WO2013098459A1 - Procédé et système pour réaliser une insertion en post-forage - Google Patents

Procédé et système pour réaliser une insertion en post-forage Download PDF

Info

Publication number
WO2013098459A1
WO2013098459A1 PCT/FI2011/051160 FI2011051160W WO2013098459A1 WO 2013098459 A1 WO2013098459 A1 WO 2013098459A1 FI 2011051160 W FI2011051160 W FI 2011051160W WO 2013098459 A1 WO2013098459 A1 WO 2013098459A1
Authority
WO
WIPO (PCT)
Prior art keywords
feed
feeding
drilling
unit
insertion object
Prior art date
Application number
PCT/FI2011/051160
Other languages
English (en)
Inventor
Federico Scolari
Original Assignee
Sandvik Mining And Construction Oy
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sandvik Mining And Construction Oy filed Critical Sandvik Mining And Construction Oy
Priority to SE1450819A priority Critical patent/SE1450819A1/sv
Priority to PCT/FI2011/051160 priority patent/WO2013098459A1/fr
Publication of WO2013098459A1 publication Critical patent/WO2013098459A1/fr

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D20/00Setting anchoring-bolts
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F42AMMUNITION; BLASTING
    • F42DBLASTING
    • F42D1/00Blasting methods or apparatus, e.g. loading or tamping
    • F42D1/08Tamping methods; Methods for loading boreholes with explosives; Apparatus therefor
    • F42D1/10Feeding explosives in granular or slurry form; Feeding explosives by pneumatic or hydraulic pressure

