WO2014071304A1 - Efficient allocation of uplink harq-ack resources - Google Patents
Efficient allocation of uplink harq-ack resources Download PDFInfo
- Publication number
- WO2014071304A1 WO2014071304A1 PCT/US2013/068315 US2013068315W WO2014071304A1 WO 2014071304 A1 WO2014071304 A1 WO 2014071304A1 US 2013068315 W US2013068315 W US 2013068315W WO 2014071304 A1 WO2014071304 A1 WO 2014071304A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- harq
- epdcch
- ack
- pucch
- resource
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Ceased
Links
Classifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L1/00—Arrangements for detecting or preventing errors in the information received
- H04L1/12—Arrangements for detecting or preventing errors in the information received by using return channel
- H04L1/16—Arrangements for detecting or preventing errors in the information received by using return channel in which the return channel carries supervisory signals, e.g. repetition request signals
- H04L1/1607—Details of the supervisory signal
- H04L1/1614—Details of the supervisory signal using bitmaps
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L1/00—Arrangements for detecting or preventing errors in the information received
- H04L1/12—Arrangements for detecting or preventing errors in the information received by using return channel
- H04L1/16—Arrangements for detecting or preventing errors in the information received by using return channel in which the return channel carries supervisory signals, e.g. repetition request signals
- H04L1/18—Automatic repetition systems, e.g. Van Duuren systems
- H04L1/1829—Arrangements specially adapted for the receiver end
- H04L1/1854—Scheduling and prioritising arrangements
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L1/00—Arrangements for detecting or preventing errors in the information received
- H04L1/12—Arrangements for detecting or preventing errors in the information received by using return channel
- H04L1/16—Arrangements for detecting or preventing errors in the information received by using return channel in which the return channel carries supervisory signals, e.g. repetition request signals
- H04L1/18—Automatic repetition systems, e.g. Van Duuren systems
- H04L1/1829—Arrangements specially adapted for the receiver end
- H04L1/1864—ARQ related signaling
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L5/00—Arrangements affording multiple use of the transmission path
- H04L5/003—Arrangements for allocating sub-channels of the transmission path
- H04L5/0053—Allocation of signalling, i.e. of overhead other than pilot signals
- H04L5/0055—Physical resource allocation for ACK/NACK
Definitions
- LTE Long-Term Evolution
- Enhancements in LTE Release 10 and Release 11 such as improved Downlink (DL) and Uplink (UL) Multi-User Multiple-Input/Multiple-Output (MU- MIMO), DL and UL Coordinated Multipoint Transmission (CoMP) - either with unique physical cell IDs or a shared physical cell ID scenario - and new carrier types for Carrier Aggregation (CA), put a heavy burden on legacy DL control channel capacity.
- the interference from a macro base station as experienced by User Equipment (UE) within the cell range expansion region of a low power node may prevent successful decoding of DL control signals.
- an Enhanced Physical Downlink Control Channel is included for LTE Release 11, where some of the objectives of the EPDCCH include increased control channel capacity, the ability to support frequency domain inter-cell interference control, improved spatial reuse of control channel resources and support of beamforming on the control channel.
- Disclosed embodiments provide systems and methods for selecting Physical
- Uplink Control Channel PUCCH resources.
- An Enhanced Physical Downlink Control Channel (EPDCCH) is detected in signals received from a base station in a first subframe.
- a HARQ- ACK resource indicator offset (AARO) value is identified for the EPDCCH.
- a PUCCH resource is selected for transmission of a Hybrid Automatic Repeat reQuest-ACKnowledgement (HARQ- ACK) corresponding to the EPDCCH.
- the PUCCH resource is selected based upon the AARO value.
- a second PUCCH resource may be selected for transmission of the HARQ-ACK on a second antenna port.
- the AARO field in the EPDCCH may alternatively indicate one out of a set of semi-statically configured PUCCH resources.
- a HARQ-ACK resource offset field value may be detected in a Downlink Control
- the AARO value for the EPDCCH can be identified by looking up the HARQ-ACK resource offset field value in a table that maps the HARQ-ACK resource offset field value for certain DCI formats to AARO values.
- the HARQ-ACK resource offset field value may be a two-bit field in a DCI payload.
- the two-bit field may correspond to AARO values in the range ⁇ 0, -1, -2, 2 ⁇ .
- the HARQ-ACK resource offset field in the DCI format of the EPDCCH may be used to indicate a small offset or a large offset.
- a user equipment device comprises a receiver processor circuit that is configured to detect an Enhanced Physical Downlink Control Channel (EPDCCH) in signals received from a base station in a sub frame n.
- the user equipment device further comprises a transmit processor circuit configured to select a Physical Uplink Control Channel (PUCCH) resource for transmission of a Hybrid Automatic Repeat reQuest-ACKnowledgement (HARQ-ACK) to the base station in a subframe n + k, where k ⁇ 4 and the PUCCH resource is selected based upon a HARQ-ACK resource offset.
- the user equipment device further comprises a modem configured to transmit the PUCCH resource to the base station.
- the transmit processor circuit may be further configured to select a second PUCCH resource for transmission of the HARQ-ACK on a second antenna port.
- FIG. 1 illustrates the EPDCCH blocking probability taking into account PUCCH resource blocking between two EPDCCH sets for the case where there is no ARO.
- FIG. 3 is a chart illustrating a comparison of the blocking probability in a lightly loaded system consisting of four UEs.
- FIG. 4 is a chart illustrating a comparison of the PUCCH utilization for the lightly loaded system shown in FIG. 3.
- FIG. 5 is a chart illustrating a comparison of the blocking probability in a heavily loaded system consisting of fourteen UEs.
- FIG. 6 is a chart illustrating a comparison of the PUCCH utilization for the heavily loaded system shown in FIG. 5.
- FIG. 7 is a block diagram of a wireless communication network according to one embodiment.
- FIG. 8 is a high level block diagram of a system that may be used as an eNB or
- FIG. 9 illustrates EPDCCH-based PUCCH resource allocation according to one embodiment.
- FIG. 10 is a block diagram illustrating the use of a small AA R O value within one
- FIG. 11 is a block diagram illustrating the use of a large AA R O value to move from one PUCCH resource allocation block to another.
- FIG. 12 block diagram illustrating a modification wherein UE resource allocations are moved beyond adjacent blocks.
- EPCCH Enhanced Physical Downlink Control Channel
- HARQ-ACK Hybrid Automatic Repeat reQuest-ACKnowledgement
- the dynamic PUCCH resource is given by the expression:
- N u CCH is a dynamic PUCCH offset parameter that delineates a dynamic PUCCH region from a semi-static PUCCH region and is either common for the entire cell (cell-specific) or dedicated to a particular UE (UE-specific).
- the parameter n CCE denotes the first, or lowest- indexed, control channel element used for the PDCCH that schedules a corresponding Downlink Shared Channel (DL-SCH) data transmission on the PDSCH.
- DL-SCH Downlink Shared Channel
- EPDCCH For EPDCCH, it has been agreed that the EPDCCH region is configured in a dedicated manner for a UE.
- a UE can be configured with up to two EPDCCH sets to form a UE-specific search space for receiving downlink control information.
- Each set may contain ⁇ 2, 4, 8 ⁇ Physical Resource Block (PRB) pairs and each set consists of a number of enhanced Control Channel Elements (ECCEs).
- PRB Physical Resource Block
- ECCEs are indexed per EPDCCH set.
- One or more ECCEs are aggregated for transmitting a Downlink Control Information (DO) message on the EPDCCH.
- DO Downlink Control Information
- the dynamic PUCCH resource allocation is defined per EPDCCH set and is modified from equation (1) to
- the f(n eCCE ) term is a function of the lowest-indexed ECCE in EPDCCH set k that is used to construct the transmitted EPDCCH.
- the Npu CCH.UE k term is a semi-statically configured dedicated PUCCH resource starting offset for EPDCCH set k.
- AA R O is a dynamically signaled HARQ-ACK resource indicator offset that can be used to resolve collisions between PUCCH resources from PDCCH and an EPDCCH set. It can also be used to resolve collisions between PUCCH resources associated with two EPDCCH sets.
- the PUCCH regions corresponding to PDCCH and EPDCCH DL assignments can be mapped to non-overlapping PUCCH regions. This partitioning avoids possible collisions between PUCCH resources derived from PDCCH and EPDCCH DL assignments. On the other hand, creating non-overlapping regions is not an efficient use of UL resources because it limits the uplink frequency resources that are available for Uplink Shared Channel (UL-SCH) data transmission on the Physical Uplink Shared Channel (PUSCH).
- UL-SCH Uplink Shared Channel
- a 2-bit ARO field is defined with values [- ⁇ , 0, ⁇ , 2 ⁇ ], where ⁇ is the unit offset value.
- the ARO described herein is conveyed in a new field in a DCI format scheduling a DL assignment on the PDSCH. If a UE receives a value of '0' it indicates that no offset is applied in determining the PUCCH resource of equation (2). Therefore, an LTE Evolved Node B (eNB) has three possible offsets that it can use to avoid collision between PUCCH resources when the PUCCH regions are overlapped between PDCCH and EPDCCH sets.
- eNB LTE Evolved Node B
- FIG. 1 illustrates the EPDCCH blocking probability taking into account PUCCH resource blocking between two EPDCCH sets for the case where there is no ARO.
- the different curves in FIG. 1 show different levels of overlap in the PUCCH regions associated with the two EPDCCH sets.
- the ARO reduces the overall blocking probability
- the ARO also introduces some limitations. For example, if a UE is configured to receive PDSCH on a secondary serving cell (SCell) in carrier aggregation, the UE is also configured to transmit HARQ-ACK feedback using either PUCCH format lb with channel selection or PUCCH format 3.
- PUCCH format the PUCCH resource(s) corresponding to a detected data transmission on the PDSCH on a SCell is indicated by a HARQ-ACK Resource Indicator (ARI) value that is conveyed in the Transmit Power Control (TPC) field of the DCI that schedules the PDSCH.
- ARI HARQ-ACK Resource Indicator
- embodiments of the present invention include the following options for the ARO field, namely: (1) the ARO field is not configured in the DCI format, (2) the ARO field is configured in the DCI format with redundant information, or (3) designating the ARO field as reserved when the DCI is transmitted on an EPDCCH scheduling PDSCH on a SCell.
