WO2013181824A1 - Electrical tilt method, device and system - Google Patents

Electrical tilt method, device and system Download PDF

Info

Publication number
WO2013181824A1
WO2013181824A1 PCT/CN2012/076588 CN2012076588W WO2013181824A1 WO 2013181824 A1 WO2013181824 A1 WO 2013181824A1 CN 2012076588 W CN2012076588 W CN 2012076588W WO 2013181824 A1 WO2013181824 A1 WO 2013181824A1
Authority
WO
WIPO (PCT)
Prior art keywords
current
esc
antenna device
electrically adjustable
adjusted
Prior art date
Application number
PCT/CN2012/076588
Other languages
French (fr)
Chinese (zh)
Inventor
吴立昌
李悦
Original Assignee
华为技术有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 华为技术有限公司 filed Critical 华为技术有限公司
Priority to PCT/CN2012/076588 priority Critical patent/WO2013181824A1/en
Priority to CN201280000666.6A priority patent/CN102835145B/en
Publication of WO2013181824A1 publication Critical patent/WO2013181824A1/en

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W24/00Supervisory, monitoring or testing arrangements
    • H04W24/02Arrangements for optimising operational condition
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01QANTENNAS, i.e. RADIO AERIALS
    • H01Q3/00Arrangements for changing or varying the orientation or the shape of the directional pattern of the waves radiated from an antenna or antenna system
    • H01Q3/26Arrangements for changing or varying the orientation or the shape of the directional pattern of the waves radiated from an antenna or antenna system varying the relative phase or relative amplitude of energisation between two or more active radiating elements; varying the distribution of energy across a radiating aperture
    • H01Q3/267Phased-array testing or checking devices
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W16/00Network planning, e.g. coverage or traffic planning tools; Network deployment, e.g. resource partitioning or cells structures
    • H04W16/24Cell structures
    • H04W16/28Cell structures using beam steering

