WO2013184002A1 - Method and device for conditioning a railroad - Google Patents

Method and device for conditioning a railroad Download PDF

Info

Publication number
WO2013184002A1
WO2013184002A1 PCT/NL2013/050406 NL2013050406W WO2013184002A1 WO 2013184002 A1 WO2013184002 A1 WO 2013184002A1 NL 2013050406 W NL2013050406 W NL 2013050406W WO 2013184002 A1 WO2013184002 A1 WO 2013184002A1
Authority
WO
WIPO (PCT)
Prior art keywords
rail
railroad
top surface
along
right rail
Prior art date
Application number
PCT/NL2013/050406
Other languages
French (fr)
Inventor
René SLAGTER
Berendina Jeannette SLAGTER MELLEMA
Original Assignee
Ns Reizigers B.V.
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ns Reizigers B.V. filed Critical Ns Reizigers B.V.
Priority to DK13733076.7T priority Critical patent/DK2872692T3/en
Priority to EP13733076.7A priority patent/EP2872692B1/en
Publication of WO2013184002A1 publication Critical patent/WO2013184002A1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B19/00Protection of permanent way against development of dust or against the effect of wind, sun, frost, or corrosion; Means to reduce development of noise
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61KAUXILIARY EQUIPMENT SPECIALLY ADAPTED FOR RAILWAYS, NOT OTHERWISE PROVIDED FOR
    • B61K3/00Wetting or lubricating rails or wheel flanges

