WO2016020982A1 - 情報処理システム及び情報処理方法 - Google Patents

情報処理システム及び情報処理方法 Download PDF

Info

Publication number
WO2016020982A1
WO2016020982A1 PCT/JP2014/070584 JP2014070584W WO2016020982A1 WO 2016020982 A1 WO2016020982 A1 WO 2016020982A1 JP 2014070584 W JP2014070584 W JP 2014070584W WO 2016020982 A1 WO2016020982 A1 WO 2016020982A1
Authority
WO
WIPO (PCT)
Prior art keywords
instruction
shipper
plan
shipping
information processing
Prior art date
Application number
PCT/JP2014/070584
Other languages
English (en)
French (fr)
Inventor
竜治 嶺
Original Assignee
株式会社日立製作所
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社日立製作所 filed Critical 株式会社日立製作所
Priority to PCT/JP2014/070584 priority Critical patent/WO2016020982A1/ja
Publication of WO2016020982A1 publication Critical patent/WO2016020982A1/ja

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G61/00Use of pick-up or transfer devices or of manipulators for stacking or de-stacking articles not otherwise provided for
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/08Logistics, e.g. warehousing, loading or distribution; Inventory or stock management

Definitions

  • the present invention relates to an information processing system that outputs an optimal plan and instructions according to received instructions.
  • the big data is, for example, consignment information, inventory information, POS data, etc. in the physical distribution field, and the amount of electricity and water used at home, weather, published data, etc. in the infrastructure sector.
  • Patent Document 1 is known as background art in this technical field.
  • Patent Document 1 discloses a method in which a result of a work instruction is recorded in a quantity warehouse, the result is input to a physical distribution simulator, a simulation result is referred to by an operator, and a parameter that gives an optimum result is selected. It is disclosed.
  • Non-Patent Document 1 discloses an adaptive signal processing technique in the signal processing field. Specifically, a method of minimizing the residual (estimated error) between the signal predicted from the prediction model and the observed signal (LMS: Least Mean Square) and adaptively changing the parameters of the prediction model is disclosed. Has been.
  • Distribution warehouses ship products to customers in response to instructions from shippers.
  • the shipper issues a shipping instruction to the warehouse.
  • the shipping instruction includes information such as the type of product and the number of products, the customer name of the shipping destination, and the shipping deadline.
  • a goods arrival instruction (order) is sent to the manufacturer.
  • the manufacturer Based on the arrival instruction, the manufacturer prepares a necessary number of types of goods to be received and delivers them to the warehouse.
  • a plan for the personnel required for the work in the warehouse is made based on the shipping instruction, and the staffing company that dispatches the personnel to perform the work is instructed to arrange the personnel.
  • Personnel arrangement is a request concerning the number of personnel and work contents, work place, working hours, etc. necessary for work in the warehouse on the day.
  • the temporary staffing company arranges personnel and sends them to the warehouse.
  • a dispatching plan for a delivery vehicle necessary for shipping is made, and the dispatching instruction is transmitted to the shipping company.
  • the shipping company prepares the required number of vehicles based on the dispatch instruction and sends it to the warehouse.
  • the manager adjusts arrival, personnel, and dispatch based on experience and intuition based on site constraints, and creates arrival instructions, worker instructions, and dispatch instructions. Then, the shipping operation is performed based on the received arrival instruction, worker instruction, and dispatch instruction.
  • on-site constraints are the space in the warehouse that stores the deliverables from the manufacturer, the number of people that can work in the warehouse at the same time, the number of trucks that can be placed on the shipping floor at the same time, the work before a certain work The order of the work that needs to be completed, the exclusivity between the work that a certain work and a certain work cannot be executed at the same time, and the like.
  • the truck for shipping comes first, and the truck waits in the warehouse, so that waste occurs.
  • the personnel may be adjusted only on a day-by-day basis due to the circumstances of the temporary staffing company.
  • an upper limit may be set on the number of people who can work simultaneously due to the work space in the warehouse. is there.
  • an inappropriate plan is derived due to site constraints.
  • an infeasible plan may be derived.
  • Patent Document 1 discloses a physical distribution simulation apparatus for performing operation prediction when various control patterns are set based on operation parameters of an operating physical distribution online control system, and the simulation result is reflected in online control. A control method that can be used is disclosed.
  • the time series pattern of the objective variables (operating rate, receipt / shipment quantity, receipt / shipment quantity, etc.) is simulated, and the results are expressed in graphs. It was in the form of displaying all together. Therefore, it is necessary for the user to select a control parameter while viewing the graph, and there is a problem that an optimum simulation result is not necessarily obtained depending on how the control parameter is selected.
  • Non-Patent Document 1 discloses an adaptive signal processing technique in the signal processing field. Specifically, a method is disclosed in which a residual between a signal predicted from a prediction model and an observation signal is minimized (LMS: Least Mean Square), and parameters of the prediction model are adaptively changed. When there is one signal source, it can be accurately predicted with one model, so that the effect of reducing the residual is fast and the convergence is fast. If this adaptive signal processing technology is associated with a distribution warehouse, the observed signal corresponds to the shipper's shipping instruction, and the predicted signal is based on the arrival plan, personnel plan, and dispatch plan, and the amount of shipment that can be handled in the warehouse on that day. Equivalent to.
  • LMS Least Mean Square
  • any prediction signal can be generated in the field of signal processing, the residual can be minimized.
  • arrivals are made with a certain number of products, temporary workers can only contract with a certain number of people for a certain period of time, and the weight of items that can be loaded with delivery trucks is selected finely Things that can't be done can happen. Therefore, compared to the shipper's shipping instructions, there is a shortage of merchandise inventory and delivery vehicles, excessive inventory is generated and inventory costs are increased, and excessive labor is generated.
  • the present invention has been made to solve the above-described problems, and a typical object of the present invention is to generate an arrival instruction, a staff instruction, and a delivery instruction reflecting the on-site restrictions of a distribution warehouse.
  • the purpose is to realize the operation of the distribution warehouse without excessive or wasteful.
  • the present invention is an information processing system including a computer having a processor and a memory, wherein the computer receives a shipping instruction from a shipper and determines a shipper's instruction pattern from the received shipping instruction and a past shipping instruction.
  • a shipper instruction pattern generation unit that generates one shipper instruction pattern, a planer that generates a plurality of plans that satisfy the shipping instruction based on the first shipper instruction pattern,
  • An on-site constraint reflecting unit that selects a plan that satisfies the constraints, a simulator that simulates a shipping amount as a second shipper instruction pattern based on the plan selected by the on-site constraint reflecting unit, and a second output from the simulator
  • An instruction pattern matching unit that selects a second shipper instruction pattern that matches the first shipper instruction pattern from among the shipper instruction patterns; Based on the serial instruction pattern matching unit of the second shipper instruction pattern selected in plan, and a instruction generator for generating an instruction corresponding to the shipment.
  • the present invention it is possible to generate a plan and an instruction that satisfy a restriction specific to a place (distribution warehouse, etc.) where shipping is performed for a shipper instruction, an appropriate inventory, an appropriate personnel, and a delivery.
  • the instruction can be automatically calculated by the computer without depending on the experience and intuition of the manager.
  • FIG. 1 is a block diagram illustrating an example of a configuration of an information processing system according to a first embodiment of this invention.
  • FIG. It is a figure which shows 1st Example of this invention and shows an example of a simultaneous execution combination table.
  • FIG. 1st Example of this invention shows an example of a parameter table.
  • FIG. 1st Example of this invention shows an example of an external table.
  • FIG. 1 shows an information processing system of the present invention, and is a block diagram schematically showing the flow of products, people, and information in a distribution warehouse that ships products to customers in response to instructions from the shipper.
  • the shipper 202 transmits a shipping instruction (shipper instruction) from the shipper server to be described later to the distribution warehouse 201.
  • the shipping instruction includes information such as the type of product, the number of products, the customer name of the shipping destination, and the shipping deadline.
  • a management server (described later) of the distribution warehouse 201 generates an arrival plan 207, a personnel plan 209, and a delivery plan 211 based on the shipper instruction.
  • the arrival plan 207 includes the type of product to satisfy the shipping instruction, the number of products, the type of product to be ordered from the manufacturer calculated from the inventory of the distribution warehouse 201, the number of products, and the delivery date in time for the shipping deadline.
  • the personnel plan 209 includes the number of personnel necessary for the work of the distribution warehouse 201, work contents, work place, working hours, dispatch period, and the like.
  • the delivery plan 211 includes the number of delivery vehicles, the date and time, the shipping destination, and the like that are required when the product is shipped.
  • the management server corrects each plan to an appropriate plan reflecting the restrictions (site restrictions) unique to the distribution warehouse 201 (213), sends a goods arrival instruction 215 to the maker 204, and dispatches the staffing company 205.
  • the personnel instruction 217 is transmitted to the shipping company 206, and the delivery instruction 219 is transmitted to the shipping company 206.
  • on-site restrictions are specific to the distribution warehouse 201, such as the size of the distribution warehouse 201 that can store deliverables from the manufacturer 204, the number of personnel that can work simultaneously, and the number of trucks that can be placed next to the shipping area at the same time. Indicates a constraint.
  • the arrival instruction 215 includes the type of product, the number of products, and the delivery date.
  • the personnel instruction 217 includes the number of personnel, work contents (work classification), working hours, dispatch period, and the like.
  • the delivery instruction 219 includes the number of vehicles, date and time, shipping destination, and the like. In the distribution warehouse 201, a work instruction in which specific contents of work are set is generated. This work instruction can be included in the personnel instruction.
  • the manufacturer 204 returns an arrival response 216 to the distribution warehouse 201. Further, the staffing agency 205 returns a personnel response 218 to the distribution warehouse 201.
  • the shipping company 206 returns a delivery response 220 to the distribution warehouse 201.
  • the delivery for the arrival instruction 215 is referred to as an arrival response 216.
  • sending personnel to the distribution warehouse 201 in response to the personnel instruction 217 is referred to as personnel response 218.
  • preparing the required number of vehicles for the delivery instruction 219 and sending them to the distribution warehouse 201 is called a delivery response 220.
  • delivery of goods is not limited to a vehicle. Other transportation equipment such as ships and aircraft may be used. Also, a combination of different types of transportation equipment may be used.
  • the arrival response 216 returned to the distribution warehouse 201 becomes the arrival instruction 221 as it is, the personnel response 218 becomes the worker instruction 222 as it is, and the delivery response 220 becomes the delivery instruction 223 as it is. In response to these instructions, shipping work is performed in the distribution warehouse 201.
  • FIG. 16 is a flowchart showing a flow of work performed in the distribution warehouse 201 shown in FIG.
  • the shipper 202 transmits a shipping instruction (or shipper instruction) from the shipper server (described later) to the management server of the distribution warehouse 201 (1902).
  • the management server generates an arrival plan (1903) and creates an arrival instruction based on the arrival plan (1904).
  • the management server generates a personnel plan (1905) and creates a personnel instruction based on the personnel plan (1906).
  • the management server generates a delivery plan (1907) and creates a delivery instruction based on the delivery plan (1908).
  • the management server adjusts the arrival instruction, the personnel instruction, and the delivery instruction to an instruction that takes into account the site restrictions of the distribution warehouse 201 (1909). In addition, you may perform adjustment which considered this field constraint with respect to a plan.
  • the management server obtains site constraints, and corrects the contents of each instruction (or plan) that deviates from site constraints and adjusts them to satisfy the site constraints. To do. For example, if a personnel instruction is generated that exceeds the number of people who can work at the loading site for loading products to be shipped, the management server reduces the number of personnel placed at the loading site and performs the work performed at the loading site. Extend the time and adjust the product of personnel and work time to match the personnel plan.
  • the management server transmits an arrival instruction after adjustment in consideration of site restrictions to a server (described later) of the manufacturer 204 (1910), and receives an arrival response (1911) from the manufacturer 204. Similarly, the management server transmits a staff instruction after adjustment due to site restrictions to a server (described later) of the staffing company 205 and receives a staff response (1913). Similarly, the management server transmits a delivery instruction adjusted with site restrictions to a server (described later) of the shipping company 206 and receives a delivery response (1915). In the distribution warehouse 201, the management server outputs a work instruction based on the arrival response, personnel response, and delivery response (1916). When the work is completed, the product is shipped (1917), and the process for the shipping instruction received from the shipper is terminated (1918).
  • FIG. 2 is a block diagram showing functions of the information processing system of the present invention.
  • the shipper 202 inputs the shipper instruction to the shipper instruction pattern generation unit 302 of the information processing system that manages the distribution warehouse 201 using the shipper instruction input unit 301 of the shipper server (described later).
  • the shipper instruction pattern generation unit 302 stores the input shipper instruction in a shipper instruction history database (DB in the figure) 306 and refers to the shipper instruction history database 306 to generate the latest shipper instruction pattern. Then, the shipper instruction pattern generation unit 302 sends the generated shipper instruction pattern to the shipper instruction pattern verification unit 303, the arrival planning unit 317, the personnel planning unit 318, and the delivery planning unit 319. Note that the shipper instruction pattern generation unit 302 also functions as a reception unit that receives a shipper instruction (shipment instruction) from the shipper.
  • DB shipper instruction history database
  • the arrival planning unit 317 refers to the instruction history database 316 and generates an arrival plan that satisfies the present shipper instruction based on a plurality of past instructions (hereinafter also referred to as results). In the arrival plan, which product is to be received from the maker 204 and how much is to be received in the distribution warehouse 201, the generated arrival plan is sent to the simultaneous execution combination determination unit 315.
  • the instruction history database 316 stores instruction contents 305 that have been processed as a history.
  • the personnel planning unit 318 refers to the instruction history database 316, estimates how many personnel are necessary based on past instructions, generates a personnel plan that satisfies the current shipper instruction, and The plan is sent to the simultaneous execution combination determination unit 315.
  • the delivery plan unit 319 refers to the instruction history database 316, generates a delivery plan that satisfies the current shipper instruction based on the past instructions, and sends the generated delivery plan to the simultaneous execution combination determination unit 315.
  • the arrival planning unit 317, the personnel planning unit 318, and the delivery planning unit 319 if there is a past shipper instruction that approximates the present shipper instruction among the past shipper instructions in the shipper instruction history database 306, An instruction corresponding to the shipper instruction can be used as a plan.
  • Each instruction in the arrival instruction table 501, the personnel arrangement table 601, and the vehicle arrangement table 701 corresponding to the past shipper instruction in the shipper instruction history database 306 can be selected as each plan.
  • the past shipper instruction that approximates the current shipper instruction can be an approximate history if there is a match of the type of product, a match of the manufacturer 204, a match of the shipping destination (customer name), and the like.
  • the arrival planning unit 317, the personnel planning unit 318, and the delivery planning unit 319 may each generate a plan with one or more preset patterns.
  • the arrival planning unit 317, the personnel planning unit 318, and the delivery planning unit 319 output to the simultaneous execution combination determination unit 315 both the plan generated in a predetermined pattern and the plan acquired from the instruction corresponding to the past shipper instruction. You may make it do.
  • the simultaneous execution combination determination unit 315 can be executed within the constraints of the distribution warehouse 201 in the input plan using the combination information of the plans that can be executed simultaneously in the distribution warehouse 201 stored in the simultaneous execution combination table 1201. Select content. In other words, the simultaneous execution combination determination unit 315 excludes combinations of plans that cannot be executed simultaneously.
  • the output of the simultaneous execution combination determination unit 315 is input to the parameter determination unit 313.
  • the simultaneous execution combination table 1201 holds combination information of plans that can be executed simultaneously, which are input from the simultaneous execution combination input unit 314.
  • the simultaneous execution combination determination unit 315 may be instructed from the simultaneous execution combination input unit 314 for plan combination information that can be executed simultaneously.
  • the parameter determination unit 313 further selects the content of each generated plan based on the parameters of each plan (work content) stored in the parameter table 1301, that is, the upper limit value and the lower limit value.
  • the parameter determination unit 313 outputs a plan that satisfies the conditions set in the parameter table 1301 among the plurality of input plans. In other words, plans that do not satisfy the conditions of the parameter table 1301 are excluded.
  • the output of the parameter determination unit 313 is input to the frequency determination unit 311.
  • the parameter table 1301 includes restrictions on preset items such as restrictions unique to the distribution warehouse 201, restrictions when ordering goods, and restrictions when arranging personnel. Therefore, the parameter determination unit 313 can select a plan that satisfies the restrictions specific to the distribution warehouse 201 set in the parameter table 1301.
  • the parameter table 1301 may hold parameters of each plan (work content) input from the executable parameter input unit 312, that is, an upper limit value, a lower limit value, and the like.
  • the parameters of each plan input from the executable parameter input unit 312 may be instructed to the parameter determination unit 313.
  • the frequency determination unit 311 refers to the frequency table 1401 and further selects a plan using information indicating how often the input plan can be executed.
  • a plan using information indicating how often the input plan can be executed.
  • an executable frequency is set for each plan.
  • restrictions on the frequency of plans executed in the distribution warehouse 201 are set in advance.
