WO2012079906A1 - Method and apparatus for transformer diagnosis - Google Patents
Method and apparatus for transformer diagnosis Download PDFInfo
- Publication number
- WO2012079906A1 WO2012079906A1 PCT/EP2011/070356 EP2011070356W WO2012079906A1 WO 2012079906 A1 WO2012079906 A1 WO 2012079906A1 EP 2011070356 W EP2011070356 W EP 2011070356W WO 2012079906 A1 WO2012079906 A1 WO 2012079906A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- transformer
- load
- value
- measurements
- diagnosis
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Ceased
Links
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R31/00—Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
- G01R31/50—Testing of electric apparatus, lines, cables or components for short-circuits, continuity, leakage current or incorrect line connections
- G01R31/62—Testing of transformers
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R29/00—Arrangements for measuring or indicating electric quantities not covered by groups G01R19/00 - G01R27/00
- G01R29/20—Measuring number of turns; Measuring transformation ratio or coupling factor of windings
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R31/00—Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
- G01R31/50—Testing of electric apparatus, lines, cables or components for short-circuits, continuity, leakage current or incorrect line connections
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R19/00—Arrangements for measuring currents or voltages or for indicating presence or sign thereof
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R31/00—Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R31/00—Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
- G01R31/50—Testing of electric apparatus, lines, cables or components for short-circuits, continuity, leakage current or incorrect line connections
- G01R31/72—Testing of electric windings
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R31/00—Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
- G01R31/50—Testing of electric apparatus, lines, cables or components for short-circuits, continuity, leakage current or incorrect line connections
- G01R31/52—Testing for short-circuits, leakage current or ground faults
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R35/00—Testing or calibrating of apparatus covered by the other groups of this subclass
- G01R35/02—Testing or calibrating of apparatus covered by the other groups of this subclass of auxiliary devices, e.g. of instrument transformers according to prescribed transformation ratio, phase angle, or wattage rating
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02H—EMERGENCY PROTECTIVE CIRCUIT ARRANGEMENTS
- H02H7/00—Emergency protective circuit arrangements specially adapted for specific types of electric machines or apparatus or for sectionalised protection of cable or line systems, and effecting automatic switching in the event of an undesired change from normal working conditions
- H02H7/04—Emergency protective circuit arrangements specially adapted for specific types of electric machines or apparatus or for sectionalised protection of cable or line systems, and effecting automatic switching in the event of an undesired change from normal working conditions for transformers
Definitions
- the present invention relates to the field of power transformers, and in particular to on-line diagnosis of transformers. Background
- Transformers generally form an integral part of a power transmission system, providing the possibility of converting one voltage level to another.
- Transformers in power transmission systems often represent huge investments, and are typically not manufactured until ordered.
- a transformer in a power transmission system needs to be replaced, it is often a lengthy process to get a replacement.
- Transformer on-line monitoring systems have been designed to detect and indicate, while the transformer is in operation, deviations in properties of the transformer which could indicate a deterioration of the transformer status. Examples of properties that can be monitored are temperature, combustible dissolved gas, and bushing capacitance.
- transformer impedance is a further property which has been used in transformer diagnostics.
- transformer impedance has been determined off-line, i.e. from measurements performed when the transformer was disconnected from the power transmission system.
- US2010/0188240 it is proposed to monitor the transformer impedance while the transformer is in operation.
- the possibility of on-line impedance monitoring would be of great benefit, since the impedance of a transformer carries useful information on the transformer status, while disconnecting a transformer from the power transmission system in order to determine the impedance is costly.
- An object of the present invention is to provide a more accurate method for on-line diagnostics of transformers.
- a transformer diagnosis method which can be used for a transformer having at least a load winding and a source winding.
- the method comprises collecting, for at least two different transformer loads, measurements of a current being indicative of the transformer load, and measurements of at least one further transformer AC signal.
- the method further comprises deriving, from the collected measurements, at least two values of a quantity which depends on at least one transformer property as well as on transformer load, and determining, from the derived values, a set of coefficient(s) of a relation for how said quantity is expected to vary with transformer load.
- the method further comprises using at least one of said coefficient(s) in performing a diagnosis of the transformer.
- the inventive method is provided a way to determine values of transformer properties which are otherwise difficult to measure. Furthermore, the inventive diagnosis method can advantageously be used in on-line scenarios, thus facilitating for monitoring and diagnosis without having to take the transformer off line.
- transformer AC signal is here used to refer to a signal from the set I 2 , V lt V 2 ⁇ , where I I 2 are the currents through the source and load windings of the transformer, respectively, and V x , V 2 are the voltages across the source and load sides of the transformer, respectively.
- the collecting of measurements could be performed by receiving measurement signals directly from measurement equipment, or by receiving measurement data from another source, such as a computer readable memory or a different diagnosis apparatus.
- the value of a coefficient can typically be described in terms of an expression involving at least one transformer property. Some coefficients are actually equal to the value of a transformer property, in which case the expression becomes simple.
- the performing a diagnosis comprises using at least one coefficient for obtaining at least one transformer property, using the expression for how the coefficient depends on the transformer properti(es).
- a value of a transformer property can be determined from on-line measurements, providing useful information on the status of the transformer.
- the determination of a transformer property can be repeated from time to time, by collecting further measurements at different loads, and determining a new set of coefficient(s) from which a new value of the property can be determined.
- performing a diagnosis includes collecting an on-line monitoring measurement of at least one terminal AC signal at a first monitoring load; deriving a measured-based value of the quantity from the monitoring measurement; and determining an expected value of the quantity at the first monitoring load by using said relation and said coefficient s).
- the measured-based value of the quantity is then compared with the expected value of the quantity, so as to detect any transformer problem giving rise to a change in the quantity. Since the quantity depends on at least one transformer property, changes in a transformer property on which the quantity depends will be reflected in the value of the quantity. Hence, by on-line monitoring of the quantity, and on-line monitoring of the properties on which the quantity depends can effectively be achieved. If desired, the actual value of the transformer propertie(s) can be determined upon an indication of a change.
- the collecting of an on-line monitoring measurement and the comparison with the corresponding expected value can be repeated as often as necessary or desired, for example in time ranges from seconds to years. Monitoring measurements could be performed on a regular basis, or on demand.
- the relation for how the quantity varies with transformer load can be a linear relation, wherein the slope and/or the intersection at zero load is indicative of a transformer property.
- the quantity is the difference between the voltage across the terminals of a first winding on a first side of the transformer and the voltage across a second winding on a second side of the transformer as reflected to the first side.
- the relation corresponds to:
- Zi is the impedance of the source winding
- I 0 is the magnetizing current
- n is the ratio of the number of turns of the source winding to the number of turns of the load winding
- Z w is the total winding impedance
- I 2 is the load current
- AV is the difference between the voltage across the terminals of the source winding and the voltage across the load winding as reflected to the source side
- AV is the difference between the voltage across the source winding as reflected to the load side and the voltage across the terminals of the load winding.
- transformer properties on which the coefficients of the relation depend are the total winding impedance, turn ratio, magnetizing current and the impedance of the source winding.
- the quantity is the source current.
- the relation corresponds to:
- Ii is the source current
- I 2 is the load current
- I 0 is the magnetizing current
- n is the ratio of the number of turns of the source winding to the number of turns of the load winding.
- the quantity is the power loss in the transformer. In an implementation of this embodiment wherein the transformer only has one winding per side which carry significant power, the relation corresponds to: c _ VT * +7 h + 7
- the power loss in the transformer is a general indicator of many types of problems. By monitoring the power loss, a fast indication can most often be obtained in the case a problem occurs.
- the transformer diagnosis apparatus comprises: an input configured to receive signals indicative of AC signal measurements of a transformer, including measurements of the transformer load current; an output configured to deliver a transformer diagnosis result; and a coefficient generator (706) connected to the input.
- the coefficient generator is configured to collect, for at least two different transformer loads, measurements of a current being indicative of the transformer load, and measurements of at least one further transformer AC signal.
- the coefficient generator is further configured to derive, from the collected measurements, at least two values of a quantity which depends on a transformer property as well as on transformer load; and to determine, from the derived values, a set of coefficient(s) of a relation for how said quantity is expected to vary with transformer load.
