WO2016034769A1 - Method for removing sodium from chloride solutions - Google Patents

Method for removing sodium from chloride solutions Download PDF

Info

Publication number
WO2016034769A1
WO2016034769A1 PCT/FI2015/050569 FI2015050569W WO2016034769A1 WO 2016034769 A1 WO2016034769 A1 WO 2016034769A1 FI 2015050569 W FI2015050569 W FI 2015050569W WO 2016034769 A1 WO2016034769 A1 WO 2016034769A1
Authority
WO
WIPO (PCT)
Prior art keywords
stream
sodium
hydrometallurgical process
solution
process stream
Prior art date
Application number
PCT/FI2015/050569
Other languages
French (fr)
Inventor
Tuukka KOTIRANTA
Kari Valkama
Original Assignee
Outotec (Finland) Oy
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Outotec (Finland) Oy filed Critical Outotec (Finland) Oy
Priority to AU2015310744A priority Critical patent/AU2015310744B2/en
Priority to RU2017107541A priority patent/RU2658532C1/en
Priority to CA2959113A priority patent/CA2959113C/en
Priority to EP15763377.7A priority patent/EP3189168A1/en
Publication of WO2016034769A1 publication Critical patent/WO2016034769A1/en

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22BPRODUCTION AND REFINING OF METALS; PRETREATMENT OF RAW MATERIALS
    • C22B3/00Extraction of metal compounds from ores or concentrates by wet processes
    • C22B3/20Treatment or purification of solutions, e.g. obtained by leaching
    • C22B3/22Treatment or purification of solutions, e.g. obtained by leaching by physical processes, e.g. by filtration, by magnetic means, or by thermal decomposition
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22BPRODUCTION AND REFINING OF METALS; PRETREATMENT OF RAW MATERIALS
    • C22B3/00Extraction of metal compounds from ores or concentrates by wet processes
    • C22B3/20Treatment or purification of solutions, e.g. obtained by leaching
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22BPRODUCTION AND REFINING OF METALS; PRETREATMENT OF RAW MATERIALS
    • C22B1/00Preliminary treatment of ores or scrap
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D1/00Evaporating
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D9/00Crystallisation
    • B01D9/0018Evaporation of components of the mixture to be separated
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22BPRODUCTION AND REFINING OF METALS; PRETREATMENT OF RAW MATERIALS
    • C22B23/00Obtaining nickel or cobalt
    • C22B23/04Obtaining nickel or cobalt by wet processes
    • C22B23/0407Leaching processes
    • C22B23/0446Leaching processes with an ammoniacal liquor or with a hydroxide of an alkali or alkaline-earth metal
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P10/00Technologies related to metal processing
    • Y02P10/20Recycling

