WO2016038602A1 - Integrated jacking pipe - Google Patents

Integrated jacking pipe Download PDF

Info

Publication number
WO2016038602A1
WO2016038602A1 PCT/IL2015/050902 IL2015050902W WO2016038602A1 WO 2016038602 A1 WO2016038602 A1 WO 2016038602A1 IL 2015050902 W IL2015050902 W IL 2015050902W WO 2016038602 A1 WO2016038602 A1 WO 2016038602A1
Authority
WO
WIPO (PCT)
Prior art keywords
jacking
envelope
concrete
pipe
integrated
Prior art date
Application number
PCT/IL2015/050902
Other languages
French (fr)
Inventor
Ben Ami SOREK
Orel MARKOVICH
Original Assignee
Mekorot Water Company, Ltd.
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mekorot Water Company, Ltd. filed Critical Mekorot Water Company, Ltd.
Priority to CN201580052835.4A priority Critical patent/CN107109937A/en
Priority to ES15839927T priority patent/ES2938522T3/en
Priority to US15/509,635 priority patent/US10370967B2/en
Priority to SG11201701967PA priority patent/SG11201701967PA/en
Priority to EP15839927.9A priority patent/EP3191686B1/en
Priority to PL15839927.9T priority patent/PL3191686T3/en
Priority to KR1020177008660A priority patent/KR20170047365A/en
Publication of WO2016038602A1 publication Critical patent/WO2016038602A1/en
Priority to IL251035A priority patent/IL251035B/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/005Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries by forcing prefabricated elements through the ground, e.g. by pushing lining from an access pit
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling
    • E21B7/20Driving or forcing casings or pipes into boreholes, e.g. sinking; Simultaneously drilling and casing boreholes
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L1/00Laying or reclaiming pipes; Repairing or joining pipes on or under water
    • F16L1/024Laying or reclaiming pipes on land, e.g. above the ground
    • F16L1/028Laying or reclaiming pipes on land, e.g. above the ground in the ground
    • F16L1/036Laying or reclaiming pipes on land, e.g. above the ground in the ground the pipes being composed of sections of short length
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L13/00Non-disconnectible pipe-joints, e.g. soldered, adhesive or caulked joints
    • F16L13/02Welded joints
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L25/00Constructive types of pipe joints not provided for in groups F16L13/00 - F16L23/00 ; Details of pipe joints not otherwise provided for, e.g. electrically conducting or insulating means
    • F16L25/0027Joints for pipes made of reinforced concrete
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L9/00Rigid pipes
    • F16L9/14Compound tubes, i.e. made of materials not wholly covered by any one of the preceding groups
    • F16L9/153Compound tubes, i.e. made of materials not wholly covered by any one of the preceding groups comprising only layers of metal and concrete with or without reinforcement