- an explicit ARO field is introduced for all DCI formats that are transmitted on the EPDCCH - except for DCI format 4, which is used to schedule UL MIMO transmission.
- a UE receives a PDSCH transmission indicated by detection of a DL assignment on the EPDCCH or an EPDCCH indicating downlink Semi Persistent Scheduling (SPS) release on the primary cell, the UE decodes the EPDCCH with an explicit 2-bit ARO field in the DCI payload.
- SPS Semi Persistent Scheduling
- the ARO field value indicates a resource offset (AA R O) in the range ⁇ -2, 0, 2, 4 ⁇ .
- the range may be ⁇ -1, 0, 1, 3 ⁇ or ⁇ -2.
- -1, 0, 2 ⁇ the main idea taught here is that small offset values are defined to resolve PUCCH resource collisions.
- Tables 1 and 2 illustrate alternative AA R O mappings for values in the ARO field in DCI format.
- the resource offset range may be configured based on whether the UE is configured for transmit diversity on PUCCH format la/lb.
- the ARO field indicates an offset in the range ⁇ -2, 0, 2, 4 ⁇ .
- the ARO field indicates an offset in the range ⁇ - 1 , 0, 1 , 2 ⁇ or in the range ⁇ 0, 1 , 2, 3 ⁇ .
- the ARO field may be reserved under the following conditions:
- Time-Division Duplex (TDD) UE that is configured for PUCCH format 3 and an EPDCCH is detected with the value of the downlink assignment index (DAI) greater than 1 in the DCI message; or
- an explicit ARO field may be used to indicate a semi-statically configured resource, such as one out of a set of four semi-statically configured resources.
- the TPC field of the DCI format may be re-interpreted as the
- the TPC field of the DCI format scheduling PDSCH may be used to indicate the ARI if the Downlink Assignment Index (DAI) value is greater than 1. This embodiment restores the TPC field to its original function of providing TPC commands instead of indicating an ARI value.
- DAI Downlink Assignment Index
- the TPC field indicates transmit power control commands and the HARQ-ACK resource offset (ARO) field indicates one out of a set of up to four semi-statically configured PUCCH format 3 resources.
- ARO HARQ-ACK resource offset
- the TPC field of the EPDCCH may indicate one out of a set of up to four semi- statically configured PUCCH format 3 resources.
- the ARO field of the EPDCCH may be set to zero or may be reserved (i.e., the value is undefined).
- both the TPC field and the ARO field of the EPDCCH may indicate the same PUCCH format 3 resource out of the set of up to four semi-statically configured PUCCH format 3 resources.
- the TPC field may indicate the TPC command, while the ARO field indicates one PUCCH format 3 resource out of the set of up to four semi-statically configured PUCCH format 3 resources. If a UE detects in the same subframe an EPDCCH on the primary cell scheduling PDSCH on the primary cell and another EPDCCH on the primary cell scheduling PDSCH on a secondary cell, the same TPC value is transmitted on both EPDCCHs.
- TPC field and ARO field may both indicate the same
- an explicit ARO field is inserted only in DCI formats carried in EPDCCH on the primary cell.
- the UE decodes the EPDCCH on the primary cell assuming the presence of the ARO field. For EPDCCH on a secondary cell, there is no explicit ARO field.
- TDD dynamic PUCCH resource allocation corresponding to a detected EPDCCH is similar to FDD with one important exception.
- the UE may need to send HARQ- ACK feedback in an UL subframe corresponding to PDSCH received in multiple DL subframes.
- PUCCH resources must be reserved for each DL subframe of a length- HARQ-ACK bundling window.
- the HARQ-ACK bundling window is also known as the DL association set.
- the length M of the DL association set depends on the TDD UL/DL configuration and the UL subframe.
- the PUCCH resource regions for EPDCCH scheduling are sequentially allocated for each subframe of the HARQ-ACK DL association set of length M.
- the PUCCH region is offset by the total number of ECCEs in all preceding subframes 0, ... , i- 1. If there are N eCCE m ECCEs in EPDCCH set q for the subframe n - k m , an equal number of N eCCE q m PUCCH resources are reserved in UL subframe n for PDSCH transmitted in subframe n - k m .
- distributed EPDCCH ' and N e ⁇ CE is the number of ECCEs in a resource block for EPDCCH set q.
- the ARO field size may be set to 3 bits in order to support both collision avoidance and PUCCH resource compression.
- Table 3 illustrates an exemplary mapping of the ARO field value in the DCI format to the PUCCH resource in Equation 3 above.
- the last four entries offset the resource allocation by the number of ECCEs allocated to set q in one or more previous DL subframes.
- TDD PUCCH resource compression reduces the resource collision avoidance capability if the ARO field size is unchanged with respect to FDD. If this is deemed acceptable in order to keep the same ARO field size in DCI formats for both duplex modes, the following set of values may be used in various options.
- the ARO set may be defined as
- both small offsets and large offsets can be designed for the ARO field.
- the small offsets are used to resolve PUCCH resource collisions between assignments in two EPDCCH sets or between an EPDCCH set and PDCCH-based resource allocation.
- the large offset on the other hand, is used to compress PUCCH resource by moving from one reserved block to another.
- FIG. 3 is a chart illustrating a comparison of the blocking probability given two
- EPDCCH sets, TDD UL/DL Configuration #2 and a lightly loaded system consisting of four UEs.
- FIG. 4 is a chart illustrating a comparison of the PUCCH utilization for the lightly loaded system shown in FIG. 3.
- FIG. 5 is a chart illustrating a comparison of the blocking probability given two
- EPDCCH sets, TDD UL/DL Configuration #2 and a heavily loaded system consisting of fourteen UEs.
- FIG. 6 is a chart illustrating a comparison of the PUCCH utilization for the heavily loaded system shown in FIG. 5.
- FIGS. 3-6 compare options 1, 2, and 3 as described above. As a baseline, the results with no ARO and results using an FDD ARO set of ⁇ 0, 2, -1, -2 ⁇ are included in the comparisons.
- FIGS. 3 and 5 show the blocking probability for each scheduled DL subframe assuming all UEs are scheduled in each subframe of the bundling window.
- FIGS. 4 and 6 show the PUCCH utilization for each PUCCH sub-region corresponding to each of the scheduled DL subframes.
- the comparison results illustrated in FIGS. 3-6 can be summarized as follows.
- FIG. 5 also indicates that the blocking probability is low for Option 3 because, for each DL subframe, more degrees of freedom are used for resource compression to the detriment of collision avoidance. In contrast, Options 1 and 2 appear to efficiently utilize the degrees of freedom to provide both resource compression and collision avoidance capabilities.
- An LTE Release 11 UE can be configured to monitor the EPDCCH on a subset of all possible DL and special subframes.
- the UE When the UE is not configured to monitor EPDCCH in a subframe, it monitors the legacy PDCCH for DL assignments including PDCCH indicating SPS release and UL grants. It may occur that in the same DL association set of length M> 1, the UE may be configured to monitor EPDCCH in some subframes and PDCCH in the other subframes. For such scenarios the PUCCH resource allocation needs to be specified.
- This TDD resource allocation implies that if a UE is configured to monitor EPDCCH in all M DL subframes of a DL association set, then
- TDD UL-DL configuration 5 with nine DL subframes and one UL subframe.
- FIG. 7 is a block diagram of a wireless communication network 700, which may be an LTE network that utilizes orthogonal frequency-division multiple access (OFDMA) on the downlink and single-carrier frequency division multiple access (SC-FDMA) on the uplink.
- LTE partitions system bandwidth into multiple orthogonal subcarriers, which may be referred to as frequency tones or frequency bins. Each subcarrier may be modulated with data, control, or reference signals.
- the wireless network 700 includes a number of evolved Node Bs (eNBs) 701 and other network entities.
- the eNBs 701 communicate with user equipment devices (UEs) 702, 705.
- Each eNB 701 provides communication services for a particular geographic area or "cell" 703.
- eNB 701 may be a macro base station, micro base station, pico base station, or femto base station, for example.
- a network controller 704 may be coupled to a set of eNBs 701 and provide coordination and control for these eNBs 701.
- UEs 702, 705 may be stationary or mobile and may be located throughout the wireless network 700.
- UEs 702, 705 may be referred to as a terminal, a mobile station, a subscriber unit, a station, such as a mobile telephone, a personal digital assistant (PDA), a wireless modem, a laptop or notebook computer, a tablet, and the like.
- PDA personal digital assistant
- a UE 702 communicates with an eNB 701 serving the cell 703 in which the UE 702 is located.
- a UE 702 may communicate with more than one eNB 701 if the cells 703 of the eNBs 701 overlap.
- One eNB 701 will be the primary cell (PCell) and the other eNBs 701 will be secondary serving cells (SCell).
- PCell primary cell
- SCell secondary serving cells
- FIG. 8 is a high level block diagram of a system 800 that may be used as an eNB or UE, which may be, for example, eNB 701 or UE 702 in FIG. 7.
- System 800 receives data to be transmitted from an interface 801 at transmit processor 802.
- the data may include, for example, audio or video information or other data file information to be transmitted on a
- the transmit processor 802 may also receive control or HARQ-ACK information to be transmitted on a PUCCH, PUSCH, or SRS, from a controller 803. Transmit processor 802 processes (e.g., encode and symbol map) the data and control information to obtain data symbols, control symbols, and reference symbols. The transmit processor 802 may also perform spatial processing or precoding on the data symbols and/or the control symbols and reference symbols. The output of the transmit processor 802 is provided to a modem 804. Modem 804 processes the output symbol stream from the transmit processor 802 to obtain an output sample stream that is further processed by converting to analog, amplifying, and upconverting before being transmitted via antenna 805. In other embodiments, multiple modems 804 may be used to support multiple-input multiple -output (MIMO) transmission on multiple antennas 805.
- MIMO multiple-input multiple -output
- Signals are also received at system 800 on antenna 805 from other devices.
- the received signals are provided to modem 804 for demodulation.
- Modem 804 processes the signals by filtering, amplifying, downconverting, and/or digitizing, for example, to obtain input samples.
- Modem 804 or a receive processor 806 may further process the input samples to obtain received symbols.
- Receive processor 806 then processes the symbols by demodulating, deinterleaving, and/or decoding, for example.
- Receive processor 805 then provides decoded data to interface 801 for use by the eNB or UE.
