WO2014082281A1 - Procédé de mise en œuvre pour pool de ressources de bande de base de liaison montante et de liaison descendante et station de base - Google Patents

Procédé de mise en œuvre pour pool de ressources de bande de base de liaison montante et de liaison descendante et station de base Download PDF

Info

Publication number
WO2014082281A1
WO2014082281A1 PCT/CN2012/085621 CN2012085621W WO2014082281A1 WO 2014082281 A1 WO2014082281 A1 WO 2014082281A1 CN 2012085621 W CN2012085621 W CN 2012085621W WO 2014082281 A1 WO2014082281 A1 WO 2014082281A1
Authority
WO
WIPO (PCT)
Prior art keywords
board
channel
slave
control module
main
Prior art date
Application number
PCT/CN2012/085621
Other languages
English (en)
Chinese (zh)
Inventor
符鸿亮
何伟
郑中亮
Original Assignee
华为技术有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 华为技术有限公司 filed Critical 华为技术有限公司
Priority to PCT/CN2012/085621 priority Critical patent/WO2014082281A1/fr
Priority to CN201280002552.5A priority patent/CN103222325B/zh
Publication of WO2014082281A1 publication Critical patent/WO2014082281A1/fr

Links

Images

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W24/00Supervisory, monitoring or testing arrangements
    • H04W24/02Arrangements for optimising operational condition

