WO2012082263A1 - Top guide inspection fixture - Google Patents
Top guide inspection fixture Download PDFInfo
- Publication number
- WO2012082263A1 WO2012082263A1 PCT/US2011/059852 US2011059852W WO2012082263A1 WO 2012082263 A1 WO2012082263 A1 WO 2012082263A1 US 2011059852 W US2011059852 W US 2011059852W WO 2012082263 A1 WO2012082263 A1 WO 2012082263A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- central shaft
- fuel assembly
- inspection
- frame
- inspection fixture
- Prior art date
Links
Classifications
-
- G—PHYSICS
- G21—NUCLEAR PHYSICS; NUCLEAR ENGINEERING
- G21C—NUCLEAR REACTORS
- G21C17/00—Monitoring; Testing ; Maintaining
- G21C17/003—Remote inspection of vessels, e.g. pressure vessels
-
- G—PHYSICS
- G21—NUCLEAR PHYSICS; NUCLEAR ENGINEERING
- G21C—NUCLEAR REACTORS
- G21C17/00—Monitoring; Testing ; Maintaining
-
- G—PHYSICS
- G21—NUCLEAR PHYSICS; NUCLEAR ENGINEERING
- G21C—NUCLEAR REACTORS
- G21C17/00—Monitoring; Testing ; Maintaining
- G21C17/017—Inspection or maintenance of pipe-lines or tubes in nuclear installations
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E30/00—Energy generation of nuclear origin
- Y02E30/30—Nuclear fission reactors
Definitions
- This invention pertains in general to the inspection of boiling water reactor internals and more particularly to the inspection of the underside of a top guide for a boiling water reactor.
- FIG 1 is a sectional view, with parts cut away, of a typical reactor pressure vessel 10 for a boiling water nuclear reactor.
- coolant water circulating in the reactor pressure vessel 10 is heated by nuclear fission produced in the core 12.
- Feedwater is admitted into the reactor pressure vessel 10 by a feedwater inlet 14 and feedwater sparger 16.
- the sparger 16 is a ring-shaped pipe that includes apertures for circumferentially distributing the feedwater inside the reactor pressure vessel 10.
- the feedwater from the feedwater sparger 16 flows downwardly through downcomer annulus 18, which is an annular region between the reactor pressure vessel 10 and the core shroud 20.
- the core shroud 20 is a stainless steel cylinder that surrounds the core 12.
- Core 12 includes a multiplicity of fuel bundle assemblies 22; two arrays of which are shown in Figure 1.
- Each array of fuel bundle assemblies 22 is supported at its top by top guide 24 and at the bottom by core plate 26.
- Top guide 24 provides lateral support for the top of the fuel bundle assemblies 22 and maintains correct fuel channel spacing to permit control rod insertion.
- the coolant water flows downward through downcomer annulus 18 and into core lower plenum 28.
- the coolant water in the core lower plenum 28 in turn flows upward through the core 12.
- the coolant water enters fuel bundle assemblies 22 wherein a boiling boundary layer is established.
- a mixture of water and steam exits core 12 and enters core upper plenum 30 under shroud head 32.
- Core upper plenum 30 provides a standoff between the steam- water mixture exiting the core 12 and entering standpipes 34.
- Standpipes 34 are disposed atop shroud head 32 and in fluid communication with core upper plenum 30.
- the steam-water mixture flows through standpipes 34 and enters steam separators 36, which may be, for example, of the axial-flow centrifugal type.
- Steam separators 36 substantially separate the steam- water mixture into liquid water and steam.
- the separated liquid water mixes with feedwater in mixing plenum 38. This mixture then returns to the core 12 via downcomer annulus 18.
- the separated steam passes through steam dryers 40 and enters the steam dome 42.
- the dried steam is withdrawn from the reactor pressure vessel 10 via steam outlet 44 for use in turbines and other equipment (not shown).
