WO2013086655A1 - Arch-bridge arch type railway and highway protective covers - Google Patents

Arch-bridge arch type railway and highway protective covers Download PDF

Info

Publication number
WO2013086655A1
WO2013086655A1 PCT/CN2011/002101 CN2011002101W WO2013086655A1 WO 2013086655 A1 WO2013086655 A1 WO 2013086655A1 CN 2011002101 W CN2011002101 W CN 2011002101W WO 2013086655 A1 WO2013086655 A1 WO 2013086655A1
Authority
WO
WIPO (PCT)
Prior art keywords
arch
bridge
arches
protective covers
constructing
Prior art date
Application number
PCT/CN2011/002101
Other languages
French (fr)
Chinese (zh)
Inventor
匡仲平
Original Assignee
Kuang Zhongping
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kuang Zhongping filed Critical Kuang Zhongping
Priority to PCT/CN2011/002101 priority Critical patent/WO2013086655A1/en
Publication of WO2013086655A1 publication Critical patent/WO2013086655A1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01FADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
    • E01F7/00Devices affording protection against snow, sand drifts, side-wind effects, snowslides, avalanches or falling rocks; Anti-dazzle arrangements ; Sight-screens for roads, e.g. to mask accident site
    • E01F7/04Devices affording protection against snowslides, avalanches or falling rocks, e.g. avalanche preventing structures, galleries

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

Disclosed is a method for shielding, blocking or guiding sand storm, quicksand, accumulated snow, mountain torrents, detritus streams, and falling soil and broken rocks due to landslide by using arch-bridge arch type protective covers comprises: constructing the arch-bridge arch type protective covers with the reinforced concrete structures in railroad sections and road sections where disasters and dangerous cases frequently occur; determining strength, a span and a bridge floor gradient according to types and properties of disaster prevention; for resisting sand storm, in which sands and sandy soil are piled up on the outer sides of arches of the protective covers, the gradient being smaller than 30%; for resisting quicksand and accumulated snow, constructing the arches of the protective covers; for resisting mountain torrents, detritus stream, and falling soil and broken rocks due to landslide, constructing arch bridges, so that the gradient of the arch-top upper slope bridge floors being larger than 10%, and the gradient of the arch-top lower slope bridge floors being larger than 45%; constructing embankments on each arch-bridge bridge floor extending to two sides along the disasters; embedding the ends of the arch-bridge arches of the protective covers into the stratum for a certain depth, so as to reinforce the whole; and reserving spaces for the arch-bridge arches and the bridge floors to fill the spaces with the sandy soil and broken stones, so as to reduce damage of bridge floor shake to the arches.

Description

拱桥拱洞式铁路公路防护罩  Arch bridge arch tunnel road shield
技 术 领 域  Technical field
本发明涉及经常发生沙尘暴、 力浪、 流沙、积雪、 泥石流、 山体滑坡等重大自然灾 害和险情的铁路公路防灾、 抗灾减灾领域。  The invention relates to the field of railway road disaster prevention, disaster prevention and mitigation for frequent natural disasters and dangers such as sandstorms, force waves, quicksand, snow accumulation, mudslides and landslides.
背 景 技 术  Background technique
对上述自然灾害, 目前国内外均无有效防护措施。  For the above natural disasters, there are no effective protective measures at home and abroad.
发 明 内 容  Invented content
构筑拱桥拱洞式钢筋混凝土结构铁路公路防护罩, 抵御上述自然灾害。  Construct arch bridge reinforced concrete structure railway road protection cover to resist the above natural disasters.
技 术 方 案  Technical solutions
通过构筑拱桥拱洞式防护罩,使上述自然灾害受到拱洞遮挡阻挡或经拱桥桥面顺畅 流过, 从而避免对铁路公路及过往列车、 车辆造成损毁。  By constructing the arch bridge arch shield, the above natural disasters are blocked by the arches or flow smoothly through the arch bridge deck, thus avoiding damage to the railway roads and passing trains and vehicles.
具 体 实 施 方 式  detailed description
1、 在灾害、 险情频发线路区间、 路段, 构筑钢筋混凝土结构拱桥拱洞式防护罩;  1. Constructing a reinforced concrete arch bridge arch shield in the frequent occurrences and sections of disasters and dangers;
2、 根据灾害预防种类性质, 确定其强度、 跨度和桥面坡度;  2. Determine the strength, span and bridge slope according to the nature of the disaster prevention;
3、 抗沙尘暴、 力浪的拱洞外测应堆积沙石土, 坡度应小于 30%。;  3. Sand and gravel should be piled up outside the arch of sand and dust storms, and the slope should be less than 30%. ;
4、 抗流沙、 积雪可只构筑拱洞;  4, anti-sanding, snow can only build arches;
5、 抗山洪、 泥石流、 山体滑坡碎落土石的拱桥, 拱顶上坡桥面坡度应大于 10%。, 拱 顶下坡桥面坡度应大于 45%。;  5. For arch bridges that resist mountain torrents, mudslides, and landslides and landslides, the slope of the arched uphill bridge deck should be greater than 10%. The slope of the arched downhill bridge deck should be greater than 45%. ;
6、 拱桥桥面沿上述灾害流向两测, 应构筑防护堤;  6. The arch bridge deck faces two surveys along the above-mentioned disasters, and a protective levee should be constructed;
7、 拱桥拱涧各端应嵌入地层一定深度, 以加固整体;  7. Each end of the arch bridge arch should be embedded in the ground to a certain depth to strengthen the whole;
8、拱桥拱洞与桥面应留有空间,并做沙土、碎石填充,以减少桥面震动对桥洞的损害;  8. Arch bridge arches and bridge decks should have space and be filled with sand and gravel to reduce the damage of bridge deck vibration to bridge holes;

