WO2012118380A1 - Carbon fibre sleeve reinforcement of a cable joint - Google Patents
Carbon fibre sleeve reinforcement of a cable joint Download PDFInfo
- Publication number
- WO2012118380A1 WO2012118380A1 PCT/NO2012/000019 NO2012000019W WO2012118380A1 WO 2012118380 A1 WO2012118380 A1 WO 2012118380A1 NO 2012000019 W NO2012000019 W NO 2012000019W WO 2012118380 A1 WO2012118380 A1 WO 2012118380A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- cable
- sleeve
- carbon fibre
- joint
- joint reinforcement
- Prior art date
Links
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02G—INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
- H02G15/00—Cable fittings
- H02G15/007—Devices for relieving mechanical stress
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02G—INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
- H02G15/00—Cable fittings
- H02G15/08—Cable junctions
- H02G15/18—Cable junctions protected by sleeves, e.g. for communication cable
Definitions
- the present invention relates to a joint reinforcement arrangement in an electrical cable, which electrical cable includes at least one heavy gauge metallic conductor embedded in at least an insulating matrix, which matrix is able to transmit shear forces arising in said cable between the conductor and the cable surface.
- Joints in electrical cables are known to be mechanically weak spots in the completed cable, especially with regards to axial forces, as the welding of the metallic conductor creates annealed areas with reduced strength and yield.
- the usual methods for improving the axial strength and/or yield of joints focus on improvements in the welding technique.
- the limits of welding technique were reached without sufficient results for the needs of the project application.
- the application also required that any increase in the outer diameter of the cable after jointing be minimized to the greatest extent possible.
- a reinforcement arrangement in an electrical cable joint of the introductory said kind is provided, which joint reinforcement arrangement is distinguished in that a braided carbon fibre sleeve of predetermined length is glued onto the external surface of the cable and extends in both directions from the centre of a cable joint splice, which braided carbon fibre sleeve is kept in tension during the gluing process until hardening thereof.
- the braided carbon fibre sleeve is a weave composed of crossing threads of carbon fibre, which during tension thereof, tends to decrease the diameter of the sleeve and straighten the angle of the weave in the longitudinal direction of the cable.
- the cable is normally composed of one or more of the following elements; a metallic conductor consisting of a plurality of single wires or a solid rod, an inner semi- conductive layer, an insulation matrix, an outer semi-conductive layer, a metallic screen and an outer jacket, or constitutes an element within a control or power umbilical.
- the glue can be in the form of a mixture of an epoxy resin and a hardener and the glue can be applied in several layers.
- braided carbon fibre sleeve can be applied in several layers and embedded in the glue or the epoxy resin.
- a method of the introductory said kind is also provided, which method is distinguished in that firstly at least one braided carbon fibre sleeve is slid onto the cable and temporarily parked at a location a predetermined distance away from the joint, if necessary the surface of the cable is prepared to ensure grip, a mixture of epoxy and hardener is applied to said surface of the cable, the braided carbon fibre sleeve is stretched over the joint to straddle over approximately the same distance in both ends of the cable, and further said mixture is added as required to at least partly embed the braided carbon fibre sleeve in said mixture of epoxy and hardener.
- the surface of the cable is prepared to ensure grip by gritting the surface thereof, cleaning said surface and optionally flame treating the surface of the section to be glued.
- Such sleeves may be added in several layers. Then the steps of the second section above are repeated as necessary to apply one or more additional braided carbon fibre sleeves onto the cable, which subsequent sleeves are somewhat shorter than the firstly applied sleeve.
- Fig. 1 shows in schematic view a typical braided carbon fiber sleeve
- Fig. 2 shows in schematic view a typical cable joint before rebuilding of insulation etc.
- figure 1 shows a splicing area of a cable to be reinforced to strengthen the weakened area due to the splice. At both ends, to the right and to the left in the drawing, the original cable 1 can be seen. Such cable 1 can be several kilometers long and needs to be spliced at intervals to increase the total length of the cable 1, or to make repairs in case of damage. The splicing operation will be described below together with figure 2.
