobility, it also allows thermal propagation into the formation that enhances the expansion gas drive, reduces viscosities and promotes liquid expansion.
  • the sacrificial plug 50 could force the head of dampening fluid, such as water, in the second vertical wellbore in a manner to create a hydraulic pressure relief mechanism.
  • the liquid head pressure can act as a dampener and pressure control mechanism as the reservoir pressure displaces the dampening fluid to the surface for collection and reuse.
  • Figs. 3 to 7 illustrate the fuel and oxidant being injected through the first wellbore 70 and the dampening fluid in the second vertical wellbore 20.
  • the fuel and oxidant can be injected through the second wellbore while the dampening fluid can be injected through the first wellbore (see e.g., Fig. 1 1 ).
  • the surface storage tank 40 should be fluidly connected to the first wellbore.
  • a blow case sump 100 can be reamed or otherwise created within the formation about a downhole end of the vertical wellbore 20.
  • the sump 100 is created sufficiently large to fluidly connect the horizontal section 10 with the vertical wellbore 20.
  • the vertical wellbore 20 and the sump 100 can be filled with a dampening fluid 90, such as brackish water, to create a head of fluid in the vertical wellbore 20.
  • a dampening fluid 90 such as brackish water
  • the height of this liquid column within the vertical well bore is directly linked to reservoir pressure (i.e., height of the head of fluid)
  • reservoir pressure i.e., height of the head of fluid
  • the sump 100 can be filled with the dampening fluid by a conveyance string 1 10 fluidly connected to the surface liquid storage tank 40.
  • the annulus between the conveyance string 1 10 and the vertical wellbore 20 can be plugged using a bridge plug, cement 1 15, or by other means.
  • Residual energy from the combustion reaction can be limited and dampened by the second vertical wellbore 20 and sump 100.
  • the residual energy can be absorbed by the head of dampening fluid within the second vertical wellbore 20, causing the dampening fluid to rise.
  • the dampening fluid can flow to the surface and into the surface storage tank through the conveyance string 1 10 in the vertical wellbore 20. Any fluids forced to the surface would be captured for storage and eventual reuse from surface storage tank 40.
  • the second vertical well 20 in addition to the first horizontal well 10, is used as a production well.
  • the top panel of Fig. 12 shows the explosive oxidation reaction causing both thermal and gaseous expansion and fracturing of the formation (arrows).
  • the bottom panel of Fig. 12 shows mobilized hydrocarbons from the formation draining by gravity into the horizontal wellbore and into the sump 100 (vertical arrows) and being produced from the second vertical well and the horizontal well, with a thermally-enhanced gas drive.
  • an embodiment of this dynamic loading and thermal fracturing method can be adapted to be used with a single vertical wellbore in a hydrocarbon formation, where the geological structure is prone to channelling because of the inherent permeability. Accordingly, Applicant believes that fracturing along a horizontal plane within such formations using dynamic loading and thermal fracturing can create incremental horizontal permeability in conjunction with enhanced fluid drive mechanisms; reduced tendency for early breakthrough on gravity drainage applications, solution gas drive, over riding gas drive, decreased viscosity, etc.
  • a vertical wellbore 20 can be drilled into a hydrocarbon reservoir having geological structures that promote vertical channeling and inhibit horizontal communication necessary to support enhanced hydrocarbon exploitation.
  • a combustion cavity 105 can be reamed out or otherwise created about the downhole end of the wellbore 20. In an embodiment, the combustion cavity 105 can be drilled into the bottom rock structure below the hydrocarbon rich pay zone, typical of most carbonate structures.
  • Conveyance strings 120 and 122 can be run down the vertical wellbore 10, such that a downhole end of the conveyance strings 120 and 122 are positioned within the combustion cavity 105.
  • a packer 50 may be used to isolate the combustion cavity 105 from the cased wellbore 20 above.
  • an isolation bladder 130 can be used to provide segregation of the two reactants, fuel and oxygen.
  • a gaseous hydrocarbon fuel such as CH 4
  • a gaseous oxidant such as enriched air or O2
  • a gaseous oxidant such as enriched air or O2
  • a slug of pyrophoric gas such as silane
  • a slug of gaseous oxidant may also be injected into the cavity via conveyance string 120, to facilitate the auto-ignition reaction.
  • the injection of the pyrophoric gas can be chased with a nitrogen gas purge, the inert nitrogen being injected into the bore of the conveyance string 122 and optionally also into the bore of conveyance string 120.
  • a bladder 130 which may be flexible, inflatable or rigid, and a valve mechanism 140 can be incorporated into the conveyance string 120 to act as a trigger mechanism and a finer control for auto-ignition of silane and ignition of the fuel (CH 4 ) and oxidant (O2).
  • the bladder may be, for example, a plastic liner.
  • the bladder may be filled with hydrocarbon fuel or oxidant, and the cavity surrounding the bladder with oxidant or hydrocarbon fuel, respectively, thus separating the fuel and oxidant until ignition by the pyrophoric gas.
  • a mixture of oxidant and hydrocarbon fuel may be disposed outside of the bladder within the cavity.
  • the hydrocarbon fuel within or outside of the bladder may be liquid or gaseous.
  • Oxygen may be injected at the same time that the silane is injected, but down a separate conveyance string. This may be the conveyance string that is connected to the bladder, and at the interface between the conveyance string and the bladder a valve assembly may be operated to switch the outlet of the conveyance string from the bladder to the surrounding cavity. The oxygen would now flow into the surrounding cavity to contact the silane, causing the silane to auto- ignite.