Definitions

  • the invention relates to the field of pipe jacking.
  • Pipe jacking is often referred to as a guided, trenchless method for installation of pipe sections under obstacles.
  • a tunnel is formed using a drilling head, which is pushed further and further into the ground by reinforced concrete jacking pipes pushed behind it, in series.
  • the pushing (or "jacking") is performed using several sets of hydraulic jacks.
  • the drilling head usually houses a mechanical digging arm or a rotating head, and is steered using hydraulic steering jacks.
  • the drilling head may be remotely controlled and navigated by a human operator and/or in an automatic manner.
  • One way of navigating the drilling head is by emitting a laser beam into the jacked pipes, thereby creating a virtual straight path for the drilling head to follow.
  • it is quite common to have curved tunnels formed by pipe jacking in which case the navigation may intentionally but accurately deviate from the straight path of the laser beam.
  • the soil may be evacuated backwards using one or more conveyors or a pipeline with one or more pumps.
  • Some drilling heads are also equipped for grinding the excavated soil, for easier evacuation. It is also customary to fluidize the soil using one or more suitable agents, to make its evacuation even easier.
  • Pipe jacked tunnels are commonly manufactured with diameters ranging from 120 cm to 400 cm, however smaller and larger tunnels do exist occasionally.
  • intermediate jacking stations are sometimes introduced, to reduce the pressures.
  • the intermediate jacking stations provide for sections of the pipeline (namely, sections formed of multiple jacking pipes) to be independently moved, which reduces the force which the hydraulic jacks, at the entrance to the tunnel, have to apply.
  • reducing of the pressure is also often achieved by lubricating the outer annulus of the pipelines.
  • a jacking pipe may be made in a way that allows a serial connection of multiple jacking pipes, which finally form the desired tunnel. While the tunnel is being formed, a set of metal pipes is introduced into the serially -connected jacking pipes, to form a conduit in which a fluid will flow. The metal pipes are then welded to one another while introduced process. The welding makes the set of metal pipes form an elongated, sealed conduit within the jacking pipes and along the tunnel.
  • An embodiment provides an integrated jacking pipe comprising a concrete jacking envelope integrally-formed with and encircling a metal pipe, wherein said metal pipe comprises a spigot protruding from said concrete jacking envelope and a bell whose diameter is larger than a diameter of said spigot.
  • a further embodiment provides a method for pipe jacking, comprising: jack- pushing a drilling head into the ground; serially jack -pushing multiple integrated jacking pipes into the ground, wherein each of said multiple integrated jacking pipes comprises a concrete jacking envelope integrally-formed with and encircling a metal pipe, wherein said metal pipe comprises a spigot protruding from said concrete jacking envelope and a bell whose diameter is larger than a diameter of said spigot; and welding said metal pipes of said multiple integrated jacking pipes, to form a sealed conduit.
  • a further embodiment provides a tunnel comprising a series of integrated jacking pipes each comprising: a concrete jacking envelope integrally-formed with and encircling a metal pipe, wherein said metal pipe comprises a spigot protruding from said concrete jacking envelope and a bell whose diameter is larger than a diameter of said spigot, wherein every adjacent pair of said series of integrated jacking pipes comprises the spigot of one metal pipe welded to the bell of the other metal pipe, and wherein said metal pipes form together a sealed, pressure-resistant, elongated conduit.
  • the diameter of said bell is larger than the diameter of said spigot by more than twice a wall thickness of said metal pipe.
  • said bell is parallel to said spigot.
  • said bell is conical.
  • said concrete jacking envelope is made of reinforced concrete.
  • said metal pipe is made of steel.
  • said concrete jacking envelope comprises a first end portion with a circumferential seal and a second end portion with a circumferential metal collar.
  • said concrete jacking envelope comprises a lifting anchor.
  • the integrated jacking pipe further comprises a lubrication nozzle formed in both of said concrete jacking envelope and said metal pipe.
  • the integrated jacking pipe further comprises a load distributor disposed on a side rim of said concrete jacking envelope.
  • said load distributor comprises a plywood pad.
  • the method further comprises jack-pushing an intermediate jacking station between two adjacent ones of said multiple integrated jacking pipes, and operating said intermediate jacking station to repeatedly contract and expand.
  • said welding is a direct welding between said metal pipes.
  • Fig. 1 shows a front isometric view of an exemplary integrated jacking pipe
  • Fig. 2 shows a rear isometric view of the exemplary integrated jacking pipe
  • Fig. 3 shows a front view of the exemplary integrated jacking pipe
  • Fig. 4 shows a side view of the exemplary integrated jacking pipe
  • Fig. 5 shows a rear view of the exemplary integrated jacking pipe
  • Fig. 6 shows a side cross-sectional view of the exemplary integrated jacking pipe
  • Fig. 7 shows front isometric cross- sectional view of the exemplary integrated jacking pipe
  • Fig. 8 shows rear isometric cross-sectional view of the exemplary integrated jacking pipe.
  • an integrated jacking pipe which includes a concrete jacking envelope encircling a metal pipe.
  • the concrete jacking envelope and the metal pipe may be integrally-formed, for example by pouring concrete into a space between the metal pipe and a mold encircling the metal pipe, and allowing the concrete to cure.
  • the integrated jacking pipe may be configured in a way which allows, on one hand, durability of the metal pipe in high internal fluid pressures, and, on the other hand, utilization of the concrete jacking envelope for protecting the metal pipe against forces applied by the soil above, and for withstanding the loads applied during the jacking process.
  • multiple integrated jacking pipes may be serially connected in a "bell and spigot" configuration, to form a tunnel; unlike the common method in which a metal ring is used as a welding interface between two adjacent pipes, the present bell and spigot configuration has a much lesser need for labor- intensive welding of the metal pipes.
  • the metal pipe may have a wider end segment (hereinafter “bell”) and a narrower end segment (hereinafter “spigot”), such that, when multiple integrated jacking pipes are connected in series, the spigot of one metal pipe penetrates into the bell of another metal pipe. Following the jacking process, every pair of adjacent bell and spigot may be welded, to form a seal.
  • the metal pipe may be formed such that a certain circumferential clearance is maintained between every pair of adjacent bell and spigot. The clearance may prevent, or at least mitigate, any deformity that can result from contact between one metal pipe and another metal pipe during the pipe jacking process, in which, occasionally, two adjacent metal pipes may change their relative posture.
  • the clearance while slightly varying between different integrated jacking pipes, may still endow the space needed for the aforesaid purpose.
  • the level of clearance may be selected such that it balances between the deformity prevention and the subsequent welding; while the best welding is naturally achieved with near-zero clearance, adequate welding may still be achieved if some clearance exists, such as a clearance of a few millimeters to a few centimeters.
  • the concrete jacking envelope may include a concrete cylinder which has a narrower end segment (hereinafter “male end segment”) on one side, optionally surrounded by a rubber seal, and a circumferential metal collar (hereinafter “female end segment”) on the other side.
  • the female end segment may be anchored to the concrete cylinder when the integrated jacking pipe is formed, for example by molding.
  • the female end segment of one concrete jacking envelope may slide over the male end segment of an adjacent concrete jacking envelope, with the rubber seal interfacing between the two.
  • the rubber seal may prevent unwanted substances, such as underground water or/and a muddy mixture from penetrating the metal pipe.
  • the concrete jacking envelope may further include a load distributor, such as a plywood pad, disposed on a side rim of the concrete jacking envelope. If two adjacent integrated jacking pipes are not entirely parallel during the jacking process, the load distributor may absorb and distribute, over a relative large area of the side rim, the loads that, otherwise, would not have been evenly distributed over the side rim. This may help prevent damage to the concrete jacking envelope.
  • a load distributor such as a plywood pad
  • a plurality of integrated jacking pipes may be used in a jacking process, for example as follows:
  • a drilling head may be jack -pushed, from a jacking pit, into the ground. Following the drilling head, the integrated jacking pipes may be serially jack-pushed into the ground.
  • One or more intermediate jacking stations may be occasionally jack-pushed between two adjacent integrated jacking pipes, to relieve and distribute some of the pressure applied by the jack-pushing. The one or more intermediate jacking stations may be controlled and operated as known in the art, by causing then to repeatedly contract and expand as necessary.
  • a welding process may commence. However, if one or more of the intermediate jacking stations were used, these may be evacuated prior to welding. In the welding, the clearance between the spigot of one metal pipe and the bell of an adjacent metal pipe may be welded and filled with a consumable electrode (a "filler"). This welding may be referred to as “direct” “lap welding” of the spigot of one metal pipe to the bell of an adjacent metal pipe, since no other interfacing element, other than the filler, may be used. The filler may be the only interconnection between the two metal pipes.
