WO2015075772A1 - 蓄電池の制御装置、制御方法、制御プログラム、および蓄電システム - Google Patents

蓄電池の制御装置、制御方法、制御プログラム、および蓄電システム Download PDF

Info

Publication number
WO2015075772A1
WO2015075772A1 PCT/JP2013/081140 JP2013081140W WO2015075772A1 WO 2015075772 A1 WO2015075772 A1 WO 2015075772A1 JP 2013081140 W JP2013081140 W JP 2013081140W WO 2015075772 A1 WO2015075772 A1 WO 2015075772A1
Authority
WO
WIPO (PCT)
Prior art keywords
storage battery
charge
unit
electricity
electric energy
Prior art date
Application number
PCT/JP2013/081140
Other languages
English (en)
French (fr)
Inventor
正記 内藤
Original Assignee
中国電力株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 中国電力株式会社 filed Critical 中国電力株式会社
Priority to US15/025,442 priority Critical patent/US20160241071A1/en
Priority to JP2014528784A priority patent/JP5661975B1/ja
Priority to PCT/JP2013/081140 priority patent/WO2015075772A1/ja
Priority to KR1020167007905A priority patent/KR20160047545A/ko
Priority to EP13897922.4A priority patent/EP3073597A4/en
Priority to CN201380079778.XA priority patent/CN105580235A/zh
Publication of WO2015075772A1 publication Critical patent/WO2015075772A1/ja

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J7/00Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
    • H02J7/0068Battery or charger load switching, e.g. concurrent charging and load supply
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q30/00Commerce
    • G06Q30/02Marketing; Price estimation or determination; Fundraising
    • G06Q30/0201Market modelling; Market analysis; Collecting market data
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01MPROCESSES OR MEANS, e.g. BATTERIES, FOR THE DIRECT CONVERSION OF CHEMICAL ENERGY INTO ELECTRICAL ENERGY
    • H01M10/00Secondary cells; Manufacture thereof
    • H01M10/42Methods or arrangements for servicing or maintenance of secondary cells or secondary half-cells
    • H01M10/44Methods for charging or discharging
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/008Circuit arrangements for ac mains or ac distribution networks involving trading of energy or energy transmission rights
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/12Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load
    • H02J3/14Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load by switching loads on to, or off from, network, e.g. progressively balanced loading
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/28Arrangements for balancing of the load in a network by storage of energy
    • H02J3/32Arrangements for balancing of the load in a network by storage of energy using batteries with converting means
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J7/00Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01MPROCESSES OR MEANS, e.g. BATTERIES, FOR THE DIRECT CONVERSION OF CHEMICAL ENERGY INTO ELECTRICAL ENERGY
    • H01M10/00Secondary cells; Manufacture thereof
    • H01M10/42Methods or arrangements for servicing or maintenance of secondary cells or secondary half-cells
    • H01M10/425Structural combination with electronic components, e.g. electronic circuits integrated to the outside of the casing
    • H01M2010/4271Battery management systems including electronic circuits, e.g. control of current or voltage to keep battery in healthy state, cell balancing
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2310/00The network for supplying or distributing electric power characterised by its spatial reach or by the load
    • H02J2310/50The network for supplying or distributing electric power characterised by its spatial reach or by the load for selectively controlling the operation of the loads
    • H02J2310/56The network for supplying or distributing electric power characterised by its spatial reach or by the load for selectively controlling the operation of the loads characterised by the condition upon which the selective controlling is based
    • H02J2310/62The condition being non-electrical, e.g. temperature
    • H02J2310/64The condition being economic, e.g. tariff based load management
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02E60/10Energy storage using batteries
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S50/00Market activities related to the operation of systems integrating technologies related to power network operation or related to communication or information technologies
    • Y04S50/10Energy trading, including energy flowing from end-user application to grid
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S50/00Market activities related to the operation of systems integrating technologies related to power network operation or related to communication or information technologies
    • Y04S50/14Marketing, i.e. market research and analysis, surveying, promotions, advertising, buyer profiling, customer management or rewards

