WO2014000096A1 - Contrôle dgmv dans des réservoirs à fuite - Google Patents

Contrôle dgmv dans des réservoirs à fuite Download PDF

Info

Publication number
WO2014000096A1
WO2014000096A1 PCT/CA2013/000621 CA2013000621W WO2014000096A1 WO 2014000096 A1 WO2014000096 A1 WO 2014000096A1 CA 2013000621 W CA2013000621 W CA 2013000621W WO 2014000096 A1 WO2014000096 A1 WO 2014000096A1
Authority
WO
WIPO (PCT)
Prior art keywords
sagd
reservoir
leaky
water
pressure
Prior art date
Application number
PCT/CA2013/000621
Other languages
English (en)
Inventor
Peter Yang
Richard Kelso Kerr
Original Assignee
Nexen Energy Ulc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nexen Energy Ulc filed Critical Nexen Energy Ulc
Priority to CN201380044676.4A priority Critical patent/CN104704197A/zh
Publication of WO2014000096A1 publication Critical patent/WO2014000096A1/fr

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/12Methods or apparatus for controlling the flow of the obtained fluid to or in wells
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/16Enhanced recovery methods for obtaining hydrocarbons
    • E21B43/24Enhanced recovery methods for obtaining hydrocarbons using heat, e.g. steam injection
    • E21B43/2406Steam assisted gravity drainage [SAGD]
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/16Enhanced recovery methods for obtaining hydrocarbons
    • E21B43/24Enhanced recovery methods for obtaining hydrocarbons using heat, e.g. steam injection
    • E21B43/2406Steam assisted gravity drainage [SAGD]
    • E21B43/2408SAGD in combination with other methods
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B47/00Survey of boreholes or wells
    • E21B47/10Locating fluid leaks, intrusions or movements
    • E21B47/117Detecting leaks, e.g. from tubing, by pressure testing