  • the end result may be a tunnel composed of a series of integrated jacking pipes, whose metal pipes form a sealed, pressure-resistant, elongated conduit extending between the jacking pit and receiving pit, allowing for the flow of a fluid (i.e. liquid and/or gas), which is optionally pressurized significantly above atmospheric pressure.
  • a fluid i.e. liquid and/or gas
  • Common pressures may be from a few bars to ten or more bars.
  • Integrated jacking pipe 100 may include a metal pipe 102 surrounded by a concrete envelope 108.
  • Metal pipe 102 may have the general shape of a right circular cylinder, except for at least one end segment thereof, as discussed below.
  • a metal pipe may have a different general shape, such as an elliptical cylinder, a hollow N-gonal prism (where N >3), a non-symmetrical amorphous shape, etc.
  • a wall thickness of metal pipe 102 may be determined based on, for example, an intended fluid pressure anticipated to flow within the metal pipe, a viscosity of the fluid, an intended flow rate of the fluid, and/or the like.
  • the wall thickness may be between 0.4-1 centimeters (cm), 1-2 cm, 2-3 cm, 3-5 cm, or more than 5 cm.
  • a diameter of metal pipe 102 may be determined based on, for example, an intended fluid pressure anticipated to flow within the metal pipe, a viscosity of the fluid, an intended flow rate of the fluid, and/or the like.
  • the diameter may be between 50- 100 cm, 100-200 cm, 200-300 cm, 300-400 cm, or more than 400 cm.
  • Metal pipe 102 may be made, for example, of Grade B steel, as defined in ASTM
  • Metal pipe 102 may include a main segment 102a which bears the shape of a right circular cylinder, as discussed above. Metal pipe 102 may also include a spigot 104 which protrudes out of concrete envelope 108. Further, metal pipe 102 may include a bell 106. Segments 102a, 104 and 106 may be integrally-formed as a single metal pipe.
  • Spigot 104 may be a direct continuation of main segment 102a, namely, it may have the same diameter as main segment 102a.
  • Bell 106 may have a diameter larger than that of main segment 102a.
  • the difference between the diameters of bell 106 and main segment 102a may be over twice the wall thickness of metal pipe 102; for example, if the wall thickness is X, the diameter of bell 106 may be larger than the diameter of main segment 102a by 2X+a, where a is larger than zero.
  • a indicates the amount of clearance between a spigot of one metal pipe as it fits inside a bell of another metal pipe.
  • the transition between the main segment 102a and bell 106 may be a bend in metal pipe 102, which bend is optionally sigmoid-curved.
  • Bell 106 may extend in a parallel manner with respect to main segment 102a, namely - bell 106 may have a uniform diameter along its length.
  • a bell may be cone-shaped, opening gradually in the opposite direction from a main segment.
  • metal pipe 102 may be coated with a polyethylene layer (not shown) along a substantial amount of its outer surface, up to the entirety of its outer surface.
  • the polyethylene layer is approximately 5 millimeters (+50%, -20%) thick.
  • the polyethylene layer may have a different thickness.
  • the polyethylene layer may serve to absorb expansion of metal pipe 102, and prevent its expansion from reaching and affecting concrete envelope 108. Namely, the polyethylene layer may allow a certain degree of motion freedom between metal pipe 102 and concrete envelope 108. Additionally or alternatively, the polyethylene layer may serve to prevent or mitigate corrosion to metal pipe 102, in case humidity reaches the area of the metal pipe.
  • concrete envelope 108 ruptures and allows water to penetrate it towards metal pipe 102. In these embodiments, concrete envelope 108 contacts the polyethylene layer and not metal pipe 102 directly.
  • an edge 134 of bell 106 may undergo coating with an anticorrosive coating along the entire circumference of that edge.
  • the coating may take place after a bell of one integrated jacking pipe has been welded to the spigot of another jacking pipe.
  • spigot 104 is optionally provided with one or multiple apertures (not shown) along its circumference, through which a coating agent may be injected, in liquid form, from inside metal pipe 102 to a space delimited between: edge 134, a non-welded internal surface of bell 106, a plywood pad 118 (further discussed below), and an edge 136 of concrete envelope 108.
  • the injected coating agent may propagate along the circumference of bell 106 and optionally its non-welded internal surface, and completely fill the aforementioned space. After curing or hardening (depending on the type of coating agent used), the coating may protect edge 134 and optionally some of the non- welded internal surface of bell 106, from the damaging effect of humidity and water.
  • the coating agent includes one or more epoxy resins which cure after being injected through the apertures in spigot 104.
  • Concrete envelope 108 may have the shape of a right circular cylinder, except for two opposing end portions of concrete envelope 108, as discussed below. In other embodiments (not shown), concrete envelope 108 may have a different shape, such as an elliptical cylinder, a hollow N-gonal prism (where N ⁇ 3), a non-symmetrical amorphous shape, etc.
  • Concrete envelope 108 may be made of reinforced concrete.
  • the reinforcement may be using steel bars and/or the like which are implanted in concrete envelope 108 when it is formed.
  • Concrete envelope 108 due to being formed by pouring concrete over metal pipe 102, may have an inner shape imitating an outer shape of metal pipe 102.
  • a wall thickness of concrete envelope 108 may be dictated by the outer shape of metal pipe 102 and the shape of the mold used (not shown). The wall thickness of concrete envelope 108 may be determined based on, for example, predicted loads that may be applied to the concrete envelope during the jacking process, a pressure of the upper soil on the concrete envelope 108, requirements under certain standards and/or the like.
  • Concrete envelope 108 may include a first end portion 112, a second end portion 114 and a female end segment 110 positioned about the second end portion.
  • Female end segment 110 may be secured to concrete envelope 108 with one or more rigid anchors, such as anchor 110a, which are transplanted inside the concrete envelope when formed.
  • Female end segment 110 may enable a precise serial connection between two adjacent ones of integrated jacking pipe 100. Namely, female end segment 110 may receive and guide a first end portion of an adjacent concrete envelope 108, as the two are moved towards one another in the jacking process.
  • female end segment 110 may enable the forming of a seal between two adjacent ones of concrete envelope 108.
  • first end portion 112 may have a circumferential (optionally rubber) seal 116 disposed over it, such as inside a niche in the first end portion.
  • Circumferential seal 116 may be used in order to seal the connection between two adjacent ones of integrated jacking pipe 100.
  • a female end segment of one concrete envelope may encircle and engage a circumferential seal of another concrete envelope, thereby forming a seal between the two.
  • Such seal may be useful, for example, in cases where the jacking process takes place in a moist soil and/or in underground water.
  • Concrete envelope 108 may further include a load distributor, such as a ring- shaped plywood pad 118, disposed on a side rim nearest second end portion 114 of the concrete envelope.
  • Plywood pad 118 may be use to absorb and distribute the loads around the rim surface of concrete envelope 108, when two concrete envelopes are pushed one against the other in the jacking process.
  • Plywood pad 118 may compensate for the fact that an interface between the side rim nearest second end portion 114 of one concrete envelope, and a side ream nearest first end portion 112 of another concrete envelope, may not be flat. Namely, these rims may not be in full contact with one another, causing excessive forces to be applied to one or more sub-areas of the rims.
  • Plywood pad 118 may distribute these forces more evenly across the areas of the rims.
  • Concrete envelope 108 may further include one or more lifting anchors, such as lifting anchors 120, 122, 124, 126.
  • Lifting anchors 120, 122, 124 and 126 may enable securing integrated jacking pipe 100 to a crane or the like, for transporting the integrated jacking pipe, inserting it into a jacking pit, etc.
  • One or more of lifting anchors 120, 122, 124 and 126 are optionally DEHA-type anchors embedded inside concrete envelope 108; these anchors may be implanted when the concrete envelope is formed.
  • Lifting anchor 120 is shown enlarged, making its shape more clearly visible - an elongated cylinder with two opposing wider end segments, one embedded in concrete envelope 108 and one exposed.
  • One or more lubrication nozzles may exist in both concrete envelope 108 and metal pipe 102. Each such nozzle may be an opening which extends from an inner void of metal pipe 102 and out of an outer surface of concrete envelope 108.
  • Nozzles 128, 130, 132 may be used for injection of a lubrication fluid in cases of rough soil conditions, as known in the art, thereby reducing friction between an outer surface of concrete envelope 108 and the soil.
  • one or more of nozzles 128, 130, 132 may be sealed, for example with a combination of a sealant (not shown) deposited within the nozzles, and a conical steel cap (not shown) threaded from within metal pipe 102 into each of the nozzles. Once fully threaded, each conical steel cap may lie essentially flat with the rest of the internal surface of metal pipe 102. Optionally, the circumference of the conical steel cap may then be welded to metal pipe 102, to form a durable seal able to withstand the anticipated fluid pressure in the metal pipe.
  • nozzles 128, 130, 132 and lifting anchors 120, 122, 124, 126 it should be noted that a radial position of some of these elements has been shifted between Figs. 1-2 versus Fig. 6, in order for some of these elements to be more conveniently-visible in the cross sectional view which Fig. 6 provides.
  • the position of these elements in integrated jacking pipe 100 is only one example of such positioning. In other embodiments (not shown), the position of one or more such elements may be different, and determined, for example, by considerations related to lifting and lubrication, respectively.