- Receive processor further provides decoded control information to controller 803.
- Controller 803 may direct the operation of system 800 in the eNB or UE, such as by adjusting timing and power levels.
- a memory 807 may store data and program codes for controller 803, transmit processor 802, and/or receive processor 806.
- Additional components, such as a scheduler 808 may schedule downlink and/or uplink data transmission on one or more component carriers by system 800 (e.g., in an eNB).
- FIG. 9 illustrates EPDCCH-based PUCCH resource allocation according to one embodiment.
- eNodeB 901 transmits on downlink channels to UE 902.
- UE 902. For example, eNodeB
- 901 transmits M EPDDCH and PDSCH to UE 902 on M downlink subframes 903-1 through 903-M starting at subframe n - k 0 to subframe n - k M -i- In a subsequent uplink subframe n, UE
- eNodeB 901 reserves PUCCH resources 905 for M subframes.
- Embodiments of the invention disclosed herein provide a system and method for PUCCH resource compression, which saves PUCCH resources when PDSCH is scheduled by EPDCCH. Additionally, embodiments avoid PUCCH resource collision between multiple UEs and/or between multiple EPDCCH sets.
- the dynamic HARQ-ACK resource offset (AA R O) is used to compress PUCCH resources in an UL subframe 904 as shown in Equation 3 above.
- FIG. 10 is a block diagram illustrating the use of a small AA R O value within one
- PUCCH resource allocation block For FDD and TDD, using a relatively small value of AA R O 1001, the UE moves from resource 1002 to resource 1003 within PUCCH resource allocation block 1004. This movement within a single PUCCH resource allocation block is used to avoid collision between different UEs.
- UL/DL Subframe n For FDD and TDD, using a relatively small value of AA R O 1001, the UE moves from resource 1002 to resource 1003 within PUCCH resource allocation block 1004. This movement within a single PUCCH resource allocation block is used to avoid collision between different UEs.
- FIG. 1 1 is a block diagram illustrating the use of a large AARO value to move from one PUCCH resource allocation block to another.
- a UE is moved from 1 102 in PUCCH resource allocation block 1 103 to 1 104 within PUCCH resource allocation block 1 105. This movement saves PUCCH resource allocation block 1 103.
- FIG. 12 is a block diagram illustrating a modification of the embodiment shown in FIG. 1 1 wherein UE resource allocations are moved beyond adjacent blocks.
- AARO 1201 moves the UE resource allocation from 1202 in block 1203 to resource 1204 in block 1205.
- EPDCCH in subframe « - 4 or for an EPDCCH indicating downlink SPS release in subframe n - 4 , the UE shall use:
- EPDCCH-PRB-set is configured for distributed transmission
- ECCE i.e., lowest ECCE index used to construct the EPDCCH
- the value of A ARO is determined from the HARQ-ACK resource offset field in the DCI format of the corresponding EPDCCH as given in a Table 5 below, which is a mapping of the ACK/NACK Resource offset field in DCI format 1A/1B/1D/1/2A/2/2B/2C/2D to A AR0 values.
- N ⁇ 3 ⁇ 4 c3 ⁇ 4q for EPDCCH-PRB-set q is configured by a higher layer parameter designated as pucch-ResourceStartOffset-rl 1.
- N ⁇ CE ' 9 for EPDCCH- PRB-set q is given in section 6.8A.1 of 3GPP TS 36.211 : "Evolved Universal Terrestrial Radio Access (E-UTRA); Physical channels and modulation.”
- n' is determined from the antenna port used for localized EPDCCH transmission which is described in section 6.8A.5 in 3GPP TS 36.211.
- EPDCCH-PRB-set is configured for distributed transmission
- EPDCCH-PRB-set is configured for localised transmission.
Landscapes
- Engineering & Computer Science (AREA)
- Signal Processing (AREA)
- Computer Networks & Wireless Communication (AREA)
- Mobile Radio Communication Systems (AREA)
- Detection And Prevention Of Errors In Transmission (AREA)
Abstract
Systems and methods for selecting Physical Uplink Control Channel (PUCCH) resources are disclosed. An Enhanced Physical Downlink Control Channel (EPDCCH) is detected in signals received from a base station in a first subframe. A HARQ-ACK resource indicator offset (AARO) value is identified for the EPDCCH. A PUCCH resource is selected for transmission of a Hybrid Automatic Repeat reQuest-ACKnowledgement (HARQ-ACK) corresponding to the EPDCCH. The PUCCH resource is selected based upon the AARO value. The AARO value may correspond to a semi-statically configured PUCCH resource. A second PUCCH resource may be selected for transmission of the HARQ-ACK on a second antenna port. A HARQ-ACK resource offset field value may be detected in a Downlink Control Information (DCI) format of the EPDCCH. A table that maps the HARQ-ACK resource offset field value for certain DCI formats to AARO values may be used to determine the AARO value for the EPDCCH.
Description
EFFICIENT ALLOCATION OF UPLINK HARQ-ACK RESOURCES
BACKGROUND
[0001] Long-Term Evolution (LTE) systems are evolving from homogenous networks of macro base stations that provide basic coverage to multi-layered, heterogeneous networks in which a macro base station may be overlaid and complemented by low-power nodes, such as micro, pico, and femto base stations and relay nodes. It has been observed that some of the original signaling design principles used in LTE Release 8 are no longer optimal when employed in these heterogeneous networks. Enhancements in LTE Release 10 and Release 11, such as improved Downlink (DL) and Uplink (UL) Multi-User Multiple-Input/Multiple-Output (MU- MIMO), DL and UL Coordinated Multipoint Transmission (CoMP) - either with unique physical cell IDs or a shared physical cell ID scenario - and new carrier types for Carrier Aggregation (CA), put a heavy burden on legacy DL control channel capacity. Furthermore, the interference from a macro base station as experienced by User Equipment (UE) within the cell range expansion region of a low power node may prevent successful decoding of DL control signals. Therefore, an Enhanced Physical Downlink Control Channel (EPDCCH) is included for LTE Release 11, where some of the objectives of the EPDCCH include increased control channel capacity, the ability to support frequency domain inter-cell interference control, improved spatial reuse of control channel resources and support of beamforming on the control channel.
SUMMARY
[0002] Disclosed embodiments provide systems and methods for selecting Physical
Uplink Control Channel (PUCCH) resources. An Enhanced Physical Downlink Control Channel (EPDCCH) is detected in signals received from a base station in a first subframe. A HARQ- ACK resource indicator offset (AARO) value is identified for the EPDCCH. A PUCCH resource is selected for transmission of a Hybrid Automatic Repeat reQuest-ACKnowledgement (HARQ- ACK) corresponding to the EPDCCH. The PUCCH resource is selected based upon the AARO value. A second PUCCH resource may be selected for transmission of the HARQ-ACK on a
second antenna port. The AARO field in the EPDCCH may alternatively indicate one out of a set of semi-statically configured PUCCH resources.
[0003] A HARQ-ACK resource offset field value may be detected in a Downlink Control
Information (DCI) format of the EPDCCH. The AARO value for the EPDCCH can be identified by looking up the HARQ-ACK resource offset field value in a table that maps the HARQ-ACK resource offset field value for certain DCI formats to AARO values.
[0004] The HARQ-ACK resource offset field value may be a two-bit field in a DCI payload. For example, the two-bit field may correspond to AARO values in the range {0, -1, -2, 2} . The HARQ-ACK resource offset field in the DCI format of the EPDCCH may be used to indicate a small offset or a large offset.
[0005] In one embodiment, a user equipment device comprises a receiver processor circuit that is configured to detect an Enhanced Physical Downlink Control Channel (EPDCCH) in signals received from a base station in a sub frame n. The user equipment device further comprises a transmit processor circuit configured to select a Physical Uplink Control Channel (PUCCH) resource for transmission of a Hybrid Automatic Repeat reQuest-ACKnowledgement (HARQ-ACK) to the base station in a subframe n + k, where k≥ 4 and the PUCCH resource is selected based upon a HARQ-ACK resource offset. The user equipment device further comprises a modem configured to transmit the PUCCH resource to the base station. The transmit processor circuit may be further configured to select a second PUCCH resource for transmission of the HARQ-ACK on a second antenna port.
BRIEF DESCRIPTION OF THE DRAWINGS
[0006] FIG. 1 illustrates the EPDCCH blocking probability taking into account PUCCH resource blocking between two EPDCCH sets for the case where there is no ARO.
[0007] FIG. 2 illustrates EPDCCH blocking probability for the case where ARO is present with δ = 1.
[0008] FIG. 3 is a chart illustrating a comparison of the blocking probability in a lightly loaded system consisting of four UEs.
[0009] FIG. 4 is a chart illustrating a comparison of the PUCCH utilization for the lightly loaded system shown in FIG. 3.
[0010] FIG. 5 is a chart illustrating a comparison of the blocking probability in a heavily loaded system consisting of fourteen UEs.
[0011] FIG. 6 is a chart illustrating a comparison of the PUCCH utilization for the heavily loaded system shown in FIG. 5.
[0012] FIG. 7 is a block diagram of a wireless communication network according to one embodiment.
[0013] FIG. 8 is a high level block diagram of a system that may be used as an eNB or
UE according to one embodiment.
[0014] FIG. 9 illustrates EPDCCH-based PUCCH resource allocation according to one embodiment.
[0015] FIG. 10 is a block diagram illustrating the use of a small AARO value within one
PUCCH resource allocation block.
[0016] FIG. 11 is a block diagram illustrating the use of a large AARO value to move from one PUCCH resource allocation block to another.
[0017] FIG. 12 block diagram illustrating a modification wherein UE resource allocations are moved beyond adjacent blocks.
DETAILED DESCRIPTION OF EXAMPLE EMBODIMENTS
[0018] An Enhanced Physical Downlink Control Channel (EPDCCH) is introduced in
LTE Release 11. Hybrid Automatic Repeat reQuest-ACKnowledgement (HARQ-ACK) resources on a Physical Uplink Control Channel (PUCCH) need to be determined in response to a Physical Downlink Shared Channel (PDSCH) transmission that is scheduled by either the Physical Downlink Control Channel (PDCCH) or the EPDCCH.
