WO2012066625A1 - 通信システムの制御方法、通信システム、通信装置 - Google Patents

通信システムの制御方法、通信システム、通信装置 Download PDF

Info

Publication number
WO2012066625A1
WO2012066625A1 PCT/JP2010/070331 JP2010070331W WO2012066625A1 WO 2012066625 A1 WO2012066625 A1 WO 2012066625A1 JP 2010070331 W JP2010070331 W JP 2010070331W WO 2012066625 A1 WO2012066625 A1 WO 2012066625A1
Authority
WO
WIPO (PCT)
Prior art keywords
link
port
communication device
ports
eco
Prior art date
Application number
PCT/JP2010/070331
Other languages
English (en)
French (fr)
Inventor
一滋 黒川
Original Assignee
富士通株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 富士通株式会社 filed Critical 富士通株式会社
Priority to PCT/JP2010/070331 priority Critical patent/WO2012066625A1/ja
Priority to JP2012544024A priority patent/JP5534026B2/ja
Priority to EP10859681.8A priority patent/EP2642699A1/en
Publication of WO2012066625A1 publication Critical patent/WO2012066625A1/ja
Priority to US13/892,343 priority patent/US20130250829A1/en

Links

Images

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W52/00Power management, e.g. TPC [Transmission Power Control], power saving or power classes
    • H04W52/02Power saving arrangements
    • H04W52/0209Power saving arrangements in terminal devices
    • H04W52/0261Power saving arrangements in terminal devices managing power supply demand, e.g. depending on battery level
    • H04W52/0274Power saving arrangements in terminal devices managing power supply demand, e.g. depending on battery level by switching on or off the equipment or parts thereof
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L12/00Data switching networks
    • H04L12/02Details
    • H04L12/12Arrangements for remote connection or disconnection of substations or of equipment thereof
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L47/00Traffic control in data switching networks
    • H04L47/10Flow control; Congestion control
    • H04L47/41Flow control; Congestion control by acting on aggregated flows or links
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L49/00Packet switching elements
    • H04L49/40Constructional details, e.g. power supply, mechanical construction or backplane
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02DCLIMATE CHANGE MITIGATION TECHNOLOGIES IN INFORMATION AND COMMUNICATION TECHNOLOGIES [ICT], I.E. INFORMATION AND COMMUNICATION TECHNOLOGIES AIMING AT THE REDUCTION OF THEIR OWN ENERGY USE
    • Y02D30/00Reducing energy consumption in communication networks
    • Y02D30/70Reducing energy consumption in communication networks in wireless communication networks

Definitions

  • the present invention relates to a communication system control method, a communication system, and a communication apparatus.
  • Link Aggregation Group In a network, multiple physical links are virtually bundled into a single link (Link Aggregation Group), and the communication speed of the bundled physical links is added.
  • a Link Aggregation function that can communicate at a speed is known.
  • the link aggregation function is one of Ethernet (registered trademark) functions, and is defined in IEEE (The Institute of Electrical and Electronics Electronics, Inc.) 802.3ad.
  • Ethernet registered trademark
  • IEEE The Institute of Electrical and Electronics Electronics, Inc. 802.3ad.
  • Fiber Channel Fiber Channel
  • a trunking function capable of performing communication at a communication speed is known.
  • a link aggregation redundancy method for performing link redundancy using a backup link in communication between network relay devices, creating a link aggregation group using two or more predetermined links as operation links, If a link of a link aggregation group is monitored, the status of the active links in the link aggregation group is monitored, and if some of the active links become unusable, the link becomes unusable. It is proposed that a part of the active link is detached from the link aggregation group (detached), the pseudo-blocking state of the spare link is released, and the spare link is attached (added) to the link aggregation group as an active link. Has been.
  • the data amount detection unit is the amount of uplink data that is the amount of communication data from the radio terminal to each radio unit, and the amount of communication data from the radio unit to the radio terminal
  • the control unit causes the power supply control unit to stop supplying power to the transmitter of any of the radio units, and the amount of downlink data is If the data amount is larger than the uplink data amount, the control unit causes the power supply control unit to stop supplying power to the receiving unit of one of the radio units, and both the uplink data amount and the downlink data amount are smaller than a predetermined threshold value.
  • the control unit causes the power supply control unit to stop power supply to the transmission unit and the reception unit of any one of the radio units.
  • link aggregation groups that are virtually bundled have redundancy in the bandwidth used. Therefore, a period in which the used bandwidth secured by the link aggregation group is surplus with respect to the bandwidth necessary for communication inevitably occurs. Therefore, it is desired to reduce power consumption when performing communication while maintaining redundancy in the link aggregation group.