Definitions

  • the invention relates to method for post drilling insertion, wherein an elongated insertion object is fed into a pre-drilled hole.
  • the feeding is per- formed by means of an insertion unit, which is arranged to a free end a boom that belongs to a mining vehicle.
  • the insertion object is pushed to the pre- drilled hole at least partly.
  • the invention still further relates to an insertion unit and to a mining vehicle.
  • Rock may be drilled in rounds. Then, drill holes are first drilled in rock, after which the drill holes are charged and blasted. Rock material becomes detached from the rock by the amount of the length of the round, and it is transported elsewhere before drilling the next round.
  • Various tunnels, underground storage halls, containers, parking spaces or other corresponding rock caverns may be formed in the rock by excavation.
  • the rock in which such rock caverns are excavated is not always sufficiently firm, uniform and stable by nature.
  • blasting a round may break or otherwise weaken the rock defining the rock cavern, so that the firmness of the rock is insufficient after excavation.
  • the ceiling and walls of the rock cavern sometimes even the floor, must be reinforced.
  • Reinforcing may be done by drilling to the rock several reinforcement holes in which a rock bolt, a cable or the like reinforcement member or reinforcement material is fitted.
  • the reinforcement holes may be drilled by using a mining vehicle provided with a drilling boom having a drilling unit and means for mounting the reinforcement in the drilled hole.
  • the drilling unit and reinforcement insertion means are arranged to the drilling boom so that at first a drill hole is drilled and there after the drilling unit is indexed away and the insertion means are placed in the front of the drill hole mouth.
  • the drilling boom is kept stationary and the units at the free end of it are moved.
  • a disadvantage in such arrangement is one unit stands still while the other unit is operating, whereby the working principle is ineffective. Also this arrangement causes extra weight and stresses to the boom construction.
  • An object of the invention is to provide a novel and improved method, an insertion unit and a mining vehicle for inserting objects into pre-drilled drill holes.
  • the method according to the invention is characterized by changing feeding angle of the insertion object during the insertion relative to the direction of the pre-drilled hole.
  • the insertion unit according to the invention is characterized in that the insertion unit comprises at least one angle adjusting device for changing the feeding angle of the insertion object.
  • the mining vehicle according to the invention is characterized in that the insertion unit comprises at least one angle adjusting device, whereby a feeding angle of the insertion object can be changed during the feed.
  • the drilling unit and the insertion unit are in different booms. Furthermore, the insertion unit is provided with one or more angle adjusting device which is arranged to change or alternate feeding angle of the insertion object relative to the direction of the pre-drilled hole.
  • the disclosed angle adjusting feature finds the hole direction automatically, whereby there is no need to position the inserting unit exactly to the same direction as a center line of the pre- drilled hole. This makes the positioning of the insertion unit faster. Further, less demand is set to directional information of the pre-drilled hole and insertion unit. Moreover, the insertion object penetrates more easily to the pre-drilled hole due to the feeding angle adjustment, whereby feed force can be decreased. The construction is subjected to minor stresses, which improves the operational life of the insertion unit. Also, thanks to the presented solution feeding of the insertion object can be ensured even in demanding circumstances and situations. Thereby preplanned post-drilling measures can be per- formed effectively. All in all, a solution is presented to miss-alignment and hole irregularity problems occurring in the insertion procedure.
  • the insertion unit is provided with an angle adjusting device which is arranged to move the rear end of the feed beam in transverse direction relative to the feed line. During the adjustment the front end of the feed beam can be kept stationary in transverse direction. According to an embodiment a front end of the insertion object is kept stationary in a transverse direction during the change in the feeding angle. Thereby the change in the feeding angle is performed relative to the front end.
  • the adjustment of feeding angle of the insertion object is set to be proportional to the feeding distance.
  • the feeding angle is changed with a greater magnitude and when feeding proceeds, the angle adjustment decreases.
  • the feeding angle adjustment may be terminated.
  • the decrease in angular adjust- ment can be continuous or it can be accomplished step wise.
  • the angle adjusting device is arranged to rotate or turn the rear end of the feed beam along a curved path of movement.
  • the feeding angle is changed by apply- ing a spiral movement, whereby the rear part of the insertion object proceeds during the insertion along a helical path of movement as it is simultaneously moved in its longitudinal feed direction.
  • the insertion unit is provided with one or more sensing means for detecting load that resists pushing of the insertion object into the pre-drilled hole.
  • the insertion unit may comprise one or more force sensor, for example a strain gauge, or alternatively force generated by the feeding device can be measured.
  • force sensor for example a strain gauge
  • the control unit there may be a preset force level above which level insertion aid measures are started at the latest.
  • the feeding of the insertion object is stopped when the force resisting the feeding exceeds the preset force level. This avoids jamming of the insertion object and breakage of the feeding equipment and the insertion object.
  • the feeding of the inserted object is stopped and the feeding direction is changed from the normal feed direction to the reverse direction when the force resisting the feeding exceeds the preset force level.
  • the insertion object can be pulled backwards for a relatively short distance and after that the feeding to the normal feed direction is started again. If necessary this push and pull sequence is repeated.
  • the feeding aid cycle including the change in the feeding direction can be combined with the feeding aid cycle including the change in the feeding angle. At the end of the feeding of the insertion object when no angle adjustment is no longer possible problems occurring in the feeding can be solved by means of push and pull aid cycle.
  • the insertion unit is controlled by one or more control unit.
  • the control unit may be provided with two, three, four or even more installation modes having different control strategy for installing an object into a pre-drilled hole.
  • the operation cycle of the insertion unit is controlled automatically by means of the control unit.
  • the control unit may start the automatically insertion cycle including the steps and measures disclosed in this application.
  • the operation cycle of the insertion unit is controlled manually by an operator of the mining vehicle or alternatively in co-operation with the control unit.
  • the inserting unit is provided with one or more installation aid means in addition to the angle adjusting device.