Definitions

  • the present invention relates to a storage battery control device, control method, control program, and power storage system.
  • the main present invention that solves the above-described problem is a first acquisition unit that acquires first information indicating an electricity rate set for each time zone, and second information that acquires second information indicating charge / discharge efficiency of a storage battery.
  • a third calculation unit that calculates a unit price of charge per unit amount of electricity required to charge the amount, and compares the electricity rate with the unit price of charge for each time period, and the electricity rate is less than the unit price of charge. If there is, the power storage from the power system It is charged, if the electricity rate is the charge unit prices above, and a control unit to discharge to the load from the battery.
  • FIG. 1 schematically illustrates an example of a usage pattern of a power storage system according to an embodiment of the present invention.
  • the power storage system 1 in the embodiment of the present invention is installed in a consumer's house, charged from the power system, and discharged to a load 6 (61, 62, 63) in the house.
  • the smart meter 5 is installed between the indoor wiring and electric power system in a consumer's house. It is assumed that the smart meter 5 is provided with information related to the electricity bill for each hour set on the next day by the electric power company.
  • the power storage system 1 includes a storage battery 2 and a control device 3 that controls charging and discharging of the storage battery 2.
  • a storage battery 2 is controlled by one control device 3.
  • a plurality of storage batteries 2 may be controlled by one control device 3.
  • FIG. 2 is a block diagram showing an outline of the control device.
  • the control device 3 is a device that controls charging from the power system to the storage battery 2 and discharging from the storage battery 2 to the load 6, and includes an electricity rate acquisition unit 31, a charge / discharge efficiency acquisition unit 32, and a basic schedule determination unit 33.
  • the charge / discharge efficiency acquisition unit 32 acquires second information indicating the charge / discharge efficiency p, q of the storage battery 2.
  • the charge / discharge efficiencies p and q are generic terms including the charge efficiency p and the discharge efficiency q.
  • the charging efficiency p means the ratio of the amount of power charged in the storage battery 2 to the amount of power supplied from the power system to the storage battery 2.
  • the discharge efficiency q means the ratio of the amount of power discharged from the storage battery 2 to the load 6 with respect to the amount of power charged in the storage battery 2. For example, as shown in FIG.
  • the charging unit price per 1.00 kWh of the storage battery 2 in this case is 12.5 yen. Therefore, for example, discharging from the storage battery 2 to the load in a time zone in which the electricity rate is 11 yen / 1.00 kWh is not suitable for the economic benefit of the user.
  • the charge unit price of the amount of power charged in the storage battery 2 is 12.5 yen / 1.00 kWh, the user must not charge the storage battery 2 during the time period of 10 yen / 1.00 kWh or less. Does not lead to economic benefits.
  • the charge / discharge efficiency acquisition unit 32 may read a numerical value input by the user via the external interface 302 and set the charge / discharge efficiency p and q, for example.
  • the charging / discharging efficiency acquisition part 32 has the information of the main storage battery model and charging / discharging efficiency, and if the model of the storage battery 2 connected to the control apparatus 3 is specified, the charging / discharging efficiency corresponding to the model will be shown. You may make it acquire discharge efficiency automatically.
  • the charge power amount calculation unit 34 calculates the first power amount charged in the storage battery 2.
  • the charge power amount calculation unit 34 includes a charge power amount integration unit 34A and a discharge power amount integration unit 34B.
  • the charged power amount integrating unit 34A integrates the power amount Wt supplied from the power system in order to newly charge the storage battery 2 between the immediately preceding time zone (t-1) and the time zone t. Further, the discharge power amount integration unit 34B integrates the power amount Pt discharged from the storage battery 2 to the load during the immediately preceding time zone (t ⁇ 1) to time zone t.
  • the first power amount in the time zone t is obtained by adding the power amount Wt ⁇ p and subtracting the power amount Pt ⁇ q to the calculated first power amount in the time zone (t ⁇ 1).
  • the method by which the charging power amount calculation unit 34 calculates the first power amount is not limited to the above method.
  • the charge power amount calculation unit 34 may directly acquire the first power amount charged in the storage battery 2 from the storage battery 2 in the time zone t.
  • the power amounts Wt and Pt are obtained from the difference between the first power amounts in the time zones t and (t ⁇ 1) and the charge / discharge efficiencies p and q.
  • the difference is a positive value
  • the electric energy is Wt ⁇ p
  • the difference is negative
  • the electric energy is Pt ⁇ q.
  • the dischargeable power amount calculation unit 35 When the storage battery 2 is charged from the power system, the dischargeable power amount calculation unit 35 is configured to store the storage battery 2 that can be discharged from the storage battery 2 to the load 6 based on the power amount Wt and the charge / discharge efficiencies p and q described above. A second power amount S is calculated. The dischargeable power amount calculation unit 35 stores the second power amount S ′ of the storage battery 2 that was able to be discharged in the immediately preceding time zone (t ⁇ 1), and the second amount of storage battery 2 that can be discharged in the time zone t.
  • the charge unit price calculation unit 36 is a unit power amount required to charge the second power amount S based on the second power amount S, the electricity rate At, the power amount Wt, and the charge / discharge efficiencies p and q in the time period t.
  • the per unit charge X is calculated.
  • the charging unit price calculation unit 36 stores the charging unit price X ′ in the immediately preceding time zone (t ⁇ 1), and the charging unit price X in the time zone t is expressed by a relational expression. Calculate based on
  • the electricity bill correction coefficient acquisition unit 37 obtains a coefficient ⁇ for correcting the electricity bill At.
  • the coefficient ⁇ is an arbitrary constant set in order to prevent the storage battery 2 from being deteriorated due to frequent repeated charging and stopping of the storage battery 2.
  • the coefficient ⁇ may be set from the beginning, or may be a value input from the external interface 302 by the user.
  • the charging unit price correction coefficient acquisition unit 38 acquires a coefficient ⁇ for correcting the charging unit price X.
  • the coefficient ⁇ is an arbitrary constant set in order to prevent the storage battery 2 from being deteriorated due to frequent repeated discharge and stoppage of discharge.
  • the coefficient ⁇ may be set from the beginning, or may be a value input from the external interface 302 by the user.
  • the basic schedule determination unit 33 determines a basic schedule related to charging / discharging of the storage battery 2. That is, the basic schedule determination unit 33 charges or discharges the storage battery 2 in the time zone t based on the electricity rate At and the charge / discharge efficiencies p and q corresponding to the time zone t, or does not charge or discharge it. To decide.
  • the basic schedule determination unit 33 reads the electricity charges At in the time zone t from the electricity fee acquisition unit 31 and rearranges them in ascending order of price, and then the time zones B1 to B24. And electricity charges C1 to C24.
  • the basic schedule determination unit 33 charges the storage battery 2 in the time zone Bk corresponding to the cheaper electricity rate Ck. Then, the storage battery 2 is discharged in the time zone B (24- (k-1)) corresponding to the higher electricity rate C (24- (k-1)). This is because charging the storage battery 2 in the time zone Bk and discharging the storage battery 2 in the time zone B (24- (k-1)) are considered to have economic benefits for the user.
  • the basic schedule determination unit 33 sets the electricity rates Ck and C (24 ⁇ (k ⁇ 1)) respectively. It is assumed that the storage battery 2 is neither charged nor discharged in the corresponding time zone Bk, B (24- (k-1)). This is because in the time zones Bk and B (24- (k-1)), neither charging nor discharging of the storage battery 2 is considered to lead to economic benefits for the user.
  • the basic schedule determination unit 33 determines a basic schedule related to charging / discharging of the storage battery 2 on the next day, for example, once a day.
  • the timing at which the basic schedule determination unit 33 determines the basic schedule for the next day is after the electricity rate acquisition unit 31 updates the electricity rate At to the next day and before 12:00 at night.
  • Control unit 39 compares the electric charge At with the charging unit price X for each time period t, and if the electric charge At is less than the charging unit price X, the control unit 39 charges the storage battery 2 from the power system, and the electric charge At is charged with the charging unit price X. When it is above, the storage battery 2 is discharged to the load 6. In addition, as will be described later, correction may be applied to the electricity bill At and the charging unit price X.
  • control unit 39 first refers to the basic schedule determined by the basic schedule determination unit 33, and “charges” and “discharges” the operation of the storage battery 2 in the time zone t. And “Neither”.
  • the control unit 39 charges the storage battery 2 from the power system within the range of power allowed based on the power supply contract during the time zone t.
  • the charging power amount integration unit 34A calculates the power amount Wt supplied from the power system in order to charge the storage battery 2 during the time period t.
  • the dischargeable power amount calculation unit 35 calculates the dischargeable power amount S using the charge / discharge efficiencies p and q and the power amount Wt, and the charge unit price calculation unit 36 calculates the charge / discharge efficiency.
  • Charge unit price X is calculated using p, q, electric energy Wt, and dischargeable electric energy S.
  • the control unit 39 discharges from the storage battery 2 to the load 6 within a range in which the power output from the storage battery 2 does not reversely flow into the power system during the time zone t.
  • accumulating part 34B calculates the electric energy Pt discharged to the load from the storage battery 2 during the time slot
  • the dischargeable power amount calculation unit 35 calculates the dischargeable power amount S using the power amount Pt.
  • the control unit 39 determines whether the charging / discharging of the storage battery 2 is suitable for the economic benefit of the user based on a criterion different from the determination of the basic schedule. In order to examine in detail, the following operations are performed.
  • the control unit 39 compares the electricity charge At in the time zone t with the charge unit price X. When the electricity charge At is less than the charge unit price X, the control unit 39 uses the corrected electricity charge At ′ as the charge unit price X in order to determine whether the charging of the storage battery 2 brings economic benefits to the user. Compare.
  • the control unit 39 charges the storage battery 2 from the power system. In this case, since the charge unit price X of the storage battery 2 is lowered by charging the storage battery 2, charging the storage battery 2 is suitable for the economic benefit of the user.
  • the control unit 39 stops the power storage system 1 during the time period t. This is because the charging unit price X of the storage battery 2 due to the charging is not suitable for the user's economic benefit, and the storage battery 2 associated with repeated charging and stopping of the charging rather than the benefit obtained by the user by the charging. This is because the loss suffered by the user due to deterioration of the user is more important.
  • the control unit 39 corrects the charge unit price (X + ⁇ ) corrected for the electricity charge At to determine whether or not the discharge of the storage battery 2 brings economic benefits to the user. ). That is, the control unit 39 determines whether or not the discharge is possible in consideration of the deterioration of the storage battery 2 due to frequent discharge and stoppage of discharge. And when the electricity bill At is larger than the corrected charging unit price (X + ⁇ ), the control unit 39 causes the storage battery 2 to discharge to the load 6. This is because supplying the load 6 with electric power having a charging unit price X that is at least ⁇ lower than the electric charge At brings economic benefits to the user.