Definitions

  • the present invention relates to the field of wireless communication technologies, and in particular, to a method and a base station for implementing a downlink and uplink baseband resource pool in a long term evolution LTE base station.
  • the baseband board In Long Term Evolution (LTE) systems, the baseband board is responsible for implementing physical layer protocols, baseband related algorithms, and product related features throughout the base station system. As the protocol evolves, the complexity of the physical layer protocol, the complexity of the algorithm, and the application scenarios of the product become more and more complex, requiring the processing capability of the baseband board to be higher and higher.
  • LTE Long Term Evolution
  • some base station systems have both an old version of the baseband board and a new version of the baseband board.
  • the old version of the baseband board can support some old protocols, algorithms, and features; the new version of the new baseband board supports new protocols, algorithms, and features.
  • the combination of the new and old versions of the baseband board is to use the old and new versions of the baseband board. Specifically, the old version of the baseband board handles some users, while the new version of the baseband board handles other users. Operators save a lot of money.
  • the downlink resource pool of the base station system has two baseband boards: a main board and a slave board, the main board is a new version of the baseband board, and the slave board is an old version of the baseband board.
  • the main board handles the channel of a part of the user, and the slave board processes the channel of another part of the user.
  • the extent to which the slave board processes the user data to the bit level is ended, and then the bit level data is transmitted to the motherboard, and the remaining processing of all users is performed by the motherboard.
  • the uplink resource pool of the base station system has two baseband boards: a main board and a slave board, the main board processes a part of the user's channel, and the slave board processes another part of the user's channel.
  • the bit level only accounts for 30% of the total computational load.
  • the slave board does not share the processing amount of the entire downlink user well.
  • the user allocates the board and the slave board according to the user. When multiple user frequency domain resources are multiplexed, if they are allocated on different baseband boards, it will cause repeated calculations and waste hardware resources.
  • the technical problem to be solved by the present invention is to provide a method and a base station for implementing a downlink and uplink baseband resource pool in an LTE base station, which can reasonably utilize the processing capability of the main board and the slave board, and solve the coupling between users in the channel.
  • An aspect of the present invention is to provide a method for implementing a downlink baseband resource pool in an LTE base station, including: the main control module dispatches the information to the main board and the slave board according to the information of the downlink user configured on the main board and the slave board respectively Corresponding downlink user's channel; the main board and the slave board respectively perform bit level and symbol level processing on information carried by the channel of the downlink user scheduled by the main control module, and obtain time domain data generated by the main board Time domain data generated from the slave board.
  • the step of performing processing at the bit level and the symbol level on the information carried by the main board and the slave board respectively on the channel of the downlink user scheduled by the main control module including: the main board and the slave board respectively And performing bit level and symbol level processing on the information carried by the physical downlink shared channel PDSCH of the downlink user scheduled by the main control module; or, the main board and the slave board are respectively scheduled to the main control module.
  • the information carried by the physical downlink control channel PDCCH of the downlink user performs bit level and symbol level processing.
  • the step of the main control module scheduling the channel of the corresponding downlink user to the main board and the slave board according to the downlink user information that the main board and the slave board respectively have configured including: the main control module according to the main board and The downlink user information and load balancing respectively configured by the slave board, and the channel of the downlink user that needs to be processed by the current transmission time interval TTI corresponding to the load condition of the board and the slave board are scheduled to be sent to the board and the slave board.
  • the step of the main control module scheduling the channel of the corresponding downlink user to the main board and the slave board according to the downlink user information that the main board and the slave board respectively have configured including: the main control module according to the main board and Downlink user information that has been configured on the slave board, and processing capabilities or supported characteristics of the master board and the slave board, and scheduling downlink users corresponding to their processing capabilities or supported characteristics to the motherboard and the slave board Channel.
  • the method further includes: a control format indication CFI, a hybrid automatic repeat request indication HI, a physical broadcast channel PBCH, a synchronization channel SCH, and a positioning-pilot P of the downlink user allocated by the main board to the main control module.
  • a control format indication CFI a hybrid automatic repeat request indication HI
  • a physical broadcast channel PBCH a physical broadcast channel PBCH
  • a synchronization channel SCH a positioning-pilot P of the downlink user allocated by the main board to the main control module.
  • -RS and channel state information The information carried by the pilot CSI-RS common channel is processed.
  • the method includes: the main control module respectively speaking to the The main board and the slave board configure information of the downlink user.
  • the main board and the slave board respectively perform bit level and symbol level processing on information carried by the channel of the downlink user scheduled by the main control module, and obtain time domain data and a field generated by the main board.
  • the method includes: transmitting, by the slave board, time domain data generated by the slave board to the motherboard; the motherboard generates time domain data from the slave board and the board The time domain data is superimposed; the main board sends the superposed time domain data to the middle radio frequency module.
  • Another aspect of the present invention provides a method for implementing an uplink baseband resource pool in an LTE base station, including: the main control module scheduling corresponding to the main board and the slave board according to different channels configured by the main board and the slave board respectively An uplink user of the channel; the main board and the slave board respectively process information carried by a channel of an uplink user scheduled by the main control module.
  • the step of the main control module scheduling the uplink user of the corresponding channel to the main board according to the different channels configured by the main board includes: the main control module scheduling the main board according to different channels configured by the main board An uplink user of the physical uplink shared channel PUSCH, or an uplink user that schedules a physical uplink control channel PUCCH to the main board, or an uplink user that schedules a measurement reference signal SRS to the main board, or schedules a physical random access channel PRACH to the main board Upstream users.
  • the step of processing, by the main board, the information carried by the channel of the uplink user scheduled by the main control module includes: the host board carries the channel of the uplink user of the PUSCH scheduled by the main control module.
  • the information is processed by the main board to the information carried by the channel of the uplink user of the scheduled PUCCH of the main control module; or the main board of the uplink user of the SRS that has been scheduled by the main control module
  • the information carried by the channel is processed; or the main board processes information carried by the channel of the uplink user of the PRACH scheduled by the main control module.
  • the step of the main control module scheduling the uplink user of the corresponding channel to the slave board according to different channels configured by the board includes: the master control module according to different channels configured by the slave board,
  • the slave board is configured to schedule an uplink user of the PUSCH, or an uplink user that schedules a PUCCH to the slave board, or an uplink user that schedules an SRS to the slave board, or an uplink user that schedules a PRACH to the slave board.
  • the step of processing, by the slave board, the information carried by the channel of the uplink user scheduled by the master control module includes: the slave board is configured by the uplink user channel of the PUSCH scheduled by the master control module.
  • the information carried by the uplink device of the PUCCH scheduled by the main control module is processed by the slave board; or the SRS is scheduled by the slave board to the master control module.
  • the information carried by the channel of the uplink user is processed; or the slave board processes information carried by the channel of the uplink user of the PRACH scheduled by the master module.
  • the main control module separately includes: the main control module respectively to the main board
  • the information about the uplink user in the cell is repeatedly configured with the slave board, and the master control module separately configures different channels to the motherboard and the slave board.
  • the step of the main control module scheduling the uplink user of the corresponding channel to the main board and the slave board according to different channels configured by the main board and the slave board respectively including: the main control module according to the main board and the An uplink user that needs to be processed by scheduling a TTI of a corresponding channel to the main board and the slave board by using different channels that have been configured on the slave board.
  • the main board and the slave board After the step of processing, by the main board and the slave board, the information carried by the channel of the uplink user scheduled by the main control module, the board and the slave board carry the channel The processed information is reported to the main control module.
  • a further aspect of the present invention is to provide a base station, the base station includes: a main control module, a main board, and a slave board; the main control module is configured to respectively perform downlink user information according to the main board and the slave board And scheduling, by the main board and the slave board, a channel of a corresponding downlink user; the main board and the slave board are configured to perform bit level and symbol respectively on information carried by a channel of a downlink user scheduled by the main control module Level processing, obtaining time domain data generated by the motherboard and time domain data generated by the slave board.
  • the main board includes a main board baseband processing module
  • the slave board includes a slave board baseband processing module