Definitions

  • the present invention relates to the field of communications, and in particular, to an electrical tuning method, apparatus, and system. Background technique
  • electronically modulated antennas have become mainstream, and electronically adjustable antennas optimize the network by adjusting the electrical downtilt of the antenna.
  • the threshold value of the current supply current of the ESC master device to the antenna antenna device (Antenna L ine Dev ice, ALD) is fixedly configured, and the maximum operating current of the ALD device is also fixed, different.
  • the maximum operating current of manufacturers and different types of ALD equipment can be different, but the ESC master equipment does not know the maximum operating current of the ALD equipment.
  • a disadvantage of the prior art is that when the ESC master device is connected to a new type of ALD device or cascaded to a new ALD device, the maintenance personnel are required to reconfigure the supply current threshold according to the maximum operating current of the ALD device; if the maintenance personnel are not reconfigured The supply current threshold, or the reconfigured supply current threshold, does not meet the maximum operating current of the ALD device. If the supply current threshold of the ALD device to the ALD device does not meet the maximum operating current of the ALD device, The ESC operation may cause the ESC master current to exceed the protection threshold to close the port and the ALD device operation cannot be performed. In this case, the operation of the ALD device can be continued by manually modifying the power supply threshold of the ESC master device. Therefore, under the prior art, the ECU device has poor operability and is inconvenient to operate. Summary of the invention
  • Embodiments of the present invention provide an electrical adjustment method, apparatus, and system, which implement current negotiation between an ESC master device and an ESC antenna device, so that the ESC master device can better support the ESC antenna device. For the business operation of the backup, the operation of the ESC of the ESC antenna device is good.
  • an embodiment of the present invention provides an electrical adjustment method, where the method includes: acquiring a current parameter of an electrical adjustment antenna device;
  • the acquiring the current parameter of the ESC antenna device comprises: sending a current parameter request message to one or more ESC antenna devices; receiving the one or more ESC antenna devices according to the circuit parameter request message The current parameter.
  • the current parameter comprises a maximum operating current.
  • the method further includes: if the adjusted power supply current threshold is not adapted to the current parameter of the one of the electrical adjustment antenna devices, sending an adjustment to the one electrical adjustment antenna device The adjustment message of the maximum working current; receiving the response message of the maximum operating current according to the adjustment message; and determining whether the adjusted power supply current threshold is greater than or equal to the one Adjusting the adjusted maximum operating current of the antenna device, if greater than or equal to, performing the step of transmitting an ESC operation message to the one ESC antenna device.
  • the method further includes: if the adjusted power supply current threshold is not adapted to the current parameters of the plurality of electrically adjustable antenna devices, to the multiple The adjusting antenna device sends an adjustment message for adjusting the maximum working current; receiving the response message that the plurality of electrically adjustable antenna devices adjust the maximum working current according to the adjustment message; determining whether the adjusted power supply current threshold is And greater than or equal to a sum of the adjusted maximum operating currents of the plurality of electrically adjustable antenna devices, if greater than or equal to, performing an electrical adjustment operation to the plurality of electrically adjustable antenna devices a step of a message, otherwise selecting a partial ESC antenna device from the plurality of ESC antenna devices, and transmitting an ESC operation message to the portion of the ESC antenna device.
  • the method further includes: receiving a response message after the ESC antenna device completes the ESC according to the ESC operation message; Resetting the current threshold to the supply current threshold before the adjustment; transmitting, to the electrically adjustable antenna device, a restoration message that restores the maximum operating current, so that the electrically adjustable antenna device will adjust the maximum The operating current is reduced to the maximum operating current before the adjustment.
  • an embodiment of the present invention provides an electrical adjustment method, where the method includes: receiving a current parameter request message sent by an ESC master device;
  • an ESC operation is performed.
  • the method further includes: Receiving, by the ESC master device, an adjustment message for adjusting the maximum operating current; adjusting the maximum operating current according to the adjustment message; and transmitting, to the ESC master device, a response message for adjusting the maximum operating current.
  • the method further includes: receiving a restoration message sent by the ESC main device to restore the maximum working current; and restoring the adjusted maximum operating current To adjust the maximum operating current before.
  • an embodiment of the present invention provides an ESC master device, where the ESC master device includes: an acquiring unit, configured to acquire a current parameter of the ESC antenna device, and transmit the current parameter to the judging unit;
  • a determining unit configured to receive the current parameter from the determining unit, and determine whether a power supply current threshold value of the electronically adjustable antenna device is adapted to the current parameter, and transmit the determination result To the adjustment unit;
  • an adjusting unit configured to receive the determination result from the adjusting unit, where the determining unit determines that the power supply current threshold value does not match the current parameter, and adjusts the power supply current threshold to enable adjustment
  • the power supply current threshold value is adapted to the current parameter of the electronically tuned antenna device;
  • the first sending unit is configured to send a power adjustment operation message to the electrical adjustment antenna device, so that the electrical adjustment antenna device Perform an ESC operation.
  • the obtaining unit is specifically configured to: send a request message for acquiring the current parameter to one or more electrically adjustable antenna devices; and receive the current parameter sent by the one or more electrically adjustable antenna devices according to the request message .
  • the current parameter comprises a maximum operating current.
  • the ESC master device further includes: a second sending unit, configured to: when the adjusted power supply current threshold value of the adjusting unit is not adapted to the current parameter of the one electronically adjustable antenna device, to the one
  • the electrical adjustment antenna device sends an adjustment message for adjusting the maximum working current
  • the first receiving unit is configured to receive a response message that the one electrical adjustment antenna device adjusts the maximum working current according to the adjustment message; Determining whether the adjusted current threshold value of the adjustment unit is greater than or equal to the adjusted maximum operating current of the one electrically adjustable antenna device, and if yes or greater, performing sending to the one electrically adjustable antenna device The steps of the ESC operation message.
  • the second sending unit is further configured to: when the adjusted supply current threshold value of the adjusting unit is not adapted to the current parameters of the plurality of electrically adjustable antenna devices, to the plurality of The adjusting antenna device sends an adjustment message for adjusting the maximum working current;
  • the first receiving unit is further configured to: receive, by the plurality of electrically adjustable antenna devices, a response message that adjusts the maximum working current according to the adjustment message;
  • the processing unit is further configured to: determine whether the adjusted current supply threshold value of the adjusting unit is greater than or equal to a sum of the adjusted maximum operating currents of the plurality of electrically adjustable antenna devices, and if yes or greater, perform a And the step of transmitting, by the plurality of electrically adjustable antenna devices, an electrical tones operation message, or selecting a partial electrical adjustment antenna device from the plurality of electrically adjustable antenna devices, and transmitting an electrical adjustment operation message to the partial electrical adjustment antenna device.
  • the ESC master device further includes: a second receiving unit, configured to receive a response message after the ESC antenna device completes the ESC according to the ESC operation message; and a restoration unit, configured to: The power supply current threshold value after the unit adjustment is restored to the power supply current threshold value before the adjustment; the third sending unit is configured to send, to the electrical adjustment antenna device, a restoration message that restores the maximum working current, to And causing the electrically adjustable antenna device to restore the adjusted maximum operating current to the maximum operating current before the adjustment.
  • a second receiving unit configured to receive a response message after the ESC antenna device completes the ESC according to the ESC operation message
  • a restoration unit configured to: The power supply current threshold value after the unit adjustment is restored to the power supply current threshold value before the adjustment
  • the third sending unit is configured to send, to the electrical adjustment antenna device, a restoration message that restores the maximum working current, to And causing the electrically adjustable antenna device to restore the adjusted maximum operating current to the maximum operating current before the adjustment.
  • an embodiment of the present invention provides an electrical adjustment antenna device, where the electrical adjustment antenna device includes:
  • a first receiving unit configured to receive a current parameter request message sent by the ESC master device, where the first sending unit is configured to send a current parameter to the ESC master device, where the current parameter includes a maximum operating current;
  • a first receiving unit configured to receive an ESC operation message sent by the ESC master device according to the maximum operating current and the power supply current threshold value
  • a processing unit configured to perform an electrical adjustment operation according to the ESC operation message.
  • the electrical adjustment antenna device further includes: an adjustment unit, configured to receive an adjustment message sent by the ESC main device to adjust the maximum working current; and adjust the maximum working current according to the adjustment message;
  • the ESC master device transmits a response message that adjusts the maximum operating current.
  • the electrical adjustment antenna device further includes: a third receiving unit, configured to receive a restoration message sent by the ESC main device to restore the maximum working current; and a restoration unit, configured to: The operating current is reduced to the maximum operating current before the adjustment.
  • an embodiment of the present invention further provides an ESC master device, where the ESC master device includes:
  • a receiver configured to acquire a current parameter of the electrical adjustment antenna device, and transmit the current parameter to the processor
  • a processor configured to receive the current parameter from the receiver, and determine whether a supply current threshold value of the electrical adjustment antenna device is adapted to the current parameter; if the supply current threshold If the current parameter is not adapted, the power supply current threshold is adjusted such that the adjusted power supply current threshold is adapted to the current parameter of the electrical adjustment antenna device, and the adjusted adaptation is performed. The result is transmitted to the transmitter;
  • a transmitter configured to receive a result of the adjusted adaptation from the processor, and send an ESC operation message to the eave antenna device to cause the ESC antenna device to perform an ESC operation.
  • the transmitter is further configured to: when the adjusted power supply current threshold value of the processor is not adapted to the current parameter of the electrical adjustment antenna device, send an adjustment station to the electrical adjustment antenna device An adjustment message of a maximum operating current; the receiver will receive a response message that the eave antenna device adjusts the maximum operating current according to the adjustment message, and transmit the response message to the processor; Receiving, by the processor, the response message for adjusting the maximum operating current, and determining whether the adjusted supply current threshold is adapted to the adjusted current parameter of the electrically adjustable antenna device And if adapted, performing the step of transmitting an ESC operation message to the one ESC antenna device.
  • the receiver is further configured to receive a response message after the ESC antenna device completes the ESC according to the ESC operation message, and transmit the response message after the ESC is completed to the processor;
  • the processor is configured to receive the response message after the ESC is completed from the receiver, and restore the adjusted supply current threshold to the supply current threshold before adjustment; the transmitter And a method for transmitting, to the electrically adjustable antenna device, a restoration message that restores the maximum operating current, so that the electrically adjustable antenna device restores the adjusted current parameter to the current parameter before adjustment.
  • an embodiment of the present invention provides an electrical adjustment antenna device, where the electrical adjustment antenna device includes:
  • a receiver configured to receive a current parameter request message sent by the ESC master device, and transmit the current parameter request message to a processor, so that the processor acquires the current parameter according to the current parameter request message and Transmitting the current parameter to a transmitter;
  • a transmitter configured to receive the current parameter from the processor, and to the ESC master device Transmitting a current parameter, the current parameter including a maximum operating current
  • the receiver is further configured to receive an ESC operation message sent by the ESC master device according to the maximum operating current and the supply current threshold value, and transmit the ESC operation message to the process.
  • a processor configured to receive the ESC operation message from the receiver, and perform an ESC operation according to the ESC operation message.
  • the receiver is further configured to receive an adjustment message sent by the ESC device to adjust the maximum working current, and transmit the adjustment message to the processor; Receiving the adjustment message, and adjusting the maximum operating current according to the adjustment message, transmitting an adjustment result to the transmitter; the transmitter receiving the adjustment result from the processor, and reporting to the The ESC master sends a response message that adjusts the maximum operating current.
  • an embodiment of the present invention provides an ESC system, where the system includes the ESC main device and an ESC antenna device.
  • the embodiment of the present invention implements current negotiation between the ESC master device and the ESC antenna device, so that the ESC master device can better support the service operation of the ESC antenna device, and the ESC of the ESC antenna device The operation is good.
  • FIG. 1 is a schematic diagram of an application scenario of an electrical adjustment method according to an embodiment of the present disclosure
  • FIG. 3 is a flowchart of still another method for electrically adjusting according to an embodiment of the present invention.
  • FIG. 4 is an application interaction diagram of an electrical adjustment system according to an embodiment of the present invention.
  • FIG. 5 is a schematic diagram of an ESC master device according to an embodiment of the present invention.
  • FIG. 6 is a schematic diagram of an electrical adjustment antenna device according to an embodiment of the present disclosure.
  • FIG. 3 is a schematic diagram of an ESC master device according to an embodiment of the present invention.
  • FIG. 8 is a schematic diagram of an electrical adjustment antenna device according to an embodiment of the present invention. detailed description
  • FIG. 1 is a schematic diagram of an application scenario of an electrical adjustment method according to an embodiment of the present invention.
  • the electrical tuning method, device and system provided by the embodiments of the present invention can be applied to all scenarios for conducting electrical adjustment operations as a new electrical tuning method in practical applications.
  • the ESC master device does not match the power supply current threshold of the ESC antenna device and the current parameter of the ESC antenna device
  • the ESC master device needs to negotiate current with the ESC antenna device and adjust its own according to the negotiation result.
  • Embodiments of the present invention provide a method flow for performing an ESC operation in a scenario of an ESC operation.
  • an ESC master device can be connected to one or more ESC antenna devices.
  • an ESC master device can have multiple power supply ports, and each power port can be connected to one or more ESC antenna devices.
  • the present invention assumes that these ESC antenna devices share one power supply port; when the ESC master device has multiple power supply ports connected to the ESC antenna device, each of the power supply ports and their connected ESC antenna devices may be in accordance with the method provided by the present invention.
  • Perform an ESC operation After establishing the connection between the ESC master device and the ESC antenna device, before sending the ESC message to the ESC antenna device, first obtain and set the current parameters of the ESC antenna device to implement current negotiation and better support the ESC antenna device. Business operations.
  • Embodiments of the present invention provide an electrical modulation method, apparatus, and system.
  • the ESC master device After the ESC master device establishes a connection with the ESC antenna device, the ESC master device obtains the current parameter of the ESC antenna device, and according to whether the power supply current threshold value of the ESC antenna device and the obtained ESC antenna device are obtained. The current parameter is adapted. If it is not adapted, the current parameter is negotiated with the ESC antenna device. According to the result of the negotiation, the supply current threshold is adjusted to match the current parameter of the ESC device, and then the ESC is adjusted. The antenna device sends an ESC operation message for subsequent ESC operations.
  • the embodiment of the present invention implements dynamic line current negotiation between the ESC master device and the ESC antenna device, and adjusts the power supply current threshold value according to the negotiated result or sets the current parameter of the ESC antenna device. To better support the business operation of the ESC antenna device, the operability of the ESC operation of the ESC antenna device becomes better.
  • ESC master device mentioned in this application is an antenna interface standard organization.
  • AISG Antenna Interface Standards Group
  • the mentioned ESC antenna device is a slave device defined in AISG, such as TMA Tower-mounted ampl if ier, RET ( Remote electr ica ltilt) device, RAB (Remote Az imuth Beamwidth) device, RAS (Remote Az imuth Steer ing) device, etc.
  • other devices such as: a repeater, etc., may be described in the embodiment of the present invention, and the base station is used as the electrical control master device.
  • the description by the base station is only a specific embodiment of the present invention, and is not used to limit the present invention. The scope of protection of the invention.
  • FIG. 2 is a flowchart of an electrical adjustment method according to an embodiment of the present invention.
  • the main body of this embodiment is an ESC master device, such as a base station, in which a method of conducting current parameter negotiation and performing ESC between the base station and the established ESC antenna device is described in detail. As shown in FIG. 2, this embodiment includes the following steps:
  • Step 201 The base station acquires a current parameter of the electrical adjustment antenna device.
  • the current parameter negotiation interface extended by the AIS SG standard protocol defined by the AISG acquires the current parameter of the ESC antenna device, and the current parameter includes the maximum operating current and the minimum allowable operating current of the ESC antenna device.
  • Quiescent Current For example, the base station obtains the maximum operating current, minimum allowable operating current, and quiescent current of an ESC antenna device of 500 mA, 400 mA, and 20 mA, respectively.
  • the current parameter of the one ESC antenna device may be obtained; if the base station currently cascades a plurality of ESC antenna devices, the currents of the plurality of ESC antenna devices are acquired. parameter.
  • a common method for a base station to acquire current parameters of an electrical tune antenna device is The connected ESC device is configured to send a message for acquiring the current parameter. After receiving the message, the ESC antenna device can send its current parameter to the base station through the response message, so that the base station can obtain the current parameter of the ESC antenna device. .
  • Step 202 The base station determines whether the power supply current threshold of the electrical adjustment antenna device is adapted to the current parameter.
  • the base station After obtaining the current parameter of the ESC antenna device, the base station checks whether the power supply current threshold of the ESC antenna device is adapted to the current parameter. That is, when the base station is connected to an ESC antenna device and obtains the current parameter of the ESC antenna device, it is determined whether the power supply current threshold value of the ESC antenna device is greater than or equal to the maximum operating current of the one ESC antenna device. When the base station is connected to the plurality of electrically adjustable antenna devices and obtains current parameters of the plurality of electrically adjustable antenna devices, determining whether the power supply current threshold value of the electronically adjustable antenna device is greater than or equal to the obtained plurality of electrically adjustable antenna devices The sum of the maximum operating currents.
  • the base station sets the power supply current threshold of the ESC antenna device to 1A, and the base station has five ESC antenna devices, and the maximum operating current, minimum allowable operating current, and static of each ESC antenna device.
  • the power supply set by the base station is 2.
  • the power supply current threshold 1A is less than the sum of the maximum operating currents 2.
  • 5A indicating the power supply set by the base station, the current is 500mA, 400mA, 20mA, respectively.
  • the current threshold does not match the current parameter.
  • an ESC operation message is sent to the ESC device to enable the ESC antenna device to perform corresponding service operations, such as calibrating the antenna of the base station. Or set the inclination of the antenna, etc.
  • Step 203 If the power supply current threshold value is not adapted to the current parameter, the base station adjusts the power supply current threshold value, so that the adjusted power supply current threshold value and the electrical adjustment antenna device Current parameter adaptation.
  • step 202 the junction of the supply current threshold value and the current parameter is obtained. If so, the base station will adjust the supply current threshold within the range of allowable adjustments to adapt the adjusted supply current threshold to the current parameters of the electrically adjustable antenna device.
  • the adjusted supply current threshold cannot exceed the upper limit of its own supply current threshold.
  • the supply current threshold is adjusted such that the adjusted supply current threshold is adapted to the current parameter.
  • the supply current threshold value is not adapted to the current parameter, the supply current threshold is adjusted, and the adjusted supply current threshold value is
  • the step of adapting the current parameter of the electric adjustable antenna device is specifically: if the power supply current threshold is less than the maximum operating current of the obtained electronically adjustable antenna device, adjusting the supply current threshold to make the adjustment The supply current threshold is greater than or equal to the maximum operating current of the obtained ESC device.
  • the step of adapting the current parameter of the electrically adjustable antenna device is specifically: if the supply current threshold is less than the sum of the maximum operating currents of the plurality of electrically adjustable antenna devices, adjusting the supply current threshold And adjusting the adjusted supply current threshold to be greater than or equal to a sum of the obtained maximum operating currents of the plurality of electrically adjustable antenna devices.
  • the supply current threshold is adjusted from 1A in the above example to 2. 5A, and the adjusted supply current threshold is equal to the sum of the maximum operating currents of the five ESC devices in the above example. 2. 5A, that is, the adjusted supply current threshold value is adapted to the current parameter of the electrically adjustable antenna device.
  • the upper limit of the power supply current threshold that can be set by the base station (generally the value is 2 - 3A) is usually much larger than the current when an ESC device is ESC (generally several hundred mA). Therefore, for a case where a base station is connected to an ESC antenna device, the power supply current threshold value adjusted by the base station can generally be adapted to the current parameter of an ESC antenna device. And For a case where a base station is connected to a plurality of ESC antenna devices, the power supply current threshold value adjusted by the base station may not be greater than the sum of the maximum operating currents of the plurality of ESC antenna devices, and the adaptation cannot be achieved.
  • a setting message for setting the maximum working current to the current working current may be sent to the electrical adjustment antenna device, so that the electrical adjustment antenna device Set its current maximum operating current based on this setup message.
  • the current operating current setting is not lower than the minimum allowable operating current of the electrically adjustable antenna device.
  • step 204 is performed.
  • Step 204 The base station sends an ESC operation message to the ESC antenna device, so that the ESC antenna device performs an ESC operation.
  • the base station adjusts its own power supply current threshold value by the method described in step 203, and when the adjusted power supply current threshold value can be matched with the current parameter of the electrical adjustment antenna device, the base station may send an ESC operation message to the electrical adjustment antenna device.
  • the ESC antenna device may perform subsequent ESC operations, such as calibrating the antenna of the base station or setting the tilt angle of the antenna.
  • the base station adjusts its own power supply current threshold according to the method described in step 203, and still cannot adapt to the current parameter of the electrical adjustment antenna device, and sends an adjustment message for adjusting the maximum working current to the electrical adjustment antenna device, and can receive the power. Adjusting the response message sent by the antenna device, and after receiving the response message, determining whether the adjusted power supply current threshold is greater than or equal to the adjusted maximum operating current of the one electronically adjustable antenna device, or determining the adjusted location Whether the supply current threshold is greater than or equal to the sum of the adjusted maximum operating currents of the plurality of electrically adjustable antenna devices. If the value is greater than or equal to, step 204 is performed.
  • the base station cannot support the ESC operation of the ESC device; if the adjusted power supply The current threshold is still smaller than the sum of the adjusted maximum operating currents of the plurality of electrically adjustable antenna devices, and then one of the plurality of electrically adjustable antenna devices may be selected such that the current supply gate of the base station The limit is greater than or equal to the electrical conductivity of the antenna devices The sum of the maximum operating current and the quiescent current of the remaining ESC antenna devices, and sends an ESC operation message to the several preferred ESC antenna devices.
  • the base station After the ESCs complete the ESC operation, the base station obtains the message that the devices complete the ESC operation, and then continues to send the ESC operation message to the other ESC devices according to the above method. Specifically, several preferred electronically tuned antenna devices are selected, and the base station can be calculated according to the calculation.
  • the adjustment message for adjusting the maximum working current before the adjustment message for adjusting the maximum working current is sent to the plurality of electrically adjustable antenna devices, it may be determined whether the adjusted supply current threshold is greater than or equal to the minimum allowable operation of the plurality of electrically adjustable antenna devices. The sum of the currents, if yes, the adjustment message for adjusting the maximum operating current can be sent to the plurality of electrically adjustable antenna devices; if not, the base station supply current gate cannot be realized even after the plurality of electrically adjustable antenna devices adjust the maximum operating current The limit is adapted to the current parameter of the ESC antenna device because the adjusted maximum operating current parameter cannot be less than the minimum allowable operating current.
  • the adjustment message for adjusting the maximum operating current may not be sent to the electrical adjustment antenna device, but the plurality of electrical adjustment antenna devices cascaded for the base station may be determined by dividing into several groups to implement the electrical adjustment operation. If the current parameters of the ESC antenna device are not adjusted, the two groups can be divided into two groups to complete the ESC operation. Instead of adjusting the current parameters of the ESC antenna device, the ESC can be directly sent to one of the ESC antenna devices. After the operation message is received, the set of electronically adjustable antenna devices completes the ESC operation, and after receiving the message that the preferred devices complete the ESC operation, the base station continues to send the ESC operation message to the other group of the ESC antenna devices according to the foregoing method. .
  • the adjusted supply current threshold is greater than or equal to the sum of the minimum allowable operating currents of the plurality of ESC devices, and then determining whether to adjust the current parameter of the ESC device, thereby avoiding the need to adjust the ESC.
  • the operating current parameter of the antenna device adjusts the current parameter of the ESC antenna device, the interaction process is increased, and the working state of the ESC antenna device operating at the maximum operating current is optimal. The following is an example of this.
  • the base station cascades five ESC devices with the same specifications.
  • the maximum operating current is 500mA during ESC
  • the minimum allowable operating current is 400mA
  • the quiescent current is 20mA
  • the current base station port current threshold is set to 1A.
  • the base station can only support one ALD at the same time.
  • the base station current threshold is set to 2A, and the base station adjusts its own supply current threshold to 2A.
  • the threshold is still less than the current required by 5 ALD devices for simultaneous ESC (2.5A).
  • the 3+3 scheme because there is no need to reset the operating current parameter of the ESC antenna device [reduce the interaction process], the ESC antenna device works at the maximum working current [the best working state], which is better than 4+2. Program.
  • the method further includes the following steps: receiving a response message after the ESC antenna device completes the ESC according to the message; The supply current threshold is restored to the supply current threshold before the adjustment; sending a setting message for restoring the maximum operating current to the electrically adjustable antenna device, so that the electrically adjustable antenna device is to be set The maximum operating current is reduced to the maximum operating current before the setting.
  • the base station after acquiring the current parameter of the electronically tuned antenna device, the base station first determines whether the power supply current threshold value of the electrical adjustment antenna device is adapted to the current parameter of the obtained electrical adjustment antenna device, if not With the coordination, the current parameters are negotiated with the ESC antenna device, according to the negotiation As a result, the supply current threshold is adjusted to match the current parameter of the ESC antenna device, and then an ESC operation message is sent to the ESC antenna device for subsequent ESC operation. Therefore, the embodiment of the present invention implements dynamic line current negotiation between the base station and the ESC antenna device, and adjusts the power supply current threshold value according to the negotiated result or sets the current parameter of the ESC antenna device. Support the business operation of the ESC antenna equipment.
  • the foregoing embodiment describes a method for dynamically performing parameter negotiation between a base station and an electronically tuned antenna device by using a base station as an execution body.
  • the following embodiments are mainly directed to an electrical adjustment antenna device, and the technical solution of the electrical modulation method of the present invention is described in detail.
  • FIG. 3 is a flowchart of still another method for electrically adjusting according to an embodiment of the present invention.
