WO2015161811A1 - Pre-reservoir processing system characterized by landscape integration - Google Patents

Pre-reservoir processing system characterized by landscape integration Download PDF

Info

Publication number
WO2015161811A1
WO2015161811A1 PCT/CN2015/077251 CN2015077251W WO2015161811A1 WO 2015161811 A1 WO2015161811 A1 WO 2015161811A1 CN 2015077251 W CN2015077251 W CN 2015077251W WO 2015161811 A1 WO2015161811 A1 WO 2015161811A1
Authority
WO
WIPO (PCT)
Prior art keywords
zone
area
ecological
processing system
purification zone
Prior art date
Application number
PCT/CN2015/077251
Other languages
French (fr)
Chinese (zh)
Inventor
张毅敏
吴晗
晁建颖
汪龙眠
高月香
杨飞
Original Assignee
环境保护部南京环境科学研究所
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 环境保护部南京环境科学研究所 filed Critical 环境保护部南京环境科学研究所
Priority to KR1020167003961A priority Critical patent/KR102003419B1/en
Publication of WO2015161811A1 publication Critical patent/WO2015161811A1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/02Stream regulation, e.g. breaking up subaqueous rock, cleaning the beds of waterways, directing the water flow
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B1/00Equipment or apparatus for, or methods of, general hydraulic engineering, e.g. protection of constructions against ice-strains
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B5/00Artificial water canals, e.g. irrigation canals
    • E02B5/02Making or lining canals
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B5/00Artificial water canals, e.g. irrigation canals
    • E02B5/08Details, e.g. gates, screens
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B2201/00Devices, constructional details or methods of hydraulic engineering not otherwise provided for

