WO2013025143A1 - Base station, user equipment and methods therein for control timing configuration assignment in a multiple cell communications network - Google Patents

Base station, user equipment and methods therein for control timing configuration assignment in a multiple cell communications network Download PDF

Info

Publication number
WO2013025143A1
WO2013025143A1 PCT/SE2012/050093 SE2012050093W WO2013025143A1 WO 2013025143 A1 WO2013025143 A1 WO 2013025143A1 SE 2012050093 W SE2012050093 W SE 2012050093W WO 2013025143 A1 WO2013025143 A1 WO 2013025143A1
Authority
WO
WIPO (PCT)
Prior art keywords
downlink
timing
uplink
configuration
user equipment
Prior art date
Application number
PCT/SE2012/050093
Other languages
French (fr)
Inventor
Jung-Fu Cheng
Daniel Larsson
Mattias Frenne
Dirk Gerstenberger
Robert Baldemair
Original Assignee
Telefonaktiebolaget L M Ericsson (Publ)
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Family has litigation
First worldwide family litigation filed litigation Critical https://patents.darts-ip.com/?family=45757759&utm_source=google_patent&utm_medium=platform_link&utm_campaign=public_patent_search&patent=WO2013025143(A1) "Global patent litigation dataset” by Darts-ip is licensed under a Creative Commons Attribution 4.0 International License.
Priority to DK12705917.8T priority Critical patent/DK2742756T3/en
Priority to US13/510,201 priority patent/US9295055B2/en
Priority to ES12705917.8T priority patent/ES2529998T3/en
Priority to JP2014524966A priority patent/JP5938099B2/en
Priority to KR1020147003695A priority patent/KR101875253B1/en
Application filed by Telefonaktiebolaget L M Ericsson (Publ) filed Critical Telefonaktiebolaget L M Ericsson (Publ)
Priority to CN201280039309.0A priority patent/CN103782639B/en
Priority to BR112014003316-1A priority patent/BR112014003316B1/en
Priority to EP12705917.8A priority patent/EP2742756B1/en
Publication of WO2013025143A1 publication Critical patent/WO2013025143A1/en
Priority to US15/073,315 priority patent/US11070346B2/en
Priority to US17/365,493 priority patent/US20210328753A1/en

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L5/00Arrangements affording multiple use of the transmission path
    • H04L5/14Two-way operation using the same type of signal, i.e. duplex
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L1/00Arrangements for detecting or preventing errors in the information received
    • H04L1/12Arrangements for detecting or preventing errors in the information received by using return channel
    • H04L1/16Arrangements for detecting or preventing errors in the information received by using return channel in which the return channel carries supervisory signals, e.g. repetition request signals
    • H04L1/18Automatic repetition systems, e.g. Van Duuren systems
    • H04L1/1829Arrangements specially adapted for the receiver end
    • H04L1/1861Physical mapping arrangements
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04BTRANSMISSION
    • H04B7/00Radio transmission systems, i.e. using radiation field
    • H04B7/24Radio transmission systems, i.e. using radiation field for communication between two or more posts
    • H04B7/26Radio transmission systems, i.e. using radiation field for communication between two or more posts at least one of which is mobile
    • H04B7/2612Arrangements for wireless medium access control, e.g. by allocating physical layer transmission capacity
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04JMULTIPLEX COMMUNICATION
    • H04J11/00Orthogonal multiplex systems, e.g. using WALSH codes
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04JMULTIPLEX COMMUNICATION
    • H04J11/00Orthogonal multiplex systems, e.g. using WALSH codes
    • H04J11/0023Interference mitigation or co-ordination
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L1/00Arrangements for detecting or preventing errors in the information received
    • H04L1/12Arrangements for detecting or preventing errors in the information received by using return channel
    • H04L1/16Arrangements for detecting or preventing errors in the information received by using return channel in which the return channel carries supervisory signals, e.g. repetition request signals
    • H04L1/18Automatic repetition systems, e.g. Van Duuren systems
    • H04L1/1812Hybrid protocols; Hybrid automatic repeat request [HARQ]
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L5/00Arrangements affording multiple use of the transmission path
    • H04L5/0001Arrangements for dividing the transmission path
    • H04L5/0003Two-dimensional division
    • H04L5/0005Time-frequency
    • H04L5/0007Time-frequency the frequencies being orthogonal, e.g. OFDM(A), DMT
    • H04L5/001Time-frequency the frequencies being orthogonal, e.g. OFDM(A), DMT the frequencies being arranged in component carriers
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L5/00Arrangements affording multiple use of the transmission path
    • H04L5/003Arrangements for allocating sub-channels of the transmission path
    • H04L5/0053Allocation of signaling, i.e. of overhead other than pilot signals
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L5/00Arrangements affording multiple use of the transmission path
    • H04L5/003Arrangements for allocating sub-channels of the transmission path
    • H04L5/0053Allocation of signaling, i.e. of overhead other than pilot signals
    • H04L5/0055Physical resource allocation for ACK/NACK
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L5/00Arrangements affording multiple use of the transmission path
    • H04L5/14Two-way operation using the same type of signal, i.e. duplex
    • H04L5/1469Two-way operation using the same type of signal, i.e. duplex using time-sharing
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L5/00Arrangements affording multiple use of the transmission path
    • H04L5/14Two-way operation using the same type of signal, i.e. duplex
    • H04L5/16Half-duplex systems; Simplex/duplex switching; Transmission of break signals non-automatically inverting the direction of transmission
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W72/00Local resource management
    • H04W72/04Wireless resource allocation
    • H04W72/044Wireless resource allocation based on the type of the allocated resource
    • H04W72/0446Resources in time domain, e.g. slots or frames
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W72/00Local resource management
    • H04W72/20Control channels or signalling for resource management
    • H04W72/21Control channels or signalling for resource management in the uplink direction of a wireless link, i.e. towards the network
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W72/00Local resource management
    • H04W72/20Control channels or signalling for resource management
    • H04W72/23Control channels or signalling for resource management in the downlink direction of a wireless link, i.e. towards a terminal
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W76/00Connection management
    • H04W76/20Manipulation of established connections
    • H04W76/27Transitions between radio resource control [RRC] states
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W88/00Devices specially adapted for wireless communication networks, e.g. terminals, base stations or access point devices
    • H04W88/02Terminal devices
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W88/00Devices specially adapted for wireless communication networks, e.g. terminals, base stations or access point devices
    • H04W88/08Access point devices

