WO2015149325A1 - 传输pusch的方法、用户设备和基站 - Google Patents

传输pusch的方法、用户设备和基站 Download PDF

Info

Publication number
WO2015149325A1
WO2015149325A1 PCT/CN2014/074725 CN2014074725W WO2015149325A1 WO 2015149325 A1 WO2015149325 A1 WO 2015149325A1 CN 2014074725 W CN2014074725 W CN 2014074725W WO 2015149325 A1 WO2015149325 A1 WO 2015149325A1
Authority
WO
WIPO (PCT)
Prior art keywords
subframe
uplink
uplink resource
control signaling
starting position
Prior art date
Application number
PCT/CN2014/074725
Other languages
English (en)
French (fr)
Inventor
栗忠峰
唐臻飞
王轶
Original Assignee
华为技术有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 华为技术有限公司 filed Critical 华为技术有限公司
Priority to PCT/CN2014/074725 priority Critical patent/WO2015149325A1/zh
Priority to CN201480003250.9A priority patent/CN105309024B/zh
Priority to CN201910810556.XA priority patent/CN110896346B/zh
Publication of WO2015149325A1 publication Critical patent/WO2015149325A1/zh

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L5/00Arrangements affording multiple use of the transmission path
    • H04L5/003Arrangements for allocating sub-channels of the transmission path
    • H04L5/0053Allocation of signaling, i.e. of overhead other than pilot signals
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W72/00Local resource management
    • H04W72/20Control channels or signalling for resource management

