WO2014183199A1 - Ore removal production line, twin ramps and ground support installation method - Google Patents

Ore removal production line, twin ramps and ground support installation method Download PDF

Info

Publication number
WO2014183199A1
WO2014183199A1 PCT/CA2014/000428 CA2014000428W WO2014183199A1 WO 2014183199 A1 WO2014183199 A1 WO 2014183199A1 CA 2014000428 W CA2014000428 W CA 2014000428W WO 2014183199 A1 WO2014183199 A1 WO 2014183199A1
Authority
WO
WIPO (PCT)
Prior art keywords
production line
hard
mine
ore
ramps
Prior art date
Application number
PCT/CA2014/000428
Other languages
French (fr)
Inventor
Daniel MACINTYRE
Peter Golde
Michael VAN DER HOOFT
Original Assignee
Macintyre Daniel
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Macintyre Daniel filed Critical Macintyre Daniel
Priority to EA201592187A priority Critical patent/EA029688B1/en
Priority to EP14797857.1A priority patent/EP2997227A4/en
Publication of WO2014183199A1 publication Critical patent/WO2014183199A1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C35/00Details of, or accessories for, machines for slitting or completely freeing the mineral from the seam, not provided for in groups E21C25/00 - E21C33/00, E21C37/00 or E21C39/00
    • E21C35/20General features of equipment for removal of chippings, e.g. for loading on conveyor
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C41/00Methods of underground or surface mining; Layouts therefor
    • E21C41/16Methods of underground mining; Layouts therefor
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C41/00Methods of underground or surface mining; Layouts therefor
    • E21C41/16Methods of underground mining; Layouts therefor
    • E21C41/22Methods of underground mining; Layouts therefor for ores, e.g. mining placers
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F13/00Transport specially adapted to underground conditions
    • E21F13/02Transport of mined mineral in galleries
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F13/00Transport specially adapted to underground conditions
    • E21F13/06Transport of mined material at or adjacent to the working face

