WO2013168880A1 - 엘티이기반 이동통신시스템에서의 전력 제어 및 링크 적응 방법 - Google Patents

엘티이기반 이동통신시스템에서의 전력 제어 및 링크 적응 방법 Download PDF

Info

Publication number
WO2013168880A1
WO2013168880A1 PCT/KR2012/011595 KR2012011595W WO2013168880A1 WO 2013168880 A1 WO2013168880 A1 WO 2013168880A1 KR 2012011595 W KR2012011595 W KR 2012011595W WO 2013168880 A1 WO2013168880 A1 WO 2013168880A1
Authority
WO
WIPO (PCT)
Prior art keywords
value
power control
psd
channel
delay time
Prior art date
Application number
PCT/KR2012/011595
Other languages
English (en)
French (fr)
Inventor
김희욱
강군석
구본준
안도섭
Original Assignee
한국전자통신연구원
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from KR1020120124225A external-priority patent/KR101984754B1/ko
Application filed by 한국전자통신연구원 filed Critical 한국전자통신연구원
Priority to US14/399,926 priority Critical patent/US9277505B2/en
Publication of WO2013168880A1 publication Critical patent/WO2013168880A1/ko

Links

Images

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W52/00Power management, e.g. TPC [Transmission Power Control], power saving or power classes
    • H04W52/04TPC
    • H04W52/06TPC algorithms
    • H04W52/08Closed loop power control
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W52/00Power management, e.g. TPC [Transmission Power Control], power saving or power classes
    • H04W52/04TPC
    • H04W52/18TPC being performed according to specific parameters
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W52/00Power management, e.g. TPC [Transmission Power Control], power saving or power classes
    • H04W52/04TPC
    • H04W52/54Signalisation aspects of the TPC commands, e.g. frame structure