  • the installation unit may be provided with one or more vibrating device.
  • the vibrating device may comprise a hydraulic motor which is arranged to rotate an eccentric piece, for example.
  • the vibration may occur simultaneously with one or more other installation aid means disclosed in this application.
  • the installed object is rotated around its longitudinal axis in order to facilitate the installation.
  • the installation unit may be provided with a rotation device.
  • the rotation device may correspond to a hydraulic rotation motor of a drilling machine, for example.
  • the rotation may occur simultaneously with one or more other installation aid means disclosed in this application.
  • impact pulses are directed to the installed object during insertion.
  • the installation unit may be provided with an impact device.
  • the impact device may be hydraulically oper- ated, for example. Percussion may occur simultaneously with one or more other installation aid means disclosed in this application.
  • the pre-drilled hole is a reinforcing hole.
  • the insertion object may be an elongated physical piece such as a rock bolt, tube or cable that is pushed into the drill hole.
  • the insertion object may be a feed hose, tube or channel that can be partly pushed into the drill hole where after reinforcing injection material such as a concrete or any other soldering material can be fed through the hose inside the drill hole.
  • the insertion object may be a reinforcing piece or feeding means for charging material.
  • the pre-drilled hole is a blasting hole.
  • an explosive is fed to the drill hole.
  • the explosive can be in a form of a powder or granules whereby it can be fed into the drill hole by means of an elongated feed hose, tube or channel pushed at least partly in- side the drill hole.
  • propellant charges are fed into the drill hole through an elongated hose or tube.
  • the insertion object may be an elongated explosive package or feeding means for blasting or propellant material.
  • an elongated measuring probe is fed into the drill hole.
  • the insertion object may be a sensing or measuring instrument.
  • drilling accuracy compared to a drilling plan can be confirmed.
  • direction of the drill hole and bottom coordinates of the drill hole can be determined.
  • the mining vehicle is a post-drilling vehicle without any drilling unit.
  • a mining vehicle is a special-purpose vehicle equipped only for feeding insertion objects into the pre-drilled holes. Construction and control of such special mining vehicle can be optimized according to one purpose only.
  • the mining vehicle is a multi-use vehicle being capable of drilling and insertion operations.
  • a mining vehicle is provided with at least two booms wherein at least one first boom is a drilling boom provided with a drilling unit and at least one second boom is a post- drilling boom provided with an insertion unit.
  • the positioning of an insertion unit at a pre-drilled hole includes two phases, namely a rough positioning and a fine positioning. The rough positioning is based on information gathered during the drilling of the hole in question. For example coordinates and directional angles of the holes are stored during drilling. By means of the rough positioning the insertion boom and the insertion unit therein can be positioned close to the pre-drilled hole.
  • the insertion unit In the fine positioning the insertion unit is positioned to the pre- drilled hole so that it is possible to feed a front end of the insertion object to a hole collar.
  • the insertion device may be provided with one or more cameras and a hole recognition system to identify the pre-drilled hole in a rock surface.
  • the hole recognition system detects accurate position of the pre-drilled hole and control commands are given to boom actuators to implement the fine positioning.
  • the insertion unit may be equipped with another type of detector to detect or measure the accurate position of the hole mouth.
  • one or more identifier is arranged in connection with at least one drilled bore hole in order to facilitate positioning of devices used in the post-drilling phases.
  • the insertion unit may be provided with means for reading or identifying the identifier placed into the drill hole or near the mouth of the borehole.
  • the drilling unit may be provided with a mounting or applying device for arranging the identifier at the drill hole before starting the drilling operation, during the drilling operation or directly after the drilling.
  • the identifier is installed before the drilling unit is moved away from the drilled hole towards the next drill hole position. The use of the identifier fastens and simplifies the positioning of the post drilling units and devices and makes the positioning accurate too.
  • one or more drilled hole is provided with one or more physical identifier piece.
  • the identifier may be a tubular piece, which can be partly inserted in a borehole, for example.
  • the identifier improves detection of the drilled hole.
  • the identifier may have a colour or a shape that is easier to detect by means of a camera.
  • the identifier piece may form a sharp edge for the drill hole, which improves detection of the hole by optical means.
  • the identifier may comprise a transmitter and the post-drilling device may comprise a receiver whereby a wireless data connection can be created between the identifier and the insertion device. The data transmission can be used for positioning the post-drilling units accurately to the predrilled hole.
  • the identifier may comprise a RFID (Radio Frequency IDentifi- cation) tag, for example.
  • one or more pre-drilled hole is provided with one or more colour medium.
  • a colour marking can be painted.
  • the marking may have an annular shape.
  • the drilling unit may be provided with a spraying device or nozzle for applying the colour medium to the drill hole collar.
  • the colour medium can be selected so that the pre-drilled hole can be detected more easily with an optical hole recognition system comprising one or more cameras and a computer vision system. Thanks to the painted marking influence of shadows and surface irregularities can be diminished.
  • One possibility is to use reflecting paint or electromagnetic waves emitting paint and to provide the insertion unit with a light source or another suitable emitter.
  • the computer vision system executes an image processing for digital images taken by a digital camera arranged in the post-drilling unit.
  • the im- age processing can be based on feature detection and feature extraction.
  • accurate position of the pre-drilled hole can be automatically detected and control commands can be formed in a control unit of the mining vehicle for controlling boom actuators.
  • the identifier according to this embodiment can radically improve efficiency of the optical hole recogni- tion. Painted identifier is also easy to apply, inexpensive and endures well in demanding conditions.
  • colour medium is fed through a drilling tool in order to make a position identifier to the rock surface.
  • the colour medium can be fed via normal flushing channels to a drill bit wherefrom the colour medium spreads to surrounding surfaces.
  • colour medium is fed through a drill bit after being extracted from the drill hole.
  • a painted ring is formed around the drill hole opening. This improves optical detection of the edge of the drill hole opening.
