WO2015016625A1 - 상향 링크 스케줄링 방법 및 상향링크 전송 방법 - Google Patents

상향 링크 스케줄링 방법 및 상향링크 전송 방법 Download PDF

Info

Publication number
WO2015016625A1
WO2015016625A1 PCT/KR2014/007029 KR2014007029W WO2015016625A1 WO 2015016625 A1 WO2015016625 A1 WO 2015016625A1 KR 2014007029 W KR2014007029 W KR 2014007029W WO 2015016625 A1 WO2015016625 A1 WO 2015016625A1
Authority
WO
WIPO (PCT)
Prior art keywords
base station
subframe
uplink
terminal
type
Prior art date
Application number
PCT/KR2014/007029
Other languages
English (en)
French (fr)
Inventor
고영조
문성현
김철순
신준우
안재영
Original Assignee
한국전자통신연구원
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 한국전자통신연구원 filed Critical 한국전자통신연구원
Priority to US14/909,415 priority Critical patent/US20160183290A1/en
Priority claimed from KR1020140097929A external-priority patent/KR20150016473A/ko
Publication of WO2015016625A1 publication Critical patent/WO2015016625A1/ko

Links

Images

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04BTRANSMISSION
    • H04B7/00Radio transmission systems, i.e. using radiation field
    • H04B7/02Diversity systems; Multi-antenna system, i.e. transmission or reception using multiple antennas
    • H04B7/022Site diversity; Macro-diversity
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W72/00Local resource management
    • H04W72/12Wireless traffic scheduling
    • H04W72/1263Mapping of traffic onto schedule, e.g. scheduled allocation or multiplexing of flows
    • H04W72/1268Mapping of traffic onto schedule, e.g. scheduled allocation or multiplexing of flows of uplink data flows