  • the main body of this embodiment is an electric adjustment antenna device, and a method of setting an electric current of the electric adjustment antenna device and performing electric adjustment is described in detail. As shown in FIG. 3, this embodiment includes the following steps:
  • Step 301 The ESC antenna device receives a current parameter request message sent by the ESC master device.
  • a base station as an example of an electrical control master device, but the description by the base station is only a specific embodiment of the present invention, and is not used to limit the protection of the present invention. range.
  • the current parameter negotiation interface defined by the AI SG interface sends a request message for obtaining the current parameter to the ESC antenna device, so that the ESC antenna device can receive the current parameter request message sent by the base station.
  • Step 302 The ESC antenna device sends a current parameter to the ESC master device, where the current parameter includes a maximum operating current.
  • the ESC antenna device After receiving the current parameter request message, the ESC antenna device sends a current parameter to the base station, where the current parameter includes a maximum operating current, a minimum allowable operating current, and a quiescent current.
  • Step 303 The ESC antenna device receives an ESC operation message sent by the ESC master device according to the maximum operating current and the power supply current threshold value.
  • the base station can adjust the current parameter of the ESC antenna device by adjusting the current supply current threshold value.
  • the power supply current threshold of the line device when the adjusted power supply current threshold is adapted to the maximum operating current, may send an ESC operation message to the ESC antenna device.
  • the adjustment message for adjusting the maximum operating current is sent to the electronically adjustable antenna device, and the electronically adjustable antenna device is requested to adjust its maximum working. Current.
  • the ESC antenna device adjusts the maximum operating current according to the adjustment message.
  • the tunable antenna device can adjust its current operating current to the maximum operating current.
  • the adjustment message carries a current value that the base station wants to adjust the maximum operating current of the ESC antenna device, if the current value is within the allowable operating current range of the ESC antenna device, the ESC antenna device can also set the maximum operating current. Adjust to this current value.
  • the response message is sent to the base station, and the response message carries the adjusted maximum working current, so that the base station determines the adjusted supply current threshold according to the adjusted maximum working current. Whether the value is adapted to the adjusted maximum operating current, the base station can then send an ESC operation message to the ESC antenna device.
  • Step 304 The ESC antenna device performs an ESC operation according to the ESC operation message.
  • the ESC antenna device can perform subsequent ESC operations, such as calibrating the antenna of the base station or setting the tilt angle of the antenna, and performing the ESC operation according to the received ESC message is prior art. It will not be detailed here.
  • the method further includes the following steps: receiving a restore message sent by the ESC master device to restore the maximum operating current; The maximum operating current is reduced to the maximum operating current before the adjustment.
  • the ESC After the ESC device completes the ESC operation, the ESC sends a response message to the base station, and after receiving the response message, the base station restores the adjusted power supply current threshold to the pre-adjustment supply current threshold.
  • a restore message that restores the adjusted maximum operating current to the maximum operating current before the adjustment is sent to the ESC antenna device to cause the ESC antenna device to restore its maximum operating current.
  • the electrical adjustment antenna device receives a current parameter request message sent by the base station, and sends a current parameter to the base station, where the current parameter includes a maximum operating current; receiving the base station root And the ESC operation message sent after the maximum operating current is compared with the supply current threshold value; and the ESC operation is performed according to the ESC operation message. Therefore, the embodiment of the present invention implements dynamic line current negotiation between the base station and the ESC antenna device, and adjusts the power supply current threshold value according to the negotiated result or enables the ESC antenna device to set its current parameter, which is better. Supports business operations of electrical tune antenna devices.
  • FIG. 4 is an application interaction diagram of an electrical adjustment system according to an embodiment of the present invention. As shown in FIG. 4, this embodiment includes the following steps:
  • Step 401 Establish a connection between the base station and the ESC antenna device.
  • the electrical adjustment antenna device After the base station sends a connection establishment message to the electrical adjustment antenna device, the electrical adjustment antenna device sends a reply message agreeing to establish a connection to the base station, and the base station can successfully establish a connection with the electrical adjustment antenna device.
  • Step 402 The base station acquires a current parameter of the electrical adjustment antenna device.
  • the current parameter negotiation interface defined by the AI SG sends a request message for acquiring the current parameter of the electrical adjustment antenna device to the electrical adjustment antenna device, and the electrical adjustment antenna device can send the power to the base station by using the response message.
  • Adjust the current parameter of the antenna device which includes the maximum operating current of the ESC antenna device, the minimum allowable operating current, and the quiescent current.
  • the current parameter of the one ESC antenna device can be obtained; if the base station is currently cascaded with a plurality of ESC antenna devices, it can be sent to each ESC antenna device. Obtaining a request message of the current parameter to obtain current parameters of the plurality of ESC antenna devices.
  • Step 403 The base station adjusts its own power supply current threshold for the ESC antenna device.
  • the base station When the base station is currently connected to only one ESC antenna device, if the current parameter of the ESC antenna device is within the range of the supply current threshold of the base station, that is, the maximum operating current in the current parameter is less than or equal to the supply current threshold of the base station. , the base station can support the operation of the electrical adjustment antenna device, and can be modified without any modification; if the maximum operating current of the electrical adjustment antenna device exceeds the supply current threshold of the base station, the base station first adjusts its own threshold value. Therefore, the maximum operating current of the electric adjustable antenna device is less than or equal to the adjusted current supply current threshold of the base station. If the base station can adjust itself, If the maximum operating current of the electronically tuned antenna device is less than or equal to the adjusted power supply current threshold of the base station, step 405 is performed; otherwise, step 404 is performed.
  • the base station When the base station is currently connected to multiple electrical tune antenna devices, if the sum of the maximum operating currents of the plurality of electrically adjustable antenna devices is within the range of the supply current threshold of the base station, that is, the sum of the maximum operating currents in the current parameters is less than or equal to the base station.
  • the power supply current threshold indicates that the base station can support multiple ESC antenna devices to perform the ESC operation at the same time without any modification; if the sum of the maximum operating currents of the multiple ESC devices exceeds the supply current of the base station
  • the base station first adjusts its own threshold so that the sum of the maximum operating currents of the plurality of electrically adjustable antenna devices is less than or equal to the adjusted supply current threshold of the base station. If the base station can adjust the maximum working current of the plurality of electrically adjustable antenna devices to be less than or equal to the adjusted current supply current threshold of the base station, step 405 is performed, otherwise step 404 is performed.
  • Step 404 Adjust an operating current parameter of the electrical adjustment antenna device.
  • an adjustment message may be sent to the electrical adjustment antenna device, so that The ESC antenna device adjusts its maximum operating current.
  • the ESC antenna device When the ESC antenna device receives the adjustment message, it can adjust its current operating current to the maximum operating current.
  • the adjustment message may also carry a current value that the base station wants to adjust the maximum operating current of the ESC antenna device. If the current value is within the allowable operating current range of the ESC antenna device, the ESC antenna device may also apply the maximum operating current. Adjust to this current value.
  • the response message is sent to the base station, and the response message carries the adjusted maximum working current, so that the base station determines the adjusted supply current threshold according to the adjusted maximum working current. Whether the value is adapted to the adjusted maximum operating current. If it is adapted, step 405 is performed. Otherwise, the base station cannot support the ESC operation of the base station.
  • step 406 When the base station is connected to the plurality of electrically adjustable antenna devices, after determining the response message sent by the plurality of electrically adjustable antenna devices, determining whether the adjusted supply current threshold is adjusted with the plurality of electrically adjustable antenna devices The sum of the maximum operating currents is adapted, if it is adapted, step 406 is performed, otherwise The base station cannot support the plurality of ESC antenna devices to perform the ESC operation at the same time. In this case, several preferred ESC antenna devices can be selected, and step 405 is performed.
  • Step 405 The base station sends an ESC operation message to the ESC antenna device, and the ESC antenna device performs an ESC service operation.
  • the adjusted power supply current threshold value can be matched with the current parameter of the electrical adjustment antenna device, and the electrical adjustment operation message can be sent to the electrical adjustment antenna device to enable the electrical adjustment antenna device to perform Subsequent ESC operations, such as calibrating the antenna of the base station or setting the tilt angle of the antenna.
  • the ESC antenna device can perform its own service operation, and after the execution is completed, it can send a response message to the base station.
  • Step 406 The base station restores the adjusted power supply current threshold to the power supply current threshold before the adjustment.
  • the base station If the base station adjusts its own supply current threshold during the ESC process, it should restore its own supply current threshold after the ESC is completed.
  • Step 407 Restore current parameters of the electrical adjustment antenna device.
  • the base station informs the ESC antenna device to modify its current parameter during the ESC process, the ESC antenna device should be notified to restore the current parameter to the original value after the ESC is completed.
  • the base station after obtaining the current parameter of the ESC antenna device, the base station first determines whether the power supply current threshold value of the ESC antenna device is adapted to the current parameter of the obtained ESC antenna device. If not, Then, the current parameter is negotiated with the ESC antenna device, and according to the result of the negotiation, the power supply current threshold is adjusted to match the current parameter of the ESC antenna device, and then the ESC operation message is sent to the ESC antenna device for subsequent power transmission. Adjust the operation. Therefore, the embodiment of the present invention implements dynamic line current negotiation between the base station and the ESC antenna device, and adjusts the power supply current threshold value according to the negotiated result or sets the current parameter of the ESC antenna device. The ground supports the business operation of the electronically tuned antenna device, and the operability of the electrical adjustment operation of the electronically tuned antenna device becomes better.
  • an embodiment of the present invention further provides an ESC master device.
  • the power-on master device provided in this embodiment may be a base station or another device.
  • This embodiment uses a base station as an example for description, but It is not necessary to limit the scope of protection of the embodiment.
  • FIG. 5 is a schematic diagram of an ESC master device according to an embodiment of the present invention. As shown in FIG. 5, the ESC master device includes the following units:
  • the obtaining unit 501 is configured to acquire a current parameter of the ESC antenna device, and transmit the current parameter to the judging unit.
  • the obtaining unit 501 is configured to obtain a current parameter of the ESC antenna device, where the current parameter includes a maximum operating current, a minimum allowable operating current, and a quiescent current of the ESC antenna device.
  • the obtaining unit 501 is configured to obtain current parameters of the plurality of electrically adjustable antenna devices, that is, obtain a maximum operating current, a minimum allowable operating current, and a quiescent current of each of the electrically adjustable antenna devices.
  • the determining unit 502 is configured to receive the current parameter from the determining unit, and determine whether a power supply current threshold value of the electronically adjustable antenna device is adapted to the current parameter, and transmit the determination result to the adjustment unit.
  • the determining unit 502 is specifically configured to determine whether the power supply current threshold value of the electrical adjustable antenna device is greater than or equal to the obtained maximum operating current of the one electrical adjustable antenna device. .
  • the determining unit 502 is specifically configured to determine whether the power supply current threshold of the electrical adjustable antenna device is greater than or equal to the obtained maximum operation of the plurality of electrically adjustable antenna devices. The sum of the currents.
  • the adjusting unit 503 is configured to receive the determination result from the adjusting unit, where the determining unit determines that the power supply current threshold value is not adapted to the current parameter, and adjusts the power supply current threshold value, so that The adjusted supply current threshold is adapted to the current parameter of the electrically adjustable antenna device.
  • the adjusting unit 503 is specifically configured to: when the determining unit determines that the power supply current threshold is less than the obtained maximum operating current of the one of the electronically adjustable antenna devices, The supply current threshold is set such that the adjusted supply current threshold is greater than or equal to the obtained maximum operating current of the one ESC device.
  • the adjusting unit 503 is specifically configured to: when the determining unit determines that the power supply current threshold is less than a sum of the obtained maximum operating currents of the plurality of electrically adjustable antenna devices And adjusting the supply current threshold to make the adjusted supply current threshold equal to or greater than a sum of the obtained maximum operating currents of the plurality of electrically adjustable antenna devices.
  • the first sending unit 504 is configured to send an ESC operation message to the ESC antenna device, so that the ESC antenna device performs an ESC operation.
  • the first sending unit 504 is further configured to send an ESC operation message to the ESC device.
  • the apparatus of this embodiment further includes: a second sending unit 505, wherein the power supply current threshold value adjusted by the adjusting unit is not adapted to a current parameter of the one electronically adjustable antenna device, Said an ESC antenna device transmitting an adjustment message for adjusting the maximum operating current;
  • the first receiving unit 506 is configured to receive, by the one electrical adjustment antenna device, a response message for adjusting the maximum working current according to the adjustment message;
  • the processing unit 507 is configured to determine whether the adjusted current supply threshold value of the adjustment unit is greater than or equal to the adjusted maximum operating current of the one electrical toroidal antenna device, and if yes or greater, perform the The step of transmitting an ESC operation message by an ESC antenna device.
  • the second transmitting unit 505 is further configured to: And adjusting, when the adjusted current threshold value of the adjusting unit is not adapted to the current parameters of the plurality of electrically adjustable antenna devices, transmitting, to the plurality of electrically adjustable antenna devices, an adjustment message for adjusting the maximum operating current;
  • the first receiving unit 506 is further configured to receive the response message that the plurality of electrically adjustable antenna devices adjust the maximum operating current according to the adjustment message;
  • the processing unit 507 is further configured to determine the adjusted current supply current by the adjusting unit Whether the threshold value is greater than or equal to a sum of the adjusted maximum operating currents of the plurality of electrically adjustable antenna devices, and if greater than or equal to, performing the step of transmitting an ESC operation message to the plurality of electrically adjustable antenna devices, otherwise A part of the electrical adjustment antenna devices are selected from the plurality of electrically adjustable antenna devices, and
  • a reducing unit 509 configured to restore the power supply current threshold value adjusted by the adjusting unit to the power supply current threshold value before adjusting
  • a third sending unit 510 configured to send, to the electrical tune antenna device, a restoration message that restores the maximum working current, so that the electrically adjustable antenna device restores the adjusted maximum operating current to the pre-adjustment Maximum operating current.
  • the base station after acquiring the current parameter of the electronically tuned antenna device, the base station first determines whether the power supply current threshold value of the electrical adjustment antenna device is adapted to the current parameter of the obtained electrical adjustment antenna device, if not Matching, the current parameter negotiation is performed with the ESC antenna device, and according to the result of the negotiation, the power supply current threshold value is adjusted and the current parameter of the ESC antenna device is adapted, and then the ESC operation message is sent to the ESC antenna device for subsequent operation.
  • the ESC operation Therefore, the embodiment of the present invention implements dynamic line current negotiation between the base station and the ESC antenna device, and adjusts the power supply current threshold value according to the negotiated result or sets the current parameter of the ESC antenna device. Supporting the operation of the ESC antenna device makes the operability of the ESC antenna device better and more reliable.
  • FIG. 6 is a schematic diagram of an electrical adjustment antenna device according to an embodiment of the present invention.
  • the electrical adjustment antenna device includes the following unit:
  • the first receiving unit 601 is configured to receive a current parameter request message sent by the ESC master device.
  • this embodiment is also described by using a base station as an example of an electrical control master device, but the description by the base station is only a specific embodiment of the present invention, and is not used to limit the protection of the present invention. range.
  • the current parameter negotiation interface defined by the AI SG interface sends a request message for obtaining the current parameter to the ESC antenna device, so that the ESC antenna device can receive the current parameter request message sent by the base station.
  • the first sending unit 602 is configured to send a current parameter to the ESC master device, where the current parameter includes a maximum operating current.
  • the ESC antenna device After receiving the current parameter request message, the ESC antenna device sends a current parameter to the base station, where the current parameter includes a maximum operating current, a minimum allowable operating current, and a quiescent current.
  • the second receiving unit 603 is configured to receive an ESC operation message that is sent by the ESC master device according to the maximum operating current and the power supply current threshold value.
  • the base station can adjust the current parameter of the ESC antenna device by adjusting the current supply current threshold value, and then adjust the power supply current gate of the ESC antenna device.
  • the limit value when the adjusted supply current threshold is adapted to the maximum operating current, can send an ESC operation message to the ESC antenna device.
  • the adjustment message for adjusting the maximum operating current is sent to the electronically adjustable antenna device, and the electronically adjustable antenna device is requested to adjust its maximum working. Current.
  • the ESC antenna device adjusts the maximum operating current according to the adjustment message.
  • the tunable antenna device can adjust its current operating current to the maximum operating current.
  • the adjustment message carries a current value that the base station wants to adjust the maximum operating current of the ESC antenna device, if the current value is within the allowable operating current range of the ESC antenna device, the ESC antenna device can also set the maximum operating current. Adjust to this current value.
  • the response message is sent to the base station, and the response message carries the adjusted maximum working current, so that the base station determines the adjusted supply current threshold according to the adjusted maximum working current. Whether the value is adapted to the adjusted maximum operating current, the base station can then send an ESC operation message to the ESC antenna device.
  • the processing unit 604 is configured to perform an electrical adjustment operation according to the ESC operation message.
  • the embodiment further includes: an adjusting unit 605, configured to receive an adjustment message for adjusting a maximum working current sent by the ESC master device; and adjusting the maximum working current according to the adjustment message; to the ESC master device A response message that adjusts the maximum operating current is sent.
  • an adjusting unit 605 configured to receive an adjustment message for adjusting a maximum working current sent by the ESC master device; and adjusting the maximum working current according to the adjustment message; to the ESC master device A response message that adjusts the maximum operating current is sent.
  • the embodiment further includes: a second receiving unit 606, configured to receive a restoration message sent by the ESC master device to restore the maximum working current;
  • a restoring unit 607 configured to restore the adjusted maximum operating current to the most Large working current.
  • the electrical adjustment antenna device receives a current parameter request message sent by the ESC master device, and sends a current parameter to the ESC master device, where the current parameter includes a maximum operating current; and receiving the ESC master device according to The ESC operation message sent after the maximum operating current is compared with the supply current threshold value; and the ESC operation is performed according to the ESC operation message. Therefore, the embodiment of the present invention implements dynamic line current negotiation between the ESC master device and the ESC antenna device, and adjusts the power supply current threshold value or sets the current parameter of the ESC antenna device according to the negotiated result. Better support for business operations of ESC antenna equipment.
  • the embodiment of the present invention further provides an electronically-tuned master device.
  • the power-switching master device provided in this embodiment may be a base station, or may be another device.
  • This embodiment uses a base station as an example for description, but the present embodiment is not limited.
  • FIG. 7 is a schematic diagram of an ESC master device according to an embodiment of the present invention. As shown in FIG. 7, the ESC master device provided in this embodiment includes the following components:
  • the receiver 701 is configured to acquire a current parameter of the ESC antenna device and transmit the current parameter to the processor.
  • the receiver 701 is configured to obtain a current parameter of an ESC antenna device, and the current parameter includes a maximum operating current, a minimum allowable operating current, and a quiescent current of the ESC antenna device.
  • the receiver 701 is configured to obtain current parameters of the plurality of electrically adjustable antenna devices, that is, obtain a maximum operating current, a minimum allowable working current, and a quiescent current of each of the electrically adjustable antenna devices.
  • the processor 702 is configured to receive the current parameter from the receiver, and determine whether a power supply current threshold of the electronically adjustable antenna device is matched with the current parameter; if the power supply current threshold is If the current parameter is not adapted, the power supply current threshold is adjusted such that the adjusted power supply current threshold is adapted to the current parameter of the electronically tuned antenna device, and the adjusted after adaptation The result is transmitted to the transmitter.
  • the processor 702 provided by the embodiment of the present invention may be a single core processor or a multi-core processor. Cry.
  • the transmitter 703 is configured to receive a result of the adjusted adaptation from the processor, and send an ESC operation message to the electrical tune antenna device, so that the electrical tune antenna device performs an electrical adjustment operation.
  • the transmitter 703 can transmit an ESC operation message to the ESC antenna device.
  • the processor 702 adjusts the supply current threshold, the adjusted supply current threshold is still not adapted to the current parameter of the ESC device, and the transmitter 703 is further configured to send the adjustment to the ESC device. Adjustment message of maximum working current;
  • the receiver 701 After the transmitter 703 sends an adjustment message to adjust the maximum operating current to the electrical adjustment antenna device, the receiver 701 is further configured to receive the response message that the electrical adjustment antenna device adjusts the maximum working current according to the adjustment message, and The response message is transmitted to the processor 702;
  • the processor 702 is further configured to receive, by the receiver 701, the response message that adjusts the maximum operating current, and determine whether the adjusted supply current threshold is related to the adjusted current of the electronically adjustable antenna device. Parameter adaptation, if adapted, performs the step of transmitting an ESC operation message to the one ESC antenna device.
  • the receiver 701 is further configured to receive a response message after the ESC operation device completes the ESC according to the ESC operation message, and transmit the response message after the ESC is completed to the processor 702;
  • the processor 702 is further configured to receive the response message after the ESC is completed from the receiver 701, and restore the adjusted supply current threshold to the supply current threshold before the adjustment;
  • the transmitter 703 is further configured to send, to the electrically adjustable antenna device, a restore message that restores the maximum operating current, so that the electrically adjustable antenna device restores the adjusted current parameter to the current parameter before adjustment.
  • the base station may be connected to one or more electrical adjustment antenna devices. Therefore, the technical solution introduced in the embodiment of the present invention supports the case where the base station is connected to one or more electrical adjustment antenna devices, and the base station is connected to an electrical adjustment antenna device.
  • Method for connecting multiple ESC antenna devices with a base station Please refer to the detailed description of the method embodiment part of this application file, which is not mentioned here.
  • FIG. 8 is a schematic diagram of an electrical adjustment antenna device according to an embodiment of the present invention. As shown in FIG. 8, the electrical adjustment antenna device provided in this embodiment includes the following components:
  • a receiver 801 configured to receive a current parameter request message sent by the ESC master device, and transmit the current parameter request message to the processor, so that the processor acquires the current parameter according to the current parameter request message The current parameter is transmitted to the transmitter.
  • the current parameter negotiation interface defined by the AI SG interface sends a request message for obtaining the current parameter to the ESC antenna device, so that the ESC antenna device can receive the current parameter request message sent by the base station.
  • the transmitter 802 is configured to receive the current parameter from the processor, and send a current parameter to the ESC device, the current parameter including a maximum operating current.
  • the receiver 801 is further configured to receive an ESC operation message that is sent by the ESC master device according to the maximum operating current and the supply current threshold value, and transmit the ESC operation message to the processor. .
  • the ESC antenna device After receiving the current parameter request message, the ESC antenna device sends a current parameter to the base station, where the current parameter includes a maximum operating current, a minimum allowable operating current, and a quiescent current.
  • the base station can adjust the current parameter of the ESC antenna device by adjusting the current supply current threshold value, and then adjust the power supply current gate of the ESC antenna device.
  • the limit value when the adjusted supply current threshold is adapted to the maximum operating current, can send an ESC operation message to the ESC antenna device.
  • the adjustment message for adjusting the maximum operating current is sent to the electronically adjustable antenna device, and the electronically adjustable antenna device is requested to adjust its maximum working. Current.
  • the ESC antenna device adjusts the maximum operating current according to the adjustment message.
  • the tunable antenna device can adjust its current operating current to the maximum operating current.
  • the adjustment message carries a base station, it hopes to adjust the tone.
  • the current value of the antenna device that adjusts the maximum operating current. If the current value is within the allowable operating current range of the ESC antenna device, the ESC antenna device can also adjust the maximum operating current to the current value.
  • the response message is sent to the base station, and the response message carries the adjusted maximum working current, so that the base station determines the adjusted supply current threshold according to the adjusted maximum working current. Whether the value is adapted to the adjusted maximum operating current, the base station can then send an ESC operation message to the ESC antenna device.
  • the processor 803 is configured to receive the ESC operation message from the receiver, and perform an ESC operation according to the ESC operation message.
  • the receiver 801 is further configured to receive an adjustment message that is sent by the ESC device to adjust the maximum working current, and transmit the adjustment message that adjusts the maximum working current to the processor 803; the processor 803 Also for receiving, from the receiver 801, the adjustment message for adjusting the maximum operating current, and adjusting the maximum operating current according to the adjustment message, transmitting an adjustment result to the transmitter 802; the transmitting The machine 802 is further configured to receive the adjustment result from the processor 803, and send a response message to adjust the maximum operating current to the ESC master device.
  • the receiver 801 is further configured to receive a restore message sent by the ESC master device to restore the maximum working current, and transmit the restore message to the processor 803; the processor 803 further And for receiving the restored message from the receiver, and reducing the adjusted maximum operating current to the maximum operating current before the adjusting.
  • the embodiment of the invention also provides an electrical adjustment system.
  • the system is embedded with the electrical tuning method provided by the embodiment of the present invention, including the above-mentioned ESC master device and ESC antenna device.
  • the ESC master device obtains the current parameter of the ESC antenna device, and first determines whether the power supply current threshold value of the ESC antenna device is obtained and acquired. If the current parameter of the ESC antenna device is adapted, if it is not adapted, the current parameter is negotiated with the ESC antenna device, and according to the result of the negotiation, the supply current threshold is adjusted and the current parameter of the ESC device is adapted.
  • the embodiment of the invention implements dynamic line current negotiation between the ESC master device and the ESC antenna device. According to the result of the negotiation, the power supply current threshold is adjusted or the current adjustment parameter is set by the electrical adjustment antenna device to better support the operation of the electrical adjustment antenna device. Therefore, the electric adjustment system provided by the embodiment of the present invention is also within the protection scope of the present invention.
  • RAM random access memory
  • ROM read-only memory
  • EEPROM electrically programmable ROM
  • EEPROM electrically erasable programmable ROM
  • registers hard disk, removable disk, CD-ROM, or technical field Any other form of storage medium known.