Definitions

  • the invention relates to the issues with slippery rails for trains.
  • the slipperiness is caused by the build-up of a layer of slippery material or deposit on the rails through exogenous influences.
  • a first known example is slipperiness caused by leaf fall in the autumn, wherein leaves end up on the rails and under the influence of humidity and passing trains riding over them the leaves change into a slippery layer of biological material. This slipperiness occurs during specific times of the year.
  • Further examples are a deposit caused by settling soot particles from exhaust fumes, substances from industry, iron oxide particles as a result of trains decelerating or grinding dust from the overhead power lines and the pantographs. This may also occur in combination with the above-mentioned leaf fall. In certain countries slipperiness is caused by colonies of snails that crawl over the rails being squashed.
  • the invention provides a method for conditioning a railroad for a train with a station or stop location for the train, wherein a deceleration section and/or an acceleration section for the train has been defined over the railroad, wherein the deceleration section regards the distance over the railroad reguired for bringing the approaching train to a standstill at the station or the stop location and the acceleration section regards the distance over the railroad required for speeding up the train departing from the station or the stop location, wherein the railroad comprises a left rail and a right rail that are parallel to each other and are both provided with a top surface for contacting the wheels of the train, and wherein the railroad is provided with a fixed moistening device for moistening the top surface of the left rail and the right rail, wherein the method comprises by means of the moistening device supplying and keeping the agueous fluid present on the top surface of the left rail and the top surface of the right rail distributed over at least a part of the deceleration section and/or acceleration section.
  • Attachment and build-up of a layer of biological material or another deposit can particularly be counteracted if by means of the moistening device the aqueous fluid is kept continuously present on the top surface of the left rail and the top surface of the right rail.
  • the aqueous fluid is kept present on the top surface of the left rail and the top surface of the right rail for at least one week.
  • the aqueous fluid is excessively supplied for at least one hour and the top surface of the left rail and the top surface of the right rail are flooded with the supplied aqueous fluid.
  • the excessive supply ensures that a layer of biological material that is already present is dissolved and discharged from the top surfaces of the rails.
  • supplying the aqueous fluid by means of the moistening device is interrupted during a rain shower.
  • the aqueous fluid is water. It can for instance be taken from the water supply system or from a subterranean water source.
  • the railroad is provided with a moistening device for moistening the top surface of the left rail and the top surface of the right rail
  • the moistening device comprises a fluid guide extending along the railroad and a supply of an aqueous fluid to the fluid guide, wherein the fluid guide is provided with several outflow openings distributed along the left rail and along the right rail for discharging the aqueous fluid, wherein the outflow openings are distributed over at least a part of the deceleration section and/or the acceleration section.
  • outflow openings along the left rail and along the right rail are distributed over the largest part of or the entire deceleration section and/or the entire acceleration section, so that normal and even deceleration and acceleration is possible over said entire distance.
  • Formulated according to quantity the outflow openings along the left rail and along the right rail are distributed over at least 80% of the deceleration section and/or the acceleration section.
  • the deceleration section and/or the acceleration section as regards length correspond with the legally standardized deceleration section of a train under normal conditions without exogenous influences on the top surface of the left rail and the right rail.
  • the outflow openings along the left rail and along the right rail are distributed over a distance of at least 200 metres before and/or after the station or the stop location.
  • outflow openings along the left rail and along the right rail are distributed over a distance of at least 400 metres before and/or after the station or the stop location.
  • outflow openings along the left rail and along the right rail are distributed over a distance of at least 800 metres before and/or after the station or the stop location.
  • the fluid guide comprises a left conduit extending along the left rail and a right conduit extending along the right rail.
  • the left conduit and the right conduit can be arranged along an existing railroad.
  • the left rail and the right rail are provided with a foot, a body and a head on top of which the top surface is situated, wherein the left conduit and the right conduit are attached against the head of the left rail and the head of the right rail, respectively.
  • the invention furthermore provides a railroad for a train with a station or stop location for the train, wherein a deceleration section and/or an acceleration section for the train has been defined over the railroad, wherein the deceleration section regards the distance over the railroad reguired for bringing the approaching train to a standstill at the station or the stop location and the acceleration section regards the distance over the railroad required for speeding up the train departing from the station or the stop location, wherein the railroad comprises a left rail and a right rail that are parallel to each other and are both provided with a top surface for contacting the wheels of the train, wherein the railroad is provided with a moistening device for moistening the top surface of the left rail and the top surface of the right rail, wherein the moistening device comprises a fluid guide extending along the railroad and a supply of an aqueous fluid to the fluid guide, wherein the fluid guide is provided with several outflow openings distributed along the left rail and along the right rail for discharging the aqueous fluid, where
  • the moistening device can supply the aqueous fluid to the top surfaces of both rails over at least a part of the deceleration section and/or the acceleration section.
  • the aqueous fluid is able to counteract that a layer of biological material or another deposit adheres to the rails.
  • a grown layer of biological material or another deposit may effectively be dissolved and flushed away. Trains that may pass by will then even have a rubbing effect.
  • outflow openings along the left rail and along the right rail are distributed over the largest part of or the entire deceleration section and/or the entire acceleration section, so that normal and even deceleration and acceleration is possible over said entire distance.
  • Formulated according to quantity the outflow openings along the left rail and along the right rail are distributed over at least 80% of the deceleration section and/or the acceleration section.
  • the deceleration section and/or the acceleration section as regards length correspond with the legally standardized deceleration section of a train under normal conditions without exogenous influences on the top surface of the left rail and the right rail.
  • the outflow openings along the left rail and along the right rail are distributed over a distance of at least 200 metres before and/or after the station or the stop location.
  • outflow openings along the left rail and along the right rail are distributed over a distance of at least 400 metres before and/or after the station or the stop location.
  • outflow openings along the left rail and along the right rail are distributed over a distance of at least 800 metres before and/or after the station or the stop location.
  • the fluid guide comprises a left conduit extending along the left rail and a right conduit extending along the right rail.
  • the left conduit and the right conduit can be arranged along an existing railroad.
  • the left rail and the right rail are provided with a foot, a body and a head on top of which the top surface is situated, wherein the left conduit and the right conduit are attached against the head of the left rail and the head of the right rail, respectively.
  • the left conduit and the right conduit are both provided with the outflow openings, wherein the outflow openings preferably are oriented to the top surface of the rail. After having been discharged from the outflow openings, the aqueous fluid can then flow out directly over the top surface of the rail .
  • the left conduit and the top surface of the left rail together bound a left fluid bath and the right conduit and the top surface of the right rail together bound a right fluid bath, so that the aqueous fluid can remain prolonged on the top surfaces of the rails for the above-mentioned preventive action.
  • the left rail and the right rail are provided with a foot, a body and a head on top of which the top surface is situated, wherein the left conduit and the right conduit are attached against the outer side of the head of the left rail and the right rail, respectively, which outer side faces away from the railroad, so that they will not contact the wheels of the trains passing by.