- the transformer diagnosis apparatus further comprises a diagnosis mechanism arranged to use the set of coefficients in the generation of a diagnosis result.
- the diagnosis mechanism is connected to the coefficient generator and to the output of the transformer diagnosis apparatus (possibly via further components of the diagnosis apparatus).
- the problem is also addressed by a transformer comprising a transformer diagnosis apparatus.
- the transformer could be a single phase transformer, or include further phases.
- the transformer could have two or more windings per phase.
- the coefficient generator may be configured to generate a set of coefficients for each of the tap changer tap points.
- the status monitor can be configured to determine, if a deviation is detected, at which tap changer position(s) the deviation occurs.
- a position where a fault has occurred can be localized.
- Fig. 1 is an illustration of an ideal transformer model.
- Fig. 2a is an illustration of a transformer model taking into account effects of magnetizing currents in the transformer core, leakage inductances and effective resistances of the primary and secondary windings.
- Fig. 2b is an alternative illustration of the transformer model shown in Fig. 2a, wherein the impedances on the load side have been reflected to the source side.
- Fig. 2c is an alternative illustration of the transformer model shown in Fig. 2a and 2b, wherein the impedances on the source side have been reflected to the load side.
- Fig. 3 is a graph showing AV as a function of I 2 for a transformer, where AV is the
- Fig. 4 is a graph showing experimental results of Ii vs. I 2 , where Ii is the source terminal current and I 2 is the load current.
- Fig. 5 is a flowchart schematically illustrating an embodiment of an inventive method.
- Fig. 6a is a flowchart schematically illustrating an example of a use of a T(l2)-relation determined by means of the method shown in Fig. 5.
- Fig. 6b is a flowchart schematically illustrating a further example of a use of a T(I 2 )- relation determined by means of the method shown in Fig. 5.
- Fig. 7a is an example of an embodiment of a diagnosis apparatus according to the
- Fig. 7b is an example of an embodiment of a coefficient generator.
- Fig. 7c is an example of an embodiment of a status monitor.
- Fig. 8 is an alternative illustration of a diagnosis apparatus, a coefficient generator, a transformer property value generator, or a status monitor.
- Fig. 9 is a schematic illustration of a transformer having a tap changer.
- transformers are typically used for transforming one voltage level into another, and/or for providing galvanic isolation between different sections of a power transmission system.
- a schematic illustration of a transformer 100 is shown in Fig. 1.
- the transformer 100 of Fig. 1 comprises a first winding 105, a second winding 110, a transformer core 113, a first pair of winding terminals 115a, 115b connected to the first winding 105, and a second pair of winding terminals 120a, 120b connected to the second winding 110.
- the voltage across the first winding 105 is denoted Vi, and the voltage across the second winding 110 is denoted V 2 , while the current through the first winding 105 is denoted Ii and the current through the second winding 110 is denoted I 2 .
- the number of turns of the first winding is denoted n 1? and the number of turns on the second winding is denoted n 2 , the ratio ni/n 2 hereinafter being referred to as the turn ratio n. Note that, although an often used convention is to have n greater than 1, n as defined herein can be either smaller than, equal to, or greater than 1.
- the voltage across a winding 105/110 will often be referred to as a terminal voltage
- a current through a winding 105/110 will often be referred to as a terminal current
- the terminal voltages and currents will not directly reflect the winding voltages/currents, but will provide a means for deriving the winding voltages/currents.
- the first winding 105 is the winding which is fed by a source
- the second winding 110 is the winding which delivers power to a load.
- an opposite convention may alternatively be used.
- ⁇ Losses in the core referred to as core loss or no-load loss: hysteresis losses and eddy current losses.
- Fig. 2a shows an example of an often used equivalent circuit for a non-ideal transformer 100, referred to as a first order model of a transformer 100.
- Fig. 2a also illustrates the effects of the voltage drop through the transformer caused by leakage magnetic flux and of the apparent power losses discussed above.
- the effects causing such voltage drop and apparent power loss are illustrated by including, in the equivalent circuit, the following elements:
- Ri and Xi are connected in series with the source winding 105; R 2 and X 2 are connected in series with the load winding 110; and R m and X m , which are connected in parallel, form an equivalent shunt element which is connected in parallel with the source winding 105.
- the equivalent current through the equivalent shunt element is denoted Io, whereas the voltage across the equivalent shunt element is denoted Ei.
- the current I 0 will hereinafter be referred to as the magnetizing current I 0 .
- the first order transformer model of Fig. 2a is described in terms of an equivalent model, wherein the impedances are seen from a single side of the transformer only.
- Such equivalent models simplify the analysis of the transformer model, since the voltage level is generally different at the two sides.
- Fig. 2b is shown an equivalent first order transformer model wherein the load side impedances have been reflected to the source side
- Fig. 2c shows an equivalent first order transformer model wherein the source side impedances have been reflected to the load side.
- the following notation is used in Figs. 2b and 2c:
- R m the equivalent resistance representing the core losses, as seen from the source side
- the total impedance Z w of the transformer windings can be estimated off-line as the ratio between an applied voltage and the current drawn by the transformer on the source side while the load side is short-circuited, where the total winding impedance corresponds to the sum of the series impedance Zi of the source-side winding and the series impedance Zi 2 of the load-side winding as seen from the source side, i.e.
- Zi 2 is often referred to as the reflected impedance on the source side, and can be expressed as Z 12 — Z 2 .
- the resistance of a winding (cf. Ri and R 12 ) can be measured by
- values of the components R m and X m of the magnetizing branch can be estimated by performing no-load measurements, during which only the magnetizing current I 0 flows into the transformer.
- the turn ratio n can be determined off-line by means of no-load voltage measurements, using the following relation, where the influence of the
- US2010/0188240 The method presented in US2010/0188240, wherein on-line measurements of the terminal voltages and currents are used to calculate values of the transformer impedance, can provide a rough estimate of the transformer impedance in an on-line scenario.
- US2010/0188240 does not take any magnetizing current into account, but assumes that the entire voltage drop across the windings 105 and 110 is caused by the load current over the transformer impedance (which in US2010/0188240 is defined as an impedance matrix).
- the influence of the magnetizing current on the impedance and turn ratio calculations is often non-negligible, and moreover, this influence is not constant, so that the accuracy of any values of the transformer impedance derived by use of the method suggested in US2010/0188240 will typically be poor.
- a diagnosis of a transformer 100 can be obtained by means of collecting, for at least two different transformer loads, measurements of a current being indicative of the transformer load, as well as measurements of at least one further terminal AC signal. From such measurements, the coefficients of a relation between a quantity T and the transformer load can be established, where the quantity T depends on a transformer property to be determined as well as on the transformer load, while at the same time being obtainable from the collected measurements.
- a value of a transformer property, on which the value of T depends can be derived.
- a quantity T can typically be described as a sum of a load dependent term and a term which is independent on load, although quantities T having other load dependencies can be contemplated.
- the transformer property can be extracted from the variation of the quantity T with transformer load.
- a suitable analysis of the quantity variation with load will give information on the value of the property to be determined.
- transformer properties that can be determined by an analysis as described above are the short circuit impedance Z w , the turn ratio n and the magnetization current I 0 .
- the suggested analysis could be used to determine, from on-line measurements of terminal AC signals, an absolute value of a transformer property. Furthermore, the analysis could be used in on-line monitoring of the status of the transformer.
- the coefficients of the relation between the quantity T and the transformer load are typically first determined under circumstances reflecting a normal state of the transformer. The value of the quantity T is then monitored, so that any significant deviation in the value of the quantity T as measured from the quantity T as obtained by use of the determined normal state T-load-relation will be detected.
- the accuracy of the monitoring and the accuracy of the determination of the absolute value of the transformer property will be improved.
- the T(I 2 ) relation used in the analysis can for example be based on the equivalent circuit of the first order model shown in Fig. 2a.
- a transformer property is related to the parameters of the first order transformer model, often in a manner such that a transformer property of interest is represented by a parameter of the transformer model.
- useful quantities T include the terminal current Ii on the source side of the transformer (which in the convention used herein is the primary side); the difference between the load-side terminal voltage Vi and the load-side voltage V 12 as seen from the source side, this difference hereinafter referred to as the voltage drop, AV; and the power loss Si oss in the transformer.