Definitions

  • Embodiments of the present invention relate to the field of wireless communications, and more particularly, to a method of transmitting a PUSCH, a user equipment, and a base station. Background technique
  • the uplink transmission of the Time Division Multiplex (TDD) system is time-multiplexed.
  • the TDD system of Long Term Evolution (LTE) defines seven uplink and downlink subframe ratios, as shown in Table 1.
  • the uplink and downlink subframe ratios can be applied to scenarios with different uplink and downlink service requirements.
  • D represents a downlink subframe
  • S represents a special subframe
  • U represents an uplink subframe. It can be seen from Table 1 that in the TDD system, some of the subframes in one radio frame are uplink subframes, and some subframes are downlink subframes. In other words, part of the duration of one radio frame is used for uplink transmission, and part of the duration is used for downlink transmission. This time division method causes the uplink throughput (data transmission amount per unit time) of the system to be small. Summary of the invention
  • the embodiment of the invention provides a method for transmitting a PUSCH, a user equipment and a base station, so as to increase the uplink throughput of the TDD system.
  • a method for transmitting a PUSCH including: receiving, in a current subframe, control signaling sent by a base station, where the control signaling is used to indicate that a PUSCH is transmitted; and determining, according to a subframe position of the current subframe, And transmitting, by the uplink resource, the uplink resource, where the uplink resource includes an uplink pilot time slot UpPTS, and transmitting, by the uplink resource, the PUSCH.
  • the uplink resource is one
  • the current subframe is a subframe n when an uplink and downlink subframe ratio is r, and the UpPTS is located.
  • the hybrid automatic retransmission request HARQ process corresponding to the PUSCH transmission is when the uplink and downlink subframe ratio is r
  • the uplink resource further includes an uplink subframe, and the uplink resource is a continuous uplink resource.
  • the uplink resource is an uplink resource when the uplink and downlink subframe ratio is 0, and the uplink resource includes 2 UpPTS and 6 uplink subframes.
  • the control signaling is a PDCCH or an EPDCCH
  • the current subframe is a subframe n
  • the current The subframe is a subframe m
  • the uplink resource is an uplink resource when the uplink and downlink subframe ratio is 1, and the uplink resource includes 2 UpPTS and 4 uplink subframes.
  • the control signaling is a PDCCH or an EPDCCH
  • the current subframe is a subframe n
  • the control signaling is a PDCCH or an EPDCCH
  • the current subframe is a subframe n
  • the current subframe is a subframe m
  • the uplink resource is an uplink resource when the uplink and downlink subframe ratio is 2, and the uplink resource includes 2 UpPTS and 2 uplink subframes.
  • the control signaling is a PDCCH or an EPDCCH
  • the current subframe is a subframe n
  • the uplink resource is an uplink resource when the uplink and downlink subframe ratio is 3, and the uplink resource includes 1 UpPTS and 3 uplink subframes.
  • the control signaling is a PDCCH or an EPDCCH
  • the current subframe is a subframe n
  • the current subframe is a subframe m
  • the control signaling is a PDCCH or an EPDCCH
  • the current subframe is a subframe n
  • the uplink resource is an uplink resource when the uplink and downlink subframe ratio is 4, and the uplink resource includes 1 UpPTS and 2 uplink subframes.
  • the control signaling is a PDCCH or an EPDCCH
  • the current subframe is a subframe n
  • the current subframe is a subframe m
  • the control signaling is a PDCCH or an EPDCCH
  • the current subframe is a subframe n
  • the current subframe is a subframe m
  • the uplink resource is an uplink resource when the uplink and downlink subframe ratio is 5, and the uplink resource includes 2 UpPTS and 2 uplink subframes.
  • control signaling is a PDCCH or an EPDCCH
  • the current subframe is a subframe n
  • the uplink resource is an uplink resource when the uplink and downlink subframe ratio is 6, and the uplink resource includes 2 UpPTS and 5 uplink subframes.
  • the control signaling is a PDCCH or an EPDCCH
  • the current subframe is a subframe n
  • the current The subframe is the subframe m
  • the control signaling is a PDCCH or an EPDCCH
  • the current subframe is a subframe n
  • the current subframe is a subframe m
  • the UpPTS in the uplink resource includes an extended UpPTS, where, when the extended UpPTS is located When the frame is inserted into the normal cyclic prefix CP, the number of symbols occupied by the extended UpPTS is ⁇ ⁇ (3, 10); when the extended subframe of the extended UpPTS is inserted into the extended CP, the symbol occupied by the extended UpPTS The number X ⁇ (3, 8).
  • a method for transmitting a PUSCH including: transmitting control signaling to a user equipment UE in a current subframe, where the control signaling is used to indicate that a PUSCH is transmitted; according to a subframe position where the current subframe is located, Determining an uplink resource for transmitting the PUSCH, where the uplink resource includes an uplink pilot time slot UpPTS; and receiving, by the uplink resource, the PUSCH.
  • the uplink resource is one UpPTS.
  • the current subframe is a subframe n when an uplink-downlink subframe ratio is r, where the UpPTS is located.
  • the hybrid automatic retransmission request HARQ process corresponding to the PUSCH transmission is when the uplink and downlink subframe ratio is r
  • the uplink resource further includes an uplink subframe, and the uplink resource is a continuous uplink resource.
  • the uplink resource is an uplink resource when the uplink and downlink subframe ratio is 0, and the uplink resource includes 2 UpPTS and 6 uplink subframes.
  • the control signaling is a PDCCH or an EPDCCH
  • the current subframe is a subframe n
  • the current subframe is the subframe m
  • the uplink resource is an uplink resource when the uplink and downlink subframe ratio is 1, and the uplink resource includes 2 UpPTS and 4 uplink subframes.
  • the control signaling is a PDCCH or an EPDCCH
  • the current subframe is a subframe n
  • the control signaling is a PDCCH or an EPDCCH
  • the current subframe is a subframe n
  • the current subframe is a subframe m
  • the uplink resource is an uplink resource when the uplink and downlink subframe ratio is 2, and the uplink resource includes 2 UpPTS and 2 uplink subframes.
  • the control signaling is a PDCCH or an EPDCCH
  • the current subframe is a subframe n
  • the uplink resource is an uplink resource when the uplink and downlink subframe ratio is 3, and the uplink resource includes 1 UpPTS and 3 uplink subframes.
  • the control signaling is a PDCCH or an EPDCCH
  • the current subframe is a subframe n
  • the current subframe is a subframe m
  • the control signaling is a PDCCH or an EPDCCH
  • the current subframe is a subframe n
  • the uplink resource is an uplink resource when the uplink and downlink subframe ratio is 4, and the uplink resource includes 1 UpPTS and 2 uplink subframes.
  • the control signaling is a PDCCH or an EPDCCH
  • the current subframe is a subframe n
  • the current subframe is a subframe m
  • the control signaling is a PDCCH or an EPDCCH
  • the current subframe is a subframe n
  • the current subframe is a subframe m
  • the uplink resource is an uplink resource when the uplink and downlink subframe ratio is 5, and the uplink resource includes 2 UpPTS and 2 uplink subframes.
  • control signaling is a PDCCH or an EPDCCH
  • the current subframe is a subframe n
  • the uplink resource is an uplink resource when the uplink and downlink subframe ratio is 6, and the uplink resource includes 2 UpPTS and 5 uplink subframes.
  • the control signaling is a PDCCH or an EPDCCH
  • the current subframe is a subframe n
  • the current subframe is the subframe m
  • the control signaling is a PDCCH or an EPDCCH
  • the current subframe is a subframe n
  • the current subframe is a subframe m
  • the UpPTS in the uplink resource includes an extended UpPTS, where, when the extended UpPTS is located When the frame is inserted into the normal cyclic prefix CP, the number of symbols occupied by the extended UpPTS is xe (3, 10); when the extended subframe of the extended UpPTS is inserted into the extended CP, the number of symbols occupied by the extended UpPTS X e (3, 8).
  • a user equipment including: a receiving unit, configured to receive control signaling sent by a base station in a current subframe, where the control signaling is used to indicate that a physical uplink shared channel PUSCH is transmitted; Receiving, by the receiving unit, a subframe position of the current subframe of the control signaling, determining an uplink resource used for transmitting the PUSCH, where the uplink resource includes an uplink pilot time slot UpPTS, and a transmission unit, configured to The uplink resource determined by the determining unit Transmitting the PUSCH.
  • the uplink resource is one
  • the current subframe is a subframe n when an uplink and downlink subframe ratio is r, and the UpPTS is located.
  • the hybrid automatic repeat request HARQ process corresponding to the PUSCH transmission is when the uplink and downlink subframe ratio is r
  • the uplink resource further includes an uplink subframe, and the uplink resource is a continuous uplink resource.
  • the uplink resource is an uplink resource when the uplink and downlink subframe ratio is 0, and the uplink resource includes 2 UpPTS and 6 uplink subframes.
  • the control signaling is a PDCCH or an EPDCCH
  • the current subframe is a subframe n
  • the current subframe is the subframe m
  • the uplink resource is an uplink resource when the uplink-downlink subframe ratio is 1, and the uplink resource includes two UpPTSs and four uplink subframes.
  • the control signaling is a PDCCH or an EPDCCH
  • the current subframe is a subframe n
  • the control signaling is a PDCCH or an EPDCCH
  • the current subframe is a subframe n
  • the current subframe is a subframe m
  • the uplink resource is an uplink resource when the uplink and downlink subframe ratio is 2, and the uplink resource includes 2 UpPTS and 2 uplink subframes.
  • the control signaling is a PDCCH or an EPDCCH
  • the current subframe is a subframe n
  • the uplink resource is an uplink resource when the uplink and downlink subframe ratio is 3, and the uplink resource includes 1 UpPTS and 3 uplink subframes.
  • the control signaling is a PDCCH or an EPDCCH
  • the current subframe is a subframe n
  • the current subframe is a subframe m
  • the control signaling is a PDCCH or an EPDCCH
  • the current subframe is a subframe n
  • the uplink resource is an uplink resource when the uplink and downlink subframe ratio is 4, and the uplink resource includes 1 UpPTS and 2 uplink subframes.
  • the control signaling is a PDCCH or an EPDCCH
  • the current subframe is a subframe n
  • the current subframe is a subframe m
  • the control signaling is a PDCCH or an EPDCCH
  • the current subframe is a subframe n
  • the current subframe is a subframe m
  • the uplink resource is an uplink resource when the uplink and downlink subframe ratio is 5, and the uplink resource includes 2 UpPTS and 2 uplink subframes.
  • control signaling is a PDCCH or an EPDCCH
  • the current subframe is a subframe n
  • the uplink resource is an uplink resource when the uplink and downlink subframe ratio is 6, and the uplink resource includes 2 UpPTS and 5 uplink subframes.
  • the control signaling is a PDCCH or an EPDCCH
  • the current subframe is a subframe n
  • the current subframe is the subframe m
  • the control signaling is a PDCCH or an EPDCCH
  • the current subframe is a subframe n
  • the current subframe is a subframe m
  • the UpPTS in the uplink resource includes an extended UpPTS, where, when the extended UpPTS is located When the frame is inserted into the normal cyclic prefix CP, the number of symbols occupied by the extended UpPTS is ⁇ ⁇ (3, 10); when the extended subframe of the extended UpPTS is inserted into the extended CP, the symbol occupied by the extended UpPTS The number X ⁇ (3, 8).
  • a base station including: a sending unit, configured to send control signaling to a user equipment UE in a current subframe, where the control signaling is used to indicate that a physical uplink shared channel PUSCH is transmitted;
  • the sending unit sends the subframe position of the current subframe in the control signaling, and determines an uplink resource used for transmitting the PUSCH, where the uplink resource includes an uplink pilot time slot UpPTS; Receiving the PUSCH by the uplink resource determined by the determining unit.
  • the uplink resource is one UpPTS.
  • the current subframe is a subframe n when an uplink-downlink subframe ratio is r, and the UpPTS is located.
  • the hybrid automatic retransmission request HARQ process corresponding to the PUSCH transmission is when the uplink and downlink subframe ratio is r
  • the uplink resource further includes an uplink subframe, and the uplink resource is a continuous uplink resource.
  • the uplink resource is an uplink resource when the uplink and downlink subframes are 0, and the uplink resource includes two UpPTSs and six uplink subframes.
  • the control signaling is a PDCCH or an EPDCCH
  • the current subframe is a subframe n
  • the current subframe is the subframe m
  • the uplink resource is an uplink resource when the uplink and downlink subframe ratio is 1, and the uplink resource includes 2 UpPTS and 4 uplink subframes.
  • the control signaling is a PDCCH or an EPDCCH
  • the current subframe is a subframe n
  • the control signaling is a PDCCH or an EPDCCH
  • the current subframe is a subframe n
  • the current subframe is a subframe m
  • the uplink resource is an uplink resource when the uplink and downlink subframe ratio is 2, and the uplink resource includes 2 UpPTS and 2 uplink subframes.
  • the control signaling is a PDCCH or an EPDCCH
  • the current subframe is a subframe n
  • the control signaling is the PHICH
  • the current subframe is the subframe m
  • the uplink resource is an uplink resource when the uplink and downlink subframe ratio is 3, and the uplink resource includes 1 UpPTS and 3 uplink subframes.
  • the control signaling is a PDCCH or an EPDCCH
  • the current subframe is a subframe n
  • the current subframe is a subframe m
  • the control signaling is a PDCCH or an EPDCCH
  • the current subframe is a subframe n
  • the uplink resource is an uplink resource when the uplink and downlink subframe ratio is 4, and the uplink resource includes 1 UpPTS and 2 uplink subframes.
  • the control signaling is a PDCCH or an EPDCCH
  • the current subframe is a subframe n
  • the current subframe is a subframe m
  • the control signaling is a PDCCH or an EPDCCH
  • the current subframe is a subframe n
  • the current subframe is a subframe m
  • the uplink resource is an uplink resource when the uplink and downlink subframes are 5, and the uplink resource includes 2 UpPTSs and 2 uplink subframes.
  • control signaling is a PDCCH or an EPDCCH
  • the current subframe is a subframe n
  • the uplink resource is an uplink resource when the uplink and downlink subframe ratio is 6, and the uplink resource includes 2 UpPTS and 5 uplink subframes.
  • the control signaling is a PDCCH or an EPDCCH
  • the current subframe is a subframe n
  • the current subframe is the subframe m
  • the control signaling is a PDCCH or an EPDCCH
  • the current subframe is a subframe n
  • the current subframe is a subframe m
  • the UpPTS in the uplink resource includes an extended UpPTS, where, when the extended UpPTS is located When the frame is inserted into the normal cyclic prefix CP, the number of symbols occupied by the extended UpPTS is ⁇ ⁇ (3, 10); when the extended subframe of the extended UpPTS is inserted into the extended CP, the symbol occupied by the extended UpPTS The number X e (3, 8).
  • the UpPTS is used for PUSCH transmission, which is equivalent to increasing the amount of uplink transmission in a unit time, thereby increasing the uplink throughput of the TDD system.
  • FIG. 1 is a schematic structural diagram of a special subframe.
  • FIG. 2 is a schematic flowchart of a method for transmitting a PUSCH according to an embodiment of the present invention.
  • FIG. 3 is a schematic flowchart of a method for transmitting a PUSCH according to an embodiment of the present invention.
  • FIG. 4 is a schematic block diagram of a user equipment according to an embodiment of the present invention.
  • FIG. 5 is a schematic block diagram of a base station according to an embodiment of the present invention.
  • FIG. 6 is a schematic block diagram of a user equipment according to an embodiment of the present invention.
  • FIG. 7 is a schematic block diagram of a base station according to an embodiment of the present invention. detailed description
  • the subframes of the TDD system can be divided into three categories: uplink subframes, downlink subframes, and special subframes. See Figure 1 for the structure of the special subframe.
  • the special subframe includes a Downlink Pilot Time Slot (DwPTS), a Guard Period (GP), and an Uplink Pilot Time Slot (UpPTS).
  • DwPTS Downlink Pilot Time Slot
  • GP Guard Period
  • UpPTS Uplink Pilot Time Slot
  • the DwPTS portion is used for downlink transmission, for example, control channel, data channel, synchronization signal, and transmission of pilot signals.
  • the GP part is used as a guard interval and no uplink and downlink transmission is performed.
  • the UpPTS part is used to transmit an uplink Sounding Reference Signal (SRS) or a Physical Random Access Channel (PRACH).
  • SRS Sounding Reference Signal
  • PRACH Physical Random Access Channel
  • the embodiment of the present invention uses the UpPTS to transmit a Physical Uplink Shared Channel (PUSCH), which is specifically discussed below with reference to the accompanying drawings.
  • PUSCH Physical Uplink Shared Channel
  • FIG. 2 is a schematic flowchart of a method for transmitting a PUSCH according to an embodiment of the present invention.
  • the method of FIG. 2 can be performed by a User Equipment (UE).
  • UE User Equipment
  • the UE includes, but is not limited to, a mobile station (MS, Mobile Station), a mobile terminal (Mobile Terminal), a mobile telephone (Mobile Telephone), a mobile phone (handset), and a portable device (ortable equipment).
  • the user equipment can pass through a radio access network (RAN, Radio Access Network) Communicating with one or more core networks, for example, the user equipment can be a mobile phone (or "cellular" phone), a computer with wireless communication capabilities, etc., and the user device can also be portable, pocket, handheld, computer Built-in or in-vehicle mobile device.
  • RAN Radio Access Network
  • the method of Figure 2 includes:
  • the current subframe herein may be a downlink subframe or a special subframe.
  • control signaling is carried in the DwPTS of the special subframe.
  • control signaling may be referred to as a Physical Downlink Control Channel (PDCCH) or an Enhanced Physical Downlink Control Channel (EPDCCH).
  • the control signaling may refer to Downlink Control Information (DCI) included in the PDCCH/EPDCCH, for example, DCI format 0 or DCI format 4.
  • DCI Downlink Control Information
  • the control signaling may be a Physical Hybrid Automatic Repeat Request Indicator Channel (PHICH).
  • PHICH Physical Hybrid Automatic Repeat Request Indicator Channel
  • the control signaling may include the PHICH and the PDCCH, that is, the PHICH and the PDCCH are simultaneously received in the current subframe.
  • the control signaling may include the PHICH and the EPDCCH, that is, the PHICH and the EPDCCH are simultaneously received in the current subframe.
  • control signaling is used to indicate that the transmission PUSCH may specifically refer to: control signaling scheduling PUSCH transmission; or, the control signaling triggers transmission of the PUSCH.
  • the step 220 may include: determining, according to the subframe position and the timing relationship of the current subframe, an uplink resource used for transmitting the PUSCH, where the timing relationship is used to indicate a subframe position of the current subframe and an uplink resource.
  • the timing relationship here can be pre-configured, and the subframe position can be a subframe number.
  • the foregoing uplink resource may include an UpPTS, and may also include an uplink subframe (or an normal subframe of an uplink).
  • the uplink resource may be an UpPTS in one special subframe.
  • the uplink resource may include UpPTS in multiple special subframes, such as including 2 UpPTSs located in one frame.
  • the uplink resource may include at least one UpPTS And at least one uplink subframe.
  • the multiple subframes may be referred to as binding subframes. The specific binding form and distribution location of the uplink resource, and the timing relationship between the PUSCH transmitted by the uplink resource and the control signaling (PDCCH/EPDCCH/PHICH) for triggering the PUSCH are described in detail.
  • the foregoing PUSCH may be one PUSCH or multiple PUSCHs, and the specific number of PUSCHs may be related to the length and distribution position of the uplink resources.
  • the uplink resource is one UpPTS
  • one PUSCH can be transmitted through the UpPTS.
  • the H no uplink resource includes multiple UpPTSs, and one or more PUSCHs may be transmitted through the multiple UpPTSs.
  • the uplink resource includes an UpPTS and an uplink subframe, and one PUSCH may be transmitted in the UpPTS, and one PUSCH may be transmitted in each uplink subframe.
  • one UpPTS and one uplink sub-location may be used.
  • the frames jointly transmit one PUSCH, and the remaining uplink subframes each transmit one PUSCH.
  • the UpPTS here may be an existing UpPTS or an extended UpPTS.
  • the number of Orthogonal Frequency Division Multiplexing (OFDM) symbols occupied by the extended UpPTS in the special subframe is larger than the number of OFDM symbols occupied by the existing UpPTS in the special subframe.
  • OFDM Orthogonal Frequency Division Multiplexing
  • the duration of the subframe includes a Cyclic Prefix (CP), and each OFDM symbol in the subframe has a CP.
  • CP Cyclic Prefix
  • normal CP one subframe contains 14 OFDM symbols; for an extended CP, one subframe includes 12 OFDM symbols.
  • the UpPTS of the existing special subframe has a maximum of only 2 OFDM symbols and does not support PUSCH transmission. Since the DwPTS has a length of at least 3 OFDM symbols in a special subframe, the GP length is at least 1 OFDM symbol.
  • the number of symbols occupied by the UpPTS can be expanded.
  • the extended UpPTS length is greater than 2 OFDM symbols and less than or equal to 10 OFDM symbols.
  • the extended UpPTS length is greater than 2 OFDM symbols and less than or equal to 8 OFDM symbols.
  • the increased number of symbols occupied by the extended UpPTS can further increase the resources used for uplink transmission, thereby further increasing the uplink throughput of the TDD system.
  • the UpPTS is used for PUSCH transmission, which is equivalent to increasing the amount of uplink transmission in a unit time, thereby increasing the uplink throughput of the TDD system.
  • the binding form and distribution location of the uplink resource, and the transmission of the uplink resource are described above.
  • the timing relationship between the PUSCH and the control signaling used to trigger the PUSCH can be varied, as will be The detailed description is made in conjunction with the tables and specific embodiments.
  • the uplink resource may be one UpPTS.
  • the PUSCH can be transmitted separately through one UpPTS.
  • one UpPTS here may be an existing UpPTS or an extended UpPTS.
  • the extended UpPTS length is greater than 2 OFDM symbols and less than or equal to 10 OFDM symbols.
  • the extended UpPTS length is greater than 2 OFDM symbols and less than or equal to 8 OFDM symbols.
  • the extended UpPTS includes an increase in OFDM symbols to better support the transmission of uplink data.
  • the time of the PDCCH or EPDCCH in the control signaling to the transmitted PUSCH is minimized while satisfying the minimum time processing requirement of the base station or the UE, such as 3 ms.
  • Round Trip Time value that is, the time the packet was first transmitted to retransmission
  • add as little extra RTT as possible.
  • the ratio of the uplink and downlink subframes is 0, and the current subframe is the subframe n, that is, the control signal is received in the subframe n.
  • the transmission of the UpPTS to the PUSCH may be implemented by using a newly added HARQ process.
  • the number of newly added HARQ processes is not specifically limited. Combined with the above design principles, two examples are given below: Case 1 and Case 2.
  • Case 1 adds two HARQ processes to the existing HARQ process. The RTT value of the newly added process is 10 ms.
  • Case 2 adds three HARQ processes to the existing HARQ process. The RTT value corresponding to the process is 15ms.
  • the new HARQ process can use the HARQ process reserved bits in the existing DCI to indicate or use the new bits in the DCI to indicate or multiplex existing bits in the DCI for indication or use RRC signaling to combine with DCI. Give instructions.
  • Table 2 An implementation when the ratio of uplink and downlink subframes is 0.
  • Table 2 shows the two new HARQ processes: HARQ process x and HARQ process y.
  • X is the PUSCH corresponding to the HARQ process X
  • Gx is the UL grant (PDCCH or EPDCCH) corresponding to the HARQ process x
  • Px is the PHICH corresponding to the HARQ process x
  • the HARQ process y is the same.
  • Table 2 shows the timing relationship of the HARQ process X and the HARQ process y in consecutive 4 frame times (frame t to frame t+3).
  • the corresponding PUSCH is transmitted in the following uplink resource: UpPTS of the subframe 6 of the frame t.
  • the corresponding PUSCH is transmitted in the following uplink resource: UpPTS of the subframe 1 of the frame t+1.
  • the existing system (UE or base station) can support 7 HARQ processes, where X and y can be new The HARQ process 8 and the HARQ process 9 are added.
  • the HARQ process corresponding to the PUSCH transmission may be a new HARQ process 8 or a HARQ process 9.
  • the PHICH may be feedback of the PUSCH transmitted in the subframe 1 or the subframe 6 before the subframe n.
  • Table 2 the transmission times of the two PUSCHs of each HARQ process differ by 10 ms, that is, the RTT value of each HARQ process is 10 ms, and the RTT value of the existing system is reused, and the existing protocol is changed little.
  • the time interval from the receipt of the control signaling to the transmission of the PUSCH is the minimum value that satisfies the minimum processing time (3 ms) of the UE or the base station, in such a manner. Can effectively reduce the transmission delay of data.
  • Table 3 An implementation when the ratio of uplink and downlink subframes is 0.
  • Table 3 is similar to Table 2, except that the corresponding embodiment of Table 3 introduces three HARQ processes:
  • HARQ process x HARQ process y and HARQ process z. It can be seen from Table 3 that, whether it is the HARQ process X, the HARQ process y or the HARQ process z, when the PHICH or the UL grant is received in the subframe 1 or 6, the corresponding PUSCH is transmitted in the following uplink resource resources: the subframe UpPTS of the 5th subframe after 1 or 6.
  • the difference between the two PUSCH transmission times of each HARQ process is 15 ms, that is, the RTT value of each HARQ process is 15 ms.
  • x, y, and z are only for convenience of description, and are not intended to limit specific parameters of the HARQ process.
  • the existing system (UE or base station) Supporting 7 HARQ processes, where x, y, and z can be newly added HARQ process 8, HARQ process 9 and HARQ process 10, respectively, in other words, the HARQ process corresponding to the PUSCH transmission may be a new HARQ process.
  • the time interval from the receipt of control signaling to the transmission of the PUSCH is the minimum value that satisfies the minimum processing time (3 ms) of the UE or the base station, and can be used in such a manner. Effectively reduce the transmission delay of data.
  • the uplink and downlink subframe ratio is 1, and the current subframe is the subframe n, that is, the control signal (PDCCH/EPDCCH/PHICH) is received in the subframe n.
  • one or more HARQ processes may be added to the UpPTS transmission PUSCH. It should be noted that the specific number of the HARQ process is not limited in the embodiment of the present invention.
  • the new HARQ process can be indicated or used by using the HARQ process reserved bits in the existing DCI.
  • the newly added bits in the DCI are indicated or multiplexed with existing bits in the DCI for indication or combined with DCI using RRC signaling. Table 4 shows an example of adding two HARQ processes.
  • Table 4 An implementation of the ratio of the uplink and downlink subframes to 1 is
  • Table 4 shows the two new HARQ processes: HARQ process x and HARQ process y.
  • X is the PUSCH corresponding to the HARQ process X
  • Gx is the UL grant (PDCCH or EPDCCH) corresponding to the HARQ process x
  • Px is the PHICH corresponding to the HARQ process x
  • the HARQ process y is the same.
  • Table 4 shows the timing relationship of the HARQ process X and the HARQ process y in consecutive 4 frame times (frame t to frame t+3).
  • the corresponding PUSCH is transmitted in the following uplink resources: UpPTS of the subframe 6 of the frame t.
  • the corresponding PUSCH is transmitted in the following uplink resources: UpPTS of the subframe 1 of the frame t+1.
  • the existing system (UE or base station) can support 4 HARQ processes, where X and y can be newly added HARQ process 5 and HARQ process 6, respectively, in other words, the above
  • the HARQ process corresponding to the PUSCH transmission may be a new HARQ process 5 or a HARQ process 6.
  • the newly added HARQ process can be indicated by using a reserved bit in the 3 bit indication of the HARQ process in the existing DCI.
  • the difference between the two PUSCH transmission times of each HARQ process is 10 ms, that is, the RTT value of the HARQ process is 10 ms, that is, the RTT value of each HARQ process is 10 ms, and the RTT value of the existing system is reused. Changes to existing protocols are small.
  • the time interval from the receipt of the control signaling to the transmission of the PUSCH is the minimum value that satisfies the minimum processing time (3 ms) of the UE or the base station, and uses such a The method can effectively reduce the transmission delay of data.
  • the uplink and downlink subframe ratio is 1, and the current subframe is the subframe n, that is, the control signal (PDCCH/EPDCCH/PHICH) is received in the subframe n.
  • Table 5 An implementation when the ratio of uplink and downlink subframes is 1.
  • Table 5 is similar to Table 4, except that the HARQ process of the corresponding embodiment of Table 5 and Table 4
  • the HARQ processes of the corresponding embodiments have different timing relationships. It can be seen from Table 5 that whether the HARQ process x, the HARQ process y or the HARQ process z, when the PHICH or the UL grant is received in the subframe 0 or 5, the corresponding PUSCH is transmitted in the following uplink resources: the subframe 0 Or UpPTS of the 6th subframe after 5.
  • the difference between the two PUSCH transmission times of each HARQ process is 10 ms, that is, the RTT value of the HARQ process is 10 ms.
  • the difference between the two PUSCH transmission times of each HARQ process is 10 ms, that is, the RTT value of the HARQ process is 10 ms, and the RTT value of the existing system is reused, and the existing protocol changes are small.
  • the time interval from the receipt of the control signaling to the transmission of the PUSCH is the minimum value that satisfies the minimum processing time (3 ms) of the UE or the base station, and uses such a The method can effectively reduce the transmission delay of data.
  • the receiving subframe of the control signaling of the newly added HARQ process avoids the receiving subframe of the control signaling of the existing HARQ process, and avoids adding a number of bits for distinguishing different HARQ processes in the control signaling. Reduce the overhead of control signaling.
  • the uplink and downlink subframe ratio is 2, and the current subframe is the subframe n, that is, the control signal is received in the subframe n.
  • a separate HARQ process may be allocated for the UpPTS transmission PUSCH.
  • the new HARQ process can use the HARQ process reserved bits in the existing DCI to indicate or use the new bits in the DCI to indicate or multiplex existing bits in the DCI for indication or use RRC signaling to combine with DCI.
  • RTT 10ms.
  • Table 6 An implementation when the ratio of uplink and downlink subframes is 2.
  • Table 6 shows the two new HARQ processes: HARQ process x and HARQ process y.
  • X represents the PUSCH corresponding to the HARQ process X
  • Gx represents the UL grant (PDCCH or EPDCCH) corresponding to the HARQ process x
  • Px represents the PHICH corresponding to the HARQ process x
  • the HARQ process y is the same.
  • Table 6 shows the timing relationship between the HARQ process X and the HARQ process y for four consecutive frame times (frame t to frame t+3).
  • the corresponding PUSCH is transmitted in the following uplink resources: UpPTS of the subframe 6 of the frame t.
  • the corresponding PUSCH is transmitted in the following uplink resource: UpPTS of the subframe 1 of the frame t+1.
  • the existing system (UE or base station) can support The two HARQ processes, where x and y can be the new HARQ process 3 and the HARQ process 4, respectively, in other words, the HARQ process corresponding to the PUSCH transmission may be the new HARQ process 3 or the HARQ process 4.
  • the newly added HARQ process can be indicated by using the reserved bits in the 3 bit indication of the HARQ process in the existing DCI.
  • the difference between the two PUSCH transmission times of each HARQ process is 10 ms, that is, the RTT value of the HARQ process is 10 ms, and the RTT value of the existing system is reused, and the existing protocol is changed little.
  • the time interval from receiving control signaling to transmitting PUSCH is the minimum value that satisfies the minimum processing time (3 ms) of the UE or the base station, and uses such a The method can effectively reduce the transmission delay of data.
  • the receiving subframe of the control signaling of the newly added HARQ process avoids the receiving subframe of the control signaling of the existing HARQ process, and avoids adding a number of bits for distinguishing different HARQ processes in the control signaling. Reduce the overhead of control signaling.
  • the uplink and downlink subframe ratio is 3, and the current subframe is the subframe n, that is, the control signaling is received in the subframe n.
  • a separate HARQ process may be allocated for the UpPTS transmission PUSCH.
  • RTT 10ms.
  • Table 7 An implementation when the ratio of uplink and downlink subframes is 3.
  • Table 7 shows the new 1 HARQ process: HARQ process x.
  • x represents the PUSCH corresponding to the HARQ process X
  • Gx represents the UL grant (PDCCH or EPDCCH) corresponding to the HARQ process x
  • Px represents the PHICH corresponding to the HARQ process x.
  • Table 7 shows the timing relationship of the HARQ process X in consecutive 4 frame times (frame t to frame t+3). For example, in the HARQ process X, when the PHICH and/or the UL grant are received in the subframe 7 of the frame t, the corresponding PUSCH is transmitted in the following uplink transmission resource: UpPTS of the subframe 1 of the frame t+1.
  • the existing system (UE or base station) can support 3 HARQ processes, where X can be a new HARQ process 4, in other words, the HARQ corresponding to the PUSCH transmission.
  • the process can be a new HARQ process 4.
  • the newly added HARQ process can be indicated by using a reserved bit in the 3 bit indication of the HARQ process in the existing DCI.
  • the two PUSCH transmission times of the HARQ process X differ by 10 ms, that is, the RTT value of the HARQ process is 10 ms, and the RTT value of the existing system is reused, and the existing protocol is changed little.
  • the time interval from the receipt of the control signaling to the transmission of the PUSCH is the minimum value that satisfies the minimum processing time (3 ms) of the UE or the base station, in such a manner. Can effectively reduce the transmission delay of data.
  • the receiving subframe of the control signaling of the newly added HARQ process avoids the receiving subframe of the control signaling of the existing HARQ process, and avoids adding a number of bits for distinguishing different HARQ processes in the control signaling. Reduce the overhead of control signaling.
  • the uplink and downlink subframe ratio is 4, and the current subframe is the subframe n, that is, the control signal (PDCCH/EPDCCH/PHICH) is received in the subframe n.
  • a separate HARQ process may be allocated for the UpPTS transmission PUSCH.
  • Table 8 An implementation when the ratio of uplink and downlink subframes is 4.
  • the PUSCH corresponding to the HARQ process X indicates the UL grant (PDCCH or EPDCCH) corresponding to the HARQ process x, and Px indicates the PHICH corresponding to the HARQ process x.
  • Table 8 shows the timing relationship of the HARQ process X in the continuous 4 frame time (frame t to frame t+3).
  • the corresponding PUSCH is transmitted in the following uplink resources: UpPTS of the subframe 1 of the frame t+1. It should be noted that the X here is only for convenience of description, and the specific parameters of the HARQ process are not limited.
  • the existing system (UE or base station) can support 2
  • the HARQ process, where X may be a new HARQ process 3, in other words, the HARQ process corresponding to the PUSCH transmission may be a new HARQ process 3.
  • the newly added HARQ process can be indicated by using the reserved bits in the 3 bit indication of the HARQ process in the existing DCI.
  • the two PUSCH transmission times of the HARQ process X differ by 10 ms, that is, the RTT value of the HARQ process is 10 ms, and the RTT value of the existing system is reused, and the existing protocol is changed little.
  • the time interval from the receipt of the control signaling to the transmission of the PUSCH is the minimum value that satisfies the minimum processing time (3 ms) of the UE or the base station, and uses such a The method can effectively reduce the transmission delay of data.
  • the receiving subframe of the control signaling of the newly added HARQ process avoids the receiving subframe of the control signaling of the existing HARQ process, and avoids adding a number of bits for distinguishing different HARQ processes in the control signaling. Reduce the overhead of control signaling.
  • the uplink and downlink subframe ratio is 5, and the current subframe is subframe n, which is subframe n, that is, the control signal (PDCCH/EPDCCH/PHICH) is received in subframe n.
  • Table 9 shows the new HARQ process: HARQ process x.
  • x represents the PUSCH corresponding to the HARQ process X
  • Gx represents the UL grant (PDCCH or EPDCCH) corresponding to the HARQ process x
  • Px represents the PHICH corresponding to the HARQ process x.
  • Table 9 shows the timing relationship of the HARQ process X for four consecutive frame times (frame t to frame t+3). For example, in the HARQ process X, when the PHICH and/or the UL grant are received in the subframe 7 of the frame t, the corresponding PUSCH is transmitted in the following uplink resources: the subframe 1 of the frame t+1.
  • the existing system (UE or base station) can support 1
  • the HARQ process, where x may be a new HARQ process 2, in other words, the HARQ process corresponding to the PUSCH transmission may be a new HARQ process 2.
  • the newly added HARQ process can be indicated by using the reserved bits in the 3 bit indication of the HARQ process in the existing DCI.
  • the difference between the two PUSCH transmission times of the HARQ process X is 10 ms, that is, the RTT value of the HARQ process is 10 ms, and the RTT value of the existing system is reused, and the existing protocol is The changes are small.
  • the time interval from the receipt of the control signaling to the transmission of the PUSCH is the minimum value that satisfies the minimum processing time (3 ms) of the UE or the base station, and uses such a The method can effectively reduce the transmission delay of data.
  • the receiving subframe of the control signaling of the newly added HARQ process avoids the receiving subframe of the control signaling of the existing HARQ process, and avoids adding a number of bits for distinguishing different HARQ processes in the control signaling. Reduce the overhead of control signaling.
  • the uplink and downlink subframe ratio is 6, and the current subframe is the subframe n is the subframe n, that is, the control signaling (PDCCH/EPDCCH/PHICH) is received in the subframe n.
  • a separate HARQ process may be allocated for the UpPTS transmission PUSCH.
  • the specific number of HARQ processes is not limited in the embodiment of the present invention.
  • Case 1 adds two HARQ processes based on the existing HARQ process. The corresponding RTT value is 10 ms. For details, see Table 10.
  • Case 2 is existing. Three HARQ processes are added to the existing HARQ process. The corresponding RTT value is 15 ms. See Table 11 for details.
  • Table 10 An implementation of the uplink and downlink subframe ratio of 6
  • Table 10 shows the two new HARQ processes: HARQ process x and HARQ process y.
  • x represents the PUSCH corresponding to the HARQ process X
  • Gx represents the UL grant (PDCCH or EPDCCH) corresponding to the HARQ process x
  • Px represents the PHICH corresponding to the HARQ process x
  • the HARQ process y is the same.
  • Table 10 shows the timing relationship between the HARQ process X and the HARQ process y for four consecutive frame times (frame t to frame t+3).
  • the corresponding PUSCH is transmitted in the following uplink resource: the subframe 6 of the frame t.
  • the corresponding PUSCH is transmitted in the following uplink resource: UpPTS of the subframe 1 of the frame t+1.
  • the existing system (UE or base station) can support 6 HARQ processes, where X and y may be new HARQ process 7 and HARQ process 8, respectively.
  • the HARQ process corresponding to the PUSCH transmission may be a new HARQ process 7 or a HARQ process 8.
  • the newly added HARQ process can be indicated by using the reserved bits in the 3 bit indication of the HARQ process in the existing DCI.
  • the time interval from the receipt of the control signaling to the transmission of the PUSCH is the minimum value that satisfies the minimum processing time (3 ms) of the UE or the base station, and uses such a The method can effectively reduce the transmission delay of data.
  • Table 11 is similar to Table 10, except that the corresponding embodiment of Table 11 introduces three HARQ processes: HARQ process x, HARQ process y and HARQ process z. It can be seen from Table 11 that whether the HARQ process x, the HARQ process y or the HARQ process z, when the PHICH or UL grant is received in the subframe 1 or 6, the corresponding PUSCH is transmitted in the following uplink resources: subframe 1 or
  • the difference between the two PUSCH transmission times of each HARQ process is 15 ms, that is, the RTT value of the HARQ process is 15 ms.
  • the X and y are only for convenience of description, and the specific parameters of the HARQ process are not limited.
  • the existing system UE or base station
  • the existing system can support 6 HARQ processes, where X, y, and z can be newly added HARQ process 7, HARQ process 8 and HARQ process 9, respectively, in other words, the HARQ process corresponding to the PUSCH transmission can be It is a new HARQ process 7, HARQ process 8 or HARQ process 9.
  • the time interval from receiving control signaling to transmitting PUSCH is the minimum value that satisfies the minimum processing time (3 ms) of the UE or the base station, and can be used in such a manner. Effectively reduce the transmission delay of data.
  • the above uses a single UpPTS to transmit PUSCH, which can effectively increase the uplink throughput of the TDD system.
  • the PUSCH can be transmitted by using UpPTS in combination with other uplink resources, as described below.
  • the uplink resource in the method of FIG. 2 further includes an uplink subframe, and the uplink resource is a continuous uplink resource.
  • the uplink resource includes both an UpPTS and an uplink subframe, and the uplink resource is implemented by binding the UpPTS and the uplink subframe.
  • Each UpPTS included in the uplink resource may be an UpPTS of an existing system or an extended UpPTS.
  • the extended UpPTS length is greater than 2 OFDM symbols and less than or equal to 10 OFDM symbols.
  • the extended UpPTS length is greater than 2 OFDM symbols and less than or equal to 8 OFDM symbols.
  • the extended UpPTS includes an increase in OFDM symbols to better support the transmission of upstream data.
  • the UpPTS is used for PUSCH transmission, which is equivalent to increasing the amount of uplink transmission in a unit time, thereby increasing the uplink throughput of the TDD system.
  • the PUSCH is transmitted in the manner that the UpPTS is bound to other uplink resources, which is equivalent to increasing the number of uplink data transmissions per unit time, thereby increasing the signal-to-noise ratio of uplink data reception, thereby increasing the uplink coverage.
  • consecutive uplink resources does not require that the uplink resources are consecutive in time, but that the uplink resources are either consecutive in time or non-uplink resources in the middle.
  • the non-uplink resources include: the downlink subframe, the DwPTS of the special subframe, or the GP row resource of the special subframe also fall within the protection scope of the embodiment of the present invention.
  • the method further includes: determining binding subframe configuration information, where the binding subframe configuration information may include: binding the number of subframes and/or uplink Information such as the location of resources.
  • the subframe configuration information may be pre-configured by the base station or the UE.
  • the determining the binding subframe configuration information may include: receiving, by the base station, signaling that carries the binding subframe configuration information.
  • the signaling may be a binding subframe initiation signaling, or may be a binding subframe number configuration signaling, for example, may be a Radio Resource Control (RRC). Signaling, Media Access Control (MAC) signaling or
  • the following principles can be considered in the design of the timing relationship of the HARQ process for transmitting the PUSCH, the binding form of the uplink resource, and the distribution location of the uplink resource:
  • Control signaling PDCCH or EPDCCH to the transmitted PUSCH time is minimized while meeting the minimum time processing requirements of the base station or UE, such as 3ms.
  • Each HARQ process tries to have the same number of UpPTSs.
  • the uplink and downlink subframes are 0, and the uplink resource includes 2 UpPTSs and 6 uplink subframes.
  • the uplink subframe may be located at the beginning of the uplink resource, or the UpPTS may be located at the beginning of the uplink resource.
  • the number of the HARQ process or the RTT value of the HARQ process may be multiple, which is not specifically limited in this embodiment of the present invention. Two specific implementations with an RTT value of 30ms are given below: Case 1 and Case 2. Other implementations of the embodiments of the present invention will be described in detail later.
  • Case 1 The uplink and downlink subframes are 0, the uplink resource includes 2 UpPTSs and 6 uplink subframes, the UpPTS is located at the beginning of the uplink resource, and the UL grant (PDCCH or EPDCCH) is received (or detected) in the subframe n. , and/or receive (or detect) the PHICH in the first subframe before subframe n.
  • the number of HARQ processes is 3 (ie, upper
  • the HARQ process corresponding to the transmission of the PUSCH is one of three HARQs when the ratio of the uplink and downlink subframes is 0, and/or the RTT value is 30 ms.
  • the number of HARQ processes is 3 (ie, upper)
  • the HARQ process corresponding to the transmission of the PUSCH is one of three HARQs when the ratio of the uplink and downlink subframes is 0, and/or the RTT value is 30 ms.
  • Table 12 An implementation when the ratio of uplink and downlink subframes is 0.
  • Table 12 shows three HARQ processes: HARQ process x, HARQ process y, and HARQ process z.
  • X represents a PUSCH corresponding to the HARQ process X
  • Gx represents a UL grant (PDCCH or EPDCCH) corresponding to the HARQ process x
  • Px represents a PHICH corresponding to the HARQ process x
  • the HARQ process y and the HARQ process z are the same.
  • Table 12 shows the uplink resources in the HARQ process x, the HARQ process y, and the HARQ process z for consecutive 6 frame times (frame t to frame t+5). Binding form, distribution location, and HARQ timing relationship.
  • the corresponding PUSCH is transmitted in the following uplink resources: in the frame t+2 UpPTS of subframe 1, subframe 2, subframe 3, subframe 4, UpPTS of subframe 6, subframe 7, subframe 8, and subframe 9.
  • the corresponding PUSCH is transmitted in the following uplink resources: the frame t UpPTS of subframe 1 in +3, subframe 2, subframe 3, subframe 4, UpPTS of subframe 6, subframe 7, subframe 8, and subframe 9.
  • the RTT values of the HARQ process x, the HARQ process y, and the HARQ process z are both 30 ms.
  • the uplink transmission starts in the subframe 1 of the frame t (the first of the frame t)
  • the position where the X appears, the start position of the next uplink transmission is the subframe 1 of the frame t+3 (the position where the first X of the frame t+3 appears), and the middle is separated by 30 ms.
  • the general transmission delay requirement is about 50 ms
  • the RTT value of the HARQ process is set to 30 ms, which can effectively increase the time diversity gain of the delay-sensitive service transmission.
  • the time interval from the receipt of the control signaling to the transmission of the PUSCH is the minimum value that satisfies the minimum processing time (3 ms) of the UE or the base station, and uses such a The method can effectively reduce the transmission delay of data.
  • the number of UpPTSs included in each HARQ process is the same, which reduces the complexity of coordinating the processing of each HARQ process by the system (UE or base station).
  • the transmission of the PUSCH is performed after receiving the PHICH and the UL grant, this is only an example, and it is not necessary to restrict the transmission of the PUSCH to be based on the receipt of the PHICH and the UL grant.
  • the location of the uplink resource for transmitting the PUSCH may also be found based only on the PHICH or UL grant.
  • the base station may only send the PHICH to the UE, and after receiving the PHICH, the UE may find the location of the uplink resource that transmits the PUSCH based on the subframe where the PHICH is located.
  • the base station sends the PHICH and the UL grant to the UE, but the UE fails to correctly receive the UL grant, and the UE can find the location of the uplink resource that transmits the PUSCH according to the subframe where the PHICH is received before.
  • the starting position of the uplink resource is determined to be located after the subframe m based on the subframe m.
  • the uplink and downlink subframes have a ratio of 0, and the uplink resources include 2 UpPTSs and 6 uplinks.
  • the frame, the UpPTS is not located at the beginning of the uplink resource, receives the UL grant (PDCCH or EPDCCH) in the subframe n, and/or receives the PHICH in the first subframe before the subframe n.
  • the other parameters in Case 2 may include:
  • the number of HARQ processes is 3 (that is, the HARQ process corresponding to the transmission of the foregoing PUSCH is one of three HARQ processes when the uplink and downlink subframe ratio is 0), and/or the RTT value is 30 ms. .
  • the general transmission delay requirement is about 50 ms, and the RTT value of the HARQ process is set to 30 ms, which can effectively increase the time diversity gain of the delay-sensitive service transmission.
  • the number of UpPTSs included in each HARQ process is the same, which reduces the complexity of coordinating the processing of each HARQ process by the system (UE or base station).
  • the PUSCH transmission is performed after receiving the PHICH and the UL grant, this is only an example, and it is not necessary to restrict the transmission of the PUSCH to be based on the receipt of the PHICH and the UL grant.
  • the location of the uplink resource for transmitting the PUSCH may also be found based only on the PHICH or UL grant.
  • the base station may only send the PHICH to the UE, and after receiving the PHICH, the UE may find the location of the uplink resource that transmits the PUSCH based on the subframe where the PHICH is located.
  • the base station sends the PHICH and the UL grant to the UE, but the UE fails to correctly receive the UL grant, and the UE can find the location of the uplink resource that transmits the PUSCH according to the subframe where the PHICH is received before.
  • the UE fails to correctly receive the UL grant, and the UE can find the location of the uplink resource that transmits the PUSCH according to the subframe where the PHICH is received before.
  • the PHICH is received in the subframe m, and the UL grant is not received or the UL grant is not correctly received
  • the starting position of the uplink resource is determined to be located after the subframe m based on the subframe m.
  • the uplink and downlink subframe ratio is 1, and the uplink resource includes 2 UpPTSs and 4 uplink subframes.
  • the uplink subframe may be located at the beginning of the uplink resource, and the UpPTS may be located at the beginning of the uplink resource.
  • the binding form of the uplink resource the number of bound subframes and/or the binding subframe distribution form (continuous distribution or discrete distribution, etc.) is determined, the number of HARQ processes or the RTT value of the HARQ process can be increased.
  • the embodiment of the present invention does not specifically limit this. Two specific implementations with an RTT value of 30ms are given below: Case 1 and Case 2.
  • the uplink and downlink subframes have a ratio of 1, and the uplink resource includes two UpPTSs and four uplink subframes.
  • the UpPTS is located at the start of the uplink resource, and receives the UL grant (PDCCH or EPDCCH) in the subframe n, and/or
  • the PHICH is received in the //th subframe before subframe n.
  • the other parameters in Case 1 may include:
  • the number of HARQ processes is 3 (that is, the HARQ process corresponding to the transmission of the foregoing PUSCH is one of three HARQ processes when the ratio of the uplink and downlink subframes is 1;), and/or the RTT value is 30ms, see Table 13 for details.
  • Table 13 An implementation when the ratio of uplink and downlink subframes is 1.
  • Table 13 shows three HARQ processes: HARQ process x, HARQ process y, and HARQ process z.
  • x is the PUSCH corresponding to the HARQ process X
  • Gx is the UL grant (PDCCH or EPDCCH) corresponding to the HARQ process x
  • Px is the PHICH corresponding to the HARQ process x
  • the HARQ process y is the same as the HARQ process z.
  • Table 13 shows the binding form, distribution position, and HARQ timing relationship of the uplink resources in the HARQ process x, the HARQ process y, and the HARQ process z in consecutive 6 frame times (frame t to frame t+5).
  • the corresponding PUSCH is transmitted in the following uplink resources: in the frame t+2 UpPTS of subframe 1 , subframe 2 , subframe 3 , UpPTS of subframe 6 , subframe 7 , and subframe 8 .
  • the corresponding PUSCH is transmitted in the following uplink resources: the frame t UpPTS of subframe 1 in +3, subframe 2, subframe 3, UpPTS of subframe 6, subframe 7, and subframe 8.
  • the RTT values of the HARQ process x, the HARQ process y, and the HARQ process z are both 30 ms.
  • the uplink transmission starts at the subframe 1 of the frame t (the position where the first X of the frame t appears), and the start position of the next uplink transmission is the subframe 1 of the frame t+3 (frame The position where the first X of t+3 appears) is separated by 30ms.
  • the general transmission delay requirement is about 50 ms
  • the RTT value of the HARQ process is set to 30 ms, which can effectively increase the time diversity gain of the delay-sensitive service transmission.
  • the time interval from the receipt of the control signaling to the transmission of the PUSCH is the minimum value that satisfies the minimum processing time (3 ms) of the UE or the base station, and uses such a The method can effectively reduce the transmission delay of data.
  • the number of UpPTSs included in each HARQ process is the same, which reduces the complexity of coordinating the processing of each HARQ process by the system (UE or base station).
  • the transmission of the PUSCH is performed after receiving the PHICH and the UL grant, this is only an example, and it is not necessary to restrict the transmission of the PUSCH to be based on the receipt of the PHICH and the UL grant.
  • the location of the uplink resource for transmitting the PUSCH may also be found based only on the PHICH or UL grant.
  • the base station may only send the PHICH to the UE, and after receiving the PHICH, the UE may find the location of the uplink resource that transmits the PUSCH based on the subframe where the PHICH is located.
  • the base station sends the PHICH and the UL grant to the UE, but the UE fails to correctly receive the UL grant, and the UE can find the transmission according to the subframe in which the PHICH is received before.
  • the location of the uplink resource that transmits the PUSCH Specifically, in Case 1, it is assumed that when the PHICH is received in the subframe m, and the UL grant is not received or the UL grant is not correctly received, the starting position of the uplink resource is determined to be located after the subframe m based on the subframe m.
  • the uplink and downlink subframes have a ratio of 1, and the uplink resource includes two UpPTSs and four uplink subframes.
  • the UpPTS is not located at the start position of the uplink resource, and receives the UL grant (PDCCH or EPDCCH) in the subframe n, and/ Or receive the PHICH in the first subframe before subframe n.
  • the other parameters in Case 2 may include:
  • the number of HARQ processes is 3 (that is, the HARQ process corresponding to the transmission of the foregoing PUSCH is one of three HARQ processes when the uplink and downlink subframe ratio is 0), and/or the RTT value is 30 ms. .
  • the general transmission delay requirement is about 50 ms, and the RTT value of the HARQ process is set to 30 ms, which can effectively increase the time diversity gain of the delay-sensitive service transmission.
  • the number of UpPTSs included in each HARQ process is the same, which reduces the complexity of coordinating the processing of each HARQ process by the system (UE or base station).
  • the PUSCH transmission is performed after receiving the PHICH and the UL grant, this is only an example, and it is not necessary to restrict the transmission of the PUSCH to be based on the receipt of the PHICH and the UL grant.
  • the location of the uplink resource for transmitting the PUSCH may also be found based only on the PHICH or UL grant.
  • the base station may only send the PHICH to the UE, and after receiving the PHICH, the UE may find the location of the uplink resource that transmits the PUSCH based on the subframe where the PHICH is located.
  • the base station sends the PHICH and the UL grant to the UE, but the UE fails to correctly receive the UL grant, and the UE can find the location of the uplink resource that transmits the PUSCH according to the subframe where the PHICH is received before.
  • the starting position of the uplink resource is determined to be located after the subframe m based on the subframe m.
  • the uplink and downlink subframe ratio is 2, and the uplink resource includes 2 UpPTSs and 2 uplink subframes.
  • the uplink subframe may be located at the beginning of the uplink resource, and the UpPTS may be located at the uplink.
  • the starting position of the resource may be 2
  • the number of the HARQ process or the RTT value of the HARQ process may be multiple, which is not specifically limited in this embodiment of the present invention. Two specific implementations with an RTT value of 30ms are given below: Case 1 and Case 2. Other implementations of the embodiments of the present invention will be described in detail later.
  • the uplink and downlink subframes have a ratio of 2, the uplink resource includes 2 UpPTSs and 2 uplink subframes, and the UpPTS is located at a start position of the uplink resource, and receives a UL grant (PDCCH and/or EPDCCH) in the subframe n, and / or receive the PHICH in the first subframe before subframe n.
  • the other parameters in Case 1 may include:
  • the number of HARQ processes is 3 (that is, the HARQ process corresponding to the transmission of the foregoing PUSCH is one of three HARQ processes when the ratio of the uplink and downlink subframes is 2;), and/or the RTT value is 30ms, see Table 14 for details.
  • Table 14 shows three HARQ processes: HARQ process x, HARQ process y, and HARQ process z.
  • x is the PUSCH corresponding to the HARQ process x
  • Gx is the UL grant (PDCCH or EPDCCH) corresponding to the HARQ process x
  • Px is the PHICH corresponding to the HARQ process x
  • the HARQ process y is the same as the HARQ process z.
  • Table 14 shows the binding form, distribution position, and HARQ timing relationship of the uplink resources in the HARQ process x, HARQ process y, and HARQ process z for six consecutive frames (frame t to frame t+5).
  • the corresponding PUSCH is transmitted in the following uplink resources: in the frame t+2 UpPTS of subframe 1, subframe 2, UpPTS of subframe 6, and subframe 7.
  • the corresponding PUSCH is transmitted in the following uplink resources: the frame t UpPTS of subframe 1 in +3, UpPTS of subframe 2, UpPTS of subframe 6, and subframe 7.
  • the RTT values of the HARQ process x, the HARQ process y, and the HARQ process z are both 30 ms.
  • the uplink transmission starts at the subframe 1 of the frame t (the position where the first X of the frame t appears), and the start position of the next uplink transmission is the subframe 1 of the frame t+3 (frame The position where the first X of t+3 appears) is separated by 30ms.
  • the general transmission delay requirement is about 50 ms
  • the RTT value of the HARQ process is set to 30 ms, which can effectively increase the time diversity gain of the delay-sensitive service transmission.
  • the time interval from the receipt of the control signaling to the transmission of the PUSCH is the minimum value that satisfies the minimum processing time (3 ms) of the UE or the base station, and uses such a The method can effectively reduce the transmission delay of data.
  • the number of UpPTSs included in each HARQ process is the same, which reduces the complexity of coordinating the processing of each HARQ process by the system (UE or base station).
  • the transmission of the PUSCH is performed after receiving the PHICH and the UL grant, this is only an example, and it is not necessary to restrict the transmission of the PUSCH to be based on the receipt of the PHICH and the UL grant.
  • the location of the uplink resource for transmitting the PUSCH may also be found based only on the PHICH or UL grant.
  • the base station may only send the PHICH to the UE, and after receiving the PHICH, the UE may find the PUSCH based on the subframe where the PHICH is located. The location of the upstream resource.
  • the base station sends the PHICH and the UL grant to the UE, but the UE fails to correctly receive the UL grant, and the UE can find the location of the uplink resource that transmits the PUSCH according to the subframe where the PHICH is received before.
  • the starting position of the uplink resource is determined to be located after the subframe m based on the subframe m.
  • the uplink and downlink subframe ratio is 3, and the uplink resource includes 1 UpPTS and 3 uplink subframes.
  • the uplink subframe may be located at the beginning of the uplink resource, and the UpPTS may be located at the beginning of the uplink resource.
  • the number of the HARQ process or the RTT value of the HARQ process may be multiple, which is not specifically limited in this embodiment of the present invention. Two specific implementations with an RTT value of 30ms are given below: Case 1 and Case 2. Other implementations of the embodiments of the present invention will be described in detail later.
  • the uplink and downlink subframes have a ratio of 3, and the uplink resource includes one UpPTS and three uplink subframes, and the UpPTS is located at a start position of the uplink resource, and receives a UL grant (PDCCH and/or EPDCCH) in the subframe n, and / or receive the PHICH in the first subframe before subframe n.
  • the other parameters in Case 1 may include:
  • the number of HARQ processes is 3 (that is, the HARQ process corresponding to the transmission of the foregoing PUSCH is one of three HARQ processes when the uplink and downlink subframes are 3), and/or the RTT value is 30 ms. See Table 15 for details.
  • Table 15 An implementation when the ratio of uplink and downlink subframes is 3.
  • Table 15 shows three HARQ processes: HARQ process x, HARQ process y, and HARQ process z.
  • X is the PUSCH corresponding to the HARQ process X
  • Gx is the UL grant (PDCCH or EPDCCH) corresponding to the HARQ process x
  • Px is the PHICH corresponding to the HARQ process x
  • the HARQ process y is the same as the HARQ process z.
  • Table 15 shows the binding form, distribution position, and HARQ timing relationship of the uplink resources in the HARQ process x, the HARQ process y, and the HARQ process z for six consecutive frames (frame t to frame t+5).
  • the corresponding PUSCH is transmitted in the following uplink resources: in the frame t+2 UpPTS, subframe 2, subframe 3, and subframe 4 of subframe 1.
  • the corresponding PUSCH is transmitted in the following uplink resources: the frame t UpPTS, subframe 2, subframe 3, and subframe 4 of subframe 1 in +3.
  • the RTT values of the HARQ process x, the HARQ process y, and the HARQ process z are both 30 ms.
  • the uplink transmission starts at the subframe 1 of the frame t (the position where the first X of the frame t appears), and the start position of the next uplink transmission is the subframe 1 of the frame t+3 (frame The position where the first X of t+3 appears) is separated by 30ms.
  • the general transmission delay requirement is about 50 ms
  • the RTT value of the HARQ process is set to 30 ms, which can effectively increase the time diversity gain of the delay-sensitive service transmission.
  • each HARQ process from receiving control signaling to transmitting PUSCH
  • the interval time is the minimum value that satisfies the minimum processing time (3ms) of the UE or the base station. In this way, the data transmission delay can be effectively reduced.
  • the number of UpPTSs included in each HARQ process is the same, which reduces the complexity of the system (UE or base station) coordinating the processing of each HARQ process.
  • the transmission of the PUSCH is performed after receiving the PHICH and the UL grant, this is only an example, and it is not necessary to restrict the transmission of the PUSCH to be based on the receipt of the PHICH and the UL grant.
  • the location of the uplink resource for transmitting the PUSCH may also be found based only on the PHICH or UL grant.