  • silane may be injected down the same tubular as the methane but out into the cavity via a valve that can direct a gas from the conduit into the bladder or into the cavity.
  • the cavity contains oxygen and in some embodiments also methane. Oxygen may be injected at the same time as the silane is injected, down the other tubular.
  • the bladder 130 is disposed along all or a part of the horizontal section of a horizontal well. This may be accomplished, for example, as described in US 4,064,935.
  • One preferred embodiment of the method uses a liquid hydrocarbon fuel, such as diesel, in the cavity, and a gaseous oxidant in the bladder.
  • the liquid fuel may optionally contain a proppant, so that when the combustion reaction occurs the proppant is disposed in the fractures formed.
  • a rupture mechanism or valve mechanism 140 can cause the bladder 130 to discharge the oxidant or fuel into the combustion cavity 105. Then, when the pyrophoric catalyst comes into contact with the oxidant (or added oxidant), spontaneous combustion or auto-ignition causes a thermal and gaseous propagation. The injection of the pyrophoric gas causes a threshold combustion event sufficient to melt the plastic liner and permit the oxidant and fuel to mix in the cavity. The two combusting reactants create a gas expansion front moving radially away from the wellbore, subsequently migrating into pre-existing fractures with enough energy to further fracture the associated geological structure.
  • the fuel in the combustion cavity 100 can be enriched with a concentration of the oxidant, although care must be taken to ensure that the fuel to oxygen ratio stays below its lower explosive limit (LEL), in order to prevent premature auto-ignition.
  • LEL lower explosive limit
  • a frangible section on the plastic liner 130 can initiate rupture of the bladder when the bladder is pressurized beyond a selected pressure by the gas contained therein, for example.
  • Applicant believes embodiments of vertical dynamic loading and thermal fracturing can be applied to formations that are prone to vertical channeling, such as carbonate formations and/or formations that have undergone primary production, for example CHOPS (cold heavy oil production with sand) depleted formations.
  • existing channels in the formation form the directional flow path, thus obviating the need for a second vertical wellbore beyond the existing CHOPS wellbore.
  • Figs. 1 1A and 1 1 B illustrate various steps in another embodiment of the dynamic loading and thermal fracturing method described herein.
  • a directional path can be created by fluidly connecting the uncased (openhole) horizontal wellbore 10 to a second vertical wellbore 20 by forming a combustion cavity 100, such as by reaming or other known methods, or by directly intersecting the vertical wellbore with the horizontal wellbore (top panel in Fig 1 1 A).
  • Dampening fluid 90 can be injected into the vertical portion of the horizontal wellbore (and possibly also into the vertical wellbore) to serve to dampen or absorb the pressure wave that will result from dynamic loading and thermal fracturing (middle panel in Fig 1 1 A).
  • a wiper plug 50 may be inserted to isolate the uncased (openhole) horizontal wellbore from the column of dampening fluid.
  • a surface liquid storage tank 40 can be fluidly connected to either or both of the horizontal wellbore or the vertical wellbore for receiving and storing any dampening fluid that may exit the wellbores during fracturing.
  • Hydrocarbon fuel gas and gaseous oxidant can be injected into the cavity 100 using concentric tubing via conduits 62 and 60, respectively, and permitted to propagate throughout the wellbore and potentially also into the formation, to saturate the formation as much as possible with a mixture of fuel gas and oxidant.
  • the gases may be injected first at a low pressure (just above formation pressure) and second at a higher pressure (a pressure that will result in a pressure, on combustion, that exceeds fracking pressure) (middle and lower panel in Fig 1 1 A).
  • Conduits 60 and 62 may further comprise check valves as a back pressure control means.
  • a pyrophoric gas such as silane
  • Oxygen can be concurrently injected into cavity 100 via conduit 60, to enhance the auto-ignition of the pyrophoric gas.
  • the injection of the pyrophoric gas and oxygen can be followed by a purge of inert gas, such as nitrogen, for safety or other reasons.
  • FIG. 13 illustrates an embodiment after the fracturing method described herein was employed on an uncased (openhole) slanted wellbore 10, which is in production phase.
  • a second vertical wellbore 20 was drilled and fluidly connected to the slanted wellbore 10 by a sump 100 located near toe 30 of the slanted wellbore.
  • the sump was a water sump used to control pressure during the combustion stage, as described previously. In production it is an oil sump, the oil being delivered uphole via pump 150.
  • a combustion cavity at the bottom of a vertical well was reamed such that the target formation was exposed at the downhole end of the wellbore.
  • Two coiled tubing conveyance strings were run down the vertical wellbore such that the downhole end of the conveyance strings were positioned within the cavity.
  • the graph in Fig. 14 shows the temperature and pressure near the cavity, as measured by instrumentation installed in a water column in the wellbore above the cavity and in fluid communication with the cavity.
  • the graph shows a rapid rise in pressure to about 900 kPa, and temperature to about 100°C coinciding with the auto- ignition of the silane and O2 mixture, which in turn initiated rapid combustion of the O2 and CH 4 mixture. After ignition was observed through the pressure and temperature indicators, the flow of oxygen was stopped and the pressure and temperature returned to pre-ignition levels.
  • This small-scale, low-pressure test demonstrates the feasibility of a silane accelerant to achieve auto-ignition and initiation of rapid combustion, and that higher-volume, higher-pressure injection of O2, CH 4 , and an accelerant will prove effective when utilized in the embodiments described herein.