- n ⁇ I 12 n 2 ⁇ 7 2 n (3b)
- the load voltage V 12 as seen from the source side can be obtained from the load terminal voltage, V 2; and the voltage drop AV can thus be obtained from measurements:
- expression (4a) is a measurement-based expression for obtaining a value of AV (being an example of a quantity T) from measurements of transformer AC signals.
- AV being an example of a quantity
- n can be obtained from an analysis of a further quantity T, or could be assumed to take the nameplate value.
- the voltage drop AV represents the voltage drop caused by the magnetizing current I 0 and the current I 12 (load current reflected on the source side) flowing through the transformer impedance (cf. Fig. 2). Assuming the first order transformer model, AV can alternatively be expressed as:
- the voltage drop vs. load can be described by a linear expression, with the slope of the dependency corresponding to the total winding impedance, Z w .
- the variations in magnetizing current I 0 are insignificant, and the linear relation of expression (4b) will accurately describe the relationship between the voltage and transformer load.
- high loads could for example be loads for which l x > 10/ 0 .
- the intercept of this linear dependency with the AV-axis at zero load corresponds to the product of the magnetizing current I 0 and the first winding impedance Z ⁇ .
- the high load magnetizing current I 0 can be obtained from studies of the source side current Ii vs.
- the source winding impedance Z ⁇ can be determined from the intercept of the linear expression (4b).
- the load winding impedance Z 12 can then be determined from the total winding impedance Z w determined from the gradient of the linear expression (4b).
- the quantity T is the source current, which can simply be obtained from Ii- measurements:
- expression (5b) is a measurement-based expression for obtaining a value of Ii from measurements of a transformer terminal AC signal.
- the source-side current Ii shows a linear dependency on the load-side current I 2 , where the slope of the dependency corresponds to the inverse of the transformer turn ratio n.
- any deviation in a transformer property (such as Z w , Io or n) on which the quantity T depends can be detected by further measurements of the suitable terminal AC signals.
- the quantities AV and Ii both show a linear dependency on load.
- the coefficients of the linear expression can be determined, from the measured values obtained in step 503, by means of a suitable linear regression method, such as for example a least square fit.
- the power loss Si oss inside the transformer 100 is a quantity T which shows a quadratic dependency on load.
- the power loss Si oss can be obtained as the difference between the apparent power input, Si n , and the apparent power output, S out, of the transformer 100:
- Expression (6a) represents a measurement-based expression for the power loss.
- a measurement value of Si oss can be determined, STM s asured .
- the power loss expressed in terms of the load current, I 2 as follows: +/ 0 o * + - + / oT- + / ol + Z l
- Zi is the impedance of the source winding 105 and Z 12 is the impedance of the load winding 1 10 reflected to the source side.
- the coefficients a, b and c of expression (6b) can be determined, e.g. by means of a least square fit.
- the power loss can be monitored in on-line monitoring measurements in order to detect a deviation from the expected value obtained from expression (6b), using the derived coefficients.
- a deviation of the measured power loss from the expected relation provided by expression (6b) could for example be used as a trigger for a further analysis of the measured values, for example an analysis using expression (4b) and/or (5a).
- the coefficients of expression (6b) could be used for obtaining information on the value of the transformer properties I 0 , n, Z w and Z ⁇ .
- a value of these transformer properties could be obtained from determined coefficients a, b and c.
- the constant term in expression (6b), referred to as a provides a value of the no load loss at rated voltage when Vi equals the rated voltage.
- the power loss, Si oss can be divided into a contribution from magnetization and other stray losses, S n , and a contribution from winding losses, S ⁇ din3 :
- V 1 ⁇ /i -(Vi - AV) ⁇ I* 2 V 1 ⁇ (/* - I* 2 ) + AV ⁇ I* 2 « V 1 ⁇ / 0 * + AV ⁇ I* 2 (6c)
- the power loss contributions can be determined from values of the magnetising current I 0 and the turn ratio n determined in accordance with the above.
- Information relating to whether one or both of the power loss contributions increases in an unexpected manner can be used to identify if a problem has occurred in the core 113 and/or in the windings 105/110. Furthermore, if there is an unexpected increase in the power loss, without an increase in either of the magnetization contribution and the winding loss contribution, one can conclude that the increase is caused by a further source of power loss.
- Analysis of a quantity T can give information on more than one transformer property, depending on which transformer properties that influence the quantity as a function of load. For example, analysis of the linear dependency Ii(I 2 ) can provide information on the turn ratio n (slope) and on the magnetizing current I 0 (intercept). Furthermore, an analysis can be performed on more than one quantity T, obtained from the same set of data, in order to obtain information on more than one transformer property. For example, I and V measurements at different loads can be used to obtain information on any combination of the quantities S loss (l2); (h) and AV(I 2 ). Different quantities T could then be used for deriving values of different transformer properties.
- different quantities T could be used for deriving values of the same transformer propertie(s), in order to check the consistency of the results.
- more than one quantity T could be used when an analysis of a quantity T as a function of load provides a value of a combination (product/quotient) of more than one transformer property - additional quantity(es) T could then be used to separate the properties that are determined as a combination. For example, if n, Zi, I 0 and Z w are all unknown, an analysis of AV as a function of load (cf. expression 4b) can provide information on the combinations Zil 0 and Z w /n.
- Si oss as function of load can provide a value of further combinations of the transformer properties n, Zi, I 0 and Z w ; and a separation of the combinations could hence be made by using values of combinations obtained from both ⁇ and Si oss -
- measurements of terminal AC signals could be used in monitoring of a transformer property over time, so as to detect changes in the transformer property.
- Detected changes in the transformer impedance Z w typically indicate that there is a contact problem and/or geometrical deformation/displacement of the windings.
- Contact problems could for example include broken winding strands; terminal contact problems, an increased resistance at contact points in for example a tap changer, etc.
- Deviations in the imaginary part of the transformer impedance Z w are typically associated with issues relating to the transformer geometry, while deviations in the real part are typically associated with contact problems.
- Detected changes in the turn ratio n typically indicate turn-to-turn faults, such as short circuits between turns.
- Detected changes in the magnetizing current I 0 typically indicate a deteriorated transformer core 113, such as for example unwanted grounding of the core 113, mechanical deformation of lamination and joints forming the core 113, short-circuiting of core lamination packets, or significant eddy currents on other parts of the transformer, e.g. around the surface of the core 113 etc.
- Fig. 3 experimental results of AV are plotted as a function of I 2 .
- the plotted values refer to one of the phases.
- n 0.99-n name piate
- a small error in the assumed value of n will not significantly influence the value of the deduced total impedance Z 12 .
- a 1% change in n will only alter the total winding impedance Z w deduced from the linear fits by around 0.05 %.
- the turn ratio n can be accurately determined using expression (5a), and such determined value can be used in a AV-analysis of the transformer.
- the influence of an incorrect value of n will typically be more noticeable in the no-load voltage drop, and hence, in order to obtain an accurate analysis result of the components of the no-load voltage drop term, a turn ratio determined by using expression (5a) can be useful.
- magnetization of the core 113 shows a non-linear behaviour, and also there is a slight increase in supply voltage at very light load).
- I 0 with load one could advantageously only include measurements where l x > 10/ 0 when performing an analysis of the Ii(I 2 ) -relation, as well as for the AV- analysis discussed in relation to expression (4b) and Fig. 3.
- a linear fit may result in a value of n having a small imaginary part. Since the turn ratio should be a real number, the magnitude of the imaginary part obtained from the line fit reflects the accuracy of the fit. A small imaginary part can generally be neglected, while a more significant imaginary part indicates that the accuracy of the fit is insufficient. A check of the magnitude of the imaginary part of n could hence serve as a consistency test of the analysis of n, as well as of I 0 and Z w . The low load measurements, for which I 0 deviates significantly from the high load value, will influence the derived value of n so as to increase the imaginary part. Hence, the linear fit could advantageously be made using the high load values.
- the magnetizing current I 0 typically varies with source voltage Vi. Hence, the
- measurements used for obtaining a relation between a quantity T and the transformer load I 2 should preferably be measured at similar source voltages Vi.