Abstract

The present invention relates to an electric tilt method, device and system. The method comprises: obtaining the electric current parameter of an antenna line device (ALD); assessing whether the electric current threshold value for the power supply to the ALD matches the parameter, and if the threshold value and the parameter do not match, adjusting the threshold value so that the adjusted threshold value matches said parameter of the ALD; sending an electric tilt operation message to the ALD, so that the ALD can perform an electric tilt operation. The present invention enables the coordination of the electric current of an electric tilt master device and an ALD, thereby allowing the electrical tilt master device to better support operations of the ALD and allowing the ALD to better perform electrical tilt operations.

Description

电调方法、 装置和系统 技术领域  Electric control method, device and system
本发明涉及通信领域, 尤其涉及一种电调方法、 装置和系统。 背景技术  The present invention relates to the field of communications, and in particular, to an electrical tuning method, apparatus, and system. Background technique
在移动通信系统中, 电调天线已经成为主流, 电调天线通过调整天线的 电下倾角来优化网络。  In mobile communication systems, electronically modulated antennas have become mainstream, and electronically adjustable antennas optimize the network by adjusting the electrical downtilt of the antenna.
现有技术下, 电调主设备对电调天线设备( Antenna L ine Dev i ce , ALD ) 的供电电流的门限值是固定配置的, 而 ALD设备的最大工作电流也是固定不 变的, 不同厂家、 不同型号的 ALD设备最大工作电流可以不一样, 但是电调 主设备不知道 ALD设备的最大工作电流。 现有技术的缺点是, 电调主设备连 接新型号的 ALD设备或级联连接新的 ALD设备时, 需要维护人员根据 ALD设 备最大工作电流重新配置供电电流门限值; 若维护人员没有重新配置供电电 流门限值, 或重新配置的供电电流门限值不能满足 ALD设备的最大工作电流, 在电调主设备对 ALD设备的供电电流门限值不能满足 ALD设备的最大工作电 流时, 如果执行电调操作可能会导致电调主设备电流超过保护门限值从而关 闭端口, 无法执行 ALD设备的操作, 这时通过手动修改电调主设备的供电门 限值才能继续 ALD设备的操作。 因此, 现有技术下, ALD设备的电调操作的 操作性差, 操作不便利。 发明内容  In the prior art, the threshold value of the current supply current of the ESC master device to the antenna antenna device (Antenna L ine Dev ice, ALD) is fixedly configured, and the maximum operating current of the ALD device is also fixed, different. The maximum operating current of manufacturers and different types of ALD equipment can be different, but the ESC master equipment does not know the maximum operating current of the ALD equipment. A disadvantage of the prior art is that when the ESC master device is connected to a new type of ALD device or cascaded to a new ALD device, the maintenance personnel are required to reconfigure the supply current threshold according to the maximum operating current of the ALD device; if the maintenance personnel are not reconfigured The supply current threshold, or the reconfigured supply current threshold, does not meet the maximum operating current of the ALD device. If the supply current threshold of the ALD device to the ALD device does not meet the maximum operating current of the ALD device, The ESC operation may cause the ESC master current to exceed the protection threshold to close the port and the ALD device operation cannot be performed. In this case, the operation of the ALD device can be continued by manually modifying the power supply threshold of the ESC master device. Therefore, under the prior art, the ECU device has poor operability and is inconvenient to operate. Summary of the invention
本发明实施例提供了一种电调方法、 装置和系统, 实现了电调主设备与 电调天线设备之间的电流协商, 使得电调主设备可以更好地支持电调天线设 备的业务操作, 电调天线设备的电调操作的操作性好。 Embodiments of the present invention provide an electrical adjustment method, apparatus, and system, which implement current negotiation between an ESC master device and an ESC antenna device, so that the ESC master device can better support the ESC antenna device. For the business operation of the backup, the operation of the ESC of the ESC antenna device is good.
第一方面, 本发明实施例提供了一种电调方法, 所述方法包括: 获取电调天线设备的电流参数;  In a first aspect, an embodiment of the present invention provides an electrical adjustment method, where the method includes: acquiring a current parameter of an electrical adjustment antenna device;
判断对所述电调天线设备的供电电流门限值是否与所述电流参数适配; 如果所述供电电流门限值与所述电流参数不适配, 则调整所述供电电流 门限值, 以使得调整后的所述供电电流门限值与所述电调天线设备的电流参 数适配;  Determining whether the power supply current threshold value of the electrical conductivity antenna device is adapted to the current parameter; if the power supply current threshold value is not adapted to the current parameter, adjusting the power supply current threshold value, So that the adjusted supply current threshold value is adapted to the current parameter of the electrically adjustable antenna device;
向所述电调天线设备发送电调操作消息, 以使得所述电调天线设备进行 电调操作。  And transmitting an ESC operation message to the ESC device to cause the ESC device to perform an ESC operation.
优选地, 所述获取电调天线设备的电流参数具体包括: 向一个或多个电 调天线设备发送电流参数请求消息; 接收所述一个或多个电调天线设备根据 所述电路参数请求消息发送的所述电流参数。  Preferably, the acquiring the current parameter of the ESC antenna device comprises: sending a current parameter request message to one or more ESC antenna devices; receiving the one or more ESC antenna devices according to the circuit parameter request message The current parameter.
优选地, 所述电流参数包括最大工作电流。  Preferably, the current parameter comprises a maximum operating current.
所述调整所述供电电流门限值之后还包括: 如果调整后的所述供电电流 门限值与所述一个电调天线设备的电流参数不适配, 向所述一个电调天线设 备发送调整所述最大工作电流的调整消息; 接收所述一个电调天线设备根据 所述调整消息调整所述最大工作电流的应答消息; 判断调整后的所述供电电 流门限值是否大于等于所述一个电调天线设备的调整后的所述最大工作电 流, 如果大于等于, 则执行向所述一个电调天线设备发送电调操作消息的步 骤。  After the adjusting the power supply current threshold, the method further includes: if the adjusted power supply current threshold is not adapted to the current parameter of the one of the electrical adjustment antenna devices, sending an adjustment to the one electrical adjustment antenna device The adjustment message of the maximum working current; receiving the response message of the maximum operating current according to the adjustment message; and determining whether the adjusted power supply current threshold is greater than or equal to the one Adjusting the adjusted maximum operating current of the antenna device, if greater than or equal to, performing the step of transmitting an ESC operation message to the one ESC antenna device.
优选地, 所述调整所述供电电流门限值之后还包括: 如果调整后的所述 供电电流门限值与所述多个电调天线设备的电流参数不适配, 向所述多个电 调天线设备发送调整所述最大工作电流的调整消息; 接收所述多个电调天线 设备根据所述调整消息调整所述最大工作电流的应答消息; 判断调整后的所 述供电电流门限值是否大于等于所述多个电调天线设备调整后的所述最大工 作电流之和, 如果大于等于, 则执行向所述多个电调天线设备发送电调操作 消息的步骤, 否则从所述多个电调天线设备中挑选出部分电调天线设备, 并 向所述部分电调天线设备发送电调操作消息。 Preferably, after the adjusting the power supply current threshold, the method further includes: if the adjusted power supply current threshold is not adapted to the current parameters of the plurality of electrically adjustable antenna devices, to the multiple The adjusting antenna device sends an adjustment message for adjusting the maximum working current; receiving the response message that the plurality of electrically adjustable antenna devices adjust the maximum working current according to the adjustment message; determining whether the adjusted power supply current threshold is And greater than or equal to a sum of the adjusted maximum operating currents of the plurality of electrically adjustable antenna devices, if greater than or equal to, performing an electrical adjustment operation to the plurality of electrically adjustable antenna devices a step of a message, otherwise selecting a partial ESC antenna device from the plurality of ESC antenna devices, and transmitting an ESC operation message to the portion of the ESC antenna device.
优选地, 所述向所述电调天线设备发送电调操作消息之后还包括:接收所 述电调天线设备根据所述电调操作消息电调完成后的应答消息; 将调整后的 所述供电电流门限值还原为调整前的所述供电电流门限值; 向所述电调天线 设备发送还原所述最大工作电流的还原消息, 以使得所述电调天线设备将调 整后的所述最大工作电流还原为调整前的所述最大工作电流。  Preferably, after the sending the ESC operation message to the ESC antenna device, the method further includes: receiving a response message after the ESC antenna device completes the ESC according to the ESC operation message; Resetting the current threshold to the supply current threshold before the adjustment; transmitting, to the electrically adjustable antenna device, a restoration message that restores the maximum operating current, so that the electrically adjustable antenna device will adjust the maximum The operating current is reduced to the maximum operating current before the adjustment.
第二方面, 本发明实施例提供了一种电调方法, 所述方法包括: 接收电调主设备发送的电流参数请求消息;  In a second aspect, an embodiment of the present invention provides an electrical adjustment method, where the method includes: receiving a current parameter request message sent by an ESC master device;
向所述电调主设备发送电流参数, 所述电流参数包括最大工作电流; 接收所述电调主设备根据所述最大工作电流与供电电流门限值适配比较 后发送的电调操作消息;  Transmitting a current parameter to the ESC master device, where the current parameter includes a maximum operating current; receiving an ESC operation message sent by the ESC master device according to the maximum operating current and the supply current threshold value;
根据所述电调操作消息, 进行电调操作。  According to the ESC operation message, an ESC operation is performed.
优选地, 所述向所述电调主设备发送电流参数之后, 接收所述电调主设 备根据所述最大工作电流与供电电流门限值适配比较后发送的电调操作消息 之前还包括: 接收所述电调主设备发送的调整所述最大工作电流的调整消息; 根据所述调整消息, 调整所述最大工作电流; 向所述电调主设备发送调整所 述最大工作电流的应答消息。  Preferably, after the sending the current parameter to the ESC device, receiving the ESC operation message sent by the ESC device according to the maximum operating current and the supply current threshold value, the method further includes: Receiving, by the ESC master device, an adjustment message for adjusting the maximum operating current; adjusting the maximum operating current according to the adjustment message; and transmitting, to the ESC master device, a response message for adjusting the maximum operating current.
优选地, 所述根据所述电调操作消息, 进行电调操作之后还包括: 接收 所述电调主设备发送的还原所述最大工作电流的还原消息; 将调整后的所述 最大工作电流还原为调整前的所述最大工作电流。  Preferably, after performing the ESC operation according to the ESC operation message, the method further includes: receiving a restoration message sent by the ESC main device to restore the maximum working current; and restoring the adjusted maximum operating current To adjust the maximum operating current before.
第三方面, 本发明实施例提供了一种电调主设备, 所述电调主设备包括: 获取单元, 用于获取电调天线设备的电流参数, 以及将所述电流参数传 输至判断单元;  In a third aspect, an embodiment of the present invention provides an ESC master device, where the ESC master device includes: an acquiring unit, configured to acquire a current parameter of the ESC antenna device, and transmit the current parameter to the judging unit;
判断单元, 用于从所述判断单元接收所述电流参数, 以及判断对所述电 调天线设备的供电电流门限值是否与所述电流参数适配, 并将判断结果传输 至所述调整单元; a determining unit, configured to receive the current parameter from the determining unit, and determine whether a power supply current threshold value of the electronically adjustable antenna device is adapted to the current parameter, and transmit the determination result To the adjustment unit;
调整单元, 用于从所述调整单元接收所述判断结果, 所述判断单元判断 所述供电电流门限值与所述电流参数不适配时, 调整所述供电电流门限值, 以使得调整后的所述供电电流门限值与所述电调天线设备的电流参数适配; 第一发送单元, 用于向所述电调天线设备发送电调操作消息, 以使得所 述电调天线设备进行电调操作。  And an adjusting unit, configured to receive the determination result from the adjusting unit, where the determining unit determines that the power supply current threshold value does not match the current parameter, and adjusts the power supply current threshold to enable adjustment The power supply current threshold value is adapted to the current parameter of the electronically tuned antenna device; the first sending unit is configured to send a power adjustment operation message to the electrical adjustment antenna device, so that the electrical adjustment antenna device Perform an ESC operation.
优选地, 获取单元具体用于: 向一个或多个电调天线设备发送获取所述 电流参数的请求消息; 接收所述一个或多个电调天线设备根据所述请求消息 发送的所述电流参数。  Preferably, the obtaining unit is specifically configured to: send a request message for acquiring the current parameter to one or more electrically adjustable antenna devices; and receive the current parameter sent by the one or more electrically adjustable antenna devices according to the request message .
优选地, 所述电流参数包括最大工作电流。  Preferably, the current parameter comprises a maximum operating current.
所述电调主设备还包括: 第二发送单元, 用于所述调整单元调整后的所 述供电电流门限值与所述一个电调天线设备的电流参数不适配时, 向所述一 个电调天线设备发送调整所述最大工作电流的调整消息; 第一接收单元, 用 于接收所述一个电调天线设备根据所述调整消息调整所述最大工作电流的应 答消息; 处理单元, 用于判断所述调整单元调整后的所述供电电流门限值是 否大于等于所述一个电调天线设备的调整后的所述最大工作电流, 如果大于 等于, 则执行向所述一个电调天线设备发送电调操作消息的步骤。  The ESC master device further includes: a second sending unit, configured to: when the adjusted power supply current threshold value of the adjusting unit is not adapted to the current parameter of the one electronically adjustable antenna device, to the one The electrical adjustment antenna device sends an adjustment message for adjusting the maximum working current; the first receiving unit is configured to receive a response message that the one electrical adjustment antenna device adjusts the maximum working current according to the adjustment message; Determining whether the adjusted current threshold value of the adjustment unit is greater than or equal to the adjusted maximum operating current of the one electrically adjustable antenna device, and if yes or greater, performing sending to the one electrically adjustable antenna device The steps of the ESC operation message.
优选地, 所述第二发送单元还用于, 所述调整单元调整后的所述供电电 流门限值与所述多个电调天线设备的电流参数不适配时, 向所述多个电调天 线设备发送调整所述最大工作电流的调整消息; 所述第一接收单元还用于, 接收所述多个电调天线设备根据所述调整消息调整所述最大工作电流的应答 消息; 所述处理单元还用于, 判断所述调整单元调整后的所述供电电流门限 值是否大于等于所述多个电调天线设备调整后的所述最大工作电流之和, 如 果大于等于, 则执行向所述多个电调天线设备发送电调操作消息的步骤, 否 则从所述多个电调天线设备中挑选出部分电调天线设备, 并向所述部分电调 天线设备发送电调操作消息。 优选地, 所述电调主设备还包括: 第二接收单元, 用于接收所述电调天 线设备根据所述电调操作消息电调完成后的应答消息; 还原单元, 用于将所 述调整单元调整后的所述供电电流门限值还原为调整前的所述供电电流门限 值; 第三发送单元, 用于向所述电调天线设备发送还原所述最大工作电流的 还原消息, 以使得所述电调天线设备将调整后的所述最大工作电流还原为调 整前的所述最大工作电流。 Preferably, the second sending unit is further configured to: when the adjusted supply current threshold value of the adjusting unit is not adapted to the current parameters of the plurality of electrically adjustable antenna devices, to the plurality of The adjusting antenna device sends an adjustment message for adjusting the maximum working current; the first receiving unit is further configured to: receive, by the plurality of electrically adjustable antenna devices, a response message that adjusts the maximum working current according to the adjustment message; The processing unit is further configured to: determine whether the adjusted current supply threshold value of the adjusting unit is greater than or equal to a sum of the adjusted maximum operating currents of the plurality of electrically adjustable antenna devices, and if yes or greater, perform a And the step of transmitting, by the plurality of electrically adjustable antenna devices, an electrical tones operation message, or selecting a partial electrical adjustment antenna device from the plurality of electrically adjustable antenna devices, and transmitting an electrical adjustment operation message to the partial electrical adjustment antenna device. Preferably, the ESC master device further includes: a second receiving unit, configured to receive a response message after the ESC antenna device completes the ESC according to the ESC operation message; and a restoration unit, configured to: The power supply current threshold value after the unit adjustment is restored to the power supply current threshold value before the adjustment; the third sending unit is configured to send, to the electrical adjustment antenna device, a restoration message that restores the maximum working current, to And causing the electrically adjustable antenna device to restore the adjusted maximum operating current to the maximum operating current before the adjustment.
第四方面, 本发明实施例提供了一种电调天线设备, 所述电调天线设备 包括:  In a fourth aspect, an embodiment of the present invention provides an electrical adjustment antenna device, where the electrical adjustment antenna device includes:
第一接收单元, 用于接收电调主设备发送的电流参数请求消息; 第一发送单元, 用于向所述电调主设备发送电流参数, 所述电流参数包 括最大工作电流;  a first receiving unit, configured to receive a current parameter request message sent by the ESC master device, where the first sending unit is configured to send a current parameter to the ESC master device, where the current parameter includes a maximum operating current;
第一接收单元, 用于接收所述电调主设备根据所述最大工作电流与供电 电流门限值适配比较后发送的电调操作消息;  a first receiving unit, configured to receive an ESC operation message sent by the ESC master device according to the maximum operating current and the power supply current threshold value;
处理单元, 用于根据所述电调操作消息, 进行电调操作。  And a processing unit, configured to perform an electrical adjustment operation according to the ESC operation message.
优选地, 所述电调天线设备还包括: 调整单元, 用于接收所述电调主设 备发送的调整所述最大工作电流的调整消息; 根据所述调整消息, 调整所述 最大工作电流; 向所述电调主设备发送调整所述最大工作电流的应答消息。  Preferably, the electrical adjustment antenna device further includes: an adjustment unit, configured to receive an adjustment message sent by the ESC main device to adjust the maximum working current; and adjust the maximum working current according to the adjustment message; The ESC master device transmits a response message that adjusts the maximum operating current.
优选地, 所述电调天线设备还包括: 第三接收单元, 用于接收所述电调 主设备发送的还原所述最大工作电流的还原消息; 还原单元, 用于将调整后 的所述最大工作电流还原为调整前的所述最大工作电流。  Preferably, the electrical adjustment antenna device further includes: a third receiving unit, configured to receive a restoration message sent by the ESC main device to restore the maximum working current; and a restoration unit, configured to: The operating current is reduced to the maximum operating current before the adjustment.
第五方面, 本发明实施例还提供了一种电调主设备, 所述电调主设备包 括:  In a fifth aspect, an embodiment of the present invention further provides an ESC master device, where the ESC master device includes:
接收机, 用于获取电调天线设备的电流参数, 以及将所述电流参数传输 至处理器;  a receiver, configured to acquire a current parameter of the electrical adjustment antenna device, and transmit the current parameter to the processor;
处理器, 用于从所述接收机接收所述电流参数, 并判断对所述电调天线 设备的供电电流门限值是否与所述电流参数适配; 如果所述供电电流门限值 与所述电流参数不适配, 则调整所述供电电流门限值, 以使得调整后的所述 供电电流门限值与所述电调天线设备的电流参数适配, 以及将调整后适配的 结果传输至发射机; a processor, configured to receive the current parameter from the receiver, and determine whether a supply current threshold value of the electrical adjustment antenna device is adapted to the current parameter; if the supply current threshold If the current parameter is not adapted, the power supply current threshold is adjusted such that the adjusted power supply current threshold is adapted to the current parameter of the electrical adjustment antenna device, and the adjusted adaptation is performed. The result is transmitted to the transmitter;
发射机, 用于从所述处理器接收所述调整后适配的结果, 以及向所述电 调天线设备发送电调操作消息, 以使得所述电调天线设备进行电调操作。  And a transmitter, configured to receive a result of the adjusted adaptation from the processor, and send an ESC operation message to the eave antenna device to cause the ESC antenna device to perform an ESC operation.
优选地, 所述发射机还用于: 所述处理器调整后的所述供电电流门限值 与所述电调天线设备的电流参数不适配时, 向所述电调天线设备发送调整所 述最大工作电流的调整消息; 所述接收机将接收所述电调天线设备根据所述 调整消息调整所述最大工作电流的应答消息, 并将所述应答消息传输至所述 处理器; 所述处理器从所述接收机接收所述调整所述最大工作电流的应答消 息, 以及判断调整后的所述供电电流门限值是否与所述电调天线设备的调整 后的所述电流参数适配, 如果适配, 则执行向所述一个电调天线设备发送电 调操作消息的步骤。  Preferably, the transmitter is further configured to: when the adjusted power supply current threshold value of the processor is not adapted to the current parameter of the electrical adjustment antenna device, send an adjustment station to the electrical adjustment antenna device An adjustment message of a maximum operating current; the receiver will receive a response message that the eave antenna device adjusts the maximum operating current according to the adjustment message, and transmit the response message to the processor; Receiving, by the processor, the response message for adjusting the maximum operating current, and determining whether the adjusted supply current threshold is adapted to the adjusted current parameter of the electrically adjustable antenna device And if adapted, performing the step of transmitting an ESC operation message to the one ESC antenna device.
优选地, 所述接收机还用于接收所述电调天线设备根据所述电调操作消 息电调完成后的应答消息, 以及将所述电调完成后的应答消息传输至所述处 理器; 所述处理器用于从所述接收机接收所述电调完成后的应答消息, 以及 将调整后的所述供电电流门限值还原为调整前的所述供电电流门限值; 所述 发射机用于向所述电调天线设备发送还原所述最大工作电流的还原消息, 以 使得所述电调天线设备将调整后的所述电流参数还原为调整前的所述电流参 数。  Preferably, the receiver is further configured to receive a response message after the ESC antenna device completes the ESC according to the ESC operation message, and transmit the response message after the ESC is completed to the processor; The processor is configured to receive the response message after the ESC is completed from the receiver, and restore the adjusted supply current threshold to the supply current threshold before adjustment; the transmitter And a method for transmitting, to the electrically adjustable antenna device, a restoration message that restores the maximum operating current, so that the electrically adjustable antenna device restores the adjusted current parameter to the current parameter before adjustment.
第六方面, 本发明实施例提供了一种电调天线设备, 所述电调天线设备 包括:  In a sixth aspect, an embodiment of the present invention provides an electrical adjustment antenna device, where the electrical adjustment antenna device includes:
接收机, 用于接收电调主设备发送的电流参数请求消息, 以及将所述电 流参数请求消息传输至处理器, 以使得所述处理器根据所述电流参数请求消 息获取所述电流参数并将所述电流参数传输至发射机;  a receiver, configured to receive a current parameter request message sent by the ESC master device, and transmit the current parameter request message to a processor, so that the processor acquires the current parameter according to the current parameter request message and Transmitting the current parameter to a transmitter;
发射机, 用于从所述处理器接收所述电流参数, 以及向所述电调主设备 发送电流参数, 所述电流参数包括最大工作电流; a transmitter, configured to receive the current parameter from the processor, and to the ESC master device Transmitting a current parameter, the current parameter including a maximum operating current;
所述接收机还用于接收所述电调主设备根据所述最大工作电流与供电电 流门限值适配比较后发送的电调操作消息, 以及将所述电调操作消息传输至 所述处理器;  The receiver is further configured to receive an ESC operation message sent by the ESC master device according to the maximum operating current and the supply current threshold value, and transmit the ESC operation message to the process. Device
处理器, 用于从所述接收机接收所述电调操作消息, 以及根据所述电调 操作消息, 进行电调操作。  And a processor, configured to receive the ESC operation message from the receiver, and perform an ESC operation according to the ESC operation message.
优选地, 所述接收机还用于接收所述电调主设备发送的调整所述最大工 作电流的调整消息, 以及将所述调整消息传输至所述处理器; 所述处理器从 所述接收机接收所述调整消息, 以及根据所述调整消息, 调整所述最大工作 电流, 将调整结果传输至所述发射机; 所述发射机从所述处理器接收所述调 整结果, 以及向所述电调主设备发送调整所述最大工作电流的应答消息。  Preferably, the receiver is further configured to receive an adjustment message sent by the ESC device to adjust the maximum working current, and transmit the adjustment message to the processor; Receiving the adjustment message, and adjusting the maximum operating current according to the adjustment message, transmitting an adjustment result to the transmitter; the transmitter receiving the adjustment result from the processor, and reporting to the The ESC master sends a response message that adjusts the maximum operating current.
第七方面, 本发明实施例提供了一种电调系统, 所述系统包括上述电调 主设备和电调天线设备。  In a seventh aspect, an embodiment of the present invention provides an ESC system, where the system includes the ESC main device and an ESC antenna device.
通过上述方案, 本发明实施例实现了电调主设备与电调天线设备之间的 电流协商, 使得电调主设备可以更好地支持电调天线设备的业务操作, 电调 天线设备的电调操作的操作性好。 附图说明  Through the foregoing solution, the embodiment of the present invention implements current negotiation between the ESC master device and the ESC antenna device, so that the ESC master device can better support the service operation of the ESC antenna device, and the ESC of the ESC antenna device The operation is good. DRAWINGS
图 1为本发明实施例提供的电调方法的应用场景示意图;  FIG. 1 is a schematic diagram of an application scenario of an electrical adjustment method according to an embodiment of the present disclosure;
图 2为本发明实施例提供的一种电调方法流程图;  2 is a flowchart of an electrical adjustment method according to an embodiment of the present invention;
图 3为本发明实施例提供的又一电调方法流程图;  FIG. 3 is a flowchart of still another method for electrically adjusting according to an embodiment of the present invention;
图 4为本发明实施例提供的一种电调系统的应用交互图;  4 is an application interaction diagram of an electrical adjustment system according to an embodiment of the present invention;
图 5为本发明实施例提供的一种电调主设备示意图;  FIG. 5 is a schematic diagram of an ESC master device according to an embodiment of the present invention;
图 6为本发明实施例提供的一种电调天线设备示意图;  FIG. 6 is a schematic diagram of an electrical adjustment antenna device according to an embodiment of the present disclosure;
图 Ί为本发明实施例提供的一种电调主设备示意图;  FIG. 3 is a schematic diagram of an ESC master device according to an embodiment of the present invention;
图 8为本发明实施例提供的一种电调天线设备示意图。 具体实施方式 FIG. 8 is a schematic diagram of an electrical adjustment antenna device according to an embodiment of the present invention. detailed description
以下描述中, 为了说明而不是为了限定, 提出了诸如特定系统结构、 接 口、 技术之类的具体细节, 以便透切理解本发明。 然而, 本领域的技术人员 情况中, 省略对众所周知的装置、 电路以及方法的详细说明, 以免不必要的 细节妨碍本发明的描述。  In the following description, for purposes of illustration and description, reference reference However, well-known devices, circuits, and methods are omitted in the description of the present invention in order to avoid obscuring the description of the present invention.
图 1 为本发明实施例提供的一种电调方法的应用场景示意图。 本发明实 施例提供的电调方法、 装置和系统在实际应用时, 作为一种新的电调方法可 应用于所有进行电调操作的场景。 假设电调主设备对电调天线设备的供电电 流门限值与电调天线设备的电流参数不适配, 则电调主设备需要与电调天线 设备进行电流协商, 并根据协商结果调整自身的配置或使电调天线设备设置 其电流参数, 实现供电电流门限值与电调天线设备的电流参数适配。 本发明 实施例提供了在电调操作的场景下进行电调操作的方法流程。 如图 1 所示, 一个电调主设备可以连接一个或多个电调天线设备。 具体地, 一个电调主设 备可以有多个供电端口, 每个供电端口可以连接一个或多个电调天线设备。 本发明假设这些电调天线设备共用一个供电端口; 当电调主设备有多个供电 端口连接电调天线设备时, 对每一个供电端口及其连接的电调天线设备可以 按照本发明提供的方法进行电调操作。 电调主设备与电调天线设备建立连接 后, 在向电调天线设备发送电调消息之前, 首先获取并设置电调天线设备的 电流参数, 实现电流协商, 更好地支持电调天线设备的业务操作。  FIG. 1 is a schematic diagram of an application scenario of an electrical adjustment method according to an embodiment of the present invention. The electrical tuning method, device and system provided by the embodiments of the present invention can be applied to all scenarios for conducting electrical adjustment operations as a new electrical tuning method in practical applications. Assuming that the ESC master device does not match the power supply current threshold of the ESC antenna device and the current parameter of the ESC antenna device, the ESC master device needs to negotiate current with the ESC antenna device and adjust its own according to the negotiation result. Configure or enable the ESC antenna device to set its current parameters to match the supply current threshold to the current parameters of the ESC antenna device. Embodiments of the present invention provide a method flow for performing an ESC operation in a scenario of an ESC operation. As shown in Figure 1, an ESC master device can be connected to one or more ESC antenna devices. Specifically, an ESC master device can have multiple power supply ports, and each power port can be connected to one or more ESC antenna devices. The present invention assumes that these ESC antenna devices share one power supply port; when the ESC master device has multiple power supply ports connected to the ESC antenna device, each of the power supply ports and their connected ESC antenna devices may be in accordance with the method provided by the present invention. Perform an ESC operation. After establishing the connection between the ESC master device and the ESC antenna device, before sending the ESC message to the ESC antenna device, first obtain and set the current parameters of the ESC antenna device to implement current negotiation and better support the ESC antenna device. Business operations.