Definitions

  • the invention relates to a pre-library, in particular to a pre-library processing system featuring landscape integration.
  • CN1621622A a non-point source pollution enhanced purification pre-column system in the plain net river area is disclosed, which effectively solves surface runoff pollutants, but can only be used for Non-point source pollution control;
  • the Hukou District natural energy-driven pre-library system (patent publication number CN102134140A) patent proposes to add natural energy driving devices in the pre-bank processing system, and introduce the water into the water diversion buffer. After passing through the ecological interception and settlement zone, the intensive purification zone, the deep purification zone and the ecological stability zone, the pollution load of the lake is reduced by the loop cleaning and step by step of each treatment zone.
  • Yancheng is located in Wujin District of Changzhou City. It is the oldest urban area preserved in China from the Western Zhou Dynasty to the Spring and Autumn Period. It covers an area of about 1 square kilometer and has a history of nearly 3,000 years. It is also the only three-city and three-river system in the world. The ancient city, from the inside out, Zicheng, Zicheng River, Inner City, Inner City River, Outer City, Waicheng River, three cities and three rivers. A thousand-year-old city that has experienced vicissitudes in Yancheng is still alive and well. It is now an important cultural relics protection unit and tourist attraction in the country.
  • the pre-depth deep purification area was designed into the three-city and three-river sets of geometric figures, which not only improved the role of the pre-pool processing, but also added the natural landscape effect, making the front-storage library beautiful and beautiful. Handling the organic combination with the landscape, the unity of environmental improvement and aesthetic enjoyment.
  • the present invention provides a pre-bank processing system characterized by landscape integration, which has the characteristics of high pollution load treatment efficiency, simple management and landscape effect.
  • a pre-bank processing system featuring landscape integration which includes five units of water pumping station, ecological interception zone, intensive purification zone, deep purification zone and ecological stability zone; the water pumping station first enters the lake into the water It is sent to the ecological interception zone, and then enters the intensive purification zone, the deep purification zone, and the ecological stability zone.
  • the zones are connected by the overflow dam in turn.
  • the area of the pre-treatment system should be designed according to the pollutant load, with an area of 15000- 25000m 2 .
  • a pre-bank processing system characterized by landscape integration, wherein the enhanced purification zone and the ecological interception zone are parallel to each other, and the inflow water flows through the ecological interception zone and flows backward into the enhanced purification zone, and the enhanced purification zone is provided with water.
  • Flower field; the ecological stability zone is downstream of the deep purification zone.
  • the stacked water field is composed of four ladder-shaped structures, each of which is regarded as a pool (paddy field), and is planted with aquatic flowers such as water lilies.
  • the deep purification zone is composed of three concentric annular earth dams of different sizes; the radius of the outer ring ring earth dam is 40-50 m, the middle ring earth dam radius is 25-30 m, and the innermost ring earth dam The radius is 15-20m; three concentric ring earth dams are connected to each other.
  • the ecological interception zone has an area of 4000-6000 m 2
  • the enhanced purification zone has an area of 3000-6000 m 2
  • the deep purification zone has an area of 5000-8000 m 2
  • the ecological stable zone has an area of 3000- 5000m 2 .
  • the pre-depot processing system of the present invention is connected in series through the overflow dam, and has a water drop effect, and the difference in the natural water formed upstream and downstream can enhance the aeration and increase the dissolved oxygen in the water body.
  • the stacked water field makes the water flow in a stepped manner.
  • the water flows down a pool (paddy field) through a pool (paddy field), and aquatic flowers such as water lily are planted in the pool to present the beauty of the flower.
  • the water is lively and colorful, and it enhances the appearance while purifying the aquatic flowers and reducing the water and aeration.
  • the deep purification area is composed of three concentric circular earth dams of different sizes, which makes the inflow of water flowing between the ring earth dams, which not only increases the water retention time but also improves the water quality.
  • the deep purification area is designed into the geometric pattern of the three cities and three rivers. It has historical and cultural characteristics and aesthetic effects, and realizes the organic combination of treatment and landscape, and the unification of environmental improvement and aesthetic enjoyment.
  • FIG. 1 is a schematic plan view showing a planar structure of a pre-bank processing system characterized by landscape integration
  • Figure 2 is a schematic cross-sectional view of a stacked water field
  • 1-water pumping station 2-ecological interception zone, 3-water flow direction, 4-overflow dam, 5-enhanced purification zone, 6-dual water flower field, 7-ring earth dam, 8-depth purification zone, 9- Ecological stability zone.
  • a pre-bank processing system featuring landscape integration was constructed in a lake area of southern Jiangsu.
  • the designed hydraulic load was 0.30m 3 /m 2 /d (cubic meters / square meter / day), and the front reservoir surface
  • the area is 25000m 2
  • the volume is 34000m 3
  • the water intake is 6000m 3 /d
  • the hydraulic retention time is 6d.
  • the periphery of the front storage is mainly an earthy structure, and the areas are connected to each other by an overflow dam 4.
  • the front-bank processing system featuring landscape integration consists of a water pumping station 1, an ecological interception zone 2, an enhanced purification zone 5, a deep purification zone 8 and an ecological stabilization zone 9, and the water entering the lake passes through
  • the water pumping station 1 first passes through the ecological interception zone 2, and then enters the enhanced purification zone 5, the deep purification zone 8, and the ecological stability zone 9 in turn; wherein the enhanced purification zone 5 and the ecological interception zone 2 are parallel to each other, and the influent passes through the ecological interception zone.
  • the overflow dam 4 flows backward into the enhanced purification zone 5, and the enhanced purification zone 5 is provided with a stacked water field 6;
  • the deep purification zone 8 is composed of three concentric annular earth dams 7 of different sizes and is connected to each other. Through; the ecological stability zone 9 is downstream of the deep purification zone 8.
  • the stacked water flower field 6 is a step-shaped structure (as shown in FIG. 2), and is composed of four step-shaped structures; the step-shaped structure is planted with aquatic flowers.
  • Deep purification area the area is 8000m 2 , the radius of the outer ring ring earth dam is 50m, the radius of the middle ring earth dam is 30m, and the radius of the inner ring of the inner ring is 20m;
  • a pre-bank processing system featuring landscape integration was constructed.
  • the designed hydraulic load was 0.26m 3 /m 2 /d (cubic meters / square meter / day), and the front reservoir surface area was 20000m 2 , the volume is 26000m 3 , the water inflow is 5000m 3 /d, and the hydraulic retention time is 5d.
  • the area of the ecological interception area is 5000 m 2
  • the area of the enhanced purification area is 4000 m 2
  • the area of the deep purification area is 7000 m 2
  • the radius of the outer ring ring earth dam is 46 m.
  • the radius of the dam is 28m
  • the radius of the inner ring of the innermost ring is 17m
  • the area of the ecological stability zone is 4000m 2 .
  • a pre-bank processing system featuring landscape integration was constructed in a Hukou area.
  • the designed hydraulic load was 0.2m 3 /m 2 /d (cubic meters / square meter / day), and the front reservoir water surface area was 18000m 2 , the volume is 23000m 3 , the water intake is 4700m 3 /d, and the hydraulic retention time is 5d.
  • Example 2 Its structure and parameters as in Example 1, except that the ecological interception area of 4000m 2, strengthening purification area of 5000m 2, the depth of the area of the purifying region 8 6000m 2, the outermost radius of the ring dam 44M, intermediate ring soil The radius of the dam is 26m, the radius of the inner ring of the inner ring is 16m, and the area of the ecological stability zone is 3000m 2 .
  • a pre-bank processing system featuring landscape integration was constructed in a Hukou area.
  • the designed hydraulic load was 0.2m 3 /m 2 /d (cubic meters / square meter / day), and the front reservoir water surface area was 15000m 2 , the volume is 20000m 3 , the water intake is 4000m 3 /d, and the hydraulic retention time is 5d.
  • the area of the ecological interception area is 4000 m 2
  • the area of the enhanced purification area is 3000 m 2
  • the area of the deep purification area is 5000 m 2
  • the radius of the outer ring ring earth dam is 40 m.
  • the radius of the dam is 25m
  • the radius of the inner ring of the inner ring is 15m
  • the area of the ecological stability zone is 3000m 2 .

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Purification Treatments By Anaerobic Or Anaerobic And Aerobic Bacteria Or Animals (AREA)

Abstract

Disclosed is a pre-reservoir processing system characterized by landscape integration, composed of a supplemental water pumping station (1), an ecological interception area (2), a reinforced purification area (5), a deep purification area (8), and an ecological stabilizing area (9), wherein the supplemental water pumping station (1) first sends river water flowing to the lake into the ecological interception area (2), and then the water successively enters into the reinforced purification area (5), the deep purification area (8) and the ecological stabilizing area (9). The ecological interception area (2), the reinforced purification area (5), the deep purification area (8) and the ecological stabilizing area (9) are connected successively through overflow dams. The deep purification area (8) is composed of 3 concentric annulus dams (7) of different sizes.