Definitions

  • Example embodiments are directed towards a base station and user equipment, and methods therein, for the assignment and implementation of a control timing configuration number for control timing in a multiple cell communications network.
  • LTE Long Term Evolution
  • OFDM Orthogonal Frequency Division Multiplexing
  • DFT Discrete Fourier Transform
  • the basic LTE downlink physical resource can thus be seen as a time-frequency grid as illustrated in Figure 1 , where each resource element corresponds to one OFDM subcarrier during one OFDM symbol interval.
  • resource allocation in LTE is typically described in terms of resource blocks, where a resource block corresponds to one slot (0.5 ms) in the time domain and 12 subcarriers in the frequency domain. Resource blocks are numbered in the frequency domain, starting with 0 from one end of the system bandwidth.
  • Downlink transmissions are dynamically scheduled, i.e., in each subframe the base station transmits control information about to which user equipments data is transmitted and upon which resource blocks the data is transmitted, in the current downlink subframe.
  • This control signaling is typically transmitted in the first 1 , 2, 3 or 4 OFDM symbols in each subframe.
  • a downlink system with 3 OFDM symbols for control purposes is illustrated in Figure 3.
  • the dynamic scheduling information is communicated to the user equipments via a Physical Downlink Control Channel (PDCCH) transmitted in the control region.
  • PDCCH Physical Downlink Control Channel
  • the user equipment shall perform reception of the Physical Downlink Shared Channel (PDSCH) or transmission of the Physical Uplink Shared Channel (PUSCH) according to pre-determined timing specified in the LTE specifications.
  • PDSCH Physical Downlink Shared Channel
  • PUSCH Physical Uplink Shared Channel
  • LTE uses a Hybrid-Automatic Repeat Request (HARQ), where, after receiving downlink data in a subframe, the user equipment attempts to decode it and reports to the base station whether the decoding was successful, sending an Acknowledge (ACK), or not, sending a Non-Acknowledgement (NACK) via the Physical Uplink Control CHannel (PUCCH).
  • HARQ Hybrid-Automatic Repeat Request
  • ACK Acknowledge
  • NACK Non-Acknowledgement
  • PUCCH Physical Uplink Control CHannel
  • the base station can retransmit the erroneous data.
  • the base station can indicate to the UE whether the decoding of the PUSCH was successful, sending an ACK, or not, sending a NACK, via the Physical Hybrid ARQ Indicator CHannel (PHICH).
  • PHICH Physical Hybrid ARQ Indicator CHannel
  • Uplink control signaling from the user equipment to the base station may comprise (1) HARQ acknowledgements for received downlink data; (2) user equipment reports related to the downlink channel conditions, used as assistance for the downlink scheduling; and/or (3) scheduling requests, indicating that a mobile user equipment needs uplink resources for uplink data transmissions.
  • the L1/L2 control information such as channel-status reports, HARQ acknowledgments, and scheduling requests, is transmitted in uplink resources e.g. in resource blocks, specifically assigned for uplink L1/L2 control on Release 8 (Rel-8) PUCCH. As illustrated in Figure 4, these uplink resources are located at the edges of the total available transmission bandwidth. Each such uplink resource comprises 12
  • subcarriers within each of the two slots of an uplink subframe.
  • these frequency resources are frequency hopping, indicated by the arrow, on the slot boundary, i.e. one “resource” comprises 12 subcarriers at the upper part of the spectrum within the first slot of a subframe and an equally sized resource at the lower part of the spectrum during the second slot of the subframe or vice versa.
  • resources are needed for the uplink L1/L2 control signaling, e.g. in case of very large overall transmission bandwidth supporting a large number of users, additional resources blocks can be assigned next to the previously assigned resource blocks.
  • LTE Release 10 (Rel-10) standard has recently been standardized, supporting bandwidths larger than 20 MHz.
  • LTE Rel-10 One requirement on LTE Rel-10 is to assure backward compatibility with LTE Rel-8. This may also include spectrum compatibility. That would imply that an LTE Rel-10 carrier, wider than 20 MHz, should appear as a number of LTE carriers to an LTE Rel-8 user equipment. Each such carrier can be referred to as a Component Carrier (CC).
  • CC Component Carrier
  • CA Carrier Aggregation
  • the number of aggregated CCs as well as the bandwidth of the individual CCs may be different for uplink and downlink.
  • a symmetric configuration refers to the case where the number of CCs in downlink and uplink is the same whereas an asymmetric
  • the number of CCs is different. It should be noted that the number of CCs configured in a cell may be different from the number of CCs seen by a user equipment. A user equipment may for example support more downlink CCs than uplink CCs, even though the network is configured with the same number of uplink and downlink CCs.
  • a LTE Rel-10 user equipment behaves similarly to a LTE Rel-8 user equipment.
  • a user equipment may - depending on its own capabilities and the network - be configured with additional CCs for uplink and downlink. Configuration is based on the Radio Resource Control (RRC). Due to the heavy signaling and rather slow speed of RRC signaling it is envisioned that a user equipment may be configured with multiple CCs even though not all of them are currently used. If a user equipment is configured on multiple CCs this would imply it has to monitor all downlink CCs for PDCCH and PDSCH. This implies a wider receiver bandwidth, higher sampling rates, etc., resulting in high power consumption.
  • RRC Radio Resource Control
  • LTE Rel-10 supports activation of CCs on top of configuration.
  • the user equipment monitors only configured and activated CCs for PDCCH and PDSCH. Since activation is based on Medium Access Control (MAC) control elements, which are faster than RRC signaling, activation/de-activation can follow the number of CCs that are required to fulfill the current data rate needs.
  • MAC Medium Access Control
  • DL PCC Downlink Primary CC
  • Scheduling of a CC may be done on the PDCCH via downlink assignments.
  • Control information on the PDCCH may be formatted as a Downlink Control Information (DCI) message.
  • DCI Downlink Control Information
  • a user equipment may only operate with one downlink and one uplink CC. The association between downlink assignment, uplink grants and the corresponding downlink and uplink CCs is therefore clear.
  • two modes of CA should be distinguished.
  • a first mode is very similar to the operation of multiple Rel-8 CC, a downlink assignment or uplink grant contained in a DCI message transmitted on a CC is either valid for the downlink CC itself or for associated (either via cell-specific or user equipment specific linking) uplink CC.
  • a second mode of operation augments a DCI message with the Carrier Indicator Field (CIF).
  • CIF Carrier Indicator Field
  • DCI messages for downlink assignments comprise among others resource block assignment, modulation and coding scheme related parameters, HARQ redundancy version, etc. In addition to those parameters that relate to the actual downlink
  • most DCI formats for downlink assignments also comprise a bit field for Transmit Power Control (TPC) commands. These TPC commands are used to control the uplink power control behavior of the corresponding PUCCH that is used to transmit the HARQ feedback.
  • TPC Transmit Power Control
  • the transmission of PUCCH is mapped onto one specific uplink CC, the Uplink (UL) Primary CC (UL PCC).
  • User equipments configured with a single downlink CC (which is then the DL PCC) and uplink CC (which is then the UL PCC) are operating dynamic ACK/NACK on PUCCH according to Rel-8.
  • the first Control Channel Element (CCE) used to transmit PDCCH for the downlink assignment determines the dynamic ACK/NACK resource on Rel-8 PUCCH. Since only one downlink CC is cell-specifically linked with the UL PCC, no PUCCH collisions can occur since all PDCCH are transmitted using different first CCE.
  • CA PUCCH Upon reception of downlink assignments on a single Secondary CC (SCC) or reception of multiple DL assignments, CA PUCCH should be used.
  • a downlink SCC assignment alone is untypical.
  • the scheduler in the base station should strive to schedule a single downlink CC assignment on the DL PCC and try to de-activate SCCs if not needed.
  • a possible scenario that may occur is that the base station schedules user equipment on multiple downlink CCs including the PCC. If the user equipment misses all but the DL PCC assignment it will use Rel-8 PUCCH instead of CA PUCCH. To detect this error case the base station has to monitor both the Rel-8 PUCCH and the CA
  • the CA PUCCH format is based on the number of configured CCs.
  • Configuration of CCs is based on RRC signaling. After successful reception/application of the new configuration a confirmation message is sent back making RRC signaling very safe.
  • Time Division Duplex
  • Transmission and reception from a node e.g. user equipment in a cellular system such as LTE, can be multiplexed in the frequency domain or in the time domain (or combinations thereof).
  • Frequency Division Duplex (FDD) as illustrated to the left in
  • Time Division Duplex (TDD), as illustrated to the right in Figure 6, implies that downlink and uplink transmissions take place in different, non- overlapping time slots.
  • TDD Time Division Duplex
  • FDD requires paired spectrum.
  • the structure of the transmitted signal in a communication system is organized in the form of a frame structure.
  • LTE uses ten equally-sized subframes of length 1 ms per radio frame as illustrated in Figure 7.
  • FDD frequency division duplex
  • f UL uplink transmission
  • FDD can be either full duplex or half duplex.
  • a user equipment can transmit and receive simultaneously, while in half-duplex operation, the user equipment cannot transmit and receive simultaneously (the base station is capable of simultaneous
  • reception/transmission though e.g. receiving from one user equipment while
  • a half-duplex user equipment is monitoring/receiving in the downlink except when explicitly being instructed to transmit in a certain subframe.
  • TDD operation there may be only a single carrier frequency and uplink and downlink transmissions are typically separated in time on a cell basis.
  • the same carrier frequency is used for uplink and downlink transmission, both the base station and the mobile user equipments need to switch from transmission to reception and vice versa.
  • An aspect of any TDD system is to provide the possibility for a sufficiently large guard time where neither downlink nor uplink transmissions occur. This is required to avoid interference between uplink and downlink transmissions.
  • this guard time is provided by special subframes (subframe 1 and, in some cases, subframe 6), which are split into three parts: a downlink part, a Downlink Pilot Time Slot (DwPTS), a guard period (GP), and an uplink part, an Uplink Pilot Time Slot (UpPTS).
  • DwPTS Downlink Pilot Time Slot
  • GP guard period
  • UpPTS Uplink Pilot Time Slot
  • Some of the example embodiments presented herein is to provide an efficient means of assigning uplink-downlink configurations a cross all aggregated CCs. Accordingly, some of the example embodiments may be directed towards a method, in a base station, for configuring control timing to and from a user equipment in a multiple cell communications network. The method comprises determining at least one timing configuration number for a plurality of aggregated cells of the multiple cell
  • Each aggregated cell is associated with an uplink-downlink configuration number, where at least two uplink-downlink configuration numbers of the plurality of aggregated cells are not equal.
  • the plurality of aggregated cells is associated with the user equipment.
  • the method also comprises assigning the at least one timing configuration number to the user equipment.
  • Some of the example embodiments may be directed towards a base station for configuring control timing to and from a user equipment in a multiple cell communications network.
  • the base station comprises a determination unit configured to determine at least one timing configuration number for a plurality of aggregated cells of the multiple cell communications network. Each aggregated cell is associated with an uplink-downlink configuration number. At least two uplink-downlink configuration numbers of the plurality of aggregated cells are not equal.
  • the plurality of aggregated cells is associated with the user equipment.
  • the base station also comprises an assignment unit configured to assign the at least one timing configuration number to the user equipment.
  • Some of the example embodiments may be directed towards a method, in a user equipment, for a configuration of control timing for a user equipment in a multiple cell communications network.
  • the method comprises receiving, from a base station, at least one timing configuration number for a plurality of aggregated cells of the multiple cell communications network. Each aggregated cell is associated with an uplink-downlink configuration number, and where at least two uplink-downlink configuration numbers of the plurality of aggregated cells are not equal.
  • the plurality of aggregated cells is associated with the user equipment.
  • the method also comprises implementing control timing based on the at least one timing configuration number.
  • Some of the example embodiments may be directed towards a user equipment, for a configuration of control timing for a user equipment in a multiple cell communications network.
  • the user equipment comprises a determining unit configured to receive, from a base station, at least one timing configuration number for a plurality of aggregated cells of the multiple cell communications network, where each aggregated cell is associated with an uplink-downlink configuration number, and where at least two uplink-downlink configuration numbers of the plurality of aggregated cells are not equal.
  • the plurality of aggregated cells is associated with the user equipment.
  • the user equipment also comprises an implementation unit configured to implement control timing based on the at least one timing configuration number.
  • FIG. 1 is an illustrative example of a LTE downlink physical resource
  • FIG. 2 is a schematic of a LTE time-domain structure
  • FIG. 3 is an illustration of a downlink subframe
  • FIG. 4 is an illustrative example of an uplink L1/L2 control signalling transmission on Rel-8 PUCCH
  • FIG. 5 is an illustrative example of carrier aggregation
  • FIG. 6 is an illustrative example of frequency and time-division duplex
  • FIG. 7 is a schematic of an uplink-downlink time/frequency structure for LTE for the case of FDD and TDD;
  • FIG. 8 is a schematic of different downlink/uplink configurations for the case of TDD
  • FIG. 9 is an illustrative example of uplink-downlink interference in TDD.
  • FIG. 10 is an illustration of PDSCH A N feedback timings for a configuration 1 cell and a configuration 2 cell;
  • FIG. 11 is an illustration of PUSCH grant and A/N feedback timings for a
  • FIG. 12 is an illustration of PDSCH A N feedback timings for a configuration 1 cell and a configuration 3 cell;
  • FIG. 13 is an illustration of PUSCH grant and A/N feedback timings for a configuration 1 cell and a configuration 3 cell;
  • FIG. 14 is an illustrative example of carrier aggregation of TDD cells with different uplink-downlink configurations
  • FIG. 5 is an illustrative example of subframe compatibility hierarchy, according to some of the example embodiments.
  • FIG. 16 is an illustration of PUSCH grant and A/N feedback timings for aggregation of a configuration 1 ceil as Pcell and a configuration 2 cell as Scell, according to some of the example embodiments;
  • FIG. 17 is an illustration of PUSCH grant and A/N feedback timings for aggregation of a configuration 2 cell as Pcell and a configuration 1 cell as Scell, according to some of the example embodiments;
  • FIG. 18 is an illustration of PDSCH A/N feedback timings for aggregation of a configuration 1 cell and a configuration 2 cell, according to some of the example embodiments;
  • FIG. 19 is an illustration of PUSCH grant and A N feedback timings for aggregation of a configuration 1 cell as Pcell and a configuration 3 cell as Scell, according to some of the example embodiments;
  • FIG. 20 is an illustration of PUSCH grant and A N feedback timings for aggregation of a configuration 3 cell as Pcell and a configuration 1 cell as Scell, according to some of the example embodiments;
  • FIG. 21 is an illustration of PDSCH A/N feedback timings for aggregation of a configuration 1 cell and a configuration 3 cell, according to some of the example embodiments;
  • FIG. 22 is an illustrative example of the timing of additional forward-subframe DL scheduling PDCCHs in support of half-duplex UEs with aggregation of a configuration 1 cell and a configuration 2 cell, according to some of the example embodiments;
  • FIG. 23 is an illustrative example of the timing of additional forward-subframe DL scheduling PDCCHs in support of half-duplex UEs with aggregation of a configuration 1 cell and a configuration 3 cell, according to some of the example embodiments;
  • FIG. 24 is an illustrative example of the timing of additional cross-carrier forward- subframe DL scheduling PDCCHs in support of full-duplex UEs with aggregation of a configuration 1 cell as Pcell and a configuration 2 cell as Scell, according to some of the example embodiments;
  • FIG. 25 is an illustrative example of the timing of additional cross-carrier forward- subframe DL scheduling PDCCHs in support of full-duplex UEs with aggregation of a configuration 1 cell and a configuration 3 cell, according to some of the example embodiments;
  • FIG. 26 is a schematic of a base station configured to perform the example embodiments described herein;
  • FIG. 27 is a schematic of a user equipment configured to perform the example embodiments described herein
  • FIG. 28 is a flow diagram depicting example operations of the base station of FIG. 26.
  • FIG. 29 is a flow diagram depicting example operations of the user equipment of FIG. 27.
  • TDD allows for different asymmetries in terms of the amount of resources allocated for uplink and downlink transmission, respectively, by means of different downlink/uplink configurations.
  • LTE Long Term Evolution
  • a downlink subframe may mean either downlink or the special subframe.
  • neighbor cells should have the same downlink/uplink configuration. If this is not done, uplink transmission in one cell may interfere with downlink transmission in the neighboring cell and vice versa as illustrated in Figure 9. Hence, the downlink/uplink asymmetry may typically not vary between cells, but is signaled as part of the system information and remains fixed for a long period of time.
  • the description provided herein is arranged as follows. First, an overview of current systems and methods for control timing configuration is presented under the heading 'Existing Systems - TDD HARQ Control Timing'. Thereafter, limitations of the existing systems are explored under the subheading 'Problems with Existing Solutions'.
  • a basis for the example embodiments is thereafter presented in the section entitled 'Subframe Timing Compatibility', where complex configuration tables (explained in 'Existing Systems - TDD HARQ Control Timing') may be replaced with the use of a subframe timing compatibility hierarchy.
  • control timing configuration assignment utilizing the subframe timing compatibility hierarchy, are provided in the sub-section entitled 'Configuration Assignment'.
  • Examples of control timing configuration assignment based on an ordered listing of the subframe timing compatibility hierarchy is provided in the sub-section 'Computation of the Subframe Timing Compatibility based on Efficient Storage.”
  • control timing configuration assignment of user equipments utilizing a half-duplex mode of operation are provided in the sub-section 'Examples of Half-Duplex Configuration Assignment". Similarly, examples of control timing
  • Example Node Operations provide a generalized explanation of node operations which may encompass all of the examples provided in the foregoing sub-headings which are not related to existing systems.
  • the timings for HARQ ACK/NACK (A/N) feedbacks for the PUSCH and the PDSCH as well as the grant of PUSCH may be specified with extensive tables and procedure descriptions for each uplink-downlink configuration.
  • the user equipment shall upon detection of a PDCCH with an uplink DCI format and/or a PHICH transmission in subframe n intended for the user equipment, adjust the corresponding PUSCH transmission in subframe n+k, with k given in Table 1, shown below, according to the PDCCH and PHICH information.
  • the user equipment shall upon detection of a PDCCH with uplink DCI format and/or a PHICH transmission in subframe n intended for the user equipment, adjust the corresponding PUSCH
  • MSB Most Significant Bit
  • both the MSB and LSB of the UL index in the PDCCH with uplink DCI format are sent in subframe n
  • the user equipment shall adjust the corresponding PUSCH transmission in both subframes n+ k and n+7, with k given in Table 1.
  • a user equipment For PUSCH transmissions scheduled from a serving cell c in subframe n, a user equipment shall determine the corresponding PHICH resource of serving cell c in subframe n+ k PHICH , where k mcH is given in Table 2, provided below, for TDD. For subframe bundling operation, the corresponding PHICH resource is associated with the last subframe in the bundle.
  • the user equipment shall also feedback PDSCH decoding A/N information in predefined UL subframes.
  • the user equipment shall transmit such a HARQ A N response on the PUCCH in UL subframe , if there is PDSCH transmission indicated by the detection of corresponding PDCCH or there is PDCCH indicating downlink SPS release within subframe(s) n - k , where k is within the association set K- ⁇ k 0 ,k L k M _ ⁇ listed in Table 3, provided below.
  • U represents uplink subframes
  • D represents downlink subframes
  • S represents special subframes which may be used for both uplink and downlink. It should be appreciated that for the purpose of simplicity, the S subframes will be treated as downlink subframes in the examples provided herein.
  • Secondary-cell (Scell) PDSCH may be fed-back based on the timing rules of Pcell.
  • the configuration 1 cell is the Pcell, there will be no A/N feedback timing rules for subframes 3 and 8 in the configuration 2 Scell.
  • control timing problems may be even more severe than the examples discussed above.
  • the HARQ control timings don't work regardless of which configuration is the Pcell.
  • the U/D configurations of neighboring cells need to be compatible to avoid severe interference problems.
  • the neighboring cells are operated by different operators or different wireless systems.
  • the LTE TDD cells adjacent to those neighboring systems are hence required to adopt certain compatible U/D configurations.
  • an operator may have several TDD cells having different U/D configurations on different frequencies as illustrated in Figure 14.
  • TDD user equipment may be required to transmit and receive simultaneously in certain subframes (such as subframe 7 and 8 in Figure 14).
  • Such FDD-like operations are incompatible with existing designs of TDD user equipments.
  • To enable such full-duplex operations in Rel-11 may impose additional user equipment complexity and costs. It is therefore necessary to also consider possible half-duplex operations during such conflicting subframes. That is, the user equipment should be instructed to perform either reception or transmission but not both during such conflicting subframes.
  • a subframe timing compatibility is designed and illustrated in Figure 15.
  • the subframe timing compatibility is a hierarchy that may be encoded as look-up tables, a linked list or a plurality of digital representations suitable for storage in communication devices.
  • the subframe timing compatibility hierarchy may be designed with the following principles:
  • the UL subframes in a TDD configuration are also UL subframes in those TDD configurations that can be corrected with upward arrows.
  • subframes 2 and 3 are UL subframes in configuration 4. These two subframes are also UL in configurations 3, 1, 6 and 0, all of which can be connected from configuration 4 with upward arrows.
  • subframes 2 and 7 are UL subframes in configuration 2. These two subframes are not both UL in configuration 3 because there is no upward arrow connecting the two configurations.
  • the DL subframes in a TDD configuration are also DL subframes in those TDD configurations that can be corrected with downward arrows.
  • subframe 0, 1, 5, 6 and 9 are DL subframes in configuration 6. These five subframes are also DL in configurations 1, 2, 3, 4 and 5, all of which can be connected from configuration 6 with downward arrows.
  • subframe 7 is a DL subframe in configuration 3 but not a DL subframe in configuration 2 because there is no downward arrow connecting the two configurations.
  • TDD configuration Given a set of TDD configurations to be aggregated, a TDD configuration that can be connected from all of the given TDD configurations with upward arrows has the following two properties:
  • the TDD configuration comprises UL subframes that are a superset of all UL subframes from all given TDD configurations.
  • the TDD configuration comprises DL subframes that are available in all given TDD configurations.
  • TDD configuration 1 and 2 all subframes that are UL in either configuration 1 or 2 are also UL subframes in configuration 1 , 6 and 0.
  • the DL subframes in configuration 1 , 6 or 0 are also DL subframes in configuration 1 and 2.
  • TDD configuration 1 and 3 all subframes that are UL in either configuration 1 or 3 are also UL in configuration 6 and 0.
  • the DL subframes in configuration 6 or 0 are also DL subframes in configuration 1 , 2, 3, 4, 5 and 6.
  • TDD configuration 2 3 and 4
  • all subframes that are UL in any of the three configurations are also UL in configuration 6 and 0.
  • the DL subframes in configuration 6 or 0 are also DL subframes in configuration 1 , 2, 3, 4, 5 and 6.
  • TDD configuration that can be connected from all of the given TDD configurations with downward arrows has the following two properties:
  • the TDD configuration comprises DL subframes that are a superset of all DL subframes from all given TDD configurations.
  • the TDD configuration comprises UL subframes that are available in all given TDD configurations.
  • TDD configuration 1 and 2 all subframes that are DL in either configuration 1 or 2 are also DL in configuration 2 and 5.
  • the UL subframes in configuration 2 or 5 are also UL subframes in configuration 1 , 2, 6 and 0.
  • TDD configuration 1 and 3 Given TDD configuration 1 and 3, all subframes that are DL in either configuration 1 or 3 are also DL in configuration 4 and 5.
  • the UL subframes in configuration 4 or 5 are also UL subframes in configuration 0, 3, 4 and 6.
  • TDD configuration 2, 3 and 4 all subframes that are DL in any of the three configurations are also DL in configuration 5.
  • the UL subframes in configuration 5 are also UL subframes in configuration 0, 1 , 2, 3, 4 and 6.
  • Rel-8 TDD the following two sets of subframe timings are set based on the same parameter, which is the serving cell U/D configuration number: (1) UL HARQ control and grant subframe timing, and (2) DL HARQ A/N subframe timing.
  • Rel-10 TDD CA both types of subframe timings across all cells are set based on the same parameter, which is the Pcell U/D configuration number.
  • the user equipment may be configured with the following two numbers according to the teaching of the example embodiments: (1) an UL control timing configuration number for setting UL HARQ and grant timings across all aggregated cells, and (2) a DL HARQ control timing configuration number for setting DL HARQ timings across all aggregated cells.
  • the UL control timing configuration number may be set to the configuration number of a configuration that can be connected from all aggregated configurations with upward arrows in the subframe timing compatibility hierarchy in Figure 15. If more than one configuration number can be chosen, the chosen setting may be the configuration at the lowest level in the subframe timing compatibility hierarchy. The chosen setting may result in more DL subframes for PUSCH grant and A N feedback.
  • Example Case 1 is provided below for the purpose of explaining some of the example embodiments.
  • configuration number can be set to 1 , 6 or 0.
  • the chosen setting may be 1.
  • configuration number can be set to 6 or 0.
  • the chosen setting may be 6, which is different than the U/D configuration numbers of the two TDD cells.
  • This UL control timing configuration number setting ensures identical PUSCH grant and PHICH timings across all CCs and DL subframes are available at these timings regardless of the Pcell configuration. That is, the PUSCH grant and PHICH subframes are never in subframes with conflicting U/D directions across different CCs. This setting further ensures all UL subframes from all aggregated CCs can be scheduled either in-CC or cross-CC.
  • the DL HARQ control timing configuration number may be set to the configuration number of a configuration that can be connected from all aggregated configurations with downward arrows in the subframe timing compatibility hierarchy in Figure 15. If more than one configuration number can be chosen, the chosen setting may be that of the configuration at the highest level in the subframe timing compatibility hierarchy. The chosen setting may result in more UL subframes for PDSCH A N feedback.