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Filling Or Discharging Of Gas Storage Vessels (AREA)

Abstract

L'invention concerne un procédé de création de fractures dans une formation souterraine adjacente à un puits de forage non tubé ou une autre cavité à proximité de la formation, qui consiste à injecter un oxydant gazeux dans la cavité pour le mélanger à un combustible hydrocarboné qui soit pré-existe dans la cavité, soit est introduit dans la cavité, puis amorcer une réaction d'auto-allumage d'un gaz pyrophorique qui, à son tour, amorce la combustion de l'oxydant et du carburant, ce qui provoque le déplacement d'ondes de choc le long de la cavité et la formation de fractures dans la formation souterraine. Un moyen de régulation de pression, tel qu'un puits d'aération, peut être utilisé pour réguler la pression de fracture. Le procédé permet la fracturation d'une formation entière en un événement, réduit l'utilisation d'eau et fournit de l'énergie thermique pour augmenter la production, entre autres avantages.
PCT/CA2015/051106 2014-10-30 2015-10-29 Chargement dynamique et fracturation thermique de formations d'hydrocarbures WO2016065478A1 (fr)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US201462072736P 2014-10-30 2014-10-30
US62/072,736 2014-10-30

Publications (1)

Publication Number Publication Date
WO2016065478A1 true WO2016065478A1 (fr) 2016-05-06

Family

ID=55856318

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CA2015/051106 WO2016065478A1 (fr) 2014-10-30 2015-10-29 Chargement dynamique et fracturation thermique de formations d'hydrocarbures

Country Status (1)

Country Link
WO (1) WO2016065478A1 (fr)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US11326434B2 (en) 2017-08-04 2022-05-10 Halliburton Energy Services, Inc. Methods for enhancing hydrocarbon production from subterranean formations using electrically controlled propellant
CN114876435A (zh) * 2022-05-30 2022-08-09 中国矿业大学 一种页岩气井助燃剂投放与甲烷原位燃爆压裂方法
CN115012897A (zh) * 2022-06-29 2022-09-06 西南石油大学 一种提高页岩油采收率的方法