Description

一种以景观一体化为特征的前置库处理系统A pre-database processing system featuring landscape integration 技术领域Technical field
本发明涉及一种前置库,特别涉及到一种以景观一体化为特征的前置库处理系统。The invention relates to a pre-library, in particular to a pre-library processing system featuring landscape integration.
背景技术Background technique
随着经济的高速发展,人口的急剧增长以及工业化和城市化进程的加快,氮、磷营养物质向水体的排放量日益增多,湖泊富营养化程度加剧,当污染水体流入到大面积水域时,治理富营养化难度将进一步增大,因此,在入湖河口设置污水处理系统非常必要,其中前置库处理系统是一种比较实用的技术方法。With the rapid development of the economy, the rapid growth of population, and the acceleration of industrialization and urbanization, the emission of nitrogen and phosphorus nutrients to water bodies is increasing, and the degree of eutrophication of lakes is increasing. When polluted water bodies flow into large areas of waters, The difficulty of managing eutrophication will be further increased. Therefore, it is necessary to set up a sewage treatment system at the mouth of the lake. The pre-treatment system is a practical technical method.
经典前置库是在入湖口筑坝,建成位于主体湖泊水库上游的小型水库,用于截留进入主体水库的污染物。在以往前置库系统研究中,主要是集中在丘陵地带,利用天然坡降,来实现泥沙和N、P营养物有效去除,由于需要特殊的地理条件,此技术应用受到了一定的限制。近年来在我国此技术得到了一定的改进,如在专利公开号CN1621622A,公开了一种平原网河地区面源污染强化净化前置库系统,有效解决了地表径流污染物,但只能用于面源污染控制;另外湖口区天然能源驱动的前置库系统(专利公开号CN102134140A)专利,提出在前置库处理系统中增加天然能源驱动装置,将入湖河水引入引水调蓄缓冲区,在分别经过生态拦截与沉降区、强化净化区、深度净化区和生态稳定区,通过各处理区环环净化、步步拦截后,从而降低入湖污染负荷。虽然这些技术解决了库区的进水和强化净化所需要的动力问题,但各区结构简单,净化效果不高,功能单一,仅以净化为目标,缺乏景观化效果。The classic front-loading dam is built in the estuary of the lake, and a small reservoir located upstream of the main lake reservoir is built to intercept the pollutants entering the main reservoir. In the past research of pre-banking system, it mainly concentrated in hilly areas, using natural slopes to achieve effective removal of sediment and N and P nutrients. Due to the special geographical conditions, the application of this technology has been limited. In recent years, this technology has been improved in China. For example, in Patent Publication No. CN1621622A, a non-point source pollution enhanced purification pre-column system in the plain net river area is disclosed, which effectively solves surface runoff pollutants, but can only be used for Non-point source pollution control; In addition, the Hukou District natural energy-driven pre-library system (patent publication number CN102134140A) patent proposes to add natural energy driving devices in the pre-bank processing system, and introduce the water into the water diversion buffer. After passing through the ecological interception and settlement zone, the intensive purification zone, the deep purification zone and the ecological stability zone, the pollution load of the lake is reduced by the loop cleaning and step by step of each treatment zone. Although these technologies solve the power problems required for the influent and enhanced purification of the reservoir area, the structures of each area are simple, the purification effect is not high, and the function is single, and only the purification is targeted, and the landscape effect is lacking.
淹城位于常州市武进区,是我国目前西周到春秋时期保存下来的最古老的城市区,面积约1平方公里,迄今已有将近3000年的历史,这也是世界上仅有的三城三河形制的古城,从里向外,子城、子城河、内城、内城河、外城、外城河,三城三河相套。淹城一座历经沧桑的千年古城,如今依然活力四射,现为全国重要文物保护单位和旅游胜地。参照历史文化背景,将前置库深度净化区设计成三城三河相套几何图形,不仅提高了前置库处理的作用,更增添了自然景观效果,使前置库风光迤逦,美不胜收,实现了处理与景观的有机结合,环境改善与美观享受的统一。 Yancheng is located in Wujin District of Changzhou City. It is the oldest urban area preserved in China from the Western Zhou Dynasty to the Spring and Autumn Period. It covers an area of about 1 square kilometer and has a history of nearly 3,000 years. It is also the only three-city and three-river system in the world. The ancient city, from the inside out, Zicheng, Zicheng River, Inner City, Inner City River, Outer City, Waicheng River, three cities and three rivers. A thousand-year-old city that has experienced vicissitudes in Yancheng is still alive and well. It is now an important cultural relics protection unit and tourist attraction in the country. Referring to the historical and cultural background, the pre-depth deep purification area was designed into the three-city and three-river sets of geometric figures, which not only improved the role of the pre-pool processing, but also added the natural landscape effect, making the front-storage library beautiful and beautiful. Handling the organic combination with the landscape, the unity of environmental improvement and aesthetic enjoyment.
发明内容Summary of the invention
1.发明要解决的技术问题1. The technical problem to be solved by the invention