  • the frequency determination unit 311 outputs a frequency plan that can be executed in the distribution warehouse 201.
  • the output of the frequency determination unit 311 is input to the order determination unit 309.
  • the frequency table 1401 holds a value input from the executable frequency input unit 310, that is, information indicating how often each plan can be executed (or updated).
  • the order determination unit 309 refers to the execution order table 1501 to determine the execution order dependency of each plan, and selects a plan that satisfies the execution order constraint.
  • the execution order table 1501 includes information in which restrictions on the execution order of plans in the distribution warehouse 201 and time-series restrictions when executing each plan are set in advance.
  • the order determination unit 309 outputs a combination of plans in an executable order.
  • the output of the order determination unit 309 is input to the simulator 307.
  • the execution order table 1501 is input from the executable order input unit 308.
  • the execution order of each plan that is, which plan needs to be executed before which plan and which plan is executed after which plan. Information indicating dependency between plans, such as whether there should be a restriction on the order of plans or not, is held.
  • the on-site constraint reflection unit 330 includes the simultaneous execution combination determination unit 315, the parameter determination unit 313, the frequency determination unit 311, and the order determination unit 309.
  • the site constraint reflection unit 330 filters the generated arrival plan, personnel plan, and delivery plan based on the constraints of the distribution warehouse 201 and time-series constraints, and selects a plan that satisfies the site constraints. Input to 307.
  • the simulator 307 simulates what kind of products can be shipped after being collected in the distribution warehouse 201 by using the plan narrowed down by each of the determination units described above. That is, a shipper instruction is simulated, and for example, a time-series shipment amount is estimated.
  • the simulator 307 may apply a known or publicly known technique, and may be any one that outputs the relationship between the shipment amount and the date (time series) from each plan narrowed down as described above.
  • the shipper instruction pattern collating unit 303 simulates (estimates) the shipping amount using the shipper instruction pattern (first shipper instruction pattern) generated by the shipper instruction pattern generating unit 302 and the plan input to the simulator 307.
  • the shipper instruction pattern (second shipper instruction pattern) is compared.
  • the shipper instruction pattern collating unit 303 selects a second shipper instruction pattern that matches the first shipper instruction pattern, and selects the plan that generated the second shipper instruction pattern.
  • the second shipper instruction pattern that matches the first shipper instruction pattern is a second shipper instruction pattern that is a simulation result that approximates or matches the first shipper instruction pattern.
  • the shipper instruction pattern matching unit 303 outputs the plan that generated the second shipper instruction pattern as a plan that satisfies the shipper instruction pattern.
  • the shipper instruction pattern collating unit 303 sets the second difference 2105 between the first shipper instruction pattern corresponding to the demand curve in FIG. 18 and the second shipper instruction pattern corresponding to the supply curve in FIG. A shipper instruction pattern may be selected.
  • the plan that generated the second shipper instruction pattern is output as a plan that satisfies the shipper instruction pattern.
  • the instruction generation unit 304 generates instruction contents 305 including an arrival instruction, a staff instruction, and a delivery instruction from a plan that satisfies the shipper instruction pattern. These instruction contents are sent to the manufacturer 204, the staffing company 205, and the shipping company 206, respectively.
  • FIG. 3 is a diagram illustrating an example of the shipper instruction history database 306.
  • the shipper instruction history database 306 includes a shipper instruction ID 402 for storing an instruction identifier from the shipper 202, a shipper ID 403 for storing the identifier of the shipper 202, a product ID 404 for storing the product identifier, and a quantity for storing the quantity of the product. 405, a customer ID 406 that stores the identifier of the customer who is the delivery destination of the product, a customer name 407 that ranks the customer's name, an instruction date and time 408 that stores the date and time when the instruction from the shipper 202 is received, and the instruction One record is made up of the delivery date and time 409 for storing the due date for.
  • the shipper instruction ID 402 is an identifier uniquely assigned for each instruction of the shipper 202.
  • the shipper ID 403 is an identifier uniquely assigned to each shipper 202.
  • the product ID 404 is an identifier uniquely assigned to each product.
  • the quantity 405 is the quantity instructed by the shipper 202 how many products having the product ID 404 should be shipped in the shipper instruction.
  • the customer ID 406 is a unique identifier assigned to the destination of the product.
  • the customer name 407 represents the name of the customer specified by the customer ID 406.
  • the instruction date and time (408) represents the date and time when the shipper 202 inputs the shipper instruction.
  • the delivery date and time 409 indicates a time limit for sending a product having the product ID 404 designated by the shipper 202 to the customer ID 406.
  • FIG. 4 is a diagram illustrating an example of the arrival instruction table 501.
  • the arrival instruction table (501) stores information such as which products should be placed on which shelves in the distribution warehouse 201 by when.
  • the arrival instruction table 501 constitutes instruction contents 305.
  • the arrival instruction table 501 is generated by the instruction generation unit 304 as will be described later.
  • the instruction generation unit 304 generates an arrival instruction table 501, a personnel arrangement table 601, and a vehicle arrangement table 701 based on the output of the shipper instruction pattern matching unit 303.
  • the arrival instruction table 501 includes an arrival instruction ID 502 for storing an identifier for each arrival instruction, a manufacturer ID 503 for storing an identifier given in advance to a manufacturer that manufactures the commodity for the arrival instruction, a manufacturer name 504, and a commodity for the arrival instruction.
  • one record is composed of the arrival deadline date and time 510 for storing the delivery deadline.
  • the arrival instruction ID (502) is a number uniquely assigned to the arrival instruction.
  • FIG. 5 is a diagram showing an example of the personnel arrangement table 601.
  • the staff arrangement table 601 constitutes the instruction content 305.
  • the staff arrangement table 601 is generated by the instruction generation unit 304 as described later.
  • the personnel arrangement table 601 stores information such as what working hours and how many workers are engaged in what work contents.
  • the personnel arrangement table 601 includes an arrangement ID 602 for storing an identifier for personnel arrangement, a work category 603 for storing an identifier for work performed by the arranged personnel, a work time shift 604 for storing the working hours of the personnel to be arranged, and an arrangement.
  • FIG. 6 is a diagram illustrating an example of the vehicle arrangement table 701.
  • the vehicle arrangement is to prepare a delivery means such as a truck which is necessary at the time of shipment. Specifically, it is a delivery means necessary for sending and delivering the product and number in the shipper instruction at a time determined by the customer, and can use a vehicle, a ship, an aircraft, or the like. Below, the example which uses a vehicle as a delivery means is shown.
  • the vehicle arrangement table 701 constitutes the instruction content 305.
  • the vehicle arrangement table 701 is generated by the instruction generation unit 304 as will be described later.
  • the vehicle arrangement table 701 includes a vehicle allocation ID 702 for storing an identifier for vehicle arrangement, a vehicle classification 703 for storing an identifier for specifying the type and specification of the vehicle, a number of passengers 704 for storing the number of persons boarding the vehicle, Loading location 705 for storing location information in the distribution warehouse 201, loading time 706 for storing the date and time for loading the product, shipping destination name 707 for storing the delivery destination of the product, and shipping destination name of the product
  • One record is made up of a shipping destination ID 708 that stores the identifier and an arrival date 709 that stores the arrival date and time at the delivery destination.
  • FIG. 7 is a diagram illustrating an example of the picking work instruction table 801.
  • the picking work instruction table 801 constitutes instruction contents 305.
  • the picking work instruction table 801 is generated by the instruction generating unit 304 as will be described later.
  • the picking operation is an operation in which a necessary number of necessary products are selected from a stock in the distribution warehouse 201 by a worker according to a shipper instruction and taken out from a shelf or the like.
  • the taken-out merchandise is stored in a predetermined box and delivered to the inspection packing work.
  • the picking work constitutes a work instruction of the distribution warehouse 201 together with the inspection packing work described later. This work instruction may be included in the personnel instruction.
  • the picking work instruction table 801 includes an instruction ID 802 for storing an identifier given for each picking work instruction, a shelf ID 803 for storing a shelf identifier as position information for performing the picking work, and a product name for storing the name of a product to be handled. 804, a product ID 805 that stores a product identifier, a product size 806, a product color 807, a product number 808, and a box ID 809 that stores a product storage box or container identifier. Composed.
  • FIG. 8 is a diagram showing a configuration example of the inspection packing work instruction table 901. Inspecting and packing work, for the products for which picking work has been completed, work personnel determine whether the size, color, and number of products are in accordance with the shipper's instructions, and confirm that there is no dirt or damage. It is. In addition, the worker performs the work of packing the product into a predetermined box after confirmation.
  • the inspection packing work instruction table 901 constitutes instruction contents 305.
  • the inspection packing work instruction table 901 is generated by the instruction generating unit 304 as described later.
  • the inspection packing work instruction table 901 includes an instruction ID 902 for storing an identifier given for each work instruction, a box ID 903 for storing an identifier of a box for storing a product, a product name 904 for storing a name of a product to be inspected,
  • One record is composed of the approval ID 905 of the worker who inspected the product, the size 906 of the product, the color 907 of the product, the number 908 of the product, and the dispatch ID 909 that stores the identifier of the vehicle arrangement to be delivered.
  • FIG. 9 is a graph showing a relationship between a work demand curve and a work supply curve in a distribution warehouse.
  • the horizontal axis indicates the date and time
  • the vertical axis indicates the shipping amount.
  • the demand for the shipment amount at a certain date and time (corresponding to the demand amount of the work necessary for shipping those shipment amounts) is shown by a curve 1003.
  • the supply amount of the shipment amount (the amount of work that can be provided by the physical distribution warehouse 201) at the same date and time is indicated by a curve 1004.
  • An illustrated curve 1004 shows an example in which the information processing system of the present invention is not applied.
  • the worker When the supply amount of work is less than the demand amount, that is, when there is a difference between demand and supply (1005) due to the relationship between the two, for example, the worker can be urgently replenished to finish shipping work or overtime work is possible It is necessary to instruct workers to work overtime and finish the shipping work.
  • FIG. 10 is a block diagram showing an example of the information processing system of the present invention.
  • This information processing system includes a management server 1100 that manages the distribution warehouse 201, a database (DB in the figure) 1110 that stores various data, and a shipper instruction input unit 301 that transmits a shipper instruction to the management server 1100.
  • 1120 a manufacturer server 1121 that receives an arrival instruction (arrival instruction 1910) from the management server 1100, a staffing agency server 1122 that receives personnel arrangement (personal instruction 1912) from the management server 1100, and a delivery instruction from the management server 1100
  • the database 1110 may be stored in a local storage device of the management server 1100.
  • the management server 1100 gives one or more CPUs 1101, a RAM 1102 for storing software (programs) and data, a keyboard 1103 for inputting data and commands, input data, output data, and results and processes of data conversion processing to the user.
  • the display device 1104 shown, the printer 1105 that prints input data and output data, the results and process of data conversion processing on paper, the mouse 1106 that inputs data and commands, and the data between each of the above are communicated
  • a bus 1107 for communicating with the network 1109, and an interface 1108 for communicating with the network 1109.
  • the database 1110 may store not only input data but also the processing result of the information processing system and the process of processing.
  • a program executed by the management server 1100 may be stored in the database 1110 as a storage device.
  • the programs executed by the CPU 1101 of the management server 1100 include, among the functional elements shown in FIG. 2, a shipper instruction pattern generation unit 302, a shipper instruction pattern verification unit 303, an arrival plan unit 317, a personnel plan unit 318, and a delivery plan unit. 319, simultaneous execution combination determination unit 315, parameter determination unit 313, frequency determination unit 311, order determination unit 309, simulator 307, executable sequence input unit 308, executable frequency input unit 310, executable parameter input unit 312, simultaneous execution A combination input unit 314.
  • the CPU 1101 operates as a functional unit that provides a predetermined function by processing according to the program of each functional unit.
  • the CPU 1101 functions as the arrival planning unit 317 by performing processing according to the arrival planning program.
  • the CPU 1101 also operates as a function unit that provides each function of a plurality of processes executed by each program.
  • a computer and a computer system are an apparatus and a system including these functional units.
  • Information such as programs and tables for realizing each function such as the instruction generation unit 304 is stored in a storage subsystem, a nonvolatile semiconductor memory, a hard disk drive, a storage device such as an SSD (Solid State Drive), an IC card, an SD card, It can be stored in a computer-readable non-transitory data storage medium such as a DVD.
  • a storage subsystem a nonvolatile semiconductor memory, a hard disk drive, a storage device such as an SSD (Solid State Drive), an IC card, an SD card, It can be stored in a computer-readable non-transitory data storage medium such as a DVD.
  • the database 1110 includes a shipper instruction history database 306 (FIG. 3), an instruction history database 316, instruction contents 305, and a determination table group 1550.
  • the instruction content 305 includes an arrival instruction table 501 (FIG. 4), a personnel arrangement table 601 (FIG. 5), a vehicle arrangement table 701, a picking operation instruction table 801, and an inspection and packing operation instruction table 901.
  • the determination table group 1550 includes a simultaneous execution combination table 1201, a parameter table 1301, a frequency table 1401, and an execution order table 1501, as will be described later.
  • each computer of the shipper server 1120, the manufacturer server 1121, the staffing company server 1122, and the shipping company server 1123 is the same as that of the management server 1100 although not shown.
  • FIG. 11 is a diagram illustrating an example of the simultaneous execution combination table 1201.
  • the simultaneous execution combination table 1201 is a table storing a constraint indicating whether or not a plurality of selected plans can be executed simultaneously when a plurality of plans are executed.
  • the simultaneous execution combination table 1201 stores “1” (1205) in the figure when the contents of the plan number 1203 for storing the identifier of the plan and the plan number 1202 can be executed simultaneously, and in the figure when they cannot be executed simultaneously. “0” (1206) is stored. If the plan numbers 1203 and 1202 are the same, “-” (1204) is stored.
  • plan with the plan number 1203 “1” can be executed simultaneously with the plan number “2”, but cannot be executed simultaneously with the plan numbers “3” and “4”.
  • FIG. 12A to 12C are diagrams showing an example of the parameter table 1301.
  • FIG. 12B shows the external table 1311 with the pointer “# 1”.
  • FIG. 12C shows the external table 1321 whose pointer is “# 2”.
  • a parameter table 1301 includes a plan number 1302 for storing a plan identifier, a content 1303 for storing a change target, a parameter number 1304 for storing the number of parameters to be changed, and a condition for setting a changeable condition.
  • One record is composed of the expression 1305 and the external table 1306 that stores a pointer to the external table.
  • the parameter ⁇ 1 indicates that the attendance time can be set after 9:00
  • the parameter ⁇ 2 indicates that the lunch break starts. This indicates that it can be set before 12:00
  • the parameter ⁇ 3 indicates that the end of the lunch break can be set before 13:00
  • the parameter ⁇ 4 can be set before 18:00. It shows that.
  • the external table 1311 for pointer # 1 is composed of a product ID 1312 for storing product identifiers, a lower limit number 1313 for ordering products, and an upper limit number 1314 for ordering products. .
  • the external table 1321 of pointer # 2 arranges a loading capacity 1322 for storing the loading capacity of the vehicle, a format 1323 for storing the type of the vehicle, a lower limit number 1324 when arranging the vehicle, and a vehicle.
  • One record is composed of the upper limit number 1325 at the time.
  • FIG. 13 is a diagram showing an example of the frequency table 1401.
  • the frequency table 1401 stores the frequency at which the contents of the plan can be changed (updated).
  • the frequency table 1401 is composed of a plan number 1402 and an updatable frequency 1403 for storing updatable time and conditions.
  • FIG. 14 is a diagram illustrating an example of the execution order table 1501.
  • the execution order table 1501 stores execution order constraints such as which plan should be executed first and which plan should be executed later when a plurality of plans are executed.
  • the execution order table 1501 expresses numerically whether the plan with the plan number 1502 storing the plan identifier should be executed first, or later, or there is no order restriction. .
  • 15A to 15D show graphs of the shipper instruction pattern generated by the shipper instruction pattern generation unit 302 shown in FIG. 2 based on the shipper instruction history database 306 shown in FIG.
  • each shipper instruction pattern is shown as a graph with the horizontal axis representing the date and time and the vertical axis representing the shipment amount from the history instructed by the shipper.
  • the shipper instruction pattern generation unit 302 acquires a time-series tendency for the shipper instruction and generates a shipper instruction pattern.
  • the shipper instruction pattern 1611 in FIG. 15A can be created from the shipper instruction history database 306.
  • the shipper instruction pattern generation unit 302 divides the instruction date and time 1608 at a predetermined time interval (or date interval) into the X axis of the shipper instruction pattern 1611, and the goods shipped at that time
  • the shipper instruction pattern 1611 can be generated by setting the quantity 1605 of Y as the Y axis.
  • the shipper instruction pattern 1612 of FIG. 15B, the shipper instruction pattern 1613 of FIG. 15C, and the shipper instruction pattern 1614 of FIG. 15D are also patterns generated by the shipper instruction pattern generation unit 302 in the same manner.
  • the quantity of shipped products increases with the passage of time (or the passage of date).
  • the quantity of products decreases with the passage of time (or the passage of date).
  • the shipper instruction pattern 1613 in FIG. 15C the time has elapsed (or the day has passed), and after the quantity of the product has temporarily increased, it has decreased again.
  • the shipper instruction pattern 1614 in FIG. 15D the quantity temporarily decreases with the passage of time (or the passage of date), and the number of commodities increases again.
  • FIG. 17 is a flowchart showing an example of processing performed in the management server 1100 of the present invention. This process is started based on an instruction output from the shipper server 1120.