- the source voltage Vi at which monitoring of the transformer takes place should preferably be similar to the voltage level at which the relation was established. Measurements at which the source voltage Vi significantly deviates from the rated voltage could hence advantageously be excluded from the analysis.
- Fig. 5 a flowchart is shown which schematically illustrates an embodiment of an inventive method wherein an analysis as discussed above is used in diagnosing the status of a transformer 100.
- step 500 measurements of the load current, as well as of at least one further AC signal, are performed at different loads.
- step 503 measured values of T are derived at the different loads, using a suitable measure-based expression (cf.
- Step 505 a set of at least one coefficient(s) of a T(I 2 ) relation are determined by fitting the measured T-values to the applicable T(I 2 )-relation (cf. expressions (4b), (5a) and (6b)). Steps 500, 503 and 505 can be referred to as a learning phase of the diagnosis.
- step 510 of Fig. 5 the coefficients determined in step 505 are used to analyse the status of the transformer 100.
- step 600 an embodiment of step 510 of the method of Fig. 5 is shown as a step 600.
- the coefficients obtained in step 505 are used to obtain the value of one or more transformer properties.
- a coefficient in itself represents the value of a transformer parameter, in which case step 600 is very simple.
- table 1 an overview is provided of examples of different quantities T which can be used to determine or monitor transformer properties by use of different embodiments of the invention. Examples of transformer properties that can be obtained by analysing the different T(I 2 )-relations are also given.
- the AC signals which are used to obtain a value of T are also shown, including the AC signal used to determine the load. The load is typically obtained from measurements of I 2 .
- Fig. 6b is shown a flowchart which schematically illustrates a further example of how the coefficients, determined in step 505, can be used in the analysis of the status of a transformer 100.
- the flowchart in Fig. 6b illustrates an example of an on-line monitoring process according to the invention.
- step 605 a maximum acceptable deviation, DEV max , is determined, representing the maxim acceptable deviation of a measured value of T from a value of T derived by use of an expected T(I 2 ) relation. This is typically done by analysing the measurement results obtained in step 500.
- DEV max can be determined for example as the maximum deviation of a certified set of measurements, or as a fixed value.
- a load-specific value of ⁇ can be determined for each load at which measurements have been taken. Further values of ⁇ could then be extrapolated for loads at which no measurements are available, if necessary.
- a general estimate of ⁇ could be obtained from the distribution of , where
- Tmeasured is a measured value of T at a particular load
- Tfi t is the value of T expected from the relation obtained in step 505 at the particular load.
- a combination of a general estimate of ⁇ and load-specific values of ⁇ are used, so that the general estimate of ⁇ is used when there is no load-specific value of ⁇ obtained from measurements at the particular load, thus benefiting from the more narrow load-specific distribution when there are measurements available at the particular load, while using a general estimate of DEV max at other loads.
- a monitoring measurement of the load, as well as of further AC signal(s) required in order to obtain a value of T are performed (cf. Table 1).
- a value of T referred to as Tmonitor, is then determined from the monitoring measurement.
- the deviation of Tmonitor from the expected value Tf lt at the present load is determined.
- a further monitoring measurement is performed by re-entering step 610.
- the re-entering of step 610 could be preceded by a re-determination of DEVmax (cf. path b of Fig. 6b), or step 610 could be entered using the previous value of DEVmax (cf path a).
- a new definition of the maximum acceptable deviation could be obtained by including the monitoring measurement(s) obtained in step 610 in the T-distribution on which the value of DEVmax is based.
- a re-determination of DEVmax could e.g. also be useful if a new load range, for which monitoring has not previously been performed, has been entered.
- step 620 is entered.
- appropriate action is taken.
- the action taken in step 620 is to determine the present value of a transformer property obtainable from the quantity T (cf. Table 1).
- a further analysis of the status of the transformer 100 could also be triggered upon entering step 620, in order to determine the cause for such deviation.
- Such further analysis, or diagnosis of the transformer could for example include checking the temperature, gas level, an analysis based on a further quantity T(I 2 ), etc.
- the entry into step 620 will trigger more frequent monitoring measurements, in order to allow for a close watch of the development of the status of the transformer.
- the entry into step 620 will trigger the issuing of an alarm, the alarm indicating to an operator of the transformer 100 that a further investigation into the status of the transformer 100 is desired.
- alarm could for example be a light indication, a sound indication, the transmission of an e-mail or an SMS to a predetermined e-mail address or cell phone number, or any suitable alarm, or a combination thereof.
- a further possible action to be taken in step 620 is to perform a planned disconnection of the transformer 100 in order to perform off-line investigations based on a different analysis technique.
- the value of DEV max will typically depend on what actions will be taken in step 620 if a deviation from the expected value of T is detected.
- the desired value of DEV max will typically be higher than if the action in step 620 is to perform a further analysis of the measured data, or to increase the monitoring measurement rate.
- Suitable values of DEV max could for example lie within the range of 6 ⁇ -8 ⁇ for the triggering of a planned disconnection of the transformer 100; within the range of 4 ⁇ -6 ⁇ for issuing an alarm; and within the range of 2 ⁇ -4 ⁇ for increasing the monitoring measurement rate and performing a further analysis.
- a set of two or more values of DEV max could be defined for the same monitoring procedure, if desired, so that a first action is triggered upon the deviation exceeding a first DEV max , a second action is triggered upon the deviation from a second DEV max , etc.
- the method of Fig. 6b could include a step 600 wherein a value of the transformer property is determined from the T(I 2 )-relation provided by the coefficients determined in step 505.
- step 615 could, instead of the check of the quantity T, involve a check as to whether the value of a transformer property, derived from the quantity T, deviates from the value of the property obtained from the coefficients determined in step 505.
- Such determination of the present value of a transformer property would involve collecting measurements at different loads, and performing a new fit of the measured values to the applicable T(I 2 )-relation.
- the currents and voltages Vi, V 2 , Ii, and I 2 as used above represent the fundamental frequency components at 50/60 Hz of the currents and voltages, respectively. These currents and voltages are complex quantities and can for example be expressed as phasors.
- the phasor of a current/voltage can for example be determined by applying a Fast Fourier Transform to a continuous measurement of the voltage/current at a relevant terminal pair 115, 120, or by applying a Discrete Fourier Transform to a set of samples of the relevant voltage/current, where the sampling rate could for example be 1000 Hz.
- an average of several phasors could be determined, for example as a moving average. In a monitoring situation, there is generally no time pressure, and ample time could be spent on collecting the measurement results, if desired. Other ways of obtaining the phasor values from measurements may be used.
- the fundamental frequency of a power transmission system may, from time to time, deviate from the nominal frequency of 50/60 Hz. For example, in Europe, a deviation of + 0.2 % is generally tolerated. Frequency variations may influence the value of the measured phasor, so that the accuracy of the determination of the transformer properties is reduced if measurements are taken at different frequencies. In order to improve the accuracy of the determined transformer properties, the power transmission frequency could be monitored, and measurements which were performed at the a particular frequency (e.g. 50/60 Hz), or in a certain frequency range (e.g. 50/60 Hz + 0.1%), could be selected for the determination of the transformer quantities.
- a particular frequency e.g. 50/60 Hz
- a certain frequency range e.g. 50/60 Hz + 0.16%
- Figs. 7a-c schematically illustrate an embodiment of a transformer diagnosis apparatus 700.
- the transformer diagnosis apparatus 700 is shown to comprise an input 702, an output 704, a coefficient generator 706, a transformer property value generator 708 and a status monitor 710.
- Input 702 is arranged to receive a signal I 2 indicative of the load current, as well as at least one further AC signal Ii, Vi and/or V 2 .
- Input 702 is connected to measurement equipment (not shown), such as current and voltage transformers, arranged to measure AC signals at the source and load winding terminals 115/120 of a transformer 100.
- Input 702 is connected to an input of the coefficient generator 706.
- Coefficient generator 706 is arranged to generate, from input signals received at input 702, coefficients C of an T(I 2 )-relation (cf. expressions ((4b), (5a) and (6b)).
- An output of coefficient generator 706 is, in the embodiment of the diagnosis apparatus 700 shown in Fig. 7a, connected to a transformer property value generator 708 as well as to a status monitor 710.