- the boiling water reactor also includes a coolant recirculation system that provides the forced convection flow through the core 12 necessary to attain the required power density.
- a portion of the water is sucked from the lower end of the downcomer annulus 18 via recirculation water outlet 46 and forced by a centrifugal recirculation pump (not shown) into a plurality of jet pump assemblies 48 (only one of which is shown) via recirculation water inlets 50.
- the jet pump assemblies 48 are
- a new method is desired that can verify that the inspection criteria has been followed. More particularly, a new apparatus is desired that can carry out such a method and maintain a known camera angle and distance from the inspection piece as well as provide rigidity to keep flow induced impact on the inspection process at a minimum if not entirely eliminated.
- the apparatus of this invention provides an inspection fixture for a top guide of a boiling water reactor.
- the inspection fixture includes a frame sized to rest and be supported on a top edge of a fuel assembly opening within the top guide.
- a wheel track is supported from the frame in a manner to extend around a periphery of the fuel assembly opening, substantially proximate a border thereof, when the frame is supported on the top edge of the fuel assembly opening.
- a central shaft is rotably supported from the frame and extends down below the fuel assembly opening, substantially along an axis of a fuel assembly to be positioned below the opening, when the frame is supported on the top edge of the fuel assembly opening.
- a linkage bracket is fixedly connected to the central shaft and extends laterally therefrom with a hinged distal link having a hinge line substantially parallel to and spaced from the central shaft.
- a cam follower rides on the wheel track and is supported from the distal link.
- An inspection sensor bracket is connected between the central shaft and the distal link for supporting a camera at a fixed angle to survey the underside of the top guide.
- the fixture includes a hard stop ring for preventing the central shaft from rotating more than approximately 380°.
- the hinged distal link is spring-biased in a preselected orientation that is preferably at an angle of 0° with another portion of the linkage bracket between the hinge line and the central shaft.
- the wheel track is substantially rectangular and preferably substantially square. Desirably, the wheel track is suspended from the frame within the fuel assembly opening in the top guide when the frame rests on the top edge of the fuel assembly opening and in one embodiment the wheel track sits just below the top surface of the top guide.
- the inspection fixture of this invention includes a coupling at an upper end of the central shaft for coupling with a drive means for rotating the central shaft.
- the drive means includes a pole that connects to the coupling for positioning the inspection fixture on the top edge of the fuel assembly opening and rotating the central shaft.
- Figure 1 is a sectional view, with parts cut away, of a typical reactor pressure vessel for a boiling water reactor
- Figure 2 is an exploded view of the inspection fixture of this invention.
- Figure 3 is an exploded view of the frame and wheel track of the inspection fixture shown in Figure 2;
- Figure 4 is a perspective view of a portion of the central shaft and the link assembly that is connected directly to the central shaft of the inspection fixture of this invention
- Figure 5 is a perspective view of the distal end of the link assembly which is hingedly attached to the portion of the link assembly shown in Figure 4;
- Figure 6 is a perspective view of the underside of the fixture of this invention in place within the fuel assembly opening of a top guide, with the inspection sensor bracket in a first orientation;
- Figure 7 is a perspective view of the inspection fixture of this invention shown in Figure 6, in a second orientation.
- the top guide inspection fixture of this invention is shown in the exploded view illustrated in Figure 2 and is supplied from a reactor work platform by way of a small handling pole 52 that has a dimple 54 that fits in a J-slot coupling 56 in a distal end of a sleeve 58 which is the upper part of the central shaft 60 of the inspection fixture 62 of this invention.
- the small handling pole 52 sets the fixture 62 into the cell of the top guide, i.e., the fuel assembly opening.
- the fixture then allows for manual mechanical manipulation and rotation of a camera or other inspection sensor through the small handling poles to visually inspect the underside surface of the top guide to meet visual inspection requirements.
- the inspection can be performed in either a clockwise or counterclockwise direction, as desired.
- the inspection fixture 62 features a cross-member frame 64 and wheel track 66 that is shown in more detail in the exploded view shown in Figure 3.