  • the main board baseband processing module and the slave board baseband processing module are respectively used for the downlink user scheduled by the main control module.
  • the information carried by the PDSCH channel is processed at the bit level and the symbol level; or the main board baseband processing module and the slave baseband processing module are respectively used for the PDCCH channel of the downlink user scheduled by the main control module
  • the carried information is processed at the bit level and symbol level.
  • the main control module includes a scheduling unit, and the scheduling unit is configured to schedule, according to the downlink user information and load balancing configured by the main board and the slave board, the load corresponding to the main board and the slave board.
  • the current TTI of the situation needs to be processed by the downlink user's channel.
  • the main control module includes a scheduling unit, where the scheduling unit is configured to perform downlink user information respectively configured according to the main board and the slave board, and processing capability or supported characteristics of the main board and the slave board. And scheduling, by the main board and the slave board, a channel of a downlink user corresponding to its processing capability or supported characteristics.
  • the main board is further configured to: control a CFI, a hybrid automatic repeat request indication HI, a physical broadcast channel PBCH, a synchronization channel SCH, a positioning-pilot P-RS, and a downlink user that has been allocated by the main control module.
  • Channel State Information The information carried by the pilot CSI-RS common channel is processed.
  • the main control module is further configured to configure downlink user information to the main board and the slave board respectively.
  • the slave board is configured to transmit time domain data generated by the slave board to the motherboard;
  • the motherboard is configured to superimpose time domain data from the slave board and time domain data generated by the board;
  • the motherboard is configured to send the superposed time domain data to the middle radio frequency module.
  • a further aspect of the present invention is to provide a base station, the base station includes: a main control module, a main board, and a slave board; and the main control module is configured to use different channels respectively configured by the main board and the slave board, And an uplink user that schedules a corresponding channel to the main board and the slave board; the main board and the slave board respectively process information carried by a channel of an uplink user scheduled by the main control module.
  • the main control module includes a mainboard scheduling unit, and the mainboard scheduling unit is configured to schedule an uplink user of the PUSCH to the mainboard according to different channels configured by the mainboard, or schedule an uplink user of the PUCCH to the mainboard, Or scheduling an uplink user of the SRS to the main board, or scheduling an uplink user of the PRACH to the main board.
  • the main board includes a main board baseband processing module; the main board baseband processing module is configured to process information carried by a channel of an uplink user of the PUSCH scheduled by the mainboard scheduling unit; or, the main board baseband processing module is used by the main board Processing the information carried by the uplink user channel of the scheduled PUCCH of the mainboard scheduling unit; or the mainboard baseband processing module is configured to carry the channel of the uplink user of the scheduled SRS of the mainboard scheduling unit
  • the information is processed by the motherboard baseband processing module.
  • the information carried by the uplink user channel of the PRACH scheduled by the mainboard scheduling unit is processed.
  • the master control module includes a slave scheduling unit, and the slave scheduling unit is configured to schedule an uplink user of the PUSCH to the slave board according to different channels configured by the slave board, or schedule the uplink user to the slave board.
  • the slave board includes a slave board baseband processing module; the slave board baseband processing module is configured to process information carried by the uplink user channel of the PUSCH scheduled by the board scheduling unit; or the slave The board baseband processing module is configured to process information carried by the uplink user channel of the PUCCH scheduled by the board scheduling unit; or the slave baseband processing module is configured to schedule the slave board scheduling unit
  • the information carried by the channel of the uplink user of the SRS is processed; or the slave baseband processing module is configured to process information carried by the channel of the uplink user of the PRACH scheduled by the board scheduling unit.
  • the main control module is further configured to repeatedly configure information of the uplink user in the cell to the main board and the slave board, where the main control module is further configured to separately configure the main board and the slave board respectively. Channel.
  • the main control module is further configured to schedule an uplink user to be processed by the TTI of the corresponding channel to the main board and the slave board according to different channels that are configured by the main board and the slave board respectively.
  • the main board and the slave board are further configured to report the result of processing the information carried by the channel to the main control module.
  • the main board is further configured to report the result of processing the information carried by the channel to the mainboard scheduling unit; the slave board is further configured to process the information carried by the channel The slave board scheduling unit reports.
  • a still further aspect of the present invention provides an apparatus for implementing a downlink baseband resource pool in an LTE base station, the apparatus comprising a processor and a memory coupled to the processor; the processor is configured to control the main control module according to the motherboard and the slave The information of the downlink user that has been configured on the board, and the channel of the corresponding downlink user is scheduled to the main board and the slave board; the processor is configured to control that the main board and the slave board are respectively scheduled for the main control module The information carried by the downlink user's channel is processed at the bit level and the symbol level to obtain time domain data generated by the main board and time domain data generated by the slave board.
  • a further aspect of the present invention provides an apparatus for implementing an uplink baseband resource pool in an LTE base station, the apparatus comprising a processor and a memory coupled to the processor; the processor is configured to control the main control module according to the main board and the slave And an uplink user that schedules a corresponding channel to the main board and the slave board, where the processor is configured to control an uplink user that is scheduled by the main board and the slave board to be respectively scheduled by the main control module.
  • the information carried by the channel is processed.
  • the LTE base station in the downlink baseband resource pool configures downlink user information for the main board and the slave board according to the downlink user, and the downlink user allocated by the main board and the slave board pair.
  • the channel is processed at the bit level and the symbol level. In this way, the processing capability of the main board and the slave board can be reasonably utilized; in the uplink baseband resource pool, the main board and the slave board are respectively configured according to the channel, and then the corresponding channel is scheduled.
  • the uplink user, the main board and the slave board process the channel of the scheduled uplink user, and in this way, the coupling between users in the channel can be solved.
  • FIG. 1 is a schematic diagram of a method for implementing a downlink baseband resource pool in a LTE base station in the prior art
  • FIG. 2 is a schematic diagram of an implementation method of an uplink baseband resource pool in a LTE base station in the prior art
  • FIG. 3 is a flowchart of a method for implementing an uplink baseband resource pool in a prior art LTE base station
  • FIG. 4 is a flowchart of an implementation manner of a downlink baseband resource pool in an LTE base station according to the present invention
  • FIG. 5 is a flowchart of another implementation manner of a method for implementing a downlink baseband resource pool in an LTE base station according to the present invention
  • FIG. 6 is a flowchart of still another implementation manner of a downlink baseband resource pool in an LTE base station according to the present invention.
  • FIG. 7 is a flowchart of still another implementation manner of a downlink baseband resource pool in an LTE base station according to the present invention.
  • FIG. 8 is a flowchart of an implementation manner of an uplink baseband resource pool in an LTE base station according to the present invention.
  • FIG. 9 is a flowchart of another implementation manner of an implementation method of an uplink baseband resource pool in an LTE base station according to the present invention.
  • FIG. 10 is a flowchart of still another embodiment of an implementation method of an uplink baseband resource pool in an LTE base station according to the present invention.
  • FIG. 11 is a schematic structural diagram of an embodiment of a base station according to the present invention.
  • FIG. 12 is a schematic structural diagram of another embodiment of a base station according to the present invention.
  • FIG. 13 is a schematic structural diagram of a base station of the present invention in a practical application
  • FIG. 14 is a schematic structural diagram of still another embodiment of a base station according to the present invention.
  • FIG. 15 is a schematic structural diagram of still another embodiment of a base station according to the present invention.
  • FIG. 16 is a schematic structural diagram of a base station according to another embodiment of the present invention.
  • 17 is a flow chart of a method for implementing an uplink baseband resource pool in a base station according to the present invention.
  • the physical downlink shared channel (PDSCH, Physical Downlink Shared) Channels are becoming more and more complex, requiring more and more users to be able to simultaneously connect and transmit to the cell, which results in higher and higher requirements for the processing capability of the PDSCH channel to the baseband board.
  • PDSCH Physical Downlink Shared
  • the user equipment For the LTE protocol uplink, the user equipment (UE, User Equipment) supports multi-antenna transmission, multi-cell cooperation, and more and more online transmission of users in the cell.
  • the requirements for uplink demodulation for the processing capability of the baseband board are also increasing.
  • FIG. 1 is a schematic diagram of a method for implementing a downlink baseband resource pool in a LTE base station in a prior art.
  • the downlink baseband resource pool has two baseband boards: a motherboard and a slave board, and the motherboard is a new version of the baseband board, and the slave board is an old version.
  • Baseband board The main control module of the base station manages the main board and the slave board at the same time, and the main control module allocates a part of the downlink users to the main board for processing, and allocates another part of the downlink users to the slave board for processing.