Definitions

  • SAGD Steam assisted gravity drainage
  • EOR thermal enhanced oil recovery
  • the Athabasca bitumen resource in Alberta, Canada is one of the world's largest deposits of hydrocarbons. As describe above, a significant portion of the resource can be impaired by a water zone - causing the reservoir to be "leaky.” Also, The Athabasce bitumen resource in Alberta, Canada is unique for the following reasons:
  • the in situ EOR estimate is based on SAGD, or a similar process.
  • Bitumen reservoirs have a top seal (cap rock) that prevents oil from leaking and contains the resource. Bitumen was formed by bacterial degradation of lighter source oil to a stage where the degraded bitumen is immobile under reservoir conditions. Bitumen reservoirs can be self-sealed (no cap rock seal). If an in situ EOR process hits the "ceiling", the process may not be contained and it can easily be contaminated by water or gas from above the bitumen.
  • Bitumen density is close to the density of water or brine. Some bitumens are denser than water; some are less dense than water. During the bacterial- degradation and formation of bitumen, the hydrocarbon density can pass through a density transition and water can, at first, be less dense than the reservoir "oil”. Bitumen reservoir water zones are found above the bitumen (top water), below the bitumen (bottom water), or interspersed in the bitumen net pay zone (water lean zones (WLZ)).
  • This invention describes an alternate volume control method for SAGD steam injection in leaky reservoirs.
  • the technique involves using WRR (the water recycle ratio) as the key measurement and control parameter.
  • WRR is volume ratio (measured as water) of water produced to steam injected.
  • a use of water recycle ratio for controlling at least one SAGD parameter in a leaky bitumen reservoir is provided.
  • said parameter is selected from volume rate, pressure, temperature, and combinations thereof.
  • a process to control SAGD steam injection rate for an individual SAGD well pair in a leaky bitumen reservoir comprising replacing pressure control of said SAGD steam injection rate with volume control.
  • said leaky bitumen reservoir is determined by geological knowledge of an interspersed WLZ, top water or bottom water in a SAGD pattern volume, more preferably said leaky bitumen reservoir is determined by a cold water injection test prior to SAGD initiation, most preferably the reservoir is deemed leaky when WRR is measured and after 200 days of more of SAGD operation using pressure control for steam injection, and the WRR varies from 1.0 by more than 10 percent.
  • said process further comprises sub-cool control (steam-trap control) for liquids production (bitumen + water).
  • sub-cool control steam-trap control
  • liquids production bitumen + water
  • said volume rate control is instituted by injecting a pre-set target volume rate of steam into the SAGD injector well.
  • said volume rate control is instituted by i. Continually measuring WRR for the SAGD well pair
  • the target WRR is between 0.9 and 1.0
  • said process is applied to a leaky reservoir with a high-water-saturation zone in or adjacent to the bitumen pay zone, where the target WRR is set at between 1.0 and 1.5.
  • said leaky reservoir is caused by an interspersed water lean zone (WLZ) within the net pay zone.
  • WLZ interspersed water lean zone
  • said leaky reservoir is caused by a top water zone.
  • said leaky reservoir is caused by a bottom water zone.
  • said leaky reservoir is caused by multiple factors comprising WLZ, top water and/or bottom water.
  • said bitumen is a hydrocarbon with ⁇ 10 API density and > 100,000 cp viscosity, at native reservoir conditions.
  • SAGD pressure in the reservoir does not exceed the reservoir parting pressure, for unconsolidated reservoirs, or the reservoir fracturing pressure, for consolidated reservoirs.
  • the maximum SAGD pressure allowed is about 80 percent of the parting pressure and/or the fracturing pressure.
  • the minimum SAGD operating pressure is equal to the native reservoir pressure.
  • bitumen reservoir is located in the Athabasca region of Alberta, Canada. BRIEF DESCRIPTION OF THE DRAWINGS
  • Figure 1 depicts a typical SAGD Well Configuration
  • FIG. 1 depicts SAGD stages
  • FIG. 3 depicts Saturated Steam Properties
  • FIG. 4 depicts Bitumen and Heavy Oil Viscosities
  • FIG. 5 depicts SAGD Productivity per Well
  • FIG. 7 depicts Interspersed Bitumen Lean Zones
  • Figure 8 depicts Top/Bottom Water: Oilsands
  • Figure 9 depicts SAGD Simulation
  • Figure 10 depicts WRR Performance for a Homogeneous Reservoir with Contained
  • Figure 1 1 depicts Bitumen Voidage and Steam Volumes
  • Figure 12 depicts Well Pair Cross-Flow Model
  • Figure 13 depicts SAGD performance Case 1
  • Figure 15 depicts SAGD performance Case 2(a)
  • Figure 16 depicts SAGD performance Case 3
  • Figure 17 depicts SAGD performance Case 4
  • Figure 19 depicts SAGD cumulative well pair performance of Cases 1-3
