WO2012073266A1 - Command system for the active and diagnostic control of a railway pantograph - Google Patents

Command system for the active and diagnostic control of a railway pantograph Download PDF

Info

Publication number
WO2012073266A1
WO2012073266A1 PCT/IT2011/000378 IT2011000378W WO2012073266A1 WO 2012073266 A1 WO2012073266 A1 WO 2012073266A1 IT 2011000378 W IT2011000378 W IT 2011000378W WO 2012073266 A1 WO2012073266 A1 WO 2012073266A1
Authority
WO
WIPO (PCT)
Prior art keywords
pantograph
diagnostic
control unit
previous
contact line
Prior art date
Application number
PCT/IT2011/000378
Other languages
French (fr)
Inventor
Gianfranco Borriello
Giorgio Diana
Andrea Collina
Original Assignee
Contact S.R.L.
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Contact S.R.L. filed Critical Contact S.R.L.
Priority to EP11805975.7A priority Critical patent/EP2646272A1/en
Publication of WO2012073266A1 publication Critical patent/WO2012073266A1/en

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L5/00Current collectors for power supply lines of electrically-propelled vehicles
    • B60L5/18Current collectors for power supply lines of electrically-propelled vehicles using bow-type collectors in contact with trolley wire
    • B60L5/22Supporting means for the contact bow
    • B60L5/28Devices for lifting and resetting the collector
    • B60L5/32Devices for lifting and resetting the collector using fluid pressure
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L2200/00Type of vehicles
    • B60L2200/26Rail vehicles

Definitions

  • the pantograph is the device that picks up in trains the current from the overhead feeder line.
  • the thrust of the pantograph on the overhead supply line is determined by electropneumatic motor systems and by aerodynamic forces.
  • the system that constitutes the object of the present patent for industrial invention, allows the continuous control of the pantograph thrust as a function of the running parameters of the railway vehicle and realizes a diagnostic system able to detect and to prevent the faultiness of the pantograph and that of the contact line.
  • This continuous control of the pantograph thrust is carried out by operating on the pneumatic actuator which, in the case of a railway pantograph, consists of an air spring.
  • pantograph [1) On the enclosed table a pantograph [1) is shown, with a diagram of the command system for the active and diagnostic control.
  • the active control of the pressure of the spring air (2) is realized by means of a proportional valve (4] that, under the command signal coming from the electronic control unit [3), governs, in a continous way, the outgoing pressure.
  • the command signal processed by the electronic control unit (3) is a function of the running parameters of the vehicle on which the pantograph is installed. These running parameters of the train are tranferred to the electronic control unit by the vehicle bus (MVB or ethernet or by wired signals.
  • VVB vehicle bus
  • control unit (3) processes a command current signal (typical value 4 ⁇ 20mA) for the proportional valve (4).
  • the proportional valve (4) as a function of the command of the control unit (3), supplies a continuous outgoing pressure (typical value 0 ⁇ 5 bar] controlled by a pressure sensor placed on the outgoing pneumatic pipe of the valve itself.
  • control unit (3) supplies, as a function of the running parameters, a continuous pressure which is controlled as input by the pantograph air spring that brings about a continuous and controlled thrust of the pantograph on the catenary.
  • the standard configuration of the control unit (3) consists of the following boards: • Micro board (3.1) with electric/optic interface MVB or electric interface Ethernet (bus-vehicle dialogue) and connection with diagnostic board (5).
  • Interface board digital output (3.4) (interface for digital output signals of the vehicle).
  • the standard configuration of the proportional valve (4) consists of:
  • the system includes a diagnostic (5) to register the failures of both the pantograph and the overhead contact line, bringing about their maintenance under condition.
  • the picking up systems nowadays in use do not include diagnostic systems able to measure the acceleration of the pantograph slidings and the dynamic parameters of the board.
  • the control unit (5) by processing the analogue signals coming from the optical sensors and interrelating them with the train speed and its geographic location, may transmit any information to the train diagnostic system, by means of a bus MVB/Ethernet, concerning possible faultiness of:
  • pantograph motor system air spring
  • the diagnostic system measures and processes the acceleration signals of the pantograph single sliding bow.
  • the passband required for optical accelerometers is 0,5 ⁇ 200 Hz and the sampling rate is equal to 2 Hz.
  • the relative data, combined with the train speed and location, are transmitted to the train diagnostic through the bus vehicle.
  • the standard configuration of the diagnostic system consists of:
  • optical sensors • optical sensors (6) with fibre optics and connectors (standard configuration optical accelerometers),