  • the processing of the entire downlink user is divided into a bit level and a symbol level, and the data processing from the board to the downlink user to the bit level can be ended, and then the bit level data is transmitted to the main board, and the remaining processing of all the downlink users is completed by the main board.
  • the interaction between the master and the slave is the data of the downlink user to the bit level.
  • the processing amount of the entire downlink user data is regarded as a whole, the processing operation of the bit level only accounts for 30% of the entire calculation amount, and 70% of the calculation amount is the symbol level. Processing, therefore, in the existing scheme, the slave board does not share the processing amount of the data of the entire downlink user well.
  • FIG. 2 and FIG. 3 are implementation methods of an uplink baseband resource pool in an LTE base station in the prior art.
  • the uplink baseband resource pool has two baseband boards: a main board and a slave board, and the main board is a new version of the baseband board.
  • the board is an old version of the baseband board.
  • the main control module repeatedly configures the information of the uplink user in the cell to the main board and the slave board; or configures the user information to the main board and the slave board according to load balancing; the main board L2 scheduling module sets the current transmission time interval according to load balancing (TTI).
  • TTI load balancing
  • the uplink user to be processed is allocated to the main board and the slave board for processing; the main uplink and the slave board are respectively allocated to the physical uplink shared channel of the uplink user (PUSCH, Physical) Uplink Shared Channel), physical uplink control channel (PUCCH, Physical Uplink Control) Channel) and the data carried by the SRS (Sounding Reference Signal) channel are processed.
  • PUSCH Physical
  • Uplink Shared Channel Physical Uplink Shared Channel
  • PUCCH Physical Uplink Control channel
  • SRS Sounding Reference Signal
  • the PUSCH channel considers multiple points of cooperation (COMP, Coordinated) Multi-Point
  • COMP Coordinated
  • the L2 scheduling module of the main board can only be used for centralized scheduling. Each baseband board cannot be independently scheduled, and cannot be scheduled in parallel, which is easy to waste resources.
  • FIG. 4 is a flowchart of an implementation manner of a downlink baseband resource pool in an LTE base station according to the present invention, including:
  • Step S101 The main control module schedules channels of the corresponding downlink users to the main board and the slave board according to the information of the downlink users that have been configured on the main board and the slave board respectively.
  • the main control module is a module for controlling, scheduling, and configuring the main board and the slave board in the downlink baseband resource pool of the LTE base station, for example, configuring downlink user information to the main board and the slave board respectively, and scheduling the downlink user channel to the main board and the slave board respectively.
  • the main board and the slave board For the main board and the slave board to process; to configure the cell information to the main board and the slave board respectively; according to the processing capability of the baseband board (main board or slave board), modify the parameters of the cell, and the like.
  • the main control module automatically recognizes the newly added baseband board and the processing capability of the baseband board.
  • the main board and the slave board are the baseband boards of the LTE base station, and usually represent the new baseband board and the old baseband board.
  • the number of the main board and the slave board is determined according to the actual application.
  • a downlink user refers to a user who sends information to a user equipment of a user. It should be noted that the downlink users herein may be downlink users of the same cell or downlink users of different cells.
  • a channel is a channel through which information is transmitted, that is, a path through which information is transmitted.
  • the channels of the downlink users include, but are not limited to, a physical downlink shared channel PDSCH, a physical downlink control channel PDCCH, a physical broadcast channel PBCH, and the like.
  • the main control module separately configures the information of the downlink user for the main board and the slave board according to the identified main board and the slave board. According to the information of the configured downlink users, the main control module schedules the channels of the corresponding downlink users to the main board and the slave board, so that the data carried by the main board and the slave board on the channel are processed.
  • Step S102 The main board and the slave board respectively perform bit level and symbol level processing on the information carried by the channel of the downlink user scheduled by the main control module, and obtain time domain data generated by the main board and time domain data generated by the slave board.
  • Bit-level processing mainly includes: transport block (Transport) Block, TB) CRC addition, sub-block division and CRC addition, channel coding, rate matching, code block concatenation, channel coding and rate matching of control information, service data and control information multiplexing, channel interleaving, and data bit scrambling Wait.
  • the symbol level processing mainly includes: scrambling the channel-coded bits in each codeword transmitted on the physical channel; modulating the scrambled bits to obtain a complex modulation symbol; and mapping the obtained complex modulation symbols At one or more transport layers; precoding the complex modulation symbols for each layer; mapping complex modulation symbols on each antenna port to resource elements (RE, Resource) Element); generates a complex time domain signal on each antenna port.
  • RE Resource
  • RE Resource
  • the time domain is the basic nature of the signal, and the interaction between the reactive signal and the interconnect is clearly understood.
  • the main board performs bit level and symbol level processing on the information carried by the channel of the downlink user scheduled by the main control module, and obtains time domain data generated by the main board; information carried by the board to the channel of the downlink user scheduled by the main control module. Perform bit-level and symbol-level processing to obtain time domain data generated from the board.
  • the LTE base station configures downlink user information for the main board and the slave board according to the downlink user, and performs processing on the bit-level and symbol level of the allocated downlink user channel by the main board and the slave board. Can properly utilize the processing power of the motherboard and slave board.
  • FIG. 5 to FIG. 7 are flowcharts of a third implementation manner of a method for implementing a downlink baseband resource pool in an LTE base station according to the present invention, including:
  • Step S201 The main control module separately configures information of the downlink user to the main board and the slave board.
  • the main control module separately configures downlink user information for the main board and the slave board according to the identified main board and the slave board.
  • the main control module is a module for controlling, scheduling, and configuring the main board and the slave board in the downlink baseband resource pool of the LTE base station.
  • the main board and the slave board are the baseband boards of the LTE base station, and usually represent the new baseband board and the old baseband board.
  • the number of the main board and the slave board is determined according to the actual application.
  • a downlink user refers to a user who sends information to a user equipment of a user. It should be noted that the downlink users herein may be downlink users of the same cell or downlink users of different cells.
  • Step S202 The main control module schedules channels of the corresponding downlink users to the main board and the slave board according to the information of the downlink users that have been configured on the main board and the slave board respectively.
  • a channel is a channel through which information is transmitted, that is, a path through which information is transmitted.
  • the main control module schedules the channels of the corresponding downlink users to the main board and the slave board, so that the data carried by the main board and the slave board on the channel are processed.
  • the channel of the corresponding downlink user may be separately scheduled to the main board and the slave board according to the two situations, respectively:
  • the first type of basis according to the downlink user information and load balancing configured by the main board and the slave board respectively, the main control module schedules the downlink user channel to be processed by the current transmission time interval TTI corresponding to the load condition of the main board and the slave board.
  • TTI Transmit Time Interval
  • UMTS Universal Mobile Telecommunications System
  • UMTS Universal Mobile Telecommunications System
  • TTI It is related to the size of the data block from the higher network layer to the wireless link layer. It is the basic unit of time governed by radio resource management (such as scheduling). Each transport channel corresponds to one service. Since the delay requirements of various services are different, the TTIs are different, and the TTI may be 10 ms, 20 ms, 40 ms, or 80 ms.
  • Load balancing means that the number of downlink users on the main board and the slave board is roughly equal. For example, the number of downlink users configured by the main control module to the mainboard load is 10, and the number of downlink users configured for the slave load is 5, at this time, according to the load. In the equalization, the main control module schedules the downlink user's channel to be processed by the current TTI corresponding to the slave load condition from the slave board.
  • the second basis the main control module dispatches the downlink and the slave board and the slave board according to the downlink user information that has been configured on the board and the slave board, and the processing capability or supported characteristics of the board and the slave board. User's channel.
  • the processing capacity of the main board and the slave board for example, the traffic of the main board is 500M, and the traffic of the slave board is 300M.
  • the channel of the downlink user whose downlink requirement is less than 300M can be scheduled to be processed by the slave board.
  • the downlink user's channel scheduling of the downlink user whose traffic requirement is greater than 300M is processed by the main board.
  • the features supported by the motherboard and the slave board for example, the new features of the product are used by the downlink users.
  • the slave board cannot process, the downlink user's channel can be scheduled to the motherboard for processing.
  • the main control module schedules the channel of the corresponding downlink user to the main board and the slave board, the above two basis can be selected according to the actual application.
  • Step S203 The main board and the slave board respectively perform bit level and symbol level processing on the information carried by the channel of the downlink user scheduled by the main control module, and obtain time domain data generated by the main board and time domain data generated by the slave board.
  • the bit-level processing mainly includes: CRC addition of the transport block, sub-block splitting and CRC addition, channel coding, rate matching, code block cascading, channel coding and rate matching of control information, multiplexing of service data and control information, channel interleaving, and Data bit scrambling, etc.