Definitions

  • the present invention refers to a set of methods and procedures that may be combined in order to greatly increase the speed of development of an access ramp in a underground hard-rock mine.
  • Rail-Veyor a new technology, named “Rail-Veyor” (described on the patent application US2007/088107) provides a new platform to revolutionise the way material is removed of an underground mine.
  • the Rail-Veyor technology presents the opportunity to challenge the current historic low rate of development of underground mines of 35 meters per week.
  • the Rail-Veyor is a new type of particulate transportation machine, designed for general purposes, such as transporting minerals, cement and wood chips.
  • the Rail- Veyor comprises a pair of rails, and a set of cars interconnected by clevis joints. Each one of Jhese ⁇ ars communicates with the adjacent car, revealing no boundaries between them.
  • the element comprised by the cars, that allow this mutual connection, is an urethane flap, designed to cover the gap among two adjacent cars, providing a continuous surface at the bottom of the cars.
  • the Rail-Veyor cars do not comprehend any internal drive. They are moved along the rails by means of external drive stations which comprise rubber tires associated with electric motors. The external surface of those rubber tires are positioned in parallel with the side surfaces of the cars, and when those tires spin, they propel the Rail- Veyor forward, in the similar way that a roller coaster car is propelled over its track.
  • Another particular feature of this transportation method is the inclusion of an upper guiding plate inside of the rails, which prevents the cars from de-railing when they come across a vertical loop ahead in their path. This vertical loop defined by the Rail- Veyor's rails allows the cars to be turned upside-down, above a storage site, for the sake of material discharging.
  • Rail-Veyor can be considered "breakthrough technology" which opens a new line of opportunity to speed up the ore extraction process, when the whole ore removal operation in a hard rock mining is taken into consideration, taking into account all the auxiliary machines and methods that operate in conjunction with the Rail-Veyor, this technology alone is not capable of diminishing the time for the ore removal execution.
  • a large cross-section area of the ramp (currently in the range of at least 5 m high and 5 m wide) which require more holes to be drilled on the work face of the ramps for the placement of the explosive charges; Interference of machines and personal that get across each other when traveling in opposite directions inside of the ramp; and
  • the invention describes an ore production line for a hard rock mine that comprises the following equipment linearly arranged between the work face of the mine and the outdoor environment: at least one continuous loader machine placed nearby the work face; followed by
  • the invention also describes a Hard Rock Mining Access Plan for a hard-rock mine that includes two parallel ramps interconnected by a series of cross-cuts passageways, both ramps and the cross-cuts passageways having between 2.9 and 3.3 meters high and between 3.5 and 3.9 meters wide. Further, the invention also describes a Ground Support Installation method for a hard rock mining operation, which comprises two steps: the first step consists of installing a minimum support required to ensure the safety of the development miners and the stability of the opening for the development phase;
  • the second step consists of installing a permanent support required to ensure the safety of the workers and the opening stability throughout the mine's life.
  • Figure 1 Top perspective view of a computerized representation of the "twin ramps" comprised by the present invention
  • Figure 2 Depicts the bolt pattern applied to the spans in the ground support operation in a preferred embodiment of the invention
  • Figure 3 Depicts a top view representation of the twin ramps of the present invention connected by cross-cuts passageways;
  • Figure 4 Depicts a Hauling equipment employed by the ore production line of the conventional operation
  • Figure 5- Depicts a Continuous Loader equipment employed by the ore production line of the proposed invention
  • the present invention describes a combination of methods and equipments whose combined operation provides a faster material removal process and a faster ramp access development rate in a hard rock mining operation.
  • the invention achieves its objectives by targeting each one of the former bottlenecks encompassed by the conventional ramp development operation.
  • the present invention comprises two parallel ramps, also called “twin ramps", each one of them revealing the same cross-sectional area of: 3 meters high and 3.6 meters wide.
  • 3 m H and 3.6 m W are the preferred dimensions comprised by the twin ramps, it is worth to note that any dimensions comprised between 2.9 and 3.3 for the height and anything between 3.5 and 3.9 for the width of the ramps is under the scope of the present invention.
  • RV ramp 1 (or Rail-Veyor Ramp) is used exclusively as the passageway of the Rail-Veyor.
  • RT ramp 2 Rubber-Tired Ramp
  • RT ramp 2 Rubber-Tired Ramp
  • twin ramps follow parallel paths and they are interconnected by a series of crosscuts passageways (#3) adjoining the two ramps (#1 & 2). These passageways have the same dimensions of the RV ramp #and the RT ramp#. These ramps can be seen in Figure 3.
  • the dimensions 3 m high and 3.6 m wide were chosen, based on the sizes of the equipment employed by the present invention and the flow rate of fresh air required at the work face of the ramps. Although lower dimensions could be applied to the RV ramp, the RV ramp dimensions mimic the RT ramp dimensions mainly due to the following facts: by doing so, both ramps (the RV and the RT ramp) have similar advance rates; and, by doing so, both of them may share the same mining equipment.
  • two smaller cross sectional areas are much better suited for a faster access plan than a single large cross sectional area.
  • the reason for this is the fact that the two parallel ramps can be drilled at the same time.
  • a smaller cross sectional ramp may be opened more quickly when compared to a large cross sectional ramp. This is because a smaller cross sectional work face require less explosive holes to be drilled at the wall, less explosive charges to be placed inside those holes, and less material to be scooped out of the stope after the detonations.