  • the following example cases are provided below for the purpose of explaining some of the example embodiments.
  • the DL HARQ control timing configuration number can be set to 2 or 5.
  • the chosen setting may be 2.
  • the DL HARQ control timing configuration number can be set to 4 or 5.
  • the chosen setting may be 4, which is different than the U/D configuration numbers of the two TDD cells.
  • This DL HARQ control timing configuration number setting ensures identical PDSCH A/N feedback timings across all CCs and UL subframes are available at these timings regardless of the Pcell configuration.
  • the two HARQ control timing configuration numbers may be set as follows:
  • the UL control timing configuration number may be set to 1.
  • the DL HARQ control timing configuration number may be set to 2.
  • the PUSCH grant and A/N feedback timings for aggregation of a configuration 1 cell as Pcell and a configuration 2 cell as Scell are illustrated in Figure 16.
  • the PUSCH grant and A N feedback timings for aggregation of a configuration 2 cell as Pcell and a configuration 1 cell as Scell are illustrated in Figure 17. This analysis shows that all the UL subframes can be scheduled either from the Pcell (if cross-carrier scheduling is configured) or from the Scell itself (if cross-carrier scheduling is not configured).
  • the PDSCH A N feedback timings for aggregation of a configuration 1 cell and a configuration 2 cell is shown in Figure 18.
  • the analysis confirms that A N feedbacks for all PDSCH in both the Pcell and the Scell are clearly assigned to suitable UL subframes on the Pcell.
  • the two HARQ control timing configuration numbers may be set as follows:
  • the UL control timing configuration number may be set to 6.
  • the DL HARQ control timing configuration number may be set to 4.
  • the PUSCH grant and A/N feedback timings (i.e., for uplink A N feedback timing) for aggregation of a configuration 1 cell as Pcell and a configuration 3 cell as Scell are illustrated in Figure 19.
  • the PUSCH grant and A/N feedback timings for aggregation of a configuration 3 cell as Pcell and a configuration 1 cell as Scell are illustrated in Figure 20.
  • This analysis shows that all the UL subframes can be scheduled either from the Pcell (if cross-carrier scheduling is configured) or from the Scell itself (if cross-carrier scheduling is not configured). Furthermore, A N feedback timings for all UL subframes are clearly assigned.
  • the PDSCH A N feedback timings for aggregation of a configuration 1 cell and a configuration 3 cell is shown in Figure 21.
  • the analysis confirms that A/N feedbacks for all PDSCH in both the Pcell and the Scell are clearly assigned to suitable UL subframes on the Pcell.
  • the UL control and DL HARQ control timing configuration numbers may be set based on a systematic rule encoded in the subframe timing compatibility hierarchy, for example as illustrated in Figure 15.
  • the UL control and DL HARQ control timing configuration numbers so chosen may be different than any of the U/D configuration number of the aggregated cells.
  • the UL control timing configuration number may be set to the configuration number of a configuration that can be connected from all aggregated configurations with upward arrows in the subframe timing compatibility hierarchy in Figure 15. If more than one configuration number can be chosen, a setting may be chosen to be the configuration at the lowest level in the subframe compatibility hierarchy. This setting results in more DL subframes for PUSCH grant and A/N feedback.
  • the DL HARQ control timing configuration number may be set to the configuration number of a configuration that can be connected from all aggregated configurations with downward arrows in the subframe timing compatibility hierarchy in Figure 15. If more than one configuration number can be chosen, the setting may be chosen to be the
  • Some of the example embodiments may also be directed towards efficient digital representation and storage methods of the subframe timing compatibility hierarchy. Some of the example embodiments may also be directed towards efficient computational methods and a corresponding apparatus for computing the UL control timing configuration number and the DL HARQ control timing configuration number.
  • the subframe timing compatibility hierarchy may be represented with a table of sets.
  • the UL control timing configuration number and the DL HARQ control timing configuration number may be computed with set intersection operations. If there is more than one control timing configuration number candidates after the set intersection operations, the network node can select a preferred control timing configuration number setting based on at least system loads and user equipment application needs.
  • An UL control timing configuration candidate set and a DL HARQ control timing configuration candidate set may be stored for each of the LTE cell U/D configurations.
  • An example of the specific values of the candidate sets are shown in the table provided below.
  • the UL control timing configuration number may be set to a configuration number from the intersection of all UL control timing configuration candidate sets corresponding to the cell U/D configurations to be aggregated.
  • the corresponding UL control timing configuration candidate sets may be ⁇ 1,6,0 ⁇ and ⁇ 2,1 ,6,0 ⁇ . The intersection of all these sets can be computed to be ⁇ 1 ,6,0 ⁇ . Therefore, the UL control timing configuration number can be set to 1 , 6 or 0.
  • Example Case 2
  • the corresponding UL control timing configuration candidate sets may be ⁇ 1,6,0 ⁇ and ⁇ 3,6,0 ⁇ . The intersection of all these set can be computed to be ⁇ 6,0 ⁇ . Therefore, the UL control timing configuration number can be set to 6 or 0.
  • the corresponding UL control timing configuration candidate sets may be ⁇ 1 ,6,0 ⁇ , ⁇ 3,6,0 ⁇ and ⁇ 4,1 ,3,6,0 ⁇ . The intersection of all these set can be computed to be ⁇ 6,0 ⁇ . Therefore, the UL control timing configuration number can be set to 6 or 0.
  • the DL HARQ control timing configuration number may be set to a configuration number from the intersection of. all DL HARQ control timing configuration candidate sets corresponding to the cell U/D configurations to be
  • the corresponding DL HARQ control timing configuration candidate sets may be ⁇ 1 ,2,4,5 ⁇ and ⁇ 2,5 ⁇ . The intersection of all these sets can be computed to be ⁇ 2,5 ⁇ . Therefore, the DL HARQ control timing configuration number can be set to 2 or 5.
  • the corresponding DL HARQ control timing configuration candidate sets may be ⁇ 1 ,2,4,5 ⁇ and ⁇ 3,4,5 ⁇ . The intersection of all these sets may be computed to be ⁇ 4,5 ⁇ . Therefore, the DL HARQ control timing configuration number can be set to 4 or 5.
  • the corresponding DL HARQ control timing configuration candidate sets may be ⁇ 1 ,2,4,5 ⁇ , ⁇ 3,4,5 ⁇ and ⁇ 4,5 ⁇ . The intersection of all of these sets may be computed to be ⁇ 4,5 ⁇ . Therefore, the DL HARQ control timing configuration number can be set to 4 or 5.
  • the network node or user equipment can select and signal a preferred control timing configuration number setting based on at least system loads and user equipment application needs. Signaling of the control timing could for example be done with radio resource control (RRC) signaling.
  • RRC radio resource control
  • the subframe timing compatibility hierarchy may be represented with a table of ordered sets.
  • the UL control timing configuration number and the DL HARQ control timing configuration number may be computed with set intersection operations while preserving the order of numbers within the set.
  • the chosen control timing configuration number may be the first or last number after the set intersection operation.
  • An UL control timing configuration candidate set and a DL HARQ control timing configuration candidate set may be stored for each of the LTE cell U/D configurations.
  • the specific values of the candidate or ordered sets are shown in table 4.
  • the order of candidate configuration numbers in each of the candidate sets shown in the table may be preserved in storage.
  • the UL control timing configuration number may be set to a configuration number from the intersection of all UL control timing configuration candidate sets corresponding to the cell U/D configurations to be aggregated, where the set intersection operations preserve the ordering of numbers in the concerned sets.
  • the corresponding UL control timing configuration candidate or ordered sets may be ⁇ 1 ,6,0 ⁇ and ⁇ 2,1 ,6,0 ⁇ . The intersection of all these set can be computed to be ⁇ 1 ,6,0 ⁇ . Therefore, the chosen UL control timing configuration number may be 1.
  • the corresponding UL control timing configuration candidate or ordered sets may be ⁇ 1 ,6,0 ⁇ and ⁇ 3,6,0 ⁇ . The intersection of all these set can be computed to be ⁇ 6,0 ⁇ . Therefore, the chosen UL control timing configuration number may be 6.
  • the corresponding UL control timing configuration candidate or ordered sets may be ⁇ 1 ,6,0 ⁇ , ⁇ 3,6,0 ⁇ and
  • the chosen UL control timing configuration number may be 6.
  • the DL HARQ control timing configuration number may be set to a configuration number from the intersection of all DL HARQ control timing configuration candidate sets corresponding to the cell U/D configurations to be aggregated, where the set intersection operations preserve the ordering of numbers in the concerned sets.
  • the corresponding DL HARQ control timing configuration candidate or ordered sets may be ⁇ 1 ,2,4,5 ⁇ and ⁇ 2,5 ⁇ . The intersection of all these set can be computed to be ⁇ 2,5 ⁇ . Therefore, the chosen DL HARQ control timing configuration number may be 2.
  • the corresponding DL HARQ control timing configuration candidate or ordered sets may be ⁇ 1 ,2,4,5 ⁇ and ⁇ 3,4,5 ⁇ . The intersection of all these set can be computed to be ⁇ 4,5 ⁇ . Therefore, the chosen DL HARQ control timing configuration number may be 4.
  • the corresponding DL HARQ control timing configuration candidate sets may be ⁇ 1 ,2,4,5 ⁇ , ⁇ 3,4,5 ⁇ and ⁇ 4,5 ⁇ . The intersection of all these set can be computed to be ⁇ 4,5 ⁇ . Therefore, the chosen DL HARQ control timing configuration number may be 4.
  • a user equipment capable of only half-duplex operations can perform either transmission or reception in a subframe but not both actions. Therefore, according to some of the example embodiments, subframes without conflicting U/D directions can be scheduled with PDCCH transmitted in the same subframe time (in-subframe scheduling).
  • Forward- subframe UL scheduling is already used in LTE. However, additional forward-subframe DL scheduling PDCCHs may be needed. According to the example embodiments, the following features are designed for the forward-subframe DL scheduling PDCCHs:
  • additional forward-subframe DL scheduling PDCCHs for the individual cells may be added (referred to as in-CC forward- subframe DL scheduling PDCCHs).
  • cross-CC scheduling is configured, additional cross-CC forward-subframe DL scheduling PDCCHs from the Pcell may be added.
  • the forward-scheduling timing may be based on the UL grant timing of the same target cell.Other forward-scheduling timing methods may also be used.
  • the forward-subframe DL scheduling PDCCHs can be implemented according to the teaching of flexible carrier indicator.
  • the two HARQ control timing configuration numbers may be set as follows:
  • the UL control timing configuration number may be set to 1.
  • the DL HARQ control timing configuration number may be set to 2.
  • Additional forward-subframe DL scheduling PDCCHs based on UL grant timings may be introduced as follows:
  • the two HARQ control timing configuration numbers may be set as follows:
  • the UL control timing configuration number may be set to 6.
  • the DL HARQ control timing configuration number may be set to 4.
  • Additional forward-subframe DL scheduling PDCCHs based on UL grant timings may be introduced as follows:
  • cross-CC scheduling is configured, three cross-CC forward-subframe DL scheduling PDCCHs from the Pcell may be added as shown in Figure 23.
  • a full-duplex user equipment can perform transmission and reception
  • all DL subframes can be scheduled in-CC and in-subframe.
  • the DL subframes in the scheduling cell can carry the cross-carrier DL scheduling
  • PDCCHs to schedule other DL subframes of the same subframe time on other cells.
  • a scheduling cell if the scheduling cell is a DL subframe, PDCCH(s) can be sent from said subframe to schedule other DL subframes of the same subframe time on other cells. Additionally, in a subframe with conflicting directions, if the scheduling cell is an UL subframe, PDCCH(s) cannot be sent from said subframe to schedule other DL subframes of the same subframe time on other cells.
  • cross-CC forward-subframe DL scheduling PDCCHs from the scheduling cell may be enabled.
  • the cross-CC forward-subframe DL scheduling PDCCHs designed in the example embodiments directed towards the half-duplex operations are applied to support full-duplex operations with certain cross-carrier scheduling scenarios.
  • the two HARQ control timing configuration numbers may be set as follows:
  • the UL control timing configuration number may be set to 1.
  • the DL HARQ control timing configuration number may be set to 2.
  • all DL subframes can be scheduled in-subframe and in-CC or cross-CC.
  • configuration 1 is the Pcell
  • all DL subframes can be scheduled in-CC and in-subframe.
  • all DL subframes in the Scell can be CC-scheduled in subframe except subframes 3 and 8. Note these two subframes are the subframes with conflicting U/D directions. Hence, the half-duplex solution can be reused here.
  • the two subframes are scheduled with forward- subframe scheduling PDCCH based on the UL grant timings of these two subframes.
  • the two additional cross-CC forward-subframe DL scheduling PDCCHs are shown in Figure 24.
  • the two HARQ control timing configuration numbers may be set as follows:
  • the UL control timing configuration number may be set to 6.
  • the DL HARQ control timing configuration number may be set to 4.
  • all DL subframes can be scheduled in-CC and in-subframe. If cross-scheduling is configured, all DL subframes in the Scell can be CC-scheduled in-subframe except subframes 7 and 8 in configuration 3 cannot be cross- scheduled in-subframe if configuration 1 is the Pcell. Additionally, subframe 4 cannot be cross-scheduled in-subframe if configuration 3 is the Pcell.
  • half-duplex solution from the example embodiments directed towards half- duplex scheduling two (if configuration 1 is the Pcell) or one (if configuration 3 is the Pcell) additional cross-CC forward-subframe DL scheduling PDCCHs based on the corresponding UL grant timings are used as shown in Figure 25.
  • the forward-subframe DL scheduling PDCCHs introduced in the example embodiments directed to half and full duplex assignment are new features and may require implementation complexity to integrate into existing network node hardware and software architecture. There is hence a benefit in reducing the need to rely on such new forward-subframe DL scheduling PDCCHs.
  • the following two operation rules may be implemented on the user equipment for a subframe with conflicting directions across the aggregated CCs:
  • a user equipment may monitor PDCCH(s) in scheduling CC(s) with the DL direction (even if the user equipment has been given in advance grant(s) to transmit in CC(s) with the UL direction).
  • a user equipment may monitor PDCCH(s) in scheduling CC(s) with the DL direction if the user equipment has not been given in advance any grant to transmit in any CC with the UL direction.
  • Figure 26 illustrates an example of a base station 103 which may incorporate some of the example embodiments discussed above.
  • the base station 103 may comprise a receiving 302 and transmitting 304 units configured to receive and transmit, respectively, any form of communications or control signals within a network.
  • the receiving 302 and transmitting 304 units may be comprised as a single transceiving unit.
  • the receiving 302 and transmitting 304 units, or transceiving unit may be in the form of any input/output communications port known in the art.
  • the base station 103 may further comprise at least one memory unit 308 that may be in communication with the receiving 302 and transmitting 304 units.
  • the memory unit 308 may be configured to store received or transmitted data and/or executable program instructions.
  • the memory unit 308 may also be configured to store the timing
  • the memory unit 308 may be any suitable type of computer readable memory and may be of volatile and/or non-volatile type.
  • the base station 103 further comprises a determination unit 308 which is configured to determine at least one timing configuration number for a plurality of aggregated cells.
  • the base station further comprises an assignment unit 310 which is configured to assign the uplink-downlink configuration to a user equipment 101.
  • the determination unit 308 and/or the assignment unit310 may be any suitable type of computation unit, e.g. a microprocessor, digital signal processor (DSP), field
  • FPGA programmable gate array
  • ASIC application specific integrated circuit
  • Figure 27 illustrates an example of a user equipment 101 which may incorporate some of the example embodiments discussed above.
  • the user equipment 101 may comprise a receiving 401 and transmitting 404 units configured to receive and transmit, respectively, any form of communications or control signals within a network.
  • the receiving 401 and transmitting 404 units may be comprised as a single transceiving unit.
  • the receiving 401 and transmitting 404 units, or transceiving unit may be in the form of any input/output communications port known in the art.
  • the user equipment 101 may further comprise at least one memory unit 408 that may be in communication with the receiving 402 and transmitting 404 units.
  • the memory unit 408 may be configured to store received or transmitted data and/or executable program instructions.
  • the memory unit 408 may also be configured to store the timing compatibility hierarchy and/or HARQ control timing configuration candidate or ordered sets.
  • the memory unit 408 may be any suitable type of computer readable memory and may be of volatile and/or non-volatile type.
  • the user equipment 101 may further comprise an implementation unit 408 which may be configured to implement a control timing based on at least one timing
  • the user equipment 101 may also comprise a determining unit 402 that may be configured to receive or determine the at least one timing configuration number.
  • the implementation unit408 and/or the determining unit 402 may be any suitable type of computation unit, e.g. a microprocessor, digital signal processor (DSP), field programmable gate array (FPGA), or application specific integrated circuit (ASIC). It should be appreciated that the implementation unit and the determining unit need not be provided as two separate units but may be provided as a single or any number of units.
  • Figure 28 is a flow diagram depicting example operations which may be taken by the base station 103 of Figure 26.
  • the base station determines 10 at least one timing configuration number for a plurality of aggregated cells of the multiple carrier network. Each aggregated cell is associated with an uplink-downlink configuration number. At least two uplink-downlink configuration numbers of the plurality of aggregated cells are not equal. The plurality of aggregated cells is associated with the user equipment.
  • the determination unit 308 is configured to perform the determining 10.
  • the at least one timing configuration number may be indicative of, or used to determine, a downlink HARQ control timing configuration for establishing downlink HARQ A/N timings across the plurality of aggregated cells.
  • the at least one timing configuration number may be indicative of, or used to determine, an uplink control timing configuration number for establishing uplink scheduling grant and/or A N timings across the plurality of aggregated cells.
  • the determining 10 may further comprise determining 11 the at least one timing configuration number based on the uplink-downlink configuration numbers of the plurality of aggregated cells.
  • determination unit 308 is configured to perform the determining 10.
  • the at least one timing configuration number may be determined to be equal to one of said uplink-downlink configuration numbers of the plurality of aggregated cells, for example as illustrated in Example Case 2 under the sub-heading Configuration Assignment. In some of the example embodiments, the at least one timing configuration number may be determined to not be equal to any of the uplink-downlink configuration numbers of said plurality of aggregated cells, for example as illustrated in Example Case 1 under the sub-heading Configuration Assignment.
  • the at least one timing configuration number may be determined such that control data is transmitted to and from the use equipment and the network in a non-conflicting manner.
  • the determining 10 may further comprise determining 12 the uplink-downlink configuration based on a subframe timing compatibility ordering, for example as illustrated in Figure 15.
  • the determination unit 308 may perform the determining 12.
  • the determining 12 may further comprise arranging 14 the subframe timing compatibility ordering such that uplink- downlink configurations on a higher level of the ordering comprise uplink subframes that are a superset of all uplink subframes from uplink-downlink configurations on a lower level of the ordering.
  • the determination unit may be configured to perform the arranging 14.
  • the determining 12 may further comprise arranging 16 the subframe timing compatibility ordering such that uplink- downlink configurations on a lower level of the ordering comprise uplink subframes that are a superset of all downlink subframes from uplink-downlink configurations on a higher level of the ordering.
  • the determination unit may be configured to perform the arranging 16.
  • the base station 103 assignsl 8 the at least one timing configuration number to the user equipment.
  • the assigning unit 310 is configured to perform the assigning 18.
  • the assigning 8 may further comprise assigning 20, in the presence of conflicting subframes, a forward-subframe downlink scheduling with respect to a PDCCH, as explained in Figures 22-25.
  • the assigning unit 310 may be configured to perform the assigning 20.
  • the assigning 18 may further comprise assigning 22, in the presence of conflicting subframes, a cross component carrier forward subframe downlink scheduling with respect to a PDCCH, as explained in Figures 22, 24 and 25.
  • the assigning unit 310 may be configured to perform the assigning 22.
  • the method may further comprise regulating 24 a usage of forward-subframe downlink scheduling by monitoring, in a full- duplex mode of operation a PDCCH in a scheduling component carrier with a downlink subframe, if the user equipment has been given an advance grant to transmit carrier components in an uplink direction.
  • the assignment unit and/or determination unit may perform the regulating 24.
  • the method may also comprise regulating 26 a usage of a forward-subframe downlink scheduling by monitoring, in a half- duplex mode of operation, a PDCCH in a scheduling component carrier with a downlink subframe, if the user equipment has not been given an advance grant to transmit carrier components in an uplink direction.
  • the assignment unit and/or determination unit may perform the regulating 26.
  • the method may also comprise communication 28 to the user equipment the at least one timing configuration number via RRC signaling.
  • the determination unit and/or transmitting unit may perform the communication 28.
  • Figure 29 is a flow diagram depicting example operations which may be taken by the user equipment 101 of Figure 27.
  • the user equipment determines 30 at least one timing configuration number for a plurality of aggregated cells of the multiple carrier network, where each aggregated cell is associated with an uplink-downlink configuration number, where at least two uplink- downlink configuration numbers of the plurality of aggregated cells are not equal.
  • the plurality of aggregated cells is associated with the user equipment.
  • the determination 308 is configured to perform the determining 30.
  • the at least one timing configuration number may be indicative of, or used to determine HARQ control timing configuration for establishing downlink HARQ A/N timings across the plurality of aggregated cells.
  • the at least one timing configuration number may be indicative of, or used to determine, an uplink control timing configuration number for establishing uplink scheduling grant and/or A N timings across the plurality of aggregated cells.
  • the determining 30 may further comprise receiving 31 the at least one timing configuration from a base station. It should be appreciated that the at least one timing configuration number may be received via RRC signaling. The determining unit and/or receiving unit may be configured to perform the receiving 31.
  • Example Operation 32
  • the determining 30 may further comprise determining 32 the at least one timing configuration number such that control data is transmitted to and from the user equipment and the network in a non-conflicting manner.
  • the determining unit may be configured to perform the determining 32.
  • the user equipment 101 implements 33control timing based on the at least one timing configuration number.
  • the implementation unit 408 is configured to perform the implementing operation.
  • the at least one timing configuration number may be implemented to be equal to one of said uplink-downlink configuration numbers of the plurality of aggregated cells, for example as illustrated in Example Case 2 under the sub-heading Configuration Assignment. In some of the example embodiments, the at least one timing configuration number may be implemented to not be equal to any of the uplink-downlink configuration numbers of said plurality of aggregated cells, for example as illustrated in Example Case 1 under the sub-heading Configuration Assignment.
  • the implementing 33 may further comprise scheduling 34, in the presence of conflicting subframes, a forward-subframe downlink with respect to a PDCCH.
  • the implementation unit 408 may be configured to perform the scheduling 34.
  • the implementing 33 may further comprise scheduling 36, in the presence of conflicting subframes, a cross component carrier forward-subframe downlink with respect to a PDCCH.
  • the implementation unit 408 may be configured to perform the scheduling 36.
  • the implementing 33 may further comprise scheduling 37 control data, based on the at least one timing configuration, such that the control data is transmitted to and from the user equipment and the network in a non-conflicting manner.
  • a “device” as the term is used herein, is to be broadly interpreted to include a radiotelephone having ability for Internet intranet access, web browser, organizer, calendar, a camera (e.g., video and/or still image camera), a sound recorder (e.g., a microphone), and/or global positioning system (GPS) receiver; a personal
  • PCS communications system
  • radiotelephone with data processing a personal digital assistant (PDA) that can include a radiotelephone or wireless communication system; a laptop; a camera (e.g., video and/or still image camera) having communication ability; and any other computation or communication device capable of transceiving, such as a personal computer, a home entertainment system, a television, etc.
  • PDA personal digital assistant
  • user equipment is a non-limiting term which means any wireless device, terminal, or node capable of receiving in DL and transmitting in UL (e.g. PDA, laptop, mobile, sensor, fixed relay, mobile relay or even a radio base station, e.g. femto base station).
  • UL e.g. PDA, laptop, mobile, sensor, fixed relay, mobile relay or even a radio base station, e.g. femto base station.
  • a cell is associated with a radio node, where a radio node or radio network node or eNodeB used interchangeably in the example embodiment description, comprises in a general sense any node transmitting radio signals used for measurements, e.g., eNodeB, macro/micro/pico base station, home eNodeB, relay, beacon device, or repeater.
  • a radio node herein may comprise a radio node operating in one or more frequencies or frequency bands. It may be a radio node capable of CA. It may also be a single- or muti- RAT node.
  • a multi-RAT node may comprise a node with co-located RATs or supporting multi-standard radio ( SR) or a mixed radio node.
  • SR multi-standard radio
  • a computer-readable medium may include removable and nonremovable storage devices including, but not limited to, Read Only Memory (ROM), Random Access Memory (RAM), compact discs (CDs), digital versatile discs (DVD), etc.
  • program modules may include routines, programs, objects, components, data structures, etc. that perform particular tasks or implement particular abstract data types.
  • Computer-executable instructions, associated data structures, and program modules represent examples of program code for executing steps of the methods disclosed herein. The particular sequence of such executable instructions or associated data structures represents examples of corresponding acts for implementing the functions described in such steps or processes.