  • the shipper 202 transmits the shipper instruction via the shipper instruction input unit 301 of the shipper server 1120, and the management server 1100 receives it (2002).
  • the shipper instruction pattern generation unit 302 registers the input shipper instruction in the shipper instruction history database 306 (2003).
  • the shipper instruction pattern generation unit 302 selects the latest shipper instruction pattern with reference to the shipper instruction history database 306 (2004).
  • the consignor instruction pattern generation unit 302 transmits the selected consignor instruction pattern to the consignor instruction pattern verification unit 303, the arrival planning unit 317, the personnel planning unit 318, and the delivery planning unit 319.
  • the arrival planning unit 317 refers to the past shipper instruction from the past instruction history database 316 including a plurality of records, calculates which product should be received from the manufacturer 204 and how much to the distribution warehouse 201, and plans the arrival plan. Generate (2005). Note that a plurality of arrival plans are generated, and arrival plans with different orders and sizes are generated. Then, the arrival plan unit 317 outputs the arrival plan to the simultaneous execution combination determination unit 315.
  • the personnel planning unit 318 estimates how many personnel are required from past instructions in the instruction history database 316 and generates a personnel plan to be requested to a staffing agency (2006). Note that a plurality of personnel plans are generated, and personnel plans with different numbers of requested personnel and different periods are generated. Then, the personnel planning unit 318 outputs the generated personnel plan to the simultaneous execution combination determination unit 315.
  • the delivery plan unit 319 generates a delivery plan by estimating how many vehicles are needed from past instructions in the instruction history database 316 (2007). Note that a plurality of delivery plans are generated, and arrival plans with different numbers of requested vehicles and different dates are generated. Then, the delivery plan unit 319 outputs the generated delivery plan to the simultaneous execution combination determination unit 315.
  • the simultaneous execution combination determination unit 315 obtains combination information of simultaneously executable plans stored in the simultaneous execution combination table 1201 (2008), and among the received arrival plans, personnel plans, and delivery plans, An executable plan is determined (2009). That is, the simultaneous execution combination determination unit 315 selects plans that can be executed simultaneously in accordance with the restrictions on the site of the distribution warehouse 201.
  • the narrowing (or selection) process may be realized by a process such as filtering or selection using the simultaneous execution combination table 1201. The same applies to the narrowing-down process described below.
  • the simultaneous execution combination determination unit 315 may be instructed from the simultaneous execution combination input unit 314 for plan combination information that can be executed simultaneously.
  • the parameter determination unit 313 acquires parameters of each plan (work contents) stored in the parameter table 1301, that is, executable parameters such as an upper limit value and a lower limit value such as the order quantity (2010).
  • the parameter determination unit 313 further narrows down the contents of each plan based on the acquired parameters. For example, in the parameter table 1301, a product for which a lower limit for the order quantity is set and an upper limit value for the number that can be stocked on the shelf of the distribution warehouse 201 are set for each product or product size.
  • the parameter determination unit 313 determines that an arrival plan that satisfies the set value of the parameter table 1301 among the plurality of generated arrival plans is an executable arrival plan (2011). As shown in FIG. 2, the parameters of each plan input from the executable parameter input unit 312 may be instructed to the parameter determination unit 313.
  • the frequency determination unit 311 refers to the frequency table 1401 and determines how often the narrowed down plan can be executed. First, the frequency determination unit 311 acquires an executable frequency for each plan with reference to the frequency table 1401 (2012). The frequency determination unit 311 determines an actually executable plan from the executable frequency for each plan (2013). As shown in FIG. 2, the frequency of each plan input from the executable frequency input unit 310 may be instructed to the frequency determination unit 311.
  • the order determination unit 309 refers to the execution order table 1501 and determines the order of executable plans.
  • the execution order table 1501 is the execution order of each plan, that is, which plan needs to be executed before which plan, which plan should be executed after which plan, and there is no restriction on the order of the plans. , And so on.
  • the order determination unit 309 acquires the execution order of each plan from the execution order table 1501 (2014).
  • the order determination unit 309 selects a combination of plans that satisfy the acquired execution order. As shown in FIG. 2, the order determination unit 309 may be instructed about the execution order of each plan input from the executable order input unit 308.
  • the simulator 307 simulates what products can be shipped after being collected in the distribution warehouse 201 using the plan narrowed down in the above-described steps 2009 to 2015 (2016). That is, a shipper instruction is simulated.
  • the shipper instruction pattern collation unit 303 collates the shipper instruction pattern generated by the shipper instruction pattern generation unit 302 with the shipper instruction pattern (simulation result) generated by inputting the plan into the simulator 307 (2017).
  • the simulation result that matches the shipper instruction pattern is selected.
  • the shipper instruction pattern matching unit 303 outputs the plan that generated the simulation result.
  • the simulator 307 determines the number of work personnel from the past instructions stored in the instruction history database 316. Search for results that are close to X, the amount of goods received is close to Y, and the number of vehicles dispatched is close to Z. The simulator 307 sets the search result to s (t) as the total quantity at a certain date and time t.
  • the simulation values from the dates from t-1 to t-M can be obtained.
  • M is a predetermined natural number.
  • values close to X, Y, and Z values within a range set in advance for each of X to Z can be used.
  • the average productivity is X
  • the multiplied value may be a value obtained by a simulator.
  • collation of the shipper's instruction pattern in step 2017 and the simulation result can be performed as follows.
  • d (t) be the total quantity of shipper instructions at date and time t
  • s (t) be the total quantity that can be shipped at date and time t based on the output of the simulator.
  • the former d (t) corresponds to the demand (curve 1003) shown in FIG. 9, and the latter s (t) corresponds to the supply (curve 1004) shown in FIG. Therefore, the difference between supply and demand at date t is
  • the closeness of the demand and supply patterns can be quantified, and a pattern with a similar value is selected based on this numerical value.
  • the supply side may select a pattern that is close based on whether or not the temporary derivative is a positive value.
  • the demand or supply tends to decrease, whether or not the first derivative of both is a negative value may be used for the judgment of collation.
  • demand and supply can be verified by using an arbitrary approximate function. For example, divide tM from date and time t into two,
  • d (t) and s (t) can be expressed by approximate functions, and close patterns can be selected based on the proximity of the approximate functions.
  • the approximate function for example, a linear approximate curve, a logarithmic approximate curve, a polynomial approximate curve, a power approximate curve, an exponential approximate curve, a moving average approximate curve, a spline approximate curve, or the like can be used.
  • a specific method for calculating the proximity of an approximate function is that a spline approximate curve of d (t) is e (t) and a spline approximate curve of s (t) is u (t).
  • the instruction generation unit 304 generates a work instruction based on the plan selected by the collation (2016).
  • the instruction generation unit 304 generates an arrival instruction based on the selected arrival plan and transmits it to the manufacturer server 1121.
  • the instruction generation unit 304 stores the generated arrival instruction in the arrival instruction table 501 of the instruction content 305.
  • the instruction generation unit 304 generates a staff arrangement instruction, a picking work instruction, and an inspection packing work instruction based on the selected personnel plan, and transmits them to the staffing agency server 1122.
  • the instruction generation unit 304 stores the generated personnel arrangement instruction, picking operation instruction, and inspection packing operation instruction in the personnel arrangement table 601, picking operation instruction table 801, and inspection packing operation instruction table 901 of the instruction content 305.
  • the instruction generation unit 304 generates a delivery instruction based on the selected delivery plan and transmits it to the shipping company server 1123.
  • the instruction generation unit 304 stores the generated delivery instruction in the vehicle arrangement table 701 of the instruction content 305.
  • Work instructions include an instruction for the outside of the distribution warehouse 201 and an instruction for the inside of the distribution warehouse 201.
  • an arrival instruction, a staff arrangement instruction, and a delivery instruction are generated. These instruction contents are transmitted to the manufacturer 204, the temporary staffing company 205, and the shipping company 206, respectively.
  • the instruction for the inside of the distribution warehouse 201 is an instruction related to the work content performed by the worker in the distribution warehouse 201.
  • a work instruction (801) for picking work shown in FIG. 7 and a work instruction (901) for inspection packing work shown in FIG. 8 are shown.
  • FIG. 18 is a graph showing the relationship between the work demand curve 2103 and the supply curve 2104 in the physical distribution warehouse 201 when the work of the physical distribution warehouse 201 is controlled by the information processing system of the present invention.
  • the horizontal axis is the date and time
  • the vertical axis is the shipment amount.
  • the shipment amount at a certain date and time (equivalent to the demand amount of work necessary to ship those shipment amounts) and the shipment amount at the same date and time
  • the relationship of the supply amount (the work amount that can be provided by the physical distribution warehouse 201) is shown.
  • the graph of FIG. 18 differs from the example of FIG. 9 in that the relationship between the two can reduce the difference 2105 between supply and demand.
  • the shipper instruction pattern matching unit 303 performs a simulation in which the difference 2105 between demand and supply is the smallest. Select a result. And the plan which produced
  • the distribution warehouse 201 has been described as an application example of the present invention.
  • the information processing system and method disclosed in the present invention are not limited to the distribution warehouse 201.
  • the present invention can be applied to petroleum plants, chemical plants, clothing plants, food plants, water treatment plants, recycling plants, industrial waste plants, and the like.
  • the above plant has a wide variety of sensors such as water meters, densitometers, thermometers, hygrometers and other sensors. To optimally control the plant, control from the outside while considering the sensor information above. It is necessary to obtain electric power, materials, water, etc. from the outside in an appropriate amount and at an appropriate timing based on the instructions.
  • the shipping instruction in FIG. 1 corresponds to a plant control instruction.
  • Incoming instructions correspond to energy supply instructions, power transmission instructions, and material delivery instructions.
  • Personnel instructions correspond to personnel instructions as they are, and delivery instructions can also be used as delivery instructions. It can be operated.
  • the shipping instruction shown in FIG. 1 is a maintenance instruction for the plant.
  • the arrival instruction shown in FIG. 1 corresponds to an energy supply instruction, a power transmission instruction, and a material delivery instruction to the plant
  • the personnel instruction corresponds to the personnel instruction as it is
  • the delivery instruction is also the delivery instruction as it is.
  • the framework allows efficient operation of the plant without waste or effort.
  • the present invention is applicable to maintenance systems such as industrial machines and construction machines.
  • the shipping instruction in FIG. 1 corresponds to a maintenance instruction.
  • the arrival request in FIG. 1 is a parts delivery request or a power transmission request
  • a personnel request is directly a personnel request
  • a delivery request is also a delivery request
  • the maintenance system can be efficiently operated in the same framework without waste or effort. Can do.
  • the management server 1100 generates a plurality of arrival plans, personnel plans, and delivery plans based on the first shipper instruction pattern generated from the received shipper instructions (shipment instructions), and these plans are stored in the distribution warehouse 201. It is adjusted by the site constraint reflecting unit 330 that takes into account the constraints (or limitations) unique to the. Then, a plan that satisfies on-site constraints is selected and input to the simulator 307, and the shipping amount that can be realized in the distribution warehouse 201 is calculated as the second shipper instruction pattern.
  • the management server 1100 generates a first shipper instruction pattern from the received shipper instruction and the past shipper instruction, and compares it with the second shipper instruction pattern output by the simulator 307.
  • the management server 1100 selects a second instruction pattern close to the first shipper instruction pattern from the second shipper instruction patterns. Then, an arrival instruction, a staff instruction, and a delivery instruction are generated from the plan for generating the selected second instruction pattern.
  • the shipper instruction pattern generated from the shipper instruction and the past shipper instruction, and the site constraint reflecting unit 330 can generate an instruction satisfying the restrictions specific to the distribution warehouse 201, and the appropriate inventory
  • appropriate personnel and transportation instructions can be automatically calculated by a computer without depending on the experience and intuition of the manager.
  • the process of the site constraint reflection unit 330 is performed in the order of the simultaneous execution combination determination unit 315, the parameter determination unit 313, the frequency determination unit 311, and the order determination unit 309.
  • the present invention is not limited, and it may be performed in a desired order.
  • the simultaneous execution combination determination unit 315, the parameter determination unit 313, the frequency determination unit 311, and the order determination unit 309 are combined is shown as the process of the site constraint reflection unit 330.
  • the present invention is not limited thereto.
  • at least one of the simultaneous execution combination determination unit 315, the parameter determination unit 313, the frequency determination unit 311 or the order determination unit 309 may be included.
  • FIG. 19 shows an example in which a plurality of plans (or past instructions) are combined to process a shipper's shipping instructions.
  • a graph composed of the date and time on the horizontal axis in the figure, the shipment amount on the vertical axis in the figure, and the demand curve 2203 represents a shipment instruction pattern of the shipper.
  • the shipment volume has increased with the passage of time (or increase).
  • an increase in the shipment amount is suppressed as the date and time becomes the second half (a predetermined value has passed).
  • An example in which the management server 1100 generates an instruction that can be dealt with by combining a plurality of plans (or past instructions) for the demand curve 2203 will be described in a second embodiment.
  • the graph composed of the date and time on the horizontal axis in the figure, the shipment amount on the vertical axis in the figure, and the supply curve 2213 represents the first demand pattern.
  • the shipment amount monotonously increases as the date and time increase.
  • the graph composed of the supply (shipment amount) curve 2223 represents the second demand pattern.
  • the shipment amount gradually decreases and then the shipment amount gradually decreases when the date and time passes a predetermined value. That is, by combining the supply curve 2213 and the supply curve 2223, an instruction of the distribution warehouse 201 for satisfying the demand curve 2203 can be generated from two plans (or instructions).
  • the information processing system for realizing the second embodiment can use the same configuration as that in FIGS. 2 and 10 of the first embodiment.
  • the processing executed by the management server 1100 can be realized by replacing the verification (2017) shown in FIG. 17 shown in the first embodiment with the flowchart shown in FIG.
  • FIG. 20 is a flowchart illustrating an example of a collation process performed in the information processing system.
  • the management server 1100 first starts processing (2301), and then initializes (2302) the threshold value to a predetermined value ⁇ .
  • the management server 1100 initializes the residual (2303). Specifically, the management server 1100 sets the residual to the total quantity number of the shipper instruction. In the second embodiment, the residual indicates a difference between the demand corresponding to the shipper instruction and the supply provided by the distribution warehouse 201.
  • the management server 1100 repeatedly executes the following processing for all plans i (1 ⁇ i ⁇ M) (2304).
  • the management server 1100 compares the residual with a threshold value (2305). If the residual is larger, the management server 1100 again sets the residual by subtracting the number of physical quantities that can be processed by the plan i.
  • the management server 1100 ends the processing in step 2306 (2307).
  • the management server 1100 ends the processing when the comparison is completed for all the plans i (2308). In this way, the plans selected in the process (2306) may be combined.
  • the residual is calculated for M executable plans i.
  • the residual may be updated only when the residual is small.
  • Such a configuration has an effect of combining a plurality of plans and deriving an unreasonable or lean instruction for the shipper's shipping instruction.
  • KPI Key Performance Indicator: Key Performance Indicator
  • KPI is a group of calculation indicators that help to define the degree of achievement of organizational goals. In the case of the distribution warehouse 201, quality, work time, productivity, finance (cost), etc. can be adopted as the KPI.
  • quality KPIs include ordering accuracy at the time of procurement (emergency order rate, order cancellation rate, order error rate, etc., order correction rate, order error rate, invoice error rate, inventory shortage rate, logistics Accident product rate, defective product rate, returned unprocessed product inventory rate, error shipment rate, inventory accuracy, distribution warehouse 201 accident rate, form error rate, emergency shipping rate, shipping accident rate, error delivery rate, etc.) Can be adopted.
  • the work time KPI it is possible to adopt a delivery date compliance rate, a delivery time response time, a warehousing time, a daily shipment ratio, and the like.
  • productivity KPI it is possible to employ personnel request ordering rate per person and hour, immovable inventory ratio, complementary efficiency, shipping truck loading rate, shipping truck rotation rate, shipping truck actual working rate, and the like.
  • financial KPI cost per order, management cost per inventory, shipping cost, etc. can be adopted.
  • FIG. 21 shows an information processing system for the distribution warehouse 201 that selects a plan (simulation result) that satisfies KPI.
  • FIG. 21 is a block diagram illustrating an example of functions of the information processing system of the distribution warehouse 201.
  • the difference between the first embodiment and FIG. 2 is that a KPI input unit 320 is added.
  • the shipper instruction pattern matching unit 303 It is possible to select a plan in consideration of the KPI of the distribution warehouse 201 input from the KPI input unit 320.
  • the contents of the instruction history database 316 are set in advance as to which KPI in the distribution warehouse 201 is linked.
  • each of the above-described configurations, functions, processing units, and the like may be realized by hardware by designing a part or all of them with, for example, an integrated circuit.
  • each of the above-described configurations, functions, and the like may be realized by software by the processor interpreting and executing a program that realizes each function.
  • Information such as programs, tables, and files that realize each function can be stored in a memory, a hard disk, a recording device such as an SSD (Solid State Drive), or a recording medium such as an IC card, an SD card, or a DVD.