[0019] For PDCCH, the dynamic PUCCH resource is given by the expression:
M puccH ~ ^CCE -^PUCCH Eq. (1) wherein N uCCH is a dynamic PUCCH offset parameter that delineates a dynamic PUCCH region from a semi-static PUCCH region and is either common for the entire cell (cell-specific) or dedicated to a particular UE (UE-specific). The parameter nCCE denotes the first, or lowest- indexed, control channel element used for the PDCCH that schedules a corresponding Downlink Shared Channel (DL-SCH) data transmission on the PDSCH.
[0020] For EPDCCH, it has been agreed that the EPDCCH region is configured in a dedicated manner for a UE. A UE can be configured with up to two EPDCCH sets to form a UE-specific search space for receiving downlink control information. Each set may contain {2,
4, 8} Physical Resource Block (PRB) pairs and each set consists of a number of enhanced Control Channel Elements (ECCEs). The ECCEs are indexed per EPDCCH set. One or more ECCEs are aggregated for transmitting a Downlink Control Information (DO) message on the EPDCCH. Based on this EPDCCH definition, the dynamic PUCCH resource allocation is defined per EPDCCH set and is modified from equation (1) to
nPUCCH ~ f{neCCE ) "*" ^PUCCH-UE, k "*~ ^ ARO Eq. (2)
The f(neCCE ) term is a function of the lowest-indexed ECCE in EPDCCH set k that is used to construct the transmitted EPDCCH. The NpuCCH.UE k term is a semi-statically configured dedicated PUCCH resource starting offset for EPDCCH set k. AARO is a dynamically signaled HARQ-ACK resource indicator offset that can be used to resolve collisions between PUCCH resources from PDCCH and an EPDCCH set. It can also be used to resolve collisions between PUCCH resources associated with two EPDCCH sets.
[0021] The PUCCH regions corresponding to PDCCH and EPDCCH DL assignments can be mapped to non-overlapping PUCCH regions. This partitioning avoids possible collisions between PUCCH resources derived from PDCCH and EPDCCH DL assignments. On the other hand, creating non-overlapping regions is not an efficient use of UL resources because it limits the uplink frequency resources that are available for Uplink Shared Channel (UL-SCH) data transmission on the Physical Uplink Shared Channel (PUSCH).
[0022] Therefore, it is more efficient to allow some degree of overlap between PUCCH regions derived from PDCCH and EPDCCH and use the dynamically signaled HARQ-ACK resource indicator offset (AARO) to resolve potential PUCCH resource collisions. A 2-bit ARO field is defined with values [-δ, 0, δ, 2δ], where δ is the unit offset value. In one embodiment of the present invention the ARO described herein is conveyed in a new field in a DCI format scheduling a DL assignment on the PDSCH. If a UE receives a value of '0' it indicates that no offset is applied in determining the PUCCH resource of equation (2). Therefore, an LTE Evolved Node B (eNB) has three possible offsets that it can use to avoid collision between PUCCH resources when the PUCCH regions are overlapped between PDCCH and EPDCCH sets.
Furthermore, using a unit offset of δ = 2 ensures that two consecutive resources can be reserved in the case of PUCCH transmit diversity.
[0023] To demonstrate the need for an ARO, FIG. 1 illustrates the EPDCCH blocking probability taking into account PUCCH resource blocking between two EPDCCH sets for the case where there is no ARO. The different curves in FIG. 1 show different levels of overlap in the PUCCH regions associated with the two EPDCCH sets. FIG. 2 illustrates EPDCCH blocking probability for the case where ARO is present with δ = 1. Comparing FIGS. 1 and 2, it can be seen that for a 10% blocking probability, eight UEs (or rather eight DCI allocations) can be scheduled without ARO whereas at least twelve UEs can be scheduled with ARO. This provides a 50% increase in control channel capacity on the EPDCCH.
[0024] Although the ARO reduces the overall blocking probability, the ARO also introduces some limitations. For example, if a UE is configured to receive PDSCH on a secondary serving cell (SCell) in carrier aggregation, the UE is also configured to transmit HARQ-ACK feedback using either PUCCH format lb with channel selection or PUCCH format 3. For either PUCCH format, the PUCCH resource(s) corresponding to a detected data transmission on the PDSCH on a SCell is indicated by a HARQ-ACK Resource Indicator (ARI) value that is conveyed in the Transmit Power Control (TPC) field of the DCI that schedules the PDSCH. Hence, if EPDCCH schedules PDSCH on a SCell, there is no need for a separate ARO field in the DCI format. Accordingly, embodiments of the present invention include the following options for the ARO field, namely: (1) the ARO field is not configured in the DCI format, (2) the ARO field is configured in the DCI format with redundant information, or (3) designating the ARO field as reserved when the DCI is transmitted on an EPDCCH scheduling PDSCH on a SCell.
Explicit ARO field for all DCI formats.
[0025] In one embodiment, an explicit ARO field is introduced for all DCI formats that are transmitted on the EPDCCH - except for DCI format 4, which is used to schedule UL MIMO transmission.
[0026] If a UE receives a PDSCH transmission indicated by detection of a DL assignment on the EPDCCH or an EPDCCH indicating downlink Semi Persistent Scheduling (SPS) release on the primary cell, the UE decodes the EPDCCH with an explicit 2-bit ARO field in the DCI payload.
The ARO field value indicates a resource offset (AARO) in the range {-2, 0, 2, 4} . In other embodiments of the present invention, the range may be {-1, 0, 1, 3} or {-2. -1, 0, 2}, the main
idea taught here is that small offset values are defined to resolve PUCCH resource collisions. Tables 1 and 2 illustrate alternative AARO mappings for values in the ARO field in DCI format.
Alternatively, the resource offset range may be configured based on whether the UE is configured for transmit diversity on PUCCH format la/lb. When a UE is configured to transmit PUCCH format la/lb on two antenna ports, the ARO field indicates an offset in the range {-2, 0, 2, 4} . When a UE is configured to transmit PUCCH format la/lb on one antenna port, the ARO field indicates an offset in the range {- 1 , 0, 1 , 2} or in the range {0, 1 , 2, 3 } .
[0027] The ARO field may be reserved under the following conditions:
a Time-Division Duplex (TDD) UE that is configured for PUCCH format 3 and an EPDCCH is detected with the value of the downlink assignment index (DAI) greater than 1 in the DCI message; or
both FDD and TDD carrier aggregation, if an EPDCCH is detected scheduling PDSCH on a configured SCell and the UE is configured for either PUCCH format 3 or for PUCCH format lb with channel selection.
Semi-statically configured resources.
[0028] In another embodiment, when a UE is configured for PUCCH format 3 or when a
UE configured for carrier aggregation using PUCCH format lb with channel selection, an
explicit ARO field may be used to indicate a semi-statically configured resource, such as one out of a set of four semi-statically configured resources.
[0029] In LTE Release 10, the TPC field of the DCI format may be re-interpreted as the
ARI value when a UE detects a PDCCH scheduling PDSCH on a SCell. Additionally, when a TDD UE that is configured for single cell operation is configured for PUCCH format 3, the TPC field of the DCI format scheduling PDSCH may be used to indicate the ARI if the Downlink Assignment Index (DAI) value is greater than 1. This embodiment restores the TPC field to its original function of providing TPC commands instead of indicating an ARI value.
[0030] Therefore, when the DAI value is greater than 1 for an EPDCCH scheduling
PDSCH on the primary cell or an EPDCCH indicating SPS release on the primary cell, the TPC field indicates transmit power control commands and the HARQ-ACK resource offset (ARO) field indicates one out of a set of up to four semi-statically configured PUCCH format 3 resources.
[0031] For EPDCCH transmitted on the primary cell and scheduling PDSCH on a secondary cell, the TPC field of the EPDCCH may indicate one out of a set of up to four semi- statically configured PUCCH format 3 resources. The ARO field of the EPDCCH may be set to zero or may be reserved (i.e., the value is undefined).
[0032] In one alternative, both the TPC field and the ARO field of the EPDCCH may indicate the same PUCCH format 3 resource out of the set of up to four semi-statically configured PUCCH format 3 resources. In another alternative, the TPC field may indicate the TPC command, while the ARO field indicates one PUCCH format 3 resource out of the set of up to four semi-statically configured PUCCH format 3 resources. If a UE detects in the same subframe an EPDCCH on the primary cell scheduling PDSCH on the primary cell and another EPDCCH on the primary cell scheduling PDSCH on a secondary cell, the same TPC value is transmitted on both EPDCCHs.
[0033] In a further alternative, the TPC field and ARO field may both indicate the same
ARI value for selecting a PUCCH format 3 resource.
Primary cell only.
[0034] In a further embodiment, an explicit ARO field is inserted only in DCI formats carried in EPDCCH on the primary cell. The UE decodes the EPDCCH on the primary cell
assuming the presence of the ARO field. For EPDCCH on a secondary cell, there is no explicit ARO field.
PUCCH resource allocation for TDD.
[0035] TDD dynamic PUCCH resource allocation corresponding to a detected EPDCCH is similar to FDD with one important exception. For TDD, the UE may need to send HARQ- ACK feedback in an UL subframe corresponding to PDSCH received in multiple DL subframes. In addition to the semi-static resource offset for the EPDCCH set k, PUCCH resources must be reserved for each DL subframe of a length- HARQ-ACK bundling window. The HARQ-ACK bundling window is also known as the DL association set. The length M of the DL association set depends on the TDD UL/DL configuration and the UL subframe.
[0036] The PUCCH resource regions for EPDCCH scheduling are sequentially allocated for each subframe of the HARQ-ACK DL association set of length M. In particular, for the ith DL subframe, the PUCCH region is offset by the total number of ECCEs in all preceding subframes 0, ... , i- 1. If there are NeCCE m ECCEs in EPDCCH set q for the subframe n - km, an equal number of NeCCE q m PUCCH resources are reserved in UL subframe n for PDSCH transmitted in subframe n - km.
[0037] The dynamic PUCCH resource allocation corresponding to subframe n - km for antenna port pO is given ' cCH,m = / cCE,¾m )+ + Δ ARO 0 < ≤ M - 1 Eq. (3)
wherein,
localizedEPDCCH
[0038] From equation (3) it can be observed that the PUCCH overhead for EPDCCH- based dynamic PUCCH resource allocation can be considerable. As such, it is desirable to design methods to compress PUCCH resource allocation to improve PUSCH transmission capacity. The HARQ-ACK resource offset indicator in this case can therefore be used for two purposes:
(1) used to avoid PUCCH resource collisions between EPDCCH sets and/or between EPDCCH and PDCCH (similar to FDD); and
(2) used for PUCCH resource compression between the PUCCH regions that are reserved for each DL subframe in a HARQ-ACK bundling window.
