WO2013171361A1 PCT/FI2012/050464 FI2012050464W WO2013171361A1 WO 2013171361 A1 WO2013171361 A1 WO 2013171361A1 FI 2012050464 W FI2012050464 W FI 2012050464W WO 2013171361 A1 WO2013171361 A1 WO 2013171361A1
Authority
WO
WIPO (PCT)
Prior art keywords
pitman
pivot point
pivot
jaw
crushing
Prior art date
Application number
PCT/FI2012/050464
Other languages
English (en)
Inventor
Keijo Viilo
Original Assignee
Metso Minerals, Inc.
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Metso Minerals, Inc. filed Critical Metso Minerals, Inc.
Priority to PCT/FI2012/050464 priority Critical patent/WO2013171361A1/fr
Publication of WO2013171361A1 publication Critical patent/WO2013171361A1/fr

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B02CRUSHING, PULVERISING, OR DISINTEGRATING; PREPARATORY TREATMENT OF GRAIN FOR MILLING
    • B02CCRUSHING, PULVERISING, OR DISINTEGRATING IN GENERAL; MILLING GRAIN
    • B02C1/00Crushing or disintegrating by reciprocating members
    • B02C1/02Jaw crushers or pulverisers
    • B02C1/025Jaw clearance or overload control
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B02CRUSHING, PULVERISING, OR DISINTEGRATING; PREPARATORY TREATMENT OF GRAIN FOR MILLING
    • B02CCRUSHING, PULVERISING, OR DISINTEGRATING IN GENERAL; MILLING GRAIN
    • B02C1/00Crushing or disintegrating by reciprocating members
    • B02C1/02Jaw crushers or pulverisers
    • B02C1/04Jaw crushers or pulverisers with single-acting jaws