Definitions

  • the present invention relates to an uplink transmission method of a terminal for supporting dual connectivity and an uplink scheduling method of a base station.
  • Dual connectivity is that the terminal simultaneously maintains a connection to two base stations.
  • the macro cell manages the mobility of the terminal and provides cellular coverage, and the small cell may mainly be responsible for data transmission and reception with the terminal.
  • the macro cell since the macro cell is mainly responsible for the control plane (control plane), it is possible to control and manage the communication between the terminal and the base station. Therefore, the macro cell should have a higher priority for communication with the terminal than the small cell mainly responsible for the user plane.
  • relatively small resources may be used for communication between the macro cell to which the control information is transmitted and the terminal, compared to the communication between the small cell to which the data is mainly transmitted and the terminal.
  • An object of the present invention is to provide an uplink scheduling method of two base stations connected by non-ideal backhaul and an uplink transmission method of a dual connected base station of a terminal.
  • an uplink transmission method of a terminal includes receiving first uplink scheduling information of a first base station and information on a type of a subframe from a first base station among at least two base stations, and a second base station from a second base station among at least two base stations. Receiving uplink scheduling information of the base station, and uplink signals to the first base station and the second base station based on the first uplink scheduling information, the second uplink scheduling information, and the information on the type of the subframe, respectively. Or transmitting the channel.
  • the information about the type of the subframe may include at least three types of the subframe.
  • a first subframe of a first type among at least three types may be a common subframe of a first base station and a second base station.
  • the transmitting in the uplink transmission method may include simultaneously transmitting an uplink signal or a channel to a first base station and a second base station in a first subframe of a first type of at least three types.
  • the first base station is a master eNB and the second base station is a secondary eNB, allocating power to transmission to the first base station preferentially, and transmitting to the first base station And allocating the remaining allocated power for transmission to the second base station.
  • the channel transmitted to the first base station is a control channel
  • the channel transmitted to the second base station is a shared channel
  • allocating power to transmission of the control channel first and And allocating remaining power allocated for transmission of the control channel to transmission of the shared channel.
  • a first subframe of a first type of at least three types is a dedicated subframe of the first base station
  • a second subframe of a second type of at least three types is a dedicated subframe of the second base station.
  • the transmitting in the uplink transmission method may include transmitting an uplink signal or a channel from a first subframe of a first type of at least three types to a first base station, and a second subtype of a second type of at least three types.
  • the method may further include transmitting an uplink signal or a channel to the second base station in the frame.
  • the uplink transmission method includes a report of the maximum transmission power and the remaining power of the serving cell managed by the first base station, and the type information of the maximum transmission power, the PHR and the PHR of the serving cell managed by the second base station.
  • the transmission may further include.
  • the maximum transmission power and remaining power report for the serving cell managed by the second base station and the maximum transmission power, PHR and PHR type information for the serving cell managed by the first base station are transmitted to the second base station.
  • the method may further include transmitting.
  • an uplink scheduling method of a base station is provided in a wireless communication system supporting dual connectivity between a terminal and at least two base stations.
  • the uplink scheduling method may include allocating semi-static resources to a first subframe, transmitting information regarding a first subframe to a first base station of at least two base stations, and And transmitting uplink scheduling information including the information on the first subframe to the terminal.
  • the semi-fixed resource may include an SPS scheduling resource, a periodic CSI reporting resource, a trigger-type 0 resource, and an SR resource.
  • the uplink scheduling method may include: allocating a dynamic allocation resource to a second subframe, transmitting information on a second subframe to another base station, and uplink including information on a second subframe.
  • the method may further include transmitting scheduling information to the terminal.
  • the dynamic allocation resource may include a resource for an uplink HARQ-ACK or a trigger type 1 SRS transmitted in response to the PDCCH / e-PDCCH.
  • the determining of the second subframe for the dynamic allocation resource in the uplink scheduling method may include determining the second subframe in consideration of an uplink HARQ process.
  • an uplink scheduling method of a base station in a wireless communication system supporting dual connectivity between a terminal and at least two base stations.
  • the uplink scheduling method may include: dividing a type of a subframe into at least three types, allocating uplink resources to a first subframe of a first type among at least three types, and relating to a first subframe. And transmitting uplink scheduling information including the information to the terminal.
  • the uplink scheduling method may further include transmitting information on the type of the subframe to the other one of the at least two base stations.
  • a first subframe is a dedicated subframe of a base station
  • a second subframe of a second type of at least three types is a dedicated subframe of a first base station, and a third type of at least three types.
  • the third subframe of may be a shared subframe of the base station and the first base station.
  • an uplink scheduling method of a base station in a wireless communication system supporting dual connectivity between a terminal and at least two base stations.
  • the uplink scheduling method includes receiving information on a first subframe to which an uplink resource of a first base station is allocated from one of the at least two base stations, and based on the information on the first subframe. Allocating uplink resources of the base station to a second subframe different from the first subframe, and transmitting uplink scheduling information including information on the second subframe to the terminal.
  • the uplink scheduling method may further include receiving information on at least three types of subframes divided from a first base station.
  • a first subframe of a first type of at least three types is a dedicated subframe of the first base station
  • a second subframe of a second type of at least three types is a dedicated subframe of the base station
  • the third subframe of the third type of the at least three types may be a shared subframe of the base station and the first base station.
  • one base station of the dual-connected base station and the terminal determines the type of subframe to use for uplink and informs the other base station and the terminal, and the subframe of the shared between the terminal and at least two base stations
  • the terminal may separately transmit or simultaneously transmit an uplink signal or channel through the information about the type.
  • the base station determines the priority based on each base station and channel, etc. based on the maximum transmission power and the remaining power amount for the uplink reported by the terminal to inform the terminal, the terminal effectively transmits signals or channels simultaneously You can do that.
  • FIG. 1 is a diagram illustrating a wireless communication system supporting dual connectivity according to an embodiment of the present invention.
  • FIG. 3 is a diagram illustrating power allocation priority according to an embodiment of the present invention.
  • a mobile station is a terminal, a mobile terminal (MT), an advanced mobile station (AMS), a high reliability mobile station (HR-MS). May also refer to a subscriber station (SS), a portable subscriber station (PSS), an access terminal (AT), a user equipment (UE), and the like. It may also include all or part of the functionality of the HR-MS, SS, PSS, AT, UE and the like.
  • a base station may be an advanced base station (ABS), a high reliability base station (HR-BS), a base station B (node B), an advanced base station B (evolved node B, eNodeB), access point (AP), radio access station (RAS), base transceiver station (BTS), mobile multihop relay (MMR) -BS, relay serving as a base station station (RS), relay node (RN) serving as base station, advanced relay station (ARS) serving as base station, high reliability relay station (HR) serving as base station -RS), small base station (femoto BS), home node B (HNB), home eNodeB (HeNB), pico base station (pico BS), metro base station (metro BS), micro base station (micro BS) ), Etc., and may refer to a master eNB (MeNB), a secondary eNB (SeNB), and the like, and may include ABS, base station B, eNodeB, and A. It may refer to a master
  • FIG. 1 is a diagram illustrating a wireless communication system supporting dual connectivity according to an embodiment of the present invention.
  • the terminal 120 is connected to a base station 0 (100) and a base station 1 (110), and the base station 0 (100) and the base station 1 (110) are connected to each other through a non-ideal backhaul.
  • each base station When two base stations simultaneously connected to one terminal 120 are connected by non-ideal backhaul, each base station performs scheduling using different resources for the terminal 120.
  • the terminal 120 may transmit different types of uplink signals and channels for each base station. Since it is difficult for two base stations to exchange information immediately through the non-ideal backhaul, an uplink-shared channel (UL-SCH) and uplink control information (uplink control information) transmitted by the terminal 120 In case of targeting cells belonging to different base stations, the UCI may be efficiently transmitted from each base station.
  • UL-SCH uplink-shared channel
  • uplink control information uplink control information
  • the transmission format of the UL-SCH and the UCI transmitted by the terminal 120 to each base station needs to be determined by the operations of the base station and the terminal 120. This is because UL-SCH and UCI can be easily received at each base station without placing a large limit on the dynamic scheduling performed by each base station.
  • each base station needs to perform downlink transmission using signals and channels separated from each other by each base station. That is, the downlink shared channel (DL-SCH) and downlink control information (DCI) are managed for each base station and need to be transmitted through signals and channels separated from each other.
  • DL-SCH downlink shared channel
  • DCI downlink control information
  • base station 0 100
  • base station 1 110
  • the set of serving cells managed by base station 0100 is called cell group 0, and the set of serving cells managed by base station 1110 is called cell group 1.
  • Different carriers may be used for the serving cell managed by each base station.
  • the terminal 120 may not simultaneously satisfy the transmission power required by the two base stations according to the channel environment. For example, when the terminal 120 simultaneously transmits a signal or a channel to two base stations, a physical uplink shared channel (PUSCH) and a physical uplink control channel (PUCCH) of cell group 0 are transmitted. If power is preferentially allocated), PUSCH and PUCCH transmitted to cell group 1 may not reach the required power size. In particular, since the hybrid automatic re-request (HARQ) is not applied to the transmission of the UCI, a loss risk follows. When a loss occurs in the control information, the transmission efficiency for the cell group 1 may be lowered. Thus, in this case, UCI transmissions for two base stations need to be coordinated between cell groups so that they do not occur in the same subframe.
  • HARQ hybrid automatic re-request
  • each of the two base stations may determine a usable uplink subframe in advance so that semi-static resources do not occur in the same subframe.
  • the base station 0 (100) may transmit the configuration information of the resources to be used by the base station 1 (110), and the base station 1 (110) may determine the resources in a range that does not conflict with the base station 0 (100) have.
  • the two base stations may determine the dynamic resource allocation possible subframe in advance so that the dynamic resource allocation does not overlap in the same subframe.
  • the uplink resource may indicate a PUSCH (which may be allocated by DCI), a PDSCH, or a PDCCH / e-PDCCH (enhanced-PDCCH) indicating a downlink semi-persistent scheduling (SPS) release. ) Can be dynamically allocated for the uplink HARQ-ACK transmitted in response to the ") and the trigger type 1 sounding reference signal (SRS).
  • each base station includes an uplink HARQ process (for example, a period in which the terminal 120 retransmits a signal or a channel at the request of the base station).
  • the resource allocation subframe can be determined in advance. If the two base stations allocate the PUSCH using subframes corresponding to different HARQ processes, the two base stations may not allocate the PUSCH to the same subframe.
  • a subframe to which an uplink HARQ-ACK transmitted in response to a PDCCH / e-PDCCH indicating a PUSCH or a downlink SPS release may be allocated in an uplink HARQ process unit.
  • each base station may determine a subframe (dynamic resource assignable subframe) capable of dynamic resource allocation according to the HARQ process. For example, when base station 0 (100) determines a dynamic resource allocation capable subframe and informs base station 1 (110), base station 1 (110) determines the remaining subframes other than the subframe determined by base station 0 (100). Can be used for dynamic resource allocation.
  • a subframe dynamic resource assignable subframe
  • base station 0 (100) of the two base stations determines the semi-fixed resource allocation configuration information and the dynamic resource assignable subframe and transmits them to the base station 1 (110).
  • the base station 1 110 may allocate resources with reference to this.
  • each base station shares resource allocation information and performs scheduling based on the information of the shared counterpart.
  • the base station 0 (100) and the base station 1 (110) may be divided into three types of subframes and may share the type information of the subframe.
  • Type information of subframes shared by each base station is as follows.
  • Base station 0 subframe (only transmission from terminal to base station 0)
  • Base station 1 subframe (only transmission from terminal to base station 1)
  • the terminal 120 is not allowed to transmit to the base station 1 110 in the 'base station 0 dedicated subframe'. On the contrary, the terminal 120 is not allowed to transmit to the base station 0 100 in the 'base station 1 dedicated subframe'. However, in the 'public subframe', transmission to one base station of base station 0 (100) or base station 1 (110) and simultaneous transmission to two base stations of base station 0 (100) and base station 1 (110) are allowed.
  • Each base station should know the information on the subframe type of the uplink as described above.
  • the information about the uplink subframe type may be determined by the base station 0 (100) and reported to the base station 1 (110).
  • the terminal 120 may divide the serving cell of the terminal 120 into cell group 0 and cell group 1, and perform uplink transmission by using independent signals and channels to cells belonging to each cell group.
  • each cell group may include one or a plurality of cells.
  • the terminal 120 receives semi-fixed resource allocation information used by cell group 0 and semi-fixed resource allocation information used by cell group 1 from base station 0 (100) and base station 1 (110), respectively.
  • Semi-statically allocated resources include SPS scheduling resources, periodic channel state information (CSI) reporting resources, trigger-type 0 sounding reference signal resources, and scheduling request (SR) resources. And, the terminal 120 according to the scheduling instruction of the serving cell of the terminal 120 in the case of dynamic resource allocation.
  • the terminal 120 when the base station 0 (100) and the base station 1 (110) informs the terminal 120 of the dynamic resource allocation capable subframe of the cell group 1 or the cell group 2, the terminal 120 is a dynamic resource allocation capable sub-group of the cell group Transmitting and receiving (monitoring PDCCH / e-PDCCH, etc.) by using the information on the frame can be effectively performed.
  • HARQ retransmission resources for basic transmission may be allocated as many times as the maximum number of retransmissions possible.
  • cell group 1 since cell group 1 may not immediately know whether to retransmit terminal 120, a subframe to which retransmission resources are allocated (a retransmission possible subframe) may not be used as a resource in cell group 1.
  • a method of not using a subframe to which retransmission resources are allocated as a resource in cell group 1 has a problem that resources cannot be efficiently used.
  • cell group 1 applies PUSCH scheduling to a subframe capable of retransmission, and when the UE 120 uses the same subframe as the retransmission for cell group 0 and the PUSCH resource of cell group 1 At least one of cell group 0 and cell group 1 may be selected for transmission.
  • the terminal 120 ignores the PUSCH of the cell group 1 and the cell group Perform retransmission to zero (method 1).
  • the terminal 120 transmits the cell group 1 in the corresponding subframe. It does not perform the transmission for and performs only the transmission to the cell group 0. If the allocated resource blocks do not overlap each other when the subframe used by the PUSCH resource of cell group 1 partially or completely overlaps with the subframe used by the PUSCH resource of cell group 0, the UE 120 retransmits to cell group 0 For this purpose, the transmission power is first allocated, and the PUSCH transmission to the cell group 1 is performed using the remaining transmission power (method 2).
  • the power allocation method of the terminal 120 is determined regardless of whether UCI is included in the PUSCH transmission.
  • priority may be given to power allocation according to whether UCI is included in PUSCH transmission to ensure successful reception of UCI. For example, when there are several channels using the same subframe, the terminal 120 may allocate transmission power according to the following priority.
  • the trigger-type 0 SRS resource may be located in the last SC-FDMA symbol of the subframe.
  • the last symbol of the PUSCH of the subframe is not used for transmission, and the PUCCH formats 1 / 1a / 1b and PUCCH format 3 have a shortened format. Used.
  • the cell group 1 should know not only the setting information of the trigger-type 0 SRS resource set for the cell, but also the setting information of the trigger-type 0 SRS resource set for the cell of the cell group 0.
  • a signal or a channel transmitted to the two base stations may be allocated to the same subframe.
  • the terminal 120 transmits a signal or channel to two base stations if the wireless environment is good enough and the transmission power is sufficient, the terminal 120 may transmit the signal or channel through the same subframe. However, if the wireless environment is not good or there is no room for transmission power, the terminal 120 may not transmit a signal or a channel to both base stations at the same time through the same subframe.
  • Each base station may cause the terminal 120 to measure and report the path loss for each base station to determine whether to transmit simultaneously.
  • the terminal 120 may report the channel environment and the amount of power remaining (a value calculated according to whether the simultaneous transmission) to each base station.
  • each base station is responsible for power control of the cell it manages.
  • the power control process for the cell managed by the base station 0 (100) and the power control process for the cell managed by the base station 1 (110) may be different.
  • base station 0 (100) and base station 1 (110) may independently perform power control on each dedicated subframe.
  • the terminal 120 may not perform simultaneous transmission for each base station.
  • the terminal 120 forbids simultaneous transmission to each base station when the channel for each base station is allocated to the same subframe, only the channel for the high priority base station is transmitted and the channel for the low priority base station is May not transmit.
  • resources may be wasted because no signal or channel is transmitted because the required transmission power cannot be satisfied even though resources for transmission are allocated.
  • the transmission power for each base station may be differently allocated based on a predetermined priority.
  • the terminal 120 performs simultaneous transmission to each base station in the common subframe, it is not known whether power control is applied at each base station. Therefore, when the terminal 120 performs simultaneous transmission to a base station having a high priority and a base station having a low priority, the base station having a low priority that does not know whether the simultaneous transmission has been performed is difficult to control the uplink power.
  • MCS multi-channel scheduling
  • each base station is connected to the terminal 120.
  • the maximum power to be used when the terminal 120 transmits a signal to each base station may be determined based on the measurement result and the remaining power amount reported by the NOR.
  • the terminal 120 when the terminal 120 performs simultaneous transmission for two base stations, when the sum of the transmission powers required by each base station exceeds the maximum transmission power P CMAX, c of the terminal 120, the terminal 120 ) Should allocate power according to priority for each base station. In addition, each base station needs to know the power usage of the terminal 120 to efficiently perform power control, resource allocation, adaptive modulation and coding (AMC), and the like.
  • AMC adaptive modulation and coding
  • Terminal 120 in the embodiment of the present invention sets the P CMAX, c for the serving cell, each managed by the base station 0 100 and the base station 1 110, and all P CMAX, c, and the remaining amount of power a base station 0 ( 100) and base station 1 (110).
  • base station 0 (100) and base station 1 (110) do not share each other's dynamic scheduling information in real time because of the non-ideal backhaul environment.
  • the base station even though each base station receives a power headroom report (PHR) for a serving cell managed by another base station, the base station does not know exactly the meaning. Since the base station 0 (100) has a high priority, the information required by the base station 1 (110) is the amount of power remaining after the terminal 120 transmits a PUCCH or a PUSCH to the base station 0 (100). This is because the terminal 120 simultaneously transmits a channel or a signal to the base station 1 110 using the remaining power among the transmission powers for the base station 0 100 because the base station 1 110 has a low priority.
  • PHR power headroom report
  • the terminal 120 may apply the following power control scheme to the common subframe.
  • the terminal 120 may first set a maximum power amount P max for a base station having a high priority, and then determine the amount obtained by subtracting P MAX from the maximum transmission power as power for a base station having a low priority.
  • P MAX the maximum amount of power for at least one macro cell managed by base station 0 (100)
  • P CMAX the maximum amount of power for at least one serving cell C managed by base station 1 (110)
  • c ⁇ Can be set to P MAX .
  • type 1 In the LTE Release 10 specification TS 36.213, two types of PHR are defined, type 1 and type 2.
  • the type 1 is a PHR that can be applied to all serving cells of the terminal 120, and the PHRs belonging to the type 1 are referred to as type 1-1, type 1-2, and type 1-3.
  • Each power headroom (PH) is calculated for serving cell c and subframe i. That is, P CMAX, c (i) is the maximum transmit power of the terminal 120 when the subframe i is transmitted to the serving cell c.
  • Type 1-1 PHR is used when UE 120 transmits only PUSCH to serving cell c without PUCCH in subframe i.
  • Type 1-1 is shown in Equation 1 below.
  • Type 1-2 PHR is used when the terminal 120 transmits both the PUCCH and the PUSCH to the serving cell c in subframe i.
  • Type 1-2 is shown in Equation 2 below.
  • Type 1-3 PHR is used when the terminal 120 does not transmit the PUSCH to the serving cell c in subframe i.
  • Types 1-3 are shown in Equation 3 below.
  • the next type 2 is a PHR that can be used when the terminal 120 simultaneously transmits a PUCCH and a PUSCH in subframe i, and a PHR belonging to a type 2 is type 2-1, type 2-2, type 2-3, or type. It is called 2-4.
  • PUCCH can be transmitted only to a primary cell, but in the present invention, the terminal 120 may set a PUCCH transmission cell for each base station for dual connectivity.
  • Type 2-1 PHR is used when UE 120 transmits PUCCH and PUSCH to serving cell c in subframe i.
  • Type 2-1 is shown in Equation 4 below.
  • Type 2-2 PHR is used when UE 120 transmits only PUSCH to serving cell c without PUCCH in subframe i.
  • Type 2-2 is shown in Equation 5 below.
  • Type 2-3 PHR is used when UE 120 transmits only PUCCH to serving cell c without PUSCH in subframe i.
  • Type 2-3 is shown in Equation 6 below.
  • Type 2-4 PHR is used when the terminal 120 has no PUCCH or PUSCH transmitted to the serving cell c in subframe i.
  • Types 2-4 are shown in Equation 7 below.
  • the terminal 120 reports PHR to each serving cell or reports P CMAX, c, and PHR.
  • each PHR corresponds to which type among the plurality of types. Can not. That is, since the base station 0 (100) and the base station 1 (110) cannot know each other's scheduling situation, even if the terminal 120 transmits the PHR to each base station, the type information of the transmitted PHR is not known. Therefore, in the present invention, when the terminal 120 transmits the PHR, additional information is transmitted to each base station so that each base station can accurately determine the current state of power usage of the terminal 120.
  • the terminal 120 reports the P CMAX, c, and PHR of the serving cell managed by the base station 1 110 to the base station 1 110 , and additionally, the P CMAX, c of the serving cell managed by the base station 0 100.
  • Pass PHR and PHR type information For example, if the PHR reported by the terminal 120 to the base station 1 110 is type 1, the terminal 120 may additionally transmit type information indicating which type of type 1-1, type 1-2, and type 1-3. .
  • the terminal 120 reports P CMAX, c, and PHR for the serving cell managed by the base station 0 (100) to the base station 0 (100), and additionally, P CMAX, of the serving cell managed by the base station 1 (110) , c , PHR, and PHR type information.
  • PHR reported by the terminal 120 to the base station 0 (100) is Type 2
  • type information indicating which type of Type 2-1, Type 2-2, Type 2-3, and Type 2-4 Can be passed additionally.
  • the resources allocated to the terminal 120 by the base station may be classified into semi-statically allocated resources (semi-statically allocated resources) and dynamically allocated resources (dynamically allocated resources).
  • Semi-fixed allocation resources are resources that are periodically and continuously allocated for a predetermined time.
  • resources allocated through DL semi-persistent scheduling (DL SPS) and UL semi-continuous scheduling (UL semi- Resources allocated through persistent scheduling (UL SPS), resources for periodic CSI reporting, and scheduling request (SR) resources may be semi-fixedly allocated.
  • the periodic CSI reporting resource and the SR resource may be allocated to the terminal 120 through RRC signaling
  • the resources allocated through the SPS may be allocated to the terminal 120 through RRC signaling and DCI signaling.
  • Table 1 is a table showing a resource allocation period that can be set in the semi-fixed resource allocation method according to an embodiment of the present invention in subframe units.
  • Table 1 FDD TDD SPS Scheduling Interval 10, 20, 32, 40, 64, 80, 128, 160, 320, 640 10, 20, 30, 40, 60, 80, 130, 160, 320, 640 Periodic CSI Reporting Cycle 2, 5, 10, 20, 40, 80, 160, 32, 64, 128 1, 5, 10, 20, 40, 80, 160 SR cycle 1, 2, 5, 10, 20, 40, 80, 1, 2, 5, 10, 20, 40, 80,
  • SRS sound reference signal
  • uplink HARQ-ACK resources corresponding to the PDSCH according to the downlink SPS are also semi-statically allocated. That is, resources may be allocated semi-fixedly to uplink HARQ-ACK transmission corresponding to the PDSCH.
  • Resources are also allocated semi-statically.
  • Dynamic resource allocation is to dynamically allocate resources for PUSCH resource allocation, uplink HARQ-ACK transmission, and Trigger-type 1 SRS transmission, which are allocated using downlink DCI.
  • one of 10, 20, 32, 40, 64, 80, 128, 160, 320 and 640 ms may be used as the time interval of the SPS in subframe units.
  • the time interval of the SPS means an interval of subframes in which initial transmission or first transmission occurs in HARQ.
  • the period of the subframe for retransmission for the initial transmission is eight in subframe units (in case of FDD) starting from the subframe in which the initial transmission has occurred.
  • the SPS when determining a dedicated subframe of each base station, the SPS may be applied to each base station or at least base station 0.
  • the 'time interval' means the time interval of the second transmission of the SPS, which is 10ms.
  • a retransmission 210 for the initial transmission 200 may occur.
  • the retransmission 210 may occur first in a subframe 8 ms away from the initial transmission 200, and then the second retransmission 220 may occur in a subframe 8 ms away from the first retransmission 220.
  • the SPS time intervals allocable in subframe allocation for each base station may include 10, 20, 32, 40, 64, 80, 128, 160, 320, and 640 which are existing SPS time intervals.
  • the SPS time interval and subframe offset may be a parameter for determining the SPS allocation.
  • the terminal 120 of the present invention capable of dual access to a base station also supports a period of a conventional LTE system. Can support
  • the terminal 120 may not perform simultaneous transmission.
  • uplink resources allocated to different base stations are allocated to different subframes.
  • the base station may appropriately select the allocation period and subframe offset of the subframe to determine that semi-fixed resources (SPS resources, SR resources, periodic CSI reporting, etc.) for each base station do not occur simultaneously in the same subframe.
  • SPS resources, SR resources, periodic CSI reporting, etc. semi-fixed resources
  • the terminal 120 allocates power according to a predetermined priority and performs uplink transmission.
  • the base station may allocate resources to avoid simultaneous transmission to the two base stations based on the radio channel environment with the terminal 120.
  • the base station determines the available subframe in consideration of the HARQ process when dynamic resource allocation.
  • the base station may also allocate semi-fixed allocation resources (SPS resources, SR resources, CSI reporting resources, SRS resources, etc.) in consideration of the HARQ process.
  • SPS resources SPS resources, SR resources, CSI reporting resources, SRS resources, etc.
  • the base station may determine a semi-fixed allocation resource by giving an integer multiple of a round trip time (RTT) of an uplink HARQ process.
  • RTT round trip time
  • uplink subframes transmitted to each base station may not overlap each other in time.
  • the SPS scheduling interval, the SR period, and the period of the CSI reporting resource determined in the frequency division duplex (FDD) of Table 1 also include 8, 16, 24, and 32 subframes according to the period of the uplink HARQ process.
  • An integer multiple time of 8 ms can be further considered.
  • the terminal 120 simultaneously transmits two or more signals or channels according to channels, signals related to simultaneous transmission, and priority information related to the base station.
  • Table 3 relates to a power allocation priority applied when the terminal 120 simultaneously transmits signals or channels to different base stations using the same subframe.
  • Table 3 shows the priority between UCI_0 and UL-SCH_0 transmitted to base station 0 (100) and UCI_1 and UL-SCH_1 transmitted to base station 1 (110).
  • Base station 1 (cell group 1) ⁇ base station 0 (cell group 0) ⁇ UCI_1 UL-SCH_1 UCI_0 UCI_0> UCI_1 UCI_0> UL-SCH_1 UL-SCH_0 UCI_1> UL-SCH_0 UL-SCH_0> UL-SCH_1
  • the terminal 120 gives higher priority to the UCI than the UL-SCH when different types of information (UCI or UL-SCH) are allocated to the same subframe, and the same type of information is the same.
  • UCI is control information and HARQ is not applied
  • higher priority is given to UL-SCH to which data is transmitted to reduce reception failure.
  • base station 0 (100) has a higher priority than base station 1 (110), which means that when base station 0 (100) is MeNB and base station 1 (110) is SeNB, the connection with the MeNB responsible for the control plane is lost. This is because the connection with the SeNB responsible for the user plane should be more secure than the connection with the SeNB.
  • the base station 0 100 corresponds to a cell group 0 of two cell groups connected to the terminal 120
  • the base station 1 110 corresponds to a cell group 1.
  • the terminal 120 preferentially allocates power to information having a high priority, and transmits information having a low priority with remaining power.
  • FIG. 3 is a diagram illustrating power allocation priority according to an embodiment of the present invention.
  • a criterion according to the type of channel (PUCCH or PUSCH) is added to the power allocation priority of Table 3.
  • the terminal 120 transmits the PUSCH for the base station 0 (100) (UCI_0 and UL-SCH_0). Power is used first and power remaining in the PUSCH transmission (UL-SCH_1, or UCI_1 and UL-SCH_1) for the base station 1 (110).
  • the terminal 120 uses power for the PUCCH transmission of the cell group 0 first. . In this case, the priority is PUCCH of cell group 0> PUCCH of cell group 1> PUSCH of cell group 0> PUSCH of cell group 1.
  • the terminal 120 Since different carriers may be used for the serving cell managed by each base station in the present invention, if the terminal 120 can transmit a signal or a channel simultaneously using different carriers in the same subframe, the terminal 120 is uplinked. The link data rate can be maximized. At this time, the UCI of the terminal 120 is greater than the data transmission, but unlike the data transmission HARQ is not applied, so the reliability of the transmission should be guaranteed in one transmission. Accordingly, the priority of UCI transmission can be set higher than that of UL-SCH transmission. Priorities between UCIs may vary depending on the type of UCI.
  • the UCI transmitted by the terminal 120 includes an uplink HARQ-ACK, a CSI report, and an SR.
  • the uplink HARQ-ACK and the SR may have a higher priority than the CSI reporting. If the same type of UCI collides in the same subframe, the transmission priority of the UCI depends on the priority of the base station receiving the UCI.
  • Table 4 is a table showing the power allocation priority in the collision of PUCCH.
  • HARQ-ACK_PUCCH_0> CSI report_PUCCH_1 indicates that the priority of the PUCCH including HARQ-ACK transmitted to base station 0 (100) is the priority of PUCCH including CSI transmitted to base station 1 (110). It means higher than the rank.
  • the collision between the SR transmissions or the collision between the SR transmission and the HARQ-ACK transmission does not occur as much as possible.
  • the SR transmission has priority over transmission of the HARQ-ACK or CSI report according to Table 4. If the HARQ-ACK is not normally transmitted to the base station, the base station may perform retransmission to the terminal 120. However, if the SR of the terminal 120 is not normally delivered to the base station, scheduling from the base station may be delayed and a service delay may occur. Because.
  • the terminal 120 may give a higher priority of HARQ-ACK transmission than that of SR transmission. have. This means that the SPS resource cannot be used if the response to the downlink SPS release is not normally transmitted to the base station. However, even if the SR is not normally delivered to the base station, the terminal 120 transmits the SR to the base station through another subframe to which the SR resource is allocated. Because it can transmit.
  • priority means that power is allocated to a higher priority side when the maximum transmission power of the terminal 120 is not sufficient when two signals or channels are simultaneously transmitted. If all available power of the terminal 120 is allocated to the transmission of a signal or channel having a high priority, since there is no remaining power, a signal or channel having a low priority may not be transmitted.
  • SR transmission resources for the base station 1 (110) is not allocated. If only base station 0 100 can allocate the SPS resource, the SPS release HARQ-ACK transmission to base station 1 110 does not occur.
  • Table 5 shows priorities for resolving conflicts between the PUCCH transmitted to the base station 0 (100) and the PUCCH transmitted to the base station 1 (110) in this case.
  • the terminal 120 in the dual transmission of the terminal 120 for two base stations occurring in the same subframe, the terminal 120 may give up transmission for either base station.
  • an uplink HARQ process is determined for a base station, and each base station may allocate resources by using an SPS.
  • each base station may allocate resources by using an SPS.
  • the time interval of the initial transmission according to the conventional SPS allocation is not an integer multiple of the RTT of the uplink HARQ process, collisions may occur between the two.
  • the dynamic scheduling information of each base station is difficult to be exchanged between two base stations immediately due to the limited backhaul environment. Therefore, it is difficult for the base station 0 100 to know whether the SPS resource and the dynamically scheduled resource are included in the same subframe.
  • the base station 1 110 since the base station 1 110 receives the SPS allocation resource information from the base station 0 100, the base station 1 110 may know in advance the subframe including the SPS allocation resource of the base station 0 100. That is, the base station 1 110 may not perform blind detection in a subframe including the SPS resources allocated by the base station 0 100.
  • the transmission form of the terminal 120 may be as follows.
  • the terminal 120 may transmit a PUSCH for the base station 0 (100) in the uplink subframe and may not transmit a PUSCH to the base station 1 (110).
  • the terminal 120 transmits the base station in the corresponding subframe.
  • HARQ-ACK may be transmitted to 0 (100), but the PUSCH for the base station 1 (110) may not be transmitted.
  • each base station has a shortened format. Reliability of signal reception can be ensured by dividing the transmitted signal.
  • the terminal 120 may transmit only the HARQ-ACK PUCCH for the base station 0 (100) without transmitting the CSI report PUCCH for the base station 1 (110).
  • the base station 1 (110) since the base station 1 (110) does not know that only the HARQ-ACK PUCCH for the base station 0 (100) has been transmitted in the corresponding subframe, it performs blind detection for checking whether the CSI report PUCCH is transmitted or there is a possibility of collision.
  • the CSI reporting PUCCH transmitted in the corresponding subframe may be always ignored by determining the subframe.
  • the terminal 120 determines a subframe in which collision may occur, and in this subframe, abandons SRS transmission and transmits only the CSI report PUCCH. That is, the terminal 120 gives priority to the CSI reporting PUCCH.
  • the terminal 120 may give up transmission by the SPS or give up HARQ-ACK transmission.
  • the terminal 120 determines all subframes in which collision may occur, and abandons transmission by the SPS in the corresponding subframe.
  • the terminal 120 transmits only the signal by the SPS without transmitting the HARQ-ACK in the corresponding subframe even if the uplink HARQ-ACK occurs dynamically.
  • the terminal 120 may selectively transmit only one of the two. This is to simply receive a signal from the base station, the terminal 120 may give up the SPS transmission or give up the CSI report in all subframes in which a collision occurs.
  • the terminal 120 may transmit a PUSCH to the base station 0 (100) and transmit an SRS to the base station 1 (110) in the last symbol of the PUSCH.
  • all cells managed by the base station 0 100 and the base station 1 110 may use the same cell-specific SRS subframe.
  • the terminal 120 since it is difficult to determine whether the signal received in the corresponding subframe is the SRS in the base station 1 (110), in the present invention, in case of a subframe collision, the terminal 120 always uses the shortened format of the PUCCH for the base station 0 (100).
  • the SRS is transmitted using the last SC-FDMA symbol of the corresponding subframe.
  • the serving cells of node 0 (cell group 0) and node 1 (cell group 1) may use the same cell-specific SRS subframe configuration.
  • the terminal 120 may transmit one of the two according to the priority.
  • CA carrier aggregation
  • Table 6 shows DL-UL correspondence relationship between UL and DL configuration of TDD-LTE (TS 36.211).
  • 'D' is a downlink subframe
  • 'U' is an uplink subframe
  • 'S' is a special subframe.
  • the special subframe may be used for downlink transmission.
  • HARQ-ACK when HARQ-ACK is transmitted in a specific uplink subframe, determines in which downlink subframe a PDCCH indicating a PDSCH or downlink SPS release corresponding to the transmitted HARQ-ACK is generated; It's a relationship.
  • Table 7 shows an UL subframe in which ACK for data received in a DL subframe of TDD-LTE is transmitted.
  • the relationship between the DL subframe and the UL subframe may be determined according to a downlink association set index (DASI).
  • DASI downlink association set index
  • HARQ-ACK (corresponding to PDSCH or PDCCH transmission indicating downlink SPS release) generated in UL subframes 1, 5, and 6 may be transmitted in subframe 2 of the next radio frame.
  • the TDD carrier and the FDD carrier are used in carrier aggregation (AC), and each carrier may be managed by different base stations.
  • the two base stations are geographically separated and are connected by non-ideal backhaul, causing delays in information exchange and limited exchange capacity.
  • a cell of a base station (TDD cell) using a TDD carrier and a cell (FDD cell) of a base station using an FDD carrier use separate UCIs.
  • the TDD cell may be operated according to a UL / DL reference configuration
  • the FDD cell may be operated in the same manner as a conventional FDD cell.
  • a simultaneous transmission problem may occur.
  • the UCI for each cell should not be allocated to the same subframe.
  • the UCI transmittable candidate subframe of the TDD cell may be excluded from the UCI transmittable candidate subframes of the FDD cell. That is, UCI transmission for the TDD cell may be considered first.
  • the subframe in which the uplink HARQ-ACK transmitted in response to the PDSCH or SPS release may be transmitted may be determined by the UL / DL reference structure of the TDD. Since the downlink HARQ process is an asynchronous method, the TDD cell and the FDD cell determine different subframes for HARQ-ACK transmission.
  • each base station performs HARQ-ACK (uplink HARQ- transmission in response to the downlink SPS) of the FDD cell and the TDD cell through resource allocation intervals and offset settings. ACK) resource collision can be avoided.
  • the uplink HARQ-ACK for the subframe n may be allocated to the subframe n + 4.
  • one subframe may be used for uplink HARQ-ACK transmission in one radio frame period.
  • the TDD cell adjusts PDSCH scheduling so that HARQ-ACK is not transmitted in a subframe including HARQ-ACK transmitted from the FDD cell. Therefore, the base station of the TDD cell needs to know the SPS configuration information used in the FDD cell.
  • a subframe that can be used for uplink HARQ-ACK transmission may be different in a TDD cell and an FDD cell.
  • an uplink HARQ process of an FDD cell is a synchronous method of RTT 8 ms
  • an uplink HARQ process of a TDD cell is an RTT 10 ms (TDD UL / DL configuration 1 to 5) That's the way. Therefore, when resources are allocated in each HARQ unit of two cells, a PUSCH resource may collide in the same subframe.
  • the HARQ process used by each of the FDD cell and the TDD cell is determined, and processing is performed to allow simultaneous transmission in a subframe in which collision occurs. Therefore, the base station managing the FDD cell and the base station managing the TDD cell should be aware of both HARQ processes used by the FDD cell and the TDD cell.
  • the terminal 120 performs uplink transmission as scheduled in the FDD cell and the TDD cell.
  • the terminal 120 can efficiently perform uplink transmission by receiving information on the HARQ process used by the FDD cell and the TDD cell from the base station.
  • the terminal 120 may differently allocate transmission power for each cell or give up transmission of some signals or channels according to priority in a subframe in which simultaneous transmission occurs based on information on the HARQ process.
  • one of the base stations dually connected to the terminal 120 determines the type of subframe to be used for uplink and informs the other base station and the terminal 120, and the terminal 120 and The terminal 120 may separately transmit or simultaneously transmit an uplink signal or a channel through information on the type of a subframe shared between at least two base stations.
  • the base station determines the priority based on each base station and channel, etc. based on the maximum transmission power and the remaining power amount for the uplink reported by the terminal 120, and informs the terminal 120, the terminal 120 ) Can effectively transmit signals or channels simultaneously.