- Transformer property value generator 708 is configured to generate, from coefficients C received from the coefficient generator 706, a value of at least one transformer property P (where P can for example be the turns ratio n; the short circuit impedance Z w , the impedance of the source winding, the impedance of the load winding, and/or the high load magnetizing current I 0 ).
- transformer property value generator 708 of Fig. 7a is further configured to output a signal indicative of the value of P.
- the transformer property value generator 708 has a memory for storing the format of one or more T(I 2 )- relations (cf. expressions (4b), (5a) and (6b)), from which a value of a transformer property can be determined once the coefficients are known, as described above.
- the input of status monitor 710 is further connected to input 702 and arranged to receive signals indicative of measured load and further AC signal(s). In one embodiment, discussed in relation to Fig.
- the status monitor 710 is further arranged to receive a set ⁇ T, I 2 ⁇ of T measurements with corresponding loads I 2 from the coefficient generator 706, as indicated by the dashed line.
- the status monitor 710 is configured to monitor the status of the transformer 100, and to generate an action signal A should any significant deviation from the expected behaviour be detected.
- the outputs of the transformer property value generator 708 and of the status monitor 710 are connected to the output 704 of the transformer diagnosis apparatus 700.
- the output 704 is arranged to deliver a diagnosis result signal, of which A and P form examples.
- the transformer value generator 708 and the status monitor 710 form two different examples of transformer diagnosis mechanisms which utilise a set of coefficients generated by the coefficient generator 706 in generating a diagnosis result.
- Fig. 7b an embodiment of a coefficient generator 706 is shown in more detail.
- Coefficient generator 706 of Fig. 7b comprises an input 712, an output 714, a T generator 716 arranged to determine a measure value (T mea sured) of a property T; a T buffer 718 and a T(I 2 ) fit generator 720.
- T generator 716 is arranged to receive the load signal I 2 as well as a suitable selection of the further AC signal(s) Ii, Vi and/or V 2 , depending on which quantity T the T-generator 716 is arranged to generate. From these received signals, the T-generator 716 is configured to generate a measured value of a property T, by use of a suitable expression (cf.
- the output of the T-generator 716 is connected to the input of the T buffer 718, which is arranged to store a set of different T values received from T generator 716 together with an indication of the load I 2 at which the T value was obtained.
- the output of T buffer 718 is connected to the input of the T(I 2 ) generator 720, and arranged to deliver a signal indicative of a set ⁇ T, I 2 ⁇ of T values, for example upon request from the T(I 2 ) fit generator, upon a manual request, or when a certain number of T-values have been received.
- the T(I 2 )-generator 720 is configured to fit the received set of ⁇ T, I 2 ⁇ values to the appropriate T(I 2 )-relation (cf. step 505 of Fig. 5), for example by means of a least square fit as well known in the art.
- the T(I 2 )-generator 720 is further configured to output, to output 714, a signal C indicative of the coefficients resulting from the fitting operation performed.
- the output 714 is further connected to an output of the T buffer 718, so that a ⁇ T, 12 ⁇ signal may be generated at the output 714.
- the status monitor 710 comprises an input 722, an output 724, a coefficient memory 725, a ⁇ 3 ⁇ 4 generator 726, a T mon itor generator 728, a DEV max generator 730 and a comparator 732.
- the status monitor 710 further comprises at least one action mechanism, of which a further analysis trigger 734, an alarm generator 736 and a planned outing trigger 738 are shown as examples.
- the coefficient memory 725 is connected to the input 722 and arranged to receive a signal C, and to store the coefficients for future use.
- Coefficient memory 725 could, in one implementation, be arranged to store more than one set of coefficients C, representing different fits of the T(I 2 ) relation performed on different sets of ⁇ T, I 2 ⁇ data.
- An output of the coefficient memory is connected to the 3 ⁇ 4 generator 726.
- the coefficient memory 725 is arranged to deliver a signal indicative of the coefficients C upon request from the 3 ⁇ 4 generator.
- the 3 ⁇ 4 generator 726 is further connected to the input 722 and arranged to receive a signal I 2 indicative of the current transformer load.
- the 3 ⁇ 4 generator 726 is configured to derive, from a received I 2 signal and a suitable T(I 2 )-relation, using coefficients C received from the coefficient memory 725, a fitted value of T, 3 ⁇ 4, at the present load. Examples of T(I 2 ) relations are given in expressions (4b), (5a) and (6b).
- the Ta t generator 726 is further arranged to deliver a signal Tf lt , indicative of a derived value, at an output.
- the Tmonitor generator 728 is configured to derive a value of T from a corresponding suitable measurement-based expression, examples of which are given in expressions (4a), (5b) and (6a).
- T mon itor generator 728 is connected to the input 722 and arranged to receive a suitable selection of the AC signals Ii, I 2 , Vi and V 2 , the selection depending on which quantity T is to be determined.
- T mon itor generator 728 is further arranged to deliver a signal T mon itor, indicative of a derived value, at an output.
- T mon itor generator 728 typically functions in the same manner as T generator 716, and could in fact be implemented by the same hardware/software.
- the comparator 732 is connected to the outputs of the ⁇ 3 ⁇ 4 generator 726 and the T mon itor generator 728. Comparator 732 is configured to determine whether the deviation of a Tmonitor value from the corresponding 3 ⁇ 4 value exceeds a maximum acceptable deviation DEVmax. The comparator 732 is arranged to deliver, upon determining that the deviation of a received T m0 nitor value from a corresponding Tf lt value exceeds DEVmax, a trigger signal TR.
- DEVmax could for example be a fixed value, or could, as in the embodiment of Fig. 7c, be determined from the set of ⁇ T, I 2 ⁇ data used in determining the coefficients C.
- DEVmax generator 730 of Fig. 7c is arranged to receive a set of ⁇ T, I 2 ⁇ data, and configured to derive a value of DEVmax from the set, for example using a method described in relation to step 605 of Fig. 6b.
- DEVmax generator 730 of Fig. 7c includes a memory for storing a derived value of DEVmax, and is arranged to deliver a value of DEVmax at an output connected to the comparator 732. In implementations wherein DEVmax takes a fixed value, DEVmax generator 730 could be reduced to a memory.
- a status monitor 710 further includes at least one action mechanism, connected to the output of the comparator 732 and configured to generate an action signal At should a deviation have been detected by the comparator 732.
- Status monitor 710 of Fig. 7c includes the following action mechanisms: a further analysis trigger 734, an alarm trigger 736 and a planned outage trigger 738.
- Different action mechanisms of a status monitor 710 could be invoked at different situations - for example, the further analysis trigger 734 could be invoked when a first deviation is detected, an alarm generator 736 could then be invoked should the further analysis indicate that attention from an operator is required, a planned outing trigger 738 could be invoked should the deviation be of a certain magnitude, etc.
- the transformer diagnosis apparatus 700 is described above in terms of a single quantity T used in the analysis of the status of the transformer. However, a transformer diagnosis apparatus 700 could be configured to use two or more different quantities T in the diagnosis. Two or more quantities T could for example be monitored in parallel, or a deviation in a first quantity T could trigger the analysis of a further quantity, etc.
- FIG. 8 shows a diagnosis apparatus 700 comprising a processor 800 connected to a memory 805, as well as to input 702 and output 704.
- the memory 805 comprises computer readable means that stores computer program(s) 810, which when executed by the processing means 800 causes the diagnosis apparatus 700 to perform the method illustrated in Fig. 5 (or an embodiment thereof).
- the diagnosis apparatus 700 and its mechanisms 706, 708 and 710 are in this embodiment implemented with the help of corresponding program modules of the computer program 810.
- the processor 800 could, in an implementation, be one or more physical processors.
- the processor could be a single CPU (Central processing unit), or it could comprise two or more processing units.
- the processor may include general purpose microprocessors, instruction set processors and/or related chips sets and/or special purpose microprocessors such as ASICs (Application Specific Integrated Circuit).
- the processor may also comprise board memory for caching purposes.
- Memory 805 comprises a computer readable medium on which the computer program modules, as well as relevant data, are stored.