本发明实施例提供了一种电调方法、 装置和系统。 在电调主设备与电调 天线设备建立连接之后, 电调主设备获取电调天线设备的电流参数, 并根据 自身对电调天线设备的供电电流门限值是否与获取到的电调天线设备的电流 参数适配, 如果不适配, 则与电调天线设备进行电流参数的协商, 根据协商 的结果, 调整供电电流门限值与电调天线设备的电流参数适配, 然后向电调 天线设备发送电调操作消息, 进行后续的电调操作。 由此, 本发明实施例实 现了电调主设备与电调天线设备之间进动态地行电流协商, 并根据协商的结 果调整自身的供电电流门限值或使电调天线设备设置其电流参数, 更好地支 持电调天线设备的业务操作, 电调天线设备的电调操作的操作性变好。 Embodiments of the present invention provide an electrical modulation method, apparatus, and system. After the ESC master device establishes a connection with the ESC antenna device, the ESC master device obtains the current parameter of the ESC antenna device, and according to whether the power supply current threshold value of the ESC antenna device and the obtained ESC antenna device are obtained. The current parameter is adapted. If it is not adapted, the current parameter is negotiated with the ESC antenna device. According to the result of the negotiation, the supply current threshold is adjusted to match the current parameter of the ESC device, and then the ESC is adjusted. The antenna device sends an ESC operation message for subsequent ESC operations. Therefore, the embodiment of the present invention implements dynamic line current negotiation between the ESC master device and the ESC antenna device, and adjusts the power supply current threshold value according to the negotiated result or sets the current parameter of the ESC antenna device. To better support the business operation of the ESC antenna device, the operability of the ESC operation of the ESC antenna device becomes better.
需要说明的是, 本申请中所提及的电调主设备为天线接口标准组织 It should be noted that the ESC master device mentioned in this application is an antenna interface standard organization.
( Antenna Interface Standards Group, AISG ) 中定义的主设备的一种举例 说明, 所提及的电调天线设备为 AISG 中定义的从设备, 如塔放 (TMA Tower-mounted ampl i f ier )、 RET( Remote electr ica l t i l t )设备、 RAB( Remote Az imuth Beamwidth )设备、 RAS ( Remote Az imuth Steer ing )设备等 AISG 标准协议定义或根据 AISG标准协议扩展的从设备; AISG中定义的主设备除了 可以为基站外, 还可以为其他设备, 如: 直放站等; 本发明实施例中以基站 作为电调主设备进行描述, 但是以基站进行描述仅为本发明的具体实施方式 而已, 并不用于限定本发明的保护范围。 An example of a master device defined in the Antenna Interface Standards Group (AISG), the mentioned ESC antenna device is a slave device defined in AISG, such as TMA Tower-mounted ampl if ier, RET ( Remote electr ica ltilt) device, RAB (Remote Az imuth Beamwidth) device, RAS (Remote Az imuth Steer ing) device, etc. AISG standard protocol definition or slave device extended according to AISG standard protocol; master device defined in AISG can be base station In addition, other devices, such as: a repeater, etc., may be described in the embodiment of the present invention, and the base station is used as the electrical control master device. However, the description by the base station is only a specific embodiment of the present invention, and is not used to limit the present invention. The scope of protection of the invention.
图 2为本发明实施例提供的一种电调方法流程图。 该实施例的执行主体 是电调主设备, 如基站, 其中详细描述了基站与建立连接的电调天线设备之 间进行电流参数协商并进行电调的方法。 如图 2 所示, 本实施例包括以下步 骤:  FIG. 2 is a flowchart of an electrical adjustment method according to an embodiment of the present invention. The main body of this embodiment is an ESC master device, such as a base station, in which a method of conducting current parameter negotiation and performing ESC between the base station and the established ESC antenna device is described in detail. As shown in FIG. 2, this embodiment includes the following steps:
步骤 201 , 基站获取电调天线设备的电流参数。  Step 201: The base station acquires a current parameter of the electrical adjustment antenna device.
基站在与电调天线设备建立连接后, AISG定义的 AI SG标准协议扩展的电 流参数协商接口获取电调天线设备的电流参数, 该电流参数包括电调天线设 备的最大工作电流、 最小允许工作电流、 静态电流。 例如, 基站获取到某个 电调天线设备的最大工作电流、 最小允许工作电流、 静态电流分别为 500mA、 400mA, 20mA。  After the base station establishes a connection with the ESC antenna device, the current parameter negotiation interface extended by the AIS SG standard protocol defined by the AISG acquires the current parameter of the ESC antenna device, and the current parameter includes the maximum operating current and the minimum allowable operating current of the ESC antenna device. , Quiescent Current. For example, the base station obtains the maximum operating current, minimum allowable operating current, and quiescent current of an ESC antenna device of 500 mA, 400 mA, and 20 mA, respectively.
如果基站目前只连接了一个电调天线设备, 则获取这一个电调天线设备 的电流参数即可; 如果该基站目前级联了多个电调天线设备, 则获取多个电 调天线设备的电流参数。 基站获取电调天线设备的电流参数的常用方法为向 建立了连接的电调天线设备发送获取电流参数的消息, 电调天线设备接收到 该消息后, 可以通过应答消息向基站发送自身的电流参数, 这样基站即可获 取到电调天线设备的电流参数。 If the base station currently only connects one ESC antenna device, the current parameter of the one ESC antenna device may be obtained; if the base station currently cascades a plurality of ESC antenna devices, the currents of the plurality of ESC antenna devices are acquired. parameter. A common method for a base station to acquire current parameters of an electrical tune antenna device is The connected ESC device is configured to send a message for acquiring the current parameter. After receiving the message, the ESC antenna device can send its current parameter to the base station through the response message, so that the base station can obtain the current parameter of the ESC antenna device. .
步骤 202 ,基站判断对所述电调天线设备的供电电流门限值是否与所述电 流参数适配。  Step 202: The base station determines whether the power supply current threshold of the electrical adjustment antenna device is adapted to the current parameter.
基站获取到电调天线设备的电流参数后, 查看自身对电调天线设备的供 电电流门限值是否与所述电流参数适配。 即, 当基站与一个电调天线设备相 连并获取到这一个电调天线设备的电流参数时, 判断对电调天线设备的供电 电流门限值是否大于等于这一个电调天线设备的最大工作电流; 当基站与多 个电调天线设备相连并获取到多个电调天线设备的电流参数时, 判断对电调 天线设备的供电电流门限值是否大于等于获取到的多个电调天线设备的最大 工作电流之和。  After obtaining the current parameter of the ESC antenna device, the base station checks whether the power supply current threshold of the ESC antenna device is adapted to the current parameter. That is, when the base station is connected to an ESC antenna device and obtains the current parameter of the ESC antenna device, it is determined whether the power supply current threshold value of the ESC antenna device is greater than or equal to the maximum operating current of the one ESC antenna device. When the base station is connected to the plurality of electrically adjustable antenna devices and obtains current parameters of the plurality of electrically adjustable antenna devices, determining whether the power supply current threshold value of the electronically adjustable antenna device is greater than or equal to the obtained plurality of electrically adjustable antenna devices The sum of the maximum operating currents.
例如, 基站对电调天线设备的供电电流门限值的设置为 1A, 而与该基站 相连的有 5 个电调天线设备, 每个电调天线设备的最大工作电流、 最小允许 工作电流、 静态电流都分别为 500mA、 400mA, 20mA, 则这 5个电调天线设备 的最大工作电流之和为 2. 5A , 供电电流门限值 1A 小于最大工作电流之和 2. 5A, 说明基站设置的供电电流门限值与电流参数不适配。  For example, the base station sets the power supply current threshold of the ESC antenna device to 1A, and the base station has five ESC antenna devices, and the maximum operating current, minimum allowable operating current, and static of each ESC antenna device. 5A, The power supply set by the base station is 2. 5A, the power supply current threshold 1A is less than the sum of the maximum operating currents 2. 5A, indicating the power supply set by the base station, the current is 500mA, 400mA, 20mA, respectively. The current threshold does not match the current parameter.
如果判断的结果为供电电流门限值与所述电流参数适配, 则向所述电调 天线设备发送电调操作消息, 使电调天线设备执行相应的业务操作, 如对基 站的天线进行校准或设置天线的倾角等。  If the result of the determination is that the supply current threshold is adapted to the current parameter, an ESC operation message is sent to the ESC device to enable the ESC antenna device to perform corresponding service operations, such as calibrating the antenna of the base station. Or set the inclination of the antenna, etc.
如果判断的结果为供电电流门限值与所述电流参数不适配, 则执行步骤 If the result of the determination is that the supply current threshold is not adapted to the current parameter, then the steps are performed.
203。 203.
步骤 203 , 如果所述供电电流门限值与所述电流参数不适配, 则基站调整 所述供电电流门限值, 以使得调整后的所述供电电流门限值与所述电调天线 设备的电流参数适配。  Step 203: If the power supply current threshold value is not adapted to the current parameter, the base station adjusts the power supply current threshold value, so that the adjusted power supply current threshold value and the electrical adjustment antenna device Current parameter adaptation.
经过步骤 202 的判断, 得出供电电流门限值与所述电流参数不适配的结 果时, 基站将在允许调整的范围内调整供电电流门限值, 以使调整后的供电 电流门限值与所述电调天线设备的电流参数适配。 其中调整后的供电电流门 限值不能超过自身的供电电流门限值的上限。 调整供电电流门限值的具体操 作为: After the judgment of step 202, the junction of the supply current threshold value and the current parameter is obtained. If so, the base station will adjust the supply current threshold within the range of allowable adjustments to adapt the adjusted supply current threshold to the current parameters of the electrically adjustable antenna device. The adjusted supply current threshold cannot exceed the upper limit of its own supply current threshold. The specific operations for adjusting the supply current threshold are:
如果所述供电电流门限值小于获取到的一个电调天线设备的最大工作电 流, 则调整所述供电电流门限值, 使得调整后的所述供电电流门限值与电流 参数适配。  If the supply current threshold is less than the maximum operating current of the obtained one of the ESC devices, the supply current threshold is adjusted such that the adjusted supply current threshold is adapted to the current parameter.
当基站与一个电调天线设备相连时, 如果所述供电电流门限值与所述电 流参数不适配, 则调整所述供电电流门限值, 调整后的所述供电电流门限值 与所述电调天线设备的电流参数适配的步骤具体为: 如果所述供电电流门限 值小于获取到的一个电调天线设备的最大工作电流, 则调整所述供电电流门 限值, 使得调整后的所述供电电流门限值大于等于获取到的一个电调天线设 备的最大工作电流。  When the base station is connected to an electrical adjustment antenna device, if the supply current threshold value is not adapted to the current parameter, the supply current threshold is adjusted, and the adjusted supply current threshold value is The step of adapting the current parameter of the electric adjustable antenna device is specifically: if the power supply current threshold is less than the maximum operating current of the obtained electronically adjustable antenna device, adjusting the supply current threshold to make the adjustment The supply current threshold is greater than or equal to the maximum operating current of the obtained ESC device.
当基站级联多个电调天线设备时, 如果所述供电电流门限值与所述电流 参数不适配, 则调整所述供电电流门限值, 调整后的所述供电电流门限值与 所述电调天线设备的电流参数适配的步骤具体为: 如果所述供电电流门限值 小于获取到的多个电调天线设备的最大工作电流之和, 则调整所述供电电流 门限值, 使得调整后的所述供电电流门限值大于等于获取到的多个电调天线 设备的最大工作电流之和。  When the base station cascades the plurality of electrically adjustable antenna devices, if the supply current threshold value does not match the current parameter, adjusting the supply current threshold, the adjusted supply current threshold and The step of adapting the current parameter of the electrically adjustable antenna device is specifically: if the supply current threshold is less than the sum of the maximum operating currents of the plurality of electrically adjustable antenna devices, adjusting the supply current threshold And adjusting the adjusted supply current threshold to be greater than or equal to a sum of the obtained maximum operating currents of the plurality of electrically adjustable antenna devices.
例如, 上例中, 将供电电流门限值从上例中的 1A调整为 2. 5A , 此时调整 后的供电电流门限值等于上例中 5个电调天线设备的最大工作电流之和 2. 5A , 即调整后的所述供电电流门限值与所述电调天线设备的电流参数适配。  For example, in the above example, the supply current threshold is adjusted from 1A in the above example to 2. 5A, and the adjusted supply current threshold is equal to the sum of the maximum operating currents of the five ESC devices in the above example. 2. 5A, that is, the adjusted supply current threshold value is adapted to the current parameter of the electrically adjustable antenna device.
需要说明的是, 由于基站的能够设置的供电电流门限值的上限(一般该 值为 2- 3A )通常都会远远大于一个电调天线设备的进行电调时的电流(一般 为几百 mA ) , 所以对于一个基站连接一个电调天线设备的情况, 经过基站调 整后的供电电流门限值一般都能够与一个电调天线设备的电流参数适配。 而 对于一个基站连接多个电调天线设备的情况, 经过基站调整后的供电电流门 限值可能还是不能大于多个电调天线设备的最大工作电流之和, 无法实现适 配。 It should be noted that the upper limit of the power supply current threshold that can be set by the base station (generally the value is 2 - 3A) is usually much larger than the current when an ESC device is ESC (generally several hundred mA). Therefore, for a case where a base station is connected to an ESC antenna device, the power supply current threshold value adjusted by the base station can generally be adapted to the current parameter of an ESC antenna device. And For a case where a base station is connected to a plurality of ESC antenna devices, the power supply current threshold value adjusted by the base station may not be greater than the sum of the maximum operating currents of the plurality of ESC antenna devices, and the adaptation cannot be achieved.
当调整后的所述供电电流门限值与电调天线设备的电流参数不适配时, 可以向电调天线设备发送将最大工作电流设置为当前工作电流的设置消息, 以使电调天线设备根据该设置消息设置其目前的最大工作电流。 可选地, 当 前工作电流的设置不会低于该电调天线设备的最小允许工作电流。  When the adjusted power supply current threshold value is not adapted to the current parameter of the electrical adjustment antenna device, a setting message for setting the maximum working current to the current working current may be sent to the electrical adjustment antenna device, so that the electrical adjustment antenna device Set its current maximum operating current based on this setup message. Optionally, the current operating current setting is not lower than the minimum allowable operating current of the electrically adjustable antenna device.
当调整后的所述供电电流门限值与电调天线设备的电流参数适配时, 执 行步骤 204。  When the adjusted supply current threshold is adapted to the current parameter of the ESC device, step 204 is performed.
步骤 204 ,基站向所述电调天线设备发送电调操作消息, 以使得所述电调 天线设备进行电调操作。  Step 204: The base station sends an ESC operation message to the ESC antenna device, so that the ESC antenna device performs an ESC operation.
基站经过步骤 203所述的方法调整自身的供电电流门限值, 并且调整后 的供电电流门限值能与电调天线设备的电流参数适配时, 可以向电调天线设 备发送电调操作消息, 使电调天线设备执行后续的电调操作, 如对基站的天 线进行校准或设置天线的倾角等。  The base station adjusts its own power supply current threshold value by the method described in step 203, and when the adjusted power supply current threshold value can be matched with the current parameter of the electrical adjustment antenna device, the base station may send an ESC operation message to the electrical adjustment antenna device. To enable the ESC antenna device to perform subsequent ESC operations, such as calibrating the antenna of the base station or setting the tilt angle of the antenna.
基站经过步骤 203所述的方法调整自身的供电电流门限值, 仍然无法与 电调天线设备的电流参数适配, 并向电调天线设备发送调整最大工作电流的 调整消息后, 可以接收到电调天线设备发送的应答消息, 接收到应答消息后, 再次判断调整后的所述供电电流门限值是否大于等于所述一个电调天线设备 的调整后的最大工作电流, 或者判断调整后的所述供电电流门限值是否大于 等于所述多个电调天线设备的调整后的最大工作电流之和, 如果大于等于, 则执行步骤 204。如果调整后的所述供电电流门限值仍然小于所述一个电调天 线设备的调整后的最大工作电流, 则说明基站无法支持此电调天线设备的电 调操作; 如果调整后的所述供电电流门限值仍然小于所述多个电调天线设备 的调整后的最大工作电流之和, 则可以挑选多个电调天线设备中的几个电调 天线设备, 使得基站的所述供电电流门限值大于等于这几个电调天线设备的 最大工作电流与剩余的电调天线设备静态电流之和, 并向这几个优选电调天 线设备发送电调操作消息。 等这几个电调天线设备完成电调操作, 基站获取 到这几个设备完成电调操作的消息后, 再按照上述方法继续向其他的电调天 线设备发送电调操作消息。 具体挑选几个优选电调天线设备, 基站可以根据 计算得出。 The base station adjusts its own power supply current threshold according to the method described in step 203, and still cannot adapt to the current parameter of the electrical adjustment antenna device, and sends an adjustment message for adjusting the maximum working current to the electrical adjustment antenna device, and can receive the power. Adjusting the response message sent by the antenna device, and after receiving the response message, determining whether the adjusted power supply current threshold is greater than or equal to the adjusted maximum operating current of the one electronically adjustable antenna device, or determining the adjusted location Whether the supply current threshold is greater than or equal to the sum of the adjusted maximum operating currents of the plurality of electrically adjustable antenna devices. If the value is greater than or equal to, step 204 is performed. If the adjusted supply current threshold is still less than the adjusted maximum operating current of the one ESC device, the base station cannot support the ESC operation of the ESC device; if the adjusted power supply The current threshold is still smaller than the sum of the adjusted maximum operating currents of the plurality of electrically adjustable antenna devices, and then one of the plurality of electrically adjustable antenna devices may be selected such that the current supply gate of the base station The limit is greater than or equal to the electrical conductivity of the antenna devices The sum of the maximum operating current and the quiescent current of the remaining ESC antenna devices, and sends an ESC operation message to the several preferred ESC antenna devices. After the ESCs complete the ESC operation, the base station obtains the message that the devices complete the ESC operation, and then continues to send the ESC operation message to the other ESC devices according to the above method. Specifically, several preferred electronically tuned antenna devices are selected, and the base station can be calculated according to the calculation.
在一个优选的实施例中, 在向多个电调天线设备发送调整最大工作电流 的调整消息之前, 可以先判断调整后的供电电流门限值是否大于等于多个电 调天线设备的最小允许工作电流之和, 如果是, 则可以向向多个电调天线设 备发送调整最大工作电流的调整消息; 如果否, 说明即使多个电调天线设备 调整最大工作电流之后, 也无法实现基站供电电流门限值与电调天线设备的 电流参数的适配, 原因是调整后的最大工作电流参数不可能小于最小允许工 作电流。 在此种情况下, 可以不向所述电调天线设备发送调整最大工作电流 的调整消息, 而先判断对于基站级联的多个电调天线设备, 可以通过分为几 组来实现电调操作, 如果即使不调整电调天线设备的电流参数, 也可以分为 两组来完成电调操作, 则可以不调整电调天线设备的电流参数, 直接向其中 的一组电调天线设备发送电调操作消息, 等这一组电调天线设备完成电调操 作, 基站获取到这几个优选设备完成电调操作的消息后, 再按照上述方法继 续向另一组电调天线设备发送电调操作消息。 先判断调整后的供电电流门限 值是否大于等于多个电调天线设备的最小允许工作电流之和, 然后在决定是 否调整电调天线设备的电流参数, 这样做可以避免在不需要调整电调天线设 备的工作电流参数时反而调整了电调天线设备的电流参数, 使得增加了交互 过程, 而且电调天线设备工作在最大工作电流时的工作状态最佳。 下面通过 举例说明这一点。  In a preferred embodiment, before the adjustment message for adjusting the maximum working current is sent to the plurality of electrically adjustable antenna devices, it may be determined whether the adjusted supply current threshold is greater than or equal to the minimum allowable operation of the plurality of electrically adjustable antenna devices. The sum of the currents, if yes, the adjustment message for adjusting the maximum operating current can be sent to the plurality of electrically adjustable antenna devices; if not, the base station supply current gate cannot be realized even after the plurality of electrically adjustable antenna devices adjust the maximum operating current The limit is adapted to the current parameter of the ESC antenna device because the adjusted maximum operating current parameter cannot be less than the minimum allowable operating current. In this case, the adjustment message for adjusting the maximum operating current may not be sent to the electrical adjustment antenna device, but the plurality of electrical adjustment antenna devices cascaded for the base station may be determined by dividing into several groups to implement the electrical adjustment operation. If the current parameters of the ESC antenna device are not adjusted, the two groups can be divided into two groups to complete the ESC operation. Instead of adjusting the current parameters of the ESC antenna device, the ESC can be directly sent to one of the ESC antenna devices. After the operation message is received, the set of electronically adjustable antenna devices completes the ESC operation, and after receiving the message that the preferred devices complete the ESC operation, the base station continues to send the ESC operation message to the other group of the ESC antenna devices according to the foregoing method. . First, it is judged whether the adjusted supply current threshold is greater than or equal to the sum of the minimum allowable operating currents of the plurality of ESC devices, and then determining whether to adjust the current parameter of the ESC device, thereby avoiding the need to adjust the ESC. When the operating current parameter of the antenna device adjusts the current parameter of the ESC antenna device, the interaction process is increased, and the working state of the ESC antenna device operating at the maximum operating current is optimal. The following is an example of this.
例如, 上例中, 基站级联 5个规格一致的电调天线设备, 电调时最大工 作电流 500mA, 最小允许工作电流分别为 400mA, 静态电流为 20mA, 当前基站 端口电流门限值设置为 1A;按照当前配置,基站只能在同一时间支持一个 ALD 设备电调, 如果基站门限设置小于 580mA, 那么基站同一时间无法支持任何一 个电调天线设备电调 (总电流 =一个电调需要的电流 +其余设备非电调的静态 电流 =500+4*20=580mA ) ; 基站电流门限设置上限为 2A, 基站调整自身供电 电流门限值为 2A, 此时门限值仍然小于 5 个 ALD设备同时电调需要的电流 ( 2. 5A ) , 那么基站下发设置当前工作电流参数的设置消息, 电调天线设备 设置其最大工作电流为其自身允许的工作电流(最小允许工作电流 400mA ) , 那么调整之后,基站就能支持 5个 ALD设备同时进行电调操作了( 400mA*5 <= 2000mA ) ; For example, in the above example, the base station cascades five ESC devices with the same specifications. The maximum operating current is 500mA during ESC, the minimum allowable operating current is 400mA, the quiescent current is 20mA, and the current base station port current threshold is set to 1A. According to the current configuration, the base station can only support one ALD at the same time. Equipment ESC, if the base station threshold setting is less than 580mA, then the base station cannot support any ESC antenna device ESC at the same time (total current = current required by one ESC + quiescent current of non-electrical adjustment of other equipment = 500+4*20 =580mA) ; The base station current threshold is set to 2A, and the base station adjusts its own supply current threshold to 2A. At this time, the threshold is still less than the current required by 5 ALD devices for simultaneous ESC (2.5A). Set the setting message of the current working current parameter, the ESC antenna device sets its maximum working current to its own allowable working current (minimum allowable working current 400mA), then after adjustment, the base station can support 5 ALD devices to perform ESC operation at the same time. (400mA*5 <= 2000mA);
如果基站级联 6个上述的电调天线设备, 6个电调天线设备需要电调操 作, 即使经过上述过程操作, 也无法同时支持 6个设备电调, 根据规格计算, 调整后基站只能支持 4 个电调天线设备同时电调 (需要的瞬时电流 =4*400+2*20 = 1640mA, 5个同时电调需要的瞬时电流 =5*400+20=2020mA, 大 于基站门限 2A, 因此不支持 5个及以上 ALD设备同时电调) 。 因此可以将 6 个电调天线设备分为 2组, 每组 3个电调天线设备, 根据规格计算, 3个电调 天线设备同时按最大工作电流电调(需要的瞬时电流 =3*500+3*20 = 1560mA )。 此时, 3+3 的方案, 由于不需要重新设置电调天线设备的工作电流参数 [减少 交互过程] , 电调天线设备工作在最大工作电流 [工作状态最佳] , 优于 4+2的 方案。  If the base station cascades six of the above-mentioned ESC antenna devices, the six ESC antenna devices need to be operated by ESC. Even after the above process operation, it is impossible to support 6 devices ESC at the same time. According to the specification calculation, the base station can only support the adjustment. 4 ESC antennas are simultaneously ESC (required instantaneous current = 4*400+2*20 = 1640mA, 5 simultaneous ESC required instantaneous current = 5*400+20=2020mA, greater than the base station threshold 2A, so no Support 5 or more ALD devices simultaneously ESC). Therefore, the six ESC antenna devices can be divided into two groups, each group of three ESC antenna devices. According to the specifications, the three ESC antenna devices are simultaneously adjusted according to the maximum working current (the required instantaneous current = 3*500+) 3*20 = 1560mA). At this time, the 3+3 scheme, because there is no need to reset the operating current parameter of the ESC antenna device [reduce the interaction process], the ESC antenna device works at the maximum working current [the best working state], which is better than 4+2. Program.
需要说明的是, 在一个优选的实施例中, 在步骤 204之后, 还包括下述 操作步骤: 接收所述电调天线设备根据所述消息电调完成后的应答消息; 将 调整后的所述供电电流门限值还原为调整前的所述供电电流门限值; 向所述 电调天线设备发送还原所述最大工作电流的设置消息, 以使所述电调天线设 备将设置后的所述最大工作电流还原为所述设置前的所述最大工作电流。  It should be noted that, in a preferred embodiment, after step 204, the method further includes the following steps: receiving a response message after the ESC antenna device completes the ESC according to the message; The supply current threshold is restored to the supply current threshold before the adjustment; sending a setting message for restoring the maximum operating current to the electrically adjustable antenna device, so that the electrically adjustable antenna device is to be set The maximum operating current is reduced to the maximum operating current before the setting.
本发明实施例中, 基站获取电调天线设备的电流参数后, 首先确定据自 身对电调天线设备的供电电流门限值是否与获取到的电调天线设备的电流参 数适配, 如果不适配, 则与电调天线设备进行电流参数的协商, 根据协商的 结果, 调整供电电流门限值与电调天线设备的电流参数适配, 然后向电调天 线设备发送电调操作消息, 进行后续的电调操作。 由此, 本发明实施例实现 了基站与电调天线设备之间进动态地行电流协商, 并根据协商的结果调整自 身的供电电流门限值或使电调天线设备设置其电流参数, 更好地支持电调天 线设备的业务操作。 In the embodiment of the present invention, after acquiring the current parameter of the electronically tuned antenna device, the base station first determines whether the power supply current threshold value of the electrical adjustment antenna device is adapted to the current parameter of the obtained electrical adjustment antenna device, if not With the coordination, the current parameters are negotiated with the ESC antenna device, according to the negotiation As a result, the supply current threshold is adjusted to match the current parameter of the ESC antenna device, and then an ESC operation message is sent to the ESC antenna device for subsequent ESC operation. Therefore, the embodiment of the present invention implements dynamic line current negotiation between the base station and the ESC antenna device, and adjusts the power supply current threshold value according to the negotiated result or sets the current parameter of the ESC antenna device. Support the business operation of the ESC antenna equipment.