  • Figure 20 depicts SAGD cumulative well pair performance of Cases 1, 4 and 5
  • Figure 21 depicts SAGD dual well pair production/performance of Base Case and Case 2
  • Figure 22 depicts SAGD pressure control performance of connected well pairs
  • Figure 23 depicts SAGD WRR performance of connected well pairs Case 3
  • Figure 24 depicts SAGD WRR performance of connected well pairs Case 1 and 3
  • Figure 25 depicts bitumen production of individual well pair Case 3
  • Figure 26 depicts bitumen production rates of two well pair of Base Case and Case 3
  • Figure 27 depicts SOR Performance of Base Case and Case 3
  • SAGD is a bitumen EOR process that uses saturated-steam to deliver energy to a bitumen reservoir.
  • Figure 1 shows the basic SAGD geometry, using twin, parallel horizontal wells (2, 4)(up to about 1000m long) separated by about 2 to 8 m above the bottom of the bitumen zone (floor 8).
  • the upper well (2) is in the same vertical plane and injects saturated steam into the reservoir. The steam heats the bitumen and the reservoir matrix. As the interface between steam and cold bitumen moves outward and upward it creates a gas, gravity-drainage chamber ( Figure 2).
  • the heated bitumen and condensed steam drain, by gravity, to the lower horizontal well (4) that produces the liquids.
  • the heated liquids (bitumen + water) are pumped (or conveyed) to the surface using ESP pumps or a gas-lift system.
  • Figure 2 shows how SAGD matures.
  • a young steam chamber (1) has bitumen drainage from steep sides and from the chamber ceiling. When the chamber grows (2) and hits the top of the net pay zone, drainage from the chamber ceiling stops and the slope of the side walls decreases as the chamber continues to grow outward. Bitumen productivity peaks at about 1000 bbls/d, when the chamber hits the top of the net pay zone and falls as the chamber grows outward (3), until eventually (10-20 years) the economic limit is reached.
  • the produced fluids are at/near saturated steam temperatures, it is only the latent heat of the steam that contributes to the process in the reservoir. It is important to ensure that steam is high quality as it is injected into the reservoir.
  • WRR water recycle ratio
  • SAGD operation in a good-quality reservoir, is straightforward.
  • Steam injection rate into the upper horizontal well and steam pressure are controlled by pressure targets chosen by the operator. If the pressure is below the target, steam pressure and injection rates are increased. The opposite is done if pressure is above the target.
  • Production rates from the lower horizontal well are controlled to achieve sub-cool targets in the average temperature of the production fluids.
  • the sub-cool is the difference in temperature of saturated steam and the actual temperature of produced liquids (bitumen + water).
  • Produced fluids are kept at a lower T than saturated steam to ensure that live steam doesn't get produced. 20°C is a typical sub-cool target. This is also called steam-trap control.
  • the SAGD operator has two choices to make— the sub-cool target and the operating pressure of the process.
  • Sub-cool is safety issue, but operating pressure is more subtle and usually more important.
  • the higher the pressure the higher the temperature— linked by the properties of saturated steam ( Figure 3).
  • Figure 3 As operating temperature rises, so does the temperature of the heated bitumen which, in turn, reduces bitumen viscosity.
  • Bitumen viscosity is a strong function of temperature ( Figure 4).
  • the productivity of a SAGD well pair is proportional to the square root of the inverse bitumen viscosity (Butler (1991)). So the higher the pressure, the faster bitumen can be recovered - a key economic performance factor.
  • the SAGD operator usually opts to maximize economic returns, so the operator increases P and T as much as possible. Pressures are usually much greater than native reservoir P. A few operators have gone too far and exceeded parting pressure (fracture pressure) and caused a surface breakthrough of steam and sand (Roche, P., "Beyond Steam", New Tech. Mag., Sept 2011). Bitumen productivity peaks at about 1000 bbl/d for the best reservoirs, but it can be significantly impaired for the poorer reservoirs ( Figure 27). There also may be a hydraulic limit for SAGD ( Figure 6). The hydrostatic head between the two SAGD wells (2, 4) is about 8 psia (56 kPa).
  • the oil sands have a significant portion of the resource that is impaired by water lean zones (top water, bottom water, interspersed lean zones). These may cause the reservoir to be "leaky” with significant water influx or egress. Under these conditions, SAGD pressure control for steam injection does not work well. Pressure gradients need only be modest to transport large volumes of water and disrupt SAGD. It is hard to choose an appropriate pressure target or to accurately measure an appropriate pressure to minimize the harmful effects of a leaky reservoir.