Definitions

  • the present invention relates to a method for removing sodium from chloride containing solutions in a hydrometallurgical metal recovery processes. More specifically the invention relates to removal of sodium from hydrometallurgical process solutions resulting from chloride based leaching of nickel containing ores and/or concentrates.
  • the leaching solution is typically recirculated within the process. This leads to build-up of elements such as sodium and potassium.
  • Sodium is typically present in the solution as sodium chloride. In low concentrations, i.e. less than about 10 g/L, this is not a problem. However, the sodium will make the solution more concentrated and even- tually more solution is needed to leach same amount of metals if sodium is not removed.
  • the invention is based on the fact that the sodium chloride crystallizes before the other salts present in the solution for example calcium chloride or ammonium chloride.
  • An object of the present invention is thus to provide a method so as to alleviate the above disadvantages.
  • the objects of the invention are achieved by a method, which is characterized by what is stated in the independent claims.
  • the preferred embodiments of the invention are disclosed in the dependent claims.
  • the invention based on the realization that sodium can be removed from the hydrometallurgical process streams simultaneously to adjusting the water content of the process stream. Accordingly taking out only the impurity that needs to be removed the volume of the bleed stream can be minimized and the process can be made more economical and usually more environmental friendly. Since the sodium input to the process is usually quite small and process can tolerate some sodium, all sodium is not needed to be removed from the process stream. This enables crystallization from the bleed stream instead of the main process stream. This means smaller equipment and lower investment cost. Since the water is needed to be evaporated due to the closed solution circulation in the process the saturated solution can be produced for the crystallization when the evaporation is also put to the bleed stream. Crystallization from the saturated solution is easier since it starts immediately when more water is evaporated or temperature is lowered.
  • Sodium chloride can be taken with this invention as almost pure product since some sodium is left to the depleted sodium solution.
  • Sodium chloride is the first salt that crystallizes from the solution and therefore amount of solid impurities in the sodium chloride product is small. To further purify sodium chloride product it can be washed.
  • Figure 1 is a flow diagram illustrating an embodiment of the method of the present invention.
  • the present invention provides a method for removing sodium from a chloride-based hydrometallurgical process stream comprising the steps of:
  • the method of the present invention is suitable for treating any hydrometallurgical process streams resulting from leaching of metal containing ores and/or concentrates with chloride based leaching solutions, such as a concentrated CaC based solution.
  • the said hydrometallurgical process stream further comprises ammonium chloride, nickel chloride, copper chloride, cobalt chloride, and/or magnesium chloride.
  • the said hydrometallurgical process stream comprises ammonium chloride.
  • the hydrometallurgical process stream typically comprises significant amounts of sodium.
  • the hydrometallurgical process stream comprises 1 to 50 g/L, more particularly 5 to 25 g/L, sodium.
  • the hydrometallurgical process stream comprises 10 to 100 g/L Ca and/or 0.1 to 10 g/L NH 4 " .
  • the method of the present invention is particularly suitable for treatment of leaching solution resulting from leaching of nickel containing ore and/or concentrate.
  • concentrate refers to any product generally produced from metal containing ore for concentrating the desired metal(s) in the product and/or removing impurities from the mined ore for further treatment of the product for the recovery of one or more of said metal(s).
  • concentrate can be produced by any suitable methods known to a per- son skilled in the art.
  • the method of the present invention provides for removal of at least 30%, more preferably at least 50%, typically 30 to 90%, more typically 60 to 80%, of sodium comprised in the hydrometallurgical process stream before the withdrawal of the bleed stream.
  • the sodium depleted solu- tion returned into the main process stream i.e. the hydrometallurgical process stream, comprises less than 4 wt%, preferably less than 2 wt%, sodium.
  • the sodium concentration is higher in the main process stream after the evaporation and sodium removal than before those process steps due to the decreased total amount of the process stream.
  • FIG. 1 shows an example of a process flow of the method of the present invention.
  • a bleed stream 2 is withdrawn from a hydrometallurgical process stream 1 .
  • the bleed stream can be withdrawn at any process stage after leaching of the ore and/or concentrate.
  • the bleed stream is withdrawn at a process stage where the concentration of any valuable metals in the said process stream is as low as possible to prevent loss said valuable metals during the removal of sodium.
  • the bleed stream is withdrawn after a process stage whereby the acid concentration of the said process stream is under 5 g/L.
  • Such process stages include precipitation, solvent extraction and neutralization stages. In nickel leaching such process stages are in particularly iron precipitation, solvent extraction and/or ammonia regeneration. Suitable locations for the withdrawal include after iron precipitation, after one of the solvent extraction stages, and/or after regeneration of ammonia.
  • the bleed stream is withdrawn after regeneration of ammonia.
  • the volume of the bleed stream is dependent of the amount of water that needs to be removed from the process stream to maintain water balance. If water balance is taken care in other parts of the process the bleed stream is dependent of the amount of sodium needed to be removed, but typically the water balance determine the bleed stream amount.
  • the amount of bleed stream can be calculated from the amount of water needed to be removed from the process at this stage, from the salt concentration of the process stream and the salt concentration of the saturated sodium containing solution, e.g. a solution containing 50 g/L CaC ⁇ and 5 g/L NaCI has a salt concentration of 55 g/L.