  • the control unit 39 stops the power storage system 1 during the time period t. This is because the loss suffered by the user due to the deterioration of the storage battery 2 due to the repeated discharge and the stop of the discharge is more important than the profit obtained by the user by the discharge.
  • control device 3 includes a clock unit 301 that acquires time-related information in order to charge / discharge the storage battery 2 in accordance with the charge / discharge schedule determined by the control unit 39.
  • the clock unit 301 may acquire time information from the smart meter 5 or may acquire time information from the Internet.
  • the time recorded in the clock unit 301 is preferably synchronized with the time recorded in the smart meter 5.
  • FIG. 4 is a flowchart showing the operation of the control device 3
  • FIG. 5 is a flowchart showing the operation of the basic schedule determination unit 33
  • FIG. 6 is a flowchart showing the operation of the control unit 3.
  • control device 3 determines a basic schedule for charging / discharging the storage battery 2 on the next day in step S ⁇ b> 1, and then corrects the basic schedule in step S ⁇ b> 2.
  • Step S1 is based on the electricity rate At and the charge / discharge efficiencies p and q in the time zone t, is it worth charging the battery 2 in each time zone, is worth discharging, or is charged and discharged? This is a process for determining whether it is worth noting, and includes steps S11 to S15 as shown in FIG.
  • step S2 the basic schedule determination unit 33 rearranges the electric charges A1 to A24 in ascending order of price, sets the rearranged electric charges as C1 to C24, and sets the corresponding time zones as B1 to B24.
  • step S14 when the electricity rate ratio Ck / C (24- (k-1)) is less than the product p ⁇ q, the basic schedule determination unit 33 sets the storage battery 2 in the time zone Bk corresponding to the electricity rate Ck. It is determined that it is worth charging, and it is determined that it is worth discharging the storage battery 2 in the time zone B (24- (k-1)) corresponding to the electricity bill C (24- (k-1)). .
  • step S15 when the electricity rate ratio Ck / C (24- (k-1)) is greater than or equal to the product p ⁇ q, the basic schedule determination unit 33 sets the time zones Bk and B (24- (k-1) ), It is determined that there is a user's interest not to discharge or discharge the storage battery 2.
  • step S1 is performed after the basic schedule determination part 33 acquires the information on the electricity charge At of the next day from the electricity charge acquisition part 31.
  • Step S2 is a step of determining whether or not the storage battery 2 needs to be charged / discharged using an index different from that of step S1.
  • Step S2 includes steps S21 to S28 as shown in FIG.
  • step S21 the charge unit price X and the dischargeable electric energy S in the last time zone of the previous day are read.
  • step S22 the basic schedule of charging / discharging determined in step S1 is referred to, and the operation of the storage battery 2 in the time zone t is classified into “charging”, “discharging”, and “neither”. .
  • Step S23 includes steps S231 to S234.
  • step S231 charging from the power system to the storage battery 2 is performed within the range of the amount of power determined by the power supply contract concluded between the user and the power company.
  • step S232 the amount of power Wt supplied from the power system to charge the storage battery 2 during the time period t is calculated.
  • step S233 is executed, and the electric energy S that can be discharged from the storage battery 2 to the load 6 is calculated as described above.
  • step S234 the charging unit price X for the amount of power S is calculated, and the series of operations in step S23 ends.
  • Step S24 includes steps S241 to S243.
  • step S231 discharge from the storage battery 2 to the load 6 is performed in a range where the power output from the storage battery 2 does not flow backward to the power system.
  • step S242 the electric energy Pt discharged from the storage battery 2 to the load is calculated.
  • step S243 the dischargeable electric energy S is calculated as described above. Thus, the series of operations in step S24 is completed.
  • the charging / discharging of the storage battery 2 is determined again in steps S25 to S28 using a standard different from the determination of the basic schedule.
  • the standard used here is mainly the electric charge At and the charge unit price X with respect to the dischargeable electric energy S of the storage battery 2.
  • step S25 the electricity price At is compared with the charge unit price X. If the electricity charge At is less than the charge unit price X, the corrected electricity charge At ′ is compared with the charge unit price X in step 26 in order to further examine whether it is worth charging the storage battery 2 from the power system. Is done. As described above, the electricity bill At is corrected by the charge / discharge efficiencies p and q and the correction coefficient ⁇ to become the electricity bill At '.
  • step S23 the corrected electricity bill At 'is less than the charging unit price X
  • the corrected electricity bill At 'is equal to or higher than the charging unit price X it is determined that it is not worth charging the storage battery 2 in the time zone t, and the process proceeds to step 28.
  • the power storage system 1 is stopped during the time period t.
  • step S25 when the electricity charge At is equal to or higher than the charge unit price X in step S25, in order to further examine whether it is worth discharging from the storage battery 2 to the load 6, in step 27, the electricity charge At is corrected charge unit price. Compared with (X + ⁇ ).
  • step S24 the electricity rate At is greater than the corrected unit charge price (X + ⁇ )
  • the electricity rate At is equal to or less than the corrected unit charge price (X + ⁇ )
  • the power storage system 1 is stopped during the time period t.
  • Step S2 ends.
  • the power storage system 1 charges, discharges, or stops the storage battery 2 according to the final charging / discharging schedule of the storage battery 2 set in this way.
  • the electricity bill acquisition unit 31 obtains the first information indicating the electricity bill At set for each time zone t. Further, the charge / discharge efficiency acquisition unit 32 acquires second information indicating the charge / discharge efficiencies p and q of the storage battery 2. Further, the charging power amount calculation unit 34 calculates the first power amount charged in the storage battery 2. The dischargeable power amount calculation unit 35 calculates the second power amount S of the storage battery 2 that can be discharged from the storage battery 2 to the load 6 based on the first power amount and the charge / discharge efficiencies p and q.
  • the charge unit price calculation part 36 calculates 2nd electric energy S based on 2nd electric energy S, the electric bill At in the time slot
  • a charge unit price X per unit power amount required for charging is calculated.
  • the control unit 39 compares the electric charge At with the charging unit price X for each time zone t. When the electric charge At is less than the charging unit price X, the control unit 39 charges the storage battery 2 from the power system and charges the electric charge At. When the unit price is equal to or greater than X, the storage battery 2 is discharged to the load 6.
  • control device 1 considers the charge / discharge efficiencies p and q when calculating the charge unit price X for the second electric energy S of the storage battery 2. And the control apparatus 1 determines the necessity of charging / discharging of the storage battery 2 by comparing the charge unit price X with the electricity bill At. Therefore, even when the electricity rate is set for each time zone under real-time pricing, the storage battery 2 can be charged / discharged so as to meet the economic benefits of the user.
  • the control unit 39 corrects the electricity charge At by dividing the electricity charge At by the charge / discharge efficiencies p and q, and charges the corrected electricity charge At ′.
  • the corrected electricity bill At ′ is equal to or higher than the charging unit price X as compared with the unit price X, charging from the power system to the storage battery 2 is prohibited. It can be said that the corrected electricity bill At 'is an electricity bill converted into a price at the time of discharge.
  • the discharge of the storage battery 2 is not suitable for the user's economic benefit. By prohibiting such discharge, charging of the storage battery and stopping of charging can be controlled so as to meet the economic benefit of the user.
  • the electricity bill correction coefficient acquisition unit 37 obtains a first correction coefficient for correcting the electricity bill At.
  • the control unit 39 corrects the electricity charge At based on the first correction coefficient, compares the corrected electricity charge At ′ with the charge unit price X, and is corrected.
  • the electric charge At ′ is equal to or higher than the charging unit price X, charging from the power system to the storage battery 2 is prohibited.
  • As a 1st correction coefficient there exists a numerical value regarding deterioration of the storage battery 2, for example. That is, since the control device 1 can determine whether or not the storage battery 2 needs to be charged, including other factors of the price, the storage battery 2 can be charged so as to meet the economic benefits of the user.
  • the first correction coefficient is an arbitrary positive value ⁇ that is set so that the storage battery 2 is not repeatedly charged and stopped more than a predetermined number of times within a certain period of time.
  • the electric charge At is corrected by adding the numerical value ⁇ .
  • Frequent charging and stopping of charging lead to deterioration of the storage battery 2 and is not preferable for the user. Since the control device 1 can avoid frequent repetition of charging and stopping of the storage battery 2 by introducing an arbitrary positive numerical value ⁇ as the first correction coefficient, it is suitable for the economic benefit of the user. In this way, charging of the storage battery 2 and stopping of charging can be controlled.
  • the charging unit price correction coefficient acquisition unit 38 acquires a second correction coefficient for correcting the charging unit price X.
  • the control unit 39 corrects the charging unit price X based on the second correction coefficient, and compares the electric charge At with the corrected charging unit price to correct the electric charge At.
  • the charging unit price is less than or equal to, the discharging from the storage battery 2 to the load 6 is prohibited. That is, since the control device 1 can determine whether or not the storage battery 2 needs to be discharged including other factors of the price, the control device 1 stops the discharge and discharge of the storage battery 2 so as to meet the economic benefits of the user. Can be controlled.
  • the second correction coefficient is an arbitrary positive numerical value ⁇ that is set so that the storage battery 6 does not repeat discharging and stopping the discharge more than a predetermined number of times within a certain time.
  • the charging unit price X is corrected by adding the numerical value ⁇ . Frequent repetition of discharge and stoppage of discharge leads to deterioration of the storage battery, which is undesirable for the user.
  • the control device 1 can avoid frequent repetition of the discharge and the stop of the discharge by introducing an arbitrary positive numerical value ⁇ as the second correction coefficient. Therefore, the discharge of the storage battery 2 and the stop of the discharge can be controlled so as to meet the economic benefit of the user.
  • the basic schedule determination unit 33 discharges from the storage battery 2 to the load 6 and from the power system to the storage battery 6 based on the comparison result between the ratio of the electricity charges At and the charge / discharge efficiency p ⁇ q in different time zones t. And the storage battery 2 are stopped.
  • the correction control unit compares the electric charge At with the charging unit price X for the time zone t in which the basic schedule determination unit 33 has decided to stop the storage battery 2, and if the electric charge At is less than the charging unit price X, When the storage battery 2 is charged from the system and the electricity charge At is equal to or higher than the charging unit price X, the storage battery 2 is discharged to the load 6.
  • the power storage system 1 includes a storage battery 2 and a control device 3 that controls charging / discharging of the storage battery 2. Therefore, the electrical storage system which can charge / discharge the storage battery 2 so that it may suit a user's economical profit can be provided.
  • the time zone t when the electricity rate At is set may be 30 minutes.
  • t 1 to 48
  • the electricity bill is A1 to A48.
  • step S22 may be omitted or it may be set so that “neither” is selected in step S22.
  • each function of the control device 3 may be executed by a computer program.
  • the power storage system 1 may include a plurality of storage batteries 2 and one control device that controls the storage batteries 2 collectively.
  • control device 3 may be independent from the power storage system 1.
  • control device 3 may be incorporated in the smart meter 5.