  • An object of the present invention is to provide a control method for a communication system that can reduce power consumption in communication using a link aggregation group.
  • a plurality of links connecting a plurality of first ports of a first communication device and a plurality of second ports of a second communication device are formed by a single virtual link.
  • This is a control method for a communication system that performs communication between a first communication device and a second communication device using a certain link aggregation group.
  • the first communication device cuts off the power supply of at least one first port among the plurality of first ports based on the use band information of the link aggregation group.
  • a step of linking down the first ports, a step of transmitting a link down end notification to the second communication device after the step of the first communication device linking down, and a step of receiving the link down end notification The two communication devices disconnecting power supply to at least one second port that is linked down among the plurality of second ports.
  • the disclosed communication system control method it is possible to stop power supply to the ports at both ends of a link that has been linked down in the link aggregation group, so that it is possible to reduce power consumption in communication using the link aggregation group. it can.
  • a PHY module (PHYsical layer module) that is a physical layer module that is mounted on a port of a network switch device and is defined in the first layer of an OSI reference model that defines a communication function of a network device or the like using a hierarchical structure. Regardless of whether or not the communication is actually performed, a certain amount of power is consumed as long as the power is supplied. Therefore, when the used bandwidth reserved in the link aggregation group is excessive, the PHY module of the port that is linked up consumes power even though it does not perform communication.
  • the link when the used bandwidth reserved in the link aggregation group is surplus, the link may be deleted from the link aggregation group, and when the used bandwidth is insufficient, a link may be added to the link aggregation group. It is done.
  • the communication device is configured to disconnect the power supply from the ports at both ends of the link that is linked down in the link aggregation group while maintaining redundancy in the link aggregation group. Reduce power consumption.
  • FIG. 1 is a diagram illustrating an example of a communication system including a network switch device.
  • the communication system includes a first network switch device 1 that is a communication device, a second network switch device 2 that is a communication device, and a plurality of links 3 and 4 that connect them.
  • the first network switch device 1 is a network relay device that relays frames, and includes a link aggregation control unit 11, a plurality of first ports 12, and a third port 18.
  • the second network switch device 2 is a network relay device that relays frames, and includes a link aggregation control unit 21, a plurality of second ports 22, and a fourth port 28.
  • the plurality of first ports 12 are connected to the plurality of second ports 22 by links 3 respectively.
  • the link 3 is a transmission path such as a cable or an optical fiber.
  • the number of the first ports 12 and the number of the second ports 22 are not limited to “3”.
  • LAG5 is a unit of link in communication by link aggregation.
  • the LAG 5 is a virtual link including a plurality of links 3 that connect a plurality of first ports 12 of the first network switch device 1 and a plurality of second ports 22 of the second network switch device 2. is there.
  • Communication using LAG5 is controlled by the link aggregation control unit 11 and the link aggregation control unit 21.
  • Communication using LAG5 is, for example, communication performed in accordance with a link aggregation control protocol (LACP).
  • LACP link aggregation control protocol
  • the link aggregation control protocol is defined by, for example, IEEE 802.3ad. Therefore, the link aggregation control unit 11 and the link aggregation control unit 21 control the LAG 5 according to the link aggregation control protocol, whereby communication using the LAG 5 is executed.
  • the third port 18 is a port included in the first network switch device 1 and is a port other than the plurality of first ports 12.
  • the third port 18 is a port that does not belong to the LAG 5 that connects the plurality of first ports 12 and the plurality of second ports 22.
  • the fourth port 28 is a port included in the second network switch device 2 and is a port other than the plurality of second ports 22.
  • the fourth port 28 is a port that does not belong to the LAG 5 that connects the plurality of first ports 12 and the plurality of second ports 22.
  • the third port 18 is connected to the fourth port 28 by the link 4.
  • the link 4 is a transmission path such as a cable or an optical fiber.
  • the number of the third ports 18 and the number of the fourth ports 28 are not limited to “1” and may be plural.
  • a plurality of links connecting the plurality of third ports 18 and the plurality of fourth ports 28 are connected to the first port 12 and the second port 22. It may be used as a link aggregation group other than LAG5 to which it belongs.
  • the third port 18 may be connected to a communication device other than the second network switch device 2.
  • the fourth port 28 may be connected to a communication device other than the first network switch device 1.
  • FIG. 2 is a diagram showing an example of the configuration of the network switch device.