针对湖口区污染物的处理上存在功能单一,仅能用于面源污染控制,只是以净化为目标,同时已有的前置库系统处理效率不高和缺乏景观可观性等问题,且一直未有很好的解决办法,本发明提供一种以景观一体化为特征的前置库处理系统,该系统具有污染负荷处理效率高、管理简单和景观化效果等特点。There is a single function for the treatment of pollutants in Hukou District. It can only be used for non-point source pollution control, but only for purification. At the same time, the existing pre-pool system has low processing efficiency and lack of landscape observability. Without a good solution, the present invention provides a pre-bank processing system characterized by landscape integration, which has the characteristics of high pollution load treatment efficiency, simple management and landscape effect.
2.技术方案2. Technical solutions
一种以景观一体化为特征的前置库处理系统,其包括了补水泵站、生态拦截区、强化净化区、深度净化区、生态稳定区5个单元;补水泵站先将入湖进水送入生态拦截区,再依次进入强化净化区、深度净化区、和生态稳定区,各区通过溢流坝依次相连,该前置库处理系统的面积应根据污染物负荷进行设计,面积为15000-25000m2A pre-bank processing system featuring landscape integration, which includes five units of water pumping station, ecological interception zone, intensive purification zone, deep purification zone and ecological stability zone; the water pumping station first enters the lake into the water It is sent to the ecological interception zone, and then enters the intensive purification zone, the deep purification zone, and the ecological stability zone. The zones are connected by the overflow dam in turn. The area of the pre-treatment system should be designed according to the pollutant load, with an area of 15000- 25000m 2 .
一种以景观一体化为特征的前置库处理系统,所述的强化净化区与生态拦截区相互并列平行,进水经过生态拦截区后反向流入强化净化区,强化净化区设有叠水花田;所述的生态稳定区在深度净化区下游。A pre-bank processing system characterized by landscape integration, wherein the enhanced purification zone and the ecological interception zone are parallel to each other, and the inflow water flows through the ecological interception zone and flows backward into the enhanced purification zone, and the enhanced purification zone is provided with water. Flower field; the ecological stability zone is downstream of the deep purification zone.
所述的叠水花田由4个阶梯形状的构筑物组成,每个阶梯视为一个水池(水田),种植睡莲等水生花卉。The stacked water field is composed of four ladder-shaped structures, each of which is regarded as a pool (paddy field), and is planted with aquatic flowers such as water lilies.
所述的深度净化区由3个大小不同的同心圆环土坝环绕组成;最外圈的圆环土坝半径为40-50m,中间圆环土坝半径25-30m,最里面圆环土坝半径15-20m;3个同心圆环土坝相互连接贯通。The deep purification zone is composed of three concentric annular earth dams of different sizes; the radius of the outer ring ring earth dam is 40-50 m, the middle ring earth dam radius is 25-30 m, and the innermost ring earth dam The radius is 15-20m; three concentric ring earth dams are connected to each other.
所述生态拦截区,面积在4000-6000m2,所述强化净化区,面积在3000-6000m2;所述的深度净化区,面积在5000-8000m2;所述生态稳定区,面积在3000-5000m2The ecological interception zone has an area of 4000-6000 m 2 , the enhanced purification zone has an area of 3000-6000 m 2 , the deep purification zone has an area of 5000-8000 m 2 , and the ecological stable zone has an area of 3000- 5000m 2 .
3.有益效果3. Beneficial effects
相比于现有技术,本发明的有益效果是:Compared with the prior art, the beneficial effects of the present invention are:
本发明前置库处理系统各区通过溢流坝依次相连,具有跌水效果,上下游自然形成水的位差可以增强曝气,增加水体溶解氧。The pre-depot processing system of the present invention is connected in series through the overflow dam, and has a water drop effect, and the difference in the natural water formed upstream and downstream can enhance the aeration and increase the dissolved oxygen in the water body.
由于进水经过生态拦截区后反向流入强化净化区,在水流方向改变的时候,更有利于悬浮颗粒沉降。As the influent flows into the enhanced purification zone after passing through the ecological interception zone, it is more conducive to the sedimentation of suspended particles when the direction of the water flow changes.
强化净化区设有叠水花田,叠水花田使水呈阶梯状流出,经由一个水池(水田)跌水流向下一水池(水田),水池中种植睡莲等水生花卉,呈现花之美丽以及 水态活泼多姿,在水生花卉净化和跌水曝气的同时,也增强了美观。In the enhanced purification area, there is a stacked water field, and the stacked water field makes the water flow in a stepped manner. The water flows down a pool (paddy field) through a pool (paddy field), and aquatic flowers such as water lily are planted in the pool to present the beauty of the flower. The water is lively and colorful, and it enhances the appearance while purifying the aquatic flowers and reducing the water and aeration.
深度净化区由3个不同大小同心圆环土坝环绕组成,使进水在圆环土坝之间循环流动,不仅增加了水利停留时间,提高出水水质。The deep purification area is composed of three concentric circular earth dams of different sizes, which makes the inflow of water flowing between the ring earth dams, which not only increases the water retention time but also improves the water quality.