  • the symbol level processing mainly includes: scrambling the channel-coded bits in each codeword transmitted on the physical channel; modulating the scrambled bits to obtain a complex modulation symbol; and mapping the obtained complex modulation symbols At one or more transport layers; precoding the complex modulation symbols for each layer; mapping complex modulation symbols on each antenna port to resource elements; generating a complex time domain signal on each antenna port.
  • Step S203 specifically includes:
  • Step S203a The main board and the slave board respectively perform bit level and symbol level processing on information carried by the physical downlink shared channel PDSCH of the downlink user scheduled by the main control module.
  • step S203b physical downlink control channel (PDCCH, Physical Downlink) of the downlink user scheduled by the main board and the slave board respectively to the master module
  • PDCCH physical downlink control channel
  • the information carried by the Control Channel is processed at the bit level and symbol level.
  • Step S204 The time domain data generated from the board is transmitted from the board to the main board.
  • the information carried by the board to the downlink user's channel scheduled by the master module is processed at the bit level and the symbol level to obtain time domain data generated from the board.
  • the time domain data generated from the board is transmitted to the motherboard.
  • Step S205 The main board superimposes the time domain data from the slave board and the time domain data generated by the board.
  • Step S206 The main board sends the superposed time domain data to the middle radio frequency module.
  • Step S207 The control format indication CFI, hybrid automatic repeat request indication HI, physical broadcast channel PBCH, synchronization channel SCH, positioning-pilot P-RS, and channel state information-pilot of the downlink user allocated by the main board to the main control module The information carried by the CSI-RS common channel is processed.
  • Step S207 may be performed before step S206.
  • the LTE base station of the present invention configures downlink user information for the main board and the slave board according to the downlink user in the downlink baseband resource pool, and performs processing on the bit-level and symbol level of the allocated downlink user channel by the main board and the slave board. In a way, the processing power of the motherboard and the slave board can be reasonably utilized.
  • FIG. 8 is a flowchart of an implementation manner of an uplink baseband resource pool in an LTE base station according to the present invention, including:
  • Step S301 The main control module schedules uplink users of the corresponding channels to the main board and the slave board according to different channels that have been configured on the main board and the slave board respectively.
  • the main control module is a module for controlling, scheduling, and configuring the main board and the slave board in the downlink baseband resource pool of the LTE base station, for example, configuring downlink user information to the main board and the slave board respectively, and scheduling the downlink user channel to the main board and the slave board respectively.
  • the main board and the slave board For the main board and the slave board to process; to configure the cell information to the main board and the slave board respectively; according to the processing capability of the baseband board (main board or slave board), modify the parameters of the cell, and the like.
  • the main control module automatically recognizes the newly added baseband board and the processing capability of the baseband board.
  • the main board and the slave board are the baseband boards of the LTE base station, and usually represent the new baseband board and the old baseband board.
  • the number of the main board and the slave board is determined according to the actual application.
  • An uplink user refers to a user who sends information to a base station through a user equipment. It should be noted that the uplink user herein may be an uplink user of the same cell or an uplink user of a different cell.
  • the main control module separately configures different channels to the main board and the slave board.
  • the main control module dispatches uplink users of the corresponding channels to the main board and the slave board according to different channels that have been configured on the main board and the slave board respectively.
  • Step S302 The main board and the slave board respectively process information carried by the channel of the uplink user scheduled by the main control module.
  • the main board and the slave board respectively process the information carried by the channel of the uplink user scheduled by the main control module.
  • the LTE base station configures the main board and the slave board according to the channel, and then schedules the uplink user on the corresponding channel, and the main board and the slave board process the channel of the scheduled uplink user. It solves the coupling between users in the channel and facilitates the interference reduction operation between COMP cells.
  • FIG. 9 is a flowchart of another implementation manner of an implementation method of an uplink baseband resource pool in an LTE base station according to the present invention, including:
  • Step S401 The main control module repeatedly configures information of the uplink user in the cell to the main board and the slave board.
  • the main control module is a module for controlling, scheduling, and configuring the main board and the slave board in the downlink baseband resource pool of the LTE base station.
  • the main board and the slave board are the baseband boards of the LTE base station, and usually represent the new baseband board and the old baseband board.
  • the number of the main board and the slave board is determined according to the actual application.
  • An uplink user refers to a user who sends information to a base station through a user equipment. It should be noted that the uplink user herein may be an uplink user of the same cell or an uplink user of a different cell.
  • Repeated configuration means that the same uplink user information is repeatedly configured for both the main board and the slave board.
  • Step S402 The main control module separately configures different channels to the main board and the slave board.
  • the main control module configures different channels to the main board and the slave board according to the channel. For example, the main control module configures the PUSCH channel to the main board and configures the PUCCH channel to the slave board.
  • Step S403 The main control module schedules uplink users of the corresponding channels to the main board and the slave board according to different channels configured by the main board and the slave board respectively.
  • the main control module dispatches the uplink users of the corresponding channels to the main board and the slave board. For example, the main control module allocates the PUSCH channel to the main board, and then schedules the uplink user of the PUSCH channel to the main board; the main control module allocates the PUCCH channel to the slave board, and then schedules the uplink user of the PUCCH channel to the slave board.
  • step S403 includes:
  • Step S403a The main control module schedules the uplink users that need to be processed by the TTI of the corresponding channel to the main board and the slave board according to different channels configured by the main board and the slave board respectively.
  • TTI is the basic unit of time governed by radio resource management (eg, scheduling, etc.). Each transport channel corresponds to one service. Since the delay requirements of various services are different, the TTIs are different, and the TTI may be 10 ms, 20 ms, 40 ms, or 80 ms.
  • the main control module allocates the PUSCH channel to the main board, and then schedules the uplink user to be processed by the TTI of the PUSCH channel to the main board; the main control module configures the PUCCH channel to the slave board, and the TTI for scheduling the PUCCH channel to the slave board needs to be processed. Upstream users.
  • the step of the main control module scheduling the uplink user of the corresponding channel to the mainboard according to different channels configured by the main board includes:
  • Step S403b The main control module schedules an uplink user of the physical uplink shared channel PUSCH to the main board according to different channels configured by the main board, or schedules an uplink user of the physical uplink control channel PUCCH to the main board, or schedules an uplink user of the measurement reference signal SRS to the main board. Or scheduling the uplink user of the physical random access channel PRACH to the main board.
  • the step of the main control module scheduling the uplink user of the corresponding channel to the slave board according to different channels configured from the board includes:
  • Step S403c The main control module schedules the PUSCH uplink user to the slave board according to different channels configured from the board, or the uplink user that schedules the PUCCH to the slave board, or the uplink user that schedules the SRS to the slave board, or schedules the PRACH to the slave board. Upstream users.
  • the main control module schedules the uplink user of the PUSCH channel and the uplink user of the PUCCH channel to the main board;
  • the configured channels of the slave board are: SRS channel and PRACH channel, then the main The control module schedules the uplink user of the SRS channel and the uplink user of the PRACH channel to the slave board.
  • Step S404 The main board and the slave board respectively process information carried by the channel of the uplink user scheduled by the main control module.
  • the step of processing, by the main board, the information carried by the channel of the uplink user scheduled by the main control module includes:
  • Step S404a The main board processes the information carried by the channel of the uplink user of the scheduled PUSCH of the main control module; or the main board processes the information carried by the channel of the uplink user of the scheduled PUCCH of the main control module; or, the main board The information carried by the channel of the uplink user of the scheduled SRS of the main control module is processed; or the main board processes the information carried by the channel of the uplink user of the PRACH scheduled by the main control module.
  • the step of processing, by the board, information carried by the channel of the uplink user scheduled by the main control module includes:
  • Step S404b The information carried by the board to the channel of the uplink user of the PUSCH scheduled by the master module is processed; or the information carried by the board to the channel of the uplink user of the scheduled PUCCH of the master module is processed; or The information carried by the board to the channel of the uplink user of the SRS scheduled by the main control module is processed; or the information carried by the board to the channel of the uplink user of the PRACH scheduled by the main control module is processed.
  • Step S405 the main board and the slave board report the result of processing the information carried by the channel to the main control module.
  • the LTE base station configures the main board and the slave board according to the channel, and then schedules the uplink user on the corresponding channel, and the main board and the slave board process the channel of the scheduled uplink user. It solves the coupling between users in the channel and facilitates the interference reduction operation between COMP cells.