  • the supply of the aqueous fluid is provided with a control for switching on and switching off the supply of the aqueous fluid to the fluid guide.
  • Figure 1 is a schematic overview of a railroad including a moistening device according to the invention
  • Figure 2 is an isometric view of a part of the railroad.
  • Figures 3A and 3B show the same cross-sections of the railroad section and the moistening device.
  • Figure 1 schematically shows a railroad 1 along which a station 10 having a platform 11 is situated. Trains 12 come to a standstill alongside the platform 10 and depart in the same direction or in opposite direction. For a train 12 arriving in direction A and departing in the same direction A a deceleration section or braking section R and a start- up section or acceleration section V is defined.
  • the deceleration section R is technically dictated and is the shortest distance over the railroad 1 required for under normal conditions allowing a train to decelerate from the locally allowed maximum speed to a standstill. A train keeps said maximum speed as continuous section speed for the larger part of a section between two stations.
  • Said standards were laid down on the basis of technical calculations in which deceleration tables and brake weights of trains were included. In principle said standards are determined nationally, but where required they are internationally adapted in connection with cross-border traffic. The maximum deceleration path in this case dictates the maximum continuous section speed and vice versa.
  • a deceleration section of 400 meters In the Netherlands for a speed of 0-40 km per hour a deceleration section of 400 meters applies. For a maximum speed of 40-60 km per hour a deceleration section of 500 meters applies. For a maximum speed of 60-80 km per hour a deceleration section of 800 meters applies. For a maximum speed of 80-130 km per hour a deceleration section of 1000 meters applies. For a maximum speed of 130-160 km per hour a deceleration section of 1150 meters applies. This means that a train at the said speed should activate the brakes ultimately before the prescribed distance to the stop location. Summarizing the deceleration section therefore has a length of at least 400 meters, preferably at least 800 meters .
  • the acceleration section V is also technically dictated and is the distance over the railroad 1 that a train requires to reach its continuous section speed from a standstill at platform 11.
  • the length of the acceleration section depends on the continuous section speed to be reached.
  • the length of the acceleration section V for the same continuous section speed approximately corresponds with the length of the deceleration section R. Due to distribution of the driven and braked wheels over the length of a train, the acceleration section V and the deceleration section R may have an overlap at the location of the station 10. In figure 1 the deceleration section R and the acceleration section V are indicated with respect to the nose of the train 12.
  • a railroad 1 is built up with a left rail 21 and an identical right rail 22 that are attached parallel to each other on sleepers 23 in a track bed.
  • the left rail 21 is shown in detail in figure 3A and 3B.
  • the steel rails 21, 22 in this example are of the common Vigole type and comprise a body 26, a foot 27 and a head 25 having a bulging top surface 26.
  • a train wheel 60 comprises a tread 61 that runs over the top surface 26 and a flange 62 that guides the train wheel 60.
  • the contact area 28 at the top of the top surface 26 has a width B that is a fraction of the width of the head 25.
  • the width B of the contact area is only a few millimetres.
  • the deceleration section R and the acceleration section V can be extended for a same continuous section speed as a result of adverse exogenous influences, such as a layer of a biological material resulting from leaf fall that has grown and been driven stuck onto the head 25 of the rails 21, 22.
  • the natural conditions under which this occurs are known and can be predicted well.
  • the biological material may multiply the length of a deceleration section R or acceleration section V with respect to the regular conditions with clean rails 21, 22 on which the aforementioned standards have been based.
  • a railroad 1 has been provided with a moistening device 40.
  • the moistening device 40 is a fixed installation on the railroad 1.
  • the moistening device 40 comprises a plastic left conduit 41 extending along the outside of the head 25 of the left rail 21 and a plastic right conduit 42 extending mirror-symmetrically along the outside of the head 25 of the right rail 22.
  • the left conduit 41 and the right conduit 42 are identical and attached in the same manner against the left rail 21 and right rail 22, respectively.
  • the left conduit 41 and the right conduit 42 extend over the standardised deceleration section R and the acceleration section V.
  • the left conduit 41 and its attachment are shown in detail in figures 3A and 3B.
  • the left conduit 41 comprises a plastic body
  • the left conduit 41 is provided with a curved top surface 45 underneath which a continuous supply duct 47 has been formed.
  • several discharge ducts 46 have been formed that are distributed over the length of the left conduit 41 and extend upwardly inclined from the continuous supply duct 47 in the direction of the top surface 26 of the head 25.
  • the left conduit 41 is attached to the left rail 21 by means of several metal clamps 49 distributed over the length. The clamps 49 engage onto the foot of the left rail 21 and clamp the left conduit 41 with the abutment surface 44 in a liquid-tight manner against the side of the head 25.
  • the top side of the curved top surface 45 is at the level of, or a few millimetres above, the contact area 28.
  • the left conduit 41 in this position is not hindered by a passing train wheel 60.
  • the curved top surface 45 of the left conduit 41 together with the top surface 26 of the left rail 21 forms a water channel 50 extending along the head 25.
  • the moistening device 40 comprises a water pump 51 the entrance of which is connected to a supply conduit 52 for instance from a schematically shown ground water source 53.
  • the exit of the water pump 51 is connected to a supply line 54 with a first branch 55 to the left conduit 41 and a second branch 56 to the right conduit 42.
  • the water pump 51 is connected to an electric control in a control cabinet 57.
  • the control cabinet 57 is provided with a rain sensor.
  • the electric control is in connection with the traffic control room of the railroad 1.
  • the electric control is adapted for actuating the pump 1 at several flow rates and over various periods.
  • the wheels 60 have optimal contact with the rails 21, 22. These conditions occur the larger part of the year, usually in the winter, the spring and the summer.
  • the build-up of a biological layer as a result of leaf fall typically only occurs during a period of a few weeks in the autumn, in which a properly predictable combination of leaf fall, wind, temperature and humidity is required to form the biological layer.
  • the action of the moistening device is as follows :
  • the pump 51 is switched off.
  • the pump 51 is actuated so that water is supplied to the left conduit 41 and the right conduit 42.
  • the water leaves the continuous supply duct 47 via the discharge ducts 46 as a result of which a water bath 51 is created over the length of the deceleration section R and the acceleration section V, which water bath flows out over the contact area 28.
  • the water may optionally drip down at the opposite side of the top surface 26.
  • the control ensures that during the period of a few weeks in which a layer of biological material may arise as a result of leaf fall, the pump 51 keeps supplying sufficient water to keep the top surface 26, particularly its contact area 28, continuously moist or wet, but the dripping is limited to a minimum in order to prevent excessive penetration of water into or saturation of the underlying track bed.
  • the pump 51 may temporarily be stopped due to the in that case natural supply of water on the top surface 26.
  • trains are passing the pump 51 may temporarily be stopped because the train 12 will cause the supplied water to splash immediately.
  • the top surfaces 26 still remain moist, which is considered as the continuous presence of water or aqueous fluid.
  • top surface 26 moist or wet results in no biological layer being able to adhere to or build up on the top surface 26.
  • the same goes for attachment of a deposit of for instance soot or iron oxide particles. Passing trains even have a polishing effect.
  • the presence of water on the contact area 28 has no adverse effects on the grip of the train wheel 60 on the rails 21, 22. The water present, together with the loosened biological material and other deposits, are removed by the moving train.
  • the pump 51 is able to supply water at an increased flow rate for 1-3 hours as a result of which the top surfaces 26 are excessively flooded. This dissolves the biological layer or deposit and removes it.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Platform Screen Doors And Railroad Systems (AREA)
  • Train Traffic Observation, Control, And Security (AREA)