Claims

权 利 要 求 书 发明人对钢筋混凝土结构拱桥拱洞式铁路公路防护罩及其构筑, 提出独立权力要 求, 其特征是以拱桥拱洞遮挡阻挡或疏导沙尘暴、 力浪、 流沙、 积雪、 山洪、 泥石流、 山体滑坡碎落土石, 包括以下步骤: The inventor claims the independent power requirement for the reinforced concrete arch bridge arch tunnel type railway shield and its construction. The feature is that the arch bridge arch shields or blocks sandstorms, force waves, quicksand, snow, torrents, mudslides. Landslides and landslides, including the following steps:
1、 在灾害、 险情频发线路区间、 路段, 构筑钢筋混凝土结构拱桥拱洞式防护罩; 1. Constructing a reinforced concrete arch bridge arch shield in the frequent occurrences and sections of disasters and dangers;
2、 根据灾害预防种类性质, 确定其强度、 跨度和桥面坡度; 2. Determine the strength, span and bridge slope according to the nature of the disaster prevention;
3、 抗沙尘暴、 力浪的拱洞外测应堆积沙石土, 坡度应小于 30%。;  3. Sand and gravel should be piled up outside the arch of sand and dust storms, and the slope should be less than 30%. ;
4、 抗流沙、 积雪可只构筑拱洞;  4, anti-sanding, snow can only build arches;
5、 抗山洪、 泥石流、 山体滑坡碎落土石的拱桥, 拱顶上坡桥面坡度应大于 10%。, 拱 顶下坡桥面坡度应大于 45%。;  5. For arch bridges that resist mountain torrents, mudslides, and landslides and landslides, the slope of the arched uphill bridge deck should be greater than 10%. The slope of the arched downhill bridge deck should be greater than 45%. ;
6、 拱桥桥面沿上述灾害流向两测, 应构筑防护堤;  6. The arch bridge deck faces two surveys along the above-mentioned disasters, and a protective levee should be constructed;
7、 拱桥拱洞各端应嵌入地层一定深度, 以加固整体;  7. Each end of the arch bridge arch should be embedded in the ground to a certain depth to strengthen the whole;
8、拱桥拱洞与桥面应留有空间,并做少土、碎石填充, 以减少桥面震动对桥洞的损害;  8. Arch bridge arches and bridge decks should have space and be filled with less soil and gravel to reduce the damage of bridge deck vibration to bridge holes;
PCT/CN2011/002101 2011-12-14 2011-12-14 Arch-bridge arch type railway and highway protective covers WO2013086655A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
PCT/CN2011/002101 WO2013086655A1 (en) 2011-12-14 2011-12-14 Arch-bridge arch type railway and highway protective covers

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/CN2011/002101 WO2013086655A1 (en) 2011-12-14 2011-12-14 Arch-bridge arch type railway and highway protective covers

Publications (1)

Publication Number Publication Date
WO2013086655A1 true WO2013086655A1 (en) 2013-06-20

Family

ID=48611777

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2011/002101 WO2013086655A1 (en) 2011-12-14 2011-12-14 Arch-bridge arch type railway and highway protective covers

Country Status (1)

Country Link
WO (1) WO2013086655A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109281260A (en) * 2018-11-12 2019-01-29 中铁西北科学研究院有限公司 A kind of recyclable sand stop wall and sand wall system