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Quality & Reliability (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Human Resources & Organizations (AREA)
  • Marketing (AREA)
  • Operations Research (AREA)
  • Development Economics (AREA)
  • Strategic Management (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

 プロセッサとメモリを備えた計算機が、荷主からの出荷指示を受け付けて、前記受け付けた出荷指示と過去の出荷指示から荷主の指示パターンを第1の荷主指示パターンとして生成し、前記第1の荷主指示パターンに基づいて前記出荷指示を満たす計画を複数生成し、前記計画のうち、出荷を実施する場所の制約を満たす計画を選択し、前記選択された計画に基づいて出荷量を第2の荷主指示パターンとしてシミュレートし、前記第2の荷主指示パターンのうち前記第1の荷主指示パターンに適合する第2の荷主指示パターンを選択し、前記選択された第2の荷主指示パターンの計画に基づいて、出荷に対応する指示を生成する。

Description

情報処理システム及び情報処理方法
 本発明は、受け付けた指示に応じて最適な計画及び指示を出力する情報処理システムに関する。
 近年、ICT(情報通信技術)の発達に伴って、膨大な量のデータが日々生成され、送信されたり、保管されたり、解析されるようになった。そして、このような膨大なデータの集まり、すなわちビッグデータ、を解析することで、犯罪の対策や、企業の経営、病気の予防などに役立てられるようになってきた。ビッグデータとは、具体的には、例えば、物流分野においては荷受情報、在庫情報、POSデータ等、インフラ部門では家庭で使用される電気や水の量、天候、公表データ等である。これらの情報を、計算機を使って解析することで、人の経験や勘に頼って運用してきた経営資源をより適切に分配できるようになりつつある。
 物流分野においては、物流倉庫にて、出荷指示(前記の膨大なデータに相当)からその日の出荷指示内容に適切な施策(たとえば、作業員の人員数と勤務時間、必要な車両の数)を予測して、日々の物量変動に対応しつつ、作業コストを下げるといったことが行われている。
 本技術分野の背景技術として、特許文献1が知られている。特許文献1には、物量倉庫において、作業指示に対する実績結果を記録し、その結果を物流用のシミュレータに入力し、シミュレーションの結果をオペレータが参照し、最適な結果を与えるパラメータを選択する方法が開示されている。
 また、非特許文献1には、信号処理分野の適応信号処理技術が開示されている。具体的には、予測モデルから予測される信号と観測信号との残差(誤差の推定量)を最小化(LMS:Least Mean Square)し、予測モデルのパラメータを適応的に変化させる方法が開示されている。
特開平8-192906号公報
Scott. C. Douglas著、"Digital Signal Processing handbook"、第18章 "Introduction to Adaptive Filters"、 Digital Signal Processing: Engineering Application、Academic Press、1988年.
 物流倉庫では、荷主からの指示を受けて商品を顧客先に出荷する。荷主は、倉庫に対して、出荷指示を出す。ここで、出荷指示とは、商品の種類と商品の個数、出荷先の顧客名、出荷期限等の情報から構成される。倉庫では、荷主指示に基づいて、メーカに商品の入荷指示(発注)を送る。メーカでは、入荷指示に基づいて、入荷すべき種類の商品を必要な個数だけ準備して、倉庫に納品する。
 同様に、倉庫では、出荷指示に基づいて倉庫内の作業で必要な人員の計画を立案し、作業を行う人員を派遣する人材派遣会社に人員手配を指示する。人員手配とは、当日の倉庫内の作業に必要となる人員数と業務内容、業務場所、労働時間等に関する要求である。人材派遣会社では、人員を手配し、倉庫に人員を送る。同様に、倉庫では、出荷指示に基づいて出荷の際に必要となる配送用の車両の配車計画を立案し、運送会社に配車指示を送信する。運送会社では、配車指示に基づいて必要な車両を必要な台数だけ用意し、倉庫に送る。
 倉庫内では、管理者が現場の制約条件に基づいて、入荷と、人員と、配車をそれぞれ経験や勘に基づいて調整し、入荷指示、作業者指示、配車指示を作成する。そして、作成された入荷指示、作業者指示、配車指示をもとに出荷作業を行う。
 ここで、現場の制約とは、メーカからの納品物を格納する倉庫内のスペースや、倉庫内で同時に作業できる人員の数、同時に出荷場に横付けできるトラックの数、ある作業の前にある作業を完了させておく必要があるという作業の順序、ある作業とある作業は同時に実行することができないという作業間の排他性、等のことである。
 しかしながら、前述した現場の制約により、出荷指示に必要な作業の需要量と供給量に差が出る場合がある。これは、入荷計画と人員計画と配車計画は、それぞれ単独では、出荷指示に合わせた適切な商品が入荷され、作業に必要な人員が確保され、出荷に必要な車両が準備できる。しかし、各計画を組み合わせると、現場の制約条件により、出荷作業に必要な作業量の需要と供給のバランスが崩れてしまうことがある。
 具体的には、倉庫内の作業が終わる前に、出荷用のトラックが先に来てしまい、倉庫でトラックが待機するため無駄が発生する。また、細かい時間帯ごとに倉庫内の作業人員の数を調整した方が、荷主の出荷指示に適切に対応できるとしても、人材派遣会社の都合によって、日にち単位でしか人員は調整できない場合もある。また、荷主の出荷指示の物量をこなすには、できるだけ多い作業員を確保した方が効率がよいとしても、倉庫内の作業スペースの都合で同時に作業可能な人員数に上限が設定されることもある。すなわち、倉庫内の商品の在庫数や作業量の予測値と、商品の在庫数や作業量の実績値の差を小さくしようとすると、現場の制約によって、不適切な計画(施策)が導出されることがある。場合によっては、実行不可能な計画が導出されることがある。
 上記特許文献1には、稼働中の物流オンライン制御システムの動作パラメータをもとに各種の制御パターンを設定したときの動作予測を行うための物流シミュレーション装置と、そのシミュレーション結果をオンライン制御に反映させることができる制御方法が開示されている。
 しかしながら、制御パラメータをいくつかのパターンで変更したときの、目的変数(稼働率、入出荷量、入出庫量など)の時系列パターンをシミュレーションし、その結果を各々グラフで表現し、一つの画面にまとめて表示するという形態になっていた。したがって、ユーザがグラフを見ながら制御パラメータを選択する必要があり、制御パラメータの選び方によっては、必ずしも最適なシミュレーション結果が得られるわけではないという課題があった。
 また、非特許文献1には、信号処理分野の適応信号処理技術が開示されている。具体的には、予測モデルから予測される信号と観測信号との残差を最小化(LMS:Least Mean Square)し、予測モデルのパラメータを適応的に変化させる方法が開示されている。信号源が一つの場合は、一つのモデルで精度よく予測できるため、残差を小さくする効果も速く、また、収束も速いという特徴がある。この適応信号処理技術を物流倉庫に対応付けるとすると、観測信号が荷主の出荷指示に相当し、予測信号が入荷計画や人員計画、配車計画に基づく、当日に倉庫で扱うことが可能な出荷量に相当する。
 信号処理の分野では任意の予測信号を生成できるので、残差を極力小さくすることが可能である。しかしながら、物流分野の場合は、入荷はある一定単位の商品数で行われたり、派遣社員も一定期間まとまった人数でしか契約できなかったり、配送用のトラックも積載できる物の重さが細かく選択できない、といったことが起きうる。したがって、荷主の出荷指示に比べて、商品の在庫や配送用の車両が不足したり、過剰な在庫が発生し在庫コストを向上させてしまったり、過剰な労働力が発生したりする。
 本発明は、上述のような問題点を解決するためになされたものであり、この発明の代表的な目的は、物流倉庫の現場制約を反映した、入荷指示、人員指示及び配送指示を生成し、倉庫を運営することで、無理や無駄のない物流倉庫の運営を実現させることを目的とする。
 本発明は、プロセッサとメモリを備えた計算機を含む情報処理システムであって、前記計算機は、荷主からの出荷指示を受け付けて、前記受け付けた出荷指示と過去の出荷指示から荷主の指示パターンを第1の荷主指示パターンとして生成する荷主指示パターン生成部と、前記第1の荷主指示パターンに基づいて前記出荷指示を満たす計画を複数生成する計画部と、前記計画のうち、出荷を実施する場所の制約を満たす計画を選択する現場制約反映部と、前記現場制約反映部で選択された計画に基づいて出荷量を第2の荷主指示パターンとしてシミュレートするシミュレータと、前記シミュレータが出力する第2の荷主指示パターンのうち前記第1の荷主指示パターンに適合する第2の荷主指示パターンを選択する指示パターン照合部と、前記指示パターン照合部で選択された第2の荷主指示パターンの計画に基づいて、出荷に対応する指示を生成する指示生成部と、を備える。
 本発明によれば、荷主指示に対して、出荷を実施する場所(物流倉庫等)に固有の制約を満足する計画及び指示を生成することができ、適切な在庫と、適切な人員及び配送の指示を、管理者の経験や勘に頼ることなく、計算機によって自動的に算出することが可能となる。
本発明の第1の実施例を示し、物流倉庫の一例を示すブロック図である。 本発明の第1の実施例を示し、物流倉庫の情報処理システムの機能の一例を示すブロック図である。 本発明の第1の実施例を示し、荷主指示履歴データベースの一例を示す図である。 本発明の第1の実施例を示し、入荷指示履歴データベースの一例を示す図である。 本発明の第1の実施例を示し、人員手配テーブルの一例を示す図である。 本発明の第1の実施例を示し、車両手配テーブルの一例を示す図である。 本発明の第1の実施例を示し、ピッキング作業テーブルの一例を示す図である。 本発明の第1の実施例を示し、作業指示テーブルの一例を示す図である。 本発明の第1の実施例を示し、作業の需要曲線と、作業の供給曲線の関係を示すグラフである。 本発明の第1の実施例を示し、情報処理システムの構成の一例を示すブロック図である。 本発明の第1の実施例を示し、同時実行組合せテーブルの一例を示す図である。 本発明の第1の実施例を示し、パラメータテーブルの一例を示す図である。 本発明の第1の実施例を示し、外部テーブルの一例を示す図である。 本発明の第1の実施例を示し、外部テーブルの一例を示す図である。 本発明の第1の実施例を示し、頻度テーブルの一例を示す図である。 本発明の第1の実施例を示し、実行順序テーブルの一例を示す図である。 本発明の第1の実施例を示し、荷主指示パターンの一例を示すグラフである。 本発明の第1の実施例を示し、荷主指示パターンの一例を示すグラフである。 本発明の第1の実施例を示し、荷主指示パターンの一例を示すグラフである。 本発明の第1の実施例を示し、荷主指示パターンの一例を示すグラフである。 本発明の第1の実施例を示し、情報処理システムの処理の一例を示すフローチャートである。 本発明の第1の実施例を示し、情報処理システムの処理の一例を示すフローチャートである。 本発明の第1の実施例を示し、出荷量と日時の関係の一例を示すグラフである。 本発明の第2の実施例を示し、出荷量と日時の関係の一例を示すグラフである。 本発明の第2の実施例を示し、情報処理システムの処理の一例を示すフローチャートである。 本発明の第3の実施例を示し、物流倉庫の情報処理システムの機能の一例を示すブロック図である。
 以下、本発明の一実施形態について添付図面を用いて説明する。
 図1は、本発明の情報処理システムを示し、荷主からの指示を受けて商品を顧客先に出荷する物流倉庫の、商品や人、情報の流れを模式的に示したブロック図である。荷主202は、後述する荷主サーバから物流倉庫201に対して、出荷指示(荷主指示)を送信する。
 ここで、出荷指示とは、商品の種類と商品の個数、出荷先の顧客名、出荷期限等の情報から構成される。物流倉庫201の管理サーバ(後述)では、荷主指示に基づいて、入荷計画207と、人員計画209と、配送計画211を生成する。
 入荷計画207は、出荷指示を満たすための商品の種類と商品の個数と物流倉庫201の在庫から算出されたメーカに発注すべき商品の種類と商品の個数と、出荷期限に間に合う納期等を含む。人員計画209は、物流倉庫201の作業で必要な人員数と業務内容、業務場所、労働時間、派遣期間等を含む。配送計画211は、商品の出荷の際に必要となる配送用の車両の数量、日時、出荷先等を含む。
 管理サーバは、それぞれの計画から、物流倉庫201に固有の制約(現場制約)を反映して適切な計画に修正し(213)、メーカ204に商品の入荷指示215を送信し、人材派遣会社205に人員指示217を送信し、運送会社206に配送指示219を送信する。ここで、現場の制約とは、メーカ204からの納品物を格納できる物流倉庫201内の広さ、同時に作業できる人員の数、同時に出荷場に横付けできるトラックの台数等の物流倉庫201に固有の制約を示す。
 ここで、入荷指示215は、商品の種類と商品の個数と、納期等を含む。人員指示217は、人員数と業務内容(作業区分)及び勤務時間、派遣期間などを含む。配送指示219は、車両の数量、日時、出荷先等を含む。また、物流倉庫201内では、作業の具体的な内容を設定した作業指示が生成される。この作業指示は、人員指示に含めることができる。
 メーカ204は、入荷応答216を物流倉庫201に返す。また、人材派遣会社205は、人員応答218を物流倉庫201に返す。運送会社206では、配送応答220を物流倉庫201に返す。本実施例では、入荷指示215に対する納品のことを入荷応答216と呼ぶ。また、人員指示217に対して物流倉庫201に人員を送ることを人員応答218と呼ぶ。同様に、配送指示219に対して必要な車両を必要な台数だけ用意して、物流倉庫201に送ることを配送応答220と呼ぶ。ここでは、出荷された商品を車両で運ぶ例について述べたが、商品の配送は車両に限定されない。船舶や航空機等他の輸送機器でもよい。また、異なる種類の輸送機器の組合せでもよい。
 物流倉庫201に返された入荷応答216はそのまま入荷指示221となり、人員応答218はそのまま作業者指示222となり、配送応答220はそのまま配送指示223となる。これらの指示を受けて、物流倉庫201内で出荷作業が行われる。
 図16は、図1に示した物流倉庫201内で行われる作業の流れを示すフローチャートである。まず、作業の開始(1901)の後、荷主202が荷主サーバ(後述)から物流倉庫201の管理サーバに対して出荷指示(または荷主指示)を送信する(1902)。次に、物流倉庫201では管理サーバが入荷計画(1903)を生成し、入荷計画に基づいて入荷指示を作成する(1904)。
 続いて、物流倉庫201では、管理サーバが人員計画(1905)を生成して、人員計画に基づいて人員指示を作成する(1906)。また、物流倉庫201では、管理サーバが配送計画(1907)を生成し、配送計画に基づいて配送指示を作成する(1908)。
 次に、管理サーバは、入荷指示や人員指示、配送指示に対して、物流倉庫201の現場制約を考慮した指示に調整する(1909)。なお、この現場制約を考慮した調整は、計画に対して行ってもよい。
 現場制約による指示(または計画)の調整は、管理サーバが現場制約を取得して、各指示(または計画)のうち、現場の制約から外れる指示の内容を修正し、現場制約を満たす内容に調整する。例えば、出荷する商品を車両に積み込む荷積み場で作業可能な人数を超えて人員指示が生成された場合、管理サーバは、荷積み場に配置する人員を削減し、荷積み場で実施する作業時間を延長し、人員と作業時間の積が人員計画と一致するように調整する。
 管理サーバは、現場制約を加味して調整した後の入荷指示をメーカ204のサーバ(後述)に送信し(1910)、メーカ204から入荷応答(1911)を受け取る。同様に、管理サーバは、現場制約で調整後の人員指示を人材派遣会社205のサーバ(後述)に送信し、人員応答(1913)を受け取る。同様に、管理サーバは、現場制約で調整後の配送指示を運送会社206のサーバ(後述)に送信し、配送応答(1915)を受け取る。物流倉庫201では、管理サーバが入荷応答、人員応答、配送応答をもとに、作業指示を出力する(1916)。作業が完了したら商品を出荷し(1917)、荷主から受け付けた出荷指示に対する処理を終了する(1918)。