Abstract

Method for conditioning a railroad for a train near a station or stop location for the train, wherein the railroad comprises a left rail and a right rail that are parallel to each other and are both provided with a top surface for contacting the wheels of the train, and wherein the railroad is provided with a fixed moistening device for moistening the top surface of the left rail and the right rail, wherein the method comprises by means of the moistening device keeping the aqueous fluid present on the top surface of the left rail and the top surface of the right rail distributed over at least a part of the deceleration section and/or acceleration section of the train.

Description

Method and device for conditioning a railroad
BACKGROUND OF THE INVENTION
The invention relates to the issues with slippery rails for trains. The slipperiness is caused by the build-up of a layer of slippery material or deposit on the rails through exogenous influences.
A first known example is slipperiness caused by leaf fall in the autumn, wherein leaves end up on the rails and under the influence of humidity and passing trains riding over them the leaves change into a slippery layer of biological material. This slipperiness occurs during specific times of the year.
Further examples are a deposit caused by settling soot particles from exhaust fumes, substances from industry, iron oxide particles as a result of trains decelerating or grinding dust from the overhead power lines and the pantographs. This may also occur in combination with the above-mentioned leaf fall. In certain countries slipperiness is caused by colonies of snails that crawl over the rails being squashed.
Due to the slipperiness the wheels of the trains skid during braking and the wheels spin during accelerating or starting up. This leads to damage to the wheels and rails, it compromises the punctuality of the timetable and increases the risk of passage through a red signal and accidents.
Various attempts have been made to combat the slipperiness of rails as a result of a layer of slippery material or deposits, such as applying a friction enhancing gel and cutting back vegetation along the railroad by way of prevention. The results, however, were not satisfactory.
It is an object of the invention to provide a method and facility with which the above-mentioned slipperiness can be counteracted effectively.
SUMMARY OF THE INVENTION
According to one aspect the invention provides a method for conditioning a railroad for a train with a station or stop location for the train, wherein a deceleration section and/or an acceleration section for the train has been defined over the railroad, wherein the deceleration section regards the distance over the railroad reguired for bringing the approaching train to a standstill at the station or the stop location and the acceleration section regards the distance over the railroad required for speeding up the train departing from the station or the stop location, wherein the railroad comprises a left rail and a right rail that are parallel to each other and are both provided with a top surface for contacting the wheels of the train, and wherein the railroad is provided with a fixed moistening device for moistening the top surface of the left rail and the right rail, wherein the method comprises by means of the moistening device supplying and keeping the agueous fluid present on the top surface of the left rail and the top surface of the right rail distributed over at least a part of the deceleration section and/or acceleration section.
By supplying and keeping the aqueous fluid present on the top surfaces of both rails over the said distance it can be counteracted that over the said distance a layer of biological material or another deposit adheres to the rails. On the other hand a grown layer of biological material or another deposit can effectively be dissolved and flushed away. Trains that may pass by will then even have a rubbing effect. The trains can maintain the nominal braking and accelerating distance over this clean railroad.
Attachment and build-up of a layer of biological material or another deposit can particularly be counteracted if by means of the moistening device the aqueous fluid is kept continuously present on the top surface of the left rail and the top surface of the right rail.
In one embodiment defined according to quantity, by means of the moistening device the aqueous fluid is kept present on the top surface of the left rail and the top surface of the right rail for at least one week.
In a second embodiment defined according to quantity, by means of the moistening device the aqueous fluid is excessively supplied for at least one hour and the top surface of the left rail and the top surface of the right rail are flooded with the supplied aqueous fluid. The excessive supply ensures that a layer of biological material that is already present is dissolved and discharged from the top surfaces of the rails.
In an aqueous fluid-saving embodiment supplying the aqueous fluid by means of the moistening device is interrupted during a rain shower.
In a practical embodiment the aqueous fluid is water. It can for instance be taken from the water supply system or from a subterranean water source.
In one embodiment the railroad is provided with a moistening device for moistening the top surface of the left rail and the top surface of the right rail, wherein the moistening device comprises a fluid guide extending along the railroad and a supply of an aqueous fluid to the fluid guide, wherein the fluid guide is provided with several outflow openings distributed along the left rail and along the right rail for discharging the aqueous fluid, wherein the outflow openings are distributed over at least a part of the deceleration section and/or the acceleration section.
In one embodiment the outflow openings along the left rail and along the right rail are distributed over the largest part of or the entire deceleration section and/or the entire acceleration section, so that normal and even deceleration and acceleration is possible over said entire distance.
Formulated according to quantity the outflow openings along the left rail and along the right rail are distributed over at least 80% of the deceleration section and/or the acceleration section.
The deceleration section and/or the acceleration section as regards length correspond with the legally standardized deceleration section of a train under normal conditions without exogenous influences on the top surface of the left rail and the right rail.
In one embodiment defined according to quantity, the outflow openings along the left rail and along the right rail are distributed over a distance of at least 200 metres before and/or after the station or the stop location.
Especially the outflow openings along the left rail and along the right rail are distributed over a distance of at least 400 metres before and/or after the station or the stop location.
More particularly the outflow openings along the left rail and along the right rail are distributed over a distance of at least 800 metres before and/or after the station or the stop location.
In one embodiment the fluid guide comprises a left conduit extending along the left rail and a right conduit extending along the right rail. The left conduit and the right conduit can be arranged along an existing railroad. In one embodiment thereof the left rail and the right rail are provided with a foot, a body and a head on top of which the top surface is situated, wherein the left conduit and the right conduit are attached against the head of the left rail and the head of the right rail, respectively.