  • the base station may only send the PHICH to the UE, and after receiving the PHICH, the UE may find the location of the uplink resource that transmits the PUSCH based on the subframe where the PHICH is located.
  • the base station sends the PHICH and the UL grant to the UE, but the UE fails to correctly receive the UL grant, and the UE can find the location of the uplink resource that transmits the PUSCH according to the subframe where the PHICH is received before.
  • the starting position of the uplink resource is determined to be located after the subframe m based on the subframe m.
  • the uplink and downlink subframes have a ratio of 3, and the uplink resource includes two UpPTSs and two uplink subframes.
  • the UpPTS is not located at the start position of the uplink resource, and receives the UL grant (PDCCH and/or EPDCCH) in the subframe n. And/or receive the PHICH in the //th subframe before subframe n.
  • the other parameters in Case 2 may include:
  • the number of HARQ processes is 3 (that is, the HARQ process corresponding to the transmission of the foregoing PUSCH is one of three HARQ processes when the ratio of the uplink and downlink subframes is 3;), and/or the RTT value is 30ms, see Table 16 for details.
  • Table 16 An implementation when the ratio of the uplink and downlink subframes is 3.
  • Table 16 shows three HARQ processes: HARQ process x, HARQ process y, and HARQ process z.
  • X is the PUSCH corresponding to the HARQ process X
  • Gx is the UL grant (PDCCH or EPDCCH) corresponding to the HARQ process x
  • Px is the PHICH corresponding to the HARQ process x
  • the HARQ process y is the same as the HARQ process z.
  • Table 16 shows the binding form, distribution position, and HARQ timing relationship of the uplink resources in the HARQ process x, HARQ process y, and HARQ process z for six consecutive frames (frame t to frame t+5).
  • the corresponding PUSCH is transmitted in the following uplink resources: in the frame t+2 Subframe 3 and subframe 4, UpPTS and subframe 2 of subframe 1 of frame t+3.
  • the corresponding PUSCH is transmitted in the following uplink resources: the frame t Subframe 3 and subframe 4 in +3, UpPTS and subframe 2 of subframe 1 in frame t+4.
  • the RTT values of the HARQ process x, the HARQ process y, and the HARQ process z are both 30 ms.
  • the uplink transmission starts at the subframe 3 of the frame t (the position where the first X of the frame t appears), and the start position of the next uplink transmission is the subframe 3 of the frame t+3 (frame The position where the first X of t+3 appears) is separated by 30ms.
  • the general transmission delay requirement is about 50 ms, and the RTT value of the HARQ process is set to 30ms can effectively increase the time diversity gain of this delay-sensitive service transmission.
  • the time interval from the receipt of the control signaling to the transmission of the PUSCH is the minimum value that satisfies the minimum processing time (3 ms) of the UE or the base station, and uses such a The method can effectively reduce the transmission delay of data.
  • the number of UpPTSs included in each HARQ process is the same, which reduces the complexity of the system (UE or base station) coordinating the processing of each HARQ process.
  • the PUSCH transmission is performed after receiving the PHICH and the UL grant, this is only an example, and it is not necessary to restrict the transmission of the PUSCH to be based on the receipt of the PHICH and the UL grant.
  • the location of the uplink resource for transmitting the PUSCH may also be found based only on the PHICH or UL grant.
  • the base station may only send the PHICH to the UE, and after receiving the PHICH, the UE may find the location of the uplink resource that transmits the PUSCH based on the subframe where the PHICH is located.
  • the base station sends the PHICH and the UL grant to the UE, but the UE fails to correctly receive the UL grant, and the UE can find the location of the uplink resource that transmits the PUSCH according to the subframe where the PHICH is received before.
  • the starting position of the uplink resource is determined to be located after the subframe m based on the subframe m.
  • the uplink and downlink subframe ratio is 4, and the uplink resource includes 1 UpPTS and 2 uplink subframes.
  • the uplink subframe may be located at the beginning of the uplink resource, and the UpPTS may be located at the beginning of the uplink resource.
  • the number of the HARQ process or the RTT value of the HARQ process may be multiple, which is not specifically limited in this embodiment of the present invention. Two specific implementations with an RTT value of 30ms are given below: Case 1 and Case 2. Other implementations of the embodiments of the present invention will be described in detail later.
  • the uplink and downlink subframes have a ratio of 4, and the uplink resource includes one UpPTS and two uplink subframes, and the UpPTS is located at a start position of the uplink resource, and receives a UL grant (PDCCH and/or EPDCCH) in the subframe n, and / or receive the PHICH in the first subframe before subframe n.
  • the number of HARQ processes is 3 (that is, the transmission of the above PUSCH corresponds to The HARQ process is one of three HARQ processes when the uplink and downlink subframes are matched, and/or the RTT value is 30 ms. For details, see Table 17.
  • Table 17 An implementation when the ratio of uplink and downlink subframes is 4.
  • Table 17 shows three HARQ processes: HARQ process x, HARQ process y, and HARQ process z.
  • X represents a PUSCH corresponding to the HARQ process X
  • Gx represents a UL grant (PDCCH or EPDCCH) corresponding to the HARQ process x
  • Px represents a PHICH corresponding to the HARQ process x
  • the HARQ process y and the HARQ process z are the same.
  • Table 17 shows the uplink resources in the HARQ process x, the HARQ process y, and the HARQ process z in consecutive 6 frame times (frame t to frame t+5). Binding form, distribution location, and HARQ timing relationship.
  • the corresponding PUSCH is transmitted in the following uplink resources: frame t+ UpPTS, subframe 2, and subframe 3 of subframe 1 in 5.
  • the corresponding PUSCH is transmitted in the following uplink resources: frame t+3 UpPTS, subframe 2, and subframe 3 of subframe 1 in the middle.
  • the RTT values of the HARQ process x, the HARQ process y, and the HARQ process z are both 30 ms.
  • the uplink transmission starts at the subframe 1 of the frame t (the position where the first X of the frame t appears), and the start position of the next uplink transmission is the subframe 1 of the frame t+3 (frame The position where the first X of t+3 appears) is separated by 30ms.
  • the general transmission delay requirement is about 50 ms
  • the RTT value of the HARQ process is set to 30 ms, which can effectively increase the time diversity gain of the delay-sensitive service transmission.
  • the time interval from the receipt of the control signaling to the transmission of the PUSCH is the minimum value that satisfies the minimum processing time (3 ms) of the UE or the base station, and uses such a The method can effectively reduce the transmission delay of data.
  • the number of UpPTSs included in each HARQ process is the same, which reduces the complexity of coordinating the processing of each HARQ process by the system (UE or base station).
  • the transmission of the PUSCH is performed after receiving the PHICH and the UL grant, this is only an example, and it is not necessary to restrict the transmission of the PUSCH to be based on the receipt of the PHICH and the UL grant.
  • the location of the uplink resource for transmitting the PUSCH may also be found based only on the PHICH or UL grant.
  • the base station may only send the PHICH to the UE, and after receiving the PHICH, the UE may find the location of the uplink resource that transmits the PUSCH based on the subframe where the PHICH is located.
  • the base station sends the PHICH and the UL grant to the UE, but the UE fails to correctly receive the UL grant, and the UE can find the location of the uplink resource that transmits the PUSCH according to the subframe where the PHICH is received before.
  • the starting position of the uplink resource is determined to be located after the subframe m based on the subframe m.
  • the uplink and downlink subframes have a ratio of 4, and the uplink resource includes one UpPTS and two uplink subframes.
  • the UpPTS is not located at the start position of the uplink resource, and receives the UL grant (PDCCH) in the subframe n.
  • And/or EPDCCH), and/or the PHICH is received in the //th subframe before subframe n.
  • the other parameters in Case 2 may include:
  • the number of HARQ processes is 3 (that is, the HARQ process corresponding to the transmission of the foregoing PUSCH is one of 3 HARQ processes when the uplink and downlink subframes are 4), and/or the RTT value is 30 ms. .
  • the general transmission delay requirement is about 50 ms
  • the RTT value of the HARQ process is set to 30 ms, which can effectively increase the time diversity gain of the delay-sensitive service transmission.
  • the time interval from the receipt of the control signaling to the transmission of the PUSCH is the minimum value that satisfies the minimum processing time (3 ms) of the UE or the base station, and the data transmission can be effectively reduced in this manner. Delay.
  • the number of UpPTSs included in each HARQ process is the same, which reduces the complexity of coordinating the processing of each HARQ process by the system (UE or base station).
  • the PUSCH transmission is performed after receiving the PHICH and the UL grant, this is only an example, and it is not necessary to restrict the transmission of the PUSCH to be based on the receipt of the PHICH and the UL grant.
  • the location of the uplink resource for transmitting the PUSCH may also be found based only on the PHICH or UL grant.
  • the base station may only send the PHICH to the UE, and after receiving the PHICH, the UE may find the location of the uplink resource that transmits the PUSCH based on the subframe where the PHICH is located.
  • the base station sends the PHICH and the UL grant to the UE, but the UE fails to correctly receive the UL grant, and the UE can find the location of the uplink resource that transmits the PUSCH according to the subframe where the PHICH is received before.
  • the starting position of the uplink resource is determined to be located after the subframe m based on the subframe m.
  • the uplink and downlink subframe ratio is 6, and the uplink resource includes two.
  • UpPTS and 5 uplink subframes are located at the beginning of the uplink resource, and the UpPTS may be located at the beginning of the uplink resource.
  • the number of the HARQ process or the RTT value of the HARQ process may be multiple, which is not specifically limited in this embodiment of the present invention. Two specific implementations with an RTT value of 30ms are given below: Case 1 and Case 2. Following-up Other implementation manners of the embodiments of the present invention are described in detail.
  • the uplink and downlink subframes have a ratio of 6, and the uplink resource includes two UpPTSs and five uplink subframes.
  • the UpPTS is located at the beginning of the uplink resource, and receives the UL grant (PDCCH or EPDCCH) in the subframe n, and/or The first subframe before subframe n receives the PHICH.
  • the other parameters in Case 1 may include:
  • the number of HARQ processes is 3 (that is, the HARQ process corresponding to the transmission of the foregoing PUSCH is one of the processes of the uplink and downlink subframe ratio of 6 HARQ (3 is the total number of HARQ processes)) , and / or RTT value is 30ms, see Table 18 for details.
  • Table 18 An implementation when the ratio of uplink and downlink subframes is 6.
  • ULgrant Gy Gx PUSCH zzzzzzzyyyyyyyyyy Table 18 shows three HARQ processes: HARQ process x, HARQ process y, and HARQ process z.
  • x is the PUSCH corresponding to the HARQ process x
  • Gx is the UL grant (PDCCH or EPDCCH) corresponding to the HARQ process x
  • Px is the PHICH corresponding to the HARQ process x
  • the HARQ process y is the same as the HARQ process z.
  • Table 18 shows the binding form, distribution position, and HARQ timing relationship of the uplink resources in the HARQ process x, the HARQ process y, and the HARQ process z in consecutive 6 frame times (frame t to frame t+5).
  • the HARQ process y when the PHICH is received in the subframe 5 of the frame t+1, and the UL grant is received in the subframe 5 of the frame t+1, the corresponding PUSCH is transmitted in the following uplink resources: frame t+ UpPTS of subframe 1 in 2, subframe 2, subframe 3, subframe 4, UpPTS of subframe 6, subframe 7, and subframe 8.
  • the corresponding PUSCH is transmitted in the following uplink resources: the frame t UpPTS of subframe 1 in +3, subframe 2, subframe 3, subframe 4, UpPTS of subframe 6, subframe 7, and subframe 8.
  • the RTT values of the HARQ process x, the HARQ process y, and the HARQ process z are both 30 ms.
  • the uplink transmission starts at the subframe 1 of the frame t (the position where the first X of the frame t appears), and the start position of the next uplink transmission is the subframe 1 of the frame t+3 (frame The position where the first X of t+3 appears) is separated by 30ms.
  • the general transmission delay requirement is about 50 ms
  • the RTT value of the HARQ process is set to 30 ms, which can effectively increase the time diversity gain of the delay-sensitive service transmission.
  • the time interval from the receipt of the control signaling to the transmission of the PUSCH is the minimum value that satisfies the minimum processing time (3 ms) of the UE or the base station, and uses such a The method can effectively reduce the transmission delay of data.
  • the number of UpPTSs included in each HARQ process is the same, which reduces the complexity of coordinating the processing of each HARQ process by the system (UE or base station).
  • the transmission of the PUSCH is performed after receiving the PHICH and the UL grant, this is only an example, and it is not necessary to restrict the transmission of the PUSCH to be based on the receipt of the PHICH and the UL grant.
  • the location of the uplink resource for transmitting the PUSCH may also be found based only on the PHICH or UL grant.
  • the base station may only send the PHICH to the UE, and after receiving the PHICH, the UE may find the location of the uplink resource that transmits the PUSCH based on the subframe where the PHICH is located.
  • the base station sends the PHICH and the UL grant to the UE, but the UE does not.
  • the UE can correctly receive the UL grant, and the UE can find the location of the uplink resource that transmits the PUSCH according to the subframe in which the PHICH is received before.
  • the starting position of the uplink resource is determined to be located after the subframe m based on the subframe m.
  • the uplink and downlink subframe ratio is 6, and the uplink resource includes two UpPTSs and five uplink subframes.
  • the UpPTS is not located at the start position of the uplink resource, and receives the UL grant (PDCCH or EPDCCH) in the subframe n, and / Or receive the PHICH in the first subframe before subframe n.
  • the other parameters in the Case 2 may include: the number of HARQ processes is 3 (that is, the HARQ process corresponding to the transmission of the foregoing PUSCH is one of 3 HARQ (3 is the total number of HARQ processes) in the uplink and downlink subframe ratio of 6; ), and / or RTT value is 30ms.
  • the general transmission delay requirement is about 50 ms
  • the RTT value of the HARQ process is set to 30 ms, which can effectively increase the time diversity gain of the delay-sensitive service transmission.
  • the time interval from the receipt of the control signaling to the transmission of the PUSCH is the minimum value that satisfies the minimum processing time (3 ms) of the UE or the base station, and the data transmission can be effectively reduced in this manner. Delay.
  • the number of UpPTSs included in each HARQ process is the same, which reduces the complexity of coordinating the processing of each HARQ process by the system (UE or base station).
  • the PUSCH transmission is performed after receiving the PHICH and the UL grant, this is only an example, and it is not necessary to restrict the transmission of the PUSCH to be based on the receipt of the PHICH and the UL grant.
  • the location of the uplink resource for transmitting the PUSCH may also be found based only on the PHICH or UL grant.
  • the base station may only send the PHICH to the UE, and after receiving the PHICH, the UE may find the location of the uplink resource that transmits the PUSCH based on the subframe where the PHICH is located.
  • the base station sends the PHICH and the UL grant to the UE, but the UE fails to correctly receive the UL grant, and the UE can find the location of the uplink resource that transmits the PUSCH according to the subframe where the PHICH is received before.
  • the starting position of the uplink resource is determined to be located after the subframe m based on the subframe m.
  • the n, k, and Z values show the relative positions of the PHICH, the UL grant, and the uplink resource in each HARQ process, where k indicates that the PUSCH is transmitted starting from the kth subframe after the subframe n.
  • the reference time is used to describe the time when the control signaling (PHICH and/or UL grant) is transmitted to the uplink resource of the PUSCH.
  • Which subframe in the uplink resource is used as a reference. Specifically, the subframe in which the start position of the uplink resource is located may be used as a reference.
  • the UpPTS is located at the beginning of the uplink resource, and the special subframe where the UpPTS is located can be used as a reference, and the receiving end can directly find the starting position of the uplink resource according to the reference time.
  • the first uplink subframe of the uplink resource may be used as a reference.
  • the receiving end can estimate the starting position of the uplink resource according to the reference time and the uplink and downlink subframe ratio. It should be understood that the determination of the above reference time is merely an example. In practice, any other subframe of the uplink resource may also be used as a reference.
  • the foregoing provides some implementations of the binding manner, the distribution location, and the timing relationship of the uplink subframes corresponding to the uplink and downlink subframes in the case where the RTT value is 30 ms, but the embodiment of the present invention is not limited thereto.
  • the following describes the other implementation manners of the binding mode, the distribution location, and the timing relationship of the uplink subframes in the uplink and downlink subframe ratios.
  • UL grant PDCCH or EPDCCH
  • Table 19 An implementation when the ratio of uplink and downlink subframes is 0.
  • Table 19 shows seven HARQ processes: HARQ Process 1 to HARQ Process 7.
  • 1 indicates a PUSCH corresponding to the HARQ process 1
  • G1 indicates a UL grant (PDCCH or EPDCCH) corresponding to the HARQ process 1
  • P1 indicates a PHICH corresponding to the HARQ process 1
  • HARQ processes 2 to 7 are the same.
  • Table 19 shows the binding form, the distributed position, and the HARQ timing relationship of the uplink resources in the HARQ process 1 to the HARQ process 7 in the continuous 6 frame time (frame t to frame t+5).
  • the corresponding PUSCH is transmitted in the following uplink resources: UpPTS and subframe 7 of subframe 6 in frame t.
  • the corresponding PUSCH is transmitted in the following uplink resources. : UpPTS and subframe 2 of subframe 1 in frame t+1. Similar results can be obtained from the table for other processes.
  • the uplink and downlink subframes are matched by 0, and the uplink resources include: 2 UpPTSs in the 1 frame.
  • the uplink and downlink subframes are matched by 0, and one UpPTS is bound to four uplink subframes.
  • the UpPTS is located in the middle of the uplink resource (or not at the beginning of the uplink resource), receives the UL grant (PDCCH or EPDCCH) in the subframe n, and/or receives the PHICH in the subframe before the subframe n.
  • the other parameters in the implementation manner may further include: the number of the HARQ processes is 3 (that is, the HARQ process corresponding to the foregoing PUSCH transmission is in the process of the uplink and downlink subframe ratio is 0, 3 HARQs (3 is the total number of HARQ processes) One).
  • Table 20 An implementation when the ratio of uplink and downlink subframes is 0.
  • Table 20 shows three HARQ processes: HARQ process x, HARQ process y, and HARQ process z.
  • x is the PUSCH corresponding to the HARQ process x
  • Gx is the UL grant (PDCCH or EPDCCH) corresponding to the HARQ process x
  • Px is the PHICH corresponding to the HARQ process x
  • the HARQ process y is the same as the HARQ process z.
  • Table 20 shows the binding form, distribution location, and HARQ timing relationship of the uplink resources in the HARQ process X and the HARQ process y for six consecutive frames (frame t to frame t+5).
  • the corresponding PUSCH is transmitted in the following uplink resources: frame t Sub-frame 4 in +1, UpPTS in sub-frame 6, sub-frame 7, sub-frame 8, and sub-frame 9.
  • the corresponding PUSCH is transmitted in the following uplink resources. : Sub-frame 4 in frame t+2, UpPTS in sub-frame 6, sub-frame 7, sub-frame 8, and sub-frame 9.
  • the uplink and downlink subframes are matched by 0, and one UpPTS is bound to four uplink subframes.
  • the UpPTS is located in the middle of the uplink resource (or not at the beginning of the uplink resource), receives the UL grant (PDCCH and/or EPDCCH) in the subframe n, and/or receives the PHICH in the subframe/subframe before the subframe n.
  • the other parameters in the implementation manner may include: the number of HARQ processes is 3 (that is, the HARQ process corresponding to the foregoing PUSCH transmission is in the process of the uplink and downlink subframe ratio is 0, 3 HARQs (3 is the total number of HARQ processes) One), and / or RTT value is 20ms. See Table 21 for details.
  • Table 21 An implementation when the ratio of uplink and downlink subframes is 0.
  • Table 21 shows three HARQ processes: HARQ process x, HARQ process y, and HARQ process z.
  • X is the PUSCH corresponding to the HARQ process X
  • Gx is the UL grant (PDCCH or EPDCCH) corresponding to the HARQ process x
  • Px is the PHICH corresponding to the HARQ process x
  • the HARQ process y is the same as the HARQ process z.
  • Table 21 shows the binding form, distribution position, and HARQ timing relationship of the uplink resources in the HARQ process X and the HARQ process y for six consecutive frames (frame t to frame t+5).
  • the corresponding PUSCH is transmitted in the following uplink resources: frame t Sub-frame 4 in +1, UpPTS in sub-frame 6, sub-frame 7, sub-frame 8, and sub-frame 9.
  • the corresponding PUSCH is transmitted in the following uplink resources. : Sub-frame 2, sub-frame 3, sub-frame 4, UpPTS and sub-frame 7 of sub-frame 6 in frame t+2.
  • the RTT value of each HARQ process is 20 ms
  • the RTT value of the existing system is used to change the existing protocol d.
  • Table 22 An implementation when the ratio of uplink and downlink subframes is 1.
  • Table 22 shows four HARQ processes: HARQ process x, HARQ process y, HARQ process z, HARQ process t.
  • x is the PUSCH corresponding to the HARQ process x
  • Gx is the UL grant (PDCCH or EPDCCH) corresponding to the HARQ process x
  • Px is the PHICH corresponding to the HARQ process x
  • the HARQ process y, the HARQ process z, and the HARQ process t are the same.
  • Table 22 shows the binding form, distribution position, and HARQ timing relationship of the uplink resources in the HARQ process x and the HARQ process z for consecutive 6 frame times (frame t to frame t+5).
  • the corresponding PUSCH is transmitted in the following uplink resources: UpPTS and subframe 7 of the subframe 6 in the frame t.
  • the corresponding PUSCH is transmitted in the following uplink resources: frame t+ UpPTS and subframe 2 of subframe 1 in 1.
  • the uplink and downlink subframe ratio is 1, and the two UpPTSs are bound to the four uplink subframes.
  • Other parameters in the implementation manner may include: the number of HARQ processes is 2, and/or the RTT value is 20 ms. See Table 23 for details.
  • Table 23 An implementation when the ratio of uplink and downlink subframes is 1.
  • Table 23 shows two HARQ processes: HARQ process x and HARQ process y.
  • x is the PUSCH corresponding to the HARQ process X
  • Gx is the UL grant (PDCCH or EPDCCH) corresponding to the HARQ process x
  • Px is the PHICH corresponding to the HARQ process x
  • the HARQ process y is the same.
  • Table 23 shows the binding form, distribution position, and HARQ timing relationship of the uplink resources in the HARQ process X and the HARQ process y for six consecutive frames (frame t to frame t+5).
  • the corresponding PUSCH is transmitted in the following uplink resources: frame t+1 UpPTS of subframe 1 in subframe 1, subframe 2, subframe 3, UpPTS of subframe 6, subframe 7 and subframe 8.
  • the corresponding PUSCH is transmitted in the following uplink resources. : UpPTS of subframe 1 in frame t+2, subframe 2, subframe 3, UpPTS of subframe 6, subframe 7 and subframe 8.
  • the time interval from the receipt of the control signaling to the transmission of the PUSCH is the minimum value that satisfies the minimum processing time (3 ms) of the UE or the base station. In this way, the transmission delay of the data can be effectively reduced. .
  • the RTT value of each HARQ process is 20 ms, and the RTT value of the existing system is used, and the modification to the existing protocol is small.
  • the uplink and downlink subframes are matched by 2, and one UpPTS is bound to the uplink subframe adjacent to the UpPTS.
  • the other parameters in the implementation manner may include: the number of HARQ processes is two (that is, the HARQ process corresponding to the transmission of the foregoing PUSCH is in the process of the uplink and downlink subframe ratio is 2 when 2 HARQs (2 is the total number of HARQ processes) One). See Table 24 for details.
  • Table 24 An implementation when the ratio of uplink and downlink subframes is 2.
  • Table 24 shows two HARQ processes: HARQ process x and HARQ process y.
  • X is the PUSCH corresponding to the HARQ process X
  • Gx is the UL grant (PDCCH or EPDCCH) corresponding to the HARQ process x
  • Px is the PHICH corresponding to the HARQ process x
  • the HARQ process y is the same.
  • Table 24 shows the binding form, distribution position, and HARQ timing relationship of the uplink resources in the HARQ process X and the HARQ process y for six consecutive frames (frame t to frame t+5).
  • the corresponding PUSCH is transmitted in the following uplink resources: in the frame t UpPTS and subframe 7 of subframe 6.
  • the corresponding PUSCH is transmitted in the following uplink resources: frame t+ UpPTS and subframe 2 of subframe 1 in 1.
  • Table 25 An implementation when the ratio of uplink and downlink subframes is 2.
  • Table 25 shows two HARQ processes: HARQ process x and HARQ process y.
  • X is the PUSCH corresponding to the HARQ process X
  • Gx is the UL grant (PDCCH or EPDCCH) corresponding to the HARQ process x
  • Px is the PHICH corresponding to the HARQ process x
  • the HARQ process y is the same.
  • Table 25 shows the HARQ process for six consecutive frames (frame t to frame t+5).
  • the binding form, distribution location, and HARQ timing relationship of the uplink resources in the X and HARQ processes y For example, in the HARQ process y, when the PHICH is received in the subframe 1 of the frame t, and/or when the UL grant is received in the subframe 1 of the frame t, the corresponding PUSCH is transmitted in the following uplink resources: UpPTS and subframe 7 of subframe 6. Similarly, in the HARQ process x, when the PHICH is received in the subframe 6 of the frame t, and/or the UL grant is received in the subframe 6 of the frame t, the corresponding PUSCH is transmitted in the following uplink resources: frame t+ UpPTS and subframe 2 of subframe 1 in 1.
  • the uplink and downlink subframes are matched by 2, 2 UpPTSs and 2 uplink subframes, and/or the first subframe before the subframe n receives the PHICH, and/or
  • Table 26 An implementation when the ratio of uplink and downlink subframes is 2.
  • Table 26 shows two HARQ processes: HARQ process x and HARQ process y.
  • X represents the PUSCH corresponding to the HARQ process X
  • Gx represents the UL grant (PDCCH or EPDCCH) corresponding to the HARQ process x
  • Px represents the PHICH corresponding to the HARQ process x
  • the HARQ process y the same reason.
  • Table 26 shows the binding form, distribution position, and HARQ timing relationship of the uplink resources in the HARQ process X and the HARQ process y in the continuous 6 frame time (frame t to frame t+5).
  • the corresponding PUSCH is transmitted in the following uplink resources: frame t+1 UpPTS of subframe 1 in subframe 1, subframe 2, UpPTS of subframe 6 and subframe 7.
  • the corresponding PUSCH is transmitted in the following uplink resources. : UpPTS of subframe 1 in frame t+2, subframe 2, UpPTS of subframe 6, and subframe 7.
  • the transmission of the PUSCH is performed after receiving the PHICH and the UL grant, this is only an example, and the transmission of the PUSCH is not limited to the requirement of receiving the PHICH and the UL grant. condition.
  • the location of the uplink resource for transmitting the PUSCH may also be found based only on the PHICH or UL grant.
  • the base station may only send the PHICH to the UE, and after receiving the PHICH, the UE may find the location of the uplink resource that transmits the PUSCH based on the subframe where the PHICH is located.
  • the base station sends the PHICH and the UL grant to the UE, but the UE fails to correctly receive the UL grant, and the UE can find the location of the uplink resource that transmits the PUSCH according to the subframe where the PHICH is received before.
  • the starting position of the uplink resource is determined to be located after the subframe m based on the subframe m.
  • the uplink and downlink subframes are matched by 3, and one UpPTS is bound to the uplink subframe adjacent to the UpPTS. See Table 27 for details.
  • Table 27 An implementation when the ratio of uplink and downlink subframes is 3.
  • Table 27 shows three HARQ processes: HARQ process x, HARQ process y, and HARQ process z.
  • X is the PUSCH corresponding to the HARQ process X
  • Gx is the UL grant (PDCCH or EPDCCH) corresponding to the HARQ process x
  • Px is the PHICH corresponding to the HARQ process x
  • the HARQ process y is the same as the HARQ process z.
  • Table 27 shows the binding form, distribution position, and HARQ timing relationship of the uplink resources in the HARQ process x, HARQ process y, and HARQ process z for six consecutive frames (frame t to frame t+5).
  • the corresponding PUSCH is transmitted in the following uplink resources: frame t+1 UpPTS and subframe 2 of subframe 1 in the middle.
  • the uplink and downlink subframes are matched by 3, 1 UpPTS, and 1 uplink subframe, and control signaling (UL grant (PDCCH or EPDCCH) and/or is received in subframe n.
  • UL grant PCCH or EPDCCH
  • Table 28 An implementation when the ratio of uplink and downlink subframes is 3.
  • Table 28 shows three HARQ processes: HARQ process x, HARQ process y, and HARQ process z.
  • X is the PUSCH corresponding to the HARQ process X
  • Gx is the UL grant (PDCCH or EPDCCH) corresponding to the HARQ process x
  • Px is the PHICH corresponding to the HARQ process x
  • the HARQ process y is the same as the HARQ process z.
  • Table 28 shows the binding form, distribution position, and HARQ timing relationship of the uplink resources in the HARQ process X for six consecutive frames (frame t to frame t+5).
  • the corresponding PUSCH is transmitted in the following uplink resources: frame t+1 UpPTS and subframe 2 of subframe 1 in the middle.
  • the uplink and downlink subframes are matched by 3, and one UpPTS and two uplink subframes are bound, and the RTT value is 20 ms.
  • Table 29 An implementation when the ratio of uplink and downlink subframes is 3.
  • Table 29 shows three HARQ processes: HARQ process x, HARQ process y, and HARQ process z.
  • X is the PUSCH corresponding to the HARQ process X
  • Gx is the UL grant (PDCCH or EPDCCH) corresponding to the HARQ process x
  • Px is the PHICH corresponding to the HARQ process x
  • the HARQ process y is the same as the HARQ process z.
  • Table 29 shows the binding form, distribution position, and HARQ timing relationship of the uplink resources in the HARQ process x, HARQ process y, and HARQ process z for six consecutive frames (frame t to frame t+5).
  • the corresponding PUSCH is transmitted in the following uplink resources: frame t UpPTS, subframe 2, and subframe 3 of subframe 1 in +2.
  • each HARQ process from receiving control signaling to transmission
  • the interval between PUSCHs is the minimum value under the premise of the minimum processing time (3ms) of the UE or the base station. In this way, the transmission delay of data can be effectively reduced.
  • the RTT value of each HARQ process is 20 ms, and the RTT value of the existing system is used, and the modification to the existing protocol is small.
  • Table 30 An implementation when the ratio of uplink and downlink subframes is 3.
  • Table 30 shows three HARQ processes: HARQ process x, HARQ process y, and HARQ process z.
  • x is the PUSCH corresponding to the HARQ process x
  • Gx is the UL grant (PDCCH or EPDCCH) corresponding to the HARQ process x
  • Px is the PHICH corresponding to the HARQ process x
  • the HARQ process y is the same as the HARQ process z.
  • Table 30 shows the binding form, distribution position, and HARQ timing relationship of the uplink resources in the HARQ process x, the HARQ process y, and the HARQ process z for six consecutive frames (frame t to frame t+5).
  • the corresponding PUSCH is transmitted in the following uplink resources: frame t UpPTS, subframe 2, and subframe 3 of subframe 1 in +2.
  • the interval between PUSCHs is the minimum value that satisfies the minimum processing time (3ms) of the UE or the base station. In this way, the data transmission delay can be effectively reduced.
  • the RTT value of each HARQ process is 20 ms, and the RTT value of the existing system is used, and the changes to the existing protocol are small.
  • the transmission of the PUSCH is performed after receiving the PHICH and the UL grant, this is only an example, and the transmission of the PUSCH is not limited to the requirement of receiving the PHICH and the UL grant. condition.
  • the location of the uplink resource for transmitting the PUSCH may also be found based only on the PHICH or UL grant.
  • the base station may only send the PHICH to the UE, and after receiving the PHICH, the UE may find the location of the uplink resource that transmits the PUSCH based on the subframe where the PHICH is located.
  • the base station sends the PHICH and the UL grant to the UE, but the UE fails to correctly receive the UL grant, and the UE can find the location of the uplink resource that transmits the PUSCH according to the subframe where the PHICH is received before.
  • the starting position of the uplink resource is determined to be located after the subframe m based on the subframe m.
  • the RTT value is 20ms.
  • the UpPTS is not the first subframe in the bonded subframe.
  • the time interval from the receipt of the control signaling to the transmission of the PUSCH is the minimum value that satisfies the minimum processing time (3 ms) of the UE or the base station, and is used in such a manner. Can effectively reduce the transmission delay of data.
  • the RTT value of each HARQ process is 20ms, and the RTT value of the existing system is used to change the existing protocol.
  • the transmission of the PUSCH is performed after receiving the PHICH and the UL grant, this is only an example, and the transmission of the PUSCH is not limited to the requirement of receiving the PHICH and the UL grant. condition.
  • the location of the uplink resource for transmitting the PUSCH may also be found based only on the PHICH or UL grant.
  • the base station may only send the PHICH to the UE, and after receiving the PHICH, the UE may find the location of the uplink resource that transmits the PUSCH based on the subframe where the PHICH is located.
  • the base station sends the PHICH and the UL grant to the UE, but the UE fails to correctly receive the UL grant, and the UE can find the location of the uplink resource that transmits the PUSCH according to the subframe where the PHICH is received before.
  • the starting position of the uplink resource is determined to be located after the subframe m based on the subframe m.
  • the uplink and downlink subframes are matched by 4, and one UpPTS is bound to the uplink subframe adjacent to the UpPTS. See Table 31 for details.
  • Table 31 An implementation when the ratio of uplink and downlink subframes is 4.
  • Table 31 shows two HARQ processes: HARQ process x and HARQ process y.
  • X is the PUSCH corresponding to the HARQ process X
  • Gx is the UL grant (PDCCH or EPDCCH) corresponding to the HARQ process x
  • Px is the PHICH corresponding to the HARQ process x
  • the HARQ process y is the same.
  • Table 31 shows the HARQ process for six consecutive frames (frame t to frame t+5).
  • the binding form, distribution location, and HARQ timing relationship of the uplink resources in the X and HARQ processes y For example, in the HARQ process X, when the PHICH is received in the subframe 8 of the frame t, and/or when the UL grant is received in the subframe 8 of the frame t, the corresponding PUSCH is transmitted in the following uplink resources: frame t+1 UpPTS and subframe 2 of subframe 1 in the middle.
  • Table 32 An implementation when the ratio of uplink and downlink subframes is 4.
  • Table 32 shows two HARQ processes: HARQ process x and HARQ process y.
  • X is the PUSCH corresponding to the HARQ process X
  • Gx is the UL grant (PDCCH or EPDCCH) corresponding to the HARQ process x
  • Px is the PHICH corresponding to the HARQ process x
  • the HARQ process y is the same.
  • Table 32 shows the HARQ process in consecutive 6 frame times (frame t to frame t+5).
  • the binding form, distribution location, and HARQ timing relationship of the uplink resources in the X and HARQ processes y For example, in the HARQ process X, when the PHICH is received in the subframe 7 of the frame t, and/or when the UL grant is received in the subframe 7 of the frame t, the corresponding PUSCH is transmitted in the following uplink resources: frame t+1 UpPTS and subframe 2 of subframe 1 in the middle.
  • the uplink and downlink subframe ratio is 4, 1 UpPTS is bound to 2 uplink subframes, and/or the first subframe before the subframe n receives the PHICH.
  • Table 33 An implementation when the ratio of uplink and downlink subframes is 4.
  • Table 33 shows two HARQ processes: HARQ process x and HARQ process y.
  • X is the PUSCH corresponding to the HARQ process X
  • Gx is the UL grant (PDCCH or EPDCCH) corresponding to the HARQ process x
  • Px is the PHICH corresponding to the HARQ process x
  • the HARQ process y is the same.
  • Table 33 shows the binding form, distribution position, and HARQ timing relationship of the uplink resources in the HARQ process X and the HARQ process y for six consecutive frames (frame t to frame t+5).
  • the corresponding PUSCH is transmitted in the following uplink resources: frame t UpPTS, subframe 2, and subframe 3 of subframe 1 in +2.
  • the time interval from the receipt of the control signaling to the transmission of the PUSCH is the minimum value that satisfies the minimum processing time (3 ms) of the UE or the base station, and can be used in such a manner. Effectively reduce the transmission delay of data.
  • the RTT value of each HARQ process is 20 ms, and the RTT value of the existing system is used, and the modification to the existing protocol is small.
  • the transmission of the PUSCH is performed after receiving the PHICH and the UL grant, this is only an example, and the transmission of the PUSCH is not limited to the requirement of receiving the PHICH and the UL grant. condition.
  • the location of the uplink resource for transmitting the PUSCH may also be found based only on the PHICH or UL grant.
  • the base station may only send the PHICH to the UE, and after receiving the PHICH, the UE may find the location of the uplink resource that transmits the PUSCH based on the subframe where the PHICH is located.
  • the base station sends the PHICH and the UL grant to the UE, but the UE fails to correctly receive the UL grant, and the UE can find the location of the uplink resource that transmits the PUSCH according to the subframe where the PHICH is received before.
  • the UE when H does not receive the PHICH in the subframe m, and does not receive the UL grant or does not correctly receive the UL grant, determining, according to the subframe m, the starting position of the uplink resource is located in the subframe.
  • the uplink and downlink subframe ratio is 4, 1 UpPTS is bound to 2 uplink subframes, and/or the first subframe before the subframe n receives the PHICH.
  • the UpPTS is not the first subframe in the bonded subframe.
  • the time interval from the receipt of the control signaling to the transmission of the PUSCH is the minimum value that satisfies the minimum processing time (3 ms) of the UE or the base station. In this way, the transmission delay of the data can be effectively reduced.
  • the RTT value of each HARQ process is 20ms, and the RTT value of the existing system is used, and the modification of the existing protocol is small.
  • the transmission of the PUSCH is performed after receiving the PHICH and the UL grant, this is only an example, and the transmission of the PUSCH is not limited to the requirement of receiving the PHICH and the UL grant. condition.
  • the location of the uplink resource for transmitting the PUSCH may also be found based only on the PHICH or UL grant.
  • the base station may only send the PHICH to the UE, and after receiving the PHICH, the UE may find the location of the uplink resource that transmits the PUSCH based on the subframe where the PHICH is located.
  • the base station sends the PHICH and the UL grant to the UE, but the UE fails to correctly receive the UL grant, and the UE can find the transmission according to the subframe in which the PHICH is received before.
  • the location of the uplink resource that transmits the PUSCH Specifically, in Case 1, it is assumed that when the PHICH is received in the subframe m, and the UL grant is not received or the UL grant is not correctly received, the starting position of the uplink resource is determined to be located after the subframe m based on the subframe m.
  • the uplink and downlink subframe ratio is 5, 1 UpPTS and the
  • UpPTS neighboring uplink subframes are bound, and control signaling (UL grant (PDCCH/EPDCCH) and/or PHICH) is received in subframe n, and the starting position of the uplink resource is located in the kth subframe after subframe n.
  • UL grant PDCCH/EPDCCH
  • PHICH PHICH
  • Table 34 An implementation when the ratio of uplink and downlink subframes is 5.
  • Table 34 shows one HARQ process: HARQ process x.
  • x represents the PUSCH corresponding to the HARQ process X
  • Gx represents the UL grant (PDCCH or EPDCCH) corresponding to the HARQ process x
  • Px represents the PHICH corresponding to the HARQ process x.
  • Table 34 shows the binding form, distribution position, and HARQ timing relationship of the uplink resources in the HARQ process X for six consecutive frames (frame t to frame t+5).
  • the corresponding PUSCH is transmitted in the following uplink resources: frame t+1 UpPTS and subframe 2 of subframe 1 in the middle.
  • the uplink and downlink subframes are matched by 5, and the two UpPTSs are bound to the two uplink subframes, and the control UL grant (PDCCH or EPDCCH) is received in the subframe n, and the uplink resource is started.
  • Table 35 An implementation when the ratio of uplink and downlink subframes is 5.
  • Table 35 shows one HARQ process: HARQ process x.
  • x represents the PUSCH corresponding to the HARQ process x
  • Gx represents the UL grant (PDCCH or EPDCCH) corresponding to the HARQ process x
  • Px represents the PHICH corresponding to the HARQ process x.
  • Table 32 shows the binding form, distribution position, and HARQ timing relationship of the uplink resources in the HARQ process X for six consecutive frames (frame t to frame t+5).
  • the corresponding PUSCH is transmitted in the following uplink resources: UpPTS and subframe 2 of the subframe 1 in the frame t+4, and UpPTS and subframe 2 of subframe 1 in frame t+5.
  • the uplink and downlink subframe ratio is 6, and the UpPTS is bound to the uplink subframe adjacent to the UpPTS. See Table 36 for details.
  • Table 36 An implementation when the ratio of uplink and downlink subframes is 6.
  • Table 36 shows six HARQ processes: HARQ Process 1 to HARQ Process 6. among them, 1 denotes a PUSCH corresponding to HARQ process 1, G1 denotes a UL grant (PDCCH and/or EPDCCH) corresponding to HARQ process 1, P1 denotes a PHICH corresponding to HARQ process 1, and HARQ process 2 to HARQ process 6 are similar.
  • Table 36 shows the binding form, the distributed position, and the HARQ timing relationship of the uplink resources in the HARQ process 1 to the HARQ process 6 in the continuous 4 frame time (frame t to frame t+3).
  • the corresponding PUSCH is transmitted in the following uplink resources: UpPTS and subframe 7 of the subframe 6 in the frame t.
  • the reference time is used to describe the time when the control signaling (PHICH and/or UL grant) is transmitted to the uplink resource of the PUSCH.
  • Which subframe in the uplink resource is used as a reference Specifically, the subframe in which the start position of the uplink resource is located may be used as a reference.
  • the UpPTS is located at the beginning of the uplink resource, and the special subframe where the UpPTS is located can be used as a reference, and the receiving end can directly find the starting location of the uplink resource according to the reference time.
  • the first uplink subframe of the uplink resource may be used as a reference, and the receiving end may estimate the starting position of the uplink resource according to the reference time and the uplink and downlink subframe ratio. It should be understood that the determination of the above reference time is merely an example. In practice, any other subframe of the uplink resource may also be used as a reference.
  • the uplink and downlink subframe ratio is 6, and the UpPTS is directly bound on the existing binding subframe. See Table 37 for details.
  • Table 37 An implementation when the ratio of uplink and downlink subframes is 6.
  • Table 37 shows three HARQ processes: HARQ process x, HARQ process y and HARQ process z.
  • X is the PUSCH corresponding to the HARQ process X
  • Gx is the UL grant (PDCCH or EPDCCH) corresponding to the HARQ process x
  • Px is the PHICH corresponding to the HARQ process x
  • the HARQ process y is the same as the HARQ process z.
  • Table 37 shows the binding form, distribution position, and HARQ timing relationship of the uplink resources in the HARQ process x, HARQ process y, and HARQ process z for six consecutive frames (frame t to frame t+5).
  • the corresponding PUSCH is transmitted in the following uplink resources: UpPTS and subframe 7 of the subframe 6 in the frame t.
  • the reference time is used to describe the time when the control signaling (PHICH and/or UL grant) is transmitted to the uplink resource of the PUSCH.
  • Which subframe in the uplink resource is used as a reference Specifically, the subframe in which the start position of the uplink resource is located may be used as a reference.
  • the UpPTS is located at the beginning of the uplink resource, and the special subframe where the UpPTS is located can be used as a reference, and the receiving end can directly find the starting location of the uplink resource according to the reference time.
  • the first uplink subframe of the uplink resource may be used as a reference, and the receiving end may estimate the starting position of the uplink resource according to the reference time and the uplink and downlink subframe ratio. It should be understood that the determination of the above reference time is merely an example. In practice, any other subframe of the uplink resource may also be used as a reference.
  • the uplink and downlink subframe ratio is 6, and the two UpPTSs are bound to the five uplink subframes, and the control UL grant (PDCCH or EPDCCH) is received in the subframe n.
  • Table 38 An implementation when the ratio of uplink and downlink subframes is 6.
  • Table 38 shows 2 HARQ processes: HARQ process x and HARQ process y.
  • X is the PUSCH corresponding to the HARQ process X
  • Gx is the UL grant (PDCCH or EPDCCH) corresponding to the HARQ process x
  • Px is the PHICH corresponding to the HARQ process x
  • the HARQ process y is the same.
  • Table 38 shows the binding form, distribution position, and HARQ timing of the uplink resources in the HARQ process X and the HARQ process y for six consecutive frames (frame t to frame t+5). Department.
  • the corresponding PUSCH is transmitted in the following uplink resources: UpPTS, sub-subframe 1 of the frame t+2 Frame 2, subframe 3, subframe 4, UpPTS of subframe 6, subframe 7 and subframe 8.
  • the n, k, and Z values show the relative positions of the PHICH, the UL grant, and the uplink resource in each HARQ process, where k indicates that the k-th subframe starts to transmit the PUSCH after the subframe n.
  • the reference time is used to describe the time when the control signaling (PHICH and/or UL grant) is transmitted to the uplink resource of the PUSCH.
  • Which subframe in the uplink resource is used as a reference.
  • the subframe in which the start position of the uplink resource is located may be used as a reference.
  • the UpPTS is located at the beginning of the uplink resource, and the special subframe where the UpPTS is located may be used as a reference, and the receiving end may directly find the starting location of the uplink resource according to the reference time.
  • the first uplink subframe of the uplink resource may be used as a reference, and the receiving end may estimate the starting position of the uplink resource according to the reference time and the uplink and downlink subframe ratio. It should be understood that the determination of the above reference time is merely an example. In practice, any other subframe of the uplink resource may also be used as a reference.
  • the uplink and downlink subframes are matched by 6, and the two UpPTSs are bound to the five uplink subframes, and the control UL grant (PDCCH or EPDCCH) is received in the subframe n, and the uplink resource is started.
  • the UpPTS is not the first subframe in the bonded subframe.
  • FIG. 3 is a schematic flowchart of a method for transmitting a PUSCH according to an embodiment of the present invention. It should be understood that the interaction between the user equipment and the base station and related features, functions, and the like described on the base station side correspond to the descriptions on the user equipment side. For the sake of brevity, duplicate descriptions are omitted as appropriate.
  • the method of Figure 3 includes:
  • the UpPTS is used for PUSCH transmission, which is equivalent to increasing the amount of uplink transmission data per unit time, thereby increasing the uplink throughput of the TDD system.
  • the uplink resource is one UpPTS.
  • the q HARQ processes are the number of parallel HARQ processes maintained by each HARQ entity of the PUSCH transmission end (UE or base station).
  • the uplink resource further includes an uplink subframe, and the uplink resource is a continuous uplink resource.
  • the UpPTS is used for PUSCH transmission, which is equivalent to increasing the amount of uplink transmission in a unit time, thereby increasing the uplink throughput of the TDD system.
  • the PUSCH is transmitted in the manner that the UpPTS is bound to other uplink resources, which is equivalent to increasing the number of uplink data transmissions per unit time, thereby increasing the signal-to-noise ratio of uplink data reception, thereby increasing the uplink coverage.
  • the uplink resource is an uplink resource when the uplink and downlink subframes are 0, and the uplink resource includes 2 UpPTSs and 6 uplink subframes.
  • the uplink resource is an uplink resource when the ratio of the uplink and downlink subframes is 1, and the uplink resource includes two UpPTSs and four uplink subframes.
  • the uplink resource is an uplink resource when the uplink and downlink subframes are 2, and the uplink resource includes 2 UpPTSs and 2 uplink subframes.
  • the uplink resource is an uplink resource when the ratio of the uplink and downlink subframes is 3, and the uplink resource includes 1 UpPTS and 3 uplink subframes.
  • the uplink resource is an uplink resource when the ratio of the uplink and downlink subframes is 4, and the uplink resource includes 1 UpPTS and 2 uplink subframes.
  • the uplink resource is an uplink resource when the uplink and downlink subframes are 5, and the uplink resource includes 2 UpPTSs and 2 uplink subframes.
  • the uplink resource is an uplink resource when the ratio of the uplink and downlink subframes is 6, and the uplink resource includes two UpPTSs and five uplink subframes.
  • the user equipment and the base station according to the embodiment of the present invention are described in detail below with reference to FIG. 4 to FIG. 7 in detail with reference to FIG. 1 to FIG.
  • FIG. 4 is a schematic block diagram of a user equipment according to an embodiment of the present invention.
  • User equipment 400 of FIG. The various steps performed by the user equipment in FIGS. 1 to 3 can be implemented, and the detailed description will not be repeated in order to avoid redundancy.
  • the user equipment 400 includes a receiving unit 410, a determining unit 420, and a transmitting unit 430.
  • the receiving unit 410 is configured to receive control signaling sent by the base station in the current subframe, where the control signaling is used to indicate that the physical uplink shared channel PUSCH is transmitted;
  • the determining unit 420 is configured to determine, according to the subframe position of the current subframe that the receiving unit 410 receives the control signaling, an uplink resource for transmitting the PUSCH, where the uplink resource includes an uplink pilot time slot UpPTS;
  • the transmitting unit 430 is configured to transmit the PUSCH in the uplink resource determined by the determining unit 420.
  • the UpPTS is used for PUSCH transmission, which is equivalent to increasing the amount of uplink transmission in a unit time, thereby increasing the uplink throughput of the TDD system.
  • the uplink resource is one UpPTS.
  • the uplink resource further includes an uplink subframe, and the uplink resource is a continuous uplink resource.
  • the UpPTS is used for PUSCH transmission, which is equivalent to increasing the amount of uplink transmission in a unit time, thereby increasing the uplink throughput of the TDD system.
  • the PUSCH is transmitted in the manner that the UpPTS is bound to other uplink resources, which is equivalent to increasing the number of uplink data transmissions per unit time, thereby increasing the signal-to-noise ratio of uplink data reception, thereby increasing the uplink coverage.
  • the uplink resource is an uplink resource when the uplink and downlink subframes are 0, and the uplink resource includes 2 UpPTSs and 6 uplink subframes.
  • the uplink resource is an uplink resource when the ratio of the uplink and downlink subframes is 1, and the uplink resource includes two UpPTSs and four uplink subframes.
  • the uplink resource is an uplink resource when the uplink and downlink subframes are 2, and the uplink resource includes 2 UpPTSs and 2 uplink subframes.
  • the uplink resource is an uplink resource when the ratio of the uplink and downlink subframes is 3, and the uplink resource includes 1 UpPTS and 3 uplink subframes.
  • the control signaling is a PDCCH or an EPDCCH
  • the The first subframe is the subframe n
  • the uplink resource is an uplink resource when the ratio of the uplink and downlink subframes is 4, and the uplink resource includes 1 UpPTS and 2 uplink subframes.
  • the uplink resource is an uplink resource when the uplink and downlink subframes are 5, and the uplink resource includes 2 UpPTSs and 2 uplink subframes.
  • the uplink resource is an uplink resource when the ratio of the uplink and downlink subframes is 6, and the uplink resource includes two UpPTSs and five uplink subframes.
  • the control signaling is a PDCCH or an EPDCCH
  • the The previous subframe is subframe n
  • the control signaling is PHICH
  • the current subframe is a subframe m
  • FIG. 5 is a schematic block diagram of a base station according to an embodiment of the present invention.
  • the base station 500 of Figure 5 is capable of implementing the various steps performed by the base station in Figures 1 through 3, and will not be described in detail to avoid redundancy.
  • the 500 includes a transmitting unit 510, a determining unit 520, and a receiving unit 530.
  • the sending unit 510 is configured to send control signaling to the user equipment UE in the current subframe, where the control signaling is used to indicate that the physical uplink shared channel PUSCH is transmitted;
  • the determining unit 520 is configured to determine, according to the subframe position where the current subframe of the control signaling is sent by the sending unit 510, an uplink resource for transmitting the PUSCH, where the uplink resource includes an uplink pilot time slot UpPTS;
  • the receiving unit 530 is configured to receive the PUSCH by using the uplink resource determined by the determining unit 520.
  • the UpPTS is used for PUSCH transmission, which is equivalent to increasing the amount of uplink transmission in a unit time, thereby increasing the uplink throughput of the TDD system.
  • the uplink resource is one UpPTS.
  • the uplink resource further includes an uplink subframe, and the uplink resource is a continuous uplink resource.
  • the UpPTS is used for PUSCH transmission, which is equivalent to increasing the amount of uplink transmission data per unit time, thereby increasing the uplink throughput of the TDD system.
  • the PUSCH is transmitted by using the UpPTS in combination with other uplink resources, which is equivalent to increasing the number of uplink data transmissions per unit time, thereby increasing the signal-to-noise ratio of uplink data reception, thereby increasing the uplink coverage. cover.
  • the uplink resource is an uplink resource when the uplink and downlink subframes are 0, and the uplink resource includes 2 UpPTSs and 6 uplink subframes.
  • the uplink resource is an uplink resource when the ratio of the uplink and downlink subframes is 1, and the uplink resource includes two UpPTSs and four uplink subframes.
  • the uplink resource is an uplink resource when the uplink and downlink subframes are 2, and the uplink resource includes 2 UpPTSs and 2 uplink subframes.
  • the uplink resource is an uplink resource when the ratio of the uplink and downlink subframes is 3, and the uplink resource includes 1 UpPTS and 3 uplink subframes.
  • the uplink resource is an uplink resource when the ratio of the uplink and downlink subframes is 4, and the uplink resource includes 1 UpPTS and 2 uplink subframes.
  • the uplink resource is an uplink resource when the uplink and downlink subframes are 5, and the uplink resource includes 2 UpPTSs and 2 uplink subframes.
  • the uplink resource is an uplink resource when the ratio of the uplink and downlink subframes is 6, and the uplink resource includes two UpPTSs and five uplink subframes.
  • the control signaling is a PDCCH or an EPDCCH
  • the The previous subframe is subframe n
  • the control signaling is the PHICH
  • the current subframe is the subframe m
  • FIG. 6 is a schematic block diagram of a user equipment according to an embodiment of the present invention.
  • the user equipment 600 of FIG. 6 is capable of implementing the various steps performed by the user equipment in FIGS. 1 through 3, and is not described in detail to avoid repetition.
  • User equipment 600 includes a receiver 610, a processor 620, and a transmitter 630.
  • the receiver 610 is configured to receive control signaling sent by the base station in the current subframe, where the control signaling is used to indicate that the physical uplink shared channel PUSCH is transmitted;
  • the processor 620 is configured to determine, according to the subframe position of the current subframe of the control signaling, the uplink resource used for transmitting the PUSCH, where the uplink resource includes an uplink pilot time slot UpPTS;
  • the transmitter 630 is configured to transmit the PUSCH in the uplink resource determined by the processor 620.
  • the UpPTS is used for PUSCH transmission, which is equivalent to increasing the amount of uplink transmission in a unit time, thereby increasing the uplink throughput of the TDD system.
  • the uplink resource is one UpPTS.
  • the uplink resource further includes an uplink subframe, and the uplink resource For continuous uplink resources.
  • the UpPTS is used for PUSCH transmission, which is equivalent to increasing the amount of uplink transmission in a unit time, thereby increasing the uplink throughput of the TDD system.
  • the PUSCH is transmitted in the manner that the UpPTS is bound to other uplink resources, which is equivalent to increasing the number of uplink data transmissions per unit time, thereby increasing the signal-to-noise ratio of uplink data reception, thereby increasing the uplink coverage.
  • the uplink resource is an uplink resource when the uplink and downlink subframes are 0, and the uplink resource includes 2 UpPTSs and 6 uplink subframes.
  • the uplink resource is an uplink resource when the ratio of the uplink and downlink subframes is 1, and the uplink resource includes two UpPTSs and four uplink subframes.
  • the uplink resource is an uplink resource when the uplink and downlink subframes are 2, and the uplink resource includes 2 UpPTSs and 2 uplink subframes.
  • the uplink resource is an uplink resource when the ratio of the uplink and downlink subframes is 3, and the uplink resource includes 1 UpPTS and 3 uplink subframes.
  • the uplink resource is an uplink resource when the ratio of the uplink and downlink subframes is 4, and the uplink resource includes 1 UpPTS and 2 uplink subframes.
  • the uplink resource is an uplink resource when the uplink and downlink subframes are 5, and the uplink resource includes 2 UpPTSs and 2 uplink subframes.
  • control signaling is a PDCCH or an EPDCCH
  • the previous subframe is subframe n
  • the uplink resource is an uplink resource when the ratio of the uplink and downlink subframes is 6, and the uplink resource includes two UpPTSs and five uplink subframes.
  • FIG. 7 is a schematic block diagram of a base station according to an embodiment of the present invention.
  • the base station 700 of Fig. 7 can implement the steps performed by the base station in Figs. 1 to 3, and will not be described in detail in order to avoid redundancy.
  • 700 includes a transmitter 710, a processor 720, and a receiver 730.
  • the transmitter 710 is configured to send control signaling to the user equipment UE in the current subframe, where the control signaling is used to indicate that the physical uplink shared channel PUSCH is transmitted.
  • the processor 720 is configured to determine, according to the subframe position where the current subframe of the control signaling is sent by the transmitter 710, an uplink resource for transmitting the PUSCH, where the uplink resource includes an uplink pilot time slot UpPTS;
  • the receiver 730 is configured to receive the PUSCH by using the uplink resource determined by the processor 720.
  • the UpPTS is used for PUSCH transmission, which is equivalent to increasing the amount of uplink transmission in a unit time, thereby increasing the uplink throughput of the TDD system.
  • the uplink resource is one UpPTS.
  • the uplink resource further includes an uplink subframe, and the uplink resource is a continuous uplink resource.
  • the UpPTS is used for PUSCH transmission, which is equivalent to increasing the amount of uplink transmission in a unit time, thereby increasing the uplink throughput of the TDD system.
  • the PUSCH is transmitted in the manner that the UpPTS is bound to other uplink resources, which is equivalent to increasing the number of uplink data transmissions per unit time, thereby increasing the signal-to-noise ratio of uplink data reception, thereby increasing the uplink coverage.
  • the uplink resource is an uplink resource when the uplink and downlink subframes are 0, and the uplink resource includes 2 UpPTSs and 6 uplink subframes.
  • the uplink resource is an uplink resource when the ratio of the uplink and downlink subframes is 1, and the uplink resource includes two UpPTSs and four uplink subframes.
  • the uplink resource is an uplink resource when the uplink and downlink subframes are 2, and the uplink resource includes 2 UpPTSs and 2 uplink subframes.
  • the uplink resource is an uplink resource when the ratio of the uplink and downlink subframes is 3, and the uplink resource includes 1 UpPTS and 3 uplink subframes.
  • the uplink resource is an uplink resource when the ratio of the uplink and downlink subframes is 4, and the uplink resource includes 1 UpPTS and 2 uplink subframes.
  • the control signaling is a PDCCH or an EPDCCH
  • the current subframe is a subframe n
  • a starting position of the uplink resource is located in a kth subframe subsequent to the subframe n.
  • the current subframe is a subframe m
  • the uplink resource is an uplink resource when the uplink and downlink subframes are 5, and the uplink resource includes 2 UpPTSs and 2 uplink subframes.
  • the uplink resource is an uplink resource when the ratio of the uplink and downlink subframes is 6, and the uplink resource includes two UpPTSs and five uplink subframes.
  • the disclosed systems, devices, and methods may be implemented in other ways.
  • the device embodiments described above are merely illustrative.
  • the division of the unit is only a logical function division.
  • there may be another division manner for example, multiple units or components may be combined or Can be integrated into another The system, or some features can be ignored, or not executed.
  • the mutual coupling or direct connection or communication connection shown or discussed may be an indirect coupling or communication connection through some interface, device or unit, and may be in an electrical, mechanical or other form.
  • the components displayed for the unit may or may not be physical units, ie may be located in one place, or may be distributed over multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of the embodiment.
  • each functional unit in each embodiment of the present invention may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit.
  • the functions, if implemented in the form of software functional units and sold or used as separate products, may be stored in a computer readable storage medium.
  • the technical solution of the present invention which is essential or contributes to the prior art, or a part of the technical solution, may be embodied in the form of a software product, which is stored in a storage medium, including
  • the instructions are used to cause a computer device (which may be a personal computer, server, or network device, etc.) to perform all or part of the steps of the methods described in various embodiments of the present invention.
  • the foregoing storage medium includes: a U disk, a mobile hard disk, a read-only memory (ROM), a random access memory (RAM), a magnetic disk or an optical disk, and the like, which can store program codes. .