Abstract

Example embodiments presented herein are directed towards a base station and method therein, for configuring control timing to and from a user equipment in a multiple component cell communications network. Example embodiments presented herein are also directed towards a user equipment and method therein, for configuration of control timing for a user equipment in a multiple component cell communications network.

Description

BASE STATION, USER EQUIPMENT AND METHODS THEREIN FOR CONTROL TIMING CONFIGURATION ASSIGNMENT IN A MULTIPLE CELL COMMUNICATIONS NETWORK
TECHNICAL FIELD
Example embodiments are directed towards a base station and user equipment, and methods therein, for the assignment and implementation of a control timing configuration number for control timing in a multiple cell communications network.
BACKGROUND
Long Term Evolution Systems
Long Term Evolution (LTE) uses Orthogonal Frequency Division Multiplexing (OFDM) in the downlink direction and a Discrete Fourier Transform (DFT)-spread OFDM in the uplink direction. The basic LTE downlink physical resource can thus be seen as a time-frequency grid as illustrated in Figure 1 , where each resource element corresponds to one OFDM subcarrier during one OFDM symbol interval. In the time domain, LTE downlink transmissions may be organized into radio frames of 10 ms, with each radio frame consisting of ten equally-sized subframes of length Tsubframe = 1 ms, as illustrated in Figure 2.
Furthermore, the resource allocation in LTE is typically described in terms of resource blocks, where a resource block corresponds to one slot (0.5 ms) in the time domain and 12 subcarriers in the frequency domain. Resource blocks are numbered in the frequency domain, starting with 0 from one end of the system bandwidth.
Downlink transmissions are dynamically scheduled, i.e., in each subframe the base station transmits control information about to which user equipments data is transmitted and upon which resource blocks the data is transmitted, in the current downlink subframe. This control signaling is typically transmitted in the first 1 , 2, 3 or 4 OFDM symbols in each subframe. A downlink system with 3 OFDM symbols for control purposes is illustrated in Figure 3. The dynamic scheduling information is communicated to the user equipments via a Physical Downlink Control Channel (PDCCH) transmitted in the control region. After successful decoding of a PDCCH, the user equipment shall perform reception of the Physical Downlink Shared Channel (PDSCH) or transmission of the Physical Uplink Shared Channel (PUSCH) according to pre-determined timing specified in the LTE specifications.
LTE uses a Hybrid-Automatic Repeat Request (HARQ), where, after receiving downlink data in a subframe, the user equipment attempts to decode it and reports to the base station whether the decoding was successful, sending an Acknowledge (ACK), or not, sending a Non-Acknowledgement (NACK) via the Physical Uplink Control CHannel (PUCCH). In case of an unsuccessful decoding attempt, the base station can retransmit the erroneous data. Similarly, the base station can indicate to the UE whether the decoding of the PUSCH was successful, sending an ACK, or not, sending a NACK, via the Physical Hybrid ARQ Indicator CHannel (PHICH).
Uplink control signaling from the user equipment to the base station may comprise (1) HARQ acknowledgements for received downlink data; (2) user equipment reports related to the downlink channel conditions, used as assistance for the downlink scheduling; and/or (3) scheduling requests, indicating that a mobile user equipment needs uplink resources for uplink data transmissions.
If the mobile user equipment has not been assigned an uplink resource for data transmission, the L1/L2 control information, such as channel-status reports, HARQ acknowledgments, and scheduling requests, is transmitted in uplink resources e.g. in resource blocks, specifically assigned for uplink L1/L2 control on Release 8 (Rel-8) PUCCH. As illustrated in Figure 4, these uplink resources are located at the edges of the total available transmission bandwidth. Each such uplink resource comprises 12
"subcarriers" (one resource block) within each of the two slots of an uplink subframe. In order to provide frequency diversity, these frequency resources are frequency hopping, indicated by the arrow, on the slot boundary, i.e. one "resource" comprises 12 subcarriers at the upper part of the spectrum within the first slot of a subframe and an equally sized resource at the lower part of the spectrum during the second slot of the subframe or vice versa. If more resources are needed for the uplink L1/L2 control signaling, e.g. in case of very large overall transmission bandwidth supporting a large number of users, additional resources blocks can be assigned next to the previously assigned resource blocks.
Carrier Aggregation
The LTE Release 10 (Rel-10) standard has recently been standardized, supporting bandwidths larger than 20 MHz. One requirement on LTE Rel-10 is to assure backward compatibility with LTE Rel-8. This may also include spectrum compatibility. That would imply that an LTE Rel-10 carrier, wider than 20 MHz, should appear as a number of LTE carriers to an LTE Rel-8 user equipment. Each such carrier can be referred to as a Component Carrier (CC). In particular for early LTE Rel-10 deployments it can be expected that there will be a smaller number of LTE Rel-10-capable user equipments compared to many LTE legacy user equipments. Therefore, it may be useful to assure an efficient use of a wide carrier also for legacy user equipments, i.e. that it is possible to implement carriers where legacy user equipments can be scheduled in all parts of the wideband LTE Rel-10 carrier. The straightforward way to obtain this would be by means of Carrier Aggregation (CA). CA implies that an LTE Rel-10 user equipment can receive multiple CCs, where the CCs have, or at least the possibility to have, the same structure as a Rel-8 carrier. CA is illustrated in Figure 5.
The number of aggregated CCs as well as the bandwidth of the individual CCs may be different for uplink and downlink. A symmetric configuration refers to the case where the number of CCs in downlink and uplink is the same whereas an asymmetric
configuration refers to the case that the number of CCs is different. It should be noted that the number of CCs configured in a cell may be different from the number of CCs seen by a user equipment. A user equipment may for example support more downlink CCs than uplink CCs, even though the network is configured with the same number of uplink and downlink CCs.
During an initial access, a LTE Rel-10 user equipment behaves similarly to a LTE Rel-8 user equipment. Upon successful connection to the network a user equipment may - depending on its own capabilities and the network - be configured with additional CCs for uplink and downlink. Configuration is based on the Radio Resource Control (RRC). Due to the heavy signaling and rather slow speed of RRC signaling it is envisioned that a user equipment may be configured with multiple CCs even though not all of them are currently used. If a user equipment is configured on multiple CCs this would imply it has to monitor all downlink CCs for PDCCH and PDSCH. This implies a wider receiver bandwidth, higher sampling rates, etc., resulting in high power consumption.
To mitigate the above described problems, LTE Rel-10 supports activation of CCs on top of configuration. The user equipment monitors only configured and activated CCs for PDCCH and PDSCH. Since activation is based on Medium Access Control (MAC) control elements, which are faster than RRC signaling, activation/de-activation can follow the number of CCs that are required to fulfill the current data rate needs. Upon arrival of large data amounts multiple CCs are activated, used for data transmission, and deactivated if not needed anymore. All but one CC, the Downlink (DL) Primary CC (DL PCC), may be de-activated. Therefore, activation provides the possibility to configure multiple CC but only activate them on a need-to basis. Most of the time a user equipment would have one or very few CCs activated resulting in a lower reception bandwidth and thus battery consumption.
Scheduling of a CC may be done on the PDCCH via downlink assignments. Control information on the PDCCH may be formatted as a Downlink Control Information (DCI) message. In Rel-8 a user equipment may only operate with one downlink and one uplink CC. The association between downlink assignment, uplink grants and the corresponding downlink and uplink CCs is therefore clear. In Rel-10 two modes of CA should be distinguished. A first mode is very similar to the operation of multiple Rel-8 CC, a downlink assignment or uplink grant contained in a DCI message transmitted on a CC is either valid for the downlink CC itself or for associated (either via cell-specific or user equipment specific linking) uplink CC. A second mode of operation augments a DCI message with the Carrier Indicator Field (CIF). A DCI comprising a downlink assignment with CIF is valid for that downlink CC indicted with CIF and a DCI comprising an uplink grant with CIF is valid for the indicated uplink CC.
DCI messages for downlink assignments comprise among others resource block assignment, modulation and coding scheme related parameters, HARQ redundancy version, etc. In addition to those parameters that relate to the actual downlink
transmission, most DCI formats for downlink assignments also comprise a bit field for Transmit Power Control (TPC) commands. These TPC commands are used to control the uplink power control behavior of the corresponding PUCCH that is used to transmit the HARQ feedback.
In Rel-10 LTE, the transmission of PUCCH is mapped onto one specific uplink CC, the Uplink (UL) Primary CC (UL PCC). User equipments configured with a single downlink CC (which is then the DL PCC) and uplink CC (which is then the UL PCC) are operating dynamic ACK/NACK on PUCCH according to Rel-8. The first Control Channel Element (CCE) used to transmit PDCCH for the downlink assignment determines the dynamic ACK/NACK resource on Rel-8 PUCCH. Since only one downlink CC is cell-specifically linked with the UL PCC, no PUCCH collisions can occur since all PDCCH are transmitted using different first CCE.
Upon reception of downlink assignments on a single Secondary CC (SCC) or reception of multiple DL assignments, CA PUCCH should be used. A downlink SCC assignment alone is untypical. The scheduler in the base station should strive to schedule a single downlink CC assignment on the DL PCC and try to de-activate SCCs if not needed. A possible scenario that may occur is that the base station schedules user equipment on multiple downlink CCs including the PCC. If the user equipment misses all but the DL PCC assignment it will use Rel-8 PUCCH instead of CA PUCCH. To detect this error case the base station has to monitor both the Rel-8 PUCCH and the CA
PUCCH.
In Rel-10 LTE, the CA PUCCH format is based on the number of configured CCs. Configuration of CCs is based on RRC signaling. After successful reception/application of the new configuration a confirmation message is sent back making RRC signaling very safe. Time Division Duplex
Transmission and reception from a node, e.g. user equipment in a cellular system such as LTE, can be multiplexed in the frequency domain or in the time domain (or combinations thereof). Frequency Division Duplex (FDD) as illustrated to the left in
Figure 6 implies that downlink and uplink transmissions take place in different, sufficiently separated, frequency bands. Time Division Duplex (TDD), as illustrated to the right in Figure 6, implies that downlink and uplink transmissions take place in different, non- overlapping time slots. Thus, TDD can operate in unpaired spectrum, whereas FDD requires paired spectrum.
Typically, the structure of the transmitted signal in a communication system is organized in the form of a frame structure. For example, LTE uses ten equally-sized subframes of length 1 ms per radio frame as illustrated in Figure 7.
In the case of FDD operation (upper part of Figure 7), there are two carrier frequencies, one for uplink transmission (fUL) and one for downlink transmission (ίο0· At least with respect to the user equipment in a cellular communication system, FDD can be either full duplex or half duplex. In the full duplex case, a user equipment can transmit and receive simultaneously, while in half-duplex operation, the user equipment cannot transmit and receive simultaneously (the base station is capable of simultaneous
reception/transmission though, e.g. receiving from one user equipment while
simultaneously transmitting to another user equipment). In LTE, a half-duplex user equipment is monitoring/receiving in the downlink except when explicitly being instructed to transmit in a certain subframe.
In the case of TDD operation (lower part of Figure 7), there may be only a single carrier frequency and uplink and downlink transmissions are typically separated in time on a cell basis. As the same carrier frequency is used for uplink and downlink transmission, both the base station and the mobile user equipments need to switch from transmission to reception and vice versa. An aspect of any TDD system is to provide the possibility for a sufficiently large guard time where neither downlink nor uplink transmissions occur. This is required to avoid interference between uplink and downlink transmissions. For LTE, this guard time is provided by special subframes (subframe 1 and, in some cases, subframe 6), which are split into three parts: a downlink part, a Downlink Pilot Time Slot (DwPTS), a guard period (GP), and an uplink part, an Uplink Pilot Time Slot (UpPTS). The remaining subframes are either allocated to uplink or downlink transmission.
SUMMARY An object of some of the example embodiments presented herein is to provide an efficient means of assigning uplink-downlink configurations a cross all aggregated CCs. Accordingly, some of the example embodiments may be directed towards a method, in a base station, for configuring control timing to and from a user equipment in a multiple cell communications network. The method comprises determining at least one timing configuration number for a plurality of aggregated cells of the multiple cell
communications network. Each aggregated cell is associated with an uplink-downlink configuration number, where at least two uplink-downlink configuration numbers of the plurality of aggregated cells are not equal. The plurality of aggregated cells is associated with the user equipment. The method also comprises assigning the at least one timing configuration number to the user equipment.
Some of the example embodiments may be directed towards a base station for configuring control timing to and from a user equipment in a multiple cell communications network. The base station comprises a determination unit configured to determine at least one timing configuration number for a plurality of aggregated cells of the multiple cell communications network. Each aggregated cell is associated with an uplink-downlink configuration number. At least two uplink-downlink configuration numbers of the plurality of aggregated cells are not equal. The plurality of aggregated cells is associated with the user equipment. The base station also comprises an assignment unit configured to assign the at least one timing configuration number to the user equipment.
Some of the example embodiments may be directed towards a method, in a user equipment, for a configuration of control timing for a user equipment in a multiple cell communications network. The method comprises receiving, from a base station, at least one timing configuration number for a plurality of aggregated cells of the multiple cell communications network. Each aggregated cell is associated with an uplink-downlink configuration number, and where at least two uplink-downlink configuration numbers of the plurality of aggregated cells are not equal. The plurality of aggregated cells is associated with the user equipment. The method also comprises implementing control timing based on the at least one timing configuration number.
Some of the example embodiments may be directed towards a user equipment, for a configuration of control timing for a user equipment in a multiple cell communications network. The user equipment comprises a determining unit configured to receive, from a base station, at least one timing configuration number for a plurality of aggregated cells of the multiple cell communications network, where each aggregated cell is associated with an uplink-downlink configuration number, and where at least two uplink-downlink configuration numbers of the plurality of aggregated cells are not equal. The plurality of aggregated cells is associated with the user equipment. The user equipment also comprises an implementation unit configured to implement control timing based on the at least one timing configuration number. BRIEF DESCRIPTION OF THE DRAWINGS
The foregoing will be apparent from the following more particular description of the example embodiments, as illustrated in the accompanying drawings in which like reference characters refer to the same parts throughout the different views. The drawings are not necessarily to scale, emphasis instead being placed upon illustrating the example embodiments.
FIG. 1 is an illustrative example of a LTE downlink physical resource;
FIG. 2 is a schematic of a LTE time-domain structure;
FIG. 3 is an illustration of a downlink subframe;
FIG. 4 is an illustrative example of an uplink L1/L2 control signalling transmission on Rel-8 PUCCH;
FIG. 5 is an illustrative example of carrier aggregation;
FIG. 6 is an illustrative example of frequency and time-division duplex;
FIG. 7 is a schematic of an uplink-downlink time/frequency structure for LTE for the case of FDD and TDD;
FIG. 8 is a schematic of different downlink/uplink configurations for the case of TDD;
FIG. 9 is an illustrative example of uplink-downlink interference in TDD;
FIG. 10 is an illustration of PDSCH A N feedback timings for a configuration 1 cell and a configuration 2 cell;
FIG. 11 is an illustration of PUSCH grant and A/N feedback timings for a
configuration 1 cell and a configuration 2 cell; FIG. 12 is an illustration of PDSCH A N feedback timings for a configuration 1 cell and a configuration 3 cell;
FIG. 13 is an illustration of PUSCH grant and A/N feedback timings for a configuration 1 cell and a configuration 3 cell;
FIG. 14 is an illustrative example of carrier aggregation of TDD cells with different uplink-downlink configurations;
FIG. 5 is an illustrative example of subframe compatibility hierarchy, according to some of the example embodiments;
FIG. 16 is an illustration of PUSCH grant and A/N feedback timings for aggregation of a configuration 1 ceil as Pcell and a configuration 2 cell as Scell, according to some of the example embodiments;
FIG. 17 is an illustration of PUSCH grant and A/N feedback timings for aggregation of a configuration 2 cell as Pcell and a configuration 1 cell as Scell, according to some of the example embodiments;
FIG. 18 is an illustration of PDSCH A/N feedback timings for aggregation of a configuration 1 cell and a configuration 2 cell, according to some of the example embodiments;
FIG. 19 is an illustration of PUSCH grant and A N feedback timings for aggregation of a configuration 1 cell as Pcell and a configuration 3 cell as Scell, according to some of the example embodiments;
FIG. 20 is an illustration of PUSCH grant and A N feedback timings for aggregation of a configuration 3 cell as Pcell and a configuration 1 cell as Scell, according to some of the example embodiments;
FIG. 21 is an illustration of PDSCH A/N feedback timings for aggregation of a configuration 1 cell and a configuration 3 cell, according to some of the example embodiments;
FIG. 22 is an illustrative example of the timing of additional forward-subframe DL scheduling PDCCHs in support of half-duplex UEs with aggregation of a configuration 1 cell and a configuration 2 cell, according to some of the example embodiments;
FIG. 23 is an illustrative example of the timing of additional forward-subframe DL scheduling PDCCHs in support of half-duplex UEs with aggregation of a configuration 1 cell and a configuration 3 cell, according to some of the example embodiments;
FIG. 24 is an illustrative example of the timing of additional cross-carrier forward- subframe DL scheduling PDCCHs in support of full-duplex UEs with aggregation of a configuration 1 cell as Pcell and a configuration 2 cell as Scell, according to some of the example embodiments;
FIG. 25 is an illustrative example of the timing of additional cross-carrier forward- subframe DL scheduling PDCCHs in support of full-duplex UEs with aggregation of a configuration 1 cell and a configuration 3 cell, according to some of the example embodiments;
FIG. 26 is a schematic of a base station configured to perform the example embodiments described herein;
FIG. 27 is a schematic of a user equipment configured to perform the example embodiments described herein
FIG. 28 is a flow diagram depicting example operations of the base station of FIG. 26; and
FIG. 29 is a flow diagram depicting example operations of the user equipment of FIG. 27.
DETAILED DESCRIPTION
In the following description, for purposes of explanation and not limitation, specific details are set forth, such as particular components, elements, techniques, etc. in order to provide a thorough understanding of the example embodiments. However, the example embodiments may be practiced in other manners that depart from these specific details. In other instances, detailed descriptions of well-known methods and elements are omitted so as not to obscure the description of the example embodiments.
As part of the development of the example embodiments presented herein, a problem will first be identified and discussed. TDD allows for different asymmetries in terms of the amount of resources allocated for uplink and downlink transmission, respectively, by means of different downlink/uplink configurations. In LTE, there are seven different configurations as shown in Figure 8. Note that in the description below, under the heading 'TDD HARQ Timing', a downlink subframe may mean either downlink or the special subframe.
To avoid severe interference between downlink and uplink transmissions between different cells, neighbor cells should have the same downlink/uplink configuration. If this is not done, uplink transmission in one cell may interfere with downlink transmission in the neighboring cell and vice versa as illustrated in Figure 9. Hence, the downlink/uplink asymmetry may typically not vary between cells, but is signaled as part of the system information and remains fixed for a long period of time. The description provided herein is arranged as follows. First, an overview of current systems and methods for control timing configuration is presented under the heading 'Existing Systems - TDD HARQ Control Timing'. Thereafter, limitations of the existing systems are explored under the subheading 'Problems with Existing Solutions'.
A basis for the example embodiments is thereafter presented in the section entitled 'Subframe Timing Compatibility', where complex configuration tables (explained in 'Existing Systems - TDD HARQ Control Timing') may be replaced with the use of a subframe timing compatibility hierarchy. Thereafter, examples of control timing configuration assignment, utilizing the subframe timing compatibility hierarchy, are provided in the sub-section entitled 'Configuration Assignment'. Examples of control timing configuration assignment based on an ordered listing of the subframe timing compatibility hierarchy is provided in the sub-section 'Computation of the Subframe Timing Compatibility based on Efficient Storage."
Thereafter, examples of control timing configuration assignment of user equipments utilizing a half-duplex mode of operation are provided in the sub-section 'Examples of Half-Duplex Configuration Assignment". Similarly, examples of control timing
configuration assignment of user equipments utilizing a full-duplex mode of operation are provided in the sub-section 'Examples of Full-Duplex Configuration Assignment".
Thereafter examples of forward downlink scheduling with respect to user equipments with full and half-duplex modes of operation is provided under the sub-heading 'Examples of Forward Downlink Scheduling'.
Finally, examples of network node configurations and example operations of such nodes are presented under the sub-headings 'Example Node Configurations' and
'Example Node Operations'. It should be appreciated that the example node operations provide a generalized explanation of node operations which may encompass all of the examples provided in the foregoing sub-headings which are not related to existing systems.
Existing Systems - TDD HARQ Control Timing
The timings for HARQ ACK/NACK (A/N) feedbacks for the PUSCH and the PDSCH as well as the grant of PUSCH may be specified with extensive tables and procedure descriptions for each uplink-downlink configuration.
For TDD UL/DL (U/D) configurations 1-6 and normal HARQ operation, the user equipment shall upon detection of a PDCCH with an uplink DCI format and/or a PHICH transmission in subframe n intended for the user equipment, adjust the corresponding PUSCH transmission in subframe n+k, with k given in Table 1, shown below, according to the PDCCH and PHICH information.
Figure imgf000012_0001
Tabl e 1 PUSCH grant timing k for TDD con gurations 0-6
For TDD U/D configuration 0 and normal HARQ operation the user equipment shall upon detection of a PDCCH with uplink DCI format and/or a PHICH transmission in subframe n intended for the user equipment, adjust the corresponding PUSCH