Definitions

  • the invention relates to a jaw crusher and a processing plant and a crushing method which are suitable for mineral material crushing.
  • a jaw crusher The function of a jaw crusher is based on a force which is compressing the rock.
  • An eccentric shaft is attached to a body of the jaw crusher to which eccentric shaft is connected a movable jaw, i.e. a pitman, making an eccentric movement relative to a fixed jaw.
  • a movable jaw i.e. a pitman
  • For moving the pitman of the jaw crusher two main types are known in which two toggle plates, a so called double toggle, or one toggle plate, a so called single toggle, are used in the movement mechanism of the pitman.
  • the eccentric shaft is connected between two toggle plates to move one end of the pitman (for example, a bottom end in a Blake-crusher) and a second end of the pitman is pivoted to the body of the crusher.
  • a double toggle crusher of a so called overhead pivot-type the pivot in the upper end of the pitman is located on a bisector of the crushing chamber wherein a stroke is formed in the upper portion of the crushing chamber which is larger than the stroke in the conventional Blake-crusher, and the stroke is in a more perpendicular direction relative to the fixed jaw.
  • the stroke has a form of a large arc.
  • the single toggle type crusher is simpler than the double toggle type crusher.
  • one end of the pitman is pivoted through the eccentric shaft to the body of the crusher and the second end of the pitman is pivoted to the body of the crusher through the toggle plate.
  • the eccentric shaft a crusher of overhead eccentric type
  • a movement shape of the movable jaw is almost a circle in the upper portion of the crushing chamber because it is near the eccentric shaft.
  • the stroke in the bottom portion of the crushing chamber has a form of a narrow ellipse and the movement shape is getting upwards more and more a form of a circle in the crushing chamber.
  • the powerful stroke in the upper and centre portions of the crushing chamber is problematically short because of the form of the movement shape.
  • a large part of the compression movement is directed inclined upwards or downwards.
  • the amount of crushing strokes for breaking a single stone is high because of the short stroke what is limiting capacity and is leading to pulverizing of the surface of the material to be crushed before the actual crushing.
  • Fine material is not interesting economically and generating of the fine material is causing unnecessary energy consumption.
  • the direction of the stroke is not optimal in the bottom portion of the crushing chamber but is directed upwards wherein the material to be crushed is moving vertically on the wear surfaces. Large stones which require a long crushing distance are crushed in the upper portion of the crushing chamber.
  • the stroke length in the upper portion of the known crusher is small relative to the stone size. Because the stroke is short in the upper portion of the crushing chamber of the crusher, many strokes are required before large stones are broken.
  • the unfavorable stroke direction is wearing the jaws more than a stroke which is perpendicular to the bisector of
  • the shape and direction of the stroke are better than in the single toggle crushers.
  • the stroke is much smaller in the upper portion than in the lower portion of the crushing chamber and so the upper portion of the crushing chamber becomes easy the part which is limiting the capacity.
  • An object of the invention is to create an alternative crusher by which drawbacks present in connection with known crushers can be eliminated or at least reduced.
  • a jaw crusher comprising a body to which are arranged a fixed jaw and a pitman which is movable against the movable jaw for forming a crushing chamber which is open at the top; and the pitman is bearing-mounted to an eccentric shaft which is bearing- mounted rotatably to the body forming so a first pivot point and the pitman is bearing-mounted to the eccentric shaft at an eccentric point of the eccentric shaft forming so a second pivot point; and the pitman is supported to the body by a pivot bar which is pivoted at a first end of the pivot bar to the pitman forming so a third pivot point and at a second end of the pivot bar to the body forming so a fourth pivot point; and the at least one pivot bar which is pivoted to the pitman is arranged such that a plane passing through the third pivot point and the fourth pivot point (or the third and the fourth pivot points) is arranged substantially parallel ( ⁇ 20°) with a bisector of the crushing chamber.
  • the first pivot point is located vertically substantially on the same height with the third pivot point of the at least one pivot bar which is pivoted to the pitman or in place of the crushing chamber.
  • the plane which is passing through the first pivot point and the third pivot points is substantially perpendicular ( ⁇ 20°) to the bisector of the crushing chamber.
  • the plane which is passing through the first pivot point and the third pivot points is in an angle of 90° ⁇ 20° relative to the bisector of the crushing chamber.
  • the first pivot point and the third pivot point are located vertically substantially on the height of the vertical centre point of the crushing chamber.
  • the pivot bar is arranged substantially in a vertical position such that the fourth pivot point between the pivot bar and the body is arranged vertically substantially below or above the third pivot point.
  • the third pivot point is arranged near a wear part which is arranged to the pitman during use.