 図2は、本発明の情報処理システムの機能を示すブロック図である。荷主202は、荷主サーバ(後述)の荷主指示入力部301を用いて、荷主指示を物流倉庫201を管理する情報処理システムの荷主指示パターン生成部302に入力する。
 荷主指示パターン生成部302は、入力された荷主指示を荷主指示履歴データベース(図中DB)306に格納し、荷主指示履歴データベース306を参照して、直近の荷主指示パターンを生成する。そして、荷主指示パターン生成部302は、生成した荷主指示パターンを、荷主指示パターン照合部303、入荷計画部317、人員計画部318、配送計画部319に送る。なお、荷主指示パターン生成部302は、荷主のからの荷主指示(出荷指示)を受け付ける受付部としても機能する。
 入荷計画部317は、指示履歴データベース316を参照して、複数の過去の指示(以下実績とも呼ぶ)をもとに、今回の荷主指示を満足する入荷計画を生成する。入荷計画は、メーカ204からどの商品をどの数量だけ物流倉庫201に入荷するべきかを計画し、生成した入荷計画は同時実行組み合わせ判定部315に送られる。なお、指示履歴データベース316は、処理が完了した指示内容305を履歴として蓄積したものである。
 人員計画部318は、指示履歴データベース316を参照して、過去の指示をもとに、どれだけの人員が必要であるかを見積もり、今回の荷主指示を満足する人員計画を生成し、この人員計画を同時実行組み合わせ判定部315へ送る。
 配送計画部319は、指示履歴データベース316を参照して、過去の指示をもとに、今回の荷主指示を満足する配送計画を生成し、生成した配送計画を同時実行組み合わせ判定部315に送る。
 なお、入荷計画部317、人員計画部318及び配送計画部319は、荷主指示履歴データベース306の過去の荷主指示のうち、今回の荷主指示と近似する過去の荷主指示が存在すれば、当該過去の荷主指示に対応する指示を計画として用いることができる。荷主指示履歴データベース306の過去の荷主指示に対応する入荷指示テーブル501、人員手配テーブル601、車両手配テーブル701の各指示を各計画として選択することができる。なお、今回の荷主指示と近似する過去の荷主指示は、商品の種類の一致や、メーカ204の一致や、出荷先(顧客名)の一致などがあれば、近似した履歴とすることができる。
 また、近似する過去の荷主指示が存在しない場合、入荷計画部317、人員計画部318及び配送計画部319は、それぞれ1以上の予め設定したパターンで計画を生成するようにしても良い。
 また、入荷計画部317、人員計画部318及び配送計画部319は、所定のパターンで生成した計画と、過去の荷主指示に対応する指示から取得した計画の双方を同時実行組合せ判定部315へ出力するようにしても良い。
 同時実行組み合わせ判定部315は、同時実行組合せテーブル1201に格納された物流倉庫201で同時に実行可能な計画の組み合わせ情報を用いて、入力された計画の内、物流倉庫201の制約内で実行可能な内容を選択する。換言すれば、同時実行組み合わせ判定部315は、同時に実行できない計画の組み合わせを排除する。同時実行組み合わせ判定部315の出力は、パラメータ判定部313へ入力される。
 また、同時実行組合せテーブル1201は、同時実行組み合わせ入力部314から入力された同時に実行可能な計画の組み合わせ情報を保持する。なお、同時実行組み合わせ入力部314から同時に実行可能な計画の組み合わせ情報を同時実行組み合わせ判定部315に指示しても良い。
 パラメータ判定部313は、パラメータテーブル1301に格納された各計画(作業内容)のパラメータ、すなわち、上限値や下限値等をもとに、生成された各計画の内容をさらに選択する。パラメータ判定部313では、入力された複数の計画のうち、パラメータテーブル1301で設定された条件を満足する計画を出力する。換言すれば、パラメータテーブル1301の条件を満たさない計画を排除する。パラメータ判定部313の出力は、頻度判定部311へ入力される。
 パラメータテーブル1301は、物流倉庫201に固有の制約や、商品発注時の制約や、人員を手配する際の制約など、予め設定した項目に関する制約を含む。したがって、パラメータ判定部313は、パラメータテーブル1301に設定された物流倉庫201に固有の制約を満たす計画を選択することができる。
 パラメータテーブル1301は、実行可能パラメータ入力部312から入力された各計画(作業内容)のパラメータ、すなわち、上限値や下限値等を保持するようにしてもよい。なお、実行可能パラメータ入力部312から入力された各計画のパラメータをパラメータ判定部313に指示しても良い。
 頻度判定部311は、頻度テーブル1401を参照して、入力された計画がどの程度の頻度で実行可能であるかを示す情報を用いて、さらに計画を選択する。頻度テーブル1401は、計画毎に実行可能頻度が設定されている。頻度テーブル1401は、物流倉庫201で実行する計画の頻度に関する制約が予め設定されている。頻度判定部311は、物流倉庫201で実行可能な頻度の計画を出力する。頻度判定部311の出力は、順序判定部309へ入力される。頻度テーブル1401は実行可能頻度入力部310から入力された値、すなわち、各計画がどの程度の頻度で実行可能か(または更新可能か)を示す情報を保持する。
 順序判定部309は、実行順序テーブル1501を参照して各計画の実行順序の依存関係を判定し、実行順序の制約を満たす計画を選択する。実行順序テーブル1501は、物流倉庫201における計画の実行順序の制約や、各計画を実行する際の時系列的な制約を予め設定した情報を含む。順序判定部309は、実行可能な順序の計画の組合せを出力する。順序判定部309の出力は、シミュレータ307へ入力される。実行順序テーブル1501は、実行可能順序入力部308から入力された、各計画の実行順序、すなわち、どの計画の前にどの計画を実行しておく必要があるのか、どの計画の後にどの計画を実行すべきか、計画の順序に制約はないのか、という計画同士の依存関係を示す情報を保持する。
 上記同時実行組み合せ判定部315、パラメータ判定部313、頻度判定部311、順序判定部309から現場制約反映部330が構成される。現場制約反映部330は、生成された入荷計画、人員計画、配送計画に対して、物流倉庫201の制約や時系列的な制約でフィルタリングを行い、現場の制約を満足する計画を選別してシミュレータ307へ入力する。
 シミュレータ307は、前述の各判定部で絞り込まれた計画を用いると、どのような商品をどれくらいの数量で、物流倉庫201に集めてから出荷できるかをシミュレートする。すなわち荷主指示のシミュレートを実施し、例えば、時系列的な出荷量を推定する。なお、シミュレータ307は、周知または公知の技術を適用すればよく、上述のように絞り込んだ各計画から出荷量と日時(時系列)の関係を出力するものであればよい。
 そして、荷主指示パターン照合部303では、荷主指示パターン生成部302で生成された荷主指示パターン(第1の荷主指示パターン)と、シミュレータ307に入力された計画で出荷量をシミュレート(推定)した荷主指示パターン(第2の荷主指示パターン)とを比較する。そして、荷主指示パターン照合部303は、第1の荷主指示パターンに適合する第2の荷主指示パターンを選択し、当該第2の荷主指示パターンを生成した計画を選択する。なお、第1の荷主指示パターンに適合する第2の荷主指示パターンは、第1の荷主指示パターンに近似または一致するシミュレーション結果である第2の荷主指示パターンである。そして、荷主指示パターン照合部303は、当該第2の荷主指示パターンを生成した計画を、荷主指示パターンを満たす計画として出力する。なお、荷主指示パターン照合部303は、図18の需要曲線に相当する第1の荷主指示パターンと、図18の供給曲線に相当する第2の荷主指示パターンの差分2105が最小となる第2の荷主指示パターンを選択するようにしてもよい。
 当該第2の荷主指示パターンを生成した計画を、荷主指示パターンを満たす計画として出力する。
 そして、指示生成部304では、荷主指示パターンを満たす計画から入荷指示と人員指示及び配送指示を含む指示内容305が生成される。これらの指示内容は、それぞれメーカ204、人材派遣会社205、運送会社206に送られる。
 図3は、荷主指示履歴データベース306の一例を示す図である。荷主指示履歴データベース306は、荷主202からの指示の識別子を格納する荷主指示ID402と、荷主202の識別子を格納する荷主ID403と、商品の識別子を格納する商品ID404と、商品の数量を格納する数量405と、商品の配送先となる顧客の識別子を格納する顧客ID406と、顧客の名称を格のする顧客名407と、荷主202からの指示を受け付けた日時を格納する指示日時408と、当該指示に対する期限を格納する納期日時409からひとつのレコードが構成される。
 ここで、荷主指示ID402は、荷主202の指示毎にユニークに付与された識別子である。荷主ID403は、荷主202ごとにユニークに付与された識別子である。商品ID404は、商品ごとにユニークに付与された識別子である。数量405は、当該荷主指示において、商品ID404を持つ商品を、何個出荷すべきか荷主202が指示した数量である。顧客ID406は、当該商品の送り先に付与されたユニークな識別子である。顧客名407は、顧客ID406で特定される顧客の名称を表す。指示日時(408)は、荷主202が当該荷主指示を入力した日時を表す。納期日時409は、荷主202が指定した商品ID404を有する商品を、顧客ID406に送付する期限を示している。
 図3において、荷主202が荷主指示入力部301を用いて物流倉庫201の管理サーバに出荷の指示を送ると、荷主指示履歴データベース306に新規のレコードが追加され、荷主指示ID402から納期日時409のデータが前記レコードへ格納される。
 図4は、入荷指示テーブル501の一例を示す図である。入荷指示テーブル(501)は、どの商品を物流倉庫201内のどの棚に、いつまでに配置するべきかといった情報が格納されている。入荷指示テーブル501は、指示内容305を構成する。この入荷指示テーブル501は、後述するように、指示生成部304で生成される。なお、指示生成部304は、後述するように、荷主指示パターン照合部303の出力に基づいて、入荷指示テーブル501と、人員手配テーブル601と車両手配テーブル701を生成する。
 入荷指示テーブル501は、入荷指示毎の識別子を格納する入荷指示ID502と、当該入荷指示の商品を製造するメーカに予め付与された識別子を格納するメーカID503と、メーカ名504と、入荷指示の商品名505と、当該商品のサイズ506と、当該商品の色507と、当該入荷指示の商品の数を格納する個数508と、当該商品を納入する物流倉庫201内の位置情報を格納する棚ロケーション509と、納入の期限を格納する入荷期限日時510からひとつのレコードが構成される。入荷指示ID(502)は、入荷指示にユニークに付与された番号である。
 図5は、人員手配テーブル601の一例を示す図である。人員手配テーブル601は、指示内容305を構成する。人員手配テーブル601は、後述するように、指示生成部304で生成される。
 人員手配テーブル601は、どのような勤務時間帯に、どのような作業内容に従事する作業員が、どれだけの人数必要なのかといった情報が格納される。人員手配テーブル601は、人員手配の識別子を格納する手配ID602と、手配した人員が実施する作業の識別子を格納する作業区分603と、手配する人員の勤務時間を格納する勤務時間シフト604と、手配する人員の数を格納する必要人員605と、人員の手配を指示する社名を格納する手配先会社名606と、人員の手配を指示する会社の識別子を格納する手配先会社ID607とからひとつのレコードが構成される。
 なお、上記では人間に作業を指示する例を示したが、ロボットなどを用いてもよく、この場合、ロボットの種類などのフィールドを人員手配テーブル601に加えればよい。
 図6は、車両手配テーブル701の一例を示す図である。車両手配とは、出荷のときに必要となるトラック等の配送手段を準備することである。具体的には、荷主指示にある商品や個数を顧客先に定められた時刻に送り届けるのに必要な配送手段であり、車両や船舶あるいは航空機などを利用することができる。以下では、配送手段として車両を用いる例を示す。車両手配テーブル701は、指示内容305を構成する。車両手配テーブル701は、後述するように、指示生成部304で生成される。
 車両手配テーブル701は、車両手配の識別子を格納する配車ID702と、車両の種類や仕様を特定する識別子を格納する車両区分703と、車両に乗車する人員の数を格納する乗員数704と、商品を積み込む物流倉庫201内での位置情報を格納する荷積み場705と、商品を積み込む日時を格納する荷積み時刻706と、商品の配送先を格納する出荷先名707と、商品の配送先の識別子を格納する出荷先ID708と、配送先への到着日時を格納する着荷日時709とからひとつのレコードが構成される。
 図7は、ピッキング作業指示テーブル801の一例を示す図である。ピッキング作業指示テーブル801は、指示内容305を構成する。ピッキング作業指示テーブル801は、後述するように、指示生成部304で生成される。
 ピッキング作業とは、荷主指示に基づいて、物流倉庫201の在庫から、必要な商品を必要な個数だけ作業人員が選んで棚などから取り出す作業である。取り出した商品は、定められた箱に格納し、検品梱包作業に引き渡される。ピッキング作業は、後述する検品梱包作業とともに物流倉庫201の作業指示を構成する。この作業指示を、人員指示に含めるようにしても良い。
 ピッキング作業指示テーブル801は、ピッキング作業指示毎に付与される識別子を格納する指示ID802と、ピッキング作業を実施する位置情報として棚の識別子を格納する棚ID803と、取り扱う商品の名前を格納する商品名804と、商品の識別子を格納する商品ID805と、商品のサイズ806と、商品の色807と、商品の個数808と、商品を格納する箱や容器の識別子を格納する箱ID809からひとつのレコードが構成される。
 図8は、検品梱包作業指示テーブル901の構成例を示した図である。検品梱包作業は、ピッキング作業が完了した商品について、作業人員が商品のサイズや色や個数が荷主指示の通りであるかを判定し、また、汚れや破損等がおきていないかを確認する作業である。また、作業人員は、確認後に所定の箱へ商品を梱包する作業を行う。検品梱包作業指示テーブル901は、指示内容305を構成する。検品梱包作業指示テーブル901は、後述するように、指示生成部304で生成される。
 検品梱包作業指示テーブル901は、作業指示毎に付与される識別子を格納する指示ID902と、商品を格納する箱の識別子を格納する箱ID903と、検品する商品の名称を格納する商品名904と、検品を行った作業者の承認ID905と、商品のサイズ906と、商品の色907と、商品の個数908と、配送する車両手配の識別子を格納する配車ID909からひとつのレコードが構成される。
 図9は、物流倉庫における作業の需要曲線と、作業の供給曲線の関係を示すグラフである。図9において、横軸が日時を示し、縦軸が出荷量を示す。ある日時における、出荷量の需要(それらの出荷量を出荷するのに必要な作業の需要量に相当)を曲線1003で示す。また、同じ日時における、出荷量の供給量(当該物流倉庫201が提供可能な作業量)を曲線1004で示す。図示の曲線1004は、本発明の情報処理システムを適用しない例を示す。
 作業の供給量が需要量を下回る場合、すなわち、両者の関係で需要と供給の差分(1005)がある場合は、たとえば、作業員を緊急補充して出荷作業を終わらせたり、残業が可能な作業員に残業を指示して出荷作業を終わらせる必要がある。
 一方、作業の供給量が需要量を上回る場合、すなわち、両者の関係が需要と供給の差分(1006)にある場合は、人員等が過剰となって物流倉庫201の運営は赤字となる。