深度净化区设计成三城三河相套几何图形,具有历史文化特征与美观效果,实现了处理与景观的有机结合,环境改善与美观享受的统一。The deep purification area is designed into the geometric pattern of the three cities and three rivers. It has historical and cultural characteristics and aesthetic effects, and realizes the organic combination of treatment and landscape, and the unification of environmental improvement and aesthetic enjoyment.
附图说明DRAWINGS
图1是一种以景观一体化为特征的前置库处理系统的平面结构示意图;1 is a schematic plan view showing a planar structure of a pre-bank processing system characterized by landscape integration;
图2是叠水花田横截面示意图;Figure 2 is a schematic cross-sectional view of a stacked water field;
图中1-补水泵站,2-生态拦截区,3-水流方向,4-溢流坝,5-强化净化区,6-叠水花田,7-圆环土坝,8-深度净化区,9-生态稳定区。In the picture, 1-water pumping station, 2-ecological interception zone, 3-water flow direction, 4-overflow dam, 5-enhanced purification zone, 6-dual water flower field, 7-ring earth dam, 8-depth purification zone, 9- Ecological stability zone.
具体实施方式detailed description
下面结合附图和实施例进一步说明本发明。The invention is further illustrated by the following figures and examples.
实施例1Example 1
在苏南某湖口区构建了一种以景观一体化为特征的前置库处理系统,设计水力负荷为0.30m3/m2/d(立方米/平方米/日),前置库水面面积为25000m2,容积为34000m3,进水量为6000m3/d,水力停留时间为6d。前置库外围主要为土质构造,各区域之间通过溢流坝4相互连接。A pre-bank processing system featuring landscape integration was constructed in a lake area of southern Jiangsu. The designed hydraulic load was 0.30m 3 /m 2 /d (cubic meters / square meter / day), and the front reservoir surface The area is 25000m 2 , the volume is 34000m 3 , the water intake is 6000m 3 /d, and the hydraulic retention time is 6d. The periphery of the front storage is mainly an earthy structure, and the areas are connected to each other by an overflow dam 4.
如图1所示以景观一体化为特征的前置库处理系统,由补水泵站1、生态拦截区2、强化净化区5、深度净化区8和生态稳定区9构成,入湖进水通过补水泵站1,先经过生态拦截区2,再依次进入强化净化区5、深度净化区8、生态稳定区9;其中强化净化区5与生态拦截区2相互并列平行,进水经过生态拦截区2后通过溢流坝4反向流入强化净化区5,强化净化区5设有叠水花田6;所述的深度净化区8由3个不同大小的同心圆环土坝7环绕组成并相互连接贯通;所述的生态稳定区9在深度净化区8下游。As shown in Figure 1, the front-bank processing system featuring landscape integration consists of a water pumping station 1, an ecological interception zone 2, an enhanced purification zone 5, a deep purification zone 8 and an ecological stabilization zone 9, and the water entering the lake passes through The water pumping station 1 first passes through the ecological interception zone 2, and then enters the enhanced purification zone 5, the deep purification zone 8, and the ecological stability zone 9 in turn; wherein the enhanced purification zone 5 and the ecological interception zone 2 are parallel to each other, and the influent passes through the ecological interception zone. After 2, the overflow dam 4 flows backward into the enhanced purification zone 5, and the enhanced purification zone 5 is provided with a stacked water field 6; the deep purification zone 8 is composed of three concentric annular earth dams 7 of different sizes and is connected to each other. Through; the ecological stability zone 9 is downstream of the deep purification zone 8.
所述的叠水花田6是阶梯形状的构筑物(如图2所示),由4个阶梯形状的构筑物组成;阶梯形状的构筑物内种植水生花卉。The stacked water flower field 6 is a step-shaped structure (as shown in FIG. 2), and is composed of four step-shaped structures; the step-shaped structure is planted with aquatic flowers.
生态拦截区:面积为120m×50m=6000m2Ecological interception area: the area is 120m × 50m = 6000m 2 ;
强化净化区:面积为120m×50m=6000m2Enhanced purification zone: the area is 120m × 50m = 6000m 2 ;
深度净化区:面积为8000m2,最外圈圆环土坝半径为50m,中间圆环土坝半径为30m,最里圈圆环土坝半径为20m; Deep purification area: the area is 8000m 2 , the radius of the outer ring ring earth dam is 50m, the radius of the middle ring earth dam is 30m, and the radius of the inner ring of the inner ring is 20m;
生态稳定区:面积100m×50m=5000m2Ecological stability zone: area 100m × 50m = 5000m 2 .
经过本工程净化后,主要常规水质指标均得到改善,污水经景观前置库系统后,具体见下表。After the purification of this project, the main conventional water quality indicators have been improved. After the sewage passes through the landscape front storage system, see the following table.
Figure PCTCN2015077251-appb-000001
Figure PCTCN2015077251-appb-000001
实施例2Example 2
在某湖口区构建了一种以景观一体化为特征的前置库处理系统,设计水力负荷为0.26m3/m2/d(立方米/平方米/日),前置库水面面积为20000m2,容积为26000m3,进水量为5000m3/d,水力停留时间为5d。In the Hukou District, a pre-bank processing system featuring landscape integration was constructed. The designed hydraulic load was 0.26m 3 /m 2 /d (cubic meters / square meter / day), and the front reservoir surface area was 20000m 2 , the volume is 26000m 3 , the water inflow is 5000m 3 /d, and the hydraulic retention time is 5d.