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Strategic Management (AREA)
  • Power Engineering (AREA)
  • Accounting & Taxation (AREA)
  • Economics (AREA)
  • Finance (AREA)
  • Development Economics (AREA)
  • Health & Medical Sciences (AREA)
  • Theoretical Computer Science (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Marketing (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • General Chemical & Material Sciences (AREA)
  • Electrochemistry (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Manufacturing & Machinery (AREA)
  • Chemical & Material Sciences (AREA)
  • Game Theory and Decision Science (AREA)
  • Data Mining & Analysis (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • General Health & Medical Sciences (AREA)
  • Human Resources & Organizations (AREA)
  • Primary Health Care (AREA)
  • Tourism & Hospitality (AREA)
  • Charge And Discharge Circuits For Batteries Or The Like (AREA)
  • Supply And Distribution Of Alternating Current (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

【課題】 利用者の経済的利益に適うように蓄電池を充放電させる。 【解決手段】 蓄電池の制御装置は、時間帯ごとに設定されている電気料金を示す第1情報を取得する第1取得部を備える。また、蓄電池の充放電効率を示す第2情報を取得する第2取得部を備える。また、蓄電池に充電されている第1電力量を算出する第1算出部を備える。また、第1電力量および充放電効率に基づいて、蓄電池から負荷に放電可能な蓄電池の第2電力量を算出する第2算出部を備える。また、第2電力量、蓄電池が充電される時間帯における電気料金、第1電力量および充放電効率に基づいて、第2電力量を充電するのに要した単位電力量あたりの充電単価を算出する第3算出部を備える。また、時間帯ごとに電気料金を充電単価と比較して、電気料金が充電単価未満である場合、電力系統から蓄電池に充電させ、電気料金が充電単価以上である場合、蓄電池から負荷に放電させる制御部を備える。