  • the paint inside the hole can be removed by reinserting the drill bit inside the drill hole and feeding flushing water through the drill bit to the drill hole whereby the paint is flushed away from the inside surfaces of the drill hole.
  • the edge detection of the drill hole opening is improved since the drill hole shows as a dark circle, which is surrounded by the colour marking.
  • the colour medium can be chosen so that a clear contrast occurs between the dark circle and the annular paint marking.
  • two or more different colours are used for marking the drilled holes.
  • the above disclosed physical identifier piece or painted marking may have a colour code system wherein different colours may indicate rock features such as rock stability, fractured rock or voids in rock.
  • Hazardous drill holes can also be provided with a specific colour code. Information for the colour code system can be gathered during the drilling manually by the operator of the rock drilling rig and automatically by means of sensors and a drilling monitoring system.
  • Figure 1 shows schematically a rock drilling rig positioned in the face of a rock cavern for drilling reinforcement or blasting holes
  • Figure 2 shows schematically a perspective view of a tunnel having blasting holes and a reinforcement fan
  • Figure 3 shows schematically and seen from above an embodiment wherein a separate drilling vehicle and post-drilling vehicle are used
  • Figure 4 shows schematically and seen from above an embodiment wherein a mining vehicle includes a drilling boom and a post-drilling boom,
  • Figure 5 shows schematically an insertion unit
  • FIGS. 6a - 6c show schematically an insertion cycle comprising feed and feed angle adjustment and possible other feeding aid measures
  • Figures 7 - 10 show schematically some alternatives for moving a rear end of an insertion object along a curved path of movement
  • Figure 1 1 schematically shows a rock surface area wherein drill holes are drilled and some of the openings of the drill holes are provided with an identification aid
  • FIG 12 is a simplified diagram showing some features disclosed in this application. For the sake of clarity, the figures show some embodiments of the invention in a simplified manner. In the figures, like reference numerals identify like elements.
  • Figure 1 shows a rock drilling rig 1 navigated in a face 3 of a tunnel
  • the rock drilling rig 1 comprises a movable carrier 4 provided with one or more drilling booms 5, each of which has a rock drilling unit 6 at its outermost end.
  • the drilling unit 6 may be positioned at a start location of a drill hole 7 by moving the boom 5.
  • Drill holes 7 can be drilled for a round 8 and for a reinforcement fan 9.
  • navigation is first carried out in which the coordinate system of the drilling rig is connected to the coordinate system of the working site.
  • the actual drilling cycle is performed for each drill hole after the drilling unit 6 has first been positioned in the start location and direction determined by the drilling pattern or controlled by an operator manually.
  • the control system may comprise one or more control units 12, which may be a computer or a processor capable of determining the actual position of the boom.
  • the boom 5 may comprise two or more boom parts connected to each other by means of joints.
  • the control unit 12 can determine the location and direction of the drilling unit 6.
  • the positioning data of each hole 7 being drilled is stored and can be utilized in post-drilling actions such as in reinforcement or explosive insertion. Information can be gathered also during the drilling utilizing a so called measuring while drilling system. This hole specific information can be utilized in post-drilling measures too.
  • the drill hole data can be transmitted to a control unit 13 of a mine or directly to a control unit of a second mining vehicle comprising post-drilling insertion means.
  • the drilling unit 6 is positioned at the point of an excava- tion drill hole 7a to be drilled.
  • the tunnel 2 is excavated by drilling in the face 3 several excavation holes 7a substantially in the direction of a tunnel line L, which are charged with explosives after the drilling. At least positioning information of such blast holes 7a are saved for post-drilling charging.
  • blasting rock material is detached from the rock by the volume of the round 9. Blasting a round may damage the rock defining the tunnel contour, or the firmness of the rock may be insufficient by nature in order to guarantee a safe tunnel. Thus, there may be a need to reinforce the ceiling 14 and walls 15 of the tunnel 2.
  • the rock may be reinforced by drilling, several adjacent reinforcement holes 7b to which a rock bolt or the like reinforcement members can be fitted.
  • the number, depth, diameter, start locations and directions of reinforcement holes 7b among other drilling information may be stored in a memory media and can be used in post-drilling reinforcement insertion.
  • the reinforcement holes 7b may be drilled in a fan form, whereby there are drill holes on both walls 15 and on the ceiling 14 of the tunnel.
  • the direction of the reinforcement holes 7b is crosswise to the tunnel line L.
  • FIG. 2 it is illustrated a tunnel 2 having blast holes 7a for excavating a round 8 and a reinforcement fan 9 provided with several reinforcement holes 7b.
  • insertion objects can be inserted into these pre-drilled holes 7 by means of an insertion unit arranged in a post-drilling boom.
  • Charges such as explosives or propellants can be inserted into the blast holes and reinforcing members such as rock bolts or injection material or grouting material can be inserted into the pre-drilled holes.
  • Figure 3 shows an arrangement wherein drilling is performed by a mining vehicle 1 having one or more drilling booms 5a provided with drilling units 6, and for the post-drilling operation there is a special post-drilling mining vehicle 16 having one or more post drilling booms 5b provided with insertion units 17.
  • a rock drilling rig 1 is positioned to a drilling site and planned holes 7 are drilled.
  • the post drilling mining vehicle 16 is positioned to the drilling site and insertion objects are fed into the pre-drilled holes 7.
  • Coordinates, directional angle and other positioning information is stored during the drilling phase and the positioning information can be communicated from the control unit 12 of the rig 1 to a mine control unit 13 and to a control unit 18 of the post-drilling mining vehicle 16. Thereby positioning information gathered during drilling can be utilized in positioning the insertion unit 17 at the pre- drilled hole.
  • the positioning of the mining vehicles 1 , 16 to the working site can be based on fixed position identifiers 19, scanned wall surface profiles 20 of the working site, distance measurement based on dead reckoning, peg numbers 21 identifying mine distances, positioning based on wireless beacons, positioning in a wireless network, or their combination. Furthermore, in posi- tioning a tunnel laser 22 may also be utilized. After the positioning the mining vehicle is navigated so that one united coordinate system is used in drilling and post-drilling actions. At least the position of each drilled hole is stored when the drilling unit is positioned and drilling is started. Thereby coordinates of the drilled holes are known by the positioning system.
  • Positioning data can be stored and managed by using a standardized format, such as IREDES (Inter- national Rock Excavation Data Exchange System), whereby data is compatible for different control units involved.