 図10は、本発明の情報処理システムの一例を示すブロック図である。本情報処理システムは、物流倉庫201を管理する管理サーバ1100と、各種データを格納するデータベース(図中DB)1110と、荷主指示入力部301を備えて荷主指示を管理サーバ1100へ送信する荷主サーバ1120と、管理サーバ1100からの入荷指示(入荷指示1910)を受け付けるメーカサーバ1121と、管理サーバ1100からの人員手配(人員指示1912)を受け付ける人材派遣会社サーバ1122と、管理サーバ1100からの配送指示1914を受け付ける運送会社サーバ1123と、管理サーバ1100とデータベース1110及び各サーバ1120~1123を接続するネットワーク1109とを含む。なお、データベース1110は、管理サーバ1100のローカルのストレージ装置に格納されても良い。
 管理サーバ1100は、1以上のCPU1101と、ソフトウェア(プログラム)やデータを格納するRAM1102と、データや指令を入力するキーボード1103と、入力データや出力データ、データ変換の処理の結果や過程をユーザに示す表示装置1104と、入力データや出力データ、データ変換の処理の結果や過程を紙に印刷するプリンタ1105と、データや指令を入力やするマウス1106と、上記の各々の間のデータを通信するためのバス1107と、ネットワーク1109と通信を行うためのインターフェース1108とから構成される。
 また、データベース1110には、入力データだけではなく、情報処理システムの処理結果や、処理の過程を格納してもよい。また、管理サーバ1100で実行されるプログラムは、ストレージ装置としてデータベース1110に格納されても良い。
 管理サーバ1100のCPU1101で実行されるプログラムとしては、図2に示した機能要素の内、荷主指示パターン生成部302、荷主指示パターン照合部303、入荷計画部317、人員計画部318、配送計画部319、同時実行組み合わせ判定部315、パラメータ判定部313、頻度判定部311、順序判定部309、シミュレータ307、実行可能順序入力部308,実行可能頻度入力部310、実行可能パラメータ入力部312、同時実行組合せ入力部314、等である。
 これらの各機能部は、プログラムとしてRAM1102にロードされ、CPU1101によって実行される。
 CPU1101は、各機能部のプログラムに従って処理することによって、所定の機能を提供する機能部として稼働する。例えば、CPU1101は、入荷計画プログラムに従って処理することで入荷計画部317として機能する。他のプログラムについても同様である。さらに、CPU1101は、各プログラムが実行する複数の処理のそれぞれの機能を提供する機能部としても稼働する。計算機及び計算機システムは、これらの機能部を含む装置及びシステムである。
 指示生成部304等の各機能を実現するプログラム、テーブル等の情報は、ストレージサブシステムや不揮発性半導体メモリ、ハードディスクドライブ、SSD(Solid State Drive)等の記憶デバイス、または、ICカード、SDカード、DVD等の計算機読み取り可能な非一時的データ記憶媒体に格納することができる。
 データベース1110は、荷主指示履歴データベース306(図3)と、指示履歴データベース316と、指示内容305と、判定用テーブル群1550とを含む。
 指示内容305は、入荷指示テーブル501(図4)と、人員手配テーブル601(図5)と、車両手配テーブル701と、ピッキング作業指示テーブル801と、検品梱包作業指示テーブル901と、を含む。
 判定用テーブル群1550は、後述するように、同時実行組合せテーブル1201と、パラメータテーブル1301と、頻度テーブル1401と、実行順序テーブル1501と、を含む。
 荷主サーバ1120と、メーカサーバ1121と、人材派遣会社サーバ1122と、運送会社サーバ1123の各計算機の構成は、図示はしないが管理サーバ1100と同様に構成される。
 図11は、同時実行組合せテーブル1201の一例を示す図である。同時実行組合せテーブル1201は、複数の計画を実行するときに、選択された複数の計画が同時に実行可能であるか否かを示す制約を格納したテーブルである。
 同時実行組合せテーブル1201は、計画の識別子を格納する計画番号1203と、計画番号1202の内容が、同時に実行可能な場合は図中「1」(1205)が格納され、同時に実行できない場合は図中「0」(1206)が格納され。計画番号1203,1202が同一の場合は、「-」(1204)が格納される。
 図示の例では、計画番号1203が「1」の計画は、計画番号「2」と同時に実行可能であるが、計画番号「3」、「4」とは同時に実行できないことを示す。
 図12A~図12Cは、パラメータテーブル1301の一例を示す図である。図12Bはポインタが“#1”の外部テーブル1311を示す。図12Cはポインタが“#2”の外部テーブル1321を示す。
 図12Aにおいて、パラメータテーブル1301は、計画の識別子を格納する計画番号1302と、変更対象を格納する内容1303と、変更するパラメータの数を格納するパラメータ数1304と、変更可能な条件を設定する条件式1305と、外部テーブルへのポインタを格納する外部テーブル1306とからひとつのレコードが構成される。
 図示の例では、計画番号1302=“1”は、パラメータの数が1つで、パラメータθの値は1000以下であることを示す。また、図示の例では、計画番号1302=“4”は、パラメータの数が4つで、パラメータθ1は出勤時刻が9時00分以降に設定可能であることを示し、パラメータθ2は昼休み開始が12時00分以前に設定可能であることを示し、パラメータθ3は昼休み終了が13時00分以前に設定可能であることを示し、パラメータθ4は退社時刻が18時00分以前に設定可能であることを示す。
 また、計画番号1302=“2”は、パラメータの数が3つであるが、パラメータθの条件はポインタ#1で示される図12Bの外部テーブル1311であることを示している。また、計画番号1302=“3”は、パラメータの数が3つであるが、パラメータθの条件はポインタ#2で示される図12Cの外部テーブル1321であることを示している。
 図12Bにおいて、ポインタ#1の外部テーブル1311は、商品の識別子を格納する商品ID1312と、商品発注の際の下限個数1313と、商品発注の際の上限個数1314とからひとつのレコードが構成される。
 図12Cにおいて、ポインタ#2の外部テーブル1321は、車両の積載量を格納する積載量1322と、車両の形式を格納する形式1323と、車両を手配する際の下限台数1324と、車両を手配する際の上限台数1325とからひとつのレコードが構成される。
 パラメータテーブル1301を参照することで、各計画について変更可能な項目と、各項目で変更可能な範囲を取得することができる。
 図13は、頻度テーブル1401の一例を示す図である。頻度テーブル1401は、計画の内容について変更(更新)可能な頻度を格納する。頻度テーブル1401は、計画番号1402と、更新可能な時期や条件を格納する更新可能頻度1403とからひとつのレコードが構成される。
 たとえば、図中計画番号1402=“1”の計画を更新できる頻度は、1回/1週間(1412)に設定される。また、計画番号1402=“2”の値を更新できる頻度は、1回/1か月(1414)に設定される。また、計画番号1402=“3”の値を更新できる頻度は、月曜日または金曜日(1416)に設定される。また、計画番号1402=“4”の値を更新できる頻度は、毎日、ただし、物量が10000未満(1418)に設定される。
 頻度テーブル1401を参照することで、各計画について変更可能な時期(日時や周期)や条件を取得することができる。
 図14は、実行順序テーブル1501の一例を示す図である。実行順序テーブル1501は、複数の計画を実行するときに、どちらの計画を先に実行すべきか、どちらの計画を後に実行すべきか、といった実行順序の制約を格納したテーブルである。
 実行順序テーブル1501は、計画の識別子を格納する計画番号1503の計画に対し、計画番号1502の計画を先に実行すべきか、後から実行すべきか、順序の制約はないか、を数値で表現する。
 計画番号1503の計画を先に実行すべき場合は、該当する計画番号1502のフィールドに“1”が格納され、後から実行すべき場合は“-1”が格納され、順序の制約がない場合は“0”が格納される。
 たとえば、計画番号1503=“1”の計画は、計画番号1502=“2”よりも先に実行すべきとして、フィールド1513には“1”が格納されている。また、計画番号11503=“1”は、計画番号1502=“3”の計画とは順序の制約がないとして、フィールド1514には“0”が格納されている。また、計画番号1502=“1”の計画は、計画番号1503=“4”より後に実行すべきとして、フィールド1515には“-1”が格納されている。
 実行順序テーブル1501を参照することで、各計画について変更可能な項目と、各項目で変更可能な範囲を取得することができる。
 図15A~図15Dは、図3に示した荷主指示履歴データベース306に基づいて、図2に示した荷主指示パターン生成部302が生成した荷主指示パターンのグラフを示す。各荷主指示パターンは、一例として、荷主が指示した履歴から日時を横軸とし、出荷量を縦軸としたグラフで示した。荷主指示パターン生成部302は、荷主の指示について時系列的な傾向を取得し、荷主指示パターンを生成する。
 図15Aの荷主指示パターン1611は、荷主指示履歴データベース306から作成することができる。荷主指示パターン生成部302は、荷主指示履歴データベース306の荷主ID1603毎に、指示日時1608を所定の時間間隔(あるいは日にち間隔)で区切って荷主指示パターン1611のX軸とし、その時点で出荷した商品の数量1605をY軸とすることで、荷主指示パターン1611を生成することができる。
 図15Bの荷主指示パターン1612と、図15Cの荷主指示パターン1613と、図15Dの荷主指示パターン1614も同様にして荷主指示パターン生成部302が生成したパターンである。
 図15Aの荷主指示パターン1611は、時間の経過(あるいは日にちの経過)とともに、出荷した商品の数量が増加している。図15Bの荷主指示パターン1612では、時間の経過(あるいは日にちの経過)とともに、商品の数量が減少している。図15Cの荷主指示パターン1613では、時間の経過(あるいは日にちの経過)とともに、一時的に商品の数量が増加した後に、再度減少している。図15Dの荷主指示パターン1614では、時間の経過(あるいは日にちの経過)とともに、一時的に数量が減少し、商品の再度増加している。
 図17は、本発明の管理サーバ1100で行われる処理の一例を示すフローチャートである。この処理は、荷主サーバ1120からの指示の出力に基づいて開始される。
 荷主202は荷主サーバ1120の荷主指示入力部301を介して荷主指示を送信し、管理サーバ1100が受信する(2002)。
 管理サーバ1100は、荷主指示を受信すると、荷主指示パターン生成部302で、入力された荷主指示を荷主指示履歴データベース306に登録する(2003)。荷主指示パターン生成部302は荷主指示履歴データベース306を参照して、直近の荷主指示パターンを選択する(2004)。
 荷主指示パターン生成部302は、上記選択した荷主指示パターンを、荷主指示パターン照合部303と、入荷計画部317と、人員計画部318と、配送計画部319に送信する。
 入荷計画部317は、複数のレコードからなる過去の指示履歴データベース316から過去の荷主指示を参照して、メーカ204からどの商品をどの数量だけ物流倉庫201へ入荷すべきかを演算して入荷計画を生成する(2005)。なお、生成される入荷計画は複数とし、発注する個数やサイズなどが異なる入荷計画が生成される。そして、入荷計画部317は、当該入荷計画を同時実行組み合わせ判定部315へ出力する。
 人員計画部318では、指示履歴データベース316の過去の指示から、どれだけの人員が必要か見積もり、人材派遣会社等へ依頼する人員計画を生成する(2006)。なお、生成される人員計画は複数とし、依頼する人員数や期間などが異なる人員計画が生成される。そして、人員計画部318は生成した人員計画を同時実行組み合わせ判定部315に出力する。
 配送計画部319は、指示履歴データベース316の過去の指示から、どのような車両がどれだけ必要かを見積もって配送計画を生成する(2007)。なお、生成される配送計画は複数とし、依頼する車両の台数や日時などが異なる入荷計画が生成される。そして、配送計画部319は、生成した配送計画を同時実行組み合わせ判定部315に出力する。
 続いて、同時実行組み合わせ判定部315では、同時実行組合せテーブル1201に格納された同時に実行可能な計画の組み合わせ情報を取得して(2008)、受け付けた入荷計画や人員計画及び配送計画のうち、同時に実行可能な計画を判定する(2009)。すなわち、同時実行組み合わせ判定部315は、物流倉庫201の現場の制約に従って、同時に実行可能な計画を選択する。
 なお、絞り込む(または選択)処理は、同時実行組合せテーブル1201を用いたフィルタリングや選択などの処理で実現すれば良い。以下に示す絞り込みの処理についても同様である。なお、上述したように、同時実行組み合わせ入力部314から同時に実行可能な計画の組み合わせ情報を同時実行組み合わせ判定部315へ指示しても良い。
 続いて、パラメータ判定部313は、パラメータテーブル1301に格納された各計画(作業内容)のパラメータ、すなわち、発注個数等の上限値や下限値等の実施可能なパラメータを取得する(2010)。パラメータ判定部313は、取得したパラメータに基づいて、各計画の内容をさらに絞り込む。例えば、パラメータテーブル1301には、発注個数の下限が設定されている商品や、物流倉庫201の棚にストック可能な個数の上限値が商品や商品のサイズ毎に設定されている。パラメータ判定部313は、生成された複数の入荷計画のうち、パラメータテーブル1301の設定値を満足する入荷計画を実行可能な入荷計画として判定する(2011)。なお、図2で示したように、実行可能パラメータ入力部312から入力された各計画のパラメータをパラメータ判定部313に指示しても良い。
 頻度判定部311は、頻度テーブル1401を参照して、絞り込まれた計画がどの程度の頻度で実行可能であるかを判定する。まず、頻度判定部311は、頻度テーブル1401を参照して実行可能な頻度を計画毎に取得する(2012)。頻度判定部311は、計画毎の実行可能な頻度から、実際に実行可能な計画を判定する(2013)。なお、図2で示したように、実行可能頻度入力部310から入力された各計画の頻度を頻度判定部311に指示しても良い。
 順序判定部309は、実行順序テーブル1501を参照して実行可能な計画の順序を判定する。実行順序テーブル1501は、各計画の実行順序、すなわち、どの計画の前にどの計画を実行しておく必要があるのか、どの計画の後にどの計画を実行すべきか、計画の順序に制約はないのか、といった情報を保持する。順序判定部309は実行順序テーブル1501から各計画の実行順序を取得する(2014)。順序判定部309は取得した実行順序を満たす計画の組合せを選択する。なお、図2で示したように、実行可能順序入力部308から入力された各計画の実行順序を順序判定部309に指示しても良い。
 次に、シミュレータ307は、前述のステップ2009~2015で絞り込まれた計画を用いると、どのような商品をどれくらいの数量、物流倉庫201に集めてから出荷できるかシミュレートする(2016)。すなわち荷主指示のシミュレートを実施する。
 そして、荷主指示パターン照合部303は、荷主指示パターン生成部302で生成された荷主指示パターンと、シミュレータ307に計画を入力して生成された荷主指示パターン(シミュレーション結果)とを照合し(2017)、荷主指示パターンに適合するシミュレーション結果を選択する。そして、荷主指示パターン照合部303は、シミュレーション結果を生成した計画を出力する。
 上述のシミュレータ307には様々な手法を適用することができ、公知または周知の技術を適宜選択することができる。たとえば、作業人員数をX、入荷量をY、配車数をZとした場合の供給量をシミュレーションする場合、シミュレータ307は、指示履歴データベース316に格納された過去の指示の中から、作業人員数がXに近く、入荷量がYに近く、配車数がZに近い実績を検索する。シミュレータ307は、検索結果をある日時tにおける総物量をs(t)とする。同様に、日時t-1からt-Mについても計算を行えば、日時t-1からt-Mまでのシミュレーション値が求まる。なお、Mは所定の自然数である。また、X、Y、Zに近い値は、X~Z毎に予め設定した範囲内の値を用いることができる。
 また、作業人員ひとりあたりの平均的な生産性などの情報を、指示履歴データベース316に格納された過去の実績から計算しておき、作業人員数をXとしたときには、平均的な生産性をX倍した値をシミュレータによって求めた値としてもよい。