  • the combination of two parallel ramps instead of only one ramp, minimizes the problem of interference/collision of vehicles cruising towards the same point while driving in opposite directions inside of the mine.
  • the twin ramps also provide a cyclical path for the circulation of fresh air inside of the mine. Notice through figure 3 that the RT ramp defines an access route to fresh air, while the RV ramp defines an exit route to the return air. This design provides a constant flow of fresh air to the workers at the face, providing a better work environment for these men.
  • the inclination of the ramps be set at approximately 15%. A steeper ramp could be achieved if the power of the drive stations and the drive capacity of the other machines were to be increased. It is suggested that anything between 14% and 16% shall be considered reasonable as the steepness rate for the twin ramps. This also takes into consideration ideal mining conditions for jumbo drills, etc.
  • the inner surfaces of the ramp walls must be covered with some sort of structural layer which is designed to prevent smaller rocks from accidentally falling inside of the ramp, exposing the workers and the equipment traveling inside of the drift.
  • ground support This structural layer is called "ground support" by the mining experts.
  • the ground support installation in conventional methods represents the longest process within the development cycle. On average the ground support installation in the conventional technique accounts for 40% of the total cycle time.
  • the first step consists of installing a minimum support required to ensure the safety of the miners and the stability of the opening for the development phase.
  • the second step consists of installing a permanent support required to ensure the safety of the workers and the opening stability throughout the mine's life.
  • the first step consists in the excavation of spans ranging from 3 to 3.6 m followed by the installation of a wire mesh of #9 or #6 gauge or the application of a layer of fiber reinforced shotcrete with a nominal thickness of 2 to 3 inches throughout the entire surface of the walls (if the local Ground Control Procedures permit).
  • the second step consists in the installation of 1.5 m long grouted rebars on 1.2 m x 1.8 m staggered pattern with a 4 m x 2.75 m welded wire mesh.
  • the fiber reinforced shotcret is applied and its given sufficient curing time so that it reaches up to 6 or 7 MPa of strength. This level of strength may be achieved when the shotcrete is cured for over 8 hours without any external interference.
  • the bolt pattern applied to the spans is preferably 3 bolts (1 per shoulder and one in the drift centre) by 2 bolts staggered (see figure 2).
  • the LHD units are currently used by the conventional methods to transport rocks from the drawbell to the Rail-Veyor. These machines are empty 50% of the time they move inside of the ramp. Nonetheless, this type of equipment is much more prone to be involved in accidents than other mining machines, since they are very human dependent, and the workers in charge of their manipulation are always under pressure due to long hour shifts and the extenuating repetitive work required by their operation.
  • LHD units therefore, are the Achilles' heel of the mucking operation in hard- rock mining that use the Rail-Veyor.
  • the present invention proposes the replacement of the LHD units by an ore production line, which comprises the following set of equipment, disposed in following arrangement between the drawbell and the loading point of the Rail-Veyor: i. At Least one Continuous Loader;
  • a continuous loader (see #6 in figure 5) is a mobile equipment that uses a gathering arm equipped with a bucket to continuously pull broken ore from the drawpoint towards an internal chain flight conveyor which has the purpose of transporting the collected material to the second type of equipment comprised by the aforementioned production line.
  • the present invention uses the ITC Schaeff Loader Model ITC 120 F4. This model will operate in a 3 m x 3.6 m drift, without slashes. It can also travel in and out of the cross-cut, underneath the twin ducts required for the push auxiliary ventilation system. Operating on a 15% down ramp, handling material with a density of 2800 kg/m 3 , the loader has a mucking capacity of 1.22 m 3 / min. The loader will remain at the face during the mucking operation and will be feeding the hauling equipment.
  • scoops such as the LHD units
  • scoops may be used only at the opening operation of the ramps and to serve minor miscellaneous functions during the rock-mining development process.
  • Paus Trucks see figure 4
  • This particular truck model can be loaded by the ITC loader at the face and dump the collected material at the ore sizer, the next step of the ore production line.
  • the truck considered is the model 8000 with an ejection box that can easily fit in a 3 m wide opening and have an acceptable turning radius.
  • the ITC 8000 truck has a payload of 13 tonnes and a speed (loaded on 15% up ramp) of 6.0 kilometers per hour.
  • the aforementioned "haulage equipment” transports the ore to the ore sizer.
  • the ore sizer consists of a hybrid portable ore crushing device equipped with a scalping screen to divert grossly oversize material from the muck flow, and either rollers or opposing jaws to reduce the run of mine ore to a maximum lump size of approximately 45 cm.
  • the storage buffer unit is made up of a series of flexible modular "shuttle" conveyors that feed material onto each other and can be easily extended and rearranged to accommodate different geometries and paths required to reach the Rail-Veyor loading point.
  • the combined storage capacity of the shuttle car system must equal the volume or capacity of a fully loaded Rail-Veyor train (approximately 50 - 60 tons). This storage capacity accommodates potential operating efficiency differences or variations by providing a pre-measured full load for the ail-Veyor, which lends itself better to automation and optimization.
  • the present invention provides a safer environment for the mining personnel.
  • This safer environment stems from the higher flow of fresh air directed to the work face provided by the twin ramps design; from a process that limits the use of scoops (LHD units) and human error derived from the use of this equipment; and from the creation of a new process that can easily be turned into an automated/remote controlled operation.