- the frame has a central hub 68 with four flukes or struts 70 that are spaced 90° apart around the hub 68 and extend out radially.
- the struts 70 have support ledges 72 that are designed to sit on the top surface of the walls of the fuel assembly openings in the top guide.
- the central hub 68 has a lower sleeve bearing 74 and a modified upper sleeve bearing 76 that accommodates rotation of the central shaft 60 that passes therethrough.
- a hard stop floating ring 78 is connected to the central shaft 60 and includes a raised land 80 that cooperates with a notch 82 in the flange of the upper bearing 76 to limit rotation of the central shaft to a little more than one full revolution, i.e., approximately 380°.
- the approximately 380° rotation from hard stop to hard stop assures an overlap of the inspection area for full coverage.
- the hard stops are desirable to prevent the device, e.g., camera cable, from becoming entangled should the user continue performing all remaining inspections in the same direction and not reset the fixture after a full rotation, to a "home" position.
- Two cable restraint hooks 84 are located on the hub 68 of the frame to properly secure a video (or other sensor) cable and prevent the cable from having excessive or insufficient slack.
- a home position visual indicator 86 is located on the top side of the frame to provide feedback of the relative camera location during operation.
- a wheel track 66 is welded to the frame and sits within the fuel assembly opening just below the top surface of the top guide when the frame is in position.
- the wheel track 66 is a rectangle and more desirably a square, to follow the inside surface of the fuel assembly opening so as to guide a camera 88 in a camera support bracket 90, around the underside of the walls of the fuel assembly opening in the top guide.
- the central shaft 60 comprises an upper J-slot sleeve 58, an upper central shaft member 92, a linkage assembly sleeve 94 and a lower shaft member 97 each of which are fixedly coupled together end to end, such as by welding, with the pins 98 serving to assure that there is no rotation of slippage.
- the weight of the camera support bracket 90 is carried by a shaft collar assembly 100 which is secured to the lower central shaft member 96.
- the height of the shaft collar assembly 100 on the lower central shaft member 96 is adjustable so that the camera support bracket 90 can be raised or lowered to adjust for different top guide configurations.
- the markings 102 on the lower central shaft 96 are provide to identify the height adjustments for specific top guide designs.
- a slotted camera bracket 104 connects the camera support bracket 90 with the lower central shaft member 96 and permits lateral movement of the camera support bracket as a cam follower 124 connected to the camera support bracket 90 through a distal linkage block 1 10 follows the wheel track 66 as will be explained hereafter.
- a linkage assembly 106 generally comprises the sleeve 94, first linkage block 108 and second, distal linkage block 110.
- First linkage block 108 is more fully shown in Figure 4 and is welded to the linkage assembly sleeve 94 to form an integral member.
- Second or distal linkage block 110 is better shown in Figure 5.
- First linkage block 108 is connected to second linkage block 110 through a hinged coupling 1 12 which is pivotably coupled by linkage pin 114.
- the hinged coupling 112 includes a torsion spring 1 16 that returns the hinge orientation to a neutral position, i.e., 0° offset between the first linkage block 108 and the second linkage block 1 10.
- the bottom side of the second linkage block has a hole 1 18 for one end of a slip fit rod 120 that allows for rotational movement.
- the other end of the slip fit rod 120 is fixedly connected to the top of the camera bracket 90 to maintain the fixed orientation of the camera bracket.
- a hole 122 in the upper end of the second linkage block 1 10 seats the shaft of the cam follower 124.
- the cam 124 rides on the inside surface of the wheel track 66.
- the configuration of the fixture 62 ensures that the camera position is always in the same position as the cam roller 124. It should be appreciated that while the fixture is stated as supporting a camera 88, other nondestructive sensors can also be supported by this fixture to examine the state of the top guide. As previously mentioned, a hard stop ring 78 is positioned on the central shaft 60 to limit the fixture to one full revolution, which prevents the camera cable from binding in the fixture, as well as gives mechanical feedback for beginning and ending the inspection.