 次に、上述のステップ2017の荷主の指示パターンと、シミュレーション結果の照合は以下のようにして行うことができる。日時tにおける荷主指示の総物量をd(t)とし、シミュレータの出力に基づいて日時tにおいて出荷可能な総物量をs(t)とする。前者d(t)が図9に示した需要(曲線1003)に相当し、後者s(t)が図9に示した供給(曲線1004)に相当する。したがって、日時tにおける需要と供給の差分は、
Figure JPOXMLDOC01-appb-M000001
で表現できる。したがって、日時tから日時t-Mまでの需要と供給の差分は、
Figure JPOXMLDOC01-appb-M000002
と表現できる。この値の大小をもとに、需要と供給のパターンの近さを数値化することができ、この数値をもとに値が近いパターンを選択する。
 また、需要と供給の差分に着目するのではなく、需要や供給の増減の傾向に着目する方法を採用することができる。需要が増加するときは、上記d(t)の一次微分の総和、すなわち、
Figure JPOXMLDOC01-appb-M000003
が正の値になる。供給についても上記s(t)の一次微分の総和、すなわち、
Figure JPOXMLDOC01-appb-M000004
が正の値になる。したがって、需要の一時微分が正の値になる場合は、供給側も一時微分が正の値になっているか否かをもとに近いパターンを選択すればよい。同様に、需要や供給が減少傾向にある場合は、両者の一次微分が負の値になっているか否かを照合の判断に用いればよい。
 さらには、任意の近似関数を用いることで、需要と供給を照合することができる。たとえば、日時tからt-Mを2分割して、
Figure JPOXMLDOC01-appb-M000005
かつ、
Figure JPOXMLDOC01-appb-M000006
となる場合には、tの値が小さいとき、d(t)の値は上昇傾向にあり、tの値が大きいときは、d(t)の値の分布は下降傾向にある。同様に、上記s(t)についても、上記(5)式及び(6)式と同様にして、sfirst_half及びssecond_halfを計算することができる。そして、上記(5)式のdfirst_halfとsfirst_halfが同じ符号かつ上記(5)式のdsecond_halfとssecond_halfが同じ符号の場合、需要の傾向と、供給の傾向を近いとみなすことができる。すなわち、
(1) (dfirst_half>0かつsfirst_half>0)かつ(dsecond_half>0かつssecond_half>0)
(2) (dfirst_half>0かつsfirst_half>0)かつ(dsecond_half<0かつssecond_half<0)
(3) (dfirst_half<0かつsfirst_half<0)かつ(dsecond_half>0かつssecond_half>0)
(4) (dfirst_half<0かつsfirst_half<0)かつ(dsecond_half>0かつssecond_half>0)
のいずれかの場合、需要の傾向と、供給の傾向を近いとみなすことができる。
 また、d(t)やs(t)を近似関数で表現し、近似関数同士の近さをもとに、近いパターンを選択することができる。近似関数としては、たとえば、線形近似曲線、対数近似曲線、多項式近似曲線、累乗近似曲線、指数近似曲線、移動平均近似曲線、スプライン近似曲線などを用いることができる。具体的な近似関数の近さの計算方法は、d(t)のスプライン近似曲線をe(t)とし、s(t)のスプライン近似曲線をu(t)とすると、
Figure JPOXMLDOC01-appb-M000007
で表現できる。
 そして、指示生成部304では、上記照合によって選択された計画に基づいて作業指示を生成する(2018)。指示生成部304は、選択した入荷計画に基づいて入荷指示を生成してメーカサーバ1121へ送信する。指示生成部304は、生成した入荷指示を指示内容305の入荷指示テーブル501へ格納する。また、指示生成部304は、選択した人員計画に基づいて人員手配指示、ピッキング作業指示、検品梱包作業指示を生成して人材派遣会社サーバ1122へ送信する。指示生成部304は、生成した人員手配指示、ピッキング作業指示、検品梱包作業指示を指示内容305の人員手配テーブル601、ピッキング作業指示テーブル801、検品梱包作業指示テーブル901へそれぞれ格納する。また、指示生成部304は、選択した配送計画に基づいて配送指示を生成して運送会社サーバ1123へ送信する。指示生成部304は、生成した配送指示を指示内容305の車両手配テーブル701へ格納する。
 作業指示は、物流倉庫201の外向けの指示と物流倉庫201の内向けの指示がある。物流倉庫201の外向けとしては、入荷指示、人員手配指示、配送指示が生成される。これらの指示内容を、それぞれメーカ204と、人材派遣会社205と、運送会社206に送信する。
 物流倉庫201の内向けの指示は、作業員が物流倉庫201内で行う作業内容に関する指示である。具体的な例として、図7に示すピッキング作業の作業指示(801)と、図8に示す検品梱包作業の作業指示(901)を示す。上記の処理が全て完了すると終了(2019)となる。
 図18は、本発明の情報処理システムにて物流倉庫201の作業を制御したときの、当該物流倉庫201における作業の需要曲線2103と供給曲線2104の関係を示したグラフである。図中横軸が日時、縦軸が出荷量であり、ある日時における、出荷量の需要(それらの出荷量を出荷するのに必要な作業の需要量に相当)と、同じ日時における、出荷量の供給量(当該物流倉庫201が提供可能な作業量)の関係が示されている。図18のグラフは、図9の例とは異なり、両者の関係が需要と供給の差分2105を小さくすることができる。なお、荷主指示パターンが需要曲線2103とし、シミュレータ307のシミュレーション結果(第2の荷主指示パターン)が供給曲線2104とすると、荷主指示パターン照合部303は、需要と供給の差分2105が最も小さくなるシミュレーション結果を選択する。そして、当該シミュレーション結果を生成した計画を出力することができる。
 以上の実施例1の説明では物流倉庫201を本発明の適用例として説明したが、本発明で開示する情報処理システム及び方法は、物流倉庫201に限定されるものではない。たとえば、石油プラント、化学プラント、衣料品プラント、食品プラント、水処理プラント、再資源化プラント、産業廃棄物プラント等にも適用可能である。上記プラントには、水量計、濃度計、温度計、湿度計などの各種センサなどの多種多様なセンサがあり、プラントを最適制御するには、上記のセンサ情報を考慮しつつ、外部からの制御指示に基づいて電力や材料、水などを外部から適切な量かつ適切なタイミングで入手する必要がある。図1の出荷指示は、プラント制御指示に相当する。また、入荷指示はエネルギー供給指示や送電指示や材料納入指示に相当し、人員指示はそのまま人員指示に相当し、配送指示もそのまま配送指示にすれば、同じ枠組みで無駄や無理なくプラントを効率よく運営することができる。
 また、船舶や航空機、自家用車やタクシーやバス、鉄道車両のメンテナンスシステムにも適用可能である。この場合は、図1に示した出荷指示は上記プラントに対するメンテナンス指示になる。また、図1に示した入荷指示は、上記プラントに対するエネルギーの供給指示や送電指示や材料納入指示に相当し、人員指示はそのまま人員指示に相当し、配送指示もそのまま配送指示にすれば、同じ枠組みで無駄や無理なくプラントを効率よく運営することができる。
 さらに、本発明は、産業用機械や建設機械などのメンテナンスシステムに適用可能である。この場合は、図1の出荷指示はメンテナンス指示に相当する。また、図1の入荷依頼は、部品納品依頼や送電依頼に、人員依頼はそのまま人員依頼に、配送依頼もそのまま配送依頼にすれば、同じ枠組みで無駄や無理なくメンテナンスシステムを効率よく運営することができる。
 以上のように、管理サーバ1100は、受け付けた荷主指示(出荷指示)から生成した第1の荷主指示パターンに基づいて入荷計画、人員計画及び配送計画を複数生成し、これらの計画を物流倉庫201に固有の制約(または制限)を加味する現場制約反映部330で調整する。そして、現場の制約を満たす計画を選択してシミュレータ307へ入力し、物流倉庫201で実現可能な出荷量を第2の荷主指示パターンとして演算する。
 また、管理サーバ1100は、受け付けた荷主指示と過去の荷主指示から第1の荷主指示パターンを生成し、シミュレータ307が出力する第2の荷主指示パターンと比較する。管理サーバ1100は、第2の荷主指示パターンのうち、第1の荷主指示パターンに近い第2の指示パターンを選択する。そして、当該選択した第2の指示パターンを生成する計画から入荷指示、人員指示及び配送指示を生成する。
 以上のように、物流倉庫201の現場制約を反映した入荷指示と人員指示及び配送指示を生成して物流倉庫201を運営することで、無理や無駄のない物流倉庫201の運営を実現できる。本実施例1によれば、荷主指示と過去の荷主指示から生成した荷主指示パターンと、現場制約反映部330によって物流倉庫201に固有の制約を満足する指示を生成することができ、適切な在庫と、適切な人員及び輸送の指示を、管理者の経験や勘に頼ることなく、計算機によって自動的に算出することが可能となる。
 なお、上記実施例1では、現場制約反映部330の処理を、同時実行組合せ判定部315、パラメータ判定部313、頻度判定部311、順序判定部309の順序で行う例を示したが、これに限定されるものではなく、所望の順序で実施するようにしてもよい。
 また、上記実施例1では、現場制約反映部330の処理として、同時実行組合せ判定部315、パラメータ判定部313、頻度判定部311、順序判定部309を組み合わせた例を示したが、これに限定されるものではなく、同時実行組合せ判定部315、パラメータ判定部313、頻度判定部311または順序判定部309の少なくともひとつを含めば良い。
 荷主の出荷指示に対して、一つの計画から生成した指示では十分に対処できない場合も生じる。本実施例2では、複数の計画(または過去の指示)を組み合わせることで、荷主の出荷指示を処理する方法について説明する。
 図19は、複数の計画(または過去の指示)を組み合わせ、荷主の出荷指示を処理する例を示している。図中横軸の日時と、図中縦軸の出荷量と、需要曲線2203で構成されるグラフは、荷主の出荷指示のパターンを表している。全体的には、日時の経過(あるいは増加)とともに、出荷量が増えている。ただし、日時が後半(所定値を経過)になるにつれて出荷量の増加が抑えられている。この需要曲線2203に対し、管理サーバ1100が、複数の計画(または過去の指示)を組み合わせることで対処可能な指示を生成する例を、実施例2で示す。
 図中横軸の日時と、図中縦軸の出荷量と、供給曲線2213で構成されるグラフは、第1の需要パターンを表している。この供給曲線2213では日時の増加とともに、出荷量が単調増加している。
 一方、供給(出荷量)曲線2223で構成されるグラフは、第2の需要パターンを表している。日時の増加とともに、出荷量が徐々に増加した後に、日時が所定値を経過すると出荷量が徐々に減少する。すなわち、供給曲線2213と供給曲線2223を組み合わせることで、需要曲線2203を満たすための物流倉庫201の指示を2つの計画(または指示)から生成することができる。
 本実施例2を実現するための情報処理システムは、前記実施例1の図2及び図10と同様の構成を用いることができる。そして、管理サーバ1100で実行する処理は、前記実施例1に示した図17の照合(2017)を、図20に示すフローチャートに入れ替えることで実現できる。
 図20は、情報処理システムで行われる照合処理の一例を示すフローチャートである。管理サーバ1100は、まず、処理を開始(2301)した後に、閾値を所定値θに初期化(2302)する。
 次に、管理サーバ1100は、残差の初期化を行う(2303)。具体的には、管理サーバ1100が、残差を荷主指示の総物量数に設定する。なお、本実施例2において、残差は、荷主指示に対応する需要と、物流倉庫201が提供する供給との差分を示す。
 次に、管理サーバ1100は、すべての計画i(1≦i≦M)について、以下の処理を繰り返して実行する(2304)。管理サーバ1100は、残差を閾値と比較して(2305)、残差の方が大きければ、残差から計画iによって処理可能な物量数を引いたものを、改めて残差とする。
 管理サーバ1100は、残差と閾値の比較(2305)において、残差の方が小さければ、ステップ2306の処理を終了(2307)する。管理サーバ1100は、すべての計画iについて比較が完了したら、処理を終了する(2308)。このようにして、処理(2306)にて選ばれた計画を組み合わせればよい。
 上記では、実行可能なM個の計画iに対して、残差を計算するようにしたが、残差を更新するときに、残差が小さくなる場合のみ、更新するようにしてもよい。
 このような構成にすることにより、複数の計画を組み合わせ、荷主の出荷指示に対して、無理や無駄のない指示を導出することができるという効果がある。
 本実施例3では、荷主の出荷指示に対して、複数の計画が選択された場合、物流倉庫201のKPI(重要業績評価指標:Key Performance Indicators)に基づいて、複数の計画から最適なものを選択する例について説明する。KPIとは、組織の目標達成の度合いを定義する補助となる計算指標群である。物流倉庫201の場合は、KPIとして、品質、作業時間、生産性、財務(コスト)等を採用することができる。
 具体的には、品質のKPIとしては、調達時の発注精度(緊急発注率、発注取り消し率、発注エラー率などと、受注訂正率、受注エラー率、請求書エラー率、在庫欠品率、物流事故品発生率、不良品発生率、返品未処理品在庫比率、誤出荷率、棚卸精度、物流倉庫201内の事故率、帳票ミス率、緊急出荷率、出荷時事故率、誤配送率等)を採用することができる。
 作業時間のKPIとしては、納期順守率、納期回答時間、入庫処理時間、当日出荷比率などを採用することができる。生産性のKPIとしては、人及び時間あたりの人員依頼発注率、不動在庫比率、補完効率、出荷トラックの積載率、出荷トラックの回転率、出荷トラックの実働率等を採用することができる。財務のKPIとしては、受注1件あたりのコスト、在庫数1個あたりの管理コスト、出荷コスト等を採用することができる。
 KPIを満足する計画(シミュレーション結果)を選択する物流倉庫201向けの情報処理システムを図21に示す。図21は、物流倉庫201の情報処理システムの機能の一例を示すブロック図である。図21において、前記実施例1の図2との違いは、KPI入力部320が追加されている点である。
 同時実行組み合わせ判定部315と、パラメータ判定部313と、頻度判定部311と、順序判定部309と、シミュレータ307を経て、複数の計画が導出された場合には、荷主指示パターン照合部303が、KPI入力部320から入力された物流倉庫201のKPIを考慮して、計画を選択することが可能になる。なお、本実施例3では、指示履歴データベース316の内容について、物流倉庫201内のどのようなKPIに結びついているか予め設定されているものとする。
 このようにすることにより、荷主の出荷指示に適切に対応しつつ、物流倉庫201のKPI(コストなど)を考慮した計画及び指示の選択が可能になるという効果がある。
 <まとめ>
 なお、本発明は上記した実施例に限定されるものではなく、様々な変形例が含まれる。例えば、上記した実施例は本発明を分かりやすく説明するために詳細に記載したものであり、必ずしも説明した全ての構成を備えるものに限定されるものではない。また、ある実施例の構成の一部を他の実施例の構成に置き換えることが可能であり、また、ある実施例の構成に他の実施例の構成を加えることも可能である。また、各実施例の構成の一部について、他の構成の追加、削除、又は置換のいずれもが、単独で、又は組み合わせても適用可能である。
 また、上記の各構成、機能、及び処理部等は、それらの一部又は全部を、例えば集積回路で設計する等によりハードウェアで実現してもよい。また、上記の各構成、及び機能等は、プロセッサがそれぞれの機能を実現するプログラムを解釈し、実行することによりソフトウェアで実現してもよい。各機能を実現するプログラム、テーブル、ファイル等の情報は、メモリや、ハードディスク、SSD(Solid State Drive)等の記録装置、または、ICカード、SDカード、DVD等の記録媒体に置くことができる。