  • the positioning information is communicated to the post-drilling mining vehicle 16, which is positioned and navigated to the working site where the pre-drilled holes are located.
  • the insertion unit 17 is positioned according to the stored drill hole position information close to the pre-drilled hole 7. Since there may be inaccuracy in the positioning because of clearances of the boom joints, it may be impossible or difficult to position the insertion unit 17 directly to a collar of the pre-drilled hole. Therefore the positioning may be completed with a fine positioning wherein the insertion unit 17 is moved accurately to the collar of the pre-drilled hole. In the fine positioning a computer vision system can be utilized or different hole identifiers can be detected, for example. The fine positioning principles are discussed above in this application and also in connection with Figure 5.
  • the mining vehicle 1 is provided with one or more drilling booms 5a with drilling units 6 and one or more post-drilling or insertion booms 5b with insertion units 16.
  • the mining vehicle 1 is a multi-use apparatus that can be positioned and navigated to the working site in a manner disclosed in the description of Figure 3.
  • the drilling and insertion are carried out with different booms 5a, 5b wherefore positioning data of the drilled holes are stored and utilized when rough positioning the insertion unit 17 after drilling close to the pre-drilled hole 7 indicated as a black circle in Figure 4.
  • Positioning information can be stored in the control unit 12 of the mining vehicle 1 and, if needed, it can be communicated to one or more external control unit 13.
  • the insertion unit 17 comprises a feed beam 23 and a feed device 24 supported on the feed beam.
  • the feed beam 23 can be attached to a post-drilling boom 5b by means of a cradle 25 or corresponding means.
  • An insertion object 26 can be supported to a shank 27 of the feed device 24 and can be supported by a front support 28 to a front end 23a of the feed beam. Thereby the insertion object 26 is in a feed line 29 and can be pushed forward and pulled rearward by the feed device 24, which is movable on the feed beam 23.
  • the front end portion 23a of the feed beam may comprise one or more cameras 30 in order to detect the pre-drilled holes after the insertion unit 17 is rough positioned 31 at a proximity 32 to the pre-drilled hole on the basis of collected drilling position information. Thereafter the insertion unit 17 is fine positioned 33 from the proximity position 32 accurately to a mouth of the pre-drilled hole 7. In fine positioning 33 several cameras can be used in order to produce stereo pictures or videos.
  • the control unit 12 comprises an image processing system for detecting optically the accurate position of the pre-drilled hole 7.
  • the insertion unit 17 may comprise one or more identifiers, receivers or other de- tection means for hole recognition.
  • the inserting device 17 may comprise one or more sensors, measuring units or other sensing means 35 for detecting the feed resistance. When feed resistance is detected the control unit 12 can start various feed aid measures in order to facilitate the insertion.
  • the insertion unit 17 may comprise one or more angle adjusting device 36 by means of which a rear end portion 23b of the feed beam can be moved in transverse direction.
  • the angle adjusting device 36 may rotate R the rear part 23b of the feed beam as it is shown in Figure 5.
  • the rotation R is executed simultaneously with the feed F whereby a rear end of the insertion object 26 proceeds in a helical pattern.
  • the front end of the feed beam may be supported against a rock surface or is kept stationary in some other way.
  • Figure 6a shows in a simplified manner start of the insertion cycle.
  • the rotation R has a greater magnitude i.e rotation is performed with a greater radius. That is because at first the purpose is to sense and find the direction 34 of the pre-drilled hole 7. As the insertion proceeds and the insertion object 26 penetrates into the hole 7 the angle adjustment is decreased, as it is shown in Figures 6b and 6c. Further, in Figure 6c resisting forces are detected because there is an irregular portion 37 in the hole that causes problems for the insertion. Increased feed resistance is detected and the control unit may thereafter control the feeding with different feed aid control modes. According to one control mode feed direction is changed 38 between normal direction and reverse direction according to the feed resistance. In an- other control mode the insertion object 26 is rotated or turned around its longitudinal axis 39 during the feed.
  • Figures 7 to 9 illustrate in a highly simplified manner some possible angle adjusting devices 36 for implementing a transverse movement for a feed beam rear end 26b.
  • the angle adjusting device 36 comprises a pressure medium cylinder or a corresponding linear actuator 40 which can be turned a limited angle by means of turning actuator 41 .
  • the actuators 40, 41 are executed simultaneously the rear end of the feed beam can be rotated R in a desired magnitude and rotation direction.
  • the angle adjusting device 36 comprises two linear actuators 42, 43, such as cylinders, which can be simultaneously controlled for generating rotation R and various paths of movements.
  • the angle adjusting device 36 comprises a curved guide surface 44 along which the rear end of the feed beam 23 can be moved by a drive mechanism 45.
  • the shape of the guide surface defines the movement path.
  • An alternative angle adjusting device 36a can be arranged between the feed beam 23 and the feed device 24.
  • the device 36a may include actuators for moving the feed device 24 in the transverse direction.
  • an angular adjusting device 36b can be integrated to the feed device 24 or to a shank or adapter attached to the feed device.
  • the adjusting device 36b comprises at least one linear actuator for moving the rear end of the insertion object 26 in a transverse direction and at least one rotation device for rotating the rear end of the insertion object around axis M after being first transversally moved 29a by the linear actuator.
  • the operation of the device 36b is thus based on eccentric position of the rear end of the insertion object 26 and simul- taneous rotation.
  • These angular adjustment devices 36a, 36b may be sufficient in some cases or they may be used in combination with the angular adjustment devices influencing the feed beam. Further, it is to be noted that other possibilities exists for rotating or moving the rear end portion of the insertion object during the insertion cycle.
  • FIG 1 1 there is a rock surface area wherein drill holes are drilled and some of the openings of the pre-drilled holes 7 are provided with an identification aid.
  • the pre-d lled holes 7 show as dark circles in optical detection means.
  • a physical identifier 46 may be arranged in a drilling cycle inside the hole 7.
  • the identifier 46 may a tubular piece having an outer edge 47 having a color or shape which improves optical detection.
  • One possibility is to paint around the hole opening an annular identification marking 48 which improves the optical hole recognition.
  • the hole may be provided with a RFID tag or corresponding machine readable active or passive wireless identifier 49.
  • the features disclosed in the present application may be used as such, irrespective of other features.
  • the features disclosed in the present application may be combined so as to provide different new combinations.