Definitions

  • the present invention relates to a power control and link adaptation method for long round trip delay time and slow channel fading compensation in an LTE based mobile communication system having a long round trip delay time such as a satellite mobile system.
  • the present invention was carried out as a result of the research and development of the broadcasting and telecommunications infrastructure source technology of the Korea Communications Commission. [KCA-2012-12-911-01-201, Development of Optimum Application Technology of 2.1GHz Satellite Frequency Band for Terrestrial Mobile Communication]
  • the present invention provides power control and link adaptation to compensate for long round trip delay time and slow channel fading in LTE-based mobile communication systems having a long round trip delay time and a sensitivity to Peak to Average Power Ratio (PAPR), such as satellite mobile systems. It is about a method.
  • PAPR Peak to Average Power Ratio
  • Future mobile networks are expected to evolve in a way that land and satellite networks combine or cooperate.
  • the commonality between the satellite and the terrestrial air interface in such a satellite / terrestrial integrated system should be considered very important when considering the cost of the terminal.
  • LTE-based land mobile system is considered as the next generation IMT-Advanced system
  • LTE Long Term
  • LTE Long Term
  • power control is essential for transmitting at the power required to support certain data rates. Too much power may cause unnecessary interference, and too little power will require an increase in retransmission through increased data transmission errors, resulting in greater transmission delays and lower throughput.
  • power control is especially important for solving near-far problems (source problems) in the uplink.
  • source problems source problems
  • WCDMA-based mobile system since uplink transmission does not have orthogonality, a strong signal level of a UE in a cell center area causes a lot of interference to a weak signal of a cell boundary UE without accurate power control. to be.
  • WCDMA downlink is also considered power control to maintain a fixed data rate and delay time in a similar manner.
  • high-speed data transmission such as HSPA (High Speed Packet Access)
  • HSPA High Speed Packet Access
  • Link adaptation is a technology that adjusts and adapts transmission parameters according to changes in radio channel conditions, and aims to increase transmission speed, system capacity, and frequency efficiency.
  • Typical implementation techniques for link adaptation include power control, Hybrid Automatic Repeat reQuest (H-ARQ), and Adaptive Modulation and Coding (AMC).
  • Power control a technology directly related to the present invention, is the only method used for link adaptation in the 2nd generation CDMA method, which allocates higher transmission power to a terminal farther than a terminal close to a base station to secure the same quality as a whole.
  • Technology. Power control in CDMA relates to capacity issues that allow for maximum base station capacity. That is, if the base station increases the transmit power of the radio terminal located at the cell boundary to allow a higher transmit power to a farther radio terminal than the near radio terminal for quality assurance, it eventually acts as an interference to the neighboring cell to minimize The outgoing power must be controlled, which is called power control.
  • Power control technology can be divided into uplink power control and downlink power control, the uplink power control is divided into open loop power control and closed loop power control.
  • Uplink power control refers to transmission power control of a mobile station, and is a technique for all mobile stations to maintain good call quality and maximize capacity.
  • the transmission power of the mobile terminal is adjusted to have the minimum signal-to-noise ratio by equalizing the received power from each mobile terminal received by the base station.
  • Downlink power control refers to transmission power control (reduction of interference between mobile communication cells) of a base station, and has a large transmission output to a mobile station far from the base station and a small transmission output to a mobile station near to it.
  • the open loop power control method refers to controlling transmission power mainly by the mobile terminal without forming a loop between the mobile station and the base station, and performs power control under the assumption that the forward and reverse path losses are the same.
  • the closed loop power control method is to correct the power control error coming from the open loop method.
  • the base station compares the reception E b / N o with the request E b / N o every predetermined period to determine the power control bit and to instruct the mobile station.
  • the uplink of the LTE-based land mobile system uses SC-FDMA (Single Carrier Frequency Division Multiple Access) access with orthogonality
  • SC-FDMA Single Carrier Frequency Division Multiple Access
  • high interference levels from neighboring cells may still cause limitations in uplink coverage if the neighboring cell UEs are not power controlled.
  • IoT interference of thermal
  • uplink power control maintains orthogonality within a cell, it may be advantageous when considering adjacent cell interference.
  • power control as sophisticated as WCDMA is not required.
  • a link adaptation technique for supporting the maximum data rate according to the channel state at the maximum power is mainly used through link adaptation according to the channel state rather than power control for high-speed transmission.
  • the LTE-based land mobile system has no near-far problem due to no inter-cell interference compared to the WCDMA-based land mobile system. It is not considered important other than power control to solve the problem.
  • An object of the present invention is to prevent a sudden increase in the round trip delay time according to signal transmission through accurate power control in a satellite mobile system having a long round trip delay time.
  • Another object of the present invention is to reduce the number of retransmissions caused by the signal transmission through the accurate power control when terrestrial LTE is applied and to increase the accuracy of the power control command.
  • Another object of the present invention is to provide accurate closed loop power control when the accuracy of the power control command is low, and to provide a system capable of compensating for a long round trip delay time in the case of downlink without power control.
  • Another object of the present invention is to effectively compensate for the slow channel fading in the satellite mobile system, and to prevent useless fluctuations in the transmission terminal power according to the application of the terrestrial LTE system.
  • another object of the present invention is to provide a transmission power of a terminal that satisfies the SINR for supporting the MCS required by the terminal in accordance with the channel situation changes.
  • an object of the present invention is to propose a power control and link adaptation method that compensates for a long round trip delay time and a slow channel fading in an LTE-based mobile communication system having a long round trip delay time such as a satellite mobile system.
  • a base station determines a channel estimation value by using a PSD (Power Spectral Density) value in units of frames (a Step (b) and the base station generating a transmit power control (TPC) command in consideration of the channel estimation value and the round trip delay time, and transmitting the generated TPC command to the terminal.
  • a transmission power control value is provided using a power control method for uplink data channel transmission, characterized in that determined using the TPC command and the delay compensation index transmitted to the terminal.
  • the satellite mobile communication system is configured based on LTE
  • the data channel is a PUSCH (Physical Uplink Shared Channel: physical uplink shared channel)
  • the transmission power control value is measured using the TPC command It features.
  • the PSD value of each frame unit is an average value of PSD estimates in a subframe for a PUSCH transmitted in a frame.
  • the TPC command is determined by reflecting a difference prediction value between the received PSD value and the target PSD value after the round trip delay time determined by the following equation.
  • G 1 Channel variation estimate A predictive gain index showing how much is reflected in the value 0 ⁇ G 1 ⁇ 1
  • PSD SRS is the reception of SRS signal PSD
  • the transmission power control value is characterized by the following equation.
  • a method for controlling downlink power in a satellite mobile communication system comprising: estimating a channel state of a target band in units of frames; Determining, by the terminal, a channel variation prediction value in consideration of a round trip delay time; Determining, by the terminal, a final channel state estimation value by using a channel variation prediction value after the round trip delay time; Determining, by the terminal, the MCS level by comparing the final channel estimation value with a PSD value or a Signal to Interference and Noise Ratio (SINR) value required at each Modulation and Coding Scheme (MCS) level, and the terminal determines the MCS level
  • SINR Signal to Interference and Noise Ratio
  • MCS Modulation and Coding Scheme
  • the target band is a subband, a plurality of subbands or a full band based on a RS signal (reference signal) for channel state information (CSI) transmitted in downlink.
  • RS signal reference signal
  • CSI channel state information
  • the estimating step estimates the channel state by estimating the PSD value or SINR value of the RS signal in the target band.
  • the channel variation prediction value is determined by the following equation.
  • PSD CSI-RS (i): PSD value of RS signal for CSI in estimated i-th frame)
  • the final channel state estimation value is determined by the following equation.
  • the final channel state estimation value is determined by the following equation determined using PBCH and SCH.
  • the terminal can support the MCS level required.
  • Compatibility can be maintained within the existing LTE frame by generating a TPC command for each uplink closed loop power control in units of frames.
  • the power control and link adaptation scheme of the present invention is compatible with existing terrestrial LTE.
  • 1 is a power control block diagram for uplink PUSCH transmission in the LTE-based satellite mobile communication system having a long round trip delay proposed so far.
  • Figure 2 is a power control flowchart for uplink PUSCH transmission in the LTE-based satellite mobile communication system having a long round trip delay proposed so far.
  • 3 is a block diagram for downlink adaptation in consideration of the proposed long round trip delay time.
  • 4 is a flowchart of a downlink adaptation method considering the proposed long round trip delay time.
  • 1 is a power control block diagram for uplink PUSCH transmission in a LTE-based satellite mobile communication system having a long round trip delay time proposed so far.
  • FIG. 2 is a power control flowchart for uplink PUSCH transmission in the LTE-based satellite mobile communication system having a long round trip delay time proposed so far.
  • 3 is a block diagram for downlink adaptation considering the proposed long round trip delay time.
  • the present invention describes the present invention with an LTE-based satellite mobile communication system
  • the method of the present invention is applicable regardless of any other mobile communication system having a long round trip delay time.
  • PUSCH Physical Uplink Shared Channel
  • M (i) represents the instantaneous PUSCH bandwidth calculated as the number of resource blocks in the i th subframe
  • I a relative Signal to Interference and Noise Ratio (SINR) value to support the Modulation and Coding Scheme (MCS) level considered for PUSCH transmission in the i-th subframe
  • SINR Signal to Interference and Noise Ratio
  • M (i) is a value indicating the number of resource blocks allocated for PUSCH transmission in the i-th subframe, and reflects the fact that only the basic control is power per resource block. Thus, the allocation of more resource blocks corresponds to higher receive power, which in turn requires higher transmit power.
  • the explicit power control command controlling ⁇ (i) is not in the downlink scheduling assignment but in the uplink scheduling grant.
  • the PUSCH power control command may be provided with an explicit power control command on a special physical downlink control channel (PDCCH) that simultaneously provides power control commands to multiple terminals, and the command may be multilevel.
  • 1, which completely compensates for path attenuation, also supports ⁇ ⁇ 1 in consideration of uplink and downlink asymmetry. As long as the transmission power of the UE does not fall within the maximum transmission power limit from Equation 1, in addition to the security attenuation compensation, the network By selecting a power control scheme including the can ensure that the received SINR is the SINR required by the MCS.
  • the TPC command is a transmission power control, and refers to a power control scheme proposed in 802.11h to appropriately set transmission power in order to minimize interference with other nodes in the 5GHz band.
  • ⁇ (i) is a value representing the current PUSCH power control variation compared to the past by the TPC command for the i-th subframe, and is defined as in Equation 2 below.
  • the time delay between receiving the TPC command and applying the uplink power control command corresponds to a 4 subframe time length. That is, the current power change of the i-th subframe is defined by a TPC command transmitted through the PDCCH in the i-4th subframe.
  • the value has a value of [-1, 1] or [-1 0 1 3] according to the PDCCH format by comparing with a threshold defined by the system as shown in Equation 2.
  • the uplink data channel power control method of the LTE-based terrestrial mobile system has some problems in the case of a mobile system having a long round trip delay time such as a satellite mobile system.
  • a mobile system having a long round trip delay time such as a satellite mobile system.
  • frequent power control in units of subcarriers is not effective in a satellite mobile system that can compensate for a fast channel change due to a long round trip delay time, and small power control has a problem of causing unnecessary fluctuations in power of a transmitting terminal.
  • the TPC command transmitted from the base station to the terminal on the basis of the uplink channel situation with a long round-trip delay time has a high probability of changing from the channel situation at the time when the terminal starts transmitting, the transmission power of the terminal is increased.
  • the SINR for supporting the required MCS is not satisfied. Accordingly, in the LTE-based satellite mobile communication system having a long round trip delay time, a power control technique capable of compensating for the long round trip delay time and predicting a channel after the round trip delay
  • the base station generates a TPC command for uplink closed loop power control in units of frames instead of subframes. This can eliminate unnecessary TPC command transmission by transmitting the PDCCH channel for PUSCH channel power control once per frame.
  • This frame-by-frame power control method can also be transmitted by the base station scheduler while maintaining compatibility within existing LTE frames.
  • power control of the PUSCH transmission which is an uplink data channel
  • LTE-based mobile system having a long round-trip delay time can be expressed as follows.
  • I is a frame number, not a subframe. That is, in the proposed power control scheme, a power control command for a specific PUSCH is transmitted less than once per frame, and the reduced resource for PUCCH for a TPC command can be used for a downlink physical downlink shared channel (PDSCH).
  • PDSCH downlink physical downlink shared channel
  • the transmission capacity can be increased.
  • the power scheme proposed in the LTE-based mobile satellite communication system operates on a frame basis, it can be applied when the MCS level and the number of transmission resource blocks for PUSCH channel transmission operate on a frame basis.
  • Subframe operation in LTE-based terrestrial mobile communication system has advantages such as reduction of service delay time and adaptation of fast channel change due to reduced retransmission time delay, but in case of satellite mobile communication system, It is desirable that link adaptation techniques such as adaptive modulation and demodulation in LTE-based satellite mobile communication systems also operate on a frame basis, since there are few retransmissions, frame-to-frame retransmissions or service delay differences, and difficulty in adapting to fast channel changes. In consideration of the above, frame-based power control can be easily applied to an LTE-based satellite mobile communication system.
  • ⁇ (i) transmitted from the base station for closed loop power control is accompanied by delay compensation and channel prediction in consideration of a long round trip delay time, unlike a basic LTE-based mobile communication system.
  • the base station in order to generate a TPC command, the base station first estimates a power spectral density (PSD), which is a reception power per subcarrier of the PUSCH channel received in the i-th frame.
  • PSD estimation is an average value of PSD estimates in all subframes for the PUSCH channel transmitted in the i-th frame.
  • PSD estimation for accurate channel estimation can be replaced by SINR estimation considering interference.
  • the PSD SRS shows a received PSD of a SRS (Sounding Reference Signal) signal transmitted to estimate a user terminal channel situation in all bandwidths for uplink resource scheduling in uplink.
  • the SRS signal is a channel that is periodically transmitted from each user terminal to know the channel status of each user's frequency band, there is a wideband SRS signal and there is a narrowband SRS signal.
  • the SRS also follows the transmission power of the PUSCH channel.
  • channel quality measurement in the frequency domain through SRS signal has little effect in case of non-selective channel characteristics such as satellite communication system. Therefore, the LTE-based satellite mobile communication system can use the SRS signal transmission together to estimate the uplink channel change.
  • the SRS signal transmission level follows the PUSCH transmission power level at a constant period and is transmitted at the same transmission level during the period.
  • the SRS signal transmission period is ⁇ 2, 5, 10, 20, 40, 80, 160, 320ms ⁇
  • SRS is transmitted at 5ms or 10ms during broadband SRS transmission, and at that moment every 80ms, 160ms, 320ms
  • the power may be updated in accordance with the PUSCH channel transmission power.
  • CQI channel quality indicator
  • the G 1 value represents a channel variation estimate It is a predictive gain index that shows how much is reflected in the value, and has a value of 0 ⁇ G 1 ⁇ 1 , which is determined in the upper layer.
  • TPC command value based on value Is determined as in Equation 6.
  • Equation 6 By setting the level to [-1 0 3 1], it is possible to maintain compatibility with the existing LTE, but this level value may be appropriately changed according to the system and channel situation. E.g If you set the level to [-2 -1 1 2], you can send TPC commands to better adapt to channel changes and reduce overall power consumption.
  • TPC command determined by Equation 6 Is transmitted to the terminal through the PDCCH.
  • TPC command The UE that obtains the UE determines a transmission power control value ⁇ (i) using a recently received TPC command for PUSCH transmission in the i-th frame as shown in Equation (7).
  • is a delay compensation index and has a value of 0 ⁇ G 1 ⁇ 1 , which is determined in the upper layer.
  • Figure 1 shows a power control block diagram for uplink PUSCH transmission in the LTE-based satellite mobile communication system having a long round trip delay proposed so far.
  • Figure 2 shows a power control flowchart for uplink PUSCH transmission in the LTE-based satellite mobile communication system having a long round trip delay proposed so far.
  • the TPC command is not transmitted to the uplink, and the CQI information for link adaptation is fed back through the uplink. That is, in order to perform accurate link adaptation in downlink, the UE needs to transmit accurate CQI information.
  • the terminal determines the MCS level that satisfies the target SINR based on the received SINR of the downlink RS signal and transmits the CCS information.
  • the UE first estimates the channel state for each subband, a plurality of subbands or all bands based on the RS for CSI (Channel State Information) transmitted in downlink.
  • Channel state estimation is performed in frame units as in uplink because frequent channel state estimation in units of subframes is not effective in LTE-based satellite mobile communication systems having a long round trip delay time.
  • the channel state is achieved by estimating the PSD or SINR of an RS signal (reference signal) in a target band to which CQI information is to be sent.
  • ⁇ pred means a predicted channel change amount
  • PSD est means a final channel state estimation value reflecting ⁇ pred .
  • PSD value of RS signal for CSI in i-th frame PSD PSD in (i-1) th frame as shown in Equation 8 to consider long round trip delay time with PSD CSI-RS (i)
  • PSD est is obtained by reflecting the change trend ⁇ pred with the CSI-RS (i).
  • G 2 is a prediction gain index indicating how much the channel variation prediction value is reflected in the PSD est , and has a value of 0 ⁇ G 2 ⁇ 1, and the value is determined in the upper layer.
  • the appropriate MCS level is determined by comparing with PSD or SINR value required for each MCS level.
  • the PSD of the PBCH Physical Broadcast Channel
  • the SCH Synchronization Channel
  • 3 shows a block diagram for downlink adaptation considering the proposed long round trip delay time.
  • 4 is a flowchart of a downlink adaptation method considering the proposed long round trip delay time.
  • the apparatus described above may be implemented as a hardware component, a software component, and / or a combination of hardware components and software components.
  • the devices and components described in the embodiments are, for example, processors, controllers, Arithmetic Logic Units (ALUs), Digital Signal Processors (Microcomputers), Microcomputers, Field Programmable Gate Arrays (FPGAs).
  • ALUs Arithmetic Logic Units
  • Microcomputers Digital Signal Processors
  • Microcomputers Microcomputers
  • FPGAs Field Programmable Gate Arrays
  • PLU programmable logic unit
  • the processing device may execute an operating system (OS) and one or more software applications running on the operating system.
  • the processing device may also access, store, manipulate, process and generate data in response to the execution of the software.
  • OS operating system
  • the processing device may also access, store, manipulate, process and generate data in response to the execution of the software.
  • processing device includes a plurality of processing elements and / or a plurality of types of processing elements. It can be seen that it may include.
  • the processing device may include a plurality of processors or one processor and one controller.
  • other processing configurations are possible, such as parallel processors.
  • the software may include a computer program, code, instructions, or a combination of one or more of the above, and configure the processing device to operate as desired, or process it independently or collectively. You can command the device.
  • Software and / or data may be any type of machine, component, physical device, virtual equipment, computer storage medium or device for the purpose of interpreting or providing instructions or data to the processing device. Or may be permanently or temporarily embodied in a signal wave to be transmitted.
  • the software may be distributed over networked computer systems so that they may be stored or executed in a distributed manner.
  • Software and data may be stored on one or more computer readable recording media.
  • the method according to the embodiment may be embodied in the form of program instructions that can be executed by various computer means and recorded in a computer readable medium.
  • the computer readable medium may include program instructions, data files, data structures, etc. alone or in combination.
  • the program instructions recorded on the media may be those specially designed and constructed for the purposes of the embodiments, or they may be of the kind well-known and available to those having skill in the computer software arts.
  • Examples of computer readable recording media include magnetic media such as hard disks, floppy disks and magnetic tape, optical media such as CD-ROMs, DVDs, and magnetic disks such as floppy disks.
  • Examples of program instructions include not only machine code generated by a compiler, but also high-level language code that can be executed by a computer using an interpreter or the like.
  • the hardware device described above may be configured to operate as one or more software modules to perform the operations of the embodiments, and vice versa.