Abstract

The present invention refers to a set of methods and procedures that may be combined in order to greatly increase the speed of development of an access ramp in a underground hard-rock mine. More particularly, the present invention was designed to target all the bottle-necks comprised by the access operation of a hard-rock mine that employs a Rail-Veyor machine. The invention also comprises of an ore production line which consists in the sequential arrangement of a series of mining equipment between the work face and the entrance of a hard-rock mine. The invention also comprises a Hard Rock Mining Access Plan for a hard-rock mine which encompasses two parallel ramps interconnected by cross-cut passageways. Further, invention also comprises a Ground Support Installation method configured to shorten the time required for the installation of ground support inside of a hard-rock mine.

Description

"ORE REMOVAL PRODUCTION LINE, TWIN RAMPS AND GROUND SUPPORT
INSTALLATION METHOD"
The present invention refers to a set of methods and procedures that may be combined in order to greatly increase the speed of development of an access ramp in a underground hard-rock mine.
Background of the Invention
In a hard-rock mining operation, compressing the time required to bring an ore body into production allows for a faster generation of value, for an increase in the operating margins and to ensure that a project is completed on time and inside the boundaries of a predefined budget.
In this context, a new technology, named "Rail-Veyor" (described on the patent application US2007/088107) provides a new platform to revolutionise the way material is removed of an underground mine. The Rail-Veyor technology presents the opportunity to challenge the current historic low rate of development of underground mines of 35 meters per week.
The Rail-Veyor is a new type of particulate transportation machine, designed for general purposes, such as transporting minerals, cement and wood chips. The Rail- Veyor comprises a pair of rails, and a set of cars interconnected by clevis joints. Each one of Jhese ^ars communicates with the adjacent car, revealing no boundaries between them. The element comprised by the cars, that allow this mutual connection, is an urethane flap, designed to cover the gap among two adjacent cars, providing a continuous surface at the bottom of the cars.
The Rail-Veyor cars do not comprehend any internal drive. They are moved along the rails by means of external drive stations which comprise rubber tires associated with electric motors. The external surface of those rubber tires are positioned in parallel with the side surfaces of the cars, and when those tires spin, they propel the Rail- Veyor forward, in the similar way that a roller coaster car is propelled over its track. Another particular feature of this transportation method is the inclusion of an upper guiding plate inside of the rails, which prevents the cars from de-railing when they come across a vertical loop ahead in their path. This vertical loop defined by the Rail- Veyor's rails allows the cars to be turned upside-down, above a storage site, for the sake of material discharging.
Although the Rail-Veyor can be considered "breakthrough technology" which opens a new line of opportunity to speed up the ore extraction process, when the whole ore removal operation in a hard rock mining is taken into consideration, taking into account all the auxiliary machines and methods that operate in conjunction with the Rail-Veyor, this technology alone is not capable of diminishing the time for the ore removal execution.
Conventional methods of development do not use the Rail-Veyor technology in hard rock mining operations, and they involve other auxiliary equipment, procedures and methods that advance at slower rates, but have been utilized extensively in traditional development processes. For example, conventional methods of development have more extensive use of the LHD (load haul dump) equipment and haulage trucks. During the ore removal process, the LHD unit is empty (carrying no payload) 50% of the time. This equipment is very dependent on a human operator's skill and requires a great level of attention by the personnel involved in its manipulation. Further, it is noteworthy that the increased productivity levels demanded by the mining industry require that an operator performs the load-haul-dump cycle up to 250 times each working shift. This level of repetitive work cannot be safely sustained for the whole period as an operator will quickly tire after only four hours, thereby significantly increasing the risk of making costly mistakes that can result in equipped damage or even injury.
Other factors that contribute to slow down the ore removal operation in conventional operations, aside from the LHD units, are:
A large cross-section area of the ramp (currently in the range of at least 5 m high and 5 m wide) which require more holes to be drilled on the work face of the ramps for the placement of the explosive charges; Interference of machines and personal that get across each other when traveling in opposite directions inside of the ramp; and
The slow installation of ground support due to a higher ground support surface area and the old-fashioned methods currently employed in this operation;
Objectives
It is proposed that the following objectives would be desirable in appropriate development applications:
• To speed up the process of development of an access to the ore body inside a hard rock mine.
• To remove the bottlenecks comprised by the conventional ramp development methods.
• To provide more safety for the hard rock mining process. Brief Description of the Invention
The invention describes an ore production line for a hard rock mine that comprises the following equipment linearly arranged between the work face of the mine and the outdoor environment: at least one continuous loader machine placed nearby the work face; followed by
at least one Hauling Equipment; followed by
an Ore Sizer Equipment; followed by
a Storage Buffer; followed by
a Rail-Veyor machine.
The invention also describes a Hard Rock Mining Access Plan for a hard-rock mine that includes two parallel ramps interconnected by a series of cross-cuts passageways, both ramps and the cross-cuts passageways having between 2.9 and 3.3 meters high and between 3.5 and 3.9 meters wide. Further, the invention also describes a Ground Support Installation method for a hard rock mining operation, which comprises two steps: the first step consists of installing a minimum support required to ensure the safety of the development miners and the stability of the opening for the development phase;
the second step consists of installing a permanent support required to ensure the safety of the workers and the opening stability throughout the mine's life.
Brief Description of the Figures
Figure 1 - Top perspective view of a computerized representation of the "twin ramps" comprised by the present invention;
Figure 2 - Depicts the bolt pattern applied to the spans in the ground support operation in a preferred embodiment of the invention;
Figure 3 - Depicts a top view representation of the twin ramps of the present invention connected by cross-cuts passageways;
Figure 4 - Depicts a Hauling equipment employed by the ore production line of the conventional operation;
Figure 5- Depicts a Continuous Loader equipment employed by the ore production line of the proposed invention;
Detailed Description of the Invention
The present invention describes a combination of methods and equipments whose combined operation provides a faster material removal process and a faster ramp access development rate in a hard rock mining operation.
The invention achieves its objectives by targeting each one of the former bottlenecks encompassed by the conventional ramp development operation.
In a preferred embodiment, the present invention comprises two parallel ramps, also called "twin ramps", each one of them revealing the same cross-sectional area of: 3 meters high and 3.6 meters wide. Although 3 m H and 3.6 m W are the preferred dimensions comprised by the twin ramps, it is worth to note that any dimensions comprised between 2.9 and 3.3 for the height and anything between 3.5 and 3.9 for the width of the ramps is under the scope of the present invention.
The first ramp, called RV ramp 1 (or Rail-Veyor Ramp) is used exclusively as the passageway of the Rail-Veyor.
The second ramp, called RT ramp 2 (or Rubber-Tired Ramp) is designed to encompass all other wheeled equipment that may come inside of the mine.
The twin ramps follow parallel paths and they are interconnected by a series of crosscuts passageways (#3) adjoining the two ramps (#1 & 2). These passageways have the same dimensions of the RV ramp #and the RT ramp#. These ramps can be seen in Figure 3.
The dimensions 3 m high and 3.6 m wide were chosen, based on the sizes of the equipment employed by the present invention and the flow rate of fresh air required at the work face of the ramps. Although lower dimensions could be applied to the RV ramp, the RV ramp dimensions mimic the RT ramp dimensions mainly due to the following facts: by doing so, both ramps (the RV and the RT ramp) have similar advance rates; and, by doing so, both of them may share the same mining equipment.
Many advantages are proposed by the present invention stem from the two parallel ramps having smaller cross sectional areas.