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Earth Drilling (AREA)

Abstract

La présente invention a trait à un système permettant de réaliser une insertion en post-forage. Un véhicule d'exploitation minière (1, 16) comprend au moins un bras (5b) équipé d'une unité d'insertion (17) permettant d'introduire un objet d'insertion (26) dans un trou pré-foré (7). Afin de faciliter l'introduction, l'extrémité arrière de l'objet d'insertion (26) est déplacée transversalement durant l'introduction. L'unité d'insertion comprend un longeron d'avance (23) le long duquel un dispositif d'avance (24) est déplacé dans la direction d'avance. L'extrémité arrière (23b) du longeron d'avance peut être déplacée le long d'un trajet incurvé.
PCT/FI2011/051160 2011-12-28 2011-12-28 Procédé et système pour réaliser une insertion en post-forage WO2013098459A1 (fr)

Priority Applications (2)

Application Number Priority Date Filing Date Title
SE1450819A SE1450819A1 (sv) 2011-12-28 2011-12-28 Method and arrangement for post-drilling insertion
PCT/FI2011/051160 WO2013098459A1 (fr) 2011-12-28 2011-12-28 Procédé et système pour réaliser une insertion en post-forage

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/FI2011/051160 WO2013098459A1 (fr) 2011-12-28 2011-12-28 Procédé et système pour réaliser une insertion en post-forage

Publications (1)

Publication Number Publication Date
WO2013098459A1 true WO2013098459A1 (fr) 2013-07-04

Family

ID=48696390

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/FI2011/051160 WO2013098459A1 (fr) 2011-12-28 2011-12-28 Procédé et système pour réaliser une insertion en post-forage

Country Status (2)