According to a second aspect the invention furthermore provides a railroad for a train with a station or stop location for the train, wherein a deceleration section and/or an acceleration section for the train has been defined over the railroad, wherein the deceleration section regards the distance over the railroad reguired for bringing the approaching train to a standstill at the station or the stop location and the acceleration section regards the distance over the railroad required for speeding up the train departing from the station or the stop location, wherein the railroad comprises a left rail and a right rail that are parallel to each other and are both provided with a top surface for contacting the wheels of the train, wherein the railroad is provided with a moistening device for moistening the top surface of the left rail and the top surface of the right rail, wherein the moistening device comprises a fluid guide extending along the railroad and a supply of an aqueous fluid to the fluid guide, wherein the fluid guide is provided with several outflow openings distributed along the left rail and along the right rail for discharging the aqueous fluid, wherein the outflow openings are distributed over at least a part of the deceleration section and/or the acceleration section.
The moistening device can supply the aqueous fluid to the top surfaces of both rails over at least a part of the deceleration section and/or the acceleration section. On the one hand, due to a prolonged continuous presence of for instance a few weeks, the aqueous fluid is able to counteract that a layer of biological material or another deposit adheres to the rails. On the other hand, in case of excessive supply of the aqueous fluid, a grown layer of biological material or another deposit may effectively be dissolved and flushed away. Trains that may pass by will then even have a rubbing effect.
In one embodiment the outflow openings along the left rail and along the right rail are distributed over the largest part of or the entire deceleration section and/or the entire acceleration section, so that normal and even deceleration and acceleration is possible over said entire distance.
Formulated according to quantity the outflow openings along the left rail and along the right rail are distributed over at least 80% of the deceleration section and/or the acceleration section.
The deceleration section and/or the acceleration section as regards length correspond with the legally standardized deceleration section of a train under normal conditions without exogenous influences on the top surface of the left rail and the right rail.
In one embodiment defined according to quantity, the outflow openings along the left rail and along the right rail are distributed over a distance of at least 200 metres before and/or after the station or the stop location.
Especially the outflow openings along the left rail and along the right rail are distributed over a distance of at least 400 metres before and/or after the station or the stop location.
More particularly the outflow openings along the left rail and along the right rail are distributed over a distance of at least 800 metres before and/or after the station or the stop location.
In one embodiment the fluid guide comprises a left conduit extending along the left rail and a right conduit extending along the right rail. The left conduit and the right conduit can be arranged along an existing railroad.
In one embodiment thereof the left rail and the right rail are provided with a foot, a body and a head on top of which the top surface is situated, wherein the left conduit and the right conduit are attached against the head of the left rail and the head of the right rail, respectively.
In one embodiment the left conduit and the right conduit are both provided with the outflow openings, wherein the outflow openings preferably are oriented to the top surface of the rail. After having been discharged from the outflow openings, the aqueous fluid can then flow out directly over the top surface of the rail .
In one embodiment the left conduit and the top surface of the left rail together bound a left fluid bath and the right conduit and the top surface of the right rail together bound a right fluid bath, so that the aqueous fluid can remain prolonged on the top surfaces of the rails for the above-mentioned preventive action.
In one embodiment the left rail and the right rail are provided with a foot, a body and a head on top of which the top surface is situated, wherein the left conduit and the right conduit are attached against the outer side of the head of the left rail and the right rail, respectively, which outer side faces away from the railroad, so that they will not contact the wheels of the trains passing by.
In one embodiment the supply of the aqueous fluid is provided with a control for switching on and switching off the supply of the aqueous fluid to the fluid guide.
The aspects and measures described in this description and the claims of the application and/or shown in the drawings of this application may where possible also be used individually. Said individual aspects may be the subject of divisional patent applications relating thereto. This particularly applies to the measures and aspects that are described per se in the sub claims.
SHORT DESCRIPTION OF THE DRAWINGS
The invention will be elucidated on the basis of a number of exemplary embodiments shown in the attached drawings, in which:
Figure 1 is a schematic overview of a railroad including a moistening device according to the invention;
Figure 2 is an isometric view of a part of the railroad; and
Figures 3A and 3B show the same cross-sections of the railroad section and the moistening device.
DETAILED DESCRIPTION OF THE DRAWINGS
Figure 1 schematically shows a railroad 1 along which a station 10 having a platform 11 is situated. Trains 12 come to a standstill alongside the platform 10 and depart in the same direction or in opposite direction. For a train 12 arriving in direction A and departing in the same direction A a deceleration section or braking section R and a start- up section or acceleration section V is defined.
The deceleration section R is technically dictated and is the shortest distance over the railroad 1 required for under normal conditions allowing a train to decelerate from the locally allowed maximum speed to a standstill. A train keeps said maximum speed as continuous section speed for the larger part of a section between two stations. Based on legislation detailed standards have been laid down as regards the deceleration section R. Said standards were laid down on the basis of technical calculations in which deceleration tables and brake weights of trains were included. In principle said standards are determined nationally, but where required they are internationally adapted in connection with cross-border traffic. The maximum deceleration path in this case dictates the maximum continuous section speed and vice versa.
In the Netherlands for a speed of 0-40 km per hour a deceleration section of 400 meters applies. For a maximum speed of 40-60 km per hour a deceleration section of 500 meters applies. For a maximum speed of 60-80 km per hour a deceleration section of 800 meters applies. For a maximum speed of 80-130 km per hour a deceleration section of 1000 meters applies. For a maximum speed of 130-160 km per hour a deceleration section of 1150 meters applies. This means that a train at the said speed should activate the brakes ultimately before the prescribed distance to the stop location. Summarizing the deceleration section therefore has a length of at least 400 meters, preferably at least 800 meters .