  • Water Lean Zones (WLZ) with high water saturation may be at the top of the bitumen reservoir (top water), at the bottom (bottom water), or interspersed within the pay zone.
  • Figure 7 depicts an interspersed WLZ 18.
  • Interspersed WLZ have to be heated so that GD steam chambers can envelop the zone and continue growth of the GD chamber above and around the WLZ blockage.
  • a WLZ has a higher heat capacity than a bitumen pay zone.
  • Table 3 shows a 25% heat capacity increase for a WLZ compared to a pay zone.
  • iii. A WLZ also has higher heat conductivity than a bitumen pay zone. For example, WLZ has more than double the heat conductivity of the bitumen pay zone (Table 2).
  • v. SAGD steam can heat WLZ water to/near saturated steam T, but it cannot vaporize WLZ water. Breaching of the WLZ, will require water to drain as a liquid.
  • the WLZ can channel steam away from the SAGD steam chamber. If the steam condenses prior to removal, the water is lost but the heat can be retained. But, if the steam exits the GD steam chamber prior to condensing, both the heat and the water are lost to the process.
  • Interspersed WLZ's can distort SAGD steam chamber shapes, particularly if the WLZ is limited in lateral size. Normal growth is slowed down as the WLZ is breached. This can reduce productivity, decrease efficiency, and limit recovery.
  • bottom water zones 20 As best seen in Figure 8, the issues are similar to interspersed WLZ except that 1) bottom water underlies the bitumen and 2) the usual expectation is that bottom water is more active.
  • SAGD can operate at pressures greater than reservoir pressure as long as the following occurs: 1) pressure drops in the production well (due to flow/pumping) do not reduce local pressures below reservoir P and 2) the bottom of the reservoir, underneath the production well, is "sealed" by high- viscosity immobile bitumen (basement bitumen).
  • base bitumen basement bitumen
  • basement bitumen will become heated by conduction from the production well. After a few years, this bitumen will become partially mobile and SAGD pressure will need to be reduced to match reservoir pressure. This can be a delicate balance.
  • SAGD pressures cannot be too high or a channel may form, (reverse cone) allowing communication with the bottom water.
  • SAGD steam pressures cannot be too low either or water will be drawn from the bottom water (cresting). If this occurs, water production will exceed steam injection. The higher the pressure drops in the production well, the more delicate the balance and the more difficult it is to achieve a balance. If the reservoir is inhomogeneous or if the heating pattern is inhomogeneous, the channel or crests can be partial and the onset of the problem is accelerated.
  • top water 22 (as best seen in Figure 8), again, the issues are similar to interspersed WLZ and bottom water, with the expectation that top water is also an active water supply.
  • the problems are similar to bottom water, as above, except that SAGD wells are further away from top water. So, the initial period-when the process can be operated at higher pressures than reservoir pressure-can be extended compared to bottom water. The pressure drop in the production well is less of a concern because it is far away from the ceiling.
  • the first problem is likely to be steam breaching the top water interface. If the top water is active, water will flood the chamber and may shut the SAGD process down.
  • the usual method of SAGD operations control for a homogeneous reservoir is to first choose an operating pressure, in excess of the native reservoir pressure P, to try to maximize bitumen productivity. Then, with the chosen P as a target, the steam injection rate and pressure is adjusted to attain the pressure target (pressure control). For reason discussed in the previous section, if a WLZ is breached, the normal operating procedure becomes difficult.
  • This invention comprises a method to improve, preferably optimize SAGD performance in WLZ reservoirs (including top water and bottom water cases) or where the reservoir is a "leaky" reservoir.
  • a "leaky” reservoir loses injection fluids if operating P > native reservoir P or has encroachment of fluids if operating P ⁇ native reservoir P.
  • the invention further comprises measurement of the water recycle ratio (WRR) for reservoirs containing WLZ zones.
  • WRR is the volume ratio of produced water/injected steam, where steam injection is measured as a liquid- water equivalent. Rather than pressure control on steam injection rates, steam injection should be adjusted to attain a WRR target for each SAGD well.
  • Figure 9 shows the predicted performance. As can be seen, the predicted steam injection rate peaks at 2936 bbls/day and bitumen production rate peaks at 1002 bbls/day.
  • Figure 10 shows the predicted WRR performance. The WRR started around 0.9 and increased gradually to greater than 0.99 after 1200 days (3 1 ⁇ 4 years).