  • the third pivot point is arranged behind the wear part or at the side or in front of the wear part which is arranged to the pitman during use, preferably on the bisector of the crushing chamber.
  • the crusher comprises adjusting apparatuses of setting and jaw angle which are located in an upper end and a lower end of the fixed jaw.
  • a movement mechanism of the jaw crusher is corresponding to a four- bar linkage.
  • the body is corresponding to a frame of the four-bar linkage.
  • the pitman is corresponding to a coupler of the four-bar linkage.
  • the eccentric shaft is corresponding to a crank of the four-bar linkage.
  • the pivot bar is corresponding to a rocker of the four-bar linkage.
  • the rotation axis of the eccentric shaft relative to the body is corresponding to the first pivot point of the four-bar linkage.
  • the rotation axis of the eccentric part of the eccentric shaft relative to the pitman is corresponding to the second pivot point of the four-bar linkage.
  • the pivot formed between the first end of the pivot bar and the pitman is corresponding to the third pivot point of the four-bar linkage.
  • the pivot formed between the second end of the pivot bar and the body is corresponding to the fourth pivot point of the four-bar linkage.
  • the jaw crusher comprises a flywheel which is fixed to a centre region of the eccentric shaft.
  • a crushing plant which comprises a jaw crusher according to any embodiment of the invention.
  • a method for mineral material crushing in a jaw crusher or a crushing plant which jaw crusher or crushing plant comprises a body to which are arranged a fixed jaw and a pitman which is moved against the movable jaw for forming a crushing chamber which is open at the top; and the pitman is bearing-mounted to an eccentric shaft which is bearing-mounted rotatably to the body forming so a first pivot point and the pitman is bearing-mounted to the eccentric shaft at an eccentric point of the eccentric shaft forming so a second pivot point; and the pitman is supported to the body by a pivot bar which is pivoted at a first end of the pivot bar to the pitman forming so a third pivot point and at a second end of the pivot bar to the body forming so a fourth pivot point; and the method comprising directing a crushing stroke to the material to be crushed in a direction which is substantially per
  • the setting and the jaw angle of the jaw crusher are adjusted by adjustment apparatuses which are located in an upper end and a lower end of the fixed jaw.
  • the adjustment apparatuses are located between the body (a front end) of the jaw crusher and wear parts of the fixed jaw.
  • overload protecting devices are integrated in the adjustment apparatuses.
  • the bisector of the crushing chamber is the bisector of the smaller angle between crushing surfaces of the fixed and movable jaws at a designed minimum closed side setting of the crusher.
  • the power used by the jaw crusher per crushed amount of mineral material can be smaller than in known applications because lesser energy is used in the crushing event for moving vertically the material to be crushed between the jaws. A larger crushing volume can be gained by the same crushing power because a larger portion of the power can be directed to crushing of the mineral material.
  • the movement mechanism enables an optimal stroke in a direction perpendicular to the bisector of the crushing chamber.
  • the stroke is almost constant in the region of the whole crushing chamber and so also a sufficient stroke is gained to the upper and centre portions of the crushing chamber.
  • the stroke is increasing compared to the double toggle-type crushers and crushing probability of large blocks is increasing. Then, lesser work cycles are required and the capacity of the upper portion of the crushing chamber is increasing.
  • the whole crushing chamber can work more evenly in practice. Wearing of the jaws is lesser than in conventional crushers because the stroke is almost perpendicular to the bisector of the crushing chamber.
  • the jaw angle can be held constant during the total lifetime of the jaws.
  • the jaw angle can be adjusted convenient for each rock material.
  • a more optimal movement shape is reducing wear of the crusher and the wear parts, increasing capacity and reducing energy consumption.
  • Fig. 1 shows a side view of a crushing plant which is suitable for mineral material crushing
  • Fig. 2 shows a side view of a movement mechanism according to a preferable embodiment of the invention
  • Fig. 3 shows a side view of a movement mechanism according to a second preferable embodiment of the invention
  • Fig. 4 shows a jaw crusher having a movement mechanism according to Fig. 2;
  • Fig. 5 shows a jaw crusher having a movement mechanism according to Fig. 2 and in which a third pivot point is arranged at a bisector of a crushing chamber.
  • Fig. 1 shows a mineral material processing apparatus, a crushing plant 200 which comprises a jaw crusher 100.
  • the crushing plant 200 has a feeder 103 for feeding the material to the jaw crusher 100 and a belt conveyor 106 for transporting the crushed material farther from the crushing plant.
  • the belt conveyor 106 shown in Fig. 1 comprises a belt 107 which is adapted to pass around at least one roller 108.
  • the crushing plant 200 comprises also a power source and a control unit 105.
  • the power source can be for example a diesel or an electric motor which is providing energy for process units and hydraulic circuits.
  • the feeder 103, the crusher 100, the power source 105 and the conveyor 106 are attached to a body 101 of the crushing plant which body in this embodiment comprises additionally a track base 102 for moving the crushing plant 200.