Description

蓄電池の制御装置、制御方法、制御プログラム、および蓄電システム
 本発明は、蓄電池の制御装置、制御方法、制御プログラム、および蓄電システムに関する。
 近年、電力需要のピークを低減させること等を目的として、家庭内への蓄電システムの導入が進んでいる。また、近い将来、スマートメーターが普及し、電気料金が時間帯ごとに設定されるリアルタイムプライシングが導入されることが予想される。
 そのため、蓄電池の充放電が行われる時間帯を利用者の経済的利益に適うように決定する様々な手法が提案されている。例えば、電気料金が充電基準価格より安い場合、電力系統から蓄電池に充電させ、電気料金が放電基準価格より高い場合、蓄電池から負荷に放電させる蓄電システムが知られている(例えば、特許文献1~5参照)。
特開2012-151948号公報 特開2011-244682号公報 特開2012-16271号公報 特開2013-78193号公報 特開2013-99140号公報
 しかしながら、電力系統から蓄電池に充電させる時や蓄電池から負荷に放電させる時には損失が生ずるところ、上述した蓄電システムにおいては、蓄電池が充放電を行う時間帯を決定するに当たって、そのような損失は考慮されていない。そのため、充放電効率を考慮した充電電力量の実質的な単価が電気料金より高額である場合にも蓄電池から負荷に放電が行われ、また、充電電力量の実質的な単価が電気料金より低額である場合にも電力系統から蓄電池に充電が行われるおそれがある。つまり、利用者の経済的利益に適わないような蓄電池の充放電が行われるおそれがある。
 前述した課題を解決する主たる本発明は、時間帯ごとに設定されている電気料金を示す第1情報を取得する第1取得部と、蓄電池の充放電効率を示す第2情報を取得する第2取得部と、前記蓄電池に充電されている第1電力量を算出する第1算出部と、前記第1電力量および前記充放電効率に基づいて、前記蓄電池から負荷に放電可能な前記蓄電池の第2電力量を算出する第2算出部と、前記第2電力量、前記蓄電池が充電される前記時間帯における前記電気料金、前記第1電力量および前記充放電効率に基づいて、前記第2電力量を充電するのに要した単位電力量あたりの充電単価を算出する第3算出部と、前記時間帯ごとに前記電気料金を前記充電単価と比較して、前記電気料金が前記充電単価未満である場合、電力系統から前記蓄電池に充電させ、前記電気料金が前記充電単価以上である場合、前記蓄電池から前記負荷に放電させる制御部とを備える。
 本発明の他の特徴については、添付図面及び本明細書の記載により明らかとなる。
 本発明によれば、利用者の経済的利益に適うように蓄電池を充放電させることができる。
本発明の実施形態における蓄電システムの利用形態の一例を説明する概略図である。 本発明の実施形態における制御装置の概略を示すブロック図である。 本発明の実施形態に係る蓄電池の充放電と電力量との関係を説明する概略図である。 本発明の実施形態における制御装置の動作を示すフローチャートである。 本発明の実施形態における制御装置の基本スケジュール決定部の動作を示すフローチャートである。 本発明の実施形態における蓄電装置の制御部の動作を示すフローチャートである。
 本明細書および添付図面の記載により、少なくとも以下の事項が明らかとなる。
 図面を参照して、本発明の実施形態における蓄電システムについて説明する。
===蓄電システムの構成===
 図1は、本発明の実施形態における蓄電システムの利用形態の一例を概略的に説明している。本発明の実施形態における蓄電システム1は、図1に示すように、需要家の家屋に設置され、電力系統から充電されるとともに家屋内の負荷6(61,62,63)に放電するものとする。また、需要家の家屋における屋内配線と電力系統との間にはスマートメーター5が設置されている。スマートメーター5には、電力会社が設定した翌日の1時間ごとの電気料金に関する情報が提供されるものとする。
 図1に示すとおり、蓄電システム1は、蓄電池2と、蓄電池2の充放電を制御する制御装置3とを備えている。なお、本実施形態においては、1つの蓄電池2が1つの制御装置3によって制御されているものとする。ただし、複数の蓄電池2が1つの制御装置3によって制御されていてもかまわない。
<<制御装置>>
 図2は、制御装置の概略を示すブロック図である。制御装置3は、電力系統から蓄電池2への充電、および、蓄電池2から負荷6への放電を制御する装置であって、電気料金取得部31、充放電効率取得部32、基本スケジュール決定部33、充電電力量算出部34、放電可能電力量算出部35、充電単価算出部36、電気料金補正係数取得部37、充電単価補正係数取得部38および制御部39を含む。
<電気料金取得部>
 電気料金取得部31は、時間帯tごとに設定されている電気料金Atを示す第1情報を、例えばスマートメーター5またはインターネットを介して電力会社のサーバから取得する。本実施形態において、電気料金は1時間ごとに設定されているから、t=1~24であり、電気料金取得部31は、夜12時から午後11時までの1時間ごとの電気料金A1~A24の情報を有する。なお、制御装置3が、当日の午後11時における蓄電池2の充放電の要否を決定した後で、かつ、翌日の夜12時における蓄電池2の充放電の要否を決定する前に、電気料金取得部31は、電気料金Atを示す第1情報を翌日の第1情報に更新する。
<充放電効率取得部>
 充放電効率取得部32は、蓄電池2の充放電効率p,qを示す第2情報を取得する。ここで、充放電効率p,qは、充電効率pと放電効率qとを含む総称である。充電効率pは、電力系統から蓄電池2に供給される電力量に対する、蓄電池2に充電される電力量の割合を意味する。また、放電効率qは、蓄電池2に充電されている電力量に対する、蓄電池2から負荷6に放電される電力量の割合を意味する。例えば、図3のように、電力系統から蓄電池2に1.25kWhの電力量が供給された結果、蓄電池2に1.123kWhの電力量が充電された場合、充電効率pは0.90である。また、蓄電池2に充電されている1.123kWhの電力量を出力した結果、負荷6に1.00kWhの電力量が供給された場合、放電効率qは0.89である。ちなみに、電気料金10円/1.00kWhの時間帯に、上述した充放電効率を有する蓄電池2に電力系統から1.25kWhの電力量を充電する場合、負荷に放電可能な電力量は1.00kWhであるから、この電力量を蓄電池2に充電するために掛かる電気料金は12.5円である。よって、この場合における蓄電池2の1.00kWhあたりの充電単価は12.5円である。したがって、例えば電気料金が11円/1.00kWhである時間帯に、この蓄電池2から負荷に放電することは、利用者の経済的利益に適わないことになる。他方、蓄電池2に充電された電力量の充電単価が12.5円/1.00kWhである場合、電気料金10円/1.00kWh以下の時間帯に蓄電池2に充電しなければ、利用者の経済的利益につながらない。
 なお、充放電効率取得部32は、例えば、利用者が外部インターフェイス302を介して入力した数値を読み込み、充放電効率p,qとしてもよい。あるいは、充放電効率取得部32は、主な蓄電池の機種と充放電効率の情報を有しており、制御装置3に接続された蓄電池2の機種が特定されると、その機種に対応する充放電効率を自動的に取得するようにしてもよい。
<充電電力量算出部および放電可能電力算出部>
 充電電力量算出部34は、蓄電池2に充電されている第1電力量を算出する。本実施形態においては、電気料金Atが時間帯tごとに設定されるとの前提の下で蓄電池2の充電に要した費用を算出するため、該当する時間帯の間に蓄電池2に充電されおよび蓄電池2から放電された電力量を算出することが求められる。そのため、充電電力量算出部34は、充電電力量積算部34Aと放電電力量積算部34Bとを含む。
 充電電力量積算部34Aは、直前の時間帯(t-1)から時間帯tまでの間に新たに蓄電池2に充電するために電力系統から供給された電力量Wtを積算する。また、放電電力量積算部34Bは、直前の時間帯(t-1)から時間帯tまでの間に蓄電池2から負荷に放電された電力量Ptを積算する。時間帯tにおける第1電力量は、算出済みである時間帯(t-1)の第1電力量に、電力量Wt×pを加算し、電力量Pt÷qを減算することで得られる。
 なお、充電電力量算出部34が第1電力量を算出する方法は、上記の方法に限られない。例えば、充電電力量算出部34は、時間帯tにおいて蓄電池2に充電されている第1電力量を、蓄電池2から直接取得してもよい。この場合、電力量Wt、Ptは、時間帯tと(t-1)とにおける第1電力量同士の差分と、充放電効率p,qとから求められる。この差分が正の値の場合は電力量Wt×pであり、負の値の場合は電力量Pt÷qである。
 放電可能電力量算出部35は、蓄電池2が電力系統から充電されている場合に、上述した電力量Wtおよび充放電効率p,qに基づいて、蓄電池2から負荷6に放電可能な蓄電池2の第2電力量Sを算出する。放電可能電力量算出部35は、直前の時間帯(t-1)において放電可能であった蓄電池2の第2電力量S’を記憶しており、時間帯tにおいて放電可能な蓄電池2の第2電力量Sを、関係式
 S=S’+Wt×p×q
に基づいて算出する。また、放電可能電力量算出部35は、蓄電池2が負荷2に放電している場合には、蓄電池2の第2電力量Sを、関係式
 S=S’-Pt
に基づいて算出する。
<充電単価算出部>
 充電単価算出部36は、第2電力量S、時間帯tにおける電気料金At、電力量Wtおよび充放電効率p,qに基づいて、第2電力量Sを充電するのに要した単位電力量あたりの充電単価Xを算出する。充電単価算出部36は、直前の時間帯(t-1)における充電単価X’を記憶しており、時間帯tにおける充電単価Xを、関係式
Figure JPOXMLDOC01-appb-I000001