  • salt concentration as used herein and hereaf- ter refers to the amount of all dissolved salts in the particular stream.
  • the salt concentration of a solution is dependent on temperature and the nature of salts in the said solution.
  • the process stream typically comprises 5 to 35 wt% salts, more typically 10 to 30 wt% of the total weight of the said stream.
  • the saturated sodium containing solution typically contains 35 to 70 wt% of salts more typically 40 to 65 wt% of the total weight of the saturated solution. Typically a variation of ⁇ 10%, more typically ⁇ 5%, is tolerated for the amount of required bleed stream. If the salt concentration in the process solution, evaporation need or salt concentration the saturated sodium containing solution changes, also the amount of bleed stream will change. Examples how the amount of the bleed stream can be calculated are presented in examples 1 and 2.
  • the bleed stream is preferably withdrawn continuously from the hy- drometallurgical process stream i.e. as a continuous bleed stream of the hy- drometallurgical process stream.
  • the continuous operation of sodium chloride crystallization enables smaller equipment and more even sodium concentration in the process.
  • the other option is to withdraw a continuous bleed stream for evaporation of water in step (b) and operate the crystallization of sodium chloride in step (c) as a batch process.
  • the bleed stream 2 is then subjected to evaporation 10 in the evaporation step (b) to remove water 1 1 from the bleed stream and to concentrate sodium in the bleed stream.
  • saturated or nearly saturated as used in context of the saturated sodium containing solution refers to the fact that further evaporation of water from the solution would cause crystallization of sodium chloride thus enabling the crystallization of the same in the next step.
  • the evaporation step (b) 10 is typically performed in a multi stage evaporation equipment.
  • the first evaporation step is typically performed atmospherically or near atmospherically.
  • Further evaporation step(s) are typically performed under reduced pressure.
  • Advantageously steam formed in the first evaporation stage is utilized for indirect heating of the further evaporation step(s).
  • a part of the saturated or nearly saturated sodium containing solution 3 can be fed back to the main process between evaporation of the water and crystallization of the sodium chloride as a concentrated stream 5.
  • a part of the saturated sodium containing solution (3) obtained in step (b) is returned to the hydrometallurgical process stream before crystallization step (c).
  • part of a partly concentrated sodium containing solution i.e. part of the bleed stream being concentrated in step (b) can be returned to the hydrometallurgical process stream before it is saturated or nearly saturated. This is possible when a multi stage evaporation equipment is utilized and/or the evaporation step is otherwise performed in multiple sub- steps.
  • the bleed stream of hydrometallurgical process liquors and/or slurries withdrawn from the chloride-based hydrometallurgical process stream may be 100% of the hydrometallurgical pro- cess stream.
  • the concentrated stream 5 is preferably returned continuously to the hydrometallurgical process stream 1 .
  • the amount of such concentrated stream is dependent on the sodium amount in the stream, sodium removal need in the process and the amount of sodium at the concentrated stream af- ter crystallization, stream 4. For example if the sodium amount in the stream 3 is 100 kg/h and sodium is needed to be removed from the process 50 kg/h and the stream 4 after crystallization contains 10 kg/h sodium, 40% of the stream 3 is fed back to the main process stream in stream 5. Typically the variation of stream split percentage value is ⁇ 10%, more typically ⁇ 5%.
  • the saturated sodium containing solution 3 is then fed to crystallization step (c) 20 to remove sodium as sodium chloride 22 from the saturated sodium containing solution.
  • Crystallization can be achieved by evaporation of water thus causing the sodium chloride to crystallize from the saturated solu- tion or decreasing the temperature to cause the sodium chloride to crystallize.
  • the evaporated water is removed from the process with stream 21 .
  • crystallization in step (c) 20 is achieved in a separate crystallization device.
  • crystallization step (c) 20 can be achieved in the same equipment as the evaporation step (b) 10. Further, part of the evaporation step can be achieved in a first evaporation equipment to concentrate the stream and the final saturation and the crystallization step is achieved in an another equipment.
  • a slurry comprising sodium chloride crystals is obtained from the crystallization step.
  • the slurry is then mostly dried in a centrifuge to obtain mostly dry or dry crystals.
  • the dried crystals may then be washed with water to remove remaining mother liquor and to further purify the crystals.
  • the washing solution is preferably recirculated to the crystallization step (c) to improve the recovery of sodium chloride.
  • At least 30 wt%, preferably from 30 to 100 wt%, more preferably from 50 to 95 wt%, of the sodium chloride contained in the originally withdrawn bleed stream is crystallized. Removal of sodium chloride in step (c) results in a sodium depleted solution 4 that is returned to the process stream to keep the salts in the process in a closed circulation.
  • the sodium depleted solution 4 is returned to the hydrometallurgical process stream 1 typically at the same process stage where the bleed stream 2 was withdrawn from the process stream 1 . This enables continuation of the following process steps in a conventional manner.
  • the sodium depleted solution 4 is preferably returned to the hydro- metallurgical process stream i.e. as a continuous sodium depleted stream. This enables a steady salt concentration in the main process stream. Even if the crystallization is operated as a batch process a continuous stream of sodium depleted solution to the process stream is needed since big differences in the salt concentrations in other parts of the process make it difficult to operate the process.
  • the hydrometallurgical process stream 1 typically contains from 1 to 50 g/L, more typically 5 to 25 g/L sodium after the sodium depleted solution is mixed with the said process stream.
  • the flow of the needed bleed stream amount is calculated followingly:
  • the process solu- tion comprises 20 wt% of salts. 60 wt% of salts in the saturated solution is used.