其结构和参数如实施例1,不同在于生态拦截区面积为5000m2,强化净化区面积为4000m2,深度净化区8面积7000m2,最外圈圆环土坝半径为46m,中间圆环土坝半径为28m,最里圈圆环土坝半径为17m,生态稳定区面积4000m2Its structure and parameters are as in Example 1, except that the area of the ecological interception area is 5000 m 2 , the area of the enhanced purification area is 4000 m 2 , the area of the deep purification area is 7000 m 2 , and the radius of the outer ring ring earth dam is 46 m. The radius of the dam is 28m, the radius of the inner ring of the innermost ring is 17m, and the area of the ecological stability zone is 4000m 2 .
经过本工程净化后,主要常规水质指标均得到改善,具体见下表。After the purification of this project, the main routine water quality indicators have been improved, as shown in the table below.
水质指标Water quality index 水质指标Water quality index TN(总氮)TN (total nitrogen) TP(总磷)TP (total phosphorus) SS(悬浮物)SS (suspended matter)
进水浓度/mg.L-1 Influent concentration / mg.L -1 3.92±0.463.92±0.46 0.26±0.130.26±0.13 59.32±0.7959.32±0.79 7.13±0.567.13±0.56
出水浓度/mg.L-1 Effluent concentration / mg.L -1 2.65±0.732.65±0.73 0.15±0.160.15±0.16 28.73±0.8928.73±0.89 4.25±0.534.25±0.53
平均去除率/%Average removal rate /% 33%33% 42%42% 52%52% 40%40%
实施例3Example 3
在某湖口区构建了一种以景观一体化为特征的前置库处理系统,设计水力负荷为0.2m3/m2/d(立方米/平方米/日),前置库水面面积为18000m2,容积为23000m3,进水量为4700m3/d,水力停留时间为5d。A pre-bank processing system featuring landscape integration was constructed in a Hukou area. The designed hydraulic load was 0.2m 3 /m 2 /d (cubic meters / square meter / day), and the front reservoir water surface area was 18000m 2 , the volume is 23000m 3 , the water intake is 4700m 3 /d, and the hydraulic retention time is 5d.
其结构和参数如实施例1,不同在于生态拦截区面积为4000m2,强化净化区面积为5000m2,深度净化区8面积6000m2,最外圈圆环土坝半径为44m,中间圆环土坝半径为26m,最里圈圆环土坝半径为16m,生态稳定区面积3000m2Its structure and parameters as in Example 1, except that the ecological interception area of 4000m 2, strengthening purification area of 5000m 2, the depth of the area of the purifying region 8 6000m 2, the outermost radius of the ring dam 44M, intermediate ring soil The radius of the dam is 26m, the radius of the inner ring of the inner ring is 16m, and the area of the ecological stability zone is 3000m 2 .
经过本工程净化后,主要常规水质指标均得到改善,具体见下表。After the purification of this project, the main routine water quality indicators have been improved, as shown in the table below.
水质指标Water quality index 水质指标Water quality index TN(总氮)TN (total nitrogen) TP(总磷)TP (total phosphorus) SS(悬浮物)SS (suspended matter)
进水浓度/mg.L-1 Influent concentration / mg.L -1 3.83±0.393.83±0.39 0.25±0.180.25±0.18 38.56±0.8938.56±0.89 7.13±0.567.13±0.56
出水浓度/mg.L-1 Effluent concentration / mg.L -1 2.71±0.632.71±0.63 0.17±0.120.17±0.12 18.73±0.8918.73±0.89 4.25±0.534.25±0.53
平均去除率/%Average removal rate /% 29%29% 32%32% 50.1%50.1% 40%40%
实施例4Example 4
在某湖口区构建了一种以景观一体化为特征的前置库处理系统,设计水力负荷为0.2m3/m2/d(立方米/平方米/日),前置库水面面积为15000m2,容积为20000m3,进水量为4000m3/d,水力停留时间为5d。A pre-bank processing system featuring landscape integration was constructed in a Hukou area. The designed hydraulic load was 0.2m 3 /m 2 /d (cubic meters / square meter / day), and the front reservoir water surface area was 15000m 2 , the volume is 20000m 3 , the water intake is 4000m 3 /d, and the hydraulic retention time is 5d.
其结构和参数如实施例1,不同在于生态拦截区面积为4000m2,强化净化区面积为3000m2,深度净化区8面积5000m2,最外圈圆环土坝半径为40m,中间圆环土坝半径为25m,最里圈圆环土坝半径为15m,生态稳定区面积3000m2Its structure and parameters are as in Example 1, except that the area of the ecological interception area is 4000 m 2 , the area of the enhanced purification area is 3000 m 2 , the area of the deep purification area is 5000 m 2 , and the radius of the outer ring ring earth dam is 40 m. The radius of the dam is 25m, the radius of the inner ring of the inner ring is 15m, and the area of the ecological stability zone is 3000m 2 .
经过本工程净化后,主要常规水质指标均得到改善,具体见下表。After the purification of this project, the main routine water quality indicators have been improved, as shown in the table below.
水质指标Water quality index 水质指标Water quality index TN(总氮)TN (total nitrogen) TP(总磷)TP (total phosphorus) SS(悬浮物)SS (suspended matter)
进水浓度/mg.L-1 Influent concentration / mg.L -1 4.31±0.324.31±0.32 0.22±0.100.22±0.10 44.36±0.8944.36±0.89 8.21±0.378.21±0.37
出水浓度/mg.L-1 Effluent concentration / mg.L -1 2.82±0.582.82±0.58 0.13±0.120.13±0.12 21.73±0.8921.73±0.89 4.95±0.554.95±0.55
平均去除率/%Average removal rate /% 35%35% 39.3%39.3% 51%51% 39%39%