Claims (12)

  1.  プロセッサとメモリを備えた計算機を含む情報処理システムであって、
     前記計算機は、
     荷主からの出荷指示を受け付けて、前記受け付けた出荷指示と過去の出荷指示から荷主の指示パターンを第1の荷主指示パターンとして生成する荷主指示パターン生成部と、
     前記第1の荷主指示パターンに基づいて前記出荷指示を満たす計画を複数生成する計画部と、
     前記計画のうち、出荷を実施する場所の制約を満たす計画を選択する現場制約反映部と、
     前記現場制約反映部で選択された計画に基づいて出荷量を第2の荷主指示パターンとしてシミュレートするシミュレータと、
     前記シミュレータが出力する第2の荷主指示パターンのうち前記第1の荷主指示パターンに適合する第2の荷主指示パターンを選択する指示パターン照合部と、
     前記指示パターン照合部で選択された第2の荷主指示パターンの計画に基づいて、出荷に対応する指示を生成する指示生成部と、
    を備えたことを特徴とする情報処理システム。
  2.  請求項1に記載の情報処理システムであって、
     前記現場制約反映部は、
     前記出荷を実施する場所で同時に実行可能な計画の組み合わせを選択する同時実行組み合わせ判定部と、
     前記出荷を実施する場所に設定された制約を満たす計画を選択するパラメータ判定部と、
     前記出荷を実施する場所における実行頻度に関する制約を満たす計画を選択する頻度判定部と、
     前記出荷を実施する場所における実行順序の制約を満たす計画を選択する順序判定部と、
    の少なくともひとつを含むことを特徴とする情報処理システム。
  3.  請求項1に記載の情報処理システムであって、
     前記指示パターン照合部は、
     前記第1の荷主指示パターンと第2の荷主指示パターンの差分が最小となる第2の荷主指示パターンを選択することを特徴とする情報処理システム。
  4.  請求項1に記載の情報処理システムであって、
     前記計算機は、
     前記指示生成部が過去に生成した指示の履歴を蓄積する指示履歴情報を有し、
     前記計画部は、
     前記指示履歴情報を参照し、過去の複数の指示から前記計画を生成することを特徴とする情報処理システム。
  5.  請求項1に記載の情報処理システムであって、
     前記指示パターン照合部は、
     重要業績評価指標を受け付けて、前記第2の荷主指示パターンのうち前記重要業績評価指標を満足する第2の荷主指示パターンを選択することを特徴とする情報処理システム。
  6.  請求項1に記載の情報処理システムであって、
     前記指示生成部は、
     前記出荷指示を満たす物品の入荷指示と、前記出荷指示を満たす人員の手配を含む人員指示と、前記出荷指示を満たす前記物品の配送指示と、を生成することを特徴とする情報処理システム。
  7.  プロセッサとメモリを備えた計算機で、荷主からの出荷指示に対応する計画及び指示を生成する情報処理方法であって、
     前記計算機が、荷主からの出荷指示を受け付けて、前記受け付けた出荷指示と過去の出荷指示から荷主の指示パターンを第1の荷主指示パターンとして生成する第1のステップと、
     前記計算機が、前記第1の荷主指示パターンに基づいて前記出荷指示を満たす計画を複数生成する第2のステップと、
     前記計算機が、前記計画のうち、出荷を実施する場所の制約を満たす計画を選択する第3のステップと、
     前記計算機が、前記選択された計画に基づいて出荷量を第2の荷主指示パターンとしてシミュレートする第4のステップと、
     前記計算機が、前記第2の荷主指示パターンのうち前記第1の荷主指示パターンに適合する第2の荷主指示パターンを選択する第5のステップと、
     前記計算機が、前記選択された第2の荷主指示パターンの計画に基づいて、出荷に対応する指示を生成する第6のステップと、
    を含むことを特徴とする情報処理方法。
  8.  請求項7に記載の情報処理方法であって、
     前記第3のステップは、
     前記出荷を実施する場所で同時に実行可能な計画の組み合わせを選択する処理と、前記出荷を実施する場所に設定された制約を満たす計画を選択する処理と、前記出荷を実施する場所における実行頻度に関する制約を満たす計画を選択する処理と、前記出荷を実施する場所における実行順序の制約を満たす計画を選択する処理の少なくともひとつを含むことを特徴とする情報処理方法。
  9.  請求項7に記載の情報処理方法であって、
     前記第5のステップは、
     前記第1の荷主指示パターンと第2の荷主指示パターンの差分が最小となる第2の荷主指示パターンを選択することを特徴とする情報処理方法。
  10.  請求項7に記載の情報処理方法であって、
     前記計算機は、
     過去に生成した指示の履歴を蓄積する指示履歴情報を有し、
     前記第2のステップは、
     前記指示履歴情報を参照し、過去の複数の指示から前記計画を生成することを特徴とする情報処理方法。
  11.  請求項7に記載の情報処理方法であって、
     前記第5のステップは、
     重要業績評価指標を受け付けて、前記第2の荷主指示パターンのうち前記重要業績評価指標を満足する第2の荷主指示パターンを選択することを特徴とする情報処理方法。
  12.  請求項7に記載の情報処理方法であって、
     前記第6のステップは、
     前記出荷指示を満たす物品の入荷指示と、前記出荷指示を満たす人員の手配を含む人員指示と、前記出荷指示を満たす前記物品の配送指示と、を生成することを特徴とする情報処理方法。
PCT/JP2014/070584 2014-08-05 2014-08-05 情報処理システム及び情報処理方法 WO2016020982A1 (ja)

Priority Applications (1)

Application Number Priority Date Filing Date Title
PCT/JP2014/070584 WO2016020982A1 (ja) 2014-08-05 2014-08-05 情報処理システム及び情報処理方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/JP2014/070584 WO2016020982A1 (ja) 2014-08-05 2014-08-05 情報処理システム及び情報処理方法

Publications (1)

Publication Number Publication Date
WO2016020982A1 true WO2016020982A1 (ja) 2016-02-11

Family

ID=55263288

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2014/070584 WO2016020982A1 (ja) 2014-08-05 2014-08-05 情報処理システム及び情報処理方法

Country Status (1)

Country Link
WO (1) WO2016020982A1 (ja)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2018020897A (ja) * 2016-08-05 2018-02-08 株式会社 日立産業制御ソリューションズ 配車計画立案支援装置、配車計画立案支援システムおよび配車計画立案支援方法
US11544658B2 (en) 2019-04-18 2023-01-03 Target Brands, Inc. Platform using instruction engine to simulate and perform warehouse processes

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001034877A (ja) * 1999-07-23 2001-02-09 Nec Mobile Commun Ltd 集配管理方法及びシステム
JP2002321829A (ja) * 2001-04-26 2002-11-08 Hitachi Ltd 物流システム

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001034877A (ja) * 1999-07-23 2001-02-09 Nec Mobile Commun Ltd 集配管理方法及びシステム
JP2002321829A (ja) * 2001-04-26 2002-11-08 Hitachi Ltd 物流システム

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2018020897A (ja) * 2016-08-05 2018-02-08 株式会社 日立産業制御ソリューションズ 配車計画立案支援装置、配車計画立案支援システムおよび配車計画立案支援方法
US11544658B2 (en) 2019-04-18 2023-01-03 Target Brands, Inc. Platform using instruction engine to simulate and perform warehouse processes

Similar Documents

Publication Publication Date Title
Gayialis et al. Design of an IT-driven decision support system for vehicle routing and scheduling
US7877285B2 (en) System and method for forecasting demanufacturing requirements
KR101550740B1 (ko) 실시간 공장상황을 반영한 디지털 팩토리 생산능력 관리 시스템
Dotoli et al. A lean warehousing integrated approach: A case study
CN102201084A (zh) 库存管理
JP2024015525A (ja) 物流管理装置、物流管理装置の制御方法及び制御プログラム
WO2016020982A1 (ja) 情報処理システム及び情報処理方法
Daza-Moran et al. Improving service level performance by implementing Lean Six Sigma in SMEs of the gaming peripherals industry in Peru: a case study
US11669802B2 (en) Performance monitoring interfaces for warehouse operations
Buckley et al. Supply chain simulation
Hübl Stochastic Modelling in Production Planning
JP6695298B2 (ja) 発注制御装置
Jirsak Analyzing an impact of industry 4.0 on logistics and supply chain
Brzozowska et al. Problems of forecasting the length of the assembly cycle of complex products realized in the MTO (make-to-order) model
Lilly Manufacturing: Engineering, Management and Marketing
Budde et al. Smart Factory Framework
WO2023286524A1 (ja) ターゲット管理システム、ターゲット管理方法及びプログラム
US11436543B2 (en) Plan creation interfaces for warehouse operations
Trethepvijit et al. The software development for job shop production planning and inventory control on spreadsheet
Gulyassy et al. Materials planning with SAP
Ivanov et al. Integrated planning and scheduling with dynamic analysis and control of service level and costs
Guzmán et al. Design of a centralized warehouse layout and operation flow for the automotive industry: A simulation approach
Navon et al. Automated materials management and control model
Dewa et al. A web-based holonic inventory management system for tool and die workshop operations
Lim et al. Incorporating supply and production digital twins to mitigate demand disruptions in multi-echelon networks

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 14899481

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 14899481

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: JP