  • Figure 10 shows how a WRR-control strategy would work for SAGD in a homogeneous, sealed reservoir.
  • Case 2 allow 300 kPa ⁇ between well pairs; Case 2 (a) - extend production forecast to 3 yrs +;
  • Case 3 Same as Case 2, but after 1 year stop SAGD pressure control and shift to constant volume control (steam injection is constant);
  • Case 4 Same as Case 2, but with 3m thick WLZ (WLZ is 5% of pay zone volume);
  • Case 5 Same as Case 3, but with 3m thick WLZ;
  • Figures 13, 14, 15, 16, 17 and 18 show the predicted performance for each well pair, for Cases 1, 2, 2(a), 3, 4 and 5 respectively.
  • Figures 19 and 20 show the cumulative performance of both well pairs for the above cases.
  • Figures 21 and 22 show cumulative bitumen productivity for Case 1 (Base Case) and Case 2.
  • Figure 23 shows WRR performance for Case 3 for each well pair.
  • Figure 24 shows cumulative WRR performance for Case 1 vs. Case 3.
  • Figure 25 shows individual well pair bitumen performance for Case 3.
  • pressure control is adequate for SAGD. But, in practice it is difficult to measure pressure to a greater accuracy of about ⁇ 200 kPa (or about 10%).
  • the hydrostatic head in a 30m reservoir is about 335 kPa. Natural, lateral pressure drops in the production well can be up to over 50 kPa.
  • Figure 23 shows how volume control dramatically influences WRR. Alternately, it shows how WRR control would lead to short-term volume control.
  • Figure 24 shows that WRR profiles are similar for cumulative well pairs (well pair 1 + well pair 2).
  • a “leaky” SAGD pattern is one that produces an unusual amount of water.
  • the "leaky” SAGD pattern may have water leaks in/out of the pattern volume to other portions of the reservoir; it may have water leaks to/from an adjacent reservoir SAGD pattern; or, it may produce unusual water volumes from WLZ within the reservoir.
  • the WRR will be used as an indicator (the volume ratio of produced water to steam injected, where steam is measured as a water- volume equivalent).
  • Figure 10 shows the expected WRR behaviour.
  • WRR is between 0.90-0.95.
  • the GD steam chamber is forming, and the GD area is heating up. An inventory of liquid water is created in the reservoir.
  • WRR increases gradually from about 0.96 to 0.99. If the bitumen voidage is occupied by steam only, one would expect WRR to be greater than 0.99 ( Figure 11).
  • bitumen production is small and the WRR approaches the 0.99 value ( Figure 10).
  • a reasonable target for WRR - for a perfectly contained SAGD GD chamber and a homogeneous reservoir - during the peak period of SAGD (500-1500 days) is about 0.97.
  • Figure 23 shows WRR in a leaky reservoir and how a leaky reservoir is defined. If WRR deviates from 1.0 by more than ⁇ 0.10 after 200 or more days of continuous SAGD using normal pressure control, the reservoir is deemed as "leaky”. Using this definition, the Case 3 simulation WRR performance in Figure 23 would result in both well pair patterns deemed as "leaky”. Well pair 1 has a higher WRR, and well pair 2 has a lower WRR than the 1.0 control.
  • the SAGD pattern may be designated as “leaky” or potentially “leaky”.
  • Another alternative is to use a cold water injectivity test to quantify SAGD well connectivity to WLZ, top water, or bottom water zones (Aherne (2006)). This may also be used to designate a SAGD pattern as “leaky” or potentially “leaky”.
  • FIGs 14 and 25 show what can happen for a leaky reservoir.
  • Well pair 1 (the low P pattern) is flooded with 1) water from the WLZ and 2) from water condensed from steam injected into the adjacent well pair 2. After about 1 year, bitumen production is very small, and SOR is very high.
  • SAGD pressure control shuts off steam injection into well pair 1 after about 450 days.
  • Well pair 2 (the adjacent, high-P pattern) produces bitumen, but SOR is high.
  • steam from well pair 2 breaks through to well pair 1 ( Figure 15), and production from well pair 1 resumes as a pseudo steam flood.
  • An alternative control mechanism is to control steam injection rates, independent of reservoir pressure.
  • Figures 16 and 18 show that setting steam injection rates at fixed volumes, even after 1 year of pressure control, can restore bitumen productivity and improve other performance factors. But, a somewhat arbitrary and equal setting of volume rate targets may work partially because both well-pair patterns are homogeneous and identical expect for the WLZ connecting the patterns for the Cases studied. A more rigorous approach, and a way to account for some pattern differences, is to use WRR measurement for each pattern as a way to set targets and to control SAGD in leaky reservoirs, as follows:
  • target WRR for a near-homogeneous, contained GD chamber, target WRR ⁇ 1.0; for a leaky pattern, target WRR > 1.0, to account for water production from WLZ, top water or bottom water).
  • Pay zone 35% porosity with 80% bitumen saturation