  • the crushing plant can also be wholly or partly wheel based or movable on legs. Alternatively it can be movable/towable for example by a truck or another external power source.
  • the mineral material may be for example mined rock or it may be asphalt or construction demolition waste such as concrete or bricks etc. In addition to the above the crushing plant may also be a fixed plant.
  • Embodiments of the jaw crusher 100 shown in Figs. 2 to 5 can be used for example in the crushing plant 200 of Fig. 1.
  • the jaw crusher 100 shown in Fig. 1 comprises a movement mechanism which is based on a four-bar linkage.
  • the four-bar linkage consist of four rigid links which are attached to each other by joints or pivots to form a closed loop: a frame which does not move; a crank to which an external force is brought to move the movement mechanism; a coupler, and a rocker.
  • the crank and the rocker are pivoted directly to the frame and the coupler is pivoted via the crank and the rocker to the frame.
  • the jaw crusher 100 comprises a body 2 which is corresponding to the frame of the four-bar linkage and is the link which does not move. To the body are arranged a fixed jaw 3 and a movable jaw i.e.
  • a pitman 4 which is movable towards the fixed jaw.
  • Wear surfaces 3' of wear parts arranged to the fixed jaw and wear surfaces 5' of wear parts 5 arranged to the pitman 4 are forming there between a crushing chamber 6 which is open at the top.
  • the fixed wear surface 3' and the movable wear surface 5' are defining there between a bisector 6' of the crushing chamber 6 which is almost vertical in Figs. 2 and 3.
  • the bisector 6' of the crushing chamber is not necessary parallel with the gravitation force. Accordingly, it may be inclined such as in Fig. 2.
  • Centre points of the wear surface 3' of the wear part arranged to the fixed jaw, and of the wear surface 5' of the wear part arranged to the pitman are defining a vertical centre point of the crushing chamber 6.
  • the vertical centre point of the crushing chamber is located in a facing point of the two-part wear parts 3, 5 in Figs. 2 and 3.
  • the pitman 4 is bearing-mounted to the body 2 at a first support point by an eccentric shaft 7 which is bearing-mounted rotatably to the body.
  • the eccentric shaft 7 is corresponding to the crank of the four-bar linkage.
  • the pitman 4 is corresponding to the coupler of the four-bar linkage.
  • a rotation axis of a first bearing between the eccentric shaft 7 and the body 2 is corresponding to a first pivot point 8 of the movement mechanism.
  • the eccentricity of the eccentric shaft 7 is defining a functional length of the crank, that is a distance between first and second support points.
  • a rotation axis of a second bearing between an eccentric point of the eccentric shaft and the pitman 4 is corresponding to a second pivot point 9 of the movement mechanism.
  • a circular movement path of the second pivot point 9 relative to the first pivot point 8 is denoted with a circle 10.
  • the pitman 4 is additionally supported to the body 2 at a second support point by at least one pivot bar 11 which is corresponding to the rocker of the four-bar linkage. Both ends of the pivot bar comprises a pivot.
  • a third pivot point 12 of the movement mechanism is between the first end of the pivot bar 11 and the pitman 4.
  • a fourth pivot point 13 of the movement mechanism is between the second end of the pivot bar 11 and the body 2. The portion of the coupler between the second pivot point 9 and the third pivot point 12 belonging to the movement mechanism is demonstrated by referral number 4'.
  • the jaw crusher 100 comprises a movement mechanism in which the eccentric shaft 7 is supported to the body 2 behind the wear parts 5 of the pitman 4 and vertically substantially on the height of the centre point of the wear surface of the pitman.
  • the pivot bar 11 of the movement mechanism is preferably substantially vertical and it may be supported to the body 2 of the jaw crusher either from below or from above (a bottom support is shown in Figs. 2 and 4 and an upper support is shown in Fig. 3).
  • the pivot bar 1 may receive both compression and tension in different load situations depending on locations of the third 12 and the fourth 13 pivot points.
  • the third pivot point 12 at the pitman side is preferably located horizontally as close as possible the wear surface 5' of the wear parts 5 of the pitman wherein a very short vertical movement can be gained for the movable jaw.
  • the decreasing vertical movement of the wear surface of the pitman relative to the fixed jaw 3 is reducing the power required from the crusher when the material to be crushed must not be abraded vertically between the jaws.
  • the crusher can be lowered and a compact crusher can be generated when the eccentric shaft and the flywheel connected to it can be brought lower than in the typical single toggle crusher.
  • the opening of the crushing chamber must in practice have a certain size for example for feeding stones to the crushing chamber.
  • the efficient crushing can be affected such that the material to be crushed is kept in place and does not move upwards on the surfaces of the wear parts which are fixed to the fixed jaw and to the pitman.
  • the pitman can be moved substantially perpendicularly relative to the bisector of the crushing chamber when there is crushed with crushers according to preferable embodiments of the invention wherein the jaw angle can in some cases be increased compared to prior art. Then, the crusher can also be lowered if necessary.