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Mobile Radio Communication Systems (AREA)

Abstract

본 발명은 위성이동시스템과 같이 긴 왕복 지연 시간을 가지는 LTE기반 이동 통신시스템에서 긴 왕복 지연 시간 및 느린 채널 페이딩 보상을 하기 위한 전력제어 및 링크 적응 기법에 방법에 관한 것으로, 지상 LTE 시스템에 비해 기지국과 단말간 거리가 긴 위성이동시스템의 긴 왕복 지연 시간을 보상할 수 있으며, 왕복 지연 시간 후의 채널을 예측함으로써 단말이 요구하는 MCS 레벨을 지원 할 수 있고, 상향링크 폐루프 전력 제어를 위한 TPC 명령을 프레임 단위로 생성함으로써 기존 LTE 프레임 내에서 호환성을 유지할 수 있으며, 지상 LTE 시스템에 비해 기지국과 단말간 거리가 긴 위성이동시스템의 느린 채널 페이딩을 보상할 수 있는 효과가 있다.

Description

엘티이기반 이동통신시스템에서의 전력 제어 및 링크 적응 방법
본 발명은 위성이동시스템과 같이 긴 왕복 지연 시간을 가지는 LTE기반 이동 통신시스템에서 긴 왕복 지연 시간 및 느린 채널 페이딩 보상을 하기 위한 전력제어 및 링크 적응 방법에 관한 것이다.
본 발명은 방송통신위원회의 방송통신인프라원천기술개발사업의 연구결과로 수행되었음. [KCA-2012-12-911-01-201, 지상 이동통신을 위한 2.1GHz 위성 주파수 대역 최적 활용기술 개발]
본 발명은 위성이동시스템과 같이 긴 왕복 지연 시간을 가지고 PAPR(Peak to Average Power Ratio)에 민감한 특성을 가지는 LTE기반 이동통신시스템에서 긴 왕복 지연 시간 및 느린 채널 페이딩을 보상하기 위한 전력제어 및 링크 적응 방법에 관한 것이다.
미래의 이동 통신망은 지상망과 위성망이 결합하거나 협력하는 방향으로 진화할 것으로 예상된다. 이러한 위성/지상 통합 시스템에서 위성과 지상 무선 인터페이스 간 공통성은 단말의 비용을 고려했을 때 매우 중요하게 고려되어야 한다. 특히, 차세대 IMT-Advanced 시스템으로서 LTE기반 지상 이동 시스템이 고려되고 있는 점을 감안했을 때, 지상망에 비해 훨씬 큰 셀 반경 및 긴 왕복지연 시간을 가지며, 전력 제한적인 위성망 환경을 고려한 LTE(Long Term Evolution) 기반의 위성무선인터페이스에 대한 연구가 절실히 요구된다.
현재 셀룰러와 같은 이동통신 시스템에서 어떤 데이터율을 지원하기 위해 필요한 전력으로 전송하기 위해서는 전력 제어가 필수적이다. 너무 많은 전력은 불필요한 간섭을 야기할 수도 있으며 너무 적은 전력은 데이터 전송 오류 증가를 통해 재전송의 증가를 요구하게 되어 더 큰 전송 지연 및 더 낮은 처리율을 야기하게 된다. WCDMA기반의 이동통신시스템의 경우 전력제어는 특히 상향링크에서 near-far문제(near-far problem, 근원문제)를 해결하기 위해 중요하게 고려되고 있다. WCDMA기반 이동시스템의 경우 상향링크 전송이 직교성을 가지고 있지 않고 있어 정확한 전력제어를 하지 않고서는 셀 중심 지역 UE(User Equipment)의 강한 신호 레벨이 셀 경계지역 UE의 약한 신호에 간섭을 많이 야기하기 때문이다. WCDMA 하향링크 또한 유사한 방법으로 고정 데이터율과 지연 시간을 유지하기 위해 전력제어가 고려되고 있다. 그러나 HSPA(High Speed Packet Access)같은 고속 데이터 전송의 경우에는 전력제어보다는 단말은 full power로 전송하고 채널 상태에 따라 데이터율을 조정하는 링크 적응(link adaptation) 기술이 주로 사용되고 있다.
링크 적응(Link Adaption)은 무선 채널 상태의 변화에 따라 전송 파라미터를 조절 및 적응시키는 기술로서, 전송속도, 시스템 수용용량 및 주파수 효율을 높이는 데 목적이 있다. 링크 적응을 위한 대표적인 구현 기술로는 전력제어, H-ARQ(Hybrid Automatic Repeat reQuest), AMC(Adaptive Modulation and Coding)가 있다.
본 발명과 직접 관련된 기술인 전력제어는 2세대 CDMA 방식에서 링크 적응(Link Adaption)을 위해 유일하게 사용하던 방식으로서 기지국에서 가까운 단말보다 멀리 있는 단말에 보다 높은 송출전력을 할당하여 전체적으로 동일한 품질을 확보하는 기술이다. CDMA에서의 전력제어는 기지국 용량이 최대가 될 수 있도록 하는 용량 문제와 관련된다. 즉, 기지국에서 품질확보를 위해 가까운 무선단말 보다 멀리 있는 무선 단말에 높은 송출전력을 허락하게끔, 셀 경계에 위치한 무선단말의 송출전력을 높이게 되면, 결국 이는 인접 셀에 간섭으로 작용하게 되어 가능한 한 최소로 송출전력을 제어하여야 하는데 이를 전력제어라고 한다.
전력제어 기술은 상향링크 전력제어와 하향링크 전력제어로 나눌 수 있고, 상향링크 전력제어는 개방루프 전력제어 및 폐루프 전력제어로 구분된다.
상향 링크 전력제어는 이동국의 송신전력 제어를 말하며, 모든 이동국이 양호한 통화품질을 유지하고 용량을 최대로 하기 위한 기술이다. 기지국에 수신되는 각 이동단말기로부터의 수신전력을 같게 하여 최소한의 신호대 잡음비를 가지도록 이동단말기 송신 전력을 조정한다.
하향 링크 전력제어는 기지국의 송신전력 제어(이동통신 셀 간의 간섭경감)를 말하고, 기지국에서 멀리 있는 이동국에게는 큰 송신 출력, 가까이 있는 이동국에게는 작은 송신 출력하는 방식이다.
개방루프 전력제어 방식은 이동단말과 기지국 간에 루프를 형성하지 않고 주로 이동단말에 의해 송신전력 조절을 하는 것을 말하고, 순방향 및 역방향 경로손실이 같다는 가정 하에 전력제어 수행을 하는 방식이다.
폐루프 전력제어 방식은 개방 루프 방식에서 오는 전력제어 오차를 수정하는 것을 말한다. 기지국이 일정 주기 마다 수신 Eb/No와 요구 Eb/No를 비교하여 전력제어 비트를 결정하여 이동국에게 지시한다.
한편, LTE기반 지상이동시스템의 상향링크의 경우 직교성을 가지는 SC-FDMA(Single Carrier Frequency Division Multiple Access) 접속을 사용하기 때문에 WCDMA와 같은 near-far 문제가 존재하지 않는다. 그러나 인접한 셀로부터 높은 간섭 레벨은 여전히 인접 셀 UE가 전력제어가 되지 않는다면 상향링크 커버리지에 제한을 야기할 수 있다. 즉 인접 셀로부터의 간섭 레벨의 증가는 타겟 셀의 커버리지를 제한하는 IoT(Interference of Thermal)을 증가시킨다. 그러므로 상향링크 전력제어가 셀 내에서는 직교성을 유지하지만 인접 셀 간섭을 고려할 경우 유리할 수 있다. 그러나 셀 내 간섭이 없기 때문에 WCDMA 만큼의 정교한 전력제어는 요구하지 않는다. LTE기반 지상이동시스템 하향링크의 경우, 고속 전송을 위해 전력제어보다는 채널 상태에 따른 링크 적응을 통해 최대 전력에서 채널 상태에 따라 최대 데이터율 지원을 위한 링크 적응 기술이 주로 사용된다.
이와 같이 LTE기반의 지상이동시스템의 경우 WCDMA기반 지상이동시스템에 비해 셀 내 간섭이 없음에 따른 near-far 문제가 없을 뿐만 아니라 고속 전송을 위한 링크 적응 기술이 주요한 기술로 고려되고 있기 때문에 셀 간 간섭을 해결하기 위한 전력제어 말고는 중요하게 고려되고 있지 않는 실정이다.
그러나 위성이동시스템과 같이 긴 왕복 지연시간을 가지는 이동시스템의 경우, 고려하는 MCS(Modulation and Coding Scheme) 레벨에서의 정확한 전력제어를 통한 신호 전송이 이루어지지 않을 경우 재전송 시 긴 왕복 지연 시간으로 인한 서비스 지연 시간의 급격한 증가가 발생하기 때문에, 정확한 전력 제어를 통한 재전송 횟수를 줄이는 것이 중요하며, 또한 전력 제어 시 긴 왕복 지연 시간으로 인해 폐루프 전력제어를 위한 전력 제어명령의 정확성이 떨어지는 문제점을 해결해야 정확한 폐루프 전력제어를 할 수 있다. 마지막으로 일반적으로 전력제어를 하지 않는 하향링크의 경우 상향링크 전력제어에 고려되었던 긴 왕복지연시간 보상이 전력제어에 반영될 수 없기 때문에 긴 왕복 지연시간을 보상하기 위해서는 긴 왕복 지연 시간을 고려한 채널 상태에 따른 MCS 레벨 결정이 필요하다.
본 발명의 목적은 긴 왕복 지연시간을 가지는 위성이동시스템에 있어서, 정확한 전력 제어를 통한 신호 전송에 따라 왕복 지연시간의 급격한 증가를 막는 것이다.
또한, 본 발명의 다른 목적은 지상 LTE 적용 시 정확한 전력 제어를 통한 신호 전송이 이루어지지 않아 발생하는 재전송 횟수를 줄이고 전력제어 명령의 정확성을 높이는 것이다.
또한, 본 발명의 또 다른 목적은 전력제어 명령의 정확성이 떨어지는 경우 정확한 폐루프 전력제어를 제공하며, 전력제어를 하지 않는 하향링크의 경우 긴 왕복지연시간을 보상할 수 있는 시스템을 제공하는 것이다.
또한, 본 발명의 또 다른 목적은 위성이동시스템에서의 느린 채널 페이딩을 효과적으로 보상하고, 지상 LTE 시스템 적용에 따른 송신 단말 전력의 쓸데없는 변동을 방지 하는데 있다.