Country Link
SE (1) SE1450819A1 (fr)
WO (1) WO2013098459A1 (fr)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2016001315A1 (fr) * 2014-07-03 2016-01-07 Skanska Sverige Ab Procédé et agencement permettant de monter des boulons dans une paroi de tunnel
US20170142403A1 (en) * 2015-11-16 2017-05-18 Abb Technology Ag Automatically scanning and representing an environment having a plurality of features
US20170138192A1 (en) * 2015-11-16 2017-05-18 Abb Technology Ag Automatically scanning and representing an environment with collision avoidance
CN108301838A (zh) * 2018-01-10 2018-07-20 鞍钢集团矿业有限公司 一种金属矿床地下层状裂隙岩体的巷道开掘方法
CN111074887A (zh) * 2019-12-31 2020-04-28 中铁二十二局集团第五工程有限公司 一种便携式土钉安装机
EP3663508A1 (fr) * 2018-12-04 2020-06-10 Sandvik Mining and Construction Oy Appareil d'alimentation d'éléments de tube, appareil de forage de roche et procédé de support d'ouvertures de trous de forage
EP3610223A4 (fr) * 2017-04-13 2021-01-06 Joy Global Underground Mining LLC Système et procédé de mesure et d'alignement de boulons de toit
CN113790063A (zh) * 2021-08-27 2021-12-14 中国煤炭科工集团太原研究院有限公司 定位试验台
SE2150018A1 (en) * 2021-01-13 2022-07-14 Epiroc Rock Drills Ab A method of positioning after rock drilling and a post-drilling unit, rig, computer program and computer-readable storage medium therefor
EP4230837A1 (fr) * 2022-02-18 2023-08-23 Sandvik Mining and Construction Lyon SAS Appareil de détection de position, véhicule minier et procédé

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FI3825514T3 (fi) * 2019-11-19 2023-04-25 Sandvik Mining And Construction Lyon S A S Kallionporausyksikkö ja porattujen reikien panostusmenetelmä
BR112023008622A8 (pt) * 2020-11-13 2023-11-14 Enaex Servicios S A Sistema e método para o carregamento robótico de explosivos em mineração subterrânea

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4508035A (en) * 1982-02-19 1985-04-02 Mazda Motor Corporation Explosive charging apparatus for rock drilling
JPH09195666A (ja) * 1996-01-18 1997-07-29 Sato Kogyo Co Ltd トンネル掘削方法
US20110182672A1 (en) * 2008-10-29 2011-07-28 Sven-Olov Nystrom Injecting device, drill rig and method of rock bolting

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4508035A (en) * 1982-02-19 1985-04-02 Mazda Motor Corporation Explosive charging apparatus for rock drilling
JPH09195666A (ja) * 1996-01-18 1997-07-29 Sato Kogyo Co Ltd トンネル掘削方法
US20110182672A1 (en) * 2008-10-29 2011-07-28 Sven-Olov Nystrom Injecting device, drill rig and method of rock bolting