  • the setting and the jaw angle of the jaw crusher can be adjusted by adjusting apparatuses 14' and 15' which are located in the upper end 14 and the lower end 15 of the fixed jaw 3.
  • Preferably overload protecting devices are integrated in these adjustment apparatuses.
  • the fourth pivot point 13 is located preferably such that the direction of the stroke is perpendicular to the bisector of the crushing chamber. Then a plane passing through the pivot points 12, 13 of the pivot bars is perpendicular to a plane which is passing through the first pivot point 8 and third pivot point 13.
  • the pivot bar 11 is preferably enough long such that the movement of the movable jaw is sufficient linear.
  • the location of the eccentric shaft can somewhat be moved vertically and the optimal stroke direction can nevertheless be maintained by the locations of the pivot points 12 and 13.
  • the width of the crushing chamber 6 of the jaw crusher 100 is 1100 mm wherein a functional length of the substantially vertical pivot bar 11 of the movement mechanism of the jaw crusher between the third and the fourth pivot point is 600 mm and the eccentric shaft 7 is located at a distance 4' of 2000 mm from the third pivot point 12 in the upper end of the pivot bar 11.
  • the eccentricity 7' of the eccentric shaft 7 is 20 mm wherein the stroke is about 40 mm.
  • the movement path of the moving wear surface 5' in the upper portion 31 , in the centre 32 and in the lower portion 33 of the crushing chamber is shown with dashed lines in Fig. 2.
  • the movement mechanism of the movable jaw enables an optimal stroke in a direction perpendicular to the bisector of the crushing chamber. The stroke is almost constant in the region of the whole crushing chamber.
  • the movement mechanism of the jaw crusher 100 shown in Fig. 3 corresponds to the movement mechanism in Fig. 2, but the location of the fourth pivot point 13 in the body 2 is moved above the second pivot point 12.
  • the pivot bar 11 is so arranged in an inverted position compared to Fig. 2.
  • Fig. 4 shows a top view of a cross section of the jaw crusher 100 along a plane which is passing through the rotation axis 8 of the eccentric shaft and the third pivot point 12 of the movement mechanism.
  • side plates belonging to the body 2 of the jaw crusher 100 are connencted to each other by the fixed jaw of the crusher to which is/are attached a wear part(s) 3.
  • the eccentric shaft 7 is fixed to the body on the height of the vertical centre point of the wear surfaces 5' of the pitman 4 and horizontally behind the wear surfaces 5'.
  • Flywheels 17 are fixed to both ends of the eccentric shaft.
  • the pitman 4 is supported at a first support point to the body 2 by the eccentric shaft 7 which is bearing-mounted rotatably to the body.
  • the first rotation axis 8 of the first bearing between the eccentric shaft 7 and the body 2 is corresponding to the first pivot point of the movement mechanism.
  • the second rotation axis 9 of the second bearing between the eccentric part of the eccentric shaft 7 and the pitman 4 is corresponding to the second pivot point of the movement mechanism.
  • the distance from the first rotation axis 8 to the second rotation axis 9 is denoted with the reference number 7'.
  • the pitman 4 is supported to the body 2 at the second support point by two pivot bars 11.
  • the pivot bars 11 are fixed at holes 18 in the first ends (upper ends) of the pivot bars to a first shaft 22 which is fixed to the pitman at the location of the third pivot point 12.
  • the first shaft is fixed to the pitman and is extending to the sides of the pitman inside the side plates of the body.
  • the pivot bars 11 are fixed at holes 19 in the second ends (lower ends) of the pivot bars to a second shaft 23 which is fixed to the pitman at the location of the fourth pivot point 13.
  • the second shaft 23 is supported to the side plates of the body 2 preferably below the pitman.
  • the pivot bars 11 are preferably arranged between the pitman and the side plates of the body inside the body. A separate pivot bar 11 is shown in Fig.
  • Fig. 5 shows a top view of a cross section of the jaw crusher 100 along a plane which is passing through the rotation axis 8 of the eccentric shaft and the third pivot point 12 of the movement mechanism.
  • the side plates 32 are preferably formed of a undivided material with the pitman for example casted. It is also possible to form the side plates as a rigid piece with the pitman by welding or bolting.
  • the jaw crusher of Fig. 5 As short as possible vertical movement for the movable jaw can be achieved by the jaw crusher of Fig. 5 because the pivot bar has an optimal location on the bisector of the crushing chamber.
  • the shafts of the pivots 12 and 13 do not extend through the crushing chamber in Fig. 5 but short shafts are arranged at both sides of the crusher.
  • the decreasing vertical movement of the wear surface 5' of the pitman relative to the fixed jaw 3 is reducing the power which is required from the crusher when the material to be crushed must not be abraded vertically between the jaws.
  • the body 2 of the jaw crusher and the pitman 4 with the side walls 32 are designed curved (no sharp discontinuities) for receiving stresses due to forces.
  • one flywheel is arranged to the jaw crusher at the centre point of the eccentric shaft 7, preferably inside the body 2.
  • a recess 20 for the flywheel and one flywheel placed in the recess are shown by a dashed line wherein flywheels 17' external to the body 2 are not necessary required.