上述实施例描述了以基站为执行主体描述了基站与电调天线设备动态地 进行参数协商的方法, 下述实施例以电调天线设备为主体, 详细描述本发明 的电调方法的技术方案。  The foregoing embodiment describes a method for dynamically performing parameter negotiation between a base station and an electronically tuned antenna device by using a base station as an execution body. The following embodiments are mainly directed to an electrical adjustment antenna device, and the technical solution of the electrical modulation method of the present invention is described in detail.
图 3为本发明实施例提供的又一电调方法流程图。 该实施例主体是电调 天线设备, 其中详细描述了电调天线设备设置自己的工作电流, 并进行电调 的方法。 如图 3所示, 本实施例包括以下步骤:  FIG. 3 is a flowchart of still another method for electrically adjusting according to an embodiment of the present invention. The main body of this embodiment is an electric adjustment antenna device, and a method of setting an electric current of the electric adjustment antenna device and performing electric adjustment is described in detail. As shown in FIG. 3, this embodiment includes the following steps:
步骤 301 , 电调天线设备接收电调主设备发送的电流参数请求消息。 为了描述上的方便, 本实施例也以基站作为电调主设备的一种举例进行 描述, 但是以基站进行描述只是本发明的一种具体实施例的方式而已, 并不 用于限定本发明的保护范围。  Step 301: The ESC antenna device receives a current parameter request message sent by the ESC master device. For the convenience of description, this embodiment is also described by using a base station as an example of an electrical control master device, but the description by the base station is only a specific embodiment of the present invention, and is not used to limit the protection of the present invention. range.
基站与电调天线设备建立连接后,通过 AI SG接口定义的电流参数协商接 口向电调天线设备发送获取电流参数的请求消息, 由此电调天线设备可以接 收到基站发送的电流参数请求消息。  After the base station establishes a connection with the ESC antenna device, the current parameter negotiation interface defined by the AI SG interface sends a request message for obtaining the current parameter to the ESC antenna device, so that the ESC antenna device can receive the current parameter request message sent by the base station.
步骤 302 , 电调天线设备向所述电调主设备发送电流参数,所述电流参数 包括最大工作电流。  Step 302: The ESC antenna device sends a current parameter to the ESC master device, where the current parameter includes a maximum operating current.
当电调天线设备接收到电流参数请求消息后, 将向基站发送电流参数, 该电流参数包括最大工作电流、 最小允许工作电流、 静态电流。  After receiving the current parameter request message, the ESC antenna device sends a current parameter to the base station, where the current parameter includes a maximum operating current, a minimum allowable operating current, and a quiescent current.
步骤 303 ,电调天线设备接收所述电调主设备根据所述最大工作电流与供 电电流门限值适配比较后发送的电调操作消息。  Step 303: The ESC antenna device receives an ESC operation message sent by the ESC master device according to the maximum operating current and the power supply current threshold value.
基站在获取到电调天线设备的电流参数后, 通过调整自身配置的供电电 流门限值便可实现与电调天线设备的电流参数适配时, 则调整自身对电调天 线设备的供电电流门限值, 调整后的供电电流门限值与最大工作电流适配时, 可向电调天线设备发送电调操作消息。 After obtaining the current parameter of the ESC antenna device, the base station can adjust the current parameter of the ESC antenna device by adjusting the current supply current threshold value. The power supply current threshold of the line device, when the adjusted power supply current threshold is adapted to the maximum operating current, may send an ESC operation message to the ESC antenna device.
如果基站调整供电电流门限值后也无法得到与电流参数适配的门限值, 则此时会向电调天线设备发送调整其最大工作电流的调整消息, 请求电调天 线设备调整其最大工作电流。 电调天线设备接收到该调整消息后, 根据所述 调整消息, 调整所述最大工作电流。 优选地, 电调天线设备可将自己目前的 工作电流调整为最大工作电流。 当然, 如果调整消息中携带有基站希望电调 天线设备将最大工作电流调整的电流值, 如果该电流值在电调天线设备允许 的工作电流范围内, 则电调天线设备也可以将最大工作电流调整为该电流值。 当电调天线设备调整最大工作电流后, 将向基站发送应答消息, 应答消息中 携带调整后所得到的最大工作电流, 以使基站根据该调整后的最大工作电流 判断调整后的供电电流门限值是否与调整后的最大工作电流适配, 然后基站 即可向电调天线设备发送电调操作消息。  If the base station adjusts the power supply current threshold and cannot obtain the threshold value adapted to the current parameter, the adjustment message for adjusting the maximum operating current is sent to the electronically adjustable antenna device, and the electronically adjustable antenna device is requested to adjust its maximum working. Current. After receiving the adjustment message, the ESC antenna device adjusts the maximum operating current according to the adjustment message. Preferably, the tunable antenna device can adjust its current operating current to the maximum operating current. Of course, if the adjustment message carries a current value that the base station wants to adjust the maximum operating current of the ESC antenna device, if the current value is within the allowable operating current range of the ESC antenna device, the ESC antenna device can also set the maximum operating current. Adjust to this current value. After the ESC antenna device adjusts the maximum working current, the response message is sent to the base station, and the response message carries the adjusted maximum working current, so that the base station determines the adjusted supply current threshold according to the adjusted maximum working current. Whether the value is adapted to the adjusted maximum operating current, the base station can then send an ESC operation message to the ESC antenna device.
步骤 304 , 电调天线设备根据所述电调操作消息, 进行电调操作。  Step 304: The ESC antenna device performs an ESC operation according to the ESC operation message.
电调天线设备接收到电调操作消息后, 便可执行后续的电调操作, 如对 基站的天线进行校准或设置天线的倾角, 根据接收到的电调消息进行电调操 作为现有技术, 此处不再详述。  After receiving the ESC operation message, the ESC antenna device can perform subsequent ESC operations, such as calibrating the antenna of the base station or setting the tilt angle of the antenna, and performing the ESC operation according to the received ESC message is prior art. It will not be detailed here.
需要说明的是, 在一个优选的实施例中, 在步骤 304之后, 还包括下述 操作步骤: 接收所述电调主设备发送的还原所述最大工作电流的还原消息; 将调整后的所述最大工作电流还原为调整前的所述最大工作电流。  It should be noted that, in a preferred embodiment, after step 304, the method further includes the following steps: receiving a restore message sent by the ESC master device to restore the maximum operating current; The maximum operating current is reduced to the maximum operating current before the adjustment.
在电调天线设备完成电调操作后, 向基站发送电调完成的应答消息, 基 站接收到该应答消息后, 将自身调整后的供电电流门限值还原为调整前的供 电电流门限值, 并将向电调天线设备发送将调整后的最大工作电流还原为调 整前的最大工作电流的还原消息, 以使电调天线设备还原其最大工作电流。  After the ESC device completes the ESC operation, the ESC sends a response message to the base station, and after receiving the response message, the base station restores the adjusted power supply current threshold to the pre-adjustment supply current threshold. A restore message that restores the adjusted maximum operating current to the maximum operating current before the adjustment is sent to the ESC antenna device to cause the ESC antenna device to restore its maximum operating current.
本发明实施例中, 电调天线设备接收基站发送的电流参数请求消息; 向 所述基站发送电流参数, 所述电流参数包括最大工作电流; 接收所述基站根 据所述最大工作电流与供电电流门限值适配比较后发送的电调操作消息; 根 据所述电调操作消息, 进行电调操作。 由此本发明实施例实现了基站与电调 天线设备之间进动态地行电流协商, 并根据协商的结果调整自身的供电电流 门限值或使电调天线设备设置其电流参数, 更好地支持电调天线设备的业务 操作。 In the embodiment of the present invention, the electrical adjustment antenna device receives a current parameter request message sent by the base station, and sends a current parameter to the base station, where the current parameter includes a maximum operating current; receiving the base station root And the ESC operation message sent after the maximum operating current is compared with the supply current threshold value; and the ESC operation is performed according to the ESC operation message. Therefore, the embodiment of the present invention implements dynamic line current negotiation between the base station and the ESC antenna device, and adjusts the power supply current threshold value according to the negotiated result or enables the ESC antenna device to set its current parameter, which is better. Supports business operations of electrical tune antenna devices.
图 4为本发明实施例提供的一种电调系统的应用交互图。 如图 4所示, 本实施例包括以下步骤:  FIG. 4 is an application interaction diagram of an electrical adjustment system according to an embodiment of the present invention. As shown in FIG. 4, this embodiment includes the following steps:
步骤 401 , 基站与电调天线设备之间建立连接。  Step 401: Establish a connection between the base station and the ESC antenna device.
基站向电调天线设备发送建立连接的消息后, 电调天线设备向基站发送 同意建立连接的回复消息, 基站即可成功建立与电调天线设备之间的连接。  After the base station sends a connection establishment message to the electrical adjustment antenna device, the electrical adjustment antenna device sends a reply message agreeing to establish a connection to the base station, and the base station can successfully establish a connection with the electrical adjustment antenna device.
步骤 402 , 基站获取电调天线设备的电流参数。  Step 402: The base station acquires a current parameter of the electrical adjustment antenna device.
基站在与电调天线设备建立连接后,通过 AI SG定义的电流参数协商接口 向电调天线设备发送获取电调天线设备的电流参数的请求消息, 电调天线设 备可通过应答消息向基站发送电调天线设备的电流参数, 该电流参数包括电 调天线设备的最大工作电流、 最小允许工作电流、 静态电流。  After the base station establishes a connection with the electronically tuned antenna device, the current parameter negotiation interface defined by the AI SG sends a request message for acquiring the current parameter of the electrical adjustment antenna device to the electrical adjustment antenna device, and the electrical adjustment antenna device can send the power to the base station by using the response message. Adjust the current parameter of the antenna device, which includes the maximum operating current of the ESC antenna device, the minimum allowable operating current, and the quiescent current.
如果基站目前只连接了一个电调天线设备, 则获取这一个电调天线设备 的电流参数即可; 如果该基站目前级联了多个电调天线设备, 则可向每个电 调天线设备发送获取电流参数的请求消息, 以获取多个电调天线设备的电流 参数。  If the base station currently only connects one ESC antenna device, the current parameter of the one ESC antenna device can be obtained; if the base station is currently cascaded with a plurality of ESC antenna devices, it can be sent to each ESC antenna device. Obtaining a request message of the current parameter to obtain current parameters of the plurality of ESC antenna devices.
步骤 403 , 基站调整自身对电调天线设备的供电电流门限值。  Step 403: The base station adjusts its own power supply current threshold for the ESC antenna device.
当基站目前只连接了一个电调天线设备时, 如果该电调天线设备的电流 参数在基站的供电电流门限值范围内, 即电流参数中的最大工作电流小于等 于基站的供电电流门限值, 则说明基站能够支持该电调天线设备的操作, 可 以不做任何修改; 如果该电调天线设备的最大工作电流超过了基站的供电电 流门限值, 则基站首先调整自身的门限值, 以使电调天线设备的最大工作电 流小于等于基站调整后的供电电流门限值。 如果基站通过自身的调整后可以 实现电调天线设备的最大工作电流小于等于基站调整后的供电电流门限值, 则执行步骤 405 , 否则执行步骤 404。 When the base station is currently connected to only one ESC antenna device, if the current parameter of the ESC antenna device is within the range of the supply current threshold of the base station, that is, the maximum operating current in the current parameter is less than or equal to the supply current threshold of the base station. , the base station can support the operation of the electrical adjustment antenna device, and can be modified without any modification; if the maximum operating current of the electrical adjustment antenna device exceeds the supply current threshold of the base station, the base station first adjusts its own threshold value. Therefore, the maximum operating current of the electric adjustable antenna device is less than or equal to the adjusted current supply current threshold of the base station. If the base station can adjust itself, If the maximum operating current of the electronically tuned antenna device is less than or equal to the adjusted power supply current threshold of the base station, step 405 is performed; otherwise, step 404 is performed.
当基站目前连接了多个电调天线设备时, 如果多个电调天线设备的最大 工作电流之和在基站的供电电流门限值范围内, 即电流参数中的最大工作电 流之和小于等于基站的供电电流门限值, 则说明基站能够支持多个电调天线 设备同时进行电调操作, 可以不做任何修改; 如果多个电调天线设备的最大 工作电流之和超过了基站的供电电流门限值, 则基站首先调整自身的门限值, 以使多个电调天线设备的最大工作电流之和小于等于基站调整后的供电电流 门限值。 如果基站通过自身的调整后可以实现多个电调天线设备的最大工作 电流之和小于等于基站调整后的供电电流门限值, 则执行步骤 405 , 否则执行 步骤 404。  When the base station is currently connected to multiple electrical tune antenna devices, if the sum of the maximum operating currents of the plurality of electrically adjustable antenna devices is within the range of the supply current threshold of the base station, that is, the sum of the maximum operating currents in the current parameters is less than or equal to the base station. The power supply current threshold indicates that the base station can support multiple ESC antenna devices to perform the ESC operation at the same time without any modification; if the sum of the maximum operating currents of the multiple ESC devices exceeds the supply current of the base station For the limit, the base station first adjusts its own threshold so that the sum of the maximum operating currents of the plurality of electrically adjustable antenna devices is less than or equal to the adjusted supply current threshold of the base station. If the base station can adjust the maximum working current of the plurality of electrically adjustable antenna devices to be less than or equal to the adjusted current supply current threshold of the base station, step 405 is performed, otherwise step 404 is performed.
步骤 404 , 调整电调天线设备的工作电流参数。  Step 404: Adjust an operating current parameter of the electrical adjustment antenna device.
当基站通过调整自身的供电电流门限值仍然不能适配上述一个电调设备 的最大工作电流或多个电调天线设备的最大工作电流之和时, 可向电调天线 设备发送调整消息, 使电调天线设备调整其最大工作电流。  When the base station is still unable to adapt the maximum operating current of one of the above-mentioned electrical regulating devices or the maximum operating current of the plurality of electrically adjustable antenna devices by adjusting its own supply current threshold, an adjustment message may be sent to the electrical adjustment antenna device, so that The ESC antenna device adjusts its maximum operating current.
当电调天线设备接收到调整消息后, 可将自己目前的工作电流调整为最 大工作电流。 当然, 调整消息中也可以携带基站希望电调天线设备将最大工 作电流调整的电流值, 如果该电流值在电调天线设备允许的工作电流范围内, 则电调天线设备也可以将最大工作电流调整为该电流值。  When the ESC antenna device receives the adjustment message, it can adjust its current operating current to the maximum operating current. Of course, the adjustment message may also carry a current value that the base station wants to adjust the maximum operating current of the ESC antenna device. If the current value is within the allowable operating current range of the ESC antenna device, the ESC antenna device may also apply the maximum operating current. Adjust to this current value.
当电调天线设备调整最大工作电流后, 将向基站发送应答消息, 应答消 息中携带调整后所得到的最大工作电流 , 以使基站根据该调整后的最大工作 电流判断调整后的供电电流门限值是否与调整后的最大工作电流适配, 如果 适配, 则执行步骤 405 , 否则说明基站无法支持此基站的电调操作。  After the ESC antenna device adjusts the maximum working current, the response message is sent to the base station, and the response message carries the adjusted maximum working current, so that the base station determines the adjusted supply current threshold according to the adjusted maximum working current. Whether the value is adapted to the adjusted maximum operating current. If it is adapted, step 405 is performed. Otherwise, the base station cannot support the ESC operation of the base station.
当基站与多个电调天线设备相连接时, 可以在接收到多个电调天线设备 发送的应答消息后, 判断调整后的供电电流门限值是否与上述多个电调天线 设备的调整后的最大工作电流之和适配, 如果适配, 则执行步骤 406 , 否则说 明基站无法支持所述多个电调天线设备同时进行电调操作, 此时可以挑选几 个优选的电调天线设备, 并执行步骤 405。 When the base station is connected to the plurality of electrically adjustable antenna devices, after determining the response message sent by the plurality of electrically adjustable antenna devices, determining whether the adjusted supply current threshold is adjusted with the plurality of electrically adjustable antenna devices The sum of the maximum operating currents is adapted, if it is adapted, step 406 is performed, otherwise The base station cannot support the plurality of ESC antenna devices to perform the ESC operation at the same time. In this case, several preferred ESC antenna devices can be selected, and step 405 is performed.
步骤 405 ,基站向电调天线设备发送电调操作消息, 电调天线设备执行电 调业务操作。  Step 405: The base station sends an ESC operation message to the ESC antenna device, and the ESC antenna device performs an ESC service operation.
经过步骤 403、步骤 404所述的操作,调整后的供电电流门限值能与电调 天线设备的电流参数适配时, 可以向电调天线设备发送电调操作消息, 使电 调天线设备执行后续的电调操作, 如对基站的天线进行校准或设置天线的倾 角等。 电调天线设备接收到消息后即可执行自己的业务操作, 执行完毕后可 向基站发送一个应答消息。  After the operation of the step 403 and the step 404, the adjusted power supply current threshold value can be matched with the current parameter of the electrical adjustment antenna device, and the electrical adjustment operation message can be sent to the electrical adjustment antenna device to enable the electrical adjustment antenna device to perform Subsequent ESC operations, such as calibrating the antenna of the base station or setting the tilt angle of the antenna. After receiving the message, the ESC antenna device can perform its own service operation, and after the execution is completed, it can send a response message to the base station.
步骤 406,基站将调整后的供电电流门限值还原为调整前的供电电流门限 值。  Step 406: The base station restores the adjusted power supply current threshold to the power supply current threshold before the adjustment.
如果基站在电调过程中调整了自身的供电电流门限值, 则在电调完毕后 应该还原自身的供电电流门限值。  If the base station adjusts its own supply current threshold during the ESC process, it should restore its own supply current threshold after the ESC is completed.
步骤 407 , 还原电调天线设备的电流参数。  Step 407: Restore current parameters of the electrical adjustment antenna device.
如果基站在电调过程中通知电调天线设备修改了其电流参数, 则在电调 完毕后应该通知电调天线设备还原电流参数至原始值。  If the base station informs the ESC antenna device to modify its current parameter during the ESC process, the ESC antenna device should be notified to restore the current parameter to the original value after the ESC is completed.
本实施例中, 基站获取电调天线设备的电流参数后, 首先确定自身对电 调天线设备的供电电流门限值是否与获取到的电调天线设备的电流参数适 配, 如果不适配, 则与电调天线设备进行电流参数的协商, 根据协商的结果, 调整供电电流门限值与电调天线设备的电流参数适配, 然后向电调天线设备 发送电调操作消息, 进行后续的电调操作。 由此, 本发明实施例实现了基站 与电调天线设备之间进动态地行电流协商, 并根据协商的结果调整自身的供 电电流门限值或使电调天线设备设置其电流参数, 更好地支持电调天线设备 的业务操作, 电调天线设备的电调操作的操作性变好。  In this embodiment, after obtaining the current parameter of the ESC antenna device, the base station first determines whether the power supply current threshold value of the ESC antenna device is adapted to the current parameter of the obtained ESC antenna device. If not, Then, the current parameter is negotiated with the ESC antenna device, and according to the result of the negotiation, the power supply current threshold is adjusted to match the current parameter of the ESC antenna device, and then the ESC operation message is sent to the ESC antenna device for subsequent power transmission. Adjust the operation. Therefore, the embodiment of the present invention implements dynamic line current negotiation between the base station and the ESC antenna device, and adjusts the power supply current threshold value according to the negotiated result or sets the current parameter of the ESC antenna device. The ground supports the business operation of the electronically tuned antenna device, and the operability of the electrical adjustment operation of the electronically tuned antenna device becomes better.
相应地, 本发明实施例还提供了一种电调主设备。 本实施例提供的电调 主设备可以为基站, 也可以为其他设备, 本实施例以基站为例进行说明, 但 是并不用限定本实施例的保护范围。 图 5 为本发明实施例提供的一种电调主 设备示意图。 如图 5所示, 该电调主设备包括以下单元: Correspondingly, an embodiment of the present invention further provides an ESC master device. The power-on master device provided in this embodiment may be a base station or another device. This embodiment uses a base station as an example for description, but It is not necessary to limit the scope of protection of the embodiment. FIG. 5 is a schematic diagram of an ESC master device according to an embodiment of the present invention. As shown in FIG. 5, the ESC master device includes the following units:
获取单元 501 , 用于获取电调天线设备的电流参数, 以及将所述电流参数 传输至判断单元。  The obtaining unit 501 is configured to acquire a current parameter of the ESC antenna device, and transmit the current parameter to the judging unit.
当基站只与一个电调天线设备相连接时, 获取单元 501 用于获取一个电 调天线设备的电流参数, 电流参数包括该电调天线设备的最大工作电流、 最 小允许工作电流、 静态电流。  When the base station is connected to only one ESC antenna device, the obtaining unit 501 is configured to obtain a current parameter of the ESC antenna device, where the current parameter includes a maximum operating current, a minimum allowable operating current, and a quiescent current of the ESC antenna device.
当基站与多个电调天线设备相连接时, 获取单元 501 用于获取多个电调 天线设备的电流参数, 即获取每个电调天线设备的最大工作电流、 最小允许 工作电流、 静态电流。  When the base station is connected to the plurality of electrically adjustable antenna devices, the obtaining unit 501 is configured to obtain current parameters of the plurality of electrically adjustable antenna devices, that is, obtain a maximum operating current, a minimum allowable operating current, and a quiescent current of each of the electrically adjustable antenna devices.
判断单元 502 , 用于从所述判断单元接收所述电流参数, 以及判断对所述 电调天线设备的供电电流门限值是否与所述电流参数适配, 并将判断结果传 输至所述调整单元。  The determining unit 502 is configured to receive the current parameter from the determining unit, and determine whether a power supply current threshold value of the electronically adjustable antenna device is adapted to the current parameter, and transmit the determination result to the adjustment unit.
当基站只与一个电调天线设备相连接时, 判断单元 502 具体用于判断对 所述电调天线设备的供电电流门限值是否大于等于获取到的所述一个电调天 线设备的最大工作电流。  When the base station is connected to only one electronically tuned antenna device, the determining unit 502 is specifically configured to determine whether the power supply current threshold value of the electrical adjustable antenna device is greater than or equal to the obtained maximum operating current of the one electrical adjustable antenna device. .
当基站与多个电调天线设备相连接时, 判断单元 502 具体用于判断对所 述电调天线设备的供电电流门限值是否大于等于获取到的所述多个电调天线 设备的最大工作电流之和。  When the base station is connected to the plurality of electrically adjustable antenna devices, the determining unit 502 is specifically configured to determine whether the power supply current threshold of the electrical adjustable antenna device is greater than or equal to the obtained maximum operation of the plurality of electrically adjustable antenna devices. The sum of the currents.
调整单元 503 , 用于从所述调整单元接收所述判断结果, 所述判断单元判 断所述供电电流门限值与所述电流参数不适配, 则调整所述供电电流门限值, 以使得调整后的所述供电电流门限值与所述电调天线设备的电流参数适配。  The adjusting unit 503 is configured to receive the determination result from the adjusting unit, where the determining unit determines that the power supply current threshold value is not adapted to the current parameter, and adjusts the power supply current threshold value, so that The adjusted supply current threshold is adapted to the current parameter of the electrically adjustable antenna device.
当基站只与一个电调天线设备相连接时, 调整单元 503具体用于所述判 断单元判断所述供电电流门限值小于获取到的所述一个电调天线设备的最大 工作电流时, 调整所述供电电流门限值, 使得调整后的所述供电电流门限值 大于等于获取到的所述一个电调天线设备的最大工作电流。 当基站与多个电调天线设备相连接时, 调整单元 503具体用于所述判断 单元判断所述供电电流门限值小于获取到的所述多个电调天线设备的最大工 作电流之和时, 调整所述供电电流门限值, 以使得调整后的所述供电电流门 限值大于等于获取到的所述多个电调天线设备的最大工作电流之和。 When the base station is connected to only one electronically adjustable antenna device, the adjusting unit 503 is specifically configured to: when the determining unit determines that the power supply current threshold is less than the obtained maximum operating current of the one of the electronically adjustable antenna devices, The supply current threshold is set such that the adjusted supply current threshold is greater than or equal to the obtained maximum operating current of the one ESC device. When the base station is connected to the plurality of electrically adjustable antenna devices, the adjusting unit 503 is specifically configured to: when the determining unit determines that the power supply current threshold is less than a sum of the obtained maximum operating currents of the plurality of electrically adjustable antenna devices And adjusting the supply current threshold to make the adjusted supply current threshold equal to or greater than a sum of the obtained maximum operating currents of the plurality of electrically adjustable antenna devices.
第一发送单元 504 ,用于向所述电调天线设备发送电调操作消息, 以使得 所述电调天线设备进行电调操作。  The first sending unit 504 is configured to send an ESC operation message to the ESC antenna device, so that the ESC antenna device performs an ESC operation.
如果判断单元判断的结论为所述供电电流门限值与所述电流参数适配, 则第一发送单元 504还用于向所述电调天线设备发送电调操作消息。  If the judgment unit determines that the power supply current threshold is adapted to the current parameter, the first sending unit 504 is further configured to send an ESC operation message to the ESC device.
优选地, 本实施例的装置还包括: 第二发送单元 505 , 用于所述调整单元 调整后的所述供电电流门限值与所述一个电调天线设备的电流参数不适配, 向所述一个电调天线设备发送调整所述最大工作电流的调整消息;  Preferably, the apparatus of this embodiment further includes: a second sending unit 505, wherein the power supply current threshold value adjusted by the adjusting unit is not adapted to a current parameter of the one electronically adjustable antenna device, Said an ESC antenna device transmitting an adjustment message for adjusting the maximum operating current;
第一接收单元 506 ,用于接收所述一个电调天线设备根据所述调整消息调 整所述最大工作电流的应答消息;  The first receiving unit 506 is configured to receive, by the one electrical adjustment antenna device, a response message for adjusting the maximum working current according to the adjustment message;
处理单元 507 ,用于判断所述调整单元调整后的所述供电电流门限值是否 大于等于所述一个电调天线设备的调整后的所述最大工作电流, 如果大于等 于, 则执行向所述一个电调天线设备发送电调操作消息的步骤。  The processing unit 507 is configured to determine whether the adjusted current supply threshold value of the adjustment unit is greater than or equal to the adjusted maximum operating current of the one electrical toroidal antenna device, and if yes or greater, perform the The step of transmitting an ESC operation message by an ESC antenna device.
当基站与多个电调天线设备相连接时, 如果调整后的所述供电电流门限 值与所述多个电调天线设备的电流参数不适配, 第二发送单元 505还用于, 所述调整单元调整后的所述供电电流门限值与所述多个电调天线设备的电流 参数不适配时, 向所述多个电调天线设备发送调整所述最大工作电流的调整 消息; 第一接收单元 506还用于接收所述多个电调天线设备根据所述调整消 息调整所述最大工作电流的应答消息; 处理单元 507还用于判断所述调整单 元调整后的所述供电电流门限值是否大于等于所述多个电调天线设备调整后 的所述最大工作电流之和, 如果大于等于, 则执行向所述多个电调天线设备 发送电调操作消息的步骤, 否则从所述多个电调天线设备中挑选出部分电调 天线设备, 并向所述部分电调天线设备发送电调操作消息。 优选地, 本发明实施例还包括: 第二接收单元 508 , 用于接收所述电调天 线设备根据消息电调完成后的应答消息; When the base station is connected to the plurality of electrically adjustable antenna devices, if the adjusted supply current threshold is not adapted to the current parameters of the plurality of electrically adjustable antenna devices, the second transmitting unit 505 is further configured to: And adjusting, when the adjusted current threshold value of the adjusting unit is not adapted to the current parameters of the plurality of electrically adjustable antenna devices, transmitting, to the plurality of electrically adjustable antenna devices, an adjustment message for adjusting the maximum operating current; The first receiving unit 506 is further configured to receive the response message that the plurality of electrically adjustable antenna devices adjust the maximum operating current according to the adjustment message; the processing unit 507 is further configured to determine the adjusted current supply current by the adjusting unit Whether the threshold value is greater than or equal to a sum of the adjusted maximum operating currents of the plurality of electrically adjustable antenna devices, and if greater than or equal to, performing the step of transmitting an ESC operation message to the plurality of electrically adjustable antenna devices, otherwise A part of the electrical adjustment antenna devices are selected from the plurality of electrically adjustable antenna devices, and an electrical adjustment operation message is sent to the partial electrical adjustment antenna devices. Preferably, the embodiment of the present invention further includes: a second receiving unit 508, configured to receive a response message after the ESC is completed according to the message ESC;