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Mobile Radio Communication Systems (AREA)

Abstract

단말과 적어도 두 개의 기지국 사이의 이중 연결을 지원하는 무선통신 시스템에서, 단말이 상향링크 스케줄링 정보 및 서브프레임의 유형에 관한 정보를 바탕으로 상향링크 전송을 수행하는 방법과, 기지국이 서브프레임 유형에 관한 정보를 공유하고 상향링크 자원을 할당하는 상향링크 스케줄링 방법이 제공된다.

Description

상향 링크 스케줄링 방법 및 상향링크 전송 방법
본 발명은 이중 연결성(dual connectivity) 지원을 위한 단말의 상향 링크 전송 방법 및 기지국의 상향링크 스케줄링 방법에 관한 것이다.
이중 연결성은 단말이 두 개의 기지국에 대한 연결(connection)을 동시에 유지하는 것이다.
예를 들어, 하나의 단말이 매크로 셀 및 소형 셀에 모두 연결된 상황을 고려하면, 매크로 셀은 단말의 이동성을 관리하고 셀룰러 커버리지를 제공하며, 소형 셀은 주로 단말과의 데이터 송수신을 담당할 수 있다. 이때, 매크로 셀은 제어평면(control plane)을 주로 담당하므로, 단말과 기지국 간의 통신을 제어 및 관리할 수 있다. 따라서 사용자 평면(user plane)을 주로 담당하는 소형 셀에 비해 매크로 셀은 단말과의 통신에 대한 우선 순위가 높아야 한다. 반면, 주로 제어정보가 전송되는 매크로 셀과 단말 간의 통신에는 주로 데이터가 전송되는 소형 셀과 단말 간의 통신에 비해 상대적으로 적은 자원이 사용될 수 있다.
하지만, 단말과 동시에 연결된 두 개의 기지국이 서로 비이상적 백홀(non-ideal backhaul)을 통해 연결된 경우 기지국 사이에서 즉각적인 정보교환이 어렵고, 이중 연결성을 지원함에 있어 문제점이 발생될 수 있다.
본 발명이 이루고자 하는 과제는, 비이상적인 백홀로 연결된 두 개의 기지국의 상향링크 스케줄링 방법과 단말의 이중 연결된 기지국에 대한 상향링크 전송 방법을 제공하는 것이다.
본 발명의 한 특징에 따르면, 단말과 적어도 두 개의 기지국 사이의 이중 연결을 지원하는 무선통신 시스템에서, 단말의 상향링크 전송 방법이 제공된다. 상기 상향링크 전송 방법은, 적어도 두 개의 기지국 중 제1 기지국으로부터 제1 기지국의 제1 상향링크 스케줄링 정보 및 서브프레임의 유형에 관한 정보를 수신하는 단계, 적어도 두 개의 기지국 중 제2 기지국으로부터 제2 기지국의 제2 상향링크 스케줄링 정보를 수신하는 단계, 그리고 제1 상향링크 스케줄링 정보, 제2 상향링크 스케줄링 정보 및 서브프레임의 유형에 관한 정보를 바탕으로 제1 기지국 및 제2 기지국으로 각각 상향링크 신호 또는 채널을 전송하는 단계를 포함한다.
상기 상향링크 전송 방법에서 서브프레임의 유형에 관한 정보는, 서브프레임의 유형을 적어도 세 개 포함할 수 있다.
상기 상향링크 전송 방법에서 적어도 세 개의 유형 중 제1 유형의 제1 서브프레임은 제1 기지국 및 제2 기지국의 공용 서브프레임일 수 있다.
상기 상향링크 전송 방법에서 전송하는 단계는, 적어도 세 개의 유형 중 제1 유형의 제1 서브프레임에서 제1 기지국 및 제2 기지국으로 동시에 상향링크 신호 또는 채널을 전송하는 단계를 포함할 수 있다.
상기 상향링크 전송 방법에서 전송하는 단계는, 제1 기지국이 마스터 eNB이고 제2 기지국이 이차 eNB인 경우, 제1 기지국에 대한 전송에 우선적으로 전력을 할당하는 단계, 그리고 제1 기지국에 대한 전송에 할당되고 남은 전력을 제2 기지국에 대한 전송에 할당하는 단계를 포함할 수 있다.
상기 상향링크 전송 방법에서 전송하는 단계는, 제1 기지국으로 전송하는 채널이 제어 채널이고, 제2 기지국으로 전송하는 채널이 공유 채널인 경우, 제어 채널의 전송에 우선적으로 전력을 할당하는 단계, 그리고 제어 채널의 전송에 할당되고 남은 전력을 공유 채널의 전송에 할당하는 단계를 포함할 수 있다.
상기 상향링크 전송 방법에서 적어도 세 개의 유형 중 제1 유형의 제1 서브프레임은 제1 기지국의 전용 서브프레임이고, 적어도 세 개의 유형 중 제2 유형의 제2 서브프레임은 제2 기지국의 전용 서브프레임일 수 있다.
상기 상향링크 전송 방법에서 전송하는 단계는, 적어도 세 개의 유형 중 제1 유형의 제1 서브프레임에서 제1 기지국으로 상향링크 신호 또는 채널을 전송하고, 적어도 세 개의 유형 중 제2 유형의 제2 서브프레임에서 제2 기지국으로 상향링크 신호 또는 채널을 전송하는 단계를 더 포함할 수 있다.
상기 상향링크 전송 방법은, 제1 기지국에서 관리하는 서빙 셀에 대한 최대 전송 전력 및 남은 전력 보고와, 제2 기지국에서 관리하는 서빙 셀에 대한 최대 전송 전력, PHR 및 PHR의 타입 정보를 제1 기지국으로 전송하는 단계를 더 포함할 수 있다.
상기 상향링크 전송 방법은 제2 기지국에서 관리하는 서빙 셀에 대한 최대 전송 전력 및 남은 전력 보고와, 제1 기지국에서 관리하는 서빙 셀에 대한 최대 전송 전력, PHR 및 PHR의 타입 정보를 제2 기지국으로 전송하는 단계를 더 포함할 수 있다.
본 발명의 다른 특징에 따르면, 단말과 적어도 두 개의 기지국 사이의 이중 연결을 지원하는 무선통신 시스템에서, 기지국의 상향링크 스케줄링 방법이 제공된다. 상기 상향링크 스케줄링 방법은, 반고정적(semi-static) 자원을 제1 서브프레임에 할당하는 단계, 적어도 두 개의 기지국 중 나머지 하나의 제1 기지국으로 제1 서브프레임에 관한 정보를 전달하는 단계, 그리고 제1 서브프레임에 관한 정보가 포함된 상향링크 스케줄링 정보를 단말로 전달하는 단계를 포함한다.
상기 상향링크 스케줄링 방법에서 반고정적 자원은, SPS 스케줄링 자원, 주기적 CSI 보고 자원, 트리거-유형 0 자원, SR 자원을 포함할 수 있다.
상기 상향링크 스케줄링 방법은, 동적 할당 자원을 제2 서브프레임에 할당하는 단계, 나머지 하나의 기지국으로 제2 서브프레임에 관한 정보를 전달하는 단계, 그리고 제2 서브프레임에 관한 정보가 포함된 상향링크 스케줄링 정보를 단말로 전달하는 단계를 더 포함할 수 있다.
상기 상향링크 스케줄링 방법에서 동적 할당 자원은, PDCCH/e-PDCCH에 대한 응답으로 전송되는 상향링크 HARQ-ACK 또는 트리거 유형 1 SRS에 대한 자원을 포함할 수 있다.
상기 상향링크 스케줄링 방법에서 동적 할당 자원에 대한 제2 서브프레임을 결정하는 단계는, 상향링크 HARQ 프로세스를 고려하여 제2 서브프레임을 결정하는 단계를 포함할 수 있다.
본 발명의 다른 특징에 따르면, 단말과 적어도 두 개의 기지국 사이의 이중 연결을 지원하는 무선통신 시스템에서, 기지국의 상향링크 스케줄링 방법이 제공된다. 상기 상향링크 스케줄링 방법은, 서브프레임의 유형을 적어도 세 개의 유형으로 구분하는 단계, 적어도 세 개의 유형 중 제1 유형의 제1 서브프레임에 상향링크 자원을 할당하는 단계, 그리고 제1 서브프레임에 관한 정보가 포함된 상향링크 스케줄링 정보를 단말로 전달하는 단계를 포함한다.
상기 상향링크 스케줄링 방법은, 서브프레임의 유형에 관한 정보를 적어도 두 개의 기지국 중 나머지 하나의 제1 기지국으로 전달하는 단계를 더 포함할 수 있다.
상기 상향링크 스케줄링 방법에서 제1 서브프레임은 기지국의 전용 서프브레임이고, 적어도 세 개의 유형 중 제2 유형의 제2 서브프레임은 제1 기지국의 전용 서브프레임이며, 적어도 세 개의 유형 중 제3 유형의 제3 서브프레임은 기지국 및 제1 기지국의 공용 서브프레임일 수 있다.
본 발명의 다른 특징에 따르면, 단말과 적어도 두 개의 기지국 사이의 이중 연결을 지원하는 무선통신 시스템에서, 기지국의 상향링크 스케줄링 방법이 제공된다. 상기 상향링크 스케줄링 방법은, 적어도 두 개의 기지국 중 나머지 하나의 제1 기지국으로부터 제1 기지국의 상향링크 자원이 할당된 제1 서브프레임에 관한 정보를 수신하는 단계, 제1 서브프레임에 관한 정보를 바탕으로 제1 서브프레임과 다른 제2 서브프레임에 기지국의 상향링크 자원을 할당하는 단계, 그리고 제2 서브프레임에 관한 정보가 포함된 상향링크 스케줄링 정보를 단말로 전달하는 단계를 포함한다.
상기 상향링크 스케줄링 방법은, 제1 기지국으로부터 적어도 세 개의 유형으로 구분된 서브프레임에 관한 정보를 수신하는 단계를 더 포함할 수 있다.
상기 상향링크 스케줄링 방법에서 적어도 세 개의 유형 중 제1 유형의 제1 서브프레임은 제1 기지국의 전용 서브프레임이고, 적어도 세 개의 유형 중 제2 유형의 제2 서브프레임은 기지국의 전용 서브프레임이며, 적어도 세 개의 유형 중 제3 유형의 제3 서브프레임은 기지국 및 제1 기지국의 공용 서브프레임일 수 있다.
본 발명의 한 실시 예에 따르면, 단말과 이중 연결된 기지국 중 하나의 기지국은 상향링크에 사용할 서브프레임의 유형을 결정하여 다른 기지국 및 단말로 알려주고, 단말과 적어도 두 개의 기지국 사이에서 공유된 서브프레임의 유형에 관한 정보를 통해 단말은 상향링크 신호 또는 채널을 분리 전송 또는 동시 전송할 수 있다. 또한, 기지국은 단말이 보고한 상향링크에 대한 최대 전송 전력 및 남은 전력량 등을 바탕으로 각 기지국과 채널 등을 기준으로 하는 우선 순위를 결정하여 단말에 알려줌으로써, 단말이 신호 또는 채널을 효과적으로 동시 전송할 수 있도록 할 수 있다.
도 1은 본 발명의 실시 예에 따른 이중 연결을 지원하는 무선통신 시스템을 나타낸 도면이다.
도 2는 시간 간격이 10ms인 SPS를 나타낸다.
도 3은 본 발명의 한 실시 예에 따른 전력 할당 우선 순위를 나타낸 도면이다.
도 4는 UL-DL configuration 3에서의 DL 서브프레임 및 UL 서브프레임의 대응 관계를 나타낸다.
아래에서는 첨부한 도면을 참고로 하여 본 발명의 실시 예에 대하여 본 발명이 속하는 기술 분야에서 통상의 지식을 가진 자가 용이하게 실시할 수 있도록 상세히 설명한다. 그러나 본 발명은 여러 가지 상이한 형태로 구현될 수 있으며 여기에서 설명하는 실시 예에 한정되지 않는다. 그리고 도면에서 본 발명을 명확하게 설명하기 위해서 설명과 관계없는 부분은 생략하였으며, 명세서 전체를 통하여 유사한 부분에 대해서는 유사한 도면 부호를 붙였다.
명세서 전체에서, 이동국(mobile station, MS)은 단말(terminal), 이동 단말(mobile terminal, MT), 진보된 이동국(advanced mobile station, AMS), 고신뢰성 이동국(high reliability mobile station, HR-MS), 가입자국(subscriber station, SS), 휴대 가입자국(portable subscriber station, PSS), 접근 단말(access terminal, AT), 사용자 장비(user equipment, UE) 등을 지칭할 수도 있고, MT, MS, AMS, HR-MS, SS, PSS, AT, UE 등의 전부 또는 일부의 기능을 포함할 수도 있다.
또한, 기지국(base station, BS)은 진보된 기지국(advanced base station, ABS), 고신뢰성 기지국(high reliability base station, HR-BS), 기지국B(node B), 고도화 기지국B(evolved node B, eNodeB), 접근점(access point, AP), 무선 접근국(radio access station, RAS), 송수신 기지국(base transceiver station, BTS), MMR(mobile multihop relay)-BS, 기지국 역할을 수행하는 중계기(relay station, RS), 기지국 역할을 수행하는 중계 기지국(relay node, RN), 기지국 역할을 수행하는 진보된 중계기(advanced relay station, ARS), 기지국 역할을 수행하는 고신뢰성 중계기(high reliability relay station, HR-RS), 소형 기지국[펨토 기지국(femoto BS), 홈 기지국B(home node B, HNB), 홈 eNodeB(HeNB), 피코 기지국(pico BS), 메트로 기지국(metro BS), 마이크로 기지국(micro BS) 등], 마스터 eNB(master eNB, MeNB), 이차 eNB(secondary eNB, SeNB) 등을 지칭할 수도 있고, ABS, 기지국B, eNodeB, AP, RAS, BTS, MMR-BS, RS, RN, ARS, HR-RS, 소형 기지국 등의 전부 또는 일부의 기능을 포함할 수도 있다.
또한, 어떤 부분이 어떤 구성요소를 "포함"한다고 할 때, 이는 특별히 반대되는 기재가 없는 한 다른 구성요소를 제외하는 것이 아니라 다른 구성요소를 더 포함할 수 있는 것을 의미한다. 또한, 명세서에 기재된 "…부", "…유닛", "…기", "모듈", "블록" 등의 용어는 적어도 하나의 기능이나 동작을 처리하는 단위를 의미하며, 이는 소프트웨어나 마이크로 프로세서 등의 하드웨어 또는 소프트웨어 및 하드웨어의 결합으로 구현될 수 있다.
도 1은 본 발명의 실시 예에 따른 이중 연결을 지원하는 무선통신 시스템을 나타낸 도면이다.
도 1을 참조하면, 단말(120)은 기지국 0(100) 및 기지국 1(110)과 연결되어 있고, 기지국 0(100)과 기지국 1(110)은 비이상적 백홀을 통해 서로 연결되어 있다.
하나의 단말(120)과 동시에 각각 연결된 두 개의 기지국이 비이상적 백홀로 연결된 경우, 각 기지국은 단말(120)에 대해 서로 다른 자원을 사용하여 스케줄링을 수행한다. 이때, 단말(120)은 각 기지국별로 서로 다른 형태의 상향링크 신호 및 채널을 전송할 수 있다. 비이상적 백홀을 통해서는 두 기지국이 정보를 즉각적으로 교환하기 어렵기 때문에, 단말(120)이 전송하는 상향링크 공유 채널(uplink-shared channel, UL-SCH) 및 상향링크 제어 정보(uplink control information, UCI)는 서로 다른 기지국에 속하는 셀을 대상으로 하는 경우 서로 분리 전송되어야 각 기지국에서 효율적으로 스케줄링을 수행할 수 있다.
또한, 단말(120)이 각 기지국으로 전송하는 UL-SCH 및 UCI의 전송 포맷은 해당 기지국 및 단말(120)의 동작에 의해서 결정될 필요가 있다. 이는 각 기지국이 수행하는 동적 스케줄링에 큰 제한을 주지 않고, 각 기지국에서 UL-SCH 및 UCI가 용이하게 수신될 수 있기 때문이다. 유사하게, 기지국 사이에서 동적 스케줄링 정보를 즉각적으로 공유하지 못하는 경우, 각 기지국은 각 기지국 별로 서로 분리된 신호 및 채널을 사용하여 하향링크 송신을 수행할 필요가 있다. 즉, 하향링크 공유 채널(downlink-shared channel, DL-SCH) 및 하향링크 제어 정보(downlink control information, DCI)는 각 기지국 별로 관리되고, 서로 분리된 신호 및 채널을 통해 전송될 필요가 있다.
본 발명에서는 하나의 단말(120)에 두 개의 기지국이 연결되어 있고, 각 기지국에 대해 분리전송을 수행하는 경우를 가정한다. 아래에서는 단말(120)에 연결된 두 기지국을 기지국 0(100) 및 기지국 1(110)이라 한다. 그리고, 기지국 0(100)이 관리하는 서빙 셀의 집합을 셀 그룹 0라 하고, 기지국 1(110)이 관리하는 서빙 셀의 집합을 셀 그룹 1이라고 한다. 각 기지국에 의해 관리되는 서빙 셀에는 서로 다른 반송파(또는 요소 반송파(component carrier, CC))가 사용될 수 있다.
단말(120)은 채널 환경에 따라 두 기지국에서 요구하는 송신 전력을 동시에 충족하지 못할 수 있다. 예를 들어, 단말(120)이 두 기지국으로 동시에 신호 또는 채널을 전송할 때, 셀 그룹 0의 물리 상향링크 공유 채널(physical uplink shared channel, PUSCH) 및 물리 상향링크 제어 채널(physical uplink control channel, PUCCH)에 우선적으로 전력이 할당되면 셀 그룹 1로 전송되는 PUSCH 및 PUCCH가 요구되는 전력 크기에 미치지 못할 수 있다. 특히, UCI의 전송에는 하이브리드 자동 재전송 요청(Hybrid Automatic Repeat reQuest, HARQ)가 적용되지 않으므로 손실 위험이 뒤따르는데, 제어 정보에 손실이 발생하면 셀 그룹 1에 대한 전송 효율이 낮아질 수 있다. 따라서, 이런 경우, 두 기지국에 대한 UCI 전송은 서로 같은 서브프레임에서 발생하지 않도록 셀 그룹 간에 조정할 필요가 있다.