또한, 본 발명의 또 다른 목적은 채널상황 변동에 따른 단말이 요구하는 MCS를 지원하기 위한 SINR을 만족하는 단말의 송신전력을 제공하는 것이다.
즉, 본 발명은 위성이동시스템과 같이 긴 왕복 지연 시간을 가지는 LTE기반 이동통신시스템에서 긴 왕복 지연 시간 및 느린 채널 페이딩을 보상하는 전력제어 및 링크 적응 방법을 제안하는데 목적이 있다.
상기의 목적을 달성하기 위해 본 발명에서는 위성이동통신 시스템에서 상향링크 데이터 채널 전송을 위한 전력 제어 방법으로서, 기지국이 프레임 단위의 PSD(Power Spectral Density) 값을 이용하여 채널추정 값을 결정하는 (a) 단계 및 상기 기지국이 상기 채널추정 값 및 왕복지연시간을 고려하여 TPC(Transmit Power Control) 명령을 생성하고, 생성한 상기 TPC 명령을 단말로 전송하는 (b) 단계로 이루어지며, 상기 단말에서의 송신전력 제어값은 상기 단말로 전송한 상기 TPC 명령과 지연보상 지수를 이용하여 결정되는 것을 특징으로 하는 상향링크 데이터 채널 전송을 위한 전력 제어 방법이 제공된다.
바람직하게는, 상기 위성이동통신 시스템은 LTE 기반으로 구성되고, 상기 데이터 채널은 PUSCH(Physical Uplink Shared Channel : 물리상향링크공유채널)이고, 상기 송신전력 제어값은 상기 TPC 명령을 이용하여 측정하는 것을 특징으로 한다.
바람직하게는, 상기 프레임 단위의 PSD 값은 프레임에서 전송되는 PUSCH을 위한 부프레임에서의 PSD 추정값의 평균값인 것을 특징으로 한다.
바람직하게는, 상기 TPC 명령은 아래의 수학식에 의해 결정되는 상기 왕복지연시간 후의 수신 PSD 값과 타겟 PSD 값의 차이 예측값을 반영하여 결정되는 것을 특징으로 한다.
Figure PCTKR2012011595-appb-I000001
Figure PCTKR2012011595-appb-I000002
: 왕복지연시간 후의 수신 PSD 값과 타겟 PSD 값의 차이 예측값
Figure PCTKR2012011595-appb-I000003
: 추정한 PSDest(i)와 주어진 MCS레벨을 지원하기 위한 PSDtarget과의 차이
파라미터 k : SRS(Sounding Reference Signal)를 통한 채널 예측이 가능할 때 k=1의 값, SRS를 이용하지 못할 때 k=0의 값
G1 : 채널 변화량 예측값을
Figure PCTKR2012011595-appb-I000004
에 얼마나 반영할지를 보여주는 예측 이득 지수로서 0≤G1≤1의 값
PSDSRS는 SRS 신호의 수신 PSD)
바람직하게는, 상기 송신전력 제어값은 아래의 수학식에 의해 결정되는 것을 특징으로 한다.
Figure PCTKR2012011595-appb-I000005
Figure PCTKR2012011595-appb-I000006
: 송신 전력 제어값, α : 지연 보상 지수로써 0≤G1≤1의 값을 가짐, p(i) : 현재 TPC 명령,
p(i-1) : 과거 TPC 명령)
또한, 위성이동통신 시스템에서 하향링크 전력 제어 방법으로서, 단말이 프레임 단위로 타겟 대역의 채널 상태를 추정하는 단계; 상기 단말이 왕복지연시간을 고려하여 채널 변화량 예측값을 결정하는 단계; 상기 단말이 상기 왕복지연시간 후의 채널 변화량 예측 값을 이용하여 최종 채널상태 추정값을 결정하는 단계; 상기 단말이 상기 최종 채널 추정 값과 각 MCS(Modulation and Coding Scheme)레벨에서 요구하는 PSD 값 또는 SINR(Signal to Interference and Noise Ratio) 값과 비교하여 MCS 레벨을 결정하는 단계 및 상기 단말이 상기 MCS 레벨을 포함한 CQI(Channel Quality Indicator) 정보를 기지국으로 송신하는 단계를 포함하는 위성이동통신 시스템에서의 하향링크 전력 제어 방법이 제공된다.
바람직하게는, 상기 타겟 대역은 하향링크로 전송되는 CSI(Channel State Information)용 RS 신호(Reference Signal : 기준신호)를 바탕으로 부대역, 복수의 부대역 또는 전 대역인 것을 특징으로 한다.
바람직하게는, 프레임단위로 상기 타겟 대역의 채널 상태를 추정하는 경우, 상기 추정하는 단계는 상기 타겟 대역에서의 RS 신호의 PSD 값 또는 SINR 값을 추정함으로 채널 상태를 추정하는 것을 특징으로 한다.
바람직하게는, 상기 채널 변화량 예측값은 아래의 수학식에 의해 결정되는 것을 특징으로 한다.
Figure PCTKR2012011595-appb-I000007
(G2 : 채널 변화량 예측값을 PSDest에 얼마나 반영할지를 보여주는 예측 이득 지수, 0≤G2≤1
PSDCSI-RS (i) : 추정된 i번째 프레임에서의 CSI용 RS 신호의 PSD 값)
바람직하게는, 상기 최종 채널상태 추정값은 아래의 수학식에 의해 결정되는 것을 특징으로 한다.
Figure PCTKR2012011595-appb-I000008
바람직하게는, 상기 최종 채널상태 추정값은 PBCH와 SCH를 이용하여 결정한 아래의 수학식에 의해 결정되는 것을 특징으로 한다.
Figure PCTKR2012011595-appb-I000009
Figure PCTKR2012011595-appb-I000010
: 추정된 i번째 프레임에서의 CSI용 RS 신호의 PSD 값에 PBCH와 SCH의 PSD를 반영한 값)
기타 실시예들의 구체적인 사항들은 상세한 설명 및 도면들에 포함되어 있다.
1. 지상 LTE 시스템에 비해 기지국과 단말간 거리가 긴 위성이동시스템의 긴 왕복 지연 시간을 보상할 수 있다.
2. 왕복 지연 시간후의 채널을 예측함으로써 단말이 요구하는 MCS 레벨을 지원 할 수 있다.
3. 상향링크 폐루프 전력 제어를 위한 TPC 명령을 프레임 단위로 생성함으로써 기존 LTE 프레임 내에서 호환성을 유지할 수 있다.
4. 지상 LTE 시스템에 비해 기지국과 단말간 거리가 긴 위성이동시스템의 느린 채널 페이딩을 보상할 수 있다.
5. 본 발명의 전력 제어 및 링크 적응 기법은 기존 지상 LTE와 호환성을 가진다.
도 1은 지금까지 제안한 긴 왕복지연시간을 가지는 LTE기반 위성이동통신시스템에서 상향링크 PUSCH 전송을 위한 전력 제어 블록도.
도 2는 지금까지 제안한 긴 왕복지연시간을 가지는 LTE기반 위성이동통신시스템에서 상향링크 PUSCH 전송을 위한 전력 제어 순서도.
도 3은 제안한 긴 왕복지연시간을 고려한 하향링크 링크 적응을 위한 블록도.
도 4는 제안한 긴 왕복지연시간을 고려한 하향링크 적응 방법 순서도.
도 1은 지금까지 제안한 긴 왕복지연시간을 가지는 LTE기반 위성이동통신시스템에서 상향링크 PUSCH 전송을 위한 전력 제어 블록도이다.
도 2는 지금까지 제안한 긴 왕복지연시간을 가지는 LTE기반 위성이동통신시스템에서 상향링크 PUSCH 전송을 위한 전력 제어 순서도이다.
도 3은 제안한 긴 왕복지연시간을 고려한 하향링크 링크 적응을 위한 블록도이다
도 4는 제안한 긴 왕복지연시간을 고려한 하향링크 적응 방법 순서도이다. 이하 도 1 내지 도 4를 참조하여 본 발명에 따른 바람직한 실시 예를 상세히 설명한다.
실시 예에서 LTE 기반의 위성이동통신 시스템을 가지고 본 발명을 설명하나, 본 발명의 방법은 긴 왕복지연 시간을 가지는 다른 어떠한 이동통신 시스템에 상관없이 적용 가능하다.
전체적으로 LTE기반 이동시스템에서 상향링크 데이터 채널인 PUSCH(Physical Uplink Shared Channel : 물리상향링크공유채널) 전송의 전력제어는 다음과 같이 나타낼 수 있다.
Figure PCTKR2012011595-appb-I000011
Figure PCTKR2012011595-appb-I000012
여기서
Figure PCTKR2012011595-appb-I000013
는 시스템 정보의 일부로 브로드캐스트되는 셀-특정 파라미터로서 i번째 부프레임에서 원하는 수신 전력 레벨을 의미한다. M(i)는 i번째 부프레임에서 resource block(자원 블록) 개수로 계산된 순시 PUSCH 대역폭을 나타내고,
Figure PCTKR2012011595-appb-I000014
는 i번째 부프레임에서 PUSCH 전송을 위해 고려되는 MCS(Modulation and Coding Scheme)레벨을 지원하기 위한 상대적 SINR(Signal to Interference and Noise Ratio) 값으로서, 각 부프레임에서 PUSCH 전송을 위해 사용되는 서로 다른 변조방식과 부호화율에 따라 서로 다른 SINR 값이 요구된다는 사실을 반영한다. M(i)는 i번째 부프레임에서 PUSCH 전송을 위해 할당되는 resource block 수를 나타내는 값으로서, 단지 기본적으로 제어되는 것이 resource block당 전력이라는 사실을 반영한다. 따라서 더 많은 resource block의 할당은 더 높은 수신 전력에 해당하며, 곧 더 높은 송신 전력이 필요하다. PUSCH 전송의 경우 δ(i)를 제어하는 명시적인 전력제어 명령은 하향링크 스케줄링 할당에 들어있지 않고, 상향링크 스케줄링 승인에 들어있다. 또한 PUSCH 전력제어 명령은 여러 개의 단말들에게 전력제어 명령을 동시에 제공하는 특수 PDCCH(Physical Downlink Control Channel)상으로도 명시적인 전력제어 명령이 제공될 수 있으며 이 명령은 다중 레벨일 수 있다. 경로 감쇄를 완전히 보상하는 경우인 α=1이 되며, 상향링크와 하향링크의 비대칭성을 고려해서 α<1 값 또한 지원한다. 경호 감쇄 보상 외에 수학식 1로부터 단말의 전송 전력이 최대 전송 전력 제한에 걸리지 않는 한, 망은 MCS와