Firstly, it should be noted that, two smaller cross sectional areas are much better suited for a faster access plan than a single large cross sectional area. The reason for this is the fact that the two parallel ramps can be drilled at the same time. Further, it is obvious that a smaller cross sectional ramp may be opened more quickly when compared to a large cross sectional ramp. This is because a smaller cross sectional work face require less explosive holes to be drilled at the wall, less explosive charges to be placed inside those holes, and less material to be scooped out of the stope after the detonations. Additionally, the combination of two parallel ramps, instead of only one ramp, minimizes the problem of interference/collision of vehicles cruising towards the same point while driving in opposite directions inside of the mine.
The twin ramps also provide a cyclical path for the circulation of fresh air inside of the mine. Notice through figure 3 that the RT ramp defines an access route to fresh air, while the RV ramp defines an exit route to the return air. This design provides a constant flow of fresh air to the workers at the face, providing a better work environment for these men.
It is suggested that the inclination of the ramps be set at approximately 15%. A steeper ramp could be achieved if the power of the drive stations and the drive capacity of the other machines were to be increased. It is suggested that anything between 14% and 16% shall be considered reasonable as the steepness rate for the twin ramps. This also takes into consideration ideal mining conditions for jumbo drills, etc.
Whenever the integrity of the ground of a hard rock body is potentially compromised by mining activity, the inner surfaces of the ramp walls must be covered with some sort of structural layer which is designed to prevent smaller rocks from accidentally falling inside of the ramp, exposing the workers and the equipment traveling inside of the drift.
This structural layer is called "ground support" by the mining experts. The ground support installation in conventional methods represents the longest process within the development cycle. On average the ground support installation in the conventional technique accounts for 40% of the total cycle time.
One opportunity to speed up the ground support installation is to stage the ground support operation in two distinct steps. The first step consists of installing a minimum support required to ensure the safety of the miners and the stability of the opening for the development phase. The second step consists of installing a permanent support required to ensure the safety of the workers and the opening stability throughout the mine's life. The first step consists in the excavation of spans ranging from 3 to 3.6 m followed by the installation of a wire mesh of #9 or #6 gauge or the application of a layer of fiber reinforced shotcrete with a nominal thickness of 2 to 3 inches throughout the entire surface of the walls (if the local Ground Control Procedures permit).
The second step consists in the installation of 1.5 m long grouted rebars on 1.2 m x 1.8 m staggered pattern with a 4 m x 2.75 m welded wire mesh.
Alternatively, there might be no second step if the fiber reinforced shotcret is applied and its given sufficient curing time so that it reaches up to 6 or 7 MPa of strength. This level of strength may be achieved when the shotcrete is cured for over 8 hours without any external interference.
The bolt pattern applied to the spans is preferably 3 bolts (1 per shoulder and one in the drift centre) by 2 bolts staggered (see figure 2).
Additionally, 8 bolts shall be installed for each welded wire screen applied for the present drift dimensions.
Another major bottleneck in the conventional ore removal process is the slow rate of transportation of material from the work face (#4 in figure 3) to the loading point of the Rail-Veyor.
As stated on the description of conventional method earlier in this document, the LHD units are currently used by the conventional methods to transport rocks from the drawbell to the Rail-Veyor. These machines are empty 50% of the time they move inside of the ramp. Nonetheless, this type of equipment is much more prone to be involved in accidents than other mining machines, since they are very human dependent, and the workers in charge of their manipulation are always under pressure due to long hour shifts and the extenuating repetitive work required by their operation.
These LHD units, therefore, are the Achilles' heel of the mucking operation in hard- rock mining that use the Rail-Veyor. The present invention proposes the replacement of the LHD units by an ore production line, which comprises the following set of equipment, disposed in following arrangement between the drawbell and the loading point of the Rail-Veyor: i. At Least one Continuous Loader;
ii. At Least one Haulage equipment;
iii. One Ore Sizer; and
iv. One Storage Buffer
The four types of equipment listed above are described in details bellow:
Continuous Loader
A continuous loader (see #6 in figure 5) is a mobile equipment that uses a gathering arm equipped with a bucket to continuously pull broken ore from the drawpoint towards an internal chain flight conveyor which has the purpose of transporting the collected material to the second type of equipment comprised by the aforementioned production line.
In a preferred embodiment, the present invention uses the ITC Schaeff Loader Model ITC 120 F4. This model will operate in a 3 m x 3.6 m drift, without slashes. It can also travel in and out of the cross-cut, underneath the twin ducts required for the push auxiliary ventilation system. Operating on a 15% down ramp, handling material with a density of 2800 kg/m3, the loader has a mucking capacity of 1.22 m3 / min. The loader will remain at the face during the mucking operation and will be feeding the hauling equipment.
Two of these loaders are required for achieving the best operational results in the hard rock mining access development.
In parallel to the use of the continuous loader, scoops (such as the LHD units) may be used only at the opening operation of the ramps and to serve minor miscellaneous functions during the rock-mining development process.
Haulage equipment After the Continuous Loader, the rocks are transported to a hauling equipment (#5 in figure 4).
When the scoops are employed (on the first meters excavated in the rock body, for instance) the very same equipment is used for the hauling step. Similarly, when the ITC Schaeff Loader (or a similar equipment is used) a truck is employed at the hauling phase.
An alternative suggestion is for Paus Trucks (see figure 4) to be used as preferred equipment employed at this step. This particular truck model can be loaded by the ITC loader at the face and dump the collected material at the ore sizer, the next step of the ore production line. The truck considered is the model 8000 with an ejection box that can easily fit in a 3 m wide opening and have an acceptable turning radius. The ITC 8000 truck has a payload of 13 tonnes and a speed (loaded on 15% up ramp) of 6.0 kilometers per hour.
Preferably, in order to achieve optimum operational results, three trucks are simultaneously used.
Ore Sizer
The aforementioned "haulage equipment" transports the ore to the ore sizer.
The ore sizer consists of a hybrid portable ore crushing device equipped with a scalping screen to divert grossly oversize material from the muck flow, and either rollers or opposing jaws to reduce the run of mine ore to a maximum lump size of approximately 45 cm.
Storage Buffer
The storage buffer unit is made up of a series of flexible modular "shuttle" conveyors that feed material onto each other and can be easily extended and rearranged to accommodate different geometries and paths required to reach the Rail-Veyor loading point. The combined storage capacity of the shuttle car system must equal the volume or capacity of a fully loaded Rail-Veyor train (approximately 50 - 60 tons). This storage capacity accommodates potential operating efficiency differences or variations by providing a pre-measured full load for the ail-Veyor, which lends itself better to automation and optimization.
Advantages:
All the methods and equipment described above, when working altogether, significantly increase the speed of access to the ore body in a rock mass as compared to conventional methods under the appropriate circumstances. From the initial 35 m / week depicted by the previous technologies, the present invention was able to improve the access rate in a hard rock mine to an overwhelming rate of 143 m / week in these minimal available headings.
Additionally, the present invention provides a safer environment for the mining personnel. This safer environment stems from the higher flow of fresh air directed to the work face provided by the twin ramps design; from a process that limits the use of scoops (LHD units) and human error derived from the use of this equipment; and from the creation of a new process that can easily be turned into an automated/remote controlled operation.
Although the present invention has been described in details with regards to the exemplary embodiments thereof and accompanying drawings, it should be apparent to those skilled in the art that various modifications of the present invention may be accomplished without departing from the spirit and the scope of the invention. Accordingly, the invention is not limited to the precise embodiments shown in the drawings and described above. Rather, it is intended that all such variations not departing from the spirit of the invention be considered as within the scope thereof as limited solely by the claims appended hereto.