Abstract

Command system for the active and diagnostic control of a railway pantograph that continuously controls the pressure in the pneumatic actuator and, thus, the contact force on the catenary. The system also realizes the diagnostic and the maintenance under condition of the pantograph and of the contact line by using optical sensors.

Description

COMMAND SYSTEM FOR THE ACTIVE AND DIAGNOSTIC CONTROL OF A RAILWAY PANTOGRAPH.
The pantograph is the device that picks up in trains the current from the overhead feeder line.
For most of the vehicles in use, the thrust of the pantograph on the overhead supply line is determined by electropneumatic motor systems and by aerodynamic forces.
The users' demand for picking up systems more and more reliable and able to guarantee a suitable level in the quality of the picking up, in particular for high-speed trains, has brought about the necessity to develop a command system for the active and diagnostic control of railway pantographs.
The system, that constitutes the object of the present patent for industrial invention, allows the continuous control of the pantograph thrust as a function of the running parameters of the railway vehicle and realizes a diagnostic system able to detect and to prevent the faultiness of the pantograph and that of the contact line.
This continuous control of the pantograph thrust is carried out by operating on the pneumatic actuator which, in the case of a railway pantograph, consists of an air spring.
By continually controlling the pressure of the air spring it is possible to obtain, through the transfer function of the pantograph, the continuous control of its thrust.
Furthermore, it is possible to realize a diagnostic of the pantograph and of the contact line.
On the enclosed table a pantograph [1) is shown, with a diagram of the command system for the active and diagnostic control.
In particular, the active control of the pressure of the spring air (2) is realized by means of a proportional valve (4] that, under the command signal coming from the electronic control unit [3), governs, in a continous way, the outgoing pressure.
The command signal processed by the electronic control unit (3) is a function of the running parameters of the vehicle on which the pantograph is installed. These running parameters of the train are tranferred to the electronic control unit by the vehicle bus (MVB or ethernet or by wired signals.
The running parameters of the train transmitted to the electronic control unit [3) and necessary to realize the continuous control function of the thrust are:
• lifting and lowering control of the pantograph,
• supply voltage of the overhead contact line,
· train speed,
• train direction,
• single or multiple picking up,
• train localization.
Under these input signals the control unit (3) processes a command current signal (typical value 4÷20mA) for the proportional valve (4).
The values of the command signals of the proportional valve, as a function of the train speed, characterize therefore the overhead contact line, the train direction and the single or multiple picking up.
It is also possible to process the command signal of the proportional valve (4) as a function of the train localization.
The proportional valve (4), as a function of the command of the control unit (3), supplies a continuous outgoing pressure (typical value 0÷5 bar] controlled by a pressure sensor placed on the outgoing pneumatic pipe of the valve itself.
Finally, the system composed by the control unit (3) and the proportional valve (4) supplies, as a function of the running parameters, a continuous pressure which is controlled as input by the pantograph air spring that brings about a continuous and controlled thrust of the pantograph on the catenary. The standard configuration of the control unit (3) consists of the following boards: • Micro board (3.1) with electric/optic interface MVB or electric interface Ethernet (bus-vehicle dialogue) and connection with diagnostic board (5).
• Board with analogue interface (3.5) (proportional valve command). · Interface board digital input (3.3) (interface for digital input signals of the vehicle).
• Interface board digital output (3.4) (interface for digital output signals of the vehicle).
• Stabilized power supply (3.2).
The standard configuration of the proportional valve (4) consists of:
• a mechanic component to reduce the supply pressure to the outgoing pressure required by the control unit (3) for the selected pantograph;
• an electronic pilot system for the command and control of the mechanic component;
· a pressure sensor for the feedback on the outgoing pressure.
Apart from the continuous control of the thrust, the system includes a diagnostic (5) to register the failures of both the pantograph and the overhead contact line, bringing about their maintenance under condition. The picking up systems nowadays in use do not include diagnostic systems able to measure the acceleration of the pantograph slidings and the dynamic parameters of the board.
The absence of this kind of diagnostic system on traditional pantographs is due to the fact that the pantograph is in tension (l,5-3-15-25kV), so that the use of traditional sensors that are electrically supplied is particularly onerous in terms of electric safety and installation costs.
With the new technologies it has been possible to use sensors that are completely optical and directly connected to the pantograph. These sensors solve all the problems of galvanic insulation and safety.
In particular, by using sensors that are completely optical, without electric supply and directly connected to the pantograph, it is possible to process, in the domain of time and frequency, signals that are measured to evaluate the correct working of both the pantograph and the contact line.
The control unit (5), by processing the analogue signals coming from the optical sensors and interrelating them with the train speed and its geographic location, may transmit any information to the train diagnostic system, by means of a bus MVB/Ethernet, concerning possible faultiness of:
• picking up head,
• mobile frame,
• pantograph motor system (air spring],
· overhead supply line.
In its standard configuration, the diagnostic system measures and processes the acceleration signals of the pantograph single sliding bow.
The passband required for optical accelerometers is 0,5÷200 Hz and the sampling rate is equal to 2 Hz.
The processings required for the acceleration signals of each single sliding bow, interrelated to the train direction, location and speed are, for each km of line:
• total effective value,
• peak (max 10),
· effective value (typical) in 4 frequency bands (0,5÷4 Hz); (4÷20 Hz);
(20÷100 Hz); (55÷65 Hz).
Furthermore, regarding the acceleration values measured for each km of line, a statistical processing of the registered accelerations is carried out by calculating the:
· mean,
• root-mean-square deviation,
• skewness,
• kurtosis.
If the processed values overcome the limit values, the relative data, combined with the train speed and location, are transmitted to the train diagnostic through the bus vehicle.
The standard configuration of the diagnostic system consists of:
• optical sensors (6) with fibre optics and connectors (standard configuration optical accelerometers),
· board for the management of optical sensors (5.1) and the convertion in analogue electric signal (typical value lOOmV/g),
• board for the processing of analogue electric signal, data storage, connection to the central unit (5.2) and interface to the bus vehicle (option).
The main advantages of the command system for the active and diagnostic control are:
• improvement in the quality of the pantograph picking up, both in single and multiple picking up,
• lower wear of the slidings,
· lower aggression of the pantograph on the contact line,
• diagnostic aimed at the maintenance under condition of the pantograph and contact line.
Formal and structural changes may be made to the patent, without departing from the solution idea that is defined by the following claims.