Cited By (25)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AU2015282914B2 (en) * 2014-07-03 2017-02-23 Skanska Sverige Ab Method and arrangement for mounting bolts in a tunnel wall
US9957797B2 (en) 2014-07-03 2018-05-01 Skanska Sverige Ab Method and arrangment for mounting bolts in a tunnel wall
WO2016001315A1 (fr) * 2014-07-03 2016-01-07 Skanska Sverige Ab Procédé et agencement permettant de monter des boulons dans une paroi de tunnel
US10349035B2 (en) * 2015-11-16 2019-07-09 Abb Schweiz Ag Automatically scanning and representing an environment having a plurality of features
US20170142403A1 (en) * 2015-11-16 2017-05-18 Abb Technology Ag Automatically scanning and representing an environment having a plurality of features
US20170138192A1 (en) * 2015-11-16 2017-05-18 Abb Technology Ag Automatically scanning and representing an environment with collision avoidance
US10341639B2 (en) * 2015-11-16 2019-07-02 Abb Schweiz Ag Automatically scanning and representing an environment with collision avoidance
EP3610223A4 (fr) * 2017-04-13 2021-01-06 Joy Global Underground Mining LLC Système et procédé de mesure et d'alignement de boulons de toit
US11174731B2 (en) 2017-04-13 2021-11-16 Joy Global Underground Mining Llc System and method for measuring and aligning roof bolts
CN108301838A (zh) * 2018-01-10 2018-07-20 鞍钢集团矿业有限公司 一种金属矿床地下层状裂隙岩体的巷道开掘方法
US11578536B2 (en) 2018-12-04 2023-02-14 Sandvik Mining And Construction Oy Apparatus for feeding tube elements, rock drilling rig and method of supporting drill hole openings
EP3663508A1 (fr) * 2018-12-04 2020-06-10 Sandvik Mining and Construction Oy Appareil d'alimentation d'éléments de tube, appareil de forage de roche et procédé de support d'ouvertures de trous de forage
CN111270993A (zh) * 2018-12-04 2020-06-12 山特维克矿山工程机械有限公司 用于馈送管元件的设备、岩钻机和支承钻孔的开口的方法
JP2020112016A (ja) * 2018-12-04 2020-07-27 サンドヴィック マイニング アンド コンストラクション オーワイ 管要素を給送するための装置、削岩リグ、およびドリル孔開口を支持する方法
AU2019264602B2 (en) * 2018-12-04 2021-01-21 Sandvik Mining And Construction Oy Apparatus for feeding tube elements, rock drilling rig and method of supporting drill hole openings
CN111270993B (zh) * 2018-12-04 2024-03-08 山特维克矿山工程机械有限公司 用于馈送管元件的设备、岩钻机和支承钻孔的开口的方法
JP7398256B2 (ja) 2018-12-04 2023-12-14 サンドヴィック マイニング アンド コンストラクション オーワイ 管要素を給送するための装置、削岩リグ、およびドリル孔開口を支持する方法
CN111074887A (zh) * 2019-12-31 2020-04-28 中铁二十二局集团第五工程有限公司 一种便携式土钉安装机
SE2150018A1 (en) * 2021-01-13 2022-07-14 Epiroc Rock Drills Ab A method of positioning after rock drilling and a post-drilling unit, rig, computer program and computer-readable storage medium therefor
SE544602C2 (en) * 2021-01-13 2022-09-20 Epiroc Rock Drills Ab A method of positioning after rock drilling and a post-drilling unit, rig, computer program and computer-readable storage medium therefor
WO2022154717A1 (fr) 2021-01-13 2022-07-21 Epiroc Rock Drills Aktiebolag Procédé de positionnement après forage et unité de postforage associée
CN113790063B (zh) * 2021-08-27 2023-08-04 中国煤炭科工集团太原研究院有限公司 定位试验台
CN113790063A (zh) * 2021-08-27 2021-12-14 中国煤炭科工集团太原研究院有限公司 定位试验台
EP4230837A1 (fr) * 2022-02-18 2023-08-23 Sandvik Mining and Construction Lyon SAS Appareil de détection de position, véhicule minier et procédé
WO2023156213A1 (fr) * 2022-02-18 2023-08-24 Sandvik Mining And Construction Lyon Sas Appareil de détection de position, véhicule minier et procédé

Also Published As

Publication number Publication date
SE1450819A1 (sv) 2014-07-02

Similar Documents

Publication Publication Date Title
WO2013098459A1 (fr) Procédé et système pour réaliser une insertion en post-forage
WO2013098460A1 (fr) Procédé et véhicule d'exploitation minière pour réaliser une insertion en post-forage
US10012068B2 (en) Alignment system for alignment of a drill rod during drilling
CN106065767B (zh) 用于产生套管钻孔的钻进设备及用于操作钻进设备的方法
EP2725183B1 (fr) Véhicule d'exploitation minière et procédé de déplacement de la flèche
CA2916148C (fr) Agencement de commande de processus de forage par percussion
CA2837902C (fr) Procede et systeme pour preparer un plan de chargement
EP2721241B1 (fr) Procédé et système pour préparer un plan de chargement
EP0202013A2 (fr) Dispositif de guidage et de contrôle pour outils de forage à percussion
KR101039834B1 (ko) 3차원 지하 채굴공동 탐사 장치 및 방법
US6460630B2 (en) Method and rock drilling apparatus for controlling rock drilling
US20200149383A1 (en) Down-the-hole drilling control system for mobile drilling machines
JP2018066659A (ja) 重機類の位置姿勢計測システム
CN113227928A (zh) 用于确定采矿和/或建筑机械的位置的方法和设备
EP2041395B1 (fr) Procédé et dispositif pour déterminer la position d'un boulon de consolidation de roche
JP6810936B2 (ja) 穿孔ナビゲーション装置
JP3177691U (ja) 光利用の正確な杭打ちが可能な杭打機又は杭打船
JP6923132B2 (ja) 穿孔ナビゲーション装置
JP6923131B2 (ja) 穿孔ナビゲーション装置
KR101577326B1 (ko) 오토 레벨 기능을 갖는 비굴착 천공장치
WO2002018749A1 (fr) Appareil d'installation d'un ensemble support d'une structure rocheuse
JP7291995B1 (ja) 先受け鋼管打設位置誘導システム
US20240141775A1 (en) Survey tool system for blast hole drilling rigs
FI121243B (fi) Lastauskone
AU2021212011A1 (en) Survey system for blast hole drilling rigs

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 11878360

Country of ref document: EP

Kind code of ref document: A1

DPE1 Request for preliminary examination filed after expiration of 19th month from priority date (pct application filed from 20040101)
NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 11878360

Country of ref document: EP

Kind code of ref document: A1