- the memory 805 could be any type of non-volatile computer readable memories, such as a hard drive, a flash memory, a CD, a DVD, an EEPROM etc, or a combination of different computer readable memories.
- the computer program modules described above could in alternative embodiments be distributed on different computer program products in the form of memories within a diagnosis apparatus 700.
- Such protection system is arranged to react on instant values only, and no monitoring of the currents and voltages in the transformer is performed.
- the same current and voltage measurement sensors as are used for the protection system could, if desired, also be used for the monitoring purposes of the technology described herein.
- measurements to be used in the determination of transformer properties and/or in the monitoring of transformer properties could generally be obtained without the need for large hardware investments.
- Suitable current measurement equipment could for example be current transformers.
- Suitable voltage measurement equipment could for example be voltage transformers.
- deviations in quantities can be monitored, rather than the actual values of the quantities, and hence, the accuracy requirements of the measurement equipment are less than in a monitoring method where the actual value of a transformer property is required. If the same measurement equipment is used for both establishing the T(I 2 ) relation(s) and for the monitoring measurements, any offset in the output from the equipment can be disregarded for monitoring purposes.
- a winding 105/110 being equipped with a tap changer 900 is schematically illustrated in Fig. 9, where the tap changer 900 is shown to have six different taps 905, each equipped with a tap selector switch 910 and by means of which six different states of the tap changer 900 can be achieved, each state providing a particular number of winding turns.
- a diverter switch 915 is also provided, the diverter switch being arranged to take one of two different positions, where in a first position, a winding terminal 115/ 120a is connected to a first set of the tap selector switches 910, and in a second position, the winding terminal 115/120a is connected to a second set of the tap selector switches.
- the coefficients for the relation between the quantity T and the load current I 2 will depend on the state of the tap selector 900.
- coefficients for a relation between one (or more) quantities T and I 2 could be determined for more than one (and possibly each) state of the tap changer 900, thus giving different expected values of the transformer properti(es) for different states of the tap changer 900.
- Monitoring of the transformer properti(es) while the tap changer 900 is in different states can thus give information on the location of a fault giving rise to deviations in a transformer property, depending on the fault location in relation to the location of the different taps 905. For example, if the resistance of one of the tap selector switches 910 is increased, for example due to coking or other contaminations, the value of the voltage drop AV obtained from relation (4a) only deviate from the expected value when the tap changer is in the corresponding position.
- any winding(s) present in addition to the above discussed source and load windings will hereinafter be referred to as further winding(s).
- Further winding(s) could be source winding(s) and/or load winding(s).
- the power in any further winding(s) is insignificant or approximately constant, and does not have to be taken into account for the purposes of determining/monitoring of transformer properties - the error caused by such currents is typically insignificant and/or constant.
- expressions (4a)-(6c) can be adapted accordingly.
- expression (5a) can successfully be adapted to:
- magnetizing current Io and the turn ratios n 2 /ni and n 3 /ni can be found with a two-dimensional fit, for example using stochastic variations in I 2 and I3 and at least three measurements.
- expression (4b) can be adapted to separate into one relation for each load winding, / ' , as
- a similar adaptation of expressions (4b)-(6c) could be made for a transformer 100 of any winding configuration.
- the transformer properties can be obtained by using an N-l -dimensional fit of at least N measurements.
- the method can be applied to the diagnosis of transformers of any number of phases, and in particular to three phase transformers.
- the method can be applied to each of the phase transformers separately, once the individual currents through the windings and voltages have been determined.
- the configuration of the phases often implies that the terminal current/voltages do not directly give the individual currents and voltages.
- a ⁇ - ⁇ configuration results in a phase shift of 30 degrees between the source and load side terminal currents and voltages, as well as a difference in magnitude by a factor of ⁇ /3 between the terminal current and the winding current in the ⁇ side and between terminal-to-terminal voltage and winding voltage on the Y side.
- the individual current and voltages can typically be determined from measurements of the terminal currents and voltages, as described for example in US6507184 B1.
- the term "monitor a quantity” will be used to refer to the monitoring of either a quantity, or the monitoring of a property derived from a value of the quantity.
Landscapes
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Engineering & Computer Science (AREA)
- Power Engineering (AREA)
- Testing Of Short-Circuits, Discontinuities, Leakage, Or Incorrect Line Connections (AREA)
Abstract
Description
Claims
Priority Applications (4)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| KR1020137018842A KR101532495B1 (en) | 2010-12-17 | 2011-11-17 | Method and apparatus for transformer diagnosis |
| BR112013014847A BR112013014847B8 (en) | 2010-12-17 | 2011-11-17 | METHOD AND APPARATUS FOR TRANSFORMER DIAGNOSIS |
| CN201180060911.8A CN103328990B (en) | 2010-12-17 | 2011-11-17 | Method and apparatus for transformer diagnosis |
| US13/919,745 US9322866B2 (en) | 2010-12-17 | 2013-06-17 | Method and apparatus for transformer diagnosis |
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| EP10195712.4 | 2010-12-17 | ||
| EP10195712.4A EP2466322B1 (en) | 2010-12-17 | 2010-12-17 | Method and apparatus for transformer diagnosis |
Related Child Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| US13/919,745 Continuation US9322866B2 (en) | 2010-12-17 | 2013-06-17 | Method and apparatus for transformer diagnosis |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| WO2012079906A1 true WO2012079906A1 (en) | 2012-06-21 |
Family
ID=44073083
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| PCT/EP2011/070356 Ceased WO2012079906A1 (en) | 2010-12-17 | 2011-11-17 | Method and apparatus for transformer diagnosis |
Country Status (8)
| Country | Link |
|---|---|
| US (1) | US9322866B2 (en) |
| EP (1) | EP2466322B1 (en) |
| KR (1) | KR101532495B1 (en) |
| CN (1) | CN103328990B (en) |
| BR (1) | BR112013014847B8 (en) |
| ES (1) | ES2439279T3 (en) |
| PL (1) | PL2466322T3 (en) |
| WO (1) | WO2012079906A1 (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN104316808A (en) * | 2014-11-17 | 2015-01-28 | 国家电网公司 | Method and system for detecting fault of transformer winding |
| US9416652B2 (en) | 2013-08-08 | 2016-08-16 | Vetco Gray Inc. | Sensing magnetized portions of a wellhead system to monitor fatigue loading |
Families Citing this family (68)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| DE102012103736A1 (en) * | 2012-04-27 | 2013-10-31 | Maschinenfabrik Reinhausen Gmbh | Method for monitoring the operation of a tap changer |
| EP2890991A4 (en) | 2012-08-29 | 2016-05-25 | Megger Sweden Ab | Method and apparatus for measuring load tap changer characteristics |
| DE102012220474A1 (en) * | 2012-11-09 | 2014-05-15 | Bombardier Transportation Gmbh | Method and device for monitoring a state of a transformer |