[0039] Incorporating some resource compression reduces the degrees of freedom available for resource collision compared to FDD. For a fully loaded system where a significant number of UEs are scheduled in every subframe, resource compression may not be necessary since each PUCCH region per DL subframe is required for PUCCH transmission. For such a scenario, it is desirable to specify the same collision avoidance capability for TDD and FDD. PUCCH resource compression and collision avoidance methods.
3-bit ARO field.
[0040] In one embodiment, the ARO field size may be set to 3 bits in order to support both collision avoidance and PUCCH resource compression. Table 3 illustrates an exemplary mapping of the ARO field value in the DCI format to the PUCCH resource in Equation 3 above.
Table 3
[0041] For Option 1 in Table 3, the last four entries offset the PUCCH resource for the i
DL subframe by the number of ECCEs in subframe i-1 of EPDCCH set q. These entries retain resource collision avoidance capability as in FDD by further offsetting by the values {-2, 0, 1, 2} . This approach allows a resource compression on the order of one DL subframe. For example, for TDD UL/DL configuration 2 where the length of the DL association set M = 4 in both UL subframes n = 2 and n = 7, it is possible to save the implicit resource allocation for the fourth DL
subframe of the DL association set. A different mapping of ARO values, consisting of a mix of resource compression and collision avoidance, may also be used in other embodiments.
[0042] For Option 2 in Table 3, the last four entries offset the resource allocation by the number of ECCEs allocated to set q in one or more previous DL subframes.
Trade -off PUCCH resource collision avoidance and resource compression.
[0043] TDD PUCCH resource compression reduces the resource collision avoidance capability if the ARO field size is unchanged with respect to FDD. If this is deemed acceptable in order to keep the same ARO field size in DCI formats for both duplex modes, the following set of values may be used in various options.
Option 1
[0044] For the ith subframe of the DL association set, the set of ARO values is given as
^ ARO ^ IP' , — NECCE,?,!-1 _ 1' _ ^ECCE,?,!-1 ~~ Z > 0 .
For subframe i = 0, this set reverts back to the same one for FDD, i.e. {0, 2, -1, -2}, whereas for i > 1, resource compression of one DL subframe is possible.
Option 2
[0045] For the f subframe of the HARQ-ACK bundling window, the set of ARO values is given as
For subframe i = 0, this set reverts back to the same one for FDD, i.e. {0, 2, -1, -2}, whereas for i > 1, resource compression of one DL subframe is possible.
[0046] Options 1 and 2 are similar with a slight change in the last two offset values.
Option 3
[0047] Alternatively, the ARO set may be defined as
ARO≡{0, 2, - 1, - NEccE,?,o } *" = 1
^ ARO ^ |0' 2, — NECCE,?,0 ' _ (^ECC,q,0 + ^ECCE,?,1 )} — 2
^ ARO ^ |P' — NECC,q,0 ' _ (^ECC,q,0 + ^ECCE,?,1 )' _ (^ECC,q,0 + ^ECCE,?,1 + ^ECCE,?,2 )| > 2
[0048] Other alternative options are not precluded as the main idea taught by the present invention is that both small offsets and large offsets can be designed for the ARO field. The small offsets are used to resolve PUCCH resource collisions between assignments in two
EPDCCH sets or between an EPDCCH set and PDCCH-based resource allocation. The large offset on the other hand, is used to compress PUCCH resource by moving from one reserved block to another.
[0049] FIG. 3 is a chart illustrating a comparison of the blocking probability given two
EPDCCH sets, TDD UL/DL Configuration #2 and a lightly loaded system consisting of four UEs.
[0050] FIG. 4 is a chart illustrating a comparison of the PUCCH utilization for the lightly loaded system shown in FIG. 3.
[0051] FIG. 5 is a chart illustrating a comparison of the blocking probability given two
EPDCCH sets, TDD UL/DL Configuration #2 and a heavily loaded system consisting of fourteen UEs.
[0052] FIG. 6 is a chart illustrating a comparison of the PUCCH utilization for the heavily loaded system shown in FIG. 5.
[0053] FIGS. 3-6 compare options 1, 2, and 3 as described above. As a baseline, the results with no ARO and results using an FDD ARO set of {0, 2, -1, -2} are included in the comparisons.
[0054] FIGS. 3 and 5 show the blocking probability for each scheduled DL subframe assuming all UEs are scheduled in each subframe of the bundling window. FIGS. 4 and 6 show the PUCCH utilization for each PUCCH sub-region corresponding to each of the scheduled DL subframes. The comparison results illustrated in FIGS. 3-6 can be summarized as follows.
[0055] For a lightly loaded system, all ARO options (including the FDD ARO set) achieve the intended goal of reducing the blocking probability with respect to no ARO indication. Accordingly, one PUCCH sub-region can be saved for all three options for combining resource compression with collision avoidance. In one embodiment, options 1 and 2 achieve the best PUCCH utilization. For sixteen ECCEs in an EPDCCH set, this translates to roughly one PRB (assuming that the eNB allocates eighteen format la/lb resources in one PRB).
[0056] For a heavily loaded system, although PUCCH utilization approaches 100% in the first sub-region, there is still appreciable PUCCH utilization in the last sub-region (i.e., there is no PUCCH saving compared to using the FDD ARO set). Furthermore, from a system perspective, there may not be significant gain in minimizing PUCCH overhead for a fully loaded system. Although it may be argued that if higher aggregation levels are more likely to be
transmitted the PUCCH resource utilization for FDD is low, it is not necessarily desirable to increase packing efficiency per PUCCH PRB because of the resulting higher intra-cell interference (this is also true for PDCCH-based PUCCH resource allocation).
[0057] FIG. 5 also indicates that the blocking probability is low for Option 3 because, for each DL subframe, more degrees of freedom are used for resource compression to the detriment of collision avoidance. In contrast, Options 1 and 2 appear to efficiently utilize the degrees of freedom to provide both resource compression and collision avoidance capabilities.
EPDCCH monitoring set for PUCCH resource allocation.
[0058] An LTE Release 11 UE can be configured to monitor the EPDCCH on a subset of all possible DL and special subframes. When the UE is not configured to monitor EPDCCH in a subframe, it monitors the legacy PDCCH for DL assignments including PDCCH indicating SPS release and UL grants. It may occur that in the same DL association set of length M> 1, the UE may be configured to monitor EPDCCH in some subframes and PDCCH in the other subframes. For such scenarios the PUCCH resource allocation needs to be specified.
[0059] For a PDSCH transmission indicated by the detection of corresponding EPDCCH or a EPDCCH indicating downlink SPS release in sub-frame n - km the PUCCH resource for antenna port pO is
JPUPCoC)H,m = J f( Vn eCCE,q,m )/+T N J V P(1U)CCH-UE, q + ^ V / ,N 1 eCCE.a.m' + ^ Δ ^ARO 0 V <— m m <— M IV1 - l 1 wherein S(m ) is the subset of DL subframes in the DL association set
- kQ ,n - kx , ..., n - km_x } for which the UE is configured to monitor the EPDCCH.
This TDD resource allocation implies that if a UE is configured to monitor EPDCCH in all M DL subframes of a DL association set, then
M-\
eCCE q m PUCCH resources shall be reserved for set q. The worst case occurs for m=0
TDD UL-DL configuration 5 with nine DL subframes and one UL subframe.
[0060] FIG. 7 is a block diagram of a wireless communication network 700, which may be an LTE network that utilizes orthogonal frequency-division multiple access (OFDMA) on the downlink and single-carrier frequency division multiple access (SC-FDMA) on the uplink. LTE partitions system bandwidth into multiple orthogonal subcarriers, which may be referred to as frequency tones or frequency bins. Each subcarrier may be modulated with data, control, or
reference signals. The wireless network 700 includes a number of evolved Node Bs (eNBs) 701 and other network entities. The eNBs 701 communicate with user equipment devices (UEs) 702, 705. Each eNB 701 provides communication services for a particular geographic area or "cell" 703. eNB 701 may be a macro base station, micro base station, pico base station, or femto base station, for example. A network controller 704 may be coupled to a set of eNBs 701 and provide coordination and control for these eNBs 701.
[0061] UEs 702, 705 may be stationary or mobile and may be located throughout the wireless network 700. UEs 702, 705 may be referred to as a terminal, a mobile station, a subscriber unit, a station, such as a mobile telephone, a personal digital assistant (PDA), a wireless modem, a laptop or notebook computer, a tablet, and the like. A UE 702 communicates with an eNB 701 serving the cell 703 in which the UE 702 is located.
[0062] A UE 702 may communicate with more than one eNB 701 if the cells 703 of the eNBs 701 overlap. One eNB 701 will be the primary cell (PCell) and the other eNBs 701 will be secondary serving cells (SCell).
[0063] FIG. 8 is a high level block diagram of a system 800 that may be used as an eNB or UE, which may be, for example, eNB 701 or UE 702 in FIG. 7. System 800 receives data to be transmitted from an interface 801 at transmit processor 802. The data may include, for example, audio or video information or other data file information to be transmitted on a
PUSCH. The transmit processor 802 may also receive control or HARQ-ACK information to be transmitted on a PUCCH, PUSCH, or SRS, from a controller 803. Transmit processor 802 processes (e.g., encode and symbol map) the data and control information to obtain data symbols, control symbols, and reference symbols. The transmit processor 802 may also perform spatial processing or precoding on the data symbols and/or the control symbols and reference symbols. The output of the transmit processor 802 is provided to a modem 804. Modem 804 processes the output symbol stream from the transmit processor 802 to obtain an output sample stream that is further processed by converting to analog, amplifying, and upconverting before being transmitted via antenna 805. In other embodiments, multiple modems 804 may be used to support multiple-input multiple -output (MIMO) transmission on multiple antennas 805.
[0064] Signals are also received at system 800 on antenna 805 from other devices. The received signals are provided to modem 804 for demodulation. Modem 804 processes the signals by filtering, amplifying, downconverting, and/or digitizing, for example, to obtain input
samples. Modem 804 or a receive processor 806 may further process the input samples to obtain received symbols. Receive processor 806 then processes the symbols by demodulating, deinterleaving, and/or decoding, for example. Receive processor 805 then provides decoded data to interface 801 for use by the eNB or UE. Receive processor further provides decoded control information to controller 803.