Figure PCTKR2012011595-appb-I000015
를 포함한 전력제어 방식을 선택하여 수신 SINR이 해당 MCS에서 요구되는 SINR이 되도록 보장할 수 있다.
한편, TPC 명령은 송신전력제어로서, 5GHz 대역에서 타 노드와의 간섭을 최소화하기 위해 송출전력을 적절하게 정하기 위해 802.11h에서 제안된 전력제어 기법을 말한다.
δ(i)는 i번째 부프레임에 관한 TPC 명령에 의해 과거에 비해 현재 PUSCH 전력 제어 변화량을 나타내는 값으로서 수학식 2와 같이 정의된다.
Figure PCTKR2012011595-appb-I000016
여기서
Figure PCTKR2012011595-appb-I000017
는 TPC 명령을 수신과 상향링크 전력 제어 명령이 적용되는 사이의 시간 지연이 4 부프레임 시간 길이에 해당함을 나타낸다. 즉 현재 i번째 부프레임의 전력 변화는 i-4번째 부프레임에서 PDCCH를 통해 전송되는 TPC 명령에 의해 정의된다.
Figure PCTKR2012011595-appb-I000018
값은 수학식 2와 같이 시스템이 정의하고 있는 임계값과 비교를 통해 PDCCH format에 따라 [-1, 1] 또는 [-1 0 1 3]의 값을 가진다.
앞에서 언급한 LTE기반 지상이동시스템의 상향링크 데이터 채널 전력 제어 방법은 위성이동시스템과 같이 긴 왕복지연시간을 가지는 이동시스템의 경우 몇 가지 문제점을 가진다. 먼저 부반송파 단위로 이루어지는 잦은 전력제어는 긴 왕복지연시간으로 인해 빠른 채널 변화를 보상할 수 있는 위성이동시스템에서 효과적이지 않으며 작은 전력 제어는 송신 단말 전력의 쓸데없는 변동을 야기할 수 있는 문제점이 있다. 또한 긴 왕복 지연 시간으로 기지국 측에서 상향링크 채널 상황을 바탕으로 단말에 송신한 TPC 명령이 단말이 송신을 시작하는 시점에서의 채널 상황과 바뀌어 있을 확률이 높음으로 인해, 단말의 송신 전력이 단말이 요구하는 MCS을 지원하기 위한 SINR을 만족하지 못하게 되는 경우가 발생하는 문제점이 있다. 따라서, 긴 왕복 지연 시간을 가지는 LTE기반 위성이동통신시스템에서는 이러한 긴 왕복 지연 시간을 보상하고, 왕복 지연 시간 후의 채널을 예측함으로써 단말이 요구하는 MCS 레벨을 지원할 수 있는 전력 제어 기법이 필요하다.
이를 위해, 먼저 LTE기반 위성이동통신시스템에서는 기지국은 상향링크 폐루프 전력 제어를 위한 TPC 명령을 부프레임이 아닌 프레임 단위로 생성한다. 이는 PUSCH 채널 전력제어를 위한 PDCCH 채널이 프레임에 한 번씩 전송함으로써 쓸데없는 TPC 명령어 전송을 없앨 수 있다. 또한 프레임 단위의 이 전력 제어 방법은 기지국 스케줄러에 의해 기존 LTE 프레임 내에서 호환성을 유지하면서 전송될 수 있다.
따라서 전체적으로 긴 왕복지연 시간을 가지는 LTE기반 이동시스템에서 상향 링크 데이터 채널인 PUSCH 전송의 전력제어는 다음과 같이 나타낼 수 있다.
Figure PCTKR2012011595-appb-I000019
Figure PCTKR2012011595-appb-I000020
여기서 i는 부프레임이 아닌 프레임 번호를 의미한다. 즉 제안하는 전력제어 방식은 특정 PUSCH을 위한 전력 제어 명령이 각 프레임당 한 번 이하로 전송되며, 줄어든 TPC 명령용 PUCCH용 자원은 하향링크 PDSCH(Physical Downlink Shared Channel)를 위해 사용될 수 있으므로 하향링크 데이터 전송 용량을 증대시킬 수 있다. 반면, LTE기반 이동위성통신 시스템에서 제안하는 전력방식이 프레임 단위로 동작하기 때문에 PUSCH 채널 전송을 위한 MCS 레벨 및 전송 자원 블록 수가 프레임 단위로 동작할 때 적용할 수 있다. LTE기반 지상이동통신 시스템에서의 부프레임 동작은 재전송 시간 지연 감소로 인한 서비스 지연 시간 감소 및 빠른 채널 변화의 적응 등의 장점이 있으나, 위성이동통신시스템의 경우 긴 왕복지연시간으로 인해 부프레임 단위의 재전송이나 프레임 단위의 재전송이나 서비스 지연 시간 차이가 얼마 없을 뿐만 아니라 빠른 채널 변화에 적응하기 어렵기 때문에, LTE기반 위성이동통신시스템에서의 적응형 변복조 등 링크 적응 기술 또한 프레임 단위로 동작하는 것이 바람직한 것을 고려할 때, 프레임단위의 전력 제어는 용이하게 LTE기반 위성이동통신시스템에 적용 가능하다.
수학식 3에서
Figure PCTKR2012011595-appb-I000021
,
Figure PCTKR2012011595-appb-I000022
, M(i),
Figure PCTKR2012011595-appb-I000023
은 프레임 단위로 동작하는 것을 제외하고 기존 LTE기반 이동통신시스템에서와 같은 방법으로 결정된다. 그러나 폐루프 전력제어를 위해 기지국으로부터 송신되는 δ(i)는 기본 LTE기반 이동통신시스템과 달리 긴 왕복 지연 시간을 고려하여 지연 보상 및 채널 예측을 동반한다. 제안하는 방법에서 기지국이 TPC 명령을 생성하기 위해서는 먼저 i번째 프레임에서 수신된 PUSCH 채널의 부반송파당 수신 전력인 PSD(Power Spectral Density)를 추정한다. PSD 추정은 i번째 프레임에서 전송되는 PUSCH 채널을 위한 모든 부프레임에서의 PSD 추정값의 평균값으로 한다. 여기서 정확한 채널 추정을 위한 PSD 추정은 간섭까지 고려한 SINR 추정으로 대체가 가능하다. 이는 긴 왕복지연시간으로 인해 정확히 보상할 수 없는 빠른 채널의 영향을 줄이고 느린 채널 특성만을 보상하기 위한 것이다. 수학식 4와 같이 추정한 PSDest(i)와 주어진 MCS레벨을 지원하기 위한 타겟 PSD인 PSDtarget과의 차이를
Figure PCTKR2012011595-appb-I000024
라고 할 때,
Figure PCTKR2012011595-appb-I000025
왕복 지연 시간 후의 수신 PSD와 타켓 PSD와의 차이 예측값
Figure PCTKR2012011595-appb-I000026
는 수학식 5와 같다.
Figure PCTKR2012011595-appb-I000027
여기서 PSDSRS는 상향링크에서 상향링크 자원 스케줄링을 위해 전 대역폭에서 사용자 단말 채널 상황을 추정하기 위해 송신되는 SRS (Sounding Reference Signal) 신호의 수신 PSD를 보여준다. 보통 SRS 신호는 각 사용자의 전 주파수대역에서의 채널 상황을 알기 위해 주기적으로 각 사용자 단말에서 전송되는 채널로서 광대역 SRS 신호가 있고 협대역 SRS 신호가 있다. 일반적으로 LTE기반 이동통신시스템에서 SRS 또한 PUSCH 채널의 전송 전력을 따르게 되어있다. 그러나 위성통신시스템과 같이 주파수 비선택적 채널 특성을 가질 경우 SRS 신호를 통한 주파수 도메인에서의 채널 품질 측정은 효과가 별로 없다. 따라서 LTE기반 위성이동통신시스템은 SRS 신호 전송을 상향링크 채널 변화를 추정하기 위해 함께 사용할 수 있다. 즉 기존 LTE에서와 같이 SRS 신호 전송 레벨을 PUSCH 전송 전력 레벨을 일정한 주기로 따르고 그 주기 동안에는 같은 전송 레벨로 송신한다. 예를 들어 SRS 신호 전송 주기가 {2, 5, 10, 20, 40, 80, 160, 320ms}이기 때문에 광대역 SRS 전송 시 SRS를 5ms나 10ms로 전송하고, 80ms, 160ms, 320ms 마다 한 번씩 그 순간의 PUSCH 채널 전송 전력에 따라 전력을 업데이트 하는 식으로 동작할 수 있다. 또한 협대역 SRS 전송의 경우 주기적으로 호핑하면서 전 대역에 대한 채널 품질 정보를 획득하는 시간 동안 SRS의 전송 전력을 일정하게 할 경우, 전 대역에 걸친 좀 더 정확한 CQI(Channel Quality Indicator) 정보를 획득함과 동시에 채널 변화 추이를 예측할 수 있게 된다. 수학식 5에서 파라미터 k는 SRS를 통한 채널 예측이 가능할 때 k=1의 값을, SRS를 이용하지 못할 때 k=0의 값을 갖는다.
또한 수학식 5에서 G1값은 채널 변화량 예측값을
Figure PCTKR2012011595-appb-I000028
에 얼마나 반영할지를 보여주는 예측 이득 지수로서 0≤G1≤1의 값을 가지며 그 값은 상위계층에서 결정된다.
수학식 5에서 결정된
Figure PCTKR2012011595-appb-I000029
값을 바탕으로 TPC 명령값
Figure PCTKR2012011595-appb-I000030
는 수학식 6과 같이 결정된다.
Figure PCTKR2012011595-appb-I000031