본 발명의 실시 예에 따르면, 두 개의 기지국 각각은 반고정적(semi-static) 자원이 서로 같은 서브프레임에서 발생하지 않도록 사용 가능한 상향링크 서브프레임을 미리 결정할 수 있다. 반고정적 자원의 경우, 기지국 0(100)가 기지국 1(110)에게 자신이 사용할 자원의 설정 정보를 전달하고, 기지국 1(110)이 기지국 0(100)와 충돌하지 않는 범위에서 자원을 결정할 수 있다.
또한, 본 발명의 실시 예에 따르면, 두 기지국은 동적 자원 할당이 동일 서브프레임에서 겹치지 않도록 동적 자원 할당 가능 서브프레임을 미리 결정할 수 있다. 이때, 상향링크 자원은 PUSCH(DCI에 의해 할당될 수 있음), PDSCH를 지시하거나 또는 하향링크 반영구적 스케줄링(semi-persistent scheduling, SPS) 릴리스(release)를 지시하는 PDCCH/e-PDCCH(enhanced-PDCCH)에 대한 응답으로 전송되는 상향링크 HARQ-ACK, 및 트리거 유형 1 사운딩 참조 신호(sounding reference signal, SRS) 등을 위해 동적으로 할당될 수 있다.
두 기지국이 PUSCH를 동일 서브프레임에 할당하는 것을 피하기 위해서, 각 기지국은 상향링크 HARQ 프로세스(예를 들어, 기지국의 요청에 따라 단말(120)이 신호 또는 채널을 재전송하는 주기를 의미함)를 단위로 하여 자원할당 가능 서브프레임을 미리 결정할 수 있다. 두 기지국이 서로 다른 HARQ 프로세스에 해당하는 서브프레임을 이용하여 PUSCH를 할당하면, 두 기지국은 동일한 서브프레임에 PUSCH를 할당하지 않을 수 있다. 또한, PUSCH 또는 하향링크 SPS 릴리스를 지시하는 PDCCH/e-PDCCH에 대한 응답으로 전송되는 상향링크 HARQ-ACK가 할당될 서브프레임도 상향링크 HARQ 프로세스 단위로 할당될 수 있다. 즉, 동적으로 할당될 상향링크 자원이 동일한 서브프레임에 할당되는 것을 피하기 위해, 각 기지국은 HARQ 프로세스에 따라 동적 자원 할당이 가능한 서브프레임(동적 자원 할당 가능 서브프레임)을 결정할 수 있다. 예를 들어, 기지국 0(100)이 동적 자원 할당 가능 서브프레임을 결정하고 이를 기지국 1(110)에게 알려주면, 기지국 1(110)은 기지국 0(100)에서 결정한 서브프레임을 제외한 나머지 서브프레임을 동적 자원 할당에 이용할 수 있다.
즉, 본 발명에서 두 기지국이 동일한 서브프레임에 자원을 할당하지 않기 위해, 두 기지국 중 기지국 0(100)는 반고정적 자원 할당 설정 정보 및 동적 자원 할당 가능 서브프레임를 결정하여 이를 기지국 1(110)에게 알려주고, 기지국 1(110)은 이를 참고하여 자원을 할당할 수 있다.
한편, 단말(120)이 각 기지국에게 동시에 신호를 전송하는 것을 허용하는 자원을 할당하는 경우, 각 기지국은 자원 할당 정보를 공유하고 공유된 상대의 정보를 토대로 스케줄링을 수행한다. 이 경우 본 발명의 한 실시 예에 따르면, 기지국 0(100)와 기지국 1(110)은 서브프레임의 유형을 세 가지로 구분하고 서브프레임의 유형 정보를 공유할 수 있다. 각 기지국에서 공유되는 서브프레임의 유형 정보는 아래와 같다.
1. 기지국 0 전용 서브프레임(단말에서 기지국 0으로의 전송만 가능함)
2. 기지국 1 전용 서브프레임(단말에서 기지국 1로의 전송만 가능함)
3. 공용 서브프레임(기지국 0 및 기지국 1로의 동시 전송이 가능함)
단말(120)이 '기지국 0 전용 서브프레임'에서 기지국 1(110)로 전송하는 것은 허용되지 않는다. 반대로, 단말(120)이 '기지국 1 전용 서브프레임'에서 기지국 0(100)으로 전송하는 것은 허용되지 않는다. 다만, '공용 서브프레임'에서는 기지국 0(100) 또는 기지국 1(110) 중 하나의 기지국으로의 전송 및 기지국 0(100) 및 기지국 1(110) 두 개의 기지국으로의 동시 전송이 허용된다.
각 기지국은 위와 같은 상향링크의 서브프레임 유형에 관한 정보를 알고 있어야 한다. 이러한 상향링크의 서브프레임 유형에 관한 정보는 기지국 0(100)가 결정하고 기지국 1(110)로 알려줄 수 있다.
단말(120)은 단말(120)의 서빙 셀을 셀 그룹 0 및 셀 그룹 1로 나누고, 각 셀 그룹에 속하는 셀로 독립적인 신호 및 채널을 사용하여 상향링크 전송을 수행할 수 있다. 이때, 각 셀 그룹은 하나 또는 복수의 셀을 포함할 수 있다.
단말(120)은 셀 그룹 0이 사용하는 반고정적 자원할당 정보 및 셀 그룹 1이 사용하는 반고정적 자원할당 정보를 기지국 0(100) 및 기지국 1(110)로부터 각각 수신한다. 반고정적으로 할당되는 자원은 SPS 스케줄링 자원, 주기적 채널 상태 정보(channel state information, CSI) 보고 자원, 트리거-유형 0 사운딩 참조 신호 자원, 스케줄링 요청(scheduling request, SR) 자원 등이 있다. 그리고, 단말(120)은 동적 자원할당의 경우 단말(120)의 서빙 셀의 스케줄링 지시에 따르면 된다. 이때, 기지국 0(100) 및 기지국 1(110)에서 단말(120)에게 셀 그룹 1 또는 셀 그룹 2의 동적 자원 할당 가능 서브프레임을 알려 주면, 단말(120)은 셀 그룹의 동적 자원 할당 가능 서브프레임에 관한 정보를 활용하여 송수신(PDCCH/e-PDCCH를 모니터링 등)을 효과적으로 수행할 수 있다.
한편, 셀 그룹 0을 위한 SPS 스케줄링에서 기초 전송(앞으로 '초전송'이라 함)에 대한 HARQ 재전송 자원은 최대 재전송 가능 횟수만큼 할당될 수 있다. 이때, 셀 그룹 1에서는 단말(120)의 재전송 여부를 즉각적으로 알 수 없기 때문에 재전송 자원이 할당된 서브프레임(재전송 발생 가능 서브프레임)은 셀 그룹 1에서 자원으로 사용하지 않을 수 있다. 하지만, 재전송 자원이 할당되지 않는 경우가 대부분인 점을 고려하면, 셀 그룹 1에서 재전송 자원이 할당된 서브프레임을 자원으로 사용하지 않는 방법은 자원이 효율적으로 사용될 수 없다는 문제점이 있다. 따라서, 본 발명의 실시 예에서는 셀 그룹 1은 재전송 발생 가능 서브프레임에 대해 PUSCH 스케줄링을 적용하고, 셀 그룹 0에 대한 재전송과 셀 그룹 1의 PUSCH 자원이 동일한 서브프레임을 이용하는 경우 단말(120)이 셀 그룹 0 및 셀 그룹 1 중 적어도 하나를 선택하여 전송을 수행할 수 있다.
먼저, 본 발명의 한 실시 예에 따르면, 셀 그룹 1의 PUSCH 자원이 셀 그룹 0의 SPS 재전송 PUSCH 자원과 동일한 서브프레임을 이용하는 경우, 단말(120)은 셀 그룹 1의 PUSCH은 무시하고, 셀 그룹 0으로의 재전송을 수행한다(방법 1).
본 발명의 다른 실시 예에 따르면, 셀 그룹1이 할당한 PUSCH 자원이 셀 그룹0을 위해 할당 받은 SPS 재전송 PUSCH 자원 블록과 서로 완전히 혹은 부분적으로 겹치면, 단말 (120)은 해당 서브프레임에서 셀 그룹1을 위한 전송은 수행하지 않고 셀 그룹0으로의 전송만을 수행한다. 셀 그룹 1의 PUSCH 자원이 이용하는 서브프레임이 셀 그룹 0의 SPS 재전송 PUSCH 자원이 이용하는 서브프레임과 부분적 혹은 완전히 겹치는 경우에 할당된 자원 블록들이 서로 겹치지 않으면, 단말(120)은 셀 그룹 0으로의 재전송을 위해 송신 전력을 우선적으로 할당하고 남은 송신 전력을 이용하여 셀 그룹 1로의 PUSCH 전송을 수행한다(방법 2).
한편, 이러한 단말(120)의 전력 할당 방법은 PUSCH 전송에 UCI가 포함되어 있는지와 무관하게 결정되는 방식이다. 본 발명의 다른 실시 예에서는 UCI의 성공적인 수신을 보장하기 위해서 PUSCH 전송에 UCI가 포함되어 있는지에 따라 전력 할당에 우선 순위를 부여할 수 있다. 예를 들어, 동일한 서브프레임을 사용하는 채널이 여러 개인 경우 단말(120)은 아래와 같은 우선 순위에 따라 송신 전력을 할당할 수 있다.
우선 순위: 셀 그룹 0의 PUCCH > UCI가 포함된 셀 그룹 0의 PUSCH > 셀 그룹 1의 PUCCH > UCI가 포함된 셀 그룹 1의 PUSCH > UCI가 포함되지 않은 셀 그룹 0의 PUSCH > UCI가 포함되지 않은 셀 그룹 1의 PUSCH
한편, 트리거-유형 0 SRS 자원은 서브프레임의 마지막 SC-FDMA 심볼에 위치할 수 있다. 본 발명에서는 특정 서브프레임에서 트리거-유형 0 SRS가 전송되면, 그 서브프레임의 PUSCH의 마지막 심볼은 전송에 사용되지 않고, PUCCH 포맷 1/1a/1b 및 PUCCH 포맷 3는 단축 포맷(shortened format)이 사용된다. 이때, 셀 그룹 1은 자신의 셀에 대해 설정된 트리거-유형 0 SRS 자원의 설정 정보뿐만 아니라, 셀 그룹 0의 셀에 대해 설정된 트리거-유형 0 SRS 자원의 설정 정보도 알고 있어야 한다.
단말(120)이 두 기지국에 대해 상향링크 분리 전송을 수행할 때, 두 기지국으로 전송하는 신호 또는 채널이 같은 서브프레임에 할당될 수 있다. 단말(120)이 신호 또는 채널을 두 기지국으로 전송할 때 무선 환경이 충분히 좋고 송신 전력에 여유가 있다면, 동일한 서브프레임을 통해 신호 또는 채널을 전송할 수 있다. 하지만, 무선 환경이 좋지 않거나 송신 전력에 여유가 없다면, 단말(120)은 동일한 서브프레임을 통해 두 기지국으로 신호 또는 채널을 두 기지국으로 동시에 전송하지 않는 것이 좋다.
각 기지국은 동시 전송 여부를 판단하기 위해 단말(120)로 하여금 각 기지국에 대한 경로 손실을 측정하여 보고하도록 할 수 있다. 예를 들어, 단말(120)은 각 기지국으로 채널 환경 및 남은 전력량(동시 전송 여부에 따라 계산된 값)을 보고할 수 있다.
기존 LTE 규격에 따르면, 단말의 서빙 셀 마다 전력 제어 프로세스가 존재한다. 이때, 각 기지국은 자신이 관리하는 셀의 전력 제어를 담당한다. 본 발명의 실시 예에서 기지국 0(100)이 관리하는 셀을 위한 전력 제어 프로세스 및 기지국 1(110)이 관리하는 셀을 위한 전력 제어 프로세스는 서로 다를 수 있다. 또한 위의 서브프레임 분류에 따라 기지국 0(100) 및 기지국 1(110)은 각각의 전용 서브프레임에 대해 독립적으로 전력 제어를 수행할 수 있다.
단말(120)은 각 기지국에서 요구하는 송신 전력을 만족시킬 수 없을 경우, 각 기지국에 대한 동시 전송을 수행하지 않을 수 있다. 또한, 단말(120)이 각 기지국에 대한 동시 전송을 금지하였다면, 각 기지국에 대한 채널이 동일 서브프레임에 할당된 경우 우선 순위가 높은 기지국에 대한 채널만 전송하고 우선 순위가 낮은 기지국에 대한 채널은 전송하지 않을 수 있다. 하지만 이 방법에 따르면, 전송을 위한 자원이 할당되었음에도 불구하고 요구된 송신 전력을 만족시킬 수 없다는 이유로 신호 또는 채널을 전송하지 않기 때문에 자원이 낭비될 수 있다.
따라서, 본 발명에서는, 각 기지국에 대한 채널이 동일 서브프레임에 할당된 경우, 미리 정해진 우선 순위를 바탕으로 각 기지국에 대한 송신 전력을 다르게 할당할 수 있다. 이 경우, 단말(120)이 공용 서브프레임에서 각 기지국으로 동시 전송을 수행하더라도, 각 기지국에서는 전력 제어가 적용되었는지 아닌지 알 수 없다. 따라서, 단말(120)이 우선 순위가 높은 기지국 및 우선 순위가 낮은 기지국으로 동시 전송을 수행한 경우, 동시 전송이 수행되었는지 모르는 우선 순위가 낮은 기지국은 상향링크 전력을 제어하기 어렵다. 또한, 각 기지국이 다른 기지국으로의 전송을 위해 사용된 전력 크기를 제한적 백홀 환경을 통해 아는 것은 어려우며, 이러한 사실이 동적 전력 제어 및 멀티채널 스케줄링(multi-channel scheduling, MCS)을 더욱 어렵게 한다.
단말(120)이 사용할 수 있는 최대 송신 전력이 미리 결정되어 있고 각 기지국에 대한 최대 송신 전력의 합이 단말(120)이 사용할 수 있는 최대 송신 전력을 초과하지 않는 경우라면, 각 기지국은 단말(120)이 보고하는 측정 결과 및 남은 전력량 등을 통해 단말(120)이 각 기지국으로 신호 송신시 사용할 최대 전력을 결정할 수 있다.
하지만, 단말(120)이 두 기지국에 대해 동시 전송을 수행할 때, 각 기지국에서 요구하는 송신 전력의 합이 단말(120)의 최대 송신 전력(PCMAX, c)을 초과하는 경우, 단말(120)은 각 기지국에 대한 우선 순위에 따라 전력을 할당해야 한다. 또한 각 기지국은 단말(120)의 전력 사용 상황을 알아야 전력 제어, 자원 할당, 적응적 변조 및 코딩(adaptive modulation and coding, AMC) 등을 효율적으로 수행할 수 있다.
본 발명의 실시 예에서 단말(120)은 기지국 0(100) 및 기지국 1(110)이 관리하는 서빙 셀 각각에 대해 PCMAX, c를 설정하고, 모든 PCMAX, c 및 남은 전력량을 기지국 0(100) 및 기지국 1(110)에게 보고한다. 이때, 기지국 0(100) 및 기지국 1(110)은 비이상적 백홀 환경 때문에 서로의 동적 스케줄링 정보를 실시간으로 공유하지 못한다고 가정된다.
기존 발명에 따르면, 각 기지국은 다른 기지국에서 관리하는 서빙 셀에 대한 남은 전력량 보고(power headroom report, PHR)를 수신하더라도 그 의미를 정확하게 알 수 없다. 통상 기지국 0(100)의 우선 순위가 높으므로, 기지국 1(110)이 필요로 하는 정보는 단말(120)이 기지국 0(100)으로 PUCCH 또는 PUSCH를 전송하고 남은 전력량이다. 단말(120)은 기지국 1(110)은 우선 순위가 낮기 때문에, 기지국 0(100)에 대한 송신 전력 중 남은 전력을 사용하여 기지국 1(110)로 채널 또는 신호를 동시 전송하기 때문이다. 하지만, PUSCH 전송의 경우, 전송 포맷, 자원 할당 그리고 전력 제어 명령어에 따라 사용되는 전력이 가변적일 수 있으므로, 기지국 1(110)이 남은 전력량을 알기 어렵다. PUCCH의 경우에도 전송 포맷에 따라 할당되는 전력의 변동폭이 크기 때문에 기지국 1(110)이 남은 전력량을 알기 어렵다.
본 발명의 실시 예에서 단말(120)은 공용 서브프레임에 대해 아래 전력 제어 방식을 적용할 수 있다. 단말(120)은 먼저 우선 순위가 높은 기지국에 대한 최대 전력량 Pmax를 설정하고, 그 다음 최대 송신 전력에서 PMAX를 뺀 양을 우선 순위가 낮은 기지국에 대한 전력으로 결정할 수 있다. 예를 들어, 기지국 0(100)가 관리하는 적어도 하나의 매크로 셀에 대한 최대 전력량은 PMAX로, 기지국 1(110)이 관리하는 적어도 하나의 서빙 셀 C에 대한 최대 전력량은 PCMAX, c - PMAX로 설정될 수 있다.
한편, LTE Release 10 규격 TS 36.213 에서 PHR은 타입 1과 타입 2로 두 가지 타입이 정의되어 있다.
먼저 타입 1은 단말(120)의 모든 서빙 셀에 적용될 수 있는 PHR이고, 타입 1에 속하는 PHR을 타입 1-1, 타입 1-2, 타입 1-3이라고 한다. 각 남은 전력량(power headroom, PH)은 서빙 셀 c와 서브프레임 i에 대해 계산된다. 즉, PCMAX, c(i)는 서브프레임 i를 서빙 셀 c로 전송할 때의 단말(120)의 최대 전송 전력이다.
타입 1-1 PHR은 단말(120)이 서브프레임 i에서 PUCCH 없이 PUSCH만 서빙 셀 c로 전송하는 경우에 사용된다. 타입 1-1은 아래 수학식 1과 같다.
수학식 1
Figure PCTKR2014007029-appb-M000001
타입 1-2 PHR은 단말(120)이 서브프레임 i에서 PUCCH 및 PUSCH를 모두 서빙 셀 c로 전송하는 경우에 사용된다. 타입 1-2는 아래 수학식 2와 같다.
수학식 2
Figure PCTKR2014007029-appb-M000002
타입 1-3 PHR은 단말(120)이 서브프레임 i에서 PUSCH를 서빙 셀 c로 전송하지 않는 경우에 사용된다. 타입 1-3은 아래 수학식 3과 같다.
수학식 3
Figure PCTKR2014007029-appb-M000003
다음 타입 2는 단말(120)이 서브프레임 i에서 PUCCH 및 PUSCH를 동시에 전송하는 경우에 사용될 수 있는 PHR이고, 타입 2에 속하는 PHR을 타입 2-1, 타입 2-2, 타입 2-3, 타입 2-4라고 한다. 이때, 기존 LTE 규격에서는 주 셀(primary cell)로만 PUCCH를 전송할 수 있지만, 본 발명에서는 이중 연결성 지원을 위해 단말(120)은 각 기지국 별로 PUCCH 전송 셀을 설정할 수 있다.
타입 2-1 PHR은 단말(120)이 서브프레임 i에서 PUCCH 및 PUSCH를 서빙 셀 c로 함께 전송하는 경우에 사용된다. 타입 2-1은 아래 수학식 4와 같다.
수학식 4
Figure PCTKR2014007029-appb-M000004
타입 2-2 PHR은 단말(120)이 서브프레임 i에서 PUCCH 없이 PUSCH만 서빙 셀 c로 전송하는 경우에 사용된다. 타입 2-2는 아래 수학식 5와 같다.