transmission in subframe n+k if the Most Significant Bit (MSB) of the UL index in the PDCCH with uplink DCI format is set to 1 or PHICH is received in subframe n=0 or 5 in the resource corresponding to 1PHICH = 0 , with k given in Table 1. If, for TDD U/D configuration 0 and normal HARQ operation, the Least Significant Bit (LSB) of the UL index in the DCI format 0/4 is set to 1 in subframe n or a PHICH is received in subframe n=0 or 5 in the resource corresponding toimcH = l , or PHICH is received in subframe n=1 or 6, the user equipment shall adjust the corresponding PUSCH transmission in subframe n+7. If, for TDD U/D configuration 0, both the MSB and LSB of the UL index in the PDCCH with uplink DCI format are sent in subframe n, the user equipment shall adjust the corresponding PUSCH transmission in both subframes n+ k and n+7, with k given in Table 1.
For PUSCH transmissions scheduled from a serving cell c in subframe n, a user equipment shall determine the corresponding PHICH resource of serving cell c in subframe n+ kPHICH , where kmcH is given in Table 2, provided below, for TDD. For subframe bundling operation, the corresponding PHICH resource is associated with the last subframe in the bundle.
Figure imgf000013_0001
Table 2 k PHICH for TDD
The user equipment shall also feedback PDSCH decoding A/N information in predefined UL subframes. The user equipment shall transmit such a HARQ A N response on the PUCCH in UL subframe , if there is PDSCH transmission indicated by the detection of corresponding PDCCH or there is PDCCH indicating downlink SPS release within subframe(s) n - k , where k is within the association set K- {k0,k L kM_ } listed in Table 3, provided below.
UL-DL Subframe n
Configuration 0 1 2 3 4 5 6 7 8 9
0 6 4 6 4
1 7, 6 4 7, 6 4
8, 7, 4, 6 8, 7,
2
4, 6
7, 6, 11 6, 5 5,
3
4
12, 8, 7, 11 6, 5,
4
4, 7
13, 12, 9, 8, 7, 5,
5
4, 11, 6
6 7 7 5 7 7
Table 3Downlink association set index K : {k0,k L kM_t } for TDD
In LTERel-10, all HARQ control timings are determined based on the Primary-cell (Pcell) configuration number as discussed above. The determination of HARQ operations in LTERel-10 work only if all aggregated TDD cells have an identical U/D configuration. However, when developing the example embodiments presented herein it has been discovered that a straightforward extension of this operation for aggregation of different U/D configurations proves difficult.
Consider the PDSCH A/N feedback timing example for aggregating a configuration 1 cell and a configuration 2 cell illustrated in Figure 10. In Figure 10, U represents uplink subframes, D represents downlink subframes, and S represents special subframes which may be used for both uplink and downlink. It should be appreciated that for the purpose of simplicity, the S subframes will be treated as downlink subframes in the examples provided herein.
If the configuration 2 cell is the Pcell, A/N feedback for the configuration 1
Secondary-cell (Scell) PDSCH may be fed-back based on the timing rules of Pcell.
However, if the configuration 1 cell is the Pcell, there will be no A/N feedback timing rules for subframes 3 and 8 in the configuration 2 Scell.
Consider the PUSCH grant and A/N feedback timing example for aggregating a configuration 1 cell and a configuration 2 cell illustrated in Figure 11. If the configuration 1 cell is the Pcell, PUSCH grant and A N feedback for the configuration 2 Scell can be fed- back based on the timing rules of Pcell. However, if the configuration 2 cell is the Pcell, PUSCH cannot be scheduled for subframe 3 and 8 in configuration 1 Scell because there is no such UL grant timing in configuration 2. Note that A/N feedback timing rules for these two subframes are not available, either.
The control timing problems may be even more severe than the examples discussed above. In the case of aggregating a configuration 1 and a configuration 3 cells, the HARQ control timings don't work regardless of which configuration is the Pcell.
More specifically, consider the PDSCH A/N feedback timing illustrated in Figure 12:
If configuration 1 is the Pcell, PDSCH A/N for subframes 7 & 8 of the configuration 3 Seed cannot be fed back.
If configuration 3 is the Pcell, PDSCH A N for subframe 4 of the configuration 1 Scell cannot be fed back.
Further, consider the PUSCH grant and A/N feedback timing illustrated in Figure
13:
If configuration 1 is the Pcell, PUSCH for subframe 4 in configuration 3 Scell cannot be scheduled.
· If configuration 3 is the Pcell, PUSCH for subframe 7 & 8 in configuration 1 Scell cannot be scheduled.
Problems with Existing Systems
The following are examples of some of the problems with existing solutions, which have been recognized when developing the embodiments presented herein. In Rel-10, carrier aggregation of TDD cells is specified with the restriction that the U/D configurations for all the aggregated cells are identical. There is a need to allow more flexible carrier aggregation of TDD cells is to be addressed in Rel- of LTE.
As discussed above, the U/D configurations of neighboring cells need to be compatible to avoid severe interference problems. However, there are cases where the neighboring cells are operated by different operators or different wireless systems. The LTE TDD cells adjacent to those neighboring systems are hence required to adopt certain compatible U/D configurations. As a result, an operator may have several TDD cells having different U/D configurations on different frequencies as illustrated in Figure 14.
A further complication from such aggregation cases is that the nominally TDD user equipment may be required to transmit and receive simultaneously in certain subframes (such as subframe 7 and 8 in Figure 14). Such FDD-like operations are incompatible with existing designs of TDD user equipments. To enable such full-duplex operations in Rel-11 may impose additional user equipment complexity and costs. It is therefore necessary to also consider possible half-duplex operations during such conflicting subframes. That is, the user equipment should be instructed to perform either reception or transmission but not both during such conflicting subframes.
To circumvent problems such those identified in the above, adding additional HARQ control timing rules based on specific aggregation cases may be performed. In additional to the existing timing rules for seven TDD configurations, = 21 additional sets of rules
Figure imgf000016_0001
may be added to specify the HARQ behaviors for every possible pair of heterogeneous configuration. On top of these, additional specification for aggregation of three different U/D configurations may also be introduced. Apparently, specifying these additional rules for supporting aggregation of different U/D configurations will substantially increase the LTE complexity and implementation costs.
Subframe Timing Compatibility
To enable a systematic solution to a plurality of aggregation scenarios with different TDD U/D configurations, according to some of the example embodiments, a subframe timing compatibility is designed and illustrated in Figure 15. The subframe timing compatibility is a hierarchy that may be encoded as look-up tables, a linked list or a plurality of digital representations suitable for storage in communication devices.
The subframe timing compatibility hierarchy may be designed with the following principles:
(1) The UL subframes in a TDD configuration are also UL subframes in those TDD configurations that can be corrected with upward arrows.
For example, subframes 2 and 3 are UL subframes in configuration 4. These two subframes are also UL in configurations 3, 1, 6 and 0, all of which can be connected from configuration 4 with upward arrows. As a second example, subframes 2 and 7 are UL subframes in configuration 2. These two subframes are not both UL in configuration 3 because there is no upward arrow connecting the two configurations.
(2) The DL subframes in a TDD configuration are also DL subframes in those TDD configurations that can be corrected with downward arrows.
For example, subframe 0, 1, 5, 6 and 9 are DL subframes in configuration 6. These five subframes are also DL in configurations 1, 2, 3, 4 and 5, all of which can be connected from configuration 6 with downward arrows. As a second example, subframe 7 is a DL subframe in configuration 3 but not a DL subframe in configuration 2 because there is no downward arrow connecting the two configurations. With these design properties, the subframe timing compatibility hierarchy may provide the following utility:
(1) Given a set of TDD configurations to be aggregated, a TDD configuration that can be connected from all of the given TDD configurations with upward arrows has the following two properties:
• The TDD configuration comprises UL subframes that are a superset of all UL subframes from all given TDD configurations.
• The TDD configuration comprises DL subframes that are available in all given TDD configurations.
Example One
Given TDD configuration 1 and 2, all subframes that are UL in either configuration 1 or 2 are also UL subframes in configuration 1 , 6 and 0. The DL subframes in configuration 1 , 6 or 0 are also DL subframes in configuration 1 and 2.
Given TDD configuration 1 and 3, all subframes that are UL in either configuration 1 or 3 are also UL in configuration 6 and 0. The DL subframes in configuration 6 or 0 are also DL subframes in configuration 1 , 2, 3, 4, 5 and 6.
Given TDD configuration 2, 3 and 4, all subframes that are UL in any of the three configurations are also UL in configuration 6 and 0. The DL subframes in configuration 6 or 0 are also DL subframes in configuration 1 , 2, 3, 4, 5 and 6.
Given a set of TDD configurations, a TDD configuration that can be connected from all of the given TDD configurations with downward arrows has the following two properties:
• The TDD configuration comprises DL subframes that are a superset of all DL subframes from all given TDD configurations.
• The TDD configuration comprises UL subframes that are available in all given TDD configurations.
Example Two
Given TDD configuration 1 and 2, all subframes that are DL in either configuration 1 or 2 are also DL in configuration 2 and 5. The UL subframes in configuration 2 or 5 are also UL subframes in configuration 1 , 2, 6 and 0.
Given TDD configuration 1 and 3, all subframes that are DL in either configuration 1 or 3 are also DL in configuration 4 and 5. The UL subframes in configuration 4 or 5 are also UL subframes in configuration 0, 3, 4 and 6. Given TDD configuration 2, 3 and 4, all subframes that are DL in any of the three configurations are also DL in configuration 5. The UL subframes in configuration 5 are also UL subframes in configuration 0, 1 , 2, 3, 4 and 6. Configuration Assignment
In Rel-8 TDD, the following two sets of subframe timings are set based on the same parameter, which is the serving cell U/D configuration number: (1) UL HARQ control and grant subframe timing, and (2) DL HARQ A/N subframe timing. In Rel-10 TDD CA, both types of subframe timings across all cells are set based on the same parameter, which is the Pcell U/D configuration number.
To support carrier aggregation of TDD cells with different U/D configurations, the user equipment may be configured with the following two numbers according to the teaching of the example embodiments: (1) an UL control timing configuration number for setting UL HARQ and grant timings across all aggregated cells, and (2) a DL HARQ control timing configuration number for setting DL HARQ timings across all aggregated cells.
The UL control timing configuration number may be set to the configuration number of a configuration that can be connected from all aggregated configurations with upward arrows in the subframe timing compatibility hierarchy in Figure 15. If more than one configuration number can be chosen, the chosen setting may be the configuration at the lowest level in the subframe timing compatibility hierarchy. The chosen setting may result in more DL subframes for PUSCH grant and A N feedback. The following example cases are provided below for the purpose of explaining some of the example embodiments. Example Case 1:
If cells with configuration 1 and 2 are aggregated, the UL control timing
configuration number can be set to 1 , 6 or 0. The chosen setting may be 1.
Example Case 2:
If cells with configuration 1 and 3 are aggregated, the UL control timing
configuration number can be set to 6 or 0. The chosen setting may be 6, which is different than the U/D configuration numbers of the two TDD cells.
This UL control timing configuration number setting ensures identical PUSCH grant and PHICH timings across all CCs and DL subframes are available at these timings regardless of the Pcell configuration. That is, the PUSCH grant and PHICH subframes are never in subframes with conflicting U/D directions across different CCs. This setting further ensures all UL subframes from all aggregated CCs can be scheduled either in-CC or cross-CC.
The DL HARQ control timing configuration number may be set to the configuration number of a configuration that can be connected from all aggregated configurations with downward arrows in the subframe timing compatibility hierarchy in Figure 15. If more than one configuration number can be chosen, the chosen setting may be that of the configuration at the highest level in the subframe timing compatibility hierarchy. The chosen setting may result in more UL subframes for PDSCH A N feedback. The following example cases are provided below for the purpose of explaining some of the example embodiments.
Example Case 1:
If cells with configuration 1 and 2 are aggregated, the DL HARQ control timing configuration number can be set to 2 or 5. The chosen setting may be 2.
Example Case 2:
If cells with configuration 1 and 3 are aggregated, the DL HARQ control timing configuration number can be set to 4 or 5. The chosen setting may be 4, which is different than the U/D configuration numbers of the two TDD cells.
This DL HARQ control timing configuration number setting ensures identical PDSCH A/N feedback timings across all CCs and UL subframes are available at these timings regardless of the Pcell configuration.
Example Carrier Aggregation of Configuration 1 and 2 TDD Cells
To support the aggregation of configuration 1 and 2 TDD cells, the two HARQ control timing configuration numbers may be set as follows:
• The UL control timing configuration number may be set to 1.
· The DL HARQ control timing configuration number may be set to 2.
Note these configuration number settings are applicable regardless of which of the two TDD cells serves as the Pcell.
The PUSCH grant and A/N feedback timings for aggregation of a configuration 1 cell as Pcell and a configuration 2 cell as Scell are illustrated in Figure 16. The PUSCH grant and A N feedback timings for aggregation of a configuration 2 cell as Pcell and a configuration 1 cell as Scell are illustrated in Figure 17. This analysis shows that all the UL subframes can be scheduled either from the Pcell (if cross-carrier scheduling is configured) or from the Scell itself (if cross-carrier scheduling is not configured).
Furthermore, A/N feedback timings for all UL subframes are clearly assigned.
The PDSCH A N feedback timings for aggregation of a configuration 1 cell and a configuration 2 cell is shown in Figure 18. The analysis confirms that A N feedbacks for all PDSCH in both the Pcell and the Scell are clearly assigned to suitable UL subframes on the Pcell. Example Carrier Aggregation of Configuration 1 and 3 TDD Cells
To support the aggregation of configuration 1 and 3 TDD cells, the two HARQ control timing configuration numbers may be set as follows:
• The UL control timing configuration number may be set to 6.
• The DL HARQ control timing configuration number may be set to 4.
Note these configuration number settings are applicable regardless of which of the two TDD cells serves as the Pcell.
The PUSCH grant and A/N feedback timings (i.e., for uplink A N feedback timing) for aggregation of a configuration 1 cell as Pcell and a configuration 3 cell as Scell are illustrated in Figure 19. The PUSCH grant and A/N feedback timings for aggregation of a configuration 3 cell as Pcell and a configuration 1 cell as Scell are illustrated in Figure 20. This analysis shows that all the UL subframes can be scheduled either from the Pcell (if cross-carrier scheduling is configured) or from the Scell itself (if cross-carrier scheduling is not configured). Furthermore, A N feedback timings for all UL subframes are clearly assigned.
The PDSCH A N feedback timings for aggregation of a configuration 1 cell and a configuration 3 cell is shown in Figure 21. The analysis confirms that A/N feedbacks for all PDSCH in both the Pcell and the Scell are clearly assigned to suitable UL subframes on the Pcell. Computation of the Subframe Timing Compatibility based on Efficient Storage
As should be appreciated from above, according to some of the example
embodiments, for a given set of aggregated TDD cells with different U/D configurations, the UL control and DL HARQ control timing configuration numbers may be set based on a systematic rule encoded in the subframe timing compatibility hierarchy, for example as illustrated in Figure 15. The UL control and DL HARQ control timing configuration numbers so chosen may be different than any of the U/D configuration number of the aggregated cells.
The UL control timing configuration number may be set to the configuration number of a configuration that can be connected from all aggregated configurations with upward arrows in the subframe timing compatibility hierarchy in Figure 15. If more than one configuration number can be chosen, a setting may be chosen to be the configuration at the lowest level in the subframe compatibility hierarchy. This setting results in more DL subframes for PUSCH grant and A/N feedback.
The DL HARQ control timing configuration number may be set to the configuration number of a configuration that can be connected from all aggregated configurations with downward arrows in the subframe timing compatibility hierarchy in Figure 15. If more than one configuration number can be chosen, the setting may be chosen to be the
configuration at the highest level in the subframe timing compatibility hierarchy. This setting results in more UL subframes for PDSCH A/N feedback.
Some of the example embodiments may also be directed towards efficient digital representation and storage methods of the subframe timing compatibility hierarchy. Some of the example embodiments may also be directed towards efficient computational methods and a corresponding apparatus for computing the UL control timing configuration number and the DL HARQ control timing configuration number.
According to some of the example embodiments, the subframe timing compatibility hierarchy may be represented with a table of sets. The UL control timing configuration number and the DL HARQ control timing configuration number may be computed with set intersection operations. If there is more than one control timing configuration number candidates after the set intersection operations, the network node can select a preferred control timing configuration number setting based on at least system loads and user equipment application needs.
An UL control timing configuration candidate set and a DL HARQ control timing configuration candidate set may be stored for each of the LTE cell U/D configurations. An example of the specific values of the candidate sets are shown in the table provided below. Component cell U/D UL control timing DL HARQ control configuration configuration timing configuration
candidate set candidate set
0 {0} {0,6,1 ,3,2,4,5}
1 {1 ,6,0} {1,2,4,5}
2 {2,1 ,6,0} {2,5}
3 {3,6,0} {3,4,5}
4 {4,1 ,3,6,0} {4,5}
5 {5,2,4,1 ,3,6,0} {5}
6 {6,0} {6,1 ,3,2,4,5}
Table 4 Control Timing Configuration Sets
According to some of the example embodiments, for a given set of cell U/D configurations to be aggregated, the UL control timing configuration number may be set to a configuration number from the intersection of all UL control timing configuration candidate sets corresponding to the cell U/D configurations to be aggregated. The following example cases are provided below for the purpose of explaining some of the example embodiments.
Example Case 1:
If cells with configuration 1 and 2 are aggregated, the corresponding UL control timing configuration candidate sets may be {1,6,0} and {2,1 ,6,0}. The intersection of all these sets can be computed to be {1 ,6,0}. Therefore, the UL control timing configuration number can be set to 1 , 6 or 0. Example Case 2:
If cells with configuration 1 and 3 are aggregated, the corresponding UL control timing configuration candidate sets may be {1,6,0} and {3,6,0}. The intersection of all these set can be computed to be {6,0}. Therefore, the UL control timing configuration number can be set to 6 or 0.
Example Case 3:
If cells with configuration 1 , 3 and 4 are aggregated, the corresponding UL control timing configuration candidate sets may be {1 ,6,0}, {3,6,0} and {4,1 ,3,6,0}. The intersection of all these set can be computed to be {6,0}. Therefore, the UL control timing configuration number can be set to 6 or 0.
According to some of the example embodiments, for a given set of cell U/D configurations to be aggregated, the DL HARQ control timing configuration number may be set to a configuration number from the intersection of. all DL HARQ control timing configuration candidate sets corresponding to the cell U/D configurations to be
aggregated. The following example cases are provided below for the purpose of explaining some of the example embodiments.
Example Case 1:
If cells with configuration 1 and 2 are aggregated, the corresponding DL HARQ control timing configuration candidate sets may be {1 ,2,4,5} and {2,5}. The intersection of all these sets can be computed to be {2,5}. Therefore, the DL HARQ control timing configuration number can be set to 2 or 5.
Example Case 2:
If cells with configuration 1 and 3 are aggregated, the corresponding DL HARQ control timing configuration candidate sets may be {1 ,2,4,5} and {3,4,5}. The intersection of all these sets may be computed to be {4,5}. Therefore, the DL HARQ control timing configuration number can be set to 4 or 5.
Example Case 3:
If cells with configuration 1 , 3 and 4 are aggregated, the corresponding DL HARQ control timing configuration candidate sets may be {1 ,2,4,5}, {3,4,5} and {4,5}. The intersection of all of these sets may be computed to be {4,5}. Therefore, the DL HARQ control timing configuration number can be set to 4 or 5.
If there are more than one control timing configuration number candidates after the set intersection operations, the network node or user equipment can select and signal a preferred control timing configuration number setting based on at least system loads and user equipment application needs. Signaling of the control timing could for example be done with radio resource control (RRC) signaling.
It should also be appreciated that, according to some of the example embodiments, the subframe timing compatibility hierarchy may be represented with a table of ordered sets. The UL control timing configuration number and the DL HARQ control timing configuration number may be computed with set intersection operations while preserving the order of numbers within the set. The chosen control timing configuration number may be the first or last number after the set intersection operation.
An UL control timing configuration candidate set and a DL HARQ control timing configuration candidate set may be stored for each of the LTE cell U/D configurations. The specific values of the candidate or ordered sets are shown in table 4. The order of candidate configuration numbers in each of the candidate sets shown in the table may be preserved in storage.
For a given set of cell U/D configurations to be aggregated, the UL control timing configuration number may be set to a configuration number from the intersection of all UL control timing configuration candidate sets corresponding to the cell U/D configurations to be aggregated, where the set intersection operations preserve the ordering of numbers in the concerned sets. The following example cases are provided below for the purpose of explaining some of the example embodiments.
Example 1:
If cells with configuration 1 and 2 are aggregated, the corresponding UL control timing configuration candidate or ordered sets may be {1 ,6,0} and {2,1 ,6,0}. The intersection of all these set can be computed to be {1 ,6,0}. Therefore, the chosen UL control timing configuration number may be 1.
Example 2:
If cells with configuration 1 and 3 are aggregated, the corresponding UL control timing configuration candidate or ordered sets may be {1 ,6,0} and {3,6,0}. The intersection of all these set can be computed to be {6,0}. Therefore, the chosen UL control timing configuration number may be 6.
Example 3:
If cells with configuration cells 1 , 3 and 4 are aggregated, the corresponding UL control timing configuration candidate or ordered sets may be {1 ,6,0}, {3,6,0} and
{4,1 ,3,6,0}. The intersection of all these set can be computed to be {6,0}. Therefore, the chosen UL control timing configuration number may be 6. For a given set of cell U/D configurations to be aggregated, the DL HARQ control timing configuration number may be set to a configuration number from the intersection of all DL HARQ control timing configuration candidate sets corresponding to the cell U/D configurations to be aggregated, where the set intersection operations preserve the ordering of numbers in the concerned sets. The following example cases are provided below for the purpose of explaining some of the example embodiments.
Example 1:
If cells with configuration 1 and 2 are aggregated, the corresponding DL HARQ control timing configuration candidate or ordered sets may be {1 ,2,4,5} and {2,5}. The intersection of all these set can be computed to be {2,5}. Therefore, the chosen DL HARQ control timing configuration number may be 2.
Example 2:
If cells with configuration 1 and 3 are aggregated, the corresponding DL HARQ control timing configuration candidate or ordered sets may be {1 ,2,4,5} and {3,4,5}. The intersection of all these set can be computed to be {4,5}. Therefore, the chosen DL HARQ control timing configuration number may be 4.
Example 3:
If cells with configuration 1 , 3 and 4 are aggregated, the corresponding DL HARQ control timing configuration candidate sets may be {1 ,2,4,5}, {3,4,5} and {4,5}. The intersection of all these set can be computed to be {4,5}. Therefore, the chosen DL HARQ control timing configuration number may be 4.
Examples of Half-Duplex Configuration Assignment
A user equipment capable of only half-duplex operations can perform either transmission or reception in a subframe but not both actions. Therefore, according to some of the example embodiments, subframes without conflicting U/D directions can be scheduled with PDCCH transmitted in the same subframe time (in-subframe scheduling).
For subframes with conflicting U/D directions across CCs, the half-duplex user equipments need to be informed of the scheduled directions in advance. Forward- subframe UL scheduling is already used in LTE. However, additional forward-subframe DL scheduling PDCCHs may be needed. According to the example embodiments, the following features are designed for the forward-subframe DL scheduling PDCCHs:
If no cross-CC scheduling is configured, additional forward-subframe DL scheduling PDCCHs for the individual cells may be added (referred to as in-CC forward- subframe DL scheduling PDCCHs).
If cross-CC scheduling is configured, additional cross-CC forward-subframe DL scheduling PDCCHs from the Pcell may be added.
The forward-scheduling timing may be based on the UL grant timing of the same target cell.Other forward-scheduling timing methods may also be used.
· The forward-subframe DL scheduling PDCCHs can be implemented according to the teaching of flexible carrier indicator.
Example Carrier Aggregation of Configuration 1 and 2 TDD Cells:
To support the aggregation of configuration 1 and 2 TDD cells, the two HARQ control timing configuration numbers may be set as follows:
• The UL control timing configuration number may be set to 1.
• The DL HARQ control timing configuration number may be set to 2.
For subframes with conflicting U/D directions across CCs, the half-duplex user equipments need to be informed of the scheduled directions in advance. Additional forward-subframe DL scheduling PDCCHs based on UL grant timings may be introduced as follows:
• If configuration 1 is a Pcell and cross-CC scheduling is configured, two additional cross-CC forward-subframe DL scheduling PDCCHs (from the configuration 1 cell) are shown in Figure 22.
· If configuration 2 is a Pcell or if cross-CC scheduling is not configured, two additional in-CC forward-subframe DL scheduling PDCCHs (from the configuration 2 cell) are shown in Figure 22.
Example Carrier Aggregation of Configuration 1 and 3 TDD Cells
To support the aggregation of configuration 1 and 3 TDD cells, the two HARQ control timing configuration numbers may be set as follows:
• The UL control timing configuration number may be set to 6.
• The DL HARQ control timing configuration number may be set to 4.
For subframes with conflicting U/D directions across CCs, the half-duplex UEs may need to be informed of the scheduled directions in advance. Additional forward-subframe DL scheduling PDCCHs based on UL grant timings may be introduced as follows:
If no cross-CC scheduling is configured, three in-CC forward-subframe DL scheduling PDCCHs from the Pcell and Scell may be added as shown in Figure 23.
If cross-CC scheduling is configured, three cross-CC forward-subframe DL scheduling PDCCHs from the Pcell may be added as shown in Figure 23.
Examples of Full-Duplex Configuration Assignment
A full-duplex user equipment can perform transmission and reception
simultaneously in subframes with conflicting U/D directions across different CCs.
According to the above teaching of the example embodiments, if cross-carrier scheduling is not configured, all DL subframes can be scheduled in-CC and in-subframe.
If cross-carrier scheduling is configured, in a subframe without conflicting directions, the DL subframes in the scheduling cell can carry the cross-carrier DL scheduling
PDCCHs to schedule other DL subframes of the same subframe time on other cells.
Furthermore, in a subframe with conflicting directions, if the scheduling cell is a DL subframe, PDCCH(s) can be sent from said subframe to schedule other DL subframes of the same subframe time on other cells. Additionally, in a subframe with conflicting directions, if the scheduling cell is an UL subframe, PDCCH(s) cannot be sent from said subframe to schedule other DL subframes of the same subframe time on other cells.
Thus, according to some of the example embodiments, cross-CC forward-subframe DL scheduling PDCCHs from the scheduling cell may be enabled. According to some of the example embodiments, the cross-CC forward-subframe DL scheduling PDCCHs designed in the example embodiments directed towards the half-duplex operations are applied to support full-duplex operations with certain cross-carrier scheduling scenarios.
Example Carrier Aggregation of Configuration 1 and 2 TDD Cells
To support the aggregation of configuration 1 and 2 TDD cells, the two HARQ control timing configuration numbers may be set as follows:
• The UL control timing configuration number may be set to 1.
· The DL HARQ control timing configuration number may be set to 2.
If configuration 2 is the Pcell, all DL subframes can be scheduled in-subframe and in-CC or cross-CC.
If configuration 1 is the Pcell, if cross-CC scheduling is not configured, all DL subframes can be scheduled in-CC and in-subframe. If cross-scheduling is configured, all DL subframes in the Scell can be CC-scheduled in subframe except subframes 3 and 8. Note these two subframes are the subframes with conflicting U/D directions. Hence, the half-duplex solution can be reused here. The two subframes are scheduled with forward- subframe scheduling PDCCH based on the UL grant timings of these two subframes. The two additional cross-CC forward-subframe DL scheduling PDCCHs are shown in Figure 24.
Example Carrier Aggregation of Configuration 1 and 3 TDD Cells
To support the aggregation of configuration 1 and 3 TDD cells, the two HARQ control timing configuration numbers may be set as follows:
· The UL control timing configuration number may be set to 6.
• The DL HARQ control timing configuration number may be set to 4.
If cross-CC scheduling is not configured, all DL subframes can be scheduled in-CC and in-subframe. If cross-scheduling is configured, all DL subframes in the Scell can be CC-scheduled in-subframe except subframes 7 and 8 in configuration 3 cannot be cross- scheduled in-subframe if configuration 1 is the Pcell. Additionally, subframe 4 cannot be cross-scheduled in-subframe if configuration 3 is the Pcell.
Using the half-duplex solution from the example embodiments directed towards half- duplex scheduling, two (if configuration 1 is the Pcell) or one (if configuration 3 is the Pcell) additional cross-CC forward-subframe DL scheduling PDCCHs based on the corresponding UL grant timings are used as shown in Figure 25.
Examples of Forward Downlink Scheduling
The forward-subframe DL scheduling PDCCHs introduced in the example embodiments directed to half and full duplex assignment are new features and may require implementation complexity to integrate into existing network node hardware and software architecture. There is hence a benefit in reducing the need to rely on such new forward-subframe DL scheduling PDCCHs.
According to some of the example embodiments, the following two operation rules may be implemented on the user equipment for a subframe with conflicting directions across the aggregated CCs:
In full-duplex operations, a user equipment may monitor PDCCH(s) in scheduling CC(s) with the DL direction (even if the user equipment has been given in advance grant(s) to transmit in CC(s) with the UL direction). In half-duplex operations, a user equipment may monitor PDCCH(s) in scheduling CC(s) with the DL direction if the user equipment has not been given in advance any grant to transmit in any CC with the UL direction. Example Node Configurations
Figure 26 illustrates an example of a base station 103 which may incorporate some of the example embodiments discussed above. As shown in Figure 26, the base station 103 may comprise a receiving 302 and transmitting 304 units configured to receive and transmit, respectively, any form of communications or control signals within a network. It should be appreciated that the receiving 302 and transmitting 304 units may be comprised as a single transceiving unit. It should further be appreciated that the receiving 302 and transmitting 304 units, or transceiving unit, may be in the form of any input/output communications port known in the art.
The base station 103 may further comprise at least one memory unit 308 that may be in communication with the receiving 302 and transmitting 304 units. The memory unit 308 may be configured to store received or transmitted data and/or executable program instructions. The memory unit 308 may also be configured to store the timing
compatibility hierarchy and/or control timing configuration candidate or ordered sets. The memory unit 308 may be any suitable type of computer readable memory and may be of volatile and/or non-volatile type.
The base station 103 further comprises a determination unit 308 which is configured to determine at least one timing configuration number for a plurality of aggregated cells. The base station further comprises an assignment unit 310 which is configured to assign the uplink-downlink configuration to a user equipment 101.
The determination unit 308 and/or the assignment unit310 may be any suitable type of computation unit, e.g. a microprocessor, digital signal processor (DSP), field
programmable gate array (FPGA), or application specific integrated circuit (ASIC). It should be appreciated that the determination and/or the assignment unit may be comprised as a single unit or any number of units.
Figure 27 illustrates an example of a user equipment 101 which may incorporate some of the example embodiments discussed above. As shown in Figure 27, the user equipment 101 may comprise a receiving 401 and transmitting 404 units configured to receive and transmit, respectively, any form of communications or control signals within a network. It should be appreciated that the receiving 401 and transmitting 404 units may be comprised as a single transceiving unit. It should further be appreciated that the receiving 401 and transmitting 404 units, or transceiving unit, may be in the form of any input/output communications port known in the art.
The user equipment 101 may further comprise at least one memory unit 408 that may be in communication with the receiving 402 and transmitting 404 units. The memory unit 408 may be configured to store received or transmitted data and/or executable program instructions. The memory unit 408 may also be configured to store the timing compatibility hierarchy and/or HARQ control timing configuration candidate or ordered sets. The memory unit 408 may be any suitable type of computer readable memory and may be of volatile and/or non-volatile type.
The user equipment 101 may further comprise an implementation unit 408 which may be configured to implement a control timing based on at least one timing
configuration number. The user equipment 101 may also comprise a determining unit 402 that may be configured to receive or determine the at least one timing configuration number. The implementation unit408 and/or the determining unit 402 may be any suitable type of computation unit, e.g. a microprocessor, digital signal processor (DSP), field programmable gate array (FPGA), or application specific integrated circuit (ASIC). It should be appreciated that the implementation unit and the determining unit need not be provided as two separate units but may be provided as a single or any number of units.
Example Node Operations
Figure 28 is a flow diagram depicting example operations which may be taken by the base station 103 of Figure 26. Example Operation 10
The base station determines 10 at least one timing configuration number for a plurality of aggregated cells of the multiple carrier network. Each aggregated cell is associated with an uplink-downlink configuration number. At least two uplink-downlink configuration numbers of the plurality of aggregated cells are not equal. The plurality of aggregated cells is associated with the user equipment. The determination unit 308 is configured to perform the determining 10.
According to some example embodiments, the at least one timing configuration number may be indicative of, or used to determine, a downlink HARQ control timing configuration for establishing downlink HARQ A/N timings across the plurality of aggregated cells. According to some of the example embodiments, the at least one timing configuration number may be indicative of, or used to determine, an uplink control timing configuration number for establishing uplink scheduling grant and/or A N timings across the plurality of aggregated cells. Example Operation 11
According to some of the example embodiments, the determining 10 may further comprise determining 11 the at least one timing configuration number based on the uplink-downlink configuration numbers of the plurality of aggregated cells. The
determination unit 308 is configured to perform the determining 10.
In some of the example embodiments, the at least one timing configuration number may be determined to be equal to one of said uplink-downlink configuration numbers of the plurality of aggregated cells, for example as illustrated in Example Case 2 under the sub-heading Configuration Assignment. In some of the example embodiments, the at least one timing configuration number may be determined to not be equal to any of the uplink-downlink configuration numbers of said plurality of aggregated cells, for example as illustrated in Example Case 1 under the sub-heading Configuration Assignment. The at least one timing configuration number may be determined such that control data is transmitted to and from the use equipment and the network in a non-conflicting manner.
Example Operation 12
According to some of the example embodiments, the determining 10 may further comprise determining 12 the uplink-downlink configuration based on a subframe timing compatibility ordering, for example as illustrated in Figure 15. The determination unit 308 may perform the determining 12.
Example Operation 14
According to some of the example embodiments, the determining 12 may further comprise arranging 14 the subframe timing compatibility ordering such that uplink- downlink configurations on a higher level of the ordering comprise uplink subframes that are a superset of all uplink subframes from uplink-downlink configurations on a lower level of the ordering. The determination unit may be configured to perform the arranging 14. Example Operation 16
According to some of the example embodiments, the determining 12 may further comprise arranging 16 the subframe timing compatibility ordering such that uplink- downlink configurations on a lower level of the ordering comprise uplink subframes that are a superset of all downlink subframes from uplink-downlink configurations on a higher level of the ordering. The determination unit may be configured to perform the arranging 16.
Example Operation 18
The base station 103 assignsl 8 the at least one timing configuration number to the user equipment. The assigning unit 310 is configured to perform the assigning 18.
Example Operation 20
According to some of the example embodiments, the assigning 8 may further comprise assigning 20, in the presence of conflicting subframes, a forward-subframe downlink scheduling with respect to a PDCCH, as explained in Figures 22-25. The assigning unit 310 may be configured to perform the assigning 20.
Example Operation 22
According to some of the example embodiments, the assigning 18 may further comprise assigning 22, in the presence of conflicting subframes, a cross component carrier forward subframe downlink scheduling with respect to a PDCCH, as explained in Figures 22, 24 and 25. The assigning unit 310 may be configured to perform the assigning 22.
Example Operation 24
According to some of the example embodiments, the method may further comprise regulating 24 a usage of forward-subframe downlink scheduling by monitoring, in a full- duplex mode of operation a PDCCH in a scheduling component carrier with a downlink subframe, if the user equipment has been given an advance grant to transmit carrier components in an uplink direction. The assignment unit and/or determination unit may perform the regulating 24. Example Operation 26
According to some of the example embodiments, the method may also comprise regulating 26 a usage of a forward-subframe downlink scheduling by monitoring, in a half- duplex mode of operation, a PDCCH in a scheduling component carrier with a downlink subframe, if the user equipment has not been given an advance grant to transmit carrier components in an uplink direction. The assignment unit and/or determination unit may perform the regulating 26.
Example Operation 28
According to some of the example embodiments, the method may also comprise communication 28 to the user equipment the at least one timing configuration number via RRC signaling. The determination unit and/or transmitting unit may perform the communication 28. Figure 29 is a flow diagram depicting example operations which may be taken by the user equipment 101 of Figure 27.
Example Operation 30
The user equipment determines 30 at least one timing configuration number for a plurality of aggregated cells of the multiple carrier network, where each aggregated cell is associated with an uplink-downlink configuration number, where at least two uplink- downlink configuration numbers of the plurality of aggregated cells are not equal. The plurality of aggregated cells is associated with the user equipment. The determination 308 is configured to perform the determining 30.
According to some example embodiments, the at least one timing configuration number may be indicative of, or used to determine HARQ control timing configuration for establishing downlink HARQ A/N timings across the plurality of aggregated cells.
According to some of the example embodiments, the at least one timing configuration number may be indicative of, or used to determine, an uplink control timing configuration number for establishing uplink scheduling grant and/or A N timings across the plurality of aggregated cells.
Example Operation 31
According to some of the example embodiments, the determining 30 may further comprise receiving 31 the at least one timing configuration from a base station. It should be appreciated that the at least one timing configuration number may be received via RRC signaling. The determining unit and/or receiving unit may be configured to perform the receiving 31. Example Operation 32
According to some of the example embodiments, the determining 30 may further comprise determining 32 the at least one timing configuration number such that control data is transmitted to and from the user equipment and the network in a non-conflicting manner. The determining unit may be configured to perform the determining 32.
Example Operation 33
The user equipment 101 implements 33control timing based on the at least one timing configuration number. The implementation unit 408 is configured to perform the implementing operation.
In some of the example embodiments, the at least one timing configuration number may be implemented to be equal to one of said uplink-downlink configuration numbers of the plurality of aggregated cells, for example as illustrated in Example Case 2 under the sub-heading Configuration Assignment. In some of the example embodiments, the at least one timing configuration number may be implemented to not be equal to any of the uplink-downlink configuration numbers of said plurality of aggregated cells, for example as illustrated in Example Case 1 under the sub-heading Configuration Assignment.
Example Operation 34
According to some of the example embodiments, the implementing 33 may further comprise scheduling 34, in the presence of conflicting subframes, a forward-subframe downlink with respect to a PDCCH. The implementation unit 408 may be configured to perform the scheduling 34.
Example Operation 36
According to some of the example embodiments, the implementing 33 may further comprise scheduling 36, in the presence of conflicting subframes, a cross component carrier forward-subframe downlink with respect to a PDCCH. The implementation unit 408 may be configured to perform the scheduling 36. Example Operation 37
According to some of the example embodiments, the implementing 33 may further comprise scheduling 37 control data, based on the at least one timing configuration, such that the control data is transmitted to and from the user equipment and the network in a non-conflicting manner.
Conclusion
The description of the example embodiments provided herein have been presented for purposes of illustration. The description is not intended to be exhaustive or to limit example embodiments to the precise form disclosed, and modifications and variations are possible in light of the above teachings or may be acquired from practice of various alternatives to the provided embodiments. The examples discussed herein were chosen and described in order to explain the principles and the nature of various example embodiments and its practical application to enable one skilled in the art to utilize the example embodiments in various manners and with various modifications as are suited to the particular use contemplated. The features of the embodiments described herein may be combined in all possible combinations of methods, apparatus, modules, systems, and computer program products. It should be appreciated that the example embodiments presented herein may be practiced in any combination with each other.
It should be noted that the word "comprising" does not necessarily exclude the presence of other elements or steps than those listed and the words "a" or "an" preceding an element do not exclude the presence of a plurality of such elements. It should further be noted that any reference signs do not limit the scope of the claims, that the example embodiments may be implemented at least in part by means of both hardware and software, and that several "means", "units" or "devices" may be represented by the same item of hardware.
A "device" as the term is used herein, is to be broadly interpreted to include a radiotelephone having ability for Internet intranet access, web browser, organizer, calendar, a camera (e.g., video and/or still image camera), a sound recorder (e.g., a microphone), and/or global positioning system (GPS) receiver; a personal
communications system (PCS) user equipment that may combine a cellular
radiotelephone with data processing; a personal digital assistant (PDA) that can include a radiotelephone or wireless communication system; a laptop; a camera (e.g., video and/or still image camera) having communication ability; and any other computation or communication device capable of transceiving, such as a personal computer, a home entertainment system, a television, etc.
Although the description is mainly given for a user equipment, as measuring or recording unit, it should be understood by the skilled in the art that "user equipment" is a non-limiting term which means any wireless device, terminal, or node capable of receiving in DL and transmitting in UL (e.g. PDA, laptop, mobile, sensor, fixed relay, mobile relay or even a radio base station, e.g. femto base station).
A cell is associated with a radio node, where a radio node or radio network node or eNodeB used interchangeably in the example embodiment description, comprises in a general sense any node transmitting radio signals used for measurements, e.g., eNodeB, macro/micro/pico base station, home eNodeB, relay, beacon device, or repeater. A radio node herein may comprise a radio node operating in one or more frequencies or frequency bands. It may be a radio node capable of CA. It may also be a single- or muti- RAT node. A multi-RAT node may comprise a node with co-located RATs or supporting multi-standard radio ( SR) or a mixed radio node.
The various example embodiments described herein are described in the general context of method steps or processes, which may be implemented in one aspect by a computer program product, embodied in a computer-readable medium, including computer-executable instructions, such as program code, executed by computers in networked environments. A computer-readable medium may include removable and nonremovable storage devices including, but not limited to, Read Only Memory (ROM), Random Access Memory (RAM), compact discs (CDs), digital versatile discs (DVD), etc. Generally, program modules may include routines, programs, objects, components, data structures, etc. that perform particular tasks or implement particular abstract data types. Computer-executable instructions, associated data structures, and program modules represent examples of program code for executing steps of the methods disclosed herein. The particular sequence of such executable instructions or associated data structures represents examples of corresponding acts for implementing the functions described in such steps or processes.
In the drawings and specification, there have been disclosed exemplary embodiments. However, many variations and modifications can be made to these embodiments. Accordingly, although specific terms are employed, they are used in a generic and descriptive sense only and not for purposes of limitation, the scope of the embodiments being defined by the following claims.