| EP2787357B1 (en) * | 2013-04-05 | 2019-08-07 | Omicron electronics GmbH | Method and device for testing a transformer |
| CN103558479A (en) * | 2013-11-15 | 2014-02-05 | 国家电网公司 | Method for monitoring failures inside transformer |
| US9830651B1 (en) | 2014-01-29 | 2017-11-28 | Square, Inc. | Crowdfunding framework |
| WO2015131363A1 (en) * | 2014-03-06 | 2015-09-11 | 深圳市欣锐特科技有限公司 | Method and apparatus for measuring current |
| CN106605150A (en) * | 2014-04-15 | 2017-04-26 | Abb瑞士股份有限公司 | Transformer parameter estimation using terminal measurements |
| CN104020370B (en) * | 2014-05-22 | 2016-08-17 | 中国南方电网有限责任公司电网技术研究中心 | Transformer Internal Fault Diagnosis Method Based on Virtual Parameter Variation Monitoring |
| US10445826B1 (en) | 2014-05-26 | 2019-10-15 | Square, Inc. | Merchant financing system |
| US9984412B1 (en) | 2014-05-26 | 2018-05-29 | Square, Inc. | Approaches to location based merchant financing |
| US9786005B1 (en) | 2014-05-26 | 2017-10-10 | Square, Inc. | System and methods for financing merchant business needs |
| US9727912B1 (en) | 2014-05-26 | 2017-08-08 | Square, Inc. | Approaches for merchant financing |
| US10902512B1 (en) | 2015-01-22 | 2021-01-26 | Square, Inc. | Third party merchant financing |
| CA2975007C (en) * | 2015-02-06 | 2021-11-23 | Omicron Electronics Gmbh | Device and method for determining a parameter of a transformer |
| US9824394B1 (en) | 2015-02-06 | 2017-11-21 | Square, Inc. | Payment processor financing of customer purchases |
| US10019698B1 (en) | 2015-02-13 | 2018-07-10 | Square, Inc. | Merchant cash advance payment deferrals |
| US9779432B1 (en) | 2015-03-31 | 2017-10-03 | Square, Inc. | Invoice financing and repayment |
| US9892458B1 (en) | 2015-03-31 | 2018-02-13 | Square, Inc. | Invoice financing and repayment |
| US10453086B1 (en) | 2015-04-01 | 2019-10-22 | Square, Inc. | Individualized incentives to improve financing outcomes |
| US20160327600A1 (en) * | 2015-05-04 | 2016-11-10 | General Electric Company | Integrated transformer health monitoring architecture |
| CN105205238B (en) * | 2015-09-14 | 2018-07-20 | 华南理工大学 | Transformer electromagnetic transient simulation modeling method based on PSCAD/EMTDC softwares |
| US10538165B2 (en) * | 2015-09-22 | 2020-01-21 | Ford Global Technologies, Llc | Parameter estimation of loosely coupled transformer |
| CN105699838B (en) * | 2016-01-28 | 2018-07-06 | 云南电网有限责任公司电力科学研究院 | A kind of transformer winding state detection method and device |
| EP3208622B1 (en) * | 2016-02-18 | 2021-01-20 | ABB Power Grids Switzerland AG | A method and a system for measuring power loss in a power transformer |
| EP3288134B1 (en) * | 2016-08-26 | 2020-06-24 | ABB Power Grids Switzerland AG | Monitoring a transformer comprising a tap changer |
| CN107037311A (en) * | 2016-10-27 | 2017-08-11 | 国家电网公司 | A kind of Transformer Winding turn-to-turn insulation method for diagnosing faults and device |
| EP3324504B1 (en) * | 2016-11-22 | 2021-04-07 | ABB Power Grids Switzerland AG | Monitoring tap changer switching |
| US10203364B2 (en) | 2017-02-17 | 2019-02-12 | Doble Engineering Company | System and method for performing transformer diagnostics |
| DE102017215469B4 (en) * | 2017-09-04 | 2025-10-02 | Bayerische Motoren Werke Aktiengesellschaft | Procedure for testing a primary or secondary inductive charging unit |
| CN109991563B (en) * | 2018-01-02 | 2020-12-29 | 常熟开关制造有限公司(原常熟开关厂) | Current transformer disconnection detection method and measurement device |
| DE102018200869A1 (en) * | 2018-01-19 | 2019-07-25 | Bayerische Motoren Werke Aktiengesellschaft | Method and device for operating and / or checking an inductive charging system |
| US11881700B2 (en) | 2018-05-30 | 2024-01-23 | Nr Electric Co., Ltd. | Longitudinal differential protection method of transformer |
| CN109470132A (en) * | 2018-10-31 | 2019-03-15 | 广州供电局有限公司 | Deformation of transformer winding detection method, device and equipment |
| FR3088476B1 (en) | 2018-11-08 | 2022-01-28 | Thales Sa | METHOD FOR DETECTION AND TRANSMISSION OF STANDING FAILURE INFORMATION |
| CN109342818A (en) * | 2018-11-29 | 2019-02-15 | 山东电工电气集团智能电气有限公司 | Transformer winding measuring equipment and system |
| CN109507520B (en) * | 2018-12-20 | 2021-03-16 | 国网北京市电力公司 | Transformer inter-turn fault detection method, device, storage medium and processor |
| TWI693415B (en) | 2019-02-15 | 2020-05-11 | 南臺學校財團法人南臺科技大學 | Transformer diagnosis method, system, computer program product and computer readable recording medium |
| KR102084147B1 (en) | 2019-05-24 | 2020-03-04 | (주)엔텍시스템 | Online safety diagnosis system of electric room |
| CN110263500B (en) * | 2019-07-31 | 2022-05-13 | 西南交通大学 | A modeling method for multi-point grounding fault of wound core under inter-chip short circuit |
| CN110826011B (en) * | 2019-10-11 | 2023-06-09 | 国网安徽省电力有限公司超高压分公司 | Method and system for judging whether multiple transformers can be grouped |
| EP4235347A1 (en) * | 2019-11-14 | 2023-08-30 | Hitachi Energy Switzerland AG | A transformer assembly for electric grids and a related control method |
| WO2021146365A1 (en) * | 2020-01-14 | 2021-07-22 | S&C Electric Company | Transformer fault detection system |
| CN111336913B (en) * | 2020-03-19 | 2021-11-23 | 苏州华电电气股份有限公司 | Transformer winding deformation live monitoring device |
| US11585836B2 (en) * | 2020-03-20 | 2023-02-21 | InductEV, Inc. | Current sensing in a wireless power transfer system |
| US12174269B2 (en) | 2020-03-20 | 2024-12-24 | InductEV, Inc. | Current sensing in a wireless power transfer system |
| US11784503B2 (en) | 2021-02-22 | 2023-10-10 | Inductev Inc. | Passive arc detection and mitigation in wireless power transfer system |
| CN112068026B (en) * | 2020-07-24 | 2023-08-11 | 国网安徽省电力有限公司 | Method and device for generating sample data of arc light high resistance grounding fault |
| CN112082467A (en) * | 2020-08-06 | 2020-12-15 | 中国电力科学研究院有限公司 | Equivalent circuit and method for simulating frequency response state of transformer winding |
| KR102406425B1 (en) * | 2020-09-29 | 2022-06-08 | 전명수 | Diagnosis device for isolation deterioration of electric apparatus and diagnosis method thereof |
| CN112327220B (en) * | 2020-10-30 | 2024-04-16 | 国网福建省电力有限公司莆田供电公司 | Online diagnosis method and equipment for distribution transformer health based on multi-source data |
| CN113483849B (en) * | 2021-07-01 | 2023-10-17 | 上海申瑞继保电气有限公司 | Dynamic monitoring method for liquid level of transformer |
| CN113552863B (en) * | 2021-08-11 | 2023-03-14 | 广西电网有限责任公司电力科学研究院 | Additional temperature rise calibrating device and method for transformer winding temperature controller |
| CN113848401B (en) * | 2021-08-19 | 2025-05-16 | 南方电网科学研究院有限责任公司 | Transformer no-load current and no-load loss measurement system and method |
| EP4177781A1 (en) * | 2021-11-04 | 2023-05-10 | Hitachi Energy Switzerland AG | A method for obtaining an improved transformer design for a power plant |
| CN114200349B (en) * | 2021-11-23 | 2023-10-13 | 国网山西省电力公司电力科学研究院 | Transformer winding deformation degree evaluation method based on uninterrupted power supply detection |
| CN114325494B (en) * | 2021-12-14 | 2022-08-26 | 西南交通大学 | Method for calculating overload capacity evaluation factor of dry-type vehicle-mounted traction transformer |
| ES3042523T3 (en) * | 2022-02-17 | 2025-11-21 | Hitachi Energy Ltd | Monitoring a transformer comprising a tap changer |
| CN115656888B (en) * | 2022-10-25 | 2025-07-04 | 云南电网有限责任公司电力科学研究院 | Transformer overload warning method, device, storage medium and equipment |
| CN115597481B (en) * | 2022-11-03 | 2026-03-24 | 广西电网有限责任公司电力科学研究院 | A method and system for diagnosing and locating deformation in power transformer windings |
| CN115795872A (en) * | 2022-11-30 | 2023-03-14 | 广西电网有限责任公司电力科学研究院 | Method and system for controlling transformer no-load loss |
| CN116359625B (en) * | 2023-04-03 | 2024-01-02 | 三变科技股份有限公司 | Production method of double-split transformer and method for detecting abnormal number of turns of high-voltage coil |