  • FIG. 11 is a schematic structural diagram of an embodiment of a base station according to the present invention.
  • the base station includes: a main control module 101, a main board 102, and a slave board 103.
  • the base station of FIG. 11 may perform the operations of FIGS. 4 through 7.
  • the main control module 101 is configured to schedule the channels of the corresponding downlink users to the main board 102 and the slave board 103 according to the downlink user information respectively configured by the main board 102 and the slave board 103.
  • the main control module 101 is a module for controlling, scheduling, and configuring the main board 102 and the slave board 103 in the downlink baseband resource pool of the LTE base station.
  • the main board 102 and the slave board 103 are baseband boards of the LTE base station, and generally represent a new baseband board and an old baseband board.
  • the number of the main board 102 and the slave board 103 is determined according to practical applications.
  • a downlink user refers to a user who sends information to a user equipment of a user. It should be noted that the downlink users herein may be downlink users of the same cell or downlink users of different cells.
  • a channel is a channel through which information is transmitted, that is, a path through which information is transmitted.
  • the channels of the downlink users include, but are not limited to, a physical downlink shared channel PDSCH, a physical downlink control channel PDCCH, a physical broadcast channel PBCH, and the like.
  • the main control module 101 pre-configures the information of the downlink user for the main board 102 and the slave board 103 according to the already recognized main board 102 and the slave board 103. Based on the information of the configured downlink users, the main control module 101 schedules the channels of the corresponding downlink users to the main board 102 and the slave board 103, so that the main board 102 and the slave board 103 process the data carried on the channel.
  • the main board 102 and the slave board 103 are configured to perform bit level and symbol level processing on the information carried by the channel of the downlink user scheduled by the main control module 101, respectively, to obtain the time domain data generated by the main board 102 and the time domain generated from the board 103. data.
  • Bit-level processing mainly includes: transport block (Transport) Block, TB) CRC addition, sub-block division and CRC addition, channel coding, rate matching, code block concatenation, channel coding and rate matching of control information, service data and control information multiplexing, channel interleaving, and data bit scrambling Wait.
  • the symbol level processing mainly includes: scrambling the channel-coded bits in each codeword transmitted on the physical channel; modulating the scrambled bits to obtain a complex modulation symbol; and mapping the obtained complex modulation symbols At one or more transport layers; precoding the complex modulation symbols for each layer; mapping complex modulation symbols on each antenna port to resource elements (RE, Resource) Element); generates a complex time domain signal on each antenna port.
  • RE Resource
  • RE Resource
  • the time domain is the basic nature of the signal, and the interaction between the reactive signal and the interconnect is clearly understood.
  • the main board 102 performs bit level and symbol level processing on the information carried by the channel of the downlink user scheduled by the main control module 101 to obtain time domain data generated by the main board 102; and the downlink user of the master module 101 has been scheduled from the board 103.
  • the information carried by the channel is processed at the bit level and symbol level to obtain time domain data generated from the board 103.
  • the LTE base station configures downlink user information for the main board and the slave board according to the downlink user, and performs processing on the bit-level and symbol level of the allocated downlink user channel by the main board and the slave board. Can properly utilize the processing power of the motherboard and slave board.
  • FIG. 12 is a schematic structural diagram of another embodiment of a base station according to the present invention.
  • the base station includes: a main control module 201, a main board 202, and a slave board 203.
  • the base station of FIG. 12 may perform the operations of FIGS. 5 through 7.
  • the main control module 201 is configured to schedule the channels of the corresponding downlink users to the main board 202 and the slave board 203 according to the downlink user information respectively configured by the main board 202 and the slave board 203.
  • the main board 202 and the slave board 203 are configured to perform bit level and symbol level processing on the information carried by the channel of the downlink user scheduled by the main control module 201, respectively, to obtain the time domain data generated by the main board 202 and the time domain generated from the board 203. data.
  • the main board 202 includes a main board baseband processing module 2021
  • the slave board 203 includes a slave board baseband processing module 2031.
  • the mainboard baseband processing module 2021 and the slave baseband processing module 2031 are configured to perform bit level and symbol level processing on the information carried by the PDSCH channel of the downlink user scheduled by the main control module 201, respectively.
  • the mainboard baseband processing module 2021 and the slave baseband processing module 2031 are configured to perform bit level and symbol level processing on the information carried by the PDCCH channel of the downlink user scheduled by the main control module 201, respectively.
  • the main control module 201 includes a scheduling unit 2011, and the scheduling unit 2011 is configured to schedule the current TTI corresponding to the load condition to be processed to the main board 202 and the slave board 203 according to the downlink user information and load balancing respectively configured by the main board 202 and the slave board 203.
  • the channel of the downstream user is configured to schedule the current TTI corresponding to the load condition to be processed to the main board 202 and the slave board 203 according to the downlink user information and load balancing respectively configured by the main board 202 and the slave board 203.
  • the scheduling unit 2011 is configured to schedule the processing capability or support corresponding to the processing capability or support of the main board 202 and the slave board 203 according to the downlink user information that has been configured respectively by the main board 202 and the slave board 203, and the processing capability or supported characteristics of the main board 202 and the slave board 203. Characteristic downlink user channel.
  • the main board 202 is further configured to control the CFI, the hybrid automatic repeat request indication HI, the physical broadcast channel PBCH, the synchronization channel SCH, the positioning-pilot P-RS, and the channel state information of the downlink user that has been allocated by the main control module 201.
  • the information carried by the pilot CSI-RS common channel is processed.
  • the main control module 201 is further configured to configure downlink user information to the main board 202 and the slave board 203, respectively.
  • the slave board 203 is for transmitting time domain data generated from the board 203 to the main board 202.
  • the main board 202 is for superimposing time domain data from the slave board 203 and time domain data generated by the board.
  • the main board 202 is configured to send the superposed time domain data to the middle radio frequency module.
  • the base station of the embodiment may transfer part of the functions of the main control module to the main board, for example, the information of the downlink user processed from the board is sent by the main board MAC processing module to the slave board, and the scheduling unit of the main control module is The function is performed by the motherboard's mainboard scheduling processing module, see Figure 13.
  • the LTE base station configures downlink user information for the main board and the slave board according to the downlink user, and performs processing on the bit-level and symbol level of the allocated downlink user channel by the main board and the slave board. Can properly utilize the processing power of the motherboard and slave board.
  • FIG. 14 is a schematic structural diagram of still another embodiment of a base station according to the present invention.
  • the base station includes: a main control module 301, a main board 302, and a slave board 303.
  • the base station of FIG. 14 may perform the operations of FIGS. 8-10.
  • the main control module 301 is configured to schedule uplink users of the corresponding channels to the main board 302 and the slave board 303 according to different channels that the main board 302 and the slave board 303 have respectively configured.
  • the main control module 301 is a module for controlling, scheduling, and configuring the main board 302 and the slave board 303 in the LTE base station downlink baseband resource pool.
  • the downlink user information is respectively configured to the main board 302 and the slave board 303; and the main board 302 and the slave board are configured.
  • 303 respectively, scheduling the channel of the downlink user for processing by the main board 302 and the slave board 303; respectively configuring the cell information to the main board 302 and the slave board 303; and modifying the parameters of the cell according to the processing capability of the baseband board (the main board 302 or the slave board 303) and many more.
  • the main control module 301 automatically recognizes the newly added baseband board and the processing capability of the baseband board.
  • the main board 302 and the slave board 303 are baseband boards of the LTE base station, and generally represent a new baseband board and an old baseband board.
  • the number of the main board 302 and the slave board 303 is determined according to practical applications.
  • An uplink user refers to a user who sends information to a base station through a user equipment. It should be noted that the uplink user herein may be an uplink user of the same cell or an uplink user of a different cell.
  • the main control module 301 preliminarily configures different channels to the main board 302 and the slave board 303.
  • the main control module 301 schedules the uplink users of the corresponding channels to the main board 302 and the slave board 303 according to the different channels that the main board 302 and the slave board 303 have respectively configured.
  • the main board 302 and the slave board 303 respectively process the information carried by the channel of the uplink user scheduled by the main control module 301.
  • the main control module 301 dispatches the uplink users of the corresponding channels to the main board 302 and the slave board 303, the main board 302 and the slave board 303 respectively process the information carried by the channel of the uplink user scheduled by the main control module 301.
  • the LTE base station configures the main board and the slave board according to the channel, and then schedules the uplink user on the corresponding channel, and the main board and the slave board process the channel of the scheduled uplink user. It solves the coupling between users in the channel and facilitates the interference reduction operation between COMP cells.
  • FIG. 15 is a schematic structural diagram of still another embodiment of a base station according to the present invention.