수학식 5
Figure PCTKR2014007029-appb-M000005
타입 2-3 PHR은 단말(120)이 서브프레임 i에서 PUSCH 없이 PUCCH만 서빙 셀 c로 전송하는 경우에 사용된다. 타입 2-3은 아래 수학식 6과 같다.
수학식 6
Figure PCTKR2014007029-appb-M000006
타입 2-4 PHR은 단말(120)이 서브프레임 i에서 서빙 셀 c로 전송되는 PUCCH 또는 PUSCH가 없는 경우에 사용된다. 타입 2-4는 아래 수학식 7과 같다.
수학식 7
Figure PCTKR2014007029-appb-M000007
종래 LTE 시스템에서 단말(120)은 각 서빙 셀로 PHR을 보고하거나, 또는 PCMAX, c 및 PHR을 보고한다. 하지만, 본 발명의 실시 예와 같이 비이상적인 백홀로 연결된 기지국 0(100) 및 기지국 1(110)은 단말(120)로부터 각각 PHR을 보고 받더라도, 각 PHR가 복수의 타입 중 어느 타입에 해당하는지 알 수 없다. 즉, 기지국 0(100) 및 기지국 1(110)은 서로의 스케줄링 상황을 알 수 없기 때문에, 단말(120)이 각 기지국으로 PHR을 전송하더라도 전송된 PHR의 타입 정보를 알 수 없다. 따라서 본 발명에서는 단말(120)이 PHR를 전송할 때 각 기지국으로 추가적인 정보를 함께 전송하여 각 기지국이 단말(120)의 전력 사용 현황을 정확하게 판단할 수 있게 할 필요가 있다.
먼저 단말(120)은 기지국 1(110)로 기지국 1(110)에서 관리하는 서빙 셀에 대한 PCMAX, c 및 PHR을 보고하고, 추가적으로 기지국 0(100)에서 관리하는 서빙 셀의 PCMAX, c, PHR 그리고, PHR의 타입 정보를 전달한다. 예를 들어, 단말(120)이 기지국 1(110)로 보고하는 PHR이 타입 1이라면, 타입 1-1, 타입 1-2 및 타입 1-3 중 어떤 타입인지 알려주는 타입 정보를 추가적으로 전달할 수 있다.
마찬가지로, 단말(120)은 기지국 0(100)으로 기지국 0(100)에서 관리하는 서빙 셀에 대한 PCMAX, c 및 PHR을 보고하고, 추가적으로 기지국 1(110)에서 관리하는 서빙 셀의 PCMAX, c, PHR 그리고, PHR의 타입 정보를 전달한다. 예를 들어, 단말(120)이 기지국 0(100)으로 보고하는 PHR이 타입 2라면, 타입 2-1, 타입 2-2, 타입 2-3 및 타입 2-4 중 어떤 타입인지 알려주는 타입 정보를 추가적으로 전달할 수 있다.
본 발명에서 기지국이 단말(120)에게 할당하는 자원은 반고정적(semi-static)으로 할당되는 자원(반고정적 할당 자원) 및 동적(dynamic)으로 할당되는 자원(동적 할당 자원)으로 분류할 수 있다. 반고정적 할당 자원은 일정 시간동안 주기적 및 지속적으로 할당되는 자원으로서, LTE 시스템에서는 하향링크 반 지속적 스케줄링(DL semi-persistent scheduling, DL SPS)을 통해 할당된 자원, 상향링크 반 지속적 스케줄링(UL semi-persistent scheduling, UL SPS)을 통해 할당된 자원, 주기적 CSI 보고(periodic CSI reporting)을 위한 자원, 그리고 스케줄링 요청(scheduling request, SR) 자원이 반고정적으로 할당될 수 있다. 이때, 주기적 CSI 보고 자원 및 SR 자원은 RRC 시그널링을 통해 단말(120)에 할당되고, SPS를 통해 할당되는 자원은 RRC 시그널링 및 DCI 시그널링을 통해 단말(120)에 할당될 수 있다.
표 1은 본 발명의 실시 예에 따른 반고정적 자원 할당 방법에서 설정 가능한 자원 할당 주기를 서브프레임 단위로 나타낸 표이다.
표 1
FDD TDD
SPS 스케줄링 간격 10, 20, 32, 40, 64, 80, 128, 160, 320, 640 10, 20, 30, 40, 60, 80, 130, 160, 320, 640
주기적 CSI 보고 주기 2, 5, 10, 20, 40, 80, 160, 32, 64, 128 1, 5, 10, 20, 40, 80, 160
SR 주기 1, 2, 5, 10, 20, 40, 80, 1, 2, 5, 10, 20, 40, 80,
또한, 반고정적 자원 할당에 사용되는 신호 전송에는 Trigger-type 0 사운드 참조 신호(sound reference signal, SRS) 전송이 있다. Trigger-type 0 SRS 전송을 위한 단말(120) 고유 서브프레임 및 셀 고유 서브프레임의 할당 주기는 아래 표 2와 같다.
표 2
FDD TDD
셀 고유 SRS 서브프레임 주기 1, 2, 5, 10 2, 5, 10
단말 고유 SRS 서브프레임 주기 2, 5, 10, 20, 40, 80, 160, 320 2, 5, 10, 20, 40, 80, 160, 320
이 밖에 하향링크 SPS에 따른 PDSCH에 대응하는 상향링크 HARQ-ACK 자원도 반고정적으로 할당된다. 즉, PDSCH에 대응하는 상향링크 HARQ-ACK 전송도 반고정적으로 자원이 할당될 수 있다.
또한, 하향링크 SPS의 비활성화(Release)를 지시하는 PDCCH/E-PDCCH에 대응하는 상향링크 HARQ-ACK 자원 및 PDCCH/E-PDCCH가 포함하는 DCI에 의해 지시되는 PDSCH에 대응하는 상향링크 HARQ-ACK 자원도 반고정적으로 할당된다.
한편, 동적 자원 할당에 사용되는 신호 전송에는 Trigger-type 1 SRS 전송이 있다. 동적 자원 할당은 하향링크 DCI를 사용하여 할당되는 PUSCH 자원 할당, 상향링크 HARQ-ACK 전송 및 Trigger-type 1 SRS 전송을 위한 자원을 동적으로 할당하는 것이다.
종래 LTE 시스템의 규격에 따르면, SPS의 시간 간격은 서브프레임 단위로, 10, 20, 32, 40, 64, 80, 128, 160, 320 및 640 ms 중 하나가 사용될 수 있다. 이때, SPS의 시간 간격은 HARQ에서 초전송(initial transmission 또는 first transmission)이 발생하는 서브프레임의 간격을 의미한다. 이때, 초전송에 대한 재전송(retransmission)을 위한 서브프레임의 주기는 초전송이 발생한 서브프레임을 기점으로 (FDD의 경우) 서브프레임 단위로 8개이다.
본 발명의 실시 예에 따르면, 각 기지국의 전용 서브프레임을 결정할 때, 각 기지국에 대해 또는 최소한 기지국 0에 대해 SPS를 적용할 수 있다.
도 2는 시간 간격이 10ms인 SPS를 나타낸다. 도 2에서 '시간 간격'은 SPS의 초전송의 시간 간격을 의미하고, 10ms이다. 도 2를 참조하면, 초전송(200)에 대한 재전송(210)이 발생할 수 있다. 이때, 재전송(210)은 초전송(200)으로부터 8ms 떨어진 서브프레임에서 첫 번째로 발생하고, 이후, 첫 번째 재전송(220)으로부터 8ms 떨어진 서브프레임에서 두 번째 재전송(220)이 발생할 수 있다.
본 발명의 실시 예에서, 각 기지국 별 서브프레임 할당에서 할당 가능한 SPS 시간 간격은 기존 SPS 시간 간격인 10, 20, 32, 40, 64, 80, 128, 160, 320, 640을 포함할 수 있다. 본 발명에서도 SPS 시간 간격 및 서브프레임 옵셋(offset)은 SPS 할당을 결정하는 파라미터가 될 수 있다.
한편, SPS 할당과 유사하게, 각 기지국을 대상으로 하는 CSI 보고를 위한 서브프레임 할당 및 SRS 서브프레임 할당이 가능해야 한다. 이때, CSI 보고 및 SRS 전송에는 다른 단말(120)에 대한 코드 분할 다중 접속(code division multiplexing, CDM)이 적용될 수 있으므로, 기지국 이중 접속이 가능한 본 발명의 단말(120)도 종래 LTE 시스템의 주기를 지원할 수 있다.
본 발명에서 단말(120)의 무선 환경이 두 기지국으로 동일 서브프레임을 동시 전송할 만큼 양호하거나 동시 전송이 가능한 송신 전력을 가지고 있지 않다면, 단말(120)은 동시 전송을 수행하지 않을 수 있다. 이때, 서로 다른 기지국에 대해 할당된 상향링크 자원은 서로 다른 서브프레임에 할당된다. 예를 들어, 기지국은 서브프레임의 할당 주기 및 서브프레임 옵셋을 적절히 선택하여 각 기지국에 대한 반고정적 자원(SPS 자원, SR 자원, 주기적 CSI 보고 등)이 같은 서브프레임에서 동시에 발생하지 않도록 결정할 수 있다. 그리고, 단말(120)은 동일 서브프레임에서 각 기지국에 대한 상향링크 전송이 충돌하면, 미리 정해진 우선 순위에 따라 전력을 할당하고 상향링크 전송을 수행한다.
본 발명에서 기지국은 단말(120)과의 무선 채널 환경을 바탕으로 두 개의 기지국으로의 동시 전송을 회피할 수 있도록 자원을 할당할 수 있다. 또한 본 발명의 실시 예에 따르면, 기지국은 동적 자원 할당 시 HARQ 프로세스를 고려하여 사용 가능 서브프레임을 결정한다. 그리고, 기지국은 반고정적 할당 자원(SPS 자원, SR 자원, CSI 보고 자원, SRS 자원 등)도 HARQ 프로세스를 고려하여 할당할 수 있다. 예를 들어, 기지국은 상향링크 HARQ 프로세스의 왕복시간(round trip time, RTT)의 정수 배 시간을 주기로 하여 반고정적 할당 자원을 결정할 수 있다. 이 경우, 각 기지국으로 전송되는 상향링크 서브프레임이 서로 시간적으로 겹치지 않게 될 수 있다.
한편, 표 1의 주파수 분할 이중통신(frequency division duplex, FDD)에서 결정되는 SPS 스케줄링 간격, SR 주기 및 CSI 보고 자원의 주기도 상향링크 HARQ 프로세스의 주기에 따라 8, 16, 24, 32 서브프레임 등의 8ms의 정수 배 시간을 추가적으로 고려될 수 있다.
본 발명에서 단말(120)은 동시 전송에 관련된 채널, 신호, 그리고 기지국과 관련된 우선 순위 정보에 따라서 두 개 이상의 신호 또는 채널을 동시 전송한다.
이때 표 3은 단말(120)이 동일한 서브프레임을 이용하여 서로 다른 기지국으로 신호 또는 채널을 동시 전송할 때 적용하는 전력 할당 우선 순위에 관한 것이다. 표 3에는 기지국 0(100)으로 전송되는 UCI_0 및 UL-SCH_0과 기지국 1(110)로 전송되는 UCI_1 및 UL-SCH_1 사이의 우선 순위가 나타나 있다.
표 3
기지국 1 (셀그룹 1)→기지국 0 (셀그룹 0)↓ UCI_1 UL-SCH_1
UCI_0 UCI_0 > UCI_1 UCI_0 > UL-SCH_1
UL-SCH_0 UCI_1 > UL-SCH_0 UL-SCH_0 > UL-SCH_1
표 3을 참조하면, 단말(120)은 다른 유형의 정보(UCI 또는 UL-SCH)가 동일 서브프레임에 할당된 경우 UCI에 UL-SCH 보다 더 높은 우선 순위를 부여하고, 동일 유형의 정보가 동일 서브프레임에 할당되면 위에서 결정한 우선 순위에 따른다. UCI는 제어 정보이고 HARQ가 적용되지 않으므로 수신 실패를 줄이기 위해서 데이터가 전송되는 UL-SCH에 비해 높은 우선 순위가 부여된다. 또한, 표 3에서는 기지국 0(100)이 기지국 1(110)보다 높은 우선 순위를 갖는데, 이는 기지국 0(100)은 MeNB이고 기지국 1(110)은 SeNB인 경우 제어 평면을 담당하는 MeNB와의 연결이 사용자 평면을 담당하는 SeNB와의 연결보다 보장될 수 있어야 하기 때문이다. 단말(120)의 관점에서 기지국 0(100)은 단말(120)과 연결된 두 개의 셀 그룹 중 셀 그룹 0에 해당되고, 기지국 1(110)은 셀 그룹 1에 해당된다. 그리고 단말(120)은 우선 순위가 높은 정보에 우선적으로 전력을 할당하고, 남는 전력으로 우선 순위가 낮은 정보를 전송한다.
도 3은 본 발명의 한 실시 예에 따른 전력 할당 우선 순위를 나타낸 도면이다.
도 3의 우선 순위에는 표 3의 전력 할당 우선 순위에 채널의 종류(PUCCH 또는 PUSCH)에 따른 기준이 추가되었다.
예를 들어 기지국 0(100)에 대한 PUSCH 및 기지국 1(110)에 대한 PUSCH가 같은 서브프레임에 할당된 경우, 단말(120)은 기지국 0(100)에 대한 PUSCH 전송(UCI_0 및 UL-SCH_0)에 우선적으로 전력을 사용하고 기지국 1(110)에 대한 PUSCH 전송(UL-SCH_1, 또는 UCI_1 및 UL-SCH_1)에 남는 전력을 사용한다. 또는 기지국 0(100)에 대한 PUCCH 및 PUSCH와, 기지국 1(110)에 대한 PUCCH 및 PUSCH가 같은 서브프레임에 할당되면, 단말(120)은 셀 그룹 0의 PUCCH 전송에 가장 우선적으로 전력을 사용한다. 이 경우 우선 순위는 셀 그룹 0의 PUCCH > 셀 그룹 1의 PUCCH > 셀 그룹 0의 PUSCH > 셀 그룹 1의 PUSCH이다.
본 발명에서 각 기지국에 의해 관리되는 서빙 셀에 서로 다른 반송파가 사용될 수 있으므로, 단말(120)이 동일한 서브프레임에서 서로 다른 반송파를 사용하여 동시에 신호 또는 채널을 전송할 수 있다면, 단말(120)의 상향링크 데이터 전송률을 최대화 할 수 있다. 이때, 단말(120)의 UCI는 데이터 전송에 비해 중요성이 크지만, 데이터 전송과 달리 HARQ가 적용되지 않으므로 한 번의 전송으로 전송의 신뢰성이 보장될 수 있어야 한다. 따라서, 통상 UCI 전송의 우선 순위를 UL-SCH 전송의 우선 순위보다 높게 설정할 수 있다. UCI 간의 우선 순위는 UCI의 종류에 따라 달라질 수 있다. 단말(120)이 전송하는 UCI는 상향링크 HARQ-ACK, CSI 보고 및 SR을 포함한다. 세 가지 종류의 UCI 중 상향링크 HARQ-ACK 및 SR은 CSI 보고에 비해 높은 우선 순위를 가질 수 있다. 동일 서브프레임에서 같은 종류의 UCI가 충돌하면, UCI의 전송 우선 순위는 UCI를 수신하는 기지국의 우선 순위에 따른다.
표 4는 PUCCH의 충돌시 전력 할당 우선 순위를 나타낸 표이다.
표 4
기지국 0→기지국 1↓ CSI 보고_PUCCH_0 HARQ-ACK_PUCCH_0 SR_PUCCH_0
CSI 보고_PUCCH_1 CSI 보고_PUCCH_0 >CSI 보고_PUCCH_1 HARQ-ACK_PUCCH_0 > CSI 보고_PUCCH_1 SR PUCCH_0 >CSI 보고_PUCCH_1
HARQ-ACK_PUCCH_1 HARQ-ACK_PUCCH_1 >CSI 보고_PUCCH_0 HARQ-ACK_PUCCH_0 > HARQ-ACK PUCCH_1 SR_PUCCH_0 > HARQ-ACK_PUCCH_1
SR_PUCCH_1 SR_PUCCH_1 >CSI 보고_PUCCH_0 SR_PUCCH_1 > HARQ-ACK_PUCCH_0 SR_PUCCH_0 > SR_PUCCH_1
표 4에서, "HARQ-ACK_PUCCH_0 > CSI 보고_PUCCH_1"은 기지국 0(100)으로 전송되는, HARQ-ACK가 포함된 PUCCH의 우선 순위가 기지국 1(110)로 전송되는 CSI가 포함된 PUCCH의 우선 순위보다 높음을 의미한다.
본 발명에서 SR 전송 간의 충돌 또는 SR 전송과 HARQ-ACK 전송의 충돌은 되도록 발생하지 않는 것이 바람직하지만, 충돌이 발생하는 경우 표 4에 따라 SR 전송은 HARQ-ACK 또는 CSI 보고의 전송에 우선 한다. HARQ-ACK가 기지국에 정상적으로 전달되지 않으면 기지국이 단말(120)에게 재전송을 수행할 수 있지만, 단말(120)의 SR이 기지국에 정상적으로 전달되지 않으면 기지국으로부터의 스케줄링이 지연되어 서비스 지연이 발생할 수 있기 때문이다.
하지만, SR 전송과 HARQ-ACK 전송의 충돌시, HARQ-ACK 전송이 하향링크 SPS 릴리스에 대한 응답이라면, 단말(120)은 HARQ-ACK 전송의 우선 순위를 SR 전송의 그것보다 더 높게 부여할 수 있다. 이것은 하향링크 SPS 릴리스에 대한 응답이 기지국에 정상적으로 전달되지 않으면 해당 SPS 자원을 사용할 수 없지만, SR이 기지국에 정상적으로 전달되지 않더라도 단말(120)은 SR 자원이 할당된 다른 서브프레임을 통해 기지국으로 SR을 전송할 수 있기 때문이다.
본 발명에서 우선 순위는 두 신호 또는 채널이 동시에 전송될 때 단말(120)의 최대 송신 전력이 충분하지 못한 경우 우선 순위가 높은 쪽에 전력을 우선적으로 할당하는 것을 의미한다. 만일, 우선 순위가 높은 신호 또는 채널의 전송에 단말(120)의 모든 가용 전력이 할당되면, 남는 전력이 없으므로 우선 순위가 낮은 신호 또는 채널이 전송되지 못할 수 있다.
한편, 단말(120)이 기지국 0(100)으로만 SR을 전송할 수 있게 시스템이 설계된 경우, 기지국 1(110)에 대한 SR 전송 자원은 할당되지 않는다. 기지국 0(100)만이 SPS 자원을 할당할 수 있다면, 기지국 1(110)에 대한 SPS 릴리스 HARQ-ACK 전송은 발생하지 않는다. 표 5는 이 경우의 기지국 0(100)으로 전송되는 PUCCH 및 기지국 1(110)로 전송되는 PUCCH 사이의 충돌을 해결하기 위한 우선 순위를 나타낸다.