Claims

A method, in a base station (103), for configuring control timing to and from a user equipment (101) in a multiple cell communications network, the method comprising: determining (10) at least one timing configuration number for a plurality of aggregated cells of the multiple cell communications network, each aggregated cell being associated with an uplink-downlink configuration number, wherein at least two uplink-downlink configuration numbers of the plurality of aggregated cells are not equal, and said plurality of aggregated cells being associated with the user equipment (101); and
assigning ( 8) said at least one timing configuration number to the user equipments 01).
The method of claim 1, wherein the at least one timing configuration number is indicative of a downlink Hybrid-Automatic Repeat Request, HARQ, control timing configuration for establishing downlink HARQ A N timings across the plurality of aggregated cells.
The method of any of claims 1-2, wherein the at least one timing configuration number is indicative of an uplink control timing configuration number for establishing uplink scheduling grant and/or acknowledgement/negative-acknowledgement, A/N, timings across the plurality of aggregated cells.
The method of any of claims 1-3, wherein the at least one timing configuration number is equal to one of said uplink-downlink configuration numbers of the plurality of aggregated cells.
The method of any of claims 1-3, wherein the at least one timing configuration number is not equal to any of the uplink-downlink configuration numbers of said plurality of aggregated cells.
The method of any of claims 1-5, wherein the at least one timing configuration number is determined such that control data is transmitted, to and from the user equipment and the network, in a non-conflicting manner.
7. The method of any of claims 1 -6, wherein the determining (10) further comprises determining (11)the at least one timing configuration number based on the uplink- downlink configuration numbers of said plurality of aggregated cells.
5 8. The method of claim 7, wherein the determining (10) further comprises determining (12) the at least one timing configuration number based on a subframe timing compatibility ordering.
9. The method of claim 8, wherein the determining (12) further comprises arranging 10 (14) the subframe timing compatibility ordering such that uplink-downlink
configurations on a higher level of the ordering comprise uplink subframes that are a superset of all uplink subframes from uplink-downlink configurations on a lower level of the ordering.
15 10. The method of any of claims 8-9, wherein the determining (12) further comprises arranging (16) the subframe timing compatibility ordering such that uplink-downlink configurations on a lower level of the ordering comprise downlink subframes that are a superset of all downlink subframes from uplink-downlink configurations on a higher level of the ordering.
1 . The method of any of claims 1 -10, wherein the assigning ( 8) further comprises communicating to the user equipment said at least one timing configuration number via radio resource control, RRC, signalling.
25 12. The method of any of claims 1-11 , wherein the assigning (18) further comprises assigning (20), in the presence of conflicting subframes, a forward-subframe downlink scheduling timing with respect to a physical downlink control channel, PDCCH.
30 13. The method of any of claims 1-12, wherein the assigning (18) further comprises assigning (22), in the presence of conflicting subframes, a cross component carrier forward-subframe downlink scheduling timing with respect to a physical downlink control channel, PDCCH.
35
14. A base station (103) for configuring control timing to and from a user equipment (101) in a multiple cell communications network, the base station comprising: a determination unit (308) configured to determine at least one timing configuration number for a plurality of aggregated cells of the multiple cell communications network, each aggregated cell being associated with an uplink- downlink configuration number, wherein at least two uplink-downlink configuration numbers of the plurality of aggregated cells are not equal, and said plurality of aggregated cells being associated with the user equipment (101); and
an assignment unit (310) configured to assign said at least one timing configuration number to the user equipment (101).
15. The base station of claim 14, wherein the at least one timing configuration number is indicative of a downlink Hybrid-Automatic Repeat Request, HARQ, control timing configuration for establishing downlink HARQ A/N timings across the plurality of aggregated cells.
16. The base station of any of claims 14-15, wherein the at least one timing
configuration number is indicative of an uplink control timing configuration number for establishing uplink scheduling grant and/or acknowledgement negative- acknowledgement, A/N, timings across the plurality of aggregated cells. 7. The base station of any of claims 14-16, wherein the at least one timing
configuration number is equal to one of said uplink-downlink configuration numbers of the plurality of aggregated cells.
18. The base station of any of claims 14-16, wherein the at least one timing
configuration number is not equal to any of the uplink-downlink configuration numbers of said plurality of aggregated cells. 19. The base station of any of claims 14-18, wherein the at least one timing
configuration number is determined such that control data is transmitted, to and from the user equipment and the network, in a non-conflicting manner.
20. The base station of any of claims 14-19, wherein the determination unit (308) is further configured to determine the at least one timing configuration number based on the uplink-downlink configuration numbers of said plurality of aggregated cells. 21. The base station of claim 20, wherein the determination unit (308) is further
configured to determine the at least one timing configuration number based on a subframe timing compatibility ordering.
22. The base station of claim 20, wherein the subframe timing compatibility ordering is arranged such uplink-downlink configurations on a higher level of the ordering comprise uplink subframes that are a superset of all uplink subframes from uplink- downlink configurations on a lower level of the ordering.
23. The base station of any of claims 21-22, wherein the subframe timing compatibility ordering is arranged such uplink-downlink configurations on a lower level of the ordering comprise downlink subframes that are a superset of all downlink subframes from uplink-downlink configurations on a higher level of the ordering.
24. The base station of any of claims 14-23, wherein the assignment unit (310) is further configured to communicate to the user equipment said at least one timing configuration number via radio resource control, RRC, signalling.
25. The base station of any of claims 14-24, wherein the assignment unit(310) is further configured to assign, in the presence of conflicting subframes, a forward-subframe downlink scheduling timing with respect to a physical downlink control channel, PDCCH.
26. The base station of any of claims 14-25, wherein the assignment unit (310) is further configured to assign, in the presence of conflicting subframes, a cross component carrier forward-subframe downlink scheduling timing with respect to a physical downlink control channel, PDCCH.
27. A method, in a user equipment (101), for a configuration of control timing for a user equipment (101) in a multiple cell communications network, the method comprising: Determining (30) at least one timing configuration number for a plurality of aggregated cells of the multiple cell communications network, each aggregated cell being associated with an uplink-downlink configuration number, wherein at least two uplink-downlink configuration numbers of the plurality of aggregated cells are not 5 equal, and said plurality of aggregated cells being associated with the user
equipment (101); and
implementing (33) control timing based on the at least one timing configuration number.
10 28. The method of claim 27, wherein the at least one timing configuration number is indicative of a downlink Hybrid-Automatic Repeat Request, HARQ, control timing configuration for establishing downlink HARQ A/N timings across the plurality of aggregated cells.
15 29. The method of any of claims 27-28, wherein the at least one timing configuration number is indicative of an uplink control timing configuration number for establishing uplink scheduling grant and/or acknowledgement/negative-acknowledgement, A/N, timings across the plurality of aggregated cells.
20 30. The method of any of claims 27-29, wherein the at least one timing configuration number is equal to one of said uplink-downlink configuration numbers of the plurality of aggregated cells.
31. The method of any of claims 27-29, wherein the at least one timing configuration 25 number is not equal to any of the uplink-downlink configuration numbers of said plurality of aggregated cells.
32. The method of any of claims 27-31 , wherein the implementing (33) further
comprising scheduling (37) control data, based on that at least one timing
30 configuration number, such that the control data is transmitted, to and from the user equipment and the network, in a non-conflicting manner.
33. The method of any of claims 27-32, wherein the determining (30) further comprises receiving (31) the at least one timing configuration from a base station (103).
35
34. The method of claim 33, wherein the at least one timing configuration is received via radio resource control, RRC, signalling.
35. The method of any of claims 27-34, wherein the determining (30) further comprises 5 determining (32) the at least one timing configuration number such that control data is transmitted to and from the user equipment and the network in a non-conflicting manner.
36. The method of any of claims27-35, wherein the implementing (33) further comprises 10 scheduling (34), in the presence of conflicting subframes, a forward-subframe
downlink scheduling timing with respect to a physical downlink control channel, PDCCH.
37 The method of any of claims 27-36, wherein the implementing (33) further
15 comprises scheduling (36), in the presence of conflicting subframes, a cross
component carrier forward-subframe downlink scheduling timing with respect to a physical downlink control channel, PDCCH.
38. A user equipment (101 ), for a configuration of control timing for a user equipment in 20 a multiple cell communications network, the user equipment (101) comprising:
a determining unit (402) configured to determine at least one timing configuration number for a plurality of aggregated cells of the multiple cell communications network, each aggregated cell being associated with an uplink- downlink configuration number, wherein at least two uplink-downlink configuration 25 numbers of the plurality of aggregated cells are not equal, and said plurality of aggregated cells being associated with the user equipment (101); and
an implementation unit (408) configured to implement control timing based on the at least one timing configuration number.
30 39. The user equipment of claim 38, wherein the at least one timing configuration
number is indicative of a downlink Hybrid-Automatic Repeat Request, HARQ, control timing configuration for establishing downlink HARQ A N timings across the plurality of aggregated cells.
40. The user equipment of any of claims 38-39, wherein the at least one timing configuration number is indicative of an uplink control timing configuration number for establishing uplink scheduling grant and/or acknowledgement/negative- acknowledgement, A/N, timings across the plurality of aggregated cells.
5
41. The user equipment of any of claims 38-40, wherein the at least one timing
configuration number is equal to one of said uplink-downlink configuration numbers of the plurality of aggregated cells.
10 42. The user equipment of any of claims 38-40, wherein the at least one timing
configuration number is not equal to any of the uplink-downlink configuration numbers of said plurality of aggregated cells.
43. The user equipment of any of claims 38-42, wherein the implementation unit (408) is 15 further configured to schedule control data, based on the at least one timing
configuration number, such that control data is transmitted, to and from the user equipment and the network, in a non-conflicting manner.
44. The user equipment of any of claims 38-43, wherein the determining unit (402) is 20 further configured to receive, from the base station (103), the at least one timing configuration number.
45. The user equipment of claim 44, wherein the at least one timing configuration
number is received via radio resource control, RRC, signalling.
25
46. The user equipment of any of claims 38-45, wherein the implementation unit (408) is configured to implement the at least one timing configuration number such that control data is transmitted to and from the user equipment and the network in a non- conflicting manner.
30
47. The user equipment of any of claims 38-46, wherein the implementation unit (408) is further configured to schedule, in the presence of conflicting subframes, a forward- subframe downlink scheduling timing with respect to a physical downlink control channel, PDCCH.
35 The user equipment of any of claims 38-47, wherein the implementation unit (408) is further configured to schedule, in the presence of conflicting subframes, a cross component carrier forward-subframe downlink scheduling timing with respect to a physical downlink control channel, PDCCH.
PCT/SE2012/050093 2011-08-12 2012-01-31 Base station, user equipment and methods therein for control timing configuration assignment in a multiple cell communications network WO2013025143A1 (en)

Priority Applications (10)

Application Number Priority Date Filing Date Title
EP12705917.8A EP2742756B1 (en) 2011-08-12 2012-01-31 Base station, user equipment and methods therein for control timing configuration assignment in a multiple cell communications network
US13/510,201 US9295055B2 (en) 2011-08-12 2012-01-31 Base station, user equipment and methods therein for control timing configuration assignment in a multiple cell communications network
ES12705917.8T ES2529998T3 (en) 2011-08-12 2012-01-31 Base station, user equipment and methods for assigning control timing settings in a multi-cell communications network
JP2014524966A JP5938099B2 (en) 2011-08-12 2012-01-31 Base station, user equipment and method in them for assignment of control timing configuration in multiple cell communication network
KR1020147003695A KR101875253B1 (en) 2011-08-12 2012-01-31 Base station, user equipment and methods therein for control timing configuration assignment in a multiple cell communications network
DK12705917.8T DK2742756T3 (en) 2011-08-12 2012-01-31 BASIC STATION, USER EQUIPMENT AND METHODS OF TIME MANAGEMENT CONFIGURATION ALLOCATION IN A MULTIPLE CELL TELECOMMUNICATION NETWORK
CN201280039309.0A CN103782639B (en) 2011-08-12 2012-01-31 Base station, user equipment and its method for the control timing configured assignment in multi-cell communication network
BR112014003316-1A BR112014003316B1 (en) 2011-08-12 2012-01-31 METHOD, BASE STATION AND USER EQUIPMENT TO DETERMINE AT LEAST ONE CONTROL TIMER SETTING NUMBER
US15/073,315 US11070346B2 (en) 2011-08-12 2016-03-17 Base station, user equipment and methods therein for control timing configuration assignment in a multiple cell communications network
US17/365,493 US20210328753A1 (en) 2011-08-12 2021-07-01 Base Station, User Equipment and Methods Therein for Control Timing Configuration Assignment in a Multiple Cell Communications Network

Applications Claiming Priority (4)

Application Number Priority Date Filing Date Title
US201161522698P 2011-08-12 2011-08-12
US61/522,698 2011-08-12
US201161524859P 2011-08-18 2011-08-18
US61/524,859 2011-08-18

Related Child Applications (2)

Application Number Title Priority Date Filing Date
US13/510,201 A-371-Of-International US9295055B2 (en) 2011-08-12 2012-01-31 Base station, user equipment and methods therein for control timing configuration assignment in a multiple cell communications network
US15/073,315 Continuation US11070346B2 (en) 2011-08-12 2016-03-17 Base station, user equipment and methods therein for control timing configuration assignment in a multiple cell communications network

Publications (1)

Publication Number Publication Date
WO2013025143A1 true WO2013025143A1 (en) 2013-02-21

Family

ID=45757759

Family Applications (2)

Application Number Title Priority Date Filing Date
PCT/SE2012/050093 WO2013025143A1 (en) 2011-08-12 2012-01-31 Base station, user equipment and methods therein for control timing configuration assignment in a multiple cell communications network
PCT/SE2012/050583 WO2013025150A1 (en) 2011-08-12 2012-05-31 Storage and assignment of control timing configurations in a multiple cell communications network