The acceleration section V is also technically dictated and is the distance over the railroad 1 that a train requires to reach its continuous section speed from a standstill at platform 11. The length of the acceleration section depends on the continuous section speed to be reached. As the deceleration forces and acceleration forces of trains are both largely dictated by the friction conditions between the railroad and the wheels, the length of the acceleration section V for the same continuous section speed approximately corresponds with the length of the deceleration section R. Due to distribution of the driven and braked wheels over the length of a train, the acceleration section V and the deceleration section R may have an overlap at the location of the station 10. In figure 1 the deceleration section R and the acceleration section V are indicated with respect to the nose of the train 12.
As shown in figure 1 a railroad 1 is built up with a left rail 21 and an identical right rail 22 that are attached parallel to each other on sleepers 23 in a track bed. The left rail 21 is shown in detail in figure 3A and 3B. The steel rails 21, 22 in this example are of the common Vigole type and comprise a body 26, a foot 27 and a head 25 having a bulging top surface 26. A train wheel 60 comprises a tread 61 that runs over the top surface 26 and a flange 62 that guides the train wheel 60. The contact area 28 at the top of the top surface 26 has a width B that is a fraction of the width of the head 25. The width B of the contact area is only a few millimetres.
The deceleration section R and the acceleration section V can be extended for a same continuous section speed as a result of adverse exogenous influences, such as a layer of a biological material resulting from leaf fall that has grown and been driven stuck onto the head 25 of the rails 21, 22. The natural conditions under which this occurs are known and can be predicted well. The biological material may multiply the length of a deceleration section R or acceleration section V with respect to the regular conditions with clean rails 21, 22 on which the aforementioned standards have been based. In order to counteract these problems a railroad 1 has been provided with a moistening device 40. The moistening device 40 is a fixed installation on the railroad 1.
As shown in figure 1 the moistening device 40 comprises a plastic left conduit 41 extending along the outside of the head 25 of the left rail 21 and a plastic right conduit 42 extending mirror-symmetrically along the outside of the head 25 of the right rail 22. The left conduit 41 and the right conduit 42 are identical and attached in the same manner against the left rail 21 and right rail 22, respectively. The left conduit 41 and the right conduit 42 extend over the standardised deceleration section R and the acceleration section V. The left conduit 41 and its attachment are shown in detail in figures 3A and 3B.
The left conduit 41 comprises a plastic body
43 having an abutment surface 44 abutting the side of the head 25. At the top side the left conduit 41 is provided with a curved top surface 45 underneath which a continuous supply duct 47 has been formed. In the left conduit 41 several discharge ducts 46 have been formed that are distributed over the length of the left conduit 41 and extend upwardly inclined from the continuous supply duct 47 in the direction of the top surface 26 of the head 25. The left conduit 41 is attached to the left rail 21 by means of several metal clamps 49 distributed over the length. The clamps 49 engage onto the foot of the left rail 21 and clamp the left conduit 41 with the abutment surface 44 in a liquid-tight manner against the side of the head 25. In vertical direction the top side of the curved top surface 45 is at the level of, or a few millimetres above, the contact area 28. As shown in figure 3B the left conduit 41 in this position is not hindered by a passing train wheel 60. The curved top surface 45 of the left conduit 41 together with the top surface 26 of the left rail 21 forms a water channel 50 extending along the head 25.
As shown in figure 1 the moistening device 40 comprises a water pump 51 the entrance of which is connected to a supply conduit 52 for instance from a schematically shown ground water source 53. The exit of the water pump 51 is connected to a supply line 54 with a first branch 55 to the left conduit 41 and a second branch 56 to the right conduit 42. The water pump 51 is connected to an electric control in a control cabinet 57. The control cabinet 57 is provided with a rain sensor. The electric control is in connection with the traffic control room of the railroad 1. The electric control is adapted for actuating the pump 1 at several flow rates and over various periods.
During favourable conditions without adverse exogenous influences the wheels 60 have optimal contact with the rails 21, 22. These conditions occur the larger part of the year, usually in the winter, the spring and the summer. The build-up of a biological layer as a result of leaf fall typically only occurs during a period of a few weeks in the autumn, in which a properly predictable combination of leaf fall, wind, temperature and humidity is required to form the biological layer.
The action of the moistening device is as follows :
During the favourable conditions in which the wheels 60 have optimal contact with the head 25 of the rails 21, 22 the pump 51 is switched off. When it is expected in this example that the natural conditions will change such before long, that a layer of biological material may arise on the head 25 of the rails 21, 22, the pump 51 is actuated so that water is supplied to the left conduit 41 and the right conduit 42. The water leaves the continuous supply duct 47 via the discharge ducts 46 as a result of which a water bath 51 is created over the length of the deceleration section R and the acceleration section V, which water bath flows out over the contact area 28. The water may optionally drip down at the opposite side of the top surface 26. The control ensures that during the period of a few weeks in which a layer of biological material may arise as a result of leaf fall, the pump 51 keeps supplying sufficient water to keep the top surface 26, particularly its contact area 28, continuously moist or wet, but the dripping is limited to a minimum in order to prevent excessive penetration of water into or saturation of the underlying track bed. During a rain shower registered by the rain sensor the pump 51 may temporarily be stopped due to the in that case natural supply of water on the top surface 26. When trains are passing the pump 51 may temporarily be stopped because the train 12 will cause the supplied water to splash immediately. The top surfaces 26 still remain moist, which is considered as the continuous presence of water or aqueous fluid.
Keeping the top surface 26 moist or wet results in no biological layer being able to adhere to or build up on the top surface 26. The same goes for attachment of a deposit of for instance soot or iron oxide particles. Passing trains even have a polishing effect. The presence of water on the contact area 28 has no adverse effects on the grip of the train wheel 60 on the rails 21, 22. The water present, together with the loosened biological material and other deposits, are removed by the moving train.
In case the natural conditions have unexpectedly changed so quickly that a layer of biological material has arisen on the top surface 26 of the rails 21, 22, then the pump 51 is able to supply water at an increased flow rate for 1-3 hours as a result of which the top surfaces 26 are excessively flooded. This dissolves the biological layer or deposit and removes it.
The above description is included to illustrate the operation of preferred embodiments of the invention and not to limit the scope of the invention. Starting from the above explanation many variations that fall within the spirit and scope of the present invention will be evident to an expert.