に基づいて算出する。
<電気料金補正係数取得部および充電単価補正係数取得部>
 電気料金補正係数取得部37は、電気料金Atを補正するための係数βを取得する。係数βは、蓄電池2が頻繁に充電および充電の停止を繰り返すことなどによる蓄電池2の劣化を防止するために設定される任意の定数である。係数βは、当初から設定されていてもよいし、利用者が外部インターフェイス302から入力した値でもよい。
 充電単価補正係数取得部38は、充電単価Xを補正するための係数αを取得する。係数αは、蓄電池2が頻繁に放電および放電の停止を繰り返すことなどによる蓄電池2の劣化を防止するために設定される任意の定数である。係数αは、当初から設定されていてもよいし、利用者が外部インターフェイス302から入力した値でもよい。
<基本スケジュール決定部>
 基本スケジュール決定部33は、蓄電池2の充放電に関する基本的なスケジュールを決定する。つまり、基本スケジュール決定部33は、時間帯tに対応する電気料金Atおよび充放電効率p,qに基づいて、時間帯tにおいて蓄電池2を充電させるか、放電させるか、充電も放電もさせないかを決定する。
 具体的には、基本スケジュール決定部33は、図5に示すように、時間帯tにおける電気料金Atを電気料金取得部31から読み込み、価格の安い順に並び替えたうえで、時間帯B1~B24と電気料金C1~C24とする。そして、基本スケジュール決定部33は、最も安い電気料金C1と最も高い電気料金C24との電気料金比率C1/C24、2番目に安い電気料金C2と2番目に高い電気料金C23との電気料金比率C2/C23・・・のようにして、電気料金比率Ck/C(24-(k-1))、(ここで、k=1~12)を作り、各電気料金比率を、充電効率および放電効率の積p×qと比較する。
 電気料金比率Ck/C(24-(k-1))が積p×q未満である場合、基本スケジュール決定部33は、安い方の電気料金Ckに対応する時間帯Bkにおいて蓄電池2を充電させ、高い方の電気料金C(24-(k-1))に対応する時間帯B(24-(k-1))において蓄電池2を放電させる。時間帯Bkにおける蓄電池2の充電と、時間帯B(24-(k-1))における蓄電池2の放電とには、利用者にとって経済的な利益があると考えられるためである。
 一方、電気料金比率Ck/C(24-(k-1))が積p×q以上である場合、基本スケジュール決定部33は、電気料金Ck、C(24-(k-1))にそれぞれ対応する時間帯Bk、B(24-(k-1))において蓄電池2を充電も放電もさせないこととする。時間帯Bk、B(24-(k-1))では、蓄電池2の充電も放電も、利用者にとって経済的利益に繋がらないと考えられるためである。
 基本スケジュール決定部33は、例えば1日に1回、蓄電池2の翌日における充放電に関する基本スケジュールを決定する。基本スケジュール決定部33が翌日の基本スケジュールを決定するタイミングは、電気料金取得部31が電気料金Atを翌日のものに更新した後で、かつ、夜12時の前である。
<制御部>
 制御部39は、時間帯tごとに電気料金Atを充電単価Xと比較して、電気料金Atが充電単価X未満である場合、電力系統から蓄電池2に充電させ、電気料金Atが充電単価X以上である場合、蓄電池2から負荷6に放電させる。なお、後述するように、電気料金Atと充電単価Xとに補正が加えられる場合がある。
 本実施形態においては、制御部39は、図6に示すように、まず、基本スケジュール決定部33によって決定された基本スケジュールを参照し、時間帯tにおける蓄電池2の動作を「充電」、「放電」、「どちらでもない」の3通りに分類する。
 時間帯tが「充電」に分類されている場合、制御部39は、時間帯tの間、電力供給契約に基づいて許容される電力の範囲内において、電力系統から蓄電池2を充電させる。なお、充電電力量積算部34Aは、時間帯tの間に蓄電池2を充電させるために電力系統から供給された電力量Wtを算出する。また、時間帯tの終了後、放電可能電力量算出部35は、充放電効率p、qおよび電力量Wtを用いて放電可能電力量Sを算出し、充電単価計算部36は、充放電効率p、q、電力量Wtおよび放電可能電力量Sを用いて充電単価Xを算出する。
 時間帯tが「放電」に分類されている場合、制御部39は、時間帯tの間、蓄電池2から出力される電力が電力系統に逆潮流しない範囲において、蓄電池2から負荷6への放電を開始させる。なお、放電電力量積算部34Bは、時間帯tの間に蓄電池2から負荷に放電された電力量Ptを算出する。時間帯tの終了後、放電可能電力量算出部35は、電力量Ptを用いて放電可能電力量Sを算出する。
 時間帯tが「どちらでもない」に分類されている場合、制御部39は、蓄電池2の充放電が利用者の経済的利益に適うかどうかを、基本スケジュールの決定とは異なる基準に基づいて詳細に検討するべく、次のような動作をする。
 制御部39は、時間帯tにおける電気料金Atを充電単価Xと比較する。そして、電気料金Atが充電単価X未満であるとき、制御部39は、蓄電池2の充電が利用者に経済的利益をもたらすどうかを判断するべく、補正された電気料金At’を充電単価Xと比較する。ここに、補正された電気料金At’は、次の関係式
 At’=At/(p×q)+β
で与えられる。つまり、補正された電気料金At’は、充放電効率p,qが考慮された電気料金であるとともに、βを介して頻繁な充電および充電の停止の繰り返しなどによる蓄電池2の劣化が考慮されている。補正された電気料金At’が充電単価X未満である場合、制御部39は、電力系統から蓄電池2に充電させるようにする。この場合、蓄電池2の充電によって蓄電池2の充電単価Xが下がるので、蓄電池2を充電することは利用者の経済的利益に適っている。他方、補正された電気料金At’が充電単価X以上である場合、制御部39は、時間帯tの間、蓄電システム1を停止させる。充電によって蓄電池2の充電単価Xが上昇することは利用者の経済的利益に適わないためであり、また、充電によって利用者が得る利益よりも、充電および充電の停止の繰り返しなどに伴う蓄電池2の劣化によって利用者の被る損失の方が重視されるためである。
 また、電気料金Atが充電単価X以上であるとき、制御部39は、蓄電池2の放電が利用者に経済的利益をもたらすかどうかを判断するべく、電気料金Atを補正された充電単価(X+α)と比較する。つまり、制御部39は、頻繁な放電および放電の停止などに伴う蓄電池2の劣化を考慮して放電の可否を決定する。そして、電気料金Atが補正された充電単価(X+α)より大きい場合、制御部39は、蓄電池2から負荷6に放電させるようにする。電気料金Atより少なくともαだけ安い充電単価Xの電力を負荷6に供給することは、利用者にとって経済的利益をもたらすからである。他方、電気料金Atが補正された充電単価(X+α)以下である場合、制御部39は、時間帯tの間、蓄電システム1を停止させる。放電によって利用者が得る利益よりも、放電および放電の停止の繰り返しなどに伴う蓄電池2の劣化によって利用者の被る損失の方が重視されるためである。
 なお、制御装置3は、制御部39が決定した充放電のスケジュールにしたがって蓄電池2を充放電させるべく、時刻に関する情報を取得する時計部301を含む。時計部301は、例えばスマートメーター5から時刻の情報を取得してもよいし、インターネットから時刻の情報を取得してもよい。時計部301に記録される時刻は、スマートメーター5に記録されている時刻と同期していることが好ましい。
===蓄電システムの動作===
 図4~図6を参照して、本実施形態における制御装置3の動作を説明する。
 図4は制御装置3の動作を示すフローチャート、図5は基本スケジュール決定部33の動作を示すフローチャート、図6は制御部3の動作を示すフローチャートである。
 制御装置3は、図4に示すように、ステップS1において、蓄電池2における翌日の充放電に関する基本スケジュールを決定し、次いで、ステップS2において、基本スケジュールの補正を行う。
<<基本スケジュールの決定>>
 ステップS1は、時間帯tにおける電気料金Atと充放電効率p、qとに基づいて、各時間帯において蓄電池2を充電させる価値があるか、放電させる価値があるか、または、充電も放電もしないことに価値があるかを判定する過程であり、図5に示されるようにステップS11~S15を含む。
 つまり、ステップS11において、基本スケジュール決定部33は、電気料金取得部31から、時間帯t=1~24と、対応する電気料金A1~A24とを取り込む。
 次いで、ステップS2において、基本スケジュール決定部33は、電気料金A1~A24を価格の安い順に並び替え、並べ替えられた電気料金をC1~C24とし、対応する時間帯をB1~B24とする。
 そして、ステップS13において、基本スケジュール決定部33は、電気料金C1~C24から電気料金比率Ck/C(24-(k-1))、(ここでk=1~12)を生成し、これを充電効率pおよび放電効率qの積p×qと比較する。
 ステップS14では、電気料金比率Ck/C(24-(k-1))が積p×q未満である場合に、基本スケジュール決定部33は、電気料金Ckに対応する時間帯Bkに蓄電池2を充電させる価値があると判定し、また、電気料金C(24-(k-1))に対応する時間帯B(24-(k-1))に蓄電池2を放電させる価値があると判定する。
 ステップS15では、電気料金比率Ck/C(24-(k-1))が積p×q以上である場合に、基本スケジュール決定部33は、時間帯BkとB(24-(k-1))とには蓄電池2を放電も放電もさせないことに利用者の利益があると判定する。
 基本スケジュール決定部33は、ステップS13~S15をk=1からk=12まで繰り返し、時間帯B1~B24を、蓄電池2を充電させる時間帯、蓄電池2を放電させる時間帯、蓄電池2を充電も放電もしない時間帯の3つに分類して、ステップS1を終了する。
 なお、ステップS1は、基本スケジュール決定部33が電気料金取得部31から翌日の電気料金Atの情報を取得した後に、実行される。
<<基本スケジュールの補正>>
 ステップS2は、ステップS1とは異なる指標を用いて、蓄電池2の充放電の要否を判定するステップである。ステップS2は、図6に示されるようにステップS21~S28を含む。
 まず、ステップS21において、前日の最終の時間帯における充電単価Xと放電可能電力量Sが読み込まれる。そして、ステップS22において、ステップS1で決定された充放電の基本スケジュールが参照され、時間帯tにおける蓄電池2の動作は「充電」、「放電」および「どちらでもない」の3つに分類される。
<充電の時間帯における動作>
 時間帯tが「充電」の時間帯に分類されている場合、時間帯tの間、ステップS23にしたがって電力系統から蓄電池2に充電される。ステップS23は、ステップS231~S234を含んでいる。
 具体的には、ステップS231において、利用者と電力会社との間で締結された電力供給契約で定められた電力量の範囲内で、電力系統から蓄電池2への充電が実施される。そして、ステップS232において、時間帯tの間に蓄電池2を充電するべく電力系統から供給された電力量Wtが算出される。時間帯tの終了後、ステップS233が実行され、上述したように蓄電池2から負荷6に放電可能な電力量Sが算出される。そして、ステップS234において、電力量Sに対する充電単価Xが算出され、ステップS23の一連の動作は終了する。
<放電の時間帯における動作>
 時間帯tが「放電」の時間帯に分類されている場合、時間帯tの間、ステップS24にしたがって蓄電池2から負荷6に放電が実施される。ステップS24は、ステップS241~S243を含む。
 具体的には、ステップS231において、蓄電池2から出力された電力が電力系統に逆潮流しない範囲で、蓄電池2から負荷6に放電が実施される。そして、ステップS242において、蓄電池2から負荷に放電された電力量Ptが算出され、また、ステップS243において、上述したように放電可能電力量Sが算出される。これによりステップS24の一連の動作は終了する。
<どちらでもない時間帯における動作>
 時間帯tが「どちらでもない」の時間帯に分類されている場合、ステップS25~S28において、基本スケジュールの決定とは異なる基準を用いて、蓄電池2の充放電を再度判断する。ここで用いられる基準は、主として、電気料金Atと、蓄電池2の放電可能電力量Sに対する充電単価Xである。
 ステップS25において電気料金Atが充電単価Xと比較される。そして、電気料金Atが充電単価X未満である場合、電力系統から蓄電池2に充電する価値があるかどうかを更に検討するべく、ステップ26において、補正された電気料金At’が充電単価Xと比較される。上述したように、電気料金Atは、充放電効率p,qと補正係数βとによって補正されて、電気料金At’となる。
 補正された電気料金At’が充電単価X未満である場合、時間帯tにおいて蓄電池2を充電する価値があると判断され、充電に関するステップS23に移行する。他方、補正された電気料金At’が充電単価X以上である場合、時間帯tに蓄電池2を充電する価値はないと判断され、ステップ28に進む。ステップ28において、時間帯tの間、蓄電システム1は停止される。
 また、ステップS25において電気料金Atが充電単価X以上である場合、蓄電池2から負荷6に放電する価値があるかどうかを更に検討するべく、ステップ27において、電気料金Atが、補正された充電単価(X+α)と比較される。
 電気料金Atが補正された充電単価(X+α)より大きい場合、時間帯tにおいて蓄電池2から負荷6に放電する価値があると判断され、放電に関するステップS24に移行する。他方、電気料金Atが補正された充電単価(X+α)以下である場合、時間帯tに蓄電池2から負荷6に放電する価値はないと判断され、ステップ28に進む。ステップ28において、時間帯tの間、蓄電システム1は停止される。
 ステップS22~S28が全ての時間帯tについて実行されると、ステップS2は終了する。
 このようにして設定された蓄電池2の最終的な充放電スケジュールにしたがって、蓄電システム1は、蓄電池2を充電、放電または停止させる。
 したがって、本実施形態における蓄電システム1においては、2つの基準を用いて蓄電池2の充放電を決定するため、利用者の経済的利益に適った、蓄電池2の緻密な充放電制御が可能である。
 前述したとおり、電気料金取得部31は、時間帯tごとに設定されている電気料金Atを示す第1情報を取得する。また、充放電効率取得部32は、蓄電池2の充放電効率p,qを示す第2情報を取得する。また、充電電力量算出部34は、蓄電池2に充電されている第1電力量を算出する。放電可能電力量算出部35は、第1電力量および充放電効率p,qに基づいて、蓄電池2から負荷6に放電可能な蓄電池2の第2電力量Sを算出する。また、充電単価算出部36は、第2電力量S、蓄電池2が充電される時間帯tにおける電気料金At、第1電力量および充放電効率p,qに基づいて、第2電力量Sを充電するのに要した単位電力量あたりの充電単価Xを算出する。また、制御部39は、時間帯tごとに電気料金Atを充電単価Xと比較して、電気料金Atが充電単価X未満である場合、電力系統から蓄電池2に充電させ、電気料金Atが充電単価X以上である場合、蓄電池2から負荷6に放電させる。つまり、制御装置1は、蓄電池2の第2電力量Sに対する充電単価Xを算出するに際して充放電効率p,qを考慮する。そして、制御装置1は、充電単価Xを電気料金Atと比較して、蓄電池2の充放電の要否を決定する。したがって、リアルタイムプライシングの下で時間帯ごとに電気料金が設定される場合でも、利用者の経済的利益に適うように蓄電池2を充放電させることができる。
 また、制御部39は、電気料金Atが充電単価X未満である場合、電気料金Atを充放電効率p,qで除することで電気料金Atを補正し、補正された電気料金At’を充電単価Xと比較して、補正された電気料金At’が充電単価X以上であるとき、電力系統から蓄電池2への充電を禁止する。補正された電気料金At’は、放電の際の価格に換算された電気料金と言える。このような電気料金At’が充電単価X以上であるとき、蓄電池2の放電は利用者の経済的利益に適わない。このような放電を禁止することよって、利用者の経済的利益に適うように蓄電池の充電および充電の停止を制御することができる。
 また、電気料金補正係数取得部37は、電気料金Atを補正するための第1補正係数を取得する。制御部39は、電気料金Atが充電単価X未満である場合、電気料金Atを第1補正係数に基づいて補正し、補正された電気料金At’を充電単価Xと比較して、補正された電気料金At’が充電単価X以上であるとき、電力系統から蓄電池2への充電を禁止する。第1補正係数としては、例えば、蓄電池2の劣化に関する数値がある。つまり、制御装置1は、価格の他の要素を含めて、蓄電池2の充電の要否を決定することができるから、利用者の経済的利益に適うように蓄電池2を充電させることができる。
 また、第1補正係数は、蓄電池2が一定の時間内に所定回数より多く充電および充電の停止を繰り返さないように設定される任意の正の数値βであり、制御部39は、任意の正の数値βを加算することで電気料金Atを補正する。頻繁に充電および充電の停止を繰り返すことは、蓄電池2の劣化につながり、利用者にとって好ましくない。制御装置1は、第1補正係数として任意の正の数値βを導入することにより、蓄電池2における充電および充電の停止の頻繁な繰返しを回避することができるから、利用者の経済的利益に適うように蓄電池2の充電および充電の停止を制御することができる。
 また、充電単価補正係数取得部38は、充電単価Xを補正するための第2補正係数を取得する。制御部39は、電気料金Atが充電単価X以上である場合、充電単価Xを第2補正係数に基づいて補正し、電気料金Atを補正された充電単価と比較して、電気料金Atが補正された充電単価以下であるとき、蓄電池2から負荷6への放電を禁止する。つまり、制御装置1は、価格の他の要素を含めて、蓄電池2の放電の要否を決定することができるから、利用者の経済的利益に適うように蓄電池2の放電および放電の停止を制御することができる。
 また、第2補正係数は、蓄電池6が一定の時間内に所定回数より多く放電と放電の停止を繰り返さないように設定される任意の正の数値αであり、制御部39は、任意の正の数値αを加算することで充電単価Xを補正する。頻繁に放電および放電の停止を繰り返すことは、蓄電池の劣化につながり、利用者にとって好ましくない。制御装置1は、第2補正係数として任意の正の数値αを導入することにより、放電および放電の停止の頻繁な繰返しを回避することができる。したがって、利用者の経済的利益に適うように蓄電池2の放電および放電の停止を制御することができる。
 また、基本スケジュール決定部33は、異なる時間帯tにおける電気料金At同士の比と充放電効率p×qとの比較結果に基づいて、蓄電池2から負荷6への放電、電力系統から蓄電池6への充電、および、蓄電池2の停止をさせる。補正制御部は、基本スケジュール決定部33が蓄電池2を停止させることを決定した時間帯tについて、電気料金Atを充電単価Xと比較して、電気料金Atが充電単価X未満である場合、電力系統から蓄電池2に充電させ、電気料金Atが充電単価X以上である場合、蓄電池2から負荷6に放電させる。基本スケジュールの決定と補正制御とにおいて、異なる判断基準を用いることによって、蓄電池2の充放電の可否の判断を緻密に行うことができるから、利用者の経済的利益に適うように蓄電池2の充放電を制御することができる。
 蓄電システム1は、蓄電池2と、蓄電池2の充放電を制御する制御装置3とを備えている。したがって、利用者の経済的利益に適うように蓄電池2を充放電させることができる蓄電システムを提供することができる。
 なお、上記実施形態は、本発明の理解を容易にするためのものであり、本発明を限定して解釈するためのものではない。本発明は、その趣旨を逸脱することなく、変更、改良され得るとともに、本発明にはその等価物も含まれる。
 例えば、電気料金Atが設定される時間帯tは30分でもよい。この場合、t=1~48であり、電気料金はA1~A48となる。
 また、基本スケジュール決定部33およびこれに対応するステップS1を省略することが可能である。この場合、ステップS22を省略するか、ステップS22で「どちらでもない」が選択されるように設定すればよい。
 また、制御装置3の有する各機能は、コンピュータプログラムによって実行されてもよい。
 また、蓄電システム1は、複数の蓄電池2と、それら蓄電池2を一括して制御する1つの制御装置とを備えていてもよい。
 また、制御装置3は、蓄電システム1から独立していてもよい。
 また、制御装置3は、スマートメーター5に組み込まれていてもよい。
 1 蓄電システム
 2 蓄電池
 3 制御装置
 31 電気料金取得部
 32 充放電効率取得部
 33 基本スケジュール決定部
 34 充電電力量算出部
 35 放電可能電力量算出部
 36 充電単価算出部
 39 制御部