Family Applications After (1)

Application Number Title Priority Date Filing Date
PCT/SE2012/050583 WO2013025150A1 (en) 2011-08-12 2012-05-31 Storage and assignment of control timing configurations in a multiple cell communications network

Country Status (10)

Country Link
US (4) US9295055B2 (en)
EP (2) EP2742756B1 (en)
JP (1) JP5938099B2 (en)
KR (1) KR101875253B1 (en)
CN (3) CN107707339B (en)
AR (2) AR087499A1 (en)
BR (1) BR112014003316B1 (en)
DK (1) DK2742756T3 (en)
ES (2) ES2529998T3 (en)
WO (2) WO2013025143A1 (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2015026275A1 (en) 2013-08-23 2015-02-26 Telefonaktiebolaget L M Ericsson (Publ) A node and method for downlink scheduling and hybrid automatic repeat request timing
WO2015026274A1 (en) 2013-08-23 2015-02-26 Telefonaktiebolaget L M Ericsson (Publ) A node and method for uplink scheduling and hybrid automatic repeat request timing
WO2015104738A1 (en) * 2014-01-08 2015-07-16 Nec Corporation A signalling method
US9137787B2 (en) 2012-05-10 2015-09-15 Telefonaktiebolaget L M Ericsson (Publ) Method and apparatus for hybrid automatic repeat request signaling
US9356760B2 (en) 2012-05-10 2016-05-31 Telefonaktiebolaget Lm Ericsson (Publ) Method and apparatus for hybrid automatic repeat request signaling
JP2016154382A (en) * 2011-03-24 2016-08-25 エルジー エレクトロニクス インコーポレイティド Method for transmitting/receiving signal and device therefor
JPWO2014163163A1 (en) * 2013-04-04 2017-02-16 シャープ株式会社 Terminal device, communication method, and integrated circuit
JPWO2014148442A1 (en) * 2013-03-22 2017-02-16 シャープ株式会社 Terminal device, base station device, integrated circuit, and wireless communication method

Families Citing this family (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9515808B2 (en) * 2011-07-26 2016-12-06 Qualcomm Incorporated Transmission of control information in a wireless network with carrier aggregation
JP5938099B2 (en) 2011-08-12 2016-06-22 テレフオンアクチーボラゲット エルエム エリクソン(パブル) Base station, user equipment and method in them for assignment of control timing configuration in multiple cell communication network
KR20130075620A (en) * 2011-12-27 2013-07-05 주식회사 팬택 Method and apparatus for providing pusch/phich scheduling timing in inter-band time division duplex mode
ES2773256T3 (en) 2012-02-14 2020-07-10 Samsung Electronics Co Ltd Procedure and apparatus for transmitting uplink and downlink data in TDD system
US20150049653A1 (en) * 2012-03-16 2015-02-19 Samsung Electronics Co., Ltd. Method and system for handling ue behavior in inter-band carrier aggregation with cell specific tdd configuration
US9300395B2 (en) * 2012-07-05 2016-03-29 Telefonaktiebolaget L M Ericsson (Publ) Method and apparatus for carrier aggregation
US8811332B2 (en) * 2012-10-31 2014-08-19 Sharp Laboratories Of America, Inc. Systems and methods for carrier aggregation
US20140152459A1 (en) * 2012-12-04 2014-06-05 Schlumberger Technology Corporation Wellsite System and Method for Multiple Carrier Frequency, Half Duplex Cable Telemetry
JP6180732B2 (en) * 2012-12-17 2017-08-16 株式会社Nttドコモ User terminal, radio base station, and radio communication method
EP2945310B1 (en) * 2013-01-09 2021-09-01 LG Electronics Inc. Method and apparatus for transmitting receipt confirmation reply in wireless communication system
US10237020B2 (en) 2013-07-19 2019-03-19 Sharp Kabushiki Kaisha Systems and methods for carrier aggregation
US9559817B2 (en) * 2013-07-19 2017-01-31 Sharp Kabushiki Kaisha Systems and methods for carrier aggregation
US9577814B2 (en) * 2014-02-07 2017-02-21 Samsung Electronics Co., Ltd. Method and apparatus for allocating resources in carrier aggregation system
EP3150016B1 (en) * 2014-05-28 2023-04-05 Nec Corporation A method for operating a wireless network, a wireless network and a base station
US10194422B2 (en) * 2014-09-01 2019-01-29 Lg Electronics Inc. Signal transmission and reception method in wireless communication system supporting carrier aggregation, and device for same
US10237030B2 (en) * 2014-11-03 2019-03-19 Qualcomm Incorporated Communicating hybrid automatic repeat/request (HARQ) feedback in wireless communications
US10367633B2 (en) * 2015-04-15 2019-07-30 Nokia Technologies Oy Wireless communication
EP3759969A1 (en) * 2018-02-28 2021-01-06 Telefonaktiebolaget LM Ericsson (publ) Assistance information for spcell selection
WO2020237425A1 (en) * 2019-05-24 2020-12-03 Qualcomm Incorporated Scheduling for improved throughput in enhanced machine-type communication

Family Cites Families (37)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5991279A (en) * 1995-12-07 1999-11-23 Vistar Telecommunications Inc. Wireless packet data distributed communications system
KR100251779B1 (en) * 1997-07-25 2000-04-15 윤종용 An interfacing apparatus between pdh network and atm network
US7599327B2 (en) * 2004-06-24 2009-10-06 Motorola, Inc. Method and apparatus for accessing a wireless communication system
CN101151818B (en) * 2005-03-30 2011-08-10 摩托罗拉移动公司 Method and apparatus for reducing round-trip latency and overhead within a communication system
US9357564B2 (en) * 2007-06-19 2016-05-31 Texas Instruments Incorporated Signaling of random access preamble parameters in wireless networks
US9510360B2 (en) * 2007-10-06 2016-11-29 Alcatel-Lucent Usa Inc. Method and apparatus for a coordinated scheduling method to avoid multiplexing of control and data for power limited users in the LTE reverse link
CN101466071B (en) * 2007-12-17 2010-11-10 华为技术有限公司 Method and apparatus for distributing time frequency resource
JP5230794B2 (en) * 2008-03-24 2013-07-10 ゼットティーイー (ユーエスエー) インコーポレイテッド Dynamic adjustment of downlink / uplink allocation ratio and signaling method in LTE / TDD system
US9048924B2 (en) * 2008-07-30 2015-06-02 Lg Electronics Inc. Relay station in radio communication system and operating method for the relay station
EP4102760A1 (en) 2008-08-11 2022-12-14 Sun Patent Trust Wireless communication base station device, wireless communication terminal, and control information creation method
US9584216B2 (en) * 2008-10-31 2017-02-28 Nokia Technologies Oy Dynamic allocation of subframe scheduling for time divison duplex operation in a packet-based wireless communication system
US8526419B2 (en) * 2009-01-05 2013-09-03 Qualcomm Incorporated Provision of inter-frequency subframe configuration in wireless communication
US8073393B2 (en) * 2009-02-05 2011-12-06 Qualcomm Incorporated Methods and systems for least squares block channel estimation
WO2010133031A1 (en) * 2009-05-21 2010-11-25 华为技术有限公司 Method, device and system for allocating an ack channel under carrier aggregation
JP5328907B2 (en) * 2009-05-26 2013-10-30 パナソニック株式会社 Information presentation device
TWI486018B (en) * 2009-10-23 2015-05-21 Ind Tech Res Inst Transmission method for wireless relay system and relay station using the same
TWI519190B (en) * 2009-11-19 2016-01-21 內數位專利控股公司 Component carrier activation/deactivation in multi-carrier systems
NZ600165A (en) * 2009-12-14 2014-08-29 Ericsson Telefon Ab L M Method and arrangement for reconfiguring mapping of carrier indicator field to component carrier
US8233911B2 (en) * 2009-12-16 2012-07-31 Nokia Corporation Method and apparatus for estimating a position of a node in a communications network
CN102104897B (en) * 2009-12-17 2014-04-09 电信科学技术研究院 Method and equipment for prohibiting measurement report
US20110176461A1 (en) * 2009-12-23 2011-07-21 Telefonakatiebolaget Lm Ericsson (Publ) Determining configuration of subframes in a radio communications system
KR101750371B1 (en) 2009-12-24 2017-07-03 삼성전자 주식회사 Method and apparatus defining transmission and reception time of physical channels supporting cross carrier scheduling in TDD cellular communication systems
KR101710607B1 (en) * 2010-01-20 2017-02-27 삼성전자주식회사 Method and apparatus for surpporting handover of user equipment in mobile system
KR101740445B1 (en) * 2010-04-22 2017-05-26 엘지전자 주식회사 Method for transmitting control channel to relay node in wireless communication system and apparatus thereof
US8699386B2 (en) * 2010-08-18 2014-04-15 Qualcomm Incorporated H-ARQ timing and backhaul subframe configuration for TDD relay in LTE-A
WO2012086981A2 (en) * 2010-12-23 2012-06-28 엘지전자 주식회사 Method for reporting channel status information in a multi-cell cooperative wireless communication system, and device for same
JP5895008B2 (en) * 2011-03-18 2016-03-30 エルジー エレクトロニクス インコーポレイティド Method and apparatus for transmitting control information in wireless communication system
JP5797830B2 (en) * 2011-03-21 2015-10-21 エルジー エレクトロニクス インコーポレイティド HARQ execution method and apparatus in TDD-based wireless communication system
CN102752090B (en) * 2011-04-22 2017-06-16 北京三星通信技术研究有限公司 A kind of method that synchronous HARQ for supporting PUSCH is transmitted
WO2012148443A1 (en) 2011-04-29 2012-11-01 Intel Corporation System and method of rank adaptation in mimo communication system
WO2012161510A2 (en) * 2011-05-23 2012-11-29 엘지전자 주식회사 Method and apparatus for transmitting control information in a wireless communication system
KR101961807B1 (en) * 2011-05-31 2019-07-18 삼성전자 주식회사 Method and apparatus for defining transmit/receive timing and resource allocation of physical channels supporting carrier aggregation in tdd cellular communication systems
US20130003664A1 (en) 2011-06-28 2013-01-03 Telefonaktiebolaget Lm Ericsson (Publ) Scheduling of a User Equipment in a Radio Communication System
US9160513B2 (en) * 2011-07-28 2015-10-13 Qualcomm Incorporated Method and apparatus for signaling control data of aggregated carriers
CN102916789B (en) 2011-08-05 2016-01-13 财团法人工业技术研究院 Time division duplex wireless communication system and hybrid automatic repeat request acknowledgement reporting method
US9363820B2 (en) * 2011-08-11 2016-06-07 Industrial Technology Research Institute Method of uplink control information transmission
JP5938099B2 (en) 2011-08-12 2016-06-22 テレフオンアクチーボラゲット エルエム エリクソン(パブル) Base station, user equipment and method in them for assignment of control timing configuration in multiple cell communication network

Non-Patent Citations (5)

* Cited by examiner, † Cited by third party
Title
CATT: "HARQ and Cross-carrier Scheduling for Different TDD Configurations", 3GPP DRAFT; R2-112798, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, vol. RAN WG2, no. Barcelona, Spain; 20110509, 3 May 2011 (2011-05-03), XP050495238 *
ERICSSON ET AL: "Applicable scenarios for TDD CA of different UL-DL configurations", 3GPP DRAFT; R1-113532, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, vol. RAN WG1, no. Zhuhai; 20111010, 14 October 2011 (2011-10-14), XP050538655 *
HUAWEI ET AL: "Details on ACK/NACK time domain bundling for TDD", 3GPP DRAFT; R1-110900, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, vol. RAN WG1, no. Taipei, Taiwan; 20110221, 17 February 2011 (2011-02-17), XP050490779 *
INTEL CORPORATION: "Support of Mixed Inter-Band TDD Configurations in Rel-11 CA", 3GPP DRAFT; R2-113216 MIXED TDD CONFIGURATIONS FOR INTERBAND CA, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, vol. RAN WG2, no. Barcelona, Spain; 20110509, 3 May 2011 (2011-05-03), XP050495383 *
MEDIATEK INC: "HARQ Feedback Mechanism in CA with Different TDD Configurations", 3GPP DRAFT; R1-113047_HARQ_FEEDBACK_IN_CA_WITH_DIFF_TDD_CONFIG, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, vol. RAN WG1, no. Zhuhai; 20111010, 4 October 2011 (2011-10-04), XP050538206 *

Cited By (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2016154382A (en) * 2011-03-24 2016-08-25 エルジー エレクトロニクス インコーポレイティド Method for transmitting/receiving signal and device therefor
US9867170B2 (en) 2011-03-24 2018-01-09 Lg Electronics Inc. Method for transmitting/receiving signal and device therefor
US9807744B2 (en) 2011-03-24 2017-10-31 Lg Electronics Inc. Method for transmitting/receiving signal and device therefor
US9716571B2 (en) 2012-05-10 2017-07-25 Telefonaktiebolaget Lm Ericsson (Publ) Method and apparatus for hybrid automatic repeat request signaling
US9716569B2 (en) 2012-05-10 2017-07-25 Telefonaktiebolaget Lm Ericsson (Publ) Method and apparatus for hybrid automatic repeat request signaling
US9137787B2 (en) 2012-05-10 2015-09-15 Telefonaktiebolaget L M Ericsson (Publ) Method and apparatus for hybrid automatic repeat request signaling
US9356760B2 (en) 2012-05-10 2016-05-31 Telefonaktiebolaget Lm Ericsson (Publ) Method and apparatus for hybrid automatic repeat request signaling
US10862658B2 (en) 2013-03-22 2020-12-08 Sharp Kabushiki Kaisha Terminal device, base station device, integrated circuit, and wireless communication method
JPWO2014148442A1 (en) * 2013-03-22 2017-02-16 シャープ株式会社 Terminal device, base station device, integrated circuit, and wireless communication method
US10548137B2 (en) 2013-04-04 2020-01-28 Sharpp Kabushiki Kaisha Terminal device, communication method, and integrated circuit
JPWO2014163163A1 (en) * 2013-04-04 2017-02-16 シャープ株式会社 Terminal device, communication method, and integrated circuit
WO2015026275A1 (en) 2013-08-23 2015-02-26 Telefonaktiebolaget L M Ericsson (Publ) A node and method for downlink scheduling and hybrid automatic repeat request timing
WO2015026274A1 (en) 2013-08-23 2015-02-26 Telefonaktiebolaget L M Ericsson (Publ) A node and method for uplink scheduling and hybrid automatic repeat request timing
EP3300282A1 (en) 2013-08-23 2018-03-28 Telefonaktiebolaget LM Ericsson (publ) Nodes and user equipment for downlink scheduling and hybrid automatic repeat request timing
US10165593B2 (en) 2013-08-23 2018-12-25 Telefonaktiebolaget Lm Ericsson (Publ) Node and method for downlink scheduling and hybrid automatic repeat request timing
EP3582427A1 (en) 2013-08-23 2019-12-18 Telefonaktiebolaget LM Ericsson (publ) Node and method for uplink scheduling and hybrid automatic repeat request timing
EP3664340A1 (en) 2013-08-23 2020-06-10 Telefonaktiebolaget LM Ericsson (publ) A node and method for downlink scheduling and hybrid automatic repeat request timing
US10813121B2 (en) 2013-08-23 2020-10-20 Telefonaktiebolaget Lm Ericsson (Publ) Node and method for downlink scheduling and hybrid automatic repeat request timing
US9510361B2 (en) 2013-08-23 2016-11-29 Telefonaktiebolaget Lm Ericsson (Publ) Node and method for downlink scheduling and hybrid automatic repeat request timing
US11012200B2 (en) 2013-08-23 2021-05-18 Telefonaktiebolaget Lm Ericsson (Publ) Node and method for uplink scheduling and hybrid automatic repeat request timing
US11368976B2 (en) 2013-08-23 2022-06-21 Telefonaktiebolaget Lm Ericsson (Publ) Node and method for downlink scheduling and hybrid automatic repeat request timing
WO2015104738A1 (en) * 2014-01-08 2015-07-16 Nec Corporation A signalling method

Also Published As

Publication number Publication date
US20130136108A1 (en) 2013-05-30
CN103782638B (en) 2017-12-29
CN103782639A (en) 2014-05-07
DK2742756T3 (en) 2015-03-09
EP2742757A1 (en) 2014-06-18
BR112014003316A2 (en) 2017-03-01
CN107707339B (en) 2021-11-26
ES2534414T3 (en) 2015-04-22
AR087500A1 (en) 2014-03-26
EP2742756A1 (en) 2014-06-18
CN103782639B (en) 2018-02-02
US9084256B2 (en) 2015-07-14
ES2529998T3 (en) 2015-02-25
US20210328753A1 (en) 2021-10-21
AR087499A1 (en) 2014-03-26
KR20140054047A (en) 2014-05-08
CN103782638A (en) 2014-05-07
EP2742757B1 (en) 2015-01-14
BR112014003316B1 (en) 2022-10-18
EP2742756B1 (en) 2014-12-10
JP5938099B2 (en) 2016-06-22
US20160198520A1 (en) 2016-07-07
CN107707339A (en) 2018-02-16
US9295055B2 (en) 2016-03-22
WO2013025150A1 (en) 2013-02-21
KR101875253B1 (en) 2018-07-05
JP2014522197A (en) 2014-08-28
US20130136109A1 (en) 2013-05-30
US11070346B2 (en) 2021-07-20

Similar Documents

Publication Publication Date Title
US20210328753A1 (en) Base Station, User Equipment and Methods Therein for Control Timing Configuration Assignment in a Multiple Cell Communications Network
US20210266114A1 (en) Node and method for downlink scheduling and hybrid automatic repeat request timing
US10271319B2 (en) Physical uplink control channel (PUCCH) resource allocation (RA) for a hybrid automatic retransmission re-quest-acknowledge (HARQ-ACK) transmission
EP2962410B1 (en) Methods and apparatuses for transmitting control channel depending on ue capability in intra-cell carrier aggregation system
KR101911254B1 (en) Method for transmitting/receiving signal and device therefor
US10051668B2 (en) Method and apparatus for communicating in carrier aggregation system
EP2737653A2 (en) Transmission of control information in a wireless network with carrier aggregation
US10165593B2 (en) Node and method for downlink scheduling and hybrid automatic repeat request timing
CN105612708B (en) Method and apparatus for transmitting ACK/NACK by terminal in wireless communication system

Legal Events

Date Code Title Description
WWE Wipo information: entry into national phase

Ref document number: 13510201

Country of ref document: US

121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 12705917

Country of ref document: EP

Kind code of ref document: A1

DPE1 Request for preliminary examination filed after expiration of 19th month from priority date (pct application filed from 20040101)
WWE Wipo information: entry into national phase

Ref document number: 2012705917

Country of ref document: EP

ENP Entry into the national phase

Ref document number: 2014524966

Country of ref document: JP

Kind code of ref document: A

ENP Entry into the national phase

Ref document number: 20147003695

Country of ref document: KR

Kind code of ref document: A

NENP Non-entry into the national phase

Ref country code: DE

REG Reference to national code

Ref country code: BR

Ref legal event code: B01A

Ref document number: 112014003316

Country of ref document: BR

ENP Entry into the national phase

Ref document number: 112014003316

Country of ref document: BR

Kind code of ref document: A2

Effective date: 20140212