  • the first network switch device 1 includes a data switching unit 13, an aggregator unit 14, a transmission / reception control unit 15, and a power control unit in addition to the link aggregation control unit 11, the plurality of first ports 12 and the third port 18. 16 and a monitoring unit 17.
  • the link aggregation control unit 11 includes a switch management unit 111 and an aggregation control unit 112.
  • Each of the plurality of first ports 12 includes a MAC unit 121, a PHY module 122, and an LED (Light Emitting Diode) 123.
  • the third port 18 includes a MAC unit 181, a PHY module 182, and an LED 183.
  • the third port 18 may have a configuration similar to that of the first port 12 or may have a configuration different from that of the first port 12.
  • the second network switch device 2 has the same configuration as the first network switch device 1, for example.
  • the second port 22 has the same configuration as the first port 12, and the fourth port 28 has the same configuration as the third port 18.
  • the second network switch device 2 may have a configuration different from that of the first network switch device 1.
  • the switch management unit 111 of the first network switch device 1 when distinguishing the switch management unit 111 of the first network switch device 1 from the switch management unit 111 of the second network switch device 2, the switch management unit of the first network switch device 1 is represented as “111A”.
  • the switch management unit of the second network switch device 2 is represented as “111B”.
  • the element of the first network switch device 1 is represented by a reference symbol A
  • the element of the second network switch device 2 is represented by a reference symbol B.
  • the PHY module 122 is a physical device that performs transmission / reception and signal conversion of data in a physical layer located in the first layer of the seventh layer of the OSI reference model that hierarchically represents functions in the network for transmission / reception frames that transmit and receive It is.
  • the mounting position of the PHY module 122 is indicated by a port number.
  • the port number is identification information that uniquely identifies the first port 12 in the first network switch device 1.
  • the PHY module 122 transmits a reception frame received via a cable, an optical cable, or the like to the MAC unit 121.
  • the PHY module 122 transmits a transmission frame from the MAC unit 121 to the destination PHY module via a cable or an optical cable. The same applies to the PHY module 182.
  • the MAC unit 121 is provided corresponding to the PHY module 122 and controls transmission / reception frame transmission.
  • As the transmission control for example, frame format detection, error detection, and the like are performed. The same applies to the MAC unit 181.
  • the MAC unit 121 transmits the received frame from the PHY module 122 to the transmission / reception control unit 15. Further, the MAC unit 121 transmits a transmission frame from the transmission / reception control unit 15 to the PHY module 122.
  • the MAC unit 181 transmits the received frame from the PHY module 182 to the data switching unit 13. Further, the MAC unit 181 transmits the transmission frame from the data switching unit 13 to the PHY module 182.
  • the LED 123 displays the state of the first port 12 by turning on according to the control of the aggregation control unit 112. For example, each status is displayed as “green” when the first port 12 is linked up, “off” when the link is down, and “flashing orange” when there is an error. The same applies to the LED 183.
  • the power control unit 16 controls power supply to the plurality of PHY modules 122 and the PHY module 182. Specifically, the power supply control unit 16 supplies power to the plurality of PHY modules 122 and PHY modules 182 according to control from the switch management unit 111, and cuts off the supply of power.
  • the transmission / reception control unit 15 is a controller, parser, multiplexer, or the like provided in correspondence with the MAC unit 121.
  • the transmission / reception control unit 15 transmits the LACP frame to the aggregation control unit 112. Further, when receiving a frame other than the LACP frame from the MAC unit 121, the transmission / reception control unit 15 transmits a frame other than the LACP frame to the aggregator unit 14. Further, the transmission / reception control unit 15 transmits the frame transmitted from the aggregator unit 14 to the corresponding MAC unit 121 as it is.
  • the aggregator unit 14 is provided for each LAG 5.
  • the aggregator unit 14 transmits the received frame from the corresponding first port 12 to the data switching unit 13. Further, the aggregator unit 14 transmits the transmission frame from the data switching unit 13 to the first port 12 belonging to the LAG 5 so as to be distributed according to a predetermined communication protocol.
  • the data switching unit 13 performs frame switching. In other words, the data switching unit 13 determines the transmission destination aggregator unit 14 based on the transmission destination MAC in the frame received from the aggregator unit 14, and transmits the received frame to the determined transmission destination aggregator unit 14. .
  • the monitoring unit 17 holds used bandwidth information collected from each of the plurality of first ports 12 to be monitored.
  • the used bandwidth information includes, for example, the transmission / reception amount for each of the plurality of first ports 12, the transmission / reception amount of LAG5, the number of errors for each of the plurality of first ports 12, and the number of errors for LAG5.