[0065] Controller 803 may direct the operation of system 800 in the eNB or UE, such as by adjusting timing and power levels. A memory 807 may store data and program codes for controller 803, transmit processor 802, and/or receive processor 806. Additional components, such as a scheduler 808 may schedule downlink and/or uplink data transmission on one or more component carriers by system 800 (e.g., in an eNB).
[0066] FIG. 9 illustrates EPDCCH-based PUCCH resource allocation according to one embodiment. eNodeB 901 transmits on downlink channels to UE 902. For example, eNodeB
901 transmits M EPDDCH and PDSCH to UE 902 on M downlink subframes 903-1 through 903-M starting at subframe n - k0 to subframe n - kM-i- In a subsequent uplink subframe n, UE
902 has to feedback HARQ-ACK 904 to eNodeB 901 for the M downlink subframes 903.
eNodeB 901 reserves PUCCH resources 905 for M subframes. For FDD, M = 1 and ko = 4. For TDD, M> 1 and km > 4 and takes values depending on the UL subframe and the TDD UL/DL configuration as shown in Table 4. Embodiments of the invention disclosed herein provide a system and method for PUCCH resource compression, which saves PUCCH resources when PDSCH is scheduled by EPDCCH. Additionally, embodiments avoid PUCCH resource collision between multiple UEs and/or between multiple EPDCCH sets.
[0067] The dynamic HARQ-ACK resource offset (AARO) is used to compress PUCCH resources in an UL subframe 904 as shown in Equation 3 above.
[0068] FIG. 10 is a block diagram illustrating the use of a small AARO value within one
PUCCH resource allocation block. For FDD and TDD, using a relatively small value of AARO 1001, the UE moves from resource 1002 to resource 1003 within PUCCH resource allocation block 1004. This movement within a single PUCCH resource allocation block is used to avoid collision between different UEs.
UL/DL Subframe n
Configuration 0 1 2 3 4 5 6 7 8 9
0 - - 6 - 4 - - 6 - 4
1 - - 7, 6 4 - - - 7, 6 4 -
8, 7, 4, 6 8, 7, 4,
2 - 6
3 - - 7, 6, 1 1 6, 5 5, 4 - - - - -
4 - - 12, 8, 7, 1 1 6, 5, 4, 7 - - - - - -
13, 12, 9, 8, 7, 5, 4,
5 - 1 1 , 6
6 - - 7 7 5 - - 7 7 -
Table 4
[0069] FIG. 1 1 is a block diagram illustrating the use of a large AARO value to move from one PUCCH resource allocation block to another. For TDD with M = 4 downlink subframes, using a relatively large value of AARO 1 101 , a UE is moved from 1 102 in PUCCH resource allocation block 1 103 to 1 104 within PUCCH resource allocation block 1 105. This movement saves PUCCH resource allocation block 1 103.
[0070] FIG. 12 is a block diagram illustrating a modification of the embodiment shown in FIG. 1 1 wherein UE resource allocations are moved beyond adjacent blocks. In FIG. 12 AARO 1201 moves the UE resource allocation from 1202 in block 1203 to resource 1204 in block 1205. FDD HAPvQ-ACK procedure for one configured serving cell
[0071] For a PDSCH transmission indicated by the detection of a corresponding
EPDCCH in subframe « - 4 , or for an EPDCCH indicating downlink SPS release in subframe n - 4 , the UE shall use:
=„ , A , 7 (el)
"PUCCH "ECCE,q T " ARO T 1 v PUCCH,q
if EPDCCH-PRB-set is configured for distributed transmission; or
¾CCE,q r(el)
ECCE,q RB T " ^^ARO T 1 v PUCCH,q if EPDCCH-PRB-set is configured for localized transmission,
[0072] These values are for antenna port p0 . where nECCE q is the number of the first
ECCE (i.e., lowest ECCE index used to construct the EPDCCH) used for transmission of the corresponding DCI assignment in EPDCCH-PRB-set q . The value of AARO is determined from the HARQ-ACK resource offset field in the DCI format of the corresponding EPDCCH as given in a Table 5 below, which is a mapping of the ACK/NACK Resource offset field in DCI format 1A/1B/1D/1/2A/2/2B/2C/2D to AAR0 values. N<¾c¾q for EPDCCH-PRB-set q is configured by a higher layer parameter designated as pucch-ResourceStartOffset-rl 1. N^CE'9 for EPDCCH- PRB-set q is given in section 6.8A.1 of 3GPP TS 36.211 : "Evolved Universal Terrestrial Radio Access (E-UTRA); Physical channels and modulation." n' is determined from the antenna port used for localized EPDCCH transmission which is described in section 6.8A.5 in 3GPP TS 36.211.
[0073] For two antenna port transmission the PUCCH resource for antenna port p1 is given by
"PUCCH "ECCE,q " ARO T v PPUCCH,q
if EPDCCH-PRB-set is configured for distributed transmission; or
7 (i,ft ) " ECCE,q NECCE,q γ ^(el)
'PUCCH j -ECCE,q 1 v RB ^^ ARO T 1 v PUCCH,q
RB
if EPDCCH-PRB-set is configured for localised transmission.
Claims
1. A method for selecting Physical Uplink Control Channel (PUCCH) resources, comprising:
detecting an Enhanced Physical Downlink Control Channel (EPDCCH) in signals received from a base station in a first subframe;
identifying a HARQ-ACK resource indicator offset (AARO) value for the EPDCCH; and selecting a PUCCH resource for transmission of a Hybrid Automatic Repeat reQuest-
ACKnowledgement (HARQ-ACK) corresponding to the EPDCCH, wherein the PUCCH resource is selected based upon the AARO value.
2. The method of claim 1 , further comprising selecting a second PUCCH resource for transmission of the HARQ-ACK on a second antenna port.
3. The method of claim 1 , further comprising detecting a HARQ-ACK resource offset field value in a Downlink Control Information (DCI) format of the EPDCCH; and identifying the AARO value for the EPDCCH by looking up the HARQ-ACK resource offset field value in a table.
4. The method of claim 3, wherein the table maps the HARQ-ACK resource offset field value for certain DCI formats to AARO values.
5. The method of claim 3, wherein the HARQ-ACK resource offset field value is a two-bit field in a DCI payload.
6. The method of claim 5, wherein the two-bit field corresponds to AARO values in the range
(0, 1 , -2, 2} .
7. The method of claim 1 , wherein the AARO value indicates one out of a set of semi- statically configured PUCCH resources.
8. The method of claim 3, wherein a HARQ-ACK resource offset field in the DCI format of the EPDCCH is used to indicate a small offset or a large offset.
9. The method of claim 8, further comprising a two-bit HARQ-ACK resource offset field (AARO) is inserted in an EPDCCH set scheduling downlink assignments on the PDSCH; and the value of the HARQ-ACK resource offset field for PUCCH resource allocation for subframe n - km indicate values in the range {0, -1, -NEccE,q,m-i - 1, NEccE,q,m-i - 2} .
10. A user equipment device, comprising:
a receiver processor circuit configured to:
detect an Enhanced Physical Downlink Control Channel (EPDCCH) in signals received from a base station in a subframe n;
a transmit processor circuit configured to:
select a Physical Uplink Control Channel (PUCCH) resource for transmission of a Hybrid Automatic Repeat reQuest-ACKnowledgement (HARQ-ACK) to the base station in a subframe n + 4, the PUCCH resource selected based upon a HARQ-ACK resource offset; and a modem configured to transmit the PUCCH resource to the base station.
11. The user equipment device of claim 10, wherein the transmit processor circuit is further configured to select a second PUCCH resource for transmission of the HARQ-ACK on a second antenna port.
12. The user equipment device of claim 10, wherein the receiver processor circuit is further configured to detect a HARQ-ACK resource offset field value in a Downlink Control
Information (DCI) format of the EPDCCH; and the transmit processor circuit is further configured to identify the HARQ-ACK resource offset for the EPDCCH by looking up the HARQ-ACK resource offset field value in a table.
13. The user equipment device of claim 12, wherein the table maps the HARQ-ACK resource offset field value for certain DCI formats to HARQ-ACK resource offset values.
14. The user equipment device of claim 12, wherein the HARQ-ACK resource offset field value is a two-bit field in a DCI payload.
15. The user equipment device of claim 14, wherein the two-bit field corresponds to HARQ- ACK resource offset values in the range {0, -1, -2, 2} .
16. The user equipment device of claim 14, wherein the two-bit field corresponds to HARQ- ACK resource offset values in the range {0, -1, -NEccE,q,m-i - 1, NEccE,q,m-i - 2} .
17. The user equipment device of claim 10, wherein the two-bit HARQ-ACK resource offset value indicates one out of a set of semi- statically configured PUCCH resources.
18. The user equipment device of claim 14, wherein HARQ-ACK feedback information is transmitted on the indicated PUCCH resource.