Claims

Claims
1. Method for conditioning a railroad for a train with a station or stop location for the train, wherein a deceleration section and/or an acceleration section for the train has been defined over the railroad, wherein the deceleration section regards the distance over the railroad required for bringing the approaching train to a standstill at the station or the stop location and the acceleration section reqards the distance over the railroad required for speeding up the train departing from the station or the stop location, wherein the railroad comprises a left rail and a right rail that are parallel to each other and are both provided with a top surface for contacting the wheels of the train, and wherein the railroad is provided with a fixed moistening device for moistening the top surface of the left rail and the right rail, wherein the method comprises by means of the moistening device keeping the aqueous fluid present on the top surface of the left rail and the top surface of the right rail distributed over at least a part of the deceleration section and/or acceleration section.
2. Method according to claim 1, wherein by means of the moistening device the aqueous fluid is kept continuously present on the top surface of the left rail and the top surface of the right rail.
3. Method according to claim 1 or 2, wherein by means of the moistening device the aqueous fluid is kept present on the top surface of the left rail and the top surface of the right rail for at least one week .
4. Method according to any one of the preceding claims, wherein by means of the moistening device the aqueous fluid is excessively supplied for at least one hour and the top surface of the left rail and the top surface of the right rail are flooded with the supplied aqueous fluid.
5. Method according to any one of the preceding claims, wherein supplying the aqueous fluid by means of the moistening device is interrupted during a rain shower.
6. Method according to any one of the preceding claims, wherein the aqueous fluid is water.
7. Method according to any one of the preceding claims, wherein the moistening device comprises a fluid guide extending along the railroad and a supply of an aqueous fluid to the fluid guide, wherein the fluid guide is provided with several outflow openings distributed along the left rail and along the right rail for discharging the aqueous fluid, wherein the outflow openings are distributed over at least a part of the deceleration section and/or the acceleration section.
8. Method according to claim 7, wherein the outflow openings along the left rail and along the right rail are distributed over the largest part of or the entire deceleration section and/or the entire acceleration section.
9. Method according to claim 7 or 8, wherein the outflow openings along the left rail and along the right rail are distributed over at least 80% of the deceleration section and/or the acceleration section.
10. Method according to any one of the claims 7-9, wherein the deceleration section and/or the acceleration section as regards length corresponds with the legally standardized deceleration section of a train under normal conditions without exogenous influences on the top surface of the left rail and the right rail.
11. Method according to any one of the claims 7-10, wherein the outflow openings along the left rail and along the right rail are distributed over a distance of at least 200 metres before and/or after the station or the stop location.
12. Method according to claim 11, wherein the outflow openings along the left rail and along the right rail are distributed over a distance of at least 400 metres before and/or after the station or the stop location .
13. Method according to claim 12, wherein the outflow openings along the left rail and along the right rail are distributed over a distance of at least 800 metres before and/or after the station or the stop location .
14. Method according to any one of the claims 7-13, wherein the fluid guide comprises a left conduit extending along the left rail and a right conduit extending along the right rail.
15. Method according to claim 14, wherein the left rail and the right rail are provided with a foot, a body and a head on top of which the top surface is situated, wherein the left conduit and the right conduit are attached against the head of the left rail and the head of the right rail, respectively.
16. Railroad for a train with a station or stop location for the train, wherein a deceleration section and/or an acceleration section for the train has been defined over the railroad, wherein the deceleration section regards the distance over the railroad reguired for bringing the approaching train to a standstill at the station or the stop location and the acceleration section regards the distance over the railroad required for speeding up the train departing from the station or the stop location, wherein the railroad comprises a left rail and a right rail that are parallel to each other and are both provided with a top surface for contacting the wheels of the train, wherein the railroad is provided with a moistening device for moistening the top surface of the left rail and the top surface of the right rail, wherein the moistening device comprises a fluid guide extending along the railroad and a supply of an aqueous fluid to the fluid guide, wherein the fluid guide is provided with several outflow openings distributed along the left rail and along the right rail for discharging the aqueous fluid, wherein the outflow openings are distributed over at least a part of the deceleration section and/or the acceleration section.
17. Railroad according to claim 16, wherein the outflow openings along the left rail and along the right rail are distributed over the largest part of or the entire deceleration section and/or the entire acceleration section.
18. Railroad according to claim 16 or 17, wherein the outflow openings along the left rail and along the right rail are distributed over at least 80% of the deceleration section and/or the acceleration section .
19. Railroad according to any one of the claims 16-18, wherein the deceleration section and/or the acceleration section as regards length corresponds with the legally standardized deceleration section of a train under normal conditions without exogenous influences on the top surface of the left rail and the right rail.
20. Railroad according to any one of the claims 16-19, wherein the outflow openings along the left rail and along the right rail are distributed over a distance of at least 200 metres before and/or after the station or the stop location.
21. Railroad according to claim 20, wherein the outflow openings along the left rail and along the right rail are distributed over a distance of at least 400 metres before and/or after the station or the stop location .
22. Railroad according to claim 21, wherein the outflow openings along the left rail and along the right rail are distributed over a distance of at least 800 metres before and/or after the station or the stop location .
23. Railroad according to any one of the claims 16-22, wherein the fluid guide comprises a left conduit extending along the left rail and a right conduit extending along the right rail.
24. Railroad according to claim 23, wherein the left rail and the right rail are provided with a foot, a body and a head on top of which the top surface is situated, wherein the left conduit and the right conduit are attached against the head of the left rail and the head of the right rail, respectively.
25. Railroad according to claim 23 or 24, wherein the left conduit and the right conduit are both provided with the outflow openings, wherein the outflow openings preferably are oriented to the top surface of the rail.
26. Railroad according to any one of the claims 23-25, wherein the left rail and the right rail are provided with a foot, a body and a head on top of which the top surface is situated, wherein the left conduit and the top surface of the left rail together bound a left fluid bath and the right conduit and the top surface of the right rail together bound a right fluid bath.
27. Railroad according to any one of the claims 23-26, wherein the left rail and the right rail are provided with a foot, a body and a head on top of which the top surface is situated, wherein the left conduit and the right conduit are attached against the outer side of the head of the left rail and the right rail, respectively, which outer side faces away from the railroad.
28. Railroad according to any one of the claims 16-27, wherein the supply of the aqueous fluid is provided with a control for switching on and switching off the supply of the aqueous fluid to the fluid guide.
PCT/NL2013/050406 2012-06-07 2013-06-06 Method and device for conditioning a railroad WO2013184002A1 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
DK13733076.7T DK2872692T3 (en) 2012-06-07 2013-06-06 Procedure for conditioning a railway
EP13733076.7A EP2872692B1 (en) 2012-06-07 2013-06-06 Method for conditioning a railroad