- the cable surface is similar to the original cable.
- a first braided carbon fiber sleeve of approximately 3 meters length is bonded to the outer surface of the cable and set in a matrix of epoxy resin and hardener coated on, or applied, to the cable surface.
- a second braided carbon fiber sleeve of approximately 2 meters length is bonded to the outer surface of the first sleeve and set in another layer of epoxy resin and hardener applied to the outer surface of the first sleeve.
- Still more epoxy resin mixed with hardener can be applied to the surface of the second sleeve to more or less embed the sleeve into the epoxy resin. Additional layers can be added in the same fashion.
- FIG 2 shows a typical cable splice where the central metallic conductor 2, typically copper or aluminum, is spliced by welding.
- the cable 1 is ready to be rebuilt in respective layers of insulation and screens starting with the innermost layer 3 of inner semi conductive material.
- layer 4 is an insulation material rebuilt onto the layer 3.
- a layer 5 of outer semi conductive material is applied onto the layer 4.
- a metallic screen 6 is applied around the layer 5 and spliced by welding to the screen of both cable ends.
- an outer jacket 7 is applied around the screen 6 and thus completes the cable 1, though a weak spot is present in the splice.
- This procedure describes the method in which the medium voltage electrical cables for power umbilicals are to be reinforced in the spliced section using two layers of carbon fibre sleeve and epoxy resin. This procedure is intended for verification testing on short samples.
- the work area shall be adequately ventilated, and all necessary personal protective equipment as described in the documents above shall be worn by all relevant personnel.
- Personal protective equipment disposable gloves, eye protection, protective clothing covering arms
- Each reinforced cable section shall have a 3000mm base layer and 2000mm top layer, centered on the conductor weld in the spliced cable (or weakened point for preliminary testing).
- the #300 mini pump set is designed to dispense epoxy and hardener in a 5:1 ratio with a single depression of each pump. Select the correct tube lengths from the kit for the pumps and screw the pumps onto the epoxy and hardener containers. Prime the pumps by pressing each several times into a container to remove any air. Discard any dispensed material.
Landscapes
- Ropes Or Cables (AREA)
Abstract
A joint reinforcement in a cable joint is disclosed. The cable (1) includes at least one heavy gauge metallic conductor (2) embedded in at least an insulating matrix (4), which matrix (4) is able to transmit shear forces arising in said cable (1). A braided carbon fibre sleeve (8) of predetermined length is glued onto the external surface of the cable (1) and extends in both directions from the centre of a cable joint splice, which braided carbon fibre sleeve (8) is kept in tension during the gluing process until hardening thereof. Also a method to prepare and make a glued joint reinforcement in a cable joint is described.
Description
Carbon fibre sleeve reinforcement of a cable joint
The present invention relates to a joint reinforcement arrangement in an electrical cable, which electrical cable includes at least one heavy gauge metallic conductor embedded in at least an insulating matrix, which matrix is able to transmit shear forces arising in said cable between the conductor and the cable surface.
According to the present invention, also a method to prepare and make a reinforcement arrangement in an electrical cable joint of the above mentioned kind is provided.
Joints in electrical cables are known to be mechanically weak spots in the completed cable, especially with regards to axial forces, as the welding of the metallic conductor creates annealed areas with reduced strength and yield. The usual methods for improving the axial strength and/or yield of joints focus on improvements in the welding technique. During development of the joint for a particular project, the limits of welding technique were reached without sufficient results for the needs of the project application. The application also required that any increase in the outer diameter of the cable after jointing be minimized to the greatest extent possible. According to the present invention, a reinforcement arrangement in an electrical cable joint of the introductory said kind is provided, which joint reinforcement arrangement is distinguished in that a braided carbon fibre sleeve of predetermined length is glued onto the external surface of the cable and extends in both directions from the centre of a cable joint splice, which braided carbon fibre sleeve is kept in tension during the gluing process until hardening thereof.