Priority Applications (4)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201380055693.8A CN104782204B (en) | 2012-11-02 | 2013-11-04 | Efficient allocation of uplink HARQ-ACK resources |
| JP2015541834A JP6497706B2 (en) | 2012-11-02 | 2013-11-04 | Efficient allocation of uplink HARQ-ACK resources |
| CN202010071852.5A CN111277398B (en) | 2012-11-02 | 2013-11-04 | Efficient allocation of uplink HARQ-ACK resources |
| CN202210998629.4A CN115208547A (en) | 2012-11-02 | 2013-11-04 | Efficient allocation of uplink HARQ-ACK resources |
Applications Claiming Priority (10)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US201261721880P | 2012-11-02 | 2012-11-02 | |
| US61/721,880 | 2012-11-02 | ||
| US201361750157P | 2013-01-08 | 2013-01-08 | |
| US61/750,157 | 2013-01-08 | ||
| US201361755675P | 2013-01-23 | 2013-01-23 | |
| US61/755,675 | 2013-01-23 | ||
| US201361767012P | 2013-02-20 | 2013-02-20 | |
| US61/767,012 | 2013-02-20 | ||
| US14/026,878 US11245507B2 (en) | 2012-11-02 | 2013-09-13 | Efficient allocation of uplink HARQ-ACK resources for LTE enhanced control channel |
| US14/026,878 | 2013-09-13 |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| WO2014071304A1 true WO2014071304A1 (en) | 2014-05-08 |
Family
ID=50622323
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| PCT/US2013/068315 Ceased WO2014071304A1 (en) | 2012-11-02 | 2013-11-04 | Efficient allocation of uplink harq-ack resources |
Country Status (4)
| Country | Link |
|---|---|
| US (2) | US11245507B2 (en) |
| JP (3) | JP6497706B2 (en) |
| CN (3) | CN115208547A (en) |
| WO (1) | WO2014071304A1 (en) |
Cited By (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| EP2757728A1 (en) * | 2013-01-18 | 2014-07-23 | Nokia Solutions and Networks Oy | ARO values in PUCCH resource allocation for EPDCCH in TDD |
| AU2014208042B2 (en) * | 2013-01-17 | 2017-12-14 | Samsung Electronics Co., Ltd | A method and apparatus for transmitting and receiving acknowledgment signals |
| EP3440877A4 (en) * | 2016-04-07 | 2019-04-03 | Telefonaktiebolaget LM Ericsson (PUBL) | METHOD FOR INDICATING TRANSMISSION TIME SHIFT OF FEEDBACK MESSAGE |
| WO2020032637A1 (en) * | 2018-08-09 | 2020-02-13 | Samsung Electronics Co., Ltd. | Uplink transmission method, user equipment, base station, and computer readable medium |
| US10993141B2 (en) | 2019-02-20 | 2021-04-27 | Asustek Computer Inc. | Method and apparatus for handling sidelink and uplink HARQ-ACK feedback in a wireless communication system |
| CN114557104A (en) * | 2019-08-09 | 2022-05-27 | 瑞典爱立信有限公司 | Resolving physical uplink control channel collisions in subslots |
| US11778607B2 (en) | 2021-04-01 | 2023-10-03 | Nokia Technologies Oy | Using relative transmission occasion delay indexing |
| US12127169B2 (en) | 2018-08-09 | 2024-10-22 | Samsung Electronics Co., Ltd | Uplink transmission method, user equipment, base station, and computer readable medium |
Families Citing this family (43)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102804867B (en) | 2009-06-16 | 2016-07-27 | 夏普株式会社 | Mobile station apparatus, base station apparatus and wireless communications method |
| WO2012177073A2 (en) * | 2011-06-24 | 2012-12-27 | 엘지전자 주식회사 | Method for transmitting uplink control information, user equipment, method for receiving uplink control information, and base station |
| US9706539B2 (en) | 2012-09-27 | 2017-07-11 | Sun Patent Trust | Wireless communication terminal, base station device, and resource allocation method |
| US11245507B2 (en) * | 2012-11-02 | 2022-02-08 | Texas Instruments Incorporated | Efficient allocation of uplink HARQ-ACK resources for LTE enhanced control channel |
| WO2014084566A1 (en) * | 2012-11-29 | 2014-06-05 | 엘지전자 주식회사 | Method and apparatus for transmitting acknowledgement of reception in wireless communication system |
| CN104854773B (en) | 2013-01-14 | 2018-05-11 | 英特尔Ip公司 | Energy acquisition equipment in wireless network |
| JP6006881B2 (en) | 2013-01-31 | 2016-10-12 | エルジー エレクトロニクス インコーポレイティド | Reception confirmation response transmission method and apparatus in wireless communication system |
| US9397796B2 (en) * | 2013-03-13 | 2016-07-19 | Samsung Electronics Co., Ltd. | Computing and transmitting channel state information in adaptively configured TDD communication systems |
| US9924536B2 (en) * | 2013-05-22 | 2018-03-20 | Lg Electronics Inc. | Communication method for terminal in wireless communication system and terminal using same |
| US9749996B2 (en) * | 2013-07-29 | 2017-08-29 | Lg Electronics Inc. | Method and device for performing coordinated multi-point transmission based on selection of transmission point |
| EP3051899B1 (en) * | 2013-09-26 | 2018-09-19 | Sharp Kabushiki Kaisha | Terminal, base station, and communication method |
| CN106031071B (en) * | 2014-02-14 | 2019-08-06 | Lg电子株式会社 | Method and device for transmitting HARQ-ACK in wireless communication system |
| WO2016045011A1 (en) * | 2014-09-24 | 2016-03-31 | Telefonaktiebolaget L M Ericsson (Publ) | Method and bs for scheduling ue, and method and ue for transmitting harq |
| US9800387B2 (en) * | 2014-11-06 | 2017-10-24 | Intel IP Corporation | Computing apparatus with cross-subframe scheduling |
| US10772083B2 (en) | 2014-12-31 | 2020-09-08 | Lg Electronics Inc. | Method and apparatus for allocating resource in wireless communication system |
| CN107113096B (en) * | 2014-12-31 | 2020-03-31 | Lg 电子株式会社 | Method for transmitting ACK/NACK in wireless communication system and apparatus using the same |
| US11362759B2 (en) | 2015-04-06 | 2022-06-14 | Samsung Electronics Co., Ltd. | Transmission power control for an uplink control channel |
| US9985742B2 (en) * | 2015-04-06 | 2018-05-29 | Samsung Electronics Co., Ltd. | Transmission power control for an uplink control channel |
| JP6833166B2 (en) * | 2015-04-10 | 2021-02-24 | テレフオンアクチーボラゲット エルエム エリクソン(パブル) | Implementation of HARQ on PUSCH for multiple carriers |
| WO2016206083A1 (en) * | 2015-06-26 | 2016-12-29 | 华为技术有限公司 | Method and apparatus for uplink data transmission |
| CN107925913B (en) * | 2015-08-21 | 2022-07-26 | 株式会社Ntt都科摩 | User terminal, radio base station, and radio communication method |
| WO2017078128A1 (en) * | 2015-11-05 | 2017-05-11 | 株式会社Nttドコモ | User terminal, radio base station and radio communication method |
| CN111556571B (en) | 2015-11-11 | 2023-11-14 | 华为技术有限公司 | Method and device for transmitting scheduling information |
| US10932237B2 (en) | 2016-03-01 | 2021-02-23 | Nokia Technologies Oy | PUCCH resource allocation |
| US10440706B2 (en) * | 2016-08-08 | 2019-10-08 | Sharp Kabushiki Kaisha | Systems and methods for PUCCH resource allocation and HARQ-ACK reporting with processing time reduction |
| TWI624168B (en) * | 2016-10-21 | 2018-05-11 | 元智大學 | An intelligent deployment cascade control device based on an fdd-ofdma indoor small cell in multi-user and interference environments |
| CN108024345B (en) * | 2016-11-04 | 2023-04-28 | 中兴通讯股份有限公司 | Method and device for determining transmission resources of uplink control information |
| CN109716694B (en) * | 2016-11-04 | 2021-03-30 | 华为技术有限公司 | HARQ-ACK feedback information transmission method and related device |
| CN108306720B (en) * | 2017-01-13 | 2022-06-21 | 北京三星通信技术研究有限公司 | Method and equipment for transmitting UCI information |
| US10680782B2 (en) * | 2017-06-16 | 2020-06-09 | Qualcomm Incorporated | Strategic mapping of uplink resources |
| WO2019028735A1 (en) * | 2017-08-10 | 2019-02-14 | Lenovo (Beijing) Limited | Uplink control channel resource determination |
| US10715283B2 (en) * | 2017-10-02 | 2020-07-14 | Kt Corporation | Apparatus and method of transmitting and receiving HARQ ACK/NACK information for new radio |
| JP6701445B2 (en) * | 2017-10-26 | 2020-05-27 | テレフオンアクチーボラゲット エルエム エリクソン(パブル) | Physical uplink control channel (PUCCH) resource allocation |
| CN110351019B (en) * | 2018-04-04 | 2020-12-15 | 华为技术有限公司 | Communication method and device |
| MX2020007980A (en) * | 2018-04-06 | 2020-09-07 | Ericsson Telefon Ab L M | Power control for feedback signaling. |
| US11368260B2 (en) | 2018-05-03 | 2022-06-21 | Mediatek Singapore Pte. Ltd. | Method and apparatus for reporting hybrid automatic repeat request-acknowledge information in mobile communications |
| CN112385283A (en) * | 2018-05-07 | 2021-02-19 | 株式会社Ntt都科摩 | User terminal and wireless communication method |
| CN112583543B (en) * | 2019-09-27 | 2022-08-02 | 维沃移动通信有限公司 | Resource determination method and communication equipment |
| US12177786B2 (en) * | 2019-10-03 | 2024-12-24 | Qualcomm Incorporated | Power control for hybrid automatic repeat request feedback signal in random access |
| CN115668827A (en) * | 2020-05-29 | 2023-01-31 | 奥罗佩法国有限责任公司 | Method and communication apparatus for transmitting repetitive feedback in sidelink |
| CA3195885A1 (en) | 2020-10-19 | 2022-04-28 | XCOM Labs, Inc. | Reference signal for wireless communication systems |
| WO2022093988A1 (en) | 2020-10-30 | 2022-05-05 | XCOM Labs, Inc. | Clustering and/or rate selection in multiple-input multiple-output communication systems |
| CN119697780A (en) * | 2023-09-25 | 2025-03-25 | 北京三星通信技术研究有限公司 | Method and apparatus for transmitting and receiving uplink control information |
Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20090055703A1 (en) * | 2007-08-21 | 2009-02-26 | Samsung Electronics Co., Ltd. | Apparatus and method for transmitting/receiving the hybrid-arq ack/nack signal in mobile communication system |
| WO2010101411A2 (en) * | 2009-03-03 | 2010-09-10 | Lg Electronics Inc. | Method and apparatus for transmitting harq ack/nack signal in multi-antenna system |
| US20110096745A1 (en) * | 2008-10-30 | 2011-04-28 | Joon Kui Ahn | Method of transmitting signal in wireless communication system and apparatus thereof |