Claims

1 - Ore production line for a hard rock mine, wherein it comprises the following equipment, linearly and sequentially arranged between the work face of the mine and the outdoor environment: at least one continuous loader machine placed nearby the work face; followed by
at least one Haulage Equipment; followed by
an Ore Sizer Equipment; followed by
a Storage Buffer; followed by
a Rail-Veyor machine.
2 - Ore production line, according to claim 1, wherein it comprehends two continuous loader machines, each one of them being a ITC Schaeff Loader Model ITC 120 F4.
3 - Ore production line, according to claim 1, wherein it comprehends three Hauling Equipments, each one of them being a Paus Truck of the ITC 8000 model.
4 - Ore production line, according to claim 1, wherein it comprehends one Ore Sizer Equipment configured to limit the particle size of the collected material to a maximum lump size of 45 cm.
5 - Ore production line, according to claim 1, wherein the Storage Buffer is made up of a series of flexible modular shuttle conveyors integrated in an interconnected arrangement.
6 - Ore production line, according to claim 5, wherein the Storage Buffer is capable of holding the volume of a fully loaded Rail-Veyor.
7 - Hard Rock Mining Access Plan for a hard-rock mine, wherein it includes two parallel ramps interconnected by a series of cross-cuts passageways, both ramps and the crosscuts passageways being 2.9 to 3.3 meters high and 3.5 to 3.9 meters wide. 8 - Hard Rock Mining Access Plan according to claim 7, wherein one of the ramps is exclusively set to accommodate a rail-veyor and the other ramp is set to be used by all other wheeled equipment that may come inside of the mine.
9 - Hard Rock Mining Access Plan according to claim 7, wherein the ramps inclination is set to be anywhere between 14% and 16%.
10 - Ground Support Installation method for a hard rock mining operation, wherein it comprises two steps:
- the first step consists of installing a minimum support required to insure the safety of the development miners and the stability of the opening for the development phase;
- the second step consists of installing a permanent support required to ensure the safety of the workers and the opening stability throughout the mine's life.
11 - Ground Support Installation method according to claim 10, wherein the first step consists in the insertion of spans ranging from 3 to 3.6 m followed by the installation of a wire mesh of #9 or #6 gauge or the application of a layer of fiber reinforced shotcrete with a nominal thickness of 2 to 3 inches; and the second step consists in the installation of 1.5 m long grouted rebars on 1.2 m x 1.8 m staggered pattern with 4 m x 2.75 m welded wire mesh.
12 - Hard rock mining access operation, wherein it comprises the Ore Production Line defined on claim 1; the Hard Rock Mining Access Plan defined on claim 7; and the Ground Support Installation Method defined on claim 10.
PCT/CA2014/000428 2013-05-17 2014-05-20 Ore removal production line, twin ramps and ground support installation method WO2014183199A1 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
EA201592187A EA029688B1 (en) 2013-05-17 2014-05-20 Ore production system
EP14797857.1A EP2997227A4 (en) 2013-05-17 2014-05-20 Ore removal production line, twin ramps and ground support installation method

Applications Claiming Priority (4)

Application Number Priority Date Filing Date Title
US201361824749P 2013-05-17 2013-05-17
US201361824838P 2013-05-17 2013-05-17
US61/824,749 2013-05-17
US61/824,838 2013-05-17

Publications (1)

Publication Number Publication Date
WO2014183199A1 true WO2014183199A1 (en) 2014-11-20

Family

ID=51895218

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CA2014/000428 WO2014183199A1 (en) 2013-05-17 2014-05-20 Ore removal production line, twin ramps and ground support installation method

Country Status (8)