还原单元 509 ,用于将所述调整单元调整后的所述供电电流门限值还原为 调整前的所述供电电流门限值;  a reducing unit 509, configured to restore the power supply current threshold value adjusted by the adjusting unit to the power supply current threshold value before adjusting;
第三发送单元 510 ,用于向所述电调天线设备发送还原所述最大工作电流 的还原消息, 以使所述电调天线设备将调整后的所述最大工作电流还原为调 整前的所述最大工作电流。  a third sending unit 510, configured to send, to the electrical tune antenna device, a restoration message that restores the maximum working current, so that the electrically adjustable antenna device restores the adjusted maximum operating current to the pre-adjustment Maximum operating current.
本发明实施例中, 基站获取电调天线设备的电流参数后, 首先确定据自 身对电调天线设备的供电电流门限值是否与获取到的电调天线设备的电流参 数适配, 如果不适配, 则与电调天线设备进行电流参数的协商, 根据协商的 结果, 调整供电电流门限值与电调天线设备的电流参数适配, 然后向电调天 线设备发送电调操作消息, 进行后续的电调操作。 由此, 本发明实施例实现 了基站与电调天线设备之间进动态地行电流协商, 并根据协商的结果调整自 身的供电电流门限值或使电调天线设备设置其电流参数, 更好地支持电调天 线设备的业务操作, 使得电调天线设备的操作性变好, 更加可靠。  In the embodiment of the present invention, after acquiring the current parameter of the electronically tuned antenna device, the base station first determines whether the power supply current threshold value of the electrical adjustment antenna device is adapted to the current parameter of the obtained electrical adjustment antenna device, if not Matching, the current parameter negotiation is performed with the ESC antenna device, and according to the result of the negotiation, the power supply current threshold value is adjusted and the current parameter of the ESC antenna device is adapted, and then the ESC operation message is sent to the ESC antenna device for subsequent operation. The ESC operation. Therefore, the embodiment of the present invention implements dynamic line current negotiation between the base station and the ESC antenna device, and adjusts the power supply current threshold value according to the negotiated result or sets the current parameter of the ESC antenna device. Supporting the operation of the ESC antenna device makes the operability of the ESC antenna device better and more reliable.
相应地, 本发明实施例还提供了一种电调天线设备。 图 6为本发明实施 例提供的电调天线设备示意图。 如图 6所示, 该电调天线设备包括以下单元: 第一接收单元 601 , 用于接收电调主设备发送的电流参数请求消息。 为了描述上的方便, 本实施例也以基站作为电调主设备的一种举例进行 描述, 但是以基站进行描述只是本发明的一种具体实施例的方式而已, 并不 用于限定本发明的保护范围。  Correspondingly, an embodiment of the present invention further provides an electrical adjustment antenna device. FIG. 6 is a schematic diagram of an electrical adjustment antenna device according to an embodiment of the present invention. As shown in FIG. 6, the electrical adjustment antenna device includes the following unit: The first receiving unit 601 is configured to receive a current parameter request message sent by the ESC master device. For the convenience of description, this embodiment is also described by using a base station as an example of an electrical control master device, but the description by the base station is only a specific embodiment of the present invention, and is not used to limit the protection of the present invention. range.
基站与电调天线设备建立连接后,通过 AI SG接口定义的电流参数协商接 口向电调天线设备发送获取电流参数的请求消息, 由此电调天线设备可以接 收到基站发送的电流参数请求消息。  After the base station establishes a connection with the ESC antenna device, the current parameter negotiation interface defined by the AI SG interface sends a request message for obtaining the current parameter to the ESC antenna device, so that the ESC antenna device can receive the current parameter request message sent by the base station.
第一发送单元 602 ,用于向所述电调主设备发送电流参数,所述电流参数 包括最大工作电流。 当电调天线设备接收到电流参数请求消息后, 将向基站发送电流参数, 该电流参数包括最大工作电流、 最小允许工作电流、 静态电流。 The first sending unit 602 is configured to send a current parameter to the ESC master device, where the current parameter includes a maximum operating current. After receiving the current parameter request message, the ESC antenna device sends a current parameter to the base station, where the current parameter includes a maximum operating current, a minimum allowable operating current, and a quiescent current.
第二接收单元 603 ,用于接收所述电调主设备根据所述最大工作电流与供 电电流门限值适配比较后发送的电调操作消息。  The second receiving unit 603 is configured to receive an ESC operation message that is sent by the ESC master device according to the maximum operating current and the power supply current threshold value.
基站在获取到电调天线设备的电流参数后, 通过调整自身配置的供电电 流门限值便可实现与电调天线设备的电流参数适配时, 则调整自身对电调天 线设备的供电电流门限值, 调整后的供电电流门限值与最大工作电流适配时, 可向电调天线设备发送电调操作消息。  After obtaining the current parameter of the ESC antenna device, the base station can adjust the current parameter of the ESC antenna device by adjusting the current supply current threshold value, and then adjust the power supply current gate of the ESC antenna device. The limit value, when the adjusted supply current threshold is adapted to the maximum operating current, can send an ESC operation message to the ESC antenna device.
如果基站调整供电电流门限值后也无法得到与电流参数适配的门限值, 则此时会向电调天线设备发送调整其最大工作电流的调整消息, 请求电调天 线设备调整其最大工作电流。 电调天线设备接收到该调整消息后, 根据所述 调整消息, 调整所述最大工作电流。 优选地, 电调天线设备可将自己目前的 工作电流调整为最大工作电流。 当然, 如果调整消息中携带有基站希望电调 天线设备将最大工作电流调整的电流值, 如果该电流值在电调天线设备允许 的工作电流范围内, 则电调天线设备也可以将最大工作电流调整为该电流值。 当电调天线设备调整最大工作电流后, 将向基站发送应答消息, 应答消息中 携带调整后所得到的最大工作电流, 以使基站根据该调整后的最大工作电流 判断调整后的供电电流门限值是否与调整后的最大工作电流适配, 然后基站 即可向电调天线设备发送电调操作消息。  If the base station adjusts the power supply current threshold and cannot obtain the threshold value adapted to the current parameter, the adjustment message for adjusting the maximum operating current is sent to the electronically adjustable antenna device, and the electronically adjustable antenna device is requested to adjust its maximum working. Current. After receiving the adjustment message, the ESC antenna device adjusts the maximum operating current according to the adjustment message. Preferably, the tunable antenna device can adjust its current operating current to the maximum operating current. Of course, if the adjustment message carries a current value that the base station wants to adjust the maximum operating current of the ESC antenna device, if the current value is within the allowable operating current range of the ESC antenna device, the ESC antenna device can also set the maximum operating current. Adjust to this current value. After the ESC antenna device adjusts the maximum working current, the response message is sent to the base station, and the response message carries the adjusted maximum working current, so that the base station determines the adjusted supply current threshold according to the adjusted maximum working current. Whether the value is adapted to the adjusted maximum operating current, the base station can then send an ESC operation message to the ESC antenna device.
处理单元 604 , 用于根据所述电调操作消息, 进行电调操作。  The processing unit 604 is configured to perform an electrical adjustment operation according to the ESC operation message.
优选地, 本实施例还包括: 调整单元 605 , 用于接收电调主设备发送的调 整最大工作电流的调整消息; 根据所述调整消息, 调整所述最大工作电流; 向所述电调主设备发送调整所述最大工作电流的应答消息。  Preferably, the embodiment further includes: an adjusting unit 605, configured to receive an adjustment message for adjusting a maximum working current sent by the ESC master device; and adjusting the maximum working current according to the adjustment message; to the ESC master device A response message that adjusts the maximum operating current is sent.
优选地, 本实施例还包括: 第二接收单元 606 , 用于接收所述电调主设备 发送的还原所述最大工作电流的还原消息;  Preferably, the embodiment further includes: a second receiving unit 606, configured to receive a restoration message sent by the ESC master device to restore the maximum working current;
还原单元 607 ,用于将调整后的所述最大工作电流还原为调整前的所述最 大工作电流。 a restoring unit 607, configured to restore the adjusted maximum operating current to the most Large working current.
本发明实施例中, 电调天线设备接收电调主设备发送的电流参数请求消 息; 向所述电调主设备发送电流参数, 所述电流参数包括最大工作电流; 接 收所述电调主设备根据所述最大工作电流与供电电流门限值适配比较后发送 的电调操作消息; 根据所述电调操作消息, 进行电调操作。 由此本发明实施 例实现了电调主设备与电调天线设备之间进动态地行电流协商, 并根据协商 的结果调整自身的供电电流门限值或使电调天线设备设置其电流参数, 更好 地支持电调天线设备的业务操作。  In the embodiment of the present invention, the electrical adjustment antenna device receives a current parameter request message sent by the ESC master device, and sends a current parameter to the ESC master device, where the current parameter includes a maximum operating current; and receiving the ESC master device according to The ESC operation message sent after the maximum operating current is compared with the supply current threshold value; and the ESC operation is performed according to the ESC operation message. Therefore, the embodiment of the present invention implements dynamic line current negotiation between the ESC master device and the ESC antenna device, and adjusts the power supply current threshold value or sets the current parameter of the ESC antenna device according to the negotiated result. Better support for business operations of ESC antenna equipment.
本发明实施例还提供了一种电调主设备, 本实施例提供的电调主设备可 以为基站, 也可以为其他设备, 本实施例以基站为例进行说明, 但是并不用 限定本实施例的保护范围。 图 7 为本发明实施例提供的一种电调主设备示意 图。 如图 7所示, 本实施例提供的电调主设备包括以下部件:  The embodiment of the present invention further provides an electronically-tuned master device. The power-switching master device provided in this embodiment may be a base station, or may be another device. This embodiment uses a base station as an example for description, but the present embodiment is not limited. The scope of protection. FIG. 7 is a schematic diagram of an ESC master device according to an embodiment of the present invention. As shown in FIG. 7, the ESC master device provided in this embodiment includes the following components:
接收机 701 , 用于获取电调天线设备的电流参数, 以及将所述电流参数传 输至处理器。  The receiver 701 is configured to acquire a current parameter of the ESC antenna device and transmit the current parameter to the processor.
当基站只与一个电调天线设备相连接时, 接收机 701 用于获取一个电调 天线设备的电流参数, 电流参数包括该电调天线设备的最大工作电流、 最小 允许工作电流、 静态电流。  When the base station is connected to only one ESC antenna device, the receiver 701 is configured to obtain a current parameter of an ESC antenna device, and the current parameter includes a maximum operating current, a minimum allowable operating current, and a quiescent current of the ESC antenna device.
当基站与多个电调天线设备相连接时, 接收机 701 用于获取多个电调天 线设备的电流参数, 即获取每个电调天线设备的最大工作电流、 最小允许工 作电流、 静态电流。  When the base station is connected to a plurality of electrically adjustable antenna devices, the receiver 701 is configured to obtain current parameters of the plurality of electrically adjustable antenna devices, that is, obtain a maximum operating current, a minimum allowable working current, and a quiescent current of each of the electrically adjustable antenna devices.
处理器 702 , 用于从所述接收机接收所述电流参数, 并判断对所述电调天 线设备的供电电流门限值是否与所述电流参数适配; 如果所述供电电流门限 值与所述电流参数不适配, 则调整所述供电电流门限值, 以使得调整后的所 述供电电流门限值与所述电调天线设备的电流参数适配, 以及将调整后适配 的结果传输至发射机。  The processor 702 is configured to receive the current parameter from the receiver, and determine whether a power supply current threshold of the electronically adjustable antenna device is matched with the current parameter; if the power supply current threshold is If the current parameter is not adapted, the power supply current threshold is adjusted such that the adjusted power supply current threshold is adapted to the current parameter of the electronically tuned antenna device, and the adjusted after adaptation The result is transmitted to the transmitter.
本发明实施例提供的处理器 702 可以为单核处理器, 也可以为多核处理 哭口 。 The processor 702 provided by the embodiment of the present invention may be a single core processor or a multi-core processor. Cry.
发射机 703 , 用于从所述处理器接收所述调整后适配的结果, 以及向所述 电调天线设备发送电调操作消息, 以使得所述电调天线设备进行电调操作。  The transmitter 703 is configured to receive a result of the adjusted adaptation from the processor, and send an ESC operation message to the electrical tune antenna device, so that the electrical tune antenna device performs an electrical adjustment operation.
优选地, 在处理器 702判断供电电流门限值与所述电流参数适配时, 发 射机 703可以向电调天线设备发送电调操作消息。  Preferably, when the processor 702 determines that the supply current threshold is adapted to the current parameter, the transmitter 703 can transmit an ESC operation message to the ESC antenna device.
如果处理器 702 调整供电电流门限值后, 调整后的供电电流门限值与电 调天线设备的电流参数仍然不适配, 发射机 703还用于向所述电调天线设备 发送调整所述最大工作电流的调整消息;  If the processor 702 adjusts the supply current threshold, the adjusted supply current threshold is still not adapted to the current parameter of the ESC device, and the transmitter 703 is further configured to send the adjustment to the ESC device. Adjustment message of maximum working current;
发射机 703 向电调天线设备发送调整所述最大工作电流的调整消息后, 接收机 701 还用于接收所述电调天线设备根据所述调整消息调整所述最大工 作电流的应答消息, 并将所述应答消息传输至处理器 702 ;  After the transmitter 703 sends an adjustment message to adjust the maximum operating current to the electrical adjustment antenna device, the receiver 701 is further configured to receive the response message that the electrical adjustment antenna device adjusts the maximum working current according to the adjustment message, and The response message is transmitted to the processor 702;
处理器 702还用于从接收机 701接收所述调整所述最大工作电流的应答 消息, 以及判断调整后的所述供电电流门限值是否与所述电调天线设备的调 整后的所述电流参数适配, 如果适配, 则执行向所述一个电调天线设备发送 电调操作消息的步骤。  The processor 702 is further configured to receive, by the receiver 701, the response message that adjusts the maximum operating current, and determine whether the adjusted supply current threshold is related to the adjusted current of the electronically adjustable antenna device. Parameter adaptation, if adapted, performs the step of transmitting an ESC operation message to the one ESC antenna device.
优选地, 接收机 701 还用于接收所述电调天线设备根据所述电调操作消 息电调完成后的应答消息, 以及将所述电调完成后的应答消息传输至处理器 702 ;  Preferably, the receiver 701 is further configured to receive a response message after the ESC operation device completes the ESC according to the ESC operation message, and transmit the response message after the ESC is completed to the processor 702;
处理器 702还用于从接收机 701接收所述电调完成后的应答消息, 以及 将调整后的所述供电电流门限值还原为调整前的所述供电电流门限值;  The processor 702 is further configured to receive the response message after the ESC is completed from the receiver 701, and restore the adjusted supply current threshold to the supply current threshold before the adjustment;
发射机 703还用于向所述电调天线设备发送还原所述最大工作电流的还 原消息, 以使得所述电调天线设备将调整后的所述电流参数还原为调整前的 所述电流参数。  The transmitter 703 is further configured to send, to the electrically adjustable antenna device, a restore message that restores the maximum operating current, so that the electrically adjustable antenna device restores the adjusted current parameter to the current parameter before adjustment.
在本发明实施例中, 基站可以与一个或多个电调天线设备连接, 因此本 发明实施例介绍的技术方案支持基站连接一个或多个电调天线设备的情况, 基站连接一个电调天线设备的电调方法与基站连接多个电调天线设备的方法 可以参见本申请文件的方法实施例部分的详细介绍, 此处不再赞述。 In the embodiment of the present invention, the base station may be connected to one or more electrical adjustment antenna devices. Therefore, the technical solution introduced in the embodiment of the present invention supports the case where the base station is connected to one or more electrical adjustment antenna devices, and the base station is connected to an electrical adjustment antenna device. Method for connecting multiple ESC antenna devices with a base station Please refer to the detailed description of the method embodiment part of this application file, which is not mentioned here.
本发明实施例还提供了一种电调天线设备。 图 8为本发明实施例提供的 一种电调天线设备示意图。 如图 8 所示, 本实施例提供的电调天线设备包括 以下部件:  The embodiment of the invention further provides an electrical adjustment antenna device. FIG. 8 is a schematic diagram of an electrical adjustment antenna device according to an embodiment of the present invention. As shown in FIG. 8, the electrical adjustment antenna device provided in this embodiment includes the following components:
接收机 801 , 用于接收电调主设备发送的电流参数请求消息, 以及将所述 电流参数请求消息传输至处理器, 以使得所述处理器根据所述电流参数请求 消息获取所述电流参数并将所述电流参数传输至发射机。  a receiver 801, configured to receive a current parameter request message sent by the ESC master device, and transmit the current parameter request message to the processor, so that the processor acquires the current parameter according to the current parameter request message The current parameter is transmitted to the transmitter.
基站与电调天线设备建立连接后, 通过 AI SG接口定义的电流参数协商接 口向电调天线设备发送获取电流参数的请求消息, 由此电调天线设备可以接 收到基站发送的电流参数请求消息。  After the base station establishes a connection with the ESC antenna device, the current parameter negotiation interface defined by the AI SG interface sends a request message for obtaining the current parameter to the ESC antenna device, so that the ESC antenna device can receive the current parameter request message sent by the base station.
发射机 802 , 用于从所述处理器接收所述电流参数, 以及向所述电调主设 备发送电流参数, 所述电流参数包括最大工作电流。  The transmitter 802 is configured to receive the current parameter from the processor, and send a current parameter to the ESC device, the current parameter including a maximum operating current.
接收机 801 还用于接收所述电调主设备根据所述最大工作电流与供电电 流门限值适配比较后发送的电调操作消息, 以及将所述电调操作消息传输至 所述处理器。  The receiver 801 is further configured to receive an ESC operation message that is sent by the ESC master device according to the maximum operating current and the supply current threshold value, and transmit the ESC operation message to the processor. .
当电调天线设备接收到电流参数请求消息后, 将向基站发送电流参数, 该电流参数包括最大工作电流、 最小允许工作电流、 静态电流。  After receiving the current parameter request message, the ESC antenna device sends a current parameter to the base station, where the current parameter includes a maximum operating current, a minimum allowable operating current, and a quiescent current.
基站在获取到电调天线设备的电流参数后, 通过调整自身配置的供电电 流门限值便可实现与电调天线设备的电流参数适配时, 则调整自身对电调天 线设备的供电电流门限值, 调整后的供电电流门限值与最大工作电流适配时, 可向电调天线设备发送电调操作消息。  After obtaining the current parameter of the ESC antenna device, the base station can adjust the current parameter of the ESC antenna device by adjusting the current supply current threshold value, and then adjust the power supply current gate of the ESC antenna device. The limit value, when the adjusted supply current threshold is adapted to the maximum operating current, can send an ESC operation message to the ESC antenna device.
如果基站调整供电电流门限值后也无法得到与电流参数适配的门限值, 则此时会向电调天线设备发送调整其最大工作电流的调整消息, 请求电调天 线设备调整其最大工作电流。 电调天线设备接收到该调整消息后, 根据所述 调整消息, 调整所述最大工作电流。 优选地, 电调天线设备可将自己目前的 工作电流调整为最大工作电流。 当然, 如果调整消息中携带有基站希望电调 天线设备将最大工作电流调整的电流值, 如果该电流值在电调天线设备允许 的工作电流范围内, 则电调天线设备也可以将最大工作电流调整为该电流值。 当电调天线设备调整最大工作电流后, 将向基站发送应答消息, 应答消息中 携带调整后所得到的最大工作电流, 以使基站根据该调整后的最大工作电流 判断调整后的供电电流门限值是否与调整后的最大工作电流适配, 然后基站 即可向电调天线设备发送电调操作消息。 If the base station adjusts the power supply current threshold and cannot obtain the threshold value adapted to the current parameter, the adjustment message for adjusting the maximum operating current is sent to the electronically adjustable antenna device, and the electronically adjustable antenna device is requested to adjust its maximum working. Current. After receiving the adjustment message, the ESC antenna device adjusts the maximum operating current according to the adjustment message. Preferably, the tunable antenna device can adjust its current operating current to the maximum operating current. Of course, if the adjustment message carries a base station, it hopes to adjust the tone. The current value of the antenna device that adjusts the maximum operating current. If the current value is within the allowable operating current range of the ESC antenna device, the ESC antenna device can also adjust the maximum operating current to the current value. After the ESC antenna device adjusts the maximum working current, the response message is sent to the base station, and the response message carries the adjusted maximum working current, so that the base station determines the adjusted supply current threshold according to the adjusted maximum working current. Whether the value is adapted to the adjusted maximum operating current, the base station can then send an ESC operation message to the ESC antenna device.
处理器 803 ,用于从所述接收机接收所述电调操作消息, 以及根据所述电 调操作消息, 进行电调操作。  The processor 803 is configured to receive the ESC operation message from the receiver, and perform an ESC operation according to the ESC operation message.
优选地, 接收机 801 还用于接收所述电调主设备发送的调整所述最大工 作电流的调整消息, 以及将所述调整所述最大工作电流的调整消息传输至处 理器 803 ;处理器 803还用于从所述接收机 801接收所述调整所述最大工作电 流的调整消息, 以及根据所述调整消息, 调整所述最大工作电流, 将调整结 果传输至所述发射机 802 ;所述发射机 802还用于从所述处理器 803接收所述 调整结果, 以及向所述电调主设备发送调整所述最大工作电流的应答消息。  Preferably, the receiver 801 is further configured to receive an adjustment message that is sent by the ESC device to adjust the maximum working current, and transmit the adjustment message that adjusts the maximum working current to the processor 803; the processor 803 Also for receiving, from the receiver 801, the adjustment message for adjusting the maximum operating current, and adjusting the maximum operating current according to the adjustment message, transmitting an adjustment result to the transmitter 802; the transmitting The machine 802 is further configured to receive the adjustment result from the processor 803, and send a response message to adjust the maximum operating current to the ESC master device.
优选地, 所述接收机 801 还用于接收所述电调主设备发送的还原所述最 大工作电流的还原消息, 以及将所述还原消息传输至所述处理器 803 ; 所述处 理器 803还用于从所述接收机接收所述还原消息, 以及将调整后的所述最大 工作电流还原为调整前的所述最大工作电流。  Preferably, the receiver 801 is further configured to receive a restore message sent by the ESC master device to restore the maximum working current, and transmit the restore message to the processor 803; the processor 803 further And for receiving the restored message from the receiver, and reducing the adjusted maximum operating current to the maximum operating current before the adjusting.
本发明实施例还提供了一种电调系统。 该系统植入了本发明实施例提供 的电调方法, 包括上述电调主设备和电调天线设备。 在电调系统中, 在电调 主设备与电调天线设备建立连接之后, 电调主设备获取电调天线设备的电流 参数, 首先确定自身对电调天线设备的供电电流门限值是否与获取到的电调 天线设备的电流参数适配, 如果不适配, 则与电调天线设备进行电流参数的 协商, 根据协商的结果, 调整供电电流门限值与电调天线设备的电流参数适 配, 然后向电调天线设备发送电调操作消息, 进行后续的电调操作。 由此, 本发明实施例实现了电调主设备与电调天线设备之间进动态地行电流协商, 并根据协商的结果调整自身的供电电流门限值或使电调天线设备设置其电流 参数, 更好地支持电调天线设备的业务操作。 因此, 本发明实施例提供的电 调系统也在本发明的保护范围内。 The embodiment of the invention also provides an electrical adjustment system. The system is embedded with the electrical tuning method provided by the embodiment of the present invention, including the above-mentioned ESC master device and ESC antenna device. In the ESC system, after the ESC master device establishes a connection with the ESC antenna device, the ESC master device obtains the current parameter of the ESC antenna device, and first determines whether the power supply current threshold value of the ESC antenna device is obtained and acquired. If the current parameter of the ESC antenna device is adapted, if it is not adapted, the current parameter is negotiated with the ESC antenna device, and according to the result of the negotiation, the supply current threshold is adjusted and the current parameter of the ESC device is adapted. Then, the ESC operation message is sent to the ESC antenna device for subsequent ESC operation. Therefore, the embodiment of the invention implements dynamic line current negotiation between the ESC master device and the ESC antenna device. According to the result of the negotiation, the power supply current threshold is adjusted or the current adjustment parameter is set by the electrical adjustment antenna device to better support the operation of the electrical adjustment antenna device. Therefore, the electric adjustment system provided by the embodiment of the present invention is also within the protection scope of the present invention.
专业人员应该还可以进一步意识到, 结合本文中所公开的实施例描述的 各示例的单元及算法步骤, 能够以电子硬件、 计算机软件或者二者的结合来 实现, 为了清楚地说明硬件和软件的可互换性, 在上述说明中已经按照功能 一般性地描述了各示例的组成及步骤。 这些功能究竟以硬件还是软件方式来 执行, 取决于技术方案的特定应用和设计约束条件。 专业技术人员可以对每 个特定的应用来使用不同方法来实现所描述的功能, 但是这种实现不应认为 超出本发明的范围。  A person skilled in the art should further appreciate that the elements and algorithm steps of the various examples described in connection with the embodiments disclosed herein can be implemented in electronic hardware, computer software, or a combination of both, in order to clearly illustrate hardware and software. Interchangeability, the composition and steps of the various examples have been generally described in terms of function in the above description. Whether these functions are performed in hardware or software depends on the specific application and design constraints of the solution. A person skilled in the art can use different methods for implementing the described functions for each particular application, but such implementation should not be considered to be beyond the scope of the present invention.
结合本文中所公开的实施例描述的方法或算法的步骤可以用硬件、 处理 器执行的软件模块, 或者二者的结合来实施。 软件模块可以置于随机存储器 ( RAM ) 、 内存、 只读存储器(ROM ) 、 电可编程 R0M、 电可擦除可编程 R0M、 寄存器、 硬盘、 可移动磁盘、 CD-R0M、 或技术领域内所公知的任意其它形式 的存储介质中。  The steps of a method or algorithm described in connection with the embodiments disclosed herein can be implemented in hardware, a software module executed by a processor, or a combination of both. Software modules can be placed in random access memory (RAM), memory, read-only memory (ROM), electrically programmable ROM, electrically erasable programmable ROM, registers, hard disk, removable disk, CD-ROM, or technical field Any other form of storage medium known.
以上所述的具体实施方式, 对本发明的目的、 技术方案和有益效果进行 了进一步详细说明, 所应理解的是, 以上所述仅为本发明的具体实施方式而 已, 并不用于限定本发明的保护范围, 凡在本发明的精神和原则之内, 所做 的任何修改、 等同替换、 改进等, 均应包含在本发明的保护范围之内。  The above described embodiments of the present invention are further described in detail, and the embodiments of the present invention are intended to be illustrative only. The scope of the protection, any modifications, equivalents, improvements, etc., made within the spirit and scope of the invention are intended to be included within the scope of the invention.