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geophysics (AREA)
  • Production Of Liquid Hydrocarbon Mixture For Refining Petroleum (AREA)

Abstract

L'invention concerne l'utilisation d'un taux de recyclage d'eau pour commander au moins un paramètre de drainage par gravité au moyen de vapeur (DGMV) dans un réservoir de bitume à fuite. L'invention concerne en outre un procédé pour commander un taux d'injection de vapeur pour une paire de puits DGMV individuels, dans un réservoir de bitume à fuite, le procédé remplaçant une régulation de pression pour un taux d'injection de vapeur DGMV avec une commande de volume déterminée par un taux de recyclage d'eau (WRR)
PCT/CA2013/000621 2012-06-29 2013-06-27 Contrôle dgmv dans des réservoirs à fuite WO2014000096A1 (fr)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201380044676.4A CN104704197A (zh) 2012-06-29 2013-06-27 渗漏储层中的sagd控制

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US201261666132P 2012-06-29 2012-06-29
US61/666,132 2012-06-29

Publications (1)

Publication Number Publication Date
WO2014000096A1 true WO2014000096A1 (fr) 2014-01-03

Family

ID=49776933

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CA2013/000621 WO2014000096A1 (fr) 2012-06-29 2013-06-27 Contrôle dgmv dans des réservoirs à fuite

Country Status (4)

Country Link
US (1) US20140000876A1 (fr)
CN (1) CN104704197A (fr)
CA (1) CA2820705A1 (fr)
WO (1) WO2014000096A1 (fr)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108952693A (zh) * 2018-04-19 2018-12-07 中国石油天然气股份有限公司 一种注气井吸气剖面的吸气比例的确定方法

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA2888505C (fr) * 2012-10-16 2020-07-21 Conocophillips Company Limitation des pertes dans une zone de perte de circulation par maintien de la pression dans la zone de perte de circulation par l'intermediaire d'un chauffage a rayonnement a rad iofrequence dans un fond de puits
CN105756625A (zh) * 2014-12-17 2016-07-13 中国石油天然气股份有限公司 双水平井采油方法
CN108266169B (zh) * 2016-12-30 2020-08-07 中国石油天然气股份有限公司 水平段油藏动用程度的检测方法和装置
US9991330B1 (en) * 2017-01-11 2018-06-05 International Business Machines Corporation Resistors with controlled resistivity
CN111119820B (zh) * 2018-10-30 2022-08-05 中国石油天然气股份有限公司 Sagd采油方法
CN112963128B (zh) * 2021-03-03 2023-01-10 中国石油天然气股份有限公司 降低蒸汽腔外溢预防sagd开发过程中顶水下窜的方法
CN112943194B (zh) * 2021-03-03 2023-01-06 中国石油天然气股份有限公司 一种预防sagd开发过程中边水下内侵的方法

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20090188667A1 (en) * 2008-01-30 2009-07-30 Alberta Research Council Inc. System and method for the recovery of hydrocarbons by in-situ combustion
US20110288778A1 (en) * 2008-11-28 2011-11-24 Schlumberger Technology Corporation Method for estimation of sagd process characteristics
US20120061081A1 (en) * 2010-09-14 2012-03-15 Harris Corporation Rf fracturing to improve sagd performance