Abstract

La présente invention concerne un broyeur à mâchoires (100) comprenant un corps (2) sur lequel sont disposées une mâchoire fixe (3) et une bielle (4) qui est déplaçable contre la mâchoire fixe pour former une chambre de broyage (6) qui est ouverte sur le dessus ; et la bielle est montée sur roulements sur un arbre excentrique (7) qui est monté sur roulements en rotation sur le corps, formant ainsi un premier point de pivotement (8), et la bielle est montée sur roulements sur l'arbre excentrique à un point excentrique dudit arbre excentrique, formant ainsi un deuxième point de pivotement (9) ; et la bielle est supportée au niveau du corps par une barre de pivotement (11) qui pivote à une première extrémité de la barre de pivotement au niveau de la bielle, formant ainsi un troisième point de pivotement (12), et à une seconde extrémité de la barre de pivotement au niveau du corps, formant ainsi un quatrième point de pivotement (13) ; et pour diriger un mouvement de broyage vers le matériau à broyer dans une direction qui est sensiblement perpendiculaire à la bissectrice (6') de la chambre de broyage (6) : ladite au moins une barre de pivotement (11) qui pivote au niveau de la bielle est conçue de telle sorte qu'un plan passant à travers le troisième point de pivotement (12) et le quatrième point de pivotement (13) est disposé de manière sensiblement parallèle (± 20°) à la bissectrice de la chambre de broyage. La présente invention concerne également une installation de broyage ainsi qu'un procédé permettant de broyer un matériau minéral dans un broyeur à mâchoires (100) ou une installation de broyage (200).
PCT/FI2012/050464 2012-05-15 2012-05-15 Broyeur à mâchoires, installation de broyage et procédé de broyage WO2013171361A1 (fr)

Priority Applications (1)

Application Number Priority Date Filing Date Title
PCT/FI2012/050464 WO2013171361A1 (fr) 2012-05-15 2012-05-15 Broyeur à mâchoires, installation de broyage et procédé de broyage

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/FI2012/050464 WO2013171361A1 (fr) 2012-05-15 2012-05-15 Broyeur à mâchoires, installation de broyage et procédé de broyage

Publications (1)

Publication Number Publication Date
WO2013171361A1 true WO2013171361A1 (fr) 2013-11-21

Family

ID=46210290

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/FI2012/050464 WO2013171361A1 (fr) 2012-05-15 2012-05-15 Broyeur à mâchoires, installation de broyage et procédé de broyage

Country Status (1)