Thus it is to be understood that the solution, and subject of this patent application, was to reinforce the standard cable joint externally with a braided carbon fiber sleeve (a per se standard product sold commercially), bonded to the cable and set in a matrix with epoxy resin (also per se a standard product sold commercially, and commonly used together with carbon fiber for the construction of various objects of myriad shapes and sizes). The original cable was designed to have high shear force capacity throughout its
various layers of construction, and this facilitated the functioning of the carbon fiber sleeve reinforcement. The epoxy bonds the sleeve to the cable, and due to the higher stiffness of the carbon fiber/epoxy system, axial forces introduced on either end of the cable away from the joint are taken up in part by the sleeve, reducing the strain and thus force on the welded metallic conductor. With only a very small increase (typically 3- 5%) in outer diameter, the reinforced joint becomes stronger than the original cable, eliminating the traditional weak point in the cable.
Preferably the braided carbon fibre sleeve is a weave composed of crossing threads of carbon fibre, which during tension thereof, tends to decrease the diameter of the sleeve and straighten the angle of the weave in the longitudinal direction of the cable.
The cable is normally composed of one or more of the following elements; a metallic conductor consisting of a plurality of single wires or a solid rod, an inner semi- conductive layer, an insulation matrix, an outer semi-conductive layer, a metallic screen and an outer jacket, or constitutes an element within a control or power umbilical.
The glue can be in the form of a mixture of an epoxy resin and a hardener and the glue can be applied in several layers.
Also the braided carbon fibre sleeve can be applied in several layers and embedded in the glue or the epoxy resin.
According to the present invention, a method of the introductory said kind is also provided, which method is distinguished in that firstly at least one braided carbon fibre sleeve is slid onto the cable and temporarily parked at a location a predetermined distance away from the joint, if necessary the surface of the cable is prepared to ensure grip, a mixture of epoxy and hardener is applied to said surface of the cable, the braided carbon fibre sleeve is stretched over the joint to straddle over approximately the same distance in both ends of the cable, and further said mixture is added as required to at least partly embed the braided carbon fibre sleeve in said mixture of epoxy and hardener.
Preferably, the surface of the cable is prepared to ensure grip by gritting the surface thereof, cleaning said surface and optionally flame treating the surface of the section to be glued. Such sleeves may be added in several layers. Then the steps of the second section above are repeated as necessary to apply one or more additional braided carbon fibre sleeves onto the cable, which subsequent sleeves are somewhat shorter than the firstly applied sleeve. Other and further objects, features and advantages will appear from the following description of preferred embodiments of the invention, which is given for the purpose of description, and given in context with the appended drawings where:
Fig. 1 shows in schematic view a typical braided carbon fiber sleeve, and
Fig. 2 shows in schematic view a typical cable joint before rebuilding of insulation etc.
Reference is made to figure 1 that shows a splicing area of a cable to be reinforced to strengthen the weakened area due to the splice. At both ends, to the right and to the left in the drawing, the original cable 1 can be seen. Such cable 1 can be several kilometers long and needs to be spliced at intervals to increase the total length of the cable 1, or to make repairs in case of damage. The splicing operation will be described below together with figure 2.
After such splicing operation, the cable surface is similar to the original cable. In order to ensure at least the original strength in the splicing area, a first braided carbon fiber sleeve of approximately 3 meters length is bonded to the outer surface of the cable and set in a matrix of epoxy resin and hardener coated on, or applied, to the cable surface. Then a second braided carbon fiber sleeve of approximately 2 meters length is bonded to the outer surface of the first sleeve and set in another layer of epoxy resin and hardener applied to the outer surface of the first sleeve. Still more epoxy resin mixed with hardener can be applied to the surface of the second sleeve to more or less embed the sleeve into the epoxy resin. Additional layers can be added in the same fashion. A
still more detailed procedure of the preparation and method step by step will follow below.