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Geology (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Manufacturing & Machinery (AREA)
  • Environmental & Geological Engineering (AREA)
  • Materials Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Metallurgy (AREA)
  • Organic Chemistry (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Crystallography & Structural Chemistry (AREA)
  • Manufacture And Refinement Of Metals (AREA)

Abstract

The present invention provides a method for removing sodium from a hydrometallurgical process stream comprising ammonium chloride, nickel chloride, copper chloride, cobalt chloride, and/or magnesium chloride,comprising the steps of:(a) withdrawing a bleed stream of hydrometallurgical process liquors and/or slurries from the hydrometallurgical process steam; (b) evaporating water from the bleed stream to obtain a saturated sodium containing solution; (c) crystallizing a part of the sodium chloride comprised in the saturated sodium containing solution from the said solution to obtain a sodium depleted solution; and (d) returning the sodium depleted solution to the hydrometallurgical process stream.

Description

METHOD FOR REMOVING SODIUM FROM CHLORIDE SOLUTIONS
FIELD OF THE INVENTION
The present invention relates to a method for removing sodium from chloride containing solutions in a hydrometallurgical metal recovery processes. More specifically the invention relates to removal of sodium from hydrometallurgical process solutions resulting from chloride based leaching of nickel containing ores and/or concentrates.
BACKGROUND OF THE INVENTION
In chloride based leaching of ores and/or concentrates, in particular of nickel containing ores and/or concentrates, the leaching solution is typically recirculated within the process. This leads to build-up of elements such as sodium and potassium. Sodium is typically present in the solution as sodium chloride. In low concentrations, i.e. less than about 10 g/L, this is not a problem. However, the sodium will make the solution more concentrated and even- tually more solution is needed to leach same amount of metals if sodium is not removed.
Traditional way to remove impurities such as sodium is to take out a small bleed stream from the process. In concentrated chloride solutions this is not an economical option since the solution needs to be treated and the chlo- rides need to be replaced.
The invention is based on the fact that the sodium chloride crystallizes before the other salts present in the solution for example calcium chloride or ammonium chloride.
BRIEF DESCRIPTION OF THE INVENTION
An object of the present invention is thus to provide a method so as to alleviate the above disadvantages. The objects of the invention are achieved by a method, which is characterized by what is stated in the independent claims. The preferred embodiments of the invention are disclosed in the dependent claims.
The invention based on the realization that sodium can be removed from the hydrometallurgical process streams simultaneously to adjusting the water content of the process stream. Accordingly taking out only the impurity that needs to be removed the volume of the bleed stream can be minimized and the process can be made more economical and usually more environmental friendly. Since the sodium input to the process is usually quite small and process can tolerate some sodium, all sodium is not needed to be removed from the process stream. This enables crystallization from the bleed stream instead of the main process stream. This means smaller equipment and lower investment cost. Since the water is needed to be evaporated due to the closed solution circulation in the process the saturated solution can be produced for the crystallization when the evaporation is also put to the bleed stream. Crystallization from the saturated solution is easier since it starts immediately when more water is evaporated or temperature is lowered.
Sodium chloride can be taken with this invention as almost pure product since some sodium is left to the depleted sodium solution. Sodium chloride is the first salt that crystallizes from the solution and therefore amount of solid impurities in the sodium chloride product is small. To further purify sodium chloride product it can be washed. BRIEF DESCRIPTION OF THE DRAWINGS
In the following the invention will be described in greater detail by means of preferred embodiments with reference to the attached drawings, in which
Figure 1 is a flow diagram illustrating an embodiment of the method of the present invention.
DETAILED DESCRIPTION OF THE INVENTION
The present invention provides a method for removing sodium from a chloride-based hydrometallurgical process stream comprising the steps of:
(a) withdrawing a bleed stream of hydrometallurgical process liquors and/or slurries from the chloride-based hydrometallurgical process stream;
(b) evaporating water from the bleed stream to obtain a saturated sodium containing solution;
(c) crystallizing a part of the sodium chloride comprised in the saturated sodium containing solution from the said solution to obtain a sodium de- pleted solution; and
(d) returning the sodium depleted solution to the process stream.
The method of the present invention is suitable for treating any hydrometallurgical process streams resulting from leaching of metal containing ores and/or concentrates with chloride based leaching solutions, such as a concentrated CaC based solution. The said hydrometallurgical process stream further comprises ammonium chloride, nickel chloride, copper chloride, cobalt chloride, and/or magnesium chloride. Typically the said hydrometallurgical process stream comprises ammonium chloride. The hydrometallurgical process stream typically comprises significant amounts of sodium. In particular the hydrometallurgical process stream comprises 1 to 50 g/L, more particularly 5 to 25 g/L, sodium. Further preferably the hydrometallurgical process stream comprises 10 to 100 g/L Ca and/or 0.1 to 10 g/L NH4 ".