수학식 6에서와 같이
Figure PCTKR2012011595-appb-I000032
레벨을 [-1 0 3 1]로 함으로써 기존 LTE와 호환성을 유지할 수 있으나, 이 레벨 값은 시스템 및 채널 상황에 따라 적절히 바뀔 수 있다. 예를 들어
Figure PCTKR2012011595-appb-I000033
레벨을 [-2 -1 1 2]로 할 경우 좀 더 채널 변화에 잘 적응하면서 전체 전력 소모를 줄일 수 있는 TPC 명령을 전송할 수 있다.
수식 6에 의해서 결정된 TPC 명령
Figure PCTKR2012011595-appb-I000034
는 PDCCH를 통해 단말에 전송된다. TPC 명령
Figure PCTKR2012011595-appb-I000035
를 획득한 단말은 i번째 프레임에서의 PUSCH 전송을 위해 최근 수신된 TPC 명령을 이용한 송신 전력 제어값 δ(i)을 수학식 7과 같이 결정한다.
Figure PCTKR2012011595-appb-I000036
여기서 α는 지연 보상 지수로써 0≤G1≤1의 값을 가지며 그 값은 상위계층에서 결정된다.
도 1은 지금까지 제안한 긴 왕복지연시간을 가지는 LTE기반 위성이동통신시스템에서 상향링크 PUSCH 전송을 위한 전력 제어 블록도를 보여준다.
도 2는 지금까지 제안한 긴 왕복지연시간을 가지는 LTE기반 위성이동통신시스템에서 상향링크 PUSCH 전송을 위한 전력 제어 순서도를 보여준다.
반면 LTE기반 이동통신시스템에서의 하향링크 전력 제어의 경우 상향링크와 다르게 기본적으로 전 대역에 대해서 부반송파당 전력은 일정하게 하고 채널 변화의 보상은 스케줄링과 링크 적응 기술을 통해 이루어진다. 따라서 하향링크의 경우 TPC 명령을 상향링크로 전송하지 않으며 링크 적응을 위한 CQI 정보가 상향링크를 통해 피드백 된다. 즉 하향링크에서 정확한 링크 적응을 하기 위해서는 단말에서 정확한 CQI 정보를 전송해야 한다. 단말에서는 하향링크 RS 신호의 수신 SINR을 바탕으로 타겟 SINR을 만족하는 MCS 레벨을 결정하여 CQI 정보로 전송하게 된다. 그러나 단말에서 결정한 MCS 레벨은 긴 왕복 지연 시간 후에 하향링크 채널 상황과 일치하지 않을 가능성이 있기 때문에 왕복 지연 시간 후의 채널 상황 예측을 통한 MCS 레벨 결정 및 CQI 정보 전송이 필수적으로 요구된다. 이를 위해 먼저 단말은 하향링크로 전송되는 CSI(Channel State Information)용 RS을 바탕으로 각 부대역(Subband)별, 다수의 부대역 또는 전 대역에 걸쳐 채널 상태를 추정한다. 채널 상태 추정은 긴 왕복지연시간을 가지는 LTE기반 위성이동통신시스템의 경우 부프레임 단위의 잦은 채널 상태 추정이 효과적이지 못하기 때문에 상향링크에서와 같이 프레임단위로 이루어진다. 채널 상태는 CQI 정보를 보낼 타겟 대역에서의 RS 신호(Reference Signal : 기준신호)의 PSD 또는 SINR을 추정함으로써 이루어진다.
한편, Δpred는 채널 변화량 예측값을 의미하고, PSDest은 Δpred를 반영한 최종 채널상태 추정값을 의미한다.
추정된 i번째 프레임에서의 CSI용 RS 신호의 PSD 값, PSDCSI-RS(i)와 함께 긴 왕복지연시간을 고려하기 위해 수학식 8과 같이 (i-1)번째 프레임에서의 PSD값, PSDCSI-RS (i)과의 변화 추이 Δpred를 반영하여 PSDest를 구한다.
Figure PCTKR2012011595-appb-I000037
여기서 G2는 채널 변화량 예측값을 PSDest에 얼마나 반영할지를 보여주는 예측 이득 지수로서 0≤G2≤1의 값을 가지며 그 값은 상위계층에서 결정된다. 계산된 PSDest 값을 바탕으로 각 MCS레벨에서 요구하는 PSD나 SINR 값과 비교하여 적절한 MCS 레벨을 결정한다. 여기서 위성통신시스템과 같이 주파수 비선택적 채널 특성을 가지는 LTE기반 이동통신시스템의 경우, 주파수 영역에서의 채널 변화가 없기 때문에 하향링크에서 항상 전송되는 PBCH(Physical Broadcast Channel)와 SCH(Synchronization Channel)의 PSD나 SINR 값을 함께 고려할 경우 다이버시티 이득으로 인해 보다 정확한 채널 예측이 가능하다. PBCH와 SCH을 이용할 수 있을 경우의 PSDest는 수학식 9와 같다.
Figure PCTKR2012011595-appb-I000038
도 3은 제안한 긴 왕복지연시간을 고려한 하향링크 링크 적응을 위한 블록도를 보여준다.
도 4는 제안한 긴 왕복지연시간을 고려한 하향링크 적응 방법 순서도이다.
이상에서 설명된 장치는 하드웨어 구성요소, 소프트웨어 구성요소, 및/또는 하드웨어 구성요소 및 소프트웨어 구성요소의 조합으로 구현될 수 있다. 예를 들어, 실시예들에서 설명된 장치 및 구성요소는, 예를 들어, 프로세서, 콘트롤러, ALU(Arithmetic Logic Unit), 디지털 신호 프로세서(Digital Signal Processor), 마이크로컴퓨터, FPGA(Field Programmable Gate Array), PLU(Programmable Logic Unit), 마이크로프로세서, 또는 명령(instruction)을 실행하고 응답할 수 있는 다른 어떠한 장치와 같이, 하나 이상의 범용 컴퓨터 또는 특수 목적 컴퓨터를 이용하여 구현될 수 있다. 처리 장치는 운영 체제(OS) 및 상기 운영 체제 상에서 수행되는 하나 이상의 소프트웨어 애플리케이션을 수행할 수 있다. 또한, 처리 장치는 소프트웨어의 실행에 응답하여, 데이터를 접근, 저장, 조작, 처리 및 생성할 수도 있다. 이해의 편의를 위하여, 처리 장치는 하나가 사용되는 것으로 설명된 경우도 있지만, 해당 기술분야에서 통상의 지식을 가진 자는, 처리 장치가 복수 개의 처리 요소(processing element) 및/또는 복수 유형의 처리 요소를 포함할 수 있음을 알 수 있다. 예를 들어, 처리 장치는 복수 개의 프로세서 또는 하나의 프로세서 및 하나의 콘트롤러를 포함할 수 있다. 또한, 병렬 프로세서(parallel processor)와 같은, 다른 처리 구성(processing configuration)도 가능하다.
소프트웨어는 컴퓨터 프로그램(computer program), 코드(code), 명령(instruction), 또는 이들 중 하나 이상의 조합을 포함할 수 있으며, 원하는 대로 동작하도록 처리 장치를 구성하거나 독립적으로 또는 결합적으로(collectively)처리 장치를 명령할 수 있다. 소프트웨어 및/또는 데이터는, 처리 장치에 의하여 해석되거나 처리 장치에 명령 또는 데이터를 제공하기 위하여, 어떤 유형의 기계, 구성요소(component), 물리적 장치, 가상 장치(virtual equipment), 컴퓨터 저장매체 또는 장치, 또는 전송되는 신호 파(signal wave)에 영구적으로, 또는 일시적으로 구체화(embody)될 수 있다. 소프트웨어는 네트워크로 연결된 컴퓨터 시스템 상에 분산되어서, 분산된 방법으로 저장되거나 실행될 수도 있다. 소프트웨어 및 데이터는 하나 이상의 컴퓨터 판독 가능 기록 매체에 저장될 수 있다.
실시예에 따른 방법은 다양한 컴퓨터 수단을 통하여 수행될 수 있는 프로그램 명령 형태로 구현되어 컴퓨터 판독 가능 매체에 기록될 수 있다. 상기 컴퓨터 판독 가능 매체는 프로그램 명령, 데이터 파일, 데이터 구조 등을 단독으로 또는 조합하여 포함할 수 있다. 상기 매체에 기록되는 프로그램 명령은 실시예를 위하여 특별히 설계되고 구성된 것들이거나 컴퓨터 소프트웨어 당업자에게 공지되어 사용 가능한 것일 수도 있다. 컴퓨터 판독 가능 기록 매체의 예에는 하드 디스크, 플로피 디스크 및 자기 테이프와 같은 자기 매체(magnetic media), CD-ROM, DVD와 같은 광기록 매체(optical media), 플롭티컬 디스크(floptical disk)와 같은 자기-광 매체(magneto-optical media), 및 롬(ROM), 램(RAM), 플래시 메모리 등과 같은 프로그램 명령을 저장하고 수행하도록 특별히 구성된 하드웨어 장치가 포함된다. 프로그램 명령의 예에는 컴파일러에 의해 만들어지는 것과 같은 기계어 코드뿐만 아니라 인터프리터 등을 사용해서 컴퓨터에 의해서 실행될 수 있는 고급 언어 코드를 포함한다. 상기된 하드웨어 장치는 실시예의 동작을 수행하기 위해 하나 이상의 소프트웨어 모듈로서 작동하도록 구성될 수 있으며, 그 역도 마찬가지이다.
이상과 같이 실시예들이 비록 한정된 실시예와 도면에 의해 설명되었으나, 해당 기술분야에서 통상의 지식을 가진 자라면 상기의 기재로부터 다양한 수정 및 변형이 가능하다. 예를 들어, 설명된 기술들이 설명된 방법과 다른 순서로 수행되거나, 및/또는 설명된 시스템, 구조, 장치, 회로 등의 구성요소들이 설명된 방법과 다른 형태로 결합 또는 조합되거나, 다른 구성요소 또는 균등물에 의하여 대치되거나 치환되더라도 적절한 결과가 달성될 수 있다.
그러므로, 다른 구현들, 다른 실시예들 및 특허청구범위와 균등한 것들도 후술하는 특허청구범위의 범위에 속한다.