  • the base station includes: a main control module 401, a main board 402, and a slave board 403.
  • the base station of FIG. 15 may perform the operations of FIGS. 9 through 10.
  • the main control module 401 is configured to schedule uplink users of the corresponding channels to the main board 402 and the slave board 403 according to different channels that the main board 402 and the slave board 403 have respectively configured.
  • the main board 402 and the slave board 403 respectively process information carried by the channel of the uplink user scheduled by the main control module 401.
  • the main control module 401 includes a mainboard scheduling unit 4011.
  • the mainboard scheduling unit 4011 is configured to schedule an uplink user of the PUSCH to the main board 402 according to different channels configured by the main board 402, or schedule an uplink user of the PUCCH to the main board 402, or schedule an SRS to the main board 402.
  • the main board 402 includes a main board baseband processing module 4021;
  • the mainboard baseband processing module 4021 is configured to process information carried by a channel of an uplink user of the PUSCH scheduled by the mainboard scheduling unit 4011;
  • mainboard baseband processing module 4021 is configured to process information carried by the uplink user channel of the PUCCH scheduled by the mainboard scheduling unit 4011;
  • the motherboard baseband processing module 4021 is configured to process information carried by a channel of an uplink user of the SRS scheduled by the mainboard scheduling unit 4011;
  • the motherboard baseband processing module 4021 is configured to process information carried by the channel of the uplink user of the PRACH scheduled by the mainboard scheduling unit 4011.
  • the main control module 401 further includes a slave scheduling unit 4012; the slave scheduling unit 4012 is configured to schedule an uplink user of the PUSCH to the slave board 403 according to different channels configured from the board 403, or to uplink users that schedule the PUCCH to the slave board 403. The uplink user who schedules the SRS to the slave board 403 or the uplink user who schedules the PRACH to the slave board 403.
  • the mainboard scheduling unit 4011 and the slave scheduling unit 4012 exchange data between the scheduled uplink users, that is, the mainboard scheduling unit 4011 and the slave scheduling unit 4012, so that the main board and the slave board Obtain the corresponding uplink users for each schedule.
  • the slave board 403 includes a slave board baseband processing module 4031.
  • the slave baseband processing module 4031 is configured to process information carried by a channel of an uplink user of the PUSCH scheduled by the board scheduling unit 4012;
  • the slave baseband processing module 4031 is configured to process information carried by a channel of an uplink user of the PUCCH scheduled by the board scheduling unit 4012;
  • the slave baseband processing module 4031 is configured to process information carried by a channel of an uplink user of the SRS scheduled by the board scheduling unit 4012;
  • the slave baseband processing module 4031 is configured to process information carried by the channel of the uplink user of the PRACH scheduled by the board scheduling unit 4012.
  • the main control module 401 is further configured to repeatedly configure the information of the uplink user in the cell to the main board 402 and the slave board 403, and the main control module 401 is further configured to configure different channels to the main board 402 and the slave board 403, respectively.
  • the main control module 401 is further configured to schedule, to the main board 402 and the slave board 403, the uplink users that need to be processed by the TTI of the corresponding channel according to the different channels that the main board 402 and the slave board 403 have respectively configured.
  • the main board 402 and the slave board 403 are also used to report the information carried by the channel to the main control module 401.
  • the main board 402 is further configured to report the result of processing the information carried by the channel to the main board scheduling unit 4011; the slave board 403 is further configured to report the result of processing the information carried by the channel to the slave scheduling unit 4012.
  • the base station scheduling unit of the main control module can be disposed in the main board, for example, the main board L2.
  • the MAC processing module sets the slave scheduling unit of the master module to the slave board, for example, the slave board L2 MAC processing module. For details, refer to FIG. 16.
  • FIG. 17 For a flowchart of implementing an uplink baseband resource pool in the base station of this embodiment, refer to FIG. 17, which includes:
  • Step S501 The main control module repeatedly configures information of the uplink user in the cell to the main board and the slave board.
  • Step S502 The main control module separately configures different channels to the main board and the slave board.
  • Step S503a1 The mainboard scheduling unit schedules the uplink user to be processed by the TTI of the corresponding channel according to different channels configured by the main board.
  • Step S503a2 The slave scheduling unit schedules the uplink user to be processed by the TTI of the corresponding channel to the slave board according to different channels that have been configured from the board.
  • Step S503b1 The mainboard scheduling unit schedules the uplink user of the PUSCH to the main board according to the different channels that the main board has configured, and the main board processes the information carried by the PUSCH channel of the uplink user.
  • step S503b2 the mainboard scheduling unit schedules the uplink user of the PUCCH to the main board according to the different channels that the main board has configured, and the main board processes the information carried by the PUCCH channel of the uplink user.
  • step S503b3 the mainboard scheduling unit schedules the uplink user of the SRS to the main board according to the different channels that the main board has configured, and the main board processes the information carried by the SRS channel of the uplink user.
  • step S503b4 the mainboard scheduling unit schedules the uplink user of the PRACH to the main board according to the different channels that the main board has configured, and the main board processes the information carried by the PRACH channel of the uplink user.
  • Step S503c1 The slave scheduling unit processes the uplink user of the PUSCH to the slave board according to different channels configured from the board, and the slave board processes information carried by the PUSCH channel of the uplink user.
  • step S503c2 the slave scheduling unit processes the uplink user of the PUCCH to the slave board according to the different channels configured from the board, and the slave board processes the information carried by the PUCCH channel of the uplink user.
  • the slave scheduling unit processes the information carried by the SRS channel of the uplink user from the board to the uplink user who schedules the SRS to the slave board according to different channels that have been configured from the board.
  • step S503c4 the slave scheduling unit processes the uplink user of the PRACH to the slave according to the different channels that have been configured on the slave board, and the slave board processes the information carried by the PRACH channel of the uplink user.
  • Step S504a The main board reports the result of processing the information carried by the channel to the main board scheduling unit.
  • Step S504b The result of processing the information carried by the channel from the board is reported to the slave scheduling unit.
  • the LTE base station configures the main board and the slave board according to the channel, and then schedules the uplink user on the corresponding channel, and the main board and the slave board process the channel of the scheduled uplink user. It solves the coupling between users in the channel and facilitates the interference reduction operation between COMP cells.
  • the present invention also provides an apparatus for implementing a downlink baseband resource pool in an LTE base station, the apparatus comprising a processor and a memory coupled to the processor.
  • the processor is configured to control the main control module to schedule the channel of the corresponding downlink user to the main board and the slave board according to the information of the downlink user configured by the main board and the slave board respectively.
  • the processor is configured to perform bit level and symbol level processing on the information carried by the main board and the slave board respectively on the channel of the downlink user scheduled by the main control module, and obtain time domain data generated by the main board and time domain data generated by the slave board.
  • the present invention also provides an apparatus for implementing an uplink baseband resource pool in an LTE base station, the apparatus comprising a processor and a memory coupled to the processor.
  • the processor is configured to control the main control module to schedule uplink users of the corresponding channels to the main board and the slave board according to different channels that have been configured by the main board and the slave board respectively.
  • the processor is configured to control the information carried by the main board and the slave board respectively for the channel of the uplink user scheduled by the main control module.
  • the LTE base station configures downlink user information for the main board and the slave board according to the downlink user, and performs processing on the bit-level and symbol level of the channel of the downlink user allocated by the main board and the slave board.
  • the disclosed system, apparatus, and method may be implemented in other manners.
  • the device implementations described above are merely illustrative.
  • the division of the modules or units is only a logical function division.
  • there may be another division manner for example, multiple units or components may be used. Combinations can be integrated into another system, or some features can be ignored or not executed.
  • the mutual coupling or direct coupling or communication connection shown or discussed may be an indirect coupling or communication connection through some interface, device or unit, and may be in an electrical, mechanical or other form.
  • the units described as separate components may or may not be physically separated, and the components displayed as units may or may not be physical units, that is, may be located in one place, or may be distributed to multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of the present embodiment.
  • each functional unit in each embodiment of the present invention may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit.
  • the above integrated unit can be implemented in the form of hardware or in the form of a software functional unit.
  • the integrated unit if implemented in the form of a software functional unit and sold or used as a standalone product, may be stored in a computer readable storage medium.
  • the technical solution of the present invention which is essential or contributes to the prior art, or all or part of the technical solution, may be embodied in the form of a software product stored in a storage medium.
  • a number of instructions are included to cause a computer device (which may be a personal computer, server, or network device, etc.) or a processor to perform all or part of the steps of the methods of the various embodiments of the present invention.
  • the foregoing storage medium includes: a U disk, a mobile hard disk, a read only memory (ROM, Read-Only) Memory, random access memory (RAM), disk or optical disk, and other media that can store program code.