The method of the present invention is particularly suitable for treatment of leaching solution resulting from leaching of nickel containing ore and/or concentrate. The term "concentrate" as used herein refers to any product generally produced from metal containing ore for concentrating the desired metal(s) in the product and/or removing impurities from the mined ore for further treatment of the product for the recovery of one or more of said metal(s). Such concentrate can be produced by any suitable methods known to a per- son skilled in the art.
Preferably the method of the present invention provides for removal of at least 30%, more preferably at least 50%, typically 30 to 90%, more typically 60 to 80%, of sodium comprised in the hydrometallurgical process stream before the withdrawal of the bleed stream. Typically the sodium depleted solu- tion returned into the main process stream, i.e. the hydrometallurgical process stream, comprises less than 4 wt%, preferably less than 2 wt%, sodium. In some cases where evaporation need of the process is big the sodium concentration is higher in the main process stream after the evaporation and sodium removal than before those process steps due to the decreased total amount of the process stream.
Figure 1 shows an example of a process flow of the method of the present invention. Referring to Figure 1 , a bleed stream 2 is withdrawn from a hydrometallurgical process stream 1 . The bleed stream can be withdrawn at any process stage after leaching of the ore and/or concentrate. Preferably the bleed stream is withdrawn at a process stage where the concentration of any valuable metals in the said process stream is as low as possible to prevent loss said valuable metals during the removal of sodium. Advantageously the bleed stream is withdrawn after a process stage whereby the acid concentration of the said process stream is under 5 g/L. Such process stages include precipitation, solvent extraction and neutralization stages. In nickel leaching such process stages are in particularly iron precipitation, solvent extraction and/or ammonia regeneration. Suitable locations for the withdrawal include after iron precipitation, after one of the solvent extraction stages, and/or after regeneration of ammonia. In a preferred aspect of the present invention the bleed stream is withdrawn after regeneration of ammonia.
The volume of the bleed stream is dependent of the amount of water that needs to be removed from the process stream to maintain water balance. If water balance is taken care in other parts of the process the bleed stream is dependent of the amount of sodium needed to be removed, but typically the water balance determine the bleed stream amount. The amount of bleed stream can be calculated from the amount of water needed to be removed from the process at this stage, from the salt concentration of the process stream and the salt concentration of the saturated sodium containing solution, e.g. a solution containing 50 g/L CaC^ and 5 g/L NaCI has a salt concentration of 55 g/L. Unless otherwise denoted, the term "salt concentration" as used herein and hereaf- ter refers to the amount of all dissolved salts in the particular stream. The salt concentration of a solution is dependent on temperature and the nature of salts in the said solution. The process stream typically comprises 5 to 35 wt% salts, more typically 10 to 30 wt% of the total weight of the said stream. The saturated sodium containing solution typically contains 35 to 70 wt% of salts more typically 40 to 65 wt% of the total weight of the saturated solution. Typically a variation of ±10%, more typically ±5%, is tolerated for the amount of required bleed stream. If the salt concentration in the process solution, evaporation need or salt concentration the saturated sodium containing solution changes, also the amount of bleed stream will change. Examples how the amount of the bleed stream can be calculated are presented in examples 1 and 2.
The bleed stream is preferably withdrawn continuously from the hy- drometallurgical process stream i.e. as a continuous bleed stream of the hy- drometallurgical process stream. The continuous operation of sodium chloride crystallization enables smaller equipment and more even sodium concentration in the process. The other option is to withdraw a continuous bleed stream for evaporation of water in step (b) and operate the crystallization of sodium chloride in step (c) as a batch process.
The bleed stream 2 is then subjected to evaporation 10 in the evaporation step (b) to remove water 1 1 from the bleed stream and to concentrate sodium in the bleed stream. This results in a saturated or nearly saturated sodium containing solution 3 which is subjected to crystallization 20 in the crystal- Iization step (c). The term "saturated or nearly saturated" as used in context of the saturated sodium containing solution refers to the fact that further evaporation of water from the solution would cause crystallization of sodium chloride thus enabling the crystallization of the same in the next step.