Claims (11)

  1. 위성이동통신 시스템에서 상향링크 데이터 채널 전송을 위한 전력 제어 방법으로서,
    기지국이 프레임 단위의 PSD(Power Spectral Density) 값을 이용하여 채널추정 값을 결정하는 (a) 단계 및
    상기 기지국이 상기 채널추정 값 및 왕복지연시간을 고려하여 TPC(Transmit Power Control) 명령을 생성하고, 생성한 상기 TPC 명령을 단말로 전송하는 (b) 단계로 이루어지며,
    상기 단말에서의 송신전력 제어값은 상기 단말로 전송한 상기 TPC 명령과 지연보상 지수를 이용하여 결정되는 것을 특징으로 하는 상향링크 데이터 채널 전송을 위한 전력 제어 방법.
  2. 제 1항에 있어서,
    상기 위성이동통신 시스템은 LTE 기반으로 구성되고, 상기 데이터 채널은 PUSCH(Physical Uplink Shared Channel : 물리상향링크공유채널)이고, 상기 송신전력 제어값은 상기 TPC 명령을 이용하여 측정하는 것을 특징으로 하는 상향링크 데이터 채널 전송을 위한 전력 제어 방법.
  3. 제2항에 있어서,
    상기 프레임 단위의 PSD 값은 프레임에서 전송되는 PUSCH을 위한 부프레임에서의 PSD 추정값의 평균값인 것을 특징으로 하는 상향링크 데이터 채널 전송을 위한 전력 제어 방법.
  4. 제 2항에 있어서,
    상기 TPC 명령은 아래의 수학식에 의해 결정되는 상기 왕복지연시간 후의 수신 PSD 값과 타겟 PSD 값의 차이 예측값을 반영하여 결정되는 것을 특징으로 하는 상향링크 데이터 채널 전송을 위한 전력 제어 방법.
    Figure PCTKR2012011595-appb-I000039
    Figure PCTKR2012011595-appb-I000040
    : 왕복지연시간 후의 수신 PSD 값과 타겟 PSD 값의 차이 예측값
    Figure PCTKR2012011595-appb-I000041
    : 추정한 PSDest(i)와 주어진 MCS레벨을 지원하기 위한 PSDtarget과의 차이
    파라미터 k : SRS(Sounding Reference Signal)를 통한 채널 예측이 가능할 때 k=1의 값, SRS을 이용하지 못할 때 k=0의 값
    G1 : 채널 변화량 예측값을
    Figure PCTKR2012011595-appb-I000042
    에 얼마나 반영할지를 보여주는 예측 이득 지수로서 0≤G1≤1의 값
    PSDSRS는 SRS 신호의 수신 PSD)
  5. 제 1항에 있어서,
    상기 송신전력 제어값은 아래의 수학식에 의해 결정되는 것을 특징으로 하는 상향링크 데이터 채널 전송을 위한 전력 제어 방법.
    Figure PCTKR2012011595-appb-I000043
    (δ(i) : 송신 전력 제어값, α : 지연 보상 지수로써 0≤G1≤1의 값을 가짐, p(i) : 현재 TPC 명령,
    p(i-1) : 과거 TPC 명령)
  6. 위성이동통신 시스템에서 하향링크 전력 제어 방법으로서,
    단말이 프레임 단위로 타겟 대역의 채널 상태를 추정하는 단계;
    상기 단말이 왕복지연시간을 고려하여 채널 변화량 예측값을 결정하는 단계;
    상기 단말이 상기 왕복지연시간 후의 채널 변화량 예측 값을 이용하여 최종 채널상태 추정값을 결정하는 단계;
    상기 단말이 상기 최종 채널 추정 값과 각 MCS(Modulation and Coding Scheme)레벨에서 요구하는 PSD 값 또는 SINR(Signal to Interference and Noise Ratio) 값과 비교하여 MCS 레벨을 결정하는 단계 및
    상기 단말이 상기 MCS 레벨을 포함한 CQI(Channel Quality Indicator) 정보를 기지국으로 송신하는 단계를 포함하는 위성이동통신 시스템에서의 하향링크 전력 제어 방법.
  7. 제 6항에 있어서,
    상기 타겟 대역은 하향링크로 전송되는 CSI(Channel State Information)용 RS 신호(Reference Signal : 기준신호)를 바탕으로 부대역, 복수의 부대역 또는 전 대역인 것을 특징으로 하는 위성이동통신 시스템에서의 하향링크 전력제어 방법.
  8. 제 6항에 있어서,
    프레임단위로 상기 타겟 대역의 채널 상태를 추정하는 경우, 상기 추정하는 단계는 상기 타겟 대역에서의 RS 신호의 PSD 값 또는 SINR 값을 추정함으로 채널 상태를 추정하는 것을 특징으로 하는 위성이동통신 시스템에서의 하향링크 전력제어 방법.
  9. 제 6항에 있어서,
    상기 채널 변화량 예측값은 아래의 수학식에 의해 결정되는 것을 특징으로 하는 위성이동통신 시스템에서의 하향링크 전력제어 방법.
    Figure PCTKR2012011595-appb-I000044
    (G2 : 채널 변화량 예측값을 PSDest에 얼마나 반영할지를 보여주는 예측 이득 지수, 0≤G2≤1
    PSDCSI-RS (i) : 추정된 i번째 프레임에서의 CSI용 RS 신호의 PSD 값)
  10. 제 6항에 있어서,
    상기 최종 채널상태 추정값은 아래의 수학식에 의해 결정되는 것을 특징으로 하는 위성이동통신 시스템에서의 하향링크 전력제어 방법.
    Figure PCTKR2012011595-appb-I000045
  11. 제 6항에 있어서,
    상기 최종 채널상태 추정값은 PBCH와 SCH를 이용하여 결정한 아래의 수학식에 의해 결정되는 것을 특징으로 하는 위성이동통신 시스템에서의 하향링크 전력제어 방법.
    Figure PCTKR2012011595-appb-I000046
    (PSDCSI-RS+PBCH+SCH (i) : 추정된 i번째 프레임에서의 CSI용 RS 신호의 PSD 값에 PBCH와 SCH의 PSD를 반영한 값)
PCT/KR2012/011595 2012-05-08 2012-12-27 엘티이기반 이동통신시스템에서의 전력 제어 및 링크 적응 방법 WO2013168880A1 (ko)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US14/399,926 US9277505B2 (en) 2012-05-08 2012-12-27 Methods for power control and link adapation in LTE-based mobile communication system