Country Link
US (1) US10151200B2 (en)
EP (1) EP2997227A4 (en)
AU (1) AU2014202712C1 (en)
BR (1) BR102014012028B1 (en)
CA (1) CA2852096C (en)
CL (1) CL2014001305A1 (en)
EA (1) EA029688B1 (en)
WO (1) WO2014183199A1 (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10445443B2 (en) * 2015-09-28 2019-10-15 Freeport-Mcmoran Inc. Ground support design tool
CN106499395B (en) * 2016-12-05 2018-08-07 广西大学 The quick-fried power of shallow bore hole rock drilling-scraper cooperates with haulage Sublevel room mining
CN107152278A (en) * 2016-12-12 2017-09-12 中煤第五建设有限公司第二工程处 Bridge conveyor walking limit alarm device
CN109236369B (en) * 2018-09-12 2020-11-03 安徽理工大学 Coal mine gas real-time collection and conversion device
CN109519171B (en) * 2018-12-06 2020-05-12 河南工程学院 A intelligent collection device for in coal exploitation
CN113266389B (en) * 2021-06-23 2023-11-21 铜陵有色金属集团铜冠矿山建设股份有限公司 Mine rail transportation horizontal water sump dredging structure and method

Citations (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3975053A (en) * 1973-12-03 1976-08-17 Kochanowsky Boris J Mining methods as such and combined with equipment
US4418872A (en) * 1979-07-06 1983-12-06 Baker Mine Services, Inc. Feeder/crusher machine
US4512610A (en) * 1983-05-27 1985-04-23 Mobil Oil Corporation Mining system
US4758049A (en) * 1985-09-12 1988-07-19 Voest-Alpine Aktiengesellschaft Apparatus for the underground operation of a movable mining machine
US4957405A (en) 1988-09-26 1990-09-18 Consolidation Coal Company Apparatus for mining
US5246274A (en) 1992-06-04 1993-09-21 Amvest Corporation Remote mining haulage system with self-advancing mobile tailpiece and method of operating same
US6761504B1 (en) * 1998-07-20 2004-07-13 Mbt Holding Ag Waterproof cladding construction and method of providing the same
US20060162608A1 (en) * 2005-01-21 2006-07-27 Dibble Merton F Light rail transport system for bulk materials
US20070088107A1 (en) 2005-10-13 2007-04-19 Alexander Meyer Production and use of polycarbonates with special purified, oligomeric epoxy resins
US7736738B2 (en) * 2003-12-17 2010-06-15 Terrasimco Inc. Coated mining bolt
US20110253502A1 (en) 2010-04-16 2011-10-20 Brad Neilson Conveyor system for continuous surface mining
US20120007413A1 (en) * 2010-07-09 2012-01-12 Zimmerman Joseph J Continuous-extraction mining system
CN202187764U (en) 2011-08-15 2012-04-11 王兴龙 Integrally moving type mining and dressing unit in sand mine
US20120107049A1 (en) * 2010-10-28 2012-05-03 Hyundai Engineering & Construction Co., Ltd. Tunnel reinforcement structure and tunnel construction method capable of controlling ground displacement using pressurization
CN102748021A (en) * 2012-07-03 2012-10-24 河北天择重型机械有限公司 Multifunctional coal loader
CN202559401U (en) * 2011-03-12 2012-11-28 刘素华 Rolling-rake material loader
US8376660B2 (en) * 2008-01-04 2013-02-19 Nv Bekaert Sa Mining mesh with double knot

Family Cites Families (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2874945A (en) * 1956-12-24 1959-02-24 Goodman Mfg Co Mining systems of the room and pillar type
US3752334A (en) * 1971-11-18 1973-08-14 Dravo Corp Industrial bulk material transportation
US4440448A (en) * 1980-10-24 1984-04-03 Gustav Hoberstorfer Method for opening mineral deposit and subsequent mining thereof
US20030226470A1 (en) 2002-06-11 2003-12-11 Dibble Merton F. Rail transport system for bulk materials
US6945738B2 (en) * 2003-10-07 2005-09-20 Dbt America Method and apparatus for safety protection of temporary roof support
US7503731B2 (en) * 2004-12-16 2009-03-17 Seegmiller Ben L Yieldable prop for roof and ground control
WO2008079866A2 (en) 2006-12-21 2008-07-03 Rail-Veyor Systems, Inc. Method of controlling a rail transport system for conveying bulk materials
CA2692950C (en) * 2007-07-09 2016-06-21 Yves Potvin A mesh system
CA2741315C (en) * 2008-10-17 2013-07-09 Frank Wegner Donnelly Rail conveyance system
US9061692B1 (en) 2011-08-09 2015-06-23 Rail-Veyor Systems, Inc. System and method for train position sensing
US8955667B1 (en) 2011-08-09 2015-02-17 Rail-Veyor Systems, Inc. Bulk material handling system and method
US20140262219A1 (en) * 2013-03-14 2014-09-18 Richard Beddoes Dual underground tunnel system for hydrocarbon exploitation