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Geology (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Environmental & Geological Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Fluid Mechanics (AREA)
  • Lining And Supports For Tunnels (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)
  • Branch Pipes, Bends, And The Like (AREA)
  • Devices That Are Associated With Refrigeration Equipment (AREA)
  • Flexible Shafts (AREA)

Abstract

An integrated jacking pipe comprising a concrete jacking envelope integrally- formed with and encircling a metal pipe, wherein said metal pipe comprises a spigot protruding from said concrete jacking envelope and a bell whose diameter is larger than a diameter of said spigot.

Description

INTEGRATED JACKING PIPE
FIELD OF THE INVENTION
The invention relates to the field of pipe jacking.
BACKGROUND
Pipe jacking is often referred to as a guided, trenchless method for installation of pipe sections under obstacles. A tunnel is formed using a drilling head, which is pushed further and further into the ground by reinforced concrete jacking pipes pushed behind it, in series. The pushing (or "jacking") is performed using several sets of hydraulic jacks. The drilling head usually houses a mechanical digging arm or a rotating head, and is steered using hydraulic steering jacks. The drilling head may be remotely controlled and navigated by a human operator and/or in an automatic manner. One way of navigating the drilling head is by emitting a laser beam into the jacked pipes, thereby creating a virtual straight path for the drilling head to follow. However, it is quite common to have curved tunnels formed by pipe jacking, in which case the navigation may intentionally but accurately deviate from the straight path of the laser beam.
As the drilling head excavates soil from its frontal area, the soil may be evacuated backwards using one or more conveyors or a pipeline with one or more pumps. Some drilling heads are also equipped for grinding the excavated soil, for easier evacuation. It is also customary to fluidize the soil using one or more suitable agents, to make its evacuation even easier.
Pipe jacked tunnels are commonly manufactured with diameters ranging from 120 cm to 400 cm, however smaller and larger tunnels do exist occasionally. In ground conditions where the tunnel can be exposed to additional pressures due to the plasticity of the ground, intermediate jacking stations are sometimes introduced, to reduce the pressures. The intermediate jacking stations provide for sections of the pipeline (namely, sections formed of multiple jacking pipes) to be independently moved, which reduces the force which the hydraulic jacks, at the entrance to the tunnel, have to apply. In cases of high plasticity ground conditions, reducing of the pressure is also often achieved by lubricating the outer annulus of the pipelines.
A jacking pipe may be made in a way that allows a serial connection of multiple jacking pipes, which finally form the desired tunnel. While the tunnel is being formed, a set of metal pipes is introduced into the serially -connected jacking pipes, to form a conduit in which a fluid will flow. The metal pipes are then welded to one another while introduced process. The welding makes the set of metal pipes form an elongated, sealed conduit within the jacking pipes and along the tunnel.
The foregoing examples of the related art and limitations related therewith are intended to be illustrative and not exclusive. Other limitations of the related art will become apparent to those of skill in the art upon a reading of the specification and a study of the figures. SUMMARY
The following embodiments and aspects thereof are described and illustrated in conjunction with systems, tools and methods which are meant to be exemplary and illustrative, not limiting in scope.
An embodiment provides an integrated jacking pipe comprising a concrete jacking envelope integrally-formed with and encircling a metal pipe, wherein said metal pipe comprises a spigot protruding from said concrete jacking envelope and a bell whose diameter is larger than a diameter of said spigot.
A further embodiment provides a method for pipe jacking, comprising: jack- pushing a drilling head into the ground; serially jack -pushing multiple integrated jacking pipes into the ground, wherein each of said multiple integrated jacking pipes comprises a concrete jacking envelope integrally-formed with and encircling a metal pipe, wherein said metal pipe comprises a spigot protruding from said concrete jacking envelope and a bell whose diameter is larger than a diameter of said spigot; and welding said metal pipes of said multiple integrated jacking pipes, to form a sealed conduit.
A further embodiment provides a tunnel comprising a series of integrated jacking pipes each comprising: a concrete jacking envelope integrally-formed with and encircling a metal pipe, wherein said metal pipe comprises a spigot protruding from said concrete jacking envelope and a bell whose diameter is larger than a diameter of said spigot, wherein every adjacent pair of said series of integrated jacking pipes comprises the spigot of one metal pipe welded to the bell of the other metal pipe, and wherein said metal pipes form together a sealed, pressure-resistant, elongated conduit. In some embodiments, the diameter of said bell is larger than the diameter of said spigot by more than twice a wall thickness of said metal pipe.
In some embodiments, said bell is parallel to said spigot.
In some embodiments, said bell is conical.
In some embodiments, said concrete jacking envelope is made of reinforced concrete.
In some embodiments, said metal pipe is made of steel.
In some embodiments, said concrete jacking envelope comprises a first end portion with a circumferential seal and a second end portion with a circumferential metal collar.
In some embodiments, said concrete jacking envelope comprises a lifting anchor.
In some embodiments, the integrated jacking pipe further comprises a lubrication nozzle formed in both of said concrete jacking envelope and said metal pipe.
In some embodiments, the integrated jacking pipe further comprises a load distributor disposed on a side rim of said concrete jacking envelope.
In some embodiments, said load distributor comprises a plywood pad.
In some embodiments, the method further comprises jack-pushing an intermediate jacking station between two adjacent ones of said multiple integrated jacking pipes, and operating said intermediate jacking station to repeatedly contract and expand.
In some embodiments, said welding is a direct welding between said metal pipes.
In addition to the exemplary aspects and embodiments described above, further aspects and embodiments will become apparent by reference to the figures and by study of the following detailed description.
BRIEF DESCRIPTION OF THE FIGURES
Exemplary embodiments are illustrated in referenced figures. Dimensions of components and features shown in the figures are generally chosen for convenience and clarity of presentation and are not necessarily shown to scale. The figures are listed below.
Fig. 1 shows a front isometric view of an exemplary integrated jacking pipe; Fig. 2 shows a rear isometric view of the exemplary integrated jacking pipe; Fig. 3 shows a front view of the exemplary integrated jacking pipe;
Fig. 4 shows a side view of the exemplary integrated jacking pipe; Fig. 5 shows a rear view of the exemplary integrated jacking pipe;
Fig. 6 shows a side cross-sectional view of the exemplary integrated jacking pipe;
Fig. 7 shows front isometric cross- sectional view of the exemplary integrated jacking pipe; and
Fig. 8 shows rear isometric cross-sectional view of the exemplary integrated jacking pipe.
DETAILED DESCRIPTION
Disclosed herein is an integrated jacking pipe which includes a concrete jacking envelope encircling a metal pipe. The concrete jacking envelope and the metal pipe may be integrally-formed, for example by pouring concrete into a space between the metal pipe and a mold encircling the metal pipe, and allowing the concrete to cure.