Reference is now made to figure 2 that shows a typical cable splice where the central metallic conductor 2, typically copper or aluminum, is spliced by welding. The cable 1 is ready to be rebuilt in respective layers of insulation and screens starting with the innermost layer 3 of inner semi conductive material. Next layer 4 is an insulation material rebuilt onto the layer 3. Then a layer 5 of outer semi conductive material is applied onto the layer 4. A metallic screen 6 is applied around the layer 5 and spliced by welding to the screen of both cable ends. Finally an outer jacket 7 is applied around the screen 6 and thus completes the cable 1, though a weak spot is present in the splice.
Next procedure will be to continue as described in connection with figure 1 and outlined in detail below.
Below a detailed description of the materials, storage and the procedure how to apply a first and a second sleeve at site will follow. This is only one example of one
embodiment of the invention and shall not be considered as a limitation of the invention to this particular embodiment.
1. Introduction
1.1. This procedure describes the method in which the medium voltage electrical cables for power umbilicals are to be reinforced in the spliced section using two layers of carbon fibre sleeve and epoxy resin. This procedure is intended for verification testing on short samples.
2. Safety
All relevant personnel shall review the material safety datasheets for the materials involved, as well as the following documents:
• http://www.westsvstem.com/ss/how-to-prevent-overexposure-to-epoxy/
• http://www.westsystem.com/ss/other-epoxy-related-hazards/
• http://www.westsystem.com/ss/environmental-concerns/
• http://www.westsystem.com/ss/epoxy-chemistry/
• http://www.westsystem.com/ss/di spensing-mixing/
The work area shall be adequately ventilated, and all necessary personal protective equipment as described in the documents above shall be worn by all relevant personnel.
Materials and Storage
• Carbon Fibre Braided Sleeve
o (Siltex part number 050.12040243-C)
o 50mm nominal outer diameter at 45 degree lay angle
o Weight: 3K (3000 filaments per yarn)
o To be stored in a clean area to avoid contamination
• West System Epoxy 105
o Storage requirements are listed in the MSDS.
• West System Hardener 205
o Storage requirements are listed in the MSDS.
• West System calibrated measuring pumps (#300, Mini Pump Set (for Group Size A, B or C))
• Mixing containers
• Cleaner/solvent appropriate for PE (ethanol)
• 80-grit sand paper
• Propane torch
• Tape
• Work benches with clamping and tensioning capabilities
• Screw Clamps
• Personal protective equipment: disposable gloves, eye protection, protective clothing covering arms
Prepare the cable sample
4.1. Note: the work shall be performed in a clean, covered location at normal room temperature, away from dust and debris.
4.2. Grip one end of the cable with the workbench approximately 3 meters away from the middle of the cable splice.
4.3. Prepare carbon fibre braid
4.3.1. Check the braiding for damages/defects:
• Broken fibres
• Inconsistent braiding pattern
• Presence of dust or debris
• Discard length if any damage is found
4.3.2. Measure and cut the carbon fibre sleeves.
4.3.2.1. Each reinforced cable section shall have a 3000mm base layer and 2000mm top layer, centered on the conductor weld in the spliced cable (or weakened point for preliminary testing).
4.3.2.2. Cut one 2500mm length and one 1700mm length. Maintain a 45 degree lay angle of the carbon fibre braiding during measuring. These lengths will stretch to 3000mm and 2000mm when applied to the cable at approximately 30 degrees lay angle.
4.3.3. Slide the two carbon sleeves onto the cable, beginning with the shorter length. Working with one length at a time, bunch up the sleeves so that they are both stored away from the 3 meter area to be reinforced.
4.3.4. Fasten the other end of the cable 2 meters away from the centre of the splice and secure it to another fixing point or workbench.