  • the monitoring unit 17 holds used bandwidth information collected from the third port 18 to be monitored. Examples of the used bandwidth information include the amount of transmission / reception of the third port 18 and the number of errors of the third port 18. When there are a plurality of LAGs 5, the transmission / reception amount and the number of errors are collected for each link aggregation group.
  • the switch management unit 111 manages each of a plurality of first ports 12 and third ports 18 included in the first network switch device 1 using a port state management table 113 described later. Specifically, the switch management unit 111 monitors the PHY modules 122 and 182 installed in each of the plurality of first ports 12 and third ports 18. Then, the switch management unit 111 determines the transmission path state (link status) based on the monitoring result, and in response to a request from the aggregation control unit 112, the PHY module 122 and The power supply of 182 is controlled.
  • the aggregation control unit 112 manages the LAG 5 using the LAG management table 114 described later. Specifically, the aggregation control unit 112 exchanges link aggregation information, which is information necessary for the LAG 5, with another aggregation control unit 112 using the LACP frame.
  • the LACP frame is a frame that complies with the above-described link aggregation control protocol.
  • FIG. 3 is a diagram illustrating an example of the configuration of the link aggregation control unit.
  • the link aggregation control unit 11 includes a switch management unit 111, an aggregation control unit 112, a port state management table 113, and a LAG management table 114.
  • the aggregation control unit 112 includes a LAG monitoring unit 115, a deletion processing unit 116, an addition processing unit 117, and an update processing unit 118.
  • the link aggregation control unit 21 has the same configuration as the link aggregation control unit 11.
  • the aggregation control unit 112 of the link aggregation control unit 11 and the aggregation control unit 112 of the link aggregation control unit 21 are distinguished, the aggregation control unit of the link aggregation control unit 11 is represented as “112A”, and the link aggregation control is performed.
  • the aggregation control unit of the unit 21 is represented as “112B”.
  • the element of the link aggregation control unit 11 is represented with a reference symbol A
  • the element of the link aggregation control unit 21 is represented with a reference symbol B.
  • the aggregation control unit 112 executes the LAG5 link deletion process or the addition process based on the result of monitoring the LAG5.
  • the master device in the link aggregation control decreases or increases the number of LAG5 links in the ECO processing mode.
  • the LAG 5 is monitored by the LAG monitoring unit 115.
  • the deletion process of the LAG5 link is executed by the deletion processing unit 116.
  • the LAG5 link addition processing is executed by the addition processing unit 117.
  • the aggregation control unit 112 when the first network switch device 1 to which it belongs is a slave device in the link aggregation control, results of the link deletion processing of the LAG 5 by the second network switch device 2 that is the master device.
  • LAG5 link update processing is executed according to the result of the additional processing.
  • the slave device in the link aggregation control follows the deletion processing or the increase processing for the number of LAG5 links by the master device.
  • the update processing unit 118 executes link update processing according to the result of link deletion processing or addition processing by the master device.
  • the first network switch device 1 is a master device in link aggregation control
  • the second network switch device 2 is a slave device in link aggregation control. Which of the network switch devices 1 and 2 is the master device is determined in advance in the LAG management table 114.
  • the LAG management table 114 will be described later with reference to FIG.
  • the aggregation control unit 112 calculates the number of necessary links based on the used bandwidth information of LAG5, and compares the number of necessary links with the number of links currently linked up to LAG5.
  • the used bandwidth information of the LAG 5 is acquired from the monitoring unit 17. Then, the aggregation control unit 112 determines that the number of necessary links is based on the number of links currently linked up based on the comparison result between the number of necessary links and the number of links currently linked up to LAG5. If the number is small, link down processing is executed as link deletion processing. Further, the aggregation control unit 112 determines that the number of necessary links is greater than the number of links currently linked up based on the comparison result between the number of necessary links and the number of links currently linked up to the LAG 5. If there are many, link-up processing is executed as link addition processing.
  • the aggregation control unit 112 executes LAG5 link deletion processing based on the LAG5 used bandwidth information. Specifically, the aggregation control unit 112 cuts off power supply to at least one first port 12 among the plurality of first ports 12 and performs link-down processing.
  • Either the power supply disconnection of the first port 12 or the link down processing of the first port 12 may be executed first.
  • the aggregation control unit 112 performs link-down processing of at least one first port 12 by cutting off power supply to at least one first port 12.
  • the aggregation control unit 112 transmits a link down end notification indicating that the link down processing has ended to the second network switch device 2 after the link down processing.