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0278881A2 (en) * 1987-02-10 1988-08-17 Jean-Louis Plantier Arch-shaped structure for snow protection
JP2592512B2 (en) * 1988-12-09 1997-03-19 石塚 賢吉 Construction method of PC snow shelter
CN101575842A (en) * 2009-02-20 2009-11-11 黄灿荣 Railway sand storm-prevention arch cave
CN201411637Y (en) * 2009-04-08 2010-02-24 雷雨欣 Blizzard and sand protective cover on railways and highways
CN201538945U (en) * 2009-09-16 2010-08-04 布鲁克(成都)工程有限公司 Flexible shed tunnel for isolating and defending flyrock or rockfall
CN102493370A (en) * 2011-12-13 2012-06-13 匡仲平 Arch-bridge arch type railway and highway protective covers

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0278881A2 (en) * 1987-02-10 1988-08-17 Jean-Louis Plantier Arch-shaped structure for snow protection
JP2592512B2 (en) * 1988-12-09 1997-03-19 石塚 賢吉 Construction method of PC snow shelter
CN101575842A (en) * 2009-02-20 2009-11-11 黄灿荣 Railway sand storm-prevention arch cave
CN201411637Y (en) * 2009-04-08 2010-02-24 雷雨欣 Blizzard and sand protective cover on railways and highways
CN201538945U (en) * 2009-09-16 2010-08-04 布鲁克(成都)工程有限公司 Flexible shed tunnel for isolating and defending flyrock or rockfall
CN102493370A (en) * 2011-12-13 2012-06-13 匡仲平 Arch-bridge arch type railway and highway protective covers

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109281260A (en) * 2018-11-12 2019-01-29 中铁西北科学研究院有限公司 A kind of recyclable sand stop wall and sand wall system
CN109281260B (en) * 2018-11-12 2024-03-15 中铁西北科学研究院有限公司 But cyclic utilization keeps off husky wall and keeps off husky wall system

Similar Documents

Publication Publication Date Title
CN202369864U (en) Salinized soil railroad bed structure
CN106192646B (en) Vcehicular tunnel car-driving shock-absorbing denoising structure and its construction method
CN203188065U (en) Ballastless track railway expansion soil cutting bedding and slope protection structure
Likitlersuang et al. NUMERICAL MODELLING OF RAILWAY EMBANKMENTS FOR HIGH-SPEED TRAIN CONSTRUCTED ON SOFT SOIL.
CN211036590U (en) Roadbed protective structure permeates water
CN110004882A (en) The dissipation of mud-rock flow multistage is blocked structure
JP5913701B1 (en) Temporary dual-use main soil structure and its construction method
CN202227287U (en) High speed railway bridge protection shed tunnel structure
CN110984193A (en) Severe cold mountain area highway cutting side slope ecological protection system
CN102493370A (en) Arch-bridge arch type railway and highway protective covers
CN210946536U (en) Protective structure of small dangerous rock falling stone
CN108755746A (en) Half tunnel type highway keeps off protection structure and component and half tunnel type highway
CN208038951U (en) A kind of Plateau Permafrost Regions railway road-bridge transition section composite construction
WO2013086655A1 (en) Arch-bridge arch type railway and highway protective covers
CN106638197A (en) Anti-slip roadbed structure
CN204875404U (en) Pre -buried formula pipeline intersecting structure in road surface
US20120269573A1 (en) Systems and Methods for Diverting Sub-surface Water
CN208167783U (en) Gear mud wall composite structure
CN206581092U (en) A kind of anti-skidding road structure
CN108547262A (en) Dam body for blocking mountain channel mountain torrents, mud-rock flow
CN206127789U (en) Structure of making an uproar falls in highway tunnel driving damping
CN109162297A (en) A kind of the solid-liquid separating shed hole structure and its construction method of anti-mud-rock flow
CN104894942B (en) The recyclable combination construction sidewalk of drainage type
CN107740399A (en) A kind of structure and its construction method for handling both wired karst slope type water damages
CN107700300A (en) A kind of safety protective road foundation

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 11877227

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

32PN Ep: public notification in the ep bulletin as address of the adressee cannot be established

Free format text: NOTING OF LOSS OF RIGHTS PURSUANT TO RULE 112(1) EPC (EPO FORM 1205A DATED 07.10.14)

122 Ep: pct application non-entry in european phase

Ref document number: 11877227

Country of ref document: EP

Kind code of ref document: A1