Country Link
WO (1) WO2013171361A1 (fr)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103801425A (zh) * 2014-02-13 2014-05-21 河北万矿机械厂 一种细碎颚式破碎机
WO2016181032A1 (fr) 2015-05-13 2016-11-17 Metso Minerals, Inc. Broyeur à mâchoires, installation de traitement de matériau minéral et procédé pour traiter un matériau minéral
WO2016206744A1 (fr) * 2015-06-25 2016-12-29 Sandvik Intellectual Property Ab Ensemble de montage de mâchoire de broyage excentrique
CN107138216A (zh) * 2017-05-11 2017-09-08 能诚集团有限公司 颚式破碎机
CN109701679A (zh) * 2019-01-30 2019-05-03 江苏省群飞机械制造有限公司 一种直压式颚式破碎机

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB714240A (en) * 1952-12-22 1954-08-25 Parker Ltd Frederick Improvements relating to jaw crushers
GB1354095A (en) * 1970-04-28 1974-06-05 Parker Ltd Frederick Crushers
CA1184550A (fr) * 1982-02-18 1985-03-26 Timo Niitti Concasseur a machoires mobiles double effet

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB714240A (en) * 1952-12-22 1954-08-25 Parker Ltd Frederick Improvements relating to jaw crushers
GB1354095A (en) * 1970-04-28 1974-06-05 Parker Ltd Frederick Crushers
CA1184550A (fr) * 1982-02-18 1985-03-26 Timo Niitti Concasseur a machoires mobiles double effet

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103801425A (zh) * 2014-02-13 2014-05-21 河北万矿机械厂 一种细碎颚式破碎机
WO2016181032A1 (fr) 2015-05-13 2016-11-17 Metso Minerals, Inc. Broyeur à mâchoires, installation de traitement de matériau minéral et procédé pour traiter un matériau minéral
US10710087B2 (en) 2015-05-13 2020-07-14 Metso Minerals, Inc. Jaw crusher, mineral material processing plant and method for processing mineral material
WO2016206744A1 (fr) * 2015-06-25 2016-12-29 Sandvik Intellectual Property Ab Ensemble de montage de mâchoire de broyage excentrique
CN107810062A (zh) * 2015-06-25 2018-03-16 山特维克知识产权股份有限公司 偏心破碎颚安装组件
CN107138216A (zh) * 2017-05-11 2017-09-08 能诚集团有限公司 颚式破碎机
CN109701679A (zh) * 2019-01-30 2019-05-03 江苏省群飞机械制造有限公司 一种直压式颚式破碎机

Similar Documents

Publication Publication Date Title
US10543487B2 (en) Jaw crusher, crushing plant and crushing method
EP2135677B1 (fr) Concasseur à mâchoires avec réglage automatique de l'ouverture des mâchoires
WO2013171361A1 (fr) Broyeur à mâchoires, installation de broyage et procédé de broyage
US20060278744A1 (en) Communication device
US10682651B2 (en) Jaw crusher and crushing plant
US8702024B2 (en) Roller jaw crusher system and method
EP3122462B1 (fr) Broyeur à mâchoires, installation de broyage et méthode d'utilisation de ce broyeur
CN106914301B (zh) 一种对称双腔颚式破碎机
CN107624082B (zh) 颚式破碎机、矿物材料加工设备和用于加工矿物材料的方法
JP5955269B2 (ja) 破砕機の位置調整可能な供給装置
US223281A (en) Ore-crusher
US9662655B2 (en) System and method to minimize fine material produced during crushing of frangible material
RU2412761C1 (ru) Дробильный агрегат для разрушения строительных отходов
PL182788B1 (pl) Kruszarka szczękowa
EP3307439A1 (fr) Système et procédé pour minimiser la matière fine produite lors de l'écrasement d'un matériau cassable
PL138867B2 (en) Apparatus for crushing reinforced concrete elements

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 12726144

Country of ref document: EP

Kind code of ref document: A1

DPE1 Request for preliminary examination filed after expiration of 19th month from priority date (pct application filed from 20040101)
NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 12726144

Country of ref document: EP

Kind code of ref document: A1