Claims

权 利 要 求 书 claims
1、 一种电调方法, 其特征在于, 所述方法包括: 1. An electrical adjustment method, characterized in that the method includes:
获取电调天线设备的电流参数; Obtain the current parameters of the electrically adjustable antenna device;
判断对所述电调天线设备的供电电流门限值是否与所述电流参数适配; 如果所述供电电流门限值与所述电流参数不适配, 则调整所述供电电流 门限值, 以使得调整后的所述供电电流门限值与所述电调天线设备的电流参 数适配; Determine whether the power supply current threshold of the electrically adjustable antenna device matches the current parameter; if the power supply current threshold does not match the current parameter, adjust the power supply current threshold, So that the adjusted power supply current threshold value adapts to the current parameters of the electrically adjustable antenna device;
向所述电调天线设备发送电调操作消息, 以使得所述电调天线设备进行 电调操作。 Send an electrically adjustable operation message to the electrically adjustable antenna device, so that the electrically adjustable antenna device performs an electrically adjusted operation.
2、 根据权利要求 1所述的电调方法,其特征在于,所述判断对所述电调 天线设备的供电电流门限值是否与所述电流参数适配之后还包括: 如果所述 供电电流门限值与所述电流参数适配, 则向所述电调天线设备发送电调操作 消息。 2. The electrical adjustment method according to claim 1, wherein the step of determining whether the power supply current threshold of the electrically adjustable antenna device is adapted to the current parameter further includes: if the power supply current If the threshold value matches the current parameter, an electrical adjustment operation message is sent to the electrically adjustable antenna device.
3、 根据权利要求 1所述的电调方法,其特征在于,所述获取电调天线设 备的电流参数具体包括: 3. The electrical adjustment method according to claim 1, wherein the obtaining the current parameters of the electrically adjustable antenna device specifically includes:
向一个或多个电调天线设备发送电流参数请求消息; Send a current parameter request message to one or more electrically adjustable antenna devices;
接收所述一个或多个电调天线设备根据所述电路参数请求消息发送的所 述电流参数。 Receive the current parameter sent by the one or more electrically adjustable antenna devices according to the circuit parameter request message.
4、 根据权利要求 3所述的电调方法,其特征在于,所述电流参数包括最 大工作电流; 4. The electrical regulation method according to claim 3, wherein the current parameter includes the maximum operating current;
所述判断对所述电调天线设备的供电电流门限值是否与所述电流参数适 配具体为: The determination of whether the power supply current threshold of the electrically adjustable antenna device is adapted to the current parameters is specifically:
判断对所述电调天线设备的供电电流门限值是否大于等于获取到的所述 一个电调天线设备的最大工作电流; 或 Determine whether the power supply current threshold value of the electrically adjustable antenna device is greater than or equal to the obtained maximum operating current of the electrically adjustable antenna device; or
判断对所述电调天线设备的供电电流门限值是否大于等于获取到的所述 多个电调天线设备的最大工作电流之和。 Determine whether the power supply current threshold value for the electrically adjustable antenna device is greater than or equal to the obtained sum of the maximum operating currents of the multiple electrically adjustable antenna devices.
5、 根据权利要求 4所述的电调方法,其特征在于,所述如果所述供电电 流门限值与所述电流参数不适配, 则调整所述供电电流门限值, 使得调整后 的所述供电电流门限值与所述电调天线设备的电流参数适配具体为: 5. The electric regulation method according to claim 4, characterized in that if the power supply current threshold value does not match the current parameter, the power supply current threshold value is adjusted so that the adjusted The adaptation of the power supply current threshold value and the current parameter of the electrically adjustable antenna device is specifically:
如果所述供电电流门限值小于获取到的所述一个电调天线设备的最大工 作电流, 则调整所述供电电流门限值, 使得调整后的所述供电电流门限值大 于等于获取到的所述一个电调天线设备的最大工作电流。 If the power supply current threshold is less than the obtained maximum operating current of the one electrically adjustable antenna device, adjust the power supply current threshold so that the adjusted power supply current threshold is greater than or equal to the obtained The maximum operating current of the electrically adjustable antenna device.
6、 根据权利要求 5所述的电调方法,其特征在于,所述调整所述供电电 流门限值之后还包括: 6. The electrical regulation method according to claim 5, wherein the adjustment of the power supply current threshold further includes:
如果调整后的所述供电电流门限值与所述一个电调天线设备的电流参数 不适配, 向所述一个电调天线设备发送调整所述最大工作电流的调整消息; 接收所述一个电调天线设备根据所述调整消息调整所述最大工作电流的 应答消息; If the adjusted power supply current threshold value does not match the current parameters of the one electrically adjustable antenna device, send an adjustment message for adjusting the maximum operating current to the one electrically adjustable antenna device; receive the one electrically adjustable antenna device. The antenna adjustment device adjusts the response message of the maximum operating current according to the adjustment message;
判断调整后的所述供电电流门限值是否大于等于所述一个电调天线设备 的调整后的所述最大工作电流, 如果大于等于, 则执行向所述一个电调天线 设备发送电调操作消息的步骤。 Determine whether the adjusted power supply current threshold value is greater than or equal to the adjusted maximum operating current of the one electrically adjustable antenna device. If it is greater than or equal to the electrically adjustable antenna device, send an electrically adjustable operation message to the one electrically adjustable antenna device. A step of.
7、 根据权利要求 4所述的电调方法,其特征在于,所述如果所述供电电 流门限值与所述电流参数不适配, 则调整所述供电电流门限值, 使得调整后 的所述供电电流门限值与所述电调天线设备的电流参数适配具体为: 7. The electric regulation method according to claim 4, characterized in that if the power supply current threshold value does not match the current parameter, the power supply current threshold value is adjusted so that the adjusted The adaptation of the power supply current threshold value and the current parameter of the electrically adjustable antenna device is specifically:
如果所述供电电流门限值小于获取到的所述多个电调天线设备的最大工 作电流之和, 则调整所述供电电流门限值, 以使得调整后的所述供电电流门 限值大于等于获取到的所述多个电调天线设备的最大工作电流之和。 If the power supply current threshold is less than the obtained sum of the maximum operating currents of the plurality of electrically adjustable antenna devices, the power supply current threshold is adjusted so that the adjusted power supply current threshold is greater than It is equal to the obtained sum of the maximum operating currents of the plurality of electrically adjustable antenna devices.
8、 根据权利要求 7所述的电调方法,其特征在于,所述调整所述供电电 流门限值之后还包括: 8. The electrical regulation method according to claim 7, wherein the adjustment of the power supply current threshold further includes:
如果调整后的所述供电电流门限值与所述多个电调天线设备的电流参数 不适配, 向所述多个电调天线设备发送调整所述最大工作电流的调整消息; 接收所述多个电调天线设备根据所述调整消息调整所述最大工作电流的 应答消息; If the adjusted power supply current threshold value does not match the current parameters of the multiple electrically adjustable antenna devices, send an adjustment message for adjusting the maximum operating current to the multiple electrically adjustable antenna devices; receive the A plurality of electrically adjustable antenna devices adjust the maximum operating current according to the adjustment message. reply message;
判断调整后的所述供电电流门限值是否大于等于所述多个电调天线设备 调整后的所述最大工作电流之和, 如果大于等于, 则执行向所述多个电调天 线设备发送电调操作消息的步骤, 否则从所述多个电调天线设备中挑选出部 分电调天线设备, 并向所述部分电调天线设备发送电调操作消息。 Determine whether the adjusted power supply current threshold value is greater than or equal to the sum of the adjusted maximum operating currents of the multiple electrically adjustable antenna devices. If greater than or equal to the adjusted power supply current threshold value, perform power transmission to the multiple electrically adjustable antenna devices. The step of adjusting the operation message is to select some of the electrically adjustable antenna devices from the plurality of electrically adjustable antenna devices and send the electrically adjustable operation message to the partial electrically adjustable antenna devices.
9、 根据权利要求 5或 8所述的电调方法,其特征在于,所述向所述电调 天线设备发送电调操作消息之后还包括: 9. The electric adjustment method according to claim 5 or 8, characterized in that, after sending the electric adjustment operation message to the electric adjustment antenna device, it further includes:
接收所述电调天线设备根据所述电调操作消息电调完成后的应答消息; 将调整后的所述供电电流门限值还原为调整前的所述供电电流门限值; 向所述电调天线设备发送还原所述最大工作电流的还原消息, 以使得所 述电调天线设备将调整后的所述最大工作电流还原为调整前的所述最大工作 电流。 Receive a response message from the electrically adjusted antenna device after electrical adjustment is completed according to the electrically adjusted operation message; restore the adjusted power supply current threshold value to the power supply current threshold value before adjustment; The electronically adjustable antenna device sends a restoration message to restore the maximum operating current, so that the electrically adjustable antenna device restores the adjusted maximum operating current to the pre-adjusted maximum operating current.
10、 一种电调方法, 其特征在于, 所述方法包括: 10. An electrical adjustment method, characterized in that the method includes:
接收电调主设备发送的电流参数请求消息; Receive the current parameter request message sent by the ESC main device;
向所述电调主设备发送电流参数, 所述电流参数包括最大工作电流; 接收所述电调主设备根据所述最大工作电流与供电电流门限值适配比较 后发送的电调操作消息; Send current parameters to the main ESC device, where the current parameters include a maximum operating current; Receive an ESC operation message sent by the ESC main device according to the adaptation and comparison of the maximum operating current and the power supply current threshold;
根据所述电调操作消息, 进行电调操作。 According to the ESC operation message, the ESC operation is performed.
11、 根据权利要求 1 0所述的电调方法, 其特征在于, 所述向所述电调 主设备发送电流参数之后, 接收所述电调主设备根据所述最大工作电流与供 电电流门限值适配比较后发送的电调操作消息之前还包括: 11. The electric regulation method according to claim 10, characterized in that, after sending the current parameters to the main electronic regulation equipment, receiving the maximum operating current and the supply current threshold from the main electronic regulation equipment. The ESC operation message sent after the value adaptation comparison also includes:
接收所述电调主设备发送的调整所述最大工作电流的调整消息; 根据所述调整消息, 调整所述最大工作电流; Receive an adjustment message sent by the ESC master device to adjust the maximum operating current; adjust the maximum operating current according to the adjustment message;
向所述电调主设备发送调整所述最大工作电流的应答消息。 Send a response message for adjusting the maximum operating current to the ESC master device.
12、 根据权利要求 1 0所述的电调方法, 其特征在于, 所述根据所述电 调操作消息, 进行电调操作之后还包括: 接收所述电调主设备发送的还原所述最大工作电流的还原消息; 将调整后的所述最大工作电流还原为调整前的所述最大工作电流。 12. The electric adjustment method according to claim 10, characterized in that, after performing the electric adjustment operation according to the electric adjustment operation message, it further includes: Receive a restoration message sent by the ESC master device to restore the maximum operating current; restore the adjusted maximum operating current to the pre-adjusted maximum operating current.
1 3、 一种电调主设备, 其特征在于, 所述电调主设备包括: 1 3. An electric regulating main equipment, characterized in that, the electric regulating main equipment includes:
获取单元, 用于获取电调天线设备的电流参数, 以及将所述电流参数传 输至判断单元; An acquisition unit, used to acquire the current parameters of the electrically adjustable antenna device, and transmit the current parameters to the judgment unit;
判断单元, 用于从所述判断单元接收所述电流参数, 以及判断对所述电 调天线设备的供电电流门限值是否与所述电流参数适配, 并将判断结果传输 至所述调整单元; A judgment unit configured to receive the current parameter from the judgment unit, judge whether the power supply current threshold value of the electrically adjustable antenna device adapts to the current parameter, and transmit the judgment result to the adjustment unit ;
调整单元, 用于从所述调整单元接收所述判断结果, 所述判断单元判断 所述供电电流门限值与所述电流参数不适配时, 调整所述供电电流门限值, 以使得调整后的所述供电电流门限值与所述电调天线设备的电流参数适配; 第一发送单元, 用于向所述电调天线设备发送电调操作消息, 以使得所 述电调天线设备进行电调操作。 Adjustment unit, configured to receive the judgment result from the adjustment unit. When the judgment unit judges that the power supply current threshold value does not match the current parameter, adjust the power supply current threshold value so that the adjustment The latter power supply current threshold value is adapted to the current parameters of the electrically adjustable antenna device; a first sending unit, configured to send an electrically adjustable operation message to the electrically adjustable antenna device, so that the electrically adjustable antenna device Perform ESC operation.
14、 根据权利要求 1 3所述的电调主设备, 其特征在于, 所述第一发送 单元还用于, 所述判断单元判断所述供电电流门限值与所述电流参数适配时, 向所述电调天线设备发送电调操作消息。 14. The ESC master device according to claim 13, wherein the first sending unit is further configured to: when the judging unit judges that the supply current threshold value is adapted to the current parameter, Send an electrically calibrated operation message to the electrically calibrated antenna device.
15、 根据权利要求 1 3所述的电调主设备, 其特征在于, 所述获取单元 具体用于: 向一个或多个电调天线设备发送获取所述电流参数的请求消息; 接收所述一个或多个电调天线设备根据所述请求消息发送的所述电流参数。 15. The electronically controlled main device according to claim 13, characterized in that the acquisition unit is specifically configured to: send a request message for obtaining the current parameters to one or more electronically controlled antenna devices; receive the one or the current parameter sent by a plurality of electrically adjustable antenna devices according to the request message.
16、 根据权利要求 15所述的电调主设备, 其特征在于, 所述电流参数 包括最大工作电流; 16. The ESC main equipment according to claim 15, characterized in that the current parameters include the maximum operating current;
所述判断单元具体用于: 判断对所述电调天线设备的供电电流门限值是 否大于等于获取到的所述一个电调天线设备的最大工作电流; 或 The determination unit is specifically used to: determine whether the power supply current threshold value for the electrically adjustable antenna device is greater than or equal to the obtained maximum operating current of the electrically adjustable antenna device; or
判断对所述电调天线设备的供电电流门限值是否大于等于获取到的所述 多个电调天线设备的最大工作电流之和。 Determine whether the power supply current threshold value for the electrically adjustable antenna device is greater than or equal to the obtained sum of the maximum operating currents of the multiple electrically adjustable antenna devices.
17、 根据权利要求 16所述的电调主设备, 其特征在于, 所述调整单元 具体用于: 17. The ESC main equipment according to claim 16, characterized in that, the adjustment unit Specifically used for:
所述判断单元判断所述供电电流门限值小于获取到的所述一个电调天线 设备的最大工作电流时, 调整所述供电电流门限值, 使得调整后的所述供电 电流门限值大于等于获取到的所述一个电调天线设备的最大工作电流。 When the judgment unit determines that the power supply current threshold is less than the obtained maximum operating current of the one electrically adjustable antenna device, the power supply current threshold is adjusted so that the adjusted power supply current threshold is greater than It is equal to the obtained maximum operating current of the electrically adjustable antenna device.
18、 根据权利要求 16 所述的电调主设备, 其特征在于, 所述电调主设 备还包括: 18. The main ESC device according to claim 16, characterized in that the main ESC device further includes:
第二发送单元, 用于所述调整单元调整后的所述供电电流门限值与所述 一个电调天线设备的电流参数不适配时, 向所述一个电调天线设备发送调整 所述最大工作电流的调整消息; The second sending unit is used to send the adjusted maximum value to the one electrically adjustable antenna device when the power supply current threshold value adjusted by the adjustment unit does not match the current parameter of the one electrically adjustable antenna device. Adjustment message of working current;
第一接收单元, 用于接收所述一个电调天线设备根据所述调整消息调整 所述最大工作电流的应答消息; The first receiving unit is configured to receive a response message that the one electrically adjustable antenna device adjusts the maximum operating current according to the adjustment message;
处理单元, 用于判断所述调整单元调整后的所述供电电流门限值是否大 于等于所述一个电调天线设备的调整后的所述最大工作电流, 如果大于等于, 则执行向所述一个电调天线设备发送电调操作消息的步骤。 A processing unit, configured to determine whether the power supply current threshold adjusted by the adjustment unit is greater than or equal to the adjusted maximum operating current of the one electrically adjustable antenna device, and if it is greater than or equal to, execute the adjustment to the one The steps for the electronically adjusted antenna device to send an electronically adjusted operation message.
19、 根据权利要求 16所述的电调主设备, 其特征在于, 所述调整单元 具体用于: 19. The ESC main equipment according to claim 16, characterized in that the adjustment unit is specifically used for:
所述判断单元判断所述供电电流门限值小于获取到的所述多个电调天线 设备的最大工作电流之和时, 调整所述供电电流门限值, 以使得调整后的所 述供电电流门限值大于等于获取到的所述多个电调天线设备的最大工作电流 之和。 When the judgment unit determines that the power supply current threshold is less than the obtained sum of the maximum operating currents of the plurality of electrically adjustable antenna devices, the power supply current threshold is adjusted so that the adjusted power supply current The threshold value is greater than or equal to the obtained sum of the maximum operating currents of the plurality of electrically adjustable antenna devices.
20、 根据权利要求 18所述的电调主设备, 其特征在于, 所述第二发送 单元还用于, 所述调整单元调整后的所述供电电流门限值与所述多个电调天 线设备的电流参数不适配时, 向所述多个电调天线设备发送调整所述最大工 作电流的调整消息; 20. The electronically controlled main device according to claim 18, wherein the second sending unit is further configured to combine the power supply current threshold adjusted by the adjusting unit with the plurality of electronically controlled antennas. When the current parameters of the device are not suitable, send adjustment messages for adjusting the maximum operating current to the multiple electrically adjustable antenna devices;
所述第一接收单元还用于, 接收所述多个电调天线设备根据所述调整消 息调整所述最大工作电流的应答消息; 所述处理单元还用于, 判断所述调整单元调整后的所述供电电流门限值 是否大于等于所述多个电调天线设备调整后的所述最大工作电流之和, 如果 大于等于, 则执行向所述多个电调天线设备发送电调操作消息的步骤, 否则 从所述多个电调天线设备中挑选出部分电调天线设备并向所述部分电调天线 设备发送电调操作消息。 The first receiving unit is also configured to receive a response message for adjusting the maximum operating current of the plurality of electrically adjustable antenna devices according to the adjustment message; The processing unit is also configured to determine whether the power supply current threshold adjusted by the adjustment unit is greater than or equal to the sum of the maximum operating currents adjusted by the plurality of electrically adjustable antenna devices, and if greater than or equal to Execute the step of sending an electrically adjustable operation message to the plurality of electrically adjustable antenna devices, otherwise select some of the electrically adjustable antenna devices from the multiple electrically adjustable antenna devices and send an electrically adjustable operation message to the partial electrically adjustable antenna devices .
21、 根据权利要求 17或 20所述的电调主设备, 其特征在于, 所述电调 主设备还包括: 21. The main ESC device according to claim 17 or 20, characterized in that the main ESC device further includes:
第二接收单元, 用于接收所述电调天线设备根据所述电调操作消息电调完 成后的应答消息; A second receiving unit, configured to receive a response message from the electrically adjusted antenna device after the electrical adjustment is completed according to the electrically adjusted operation message;
还原单元, 用于将所述调整单元调整后的所述供电电流门限值还原为调整 前的所述供电电流门限值; A restoration unit, configured to restore the power supply current threshold value adjusted by the adjustment unit to the power supply current threshold value before adjustment;
第三发送单元, 用于向所述电调天线设备发送还原所述最大工作电流的还 原消息, 以使得所述电调天线设备将调整后的所述最大工作电流还原为调整 前的所述最大工作电流。 A third sending unit configured to send a restoration message for restoring the maximum operating current to the electrically adjustable antenna device, so that the electrically adjustable antenna device restores the adjusted maximum operating current to the maximum before adjustment. Working current.
22、 一种电调天线设备, 其特征在于, 所述电调天线设备包括: 第一接收单元, 用于接收电调主设备发送的电流参数请求消息; 第一发送单元, 用于向所述电调主设备发送电流参数, 所述电流参数包 括最大工作电流; 22. An electrically adjustable antenna device, characterized in that, the electrically adjustable antenna device includes: a first receiving unit, configured to receive a current parameter request message sent by the electrically adjusted main device; a first sending unit, configured to send the The main ESC device sends current parameters, which include the maximum operating current;
第二接收单元, 用于接收所述电调主设备根据所述最大工作电流与供电 电流门限值适配比较后发送的电调操作消息; The second receiving unit is configured to receive the ESC operation message sent by the ESC main device according to the adaptation and comparison between the maximum operating current and the power supply current threshold value;
处理单元, 用于根据所述电调操作消息, 进行电调操作。 A processing unit, configured to perform an ESC operation according to the ESC operation message.
23、 根据权利要求 11所述的电调天线设备, 其特征在于, 所述电调天 线设备还包括: 调整单元, 用于接收电调主设备发送的调整最大工作电流的 调整消息; 根据所述调整消息, 调整所述最大工作电流; 向所述电调主设备 发送调整所述最大工作电流的应答消息。 23. The electrically adjustable antenna device according to claim 11, wherein the electrically adjustable antenna device further includes: an adjustment unit configured to receive an adjustment message for adjusting the maximum operating current sent by the electrically adjustable main device; Adjust the message to adjust the maximum operating current; and send a response message for adjusting the maximum operating current to the main ESC device.
24、 根据权利要求 11所述的电调天线设备, 其特征在于, 所述电调天 线设备还包括: 24. The electrically adjustable antenna device according to claim 11, characterized in that: the electrically adjustable antenna Line equipment also includes:
第三接收单元, 用于接收所述电调主设备发送的还原所述最大工作电流 的还原消息; A third receiving unit, configured to receive a restoration message sent by the ESC master device to restore the maximum operating current;
还原单元, 用于将调整后的所述最大工作电流还原为调整前的所述最大 工作电流。 A restoration unit, configured to restore the adjusted maximum operating current to the pre-adjusted maximum operating current.
25、 一种电调主设备, 其特征在于, 所述电调主设备包括: 25. An electric regulating main equipment, characterized in that, the electric regulating main equipment includes:
接收机, 用于获取电调天线设备的电流参数, 以及将所述电流参数传输 至处理器; A receiver, used to obtain the current parameters of the electrically adjustable antenna device, and transmit the current parameters to the processor;
处理器, 用于从所述接收机接收所述电流参数, 并判断对所述电调天线 设备的供电电流门限值是否与所述电流参数适配; 如果所述供电电流门限值 与所述电流参数不适配, 则调整所述供电电流门限值, 以使得调整后的所述 供电电流门限值与所述电调天线设备的电流参数适配, 以及将调整后适配的 结果传输至发射机; A processor configured to receive the current parameter from the receiver and determine whether the power supply current threshold value of the electrically adjustable antenna device is adapted to the current parameter; if the power supply current threshold value is consistent with the current parameter. If the current parameter does not match, the power supply current threshold value is adjusted so that the adjusted power supply current threshold value matches the current parameter of the electrically adjustable antenna device, and the adjusted adaptation result is transmitted to the transmitter;
发射机, 用于从所述处理器接收所述调整后适配的结果, 以及向所述电 调天线设备发送电调操作消息, 以使得所述电调天线设备进行电调操作。 A transmitter, configured to receive the adjusted adaptation result from the processor, and send an electrically adjustable operation message to the electrically adjustable antenna device, so that the electrically adjustable antenna device performs an electrically adjusted operation.
26、 根据权利要求 25所述的电调主设备, 其特征在于, 所述发射机还 用于: 所述处理器判断所述供电电流门限值与所述电流参数适配时, 向所述 电调天线设备发送电调操作消息。 26. The ESC main device according to claim 25, wherein the transmitter is further used to: when the processor determines that the supply current threshold value is adapted to the current parameter, send the signal to the The electronically adjusted antenna device sends an electronically adjusted operation message.
27、 根据权利要求 25所述的电调主设备, 其特征在于, 所述发射机还 用于: 所述处理器调整后的所述供电电流门限值与所述电调天线设备的电流 参数不适配时, 向所述电调天线设备发送调整所述最大工作电流的调整消息; 所述接收机还用于接收所述电调天线设备根据所述调整消息调整所述最 大工作电流的应答消息, 并将所述应答消息传输至所述处理器; 27. The electronically adjusted main device according to claim 25, characterized in that the transmitter is also used to: adjust the power supply current threshold value adjusted by the processor and the current parameter of the electronically adjusted antenna device. When not suitable, send an adjustment message for adjusting the maximum operating current to the electrically adjustable antenna device; the receiver is also configured to receive a response from the electrically adjustable antenna device for adjusting the maximum operating current according to the adjustment message. message, and transmit the response message to the processor;
所述处理器还用于从所述接收机接收所述调整所述最大工作电流的应答 消息, 以及判断调整后的所述供电电流门限值是否与所述电调天线设备的调 整后的所述电流参数适配, 如果适配, 则执行向所述一个电调天线设备发送 电调操作消息的步骤。 The processor is further configured to receive a response message for adjusting the maximum operating current from the receiver, and determine whether the adjusted supply current threshold value is consistent with the adjusted value of the electrically adjustable antenna device. The current parameters are adapted, and if they are adapted, then the transmission to the one electrically adjustable antenna device is performed. Steps for ESC operation messages.
28、 根据权利要求 27 所述的电调主设备, 其特征在于, 所述接收机还 用于接收所述电调天线设备根据所述电调操作消息电调完成后的应答消息, 以及将所述电调完成后的应答消息传输至所述处理器; 28. The ESC master device according to claim 27, wherein the receiver is further configured to receive a response message from the ESC antenna device after the ESC is completed according to the ESC operation message, and to send the ESC response message. The response message after the ESC is completed is transmitted to the processor;
所述处理器还用于从所述接收机接收所述电调完成后的应答消息, 以及 将调整后的所述供电电流门限值还原为调整前的所述供电电流门限值; 原消息, 以使得所述电调天线设备将调整后的所述电流参数还原为调整前的 所述电流参数。 The processor is also configured to receive a response message from the receiver after the electric adjustment is completed, and restore the adjusted power supply current threshold value to the pre-adjusted power supply current threshold value; Original message , so that the electrically adjustable antenna device restores the adjusted current parameters to the pre-adjusted current parameters.
29、 一种电调天线设备, 其特征在于, 所述电调天线设备包括: 接收机, 用于接收电调主设备发送的电流参数请求消息, 以及将所述电 流参数请求消息传输至处理器, 以使得所述处理器根据所述电流参数请求消 息获取所述电流参数并将所述电流参数传输至发射机; 29. An electrically adjustable antenna device, characterized in that the electrically adjustable antenna device includes: a receiver, configured to receive a current parameter request message sent by an electrically adjustable main device, and to transmit the current parameter request message to a processor , so that the processor obtains the current parameter according to the current parameter request message and transmits the current parameter to the transmitter;
发射机, 用于从所述处理器接收所述电流参数, 以及向所述电调主设备 发送电流参数, 所述电流参数包括最大工作电流; A transmitter, configured to receive the current parameter from the processor and send the current parameter to the ESC main device, where the current parameter includes the maximum operating current;
所述接收机还用于接收所述电调主设备根据所述最大工作电流与供电电 流门限值适配比较后发送的电调操作消息, 以及将所述电调操作消息传输至 所述处理器; The receiver is also configured to receive an ESC operation message sent by the ESC main device according to the adaptation and comparison between the maximum operating current and the supply current threshold, and to transmit the ESC operation message to the processing device;
处理器, 用于从所述接收机接收所述电调操作消息, 以及根据所述电调 操作消息, 进行电调操作。 A processor, configured to receive the ESC operation message from the receiver, and perform ESC operation according to the ESC operation message.
30、 根据权利要求 29所述的电调天线设备, 其特征在于, 所述接收机 还用于接收所述电调主设备发送的调整所述最大工作电流的调整消息, 以及 将所述调整消息传输至所述处理器; 30. The electrically adjustable antenna device according to claim 29, wherein the receiver is further configured to receive an adjustment message sent by the electrically adjusted master device to adjust the maximum operating current, and to convert the adjustment message to transmitted to said processor;
所述处理器还用于从所述接收机接收所述调整消息, 以及根据所述调整 消息, 调整所述最大工作电流, 将调整结果传输至所述发射机; The processor is further configured to receive the adjustment message from the receiver, adjust the maximum operating current according to the adjustment message, and transmit the adjustment result to the transmitter;
所述发射机还用于从所述处理器接收所述调整结果, 以及向所述电调主 设备发送调整所述最大工作电流的应答消息。 The transmitter is also used to receive the adjustment result from the processor, and to send the adjustment result to the ESC master. The device sends a response message for adjusting the maximum operating current.
31、 根据权利要求 29所述的电调天线设备, 其特征在于, 所述接收机 还用于接收所述电调主设备发送的还原所述最大工作电流的还原消息, 以及 将所述还原消息传输至所述处理器; 31. The electrically adjustable antenna device according to claim 29, wherein the receiver is further configured to receive a restoration message sent by the electrically adjustable master device to restore the maximum operating current, and to convert the restoration message to transmitted to said processor;
所述处理器还用于从所述接收机接收所述还原消息, 以及将调整后的所 述最大工作电流还原为调整前的所述最大工作电流。 The processor is further configured to receive the restoration message from the receiver, and restore the adjusted maximum operating current to the pre-adjusted maximum operating current.
32、 一种电调系统, 其特征在于, 所述系统包括如权利要求 1 3-21任意 一项所述的电调主设备以及权利要求 22-24任意一项所述的电调天线设备; 或包括如权利要求 25-29任意一项所述的电调主设备以及权利要求 29-31任 意一项所述的电调天线设备。 32. An electric adjustment system, characterized in that the system includes the electric adjustment main device according to any one of claims 1 to 21 and the electric adjustment antenna device according to any one of claims 22 to 24; Or it includes the electrically adjustable main device according to any one of claims 25-29 and the electrically adjustable antenna device according to any one of claims 29-31.
PCT/CN2012/076588 2012-06-07 2012-06-07 Electrical tilt method, device and system WO2013181824A1 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
PCT/CN2012/076588 WO2013181824A1 (en) 2012-06-07 2012-06-07 Electrical tilt method, device and system
CN201280000666.6A CN102835145B (en) 2012-06-07 2012-06-07 Electricity adjusts methods, devices and systems

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/CN2012/076588 WO2013181824A1 (en) 2012-06-07 2012-06-07 Electrical tilt method, device and system

Publications (1)

Publication Number Publication Date
WO2013181824A1 true WO2013181824A1 (en) 2013-12-12

Family

ID=47336888

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2012/076588 WO2013181824A1 (en) 2012-06-07 2012-06-07 Electrical tilt method, device and system

Country Status (2)

Country Link
CN (1) CN102835145B (en)
WO (1) WO2013181824A1 (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104348503B (en) * 2013-07-23 2016-09-07 上海贝尔股份有限公司 For supporting the apparatus and method of multiple antennal interface standard group port
KR101740024B1 (en) * 2014-11-25 2017-05-26 주식회사 케이엠더블유 System and Method of Configurating Antenna Control System of Base Transceiver Station System
CN106486768A (en) * 2015-09-02 2017-03-08 中兴通讯股份有限公司 Electrical tilt antenna parameter value adjustment method and device
CN111029778B (en) * 2019-12-06 2021-10-29 京信通信技术(广州)有限公司 Electric tuning control system, electric tuning control device and electric tuning control method of multi-frequency antenna

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2008040143A1 (en) * 2006-09-06 2008-04-10 Huawei Technologies Co., Ltd. A base station and method for adjusting the down tilt angle of the antenna
CN101740864A (en) * 2008-11-21 2010-06-16 中兴通讯股份有限公司 Electric-adjusting antenna communication system and method
CN102456948A (en) * 2010-10-27 2012-05-16 华为技术有限公司 Control method and system of electrically tunable antenna, electrically tunable antenna controller and maintenance terminal

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE10104564C1 (en) * 2001-02-01 2002-09-19 Kathrein Werke Kg Control device for setting a different drop angle, in particular of mobile radio antennas belonging to a base station, and an associated antenna and method for changing a drop angle
CN1521584A (en) * 2003-02-14 2004-08-18 络达科技股份有限公司 Automatic adjustment system for mismatch of source current and sink current
CN101087449B (en) * 2007-07-02 2010-05-26 华为技术有限公司 Method, system and base station for adjusting electrical modulation tower amplification gain

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2008040143A1 (en) * 2006-09-06 2008-04-10 Huawei Technologies Co., Ltd. A base station and method for adjusting the down tilt angle of the antenna
CN101740864A (en) * 2008-11-21 2010-06-16 中兴通讯股份有限公司 Electric-adjusting antenna communication system and method
CN102456948A (en) * 2010-10-27 2012-05-16 华为技术有限公司 Control method and system of electrically tunable antenna, electrically tunable antenna controller and maintenance terminal

Also Published As

Publication number Publication date
CN102835145B (en) 2016-01-20
CN102835145A (en) 2012-12-19

Similar Documents

Publication Publication Date Title
RU2658863C1 (en) Method of communication of wearable device, communication system and corresponding device
CN107113816B (en) System and method for hidden connection merging
WO2013181824A1 (en) Electrical tilt method, device and system
EP3086620B1 (en) Antenna control system and its operating method
CN104219734A (en) Internet access method and device for internet device
WO2012089138A1 (en) Method and mobile terminal for improving antenna matching performance of multi-band mobile terminal
WO2014121471A1 (en) Method, base station and user equipment for data transmission and acquisition
US10993110B2 (en) Connectionless fast method for configuring Wi-Fi on displayless Wi-Fi IoT device
US9899735B2 (en) Signal transmission method, interface extension apparatus, and communications system
RU2677643C1 (en) Method of communication of wearable device, communication system and corresponding device
JP6100713B2 (en) Communication apparatus and communication system
RU2728544C1 (en) Method of portable device communication, communication system and corresponding device
JP2022535967A (en) Method and system for controlling working state of antenna panel of terminal, and storage medium
RU2750814C1 (en) Wearable device communication method, communication system and corresponding device
RU2702223C1 (en) Method of portable device communication, communication system and corresponding device
US10206234B2 (en) D2D communication control method, D2D communication method, and apparatuses thereof
KR20210016679A (en) Method and electronic device for controlling transmission power of wireless signal
KR20210020456A (en) Electronic device for adjusting antenna setting and method for operating thereof
WO2021213320A1 (en) Wifi hotspot management method, electronic device, and storage medium
JP6696027B2 (en) Wearable device communication method, communication system, and related equipment
KR101643512B1 (en) Data transmission method, multi-medium access point and multi-medium client
RU2772779C1 (en) Communication method for the wearable device, the communication system and the corresponding device
WO2021254602A1 (en) Distribution of traffic between a macro access node and a micro access node in a heterogeneous network
JP2022082609A (en) Wearable device communication method, communication system, and related apparatus
US10742341B2 (en) Control unit, system and method for sending and receiving radio signals in several frequency ranges

Legal Events

Date Code Title Description
WWE Wipo information: entry into national phase

Ref document number: 201280000666.6

Country of ref document: CN

121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 12878577

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 12878577

Country of ref document: EP

Kind code of ref document: A1