Claims (10)

  1.  時間帯ごとに設定されている電気料金を示す第1情報を取得する第1取得部と、
     蓄電池の充放電効率を示す第2情報を取得する第2取得部と、
     前記蓄電池に充電されている第1電力量を算出する第1算出部と、
     前記第1電力量および前記充放電効率に基づいて、前記蓄電池から負荷に放電可能な前記蓄電池の第2電力量を算出する第2算出部と、
     前記第2電力量、前記蓄電池が充電される前記時間帯における前記電気料金、前記第1電力量および前記充放電効率に基づいて、前記第2電力量を充電するのに要した単位電力量あたりの充電単価を算出する第3算出部と、
     前記時間帯ごとに前記電気料金を前記充電単価と比較して、前記電気料金が前記充電単価未満である場合、電力系統から前記蓄電池に充電させ、前記電気料金が前記充電単価以上である場合、前記蓄電池から前記負荷に放電させる制御部と
    を備えることを特徴とする蓄電池の制御装置。
  2.  前記制御部は、前記電気料金が前記充電単価未満である場合、前記電気料金を前記充放電効率で除することで前記電気料金を補正し、補正された前記電気料金を前記充電単価と比較して、前記補正された電気料金が前記充電単価以上であるとき、前記電力系統から前記蓄電池への充電を禁止する
    ことを特徴とする請求項1に記載の蓄電池の制御装置。
  3.  前記電気料金を補正するための第1補正係数を取得する第3取得部を更に備え、
     前記制御部は、前記電気料金が前記充電単価未満である場合、前記電気料金を前記第1補正係数に基づいて補正し、補正された前記電気料金を前記充電単価と比較して、前記補正された電気料金が前記充電単価以上であるとき、前記電力系統から前記蓄電池への充電を禁止する
    ことを特徴とする請求項1に記載の蓄電池の制御装置。
  4.  前記第1補正係数は、前記蓄電池が一定の時間内に所定回数より多く充電および充電の停止を繰り返さないように設定される任意の正の数値であり、
     前記制御部は、前記任意の正の数値を加算することで前記電気料金を補正する
    ことを特徴とする請求項3に記載の蓄電池の制御装置。
  5.  前記充電単価を補正するための第2補正係数を取得する第4取得部を更に備え、
     前記制御部は、前記電気料金が前記充電単価以上である場合、前記充電単価を前記第2補正係数に基づいて補正し、前記電気料金を補正された前記充電単価と比較して、前記電気料金が前記補正された充電単価以下であるとき、前記蓄電池から負荷への放電を禁止する
    ことを特徴とする請求項1~4のいずれかに記載の蓄電池の制御装置。
  6.  前記第2補正係数は、前記蓄電池が一定の時間内に所定回数より多く放電と放電の停止を繰り返さないように設定される任意の正の数値であり、
     前記制御部は、前記任意の正の数値を加算することで前記充電単価を補正する
    ことを特徴とする請求項5に記載の蓄電池の制御装置。
  7.  時間帯ごとに設定されている電気料金を示す第1情報を取得する第1取得部と、
     蓄電池の充放電効率を示す第2情報を取得する第2取得部と、
     前記蓄電池に充電されている第1電力量を算出する第1算出部と、
     前記第1電力量および前記充放電効率に基づいて、前記蓄電池から負荷に放電可能な前記蓄電池の第2電力量を算出する第2算出部と、
     前記第2電力量、前記蓄電池が充電される前記時間帯における前記電気料金、前記第1電力量および前記充放電効率に基づいて、前記第2電力量を充電するのに要した単位電力量あたりの充電単価を算出する第3算出部と、
     異なる前記時間帯における前記電気料金同士の比と前記充放電効率との比較結果に基づいて、前記蓄電池から前記負荷への放電、前記電力系統から前記蓄電池への充電、および、前記蓄電池の停止をさせる基本スケジュール決定部と、
     前記基本スケジュール決定部が前記蓄電池を停止させることを決定した前記時間帯について、前記電気料金を前記充電単価と比較して、前記電気料金が前記充電単価未満である場合、電力系統から前記蓄電池に充電させ、前記電気料金が前記充電単価以上である場合、前記蓄電池から前記負荷に放電させる補正制御部と
    を備えることを特徴とする蓄電池の制御装置。
  8.  時間帯ごとに設定されている電気料金を示す第1情報を取得し、
     蓄電池の充放電効率を示す第2情報を取得し、
     前記蓄電池に充電されている第1電力量を算出し、
     前記第1電力量および前記充放電効率に基づいて、前記蓄電池から負荷に放電可能な前記蓄電池の第2電力量を算出し、
     前記第2電力量、前記蓄電池が充電される前記時間帯における前記電気料金、前記第1電力量および前記充放電効率に基づいて、前記第2電力量を充電するのに要した単位電力量あたりの充電単価を算出し、
     前記時間帯ごとに前記電気料金を前記充電単価と比較して、前記電気料金が前記充電単価未満である場合、電力系統から前記蓄電池に充電させ、前記電気料金が前記充電単価以上である場合、前記蓄電池から前記負荷に放電させる
    ことを特徴とする蓄電池の制御方法。
  9.  時間帯ごとに設定されている電気料金を示す第1情報を取得し、
     蓄電池の充放電効率を示す第2情報を取得し、
     前記蓄電池に充電されている第1電力量を算出し、
     前記第1電力量および前記充放電効率に基づいて、前記蓄電池から負荷に放電可能な前記蓄電池の第2電力量を算出し、
     前記第2電力量、前記蓄電池が充電される前記時間帯における前記電気料金、前記第1電力量および前記充放電効率に基づいて、前記第2電力量を充電するのに要した単位電力量あたりの充電単価を算出し、
     前記時間帯ごとに前記電気料金を前記充電単価と比較して、前記電気料金が前記充電単価未満である場合、電力系統から前記蓄電池に充電させ、前記電気料金が前記充電単価以上である場合、前記蓄電池から前記負荷に放電させる
    ことをコンピュータに実行させることを特徴とする蓄電池の制御プログラム。
  10.  蓄電池と、
     前記蓄電池の充放電を制御する制御装置と、を備え、
     前記制御装置は、
      時間帯ごとに設定されている電気料金を示す第1情報を取得する第1取得部と、
      前記蓄電池の充放電効率を示す第2情報を取得する第2取得部と、
      前記蓄電池に充電されている第1電力量を算出する第1算出部と、
      前記第1電力量および前記充放電効率に基づいて、前記蓄電池から負荷に放電可能な前記蓄電池の第2電力量を算出する第2算出部と、
      前記第2電力量、前記蓄電池が充電される前記時間帯における前記電気料金、前記第1電力量および前記充放電効率に基づいて、前記第2電力量を充電するのに要した単位電力量あたりの充電単価を算出する第3算出部と、
      前記時間帯ごとに前記電気料金を前記充電単価と比較して、前記電気料金が前記充電単価未満である場合、電力系統から前記蓄電池に充電させ、前記電気料金が前記充電単価以上である場合、前記蓄電池から前記負荷に放電させる制御部と
    を含むことを特徴とする蓄電システム。
PCT/JP2013/081140 2013-11-19 2013-11-19 蓄電池の制御装置、制御方法、制御プログラム、および蓄電システム WO2015075772A1 (ja)

Priority Applications (6)

Application Number Priority Date Filing Date Title
US15/025,442 US20160241071A1 (en) 2013-11-19 2013-11-19 Control device, control method, and control program of storage battery and electricity storage system
JP2014528784A JP5661975B1 (ja) 2013-11-19 2013-11-19 蓄電池の制御装置、制御方法、制御プログラム、および蓄電システム
PCT/JP2013/081140 WO2015075772A1 (ja) 2013-11-19 2013-11-19 蓄電池の制御装置、制御方法、制御プログラム、および蓄電システム
KR1020167007905A KR20160047545A (ko) 2013-11-19 2013-11-19 축전지의 제어 장치, 제어 방법, 제어 프로그램, 및 축전 시스템
EP13897922.4A EP3073597A4 (en) 2013-11-19 2013-11-19 STORAGE BATTERY CONTROL DEVICE, CONTROL PROCEDURE, CONTROL PROGRAM AND POWER STORAGE SYSTEM
CN201380079778.XA CN105580235A (zh) 2013-11-19 2013-11-19 蓄电池的控制装置、控制方法、控制程序以及蓄电系统