Claims

C L A I M S
1) Active monitoring and diagnostics control system for railway pantograph characterized by the fact that it continuously monitors the pressure in the pneumatic actuator, and then, using the transfer function of the pantograph, the contact force on the catenary. This monitoring takes place through two sub-systems consisting of a special electronic control unit and proportional valve.
2) System, like the previous claim, characterized by the fact that it creates a device for detecting the pantograph and catenary defects thanks the use of optical sensors and special electronic diagnostic check control unit.
3) System, like the previous claims, characterized in that the electronic control units specified in claims 1) and 2] are the railway type and dialogue with the vehicle's BUS and each other.
4) System, like the previous claims, characterized in that the pantograph thrust monitoring control unit processes starting from the vehicle operation parameters such as speed, single or multi-tapping, the direction of train travel and a supply voltage of the contact line and location, the control signal to power the proportional valve continuously to regulate the pressure of the pneumatic actuator of the pantograph.
5) System, like the previous claims, characterized in that the diagnostic control unit sees to the processing from the optical sensors in the time and frequency domain.
On the basis of such signals, related to the location of the convoy, the diagnostic system reports any faults of the pantograph or contact line and provides information for the maintenance on the condition of the pantograph and contact line.
PCT/IT2011/000378 2010-11-30 2011-11-17 Command system for the active and diagnostic control of a railway pantograph WO2012073266A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
EP11805975.7A EP2646272A1 (en) 2010-11-30 2011-11-17 Command system for the active and diagnostic control of a railway pantograph

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
ITNA2010A0000058 2010-11-30
ITNA2010A000058A IT1402945B1 (en) 2010-11-30 2010-11-30 CONTROL SYSTEM ACTIVE AND DIAGNOSTIC CONTROL FOR RAILWAY PANTOGRAPH.