4.3.5. Using the workbench tensioning device, tighten the cable until it is as straight as possible (lift the cable in the middle during tightening)
4.3.6. Mark the floor below the cable with the location of the centre of the splice, and with marks for 1500mm and 1000mm away from the centre on each side.
4.3.7. Using 80-grit sandpaper, thoroughly abrade (with minimal loss of
material) the surface of the cable in the 3 meter section centred on the weld that will be reinforced.
4.3.8. Clean the surface of the section of cable to be reinforced with an ethanol cleaner/solvent.
4.3.9. Flame-treat the 3 meter section by passing a propane torch (or similar) over the surface of the cable. Ensure that no melting of the outer jacket occurs.
Apply the 1st sleeve
• All activities in this section must be completed within 10 minutes of mixing the epoxy
5.1. Prepare the epoxy
5.1.1. Prepare the pumps. The #300 mini pump set is designed to dispense epoxy and hardener in a 5:1 ratio with a single depression of each pump. Select the correct tube lengths from the kit for the pumps and screw the pumps onto the epoxy and hardener containers. Prime the pumps by pressing each several times into a container to remove any air. Discard any dispensed material.
5.1.2. Mix the epoxy and hardener. In an appropriate mixing container, add an equal number of pumps of the epoxy and hardener and stir them together. Note that once the elements are combined, the pot life is approximately 10 minutes for lOOg at room temperature. Work with small quantities.
Apply the epoxy to the 3 meter section of cable to be reinforced. This can be done by hand.
Work the 2500mm braid over the cable until one end is aligned with the edge of the glued section.
5.2. Wrap tape around the aligned end of the sleeve and apply a screw clamp over it.
Care must be taken not to damage the outer sheath of the cable (the tape is for protection only).
5.3. Work the free end of the sleeve over the glued area and pull it as tight as
possible by hand, ensuring that all the fibers are in close contact with the cable. Clamp the free end as described above.
6. Apply the 2nd sleeve
• All activities in this section must be completed with 10 minutes of completing the final activity in the previous section.
6.1. Prepare a new batch of epoxy as described above
6.2. Apply the epoxy by hand over the 1st sleeve. Ensure that the carbon braid is thoroughly saturated.
6.3. Work the 1700mm braid over the first sleeve until one end is 1 meter from the center of the reinforced area.
6.4. Tape and clamp the end of the braid as described above.
6.5. Work the rest of the sleeve over the cable until fully stretched with close
contact with the 1st sleeve.
7. Finalize the sleeve
• All activities in this section must be completed with 10 minutes of completing the final activity in the previous section.
7.1. Prepare a new batch of epoxy as described above.
7.2. Apply the epoxy by hand over the 1st sleeve. Ensure that the carbon braid is thoroughly saturated, and that no drips are allowed to harden.
7.3. Allow the epoxy to cure for 6-8 hours before handling. A similar existing application of braided carbon fiber sleeves with epoxy resin are lightweight tubes made of the material, formed around pipe that is removed after curing of the epoxy.
Typical variations would be in the length of the sleeve used, the number of layers used, the weight of the carbon fibers, etc, resulting in more or less reinforcement against axial forces, and more or less increase in outer diameter. The development was made on medium voltage power cables, but this could apply to low voltage or high voltage cables as well, or any cable with sufficient shear force capacity throughout its layers.
Other materials may be potentially used for this application, including prepregnated unidirectional carbon fiber tape or other carbon fiber material that can be applied externally after jointing (as opposed to in advance as the sleeve must be). Any other material of suitable stiffness and strength, such as glass fiber, aramid fiber, etc could also potentially be used, as could wire mesh if it could be successfully bonded to the surface in question.
Other common techniques for the application of epoxy resin to carbon fibre material, such as vacuum bag moulding and heat application to decrease curing time could be alternative application methods or could be incorporated to the embodiment described above.
Typical test results:
40,00
35.00
30,00
25,00
20,00
15,00
10,00
5,00
0,8 1 1
Elongation (%)
Claims
1.