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Mobile Radio Communication Systems (AREA)

Abstract

L'invention porte sur un procédé de mise en œuvre pour un pool de ressources de bande de base de liaison montante/liaison descendante dans une station de base LTE, et sur une station de base. Le procédé consiste à : dans un pool de ressources de bande de base de liaison descendante, configurer respectivement des informations d'utilisateur de liaison descendante pour une carte maître et une carte esclave conformément à un utilisateur de liaison descendante, et effectuer par la carte maître et la carte esclave un traitement au niveau bit et au niveau symbole sur un canal attribué de l'utilisateur de liaison descendante; et dans un pool de ressources de bande de base de liaison montante, configurer respectivement la carte maître et la carte esclave conformément à un canal, puis répartir un utilisateur de liaison montante sur un canal correspondant, et traiter par la carte maître et la carte esclave le canal de l'utilisateur de liaison montante réparti. De cette manière, les capacités de traitement d'une carte maître et d'une carte esclave peuvent être raisonnablement utilisées, et le couplage entre des utilisateurs dans un canal est résolu.
PCT/CN2012/085621 2012-11-30 2012-11-30 Procédé de mise en œuvre pour pool de ressources de bande de base de liaison montante et de liaison descendante et station de base WO2014082281A1 (fr)

Priority Applications (2)

Application Number Priority Date Filing Date Title
PCT/CN2012/085621 WO2014082281A1 (fr) 2012-11-30 2012-11-30 Procédé de mise en œuvre pour pool de ressources de bande de base de liaison montante et de liaison descendante et station de base
CN201280002552.5A CN103222325B (zh) 2012-11-30 2012-11-30 下行及上行基带资源池的实现方法和基站

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/CN2012/085621 WO2014082281A1 (fr) 2012-11-30 2012-11-30 Procédé de mise en œuvre pour pool de ressources de bande de base de liaison montante et de liaison descendante et station de base

Publications (1)

Publication Number Publication Date
WO2014082281A1 true WO2014082281A1 (fr) 2014-06-05

Family

ID=48818215

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2012/085621 WO2014082281A1 (fr) 2012-11-30 2012-11-30 Procédé de mise en œuvre pour pool de ressources de bande de base de liaison montante et de liaison descendante et station de base

Country Status (2)

Country Link
CN (1) CN103222325B (fr)
WO (1) WO2014082281A1 (fr)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103841647B (zh) * 2014-03-07 2017-04-12 北京邮电大学 基于基站资源池的多粒度可伸缩封装装置和方法
WO2016127380A1 (fr) * 2015-02-13 2016-08-18 华为技术有限公司 Unité de traitement en bande de base et système de station de base
EP3941138A1 (fr) * 2015-07-28 2022-01-19 Panasonic Intellectual Property Corporation of America Terminal, station de base, procédé de transmission et procédé de réception
WO2017135989A1 (fr) * 2016-02-03 2017-08-10 Intel IP Corporation Transmission de canal partagé de liaison descendante physique avec un intervalle de temps de transmission court
CN107105452B (zh) * 2016-02-19 2019-12-06 大唐移动通信设备有限公司 一种基于pucch的负荷均衡的方法及装置

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102299735A (zh) * 2010-06-25 2011-12-28 普天信息技术研究院有限公司 一种降低Ir接口带宽的方法及分布式基站
CN102656936A (zh) * 2011-11-22 2012-09-05 华为技术有限公司 一种lte基站中基带资源池的实现方法及装置
CN102668613A (zh) * 2011-11-22 2012-09-12 华为技术有限公司 一种lte基站中基带资源池的实现方法及装置

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7649927B1 (en) * 2006-12-29 2010-01-19 Kiomars Anvari Equalizer filter with dynamically configurable convolution filter
CN101232654B (zh) * 2007-01-25 2011-07-13 中兴通讯股份有限公司 一种基带资源池系统及其控制方法
CN101222773B (zh) * 2008-01-22 2011-01-05 中兴通讯股份有限公司 基站资源管理方法、系统和设备
CN102547991B (zh) * 2010-12-29 2015-05-27 鼎桥通信技术有限公司 一种基带板的选择方法

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102299735A (zh) * 2010-06-25 2011-12-28 普天信息技术研究院有限公司 一种降低Ir接口带宽的方法及分布式基站
CN102656936A (zh) * 2011-11-22 2012-09-05 华为技术有限公司 一种lte基站中基带资源池的实现方法及装置
CN102668613A (zh) * 2011-11-22 2012-09-12 华为技术有限公司 一种lte基站中基带资源池的实现方法及装置

Also Published As

Publication number Publication date
CN103222325B (zh) 2016-08-10
CN103222325A (zh) 2013-07-24

Similar Documents

Publication Publication Date Title
WO2021187871A1 (fr) Procédé et appareil d'optimisation et de configuration de performance basées sur la technologie o-ran
WO2018008943A1 (fr) Procédé et dispositif de gestion de la sécurité selon le service dans un système de communication sans fil
AU2018216588B2 (en) Transmission structures and formats for DL control channels
WO2018174643A1 (fr) Procédé d'attribution de csi-rs pour la gestion de faisceaux
WO2017179951A1 (fr) Procédé et appareil d'émission et de réception d'un signal par formantion de faisceaux dans un système de communication
WO2021015506A1 (fr) Procédé et appareil pour une communication de véhicule à tout (v2x) dans un système de communication sans fil
WO2017213436A1 (fr) Procédé et dispositif de fourniture d'informations de commande pour différents services
WO2018034533A1 (fr) Procédé et appareil de mappage de grille dans un système de communication sans fil
WO2020027599A1 (fr) Procédé et dispositif de gestion de la transmission de paquets dupliqués dans un système de communication sans fil
WO2019045500A1 (fr) Procédé et appareil de restriction de sous-ensemble de livre de codes pour un signalement d'informations d'état de canal dans des systèmes de communication sans fil
WO2014082281A1 (fr) Procédé de mise en œuvre pour pool de ressources de bande de base de liaison montante et de liaison descendante et station de base
WO2018045680A1 (fr) Procédé de communication, et appareil de communication
WO2015032091A1 (fr) Procédé de commutation de cellules, terminal et dispositif réseau associés
WO2014082266A1 (fr) Procédé et système de mu-mimo en liaison montante
WO2017131480A1 (fr) Appareil et procédé permettant d'émettre et de recevoir un signal dans un système de communication sans fil
WO2019216739A1 (fr) Procédé et appareil de protection de sécurité dans un système de communication sans fil
WO2018045681A1 (fr) Procédé de communication et dispositif de communication
EP4005143A1 (fr) Procédé et appareil d'exécution d'une fonction divisée dans un système de communication sans fil
WO2021010587A1 (fr) Dispositif électronique servant à transmettre des données par l'intermédiaire d'une porteuse divisée et procédé de fonctionnement de dispositif électronique
CN103891373A (zh) 下行数据传输方法、基站及用户设备
WO2019245339A1 (fr) Procédé et appareil pour synchroniser une opération de duplication de paquet entre des nœuds de station de base dans un système de communications mobiles
WO2022211596A1 (fr) Procédés réalisés par un équipement d'utilisateur ou une station de base, équipement d'utilisateur et station de base
CN104662960A (zh) 小区的切换方法、终端和网络设备
WO2014109589A1 (fr) Appareil d'émission et de réception de données en liaison descendante dans un système de communications sans fil prenant en charge la coopération entre points d'émission et procédé à cet effet
WO2021010666A1 (fr) Procédé et appareil de transmission de signal de liaison montante dans un système de communication

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 12889132

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 12889132

Country of ref document: EP

Kind code of ref document: A1