- the fixture positions the camera such that inspections performed through the fixture of this invention are within BWRVIP requirements for a VT-1 examination. This includes the relation of the camera viewing angle to the inspection surface (less than 30° from the perpendicular angle between the surface and the camera field of view) as well as inspection distance (15.24 cm from the inspection surface).
- the top guide cell i.e., the fuel assembly opening
- the foregoing fixture of this invention will also not interfere or make contact with any instrumentation, such as local power range monitors.
- each rod is designed to maintain significant contact in the slip fit hole 118 on the distal block 1 10 of the linkage while allowing vertical adjustment depending on the position of the shaft collar 100.
- the lower central shaft member 96 that holds the shaft collar 100 has small grooves 102 to indicate where to properly position the shaft collar depending on the top guide being inspected.
- the fixture of this invention provides for a smooth inspection with a known camera angle and distance from the inspection piece, as well as provides rigidity to keep flow induced impact to the inspection at a minimum, if not entirely eliminated.
- Figure 6 provides a perspective view of the fixture of this invention installed on the top guide with the cam 124 at a mid location along a straight rail of the wheel track 66 as the camera support 90 surveys the underside of the top guide 24.
- Figure 7 is a perspective view of the fixture shown in Figure 6 with the cam wheel 124 in a corner location of the wheel track 66. Figures 6 and 7 give a better appreciation of the functioning of the linkage assembly 106 as the hinge coupling 1 12 bends to
Landscapes
- Physics & Mathematics (AREA)
- Engineering & Computer Science (AREA)
- Plasma & Fusion (AREA)
- General Engineering & Computer Science (AREA)
- High Energy & Nuclear Physics (AREA)
- Monitoring And Testing Of Nuclear Reactors (AREA)
Abstract
Description
Claims
Priority Applications (5)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
EP11849792.4A EP2652744B1 (en) | 2010-12-13 | 2011-11-09 | Top guide inspection fixture |
ES11849792T ES2717648T3 (en) | 2010-12-13 | 2011-11-09 | Upper guide inspection device |
KR1020137015106A KR101767294B1 (en) | 2010-12-13 | 2011-11-09 | Top guide inspection fixture |
CA2821300A CA2821300C (en) | 2010-12-13 | 2011-11-09 | Top guide inspection fixture |
JP2013543175A JP5748310B2 (en) | 2010-12-13 | 2011-11-09 | Upper lattice plate inspection tool |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US12/965,966 US8526564B2 (en) | 2010-12-13 | 2010-12-13 | Top guide inspection fixture |
US12/965,966 | 2010-12-13 |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2012082263A1 true WO2012082263A1 (en) | 2012-06-21 |
Family
ID=46199384
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/US2011/059852 WO2012082263A1 (en) | 2010-12-13 | 2011-11-09 | Top guide inspection fixture |
Country Status (7)
Country | Link |
---|---|
US (1) | US8526564B2 (en) |
EP (1) | EP2652744B1 (en) |
JP (1) | JP5748310B2 (en) |
KR (1) | KR101767294B1 (en) |
CA (1) | CA2821300C (en) |
ES (1) | ES2717648T3 (en) |
WO (1) | WO2012082263A1 (en) |
Families Citing this family (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US8711999B2 (en) * | 2010-03-24 | 2014-04-29 | Areva Inc. | Inspection tool for top guides of a boiling water reactor |
US20160173741A1 (en) * | 2014-12-16 | 2016-06-16 | Daniel Wolfenbarger | Mooring system for underwater camera |