Landscapes

  • Engineering & Computer Science (AREA)
  • Signal Processing (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Mobile Radio Communication Systems (AREA)

Abstract

本发明提供一种传输PUSCH的方法、用户设备和基站。该方法包括:在当前子帧接收基站发送的控制信令,该控制信令用于指示传输PUSCH;根据该当前子帧的子帧位置,确定用于传输该PUSCH的上行资源,该上行资源包括UpPTS;在该上行资源传输该PUSCH。本发明实施例中,将UpPTS 用于PUSCH的传输,相当于增加了单位时间内上行传输的数据量,从而增加了TDD系统上行的吞吐量。

Description

传输 PUSCH的方法、 用户设备和基站 技术领域
本发明实施例涉及无线通信领域, 并且更具体地, 涉及传输 PUSCH的 方法、 用户设备和基站。 背景技术
时分复用 (TDD, Time Division Multiplex ) 系统的上行传输釆用时分复 用的方式。
长期演进 ( LTE, Long Term Evolution )的 TDD系统定义了 7种上下行 子帧配比, 具体如表 1所示。 其中, 不同上下行子帧配比可应用于具有不同 上下行业务需求的场景。 表 1 : 上下行子帧配比
Figure imgf000002_0001
表 1中, D表示下行子帧, S表示特殊子帧, U表示上行子帧。 由表 1 可知, 在 TDD 系统中, 1 个无线帧中的部分子帧为上行子帧、 部分子帧为 下行子帧。 换句话说, 1个无线帧的部分时长用于上行传输, 部分时长用于 下行传输,这种时分方式会导致系统上行的吞吐量(单位时间的数据传输量) 小。 发明内容
本发明实施例提供一种传输 PUSCH的方法、 用户设备和基站, 以增加 TDD系统上行的吞吐量。 第一方面, 提供一种传输 PUSCH的方法, 包括: 在当前子帧接收基站 发送的控制信令, 所述控制信令用于指示传输 PUSCH; 根据所述当前子帧 的子帧位置, 确定用于传输所述 PUSCH的上行资源, 所述上行资源包括上 行导频时隙 UpPTS ; 在所述上行资源传输所述 PUSCH。
结合第一方面, 在第一方面的一种实现方式中, 所述上行资源为 1 个
UpPTS。
结合第一方面或其上述实现方式的任一种,在第一方面的另一种实现方 式中, 所述当前子帧为上下行子帧配比为 r时的子帧 n, 所述 UpPTS位于所 述子帧 n之后的第 k个子帧中, 其中: r=0, n=l或 6, k=5 ; 或者, r=l, n=0 或 5, k=6; 或者, r=2, n=l或 6, k=5 ; 或者, r=3, n=7, k=4; 或者, r=4, η:Ί , k=4; 或者, r=5, n=7, k=4; 或者, r=6, n=l或 6, k=5。
结合第一方面或其上述实现方式的任一种,在第一方面的另一种实现方 式中,所述 PUSCH的传输对应的混合自动重传请求 HARQ进程为上下行子 帧配比为 r时 q个 HARQ进程中的一个, 其中, r=0, q=9或 10; 或者, r=l, q=6; 或者, r=2, q=4; 或者, r=3, q=4; 或者, r=4, q=3 ; 或者, r=5, q=2; 或者, r=6, q=8或 9。
结合第一方面或其上述实现方式的任一种,在第一方面的另一种实现方 式中, 所述上行资源还包括上行子帧, 且所述上行资源为连续的上行资源。
结合第一方面或其上述实现方式的任一种,在第一方面的另一种实现方 式中, 所述上行资源为上下行子帧配比为 0时的上行资源, 所述上行资源包 括 2个 UpPTS和 6个上行子帧。
结合第一方面或其上述实现方式的任一种,在第一方面的另一种实现方 式中, 所述控制信令为物理下行控制信道 PDCCH或者增强的物理下行控制 信道 EPDCCH, 所述当前子帧为子帧 n, 所述上行资源的起始位置位于所述 子帧 n之后的第 k个子帧, 其中: n=l或 6, k=5 ; 或者, 所述控制信令为物 理混合自动重传请求指示信道 PHICH,所述当前子帧为子帧 m,所述上行资 源的起始位置位于所述子帧 m之后的第 t个子帧, 其中: m=0或 5, t=16。
结合第一方面或其上述实现方式的任一种,在第一方面的另一种实现方 式中, 所述控制信令为 PDCCH或者 EPDCCH, 所述当前子帧为子帧 n, 所 述上行资源的起始位置位于所述子帧 n之后的第 k个子帧, 其中: 当 n=0或 5时, k=4; 当 n=l或 6时, k=7; 或者, 所述控制信令为 PHICH, 所述当前 子帧为子帧 m,所述上行资源的起始位置位于所述子帧 m之后的第 t个子帧, 其中: 当 m=0或 5时, t=14; 当 m=l或 6时, t=17。
结合第一方面或其上述实现方式的任一种,在第一方面的另一种实现方 式中, 所述上行资源为上下行子帧配比为 1时的上行资源, 所述上行资源包 括 2个 UpPTS和 4个上行子帧。
结合第一方面或其上述实现方式的任一种,在第一方面的另一种实现方 式中, 所述控制信令为 PDCCH或者 EPDCCH, 所述当前子帧为子帧 n, 所 述上行资源的起始位置位于所述子帧 n之后的第 k个子帧, 其中: n=l或 6, k=5; 或者, 所述控制信令为 PHICH, 所述当前子帧为子帧 m, 所述上行资 源的起始位置位于所述子帧 m之后的第 t个子帧, 其中: m=9或 4, t=17。
结合第一方面或其上述实现方式的任一种,在第一方面的另一种实现方 式中, 所述控制信令为 PDCCH或者 EPDCCH, 所述当前子帧为子帧 n, 所 述上行资源的起始位置位于所述子帧 n之后的第 k个子帧, 其中: n=4或 9, k=4; 或者, 所述控制信令为 PHICH, 所述当前子帧为子帧 m, 所述上行资 源的起始位置位于所述子帧 m之后的第 t个子帧, 其中: m=l或 6, t=17。
结合第一方面或其上述实现方式的任一种,在第一方面的另一种实现方 式中, 所述上行资源为上下行子帧配比为 2时的上行资源, 所述上行资源包 括 2个 UpPTS和 2个上行子帧。
结合第一方面或其上述实现方式的任一种,在第一方面的另一种实现方 式中, 所述控制信令为 PDCCH或者 EPDCCH, 所述当前子帧为子帧 n, 所 述上行资源的起始位置位于所述子帧 n之后的第 k个子帧, 其中: n=l或 6, k=5; 或者, 所述控制信令为 PHICH, 所述当前子帧为子帧 m, 所述上行资 源的起始位置位于所述子帧 m之后的第 t个子帧, 其中: m=8或 3, t=18。
结合第一方面或其上述实现方式的任一种,在第一方面的另一种实现方 式中, 所述上行资源为上下行子帧配比为 3时的上行资源, 所述上行资源包 括 1个 UpPTS和 3个上行子帧。
结合第一方面或其上述实现方式的任一种,在第一方面的另一种实现方 式中, 所述控制信令为 PDCCH或者 EPDCCH, 所述当前子帧为子帧 n, 所 述上行资源的起始位置位于所述子帧 n之后的第 k个子帧,其中: n=7, k=4; 或者, 所述控制信令为 PHICH, 所述当前子帧为子帧 m, 所述上行资源的起 始位置位于所述子帧 m之后的第 t个子帧, 其中: m=0, t=21。 结合第一方面或其上述实现方式的任一种,在第一方面的另一种实现方 式中, 所述控制信令为 PDCCH或者 EPDCCH, 所述当前子帧为子帧 n, 所 述上行资源的起始位置位于所述子帧 n之后的第 k个子帧, 其中: n=0或 9, k=4; 或者, 所述控制信令为 PHICH, 所述当前子帧为子帧 m, 所述上行资 源的起始位置位于所述子帧 m之后的第 t个子帧, 其中: m=9或 8, t=15。
结合第一方面或其上述实现方式的任一种,在第一方面的另一种实现方 式中, 所述上行资源为上下行子帧配比为 4时的上行资源, 所述上行资源包 括 1个 UpPTS和 2个上行子帧。
结合第一方面或其上述实现方式的任一种,在第一方面的另一种实现方 式中, 所述控制信令为 PDCCH或者 EPDCCH, 所述当前子帧为子帧 n, 所 述上行资源的起始位置位于所述子帧 n之后的第 k个子帧,其中: n=7, k=4; 或者, 所述控制信令为 PHICH, 所述当前子帧为子帧 m, 所述上行资源的起 始位置位于所述子帧 m之后的第 t个子帧, 其中: m=9, t=12。
结合第一方面或其上述实现方式的任一种,在第一方面的另一种实现方 式中, 所述控制信令为 PDCCH或者 EPDCCH, 所述当前子帧为子帧 n, 所 述上行资源的起始位置位于所述子帧 n之后的第 k个子帧,其中: n=9, k=4; 或者, 所述控制信令为 PHICH, 所述当前子帧为子帧 m, 所述上行资源的起 始位置位于所述子帧 m之后的第 t个子帧, 其中: m=8, t=15。
结合第一方面或其上述实现方式的任一种,在第一方面的另一种实现方 式中, 所述上行资源为上下行子帧配比为 5时的上行资源, 所述上行资源包 括 2个 UpPTS和 2个上行子帧。
结合第一方面或其上述实现方式的任一种,在第一方面的另一种实现方 式中, 所述控制信令为 PDCCH或者 EPDCCH, 所述当前子帧为子帧 n, 所 述上行资源的起始位置位于所述子帧 n之后的第 k个子帧,其中: n=7, k=4。
结合第一方面或其上述实现方式的任一种,在第一方面的另一种实现方 式中, 所述上行资源为上下行子帧配比为 6时的上行资源, 所述上行资源包 括 2个 UpPTS和 5个上行子帧。
结合第一方面或其上述实现方式的任一种,在第一方面的另一种实现方 式中, 所述控制信令为 PDCCH或者 EPDCCH, 所述当前子帧为子帧 n, 所 述上行资源的起始位置位于所述子帧 n之后的第 k个子帧, 其中: 当 n=0或 5时, k=6; 当 n=l或 6时, k=5; 或者, 所述控制信令为 PHICH, 所述当前 子帧为子帧 m,所述上行资源的起始位置位于所述子帧 m之后的第 t个子帧, 其中: m=0或 5, t=6。
结合第一方面或其上述实现方式的任一种,在第一方面的另一种实现方 式中, 所述控制信令为 PDCCH或者 EPDCCH, 所述当前子帧为子帧 n, 所 述上行资源的起始位置位于所述子帧 n之后的第 k个子帧, 其中: 当 n=l或 6时, k=7; 当 n=9时, k=5 ; 或者, 所述控制信令为 PHICH, 所述当前子帧 为子帧 m, 所述上行资源的起始位置位于所述子帧 m之后的第 t个子帧, 其 中: 当 m=l或 6时, t=7; 当 m=9时, t=5。
结合第一方面或其上述实现方式的任一种,在第一方面的另一种实现方 式中, 所述上行资源中的 UpPTS包括扩展后的 UpPTS , 其中, 当所述扩展 后的 UpPTS所在子帧插入正常循环前缀 CP时, 所述扩展后的 UpPTS占用 的符号数 χ ζ (3, 10); 当所述扩展后的 UpPTS所在子帧插入扩展 CP时, 所 述扩展后的 UpPTS占用的符号数 X ^ (3, 8)。
第二方面, 提供一种传输 PUSCH的方法, 包括: 在当前子帧向用户设 备 UE发送控制信令, 所述控制信令用于指示传输 PUSCH; 根据所述当前 子帧所在的子帧位置, 确定用于传输所述 PUSCH的上行资源, 所述上行资 源包括上行导频时隙 UpPTS; 在所述上行资源接收所述 PUSCH。
结合第二方面, 在第二方面的一种实现方式中, 所述上行资源为 1 个 UpPTS。
结合第二方面或其上述实现方式的任一种,在第二方面的另一种实现方 式中, 所述当前子帧为上下行子帧配比为 r时的子帧 n, 所述 UpPTS位于所 述子帧 n之后的第 k个子帧中, 其中: r=0, n=l或 6, k=5 ; 或者, r=l, n=0 或 5, k=6; 或者, r=2, n=l或 6, k=5 ; 或者, r=3, n=7, k=4; 或者, r=4, η:Ί , k=4; 或者, r=5, n=7, k=4; 或者, r=6, n=l或 6, k=5。
结合第二方面或其上述实现方式的任一种,在第二方面的另一种实现方 式中,所述 PUSCH的传输对应的混合自动重传请求 HARQ进程为上下行子 帧配比为 r时 q个 HARQ进程中的一个, 其中, r=0, q=9或 10; 或者, r=l, q=6; 或者, r=2, q=4; 或者, r=3, q=4; 或者, r=4, q=3 ; 或者, r=5, q=2; 或者, r=6, q=8或 9。
结合第二方面或其上述实现方式的任一种,在第二方面的另一种实现方 式中, 所述上行资源还包括上行子帧, 且所述上行资源为连续的上行资源。 结合第二方面或其上述实现方式的任一种,在第二方面的另一种实现方 式中, 所述上行资源为上下行子帧配比为 0时的上行资源, 所述上行资源包 括 2个 UpPTS和 6个上行子帧。
结合第二方面或其上述实现方式的任一种,在第二方面的另一种实现方 式中, 所述控制信令为物理下行控制信道 PDCCH或者增强的物理下行控制 信道 EPDCCH, 所述当前子帧为子帧 n, 所述上行资源的起始位置位于所述 子帧 n之后的第 k个子帧, 其中: n=l或 6, k=5; 或者, 所述控制信令为物 理混合自动重传请求指示信道 PHICH,所述当前子帧为子帧 m,所述上行资 源的起始位置位于所述子帧 m之后的第 t个子帧, 其中: m=0或 5, t=16。
结合第二方面或其上述实现方式的任一种,在第二方面的另一种实现方 式中, 所述控制信令为 PDCCH或者 EPDCCH, 所述当前子帧为子帧 n, 所 述上行资源的起始位置位于所述子帧 n之后的第 k个子帧, 其中: 当 n=0或 5时, k=4; 当 n=l或 6时, k=7; 或者, 所述控制信令为 PHICH, 所述当前 子帧为子帧 m,所述上行资源的起始位置位于所述子帧 m之后的第 t个子帧, 其中: 当 m=0或 5时, t=14; 当 m=l或 6时, t=17。
结合第二方面或其上述实现方式的任一种,在第二方面的另一种实现方 式中, 所述上行资源为上下行子帧配比为 1时的上行资源, 所述上行资源包 括 2个 UpPTS和 4个上行子帧。
结合第二方面或其上述实现方式的任一种,在第二方面的另一种实现方 式中, 所述控制信令为 PDCCH或者 EPDCCH, 所述当前子帧为子帧 n, 所 述上行资源的起始位置位于所述子帧 n之后的第 k个子帧, 其中: n=l或 6, k=5; 或者, 所述控制信令为 PHICH, 所述当前子帧为子帧 m, 所述上行资 源的起始位置位于所述子帧 m之后的第 t个子帧, 其中: m=9或 4, t=17。
结合第二方面或其上述实现方式的任一种,在第二方面的另一种实现方 式中, 所述控制信令为 PDCCH或者 EPDCCH, 所述当前子帧为子帧 n, 所 述上行资源的起始位置位于所述子帧 n之后的第 k个子帧, 其中: n=4或 9, k=4; 或者, 所述控制信令为 PHICH, 所述当前子帧为子帧 m, 所述上行资 源的起始位置位于所述子帧 m之后的第 t个子帧, 其中: m=l或 6, t=17。
结合第二方面或其上述实现方式的任一种,在第二方面的另一种实现方 式中, 所述上行资源为上下行子帧配比为 2时的上行资源, 所述上行资源包 括 2个 UpPTS和 2个上行子帧。 结合第二方面或其上述实现方式的任一种,在第二方面的另一种实现方 式中, 所述控制信令为 PDCCH或者 EPDCCH, 所述当前子帧为子帧 n, 所 述上行资源的起始位置位于所述子帧 n之后的第 k个子帧, 其中: n=l或 6, k=5; 或者, 所述控制信令为 PHICH, 所述当前子帧为子帧 m, 所述上行资 源的起始位置位于所述子帧 m之后的第 t个子帧, 其中: m=8或 3, t=18。
结合第二方面或其上述实现方式的任一种,在第二方面的另一种实现方 式中, 所述上行资源为上下行子帧配比为 3时的上行资源, 所述上行资源包 括 1个 UpPTS和 3个上行子帧。
结合第二方面或其上述实现方式的任一种,在第二方面的另一种实现方 式中, 所述控制信令为 PDCCH或者 EPDCCH, 所述当前子帧为子帧 n, 所 述上行资源的起始位置位于所述子帧 n之后的第 k个子帧,其中: n=7, k=4; 或者, 所述控制信令为 PHICH, 所述当前子帧为子帧 m, 所述上行资源的起 始位置位于所述子帧 m之后的第 t个子帧, 其中: m=0, t=21。
结合第二方面或其上述实现方式的任一种,在第二方面的另一种实现方 式中, 所述控制信令为 PDCCH或者 EPDCCH, 所述当前子帧为子帧 n, 所 述上行资源的起始位置位于所述子帧 n之后的第 k个子帧, 其中: n=0或 9, k=4; 或者, 所述控制信令为 PHICH, 所述当前子帧为子帧 m, 所述上行资 源的起始位置位于所述子帧 m之后的第 t个子帧, 其中: m=9或 8, t=15。
结合第二方面或其上述实现方式的任一种,在第二方面的另一种实现方 式中, 所述上行资源为上下行子帧配比为 4时的上行资源, 所述上行资源包 括 1个 UpPTS和 2个上行子帧。
结合第二方面或其上述实现方式的任一种,在第二方面的另一种实现方 式中, 所述控制信令为 PDCCH或者 EPDCCH, 所述当前子帧为子帧 n, 所 述上行资源的起始位置位于所述子帧 n之后的第 k个子帧,其中: n=7, k=4; 或者, 所述控制信令为 PHICH, 所述当前子帧为子帧 m, 所述上行资源的起 始位置位于所述子帧 m之后的第 t个子帧, 其中: m=9, t=12。
结合第二方面或其上述实现方式的任一种,在第二方面的另一种实现方 式中, 所述控制信令为 PDCCH或者 EPDCCH, 所述当前子帧为子帧 n, 所 述上行资源的起始位置位于所述子帧 n之后的第 k个子帧,其中: n=9, k=4; 或者, 所述控制信令为 PHICH, 所述当前子帧为子帧 m, 所述上行资源的起 始位置位于所述子帧 m之后的第 t个子帧, 其中: m=8, t=15。 结合第二方面或其上述实现方式的任一种,在第二方面的另一种实现方 式中, 所述上行资源为上下行子帧配比为 5时的上行资源, 所述上行资源包 括 2个 UpPTS和 2个上行子帧。
结合第二方面或其上述实现方式的任一种,在第二方面的另一种实现方 式中, 所述控制信令为 PDCCH或者 EPDCCH, 所述当前子帧为子帧 n, 所 述上行资源的起始位置位于所述子帧 n之后的第 k个子帧,其中: n=7, k=4。
结合第二方面或其上述实现方式的任一种,在第二方面的另一种实现方 式中, 所述上行资源为上下行子帧配比为 6时的上行资源, 所述上行资源包 括 2个 UpPTS和 5个上行子帧。
结合第二方面或其上述实现方式的任一种,在第二方面的另一种实现方 式中, 所述控制信令为 PDCCH或者 EPDCCH, 所述当前子帧为子帧 n, 所 述上行资源的起始位置位于所述子帧 n之后的第 k个子帧, 其中: 当 n=0或 5时, k=6; 当 n=l或 6时, k=5; 或者, 所述控制信令为 PHICH, 所述当前 子帧为子帧 m,所述上行资源的起始位置位于所述子帧 m之后的第 t个子帧, 其中: m=0或 5, t=6。
结合第二方面或其上述实现方式的任一种,在第二方面的另一种实现方 式中, 所述控制信令为 PDCCH或者 EPDCCH, 所述当前子帧为子帧 n, 所 述上行资源的起始位置位于所述子帧 n之后的第 k个子帧, 其中: 当 n=l或 6时, k=7; 当 n=9时, k=5; 或者, 所述控制信令为 PHICH, 所述当前子帧 为子帧 m, 所述上行资源的起始位置位于所述子帧 m之后的第 t个子帧, 其 中: 当 m=l或 6时, t=7; 当 m=9时, t=5。
结合第二方面或其上述实现方式的任一种,在第二方面的另一种实现方 式中, 所述上行资源中的 UpPTS包括扩展后的 UpPTS, 其中, 当所述扩展 后的 UpPTS所在子帧插入正常循环前缀 CP时, 所述扩展后的 UpPTS占用 的符号数 x e (3, 10); 当所述扩展后的 UpPTS所在子帧插入扩展 CP时, 所 述扩展后的 UpPTS占用的符号数 X e (3, 8)。
第三方面, 提供一种用户设备, 包括: 接收单元, 用于在当前子帧接收 基站发送的控制信令, 所述控制信令用于指示传输物理上行共享信道 PUSCH; 确定单元,用于根据所述接收单元接收所述控制信令的所述当前子 帧的子帧位置, 确定用于传输所述 PUSCH的上行资源, 所述上行资源包括 上行导频时隙 UpPTS; 传输单元, 用于在所述确定单元确定的所述上行资源 传输所述 PUSCH。
结合第三方面, 在第三方面的一种实现方式中, 所述上行资源为 1 个
UpPTS。
结合第三方面或其上述实现方式的任一种,在第三方面的另一种实现方 式中, 所述当前子帧为上下行子帧配比为 r时的子帧 n, 所述 UpPTS位于所 述子帧 n之后的第 k个子帧中, 其中: r=0, n=l或 6, k=5 ; 或者, r=l, n=0 或 5, k=6; 或者, r=2, n=l或 6, k=5 ; 或者, r=3, n=7, k=4; 或者, r=4, η:Ί , k=4; 或者, r=5, n=7, k=4; 或者, r=6, n=l或 6, k=5。
结合第三方面或其上述实现方式的任一种,在第三方面的另一种实现方 式中,所述 PUSCH的传输对应的混合自动重传请求 HARQ进程为上下行子 帧配比为 r时 q个 HARQ进程中的一个, 其中, r=0, q=9或 10; 或者, r=l, q=6; 或者, r=2, q=4; 或者, r=3, q=4; 或者, r=4, q=3 ; 或者, r=5, q=2; 或者, r=6, q=8或 9。
结合第三方面或其上述实现方式的任一种,在第三方面的另一种实现方 式中, 所述上行资源还包括上行子帧, 且所述上行资源为连续的上行资源。
结合第三方面或其上述实现方式的任一种,在第三方面的另一种实现方 式中, 所述上行资源为上下行子帧配比为 0时的上行资源, 所述上行资源包 括 2个 UpPTS和 6个上行子帧。
结合第三方面或其上述实现方式的任一种,在第三方面的另一种实现方 式中, 所述控制信令为物理下行控制信道 PDCCH或者增强的物理下行控制 信道 EPDCCH, 所述当前子帧为子帧 n, 所述上行资源的起始位置位于所述 子帧 n之后的第 k个子帧, 其中: n=l或 6, k=5 ; 或者, 所述控制信令为物 理混合自动重传请求指示信道 PHICH,所述当前子帧为子帧 m,所述上行资 源的起始位置位于所述子帧 m之后的第 t个子帧, 其中: m=0或 5, t=16。
结合第三方面或其上述实现方式的任一种,在第三方面的另一种实现方 式中, 所述控制信令为 PDCCH或者 EPDCCH, 所述当前子帧为子帧 n, 所 述上行资源的起始位置位于所述子帧 n之后的第 k个子帧, 其中: 当 n=0或 5时, k=4; 当 n=l或 6时, k=7; 或者, 所述控制信令为 PHICH, 所述当前 子帧为子帧 m,所述上行资源的起始位置位于所述子帧 m之后的第 t个子帧, 其中: 当 m=0或 5时, t=14; 当 m=l或 6时, t=17。
结合第三方面或其上述实现方式的任一种,在第三方面的另一种实现方 式中, 所述上行资源为上下行子帧配比为 1时的上行资源, 所述上行资源包 括 2个 UpPTS和 4个上行子帧。
结合第三方面或其上述实现方式的任一种,在第三方面的另一种实现方 式中, 所述控制信令为 PDCCH或者 EPDCCH, 所述当前子帧为子帧 n, 所 述上行资源的起始位置位于所述子帧 n之后的第 k个子帧, 其中: n=l或 6, k=5; 或者, 所述控制信令为 PHICH, 所述当前子帧为子帧 m, 所述上行资 源的起始位置位于所述子帧 m之后的第 t个子帧, 其中: m=9或 4, t=17。
结合第三方面或其上述实现方式的任一种,在第三方面的另一种实现方 式中, 所述控制信令为 PDCCH或者 EPDCCH, 所述当前子帧为子帧 n, 所 述上行资源的起始位置位于所述子帧 n之后的第 k个子帧, 其中: n=4或 9, k=4; 或者, 所述控制信令为 PHICH, 所述当前子帧为子帧 m, 所述上行资 源的起始位置位于所述子帧 m之后的第 t个子帧, 其中: m=l或 6, t=17。
结合第三方面或其上述实现方式的任一种,在第三方面的另一种实现方 式中, 所述上行资源为上下行子帧配比为 2时的上行资源, 所述上行资源包 括 2个 UpPTS和 2个上行子帧。
结合第三方面或其上述实现方式的任一种,在第三方面的另一种实现方 式中, 所述控制信令为 PDCCH或者 EPDCCH, 所述当前子帧为子帧 n, 所 述上行资源的起始位置位于所述子帧 n之后的第 k个子帧, 其中: n=l或 6, k=5; 或者, 所述控制信令为 PHICH, 所述当前子帧为子帧 m, 所述上行资 源的起始位置位于所述子帧 m之后的第 t个子帧, 其中: m=8或 3, t=18。
结合第三方面或其上述实现方式的任一种,在第三方面的另一种实现方 式中, 所述上行资源为上下行子帧配比为 3时的上行资源, 所述上行资源包 括 1个 UpPTS和 3个上行子帧。
结合第三方面或其上述实现方式的任一种,在第三方面的另一种实现方 式中, 所述控制信令为 PDCCH或者 EPDCCH, 所述当前子帧为子帧 n, 所 述上行资源的起始位置位于所述子帧 n之后的第 k个子帧,其中: n=7, k=4; 或者, 所述控制信令为 PHICH, 所述当前子帧为子帧 m, 所述上行资源的起 始位置位于所述子帧 m之后的第 t个子帧, 其中: m=0, t=21。
结合第三方面或其上述实现方式的任一种,在第三方面的另一种实现方 式中, 所述控制信令为 PDCCH或者 EPDCCH, 所述当前子帧为子帧 n, 所 述上行资源的起始位置位于所述子帧 n之后的第 k个子帧, 其中: n=0或 9, k=4; 或者, 所述控制信令为 PHICH, 所述当前子帧为子帧 m, 所述上行资 源的起始位置位于所述子帧 m之后的第 t个子帧, 其中: m=9或 8, t=15。
结合第三方面或其上述实现方式的任一种,在第三方面的另一种实现方 式中, 所述上行资源为上下行子帧配比为 4时的上行资源, 所述上行资源包 括 1个 UpPTS和 2个上行子帧。
结合第三方面或其上述实现方式的任一种,在第三方面的另一种实现方 式中, 所述控制信令为 PDCCH或者 EPDCCH, 所述当前子帧为子帧 n, 所 述上行资源的起始位置位于所述子帧 n之后的第 k个子帧,其中: n=7, k=4; 或者, 所述控制信令为 PHICH, 所述当前子帧为子帧 m, 所述上行资源的起 始位置位于所述子帧 m之后的第 t个子帧, 其中: m=9, t=12。
结合第三方面或其上述实现方式的任一种,在第三方面的另一种实现方 式中, 所述控制信令为 PDCCH或者 EPDCCH, 所述当前子帧为子帧 n, 所 述上行资源的起始位置位于所述子帧 n之后的第 k个子帧,其中: n=9, k=4; 或者, 所述控制信令为 PHICH, 所述当前子帧为子帧 m, 所述上行资源的起 始位置位于所述子帧 m之后的第 t个子帧, 其中: m=8, t=15。
结合第三方面或其上述实现方式的任一种,在第三方面的另一种实现方 式中, 所述上行资源为上下行子帧配比为 5时的上行资源, 所述上行资源包 括 2个 UpPTS和 2个上行子帧。
结合第三方面或其上述实现方式的任一种,在第三方面的另一种实现方 式中, 所述控制信令为 PDCCH或者 EPDCCH, 所述当前子帧为子帧 n, 所 述上行资源的起始位置位于所述子帧 n之后的第 k个子帧,其中: n=7, k=4。
结合第三方面或其上述实现方式的任一种,在第三方面的另一种实现方 式中, 所述上行资源为上下行子帧配比为 6时的上行资源, 所述上行资源包 括 2个 UpPTS和 5个上行子帧。
结合第三方面或其上述实现方式的任一种,在第三方面的另一种实现方 式中, 所述控制信令为 PDCCH或者 EPDCCH, 所述当前子帧为子帧 n, 所 述上行资源的起始位置位于所述子帧 n之后的第 k个子帧, 其中: 当 n=0或 5时, k=6; 当 n=l或 6时, k=5; 或者, 所述控制信令为 PHICH, 所述当前 子帧为子帧 m,所述上行资源的起始位置位于所述子帧 m之后的第 t个子帧, 其中: m=0或 5, t=6。
结合第三方面或其上述实现方式的任一种,在第三方面的另一种实现方 式中, 所述控制信令为 PDCCH或者 EPDCCH, 所述当前子帧为子帧 n, 所 述上行资源的起始位置位于所述子帧 n之后的第 k个子帧, 其中: 当 n=l或 6时, k=7; 当 n=9时, k=5 ; 或者, 所述控制信令为 PHICH, 所述当前子帧 为子帧 m, 所述上行资源的起始位置位于所述子帧 m之后的第 t个子帧, 其 中: 当 m=l或 6时, t=7; 当 m=9时, t=5。
结合第三方面或其上述实现方式的任一种,在第三方面的另一种实现方 式中, 所述上行资源中的 UpPTS包括扩展后的 UpPTS, 其中, 当所述扩展 后的 UpPTS所在子帧插入正常循环前缀 CP时, 所述扩展后的 UpPTS占用 的符号数 χ ζ (3, 10); 当所述扩展后的 UpPTS所在子帧插入扩展 CP时, 所 述扩展后的 UpPTS占用的符号数 X ^ (3, 8)。
第四方面, 提供一种基站, 包括: 发送单元, 用于在当前子帧向用户设 备 UE 发送控制信令, 所述控制信令用于指示传输物理上行共享信道 PUSCH; 确定单元,用于根据所述发送单元发送所述控制信令的所述当前子 帧所在的子帧位置, 确定用于传输所述 PUSCH的上行资源, 所述上行资源 包括上行导频时隙 UpPTS ; 接收单元, 用于在所述确定单元确定的所述上行 资源接收所述 PUSCH。
结合第四方面, 在第四方面的一种实现方式中, 所述上行资源为 1 个 UpPTS。
结合第四方面或其上述实现方式的任一种,在第四方面的另一种实现方 式中, 所述当前子帧为上下行子帧配比为 r时的子帧 n, 所述 UpPTS位于所 述子帧 n之后的第 k个子帧中, 其中: r=0, n=l或 6, k=5 ; 或者, r=l, n=0 或 5, k=6; 或者, r=2, n=l或 6, k=5 ; 或者, r=3, n=7, k=4; 或者, r=4, η:Ί , k=4; 或者, r=5, n=7, k=4; 或者, r=6, n=l或 6, k=5。
结合第四方面或其上述实现方式的任一种,在第四方面的另一种实现方 式中,所述 PUSCH的传输对应的混合自动重传请求 HARQ进程为上下行子 帧配比为 r时 q个 HARQ进程中的一个, 其中, r=0, q=9或 10; 或者, r=l, q=6; 或者, r=2, q=4; 或者, r=3, q=4; 或者, r=4, q=3 ; 或者, r=5, q=2; 或者, r=6, q=8或 9。
结合第四方面或其上述实现方式的任一种,在第四方面的另一种实现方 式中, 所述上行资源还包括上行子帧, 且所述上行资源为连续的上行资源。
结合第四方面或其上述实现方式的任一种,在第四方面的另一种实现方 式中, 所述上行资源为上下行子帧配比为 0时的上行资源, 所述上行资源包 括 2个 UpPTS和 6个上行子帧。
结合第四方面或其上述实现方式的任一种,在第四方面的另一种实现方 式中, 所述控制信令为物理下行控制信道 PDCCH或者增强的物理下行控制 信道 EPDCCH, 所述当前子帧为子帧 n, 所述上行资源的起始位置位于所述 子帧 n之后的第 k个子帧, 其中: n=l或 6, k=5; 或者, 所述控制信令为物 理混合自动重传请求指示信道 PHICH,所述当前子帧为子帧 m,所述上行资 源的起始位置位于所述子帧 m之后的第 t个子帧, 其中: m=0或 5, t=16。
结合第四方面或其上述实现方式的任一种,在第四方面的另一种实现方 式中, 所述控制信令为 PDCCH或者 EPDCCH, 所述当前子帧为子帧 n, 所 述上行资源的起始位置位于所述子帧 n之后的第 k个子帧, 其中: 当 n=0或 5时, k=4; 当 n=l或 6时, k=7; 或者, 所述控制信令为 PHICH, 所述当前 子帧为子帧 m,所述上行资源的起始位置位于所述子帧 m之后的第 t个子帧, 其中: 当 m=0或 5时, t=14; 当 m=l或 6时, t=17。
结合第四方面或其上述实现方式的任一种,在第四方面的另一种实现方 式中, 所述上行资源为上下行子帧配比为 1时的上行资源, 所述上行资源包 括 2个 UpPTS和 4个上行子帧。
结合第四方面或其上述实现方式的任一种,在第四方面的另一种实现方 式中, 所述控制信令为 PDCCH或者 EPDCCH, 所述当前子帧为子帧 n, 所 述上行资源的起始位置位于所述子帧 n之后的第 k个子帧, 其中: n=l或 6, k=5; 或者, 所述控制信令为 PHICH, 所述当前子帧为子帧 m, 所述上行资 源的起始位置位于所述子帧 m之后的第 t个子帧, 其中: m=9或 4, t=17。
结合第四方面或其上述实现方式的任一种,在第四方面的另一种实现方 式中, 所述控制信令为 PDCCH或者 EPDCCH, 所述当前子帧为子帧 n, 所 述上行资源的起始位置位于所述子帧 n之后的第 k个子帧, 其中: n=4或 9, k=4; 或者, 所述控制信令为 PHICH, 所述当前子帧为子帧 m, 所述上行资 源的起始位置位于所述子帧 m之后的第 t个子帧, 其中: m=l或 6, t=17。
结合第四方面或其上述实现方式的任一种,在第四方面的另一种实现方 式中, 所述上行资源为上下行子帧配比为 2时的上行资源, 所述上行资源包 括 2个 UpPTS和 2个上行子帧。
结合第四方面或其上述实现方式的任一种,在第四方面的另一种实现方 式中, 所述控制信令为 PDCCH或者 EPDCCH, 所述当前子帧为子帧 n, 所 述上行资源的起始位置位于所述子帧 n之后的第 k个子帧, 其中: n=l或 6, k=5; 或者, 所述控制信令为 PHICH, 所述当前子帧为子帧 m, 所述上行资 源的起始位置位于所述子帧 m之后的第 t个子帧, 其中: m=8或 3, t=18。
结合第四方面或其上述实现方式的任一种,在第四方面的另一种实现方 式中, 所述上行资源为上下行子帧配比为 3时的上行资源, 所述上行资源包 括 1个 UpPTS和 3个上行子帧。
结合第四方面或其上述实现方式的任一种,在第四方面的另一种实现方 式中, 所述控制信令为 PDCCH或者 EPDCCH, 所述当前子帧为子帧 n, 所 述上行资源的起始位置位于所述子帧 n之后的第 k个子帧,其中: n=7, k=4; 或者, 所述控制信令为 PHICH, 所述当前子帧为子帧 m, 所述上行资源的起 始位置位于所述子帧 m之后的第 t个子帧, 其中: m=0, t=21。
结合第四方面或其上述实现方式的任一种,在第四方面的另一种实现方 式中, 所述控制信令为 PDCCH或者 EPDCCH, 所述当前子帧为子帧 n, 所 述上行资源的起始位置位于所述子帧 n之后的第 k个子帧, 其中: n=0或 9, k=4; 或者, 所述控制信令为 PHICH, 所述当前子帧为子帧 m, 所述上行资 源的起始位置位于所述子帧 m之后的第 t个子帧, 其中: m=9或 8, t=15。
结合第四方面或其上述实现方式的任一种,在第四方面的另一种实现方 式中, 所述上行资源为上下行子帧配比为 4时的上行资源, 所述上行资源包 括 1个 UpPTS和 2个上行子帧。
结合第四方面或其上述实现方式的任一种,在第四方面的另一种实现方 式中, 所述控制信令为 PDCCH或者 EPDCCH, 所述当前子帧为子帧 n, 所 述上行资源的起始位置位于所述子帧 n之后的第 k个子帧,其中: n=7, k=4; 或者, 所述控制信令为 PHICH, 所述当前子帧为子帧 m, 所述上行资源的起 始位置位于所述子帧 m之后的第 t个子帧, 其中: m=9, t=12。
结合第四方面或其上述实现方式的任一种,在第四方面的另一种实现方 式中, 所述控制信令为 PDCCH或者 EPDCCH, 所述当前子帧为子帧 n, 所 述上行资源的起始位置位于所述子帧 n之后的第 k个子帧,其中: n=9, k=4; 或者, 所述控制信令为 PHICH, 所述当前子帧为子帧 m, 所述上行资源的起 始位置位于所述子帧 m之后的第 t个子帧, 其中: m=8, t=15。
结合第四方面或其上述实现方式的任一种,在第四方面的另一种实现方 式中, 所述上行资源为上下行子帧配比为 5时的上行资源, 所述上行资源包 括 2个 UpPTS和 2个上行子帧。
结合第四方面或其上述实现方式的任一种,在第四方面的另一种实现方 式中, 所述控制信令为 PDCCH或者 EPDCCH, 所述当前子帧为子帧 n, 所 述上行资源的起始位置位于所述子帧 n之后的第 k个子帧,其中: n=7, k=4。
结合第四方面或其上述实现方式的任一种,在第四方面的另一种实现方 式中, 所述上行资源为上下行子帧配比为 6时的上行资源, 所述上行资源包 括 2个 UpPTS和 5个上行子帧。
结合第四方面或其上述实现方式的任一种,在第四方面的另一种实现方 式中, 所述控制信令为 PDCCH或者 EPDCCH, 所述当前子帧为子帧 n, 所 述上行资源的起始位置位于所述子帧 n之后的第 k个子帧, 其中: 当 n=0或 5时, k=6; 当 n=l或 6时, k=5; 或者, 所述控制信令为 PHICH, 所述当前 子帧为子帧 m,所述上行资源的起始位置位于所述子帧 m之后的第 t个子帧, 其中: m=0或 5, t=6。
结合第四方面或其上述实现方式的任一种,在第四方面的另一种实现方 式中, 所述控制信令为 PDCCH或者 EPDCCH, 所述当前子帧为子帧 n, 所 述上行资源的起始位置位于所述子帧 n之后的第 k个子帧, 其中: 当 n=l或 6时, k=7; 当 n=9时, k=5; 或者, 所述控制信令为 PHICH, 所述当前子帧 为子帧 m, 所述上行资源的起始位置位于所述子帧 m之后的第 t个子帧, 其 中: 当 m=l或 6时, t=7; 当 m=9时, t=5。
结合第四方面或其上述实现方式的任一种,在第四方面的另一种实现方 式中, 所述上行资源中的 UpPTS包括扩展后的 UpPTS, 其中, 当所述扩展 后的 UpPTS所在子帧插入正常循环前缀 CP时, 所述扩展后的 UpPTS占用 的符号数 χ ζ (3, 10); 当所述扩展后的 UpPTS所在子帧插入扩展 CP时, 所 述扩展后的 UpPTS占用的符号数 X e (3, 8)。
本发明实施例中,将 UpPTS用于 PUSCH的传输,相当于增加了单位时 间内上行传输的数据量, 从而增加了 TDD系统上行的吞吐量。 附图说明
为了更清楚地说明本发明实施例的技术方案, 下面将对本发明实施例中 所需要使用的附图作简单地介绍, 显而易见地, 下面所描述的附图仅仅是本 发明的一些实施例, 对于本领域普通技术人员来讲, 在不付出创造性劳动的 前提下, 还可以根据这些附图获得其他的附图。
图 1是特殊子帧的结构示意图。
图 2是本发明一个实施例的传输 PUSCH的方法的示意性流程图。
图 3是本发明一个实施例的传输 PUSCH的方法的示意性流程图。
图 4是本发明一个实施例的用户设备的示意性框图。
图 5是本发明一个实施例的基站的示意性框图。
图 6是本发明一个实施例的用户设备的示意性框图。
图 7是本发明一个实施例的基站的示意性框图。 具体实施方式
下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行 清楚、 完整地描述, 显然, 所描述的实施例是本发明的一部分实施例, 而不 是全部实施例。 基于本发明中的实施例, 本领域普通技术人员在没有做出创 造性劳动的前提下所获得的所有其他实施例, 都应属于本发明保护的范围。
TDD 系统的子帧可分为 3类: 上行子帧、 下行子帧和特殊子帧。 特殊 子帧的结构参见图 1。 由图 1可知, 特殊子帧包括下行导频时隙 (Downlink Pilot Time Slot, DwPTS )、 保护间隔 (Guard Period, GP )和上行导频时隙 ( Uplink Pilot Time Slot, UpPTS ) 3部分。 具体地, DwPTS部分用于下行传 输, 例如, 控制信道、 数据信道、 同步信号和导频信号的传输。 GP部分作 为保护间隔, 不进行上下行传输。 UpPTS部分用于传输上行的探测参考信号 ( Sounding Reference Signal, SRS )或物理随机接入信道( Physical Random Access Channel, PRACH )。
为了达到增加 TDD系统上行吞吐量的目的, 本发明实施例将 UpPTS用 于传输物理上行共享信道(Physical Uplink Shared Channel, PUSCH ), 下面 结合附图具体论述。
图 2是本发明一个实施例的传输 PUSCH的方法的示意性流程图。 图 2 的方法可以由用户设备(User Equipment, UE )执行。 应理解, 在本发明实 施例中, UE包括但不限于移动台 (MS, Mobile Station ), 移动终端(Mobile Terminal )、移动电话( Mobile Telephone )、手机( handset )及便携设备( ortable equipment )等,该用户设备可以经无线接入网( RAN, Radio Access Network ) 与一个或多个核心网进行通信,例如,用户设备可以是移动电话(或称为 "蜂 窝" 电话)、 具有无线通信功能的计算机等, 用户设备还可以是便携式、 袖 珍式、 手持式、 计算机内置的或者车载的移动装置。 图 2的方法包括:
210、 在当前子帧接收基站发送的控制信令, 该控制信令用于指示传输 PUSCH。
应理解, 这里的当前子帧可以是下行子帧, 也可以是特殊子帧。 例如, 当该当前子帧为特殊子帧时, 控制信令承载于该特殊子帧的 DwPTS中。
应理解, 该控制信令可以是指物理下行控制信道 ( Physical Downlink Control Channel, PDCCH )或增强的物理下行控制信道( Enhanced PDCCH, EPDCCH )。 或者, 该控制信令可以是指包含在上述 PDCCH/EPDCCH中的 下行控制信息 ( Downlink Control Information, DCI ), 例如, DCI格式 0或 DCI 格式 4。 或者, 该控制信令可以是物理混合自动重传请求指示信道 ( Physical Hybrid Automatic Repeat Request Indicator Channel , PHICH ), 当 该控制信令为 PHICH时, 该 PHICH可以是对当前子帧之前的特殊子帧上传 输的 PUSCH 的反馈。 或者, 该控制信令既可以包括 PHICH, 又可以包括 PDCCH, 也就是说, 在当前子帧同时接收 PHICH和 PDCCH。 或者, 该控 制信令既可以包括 PHICH, 又可以包括 EPDCCH, 也就是说, 在当前子帧 同时接收 PHICH和 EPDCCH。
应理解, 上述控制信令用于指示传输 PUSCH具体可指: 控制信令调度 PUSCH的传输; 或者, 控制信令触发 PUSCH的传输。
220、根据该当前子帧的子帧位置,确定用于传输该 PUSCH的上行资源, 该上行资源包括 UpPTS。
具体地, 步骤 220可包括: 根据该当前子帧的子帧位置以及定时关系, 确定用于传输该 PUSCH的上行资源, 其中, 该定时关系用于指示当前子帧 的子帧位置与上行资源所在子帧的子帧位置的对应关系, 以便接收端根据该 对应关系确定该上行资源的位置。 这里的定时关系可以预先配置, 该子帧位 置可以是子帧号。
还应理解, 上述上行资源可以包括 UpPTS , 也可以包括上行子帧(或称 上行的普通子帧 ( normal subframe ) )。 例如, 该上行资源可以是 1个特殊子 帧中的 UpPTS。 或者, 该上行资源可以包括多个特殊子帧中的 UpPTS , 如 包括位于 1帧中的 2个 UpPTS。或者,该上行资源可以包括至少一个 UpPTS 和至少一个上行子帧。 应注意, 当上行资源分布在多个子帧中时, 可以称该 多个子帧为绑定子帧。 后续会详细描述上行资源的具体绑定形式和分布位 置, 以及该上行资源传输的 PUSCH 与用于触发该 PUSCH 的控制信令 ( PDCCH/EPDCCH/PHICH ) 的定时关系。
230、 在该上行资源传输该 PUSCH。
应理解,上述 PUSCH可以是 1个 PUSCH,也可以是多个 PUSCH, PUSCH 的具体数目可以与上行资源的长度和分布位置有关。 假设上行资源为 1 个 UpPTS , 可以通过该 UpPTS 传输 1 个 PUSCH。 H没上行资源包括多个 UpPTS , 可以通过该多个 UpPTS传输 1个或多个 PUSCH。 4叚设上行资源包 括 UpPTS和上行子帧, 可以在 UpPTS中传输 1个 PUSCH, 在每个上行子 帧中各传输 1个 PUSCH; 或者, 可以由 1个 UpPTS和与其位置靠近的 1个 上行子帧共同传输 1个 PUSCH, 剩余的上行子帧各自传输 1个 PUSCH。
需要说明的是, 这里的 UpPTS可以是现有的 UpPTS, 也可以是扩展后 的 UpPTS。 这里所指的扩展后的 UpPTS 在特殊子帧所占的正交频分复用 ( Orthogonal Frequency Division Multiplexing, OFDM )符号数目大于现有的 UpPTS在特殊子帧中所占的 OFDM符号数目。
具体地, 现有技术中, 子帧的持续时间内包含循环前缀( Cyclic Prefix, CP ), 子帧中的每个 OFDM符号前都有 CP。 CP分为 2种: 普通 CP和扩展 CP。 对于普通 CP, 一个子帧包含 14个 OFDM符号; 对于扩展 CP, 一个子 帧包括 12个 OFDM符号。 现有的特殊子帧的 UpPTS最大只有 2个 OFDM 符号, 且不支持 PUSCH的传输。 由于一个特殊子帧内 DwPTS长度至少为 3 个 OFDM符号, GP长度至少为 1个 OFDM符号。 作为一种实现方式, 可 以对 UpPTS 所占的符号数目进行扩展。 具体地, 针对普通 CP, 扩展后的 UpPTS长度大于 2个 OFDM符号, 小于等于 10个 OFDM符号。 针对扩展 CP, 扩展后的 UpPTS长度大于 2个 OFDM符号, 且小于等于 8个 OFDM 符号。 扩展后的 UpPTS 占用的符号数目增多, 能够进一步增加用于上行传 输的资源, 从而进一步增加 TDD系统上行的吞吐量。
本发明实施例中,将 UpPTS用于 PUSCH的传输,相当于增加了单位时 间内上行传输的数据量, 从而增加了 TDD系统上行的吞吐量。
如前所述, 上行资源的绑定形式和分布位置, 以及该上行资源传输的
PUSCH和用于触发该 PUSCH的控制信令的定时关系可以多种多样,下文将 结合表格和具体的实施例进行详细描述。
可选地, 作为一个实施例, 上行资源可以为 1个 UpPTS。 换句话说, 可 以通过 1个 UpPTS单独传输 PUSCH。 需要说明的是, 这里的 1个 UpPTS 可以是现有的 UpPTS, 也可以是扩展后的 UpPTS。 针对普通 CP: 扩展的 UpPTS长度大于 2个 OFDM符号, 小于等于 10个 OFDM符号。 针对扩展 CP, 扩展的 UpPTS长度大于 2个 OFDM符号, 小于等于 8个 OFDM符号。 扩展后的 UpPTS包含的 OFDM符号增加, 从而可以更好地支持上行数据的 传输。
在该情况下, 控制信令与 PUSCH之间的定时关系的设计可以考虑如下 原则:
控制信令中的 PDCCH或 EPDCCH到所传输的 PUSCH的时间最小化, 同时满足基站或 UE最小的时间处理需求, 如 3ms。
尽量避免一个子帧内的控制信令对应不同的 HARQ进程。
尽量复用当前的往返时间 ( RTT, Round Trip Time )值(即数据包初传 到重传的时间)或者尽可能少的增加额外的 RTT值。
尽量少地影响现有的控制信令, 或尽量少的修改控制信令的格式。
应理解,上述原则仅仅是设计 UpPTS单独传输 PUSCH时可以参考的原 贝1 J, 并非是必须要满足的原则。 具体在设计 UpPTS传输 PUSCH时, 可以仅 考虑上述原则中的部分原则,如仅考虑涉及 RTT的原则,或者考虑涉及 RTT 和 HARQ进程的原则等。 在上述原则的指导下, 下文详细描述在各种上下 行子帧配比下, UpPTS单独传输 PUSCH时, 接收控制信令与该 UpPTS的 定时关系。
上下行子帧配比为 0, 上述当前子帧为子帧 n, 即在子帧 n接收控制信 令。 用于传输 PUSCH的 1个 UpPTS可位于该子帧 n之后的第 k个子帧中, 其中: 当 n=l或 6时, k=5。需要说明的是, 当控制信令为 PHICH时, PHICH 可以是对子帧 n之前的子帧 1或子帧 6传输的 PUSCH的反馈。
具体地, 可以使用新增的 HARQ进程实现 UpPTS对 PUSCH的传输。 需要说明的是, 本发明实施例对新增 HARQ进程的数目不作具体限定。 结 合上述设计原则, 下面给出 2个示例: Case 1和 Case 2。 Case 1是在现有 HARQ进程基础上新增 2个 HARQ进程, 此时新增进程对应的 RTT值为 10ms。 Case 2是在现有 HARQ进程基础上新增 3个 HARQ进程, 此时新增 进程对应的 RTT值为 15ms。 新增的 HARQ进程可以使用现有 DCI 中的 HARQ进程保留位进行指示或者使用 DCI 中的新增比特位进行指示或者复 用 DCI中的现有比特位进行指示或者使用 RRC信令与 DCI相结合进行指示。
Case 1 : 新增 2个 HARQ进程, RTT=10ms。 具体参照表 2。
表 2: 上下行子帧配比为 0时的一种实现方式
Figure imgf000021_0001
表 2示出了新增的 2个 HARQ进程: HARQ进程 x和 HARQ进程 y。 其中, X表示 HARQ进程 X对应的 PUSCH, Gx表示 HARQ进程 x对应的 UL grant( PDCCH或 EPDCCH ), Px表示 HARQ进程 x对应的 PHICH, HARQ 进程 y同理。 此外, 表 2给出了连续 4帧时间 (帧 t至帧 t+3 ) 中, HARQ 进程 X和 HARQ进程 y的定时关系。 例如, 在 HARQ进程 y中, 在帧 t的 子帧 1收到 PHICH和 /或 UL grant时, 在以下上行资源传输对应的 PUSCH: 帧 t的子帧 6的 UpPTS。 同理, 在 HARQ进程 x中, 在帧 t的子帧 6中收到 PHICH和 /或 UL grant时, 在以下上行资源传输对应的 PUSCH: 帧 t+1的子 帧 1的 UpPTS。 需要说明的是, 这里的 X和 y仅仅是为了描述方便, 并非要 对 HARQ进程的具体参数进行限定, 实际中, 上下行子帧配比为 0时, 现 有系统( UE或基站)可支持 7个 HARQ进程, 这里的 X和 y可以分别是新 增的 HARQ进程 8和 HARQ进程 9, 换句话说, 上述 PUSCH传输对应的 HARQ进程可以是新增的 HARQ进程 8或 HARQ进程 9。
需要说明的是, 当控制信令为 PHICH时, PHICH可以是对子帧 n之前 的子帧 1或子帧 6传输的 PUSCH的反馈。 从表 2可以看出, 各个 HARQ进 程的 2个 PUSCH的传输时间之间相差 10ms , 即各个 HARQ进程的 RTT值 为 10ms, 复用了现有系统的 RTT值, 对现有协议改动小。 此外, 从表 2可 以看出, 在每个 HARQ进程中, 从接收到控制信令到传输 PUSCH所间隔的 时间是满足 UE或基站最小处理时间 (3ms )前提下的最小值, 采用这样的 方式可以有效减少数据的传输时延。
Case 2: 新增 3个 HARQ进程, RTT=15ms。 具体参照表 3。
表 3: 上下行子帧配比为 0时的一种实现方式
Figure imgf000022_0001
ULgrant Gx Gy Gz Gx
PUSCH
帧 t+6
子 子 子 子 子 子 子 子 子 子
帧 帧 帧 帧 帧 帧 帧 帧 帧 帧
0 1 2 3 4 5 6 7 8 9
PHICH Py Pz
ULgrant Gy Gz
PUSCH y
表 3与表 2类似, 不同的是, 表 3对应的实施例引入 3个 HARQ进程:
HARQ进程 x、 HARQ进程 y和 HARQ进程 z。 从表 3可以看出, 无论是 HARQ进程 X、 HARQ进程 y还是 HARQ进程 z,当在子帧 1或 6接收到 PHICH 或 UL grant时, 在以下上行资源资源中传输对应的 PUSCH: 该子帧 1或 6 之后的第 5个子帧的 UpPTS。此外,各个 HARQ进程的 2个 PUSCH传输时 间之间相差 15ms, 即各个 HARQ进程的 RTT值为 15ms。 需要说明的是, 这里的 x、 y和 z仅仅是为了描述方便, 并非要对 HARQ进程的具体参数进 行限定, 实际中, 上下行子帧配比为 0时, 现有系统(UE或基站)可支持 7个 HARQ进程,这里的 x、 y和 z可以分别是新增的 HARQ进程 8、 HARQ 进程 9和 HARQ进程 10, 换句话说, 上述 PUSCH传输对应的 HARQ进程 可以是新增的 HARQ进程 8、 HARQ进程 9或 HARQ进程 10。
从表 3 可以看出, 在每个 HARQ 进程中, 从接收到控制信令到传输 PUSCH所间隔的时间是满足 UE或基站最小处理时间 (3ms )前提下的最小 值, 釆用这样的方式可以有效减少数据的传输时延。
上下行子帧配比为 1, 上述当前子帧为子帧 n, 即在子帧 n接收控制信 令( PDCCH/EPDCCH/PHICH )。 用于传输 PUSCH的 UpPTS位于该子帧 n 之后的第 k个子帧中, 其中: 当 n=l或 6时, k=5。 需要说明的是, 当控制 信令为 PHICH时, PHICH可以是对子帧 n之前的子帧 1或子帧 6传输的 PUSCH的反馈。
具体地, 可以为 UpPTS传输 PUSCH新增 1个或多个 HARQ进程。 需 要说明的是, 本发明实施例对 HARQ 进程的具体数目不作限定。 新增的 HARQ进程可以使用现有 DCI 中的 HARQ进程保留位进行指示或者使用 DCI 中的新增比特位进行指示或者复用 DCI 中的现有比特位进行指示或者 使用 RRC信令与 DCI相结合进行指示。表 4示出了新增 2个 HARQ进程的 一个示例。
表 4: 上下行子帧配比为 1是的一种实现方式
Figure imgf000024_0001
表 4示出了新增的 2个 HARQ进程: HARQ进程 x和 HARQ进程 y。 其中, X表示 HARQ进程 X对应的 PUSCH, Gx表示 HARQ进程 x对应的 UL grant( PDCCH或 EPDCCH ), Px表示 HARQ进程 x对应的 PHICH, HARQ 进程 y同理。 此外, 表 4给出了连续 4帧时间 (帧 t至帧 t+3 ) 中, HARQ 进程 X和 HARQ进程 y的定时关系。 例如, 在 HARQ进程 y中, 当在帧 t 的子帧 1 收到 PHICH和 /或 UL grant 时, 在以下上行资源中传输对应的 PUSCH: 帧 t的子帧 6的 UpPTS。 同理, 在 HARQ进程 x中, 当在帧 t的 子帧 6 中收到 PHICH和 /或 UL grant 时, 在以下上行资源中传输对应的 PUSCH: 帧 t+1的子帧 1的 UpPTS。 需要说明的是, 这里的 X和 y仅仅是为 了描述方便, 并非要对 HARQ进程的具体参数进行限定, 实际中, 上下行 子帧配比为 1时, 现有系统(UE或基站)可支持 4个 HARQ进程, 这里的 X和 y可以分别是新增的 HARQ进程 5和 HARQ进程 6, 换句话说, 上述 PUSCH传输对应的 HARQ进程可以是新增的 HARQ进程 5或 HARQ进程 6。 新增的 HARQ进程如可以使用现有 DCI中的 HARQ进程 3bit指示中的保留 位进行指示。
从表 4可以看出, 各个 HARQ进程的 2个 PUSCH传输时间之间相差 10ms,即 HARQ进程的 RTT值为 10ms,即各个 HARQ进程的 RTT值为 10ms, 复用了现有系统的 RTT值, 对现有协议改动小。 此外, 从表 2可以看出, 在每个 HARQ进程中,从接收到控制信令到传输 PUSCH所间隔的时间是满 足 UE或基站最小处理时间 (3ms )前提下的最小值, 釆用这样的方式可以 有效减少数据的传输时延。