Advantageously, the integrated jacking pipe may be configured in a way which allows, on one hand, durability of the metal pipe in high internal fluid pressures, and, on the other hand, utilization of the concrete jacking envelope for protecting the metal pipe against forces applied by the soil above, and for withstanding the loads applied during the jacking process.
Further advantageously, multiple integrated jacking pipes may be serially connected in a "bell and spigot" configuration, to form a tunnel; unlike the common method in which a metal ring is used as a welding interface between two adjacent pipes, the present bell and spigot configuration has a much lesser need for labor- intensive welding of the metal pipes.
The metal pipe may have a wider end segment (hereinafter "bell") and a narrower end segment (hereinafter "spigot"), such that, when multiple integrated jacking pipes are connected in series, the spigot of one metal pipe penetrates into the bell of another metal pipe. Following the jacking process, every pair of adjacent bell and spigot may be welded, to form a seal. The metal pipe may be formed such that a certain circumferential clearance is maintained between every pair of adjacent bell and spigot. The clearance may prevent, or at least mitigate, any deformity that can result from contact between one metal pipe and another metal pipe during the pipe jacking process, in which, occasionally, two adjacent metal pipes may change their relative posture. In addition, due to accuracy limitations inherent to the manufacturing process of the integrated jacking pipe, the clearance, while slightly varying between different integrated jacking pipes, may still endow the space needed for the aforesaid purpose. The level of clearance may be selected such that it balances between the deformity prevention and the subsequent welding; while the best welding is naturally achieved with near-zero clearance, adequate welding may still be achieved if some clearance exists, such as a clearance of a few millimeters to a few centimeters.
The concrete jacking envelope, in turn, may include a concrete cylinder which has a narrower end segment (hereinafter "male end segment") on one side, optionally surrounded by a rubber seal, and a circumferential metal collar (hereinafter "female end segment") on the other side. The female end segment may be anchored to the concrete cylinder when the integrated jacking pipe is formed, for example by molding. When multiple integrated jacking pipes are interconnected, the female end segment of one concrete jacking envelope may slide over the male end segment of an adjacent concrete jacking envelope, with the rubber seal interfacing between the two. The rubber seal may prevent unwanted substances, such as underground water or/and a muddy mixture from penetrating the metal pipe.
The concrete jacking envelope may further include a load distributor, such as a plywood pad, disposed on a side rim of the concrete jacking envelope. If two adjacent integrated jacking pipes are not entirely parallel during the jacking process, the load distributor may absorb and distribute, over a relative large area of the side rim, the loads that, otherwise, would not have been evenly distributed over the side rim. This may help prevent damage to the concrete jacking envelope.
A plurality of integrated jacking pipes may be used in a jacking process, for example as follows:
A drilling head, as known in the art, may be jack -pushed, from a jacking pit, into the ground. Following the drilling head, the integrated jacking pipes may be serially jack-pushed into the ground. One or more intermediate jacking stations, as known in the art, may be occasionally jack-pushed between two adjacent integrated jacking pipes, to relieve and distribute some of the pressure applied by the jack-pushing. The one or more intermediate jacking stations may be controlled and operated as known in the art, by causing then to repeatedly contract and expand as necessary.
When enough integrated jacking pipes are jack -pushed and the first integrated jacking pipe in the series emerges from a receiving pit, a welding process may commence. However, if one or more of the intermediate jacking stations were used, these may be evacuated prior to welding. In the welding, the clearance between the spigot of one metal pipe and the bell of an adjacent metal pipe may be welded and filled with a consumable electrode (a "filler"). This welding may be referred to as "direct" "lap welding" of the spigot of one metal pipe to the bell of an adjacent metal pipe, since no other interfacing element, other than the filler, may be used. The filler may be the only interconnection between the two metal pipes.
The end result may be a tunnel composed of a series of integrated jacking pipes, whose metal pipes form a sealed, pressure-resistant, elongated conduit extending between the jacking pit and receiving pit, allowing for the flow of a fluid (i.e. liquid and/or gas), which is optionally pressurized significantly above atmospheric pressure. Common pressures may be from a few bars to ten or more bars.
Reference is now made to Figs. 1-8, which show, respectively, a front isometric view, a rear isometric view, a lengthwise cross -sectional view, a rear view, a front view, a side view, a rear isometric cross-sectional view and a front isometric cross- sectional view of an exemplary integrated jacking pipe 100. Integrated jacking pipe 100 may include a metal pipe 102 surrounded by a concrete envelope 108.
Metal pipe 102 may have the general shape of a right circular cylinder, except for at least one end segment thereof, as discussed below. In other embodiments (not shown), a metal pipe may have a different general shape, such as an elliptical cylinder, a hollow N-gonal prism (where N >3), a non-symmetrical amorphous shape, etc.
A wall thickness of metal pipe 102 may be determined based on, for example, an intended fluid pressure anticipated to flow within the metal pipe, a viscosity of the fluid, an intended flow rate of the fluid, and/or the like. For example, the wall thickness may be between 0.4-1 centimeters (cm), 1-2 cm, 2-3 cm, 3-5 cm, or more than 5 cm.
Similarly, a diameter of metal pipe 102 may be determined based on, for example, an intended fluid pressure anticipated to flow within the metal pipe, a viscosity of the fluid, an intended flow rate of the fluid, and/or the like. For example, the diameter may be between 50- 100 cm, 100-200 cm, 200-300 cm, 300-400 cm, or more than 400 cm.
Metal pipe 102 may be made, for example, of Grade B steel, as defined in ASTM
International, "A139 / A139M - 04(2010): Standard Specification for Electric-Fusion (Arc)-Welded Steel Pipe (NPS 4 and Over). Metal pipe 102 may include a main segment 102a which bears the shape of a right circular cylinder, as discussed above. Metal pipe 102 may also include a spigot 104 which protrudes out of concrete envelope 108. Further, metal pipe 102 may include a bell 106. Segments 102a, 104 and 106 may be integrally-formed as a single metal pipe.
Spigot 104 may be a direct continuation of main segment 102a, namely, it may have the same diameter as main segment 102a. Bell 106 may have a diameter larger than that of main segment 102a. The difference between the diameters of bell 106 and main segment 102a may be over twice the wall thickness of metal pipe 102; for example, if the wall thickness is X, the diameter of bell 106 may be larger than the diameter of main segment 102a by 2X+a, where a is larger than zero. Namely, a indicates the amount of clearance between a spigot of one metal pipe as it fits inside a bell of another metal pipe. In some embodiments, a measures between 2-15 millimeters. In other embodiments, a measures between 5-12 millimeters. In other embodiments, a measures between 8-10 millimeters.
The transition between the main segment 102a and bell 106 may be a bend in metal pipe 102, which bend is optionally sigmoid-curved.
Bell 106 may extend in a parallel manner with respect to main segment 102a, namely - bell 106 may have a uniform diameter along its length. In other embodiments (not shown), a bell may be cone-shaped, opening gradually in the opposite direction from a main segment.