Claims (6)

  1. 一种以景观一体化为特征的前置库处理系统,其特征在于,由补水泵站(1)、生态拦截区(2)、强化净化区(5)、深度净化区(8)、生态稳定区(9)5个单元构成,补水泵站(1)先将入湖河水送入生态拦截区(2),再依次进入强化净化区(5)、深度净化区(8)、和生态稳定区(9),所述生态拦截区、强化净化区、深度净化区和生态稳定区通过溢流坝依次相连。A pre-bank processing system characterized by landscape integration, characterized by: water pumping station (1), ecological interception zone (2), enhanced purification zone (5), deep purification zone (8), ecological stability District (9) consists of 5 units. The water pumping station (1) first sends the water into the ecological interception zone (2), and then enters the enhanced purification zone (5), the deep purification zone (8), and the ecological stability zone. (9) The ecological interception zone, the enhanced purification zone, the deep purification zone and the ecological stability zone are connected in sequence through the overflow dam.
  2. 根据权利要求1所述的以景观一体化为特征的前置库处理系统,所述的强化净化区(5)与生态拦截区(2)相互并列平行,进水经过生态拦截区(2)后反向流入强化净化区(5),强化净化区(5)设有叠水花田(6);所述的深度净化区(8)由3个不同大小的同心圆环土坝(7)环绕组成并相互连接贯通;所述的生态稳定区(9)在深度净化区(8)下游。The pre-bank processing system characterized by landscape integration according to claim 1, wherein the enhanced purification zone (5) and the ecological interception zone (2) are parallel to each other, and after the water enters the ecological interception zone (2) Reverse flow into the enhanced purification zone (5), enhanced purification zone (5) with stacked water field (6); the deep purification zone (8) consists of three concentric annular earth dams (7) of different sizes And connected to each other; the ecological stability zone (9) is downstream of the deep purification zone (8).
  3. 根据权利要求2所述的以景观一体化为特征的前置库处理系统,其特征在于,所述的叠水花田(6)是阶梯形状的构筑物,由4个阶梯形状的构筑物组成。The pre-bank processing system characterized by landscape integration according to claim 2, wherein the stacked water field (6) is a stepped structure and is composed of four stepped structures.
  4. 根据权利要求2所述的以景观一体化为特征的前置库处理系统,其特征在于,所述的深度净化区(8)的3个不同大小的同心圆环土坝环(7),最外圈的圆环土坝半径为40-50m,中间圆环土坝半径25-30m,最里面圆环土坝15-20m。The pre-bank processing system characterized by landscape integration according to claim 2, characterized in that: three different-sized concentric ring earth dam rings (7) of the deep purification zone (8) are the most The radius of the ring earth dam of the outer ring is 40-50m, the radius of the middle ring earth dam is 25-30m, and the inner ring earth dam is 15-20m.
  5. 根据权利要求1-3所述的任意一项以景观一体化为特征的前置库处理系统,其特征在于,所述前置库处理系统面积为15000-25000m2;所述生态拦截区,面积在3000-6000m2;所述强化净化区,面积在4000-6000m2;所述深度净化区,面积在4000-7000m2;所述生态稳定区,面积在4000-6000m2The pre-bank processing system characterized by landscape integration according to any one of claims 1-3, wherein the pre-bank processing system has an area of 15000-25000 m 2 ; In the 3000-6000 m 2 ; the enhanced purification zone, the area is 4000-6000 m 2 ; the deep purification zone has an area of 4000-7000 m 2 ; and the ecological stability zone has an area of 4000-6000 m 2 .
  6. 根据权利要求3所述的以景观一体化为特征的前置库处理系统,其特征在于,所述的阶梯形状的构筑物内种植水生花卉。 The pre-bank processing system characterized by landscape integration according to claim 3, wherein the step-shaped structure is planted with aquatic flowers.
PCT/CN2015/077251 2014-04-25 2015-04-23 Pre-reservoir processing system characterized by landscape integration WO2015161811A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020167003961A KR102003419B1 (en) 2014-04-25 2015-04-23 Pre-reservoir processing system characterized by landscape integration

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201410172893.8 2014-04-25
CN201410172893.8A CN103924551B (en) 2014-04-25 2014-04-25 A kind of with the landscape integrated front damming process system for feature

Publications (1)

Publication Number Publication Date
WO2015161811A1 true WO2015161811A1 (en) 2015-10-29

Family

ID=51142931

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2015/077251 WO2015161811A1 (en) 2014-04-25 2015-04-23 Pre-reservoir processing system characterized by landscape integration

Country Status (3)

Country Link
KR (1) KR102003419B1 (en)
CN (1) CN103924551B (en)
WO (1) WO2015161811A1 (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103924551B (en) * 2014-04-25 2016-06-15 环境保护部南京环境科学研究所 A kind of with the landscape integrated front damming process system for feature
CN105800878B (en) * 2016-05-12 2018-09-14 天津大学 Separate system rain processing system associated with magnetic flocculation-front damming
CN108560500B (en) * 2018-04-10 2021-09-10 何明利 A sluice manger plate building structure for tourism sightseeing
CN113243155A (en) * 2021-05-27 2021-08-13 安徽大学 Method for controlling water resource and nutrient element recycling in hilly and mountainous areas