Publications (1)

Publication Number Publication Date
WO2012073266A1 true WO2012073266A1 (en) 2012-06-07

Family

ID=43742882

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/IT2011/000378 WO2012073266A1 (en) 2010-11-30 2011-11-17 Command system for the active and diagnostic control of a railway pantograph

Country Status (3)

Country Link
EP (1) EP2646272A1 (en)
IT (1) IT1402945B1 (en)
WO (1) WO2012073266A1 (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102795112A (en) * 2012-08-29 2012-11-28 南车株洲电力机车有限公司 Pneumatic current collector and use method thereof
CN104949708A (en) * 2014-03-31 2015-09-30 湖南省程通科技有限公司 Locomotive pantograph detection system
CN105539158A (en) * 2015-12-14 2016-05-04 北京赛德高科铁道电气科技有限责任公司 Pantograph control device and method
WO2018058795A1 (en) * 2016-09-30 2018-04-05 中车株洲电力机车有限公司 Rail transit vehicle and method and system for adjusting pantograph-catenary contact pressure of rail transit vehicle
US20180208222A1 (en) * 2017-01-23 2018-07-26 Broadsens Corp. Train Pantograph Structural Health Monitoring System
CN108556636A (en) * 2018-06-29 2018-09-21 成都西交金测智能科技有限公司 A kind of pantograph closed-loop control system
CN108844667A (en) * 2018-08-29 2018-11-20 上海拜安传感技术有限公司 For measuring the optical MEMS pressure sensor of bow net pressure
CN109141707A (en) * 2018-06-27 2019-01-04 苏州大成电子科技有限公司 A kind of bow net pressure-detecting device
CN109910622A (en) * 2019-03-15 2019-06-21 天津益昌电气设备股份有限公司 A kind of intelligent elevated formula insulation arm pantograph

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2552244A1 (en) * 1983-09-20 1985-03-22 Montagnat Francois Device for monitoring the pressure exerted by a pantograph on the line of a catenary
EP0605214A2 (en) * 1992-12-28 1994-07-06 Hitachi, Ltd. High speed low noise current collecting equipment and method of collecting current
DE4334716A1 (en) * 1993-10-12 1995-04-13 Abb Patent Gmbh Method and device for controlling the contact force between a current collector and a contact wire
US5954171A (en) * 1996-08-05 1999-09-21 Abb Patent Gmbh Moving contact

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2408570B (en) * 2003-10-31 2005-11-23 Morganite Elect Carbon Monitoring system for electrical vehicles drawing current from overhead conductors

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2552244A1 (en) * 1983-09-20 1985-03-22 Montagnat Francois Device for monitoring the pressure exerted by a pantograph on the line of a catenary
EP0605214A2 (en) * 1992-12-28 1994-07-06 Hitachi, Ltd. High speed low noise current collecting equipment and method of collecting current
DE4334716A1 (en) * 1993-10-12 1995-04-13 Abb Patent Gmbh Method and device for controlling the contact force between a current collector and a contact wire
US5954171A (en) * 1996-08-05 1999-09-21 Abb Patent Gmbh Moving contact