The evaporation step (b) 10 is typically performed in a multi stage evaporation equipment. In a multi stage evaporation the first evaporation step is typically performed atmospherically or near atmospherically. Further evaporation step(s) are typically performed under reduced pressure. Advantageously steam formed in the first evaporation stage is utilized for indirect heating of the further evaporation step(s).
Depending on the process sodium balance, a part of the saturated or nearly saturated sodium containing solution 3 can be fed back to the main process between evaporation of the water and crystallization of the sodium chloride as a concentrated stream 5. Thus in an embodiment of the present invention a part of the saturated sodium containing solution (3) obtained in step (b) is returned to the hydrometallurgical process stream before crystallization step (c). Alternatively or additionally part of a partly concentrated sodium containing solution i.e. part of the bleed stream being concentrated in step (b) can be returned to the hydrometallurgical process stream before it is saturated or nearly saturated. This is possible when a multi stage evaporation equipment is utilized and/or the evaporation step is otherwise performed in multiple sub- steps. In the above mentioned embodiments the bleed stream of hydrometallurgical process liquors and/or slurries withdrawn from the chloride-based hydrometallurgical process stream may be 100% of the hydrometallurgical pro- cess stream.
The concentrated stream 5 is preferably returned continuously to the hydrometallurgical process stream 1 . The amount of such concentrated stream is dependent on the sodium amount in the stream, sodium removal need in the process and the amount of sodium at the concentrated stream af- ter crystallization, stream 4. For example if the sodium amount in the stream 3 is 100 kg/h and sodium is needed to be removed from the process 50 kg/h and the stream 4 after crystallization contains 10 kg/h sodium, 40% of the stream 3 is fed back to the main process stream in stream 5. Typically the variation of stream split percentage value is ±10%, more typically ±5%. The saturated sodium containing solution 3 is then fed to crystallization step (c) 20 to remove sodium as sodium chloride 22 from the saturated sodium containing solution. Crystallization can be achieved by evaporation of water thus causing the sodium chloride to crystallize from the saturated solu- tion or decreasing the temperature to cause the sodium chloride to crystallize. In evaporation crystallization option the evaporated water is removed from the process with stream 21 . Typically crystallization in step (c) 20 is achieved in a separate crystallization device. Alternatively crystallization step (c) 20 can be achieved in the same equipment as the evaporation step (b) 10. Further, part of the evaporation step can be achieved in a first evaporation equipment to concentrate the stream and the final saturation and the crystallization step is achieved in an another equipment.
Typically a slurry comprising sodium chloride crystals is obtained from the crystallization step. The slurry is then mostly dried in a centrifuge to obtain mostly dry or dry crystals. The dried crystals may then be washed with water to remove remaining mother liquor and to further purify the crystals. The washing solution is preferably recirculated to the crystallization step (c) to improve the recovery of sodium chloride.
Preferably at least 30 wt%, preferably from 30 to 100 wt%, more preferably from 50 to 95 wt%, of the sodium chloride contained in the originally withdrawn bleed stream is crystallized. Removal of sodium chloride in step (c) results in a sodium depleted solution 4 that is returned to the process stream to keep the salts in the process in a closed circulation.
The sodium depleted solution 4 is returned to the hydrometallurgical process stream 1 typically at the same process stage where the bleed stream 2 was withdrawn from the process stream 1 . This enables continuation of the following process steps in a conventional manner.
The sodium depleted solution 4 is preferably returned to the hydro- metallurgical process stream i.e. as a continuous sodium depleted stream. This enables a steady salt concentration in the main process stream. Even if the crystallization is operated as a batch process a continuous stream of sodium depleted solution to the process stream is needed since big differences in the salt concentrations in other parts of the process make it difficult to operate the process. The hydrometallurgical process stream 1 typically contains from 1 to 50 g/L, more typically 5 to 25 g/L sodium after the sodium depleted solution is mixed with the said process stream. EXAMPLES Example 1
50 t/h water is removed from a 100 t/h process solution. The flow of the needed bleed stream amount is calculated followingly: The process solu- tion comprises 20 wt% of salts. 60 wt% of salts in the saturated solution is used. The 100 t/h process solution flow then contains 20 t/h salts, 80 t/h water and produced saturated solution contains 20 t/h salts and 13.3 t/h water. Therefore in the bleed stream is 50 t/h + 13.3 t/h = 63.3 t/h water. This means that water needed to be put to the bleed stream is 63.3 t/h / 80 t/h = 0.791 times the water in the initial process stream.
Example 2
When process stream is 100 t/h, water evaporation need is 10 t/h, salt concentration of the process solution is 25 wt% and saturated solution salt concentration is 60 wt%, the amount of bleed stream is 33.3%.
It will be obvious to a person skilled in the art that, as the technology advances, the inventive concept can be implemented in various ways. The invention and its embodiments are not limited to the examples described above but may vary within the scope of the claims.