CN107958713B (en) * | 2016-10-14 | 2024-02-09 | 核动力运行研究所 | Video inspection device for inner wall of steam generator connecting pipe |
US10762996B2 (en) * | 2017-10-31 | 2020-09-01 | Westinghouse Electric Company Llc | Apparatus for use in the inspection of a top grid guide of boiling water reactor |
CN108492895B (en) * | 2018-03-09 | 2024-05-14 | 西南交通大学 | Anti-hooking mechanical test device for fuel assembly grillwork |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS6266157A (en) * | 1985-09-19 | 1987-03-25 | Toshiba Corp | Upper grid plate inspecting device |
US4826650A (en) * | 1987-05-13 | 1989-05-02 | General Electric Company | Ultrasonic examination of reactor pressure vessel top guide |
JPH03261897A (en) | 1990-03-12 | 1991-11-21 | Hitachi Ltd | Inspecting device of shroud |
US5265129A (en) * | 1992-04-08 | 1993-11-23 | R. Brooks Associates, Inc. | Support plate inspection device |
US5692024A (en) * | 1996-08-16 | 1997-11-25 | Siemens Power Corporation | Reactor pressure vessel top guide structure inspection apparatus and transport system |
US20040006448A1 (en) * | 2002-07-02 | 2004-01-08 | Penza G. Gregory | Apparatus and method for pipeline inspection |
Family Cites Families (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4169758A (en) * | 1977-10-26 | 1979-10-02 | The Babcock & Wilcox Company | Nuclear reactor vessel inspection apparatus |
JPS6166162A (en) * | 1984-09-07 | 1986-04-04 | Toshiba Corp | Lattice board inspecting apparatus |
JPS6267446A (en) * | 1985-09-20 | 1987-03-27 | Toshiba Corp | Lattice board inspector |
JPS6361162A (en) * | 1986-09-01 | 1988-03-17 | Hitachi Ltd | Apparatus for inspecting flaw of lattice plate of nuclear reactor |
JPS6415645A (en) * | 1987-07-10 | 1989-01-19 | Hitachi Ltd | Lattice-plate inspecting apparatus |
JPH01237443A (en) * | 1988-03-18 | 1989-09-21 | Hitachi Ltd | Lattice plate checking apparatus |
JP2002090490A (en) * | 2000-09-14 | 2002-03-27 | Toshiba Corp | Upper grid plate inspection device |
JP2003185783A (en) * | 2001-12-20 | 2003-07-03 | Hitachi Ltd | In-core visual inspection apparatus |
US7505547B2 (en) | 2006-12-22 | 2009-03-17 | Global Nuclear Fuel-Americas, Llc | Assembly and method for mounting a fuel assembly having a predefined orientation within a nuclear reactor |
US7769123B2 (en) * | 2007-06-20 | 2010-08-03 | Ge-Hitachi Nuclear Energy Americas, Llc | Inspection, maintenance, and repair apparatuses and methods for nuclear reactors |
US7798535B2 (en) | 2007-09-17 | 2010-09-21 | Westinghouse Electric Co. Llc | Pipe clamp |
FR2923295B1 (en) * | 2007-11-06 | 2009-12-11 | Areva Np | METHOD AND DEVICE FOR VISUALIZING AND CONTROLLING THE PROFILE OF A WELDING CORD WITHIN A CHAMFER MADE BETWEEN TWO METAL PIECES |
US8711999B2 (en) * | 2010-03-24 | 2014-04-29 | Areva Inc. | Inspection tool for top guides of a boiling water reactor |
-
2010
- 2010-12-13 US US12/965,966 patent/US8526564B2/en active Active
-
2011
- 2011-11-09 ES ES11849792T patent/ES2717648T3/en active Active
- 2011-11-09 KR KR1020137015106A patent/KR101767294B1/en active IP Right Grant
- 2011-11-09 WO PCT/US2011/059852 patent/WO2012082263A1/en unknown
- 2011-11-09 JP JP2013543175A patent/JP5748310B2/en active Active
- 2011-11-09 CA CA2821300A patent/CA2821300C/en active Active
- 2011-11-09 EP EP11849792.4A patent/EP2652744B1/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS6266157A (en) * | 1985-09-19 | 1987-03-25 | Toshiba Corp | Upper grid plate inspecting device |