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
NL2008955A NL2008955C2 (en) 2012-06-07 2012-06-07 RAILWAY FITTED WITH HUMIDIFICATION DEVICE.
NL2008955 2012-06-07

Publications (1)

Publication Number Publication Date
WO2013184002A1 true WO2013184002A1 (en) 2013-12-12

Family

ID=48741453

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/NL2013/050406 WO2013184002A1 (en) 2012-06-07 2013-06-06 Method and device for conditioning a railroad

Country Status (4)

Country Link
EP (1) EP2872692B1 (en)
DK (1) DK2872692T3 (en)
NL (1) NL2008955C2 (en)
WO (1) WO2013184002A1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2910681A1 (en) 2014-02-21 2015-08-26 Rail Road Systems B.V. Moistening device for a rail and rail system
EP2941504A4 (en) * 2013-01-03 2016-09-07 Clive Michelsen A perforated fluid dispensing hose or tube for the purpose of applying liquids and/or gases to railroad tracks including railroad switches, railroad crossings, bridge overheads and tunnel walls

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6971479B1 (en) * 1999-04-08 2005-12-06 Portec Rail Products, Inc. Top of rail applicator
GB2430419A (en) * 2005-03-12 2007-03-28 Edward O'connor Train rail guard
JP2008190136A (en) * 2007-02-01 2008-08-21 Nobuo Yunoki Device for preventing accumulation of snow
GB2456414A (en) * 2008-01-15 2009-07-22 Portec Rail Products Inc Apparatus for de-icing a rail of a railway track
KR101062625B1 (en) * 2010-12-17 2011-09-07 주식회사 진화이앤씨 Railway for noise prevention curve rail

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6971479B1 (en) * 1999-04-08 2005-12-06 Portec Rail Products, Inc. Top of rail applicator
GB2430419A (en) * 2005-03-12 2007-03-28 Edward O'connor Train rail guard
JP2008190136A (en) * 2007-02-01 2008-08-21 Nobuo Yunoki Device for preventing accumulation of snow
GB2456414A (en) * 2008-01-15 2009-07-22 Portec Rail Products Inc Apparatus for de-icing a rail of a railway track
KR101062625B1 (en) * 2010-12-17 2011-09-07 주식회사 진화이앤씨 Railway for noise prevention curve rail

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2941504A4 (en) * 2013-01-03 2016-09-07 Clive Michelsen A perforated fluid dispensing hose or tube for the purpose of applying liquids and/or gases to railroad tracks including railroad switches, railroad crossings, bridge overheads and tunnel walls
EP2910681A1 (en) 2014-02-21 2015-08-26 Rail Road Systems B.V. Moistening device for a rail and rail system

Also Published As

Publication number Publication date
EP2872692B1 (en) 2017-04-12
NL2008955C2 (en) 2013-12-10
EP2872692A1 (en) 2015-05-20
DK2872692T3 (en) 2017-07-31

Similar Documents

Publication Publication Date Title
CA2597375C (en) Method and system of limiting the application of sand to a railroad rail
US7594682B2 (en) Apparatus and method for controlled application of railway friction modifying agent
CN107031667B (en) Traction system and method
DE60026290T2 (en) IMPROVING WHEEL / RAIL LIABILITY
US6585085B1 (en) Wayside wheel lubricator
US3059724A (en) Means for lubricating curved railroad track rails
US7735607B2 (en) Gage side or field side top-of-rail plus gage corner lubrication system
KR20120049657A (en) In the commercial business electromotive car for a subway tunnel air qualitative improvement loading a sprinkler system
EP2872692B1 (en) Method for conditioning a railroad
CN108698614A (en) System and method for trailer system
CN203126851U (en) High-pressure air rail top surface cleaning device
US7513335B2 (en) Railroad switch lubricator
US3051262A (en) Apparatus for reducing friction between railroad car wheels and rails
CN206083795U (en) Prevent roll table guider of casting blank off tracking
CN102923134B (en) A kind of locomotive sands with the device that sands method and device
CN110341756A (en) A kind of anti-slip equipment safety control method of trim end
CZ36346U1 (en) Device for applying anti-icing mixture on catenary lines
JPS60181407A (en) Track beam cleaning apparatus by vehicle
CZ17502U1 (en) Bogie arrangement of rail vehicle, particularly tramway vehicle
CZ16648U1 (en) Sand spreading device for rail vehicles, particularly tramways

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 13733076

Country of ref document: EP

Kind code of ref document: A1

REEP Request for entry into the european phase

Ref document number: 2013733076

Country of ref document: EP

WWE Wipo information: entry into national phase

Ref document number: 2013733076

Country of ref document: EP

NENP Non-entry into the national phase

Ref country code: DE