표 5
기지국 0→기지국 1↓ CSI 보고_PUCCH_0 HARQ-ACK_PUCCH_0 SR_PUCCH_0
CSI 보고_PUCCH_1 CSI 보고_PUCCH_0 > CSI 보고_PUCCH_1 HARQ-ACK_PUCCH_0 > CSI 보고_PUCCH_1 SR PUCCH_0 > CSI 보고_PUCCH_1
HARQ-ACK_PUCCH_1 HARQ-ACK_PUCCH_1 > CSI 보고_PUCCH_0 HARQ-ACK_PUCCH_0 > HARQ-ACK PUCCH_1 SR_PUCCH_0 > HARQ-ACK_PUCCH_1
본 발명의 다른 실시 예에 따르면, 동일 서브프레임에서 발생한 두 기지국에 대한 단말(120)의 이중 전송에서 단말(120)은 어느 한 기지국에 대한 전송을 포기할 수 있다.
먼저, SPS 자원과 동적 할당 자원이 동일 서브프레임에서 충돌하는 경우를 설명한다.
본 발명의 한 실시 예에서, 기지국에는 상향링크 HARQ 프로세스가 결정되어 있고, 각 기지국은 SPS를 이용하여 자원을 할당할 수 있다. 다만, 통상적인 SPS 할당에 따른 초전송의 시간 간격이 상향링크 HARQ 프로세스의 RTT의 정수 배가 아닌 경우가 있어서 둘 사이의 충돌이 발생할 수 있다.
본 발명에서 각 기지국의 동적 스케줄링 정보는 제한적인 백홀 환경으로 인해 두 기지국 사이에서 즉각적으로 교환되기 어렵다. 따라서, 기지국 0(100)는 SPS 자원과 동적으로 스케줄링된 자원이 동일 서브프레임에 포함되는지 알기 어렵다. 반면, 기지국 1(110)은 기지국 0(100)으로부터 SPS 할당 자원 정보를 제공받으므로, 기지국 0(100)의 SPS 할당 자원이 포함된 서브프레임을 미리 알 수 있다. 즉, 기지국 1(110)은 기지국 0(100)이 할당한 SPS 자원이 포함된 서브프레임에는 블라인드 검출(blind detection)을 수행하지 않을 수 있다.
SPS 할당은 준정적(semi-static)인 성격을 가지므로 할당된 자원을 변경하는 것이 용이하지 않다. 그에 반해 그랜트(grant) 전송으로 수행되는 동적 스케줄링은 동적(dynamic)인 성격을 가지므로 서브프레임이 자유롭게 변경될 수 있다. 따라서, SPS 할당이 동적 자원 할당보다 우선하도록 시스템이 설계될 수 있다. 단말(120)이 두 개의 기지국(기지국 0(100) 및 기지국 1(110))에 의해 서빙(serving)된다고 할 때, 단말(120)의 전송 형태는 아래와 같을 수 있다.
- 상향링크 SPS 자원 할당에 의한 기지국 0(100)으로의 PUSCH 전송과, 기지국 1(110)로의 동적 PUSCH 전송(이때, PUSCH는 DCI를 통해 단말(120)로 할당된다). 이 동일 서브프레임에 포함된다면, 단말(120)은 해당 상향링크 서브프레임에서 기지국 0(100)을 위한 PUSCH를 전송하고 기지국 1(110)로의 PUSCH는 전송하지 않을 수 있다.
- 하향링크 SPS 자원 할당에 따라 기지국에서 전송하는 PDSCH에 대응하는 상향링크 HARQ-ACK와, 기지국 1(110)로의 동적 PUSCH 전송이 동일 서브프레임에 포함된다면, 단말(120)은 해당 서브프레임에서 기지국 0(100)으로 HARQ-ACK는 전송하고 기지국 1(110)에 대한 PUSCH는 전송하지 않을 수 있다.
다음 SRS 자원과 HARQ-ACK 자원이 동일 서브프레임에서 충돌하는 경우를 설명한다. 기지국 0(100)에 대한 HARQ-ACK가 전송되는 PUCCH와, 기지국 1(110)에 대한 SRS 자원이 동일 서브프레임에 할당된 경우, 단말(120)은 해당 서브프레임에서 단축 포맷(shortened format)을 사용하여 PUCCH를 전송할 수 있다. SRS가 다른 기지국에 대한 HARQ-ACK와 같은 서브프레임에서 전송되면, 기지국 1(110)에서는 SRS를 검출하기 위한 노력을 부가적으로 수행해야 하는데, 본 발명의 한 실시 예에 따르면 각 기지국은 단축 포맷으로 전송된 신호를 구분함으로써 신호 수신의 신뢰성을 보장받을 수 있다.
다음 CSI 보고 PUCCH 자원과 HARQ-ACK PUCCH 자원이 동일 서브프레임에서 충돌하는 경우를 설명한다. 기지국 0(100)에 대한 HARQ-ACK PUCCH 전송이 동적으로 발생되고 기지국 1(110)에 대한 주기적인 CSI 보고 PUCCH 자원이 동일 서브프레임에 할당된 경우, 두 기지국에 대한 UCI는 각각 분리 전송되어야 하므로 단말(120)은 PUCCH 포맷 2a/2b를 사용할 수 없다. 따라서 단말(120)은 기지국 1(110)에 대한 CSI 보고 PUCCH를 전송하지 않고, 기지국 0(100)에 대한 HARQ-ACK PUCCH만 전송할 수 있다. 이때, 기지국 1(110)은 해당 서브프레임에서 기지국 0(100)에 대한 HARQ-ACK PUCCH만이 전송된 것을 알 수 없기 때문에, CSI 보고 PUCCH 전송 여부를 확인하기 위한 블라인드 검출을 수행하거나, 충돌 가능성이 있는 서브프레임을 판단하여 해당 서브프레임에서 전송되는 CSI 보고 PUCCH는 항상 무시할 수 있다.
다음 SRS 자원과 CSI 보고 PUCCH 자원이 동일 서브프레임에서 충돌하는 경우를 설명한다. 이 경우 단말(120)은 충돌이 발생할 수 있는 서브프레임을 판단하여, 해당 서브프레임에서는 SRS 전송을 포기하고 CSI 보고 PUCCH만 전송한다. 즉, 단말(120)은 CSI 보고 PUCCH에 우선 순위를 둔다.
다음 SPS 자원과 HARQ-ACK PUCCH 자원이 동일 서브프레임에서 충돌하는 경우를 설명한다. 이 경우 단말(120)은 SPS에 의한 전송을 포기하거나 HARQ-ACK 전송을 포기할 수 있다. 단말(120)이 SPS 전송을 포기하는 경우, 기지국에서의 수신 복잡도를 높이지 않기 위해 단말(120)은 충돌이 발생할 수 있는 모든 서브프레임을 결정하고 해당 서브프레임에서는 SPS에 의한 전송을 포기한다. 또한, 단말(120)이 HARQ-ACK 전송을 포기하는 경우, 단말(120)은 동적으로 상향링크 HARQ-ACK가 발생하더라도 해당 서브프레임에서 HARQ-ACK를 전송하지 않고 SPS에 의한 신호만 전송한다.
다음 SPS 자원과 CSI 보고 PUCCH 자원이 동일 서브프레임에서 충돌하는 경우를 설명한다. 이 경우 단말(120)은 둘 중 하나만 선택적으로 전송할 수 있다. 이는 기지국에서 신호를 간단히 수신할 수 있게 하기 위한 것으로서, 단말(120)은 충돌이 발생하는 모든 서브프레임에서 SPS 전송을 포기하거나 CSI 보고를 포기할 수 있다.
다음 PUSCH 자원과 SRS 자원이 동일 서브프레임에서 충돌하는 경우를 설명한다. 기지국 0(100)에 대한 PUSCH 자원과 기지국 1(110)로 전송되는 SRS 자원이 동일 서브프레임에서 충돌하면, 기지국 1(110)에서는 SRS의 전송 여부를 판단하기 어렵기 때문에 수신에 문제가 발생할 수 있다. 이는 PUSCH 자원이 동적으로 스케줄링되기 때문이다. 본 발명의 실시 예에서 단말(120)은 기지국 0(100)으로 PUSCH를 전송하고, PUSCH의 마지막 심볼에서 기지국 1(110)로 SRS를 전송할 수 있다. 또는 기지국 0(100) 및 기지국 1(110)에서 관리하는 모든 셀이 동일한 셀 고유 SRS 서브프레임을 사용할 수 있다.
다음 PUCCH 자원과 SRS 자원이 동일 서브프레임에서 충돌하는 경우를 설명한다. 종래 LTE 규격에 따르면, HARQ-ACK 또는 SR이 전송되는 PUCCH와, SRS 전송이 동일한 서브프레임에서 일치하는 경우 파라미터 ' ackNackSRS-SimultaneousTransmission'이 'TRUE'일 때 단말(120)은 단축 포맷을 사용하여 PUCCH를 전송하고 'FALSE'일 때 단말(120)은 SRS를 전송하지 않는다. 그리고 일반 포맷이 사용된 HARQ-ACK 및 SR이 전송되는 PUCCH와, SRS가 동일 서브프레임에 할당되면, 단말(120)은 SRS를 전송하지 않는다. 하지만, 기지국 1(110)에서는 해당 서브프레임에서 수신된 신호가 SRS인지 판단하기 어려우므로, 본 발명에서 단말(120)은 서브프레임 충돌의 경우 기지국 0(100)에 대한 PUCCH는 항상 단축 포맷을 사용하고, 해당 서브프레임의 마지막 SC-FDMA 심볼을 사용하여 SRS를 전송한다. 또는 다른 방법으로 동일한 효과를 얻기 위해 노드 0 (셀 그룹 0) 와 노드 1 (셀 그룹 1)의 서빙 셀들 모두 동일한 셀 고유 SRS 서브프레임 설정을 사용할 수 있다.
마지막으로 SR 자원과 HARQ-ACK PUCCH 자원이 동일 서브프레임에서 충돌하는 경우, 단말(120)은 우선 순위에 따라 둘 중 하나를 전송할 수 있다.
본 발명의 다른 실시 예에서는 제한적 백홀 환경에서의 TDD 기지국 및 FDD 기지국의 반송파 집성(carrier aggregation, CA)에 관해 설명한다.
먼저 표 6은 TDD-LTE(TS 36.211)의 UL 및 DL 설정(configuration)의 DL-UL 대응 관계를 나타낸다. 표 6에서 'D'는 하향링크 서브프레임이고, 'U'는 상향링크 서브프레임이며, 'S'는 특별 서브프레임이다. 특별 서브프레임은 하향링크 전송에 사용될 수 있다.
표 6
Uplink-downlink configuration Downlink-to-Uplink Switch-point periodicity Subframe number
0 1 2 3 4 5 6 7 8 9
0 5 ms D S U U U D S U U U
1 5 ms D S U U D D S U U D
2 5 ms D S U D D D S U D D
3 10 ms D S U U U D D D D D
4 10 ms D S U U D D D D D D
5 10 ms D S U D D D D D D D
6 5 ms D S U U U D S U U D
DL-UL 대응 관계는, 특정 상향링크 서브프레임에서 HARQ-ACK가 전송될 때, 전송되는 HARQ-ACK에 대응하는 PDSCH 또는 하향링크 SPS 릴리스를 지시하는 PDCCH가 어떤 하향링크 서브프레임에서 발생된 것인지 결정해주는 관계이다.
그리고, 표 7은 TDD-LTE의 DL 서브프레임에서 수신된 데이터에 대한 ACK가 전송되는 UL 서브프레임을 나타낸다. 표 7에서 DL 서브프레임과 UL 서브프레임 간의 관계는 DASI(downlink association set index)에 따라 결정될 수 있다.
표 7
UL-DL Configuration Subframe n
0 1 2 3 4 5 6 7 8 9
0 - - 6 - 4 - - 6 - 4
1 - - 7, 6 4 - - - 7, 6 4 -
2 - - 8, 7, 4, 6 - - - - 8, 7, 4, 6 - -
3 - - 7, 6, 11 6, 5 5, 4 - - - - -
4 - - 12, 8, 7, 11 6, 5, 4, 7 - - - - - -
5 - - 13, 12, 9, 8, 7, 5, 4, 11, 6 - - - - - - -
6 - - 7 7 5 - - 7 7 -
도 4는 UL-DL configuration 3에서의 DL 서브프레임 및 UL 서브프레임의 대응 관계를 나타낸다.
도 4를 참조하면, UL 서브프레임 1, 5 및 6에서 발생한 HARQ-ACK(PDSCH 또는 하향링크 SPS 릴리스를 지시하는 PDCCH 전송에 대응한 것)는 다음 무선 프레임의 서브프레임 2에서 전송될 수 있다.
본 발명에서는, TDD 반송파 및 FDD 반송파가 반송파 집성(carrier aggregation, AC)에서 사용되고, 각 반송파는 서로 다른 기지국에 의해 관리될 수 있다. 두 기지국은 지리적으로 떨어져 위치하고 있고, 비이상적인 백홀로 연결되어 있어서 정보 교환에 지연이 발생하고 교환 용량에 제한이 있다.
TDD 반송파를 사용하는 기지국의 셀(TDD 셀) 및 FDD 반송파를 사용하는 기지국의 셀(FDD 셀)은 각각 별도의 UCI를 사용한다. 본 발명의 실시 예에 따른 이중 연결성이 지원되는 무선 통신 시스템에서, TDD 셀은 UL/DL 레퍼런스 설정(reference configuration)에 따라 동작되고, FDD 셀은 종래 FDD 셀과 동일하게 동작될 수 있지만, 단말(120)에서 두 셀로 각각 신호 또는 채널을 전송할 때 동시 전송 문제가 발생할 수 있다.
단말(120)이 FDD 셀 및 TDD 셀로 UCI를 동일 서브프레임을 사용하여 동시에 전송하기 힘든 채널 환경이라면, 각 셀에 대한 UCI는 동일 서브프레임에 할당되지 않아야 한다. TDD 셀의 경우 UCI를 전송할 수 있는 서브프레임이 제한적이므로, FDD 셀의 UCI 전송 가능 후보 서브프레임 중에서 TDD 셀의 UCI 전송 가능 후보 서브프레임은 제외될 수 있다. 즉, TDD 셀에 대한 UCI 전송이 우선적으로 고려될 수 있다.
PDSCH 또는 SPS 릴리스에 대한 응답으로 전송되는 상향링크 HARQ-ACK가 전송되는 서브프레임은 TDD의 UL/DL 레퍼런스 구조에 의해 결정될 수 있다. 하향링크 HARQ 프로레스는 비동기식 방식이므로, TDD 셀 및 FDD 셀은 HARQ-ACK 전송에 사용할 서브프레임을 서로 다르게 결정한다.
한편, FDD 셀 및 TDD 셀이 모두 하향링크 SPS를 수행한다면, 각 기지국은 자원 할당 간격 및 옵셋 설정을 통해 FDD 셀 및 TDD 셀의 HARQ-ACK(하향링크 SPS에 대한 응답으로 전송하는 상향링크 HARQ-ACK) 자원 충돌을 피할 수 있다.
FDD 셀에서 하향링크 SPS가 적용되면, 서브프레임 n에 PDSCH가 할당된 경우 그에 대한 상향링크 HARQ-ACK는, 서브프레임 n+4에 할당되라 수 있다. 주기가 10ms인 SPS에서는 한 개의 라디오 프레임 주기에서 한 개의 서브프레임이 상향링크 HARQ-ACK 전송에 사용될 수 있다. TDD 셀은 FDD 셀에서 전송되는 HARQ-ACK이 포함된 서브프레임에서 HARQ-ACK가 전송되지 않도록 PDSCH 스케줄링을 조정한다. 따라서, TDD 셀의 기지국은 FDD 셀에서 사용하는 SPS 설정 정보를 알아야 한다.
동적 자원 할당의 경우, 상향링크 HARQ-ACK 충돌을 피하기 위해, 상향링크 HARQ-ACK 전송에 사용될 수 있는 서브프레임을 TDD 셀과 FDD 셀에서 서로 달리할 수 있다.
종래, FDD 셀에서는 PUSCH 자원의 충돌을 피하기 위해 각 셀에서 서로 다른 HARQ 프로세스를 사용하였다. FDD 셀과 TDD 셀이 혼재된 무선 통신 시스템에서, FDD 셀의 상향링크 HARQ 프로세스는 RTT 8ms의 동기 방식이고, TDD 셀의 상향링크 HARQ 프로세스는 RTT 10ms(TDD UL/DL configuration 1~5)의 동기 방식이다. 따라서 두 셀의 각 기지국에서 HARQ 단위로 자원을 할당하는 경우, 동일 서브프레임에서 PUSCH 자원이 충돌하는 경우가 필연적으로 발생할 수 있다.
본 발명의 한 실시 예에서는, FDD 셀 및 TDD 셀이 각각 사용하는 HARQ 프로세스를 결정하고, 충돌이 발생하는 서브프레임에서 동시 전송이 가능하도록 처리한다. 따라서, FDD 셀의 관리하는 기지국과 TDD 셀을 관리하는 기지국은 FDD 셀과 TDD 셀이 사용하는 HARQ 프로세스를 모두 알고 있어야 한다. 단말(120)은 FDD 셀 및 TDD 셀에서 스케줄링 한 대로 상향링크 송신을 수행하는데, FDD 셀 및 TDD 셀이 사용하는 HARQ 프로세스에 관한 정보를 기지국으로부터 수신하여 상향링크 송신을 효율적으로 수행할 수 있다. 단말(120)은 HARQ 프로세스에 관한 정보를 바탕으로 동시 전송이 발생한 서브프레임에서 우선 순위에 따라 각 셀에 대한 송신 전력을 다르게 할당하거나, 일부 신호 또는 채널의 전송을 포기할 수 있다.
이와 같이 본 발명의 한 실시 예에 따르면, 단말(120)과 이중 연결된 기지국 중 하나의 기지국은 상향링크에 사용할 서브프레임의 유형을 결정하여 다른 기지국 및 단말(120)로 알려주고, 단말(120)과 적어도 두 개의 기지국 사이에서 공유된 서브프레임의 유형에 관한 정보를 통해 단말(120)은 상향링크 신호 또는 채널을 분리 전송 또는 동시 전송할 수 있다. 또한, 기지국은 단말(120)이 보고한 상향링크에 대한 최대 전송 전력 및 남은 전력량 등을 바탕으로 각 기지국과 채널 등을 기준으로 하는 우선 순위를 결정하여 단말(120)에 알려줌으로써, 단말(120)이 신호 또는 채널을 효과적으로 동시 전송할 수 있도록 할 수 있다.
이상에서 본 발명의 실시 예에 대하여 상세하게 설명하였지만 본 발명의 권리범위는 이에 한정되는 것은 아니고 다음의 청구범위에서 정의하고 있는 본 발명의 기본 개념을 이용한 당업자의 여러 변형 및 개량 형태 또한 본 발명의 권리범위에 속하는 것이다.