| US20110170499A1 (en) * | 2010-01-08 | 2011-07-14 | Interdigital Patent Holdings, Inc. | Method and apparatus for channel resource mapping in carrier aggregation |
Family Cites Families (21)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR100703287B1 (en) * | 2005-07-20 | 2007-04-03 | 삼성전자주식회사 | System and method for transmitting / receiving resource allocation information in communication system |
| KR20100011879A (en) * | 2008-07-25 | 2010-02-03 | 엘지전자 주식회사 | Method of receiving data in wireless communication system |
| KR101573072B1 (en) * | 2008-08-27 | 2015-12-01 | 엘지전자 주식회사 | Method for transmitting control information in a wireless communication system |
| CN101841892B (en) * | 2009-03-18 | 2012-10-03 | 中国移动通信集团公司 | Method, equipment and system for indicating and detecting PDCCH in a carrier aggregation system |
| BR112013003620B1 (en) * | 2010-08-20 | 2021-12-21 | Telefonaktiebolaget Lm Ericsson (Publ) | USER METHOD AND EQUIPMENT FOR IDENTIFYING A RESOURCE FOR USE IN A CONTROL INFORMATION TRANSMISSION IN PUCCH, FORMAT 3 |
| KR101771550B1 (en) * | 2010-10-15 | 2017-08-29 | 주식회사 골드피크이노베이션즈 | Method of Transmitting and Receiving Ack/Nack Signal and Apparatus Thereof |
| CN102098151B (en) * | 2010-12-28 | 2015-08-12 | 中兴通讯股份有限公司 | A kind of sending method of correct/error response message and user terminal |
| CN102638879A (en) * | 2011-02-12 | 2012-08-15 | 北京三星通信技术研究有限公司 | Method for allocating acknowledgement (ACK)/negative acknowledgement (NACK) channel resource |
| KR101919780B1 (en) * | 2011-03-03 | 2018-11-19 | 엘지전자 주식회사 | Method and apparatus for transmitting acknowledgment information in a wireless communication system |
| CN102215094B (en) * | 2011-06-01 | 2013-11-20 | 电信科学技术研究院 | Method, system and equipment for sending and receiving uplink feedback information |
| JP5895388B2 (en) | 2011-07-22 | 2016-03-30 | シャープ株式会社 | Terminal device, base station device, integrated circuit, and communication method |
| CN102316595B (en) | 2011-09-30 | 2017-04-12 | 中兴通讯股份有限公司 | Resource determination method and device for physical uplink control channel (PUCCH) of large-band-width system |
| CN102573094B (en) | 2012-01-17 | 2015-04-08 | 电信科学技术研究院 | Method and device for transmitting DCI (downlink control information) |
| AU2013228185B2 (en) * | 2012-03-05 | 2016-11-03 | Samsung Electronics Co., Ltd. | HARQ-ACK signal transmission in response to detection of control channel type in case of multiple control channel types |
| US8743820B2 (en) * | 2012-05-30 | 2014-06-03 | Intel Corporation | PUCCH resource allocation with enhanced PDCCH |
| US9516637B2 (en) * | 2012-05-31 | 2016-12-06 | Lg Electronics Inc. | Method for transceiving control signals, and apparatus therefor |
| JP6096760B2 (en) * | 2012-08-02 | 2017-03-15 | パナソニック インテレクチュアル プロパティ コーポレーション オブ アメリカPanasonic Intellectual Property Corporation of America | Base station apparatus, terminal apparatus, resource allocation method, and response signal transmission method |
| KR101800707B1 (en) * | 2012-09-28 | 2017-11-23 | 인텔 코포레이션 | Dynamic hybrid automatic repeat request-acknowledgement (harq-ack) transmission with enhanced physical downlink control channels |
| US9801171B2 (en) * | 2012-10-02 | 2017-10-24 | Industry-University Cooperation Foundation Hanyang University | Transmission method and reception method of downlink signal and channel, terminal thereof, and base station thereof |
| US11245507B2 (en) * | 2012-11-02 | 2022-02-08 | Texas Instruments Incorporated | Efficient allocation of uplink HARQ-ACK resources for LTE enhanced control channel |
| EP3678436B1 (en) * | 2012-11-14 | 2021-09-22 | Lg Electronics Inc. | Method for operating base station in carrier aggregating system, and apparatus using said method |
-
2013
- 2013-09-13 US US14/026,878 patent/US11245507B2/en active Active
- 2013-11-04 CN CN202210998629.4A patent/CN115208547A/en active Pending
- 2013-11-04 CN CN201380055693.8A patent/CN104782204B/en active Active
- 2013-11-04 CN CN202010071852.5A patent/CN111277398B/en active Active
- 2013-11-04 JP JP2015541834A patent/JP6497706B2/en active Active
- 2013-11-04 WO PCT/US2013/068315 patent/WO2014071304A1/en not_active Ceased
-
2018
- 2018-12-21 JP JP2018240280A patent/JP7148768B2/en active Active
-
2021
- 2021-10-15 JP JP2021169512A patent/JP7344264B2/en active Active
-
2022
- 2022-02-07 US US17/666,120 patent/US20220158802A1/en active Pending
Patent Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20090055703A1 (en) * | 2007-08-21 | 2009-02-26 | Samsung Electronics Co., Ltd. | Apparatus and method for transmitting/receiving the hybrid-arq ack/nack signal in mobile communication system |
| US20110096745A1 (en) * | 2008-10-30 | 2011-04-28 | Joon Kui Ahn | Method of transmitting signal in wireless communication system and apparatus thereof |
| WO2010101411A2 (en) * | 2009-03-03 | 2010-09-10 | Lg Electronics Inc. | Method and apparatus for transmitting harq ack/nack signal in multi-antenna system |
| US20120039285A1 (en) * | 2009-03-03 | 2012-02-16 | Lg Electronics Inc. | Method and apparatus for transmitting harq ack/nack signal in multi-antenna system |
| US20110170499A1 (en) * | 2010-01-08 | 2011-07-14 | Interdigital Patent Holdings, Inc. | Method and apparatus for channel resource mapping in carrier aggregation |
Cited By (12)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| AU2014208042B2 (en) * | 2013-01-17 | 2017-12-14 | Samsung Electronics Co., Ltd | A method and apparatus for transmitting and receiving acknowledgment signals |
| EP2757728A1 (en) * | 2013-01-18 | 2014-07-23 | Nokia Solutions and Networks Oy | ARO values in PUCCH resource allocation for EPDCCH in TDD |
| JP2016507188A (en) * | 2013-01-18 | 2016-03-07 | ノキア ソリューションズ アンド ネットワークス オサケユキチュア | ARO value of PUCCH resource allocation for EPDCCH in TDD |
| KR101763207B1 (en) | 2013-01-18 | 2017-07-31 | 노키아 솔루션스 앤드 네트웍스 오와이 | Aro values in pucch resource allocation for epdcch in tdd |
| US10136413B2 (en) | 2013-01-18 | 2018-11-20 | Nokia Solutions And Networks Oy | ARO values in PUCCH resource allocation for EPDCCH in TDD |
| EP3440877A4 (en) * | 2016-04-07 | 2019-04-03 | Telefonaktiebolaget LM Ericsson (PUBL) | METHOD FOR INDICATING TRANSMISSION TIME SHIFT OF FEEDBACK MESSAGE |
| US10516463B2 (en) | 2016-04-07 | 2019-12-24 | Telefonaktiebolaget Lm Ericsson (Publ) | Method for indicating a transmission time offset of a feedback message |
| WO2020032637A1 (en) * | 2018-08-09 | 2020-02-13 | Samsung Electronics Co., Ltd. | Uplink transmission method, user equipment, base station, and computer readable medium |
| US12127169B2 (en) | 2018-08-09 | 2024-10-22 | Samsung Electronics Co., Ltd | Uplink transmission method, user equipment, base station, and computer readable medium |
| US10993141B2 (en) | 2019-02-20 | 2021-04-27 | Asustek Computer Inc. | Method and apparatus for handling sidelink and uplink HARQ-ACK feedback in a wireless communication system |
| CN114557104A (en) * | 2019-08-09 | 2022-05-27 | 瑞典爱立信有限公司 | Resolving physical uplink control channel collisions in subslots |
| US11778607B2 (en) | 2021-04-01 | 2023-10-03 | Nokia Technologies Oy | Using relative transmission occasion delay indexing |
Also Published As
| Publication number | Publication date |
|---|---|
| JP2019092161A (en) | 2019-06-13 |
| JP7344264B2 (en) | 2023-09-13 |
| CN115208547A (en) | 2022-10-18 |
| CN111277398B (en) | 2023-04-04 |
| CN104782204B (en) | 2020-02-21 |
| US20140126491A1 (en) | 2014-05-08 |
| CN104782204A (en) | 2015-07-15 |
| US20220158802A1 (en) | 2022-05-19 |
| JP6497706B2 (en) | 2019-04-10 |
| JP7148768B2 (en) | 2022-10-06 |
| JP2016504803A (en) | 2016-02-12 |
| CN111277398A (en) | 2020-06-12 |
| US11245507B2 (en) | 2022-02-08 |
| JP2022009178A (en) | 2022-01-14 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US20220158802A1 (en) | Efficient allocation of uplink harq-ack resources for lte enhanced control channel | |
| US11178649B2 (en) | Methods and systems for TDD PUCCH HARQ resource allocation for enhanced physical downlink control channel (ePDCCH) | |
| EP2938013B1 (en) | Method and apparatus for transmitting downlink control information in wireless communication system | |
| KR101899907B1 (en) | Method and system for uplink acknowledgement signaling in carrier-aggregated wireless communication systems | |
| EP3582427B1 (en) | Node and method for uplink scheduling and hybrid automatic repeat request timing | |
| KR101611326B1 (en) | Method for transmitting uplink signal, user equipment, method for receiving uplink signal, and base station | |
| CN105580457B (en) | Determine the method for uplink transmission timing and the user equipment using this method | |
| US9504037B2 (en) | Method and apparatus for transmitting and receiving data | |
| EP2982068A1 (en) | Method, ue and basestation for reporting/receiving harq ack/nack for pdsch in dynamic tdd configurations | |
| KR102378516B1 (en) | Method and apparatus for transmission and reception of control information in wirelss communication system | |
| KR20190099366A (en) | Method, apparatus, and system for harq-ack multiplexing in wireless communication system |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| 121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 13850366 Country of ref document: EP Kind code of ref document: A1 |
|
| NENP | Non-entry into the national phase |
Ref country code: DE |
|
| ENP | Entry into the national phase |
Ref document number: 2015541834 Country of ref document: JP Kind code of ref document: A |
|
| 122 | Ep: pct application non-entry in european phase |
Ref document number: 13850366 Country of ref document: EP Kind code of ref document: A1 |