上下行子帧配比为 1, 上述当前子帧为子帧 n, 即在子帧 n接收控制信 令( PDCCH/EPDCCH/PHICH )。 用于传输 PUSCH的 UpPTS位于该子帧 n 之后的第 k个子帧中, 其中: 当 n=0或 5时, k=6。 新增 2个 HARQ进程, RTT=10ms。 需要说明的是, 当控制信令为 PHICH时, PHICH 可以是对子 帧 n之前的子帧 1或子帧 6传输的 PUSCH的反馈。 具体参照表 5。
表 5: 上下行子帧配比为 1时的一种实现方式
Figure imgf000025_0001
表 5与表 4类似, 不同的是, 表 5对应的实施例的 HARQ进程与表 4 对应的实施例的 HARQ进程具有不同的定时关系。 从表 5可以看出, 无论 是 HARQ进程 x、 HARQ进程 y还是 HARQ进程 z, 当在子帧 0或 5接收到 PHICH或 UL grant时, 在以下上行资源中传输对应的 PUSCH: 该子帧 0或 5之后的第 6个子帧的 UpPTS。 此外, 各个 HARQ进程的 2个 PUSCH传输 时间之间相差 10ms, 即 HARQ进程的 RTT值为 10ms。
从表 5可以看出, 各个 HARQ进程的 2个 PUSCH传输时间之间相差 10ms, 即 HARQ进程的 RTT值为 10ms, 复用了现有系统的 RTT值, 对现 有协议改动小。 此外, 从表 2可以看出, 在每个 HARQ进程中, 从接收到 控制信令到传输 PUSCH所间隔的时间是满足 UE或基站最小处理时间( 3ms ) 前提下的最小值,釆用这样的方式可以有效减少数据的传输时延。进一步地, 新增 HARQ进程的控制信令的接收子帧避开了现有 HARQ进程的控制信令 的接收子帧, 避免了在控制信令中增加用于区分不同 HARQ进程的比特数, 能够降低控制信令的开销。
上下行子帧配比为 2, 上述当前子帧为子帧 n, 即在子帧 n接收控制信 令。 用于传输 PUSCH的 UpPTS位于该子帧 n之后的第 k个子帧中, 其中: 当 n=l或 6时, k=5。 需要说明的是, 当控制信令为 PHICH时, PHICH可 以是对子帧 n之前的子帧 1或子帧 6传输的 PUSCH的反馈。
具体地, 可以为 UpPTS传输 PUSCH分配单独的 HARQ进程。 需要说 明的是, 本发明实施例对 HARQ进程的具体数目不作限定。 新增的 HARQ 进程可以使用现有 DCI中的 HARQ进程保留位进行指示或者使用 DCI中的 新增比特位进行指示或者复用 DCI中的现有比特位进行指示或者使用 RRC 信令与 DCI相结合进行指示。 结合上述设计原则, 下面给出 1个示例: Case 1。 在 Case 1中, 新增 2个 HARQ进程, RTT=10ms。 具体参照表 6。
表 6: 上下行子帧配比为 2时的一种实现方式
帧 t 帧 t+1
子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧
0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9
D S U D D D S U D D D S U D D D S U D D
PHICH Py Px Py Px
ULgrant Gy Gx Gy Gx PUSCH y y
帧 t+2 帧 t+3
子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧
0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9
PHICH Py Px Py Px
ULgrant Gy Gx Gy Gx
PUSCH y y
表 6示出了新增的 2个 HARQ进程: HARQ进程 x和 HARQ进程 y。 其中, X表示 HARQ进程 X对应的 PUSCH, Gx表示 HARQ进程 x对应的 UL grant( PDCCH或 EPDCCH ), Px表示 HARQ进程 x对应的 PHICH, HARQ 进程 y同理。 此外, 表 6给出了连续 4帧时间 (帧 t至帧 t+3 ) 中, HARQ 进程 X和 HARQ进程 y的定时关系。 例如, 在 HARQ进程 y中, 当在帧 t 的子帧 1 收到 PHICH和 /或 UL grant 时, 在以下上行资源中传输对应的 PUSCH: 帧 t的子帧 6的 UpPTS。 同理, 在 HARQ进程 x中, 当在帧 t的 子帧 6中收到 PHICH和 /或 UL grant时,在以下上行资源传输对应的 PUSCH: 帧 t+1的子帧 1的 UpPTS。 需要说明的是, 这里的 X和 y仅仅是为了描述方 便, 并非要对 HARQ进程的具体参数进行限定, 实际中, 上下行子帧配比 为 2时, 现有系统( UE或基站)可支持 2个 HARQ进程, 这里的 x和 y可 以分别是新增的 HARQ进程 3和 HARQ进程 4, 换句话说, 上述 PUSCH传 输对应的 HARQ进程可以是新增的 HARQ进程 3或 HARQ进程 4。 新增的 HARQ进程如可以使用现有 DCI中的 HARQ进程 3bit指示中的保留位进行 指示。
从表 6可以看出, 各个 HARQ进程的 2个 PUSCH传输时间之间相差 10ms, 即 HARQ进程的 RTT值为 10ms, 复用了现有系统的 RTT值, 对现 有协议改动小。 此外, 从表 6可以看出, 在每个 HARQ进程中, 从接收到 控制信令到传输 PUSCH所间隔的时间是满足 UE或基站最小处理时间( 3ms ) 前提下的最小值,釆用这样的方式可以有效减少数据的传输时延。进一步地, 新增 HARQ进程的控制信令的接收子帧避开了现有 HARQ进程的控制信令 的接收子帧, 避免了在控制信令中增加用于区分不同 HARQ进程的比特数, 能够降低控制信令的开销。 上下行子帧配比为 3, 上述当前子帧为子帧 n, 即在子帧 n接收控制信 令。 用于传输 PUSCH的 UpPTS位于该子帧 n之后的第 k个子帧中, 其中: 当 n=7时, k=4。 需要说明的是, 当控制信令为 PHICH时, PHICH可以是 对子帧 n之前的子帧 1传输的 PUSCH的反馈。
具体地, 可以为 UpPTS传输 PUSCH分配单独的 HARQ进程。 需要说 明的是, 本发明实施例对 HARQ进程的具体数目不作限定。 结合上述设计 原则, 下面给出 1个示例: Case 1。 在 Case 1中, 新增 1个 HARQ进程, RTT=10ms。 具体参照表 7。
表 7: 上下行子帧配比为 3时的一种实现方式
Figure imgf000028_0001
表 7示出了新增的 1个 HARQ进程: HARQ进程 x。其中, x表示 HARQ 进程 X对应的 PUSCH, Gx表示 HARQ进程 x对应的 UL grant ( PDCCH或 EPDCCH ), Px表示 HARQ进程 x对应的 PHICH。 此外, 表 7给出了连续 4 帧时间 (帧 t至帧 t+3 ) 中, HARQ进程 X的定时关系。 例如, 在 HARQ进 程 X中, 当在帧 t的子帧 7收到 PHICH和 /或 UL grant时, 在以下上行传输 资源传输对应的 PUSCH: 帧 t+1的子帧 1的 UpPTS。 需要说明的是, 这里 的 X仅仅是为了描述方便, 并非要对 HARQ进程的具体参数进行限定, 实 际中, 上下行子帧配比为 3时, 现有系统 ( UE或基站 ) 可支持 3个 HARQ 进程, 这里的 X可以是新增的 HARQ进程 4, 换句话说, 上述 PUSCH传输 对应的 HARQ进程可以是新增的 HARQ进程 4。 新增的 HARQ进程如可以 使用现有 DCI中的 HARQ进程 3bit指示中的保留位进行指示。
从表 7可以看出, HARQ进程 X的 2个 PUSCH传输时间之间相差 10ms, 即 HARQ进程的 RTT值为 10ms, 复用了现有系统的 RTT值, 对现有协议 改动小。 此外, 从表 7可以看出, 在每个 HARQ进程中, 从接收到控制信 令到传输 PUSCH所间隔的时间是满足 UE或基站最小处理时间( 3ms )前提 下的最小值, 采用这样的方式可以有效减少数据的传输时延。 进一步地, 新 增 HARQ进程的控制信令的接收子帧避开了现有 HARQ进程的控制信令的 接收子帧, 避免了在控制信令中增加用于区分不同 HARQ 进程的比特数, 能够降低控制信令的开销。
上下行子帧配比为 4, 上述当前子帧为子帧 n, 即在子帧 n接收控制信 令( PDCCH/EPDCCH/PHICH )。 用于传输 PUSCH的 UpPTS位于该子帧 n 之后的第 k个子帧中, 其中: 当 n=7时, k=4。 需要说明的是, 当控制信令 为 PHICH时, PHICH可以是对子帧 n之前的子帧 1传输的 PUSCH的反馈。
具体地, 可以为 UpPTS传输 PUSCH分配单独的 HARQ进程。 需要说 明的是, 本发明实施例对 HARQ 进程的具体数目不作限定。 结合上述设计 原则, 下面给出 1个示例: Case 1。 在 Case 1中, 新增 1个 HARQ进程, RTT=10ms。 具体参照表 8。
表 8: 上下行子帧配比为 4时的一种实现方式
Figure imgf000029_0001
帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧
0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9
PHICH Px Px
ULgrant Gx Gx
PUSCH
表 8中示出了新增的 1个 HARQ进程: HARQ进程 x。 其中,
HARQ进程 X对应的 PUSCH, Gx表示 HARQ进程 x对应的 UL grant( PDCCH 或 EPDCCH ), Px表示 HARQ进程 x对应的 PHICH。 此外, 表 8给出了连 续 4帧时间(帧 t至帧 t+3 )中, HARQ进程 X的定时关系。 例如, 在 HARQ 进程 X中, 当在帧 t的子帧 7收到 PHICH和 /或 UL grant时, 在以下上行资 源中传输对应的 PUSCH: 帧 t+1的子帧 1的 UpPTS。 需要说明的是, 这里 的 X仅仅是为了描述方便, 并非要对 HARQ进程的具体参数进行限定, 实 际中, 上下行子帧配比为 3时, 现有系统(UE或基站)可支持 2个 HARQ 进程, 这里的 X可以是新增的 HARQ进程 3, 换句话说, 上述 PUSCH传输 对应的 HARQ进程可以是新增的 HARQ进程 3。 新增的 HARQ进程如可以 使用现有 DCI中的 HARQ进程 3bit指示中的保留位进行指示。
从表 8可以看出, HARQ进程 X的 2个 PUSCH传输时间之间相差 10ms, 即 HARQ进程的 RTT值为 10ms, 复用了现有系统的 RTT值, 对现有协议 改动小。 此外, 从表 8可以看出, 在每个 HARQ进程中, 从接收到控制信 令到传输 PUSCH所间隔的时间是满足 UE或基站最小处理时间( 3ms )前提 下的最小值, 釆用这样的方式可以有效减少数据的传输时延。 进一步地, 新 增 HARQ进程的控制信令的接收子帧避开了现有 HARQ进程的控制信令的 接收子帧, 避免了在控制信令中增加用于区分不同 HARQ进程的比特数, 能够降低控制信令的开销。
上下行子帧配比为 5, 上述当前子帧为子帧 n为子帧 n, 即在子帧 n接 收控制信令 ( PDCCH/EPDCCH/PHICH )。 用于传输 PUSCH的 UpPTS位于 该子帧 n之后的第 k个子帧中, 其中: 当 n=7时, k=4。 需要说明的是, 当 控制信令为 PHICH时, PHICH可以是对子帧 n之前的子帧 1传输的 PUSCH 的反馈。
具体地, 可以为 UpPTS传输 PUSCH分配单独的 HARQ进程。 需要说 明的是, 本发明实施例对 HARQ进程的具体数目不作限定。 结合上述设计 原则, 下面给出 1个示例: Case 1。 在 Case 1中, 新增 1个 HARQ进程, RTT=10ms。 具体参照表 9。
表 9: 上下行子帧配比 5、 RTT=10ms的 HARQ定时关系
Figure imgf000031_0001
表 9示出了新增的 1个 HARQ进程: HARQ进程 x。其中, x表示 HARQ 进程 X对应的 PUSCH, Gx表示 HARQ进程 x对应的 UL grant ( PDCCH或 EPDCCH ), Px表示 HARQ进程 x对应的 PHICH。 此外, 表 9给出了连续 4 帧时间 (帧 t至帧 t+3 ) 中, HARQ进程 X的定时关系。 例如, 在 HARQ进 程 X中, 在帧 t的子帧 7收到 PHICH和 /或 UL grant时, 在以下上行资源中 传输对应的 PUSCH: 帧 t+1的子帧 1。 需要说明的是, 这里的 X仅仅是为了 描述方便, 并非要对 HARQ进程的具体参数进行限定, 实际中, 上下行子 帧配比为 5时, 现有系统( UE或基站)可支持 1个 HARQ进程, 这里的 x 可以是新增的 HARQ进程 2, 换句话说, 上述 PUSCH传输对应的 HARQ进 程可以是新增的 HARQ进程 2。 新增的 HARQ进程如可以使用现有 DCI中 的 HARQ进程 3bit指示中的保留位进行指示。
从表 9可以看出, HARQ进程 X的 2个 PUSCH传输时间之间相差 10ms, 即 HARQ进程的 RTT值为 10ms, 复用了现有系统的 RTT值, 对现有协议 改动小。 此外, 从表 9可以看出, 在每个 HARQ进程中, 从接收到控制信 令到传输 PUSCH所间隔的时间是满足 UE或基站最小处理时间( 3ms )前提 下的最小值, 釆用这样的方式可以有效减少数据的传输时延。 进一步地, 新 增 HARQ进程的控制信令的接收子帧避开了现有 HARQ进程的控制信令的 接收子帧, 避免了在控制信令中增加用于区分不同 HARQ 进程的比特数, 能够降低控制信令的开销。
上下行子帧配比为 6, 上述当前子帧为子帧 n为子帧 n, 即在子帧 n接 收控制信令 ( PDCCH/EPDCCH/PHICH )„ 用于传输 PUSCH的 UpPTS位于 该子帧 n之后的第 k个子帧中, 其中: 当 n=l或 6时, k=5。 需要说明的是, 当控制信令为 PHICH时, PHICH可以是对子帧 n之前的子帧 1或子帧 6传 输的 PUSCH的反馈。
具体地, 可以为 UpPTS传输 PUSCH分配单独的 HARQ进程。 需要说 明的是, 本发明实施例对 HARQ进程的具体数目不作限定。 新增的 HARQ 进程越多, 每个 HARQ进程对应的 RTT值越大。 结合上述设计原则, 下面 给出 2个示例: Case 1和 Case 2。 Case 1是在现有 HARQ进程基础上新增 2 个 HARQ进程, 此时对应的 RTT值为 10ms, 具体参见表 10。 Case 2是现有 在现有 HARQ进程基础上新增 3个 HARQ进程,此时对应的 RTT值为 15ms, 具体参见表 11。
表 10: 上下行子帧配比为 6 的一种实现方式
Figure imgf000032_0001
PHICH Py Px Py Px
ULgrant Gy Gx Gy Gx
PUSCH
表 10示出了新增的 2个 HARQ进程: HARQ进程 x和 HARQ进程 y。 其中, x表示 HARQ进程 X对应的 PUSCH, Gx表示 HARQ进程 x对应的 UL grant( PDCCH或 EPDCCH ), Px表示 HARQ进程 x对应的 PHICH, HARQ 进程 y同理。 此外, 表 10给出了连续 4帧时间 (帧 t至帧 t+3 ) 中, HARQ 进程 X和 HARQ进程 y的定时关系。 例如, 在 HARQ进程 y中, 当在帧 t 的子帧 1收到 PHICH和 /或 UL grant时,在以下上行资源传输对应的 PUSCH: 帧 t的子帧 6。 同理, 在 HARQ进程 X中, 当在帧 t的子帧 6中收到 PHICH 和 /或 UL grant时, 在以下上行资源传输对应的 PUSCH: 帧 t+1的子帧 1的 UpPTS。需要说明的是,这里的 X和 y仅仅是为了描述方便,并非要对 HARQ 进程的具体参数进行限定, 实际中, 上下行子帧配比为 6时, 现有系统(UE 或基站)可支持 6个 HARQ进程, 这里的 X和 y可以分别是新增的 HARQ 进程 7和 HARQ进程 8,换句话说, 上述 PUSCH传输对应的 HARQ进程可 以是新增的 HARQ进程 7或 HARQ进程 8。 新增的 HARQ进程如可以使用 现有 DCI中的 HARQ进程 3bit指示中的保留位进行指示。
从表 10可以看出, 各个 HARQ进程的 2个 PUSCH传输时间之间相差
10ms, 即 HARQ进程的 RTT值为 10ms, 复用了现有系统的 RTT值, 对现 有协议改动小。 此外, 从表 10可以看出, 在每个 HARQ进程中, 从接收到 控制信令到传输 PUSCH所间隔的时间是满足 UE或基站最小处理时间( 3ms ) 前提下的最小值, 釆用这样的方式可以有效减少数据的传输时延。
表 11 : 上下行子帧配比 6、 RTT=15ms的 HARQ定时关系
Figure imgf000033_0001
帧 t+2 帧 t+3
子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧
0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9
PHICH Pz Px Py Pz
ULgrant Gz Gx Gy Gz
PUSCH
帧 t+4 帧 t+5
子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧
0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9
PHICH Px Py Pz Px
ULgrant Gx Gy Gz Gx
PUSCH
帧 t+6
子 子 子 子 子 子 子 子 子 子
帧 帧 帧 帧 帧 帧 帧 帧 帧 帧
0 1 2 3 4 5 6 7 8 9
PHICH Py Px
ULgrant Gy Gx
PUSCH y
表 11与表 10类似, 不同的是, 表 11对应的实施例引入 3个 HARQ进 程: HARQ进程 x、 HARQ进程 y和 HARQ进程 z。 从表 11可以看出, 无 论是 HARQ进程 x、 HARQ进程 y还是 HARQ进程 z, 当在子帧 1或 6接收 到 PHICH或 UL grant时, 在以下上行资源中传输对应的 PUSCH: 子帧 1或
6之后的第 5个子帧的 UpPTS。 此外, 各个 HARQ进程的 2个 PUSCH传输 时间之间相差 15ms, 即 HARQ进程的 RTT值为 15ms。 需要说明的是, 这 里的 X和 y仅仅是为了描述方便, 并非要对 HARQ进程的具体参数进行限 定, 实际中, 上下行子帧配比为 6时, 现有系统(UE或基站)可支持 6个 HARQ进程, 这里的 X、 y和 z可以分别是新增的 HARQ进程 7、 HARQ进 程 8和 HARQ进程 9, 换句话说, 上述 PUSCH传输对应的 HARQ进程可以 是新增的 HARQ进程 7、 HARQ进程 8或 HARQ进程 9。
从表 11 可以看出, 在每个 HARQ 进程中, 从接收到控制信令到传输 PUSCH所间隔的时间是满足 UE或基站最小处理时间 (3ms )前提下的最小 值, 釆用这样的方式可以有效减少数据的传输时延。
上文釆用单个 UpPTS来传输 PUSCH, 能够有效地增加 TDD系统上行 的吞吐量。 为了增加 TDD系统的上行覆盖, 可以釆用 UpPTS与其他上行资 源绑定的方式传输 PUSCH, 详见下文。
可选地, 作为一个实施例, 图 2方法中的上行资源还包括上行子帧, 且 该上行资源为连续的上行资源。 换句话说, 在该实施例中, 上行资源既包括 UpPTS , 也包括上行子帧, 上行资源是通过将 UpPTS 和上行子帧绑定而实 现的。 上行资源中包括的各个 UpPTS可以是现有系统的 UpPTS , 也可以是 扩展后的 UpPTS。 针对普通 CP: 扩展后的 UpPTS长度大于 2个 OFDM符 号, 小于等于 10个 OFDM符号。 针对扩展 CP, 扩展后的 UpPTS长度大于 2个 OFDM符号,小于等于 8个 OFDM符号。扩展后的 UpPTS包含的 OFDM 符号增加, 从而可以更好地支持上行数据的传输。
本发明实施例中,将 UpPTS用于 PUSCH的传输,相当于增加了单位时 间内上行传输的数据量, 从而增加了 TDD系统上行的吞吐量。 此外, 釆用 UpPTS与其他上行资源绑定的方式传输 PUSCH, 相当于增加了单位时间内 上行数据的传输次数, 从而增加了上行数据接收的信噪比, 进而增加上行覆 盖。
需要说明的是, 上述连续的上行资源中的 "连续" 并非要求上行资源在 时间上连续,而是指上行资源要么在时间上连续,要么中间间隔非上行资源。 这里的非上行资源包括: 下行子帧、 特殊子帧的 DwPTS 或特殊子帧的 GP 行资源同样落入本发明实施例的保护范围。
还需要说明的是, 在该实施例中, 在步骤 210之前, 还可以包括: 确定 绑定子帧配置信息,该绑定子帧配置信息可包括: 绑定子帧的个数和 /或上行 资源的分布位置等信息。 具体地, 该子帧配置信息可以由基站或 UE预先配 置。 或者, 上述确定绑定子帧配置信息可包括: 接收基站发送的承载该绑定 子帧配置信息的信令。 该信令可以是绑定子帧启动信令, 也可以是绑定子帧 个数配置信令, 例如, 可以是无线资源控制(Radio Resource Control, RRC ) 信令、 媒体接入控制 ( Media Access Control, MAC ) 信令或者
PDCCH/EPDCCH信令中的一个或者它们的结合。
在该实施例中, 传输 PUSCH的 HARQ进程的定时关系、 上行资源的绑 定形式以及上行资源的分布位置的设计可以考虑如下原则:
控制信令 PDCCH或 EPDCCH到所传输的 PUSCH的时间最小化, 同时 满足基站或 UE最小的时间处理需求, 如 3ms。
尽量避免一个子帧内的控制信令对应不同的 HARQ进程。
尽量复用当前的 RTT值(即数据包初传到重传的时间)或者尽可能少 的增加额外的 RTT值。
尽量少地影响现有的控制信令, 或尽量少的修改控制信令的格式。
各个 HARQ进程尽量具有相同的 UpPTS个数。
尽量复用当前的 PUSCH到控制信令 PHICH的时间关系。
应理解, 上述原则仅仅是设计 HARQ 定时关系、 上行资源绑定形式和 上行资源分布位置时可以参考的原则, 并非是必须要满足的原则。 例如, 在 设计时, 可以仅考虑上述原则的部分原则, 如仅考虑涉及 RTT 的原则, 或 者考虑涉及 RTT和 HARQ进程的原则等。 在上述原则的指导下, 下文详细 描述在各种上下行子帧配比下, HARQ定时关系、 上行资源绑定形式和上行 资源分布位置。
可选地, 作为一个实施例, 上下行子帧配比为 0, 上行资源包括 2 个 UpPTS和 6个上行子帧。 需要说明的是, 在上下行子帧配比为 0的情况下, 可以让上行子帧位于该上行资源的起始位置, 也可以让 UpPTS位于该上行 资源的起始位置。 此外, 即使上行资源的绑定形式确定, HARQ 进程数或 HARQ进程的 RTT值也可以有多种, 本发明实施例对此不作具体限定。 下 面给出 RTT值为 30ms的 2种具体的实现方式: Case 1和 Case 2。 后续还会 对本发明实施例的其他实现方式做详细介绍。
Case 1 : 上下行子帧配比为 0, 上行资源包括 2个 UpPTS和 6个上行子 帧, UpPTS 位于上行资源的起始位置, 在子帧 n接收(或检测) UL grant ( PDCCH或 EPDCCH ), 和 /或在子帧 n之前的第 I个子帧接收(或检测) PHICH。 上行资源的起始位置位于子帧 n之后的第 k个子帧, 其中: 当 n=l 或 6时, k=5, Z=ll。 Case 1中的其他参数可包括: HARQ进程数为 3 (即上 述 PUSCH的传输对应的 HARQ进程为上下行子帧配比为 0时 3个 HARQ 中的一个), 和 /或 RTT值为 30ms, 具体参见表 12。
表 12: 上下行子帧配比为 0时的一种实现方式
Figure imgf000037_0001
表 12示出了 3个 HARQ进程: HARQ进程 x、 HARQ进程 y和 HARQ 进程 z。 其中, X表示 HARQ进程 X对应的 PUSCH, Gx表示 HARQ进程 x 对应的 UL grant( PDCCH或 EPDCCH ), Px表示 HARQ进程 x对应的 PHICH, HARQ进程 y和 HARQ进程 z同理。 此外, 表 12给出了连续 6帧时间 (帧 t至帧 t+5 ) 内, HARQ进程 x、 HARQ进程 y和 HARQ进程 z中上行资源 的绑定形式、 分布位置, 以及 HARQ定时关系。 例如, 在 HARQ进程 y中, 当在帧 t的子帧 5收到 PHICH, 在帧 t+1的子帧 6收到 UL grant时, 在以下 上行资源中传输对应的 PUSCH: 帧 t+2中的子帧 1的 UpPTS、 子帧 2、 子帧 3、 子帧 4、 子帧 6的 UpPTS、 子帧 7、 子帧 8和子帧 9。 同理, 在 HARQ进 程 X中,当在帧 t+1的子帧 5接收到 PHICH,在帧 t+2的子帧 6收到 UL grant 时, 在以下上行资源中传输对应的 PUSCH: 帧 t+3中的子帧 1的 UpPTS、 子帧 2、 子帧 3、 子帧 4、 子帧 6的 UpPTS、 子帧 7、 子帧 8和子帧 9。
从表 12可以看出, HARQ进程 x、 HARQ进程 y和 HARQ进程 z的 RTT 值均为 30ms, 举例说明, 在 HARQ进程 x中, 在帧 t的子帧 1开始上行传 输(帧 t的第 1个 X出现的位置), 下次上行传输的开始位置是帧 t+3的子帧 1 (帧 t+3的第 1个 X出现的位置), 中间相隔了 30ms。 对于如 VOIP等时延 敏感业务, 一般传输时延要求在 50ms左右, HARQ进程的 RTT值设置为 30ms 能够有效增大这种时延敏感类业务传输的时间分集增益。 此外, 从表 12可以看出, 在每个 HARQ进程中, 从接收到控制信令到传输 PUSCH所 间隔的时间是满足 UE或基站最小处理时间 (3ms )前提下的最小值, 釆用 这样的方式可以有效减少数据的传输时延。 此外, 各 HARQ进程中包含的 UpPTS数目相同, 降低了系统(UE或基站)协调处理各个 HARQ进程的复 杂度。
需要说明的是, 在 Case 1中, 虽然 PUSCH的传输是在接收到 PHICH 和 UL grant之后进行的, 但这仅仅是一个示例, 并非要限定 PUSCH的传输 必须以接收到 PHICH和 UL grant为前提条件。 作为另一种示例, 当 UE仅 接收到 PHICH或者仅接收到 UL grant时,也可以仅基于该 PHICH或 UL grant 找到传输 PUSCH的上行资源的位置。 比如,基站可以仅向 UE发送 PHICH, UE在接收到 PHICH之后, 可以基于 PHICH所在子帧找到传输 PUSCH的 上行资源的位置。 又如, 基站向 UE发送了 PHICH和 UL grant, 但是 UE未 能正确接收 UL grant,该 UE可以根据之前接收到的 PHICH所在子帧找到传 输 PUSCH的上行资源的位置。 具体地, 在 Case 1中, 假设在子帧 m接收到 PHICH,且未接收到 UL grant或者未正确接收到 UL grant时, 则基于子帧 m 确定上行资源的起始位置位于该子帧 m之后的第 t个子帧, 其中: 当 m=0 或 5时, t=16。
Case 2: 上下行子帧配比为 0, 上行资源包括 2个 UpPTS和 6个上行子 帧, UpPTS不位于上行资源的起始位置, 在子帧 n接收 UL grant ( PDCCH 或 EPDCCH ), 和 /或在子帧 n之前的第 I个子帧接收 PHICH。 上行资源的起 始位置位于子帧 n之后的第 k个子帧, 其中: 当 n=0或 5时, k=4, Z=10; 当 n=l或 6时, k=7, Z=10。 Case 2中的其他参数可包括: HARQ进程数为 3 (即上述 PUSCH的传输对应的 HARQ进程为上下行子帧配比为 0时 3个 HARQ进程中的一个), 和 /或 RTT值为 30ms。
对于如 VOIP等时延敏感业务,一般传输时延要求在 50ms左右, HARQ 进程的 RTT值设置为 30ms能够有效增大这种时延敏感类业务传输的时间分 集增益。 此外, 各 HARQ进程中包含的 UpPTS数目相同, 降低了系统(UE 或基站)协调处理各个 HARQ进程的复杂度。
需要说明的是, 在 Case 2中, 虽然 PUSCH的传输是在接收到 PHICH 和 UL grant之后进行的, 但这仅仅是一个示例, 并非要限定 PUSCH的传输 必须以接收到 PHICH和 UL grant为前提条件。 作为另一种示例, 当 UE仅 接收到 PHICH或者仅接收到 UL grant时,也可以仅基于该 PHICH或 UL grant 找到传输 PUSCH的上行资源的位置。 比如,基站可以仅向 UE发送 PHICH, UE在接收到 PHICH之后, 可以基于 PHICH所在子帧找到传输 PUSCH的 上行资源的位置。 又如, 基站向 UE发送了 PHICH和 UL grant, 但是 UE未 能正确接收 UL grant,该 UE可以根据之前接收到的 PHICH所在子帧找到传 输 PUSCH的上行资源的位置。 具体地, 在 Case 2中, 假设在子帧 m接收到 PHICH,且未接收到 UL grant或者未正确接收到 UL grant时, 则基于子帧 m 确定上行资源的起始位置位于该子帧 m之后的第 t个子帧, 其中: 当 m=0 或 5时, t=14; 当 m=l或 6时, t=17。
可选地, 作为一个实施例, 上下行子帧配比为 1, 上行资源包括 2 个 UpPTS和 4个上行子帧。 需要说明的是, 在上下行子帧配比为 1的情况下, 可以让上行子帧位于该上行资源的起始位置, 也可以让 UpPTS位于该上行 资源的起始位置。 此外, 即使上行资源的绑定形式(绑定子帧的个数和 /或绑 定子帧分布形式(连续分布或离散分布等))确定, HARQ进程数或 HARQ 进程的 RTT值也可以有多种, 本发明实施例对此不作具体限定。 下面给出 RTT值为 30ms的 2种具体的实现方式: Case 1和 Case 2。 后续还会对本发 明实施例的其他实现方式#支详细介绍。 Case 1: 上下行子帧配比为 1, 上行资源包括 2个 UpPTS和 4个上行子 帧, UpPTS位于上行资源的起始位置, 在子帧 n接收 UL grant ( PDCCH或 EPDCCH ), 和 /或在子帧 n之前的第 /个子帧接收 PHICH。 上行资源的起始 位置位于子帧 n之后的第 k个子帧, 其中: 当 n=l或 6时, k=5, Z=12。 Case 1 中的其他参数可包括: HARQ进程数为 3 (即上述 PUSCH的传输对应的 HARQ进程为上下行子帧配比为 1时 3个 HARQ进程中的一个;),和 /或 RTT 值为 30ms, 具体参见表 13。
表 13: 上下行子帧配比为 1时的一种实现方式
Figure imgf000040_0001
表 13示出了 3个 HARQ进程: HARQ进程 x、 HARQ进程 y和 HARQ 进程 z。 其中, x表示 HARQ进程 X对应的 PUSCH, Gx表示 HARQ进程 x 对应的 UL grant( PDCCH或 EPDCCH ), Px表示 HARQ进程 x对应的 PHICH, HARQ进程 y和 HARQ进程 z同理。 此外, 表 13给出了连续 6帧时间 (帧 t至帧 t+5 ) 中, HARQ进程 x、 HARQ进程 y和 HARQ进程 z中上行资源 的绑定形式、 分布位置, 以及 HARQ定时关系。 例如, 在 HARQ进程 y中, 当在帧 t的子帧 4收到 PHICH, 在帧 t+1的子帧 6收到 UL grant时, 在以下 上行资源中传输对应的 PUSCH: 帧 t+2中的子帧 1的 UpPTS、 子帧 2、 子帧 3、 子帧 6的 UpPTS、 子帧 7、 子帧 8。 同理, 在 HARQ进程 x中, 当在帧 t+1的子帧 4接收到 PHICH, 在帧 t+2的子帧 6收到 UL grant时, 在以下上 行资源中传输对应的 PUSCH: 帧 t+3中的子帧 1的 UpPTS、子帧 2、子帧 3、 子帧 6的 UpPTS、 子帧 7、 子帧 8。
从表 13可以看出, HARQ进程 x、 HARQ进程 y和 HARQ进程 z的 RTT 值均为 30ms。 举例说明, 在 HARQ进程 x中, 在帧 t的子帧 1开始上行传 输(帧 t的第 1个 X出现的位置), 下次上行传输的开始位置是帧 t+3的子帧 1 (帧 t+3的第 1个 X出现的位置), 中间相隔了 30ms。 对于如 VOIP等时延 敏感业务, 一般传输时延要求在 50ms左右, HARQ进程的 RTT值设置为 30ms 能够有效增大这种时延敏感类业务传输的时间分集增益。 此外, 从表 13可以看出, 在每个 HARQ进程中, 从接收到控制信令到传输 PUSCH所 间隔的时间是满足 UE或基站最小处理时间 (3ms )前提下的最小值, 釆用 这样的方式可以有效减少数据的传输时延。 此外, 各 HARQ进程中包含的 UpPTS数目相同, 降低了系统(UE或基站)协调处理各个 HARQ进程的复 杂度。
需要说明的是, 在 Case 1中, 虽然 PUSCH的传输是在接收到 PHICH 和 UL grant之后进行的, 但这仅仅是一个示例, 并非要限定 PUSCH的传输 必须以接收到 PHICH和 UL grant为前提条件。 作为另一种示例, 当 UE仅 接收到 PHICH或者仅接收到 UL grant时,也可以仅基于该 PHICH或 UL grant 找到传输 PUSCH的上行资源的位置。 比如,基站可以仅向 UE发送 PHICH, UE在接收到 PHICH之后, 可以基于 PHICH所在子帧找到传输 PUSCH的 上行资源的位置。 又如, 基站向 UE发送了 PHICH和 UL grant, 但是 UE未 能正确接收 UL grant,该 UE可以根据之前接收到的 PHICH所在子帧找到传 输 PUSCH的上行资源的位置。 具体地, 在 Case 1中, 假设在子帧 m接收到 PHICH,且未接收到 UL grant或者未正确接收到 UL grant时, 则基于子帧 m 确定上行资源的起始位置位于该子帧 m之后的第 t个子帧, 其中: 当 m=4 或 9时, t=17。
Case 2: 上下行子帧配比为 1, 上行资源包括 2个 UpPTS和 4个上行子 帧, UpPTS不位于上行资源的起始位置, 在子帧 n接收 UL grant ( PDCCH 或者 EPDCCH ), 和 /或在子帧 n之前的第 I个子帧接收 PHICH。 上行资源的 起始位置位于子帧 n之后的第 k个子帧, 其中: 当 n=4或 9时, k=4, 1=13。 Case 2中的其他参数可包括: HARQ进程数为 3 (即上述 PUSCH的传输对 应的 HARQ进程为上下行子帧配比为 0时 3个 HARQ进程中的一个), 和 / 或 RTT值为 30ms。
对于如 VOIP等时延敏感业务,一般传输时延要求在 50ms左右, HARQ 进程的 RTT值设置为 30ms能够有效增大这种时延敏感类业务传输的时间分 集增益。 此外, 各 HARQ进程中包含的 UpPTS数目相同, 降低了系统(UE 或基站)协调处理各个 HARQ进程的复杂度。
需要说明的是, 在 Case 2中, 虽然 PUSCH的传输是在接收到 PHICH 和 UL grant之后进行的, 但这仅仅是一个示例, 并非要限定 PUSCH的传输 必须以接收到 PHICH和 UL grant为前提条件。 作为另一种示例, 当 UE仅 接收到 PHICH或者仅接收到 UL grant时,也可以仅基于该 PHICH或 UL grant 找到传输 PUSCH的上行资源的位置。 比如,基站可以仅向 UE发送 PHICH, UE在接收到 PHICH之后, 可以基于 PHICH所在子帧找到传输 PUSCH的 上行资源的位置。 又如, 基站向 UE发送了 PHICH和 UL grant, 但是 UE未 能正确接收 UL grant,该 UE可以根据之前接收到的 PHICH所在子帧找到传 输 PUSCH的上行资源的位置。 具体地, 在 Case 1中, 假设在子帧 m接收到 PHICH,且未接收到 UL grant或者未正确接收到 UL grant时, 则基于子帧 m 确定上行资源的起始位置位于该子帧 m之后的第 t个子帧, 其中: 当 m=l 或 6时, t=17。
可选地, 作为一个实施例, 上下行子帧配比为 2, 上行资源包括 2 个 UpPTS和 2个上行子帧。 需要说明的是, 在上下行子帧配比为 2的情况下, 可以让上行子帧位于该上行资源的起始位置, 也可以让 UpPTS位于该上行 资源的起始位置。 此外, 即使上行资源的绑定形式确定, HARQ 进程数或 HARQ进程的 RTT值也可以有多种, 本发明实施例对此不作具体限定。 下 面给出 RTT值为 30ms的 2种具体的实现方式: Case 1和 Case 2。 后续还会 对本发明实施例的其他实现方式做详细介绍。
Case 1 : 上下行子帧配比为 2, 上行资源包括 2个 UpPTS和 2个上行子 帧, UpPTS位于上行资源的起始位置, 在子帧 n接收 UL grant ( PDCCH和 / 或 EPDCCH ), 和 /或在子帧 n之前的第 I个子帧接收 PHICH。 上行资源的起 始位置位于子帧 n之后的第 k个子帧, 其中: 当 n=l或 6时, k=5, Z=13。 Case 1中的其他参数可包括: HARQ进程数为 3 (即上述 PUSCH的传输对 应的 HARQ进程为上下行子帧配比为 2时 3个 HARQ进程中的一个;), 和 / 或 RTT值为 30ms, 具体参见表 14。
表 14: 上下行子帧配比 2下的 Case 1
Figure imgf000043_0001
PHICH Px Pz
ULgrant Gy Gx
PUSCH z z z z y y y y
表 14示出了 3个 HARQ进程: HARQ进程 x、 HARQ进程 y和 HARQ 进程 z。 其中, x表示 HARQ进程 x对应的 PUSCH, Gx表示 HARQ进程 x 对应的 UL grant( PDCCH或 EPDCCH ), Px表示 HARQ进程 x对应的 PHICH, HARQ进程 y和 HARQ进程 z同理。 此外, 表 14给出了连续 6帧时间 (帧 t至帧 t+5 ) 中, HARQ进程 x、 HARQ进程 y和 HARQ进程 z中上行资源 的绑定形式、 分布位置, 以及 HARQ定时关系。 例如, 在 HARQ进程 y中, 当在帧 t的子帧 3收到 PHICH, 在帧 t+1的子帧 6收到 UL grant时, 在以下 上行资源中传输对应的 PUSCH: 帧 t+2中的子帧 1的 UpPTS、 子帧 2、 子帧 6的 UpPTS、 子帧 7。 同理, 在 HARQ进程 x中, 当在帧 t+1的子帧 3接收 到 PHICH,在帧 t+2的子帧 6收到 UL grant时,在以下上行资源中传输对应 的 PUSCH: 帧 t+3中的子帧 1的 UpPTS、子帧 2、子帧 6的 UpPTS、子帧 7。
从表 14可以看出, HARQ进程 x、 HARQ进程 y和 HARQ进程 z的 RTT 值均为 30ms。 举例说明, 在 HARQ进程 x中, 在帧 t的子帧 1开始上行传 输(帧 t的第 1个 X出现的位置), 下次上行传输的开始位置是帧 t+3的子帧 1 (帧 t+3的第 1个 X出现的位置), 中间相隔了 30ms。 对于如 VOIP等时延 敏感业务, 一般传输时延要求在 50ms左右, HARQ进程的 RTT值设置为 30ms 能够有效增大这种时延敏感类业务传输的时间分集增益。 此外, 从表 13可以看出, 在每个 HARQ进程中, 从接收到控制信令到传输 PUSCH所 间隔的时间是满足 UE或基站最小处理时间 (3ms )前提下的最小值, 釆用 这样的方式可以有效减少数据的传输时延。 此外, 各 HARQ进程中包含的 UpPTS数目相同, 降低了系统(UE或基站)协调处理各个 HARQ进程的复 杂度。
需要说明的是, 在 Case 1中, 虽然 PUSCH的传输是在接收到 PHICH 和 UL grant之后进行的, 但这仅仅是一个示例, 并非要限定 PUSCH的传输 必须以接收到 PHICH和 UL grant为前提条件。 作为另一种示例, 当 UE仅 接收到 PHICH或者仅接收到 UL grant时,也可以仅基于该 PHICH或 UL grant 找到传输 PUSCH的上行资源的位置。 比如,基站可以仅向 UE发送 PHICH, UE在接收到 PHICH之后, 可以基于 PHICH所在子帧找到传输 PUSCH的 上行资源的位置。 又如, 基站向 UE发送了 PHICH和 UL grant, 但是 UE未 能正确接收 UL grant,该 UE可以根据之前接收到的 PHICH所在子帧找到传 输 PUSCH的上行资源的位置。 具体地, 在 Case 1中, 假设在子帧 m接收到 PHICH,且未接收到 UL grant或者未正确接收到 UL grant时, 则基于子帧 m 确定上行资源的起始位置位于该子帧 m之后的第 t个子帧, 其中: 当 m=8 或 3时, t=18。
可选地, 作为一个实施例, 上下行子帧配比为 3, 上行资源包括 1 个 UpPTS和 3个上行子帧。 需要说明的是, 在上下行子帧配比为 3的情况下, 可以让上行子帧位于该上行资源的起始位置, 也可以让 UpPTS位于该上行 资源的起始位置。 此外, 即使上行资源的绑定形式确定, HARQ 进程数或 HARQ进程的 RTT值也可以有多种, 本发明实施例对此不作具体限定。 下 面给出 RTT值为 30ms的 2种具体的实现方式: Case 1和 Case 2。 后续还会 对本发明实施例的其他实现方式做详细介绍。
Case 1: 上下行子帧配比为 3, 上行资源包括 1个 UpPTS和 3个上行子 帧, UpPTS位于上行资源的起始位置, 在子帧 n接收 UL grant ( PDCCH和 / 或 EPDCCH ), 和 /或在子帧 n之前的第 I个子帧接收 PHICH。 上行资源的起 始位置位于子帧 n之后的第 k个子帧, 其中: 当 n=7时, k=4, Z=17。 Case 1 中的其他参数可包括: HARQ 进程数为 3 (即上述 PUSCH 的传输对应的 HARQ进程为上下行子帧配比为 3时 3个 HARQ进程中的一个),和 /或 RTT 值为 30ms, 具体参见表 15。
表 15: 上下行子帧配比为 3时的一种实现方式
帧 t 帧 t+1
子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧
0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9
D S U U U D D D D D D S U U U D D D D D
PHICH Py Px
ULgrant Gz Gy
PUSCH
帧 t+2 帧 t+3 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧
0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9
PHICH Pz Py
ULgrant Gx Gz
PUSCH
帧 t+4 帧 t+5
子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧
0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9
PHICH Px Pz
ULgrant Gy Gx
PUSCH z z z z y y y y
表 15示出了 3个 HARQ进程: HARQ进程 x、 HARQ进程 y和 HARQ 进程 z。 其中, X表示 HARQ进程 X对应的 PUSCH, Gx表示 HARQ进程 x 对应的 UL grant( PDCCH或 EPDCCH ), Px表示 HARQ进程 x对应的 PHICH, HARQ进程 y和 HARQ进程 z同理。 此外, 表 15给出了连续 6帧时间 (帧 t至帧 t+5 ) 中, HARQ进程 x、 HARQ进程 y和 HARQ进程 z中上行资源 的绑定形式、 分布位置, 以及 HARQ定时关系。 例如, 在 HARQ进程 y中, 当在帧 t的子帧 0收到 PHICH, 在帧 t+1的子帧 7收到 UL grant时, 在以下 上行资源中传输对应的 PUSCH: 帧 t+2中的子帧 1的 UpPTS、 子帧 2、 子帧 3、 子帧 4。 同理, 在 HARQ进程 X中, 当在帧 t+1的子帧 0接收到 PHICH, 在帧 t+2的子帧 7收到 UL grant时, 在以下上行资源中传输对应的 PUSCH: 帧 t+3中的子帧 1的 UpPTS、 子帧 2、 子帧 3、 子帧 4。
从表 15可以看出, HARQ进程 x、 HARQ进程 y和 HARQ进程 z的 RTT 值均为 30ms。 举例说明, 在 HARQ进程 x中, 在帧 t的子帧 1开始上行传 输(帧 t的第 1个 X出现的位置), 下次上行传输的开始位置是帧 t+3的子帧 1 (帧 t+3的第 1个 X出现的位置), 中间相隔了 30ms。 对于如 VOIP等时延 敏感业务, 一般传输时延要求在 50ms左右, HARQ进程的 RTT值设置为 30ms 能够有效增大这种时延敏感类业务传输的时间分集增益。 此外, 从表 13可以看出, 在每个 HARQ进程中, 从接收到控制信令到传输 PUSCH所 间隔的时间是满足 UE或基站最小处理时间 (3ms )前提下的最小值, 釆用 这样的方式可以有效减少数据的传输时延。 此外, 各 HARQ进程中包含的 UpPTS数目相同, 降低了系统(UE或基站)协调处理各个 HARQ进程的复 杂度。
需要说明的是, 在 Case 1中, 虽然 PUSCH的传输是在接收到 PHICH 和 UL grant之后进行的, 但这仅仅是一个示例, 并非要限定 PUSCH的传输 必须以接收到 PHICH和 UL grant为前提条件。 作为另一种示例, 当 UE仅 接收到 PHICH或者仅接收到 UL grant时,也可以仅基于该 PHICH或 UL grant 找到传输 PUSCH的上行资源的位置。 比如,基站可以仅向 UE发送 PHICH, UE在接收到 PHICH之后, 可以基于 PHICH所在子帧找到传输 PUSCH的 上行资源的位置。 又如, 基站向 UE发送了 PHICH和 UL grant, 但是 UE未 能正确接收 UL grant,该 UE可以根据之前接收到的 PHICH所在子帧找到传 输 PUSCH的上行资源的位置。 具体地, 在 Case 1中, 假设在子帧 m接收到 PHICH,且未接收到 UL grant或者未正确接收到 UL grant时, 则基于子帧 m 确定上行资源的起始位置位于该子帧 m之后的第 t个子帧, 其中: 当 m=0 时, t=21。
Case 2: 上下行子帧配比为 3, 上行资源包括 2个 UpPTS和 2个上行子 帧, UpPTS不位于上行资源的起始位置, 在子帧 n接收 UL grant ( PDCCH 和 /或 EPDCCH ),和 /或在子帧 n之前的第 /个子帧接收 PHICH。上行资源的 起始位置位于子帧 n之后的第 k个子帧, 其中: 当 n=0或 9时, k=4, Z=ll。
Case 2中的其他参数可包括: HARQ进程数为 3 (即上述 PUSCH的传输对 应的 HARQ进程为上下行子帧配比为 3时 3个 HARQ进程中的一个;), 和 / 或 RTT值为 30ms, 具体参见表 16。
表 16: 上下行子帧配比为 3时的一种实现方式
帧 t 帧 t+1
子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧
0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9
D S U U U D D D D D D S U U U D D D D D
PHICH Py Px
ULgrant Gz Gy PUSCH
帧 t+2 帧 t+3
子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧
0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9
PHICH Pz Py
ULgrant Gx Gz
PUSCH
帧 t+4 帧 t+5
子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧
0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9
PHICH Px Pz
ULgrant Gy Gx
PUSCH z z z z y y
表 16示出了 3个 HARQ进程: HARQ进程 x、 HARQ进程 y和 HARQ 进程 z。 其中, X表示 HARQ进程 X对应的 PUSCH, Gx表示 HARQ进程 x 对应的 UL grant( PDCCH或 EPDCCH ), Px表示 HARQ进程 x对应的 PHICH, HARQ进程 y和 HARQ进程 z同理。 此外, 表 16给出了连续 6帧时间 (帧 t至帧 t+5 ) 中, HARQ进程 x、 HARQ进程 y和 HARQ进程 z中上行资源 的绑定形式、 分布位置, 以及 HARQ定时关系。 例如, 在 HARQ进程 y中, 当在帧 t的子帧 8收到 PHICH, 在帧 t+1的子帧 9收到 UL grant时, 在以下 上行资源中传输对应的 PUSCH: 帧 t+2中的子帧 3和子帧 4, 帧 t+3的子帧 1的 UpPTS和子帧 2。 同理, 在 HARQ进程 x中, 当在帧 t+1的子帧 8接收 到 PHICH,在帧 t+2的子帧 9收到 UL grant时,在以下上行资源中传输对应 的 PUSCH:帧 t+3中的子帧 3和子帧 4,帧 t+4的子帧 1的 UpPTS和子帧 2。
从表 16可以看出, HARQ进程 x、 HARQ进程 y和 HARQ进程 z的 RTT 值均为 30ms。 举例说明, 在 HARQ进程 x中, 在帧 t的子帧 3开始上行传 输(帧 t的第 1个 X出现的位置), 下次上行传输的开始位置是帧 t+3的子帧 3 (帧 t+3的第 1个 X出现的位置), 中间相隔了 30ms。 对于如 VOIP等时延 敏感业务, 一般传输时延要求在 50ms左右, HARQ进程的 RTT值设置为 30ms 能够有效增大这种时延敏感类业务传输的时间分集增益。 此外, 从表 13可以看出, 在每个 HARQ进程中, 从接收到控制信令到传输 PUSCH所 间隔的时间是满足 UE或基站最小处理时间 (3ms )前提下的最小值, 釆用 这样的方式可以有效减少数据的传输时延。 此外, 各 HARQ进程中包含的 UpPTS数目相同, 降低了系统(UE或基站)协调处理各个 HARQ进程的复 杂度。
需要说明的是, 在 Case 2中, 虽然 PUSCH的传输是在接收到 PHICH 和 UL grant之后进行的, 但这仅仅是一个示例, 并非要限定 PUSCH的传输 必须以接收到 PHICH和 UL grant为前提条件。 作为另一种示例, 当 UE仅 接收到 PHICH或者仅接收到 UL grant时,也可以仅基于该 PHICH或 UL grant 找到传输 PUSCH的上行资源的位置。 比如,基站可以仅向 UE发送 PHICH, UE在接收到 PHICH之后, 可以基于 PHICH所在子帧找到传输 PUSCH的 上行资源的位置。 又如, 基站向 UE发送了 PHICH和 UL grant, 但是 UE未 能正确接收 UL grant,该 UE可以根据之前接收到的 PHICH所在子帧找到传 输 PUSCH的上行资源的位置。 具体地, 在 Case 1中, 假设在子帧 m接收到 PHICH,且未接收到 UL grant或者未正确接收到 UL grant时, 则基于子帧 m 确定上行资源的起始位置位于该子帧 m之后的第 t个子帧, 其中: 当 m=9 或 8时, t=15。
可选地, 作为一个实施例, 上下行子帧配比为 4, 上行资源包括 1 个 UpPTS和 2个上行子帧。 需要说明的是, 在上下行子帧配比为 4的情况下, 可以让上行子帧位于该上行资源的起始位置, 也可以让 UpPTS位于该上行 资源的起始位置。 此外, 即使上行资源的绑定形式确定, HARQ 进程数或 HARQ进程的 RTT值也可以有多种, 本发明实施例对此不作具体限定。 下 面给出 RTT值为 30ms的 2种具体的实现方式: Case 1和 Case 2。 后续还会 对本发明实施例的其他实现方式做详细介绍。
Case 1 : 上下行子帧配比为 4, 上行资源包括 1个 UpPTS和 2个上行子 帧, UpPTS位于上行资源的起始位置, 在子帧 n接收 UL grant ( PDCCH和 / 或 EPDCCH ), 和 /或在子帧 n之前的第 I个子帧接收 PHICH。 上行资源的起 始位置位于子帧 n之后的第 k个子帧, 其中: 当 n=7时, k=4, Z=18。 Case 1 中的其他参数可包括: HARQ 进程数为 3 (即上述 PUSCH 的传输对应的 HARQ进程为上下行子帧配比为 4时 3个 HARQ进程中的一个),和 /或 RTT 值为 30ms, 具体参见表 17。
表 17: 上下行子帧配比为 4时的一种实现方式
Figure imgf000050_0001
表 17示出了 3个 HARQ进程: HARQ进程 x、 HARQ进程 y和 HARQ 进程 z。 其中, X表示 HARQ进程 X对应的 PUSCH, Gx表示 HARQ进程 x 对应的 UL grant( PDCCH或 EPDCCH ), Px表示 HARQ进程 x对应的 PHICH, HARQ进程 y和 HARQ进程 z同理。 此外, 表 17给出了连续 6帧时间 (帧 t至帧 t+5 ) 中, HARQ进程 x、 HARQ进程 y和 HARQ进程 z中上行资源 的绑定形式、 分布位置, 以及 HARQ定时关系。 例如, 在 HARQ进程 y中, 当在帧 t+2的子帧 9收到 PHICH, 在帧 t+4的子帧 7收到 UL grant时, 在以 下上行资源中传输对应的 PUSCH: 帧 t+5中的子帧 1的 UpPTS、 子帧 2、 子 帧 3。 同理,在 HARQ进程 X中, 当在帧 t的子帧 9接收到 PHICH,在帧 t+2 的子帧 7收到 UL grant时, 在以下上行资源中传输对应的 PUSCH: 帧 t+3 中的子帧 1的 UpPTS、 子帧 2、 子帧 3。
从表 17可以看出, HARQ进程 x、 HARQ进程 y和 HARQ进程 z的 RTT 值均为 30ms。 举例说明, 在 HARQ进程 x中, 在帧 t的子帧 1开始上行传 输(帧 t的第 1个 X出现的位置), 下次上行传输的开始位置是帧 t+3的子帧 1 (帧 t+3的第 1个 X出现的位置), 中间相隔了 30ms。 对于如 VOIP等时延 敏感业务, 一般传输时延要求在 50ms左右, HARQ进程的 RTT值设置为 30ms 能够有效增大这种时延敏感类业务传输的时间分集增益。 此外, 从表 13可以看出, 在每个 HARQ进程中, 从接收到控制信令到传输 PUSCH所 间隔的时间是满足 UE或基站最小处理时间 (3ms )前提下的最小值, 釆用 这样的方式可以有效减少数据的传输时延。 此外, 各 HARQ进程中包含的 UpPTS数目相同, 降低了系统(UE或基站)协调处理各个 HARQ进程的复 杂度。