Patent Citations (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3975053A (en) * 1973-12-03 1976-08-17 Kochanowsky Boris J Mining methods as such and combined with equipment
US4418872A (en) * 1979-07-06 1983-12-06 Baker Mine Services, Inc. Feeder/crusher machine
US4512610A (en) * 1983-05-27 1985-04-23 Mobil Oil Corporation Mining system
US4758049A (en) * 1985-09-12 1988-07-19 Voest-Alpine Aktiengesellschaft Apparatus for the underground operation of a movable mining machine
US4957405A (en) 1988-09-26 1990-09-18 Consolidation Coal Company Apparatus for mining
US5246274A (en) 1992-06-04 1993-09-21 Amvest Corporation Remote mining haulage system with self-advancing mobile tailpiece and method of operating same
US6761504B1 (en) * 1998-07-20 2004-07-13 Mbt Holding Ag Waterproof cladding construction and method of providing the same
US7736738B2 (en) * 2003-12-17 2010-06-15 Terrasimco Inc. Coated mining bolt
US20060162608A1 (en) * 2005-01-21 2006-07-27 Dibble Merton F Light rail transport system for bulk materials
US20070088107A1 (en) 2005-10-13 2007-04-19 Alexander Meyer Production and use of polycarbonates with special purified, oligomeric epoxy resins
US8376660B2 (en) * 2008-01-04 2013-02-19 Nv Bekaert Sa Mining mesh with double knot
US20110253502A1 (en) 2010-04-16 2011-10-20 Brad Neilson Conveyor system for continuous surface mining
US20120007413A1 (en) * 2010-07-09 2012-01-12 Zimmerman Joseph J Continuous-extraction mining system
US20120107049A1 (en) * 2010-10-28 2012-05-03 Hyundai Engineering & Construction Co., Ltd. Tunnel reinforcement structure and tunnel construction method capable of controlling ground displacement using pressurization
CN202559401U (en) * 2011-03-12 2012-11-28 刘素华 Rolling-rake material loader
CN202187764U (en) 2011-08-15 2012-04-11 王兴龙 Integrally moving type mining and dressing unit in sand mine
CN102748021A (en) * 2012-07-03 2012-10-24 河北天择重型机械有限公司 Multifunctional coal loader

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
"PROCEEDINGS OF THE INTERNATIONAL CONFERENCE ON ROBOTICS AND AUTOMATION", vol. 3, 15 May 1989, IEEE COMP. SOC. PRESS, pages: 1478 - 1483
KWITOWSKI A J ET AL.: "COMPUTER-BASED, TELE-OPERATION OF A NEW HIGHWALL MINING SYSTEM", PROCEEDINGS OF THE INTERNATIONAL CONFERENCE ON ROBOTICS AND AUTOMATION, 15 May 1989 (1989-05-15)
See also references of EP2997227A4 *

Also Published As

Publication number Publication date
CA2852096C (en) 2019-03-26
AU2014202712B2 (en) 2017-06-29
CA2852096A1 (en) 2014-11-17
US10151200B2 (en) 2018-12-11
AU2014202712A1 (en) 2014-12-04
EP2997227A4 (en) 2017-08-16
US20140339880A1 (en) 2014-11-20
EA201592187A1 (en) 2016-05-31
BR102014012028A8 (en) 2018-06-19
CL2014001305A1 (en) 2015-02-27
AU2014202712C1 (en) 2017-09-28
EA029688B1 (en) 2018-04-30
BR102014012028B1 (en) 2021-05-11
BR102014012028A2 (en) 2015-11-10
EP2997227A1 (en) 2016-03-23

Similar Documents

Publication Publication Date Title
CA2852096C (en) Ore removal production line, twin ramps and ground support installation method
CN102889084B (en) Continuous mining technique for thin coal layer of opencast coal mine
JP5444169B2 (en) Shield tunnel construction method
US20160186566A1 (en) Apparatus, system and method for material extraction in underground hard rock mining
US11391151B2 (en) Automatic coal mining machine and fluidized coal mining method
CN111980709B (en) Continuous mining method for high-inclination-angle thick coal seam slope coal
CN106761808A (en) A kind of track traffic bored tunnel electric railcar transports corollary system
CN102587903A (en) Comprehensive tunneling system for stone drift
JP5584813B2 (en) Shield tunnel construction method
CN206409240U (en) A kind of track traffic bored tunnel electric railcar transports corollary system
US20220162941A1 (en) Vehicle and Process for Moving Coarse Ore
Rakishev et al. Effective technology of stripping operations in deep coal opencasts with railway and auto truck transport
JP6973787B2 (en) Pyroclastic system and crushing method of rock crushing
JP4548904B2 (en) Method for projecting tunnel and hopper used in the method
CN114687739B (en) Upward horizontal layered filling mining method with non-explosive mechanical rock breaking arranged perpendicular to trend
CN112267886B (en) Strip mine mining and transporting method
Siemens et al. Continuous loading–a safe, efficient, and productive alternative for the loading of muck at the development face
Matsui Underground mining transportation systems
WO2024031130A1 (en) Underground mining
JPH06212886A (en) Waste transferring method in tunnel
CN111622759A (en) Double-lane strip type triangular coal mining method
Kramer SUBSURFACE CONSTRUCTION AND DEVELOPMENT ANALYSIS
Shields et al. Mechanical Mining in Some Bituminous-coal Mines: Progress Report 9: Face Haulage
Burke et al. Electro-monorails-an alternative operating system for deep mining
JPH0478672A (en) Crushed stone transporting device

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 14797857

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

REG Reference to national code

Ref country code: BR

Ref legal event code: B01A

Ref document number: 112015028149

Country of ref document: BR

WWE Wipo information: entry into national phase

Ref document number: 2014797857

Country of ref document: EP

WWE Wipo information: entry into national phase

Ref document number: 201592187

Country of ref document: EA

ENP Entry into the national phase

Ref document number: 112015028149

Country of ref document: BR

Kind code of ref document: A2

Effective date: 20151109