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11158833A (en) * 1997-11-25 1999-06-15 Fujita Corp River purifying facility
US6258274B1 (en) * 2000-07-05 2001-07-10 Kun-Cheng Wu Method for reducing sludge within a river or the like
CN1621622A (en) * 2004-12-10 2005-06-01 国家环境保护总局南京环境科学研究所 Plain river network area surface source pollution reinforced depuration prepositive library system
CN102134140A (en) * 2010-12-03 2011-07-27 环境保护部南京环境科学研究所 Fore-reservoir system driven by natural energy in lake outlet regions
CN103628447A (en) * 2013-12-19 2014-03-12 环境保护部南京环境科学研究所 Lake-port pre-reservoir treating system taking arc-shaped ecological diversion dike as characteristic
CN103924551A (en) * 2014-04-25 2014-07-16 环境保护部南京环境科学研究所 Pre-dam processing system characterized in landscape integration

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3323040B2 (en) * 1995-09-06 2002-09-09 シャープ株式会社 Ultrapure water production equipment
KR200432566Y1 (en) * 2006-03-03 2006-12-05 변우일 Sustainable structured wetland media
CN101172705A (en) * 2007-09-21 2008-05-07 中国科学技术大学 High-efficiency oxidation ditch biological sewage treatment method and system
CN101700932A (en) * 2009-11-03 2010-05-05 上海大学 Stepped composite vertical flow artificial wetland sewage treatment device
CN203333445U (en) * 2013-07-02 2013-12-11 贵州师范大学 Stepped sewage infiltration purification system
KR101359437B1 (en) * 2013-07-06 2014-02-10 (주)이맥스아쿠아 Cleanup block for a eco pond

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11158833A (en) * 1997-11-25 1999-06-15 Fujita Corp River purifying facility
US6258274B1 (en) * 2000-07-05 2001-07-10 Kun-Cheng Wu Method for reducing sludge within a river or the like
CN1621622A (en) * 2004-12-10 2005-06-01 国家环境保护总局南京环境科学研究所 Plain river network area surface source pollution reinforced depuration prepositive library system
CN102134140A (en) * 2010-12-03 2011-07-27 环境保护部南京环境科学研究所 Fore-reservoir system driven by natural energy in lake outlet regions
CN103628447A (en) * 2013-12-19 2014-03-12 环境保护部南京环境科学研究所 Lake-port pre-reservoir treating system taking arc-shaped ecological diversion dike as characteristic
CN103924551A (en) * 2014-04-25 2014-07-16 环境保护部南京环境科学研究所 Pre-dam processing system characterized in landscape integration

Also Published As

Publication number Publication date
CN103924551B (en) 2016-06-15
CN103924551A (en) 2014-07-16
KR20160146637A (en) 2016-12-21
KR102003419B1 (en) 2019-07-24

Similar Documents

Publication Publication Date Title
CN102992549B (en) Multilevel wetland purification system based on ecological base flow regulation
WO2015161811A1 (en) Pre-reservoir processing system characterized by landscape integration
CN105060637A (en) Method for constructing ecological purification system for substrate sludge-water polluted type shallow-narrow river
CN104926038B (en) A kind of biological and ecological composite handling arrangement for rural sewage treatment
CN101565674A (en) Low-nutrition scenedesmus and application thereof in sewage deep treatment
CN110040917A (en) A kind of the fast purification system and its processing method of black and odorous water
CN102134140A (en) Fore-reservoir system driven by natural energy in lake outlet regions
CN203144245U (en) Combined artificial wetland sewage treatment system suitable for medium and small towns
CN202988922U (en) Multistage wet land purifying system based on ecological basic flow regulation and control
CN102583764B (en) Combined packing multistage terrace type vertical flow constructed wetland sewage treatment method
CN110054365A (en) A kind of the bypass processing system and its processing method of black and odorous water
CN104098183B (en) The system of rainwash water quality is improved by optimizing view
CN206447733U (en) A kind of oil-containing sewage treatment system
CN219860850U (en) Novel ecological pool based on biological strengthening nitrogen and phosphorus purification function
CN204569552U (en) A kind of unpowered downstream riverbank artificial wet land water quality purification system
CN207498216U (en) Water process cleaning system
CN101891348B (en) Sewage treatment system for water shortage cities and storage and advanced treatment method of sewage and rainwater
CN203451289U (en) Wave type flow artificial wetland system by utilizing levee slope
CN204918308U (en) Ecological clean system in shallow narrow river of bed mud water pollution type
CN102557236B (en) Weak stream river side ditch repair system with pollutant reduction and landscape utilization functions
CN206033388U (en) Static landscape water body ecological management system in eutrophic city
CN108191063B (en) A kind of week conduction bacterium algae one microbiological fuel cell ecological water body purification system
CN206266389U (en) Biology drain treatment apparatus
CN204689826U (en) Advanced sewage treatment system
CN204689860U (en) A kind of high-density Thickener with inclined boards evenly join muddy water structure

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 15783052

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 20167003961

Country of ref document: KR

Kind code of ref document: A

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 15783052

Country of ref document: EP

Kind code of ref document: A1