Claims (21)

  1. 단말과 적어도 두 개의 기지국 사이의 이중 연결을 지원하는 무선통신 시스템에서, 단말의 상향링크 전송 방법으로서,
    상기 적어도 두 개의 기지국 중 제1 기지국으로부터 상기 제1 기지국의 제1 상향링크 스케줄링 정보 및 서브프레임의 유형에 관한 정보를 수신하는 단계,
    상기 적어도 두 개의 기지국 중 제2 기지국으로부터 상기 제2 기지국의 제2 상향링크 스케줄링 정보를 수신하는 단계, 그리고
    상기 제1 상향링크 스케줄링 정보, 상기 제2 상향링크 스케줄링 정보 및 서브프레임의 유형에 관한 정보를 바탕으로 상기 제1 기지국 및 상기 제2 기지국으로 각각 상향링크 신호 또는 채널을 전송하는 단계
    를 포함하는 상향링크 전송 방법.
  2. 제1항에서,
    상기 서브프레임의 유형에 관한 정보는,
    서브프레임의 유형을 적어도 세 개 포함하는 상향링크 전송 방법.
  3. 제2항에서,
    상기 적어도 세 개의 유형 중 제1 유형의 제1 서브프레임은 상기 제1 기지국 및 상기 제2 기지국의 공용 서브프레임인 상향링크 스케줄링 방법.
  4. 제2항에서,
    상기 전송하는 단계는,
    상기 적어도 세 개의 유형 중 제1 유형의 제1 서브프레임에서 상기 제1 기지국 및 상기 제2 기지국으로 동시에 상향링크 신호 또는 채널을 전송하는 단계
    를 포함하는 상향링크 전송 방법.
  5. 제4항에서,
    상기 전송하는 단계는,
    상기 제1 기지국이 마스터 eNB이고 상기 제2 기지국이 이차 eNB인 경우, 상기 제1 기지국에 대한 전송에 우선적으로 전력을 할당하는 단계, 그리고
    상기 제1 기지국에 대한 전송에 할당되고 남은 전력을 상기 제2 기지국에 대한 전송에 할당하는 단계
    를 포함하는 상향링크 전송 방법.
  6. 제4항에서,
    상기 전송하는 단계는,
    상기 제1 기지국으로 전송하는 채널이 제어 채널이고, 상기 제2 기지국으로 전송하는 채널이 공유 채널인 경우, 상기 제어 채널의 전송에 우선적으로 전력을 할당하는 단계, 그리고
    상기 제어 채널의 전송에 할당되고 남은 전력을 상기 공유 채널의 전송에 할당하는 단계
    를 포함하는 상향링크 전송 방법.
  7. 제2항에서,
    상기 적어도 세 개의 유형 중 제1 유형의 제1 서브프레임은 제1 기지국의 전용 서브프레임이고, 상기 적어도 세 개의 유형 중 제2 유형의 제2 서브프레임은 상기 제2 기지국의 전용 서브프레임인 상향링크 스케줄링 방법.
  8. 제2항에서,
    상기 전송하는 단계는,
    상기 적어도 세 개의 유형 중 제1 유형의 제1 서브프레임에서 상기 제1 기지국으로 상향링크 신호 또는 채널을 전송하고, 상기 적어도 세 개의 유형 중 제2 유형의 제2 서브프레임에서 상기 제2 기지국으로 상향링크 신호 또는 채널을 전송하는 단계
    를 더 포함하는 상향링크 전송 방법.
  9. 제1항에서,
    상기 제1 기지국에서 관리하는 서빙 셀에 대한 최대 전송 전력 및 남은 전력 보고(power headroom, PHR)과, 상기 제2 기지국에서 관리하는 서빙 셀에 대한 최대 전송 전력, PHR 및 PHR의 타입 정보를 상기 제1 기지국으로 전송하는 단계
    를 더 포함하는 상향링크 전송 방법.
  10. 제9항에서,
    상기 제2 기지국에서 관리하는 서빙 셀에 대한 최대 전송 전력 및 남은 전력 보고(power headroom, PHR)과, 상기 제1 기지국에서 관리하는 서빙 셀에 대한 최대 전송 전력, PHR 및 PHR의 타입 정보를 상기 제2 기지국으로 전송하는 단계
    를 더 포함하는 상향링크 전송 방법.
  11. 단말과 적어도 두 개의 기지국 사이의 이중 연결을 지원하는 무선통신 시스템에서, 기지국의 상향링크 스케줄링 방법으로서,
    반고정적(semi-static) 자원을 제1 서브프레임에 할당하는 단계,
    상기 적어도 두 개의 기지국 중 나머지 하나의 제1 기지국으로 상기 제1 서브프레임에 관한 정보를 전달하는 단계, 그리고
    상기 제1 서브프레임에 관한 정보가 포함된 상향링크 스케줄링 정보를 상기 단말로 전달하는 단계
    를 포함하는 상향링크 스케줄링 방법.
  12. 제11항에서,
    상기 반고정적 자원은,
    SPS 스케줄링 자원, 주기적 채널 상태 정보(channel state information, CSI) 보고 자원, 트리거-유형 0 자원, 스케줄링 요청(scheduling request, SR) 자원을 포함하는 상향링크 스케줄링 방법.
  13. 제11항에서,
    동적 할당 자원을 제2 서브프레임에 할당하는 단계,
    상기 나머지 하나의 기지국으로 상기 제2 서브프레임에 관한 정보를 전달하는 단계, 그리고
    상기 제2 서브프레임에 관한 정보가 포함된 상향링크 스케줄링 정보를 상기 단말로 전달하는 단계
    를 더 포함하는 상향링크 스케줄링 방법.
  14. 제13항에서,
    상기 동적 할당 자원은,
    PDCCH/e-PDCCH(enhanced-PDCCH)에 대한 응답으로 전송되는 상향링크 HARQ-ACK 또는 트리거 유형 1 사운딩 참조 신호(sounding reference signal, SRS)에 대한 자원을 포함하는 상향링크 스케줄링 방법.
  15. 제13항에서,
    상기 동적 할당 자원에 대한 제2 서브프레임을 결정하는 단계는,
    상향링크 HARQ 프로세스를 고려하여 상기 제2 서브프레임을 결정하는 단계
    를 포함하는 상향링크 스케줄링 방법.
  16. 단말과 적어도 두 개의 기지국 사이의 이중 연결을 지원하는 무선통신 시스템에서, 기지국의 상향링크 스케줄링 방법으로서,
    서브프레임의 유형을 적어도 세 개의 유형으로 구분하는 단계,
    상기 적어도 세 개의 유형 중 제1 유형의 제1 서브프레임에 상향링크 자원을 할당하는 단계, 그리고
    상기 제1 서브프레임에 관한 정보가 포함된 상향링크 스케줄링 정보를 상기 단말로 전달하는 단계
    를 포함하는 상향링크 스케줄링 방법.
  17. 제16항에서,
    상기 서브프레임의 유형에 관한 정보를 상기 적어도 두 개의 기지국 중 나머지 하나의 제1 기지국으로 전달하는 단계
    를 더 포함하는 상향링크 스케줄링 방법.
  18. 제17항에서,
    상기 제1 서브프레임은 상기 기지국의 전용 서프브레임이고, 상기 적어도 세 개의 유형 중 제2 유형의 제2 서브프레임은 상기 제1 기지국의 전용 서브프레임이며, 상기 적어도 세 개의 유형 중 제3 유형의 제3 서브프레임은 상기 기지국 및 상기 제1 기지국의 공용 서브프레임인 상향링크 스케줄링 방법.
  19. 단말과 적어도 두 개의 기지국 사이의 이중 연결을 지원하는 무선통신 시스템에서, 기지국의 상향링크 스케줄링 방법으로서,
    상기 적어도 두 개의 기지국 중 나머지 하나의 제1 기지국으로부터 상기 제1 기지국의 상향링크 자원이 할당된 제1 서브프레임에 관한 정보를 수신하는 단계,
    상기 제1 서브프레임에 관한 정보를 바탕으로 상기 제1 서브프레임과 다른 제2 서브프레임에 상기 기지국의 상향링크 자원을 할당하는 단계, 그리고
    상기 제2 서브프레임에 관한 정보가 포함된 상향링크 스케줄링 정보를 상기 단말로 전달하는 단계
    를 포함하는 상향링크 스케줄링 방법.
  20. 제19항에서,
    상기 제1 기지국으로부터 적어도 세 개의 유형으로 구분된 서브프레임에 관한 정보를 수신하는 단계
    를 더 포함하는 상향링크 스케줄링 방법.
  21. 제20항에서,
    상기 적어도 세 개의 유형 중 제1 유형의 상기 제1 서브프레임은 상기 제1 기지국의 전용 서브프레임이고, 상기 적어도 세 개의 유형 중 제2 유형의 상기 제2 서브프레임은 상기 기지국의 전용 서브프레임이며, 상기 적어도 세 개의 유형 중 제3 유형의 제3 서브프레임은 상기 기지국 및 상기 제1 기지국의 공용 서브프레임인 상향링크 스케줄링 방법.
PCT/KR2014/007029 2013-08-02 2014-07-31 상향 링크 스케줄링 방법 및 상향링크 전송 방법 WO2015016625A1 (ko)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US14/909,415 US20160183290A1 (en) 2013-08-02 2014-07-31 Uplink scheduling method and uplink transmission method