Claims

1 . A method for removing sodium from a hydrometallurgical process stream (1 ) comprising ammonium chloride, nickel chloride, copper chloride, cobalt chloride, and/or magnesium chloride, comprising the steps of:
(a) withdrawing a bleed stream (2) of hydrometallurgical process liquors and/or slurries from the hydrometallurgical process steam (1 );
(b) evaporating water (1 1 ) from the bleed stream (2) to obtain a saturated sodium containing solution (3);
(c) crystallizing a part of the sodium chloride (22) comprised in the saturated sodium containing solution (3) from the said solution to obtain a sodium depleted solution (4); and
(d) returning the sodium depleted solution (4) to the hydrometallurgical process stream.
2. The method as claimed in claim 1 , wherein the bleed stream (2) comprises less than 5 g/L HCI.
3. The method as claimed in claim 1 or 2, wherein the hydrometallurgical process stream (1 ) is a concentrated CaC based solution.
4. The method as claimed in any one of claims 1 to 3, wherein the hydrometallurgical process stream (1 ) comprises 10 to 100 g/L Ca.
5. The method as claimed in any one of claims 1 to 4, wherein the hydrometallurgical process stream comprises (1 ) 0.1 to 10 g/L NH ".
6. The method as claimed in any one of claims 1 to 5, wherein the hydrometallurgical process stream (1 ) comprises 1 to 50 g/L, more particularly 5 to 25 g/L, sodium.
7. The method as claimed in any one of claims 1 to 6, wherein the bleed stream (2) is withdrawn after a precipitation, solvent extraction and/or neutralization stage.
8. The method as claimed in claim 7, wherein the bleed stream (2) is withdrawn after regeneration of ammonium.
9. The method as claimed in any of claims 1 to 8, wherein at least
30%, preferably from 30 to 100%, more preferably from 50 to 95% of the sodium chloride comprised in the hydrometallurgical process stream (1 ) is crystallized.
10. The method as claimed in any one of claims 1 to 9, wherein the bleed stream (2) is withdrawn continuously from the hydrometallurgical process stream.
1 1 . The method as claimed in any one of claims 1 to 10, wherein the sodium depleted stream (4) is returned continuously back to the hydrometallurgical process stream.
12. The method as claimed in any one of claims 1 to 1 1 , wherein the saturated sodium containing solution (3) comprises 35 to 70 wt% of salts, preferably 40 to 65 wt% of the total weight of the saturated solution.
13. The method as claimed in any one of claims 1 to 12, wherein the hydrometallurgical process stream after returning of sodium depleted solution (4) to the hydrometallurgical process stream contains from 1 to 50 g/L, typically 5 to 25 g/L, sodium.
14. The method as claimed in any one of claims 1 to 13, wherein crystallization in step (c) is achieved in a separate crystallization device.
15. The method as claimed in any one of claims 1 to 13, wherein in crystallization in step (c) is achieved the same equipment as the evaporation step (b).
16. The method as claimed in any one of claims 1 to 15, wherein a part of the saturated sodium containing solution (3) obtained in step (b) is returned to the hydrometallurgical process stream before crystallization step (c).
17. The method as claimed in any one of claims 1 to 16, wherein a part of the bleed stream concentrated in step (b) is returned to the hydrometallurgical process stream before it is saturated or nearly saturated.
18. The method as claimed in claim 16 or 17, wherein the bleed stream in step (a) is 100% of the hydrometallurgical process stream.
PCT/FI2015/050569 2014-09-02 2015-09-01 Method for removing sodium from chloride solutions WO2016034769A1 (en)

Priority Applications (4)

Application Number Priority Date Filing Date Title
AU2015310744A AU2015310744B2 (en) 2014-09-02 2015-09-01 Method for removing sodium from chloride solutions
RU2017107541A RU2658532C1 (en) 2014-09-02 2015-09-01 Method of removing sodium from chloride solutions
CA2959113A CA2959113C (en) 2014-09-02 2015-09-01 Method for removing sodium from chloride solutions
EP15763377.7A EP3189168A1 (en) 2014-09-02 2015-09-01 Method for removing sodium from chloride solutions

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
FI20145761 2014-09-02
FI20145761A FI126932B (en) 2014-09-02 2014-09-02 A method for removing sodium from chloride solutions

Publications (1)

Publication Number Publication Date
WO2016034769A1 true WO2016034769A1 (en) 2016-03-10

Family

ID=54106387

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/FI2015/050569 WO2016034769A1 (en) 2014-09-02 2015-09-01 Method for removing sodium from chloride solutions

Country Status (8)

Country Link
EP (1) EP3189168A1 (en)
AU (1) AU2015310744B2 (en)
CA (1) CA2959113C (en)
CL (1) CL2017000458A1 (en)
FI (1) FI126932B (en)
PE (1) PE20170612A1 (en)
RU (1) RU2658532C1 (en)
WO (1) WO2016034769A1 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110668629A (en) * 2019-10-23 2020-01-10 洛阳黎明大成氟化工有限公司 Treatment method of electrolytic waste residue wastewater generated by nitrogen trifluoride preparation process by electrolytic method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3655333A (en) * 1970-05-04 1972-04-11 Dow Chemical Co Process for producing anhydrous sodium chloride and purified saturated brine
EP0492727A1 (en) * 1990-12-28 1992-07-01 Akzo Nobel N.V. Process for the preparation of sodium chloride
CN101544437A (en) * 2009-04-30 2009-09-30 河北工业大学 Process method for recovering ammonium chloride and sodium chloride from waste water containing ammonium chloride and sodium chloride
CN102199704A (en) * 2011-05-17 2011-09-28 葫芦岛辉宏有色金属有限公司 Recycling use method of sodium chloride or sodium sulfate in hydrometallurgy
CN103449653A (en) * 2013-08-19 2013-12-18 燕山大学 Combined treatment method for sodium chloride-containing wastewater generated in dressing and smelting of rare earth