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101592028B (zh) * 2008-05-28 2012-01-11 中国石油天然气股份有限公司 一种气体辅助sagd开采超稠油的方法
CN102278103B (zh) * 2011-08-25 2014-04-02 中国石油天然气股份有限公司 一种重力泄水辅助蒸汽驱提高深层超稠油油藏采收率方法

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20090188667A1 (en) * 2008-01-30 2009-07-30 Alberta Research Council Inc. System and method for the recovery of hydrocarbons by in-situ combustion
US20110288778A1 (en) * 2008-11-28 2011-11-24 Schlumberger Technology Corporation Method for estimation of sagd process characteristics
US20120061081A1 (en) * 2010-09-14 2012-03-15 Harris Corporation Rf fracturing to improve sagd performance

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108952693A (zh) * 2018-04-19 2018-12-07 中国石油天然气股份有限公司 一种注气井吸气剖面的吸气比例的确定方法
CN108952693B (zh) * 2018-04-19 2022-02-01 中国石油天然气股份有限公司 一种注气井吸气剖面的吸气比例的确定方法

Also Published As

Publication number Publication date
CA2820705A1 (fr) 2013-12-29
CN104704197A (zh) 2015-06-10
US20140000876A1 (en) 2014-01-02

Similar Documents

Publication Publication Date Title
US20140000876A1 (en) Sagd control in leaky reservoirs
CA2815737C (fr) Drainage par gravite au moyen de valeur a geometrie d'oxygene ajoutee destine a des reservoirs de bitumes endommages
RU2510455C2 (ru) Способ увеличения извлечения углеводородов
Sahin et al. A quarter century of progress in the application of CO2 immiscible EOR project in Bati Raman heavy oil field in Turkey
CA2912159C (fr) Procede employant un gaz, un solvant et la vapeur, et des puits de production horizontaux supplementaires pour ameliorer la recuperation de petrole brut et de bitume
US20140000888A1 (en) Uplifted single well steam assisted gravity drainage system and process
CN107091074B (zh) 开采深层底水稠油油藏的方法
CA2847759C (fr) Une methode permettant d'ameliorer la recuperation de ressource a partir de reservoirs souterrains
US20110272152A1 (en) Operating Wells In Groups In Solvent-Dominated Recovery Processes
Al-Murayri et al. Impact of noncondensable gas on performance of steam-assisted gravity drainage
Butler The behaviour of non-condensible gas in SAGD-a rationalization
WO2019218798A1 (fr) Procédé de développement de pétrole extra-lourd pour renforcer une chambre de vapeur sagd de façon à percer un réservoir de propriété physique faible
CA2744749C (fr) Drainage par gravite dans le plan basal
CA2766849A1 (fr) Recuperation d'un reservoir d'hydrocarbures utilisant un melange de vapeur et un solvant volatil
US20140000887A1 (en) Sagdox operation in leaky bitumen reservoirs
CN108316905B (zh) 一种抑制sagd蒸汽腔纵向突进的方法
CA2853445C (fr) Methode et systeme de gestion de la pression dans un bouchon d'essence et recuperation d'huile lourde
US20140251596A1 (en) Single vertical or inclined well thermal recovery process
CA2841520C (fr) Systeme et procede de recuperation de bitume a partir de reservoirs de carbonates fractures
CA2776704C (fr) Poussee de vapeur et de gaz modifiee avec puits de production horizontaux supplementaires pour ameliorer le procede de recuperation du petrole lourd et du bitume
CA2851782C (fr) Procede pour la recuperation des hydrocarbures grace a l'injection d'eau liquide chauffee utilisant le chauffage par radiofrequence
US9328592B2 (en) Steam anti-coning/cresting technology ( SACT) remediation process
US20130327525A1 (en) Thermal pulsing procedure for remediation of cold spots in steam assisted gravity drainage
Qin et al. Water problems and control techniques in heavy oils with bottom Aquifers
US20230051011A1 (en) End-of-life recovery of mobilized hydrocarbons

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 13810540

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 13810540

Country of ref document: EP

Kind code of ref document: A1