需要说明的是, 在 Case 1中, 虽然 PUSCH的传输是在接收到 PHICH 和 UL grant之后进行的, 但这仅仅是一个示例, 并非要限定 PUSCH的传输 必须以接收到 PHICH和 UL grant为前提条件。 作为另一种示例, 当 UE仅 接收到 PHICH或者仅接收到 UL grant时,也可以仅基于该 PHICH或 UL grant 找到传输 PUSCH的上行资源的位置。 比如,基站可以仅向 UE发送 PHICH, UE在接收到 PHICH之后, 可以基于 PHICH所在子帧找到传输 PUSCH的 上行资源的位置。 又如, 基站向 UE发送了 PHICH和 UL grant, 但是 UE未 能正确接收 UL grant,该 UE可以根据之前接收到的 PHICH所在子帧找到传 输 PUSCH的上行资源的位置。 具体地, 在 Case 1中, 假设在子帧 m接收到 PHICH,且未接收到 UL grant或者未正确接收到 UL grant时, 则基于子帧 m 确定上行资源的起始位置位于该子帧 m之后的第 t个子帧, 其中: 当 m=9 时, t=22。
Case 2: 上下行子帧配比为 4, 上行资源包括 1个 UpPTS和 2个上行子 帧, UpPTS不位于上行资源的起始位置, 在子帧 n接收 UL grant ( PDCCH 和 /或 EPDCCH ),和 /或在子帧 n之前的第 /个子帧接收 PHICH。上行资源的 起始位置位于子帧 n之后的第 k个子帧,其中: 当 n=9时, k=4, Z=ll。 Case 2中的其他参数可包括: HARQ进程数为 3 (即上述 PUSCH的传输对应的 HARQ进程为上下行子帧配比为 4时 3个 HARQ进程中的一个),和 /或 RTT 值为 30ms。
对于如 VOIP等时延敏感业务,一般传输时延要求在 50ms左右, HARQ 进程的 RTT值设置为 30ms能够有效增大这种时延敏感类业务传输的时间分 集增益。 此外, 在每个 HARQ进程中, 从接收到控制信令到传输 PUSCH所 间隔的时间是满足 UE或基站最小处理时间 (3ms )前提下的最小值, 釆用 这样的方式可以有效减少数据的传输时延。 此外, 各 HARQ进程中包含的 UpPTS数目相同, 降低了系统(UE或基站)协调处理各个 HARQ进程的复 杂度。
需要说明的是, 在 Case 2中, 虽然 PUSCH的传输是在接收到 PHICH 和 UL grant之后进行的, 但这仅仅是一个示例, 并非要限定 PUSCH的传输 必须以接收到 PHICH和 UL grant为前提条件。 作为另一种示例, 当 UE仅 接收到 PHICH或者仅接收到 UL grant时,也可以仅基于该 PHICH或 UL grant 找到传输 PUSCH的上行资源的位置。 比如,基站可以仅向 UE发送 PHICH, UE在接收到 PHICH之后, 可以基于 PHICH所在子帧找到传输 PUSCH的 上行资源的位置。 又如, 基站向 UE发送了 PHICH和 UL grant, 但是 UE未 能正确接收 UL grant,该 UE可以根据之前接收到的 PHICH所在子帧找到传 输 PUSCH的上行资源的位置。 具体地, 在 Case 1中, 假设在子帧 m接收到 PHICH,且未接收到 UL grant或者未正确接收到 UL grant时, 则基于子帧 m 确定上行资源的起始位置位于该子帧 m之后的第 t个子帧, 其中: 当 m=8 时, t=15。
可选地, 作为一个实施例, 上下行子帧配比为 6, 上行资源包括 2 个
UpPTS和 5个上行子帧。 需要说明的是, 在上下行子帧配比为 6的情况下, 可以让上行子帧位于该上行资源的起始位置, 也可以让 UpPTS位于该上行 资源的起始位置。 此外, 即使上行资源的绑定形式确定, HARQ 进程数或 HARQ进程的 RTT值也可以有多种, 本发明实施例对此不作具体限定。 下 面给出 RTT值为 30ms的 2种具体的实现方式: Case 1和 Case 2。 后续还会 对本发明实施例的其他实现方式做详细介绍。
Case 1 : 上下行子帧配比为 6, 上行资源包括 2个 UpPTS和 5个上行子 帧, UpPTS位于上行资源的起始位置, 在子帧 n接收 UL grant ( PDCCH或 者 EPDCCH ), 和 /或在子帧 n之前的第 I个子帧接收 PHICH。 上行资源的起 始位置位于子帧 n之后的第 k个子帧, 其中: 当 n=0或 5时, k=6, Z=0; 当 n=l或 6时, k=5, 1=1。 Case 1中的其他参数可包括: HARQ进程数为 3 (即 上述 PUSCH的传输对应的 HARQ进程为上下行子帧配比为 6时 3个 HARQ ( 3为总 HARQ进程数 )进程中的一个 ), 和 /或 RTT值为 30ms, 具体参见 表 18。
表 18: 上下行子帧配比为 6时的一种实现方式
帧 t 帧 t+1
子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧
0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9
D S U U U D S U U D D S U U U D S U U D
PHICH Pz Py
ULgrant Gz Gy
PUSCH
帧 t+2 帧 t+3
子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧
0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9
PHICH Px Pz
ULgrant Gx Gz
PUSCH
帧 t+4 帧 t+5
子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧
0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9
PHICH Py Px
ULgrant Gy Gx PUSCH z z z z z z z y y y y y y y 表 18示出了 3个 HARQ进程: HARQ进程 x、 HARQ进程 y和 HARQ 进程 z。 其中, x表示 HARQ进程 x对应的 PUSCH, Gx表示 HARQ进程 x 对应的 UL grant( PDCCH或 EPDCCH ), Px表示 HARQ进程 x对应的 PHICH, HARQ进程 y和 HARQ进程 z同理。 此外, 表 18给出了连续 6帧时间 (帧 t至帧 t+5 ) 中, HARQ进程 x、 HARQ进程 y和 HARQ进程 z中上行资源 的绑定形式、 分布位置, 以及 HARQ定时关系。 例如, 在 HARQ进程 y中, 当在帧 t+1的子帧 5收到 PHICH, 在帧 t+1的子帧 5收到 UL grant时, 在以 下上行资源中传输对应的 PUSCH: 帧 t+2中的子帧 1的 UpPTS、 子帧 2、 子 帧 3、 子帧 4、 子帧 6的 UpPTS、 子帧 7、 子帧 8。 同理, 在 HARQ进程 x 中,当在帧 t+2的子帧 5接收到 PHICH,在帧 t+2的子帧 5收到 UL grant时, 在以下上行资源中传输对应的 PUSCH:帧 t+3中的子帧 1的 UpPTS、子帧 2、 子帧 3、 子帧 4、 子帧 6的 UpPTS、 子帧 7、 子帧 8。
从表 18可以看出, HARQ进程 x、 HARQ进程 y和 HARQ进程 z的 RTT 值均为 30ms。 举例说明, 在 HARQ进程 x中, 在帧 t的子帧 1开始上行传 输(帧 t的第 1个 X出现的位置), 下次上行传输的开始位置是帧 t+3的子帧 1 (帧 t+3的第 1个 X出现的位置), 中间相隔了 30ms。 对于如 VOIP等时延 敏感业务, 一般传输时延要求在 50ms左右, HARQ进程的 RTT值设置为 30ms 能够有效增大这种时延敏感类业务传输的时间分集增益。 此外, 从表 13可以看出, 在每个 HARQ进程中, 从接收到控制信令到传输 PUSCH所 间隔的时间是满足 UE或基站最小处理时间 (3ms )前提下的最小值, 釆用 这样的方式可以有效减少数据的传输时延。 此外, 各 HARQ进程中包含的 UpPTS数目相同, 降低了系统(UE或基站)协调处理各个 HARQ进程的复 杂度。
需要说明的是, 在 Case 1中, 虽然 PUSCH的传输是在接收到 PHICH 和 UL grant之后进行的, 但这仅仅是一个示例, 并非要限定 PUSCH的传输 必须以接收到 PHICH和 UL grant为前提条件。 作为另一种示例, 当 UE仅 接收到 PHICH或者仅接收到 UL grant时,也可以仅基于该 PHICH或 UL grant 找到传输 PUSCH的上行资源的位置。 比如,基站可以仅向 UE发送 PHICH, UE在接收到 PHICH之后, 可以基于 PHICH所在子帧找到传输 PUSCH的 上行资源的位置。 又如, 基站向 UE发送了 PHICH和 UL grant, 但是 UE未 能正确接收 UL grant,该 UE可以根据之前接收到的 PHICH所在子帧找到传 输 PUSCH的上行资源的位置。 具体地, 在 Case 1中, 假设在子帧 m接收到 PHICH,且未接收到 UL grant或者未正确接收到 UL grant时, 则基于子帧 m 确定上行资源的起始位置位于该子帧 m之后的第 t个子帧, 其中: 当 m=0 或 5时, t=6。
Case 2: 上下行子帧配比为 6, 上行资源包括 2个 UpPTS和 5个上行子 帧, UpPTS不位于上行资源的起始位置, 在子帧 n接收 UL grant ( PDCCH 或者 EPDCCH ), 和 /或在子帧 n之前的第 I个子帧接收 PHICH。 上行资源的 起始位置位于子帧 n之后的第 k个子帧, 其中: 当 n=l或 6时, k=7, /=0; 或者, 当 n=9时, k=5, 1=0。 Case 2中的其他参数可包括: HARQ进程数为 3 (即上述 PUSCH的传输对应的 HARQ进程为上下行子帧配比为 6时 3个 HARQ ( 3为总 HARQ进程数 )进程中的一个;), 和 /或 RTT值为 30ms。
对于如 VOIP等时延敏感业务,一般传输时延要求在 50ms左右, HARQ 进程的 RTT值设置为 30ms能够有效增大这种时延敏感类业务传输的时间分 集增益。 此外, 在每个 HARQ进程中, 从接收到控制信令到传输 PUSCH所 间隔的时间是满足 UE或基站最小处理时间 (3ms )前提下的最小值, 釆用 这样的方式可以有效减少数据的传输时延。 此外, 各 HARQ进程中包含的 UpPTS数目相同, 降低了系统(UE或基站)协调处理各个 HARQ进程的复 杂度。
需要说明的是, 在 Case 2中, 虽然 PUSCH的传输是在接收到 PHICH 和 UL grant之后进行的, 但这仅仅是一个示例, 并非要限定 PUSCH的传输 必须以接收到 PHICH和 UL grant为前提条件。 作为另一种示例, 当 UE仅 接收到 PHICH或者仅接收到 UL grant时,也可以仅基于该 PHICH或 UL grant 找到传输 PUSCH的上行资源的位置。 比如,基站可以仅向 UE发送 PHICH, UE在接收到 PHICH之后, 可以基于 PHICH所在子帧找到传输 PUSCH的 上行资源的位置。 又如, 基站向 UE发送了 PHICH和 UL grant, 但是 UE未 能正确接收 UL grant,该 UE可以根据之前接收到的 PHICH所在子帧找到传 输 PUSCH的上行资源的位置。 具体地, 在 Case 1中, 假设在子帧 m接收到 PHICH,且未接收到 UL grant或者未正确接收到 UL grant时, 则基于子帧 m 确定上行资源的起始位置位于该子帧 m之后的第 t个子帧, 其中: 当 m=l 或 6时, t=7或当 m=9时, t=5。 在以上各种实现方式中, n、 k、 Z值示出了各个 HARQ进程中 PHICH、 UL grant和上行资源的相对位置, 其中, k表示在子帧 n之后的第 k个子帧 开始传输 PUSCH。 应理解, 在上述相对位置确定的情况下, 各个 HARQ进 程传输 PUSCH 的参考时间可以有多种, 该参考时间用于描述控制信令 ( PHICH和 /或 UL grant )到传输 PUSCH的上行资源的时间以该上行资源中 的哪个子帧作为参考。 具体地, 可以将上行资源的起始位置所在的子帧作为 参考。 例如, 在 Case 1中, UpPTS位于上行资源的起始位置, 则可以将该 UpPTS所在的特殊子帧作为参考,接收端根据该参考时间可以直接找到上行 资源的起始位置。 或者, 可以将上行资源的第 1 个上行子帧作为参考, 在 Case 1中, 接收端根据该参考时间以及上下行子帧配比能够推算出上行资源 的起始位置。 应理解, 以上参考时间的确定仅仅是举例说明, 实际中, 还可 以将上行资源的其他任意子帧作为参考。
上文给出了在 RTT值为 30ms的情况下,各上下行子帧配比对应的上行 子帧的绑定方式、 分布位置和定时关系的一些实现方式, 但本发明实施例不 限于此。 下文结合具体的表格, 详细描述各上下行子帧配比下, 上行子帧的 绑定方式、 分布位置和定时关系的其他实现方式。
可选地, 作为一种实现方式, 上下行子帧配比为 0, 1 个 UpPTS 与该 UpPTS相邻的上行子帧绑定, 在子帧 n接收控制信令 ( UL grant ( PDCCH 或 EPDCCH )和 /或 PHICH ), 上行资源的起始位置位于子帧 n之后的第 k 个子帧, 其中: 当 n=0或 5时, k=6; 或在子帧 n接收控制信令 ( UL grant ( PDCCH或 EPDCCH ) ), 上行资源的起始位置位于子帧 n之后的第 k个子 帧, 其中: 当 n=l或 6时, k=5。
表 19: 上下行子帧配比为 0时的一种实现方式
帧 t 帧 t+1
子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧
0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9
D S U U U D S U U U D S U U U D S U U U
PHICH P3 P5 P6 P1 P2 P4 P5 P7
P4 P7 P3 P6
ULgrant G3 G4 G6 G1 G2 G3 G5 G6 G4 G5 G7 G7 G3 G4 G6 G7
PUSCH 1 1 2 3 4 4 5 6 7 7 1 2 3 3 4 5 帧 t+2 帧 t+3
子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧
0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9
PHICH PI P3 P4 P6 P7 P2 P3 P5
P2 P5 P1 P4
ULgrant Gl G2 G4 G5 G7 G1 G3 G4
G2 G3 G5 G6 G1 G2 G4 G5
PUSCH 6 6 7 1 2 2 3 4 5 5 6 7 1 1 2 3 帧 t+4 帧 t+5
子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧
0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9
PHICH P6 PI P2 P4 P5 P7 P1 P3
P7 P3 P6 P2
ULgrant G6 G7 G2 G3 G5 G6 G1 G2
G7 Gl G3 G4 G6 G7 G2 G3
PUSCH 4 4 5 6 7 7 1 2 3 3 4 5 6 6 7 1 表 19示出了 7个 HARQ进程: HARQ进程 1到 HARQ进程 7。 其中, 1表示 HARQ进程 1对应的 PUSCH, Gl表示 HARQ进程 1对应的 UL grant ( PDCCH或 EPDCCH ), P1表示 HARQ进程 1对应的 PHICH, HARQ进程 2到 7同理。 此外, 表 19给出了连续 6帧时间 (帧 t至帧 t+5 ) 中, HARQ 进程 1到 HARQ进程 7中上行资源的绑定形式、 分布位置, 以及 HARQ定 时关系。 例如, 在 HARQ进程 4中, 当在帧 t的子帧 0收到 PHICH, 和 /或 在帧 t的子帧 1 (或 0 ) 收到 UL grant时, 在以下上行资源中传输对应的 PUSCH: 帧 t中的子帧 6的 UpPTS和子帧 7。 同理, 在 HARQ进程 7中, 当在帧 t的子帧 5接收到 PHICH,和 /或在帧 t的子帧 6 (或 5 )收到 UL grant 时, 在以下上行资源中传输对应的 PUSCH: 帧 t+1中的子帧 1的 UpPTS和 子帧 2。 类似的对于其它进程从表中可以得到相应的结果。 可选地, 作为另一个实现方式, 上下行子帧配比 0, 上行资源包括: 1 帧中的 2个 UpPTS。
可选地, 作为一种实现方式, 上下行子帧配比为 0, 1个 UpPTS与 4个 上行子帧绑定。 UpPTS位于上行资源的中间位置(或不位于上行资源的开始 位置), 在子帧 n接收 UL grant ( PDCCH或者 EPDCCH ), 和 /或在子帧 n之 前的第 /个子帧接收 PHICH。上行资源的起始位置位于子帧 n之后的第 k个 子帧, 其中: 当 n=0或 5时, k=4, 1=9; 或者, 当 n=l或 6时, k=7或 6, 1:6。 具体参见表 20。 该实现方式下的其他参数还可包括: HARQ进程数为 3 (即上述 PUSCH的传输对应的 HARQ进程为上下行子帧配比为 0时 3个 HARQ ( 3为总 HARQ进程数 )进程中的一个)。
表 20: 上下行子帧配比为 0时的一种实现方式
帧 t 帧 t+1
子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧
0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9
D S U U U D S U U U D S U U U D S U U U
PHICH Py Px
ULgrant Gz Gy
PUSCH
帧 t+2 帧 t+3
子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧
0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9
PHICH Pz Py Px
ULgrant Gx Gz Gy
PUSCH
帧 t+4 帧 t+5
子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧
0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9
PHICH Pz Py ULgrant Gx Gz Gy
PUSCH
表 20示出了 3个 HARQ进程: HARQ进程 x、 HARQ进程 y和 HARQ 进程 z。 其中, x表示 HARQ进程 x对应的 PUSCH, Gx表示 HARQ进程 x 对应的 UL grant( PDCCH或 EPDCCH ), Px表示 HARQ进程 x对应的 PHICH, HARQ进程 y和 HARQ进程 z同理。 此外, 表 20给出了连续 6帧时间 (帧 t至帧 t+5 ) 中, HARQ进程 X和 HARQ进程 y中上行资源的绑定形式、 分 布位置, 以及 HARQ定时关系。 例如, 在 HARQ进程 y中, 当在帧 t的子 帧 1收到 PHICH, 和 /或在帧 t+1的子帧 0收到 UL grant时, 在以下上行资 源中传输对应的 PUSCH: 帧 t+1中的子帧 4、 子帧 6的 UpPTS、 子帧 7、 子 帧 8和子帧 9。同理,在 HARQ进程 X中,当在帧 t+1的子帧 1接收到 PHICH, 和 /或在帧 t+2 的子帧 0收到 UL grant 时, 在以下上行资源中传输对应的 PUSCH: 帧 t+2中的子帧 4、 子帧 6的 UpPTS、 子帧 7、 子帧 8和子帧 9。
可选地, 作为一种实现方式, 上下行子帧配比为 0, 1个 UpPTS与 4个 上行子帧绑定。 UpPTS位于上行资源的中间位置(或不位于上行资源的开始 位置), 在子帧 n接收 UL grant ( PDCCH和 /或 EPDCCH ), 和 /或在子帧 n 之前的第 /个子帧接收 PHICH。 上行资源的起始位置位于子帧 n之后的第 k 个子帧, 其中: 当 n=0或 5时, k=4, 1=5; 或者, 当 n=l时, k=6, Z=5; 或 者, 当 n=6时, k=7, 1=1 ; 或者, 当 n=l时, k=7, 1=1 ; 或者, 当 n=6时, k=6, 1=5。 该实现方式下的其他参数还可包括: HARQ进程数为 3 (即上述 PUSCH的传输对应的 HARQ进程为上下行子帧配比为 0时 3个 HARQ ( 3 为总 HARQ进程数)进程中的一个),和 /或 RTT值为 20ms。具体参见表 21。
表 21 : 上下行子帧配比为 0时的一种实现方式
帧 t 帧 t+1
子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧
0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9
D S U U U D S U U U D S U U U D S U U U
PHICH Pz Py Px
ULgrant Gz Gy Gx
PUSCH 帧 t+2 帧 t+3
子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧
0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9
PHICH Pz Py Px
ULgrant Gz Gy Gx
PUSCH
帧 t+4 帧 t+5
子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧
0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9
PHICH Pz Py Px
ULgrant Gz Gy Gx
PUSCH
表 21示出了 3个 HARQ进程: HARQ进程 x、 HARQ进程 y和 HARQ 进程 z。 其中, X表示 HARQ进程 X对应的 PUSCH, Gx表示 HARQ进程 x 对应的 UL grant( PDCCH或 EPDCCH ), Px表示 HARQ进程 x对应的 PHICH, HARQ进程 y和 HARQ进程 z同理。 此外, 表 21给出了连续 6帧时间 (帧 t至帧 t+5 ) 中, HARQ进程 X和 HARQ进程 y中上行资源的绑定形式、 分 布位置, 以及 HARQ定时关系。 例如, 在 HARQ进程 y中, 当在帧 t的子 帧 5收到 PHICH, 和 /或在帧 t+1的子帧 0收到 UL grant时, 在以下上行资 源中传输对应的 PUSCH: 帧 t+1中的子帧 4、 子帧 6的 UpPTS、 子帧 7、 子 帧 8和子帧 9。同理,在 HARQ进程 X中,当在帧 t+1的子帧 1接收到 PHICH, 和 /或在帧 t+1 的子帧 6 收到 UL grant 时, 在以下上行资源中传输对应的 PUSCH: 帧 t+2中的子帧 2、 子帧 3、 子帧 4、 子帧 6的 UpPTS和子帧 7。
此外, 从表 21可以看出, 各 HARQ进程的 RTT值为 20ms, 沿用现有 系统的 RTT值, 对现有协议的改动 d、。
可选地, 作为一种实现方式, 上下行子帧配比为 1, 1 个 UpPTS 与该 UpPTS相邻的上行子帧绑定, 在子帧 n接收控制信令 ( UL grant ( PDCCH 或 EPDCCH )和 /或 PHICH ), 上行资源的起始位置位于子帧 n之后的第 k 个子帧, 其中: 当 n=l或 6时, k=5。 表 22: 上下行子帧配比为 1时的一种实现方式
Figure imgf000061_0001
表 22示出了 4个 HARQ进程: HARQ进程 x、 HARQ进程 y 、 HARQ 进程 z、 HARQ进程 t。 其中, x表示 HARQ进程 x对应的 PUSCH, Gx表 示 HARQ进程 x对应的 UL grant ( PDCCH或 EPDCCH ), Px表示 HARQ进 程 x对应的 PHICH, HARQ进程 y 、 HARQ进程 z和 HARQ进程 t同理。 此外,表 22给出了连续 6帧时间(帧 t至帧 t+5 )中, HARQ进程 x和 HARQ 进程 z中上行资源的绑定形式、 分布位置, 以及 HARQ定时关系。 例如, 在 HARQ进程 z中, 当在帧 t的子帧 1收到 PHICH, 和 /或在帧 t的子帧 1收到 UL grant时,在以下上行资源中传输对应的 PUSCH:帧 t中的子帧 6的 UpPTS 和子帧 7。 同理, 在 HARQ进程 X中, 当在帧 t的子帧 6接收到 PHICH, 和 /或在帧 t的子帧 6收到 UL grant时,在以下上行资源中传输对应的 PUSCH: 帧 t+1中的子帧 1的 UpPTS和子帧 2。
可选地, 作为一种实现方式, 上下行子帧配比为 1, 2个 UpPTS与 4个 上行子帧绑定。 在子帧 n接收控制信令 ( UL grant ( PDCCH或 EPDCCH ) ) 和 /或在子帧 n-Z接收控制信令(PHICH ), 上行资源的起始位置位于子帧 n 之后的第 k个子帧, 其中: 当 n=l或 6时, k=5, 1=2; 或者, 当 n=4或 9时, k=4, 1:?>。 该实现方式下的其他参数可包括: HARQ进程个数为 2, 和 /或 RTT值为 20ms, 具体参见表 23。
表 23: 上下行子帧配比为 1时的一种实现方式
帧 t 帧 t+1
子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧
0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9
D S U U D D S U U D D S U U D D S U U D
PHICH Py Px
ULgrant Gy Gx
PUSCH
帧 t+2 帧 t+3
子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧
0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9
PHICH Py Px
ULgrant Gy Gx
PUSCH
帧 t+4 帧 t+5
子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧
0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9
PHICH Py Px ULgrant Gy Gx
PUSCH
表 23示出了 2个 HARQ进程: HARQ进程 x和 HARQ进程 y。 其中, x表示 HARQ进程 X对应的 PUSCH, Gx表示 HARQ进程 x对应的 UL grant ( PDCCH或 EPDCCH ), Px表示 HARQ进程 x对应的 PHICH, HARQ进程 y同理。 此外, 表 23给出了连续 6帧时间 (帧 t至帧 t+5 ) 中, HARQ进程 X和 HARQ进程 y中上行资源的绑定形式、 分布位置, 以及 HARQ定时关 系。 例如, 在 HARQ进程 y中, 当在帧 t的子帧 4收到 PHICH, 和 /或在帧 t的子帧 6收到 UL grant时, 在以下上行资源中传输对应的 PUSCH: 帧 t+1 中的子帧 1的 UpPTS、 子帧 2、 子帧 3、 子帧 6的 UpPTS、 子帧 7和子帧 8。 同理, 在 HARQ进程 X中, 当在帧 t+1的子帧 4接收到 PHICH, 和 /或在帧 t+1的子帧 6收到 UL grant时,在以下上行资源中传输对应的 PUSCH:帧 t+2 中的子帧 1的 UpPTS、 子帧 2、 子帧 3、 子帧 6的 UpPTS、 子帧 7和子帧 8。
在每个 HARQ进程中,从接收到控制信令到传输 PUSCH所间隔的时间 是满足 UE或基站最小处理时间 (3ms )前提下的最小值, 釆用这样的方式 可以有效减少数据的传输时延。 此外, 从表 23可以看出, 各 HARQ进程的 RTT值为 20ms, 沿用现有系统的 RTT值, 对现有协议的改动小。
可选地, 作为一种实现方式, 上下行子帧配比为 2, 1 个 UpPTS 与该 UpPTS相邻的上行子帧绑定。 在子帧 n接收控制信令 ( UL grant ( PDCCH 或 EPDCCH )和 /或 PHICH ), 上行资源的起始位置位于子帧 n之后的第 k 个子帧,其中: 当 n=3或 8时, k=3。该实现方式中的其他参数可包括: HARQ 进程数为 2个(即上述 PUSCH的传输对应的 HARQ进程为上下行子帧配比 为 2时 2个 HARQ ( 2为总 HARQ进程数 )进程中的一个)。具体参见表 24。
表 24: 上下行子帧配比为 2时的一种实现方式
帧 t 帧 t+1
子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧
0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9
D S U D D D S U D D D S U D D D S U D D
PHICH Py Px Py Px
ULgrant Gy Gx Gy Gx PUSCH
帧 t+2 帧 t+3
子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧
0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9
PHICH Py Px Py Px
ULgrant Gy Gx Gy Gx
PUSCH y y y y
帧 t+4 帧 t+5
子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧
0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9
PHICH Py Px Py Px
ULgrant Gy Gx Gy Gx
PUSCH y y y y
表 24示出了 2个 HARQ进程: HARQ进程 x和 HARQ进程 y。 其中, X表示 HARQ进程 X对应的 PUSCH, Gx表示 HARQ进程 x对应的 UL grant ( PDCCH或 EPDCCH ), Px表示 HARQ进程 x对应的 PHICH, HARQ进程 y同理。 此外, 表 24给出了连续 6帧时间 (帧 t至帧 t+5 ) 中, HARQ进程 X和 HARQ进程 y中上行资源的绑定形式、 分布位置, 以及 HARQ定时关 系。 例如, 在 HARQ进程 y中, 当在帧 t的子帧 3收到 PHICH, 和 /或在帧 t的子帧 3收到 UL grant时, 在以下上行资源中传输对应的 PUSCH: 帧 t中 的子帧 6的 UpPTS和子帧 7。 同理, 在 HARQ进程 X中, 当在帧 t的子帧 8 接收到 PHICH, 和 /或在帧 t的子帧 8收到 UL grant时, 在以下上行资源中 传输对应的 PUSCH: 帧 t+1中的子帧 1的 UpPTS和子帧 2。
可选地, 作为一种实现方式, 上下行子帧配比为 2, 1 个 UpPTS 与该 UpPTS相邻的上行子帧绑定, 在子帧 n接收控制信令 ( UL grant ( PDCCH 或 EPDCCH )和 /或 PHICH ), 上行资源的起始位置位于子帧 n之后的第 k 个子帧, 其中: 当 n=l或 6时, k=5。 具体参见表 25。
表 25: 上下行子帧配比为 2时的一种实现方式
帧 t 帧 t+l 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧
0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9
D S U D D D S U D D D S U D D D S U D D
PHICH Py Px Py Px
ULgrant Gy Gx Gy Gx
PUSCH
帧 t+2 帧 t+3
子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧
0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9
PHICH Py Px Py Px
ULgrant Gy Gx Gy Gx
PUSCH y y y y
帧 t+4 帧 t+5
子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧
0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9
PHICH Py Px Py Px
ULgrant Gy Gx Gy Gx
PUSCH y y y y
表 25示出了 2个 HARQ进程: HARQ进程 x和 HARQ进程 y。 其中, X表示 HARQ进程 X对应的 PUSCH, Gx表示 HARQ进程 x对应的 UL grant ( PDCCH或 EPDCCH ), Px表示 HARQ进程 x对应的 PHICH, HARQ进程 y同理。 此外, 表 25给出了连续 6帧时间 (帧 t至帧 t+5 ) 中, HARQ进程
X和 HARQ进程 y中上行资源的绑定形式、 分布位置, 以及 HARQ定时关 系。 例如, 在 HARQ进程 y中, 当在帧 t的子帧 1收到 PHICH, 和 /或在帧 t的子帧 1收到 UL grant时, 在以下上行资源中传输对应的 PUSCH: 帧 t中 的子帧 6的 UpPTS和子帧 7。 同理, 在 HARQ进程 x中, 当在帧 t的子帧 6 接收到 PHICH, 和 /或在帧 t的子帧 6收到 UL grant时, 在以下上行资源中 传输对应的 PUSCH: 帧 t+1中的子帧 1的 UpPTS和子帧 2。 可选地, 作为一种实现方式, 上下行子帧配比为 2, 2个 UpPTS和 2个 上行子帧绑定, 和 /或在子帧 n之前的第 /个子帧接收 PHICH, 和 /或在子帧 n接收 UL grant ( PDCCH或 EPDCCH ), 上行资源的起始位置位于子帧 n之 后的第 k个子帧, 其中: 当 n=l或 6时, k=5, Z=3。
表 26: 上下行子帧配比为 2时的一种实现方式
Figure imgf000066_0001
表 26示出了 2个 HARQ进程: HARQ进程 x和 HARQ进程 y。 其中, X表示 HARQ进程 X对应的 PUSCH, Gx表示 HARQ进程 x对应的 UL grant ( PDCCH或 EPDCCH ), Px表示 HARQ进程 x对应的 PHICH, HARQ进程 y同理。 此外, 表 26给出了连续 6帧时间 (帧 t至帧 t+5 ) 中, HARQ进程 X和 HARQ进程 y中上行资源的绑定形式、 分布位置, 以及 HARQ定时关 系。 例如, 在 HARQ进程 y中, 当在帧 t的子帧 3收到 PHICH, 和 /或在帧 t的子帧 6收到 UL grant时, 在以下上行资源中传输对应的 PUSCH: 帧 t+1 中的子帧 1的 UpPTS、 子帧 2、 子帧 6的 UpPTS和子帧 7。 同理, 在 HARQ 进程 X中, 当在帧 t+1的子帧 3接收到 PHICH, 和 /或在帧 t+1的子帧 6收到 UL grant时, 在以下上行资源中传输对应的 PUSCH: 帧 t+2中的子帧 1的 UpPTS、 子帧 2、 子帧 6的 UpPTS和子帧 7。
需要说明的是, 在该实施例中, 虽然 PUSCH的传输是在接收到 PHICH 和 UL grant之后进行的, 但这仅仅是一个示例, 并非要限定 PUSCH的传输 必须以接收到 PHICH和 UL grant为前提条件。 作为另一种示例, 当 UE仅 接收到 PHICH或者仅接收到 UL grant时,也可以仅基于该 PHICH或 UL grant 找到传输 PUSCH的上行资源的位置。 比如,基站可以仅向 UE发送 PHICH, UE在接收到 PHICH之后, 可以基于 PHICH所在子帧找到传输 PUSCH的 上行资源的位置。 又如, 基站向 UE发送了 PHICH和 UL grant, 但是 UE未 能正确接收 UL grant,该 UE可以根据之前接收到的 PHICH所在子帧找到传 输 PUSCH的上行资源的位置。 具体地, 在 Case 1中, 假设在子帧 m接收到 PHICH,且未接收到 UL grant或者未正确接收到 UL grant时, 则基于子帧 m 确定上行资源的起始位置位于该子帧 m之后的第 t个子帧, 其中: 当 m=8 或 3时, t=8。
可选地, 作为一种实现方式, 上下行子帧配比为 3, 1 个 UpPTS 与该 UpPTS相邻的上行子帧绑定。 具体参见表 27。
表 27: 上下行子帧配比为 3时的一种实现方式
帧 t 帧 t+1
子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧
0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9
D S U U U D D D D D D S U U U D D D D D
PHICH Pz Px Py Pz Px Py
ULgrant Gz Gx Gy Gz Gx Gy
PUSCH 帧 t+2 帧 t+3
子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧
0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9
PHICH Pz Px Py Pz Px Py
ULgrant Gz Gx Gy Gz Gx Gy
PUSCH
帧 t+4 帧 t+5
子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧
0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9
PHICH Pz Px Py Pz Px Py
ULgrant Gz Gx Gy Gz Gx Gy
PUSCH y y
表 27示出了 3个 HARQ进程: HARQ进程 x、 HARQ进程 y和 HARQ 进程 z。 其中, X表示 HARQ进程 X对应的 PUSCH, Gx表示 HARQ进程 x 对应的 UL grant( PDCCH或 EPDCCH ), Px表示 HARQ进程 x对应的 PHICH, HARQ进程 y和 HARQ进程 z同理。 此外, 表 27给出了连续 6帧时间 (帧 t至帧 t+5 ) 中, HARQ进程 x、 HARQ进程 y和 HARQ进程 z中上行资源 的绑定形式、 分布位置, 以及 HARQ定时关系。 例如, 在 HARQ进程 x中, 当在帧 t的子帧 8收到 PHICH, 和 /或在帧 t的子帧 8收到 UL grant时,在以 下上行资源中传输对应的 PUSCH: 帧 t+1中的子帧 1的 UpPTS和子帧 2。
可选地, 作为一种实现方式, 上下行子帧配比为 3, 1个 UpPTS和 1个 上行子帧绑定, 在子帧 n接收控制信令 ( UL grant ( PDCCH或 EPDCCH ) 和 /或 PHICH ), 上行资源的起始位置位于子帧 n之后的第 k个子帧, 其中: 当 n=7时, k=4。 具体参见表 28。
表 28: 上下行子帧配比为 3时的一种实现方式
帧 t 帧 t+1
子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧
0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 D S U U u D D D D D D S u U u D D D D D
PHICH Pz Px Py Pz Px Py
ULgrant Gz Gx Gy Gz Gx Gy
PUSCH
帧 t+2 帧 t+3
子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧
0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9
PHICH Pz Px Py Pz Px Py
ULgrant Gz Gx Gy Gz Gx Gy
PUSCH y y
帧 t+4 帧 t+5
子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧
0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9
PHICH Pz Px Py Pz Px Py
ULgrant Gz Gx Gy Gz Gx Gy
PUSCH
表 28示出了 3个 HARQ进程: HARQ进程 x、 HARQ进程 y和 HARQ 进程 z。 其中, X表示 HARQ进程 X对应的 PUSCH, Gx表示 HARQ进程 x 对应的 UL grant( PDCCH或 EPDCCH ), Px表示 HARQ进程 x对应的 PHICH, HARQ进程 y和 HARQ进程 z同理。 此外, 表 28给出了连续 6帧时间 (帧 t至帧 t+5 )中, HARQ进程 X中上行资源的绑定形式、分布位置,以及 HARQ 定时关系。 例如, 在 HARQ进程 X中, 当在帧 t的子帧 7收到 PHICH, 和 / 或在帧 t的子帧 7收到 UL grant时, 在以下上行资源中传输对应的 PUSCH: 帧 t+1中的子帧 1的 UpPTS和子帧 2。
可选地, 作为一种实现方式, 上下行子帧配比为 3, 1个 UpPTS和 2个 上行子帧绑定, RTT值为 20ms。
表 29: 上下行子帧配比为 3时的一种实现方式
帧 t 帧 t+l 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧
0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9
D s U U U D D D D D D S U U U D D D D D
PHICH Pz Px Py
ULgrant Gy Gz Gx
PUSCH
帧 t+2 帧 t+3
子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧
0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9
PHICH Pz Px Py
ULgrant Gy Gz Gx
PUSCH
帧 t+4 帧 t+5
子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧
0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9
PHICH Pz Px Py
ULgrant Gy Gz Gx
PUSCH
表 29示出了 3个 HARQ进程: HARQ进程 x、 HARQ进程 y和 HARQ 进程 z。 其中, X表示 HARQ进程 X对应的 PUSCH, Gx表示 HARQ进程 x 对应的 UL grant( PDCCH或 EPDCCH ), Px表示 HARQ进程 x对应的 PHICH, HARQ进程 y和 HARQ进程 z同理。 此外, 表 29给出了连续 6帧时间 (帧 t至帧 t+5 ) 中, HARQ进程 x、 HARQ进程 y和 HARQ进程 z中上行资源 的绑定形式、 分布位置, 以及 HARQ定时关系。 例如, 在 HARQ进程 x中, 当在帧 t的子帧 9收到 PHICH,和 /或在帧 t+1的子帧 8收到 UL grant时,在 以下上行资源中传输对应的 PUSCH: 帧 t+2中的子帧 1的 UpPTS、 子帧 2 和子帧 3。
从表 29 可以看出, 在每个 HARQ进程中, 从接收到控制信令到传输 PUSCH所间隔的时间是满足 UE或基站最小处理时间 (3ms )前提下的最小 值, 釆用这样的方式可以有效减少数据的传输时延。 此外, 从表 29可以看 出, 各 HARQ进程的 RTT值为 20ms, 沿用现有系统的 RTT值, 对现有协 议的改动小。
可选地, 作为一种实现方式, 上下行子帧配比为 3, 1个 UpPTS和 2个 上行子帧绑定, 和 /或在子帧 n之前的第 /个子帧接收 PHICH, 和 /或在子帧 n接收 UL grant ( PDCCH或 EPDCCH ), 上行资源的起始位置位于子帧 n之 后的第 k个子帧, 其中: 当 n=7时, k=4, Z=8, RTT值为 20ms。
表 30: 上下行子帧配比为 3时的一种实现方式
Figure imgf000071_0001
PUSCH
表 30示出了 3个 HARQ进程: HARQ进程 x、 HARQ进程 y和 HARQ 进程 z。 其中, x表示 HARQ进程 x对应的 PUSCH, Gx表示 HARQ进程 x 对应的 UL grant( PDCCH或 EPDCCH ), Px表示 HARQ进程 x对应的 PHICH, HARQ进程 y和 HARQ进程 z同理。 此外, 表 30给出了连续 6帧时间 (帧 t至帧 t+5 ) 中, HARQ进程 x、 HARQ进程 y和 HARQ进程 z中上行资源 的绑定形式、 分布位置, 以及 HARQ定时关系。 例如, 在 HARQ进程 x中, 当在帧 t的子帧 9收到 PHICH,和 /或在帧 t+1的子帧 7收到 UL grant时,在 以下上行资源中传输对应的 PUSCH: 帧 t+2中的子帧 1的 UpPTS、 子帧 2 和子帧 3。
从表 30 可以看出, 在每个 HARQ进程中, 从接收到控制信令到传输
PUSCH所间隔的时间是满足 UE或基站最小处理时间 (3ms )前提下的最小 值, 釆用这样的方式可以有效减少数据的传输时延。 此外, 从表 30可以看 出, 各 HARQ进程的 RTT值为 20ms, 沿用现有系统的 RTT值, 对现有协 议的改动小。
需要说明的是, 在该实施例中, 虽然 PUSCH的传输是在接收到 PHICH 和 UL grant之后进行的, 但这仅仅是一个示例, 并非要限定 PUSCH的传输 必须以接收到 PHICH和 UL grant为前提条件。 作为另一种示例, 当 UE仅 接收到 PHICH或者仅接收到 UL grant时,也可以仅基于该 PHICH或 UL grant 找到传输 PUSCH的上行资源的位置。 比如,基站可以仅向 UE发送 PHICH, UE在接收到 PHICH之后, 可以基于 PHICH所在子帧找到传输 PUSCH的 上行资源的位置。 又如, 基站向 UE发送了 PHICH和 UL grant, 但是 UE未 能正确接收 UL grant,该 UE可以根据之前接收到的 PHICH所在子帧找到传 输 PUSCH的上行资源的位置。 具体地, 在 Case 1中, 假设在子帧 m接收到 PHICH,且未接收到 UL grant或者未正确接收到 UL grant时, 则基于子帧 m 确定上行资源的起始位置位于该子帧 m之后的第 t个子帧, 其中: 当 m=9 时, t=12。
可选地, 作为一种实现方式, 上下行子帧配比为 3, 1个 UpPTS和 2个 上行子帧绑定, 和 /或在子帧 n之前的第 /个子帧接收 PHICH, 和 /或在子帧 n接收 UL grant ( PDCCH或 EPDCCH ), 上行资源的起始位置位于子帧 n之 后的第 k个子帧, 其中: 当 n=0时, k=4, 1=2; 或者, 当 n=9时, k=4, ί=9。 RTT值为 20ms。 在该实现方式中, UpPTS不是绑定子帧中的第 1个子帧。 在该实现方式可以看出, 在每个 HARQ进程中, 从接收到控制信令到 传输 PUSCH所间隔的时间是满足 UE或基站最小处理时间( 3ms )前提下的 最小值, 釆用这样的方式可以有效减少数据的传输时延。 此外, 各 HARQ 进程的 RTT值为 20ms, 沿用现有系统的 RTT值, 对现有协议的改动 d、。
需要说明的是, 在该实施例中, 虽然 PUSCH的传输是在接收到 PHICH 和 UL grant之后进行的, 但这仅仅是一个示例, 并非要限定 PUSCH的传输 必须以接收到 PHICH和 UL grant为前提条件。 作为另一种示例, 当 UE仅 接收到 PHICH或者仅接收到 UL grant时,也可以仅基于该 PHICH或 UL grant 找到传输 PUSCH的上行资源的位置。 比如,基站可以仅向 UE发送 PHICH, UE在接收到 PHICH之后, 可以基于 PHICH所在子帧找到传输 PUSCH的 上行资源的位置。 又如, 基站向 UE发送了 PHICH和 UL grant, 但是 UE未 能正确接收 UL grant,该 UE可以根据之前接收到的 PHICH所在子帧找到传 输 PUSCH的上行资源的位置。 具体地, 在 Case 1中, 假设在子帧 m接收到 PHICH,且未接收到 UL grant或者未正确接收到 UL grant时, 则基于子帧 m 确定上行资源的起始位置位于该子帧 m之后的第 t个子帧, 其中: 当 m=8 时, t=6; 或者, 当 m=0时, t=13。
可选地, 作为一种实现方式, 上下行子帧配比为 4, 1 个 UpPTS 与该 UpPTS相邻的上行子帧绑定。 具体参见表 31。
表 31 : 上下行子帧配比为 4时的一种实现方式
Figure imgf000073_0001
0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9
PHICH Px Py Px Py
ULgrant Gx Gy Gx Gy
PUSCH y y
帧 t+4 帧 t+5
子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧
0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9
PHICH Px Py Px Py
ULgrant Gx Gy Gx Gy
PUSCH
表 31示出了 2个 HARQ进程: HARQ进程 x和 HARQ进程 y。 其中, X表示 HARQ进程 X对应的 PUSCH, Gx表示 HARQ进程 x对应的 UL grant ( PDCCH或 EPDCCH ), Px表示 HARQ进程 x对应的 PHICH, HARQ进程 y同理。 此外, 表 31给出了连续 6帧时间 (帧 t至帧 t+5 ) 中, HARQ进程
X和 HARQ进程 y中上行资源的绑定形式、 分布位置, 以及 HARQ定时关 系。 例如, 在 HARQ进程 X中, 当在帧 t的子帧 8收到 PHICH, 和 /或在帧 t的子帧 8收到 UL grant时, 在以下上行资源中传输对应的 PUSCH: 帧 t+1 中的子帧 1的 UpPTS和子帧 2。
可选地, 作为一种实现方式, 上下行子帧配比为 4, 1 个 UpPTS 与该 UpPTS 相邻的上行子帧绑定, 在子帧 n 收到控制信令 ( UL grant ( PDCCH/EPDCCH )和 /或 PHICH ), 上行资源的起始位置位于子帧 n之后 的第 k个子帧, 其中: 当 n=7时, k=4。 具体参见表 32。
表 32: 上下行子帧配比为 4时的一种实现方式
帧 t 帧 t+1
子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧
0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9
D S U U D D D D D D D S U U D D D D D D
PHICH Px Py Px Py
ULgrant Gx Gy Gx Gy PUSCH
帧 t+2 帧 t+3
子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧
0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9
PHICH Px Py Px Py
ULgrant Gx Gy Gx Gy
PUSCH y y
帧 t+4 帧 t+5
子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧
0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9
PHICH Px Py Px Py
ULgrant Gx Gy Gx Gy
PUSCH
表 32示出了 2个 HARQ进程: HARQ进程 x和 HARQ进程 y。 其中, X表示 HARQ进程 X对应的 PUSCH, Gx表示 HARQ进程 x对应的 UL grant ( PDCCH或 EPDCCH ), Px表示 HARQ进程 x对应的 PHICH, HARQ进程 y同理。 此外, 表 32给出了连续 6帧时间 (帧 t至帧 t+5 ) 中, HARQ进程
X和 HARQ进程 y中上行资源的绑定形式、 分布位置, 以及 HARQ定时关 系。 例如, 在 HARQ进程 X中, 当在帧 t的子帧 7收到 PHICH, 和 /或在帧 t的子帧 7收到 UL grant时, 在以下上行资源中传输对应的 PUSCH: 帧 t+1 中的子帧 1的 UpPTS和子帧 2。
可选地, 作为一种实现方式, 上下行子帧配比为 4, 1个 UpPTS与 2个 上行子帧绑定, 和 /或在子帧 n之前的第 I个子帧收到 PHICH, 在子帧 n收 到控制 UL grant ( PDCCH或 EPDCCH ), 上行资源的起始位置位于子帧 n之 后的第 k个子帧, 其中: 当 n=7时, k=4, Z=8, RTT值为 20ms。 具体参见 表 33。
表 33: 上下行子帧配比为 4时的一种实现方式
帧 t 帧 t+1
子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧
0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9
D S U U D D D D D D D S U U D D D D D D
PHICH Px Py
ULgrant Gy Gx
PUSCH
帧 t+2 帧 t+3
子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧
0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9
PHICH Px Py
ULgrant Gy Gx
PUSCH
帧 t+4 帧 t+5
子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧
0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9
PHICH Px Py
ULgrant Gy Gx
PUSCH
表 33示出了 2个 HARQ进程: HARQ进程 x和 HARQ进程 y。 其中, X表示 HARQ进程 X对应的 PUSCH, Gx表示 HARQ进程 x对应的 UL grant ( PDCCH或 EPDCCH ), Px表示 HARQ进程 x对应的 PHICH, HARQ进程 y同理。 此外, 表 33给出了连续 6帧时间 (帧 t至帧 t+5 ) 中, HARQ进程 X和 HARQ进程 y中上行资源的绑定形式、 分布位置, 以及 HARQ定时关 系。 例如, 在 HARQ进程 X中, 当在帧 t的子帧 9收到 PHICH, 和 /或在帧 t+1的子帧 7收到 UL grant时,在以下上行资源中传输对应的 PUSCH:帧 t+2 中的子帧 1的 UpPTS、 子帧 2和子帧 3。
从表 33 可以看出, 在每个 HARQ进程中, 从接收到控制信令到传输 PUSCH所间隔的时间是满足 UE或基站最小处理时间 ( 3ms )前提下的最小 值, 釆用这样的方式可以有效减少数据的传输时延。 此外, 从表 33可以看 出, 各 HARQ进程的 RTT值为 20ms, 沿用现有系统的 RTT值, 对现有协 议的改动小。