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3764796D1 (en) * 1986-12-16 1990-10-11 Mannesmann Ag METHOD FOR SIMULTANEOUS CRYSTALIZATION OF SODIUM CHLORIDE AND POTASSIUM CHLORIDE.
RU2296711C2 (en) * 2005-06-20 2007-04-10 Открытое акционерное общество "Новосибирский завод химконцентратов" Method of purification of the lithium-containing solutions from the sodium and calcium ions

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3655333A (en) * 1970-05-04 1972-04-11 Dow Chemical Co Process for producing anhydrous sodium chloride and purified saturated brine
EP0492727A1 (en) * 1990-12-28 1992-07-01 Akzo Nobel N.V. Process for the preparation of sodium chloride
CN101544437A (en) * 2009-04-30 2009-09-30 河北工业大学 Process method for recovering ammonium chloride and sodium chloride from waste water containing ammonium chloride and sodium chloride
CN102199704A (en) * 2011-05-17 2011-09-28 葫芦岛辉宏有色金属有限公司 Recycling use method of sodium chloride or sodium sulfate in hydrometallurgy
CN103449653A (en) * 2013-08-19 2013-12-18 燕山大学 Combined treatment method for sodium chloride-containing wastewater generated in dressing and smelting of rare earth

Also Published As

Publication number Publication date
CA2959113C (en) 2024-02-27
FI126932B (en) 2017-08-15
RU2658532C1 (en) 2018-06-21
AU2015310744A1 (en) 2017-03-23
CA2959113A1 (en) 2016-03-10
AU2015310744B2 (en) 2018-12-13
FI20145761A (en) 2016-03-03
PE20170612A1 (en) 2017-05-25
CL2017000458A1 (en) 2017-10-20
EP3189168A1 (en) 2017-07-12

Similar Documents

Publication Publication Date Title
US20200189925A1 (en) Process for recovery of lithium from a geothermal brine
RU2448046C2 (en) Method of separating potassium chloride and sodium chloride
US9970078B2 (en) Method for producing a solid scandium-containing material of enhanced scandium content
KR102372078B1 (en) Sodium removal method and metal concentration method and metal recovery method
Song et al. Separation and recovery of lithium from Li3PO4 leaching liquor using solvent extraction with saponified D2EHPA
FI125216B (en) Method for recovering metals
CN106745342A (en) The preparation method for producing nickel chloride is leached by raw material sulphuric acid of rough nickel hydroxide
US3951649A (en) Process for the recovery of copper
AU2015310744B2 (en) Method for removing sodium from chloride solutions
JPS5928616B2 (en) Iridium recovery and purification method
KR100781468B1 (en) Process for the extraction of a base metal value from an ore or concentrate containing copper and the base metal
US4314976A (en) Purification of nickel sulfate
JP6513748B2 (en) Lithium recovery method
CN111850296B (en) Method for recovering and preparing high-purity strontium compound from rare earth ore
US4101315A (en) Recovery of silver from cuprous chloride solutions by co-crystallization with sodium chloride
KR20230028221A (en) Method for producing cobalt sulfate
KR20230100733A (en) Processing methods for crystallizing metal sulfates
US2711957A (en) Method of separating cobalt as carbonates from nickel-cobalt mixtures
US2029623A (en) Working up of natural and industrial salt mixtures
WO2021010180A1 (en) Scandium recovery method
US2796342A (en) Process for recovering copper by chemical precipitation
JP2008512569A (en) Formation of zinc drugs from treatment tributaries.
US1350959A (en) Frank edward emqre
TWI531656B (en) Direct purification of a nickel laterite leaching effluent
EA044680B1 (en) METHOD FOR EXTRACTING METALS FROM OXIDE ORES

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 15763377

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 2959113

Country of ref document: CA

WWE Wipo information: entry into national phase

Ref document number: 000261-2017

Country of ref document: PE

NENP Non-entry into the national phase

Ref country code: DE

REEP Request for entry into the european phase

Ref document number: 2015763377

Country of ref document: EP

WWE Wipo information: entry into national phase

Ref document number: 2015763377

Country of ref document: EP

ENP Entry into the national phase

Ref document number: 2015310744

Country of ref document: AU

Date of ref document: 20150901

Kind code of ref document: A

ENP Entry into the national phase

Ref document number: 2017107541

Country of ref document: RU

Kind code of ref document: A