In some embodiments, metal pipe 102 may be coated with a polyethylene layer (not shown) along a substantial amount of its outer surface, up to the entirety of its outer surface. Optionally, the polyethylene layer is approximately 5 millimeters (+50%, -20%) thick. In further options, the polyethylene layer may have a different thickness. The polyethylene layer may serve to absorb expansion of metal pipe 102, and prevent its expansion from reaching and affecting concrete envelope 108. Namely, the polyethylene layer may allow a certain degree of motion freedom between metal pipe 102 and concrete envelope 108. Additionally or alternatively, the polyethylene layer may serve to prevent or mitigate corrosion to metal pipe 102, in case humidity reaches the area of the metal pipe. One example is when concrete envelope 108 ruptures and allows water to penetrate it towards metal pipe 102. In these embodiments, concrete envelope 108 contacts the polyethylene layer and not metal pipe 102 directly.
In some embodiments, an edge 134 of bell 106, and optionally some of the internal surface of the bell which remains non-welded, may undergo coating with an anticorrosive coating along the entire circumference of that edge. The coating may take place after a bell of one integrated jacking pipe has been welded to the spigot of another jacking pipe. To this end, spigot 104 is optionally provided with one or multiple apertures (not shown) along its circumference, through which a coating agent may be injected, in liquid form, from inside metal pipe 102 to a space delimited between: edge 134, a non-welded internal surface of bell 106, a plywood pad 118 (further discussed below), and an edge 136 of concrete envelope 108. The injected coating agent may propagate along the circumference of bell 106 and optionally its non-welded internal surface, and completely fill the aforementioned space. After curing or hardening (depending on the type of coating agent used), the coating may protect edge 134 and optionally some of the non- welded internal surface of bell 106, from the damaging effect of humidity and water. Optionally, the coating agent includes one or more epoxy resins which cure after being injected through the apertures in spigot 104.
Concrete envelope 108 may have the shape of a right circular cylinder, except for two opposing end portions of concrete envelope 108, as discussed below. In other embodiments (not shown), concrete envelope 108 may have a different shape, such as an elliptical cylinder, a hollow N-gonal prism (where N≥ 3), a non-symmetrical amorphous shape, etc.
Concrete envelope 108 may be made of reinforced concrete. The reinforcement may be using steel bars and/or the like which are implanted in concrete envelope 108 when it is formed.
Concrete envelope 108, due to being formed by pouring concrete over metal pipe 102, may have an inner shape imitating an outer shape of metal pipe 102. A wall thickness of concrete envelope 108 may be dictated by the outer shape of metal pipe 102 and the shape of the mold used (not shown). The wall thickness of concrete envelope 108 may be determined based on, for example, predicted loads that may be applied to the concrete envelope during the jacking process, a pressure of the upper soil on the concrete envelope 108, requirements under certain standards and/or the like.
Concrete envelope 108 may include a first end portion 112, a second end portion 114 and a female end segment 110 positioned about the second end portion. Female end segment 110 may be secured to concrete envelope 108 with one or more rigid anchors, such as anchor 110a, which are transplanted inside the concrete envelope when formed. Female end segment 110 may enable a precise serial connection between two adjacent ones of integrated jacking pipe 100. Namely, female end segment 110 may receive and guide a first end portion of an adjacent concrete envelope 108, as the two are moved towards one another in the jacking process.
Additionally or alternatively, female end segment 110 may enable the forming of a seal between two adjacent ones of concrete envelope 108. To this end, first end portion 112 may have a circumferential (optionally rubber) seal 116 disposed over it, such as inside a niche in the first end portion. Circumferential seal 116 may be used in order to seal the connection between two adjacent ones of integrated jacking pipe 100. Namely, a female end segment of one concrete envelope may encircle and engage a circumferential seal of another concrete envelope, thereby forming a seal between the two. Such seal may be useful, for example, in cases where the jacking process takes place in a moist soil and/or in underground water.
Concrete envelope 108 may further include a load distributor, such as a ring- shaped plywood pad 118, disposed on a side rim nearest second end portion 114 of the concrete envelope. Plywood pad 118 may be use to absorb and distribute the loads around the rim surface of concrete envelope 108, when two concrete envelopes are pushed one against the other in the jacking process. Plywood pad 118 may compensate for the fact that an interface between the side rim nearest second end portion 114 of one concrete envelope, and a side ream nearest first end portion 112 of another concrete envelope, may not be flat. Namely, these rims may not be in full contact with one another, causing excessive forces to be applied to one or more sub-areas of the rims. Plywood pad 118 may distribute these forces more evenly across the areas of the rims.
Concrete envelope 108 may further include one or more lifting anchors, such as lifting anchors 120, 122, 124, 126. Lifting anchors 120, 122, 124 and 126 may enable securing integrated jacking pipe 100 to a crane or the like, for transporting the integrated jacking pipe, inserting it into a jacking pit, etc. One or more of lifting anchors 120, 122, 124 and 126 are optionally DEHA-type anchors embedded inside concrete envelope 108; these anchors may be implanted when the concrete envelope is formed. Lifting anchor 120 is shown enlarged, making its shape more clearly visible - an elongated cylinder with two opposing wider end segments, one embedded in concrete envelope 108 and one exposed. One or more lubrication nozzles, such as nozzles 128, 130, 132, may exist in both concrete envelope 108 and metal pipe 102. Each such nozzle may be an opening which extends from an inner void of metal pipe 102 and out of an outer surface of concrete envelope 108. Nozzles 128, 130, 132 may be used for injection of a lubrication fluid in cases of rough soil conditions, as known in the art, thereby reducing friction between an outer surface of concrete envelope 108 and the soil. Optionally, when the injection of the lubrication fluid ends, one or more of nozzles 128, 130, 132 may be sealed, for example with a combination of a sealant (not shown) deposited within the nozzles, and a conical steel cap (not shown) threaded from within metal pipe 102 into each of the nozzles. Once fully threaded, each conical steel cap may lie essentially flat with the rest of the internal surface of metal pipe 102. Optionally, the circumference of the conical steel cap may then be welded to metal pipe 102, to form a durable seal able to withstand the anticipated fluid pressure in the metal pipe.
With regard to nozzles 128, 130, 132 and lifting anchors 120, 122, 124, 126, it should be noted that a radial position of some of these elements has been shifted between Figs. 1-2 versus Fig. 6, in order for some of these elements to be more conveniently-visible in the cross sectional view which Fig. 6 provides. In addition, the position of these elements in integrated jacking pipe 100, as shown in the various figures, is only one example of such positioning. In other embodiments (not shown), the position of one or more such elements may be different, and determined, for example, by considerations related to lifting and lubrication, respectively.
In the description and claims of the application, each of the words "comprise" "include" and "have", and forms thereof, are not necessarily limited to members in a list with which the words may be associated. In addition, where there are inconsistencies between this application and any document incorporated by reference, it is hereby intended that the present application controls.