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102795112B (en) * 2012-08-29 2015-02-25 南车株洲电力机车有限公司 Pneumatic current collector and use method thereof
CN102795112A (en) * 2012-08-29 2012-11-28 南车株洲电力机车有限公司 Pneumatic current collector and use method thereof
CN104949708A (en) * 2014-03-31 2015-09-30 湖南省程通科技有限公司 Locomotive pantograph detection system
CN105539158A (en) * 2015-12-14 2016-05-04 北京赛德高科铁道电气科技有限责任公司 Pantograph control device and method
WO2018058795A1 (en) * 2016-09-30 2018-04-05 中车株洲电力机车有限公司 Rail transit vehicle and method and system for adjusting pantograph-catenary contact pressure of rail transit vehicle
US20180208222A1 (en) * 2017-01-23 2018-07-26 Broadsens Corp. Train Pantograph Structural Health Monitoring System
US10807621B2 (en) * 2017-01-23 2020-10-20 Broadsens Corp. Train pantograph structural health monitoring system
CN109141707A (en) * 2018-06-27 2019-01-04 苏州大成电子科技有限公司 A kind of bow net pressure-detecting device
CN108556636A (en) * 2018-06-29 2018-09-21 成都西交金测智能科技有限公司 A kind of pantograph closed-loop control system
CN108556636B (en) * 2018-06-29 2024-01-26 成都西交金测智能科技有限公司 Pantograph closed-loop control system
CN108844667A (en) * 2018-08-29 2018-11-20 上海拜安传感技术有限公司 For measuring the optical MEMS pressure sensor of bow net pressure
CN108844667B (en) * 2018-08-29 2023-11-21 上海拜安传感技术有限公司 Optical MEMS pressure sensor for measuring bow net pressure
CN109910622A (en) * 2019-03-15 2019-06-21 天津益昌电气设备股份有限公司 A kind of intelligent elevated formula insulation arm pantograph

Also Published As

Publication number Publication date
IT1402945B1 (en) 2013-09-27
EP2646272A1 (en) 2013-10-09
ITNA20100058A1 (en) 2012-05-31

Similar Documents

Publication Publication Date Title
WO2012073266A1 (en) Command system for the active and diagnostic control of a railway pantograph
US8577522B2 (en) Method for monitoring at least one system parameter which influences the operating behaviour of vehicles or trains of vehicles
CN102196951B (en) Railcar brake control device
US9592810B2 (en) Brake control device, and brake control method
US9254830B2 (en) Determining a braking force for a rail vehicle
CA2847219C (en) Brake control device for a brake system, brake system, rail vehicle and method for operating a brake system
KR20160031770A (en) Automatic Train Operation System in railway vehicles
KR20070104678A (en) Control unit for a rail vehicle
US20200385036A1 (en) Method and apparatus for determining changes in the longitudinal dynamic behavior of a railway vehicle
CN110650875A (en) Braking device and method for performing emergency braking of a rail vehicle
CN107097806B (en) The electronic control system of AC drive locomotive braking system
FI80949B (en) ELEKTRONISKT KONTROLLSYSTEM FOER EN KOMBINATION AV EN DIESELMOTOR, EN GENERATOR OCH EN ELMOTOR.
EP1783026B1 (en) Method for data transmission and for central data collection of measuring data of fixed diagnostic systems
CN115406398A (en) Method and device for detecting abnormal abrasion of pantograph net of railway vehicle and storage medium
EP1119483B1 (en) Train integrity monitoring device
EP3608184B1 (en) Valve diagnostic system
CN103112443A (en) Braking control device, method and multi-machine vehicle braking control system
CN113465953B (en) Fault prediction and health management device for motor train unit transmission system and using method thereof
US11845343B2 (en) Device and method for controlling a current collector for a vehicle
CN112858843A (en) Acquisition and analysis device for monitoring bow net pressure hard points on line
CN114368378B (en) Locomotive brake monitoring device and method
AU2016200036A1 (en) Rail transport system
CN115158404A (en) Automatic driving control execution system and method for shunting locomotive
CN110686722A (en) Monitoring device for an electrical rail system and/or for a current collector of a rail system
EP3395641A1 (en) Automatic detection of train derailment

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 11805975

Country of ref document: EP

Kind code of ref document: A1

REEP Request for entry into the european phase

Ref document number: 2011805975

Country of ref document: EP

WWE Wipo information: entry into national phase

Ref document number: 2011805975

Country of ref document: EP

NENP Non-entry into the national phase

Ref country code: DE