需要说明的是, 在该实施例中, 虽然 PUSCH的传输是在接收到 PHICH 和 UL grant之后进行的, 但这仅仅是一个示例, 并非要限定 PUSCH的传输 必须以接收到 PHICH和 UL grant为前提条件。 作为另一种示例, 当 UE仅 接收到 PHICH或者仅接收到 UL grant时,也可以仅基于该 PHICH或 UL grant 找到传输 PUSCH的上行资源的位置。 比如,基站可以仅向 UE发送 PHICH, UE在接收到 PHICH之后, 可以基于 PHICH所在子帧找到传输 PUSCH的 上行资源的位置。 又如, 基站向 UE发送了 PHICH和 UL grant, 但是 UE未 能正确接收 UL grant,该 UE可以根据之前接收到的 PHICH所在子帧找到传 输 PUSCH的上行资源的位置。 具体地, 在该实施例中, H没在子帧 m接收 到 PHICH, 且未接收到 UL grant或者未正确接收到 UL grant时, 则基于子 帧 m确定上行资源的起始位置位于该子帧 m之后的第 t个子帧, 其中: 当 m=9时, t=12。
可选地, 作为一种实现方式, 上下行子帧配比为 4, 1个 UpPTS与 2个 上行子帧绑定, 和 /或在子帧 n之前的第 I个子帧收到 PHICH, 在子帧 n收 到控制 UL grant ( PDCCH或 EPDCCH ), 上行资源的起始位置位于子帧 n之 后的第 k个子帧, 其中: 当 n=9时, k=4, Z=l, RTT值为 20ms。 在该实现 方式中, UpPTS不是绑定子帧中的第 1个子帧。
在每个 HARQ进程中,从接收到控制信令到传输 PUSCH所间隔的时间 是满足 UE或基站最小处理时间 (3ms )前提下的最小值, 釆用这样的方式 可以有效减少数据的传输时延。 此外, 各 HARQ进程的 RTT值为 20ms, 沿 用现有系统的 RTT值, 对现有协议的改动小。
需要说明的是, 在该实施例中, 虽然 PUSCH的传输是在接收到 PHICH 和 UL grant之后进行的, 但这仅仅是一个示例, 并非要限定 PUSCH的传输 必须以接收到 PHICH和 UL grant为前提条件。 作为另一种示例, 当 UE仅 接收到 PHICH或者仅接收到 UL grant时,也可以仅基于该 PHICH或 UL grant 找到传输 PUSCH的上行资源的位置。 比如,基站可以仅向 UE发送 PHICH, UE在接收到 PHICH之后, 可以基于 PHICH所在子帧找到传输 PUSCH的 上行资源的位置。 又如, 基站向 UE发送了 PHICH和 UL grant, 但是 UE未 能正确接收 UL grant,该 UE可以根据之前接收到的 PHICH所在子帧找到传 输 PUSCH的上行资源的位置。 具体地, 在 Case 1中, 假设在子帧 m接收到 PHICH,且未接收到 UL grant或者未正确接收到 UL grant时, 则基于子帧 m 确定上行资源的起始位置位于该子帧 m之后的第 t个子帧, 其中: 当 m=8 时, t=5。
可选地, 作为一种实现方式, 上下行子帧配比为 5, 1 个 UpPTS 与该
UpPTS 相邻的上行子帧绑定, 在子帧 n 收到控制信令 ( UL grant ( PDCCH/EPDCCH )和 /或 PHICH ), 上行资源的起始位置位于子帧 n之后 的第 k个子帧, 其中: 当 n=7时, k=4。 具体参见表 34。
表 34: 上下行子帧配比为 5时的一种实现方式
Figure imgf000078_0001
PUSCH
表 34示出了 1个 HARQ进程: HARQ进程 x。 其中, x表示 HARQ进 程 X对应的 PUSCH, Gx表示 HARQ进程 x对应的 UL grant ( PDCCH或 EPDCCH ), Px表示 HARQ进程 x对应的 PHICH。 此外, 表 34给出了连续 6帧时间 (帧 t至帧 t+5 )中, HARQ进程 X中上行资源的绑定形式、 分布位 置, 以及 HARQ定时关系。 例如, 在 HARQ进程 x中, 当在帧 t的子帧 7 收到 PHICH, 和 /或在帧 t的子帧 7收到 UL grant时, 在以下上行资源中传 输对应的 PUSCH: 帧 t+1中的子帧 1的 UpPTS和子帧 2。
可选地, 作为一种实现方式, 上下行子帧配比为 5, 2个 UpPTS与 2个 上行子帧绑定, 在子帧 n收到控制 UL grant ( PDCCH或 EPDCCH ), 上行资 源的起始位置位于子帧 n之后的第 k个子帧, 其中: 当 n=7时, k=4。 具体 参见表 35。
表 35: 上下行子帧配比为 5时的一种实现方式
帧 t 帧 t+1
子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧
0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9
D S U D D D D D D D D S U D D D D D D D
PHICH Px
ULgrant Gx
PUSCH
帧 t+2 帧 t+3
子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧
0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9
PHICH Px
ULgrant Gx
PUSCH
帧 t+4 帧 t+5
子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9
PHICH Px
ULgrant Gx
PUSCH
表 35示出了 1个 HARQ进程: HARQ进程 x。 其中, x表示 HARQ进 程 x对应的 PUSCH, Gx表示 HARQ进程 x对应的 UL grant ( PDCCH或 EPDCCH ), Px表示 HARQ进程 x对应的 PHICH。 此外, 表 32给出了连续 6帧时间 (帧 t至帧 t+5 )中, HARQ进程 X中上行资源的绑定形式、 分布位 置, 以及 HARQ定时关系。 例如, 在 HARQ进程 x中, 当在帧 t+3的子帧 7 收到 UL grant时,在以下上行资源中传输对应的 PUSCH: 帧 t+4中的子帧 1 的 UpPTS和子帧 2, 以及帧 t+5中的子帧 1的 UpPTS和子帧 2。
可选地, 作为一种实现方式, 上下行子帧配比为 6, 1 个 UpPTS 与该 UpPTS相邻的上行子帧绑定。 具体参见表 36。
表 36: 上下行子帧配比为 6时的一种实现方式
Figure imgf000080_0001
表 36示出了 6个 HARQ进程: HARQ进程 1至 HARQ进程 6。 其中, 1表示 HARQ进程 1对应的 PUSCH, G1表示 HARQ进程 1对应的 UL grant ( PDCCH和 /或 EPDCCH ), P1表示 HARQ进程 1对应的 PHICH, HARQ 进程 2至 HARQ进程 6同理。 此外, 表 36给出了连续 4帧时间 (帧 t至帧 t+3 )中, HARQ进程 1至 HARQ进程 6中上行资源的绑定形式、 分布位置, 以及 HARQ定时关系。 例如, 在 HARQ进程 4中, 当在帧 t的子帧 0收到 PHICH和 /或 UL grant时, 在以下上行资源中传输对应的 PUSCH: 帧 t中的 子帧 6的 UpPTS和子帧 7。
应理解, 在上述相对位置确定的情况下, 各个 HARQ进程传输 PUSCH 的参考时间可以有多种, 该参考时间用于描述控制信令(PHICH 和 /或 UL grant )到传输 PUSCH的上行资源的时间以该上行资源中的哪个子帧作为参 考。 具体地, 可以将上行资源的起始位置所在的子帧作为参考。 在该实现方 式中, UpPTS位于上行资源的起始位置, 则可以将该 UpPTS所在的特殊子 帧作为参考, 接收端根据该参考时间可以直接找到上行资源的起始位置。 或 者, 可以将上行资源的第 1个上行子帧作为参考, 接收端根据该参考时间以 及上下行子帧配比能够推算出上行资源的起始位置。 应理解, 以上参考时间 的确定仅仅是举例说明, 实际中, 还可以将上行资源的其他任意子帧作为参 考。
可选地, 作为一种实现方式, 上下行子帧配比为 6, 在现有绑定子帧基 础上直接进行绑定 UpPTS。 具体参见表 37。
表 37: 上下行子帧配比为 6时的一种实现方式
Figure imgf000081_0001
0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9
PHICH Py Pz Px
ULgrant Gy Gz
PUSCH z z z
帧 t+4 帧 t+5
子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 子 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧 帧
0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9
PHICH Py Pz
ULgrant Gx Gy Gz
PUSCH y y y 表 37示出了 3个 HARQ进程: HARQ进程 x、 HARQ进程 y和 HARQ 进程 z。 其中, X表示 HARQ进程 X对应的 PUSCH, Gx表示 HARQ进程 x 对应的 UL grant( PDCCH或 EPDCCH ), Px表示 HARQ进程 x对应的 PHICH, HARQ进程 y和 HARQ进程 z同理。 此外, 表 37给出了连续 6帧时间 (帧 t至帧 t+5 ) 中, HARQ进程 x、 HARQ进程 y和 HARQ进程 z中上行资源 的绑定形式、 分布位置, 以及 HARQ定时关系。 例如, 在 HARQ进程 y中, 当在帧 t的子帧 1收到 PHICH和 /或 UL grant时, 在以下上行资源中传输对 应的 PUSCH: 帧 t中的子帧 6的 UpPTS和子帧 7。
应理解, 在上述相对位置确定的情况下, 各个 HARQ进程传输 PUSCH 的参考时间可以有多种, 该参考时间用于描述控制信令(PHICH 和 /或 UL grant )到传输 PUSCH的上行资源的时间以该上行资源中的哪个子帧作为参 考。 具体地, 可以将上行资源的起始位置所在的子帧作为参考。 在该实现方 式中, UpPTS位于上行资源的起始位置, 则可以将该 UpPTS所在的特殊子 帧作为参考, 接收端根据该参考时间可以直接找到上行资源的起始位置。 或 者, 可以将上行资源的第 1个上行子帧作为参考, 接收端根据该参考时间以 及上下行子帧配比能够推算出上行资源的起始位置。 应理解, 以上参考时间 的确定仅仅是举例说明, 实际中, 还可以将上行资源的其他任意子帧作为参 考。
可选地, 作为一种实现方式, 上下行子帧配比为 6, 2个 UpPTS与 5个 上行子帧绑定, 在子帧 n收到控制 UL grant ( PDCCH或 EPDCCH ), 上行资 源的起始位置位于子帧 n之后的第 k个子帧, 其中: 当 n=0或 5,时, k=6, 1=0。 具体参见表 38。
表 38: 上下行子帧配比为 6时的一种实现方式
Figure imgf000083_0001
表 38示出了 2个 HARQ进程: HARQ进程 x和 HARQ进程 y。 其中, X表示 HARQ进程 X对应的 PUSCH, Gx表示 HARQ进程 x对应的 UL grant ( PDCCH或 EPDCCH ), Px表示 HARQ进程 x对应的 PHICH, HARQ进程 y同理。 此外, 表 38给出了连续 6帧时间 (帧 t至帧 t+5 ) 中, HARQ进程 X和 HARQ进程 y中上行资源的绑定形式、 分布位置, 以及 HARQ定时关 系。例如,在 HARQ进程 X中,当在帧 t+1的子帧 5收到 UL grant和或 PHICH 时, 在以下上行资源中传输对应的 PUSCH: 帧 t+2中的子帧 1的 UpPTS、 子帧 2、 子帧 3、 子帧 4、 子帧 6的 UpPTS、 子帧 7和子帧 8。
在以上各种实现方式中, n、 k、 Z值示出了各个 HARQ进程中 PHICH、 UL grant和上行资源的相对位置, 其中, k表示在子帧 n之后的第 k个子帧 开始传输 PUSCH。 应理解, 在上述相对位置确定的情况下, 各个 HARQ进 程传输 PUSCH 的参考时间可以有多种, 该参考时间用于描述控制信令 ( PHICH和 /或 UL grant )到传输 PUSCH的上行资源的时间以该上行资源中 的哪个子帧作为参考。 具体地, 可以将上行资源的起始位置所在的子帧作为 参考。在该实现方式中, UpPTS位于上行资源的起始位置,则可以将该 UpPTS 所在的特殊子帧作为参考,接收端根据该参考时间可以直接找到上行资源的 起始位置。 或者, 可以将上行资源的第 1个上行子帧作为参考, 接收端根据 该参考时间以及上下行子帧配比能够推算出上行资源的起始位置。 应理解, 以上参考时间的确定仅仅是举例说明, 实际中, 还可以将上行资源的其他任 意子帧作为参考。
可选地, 作为一种实现方式, 上下行子帧配比为 6, 2个 UpPTS与 5个 上行子帧绑定, 在子帧 n收到控制 UL grant ( PDCCH或 EPDCCH ), 上行资 源的起始位置位于子帧 n之后的第 k个子帧, 其中: 当 n=l或 6,时, k=7, /=0; 或者, 当 n=9时, k=5, 1=0。 在该实现方式中, UpPTS不是绑定子帧 中的第 1个子帧。
上文中结合图 1和图 2, 从用户设备的角度详细描述了本发明实施例的 传输 PUSCH的方法, 下面将结合图 3, 从基站的角度描述本发明实施例的 传输 PUSCH的方法。
图 3是本发明一个实施例的传输 PUSCH的方法的示意性流程图。 应理 解, 基站侧描述的用户设备与基站的交互及相关特性、 功能等与用户设备侧 的描述相应, 为了简洁, 适当省略重复的描述。 图 3的方法包括:
310、 在当前子帧向 UE 发送控制信令, 该控制信令用于指示传输 PUSCH。
320、根据该当前子帧所在的子帧位置,确定用于传输该 PUSCH的上行 资源, 该上行资源包括 UpPTS;
330、 在该上行资源接收该 PUSCH。 本发明实施例中,将 UpPTS用于 PUSCH的传输,相当于增加了单位时 间内上行传输的数据量, 从而增加了 TDD系统上行的吞吐量。
可选地, 作为一个实施例, 该上行资源为 1个 UpPTS。
可选地, 作为一个实施例, 该当前子帧为上下行子帧配比为 r时的子帧 n,该 UpPTS位于该子帧 n之后的第 k个子帧中,其中: r=0, n=l或 6, k=5 ; 或者, r=l, n=0或 5, k=6; 或者, r=2, n=l或 6, k=5 ; 或者, r=3, n=7, k=4; 或者, r=4, n=7, k=4; 或者, r=5, η:Ί , k=4; 或者, r=6, n=l或 6, k=5。
可选地, 作为一个实施例, 该 PUSCH的传输对应的混合自动重传请求 HARQ进程为上下行子帧配比为 r时 q个 HARQ进程中的一个, 其中, r=0, q=9或 10; 或者, r=l, q=6; 或者, r=2, q=4; 或者, r=3, q=4; 或者, r=4, q=3 ; 或者, r=5, q=2; 或者, r=6, q=8或 9。该 q个 HARQ进程为该 PUSCH 的传输端 ( UE或基站) 的每个 HARQ实体维持的并行 HARQ进程数。
可选地, 作为一个实施例, 该上行资源还包括上行子帧, 且该上行资源 为连续的上行资源。
本发明实施例中,将 UpPTS用于 PUSCH的传输,相当于增加了单位时 间内上行传输的数据量, 从而增加了 TDD系统上行的吞吐量。 此外, 釆用 UpPTS与其他上行资源绑定的方式传输 PUSCH, 相当于增加了单位时间内 上行数据的传输次数, 从而增加了上行数据接收的信噪比, 进而增加上行覆 盖。
可选地, 作为一个实施例, 该上行资源为上下行子帧配比为 0时的上行 资源, 该上行资源包括 2个 UpPTS和 6个上行子帧。
可选地, 作为一个实施例, 该控制信令为物理下行控制信道 PDCCH或 者增强的物理下行控制信道 EPDCCH , 该当前子帧为子帧 n, 该上行资源的 起始位置位于该子帧 n之后的第 k个子帧, 其中: n=l或 6, k=5 ; 或者, 该 控制信令为物理混合自动重传请求指示信道 PHICH, 该当前子帧为子帧 m, 该上行资源的起始位置位于该子帧 m之后的第 t个子帧, 其中: m=0或 5, t=16。
可选地, 作为一个实施例, 该控制信令为 PDCCH或者 EPDCCH , 该当 前子帧为子帧 n, 该上行资源的起始位置位于该子帧 n之后的第 k个子帧, 其中: 当 n=0或 5时, k=4; 当 n=l或 6时, k=7;或者,该控制信令为 PHICH, 该当前子帧为子帧 m,该上行资源的起始位置位于该子帧 m之后的第 t个子 帧, 其中: 当 m=0或 5时, t=14; 当 m=l或 6时, t=17。
可选地, 作为一个实施例, 该上行资源为上下行子帧配比为 1时的上行 资源, 该上行资源包括 2个 UpPTS和 4个上行子帧。
可选地, 作为一个实施例, 该控制信令为 PDCCH或者 EPDCCH, 该当 前子帧为子帧 n, 该上行资源的起始位置位于该子帧 n之后的第 k个子帧, 其中: n=l或 6, k=5; 或者, 该控制信令为 PHICH, 该当前子帧为子帧 m, 该上行资源的起始位置位于该子帧 m之后的第 t个子帧, 其中: m=9或 4, t=17。
可选地, 作为一个实施例, 该控制信令为 PDCCH或者 EPDCCH, 该当 前子帧为子帧 n, 该上行资源的起始位置位于该子帧 n之后的第 k个子帧, 其中: n=4或 9, k=4; 或者, 该控制信令为 PHICH, 该当前子帧为子帧 m, 该上行资源的起始位置位于该子帧 m之后的第 t个子帧, 其中: m=l或 6, t=17。
可选地, 作为一个实施例, 该上行资源为上下行子帧配比为 2时的上行 资源, 该上行资源包括 2个 UpPTS和 2个上行子帧。
可选地, 作为一个实施例, 该控制信令为 PDCCH或者 EPDCCH, 该当 前子帧为子帧 n, 该上行资源的起始位置位于该子帧 n之后的第 k个子帧, 其中: n=l或 6, k=5; 或者, 该控制信令为 PHICH, 该当前子帧为子帧 m, 该上行资源的起始位置位于该子帧 m之后的第 t个子帧, 其中: m=8或 3, t=18。
可选地, 作为一个实施例, 该上行资源为上下行子帧配比为 3时的上行 资源, 该上行资源包括 1个 UpPTS和 3个上行子帧。
可选地, 作为一个实施例, 该控制信令为 PDCCH或者 EPDCCH, 该当 前子帧为子帧 n, 该上行资源的起始位置位于该子帧 n之后的第 k个子帧, 其中: n=7, k=4; 或者, 该控制信令为 PHICH, 该当前子帧为子帧 m, 该 上行资源的起始位置位于该子帧 m之后的第 t个子帧, 其中: m=0, t=21。
可选地, 作为一个实施例, 该控制信令为 PDCCH或者 EPDCCH, 该当 前子帧为子帧 n, 该上行资源的起始位置位于该子帧 n之后的第 k个子帧, 其中: n=0或 9, k=4; 或者, 该控制信令为 PHICH, 该当前子帧为子帧 m, 该上行资源的起始位置位于该子帧 m之后的第 t个子帧, 其中: m=9或 8, t=15。
可选地, 作为一个实施例, 该上行资源为上下行子帧配比为 4时的上行 资源, 该上行资源包括 1个 UpPTS和 2个上行子帧。
可选地, 作为一个实施例, 该控制信令为 PDCCH或者 EPDCCH, 该当 前子帧为子帧 n, 该上行资源的起始位置位于该子帧 n之后的第 k个子帧, 其中: n=7, k=4; 或者, 该控制信令为 PHICH, 该当前子帧为子帧 m, 该 上行资源的起始位置位于该子帧 m之后的第 t个子帧, 其中: m=9, t=12。
可选地, 作为一个实施例, 该控制信令为 PDCCH或者 EPDCCH, 该当 前子帧为子帧 n, 该上行资源的起始位置位于该子帧 n之后的第 k个子帧, 其中: n=9, k=4; 或者, 该控制信令为 PHICH, 该当前子帧为子帧 m, 该 上行资源的起始位置位于该子帧 m之后的第 t个子帧, 其中: m=8, t=15。
可选地, 作为一个实施例, 该上行资源为上下行子帧配比为 5时的上行 资源, 该上行资源包括 2个 UpPTS和 2个上行子帧。
可选地, 作为一个实施例, 该控制信令为 PDCCH或者 EPDCCH, 该当 前子帧为子帧 n, 该上行资源的起始位置位于该子帧 n之后的第 k个子帧, 其中: n=7, k=4。
可选地, 作为一个实施例, 该上行资源为上下行子帧配比为 6时的上行 资源, 该上行资源包括 2个 UpPTS和 5个上行子帧。
可选地, 作为一个实施例, 该控制信令为 PDCCH或者 EPDCCH, 该当 前子帧为子帧 n, 该上行资源的起始位置位于该子帧 n之后的第 k个子帧, 其中: 当 n=0或 5时, k=6; 当 n=l或 6时, k=5;或者,该控制信令为 PHICH, 该当前子帧为子帧 m,该上行资源的起始位置位于该子帧 m之后的第 t个子 帧, 其中: m=0或 5, t=6。
可选地, 作为一个实施例, 该控制信令为 PDCCH或者 EPDCCH, 该当 前子帧为子帧 n, 该上行资源的起始位置位于该子帧 n之后的第 k个子帧, 其中: 当 n=l或 6时, k=7; 当 n=9时, k=5; 或者, 该控制信令为 PHICH, 该当前子帧为子帧 m,该上行资源的起始位置位于该子帧 m之后的第 t个子 帧, 其中: 当 m=l或 6时, t=7; 当 m=9时, t=5。
上文中结合图 1至图 3, 详细描述了本发明实施例的传输 PUSCH的方 法, 下面将结合图 4至图 7, 详细描述本发明实施例的用户设备和基站。
图 4是本发明一个实施例的用户设备的示意性框图。图 4的用户设备 400 能够实现图 1至图 3中由用户设备执行的各个步骤, 为避免重复, 不再详细 描述。 用户设备 400包括接收单元 410、 确定单元 420和传输单元 430。
接收单元 410, 用于在当前子帧接收基站发送的控制信令, 该控制信令 用于指示传输物理上行共享信道 PUSCH;
确定单元 420, 用于根据该接收单元 410接收该控制信令的该当前子帧 的子帧位置, 确定用于传输该 PUSCH的上行资源, 该上行资源包括上行导 频时隙 UpPTS ;
传输单元 430,用于在该确定单元 420确定的该上行资源传输该 PUSCH。 本发明实施例中,将 UpPTS用于 PUSCH的传输,相当于增加了单位时 间内上行传输的数据量, 从而增加了 TDD系统上行的吞吐量。
可选地, 作为一个实施例, 该上行资源为 1个 UpPTS。
可选地, 作为一个实施例, 该当前子帧为上下行子帧配比为 r时的子帧 n,该 UpPTS位于该子帧 n之后的第 k个子帧中,其中: r=0, n=l或 6, k=5 ; 或者, r=l, n=0或 5, k=6; 或者, r=2, n=l或 6, k=5 ; 或者, r=3, n=7, k=4; 或者, r=4, n=7, k=4; 或者, r=5, η:Ί , k=4; 或者, r=6, n=l或 6, k=5。
可选地, 作为一个实施例, 该 PUSCH的传输对应的混合自动重传请求 HARQ进程为上下行子帧配比为 r时 q个 HARQ进程中的一个, 其中, r=0, q=9或 10; 或者, r=l, q=6; 或者, r=2, q=4; 或者, r=3, q=4; 或者, r=4, q=3 ; 或者, r=5, q=2; 或者, r=6, q=8或 9。
可选地, 作为一个实施例, 该上行资源还包括上行子帧, 且该上行资源 为连续的上行资源。
本发明实施例中,将 UpPTS用于 PUSCH的传输,相当于增加了单位时 间内上行传输的数据量, 从而增加了 TDD系统上行的吞吐量。 此外, 釆用 UpPTS与其他上行资源绑定的方式传输 PUSCH, 相当于增加了单位时间内 上行数据的传输次数, 从而增加了上行数据接收的信噪比, 进而增加上行覆 盖。
可选地, 作为一个实施例, 该上行资源为上下行子帧配比为 0时的上行 资源, 该上行资源包括 2个 UpPTS和 6个上行子帧。
可选地, 作为一个实施例, 该控制信令为物理下行控制信道 PDCCH或 者增强的物理下行控制信道 EPDCCH , 该当前子帧为子帧 n, 该上行资源的 起始位置位于该子帧 n之后的第 k个子帧, 其中: n=l或 6, k=5; 或者, 该 控制信令为物理混合自动重传请求指示信道 PHICH, 该当前子帧为子帧 m, 该上行资源的起始位置位于该子帧 m之后的第 t个子帧, 其中: m=0或 5, t=16。
可选地, 作为一个实施例, 该控制信令为 PDCCH或者 EPDCCH, 该当 前子帧为子帧 n, 该上行资源的起始位置位于该子帧 n之后的第 k个子帧, 其中: 当 n=0或 5时, k=4; 当 n=l或 6时, k=7;或者,该控制信令为 PHICH, 该当前子帧为子帧 m,该上行资源的起始位置位于该子帧 m之后的第 t个子 帧, 其中: 当 m=0或 5时, t=14; 当 m=l或 6时, t=17。
可选地, 作为一个实施例, 该上行资源为上下行子帧配比为 1时的上行 资源, 该上行资源包括 2个 UpPTS和 4个上行子帧。
可选地, 作为一个实施例, 该控制信令为 PDCCH或者 EPDCCH, 该当 前子帧为子帧 n, 该上行资源的起始位置位于该子帧 n之后的第 k个子帧, 其中: n=l或 6, k=5; 或者, 该控制信令为 PHICH, 该当前子帧为子帧 m, 该上行资源的起始位置位于该子帧 m之后的第 t个子帧, 其中: m=9或 4, t=17。
可选地, 作为一个实施例, 该控制信令为 PDCCH或者 EPDCCH, 该当 前子帧为子帧 n, 该上行资源的起始位置位于该子帧 n之后的第 k个子帧, 其中: n=4或 9, k=4; 或者, 该控制信令为 PHICH, 该当前子帧为子帧 m, 该上行资源的起始位置位于该子帧 m之后的第 t个子帧, 其中: m=l或 6, t=17。
可选地, 作为一个实施例, 该上行资源为上下行子帧配比为 2时的上行 资源, 该上行资源包括 2个 UpPTS和 2个上行子帧。
可选地, 作为一个实施例, 该控制信令为 PDCCH或者 EPDCCH, 该当 前子帧为子帧 n, 该上行资源的起始位置位于该子帧 n之后的第 k个子帧, 其中: n=l或 6, k=5; 或者, 该控制信令为 PHICH, 该当前子帧为子帧 m, 该上行资源的起始位置位于该子帧 m之后的第 t个子帧, 其中: m=8或 3, t=18。
可选地, 作为一个实施例, 该上行资源为上下行子帧配比为 3时的上行 资源, 该上行资源包括 1个 UpPTS和 3个上行子帧。
可选地, 作为一个实施例, 该控制信令为 PDCCH或者 EPDCCH, 该当 前子帧为子帧 n, 该上行资源的起始位置位于该子帧 n之后的第 k个子帧, 其中: n=7, k=4; 或者, 该控制信令为 PHICH, 该当前子帧为子帧 m, 该 上行资源的起始位置位于该子帧 m之后的第 t个子帧, 其中: m=0, t=21。
可选地, 作为一个实施例, 该控制信令为 PDCCH或者 EPDCCH, 该当 前子帧为子帧 n, 该上行资源的起始位置位于该子帧 n之后的第 k个子帧, 其中: n=0或 9, k=4; 或者, 该控制信令为 PHICH, 该当前子帧为子帧 m, 该上行资源的起始位置位于该子帧 m之后的第 t个子帧, 其中: m=9或 8, t=15。
可选地, 作为一个实施例, 该上行资源为上下行子帧配比为 4时的上行 资源, 该上行资源包括 1个 UpPTS和 2个上行子帧。
可选地, 作为一个实施例, 该控制信令为 PDCCH或者 EPDCCH, 该当 前子帧为子帧 n, 该上行资源的起始位置位于该子帧 n之后的第 k个子帧, 其中: n=7, k=4; 或者, 该控制信令为 PHICH, 该当前子帧为子帧 m, 该 上行资源的起始位置位于该子帧 m之后的第 t个子帧, 其中: m=9, t=12。
可选地, 作为一个实施例, 该控制信令为 PDCCH或者 EPDCCH, 该当 前子帧为子帧 n, 该上行资源的起始位置位于该子帧 n之后的第 k个子帧, 其中: n=9, k=4; 或者, 该控制信令为 PHICH, 该当前子帧为子帧 m, 该 上行资源的起始位置位于该子帧 m之后的第 t个子帧, 其中: m=8, t=15。
可选地, 作为一个实施例, 该上行资源为上下行子帧配比为 5时的上行 资源, 该上行资源包括 2个 UpPTS和 2个上行子帧。
可选地, 作为一个实施例, 该控制信令为 PDCCH或者 EPDCCH, 该当 前子帧为子帧 n, 该上行资源的起始位置位于该子帧 n之后的第 k个子帧, 其中: n=7, k=4。
可选地, 作为一个实施例, 该上行资源为上下行子帧配比为 6时的上行 资源, 该上行资源包括 2个 UpPTS和 5个上行子帧。
可选地, 作为一个实施例, 该控制信令为 PDCCH或者 EPDCCH, 该当 前子帧为子帧 n, 该上行资源的起始位置位于该子帧 n之后的第 k个子帧, 其中: 当 n=0或 5时, k=6; 当 n=l或 6时, k=5;或者,该控制信令为 PHICH, 该当前子帧为子帧 m,该上行资源的起始位置位于该子帧 m之后的第 t个子 帧, 其中: m=0或 5, t=6。
可选地, 作为一个实施例, 该控制信令为 PDCCH或者 EPDCCH, 该当 前子帧为子帧 n, 该上行资源的起始位置位于该子帧 n之后的第 k个子帧, 其中: 当 n=l或 6时, k=7; 当 n=9时, k=5 ; 或者, 该控制信令为 PHICH, 该当前子帧为子帧 m,该上行资源的起始位置位于该子帧 m之后的第 t个子 帧, 其中: 当 m=l或 6时, t=7; 当 m=9时, t=5。
图 5是本发明一个实施例的基站的示意性框图。 图 5的基站 500能够实 现图 1至图 3中由基站执行的各个步骤, 为避免重复, 不再详细描述。 基站
500包括发送单元 510、 确定单元 520和接收单元 530。
发送单元 510, 用于在当前子帧向用户设备 UE发送控制信令, 该控制 信令用于指示传输物理上行共享信道 PUSCH;
确定单元 520, 用于根据该发送单元 510发送该控制信令的该当前子帧 所在的子帧位置, 确定用于传输该 PUSCH的上行资源, 该上行资源包括上 行导频时隙 UpPTS ;
接收单元 530,用于在该确定单元 520确定的该上行资源接收该 PUSCH。 本发明实施例中,将 UpPTS用于 PUSCH的传输,相当于增加了单位时 间内上行传输的数据量, 从而增加了 TDD系统上行的吞吐量。
可选地, 作为一个实施例, 该上行资源为 1个 UpPTS。
可选地, 作为一个实施例, 该当前子帧为上下行子帧配比为 r时的子帧 n,该 UpPTS位于该子帧 n之后的第 k个子帧中,其中: r=0, n=l或 6, k=5 ; 或者, r=l, n=0或 5, k=6; 或者, r=2, n=l或 6, k=5 ; 或者, r=3, n=7, k=4; 或者, r=4, n=7, k=4; 或者, r=5, η:Ί , k=4; 或者, r=6, n=l或 6, k=5。
可选地, 作为一个实施例, 该 PUSCH的传输对应的混合自动重传请求 HARQ进程为上下行子帧配比为 r时 q个 HARQ进程中的一个, 其中, r=0, q=9或 10; 或者, r=l, q=6; 或者, r=2, q=4; 或者, r=3, q=4; 或者, r=4, q=3 ; 或者, r=5, q=2; 或者, r=6, q=8或 9。
可选地, 作为一个实施例, 该上行资源还包括上行子帧, 且该上行资源 为连续的上行资源。
本发明实施例中,将 UpPTS用于 PUSCH的传输,相当于增加了单位时 间内上行传输的数据量, 从而增加了 TDD系统上行的吞吐量。 此外, 釆用 UpPTS与其他上行资源绑定的方式传输 PUSCH, 相当于增加了单位时间内 上行数据的传输次数, 从而增加了上行数据接收的信噪比, 进而增加上行覆 盖。
可选地, 作为一个实施例, 该上行资源为上下行子帧配比为 0时的上行 资源, 该上行资源包括 2个 UpPTS和 6个上行子帧。
可选地, 作为一个实施例, 该控制信令为物理下行控制信道 PDCCH或 者增强的物理下行控制信道 EPDCCH, 该当前子帧为子帧 n, 该上行资源的 起始位置位于该子帧 n之后的第 k个子帧, 其中: n=l或 6, k=5; 或者, 该 控制信令为物理混合自动重传请求指示信道 PHICH, 该当前子帧为子帧 m, 该上行资源的起始位置位于该子帧 m之后的第 t个子帧, 其中: m=0或 5, t=16。
可选地, 作为一个实施例, 该控制信令为 PDCCH或者 EPDCCH, 该当 前子帧为子帧 n, 该上行资源的起始位置位于该子帧 n之后的第 k个子帧, 其中: 当 n=0或 5时, k=4; 当 n=l或 6时, k=7;或者,该控制信令为 PHICH, 该当前子帧为子帧 m,该上行资源的起始位置位于该子帧 m之后的第 t个子 帧, 其中: 当 m=0或 5时, t=14; 当 m=l或 6时, t=17。
可选地, 作为一个实施例, 该上行资源为上下行子帧配比为 1时的上行 资源, 该上行资源包括 2个 UpPTS和 4个上行子帧。
可选地, 作为一个实施例, 该控制信令为 PDCCH或者 EPDCCH, 该当 前子帧为子帧 n, 该上行资源的起始位置位于该子帧 n之后的第 k个子帧, 其中: n=l或 6, k=5; 或者, 该控制信令为 PHICH, 该当前子帧为子帧 m, 该上行资源的起始位置位于该子帧 m之后的第 t个子帧, 其中: m=9或 4, t=17。
可选地, 作为一个实施例, 该控制信令为 PDCCH或者 EPDCCH, 该当 前子帧为子帧 n, 该上行资源的起始位置位于该子帧 n之后的第 k个子帧, 其中: n=4或 9, k=4; 或者, 该控制信令为 PHICH, 该当前子帧为子帧 m, 该上行资源的起始位置位于该子帧 m之后的第 t个子帧, 其中: m=l或 6, t=17。
可选地, 作为一个实施例, 该上行资源为上下行子帧配比为 2时的上行 资源, 该上行资源包括 2个 UpPTS和 2个上行子帧。
可选地, 作为一个实施例, 该控制信令为 PDCCH或者 EPDCCH, 该当 前子帧为子帧 n, 该上行资源的起始位置位于该子帧 n之后的第 k个子帧, 其中: n=l或 6, k=5; 或者, 该控制信令为 PHICH, 该当前子帧为子帧 m, 该上行资源的起始位置位于该子帧 m之后的第 t个子帧, 其中: m=8或 3, t=18。
可选地, 作为一个实施例, 该上行资源为上下行子帧配比为 3时的上行 资源, 该上行资源包括 1个 UpPTS和 3个上行子帧。
可选地, 作为一个实施例, 该控制信令为 PDCCH或者 EPDCCH, 该当 前子帧为子帧 n, 该上行资源的起始位置位于该子帧 n之后的第 k个子帧, 其中: n=7, k=4; 或者, 该控制信令为 PHICH, 该当前子帧为子帧 m, 该 上行资源的起始位置位于该子帧 m之后的第 t个子帧, 其中: m=0, t=21。
可选地, 作为一个实施例, 该控制信令为 PDCCH或者 EPDCCH, 该当 前子帧为子帧 n, 该上行资源的起始位置位于该子帧 n之后的第 k个子帧, 其中: n=0或 9, k=4; 或者, 该控制信令为 PHICH, 该当前子帧为子帧 m, 该上行资源的起始位置位于该子帧 m之后的第 t个子帧, 其中: m=9或 8, t=15。
可选地, 作为一个实施例, 该上行资源为上下行子帧配比为 4时的上行 资源, 该上行资源包括 1个 UpPTS和 2个上行子帧。
可选地, 作为一个实施例, 该控制信令为 PDCCH或者 EPDCCH, 该当 前子帧为子帧 n, 该上行资源的起始位置位于该子帧 n之后的第 k个子帧, 其中: n=7, k=4; 或者, 该控制信令为 PHICH, 该当前子帧为子帧 m, 该 上行资源的起始位置位于该子帧 m之后的第 t个子帧, 其中: m=9, t=12。
可选地, 作为一个实施例, 该控制信令为 PDCCH或者 EPDCCH, 该当 前子帧为子帧 n, 该上行资源的起始位置位于该子帧 n之后的第 k个子帧, 其中: n=9, k=4; 或者, 该控制信令为 PHICH, 该当前子帧为子帧 m, 该 上行资源的起始位置位于该子帧 m之后的第 t个子帧, 其中: m=8, t=15。
可选地, 作为一个实施例, 该上行资源为上下行子帧配比为 5时的上行 资源, 该上行资源包括 2个 UpPTS和 2个上行子帧。
可选地, 作为一个实施例, 该控制信令为 PDCCH或者 EPDCCH, 该当 前子帧为子帧 n, 该上行资源的起始位置位于该子帧 n之后的第 k个子帧, 其中: n=7, k=4。
可选地, 作为一个实施例, 该上行资源为上下行子帧配比为 6时的上行 资源, 该上行资源包括 2个 UpPTS和 5个上行子帧。
可选地, 作为一个实施例, 该控制信令为 PDCCH或者 EPDCCH, 该当 前子帧为子帧 n, 该上行资源的起始位置位于该子帧 n之后的第 k个子帧, 其中: 当 n=0或 5时, k=6; 当 n=l或 6时, k=5 ;或者,该控制信令为 PHICH, 该当前子帧为子帧 m,该上行资源的起始位置位于该子帧 m之后的第 t个子 帧, 其中: m=0或 5, t=6。
可选地, 作为一个实施例, 该控制信令为 PDCCH或者 EPDCCH , 该当 前子帧为子帧 n, 该上行资源的起始位置位于该子帧 n之后的第 k个子帧, 其中: 当 n=l或 6时, k=7; 当 n=9时, k=5 ; 或者, 该控制信令为 PHICH, 该当前子帧为子帧 m,该上行资源的起始位置位于该子帧 m之后的第 t个子 帧, 其中: 当 m=l或 6时, t=7; 当 m=9时, t=5。
图 6是本发明一个实施例的用户设备的示意性框图。图 6的用户设备 600 能够实现图 1至图 3中由用户设备执行的各个步骤, 为避免重复, 不再详细 描述。 用户设备 600包括接收器 610、 处理器 620和发送器 630。
接收器 610, 用于在当前子帧接收基站发送的控制信令, 该控制信令用 于指示传输物理上行共享信道 PUSCH;
处理器 620, 用于根据该接收器 610接收该控制信令的该当前子帧的子 帧位置, 确定用于传输该 PUSCH的上行资源, 该上行资源包括上行导频时 隙 UpPTS ;
发送器 630, 用于在该处理器 620确定的该上行资源传输该 PUSCH。 本发明实施例中,将 UpPTS用于 PUSCH的传输,相当于增加了单位时 间内上行传输的数据量, 从而增加了 TDD系统上行的吞吐量。
可选地, 作为一个实施例, 该上行资源为 1个 UpPTS。
可选地, 作为一个实施例, 该当前子帧为上下行子帧配比为 r时的子帧 n,该 UpPTS位于该子帧 n之后的第 k个子帧中,其中: r=0, n=l或 6, k=5 ; 或者, r=l, n=0或 5, k=6; 或者, r=2, n=l或 6, k=5 ; 或者, r=3, n=7, k=4; 或者, r=4, n=7, k=4; 或者, r=5, η:Ί , k=4; 或者, r=6, n=l或 6, k=5。
可选地, 作为一个实施例, 该 PUSCH的传输对应的混合自动重传请求 HARQ进程为上下行子帧配比为 r时 q个 HARQ进程中的一个, 其中, r=0, q=9或 10; 或者, r=l, q=6; 或者, r=2, q=4; 或者, r=3, q=4; 或者, r=4, q=3 ; 或者, r=5, q=2; 或者, r=6, q=8或 9。
可选地, 作为一个实施例, 该上行资源还包括上行子帧, 且该上行资源 为连续的上行资源。
本发明实施例中,将 UpPTS用于 PUSCH的传输,相当于增加了单位时 间内上行传输的数据量, 从而增加了 TDD系统上行的吞吐量。 此外, 釆用 UpPTS与其他上行资源绑定的方式传输 PUSCH, 相当于增加了单位时间内 上行数据的传输次数, 从而增加了上行数据接收的信噪比, 进而增加上行覆 盖。
可选地, 作为一个实施例, 该上行资源为上下行子帧配比为 0时的上行 资源, 该上行资源包括 2个 UpPTS和 6个上行子帧。
可选地, 作为一个实施例, 该控制信令为物理下行控制信道 PDCCH或 者增强的物理下行控制信道 EPDCCH, 该当前子帧为子帧 n, 该上行资源的 起始位置位于该子帧 n之后的第 k个子帧, 其中: n=l或 6, k=5; 或者, 该 控制信令为物理混合自动重传请求指示信道 PHICH, 该当前子帧为子帧 m, 该上行资源的起始位置位于该子帧 m之后的第 t个子帧, 其中: m=0或 5, t=16。
可选地, 作为一个实施例, 该控制信令为 PDCCH或者 EPDCCH, 该当 前子帧为子帧 n, 该上行资源的起始位置位于该子帧 n之后的第 k个子帧, 其中: 当 n=0或 5时, k=4; 当 n=l或 6时, k=7;或者,该控制信令为 PHICH, 该当前子帧为子帧 m,该上行资源的起始位置位于该子帧 m之后的第 t个子 帧, 其中: 当 m=0或 5时, t=14; 当 m=l或 6时, t=17。
可选地, 作为一个实施例, 该上行资源为上下行子帧配比为 1时的上行 资源, 该上行资源包括 2个 UpPTS和 4个上行子帧。
可选地, 作为一个实施例, 该控制信令为 PDCCH或者 EPDCCH, 该当 前子帧为子帧 n, 该上行资源的起始位置位于该子帧 n之后的第 k个子帧, 其中: n=l或 6, k=5; 或者, 该控制信令为 PHICH, 该当前子帧为子帧 m, 该上行资源的起始位置位于该子帧 m之后的第 t个子帧, 其中: m=9或 4, t=17。
可选地, 作为一个实施例, 该控制信令为 PDCCH或者 EPDCCH, 该当 前子帧为子帧 n, 该上行资源的起始位置位于该子帧 n之后的第 k个子帧, 其中: n=4或 9, k=4; 或者, 该控制信令为 PHICH, 该当前子帧为子帧 m, 该上行资源的起始位置位于该子帧 m之后的第 t个子帧, 其中: m=l或 6, t=17。 可选地, 作为一个实施例, 该上行资源为上下行子帧配比为 2时的上行 资源, 该上行资源包括 2个 UpPTS和 2个上行子帧。
可选地, 作为一个实施例, 该控制信令为 PDCCH或者 EPDCCH, 该当 前子帧为子帧 n, 该上行资源的起始位置位于该子帧 n之后的第 k个子帧, 其中: n=l或 6, k=5; 或者, 该控制信令为 PHICH, 该当前子帧为子帧 m, 该上行资源的起始位置位于该子帧 m之后的第 t个子帧, 其中: m=8或 3, t=18。
可选地, 作为一个实施例, 该上行资源为上下行子帧配比为 3时的上行 资源, 该上行资源包括 1个 UpPTS和 3个上行子帧。
可选地, 作为一个实施例, 该控制信令为 PDCCH或者 EPDCCH, 该当 前子帧为子帧 n, 该上行资源的起始位置位于该子帧 n之后的第 k个子帧, 其中: n=7, k=4; 或者, 该控制信令为 PHICH, 该当前子帧为子帧 m, 该 上行资源的起始位置位于该子帧 m之后的第 t个子帧, 其中: m=0, t=21。
可选地, 作为一个实施例, 该控制信令为 PDCCH或者 EPDCCH, 该当 前子帧为子帧 n, 该上行资源的起始位置位于该子帧 n之后的第 k个子帧, 其中: n=0或 9, k=4; 或者, 该控制信令为 PHICH, 该当前子帧为子帧 m, 该上行资源的起始位置位于该子帧 m之后的第 t个子帧, 其中: m=9或 8, t=15。
可选地, 作为一个实施例, 该上行资源为上下行子帧配比为 4时的上行 资源, 该上行资源包括 1个 UpPTS和 2个上行子帧。
可选地, 作为一个实施例, 该控制信令为 PDCCH或者 EPDCCH, 该当 前子帧为子帧 n, 该上行资源的起始位置位于该子帧 n之后的第 k个子帧, 其中: n=7, k=4; 或者, 该控制信令为 PHICH, 该当前子帧为子帧 m, 该 上行资源的起始位置位于该子帧 m之后的第 t个子帧, 其中: m=9, t=12。
可选地, 作为一个实施例, 该控制信令为 PDCCH或者 EPDCCH, 该当 前子帧为子帧 n, 该上行资源的起始位置位于该子帧 n之后的第 k个子帧, 其中: n=9, k=4; 或者, 该控制信令为 PHICH, 该当前子帧为子帧 m, 该 上行资源的起始位置位于该子帧 m之后的第 t个子帧, 其中: m=8, t=15。
可选地, 作为一个实施例, 该上行资源为上下行子帧配比为 5时的上行 资源, 该上行资源包括 2个 UpPTS和 2个上行子帧。
可选地, 作为一个实施例, 该控制信令为 PDCCH或者 EPDCCH, 该当 前子帧为子帧 n, 该上行资源的起始位置位于该子帧 n之后的第 k个子帧, 其中: n=7, k=4。
可选地, 作为一个实施例, 该上行资源为上下行子帧配比为 6时的上行 资源, 该上行资源包括 2个 UpPTS和 5个上行子帧。
可选地, 作为一个实施例, 该控制信令为 PDCCH或者 EPDCCH , 该当 前子帧为子帧 n, 该上行资源的起始位置位于该子帧 n之后的第 k个子帧, 其中: 当 n=0或 5时, k=6; 当 n=l或 6时, k=5 ;或者,该控制信令为 PHICH, 该当前子帧为子帧 m,该上行资源的起始位置位于该子帧 m之后的第 t个子 帧, 其中: m=0或 5, t=6。
可选地, 作为一个实施例, 该控制信令为 PDCCH或者 EPDCCH , 该当 前子帧为子帧 n, 该上行资源的起始位置位于该子帧 n之后的第 k个子帧, 其中: 当 n=l或 6时, k=7; 当 n=9时, k=5 ; 或者, 该控制信令为 PHICH, 该当前子帧为子帧 m,该上行资源的起始位置位于该子帧 m之后的第 t个子 帧, 其中: 当 m=l或 6时, t=7; 当 m=9时, t=5。
图 7是本发明一个实施例的基站的示意性框图。 图 7的基站 700能够实 现图 1至图 3中由基站执行的各个步骤, 为避免重复, 不再详细描述。 基站
700包括发送器 710、 处理器 720和接收器 730。
发送器 710, 用于在当前子帧向用户设备 UE发送控制信令, 该控制信 令用于指示传输物理上行共享信道 PUSCH;
处理器 720, 用于根据该发送器 710发送该控制信令的该当前子帧所在 的子帧位置, 确定用于传输该 PUSCH的上行资源, 该上行资源包括上行导 频时隙 UpPTS ;
接收器 730, 用于在该处理器 720确定的该上行资源接收该 PUSCH。 本发明实施例中,将 UpPTS用于 PUSCH的传输,相当于增加了单位时 间内上行传输的数据量, 从而增加了 TDD系统上行的吞吐量。
可选地, 作为一个实施例, 该上行资源为 1个 UpPTS。
可选地, 作为一个实施例, 该当前子帧为上下行子帧配比为 r时的子帧 n,该 UpPTS位于该子帧 n之后的第 k个子帧中,其中: r=0, n=l或 6, k=5 ; 或者, r=l, n=0或 5, k=6; 或者, r=2, n=l或 6, k=5 ; 或者, r=3, n=7, k=4; 或者, r=4, n=7, k=4; 或者, r=5, η:Ί , k=4; 或者, r=6, n=l或 6, k=5。 可选地, 作为一个实施例, 该 PUSCH的传输对应的混合自动重传请求 HARQ进程为上下行子帧配比为 r时 q个 HARQ进程中的一个, 其中, r=0, q=9或 10; 或者, r=l, q=6; 或者, r=2, q=4; 或者, r=3, q=4; 或者, r=4, q=3; 或者, r=5, q=2; 或者, r=6, q=8或 9。
可选地, 作为一个实施例, 该上行资源还包括上行子帧, 且该上行资源 为连续的上行资源。
本发明实施例中,将 UpPTS用于 PUSCH的传输,相当于增加了单位时 间内上行传输的数据量, 从而增加了 TDD系统上行的吞吐量。 此外, 釆用 UpPTS与其他上行资源绑定的方式传输 PUSCH, 相当于增加了单位时间内 上行数据的传输次数, 从而增加了上行数据接收的信噪比, 进而增加上行覆 盖。
可选地, 作为一个实施例, 该上行资源为上下行子帧配比为 0时的上行 资源, 该上行资源包括 2个 UpPTS和 6个上行子帧。
可选地, 作为一个实施例, 该控制信令为物理下行控制信道 PDCCH或 者增强的物理下行控制信道 EPDCCH, 该当前子帧为子帧 n, 该上行资源的 起始位置位于该子帧 n之后的第 k个子帧, 其中: n=l或 6, k=5; 或者, 该 控制信令为物理混合自动重传请求指示信道 PHICH, 该当前子帧为子帧 m, 该上行资源的起始位置位于该子帧 m之后的第 t个子帧, 其中: m=0或 5, t=16。
可选地, 作为一个实施例, 该控制信令为 PDCCH或者 EPDCCH, 该当 前子帧为子帧 n, 该上行资源的起始位置位于该子帧 n之后的第 k个子帧, 其中: 当 n=0或 5时, k=4; 当 n=l或 6时, k=7;或者,该控制信令为 PHICH, 该当前子帧为子帧 m,该上行资源的起始位置位于该子帧 m之后的第 t个子 帧, 其中: 当 m=0或 5时, t=14; 当 m=l或 6时, t=17。
可选地, 作为一个实施例, 该上行资源为上下行子帧配比为 1时的上行 资源, 该上行资源包括 2个 UpPTS和 4个上行子帧。
可选地, 作为一个实施例, 该控制信令为 PDCCH或者 EPDCCH, 该当 前子帧为子帧 n, 该上行资源的起始位置位于该子帧 n之后的第 k个子帧, 其中: n=l或 6, k=5; 或者, 该控制信令为 PHICH, 该当前子帧为子帧 m, 该上行资源的起始位置位于该子帧 m之后的第 t个子帧, 其中: m=9或 4, t=17。 可选地, 作为一个实施例, 该控制信令为 PDCCH或者 EPDCCH, 该当 前子帧为子帧 n, 该上行资源的起始位置位于该子帧 n之后的第 k个子帧, 其中: n=4或 9, k=4; 或者, 该控制信令为 PHICH, 该当前子帧为子帧 m, 该上行资源的起始位置位于该子帧 m之后的第 t个子帧, 其中: m=l或 6, t=17。
可选地, 作为一个实施例, 该上行资源为上下行子帧配比为 2时的上行 资源, 该上行资源包括 2个 UpPTS和 2个上行子帧。
可选地, 作为一个实施例, 该控制信令为 PDCCH或者 EPDCCH, 该当 前子帧为子帧 n, 该上行资源的起始位置位于该子帧 n之后的第 k个子帧, 其中: n=l或 6, k=5; 或者, 该控制信令为 PHICH, 该当前子帧为子帧 m, 该上行资源的起始位置位于该子帧 m之后的第 t个子帧, 其中: m=8或 3, t=18。
可选地, 作为一个实施例, 该上行资源为上下行子帧配比为 3时的上行 资源, 该上行资源包括 1个 UpPTS和 3个上行子帧。
可选地, 作为一个实施例, 该控制信令为 PDCCH或者 EPDCCH, 该当 前子帧为子帧 n, 该上行资源的起始位置位于该子帧 n之后的第 k个子帧, 其中: n=7, k=4; 或者, 该控制信令为 PHICH, 该当前子帧为子帧 m, 该 上行资源的起始位置位于该子帧 m之后的第 t个子帧, 其中: m=0, t=21。
可选地, 作为一个实施例, 该控制信令为 PDCCH或者 EPDCCH, 该当 前子帧为子帧 n, 该上行资源的起始位置位于该子帧 n之后的第 k个子帧, 其中: n=0或 9, k=4; 或者, 该控制信令为 PHICH, 该当前子帧为子帧 m, 该上行资源的起始位置位于该子帧 m之后的第 t个子帧, 其中: m=9或 8, t=15。
可选地, 作为一个实施例, 该上行资源为上下行子帧配比为 4时的上行 资源, 该上行资源包括 1个 UpPTS和 2个上行子帧。
可选地, 作为一个实施例, 该控制信令为 PDCCH或者 EPDCCH, 该当 前子帧为子帧 n, 该上行资源的起始位置位于该子帧 n之后的第 k个子帧, 其中: n=7, k=4; 或者, 该控制信令为 PHICH, 该当前子帧为子帧 m, 该 上行资源的起始位置位于该子帧 m之后的第 t个子帧, 其中: m=9, t=12。
可选地, 作为一个实施例, 该控制信令为 PDCCH或者 EPDCCH, 该当 前子帧为子帧 n, 该上行资源的起始位置位于该子帧 n之后的第 k个子帧, 其中: n=9, k=4; 或者, 该控制信令为 PHICH, 该当前子帧为子帧 m, 该 上行资源的起始位置位于该子帧 m之后的第 t个子帧, 其中: m=8, t=15。
可选地, 作为一个实施例, 该上行资源为上下行子帧配比为 5时的上行 资源, 该上行资源包括 2个 UpPTS和 2个上行子帧。
可选地, 作为一个实施例, 该控制信令为 PDCCH或者 EPDCCH, 该当 前子帧为子帧 n, 该上行资源的起始位置位于该子帧 n之后的第 k个子帧, 其中: n=7, k=4。
可选地, 作为一个实施例, 该上行资源为上下行子帧配比为 6时的上行 资源, 该上行资源包括 2个 UpPTS和 5个上行子帧。
可选地, 作为一个实施例, 该控制信令为 PDCCH或者 EPDCCH, 该当 前子帧为子帧 n, 该上行资源的起始位置位于该子帧 n之后的第 k个子帧, 其中: 当 n=0或 5时, k=6; 当 n=l或 6时, k=5;或者,该控制信令为 PHICH, 该当前子帧为子帧 m,该上行资源的起始位置位于该子帧 m之后的第 t个子 帧, 其中: m=0或 5, t=6。
可选地, 作为一个实施例, 该控制信令为 PDCCH或者 EPDCCH, 该当 前子帧为子帧 n, 该上行资源的起始位置位于该子帧 n之后的第 k个子帧, 其中: 当 n=l或 6时, k=7; 当 n=9时, k=5; 或者, 该控制信令为 PHICH, 该当前子帧为子帧 m,该上行资源的起始位置位于该子帧 m之后的第 t个子 帧, 其中: 当 m=l或 6时, t=7; 当 m=9时, t=5。
本领域普通技术人员可以意识到, 结合本文中所公开的实施例描述的各 示例的单元及算法步骤, 能够以电子硬件、 或者计算机软件和电子硬件的结 合来实现。 这些功能究竟以硬件还是软件方式来执行, 取决于技术方案的特 定应用和设计约束条件。 专业技术人员可以对每个特定的应用来使用不同方 法来实现所描述的功能, 但是这种实现不应认为超出本发明的范围。
所属领域的技术人员可以清楚地了解到, 为描述的方便和简洁, 上述描 述的系统、 装置和单元的具体工作过程, 可以参考前述方法实施例中的对应 过程, 在此不再赘述。
在本申请所提供的几个实施例中, 应该理解到, 所揭露的系统、 装置和 方法, 可以通过其它的方式实现。 例如, 以上所描述的装置实施例仅仅是示 意性的, 例如, 所述单元的划分, 仅仅为一种逻辑功能划分, 实际实现时可 以有另外的划分方式, 例如多个单元或组件可以结合或者可以集成到另一个 系统, 或一些特征可以忽略, 或不执行。 另一点, 所显示或讨论的相互之间 的耦合或直接辆合或通信连接可以是通过一些接口, 装置或单元的间接耦合 或通信连接, 可以是电性, 机械或其它的形式。 为单元显示的部件可以是或者也可以不是物理单元, 即可以位于一个地方, 或者也可以分布到多个网络单元上。可以根据实际的需要选择其中的部分或 者全部单元来实现本实施例方案的目的。
另外, 在本发明各个实施例中的各功能单元可以集成在一个处理单元 中, 也可以是各个单元单独物理存在, 也可以两个或两个以上单元集成在一 个单元中。
所述功能如果以软件功能单元的形式实现并作为独立的产品销售或使 用时, 可以存储在一个计算机可读取存储介质中。 基于这样的理解, 本发明 的技术方案本质上或者说对现有技术做出贡献的部分或者该技术方案的部 分可以以软件产品的形式体现出来, 该计算机软件产品存储在一个存储介质 中, 包括若干指令用以使得一台计算机设备(可以是个人计算机, 服务器, 或者网络设备等)执行本发明各个实施例所述方法的全部或部分步骤。 而前 述的存储介质包括: U盘、移动硬盘、只读存储器( ROM, Read-Only Memory )、 随机存取存储器(RAM, Random Access Memory ), 磁碟或者光盘等各种可 以存储程序代码的介质。
以上所述, 仅为本发明的具体实施方式, 但本发明的保护范围并不局限 于此, 任何熟悉本技术领域的技术人员在本发明揭露的技术范围内, 可轻易 想到变化或替换, 都应涵盖在本发明的保护范围之内。 因此, 本发明的保护 范围应所述以权利要求的保护范围为准。