Joint reinforcement arrangement in an electrical cable, which electrical cable (1) includes at least one heavy gauge metallic conductor (2) embedded in at least an insulating matrix (4), which matrix (4) is able to transmit shear forces arising in said cable (1) between the conductor and the cable surface, characterized in that a braided carbon fibre sleeve (8) of predetermined length is glued onto the external surface of the cable (1) and extends in both directions from the centre of a cable joint splice, which braided carbon fibre sleeve (8) is kept in tension during the gluing process until hardening thereof.
2.
The joint reinforcement according to claim 1, characterized in that the braided carbon fiber sleeve (8) is a weave composed of crossing threads of carbon fibre, which during tension thereof, tends to decrease the diameter of the sleeve and straighten the angle of the weave in the longitudinal direction of the cable.
3.
The joint reinforcement according to claim 1 or claim 2, characterized in that the metallic conductor (2) is made of copper, aluminium, or other suitable electrical conductive metal and is composed of a plurality of single wires or a solid rod or core.
4.
The joint reinforcement according to any of the claims 1-3, characterized in that the cable (1) is a power cable.
5.
The joint reinforcement according to any of the claims 1-4, characterized in that the cable (1) includes a metallic screen (6) enclosing the insulating matrix.
6.
The joint reinforcement according to any of the claims 1-5, characterized in that the cable is a power cable including an inner semi conductive layer (3), an insulation matrix (4), an outer semi conductive layer (5), a metallic screen (6) and an outer jacket (7), and constitutes en element within an umbilical or a power umbilical.
7.
The joint reinforcement according to any of the claims 1-6, characterized in that the glue is a mixture of an epoxy resin and a hardener.
8.
The joint reinforcement according to any of the claims 1-7, characterized in that the glue is applied in several layers. 9.
The joint reinforcement according to any of the claims 1-8, characterized in that the braided carbon fiber sleeve is applied in one or several layers and embedded in glue or epoxy resin. 10.
A method to prepare and make a glued joint reinforcement in an electrical cable, which electrical cable includes at least one heavy gauge metallic conductor embedded in an insulating matrix, which matrix is able to transmit shear forces arising in said cable between the conductor and the cable surface, characterized in that firstly at least one braided carbon fibre sleeve is slid onto the cable and temporarily parked at a location a predetermined distance away from the joint, if necessary the surface of the cable is prepared to ensure grip, a mixture of epoxy and hardener is applied to said surface of the cable, the braided carbon fibre sleeve is stretched over the joint to straddle over approximately the same distance in both ends of the cable, and further said mixture is added as required to at least partly embed the braided carbon fibre sleeve in said mixture of epoxy and hardener. The method as described in claim 11 , characterized in that the surface of the cable is prepared to ensure grip by gritting the surface thereof, cleaning said surface and optionally flame treating the surface of the section to be glued.
12.