US4826650A (en) * | 1987-05-13 | 1989-05-02 | General Electric Company | Ultrasonic examination of reactor pressure vessel top guide |
JPH03261897A (en) | 1990-03-12 | 1991-11-21 | Hitachi Ltd | Inspecting device of shroud |
US5265129A (en) * | 1992-04-08 | 1993-11-23 | R. Brooks Associates, Inc. | Support plate inspection device |
US5692024A (en) * | 1996-08-16 | 1997-11-25 | Siemens Power Corporation | Reactor pressure vessel top guide structure inspection apparatus and transport system |
US20040006448A1 (en) * | 2002-07-02 | 2004-01-08 | Penza G. Gregory | Apparatus and method for pipeline inspection |
Also Published As
Publication number | Publication date |
---|---|
KR101767294B1 (en) | 2017-08-10 |
US20120148010A1 (en) | 2012-06-14 |
JP2014503810A (en) | 2014-02-13 |
EP2652744A1 (en) | 2013-10-23 |
CA2821300A1 (en) | 2012-06-21 |
ES2717648T3 (en) | 2019-06-24 |
JP5748310B2 (en) | 2015-07-15 |
EP2652744A4 (en) | 2017-05-03 |
CA2821300C (en) | 2017-08-22 |
US8526564B2 (en) | 2013-09-03 |
KR20140005896A (en) | 2014-01-15 |
EP2652744B1 (en) | 2019-01-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US5682409A (en) | Neutron fluence surveillance capsule holder modification for boiling water reactor | |
CA2821300C (en) | Top guide inspection fixture | |
US7769123B2 (en) | Inspection, maintenance, and repair apparatuses and methods for nuclear reactors | |
EP0727786A1 (en) | Apparatus for the nondestructive inspection of materials | |
JP6288782B2 (en) | Method and apparatus for moving nuclear components under shielding | |
US7139359B2 (en) | Integrated head assembly for a nuclear reactor | |
US20160247586A1 (en) | Apparatus and method to inspect nuclear reactor components in the core annulus, core spray and feedwater sparger regions in a nuclear reactor | |
US20140098922A1 (en) | Apparatus and method to inspect, modify, or repair nuclear reactor core shrouds | |
CA2870719C (en) | Incore instrumentation cable routing and support element for pressurized water reactor | |
JPS62245993A (en) | Inspection method during usage of nuclear-reactor pressure vessel | |
JP2012013436A (en) | Apparatus for installing pressure loss adjustment member | |
EP3115996B1 (en) | Chimney or riser and loading/unloading methods for the same in nuclear reactors | |
US20030026377A1 (en) | Integrated head assembly for a nuclear reactor | |
JPH05150078A (en) | Boiling water type nuclear reactor | |
JP5789085B2 (en) | System for assembling or disassembling segment bars | |
WO2014099107A2 (en) | Apparatus and method to inspect, modify, or repair nuclear reactor core shrouds | |
CA2870949A1 (en) | Incore instrumentation cable routing for pressurized water reactor | |
JP2013040823A (en) | Nozzle stub processing device of reactor vessel | |
JP2010066216A (en) | Installation method of incore equipment of natural circulation type boiling water reactor | |
JPH02228593A (en) | Installation of equipment structure in nuclear reactor | |
JP2016145785A (en) | Reactor core internal structure assembly adjustment device and assembly method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 11849792 Country of ref document: EP Kind code of ref document: A1 |
|
ENP | Entry into the national phase |
Ref document number: 2013543175 Country of ref document: JP Kind code of ref document: A |
|
ENP | Entry into the national phase |
Ref document number: 2821300 Country of ref document: CA |
|
ENP | Entry into the national phase |
Ref document number: 20137015106 Country of ref document: KR Kind code of ref document: A |
|
NENP | Non-entry into the national phase |
Ref country code: DE |