Applications Claiming Priority (4)

Application Number Priority Date Filing Date Title
KR20120048412 2012-05-08
KR10-2012-0048412 2012-05-08
KR1020120124225A KR101984754B1 (ko) 2012-05-08 2012-11-05 엘티이기반 이동통신시스템에서의 전력 제어 및 링크 적응 방법
KR10-2012-0124225 2012-11-05

Publications (1)

Publication Number Publication Date
WO2013168880A1 true WO2013168880A1 (ko) 2013-11-14

Family

ID=49550885

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/KR2012/011595 WO2013168880A1 (ko) 2012-05-08 2012-12-27 엘티이기반 이동통신시스템에서의 전력 제어 및 링크 적응 방법

Country Status (1)

Country Link
WO (1) WO2013168880A1 (ko)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2017031995A1 (zh) * 2015-08-21 2017-03-02 深圳市中兴微电子技术有限公司 一种功率控制方法、装置及计算机存储介质
US10153831B1 (en) * 2017-02-13 2018-12-11 Lockheed Martin Corporation Power usage-aware spectral resource allocation in a satellite long term evolution (LTE) communication system
CN113691347A (zh) * 2021-08-18 2021-11-23 福州锐迪优通讯科技有限公司 一种手机信号屏蔽方法及系统
US11751253B2 (en) 2021-02-25 2023-09-05 Lockheed Martin Corporation Random access for broadband 4G and 5G over satellite

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20040047907A (ko) * 2001-10-20 2004-06-05 한국전자통신연구원 위성 이동 통신 시스템에서 폐루프 전력제어 장치 및 그방법
US20070026795A1 (en) * 2000-09-28 2007-02-01 De La Chapelle Michael Return link design for psd limited mobile satellite communication systems
KR20100071687A (ko) * 2008-12-19 2010-06-29 한국전자통신연구원 이동 위성 통신 시스템에서 상향링크를 설정하는 방법
KR20100084955A (ko) * 2009-01-19 2010-07-28 한국전자통신연구원 Ofdma기반 위성 무선 시스템의 하향링크에서 par를 최소화하기 위한 제어 방법
KR20110022526A (ko) * 2009-08-27 2011-03-07 한국전자통신연구원 위성 통신 시스템에서 서비스 제공 시스템 및 방법

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20070026795A1 (en) * 2000-09-28 2007-02-01 De La Chapelle Michael Return link design for psd limited mobile satellite communication systems
KR20040047907A (ko) * 2001-10-20 2004-06-05 한국전자통신연구원 위성 이동 통신 시스템에서 폐루프 전력제어 장치 및 그방법
KR20100071687A (ko) * 2008-12-19 2010-06-29 한국전자통신연구원 이동 위성 통신 시스템에서 상향링크를 설정하는 방법
KR20100084955A (ko) * 2009-01-19 2010-07-28 한국전자통신연구원 Ofdma기반 위성 무선 시스템의 하향링크에서 par를 최소화하기 위한 제어 방법
KR20110022526A (ko) * 2009-08-27 2011-03-07 한국전자통신연구원 위성 통신 시스템에서 서비스 제공 시스템 및 방법

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2017031995A1 (zh) * 2015-08-21 2017-03-02 深圳市中兴微电子技术有限公司 一种功率控制方法、装置及计算机存储介质
US10153831B1 (en) * 2017-02-13 2018-12-11 Lockheed Martin Corporation Power usage-aware spectral resource allocation in a satellite long term evolution (LTE) communication system
US10547375B1 (en) 2017-02-13 2020-01-28 Lockheed Martin Corporation Efficient resource allocation for satellite LTE networks
US10547374B1 (en) 2017-02-13 2020-01-28 Lockheed Martin Corporation Random access for LTE over satellite
US10848238B1 (en) 2017-02-13 2020-11-24 Lockheed Martin Corporation Evolved packet system over non-LTE radio access network
US11751253B2 (en) 2021-02-25 2023-09-05 Lockheed Martin Corporation Random access for broadband 4G and 5G over satellite
CN113691347A (zh) * 2021-08-18 2021-11-23 福州锐迪优通讯科技有限公司 一种手机信号屏蔽方法及系统

Similar Documents

Publication Publication Date Title
KR101984754B1 (ko) 엘티이기반 이동통신시스템에서의 전력 제어 및 링크 적응 방법
US10841882B2 (en) Radio communication base station apparatus and method for controlling transmission power of sounding reference signal
JP5323712B2 (ja) 干渉管理のためのセル間電力制御
Kela et al. A novel radio frame structure for 5G dense outdoor radio access networks
WO2015029729A1 (ja) 無線基地局、ユーザ端末及び送信電力制御方法
WO2011008023A2 (en) Method and apparatus for controlling uplink power in a wireless communication system
WO2013100541A1 (ko) 무선 통신 시스템에서 전송 전력 제어 방법 및 장치
KR20140090351A (ko) 이동통신 시스템에서 상향링크 amc 운용을 위한 방법 및 장치
WO2013137635A1 (ko) 단말의 상향 링크 송신 전력을 제어하는 방법 및 장치
WO2013168880A1 (ko) 엘티이기반 이동통신시스템에서의 전력 제어 및 링크 적응 방법
WO2014175793A1 (en) Method and network node for link adaptation in a wireless communications network
JP2011151778A (ja) 無線通信システムにおける送信電力制御装置及び方法
CN109155921B (zh) 用于设备到设备通信的方法和装置
Chen et al. On the theoretical analysis of network-wide massive mimo performance and pilot contamination
US11146987B1 (en) Dynamically adjusting extent of MU-MIMO service based on buffer occupancy
JP6301094B2 (ja) ユーザ端末および無線通信方法
WO2013137656A1 (ko) 무선 통신 시스템에서 단말의 상향링크 송신 전력을 효율적으로 제어하는 방법 및 장치
WO2015045960A1 (ja) ユーザ端末および無線通信方法
WO2016028094A1 (ko) 무선 통신 시스템에서 낮은 복잡도로 복호를 수행하기 위한 방법 및 장치
WO2024026864A1 (en) Enhancements on transmission power adaptation
JP2017069962A (ja) ユーザ端末、無線基地局及び無線通信方法

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 12876533

Country of ref document: EP

Kind code of ref document: A1

WWE Wipo information: entry into national phase

Ref document number: 14399926

Country of ref document: US

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 12876533

Country of ref document: EP

Kind code of ref document: A1