The method as described in claim 10 or 1 1, characterized in that the steps of claim 10 are repeated to apply one or more additional braided carbon fibre sleeves onto the cable, which subsequent sleeves are somewhat shorter than the firstly applied sleeve.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
NO20110321 | 2011-03-01 | ||
NO20110321A NO20110321A1 (en) | 2011-03-01 | 2011-03-01 | Sliding cables |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2012118380A1 true WO2012118380A1 (en) | 2012-09-07 |
Family
ID=46758172
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/NO2012/000019 WO2012118380A1 (en) | 2011-03-01 | 2012-02-28 | Carbon fibre sleeve reinforcement of a cable joint |
Country Status (2)
Country | Link |
---|---|
NO (1) | NO20110321A1 (en) |
WO (1) | WO2012118380A1 (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102843792A (en) * | 2012-09-11 | 2012-12-26 | 山东理工大学 | Novel connecting method of carbon fiber yarn and metal wire joint |
EP3089298A4 (en) * | 2014-05-05 | 2017-11-08 | Grupo General Cable Sistemas, S.L.U. | Reinforcement arrangement for submarine cable junctions |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3712991A1 (en) * | 1987-04-16 | 1988-11-03 | Kabelmetal Electro Gmbh | Connecting collar for electrical cables or sleeving |
EP0499089A1 (en) * | 1991-02-14 | 1992-08-19 | Eilentropp Kg | Flexible protection hose for oblong objects |
-
2011
- 2011-03-01 NO NO20110321A patent/NO20110321A1/en not_active Application Discontinuation
-
2012
- 2012-02-28 WO PCT/NO2012/000019 patent/WO2012118380A1/en active Application Filing
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3712991A1 (en) * | 1987-04-16 | 1988-11-03 | Kabelmetal Electro Gmbh | Connecting collar for electrical cables or sleeving |
EP0499089A1 (en) * | 1991-02-14 | 1992-08-19 | Eilentropp Kg | Flexible protection hose for oblong objects |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102843792A (en) * | 2012-09-11 | 2012-12-26 | 山东理工大学 | Novel connecting method of carbon fiber yarn and metal wire joint |
EP3089298A4 (en) * | 2014-05-05 | 2017-11-08 | Grupo General Cable Sistemas, S.L.U. | Reinforcement arrangement for submarine cable junctions |
Also Published As
Publication number | Publication date |
---|---|
NO20110321A1 (en) | 2012-09-03 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
RU2447526C1 (en) | Multi-core twisted cable | |
US4499716A (en) | Reinforcement structure | |
WO2011019075A1 (en) | Structure and method for affixing terminal of linear body made of fiber reinforced plastic | |
NO331764B1 (en) | Interconnecting device for a composite core cable | |
TWI297788B (en) | ||
CN102308340A (en) | High voltage electric transmission cable | |
KR20140010138A (en) | Sawing cable for use in a cable sawing machine | |
CN102426135B (en) | Carbon fiber multifilament and fixture auxiliary tool for carbon fiber cable tensile testing | |
WO2012118380A1 (en) | Carbon fibre sleeve reinforcement of a cable joint | |
KR20180011773A (en) | Loop wire saw and method for forming such a loop | |
WO2024046427A1 (en) | Steel-continuous fiber composite smart rib having jacketed optical cable embedded in steel bar inner core and preparation method therefor | |
JP3967957B2 (en) | Manufacturing method of fiber reinforced resin strands | |
JP3088061B2 (en) | Fiber reinforced resin composite reinforced material and method for producing the same | |
JPS61211017A (en) | Method of combining section and combination | |
RU2156397C1 (en) | Method of repair of pipe lines (versions) | |
JP2012128304A (en) | Optical fiber unit, method for manufacturing optical fiber unit, and optical fiber cable using optical fiber unit | |
CN110673286B (en) | Splicing assembly and splicing method for para-aramid fault | |
CN211317986U (en) | Clamp for field detection of interlayer combination condition of white-plus-black pavement | |
US20110139351A1 (en) | Method for Fast Cure of a Composite Wrap | |
US20050078923A1 (en) | Flexible factory joint for metallic tubes which enclose loosely inside them optical fibers and its method of construction | |
JP6980365B2 (en) | How to reinforce a steel chimney | |
JP2002213048A (en) | Composite strand, composite cable, and its using method | |
JP7369610B2 (en) | bonded structure | |
CN111323277A (en) | Sample preparation device and sample preparation method for tensile property of continuously wound carbon fiber bundle filaments | |
EP4235148A1 (en) | Method of assessing load-bearing capacity and strength of annular socket joint between a composite and another material |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 12753035 Country of ref document: EP Kind code of ref document: A1 |
|
NENP | Non-entry into the national phase |
Ref country code: DE |
|
122 | Ep: pct application non-entry in european phase |
Ref document number: 12753035 Country of ref document: EP Kind code of ref document: A1 |