| CN117054798B (en) * | 2023-10-12 | 2023-12-22 | 广州市扬新技术研究有限责任公司 | A method and device for transformer health monitoring using parameter identification |
| CN118566790B (en) * | 2024-07-26 | 2024-10-01 | 山东华能线缆有限公司 | A comprehensive evaluation system for transformer load |
| CN118859042B (en) * | 2024-09-25 | 2025-02-14 | 广东电网有限责任公司肇庆供电局 | Method and device for detecting running state of transformer, electronic equipment and storage medium |
| CN119087049B (en) * | 2024-10-10 | 2025-09-02 | 西安交通大学 | Method, system, medium and equipment for measuring leakage magnetic eddy current loss of nanocrystalline core |
| CN120596988B (en) * | 2025-05-28 | 2025-11-21 | 国网四川雅安电力(集团)股份有限公司 | Method and system for detecting and diagnosing faults of power transformation equipment based on artificial intelligence |
| CN120293513B (en) * | 2025-06-12 | 2025-08-15 | 云南电网有限责任公司 | Transformer mechanical state diagnosis method and system |
Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US6507184B1 (en) | 2001-03-28 | 2003-01-14 | Abb Automation Inc. | Methods and apparatus for differential current measurement in a three-phase power system |
| US20040130329A1 (en) * | 2002-09-11 | 2004-07-08 | Omicron Electronics Gmbh | Method for testing a transformer and corresponding test device |
| US20040164745A1 (en) * | 2002-12-10 | 2004-08-26 | Alstom T&D Sa | Method of diagnosing a fault on a transformer winding |
| US20090088995A1 (en) * | 2006-06-07 | 2009-04-02 | Abb Technology Ag | Method for determining the linear electrical response of a transformer, generator or electrical motor |
| US20100188240A1 (en) | 2009-01-29 | 2010-07-29 | Wells Charles H | Continuous condition monitoring of transformers |
Family Cites Families (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US7444266B2 (en) * | 2006-03-21 | 2008-10-28 | Abb Technology Ltd. | Control system for a transformer or reactor |
| CN101833056B (en) * | 2010-03-26 | 2012-10-03 | 中国电力科学研究院 | Method for diagnosing deformation of transformer winding based on frequency response characteristics |
| US8635034B2 (en) * | 2010-12-16 | 2014-01-21 | General Electric Company | Method and system for monitoring transformer health |
-
2010
- 2010-12-17 ES ES10195712.4T patent/ES2439279T3/en active Active
- 2010-12-17 EP EP10195712.4A patent/EP2466322B1/en active Active
- 2010-12-17 PL PL10195712T patent/PL2466322T3/en unknown
-
2011
- 2011-11-17 WO PCT/EP2011/070356 patent/WO2012079906A1/en not_active Ceased
- 2011-11-17 CN CN201180060911.8A patent/CN103328990B/en active Active
- 2011-11-17 KR KR1020137018842A patent/KR101532495B1/en active Active
- 2011-11-17 BR BR112013014847A patent/BR112013014847B8/en active IP Right Grant
-
2013
- 2013-06-17 US US13/919,745 patent/US9322866B2/en active Active
Patent Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US6507184B1 (en) | 2001-03-28 | 2003-01-14 | Abb Automation Inc. | Methods and apparatus for differential current measurement in a three-phase power system |
| US20040130329A1 (en) * | 2002-09-11 | 2004-07-08 | Omicron Electronics Gmbh | Method for testing a transformer and corresponding test device |
| US20040164745A1 (en) * | 2002-12-10 | 2004-08-26 | Alstom T&D Sa | Method of diagnosing a fault on a transformer winding |
| US20090088995A1 (en) * | 2006-06-07 | 2009-04-02 | Abb Technology Ag | Method for determining the linear electrical response of a transformer, generator or electrical motor |
| US20100188240A1 (en) | 2009-01-29 | 2010-07-29 | Wells Charles H | Continuous condition monitoring of transformers |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US9416652B2 (en) | 2013-08-08 | 2016-08-16 | Vetco Gray Inc. | Sensing magnetized portions of a wellhead system to monitor fatigue loading |
| CN104316808A (en) * | 2014-11-17 | 2015-01-28 | 国家电网公司 | Method and system for detecting fault of transformer winding |
Also Published As
| Publication number | Publication date |
|---|---|
| CN103328990A (en) | 2013-09-25 |
| BR112013014847B1 (en) | 2020-05-12 |
| ES2439279T3 (en) | 2014-01-22 |
| CN103328990B (en) | 2017-03-22 |
| BR112013014847A2 (en) | 2016-10-18 |
| EP2466322A1 (en) | 2012-06-20 |
| PL2466322T3 (en) | 2014-04-30 |
| KR101532495B1 (en) | 2015-06-29 |
| KR20130113504A (en) | 2013-10-15 |
| EP2466322B1 (en) | 2013-09-11 |
| US20130282312A1 (en) | 2013-10-24 |
| BR112013014847B8 (en) | 2022-09-27 |
| US9322866B2 (en) | 2016-04-26 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US9322866B2 (en) | Method and apparatus for transformer diagnosis | |
| Bagheri et al. | Transformer fault condition prognosis using vibration signals over cloud environment | |
| US20150168478A1 (en) | Method and apparatus for measuring load tap changer characteristics | |
| Olszowiec | Insulation Measurement and Supervision in Live AC and DC Unearthed Systems | |
| JP2011158444A (en) | Method and device for detecting remaining capacity of secondary battery | |
| Kaczmarek | The source of the inductive current transformers metrological properties deterioration for transformation of distorted currents | |
| Bhide et al. | Analysis of winding inter-turn fault in transformer: A review and transformer models | |
| Kaczmarek | A practical approach to evaluation of accuracy of inductive current transformer for transformation of distorted current higher harmonics | |
| JP5998824B2 (en) | AC loss measurement method for superconducting coils | |
| Mejia-Barron et al. | Experimental data-based transient-stationary current model for inter-turn fault diagnostics in a transformer | |
| Ushakov et al. | Traditional Electrical Diagnostic Methods | |
| CN109387802A (en) | A kind of rated current error testing method of high-tension current inductor | |
| Kaczmarek | Secondary current distortion of inductive current transformer in conditions of dips and interruptions of voltage in the power line | |
| CN101460856B (en) | Method for determining linear electric response of transformer, electricity generator or electric motor | |
| Ballal et al. | Current Transformer Accuracy Improvement by Digital Compensation Technique: MS Ballal, MG Wath | |
| EP3588107A1 (en) | Method and device for calculating winding currents at delta side for a transformer | |
| Venikar et al. | Transformer incipient inter-turn fault detection based on no-load current harmonic analysis | |
| Zhang | Traceable Calibration and Evaluation of Toroidal Current Transformers for High Impedance Fault Detection in Electricity Networks | |
| Beiza et al. | Fault type estimation in power systems | |
| Peng et al. | Effects of sampling in monitoring power system oscillations using on-line Prony analysis | |
| Siada et al. | High frequency transformer computer modeling | |
| Xu et al. | Assessing system impedance based on data regrouping | |
| RU2446406C2 (en) | Method to diagnose power three-winding transformers | |
| Huang et al. | Detection of winding deformations in power transformers from inrush current characteristics using the Chen–Lee chaotic system and Gramian Angular Summation Field | |
| Pütter et al. | Reliable demagnetization of transformer cores |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| DPE2 | Request for preliminary examination filed before expiration of 19th month from priority date (pct application filed from 20040101) | ||
| 121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 11787833 Country of ref document: EP Kind code of ref document: A1 |
|
| NENP | Non-entry into the national phase |
Ref country code: DE |
|
| ENP | Entry into the national phase |
Ref document number: 20137018842 Country of ref document: KR Kind code of ref document: A |
|
| 122 | Ep: pct application non-entry in european phase |
Ref document number: 11787833 Country of ref document: EP Kind code of ref document: A1 |
|
| REG | Reference to national code |
Ref country code: BR Ref legal event code: B01A Ref document number: 112013014847 Country of ref document: BR |
|
| ENP | Entry into the national phase |
Ref document number: 112013014847 Country of ref document: BR Kind code of ref document: A2 Effective date: 20130613 |