Applications Claiming Priority (4)

Application Number Priority Date Filing Date Title
KR10-2013-0091919 2013-08-02
KR20130091919 2013-08-02
KR1020140097929A KR20150016473A (ko) 2013-08-02 2014-07-31 상향 링크 스케줄링 방법 및 상향링크 전송 방법
KR10-2014-0097929 2014-07-31

Publications (1)

Publication Number Publication Date
WO2015016625A1 true WO2015016625A1 (ko) 2015-02-05

Family

ID=52432079

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/KR2014/007029 WO2015016625A1 (ko) 2013-08-02 2014-07-31 상향 링크 스케줄링 방법 및 상향링크 전송 방법

Country Status (1)

Country Link
WO (1) WO2015016625A1 (ko)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20170025667A (ko) * 2015-08-31 2017-03-08 삼성전자주식회사 시분할 듀플렉싱 방식을 지원하는 통신 시스템에서 무선 억세스 기술 운영 장치 및 방법
WO2017209412A3 (ko) * 2016-06-02 2018-08-09 엘지전자 주식회사 무선 통신 시스템에서 스케줄링 요청을 전송하는 방법 및 장치
CN108400806A (zh) * 2017-02-06 2018-08-14 中兴通讯股份有限公司 信道传输方法及装置,终端
CN111247857A (zh) * 2018-02-07 2020-06-05 Lg 电子株式会社 在无线通信系统中发送或接收信号的方法及其设备
CN111492712A (zh) * 2017-11-10 2020-08-04 株式会社Ntt都科摩 用户终端以及无线通信方法
CN112655262A (zh) * 2019-01-04 2021-04-13 Oppo广东移动通信有限公司 资源分配的方法、终端设备和网络设备
CN113519197A (zh) * 2019-01-10 2021-10-19 瑞典爱立信有限公司 上行链路控制信息抢占

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20110069078A (ko) * 2008-09-15 2011-06-22 콸콤 인코포레이티드 멀티-캐리어 통신 시스템에서 간섭 관리
KR20110092708A (ko) * 2010-02-10 2011-08-18 삼성전자주식회사 계층적 셀 구조의 무선통신시스템에서 신호 간섭을 제거하기 위한 장치 및 방법
KR20120016534A (ko) * 2010-08-16 2012-02-24 삼성전자주식회사 셀룰러 무선 통신시스템에서 데이터 전송 방법 및 장치
KR20120049814A (ko) * 2010-11-09 2012-05-17 (주)휴맥스 소형 기지국의 상향링크에서의 동적 간섭 완화 방법
KR20120116271A (ko) * 2011-04-12 2012-10-22 삼성전자주식회사 통신 시스템에서 간섭 제어를 위한 서브프레임 운용 및 채널 정보 전송 방법 및 장치

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20110069078A (ko) * 2008-09-15 2011-06-22 콸콤 인코포레이티드 멀티-캐리어 통신 시스템에서 간섭 관리
KR20110092708A (ko) * 2010-02-10 2011-08-18 삼성전자주식회사 계층적 셀 구조의 무선통신시스템에서 신호 간섭을 제거하기 위한 장치 및 방법
KR20120016534A (ko) * 2010-08-16 2012-02-24 삼성전자주식회사 셀룰러 무선 통신시스템에서 데이터 전송 방법 및 장치
KR20120049814A (ko) * 2010-11-09 2012-05-17 (주)휴맥스 소형 기지국의 상향링크에서의 동적 간섭 완화 방법
KR20120116271A (ko) * 2011-04-12 2012-10-22 삼성전자주식회사 통신 시스템에서 간섭 제어를 위한 서브프레임 운용 및 채널 정보 전송 방법 및 장치

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102419407B1 (ko) 2015-08-31 2022-07-11 삼성전자주식회사 시분할 듀플렉싱 방식을 지원하는 통신 시스템에서 무선 억세스 기술 운영 장치 및 방법
KR20170025667A (ko) * 2015-08-31 2017-03-08 삼성전자주식회사 시분할 듀플렉싱 방식을 지원하는 통신 시스템에서 무선 억세스 기술 운영 장치 및 방법
WO2017209412A3 (ko) * 2016-06-02 2018-08-09 엘지전자 주식회사 무선 통신 시스템에서 스케줄링 요청을 전송하는 방법 및 장치
US10779314B2 (en) 2016-06-02 2020-09-15 Lg Electronics Inc. Method and apparatus for transmitting scheduling request in wireless communication system
CN108400806A (zh) * 2017-02-06 2018-08-14 中兴通讯股份有限公司 信道传输方法及装置,终端
CN108400806B (zh) * 2017-02-06 2023-03-24 中兴通讯股份有限公司 信道传输方法及装置、终端
CN111492712A (zh) * 2017-11-10 2020-08-04 株式会社Ntt都科摩 用户终端以及无线通信方法
CN111492712B (zh) * 2017-11-10 2023-11-07 株式会社Ntt都科摩 用户终端以及无线通信方法
CN111247857A (zh) * 2018-02-07 2020-06-05 Lg 电子株式会社 在无线通信系统中发送或接收信号的方法及其设备
CN111247857B (zh) * 2018-02-07 2023-08-22 Lg 电子株式会社 在无线通信系统中发送或接收信号的方法及其设备
CN112655262B (zh) * 2019-01-04 2023-05-09 Oppo广东移动通信有限公司 资源分配的方法、终端设备和网络设备
CN112655262A (zh) * 2019-01-04 2021-04-13 Oppo广东移动通信有限公司 资源分配的方法、终端设备和网络设备
CN113519197A (zh) * 2019-01-10 2021-10-19 瑞典爱立信有限公司 上行链路控制信息抢占

Similar Documents

Publication Publication Date Title
WO2015016625A1 (ko) 상향 링크 스케줄링 방법 및 상향링크 전송 방법
WO2014171596A1 (ko) 무선 통신 시스템에서 리소스 할당 방법 및 장치
WO2012112008A2 (en) Mobile communication system and channel transmission/reception method thereof
WO2012141497A2 (en) Method and apparatus for operating subframe and transmitting channel informaiton for controlling interference in communication system
WO2015065048A1 (en) Method and apparatus of controlling periodic csi reporting
US20160183290A1 (en) Uplink scheduling method and uplink transmission method
WO2014116071A1 (en) Method and apparatus for transmitting control channel in intra-cell carrier aggregation system
WO2011078581A2 (ko) 크로스 캐리어 스케쥴링을 지원하는 tdd 통신시스템에서 물리채널의 송수신 타이밍을 정의하는 방법 및 장치
WO2013103280A1 (ko) 상향링크 번들링 관련 채널의 할당 방법 및 장치
EP3195680A1 (en) Communication on licensed and unlicensed bands
WO2014163407A1 (en) Method and apparatus for transmitting channel state information in wireless communication system
WO2012077974A2 (ko) 복수의 콤포넌트 캐리어를 지원하는 무선통신 시스템에서 셀 간 간섭을 제어하기 위한 방법 및 이를 위한 기지국 장치
WO2014133321A1 (en) Method and apparatus for transmitting control channel depending on ue capability in intra-cell carrier aggregation system
WO2016163690A1 (ko) 비면허 주파수 대역을 사용하는 통신 시스템에서 harq를 지원하는 방법 및 이를 적용한 장치
WO2015142125A1 (ko) Tdd-fdd 집성을 고려한 tpc 명령 타이밍 제어 방법 및 그 장치
WO2010064828A2 (en) Method of relaying data
WO2012111911A2 (ko) 단말 협력 통신 시스템에서의 harq(hybrid automatic repeat request) 방법 및 그 장치
WO2012165782A2 (en) Mobile communication system and data transmission method thereof
WO2017034125A1 (ko) 무선통신 시스템에서 flexible fdd 프레임을 이용하여 통신을 수행하는 방법 및 이를 위한 장치
WO2016190631A1 (ko) 무선 통신 시스템에서 채널 센싱 및 그에 따른 전송을 위한 방법 및 이를 위한 장치
EP3251261A1 (en) Method and apparatus for transmitting/receiving harq-ack signal in wireless communication system supporting carrier aggregation
WO2014208924A1 (en) Method and device for processing uplink transmission
WO2016089044A1 (ko) 무선 자원에서 간섭 제어를 위한 방법 및 이를 위한 장치
WO2017171350A1 (ko) 무선 통신 시스템에서 상향링크 신호의 전송 또는 수신 방법 및 이를 위한 장치
WO2013109084A1 (en) Method and apparatus for operating plural time alignment timers in wireless communication system using coordinated multipoint technology

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 14831277

Country of ref document: EP

Kind code of ref document: A1

WWE Wipo information: entry into national phase

Ref document number: 14909415

Country of ref document: US

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 14831277

Country of ref document: EP

Kind code of ref document: A1