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/JP2013/081140 WO2015075772A1 (ja) 2013-11-19 2013-11-19 蓄電池の制御装置、制御方法、制御プログラム、および蓄電システム

Publications (1)

Publication Number Publication Date
WO2015075772A1 true WO2015075772A1 (ja) 2015-05-28

Family

ID=52437572

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2013/081140 WO2015075772A1 (ja) 2013-11-19 2013-11-19 蓄電池の制御装置、制御方法、制御プログラム、および蓄電システム

Country Status (6)

Country Link
US (1) US20160241071A1 (ja)
EP (1) EP3073597A4 (ja)
JP (1) JP5661975B1 (ja)
KR (1) KR20160047545A (ja)
CN (1) CN105580235A (ja)
WO (1) WO2015075772A1 (ja)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2017034738A (ja) * 2015-07-28 2017-02-09 株式会社日立製作所 蓄電池運用管理装置および蓄電池運用管理方法
JP2017163640A (ja) * 2016-03-07 2017-09-14 パナソニックIpマネジメント株式会社 蓄電システム、制御装置、制御方法、及び制御プログラム
JP2019092323A (ja) * 2017-11-15 2019-06-13 株式会社東芝 電力制御装置、電力制御方法及び電力制御プログラム
JP2019170102A (ja) * 2018-03-23 2019-10-03 大和ハウス工業株式会社 電力供給システム

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5975163B1 (ja) * 2015-09-29 2016-08-23 日本電気株式会社 演算装置
US10867360B1 (en) * 2016-10-28 2020-12-15 Chicago Mercantile Exchange Inc. Electric battery recharging unit controlled by a seasonality detection unit of a futures margin modeling system
EP4381454A1 (en) * 2021-08-02 2024-06-12 Rheem Australia PTY Limited Systems and methods for connecting electrical appliances to an electrical grid

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011244682A (ja) 2010-05-13 2011-12-01 Ls Industrial Systems Co Ltd 電気自動車の充放電システム、充放電方法
JP2012016271A (ja) 2010-07-02 2012-01-19 Ls Industrial Systems Co Ltd 充放電装置及び充放電方法
WO2012046832A1 (ja) * 2010-10-08 2012-04-12 三洋電機株式会社 電力供給システム
JP2012151948A (ja) 2011-01-18 2012-08-09 Panasonic Corp 電力制御システム、電力制御方法、電力制御装置、及びその電力制御プログラム
JP2013078193A (ja) 2011-09-30 2013-04-25 Sanyo Electric Co Ltd 蓄電池の充放電制御装置
JP2013099140A (ja) 2011-11-01 2013-05-20 Shimizu Corp 電力管理システム、電力管理方法、プログラム
JP2013132174A (ja) * 2011-12-22 2013-07-04 Sanyo Electric Co Ltd 充放電制御装置
JP2013207932A (ja) * 2012-03-28 2013-10-07 Kyocera Corp 制御装置、電力供給システム、及び制御方法

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7590472B2 (en) * 2006-11-09 2009-09-15 Gridpoint, Inc. Energy arbitrage by load shifting
JP5350942B2 (ja) * 2009-08-25 2013-11-27 株式会社東芝 電力系統の需給制御装置、需給制御プログラム及びその記録媒体
WO2011122669A1 (ja) * 2010-03-30 2011-10-06 三洋電機株式会社 電力供給システム、電力供給方法および電力供給システムの制御プログラム
US8700511B2 (en) * 2010-05-10 2014-04-15 Panasonic Corporation Control device, charge storage system, control method, and computer program
KR20120000011A (ko) * 2010-06-26 2012-01-03 엘지전자 주식회사 네트워크 시스템 및 에너지소비부
US9350174B2 (en) * 2010-06-26 2016-05-24 Lg Electronics Inc. Network system
US10192184B2 (en) * 2012-03-30 2019-01-29 Sony Corporation Energy storage

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011244682A (ja) 2010-05-13 2011-12-01 Ls Industrial Systems Co Ltd 電気自動車の充放電システム、充放電方法
JP2012016271A (ja) 2010-07-02 2012-01-19 Ls Industrial Systems Co Ltd 充放電装置及び充放電方法
WO2012046832A1 (ja) * 2010-10-08 2012-04-12 三洋電機株式会社 電力供給システム
JP2012151948A (ja) 2011-01-18 2012-08-09 Panasonic Corp 電力制御システム、電力制御方法、電力制御装置、及びその電力制御プログラム
JP2013078193A (ja) 2011-09-30 2013-04-25 Sanyo Electric Co Ltd 蓄電池の充放電制御装置
JP2013099140A (ja) 2011-11-01 2013-05-20 Shimizu Corp 電力管理システム、電力管理方法、プログラム
JP2013132174A (ja) * 2011-12-22 2013-07-04 Sanyo Electric Co Ltd 充放電制御装置
JP2013207932A (ja) * 2012-03-28 2013-10-07 Kyocera Corp 制御装置、電力供給システム、及び制御方法

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See also references of EP3073597A4

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2017034738A (ja) * 2015-07-28 2017-02-09 株式会社日立製作所 蓄電池運用管理装置および蓄電池運用管理方法
JP2017163640A (ja) * 2016-03-07 2017-09-14 パナソニックIpマネジメント株式会社 蓄電システム、制御装置、制御方法、及び制御プログラム
JP2019092323A (ja) * 2017-11-15 2019-06-13 株式会社東芝 電力制御装置、電力制御方法及び電力制御プログラム
JP2019170102A (ja) * 2018-03-23 2019-10-03 大和ハウス工業株式会社 電力供給システム
JP7103811B2 (ja) 2018-03-23 2022-07-20 大和ハウス工業株式会社 電力供給システム

Also Published As

Publication number Publication date
US20160241071A1 (en) 2016-08-18
KR20160047545A (ko) 2016-05-02
CN105580235A (zh) 2016-05-11
EP3073597A4 (en) 2016-11-16
JPWO2015075772A1 (ja) 2017-03-16
JP5661975B1 (ja) 2015-01-28
EP3073597A1 (en) 2016-09-28

Similar Documents

Publication Publication Date Title
JP5661975B1 (ja) 蓄電池の制御装置、制御方法、制御プログラム、および蓄電システム
Thingvad et al. Economic value of electric vehicle reserve provision in the Nordic countries under driving requirements and charger losses
KR102621905B1 (ko) 전기차 예약 충전 시스템 및 방법
US20160125339A1 (en) Demand-supply planning device, demand-supply planning method, demand-supply planning program, and recording medium
US20140015323A1 (en) Power Management System
JP7131920B2 (ja) 蓄電池管理装置、蓄電池管理方法および蓄電池管理プログラム
JP6208614B2 (ja) エネルギー管理装置、エネルギー管理方法及びエネルギー管理システム
US9225188B2 (en) Charging system
JP2018007536A (ja) 新再生エネルギー連係ハイブリッドエネルギー貯蔵装置に対する適応型エネルギー管理スケジューリングシステム及び方法
Yan et al. A multi-tiered real-time pricing algorithm for electric vehicle charging stations
US10581122B2 (en) Charge and discharge control apparatus and method for an energy storage that provides multiple services
US10063053B2 (en) Peak shaving using energy storage
CN109327035B (zh) 一种电动汽车充电功率调节方法和系统
KR102050967B1 (ko) 한국형 전력요금제 기반의 에너지 저장장치 운용방법 및 시스템
KR20150048262A (ko) 공동주택용 전기 차량의 충전 스케줄링 시스템 및 방법
CN110826801A (zh) 电动车充电站分布式电能管理方法
JP6148120B2 (ja) エネルギー管理装置、エネルギー管理方法及びエネルギー管理システム
JP6794141B2 (ja) 情報処理装置、情報処理システム、及び情報処理プログラム
JP2013051834A (ja) マルチパワーコンディショナシステム
TWI725606B (zh) 電動車充電站分散式電能管理方法
US20160241072A1 (en) Charge/discharge control device and program
JP6178179B2 (ja) 電力貯蔵装置
KR102223891B1 (ko) 대상설비의 ess 용량분배방법 및 ess 용량분배장치
KR101780342B1 (ko) 전기철도 시스템에서 에너지 저장 장치의 스케줄링 방법 및 장치
KR102018875B1 (ko) 에너지 저장장치의 전력관리장치 및 전력관리방법

Legal Events

Date Code Title Description
WWE Wipo information: entry into national phase

Ref document number: 201380079778.X

Country of ref document: CN

ENP Entry into the national phase

Ref document number: 2014528784

Country of ref document: JP

Kind code of ref document: A

121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 13897922

Country of ref document: EP

Kind code of ref document: A1

REEP Request for entry into the european phase

Ref document number: 2013897922

Country of ref document: EP

ENP Entry into the national phase

Ref document number: 20167007905

Country of ref document: KR

Kind code of ref document: A

WWE Wipo information: entry into national phase

Ref document number: 15025442

Country of ref document: US

NENP Non-entry into the national phase

Ref country code: DE