Claims

权利要求
1、 一种传输物理上行共享信道 PUSCH的方法, 其特征在于, 包括: 在当前子帧接收基站发送的控制信令, 所述控制信令用于指示传输
PUSCH;
根据所述当前子帧的子帧位置,确定用于传输所述 PUSCH的上行资源, 所述上行资源包括上行导频时隙 UpPTS;
在所述上行资源传输所述 PUSCH。
2、如权利要求 1所述的方法,其特征在于,所述上行资源为 1个 UpPTS。
3、 如权利要求 2所述的方法, 其特征在于, 所述当前子帧为上下行子 帧配比为 r时的子帧 n, 所述 UpPTS位于所述子帧 n之后的第 k个子帧中, 其中:
r=0, n=l或 6, k=5; 或者,
r=l, n=0或 5, k=6; 或者,
r=2, n=l或 6, k=5; 或者,
r=3, η:Ί, k=4; 或者,
r=4, η:Ί, k=4; 或者,
r=5, η:Ί, k=4; 或者,
r-6, n-l或 6, k=5。
4、 如权利要求 2所述的方法, 其特征在于, 所述 PUSCH的传输对应的 混合自动重传请求 HARQ进程为上下行子帧配比为 r时 q个 HARQ进程中 的一个, 其中,
r=0, q=9或 10; 或者,
r=l, q-6; 或者,
r=2, q=4; 或者,
r=3, q=4; 或者,
r=4, q=3; 或者,
r=5, q=2; 或者,
r=6, q=8或 9。
5、 如权利要求 1所述的方法, 其特征在于, 所述上行资源还包括上行 子帧, 且所述上行资源为连续的上行资源。
6、 如权利要求 5所述的方法, 其特征在于, 所述上行资源为上下行子 帧配比为 0时的上行资源, 所述上行资源包括 2个 UpPTS和 6个上行子帧。
7、 如权利要求 6所述的方法, 其特征在于,
所述控制信令为物理下行控制信道 PDCCH或者增强的物理下行控制信 道 EPDCCH, 所述当前子帧为子帧 n, 所述上行资源的起始位置位于所述子 帧 n之后的第 k个子帧, 其中: n=l或 6, k=5; 或者,
所述控制信令为物理混合自动重传请求指示信道 PHICH,所述当前子帧 为子帧 m, 所述上行资源的起始位置位于所述子帧 m之后的第 t个子帧, 其 中: m=0或 5, t=16。
8、 如权利要求 6所述的方法, 其特征在于,
所述控制信令为 PDCCH或者 EPDCCH, 所述当前子帧为子帧 n, 所述 上行资源的起始位置位于所述子帧 n之后的第 k个子帧, 其中: 当 n=0或 5 时, k=4; 当 n=l或 6时, k=7; 或者,
所述控制信令为 PHICH,所述当前子帧为子帧 m,所述上行资源的起始 位置位于所述子帧 m之后的第 t个子帧, 其中: 当 m=0或 5时, t=14; 当 m=l或 6时, t=17。
9、 如权利要求 5所述的方法, 其特征在于, 所述上行资源为上下行子 帧配比为 1时的上行资源, 所述上行资源包括 2个 UpPTS和 4个上行子帧。
10、 如权利要求 9所述的方法, 其特征在于,
所述控制信令为 PDCCH或者 EPDCCH, 所述当前子帧为子帧 n, 所述 上行资源的起始位置位于所述子帧 n之后的第 k个子帧, 其中: n=l或 6, k=5; 或者,
所述控制信令为 PHICH,所述当前子帧为子帧 m,所述上行资源的起始 位置位于所述子帧 m之后的第 t个子帧, 其中: m=9或 4, t=17。
11、 如权利要求 9所述的方法, 其特征在于,
所述控制信令为 PDCCH或者 EPDCCH, 所述当前子帧为子帧 n, 所述 上行资源的起始位置位于所述子帧 n之后的第 k个子帧, 其中: n=4或 9, k=4; 或者,
所述控制信令为 PHICH,所述当前子帧为子帧 m,所述上行资源的起始 位置位于所述子帧 m之后的第 t个子帧, 其中: m=l或 6, t=17。
12、 如权利要求 5所述的方法, 其特征在于, 所述上行资源为上下行子 帧配比为 2时的上行资源, 所述上行资源包括 2个 UpPTS和 2个上行子帧。
13、 如权利要求 12所述的方法, 其特征在于,
所述控制信令为 PDCCH或者 EPDCCH, 所述当前子帧为子帧 n, 所述 上行资源的起始位置位于所述子帧 n之后的第 k个子帧, 其中: n=l或 6, k=5; 或者,
所述控制信令为 PHICH,所述当前子帧为子帧 m,所述上行资源的起始 位置位于所述子帧 m之后的第 t个子帧, 其中: m=8或 3, t=18。
14、 如权利要求 5所述的方法, 其特征在于, 所述上行资源为上下行子 帧配比为 3时的上行资源, 所述上行资源包括 1个 UpPTS和 3个上行子帧。
15、 如权利要求 14所述的方法, 其特征在于,
所述控制信令为 PDCCH或者 EPDCCH, 所述当前子帧为子帧 n, 所述 上行资源的起始位置位于所述子帧 n之后的第 k个子帧, 其中: n=7, k=4; 或者,
所述控制信令为 PHICH,所述当前子帧为子帧 m,所述上行资源的起始 位置位于所述子帧 m之后的第 t个子帧, 其中: m=0, t=21。
16、 如权利要求 14所述的方法, 其特征在于,
所述控制信令为 PDCCH或者 EPDCCH, 所述当前子帧为子帧 n, 所述 上行资源的起始位置位于所述子帧 n之后的第 k个子帧, 其中: n=0或 9, k=4; 或者,
所述控制信令为 PHICH,所述当前子帧为子帧 m,所述上行资源的起始 位置位于所述子帧 m之后的第 t个子帧, 其中: m=9或 8, t=15。
17、 如权利要求 5所述的方法, 其特征在于, 所述上行资源为上下行子 帧配比为 4时的上行资源, 所述上行资源包括 1个 UpPTS和 2个上行子帧。
18、 如权利要求 17所述的方法, 其特征在于,
所述控制信令为 PDCCH或者 EPDCCH, 所述当前子帧为子帧 n, 所述 上行资源的起始位置位于所述子帧 n之后的第 k个子帧, 其中: n=7, k=4; 或者,
所述控制信令为 PHICH,所述当前子帧为子帧 m,所述上行资源的起始 位置位于所述子帧 m之后的第 t个子帧, 其中: m=9, t=12。
19、 如权利要求 17所述的方法, 其特征在于,
所述控制信令为 PDCCH或者 EPDCCH, 所述当前子帧为子帧 n, 所述 上行资源的起始位置位于所述子帧 n之后的第 k个子帧, 其中: n=9, k=4; 或者,
所述控制信令为 PHICH,所述当前子帧为子帧 m,所述上行资源的起始 位置位于所述子帧 m之后的第 t个子帧, 其中: m=8, t=15。
20、 如权利要求 5所述的方法, 其特征在于, 所述上行资源为上下行子 帧配比为 5时的上行资源, 所述上行资源包括 2个 UpPTS和 2个上行子帧。
21、 如权利要求 20所述的方法, 其特征在于,
所述控制信令为 PDCCH或者 EPDCCH, 所述当前子帧为子帧 n, 所述 上行资源的起始位置位于所述子帧 n之后的第 k个子帧, 其中: n=7, k=4。
22、 如权利要求 5所述的方法, 其特征在于, 所述上行资源为上下行子 帧配比为 6时的上行资源, 所述上行资源包括 2个 UpPTS和 5个上行子帧。
23、 如权利要求 22所述的方法, 其特征在于,
所述控制信令为 PDCCH或者 EPDCCH, 所述当前子帧为子帧 n, 所述 上行资源的起始位置位于所述子帧 n之后的第 k个子帧, 其中: 当 n=0或 5 时, k=6; 当 n=l或 6时, k=5; 或者,
所述控制信令为 PHICH,所述当前子帧为子帧 m,所述上行资源的起始 位置位于所述子帧 m之后的第 t个子帧, 其中: m=0或 5, t=6。
24、 如权利要求 22所述的方法, 其特征在于,
所述控制信令为 PDCCH或者 EPDCCH, 所述当前子帧为子帧 n, 所述 上行资源的起始位置位于所述子帧 n之后的第 k个子帧, 其中: 当 n=l或 6 时, k=7; 当 n=9时, k=5; 或者,
所述控制信令为 PHICH,所述当前子帧为子帧 m,所述上行资源的起始 位置位于所述子帧 m之后的第 t个子帧,其中: 当 m=l或 6时, t=7; 当 m=9 时, t=5。
25、 如权利要求 1-24 中任一项所述的方法, 其特征在于, 所述上行资 源中的 UpPTS包括扩展后的 UpPTS, 其中, 当所述扩展后的 UpPTS所在子 帧插入正常循环前缀 CP时,所述扩展后的 UpPTS占用的符号数 X e (3, 10); 当所述扩展后的 UpPTS所在子帧插入扩展 CP时, 所述扩展后的 UpPTS占 用的符号数 (3, 8)。
26、 一种传输物理上行共享信道 PUSCH的方法, 其特征在于, 包括: 在当前子帧向用户设备发送控制信令, 所述控制信令用于指示传输
PUSCH; 根据所述当前子帧所在的子帧位置, 确定用于传输所述 PUSCH的上行 资源, 所述上行资源包括上行导频时隙 UpPTS ;
在所述上行资源接收所述 PUSCH。
27、 如权利要求 26 所述的方法, 其特征在于, 所述上行资源为 1 个 UpPTS。
28、 如权利要求 27所述的方法, 其特征在于, 所述当前子帧为上下行 子帧配比为 r时的子帧 n,所述 UpPTS位于所述子帧 n之后的第 k个子帧中, 其中:
r=0, n=l或 6, k=5 ; 或者,
r=l, n=0或 5, k=6; 或者,
r=2, n=l或 6, k=5 ; 或者,
r=3, η:Ί , k=4; 或者,
r=4, η:Ί , k=4; 或者,
r=5, η:Ί , k=4; 或者,
r-6, n-l或 6, k=5。
29、 如权利要求 27所述的方法, 其特征在于, 所述 PUSCH的传输对应 的混合自动重传请求 HARQ进程为上下行子帧配比为 r时 q个 HARQ进程 中的一个, 其中,
r=0, q=9或 10; 或者,
r=l, q-6 或者,
r=2, q=4 或者,
r=3, q=4 或者,
r=4, q=3 或者,
r=5, q=2 或者,
r=6, q=8或 9。
30、 如权利要求 26所述的方法, 其特征在于, 所述上行资源还包括上 行子帧, 且所述上行资源为连续的上行资源。
31、 如权利要求 30所述的方法, 其特征在于, 所述上行资源为上下行 子帧配比为 0时的上行资源, 所述上行资源包括 2个 UpPTS和 6个上行子 帧。
32、 如权利要求 31所述的方法, 其特征在于, 所述控制信令为物理下行控制信道 PDCCH或者增强的物理下行控制信 道 EPDCCH, 所述当前子帧为子帧 n, 所述上行资源的起始位置位于所述子 帧 n之后的第 k个子帧, 其中: n=l或 6, k=5; 或者,
所述控制信令为物理混合自动重传请求指示信道 PHICH,所述当前子帧 为子帧 m, 所述上行资源的起始位置位于所述子帧 m之后的第 t个子帧, 其 中: m=0或 5, t=16。
33、 如权利要求 31所述的方法, 其特征在于,
所述控制信令为 PDCCH或者 EPDCCH, 所述当前子帧为子帧 n, 所述 上行资源的起始位置位于所述子帧 n之后的第 k个子帧, 其中: 当 n=0或 5 时, k=4; 当 n=l或 6时, k=7; 或者,
所述控制信令为 PHICH,所述当前子帧为子帧 m,所述上行资源的起始 位置位于所述子帧 m之后的第 t个子帧, 其中: 当 m=0或 5时, t=14; 当 m=l或 6时, t=17。
34、 如权利要求 30所述的方法, 其特征在于, 所述上行资源为上下行 子帧配比为 1时的上行资源, 所述上行资源包括 2个 UpPTS和 4个上行子 帧。
35、 如权利要求 34所述的方法, 其特征在于,
所述控制信令为 PDCCH或者 EPDCCH, 所述当前子帧为子帧 n, 所述 上行资源的起始位置位于所述子帧 n之后的第 k个子帧, 其中: n=l或 6, k=5; 或者,
所述控制信令为 PHICH,所述当前子帧为子帧 m,所述上行资源的起始 位置位于所述子帧 m之后的第 t个子帧, 其中: m=9或 4, t=17。
36、 如权利要求 34所述的方法, 其特征在于,
所述控制信令为 PDCCH或者 EPDCCH, 所述当前子帧为子帧 n, 所述 上行资源的起始位置位于所述子帧 n之后的第 k个子帧, 其中: n=4或 9, k=4; 或者,
所述控制信令为 PHICH,所述当前子帧为子帧 m,所述上行资源的起始 位置位于所述子帧 m之后的第 t个子帧, 其中: m=l或 6, t=17。
37、 如权利要求 30所述的方法, 其特征在于, 所述上行资源为上下行 子帧配比为 2时的上行资源, 所述上行资源包括 2个 UpPTS和 2个上行子 帧。
38、 如权利要求 37所述的方法, 其特征在于,
所述控制信令为 PDCCH或者 EPDCCH, 所述当前子帧为子帧 n, 所述 上行资源的起始位置位于所述子帧 n之后的第 k个子帧, 其中: n=l或 6, k=5; 或者,
所述控制信令为 PHICH,所述当前子帧为子帧 m,所述上行资源的起始 位置位于所述子帧 m之后的第 t个子帧, 其中: m=8或 3, t=18。
39、 如权利要求 30所述的方法, 其特征在于, 所述上行资源为上下行 子帧配比为 3时的上行资源, 所述上行资源包括 1个 UpPTS和 3个上行子 帧。
40、 如权利要求 39所述的方法, 其特征在于,
所述控制信令为 PDCCH或者 EPDCCH, 所述当前子帧为子帧 n, 所述 上行资源的起始位置位于所述子帧 n之后的第 k个子帧, 其中: n=7, k=4; 或者,
所述控制信令为 PHICH,所述当前子帧为子帧 m,所述上行资源的起始 位置位于所述子帧 m之后的第 t个子帧, 其中: m=0, t=21。
41、 如权利要求 39所述的方法, 其特征在于,
所述控制信令为 PDCCH或者 EPDCCH, 所述当前子帧为子帧 n, 所述 上行资源的起始位置位于所述子帧 n之后的第 k个子帧, 其中: n=0或 9, k=4; 或者,
所述控制信令为 PHICH,所述当前子帧为子帧 m,所述上行资源的起始 位置位于所述子帧 m之后的第 t个子帧, 其中: m=9或 8, t=15。
42、 如权利要求 30所述的方法, 其特征在于, 所述上行资源为上下行 子帧配比为 4时的上行资源, 所述上行资源包括 1个 UpPTS和 2个上行子 帧。
43、 如权利要求 42所述的方法, 其特征在于,
所述控制信令为 PDCCH或者 EPDCCH, 所述当前子帧为子帧 n, 所述 上行资源的起始位置位于所述子帧 n之后的第 k个子帧, 其中: n=7, k=4; 或者,
所述控制信令为 PHICH,所述当前子帧为子帧 m,所述上行资源的起始 位置位于所述子帧 m之后的第 t个子帧, 其中: m=9, t=12。
44、 如权利要求 42所述的方法, 其特征在于, 所述控制信令为 PDCCH或者 EPDCCH, 所述当前子帧为子帧 n, 所述 上行资源的起始位置位于所述子帧 n之后的第 k个子帧, 其中: n=9, k=4; 或者,
所述控制信令为 PHICH,所述当前子帧为子帧 m,所述上行资源的起始 位置位于所述子帧 m之后的第 t个子帧, 其中: m=8, t=15。
45、 如权利要求 30所述的方法, 其特征在于, 所述上行资源为上下行 子帧配比为 5时的上行资源, 所述上行资源包括 2个 UpPTS和 2个上行子 帧。
46、 如权利要求 45所述的方法, 其特征在于,
所述控制信令为 PDCCH或者 EPDCCH, 所述当前子帧为子帧 n, 所述 上行资源的起始位置位于所述子帧 n之后的第 k个子帧, 其中: n=7, k=4。
47、 如权利要求 30所述的方法, 其特征在于, 所述上行资源为上下行 子帧配比为 6时的上行资源, 所述上行资源包括 2个 UpPTS和 5个上行子 帧。
48、 如权利要求 47所述的方法, 其特征在于,
所述控制信令为 PDCCH或者 EPDCCH, 所述当前子帧为子帧 n, 所述 上行资源的起始位置位于所述子帧 n之后的第 k个子帧, 其中: 当 n=0或 5 时, k=6; 当 n=l或 6时, k=5; 或者,
所述控制信令为 PHICH,所述当前子帧为子帧 m,所述上行资源的起始 位置位于所述子帧 m之后的第 t个子帧, 其中: m=0或 5, t=6。
49、 如权利要求 47所述的方法, 其特征在于,
所述控制信令为 PDCCH或者 EPDCCH, 所述当前子帧为子帧 n, 所述 上行资源的起始位置位于所述子帧 n之后的第 k个子帧, 其中: 当 n=l或 6 时, k=7; 当 n=9时, k=5; 或者,
所述控制信令为 PHICH,所述当前子帧为子帧 m,所述上行资源的起始 位置位于所述子帧 m之后的第 t个子帧,其中: 当 m=l或 6时, t=7; 当 m=9 时, t=5。
50、 如权利要求 26-49中任一项所述的方法, 其特征在于, 所述上行资 源中的 UpPTS包括扩展后的 UpPTS, 其中, 当所述扩展后的 UpPTS所在子 帧插入正常循环前缀 CP时,所述扩展后的 UpPTS占用的符号数 X e (3, 10); 当所述扩展后的 UpPTS所在子帧插入扩展 CP时, 所述扩展后的 UpPTS占 用的符号数 (3, 8)。
51、 一种用户设备, 其特征在于, 包括:
接收单元, 用于在当前子帧接收基站发送的控制信令, 所述控制信令用 于指示传输物理上行共享信道 PUSCH;
确定单元,用于根据所述接收单元接收所述控制信令的所述当前子帧的 子帧位置, 确定用于传输所述 PUSCH的上行资源, 所述上行资源包括上行 导频时隙 UpPTS ;
52、 如权利要求 51 所述的用户设备, 其特征在于, 所述上行资源为 1 个 UpPTS。
53、 如权利要求 52所述的用户设备, 其特征在于, 所述当前子帧为上 下行子帧配比为 r时的子帧 n, 所述 UpPTS位于所述子帧 n之后的第 k个子
, 其中
=0, η= :1或 6, k=5 ; 或者,
Γ= :1, η: =0或 5, k=6; 或者,
Γ= =2, η= :1或 6, k=5 ; 或者,
Γ= =3, η= :7, k=4 或者,
Γ= :4, η: :7, k=4 或者,
Γ= =5, η= :7, k=4 或者,
Γ= =6, η= :1或 6, k=5。
54、 如权利要求 52所述的用户设备, 其特征在于, 所述 PUSCH的传输 对应的混合自动重传请求 HARQ进程为上下行子帧配比为 r时 q个 HARQ 进程中的一个, 其中,
r=0, q=9或 10; 或者,
r=l, q-6 或者,
r=2, q=4 或者,
r=3, q=4 或者,
r=4, q=3 或者,
r=5, q=2 或者,
r=6, q=8或 9。
55、 如权利要求 51 所述的用户设备, 其特征在于, 所述上行资源还包 括上行子帧, 且所述上行资源为连续的上行资源。
56、 如权利要求 55所述的用户设备, 其特征在于, 所述上行资源为上 下行子帧配比为 0时的上行资源, 所述上行资源包括 2个 UpPTS和 6个上 行子帧。
57、 如权利要求 56所述的用户设备, 其特征在于,
所述控制信令为物理下行控制信道 PDCCH或者增强的物理下行控制信 道 EPDCCH, 所述当前子帧为子帧 n, 所述上行资源的起始位置位于所述子 帧 n之后的第 k个子帧, 其中: n=l或 6, k=5; 或者,
所述控制信令为物理混合自动重传请求指示信道 PHICH,所述当前子帧 为子帧 m, 所述上行资源的起始位置位于所述子帧 m之后的第 t个子帧, 其 中: m=0或 5, t=16。
58、 如权利要求 56所述的用户设备, 其特征在于,
所述控制信令为 PDCCH或者 EPDCCH, 所述当前子帧为子帧 n, 所述 上行资源的起始位置位于所述子帧 n之后的第 k个子帧, 其中: 当 n=0或 5 时, k=4; 当 n=l或 6时, k=7; 或者,
所述控制信令为 PHICH,所述当前子帧为子帧 m,所述上行资源的起始 位置位于所述子帧 m之后的第 t个子帧, 其中: 当 m=0或 5时, t=14; 当 m=l或 6时, t=17。
59、 如权利要求 55所述的用户设备, 其特征在于, 所述上行资源为上 下行子帧配比为 1时的上行资源, 所述上行资源包括 2个 UpPTS和 4个上 行子帧。
60、 如权利要求 59所述的用户设备, 其特征在于,
所述控制信令为 PDCCH或者 EPDCCH, 所述当前子帧为子帧 n, 所述 上行资源的起始位置位于所述子帧 n之后的第 k个子帧, 其中: n=l或 6, k=5; 或者,
所述控制信令为 PHICH,所述当前子帧为子帧 m,所述上行资源的起始 位置位于所述子帧 m之后的第 t个子帧, 其中: m=9或 4, t=17。
61、 如权利要求 59所述的用户设备, 其特征在于,
所述控制信令为 PDCCH或者 EPDCCH, 所述当前子帧为子帧 n, 所述 上行资源的起始位置位于所述子帧 n之后的第 k个子帧, 其中: n=4或 9, k=4; 或者, 所述控制信令为 PHICH,所述当前子帧为子帧 m,所述上行资源的起始 位置位于所述子帧 m之后的第 t个子帧, 其中: m=l或 6, t=17。
62、 如权利要求 55所述的用户设备, 其特征在于, 所述上行资源为上 下行子帧配比为 2时的上行资源, 所述上行资源包括 2个 UpPTS和 2个上 行子帧。
63、 如权利要求 62所述的用户设备, 其特征在于,
所述控制信令为 PDCCH或者 EPDCCH, 所述当前子帧为子帧 n, 所述 上行资源的起始位置位于所述子帧 n之后的第 k个子帧, 其中: n=l或 6, k=5; 或者,
所述控制信令为 PHICH,所述当前子帧为子帧 m,所述上行资源的起始 位置位于所述子帧 m之后的第 t个子帧, 其中: m=8或 3, t=18。
64、 如权利要求 55所述的用户设备, 其特征在于, 所述上行资源为上 下行子帧配比为 3时的上行资源, 所述上行资源包括 1个 UpPTS和 3个上 行子帧。
65、 如权利要求 64所述的用户设备, 其特征在于,
所述控制信令为 PDCCH或者 EPDCCH, 所述当前子帧为子帧 n, 所述 上行资源的起始位置位于所述子帧 n之后的第 k个子帧, 其中: n=7, k=4; 或者,
所述控制信令为 PHICH,所述当前子帧为子帧 m,所述上行资源的起始 位置位于所述子帧 m之后的第 t个子帧, 其中: m=0, t=21。
66、 如权利要求 64所述的用户设备, 其特征在于,
所述控制信令为 PDCCH或者 EPDCCH, 所述当前子帧为子帧 n, 所述 上行资源的起始位置位于所述子帧 n之后的第 k个子帧, 其中: n=0或 9, k=4; 或者,
所述控制信令为 PHICH,所述当前子帧为子帧 m,所述上行资源的起始 位置位于所述子帧 m之后的第 t个子帧, 其中: m=9或 8, t=15。
67、 如权利要求 55所述的用户设备, 其特征在于, 所述上行资源为上 下行子帧配比为 4时的上行资源, 所述上行资源包括 1个 UpPTS和 2个上 行子帧。
68、 如权利要求 67所述的用户设备, 其特征在于,
所述控制信令为 PDCCH或者 EPDCCH, 所述当前子帧为子帧 n, 所述 上行资源的起始位置位于所述子帧 n之后的第 k个子帧, 其中: n=7, k=4; 或者,
所述控制信令为 PHICH,所述当前子帧为子帧 m,所述上行资源的起始 位置位于所述子帧 m之后的第 t个子帧, 其中: m=9, t=12。
69、 如权利要求 67所述的用户设备, 其特征在于,
所述控制信令为 PDCCH或者 EPDCCH, 所述当前子帧为子帧 n, 所述 上行资源的起始位置位于所述子帧 n之后的第 k个子帧, 其中: n=9, k=4; 或者,
所述控制信令为 PHICH,所述当前子帧为子帧 m,所述上行资源的起始 位置位于所述子帧 m之后的第 t个子帧, 其中: m=8, t=15。
70、 如权利要求 55所述的用户设备, 其特征在于, 所述上行资源为上 下行子帧配比为 5时的上行资源, 所述上行资源包括 2个 UpPTS和 2个上 行子帧。
71、 如权利要求 70所述的用户设备, 其特征在于,
所述控制信令为 PDCCH或者 EPDCCH, 所述当前子帧为子帧 n, 所述 上行资源的起始位置位于所述子帧 n之后的第 k个子帧, 其中: n=7, k=4。
72、 如权利要求 55所述的用户设备, 其特征在于, 所述上行资源为上 下行子帧配比为 6时的上行资源, 所述上行资源包括 2个 UpPTS和 5个上 行子帧。
73、 如权利要求 72所述的用户设备, 其特征在于,
所述控制信令为 PDCCH或者 EPDCCH, 所述当前子帧为子帧 n, 所述 上行资源的起始位置位于所述子帧 n之后的第 k个子帧, 其中: 当 n=0或 5 时, k=6; 当 n=l或 6时, k=5; 或者,
所述控制信令为 PHICH,所述当前子帧为子帧 m,所述上行资源的起始 位置位于所述子帧 m之后的第 t个子帧, 其中: m=0或 5, t=6。
74、 如权利要求 72所述的用户设备, 其特征在于,
所述控制信令为 PDCCH或者 EPDCCH, 所述当前子帧为子帧 n, 所述 上行资源的起始位置位于所述子帧 n之后的第 k个子帧, 其中: 当 n=l或 6 时, k=7; 当 n=9时, k=5; 或者,
所述控制信令为 PHICH,所述当前子帧为子帧 m,所述上行资源的起始 位置位于所述子帧 m之后的第 t个子帧,其中: 当 m=l或 6时, t=7; 当 m=9 时, t=5。
75、 如权利要求 51-74中任一项所述的用户设备, 其特征在于, 所述上 行资源中的 UpPTS包括扩展后的 UpPTS, 其中, 当所述扩展后的 UpPTS所 在子帧插入正常循环前缀 CP时, 所述扩展后的 UpPTS占用的符号数 X ^ (3, 10);当所述扩展后的 UpPTS所在子帧插入扩展 CP时,所述扩展后的 UpPTS 占用的符号数 (3, 8)。
76、 一种基站, 其特征在于, 包括:
发送单元, 用于在当前子帧向用户设备 UE发送控制信令, 所述控制信 令用于指示传输物理上行共享信道 PUSCH;
确定单元,用于根据所述发送单元发送所述控制信令的所述当前子帧所 在的子帧位置, 确定用于传输所述 PUSCH的上行资源, 所述上行资源包括 上行导频时隙 UpPTS;
接收单元, 用于在所述确定单元确定的所述上行资源接收所述 PUSCH。
77、 如权利要求 76 所述的基站, 其特征在于, 所述上行资源为 1 个 UpPTS。
78、 如权利要求 77所述的基站, 其特征在于, 所述当前子帧为上下行 子帧配比为 r时的子帧 n,所述 UpPTS位于所述子帧 n之后的第 k个子帧中, 其中:
r=0, n=l或 6, k=5; 或者,
r=l, n=0或 5, k=6; 或者,
r=2, n=l或 6, k=5; 或者,
r=3, η:Ί, k=4; 或者,
r=4, η:Ί, k=4; 或者,
r=5, η:Ί, k=4; 或者,
r-6, n-l或 6, k=5。
79、 如权利要求 77所述的基站, 其特征在于, 所述 PUSCH的传输对应 的混合自动重传请求 HARQ进程为上下行子帧配比为 r时 q个 HARQ进程 中的一个, 其中,
r=0, q=9或 10; 或者,
r=l, q-6; 或者,
r=2, q=4; 或者, r=3, q=4; 或者,
r=4, q=3; 或者,
r=5, q=2; 或者,
r=6, q=8或 9。
80、 如权利要求 76所述的基站, 其特征在于, 所述上行资源还包括上 行子帧, 且所述上行资源为连续的上行资源。
81、 如权利要求 80所述的基站, 其特征在于, 所述上行资源为上下行 子帧配比为 0时的上行资源, 所述上行资源包括 2个 UpPTS和 6个上行子 帧。
82、 如权利要求 81所述的基站, 其特征在于,
所述控制信令为物理下行控制信道 PDCCH或者增强的物理下行控制信 道 EPDCCH, 所述当前子帧为子帧 n, 所述上行资源的起始位置位于所述子 帧 n之后的第 k个子帧, 其中: n=l或 6, k=5; 或者,
所述控制信令为物理混合自动重传请求指示信道 PHICH,所述当前子帧 为子帧 m, 所述上行资源的起始位置位于所述子帧 m之后的第 t个子帧, 其 中: m=0或 5, t=16。
83、 如权利要求 81所述的基站, 其特征在于,
所述控制信令为 PDCCH或者 EPDCCH, 所述当前子帧为子帧 n, 所述 上行资源的起始位置位于所述子帧 n之后的第 k个子帧, 其中: 当 n=0或 5 时, k=4; 当 n=l或 6时, k=7; 或者,
所述控制信令为 PHICH,所述当前子帧为子帧 m,所述上行资源的起始 位置位于所述子帧 m之后的第 t个子帧, 其中: 当 m=0或 5时, t=14; 当 m=l或 6时, t=17。
84、 如权利要求 80所述的基站, 其特征在于, 所述上行资源为上下行 子帧配比为 1时的上行资源, 所述上行资源包括 2个 UpPTS和 4个上行子 帧。
85、 如权利要求 84所述的基站, 其特征在于,
所述控制信令为 PDCCH或者 EPDCCH, 所述当前子帧为子帧 n, 所述 上行资源的起始位置位于所述子帧 n之后的第 k个子帧, 其中: n=l或 6, k=5; 或者,
所述控制信令为 PHICH,所述当前子帧为子帧 m,所述上行资源的起始 位置位于所述子帧 m之后的第 t个子帧, 其中: m=9或 4, t=17。
86、 如权利要求 84所述的基站, 其特征在于,
所述控制信令为 PDCCH或者 EPDCCH, 所述当前子帧为子帧 n, 所述 上行资源的起始位置位于所述子帧 n之后的第 k个子帧, 其中: n=4或 9, k=4; 或者,
所述控制信令为 PHICH,所述当前子帧为子帧 m,所述上行资源的起始 位置位于所述子帧 m之后的第 t个子帧, 其中: m=l或 6, t=17。
87、 如权利要求 80所述的基站, 其特征在于, 所述上行资源为上下行 子帧配比为 2时的上行资源, 所述上行资源包括 2个 UpPTS和 2个上行子 帧。
88、 如权利要求 87所述的基站, 其特征在于,
所述控制信令为 PDCCH或者 EPDCCH, 所述当前子帧为子帧 n, 所述 上行资源的起始位置位于所述子帧 n之后的第 k个子帧, 其中: n=l或 6, k=5; 或者,
所述控制信令为 PHICH,所述当前子帧为子帧 m,所述上行资源的起始 位置位于所述子帧 m之后的第 t个子帧, 其中: m=8或 3, t=18。
89、 如权利要求 80所述的基站, 其特征在于, 所述上行资源为上下行 子帧配比为 3时的上行资源, 所述上行资源包括 1个 UpPTS和 3个上行子 帧。
90、 如权利要求 89所述的基站, 其特征在于,
所述控制信令为 PDCCH或者 EPDCCH, 所述当前子帧为子帧 n, 所述 上行资源的起始位置位于所述子帧 n之后的第 k个子帧, 其中: n=7, k=4; 或者,
所述控制信令为 PHICH,所述当前子帧为子帧 m,所述上行资源的起始 位置位于所述子帧 m之后的第 t个子帧, 其中: m=0, t=21。
91、 如权利要求 89所述的基站, 其特征在于,
所述控制信令为 PDCCH或者 EPDCCH, 所述当前子帧为子帧 n, 所述 上行资源的起始位置位于所述子帧 n之后的第 k个子帧, 其中: n=0或 9, k=4; 或者,
所述控制信令为 PHICH,所述当前子帧为子帧 m,所述上行资源的起始 位置位于所述子帧 m之后的第 t个子帧, 其中: m=9或 8, t=15。
92、 如权利要求 80所述的基站, 其特征在于, 所述上行资源为上下行 子帧配比为 4时的上行资源, 所述上行资源包括 1个 UpPTS和 2个上行子 帧。
93、 如权利要求 92所述的基站, 其特征在于,
所述控制信令为 PDCCH或者 EPDCCH, 所述当前子帧为子帧 n, 所述 上行资源的起始位置位于所述子帧 n之后的第 k个子帧, 其中: n=7, k=4; 或者,
所述控制信令为 PHICH,所述当前子帧为子帧 m,所述上行资源的起始 位置位于所述子帧 m之后的第 t个子帧, 其中: m=9, t=12。
94、 如权利要求 93所述的基站, 其特征在于,
所述控制信令为 PDCCH或者 EPDCCH, 所述当前子帧为子帧 n, 所述 上行资源的起始位置位于所述子帧 n之后的第 k个子帧, 其中: n=9, k=4; 或者,
所述控制信令为 PHICH,所述当前子帧为子帧 m,所述上行资源的起始 位置位于所述子帧 m之后的第 t个子帧, 其中: m=8, t=15。
95、 如权利要求 80所述的基站, 其特征在于, 所述上行资源为上下行 子帧配比为 5时的上行资源, 所述上行资源包括 2个 UpPTS和 2个上行子 帧。
96、 如权利要求 95所述的基站, 其特征在于,
所述控制信令为 PDCCH或者 EPDCCH, 所述当前子帧为子帧 n, 所述 上行资源的起始位置位于所述子帧 n之后的第 k个子帧, 其中: n=7, k=4。
97、 如权利要求 80所述的基站, 其特征在于, 所述上行资源为上下行 子帧配比为 6时的上行资源, 所述上行资源包括 2个 UpPTS和 5个上行子 帧。
98、 如权利要求 97所述的基站, 其特征在于,
所述控制信令为 PDCCH或者 EPDCCH, 所述当前子帧为子帧 n, 所述 上行资源的起始位置位于所述子帧 n之后的第 k个子帧, 其中: 当 n=0或 5 时, k=6; 当 n=l或 6时, k=5; 或者,
所述控制信令为 PHICH,所述当前子帧为子帧 m,所述上行资源的起始 位置位于所述子帧 m之后的第 t个子帧, 其中: m=0或 5, t=6。
99、 如权利要求 97所述的基站, 其特征在于, 所述控制信令为 PDCCH或者 EPDCCH, 所述当前子帧为子帧 n, 所述 上行资源的起始位置位于所述子帧 n之后的第 k个子帧, 其中: 当 n=l或 6 时, k=7; 当 n=9时, k=5; 或者,
所述控制信令为 PHICH,所述当前子帧为子帧 m,所述上行资源的起始 位置位于所述子帧 m之后的第 t个子帧,其中: 当 m=l或 6时, t=7; 当 m=9 时, t=5。
100、 如权利要求 76-99 中任一项所述的基站, 其特征在于, 所述上行 资源中的 UpPTS包括扩展后的 UpPTS, 其中, 当所述扩展后的 UpPTS所在 子帧插入正常循环前缀 CP时, 所述扩展后的 UpPTS 占用的符号数 x e (3, 10);当所述扩展后的 UpPTS所在子帧插入扩展 CP时,所述扩展后的 UpPTS 占用的符号数 (3, 8)。
PCT/CN2014/074725 2014-04-03 2014-04-03 传输pusch的方法、用户设备和基站 WO2015149325A1 (zh)

Priority Applications (3)

Application Number Priority Date Filing Date Title
PCT/CN2014/074725 WO2015149325A1 (zh) 2014-04-03 2014-04-03 传输pusch的方法、用户设备和基站
CN201480003250.9A CN105309024B (zh) 2014-04-03 2014-04-03 传输pusch的方法、用户设备和基站
CN201910810556.XA CN110896346B (zh) 2014-04-03 2014-04-03 传输pusch的方法、用户设备和基站

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/CN2014/074725 WO2015149325A1 (zh) 2014-04-03 2014-04-03 传输pusch的方法、用户设备和基站

Publications (1)

Publication Number Publication Date
WO2015149325A1 true WO2015149325A1 (zh) 2015-10-08

Family

ID=54239302

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2014/074725 WO2015149325A1 (zh) 2014-04-03 2014-04-03 传输pusch的方法、用户设备和基站

Country Status (2)

Country Link
CN (2) CN105309024B (zh)
WO (1) WO2015149325A1 (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107529226A (zh) * 2016-06-22 2017-12-29 电信科学技术研究院 一种物理上行共享信道的传输方法及装置
CN107734654A (zh) * 2016-08-11 2018-02-23 中国移动通信有限公司研究院 一种传输方法、装置、移动通信终端及网络侧设备
CN108076442A (zh) * 2016-11-15 2018-05-25 普天信息技术有限公司 一种pusch传输块长度确定方法及用户设备
CN109417795A (zh) * 2016-07-01 2019-03-01 高通股份有限公司 用于在上行链路导频时隙中传送物理上行链路共享信道的技术

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10404423B2 (en) * 2016-03-18 2019-09-03 Qualcomm Incorporated Techniques for communicating in an expanded uplink pilot time slot

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101365187A (zh) * 2007-08-09 2009-02-11 华为技术有限公司 一种实现上行资源指示的方法、基站和用户终端
CN101868027A (zh) * 2009-04-17 2010-10-20 大唐移动通信设备有限公司 上行信号传输资源的配置和发送方法、基站和用户终端
CN102131295A (zh) * 2007-08-09 2011-07-20 华为技术有限公司 一种实现上行资源指示的方法、基站和用户终端
CN102752862A (zh) * 2011-04-20 2012-10-24 华为技术有限公司 上下行数据业务传输的方法、基站及用户设备

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9407419B2 (en) * 2011-06-28 2016-08-02 Lg Electronics Inc. Method for user equipment transreceiving signal in wireless communication system
CN103326840A (zh) * 2012-03-23 2013-09-25 电信科学技术研究院 一种时分双工通信的方法、系统和设备
CN103378961B (zh) * 2012-04-28 2016-04-06 电信科学技术研究院 一种数据传输方法和装置
CN103516489B (zh) * 2012-06-19 2016-09-14 电信科学技术研究院 一种ack/nack信息的传输方法、设备及系统
WO2014019213A1 (en) * 2012-08-03 2014-02-06 Qualcomm Incorporated Subframe configurations for lte tdd systems

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101365187A (zh) * 2007-08-09 2009-02-11 华为技术有限公司 一种实现上行资源指示的方法、基站和用户终端
CN102131295A (zh) * 2007-08-09 2011-07-20 华为技术有限公司 一种实现上行资源指示的方法、基站和用户终端
CN101868027A (zh) * 2009-04-17 2010-10-20 大唐移动通信设备有限公司 上行信号传输资源的配置和发送方法、基站和用户终端
CN102752862A (zh) * 2011-04-20 2012-10-24 华为技术有限公司 上下行数据业务传输的方法、基站及用户设备

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107529226A (zh) * 2016-06-22 2017-12-29 电信科学技术研究院 一种物理上行共享信道的传输方法及装置
CN109417795A (zh) * 2016-07-01 2019-03-01 高通股份有限公司 用于在上行链路导频时隙中传送物理上行链路共享信道的技术
US11552763B2 (en) 2016-07-01 2023-01-10 Qualcomm Incorporated Techniques for transmitting a physical uplink shared channel in an uplink pilot time slot
CN109417795B (zh) * 2016-07-01 2023-03-31 高通股份有限公司 用于在上行链路导频时隙中传送物理上行链路共享信道的技术
CN107734654A (zh) * 2016-08-11 2018-02-23 中国移动通信有限公司研究院 一种传输方法、装置、移动通信终端及网络侧设备
CN108076442A (zh) * 2016-11-15 2018-05-25 普天信息技术有限公司 一种pusch传输块长度确定方法及用户设备

Also Published As

Publication number Publication date
CN110896346B (zh) 2022-02-25
CN105309024B (zh) 2019-09-03
CN105309024A (zh) 2016-02-03
CN110896346A (zh) 2020-03-20

Similar Documents

Publication Publication Date Title
US11272472B2 (en) System and scheme for uplink synchronization for small data transmissions
US10721759B2 (en) Method for transmitting uplink data, user equipment, and base station
TWI433497B (zh) 混合式自動重送請求時序判定
EP3113559B1 (en) Device and method for data transmission in direct communication
CN105451211A (zh) 用于设备到设备通信的方法及装置
EP3141060A1 (en) Device-to-device resource pattern signaling
TW201804836A (zh) 基於無線網絡的通信方法、終端設備和網絡設備
KR20160144473A (ko) 채널 자원 할당 제어 방법 및 장치
CN105027657A (zh) 终端装置、基站装置、集成电路以及无线通信方法
WO2015149325A1 (zh) 传输pusch的方法、用户设备和基站
EP3448092A1 (en) Uplink reference signal sending method, uplink reference signal reception method, and apparatus
CN105009631A (zh) 基站装置、终端装置、集成电路以及无线通信方法
WO2022029723A1 (en) System and methods of pucch enhancement with intra-slot repetitions towards multiple trps
JP6722777B2 (ja) アップリンク伝送のフィードバック情報を送信するための方法および装置
US10693614B2 (en) Data transmission method, terminal device, and network device
CN107534960B (zh) 确定物理混合自动重传请求指示信道资源的方法及装置
KR102670788B1 (ko) 유연한 라디오 서비스를 위한 5g nr 데이터 전달
KR20230012664A (ko) 유연한 라디오 서비스를 위한 5g nr 데이터 전달
KR20170112930A (ko) 무선 통신 시스템의 스페셜 서브프레임에서의 상향링크 데이터 전송을 지원하는 harq 동작 방법 및 장치

Legal Events

Date Code Title Description
WWE Wipo information: entry into national phase

Ref document number: 201480003250.9

Country of ref document: CN

121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 14888127

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 14888127

Country of ref document: EP

Kind code of ref document: A1