Claims

CLAIMS What is claimed is:
1. An integrated jacking pipe comprising a concrete jacking envelope integrally- formed with and encircling a metal pipe, wherein said metal pipe comprises a spigot protruding from said concrete jacking envelope and a bell whose diameter is larger than a diameter of said spigot.
2. The integrated jacking pipe according to claim 1, wherein the diameter of said bell is larger than the diameter of said spigot by more than twice a wall thickness of said metal pipe.
3. The integrated jacking pipe according to claim 1, wherein said bell is parallel to said spigot.
4. The integrated jacking pipe according to claim 1, wherein said bell is. sometimes conical. (depends on the diameter).
5. The integrated jacking pipe according to claim 1, wherein said concrete jacking envelope is made of reinforced concrete.
6. The integrated jacking pipe according to claim 1, wherein said metal pipe is made of steel.
7. The integrated jacking pipe according to claim 1, wherein said concrete jacking envelope comprises a first end portion with a circumferential seal and a second end portion with a circumferential metal collar.
8. The integrated jacking pipe according to claim 1, wherein said concrete jacking envelope comprises a lifting anchor.
9. The integrated jacking pipe according to claim 1, further comprising a lubrication nozzle formed in both of said concrete jacking envelope and said metal pipe.
10. The integrated jacking pipe according to claim 1, further comprising a load distributor disposed on a side rim of said concrete jacking envelope.
11. The integrated jacking pipe according to claim 10, wherein said load distributor comprises a plywood pad.
12. A method for pipe jacking, comprising:
jack-pushing a drilling head into the ground;
serially jack-pushing multiple integrated jacking pipes into the ground, wherein each of said multiple integrated jacking pipes comprises a concrete jacking envelope integrally-formed with and encircling a metal pipe, wherein said metal pipe comprises a spigot protruding from said concrete jacking envelope and a bell whose diameter is larger than a diameter of said spigot; and
welding said metal pipes of said multiple integrated jacking pipes, to form a sealed conduit.
13. The method according to claim 12, further comprising jack-pushing an intermediate jacking station between two adjacent ones of said multiple integrated jacking pipes, and operating said intermediate jacking station to repeatedly contract and expand.
14. The method according to claim 12, wherein said welding is a direct welding between said metal pipes.
15. The method according to claim 12, wherein the diameter of said bell is larger than the diameter of said spigot by more than twice a wall thickness of said metal pipe.
16. The method according to claim 12, wherein said bell is parallel to said spigot.
17. The method according to claim 12, wherein said bell is conical.
18. The method according to claim 12, wherein said concrete jacking envelope is made of reinforced concrete.
19. The method according to claim 12, wherein said metal pipe is made of steel.
20. The method according to claim 12, wherein said concrete jacking envelope comprises a first end portion with a circumferential seal and a second end portion with a circumferential metal collar.
21. The method according to claim 12, wherein said concrete jacking envelope comprises a lifting anchor.
22. The method according to claim 12, wherein at least some of said multiple integrated jacking pipes further comprises a lubrication nozzle formed in both of said concrete jacking envelope and said metal pipe.
23. The method according to claim 12, wherein at least some of said multiple integrated jacking pipes further comprises a load distributor disposed on a side rim of said concrete jacking envelope.
24. The method according to claim 23, wherein said load distributor comprises a plywood pad.
25. A tunnel comprising a series of integrated jacking pipes each comprising:
a concrete jacking envelope integrally-formed with and encircling a metal pipe, wherein said metal pipe comprises a spigot protruding from said concrete jacking envelope and a bell whose diameter is larger than a diameter of said spigot,
wherein every adjacent pair of said series of integrated jacking pipes comprises the spigot of one metal pipe welded to the bell of the other metal pipe, and
wherein said metal pipes form together a sealed, pressure-resistant, elongated conduit.
26. The tunnel according to claim 25, wherein the diameter of said bell is larger than the diameter of said spigot by more than twice a wall thickness of said metal pipe.
27. The tunnel according to claim 25, wherein said bell is parallel to said spigot.
28. The tunnel according to claim 25, wherein said bell is conical.
29. The tunnel according to claim 25, wherein said concrete jacking envelope is made of reinforced concrete.
30. The tunnel according to claim 25, wherein said metal pipe is made of steel.
31. The tunnel according to claim 25, wherein said concrete jacking envelope comprises a first end portion with a circumferential seal and a second end portion with a circumferential metal collar.
32. The tunnel according to claim 25, wherein said concrete jacking envelope comprises a lifting anchor.
33. The tunnel according to claim 25, wherein at least some integrated jacking pipes of said series of integrated jacking pipes further comprises a lubrication nozzle formed in both of said concrete jacking envelope and said metal pipe.
34. The tunnel according to claim 1, wherein at least some integrated jacking pipes of said series of integrated jacking pipes further comprises a load distributor disposed on a side rim of said concrete jacking envelope.
35. The tunnel according to claim 34, wherein said load distributor comprises a plywood pad.
PCT/IL2015/050902 2014-09-10 2015-09-07 Integrated jacking pipe WO2016038602A1 (en)

Priority Applications (8)

Application Number Priority Date Filing Date Title
CN201580052835.4A CN107109937A (en) 2014-09-10 2015-09-07 Integrated form push pipe
ES15839927T ES2938522T3 (en) 2014-09-10 2015-09-07 Integrated riser pipe
US15/509,635 US10370967B2 (en) 2014-09-10 2015-09-07 Integrated jacking pipes
SG11201701967PA SG11201701967PA (en) 2014-09-10 2015-09-07 Integrated jacking pipe
EP15839927.9A EP3191686B1 (en) 2014-09-10 2015-09-07 Integrated jacking pipe
PL15839927.9T PL3191686T3 (en) 2014-09-10 2015-09-07 Integrated jacking pipe
KR1020177008660A KR20170047365A (en) 2014-09-10 2015-09-07 Integrated jacking pipe
IL251035A IL251035B (en) 2014-09-10 2017-03-08 Integrated jacking pipes

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US201462048466P 2014-09-10 2014-09-10
US62/048,466 2014-09-10

Publications (1)

Publication Number Publication Date
WO2016038602A1 true WO2016038602A1 (en) 2016-03-17

Family

ID=55458421

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/IL2015/050902 WO2016038602A1 (en) 2014-09-10 2015-09-07 Integrated jacking pipe

Country Status (9)

Country Link
US (1) US10370967B2 (en)
EP (1) EP3191686B1 (en)
KR (1) KR20170047365A (en)
CN (1) CN107109937A (en)
ES (1) ES2938522T3 (en)
IL (1) IL251035B (en)
PL (1) PL3191686T3 (en)
SG (1) SG11201701967PA (en)
WO (1) WO2016038602A1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108662280A (en) * 2018-05-28 2018-10-16 中国化学工程第三建设有限公司 A kind of Novel flue gas pipeline construction method
CN115059807A (en) * 2022-06-30 2022-09-16 安钢集团永通球墨铸铁管有限责任公司 Short-length micro jacking pipe and manufacturing process thereof

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
HK1252593A2 (en) * 2018-04-19 2019-05-31 Hong Kong & China Gas Co Ltd Pipe replacement method
GB2595716A (en) * 2020-06-04 2021-12-08 Namaya Ltd Systems assemblies and methods of pipe ramming prefabricated members with a structured layout
CN114215964B (en) * 2021-12-27 2023-08-04 中建协和建设有限公司 Large-curvature corner adjustable compensation hinge construction method for large-diameter municipal engineering jacking pipe
CN114739358A (en) * 2022-03-14 2022-07-12 中铁隧道集团二处有限公司 Small-caliber long-distance pipe curtain jacking guide real-time measurement method
CN114941748B (en) * 2022-05-31 2024-07-19 重庆中环建设有限公司 Built-in steel pipe structure of pin-connected panel suitable for construction of compound annular section of jurisdiction top pipe
CN115435146B (en) * 2022-09-03 2024-07-12 郑州楷润市政工程设计有限公司 Slurry balance steel pipe jacking pipe grouting Kong Yi ring structure and construction process

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4361336A (en) * 1979-10-04 1982-11-30 Buderus Aktiengesellschaft Epoxy-concrete coated pipe
US5097871A (en) * 1989-02-10 1992-03-24 Kurimoto, Ltd. Pipe for pipe jacking
JP2000145364A (en) * 1998-11-06 2000-05-26 Chichibu Concrete Kogyo Kk Jacking pipe
WO2011105342A1 (en) * 2010-02-24 2011-09-01 積水化成品工業株式会社 Jacking pipe cushioning material, and jacking pipe