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4499945A (en) * 1983-05-26 1985-02-19 The United States Of America As Represented By The United States Department Of Energy Silane-propane ignitor/burner
US5339897A (en) * 1991-12-20 1994-08-23 Exxon Producton Research Company Recovery and upgrading of hydrocarbon utilizing in situ combustion and horizontal wells
US5346015A (en) * 1993-05-24 1994-09-13 Halliburton Company Method of stimulation of a subterranean formation

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4499945A (en) * 1983-05-26 1985-02-19 The United States Of America As Represented By The United States Department Of Energy Silane-propane ignitor/burner
US5339897A (en) * 1991-12-20 1994-08-23 Exxon Producton Research Company Recovery and upgrading of hydrocarbon utilizing in situ combustion and horizontal wells
US5346015A (en) * 1993-05-24 1994-09-13 Halliburton Company Method of stimulation of a subterranean formation

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US11326434B2 (en) 2017-08-04 2022-05-10 Halliburton Energy Services, Inc. Methods for enhancing hydrocarbon production from subterranean formations using electrically controlled propellant
US11692424B2 (en) 2017-08-04 2023-07-04 Halliburton Energy Services, Inc. Fluid injection treatments in subterranean formations stimulated using propellants
CN114876435A (zh) * 2022-05-30 2022-08-09 中国矿业大学 一种页岩气井助燃剂投放与甲烷原位燃爆压裂方法
CN115012897A (zh) * 2022-06-29 2022-09-06 西南石油大学 一种提高页岩油采收率的方法
CN115012897B (zh) * 2022-06-29 2023-11-21 西南石油大学 一种提高页岩油采收率的方法

Similar Documents

Publication Publication Date Title
CN113294134B (zh) 一种水力压裂与甲烷原位燃爆协同致裂增透方法
US10655441B2 (en) Stimulation of light tight shale oil formations
Taber et al. EOR screening criteria revisited—Part 1: Introduction to screening criteria and enhanced recovery field projects
US6769486B2 (en) Cyclic solvent process for in-situ bitumen and heavy oil production
US3775073A (en) In situ gasification of coal by gas fracturing
CN112922577B (zh) 一种页岩储层多层次径向水平井甲烷燃爆压裂方法
CA2815737C (fr) Drainage par gravite au moyen de valeur a geometrie d'oxygene ajoutee destine a des reservoirs de bitumes endommages
CN104981584A (zh) 低渗透率轻质油储层中的流体注入
RU2539048C2 (ru) Способ добычи нефти при помощи внутрипластового горения (варианты)
CN112832728B (zh) 一种基于甲烷多级燃爆的页岩储层压裂方法
CN114278270B (zh) 甲烷原位控制燃爆压裂方法及其装置
US9556719B1 (en) Methods for recovering hydrocarbons from shale using thermally-induced microfractures
CN102493795A (zh) 液化氮气在油气层内气化压裂方法
RU2432460C2 (ru) Способы гидравлического разрыва пласта и добычи углеводородной текучей среды из пласта
US9664023B1 (en) Methods for recovering light hydrocarbons from shale using thermally-induced microfractures
US4102397A (en) Sealing an underground coal deposit for in situ production
WO2024103622A1 (fr) Procédé de développement de gaz de formation houillère basé sur une fracturation par explosion de combustion in situ de méthane de puits horizontal
WO2016065478A1 (fr) Chargement dynamique et fracturation thermique de formations d'hydrocarbures
CN106050200B (zh) 一种向低渗油藏注高压空气氧化裂解驱油方法
EA026516B1 (ru) Термическая мобилизация залежей тяжелых углеводородов
RU2429346C1 (ru) Способ разработки месторождения высоковязкой нефти с использованием внутрипластового горения
RU2403382C1 (ru) Способ разработки месторождения высоковязкой нефти
Turta In situ combustion
US2880802A (en) Recovery of hydrocarbons from oil-bearing strata
CN116816323B (zh) 一种甲烷原位燃爆压裂装置及燃爆压裂方法

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 15856112

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 15856112

Country of ref document: EP

Kind code of ref document: A1