Family Cites Families (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4240470A (en) * 1978-02-21 1980-12-23 Clow Corporation Composite pipe having an integral bell end
DE3142177A1 (en) * 1981-10-23 1983-05-11 Schlegel Lining Technology GmbH, 2000 Hamburg "CONCRETE PIPE WITH A POLYMER LINING"
DE3618334C1 (en) * 1986-05-30 1987-07-02 Meyer & John Gmbh & Co Jacking pipe
JPH0193286U (en) * 1987-12-09 1989-06-19
US5482404A (en) * 1993-07-27 1996-01-09 Tenbusch, Ii; Albert A. Underground pipe replacement technique
SE513654C2 (en) * 1997-04-22 2000-10-16 Forsheda Ab Device for compression pipe with lubricant supply arranged at the pipe joints
DE29900679U1 (en) * 1999-01-11 1999-04-08 Gildemeister Tief-, Stahlbeton- u. Rohrleitungsbau GmbH & Co KG, 13409 Berlin Jacking pipe for underground laying of pipes
JP2000257378A (en) * 1999-03-05 2000-09-19 Shin Gijutsu Koei Kk Jacking pipe
JP2003214569A (en) * 2002-01-23 2003-07-30 Kidoh Construction Co Ltd Pipe joint structure
SG147350A1 (en) * 2007-05-04 2008-11-28 Bilcon Ind Pte Ltd A collar, a concrete pipe section, and methods of manufacturing the same
US7757718B1 (en) * 2007-06-20 2010-07-20 Bruce Mark H Polymer reinforcement for a clay pipe joint
AU2007221980A1 (en) * 2007-10-12 2009-04-30 Holcim (Australia) Pty Ltd Jacking pipe
CN102537515A (en) * 2010-12-31 2012-07-04 天津万联管道工程有限公司 Sedimentation-prevention type prestressing jacking pipe
CN102563229A (en) * 2010-12-31 2012-07-11 天津万联管道工程有限公司 Settlement-preventing pipe jacking
CN202302366U (en) 2011-09-28 2012-07-04 无锡华毅管道有限公司 Prestressed steel cylinder concrete jacking pipe
CN202719282U (en) * 2012-08-23 2013-02-06 四川圆通建设有限公司 Reinforced settlement prevention jacking pipe used for non-excavation construction
CN203533005U (en) * 2013-11-22 2014-04-09 浙江巨龙管业股份有限公司 Prestressed steel-concrete composite pressure jacking pipe
CN204403607U (en) * 2014-12-30 2015-06-17 宁夏青龙管业股份有限公司 A kind of prestress steel cylinder concrete push pipe with pea gravel concreten protective layer

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4361336A (en) * 1979-10-04 1982-11-30 Buderus Aktiengesellschaft Epoxy-concrete coated pipe
US5097871A (en) * 1989-02-10 1992-03-24 Kurimoto, Ltd. Pipe for pipe jacking
JP2000145364A (en) * 1998-11-06 2000-05-26 Chichibu Concrete Kogyo Kk Jacking pipe
WO2011105342A1 (en) * 2010-02-24 2011-09-01 積水化成品工業株式会社 Jacking pipe cushioning material, and jacking pipe

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See also references of EP3191686A4 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108662280A (en) * 2018-05-28 2018-10-16 中国化学工程第三建设有限公司 A kind of Novel flue gas pipeline construction method
CN108662280B (en) * 2018-05-28 2019-11-12 中国化学工程第三建设有限公司 A kind of Novel flue gas pipeline construction method
CN115059807A (en) * 2022-06-30 2022-09-16 安钢集团永通球墨铸铁管有限责任公司 Short-length micro jacking pipe and manufacturing process thereof
CN115059807B (en) * 2022-06-30 2024-02-13 安钢集团永通球墨铸铁管有限责任公司 Short-length micro-jacking pipe and manufacturing process thereof

Also Published As

Publication number Publication date
IL251035A0 (en) 2017-04-30
SG11201701967PA (en) 2017-04-27
KR20170047365A (en) 2017-05-04
US10370967B2 (en) 2019-08-06
EP3191686B1 (en) 2023-02-15
US20170298729A1 (en) 2017-10-19
PL3191686T3 (en) 2023-06-05
EP3191686A4 (en) 2018-05-02
IL251035B (en) 2020-11-30
CN107109937A (en) 2017-08-29
ES2938522T3 (en) 2023-04-12
EP3191686A1 (en) 2017-07-19

Similar Documents

Publication Publication Date Title
US10370967B2 (en) Integrated jacking pipes
CA1062634A (en) Method for repairing sewer pipes
CN102072359B (en) Curved-jacked steel pipe section and jacking method
US9068673B2 (en) Sump wall penetration fitting
CN111156032B (en) Grouting pipe inserted section steel grouting reinforcement existing subway tunnel structure and method
US20140265157A1 (en) Sump wall penetration fitting for flexible piping
US20100116372A1 (en) Method of repairing leakage in pipelines
CN109630803A (en) A kind of pipeline rehabilitation device, system and method
JP5501664B2 (en) Seismic waterproof structure for existing pipes
CN102322292A (en) Contact tunnel also serving as pump station structure between shield tunnels and construction method thereof
CN202769112U (en) Double sealed water stop interface for steel bell end reinforced concrete pipelines
CN102747722B (en) Underground continuous wall joint close grouting and covering construction method and expansion rubber plug
WO1994020730A1 (en) Double wall pipe for propulsion technique and construction of pipe end of leading pipe
CN106522968A (en) Embedded shield receiving and sealing device and method
KR101658756B1 (en) Propulsion Pipe
CN209688340U (en) A kind of pipeline rehabilitation apparatus and system
CA3078181C (en) Device for the internal monolithic insulation of a welded pipeline joint
CN207246654U (en) Pipeline rehabilitation equipment
US9551449B2 (en) Method for creating a seal between pipe liners
CN211398995U (en) Water-carrying reinforcing device for steel branch pipe of pressure water delivery pipeline
CN206458472U (en) Embedded shield receives sealing device
CN217208049U (en) Socket grouting self-overflowing type steel socket pipe for pipe jacking engineering
JP6775187B2 (en) Seal structure of vertical well casing
AU2007221980A1 (en) Jacking pipe
KR101743672B1 (en) Single-sided split construction Medium to large diameter pipeline Unscraped interior repair method

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 15839927

Country of ref document: EP

Kind code of ref document: A1

WWE Wipo information: entry into national phase

Ref document number: 251035

Country of ref document: IL

NENP Non-entry into the national phase

Ref country code: DE

REEP Request for entry into the european phase

Ref document number: 2015839927

Country of ref document: EP

WWE Wipo information: entry into national phase

Ref document number: 2015839927

Country of ref document: EP

Ref document number: 15509635

Country of ref document: US

ENP Entry into the national phase

Ref document number: 20177008660

Country of ref document: KR

Kind code of ref document: A