  • the second network switch device 2 that has received the link down end notification cuts off the power supply to at least one second port 22 that is linked down among the plurality of second ports 22. Thereby, the power supply of the 1st port 21 and the 2nd port 22 of the both ends of a link can be cut
  • the aggregation control unit 112 excludes at least one first port 12 whose power supply has been cut off based on the use band information from an error notification target indicating a link down. Thereby, in the first network switch device 1, it is possible to distinguish between a link down due to the power supply being cut off based on the use band information and an original link down due to the occurrence of an error. Whether or not to make an error notification is set in the port state management table 113.
  • the port status management table 113 will be described later with reference to FIG.
  • the aggregation control unit 112B sets the second port 22 connected via the cable or the like to the first port 12 that is linked down due to the power supply being cut off based on the use band information. , It is excluded from the target of error notification indicating link down. Thereby, in the second network switch device 2, it is possible to distinguish between a link down due to the power supply being cut off based on the use band information and an original link down due to the occurrence of an error.
  • the aggregation control unit 112 transmits a link down start notification to the second network switch device 2 prior to link deletion processing, in other words, prior to link down processing. Receiving the link down start notification, the second network switch device 2 once turns on all the second ports 22 and returns a response to the link down start notification to the aggregation control unit 112. The aggregation control unit 112 that has received the response to the link down start notification executes link down processing.
  • the link down process of the second port 22 in the second network switch device 2 can be executed independently of the link down process of the first port 12 in the aggregation control unit 112. Further, it is possible to eliminate the need for the user to link down the second port 22 in the second network switch device 2 based on the monitoring of the first port 12 in the aggregation control unit 112 by the user or the network monitoring device.
  • the aggregation control unit 112 executes LAG5 link addition processing based on the LAG5 used bandwidth information. Specifically, the aggregation control unit 112 turns on the power of at least one first port 12 among the plurality of first ports 12 and links up the first port 12.
  • the first port 12 that is linked up is a port that is powered on.
  • the aggregation control unit 112 transmits a link-up end notification to the second network switch device 2 after the link-up process ends.
  • the second network switch device 2 that has received the link up end notification cuts off the power supply of the second port 22 that is linked down among the plurality of second ports 22. Thereby, the power supply of the 1st port 21 and the 2nd port 22 of the both ends of a link can be cut
  • the aggregation control unit 112 transmits a link up start notification to the second network switch device 2 prior to the start of the link addition process.
  • the second network switch device 2 that has received the link-up start notification once turns on all the second ports 22 and returns a response to the link-up start notification to the aggregation control unit 112.
  • the aggregation control unit 112 that has received the response to the link-up start notification executes link-up processing.
  • the aggregation control unit 112 generates and uses an LA-ECO frame in the link up process and the link down process.
  • the LA-ECO frame is a frame for cutting the power supply of the port to reduce power consumption, in other words, a frame for realizing an ECO processing mode to be described later.
  • the LA-ECO frame is a type of LACP frame, and is a frame for link-up start notification, link-up end notification, link-down start notification, and link-down end notification.
  • the LA-ECO frame is also used as a response to the link-up start notification, a response to the link-up end notification, a response to the link-down start notification, and a response to the link-down end notification.
  • one or more OCCTETs at predetermined positions in a plurality of OCCTETs included in a frame are used to indicate whether or not the frame is an LA-ECO frame.
  • the specific OCTET of the LA-ECO frame has a predetermined value.
  • the frame is either a link-up start notification, a link-up end notification, a link-down start notification, a link-down end notification, or these responses. To be judged.
  • the LA-ECO frame will be described later with reference to FIG.
  • the aggregation control unit 112 When the first network switch device 1 to which the aggregation control unit 112 belongs is a master device in link aggregation control, the aggregation control unit 112 is a port (in other words, a link) to which the LAG 5 is linked based on the monitoring result.
  • the replacement process is executed. Specifically, the aggregation control unit 112 determines whether the link-up time of a currently linked-up port exceeds a predetermined threshold based on the used bandwidth information of the LAG5.
  • the link up time is “link up operation time” in the port state management table 113 as described later.
  • the aggregation control unit 112 when there is a port whose link up time exceeds the threshold, the aggregation control unit 112, for the port whose link up time after executing the link up process exceeds the threshold, Perform link-down processing. In addition, the aggregation control unit 112 selects the same number of ports as the number of ports to be linked down processing from a plurality of ports that are linked down, and executes link up processing for the selected ports. To do.
  • the above-described port replacement process prevents the specific link from being linked down and the power supply from being cut off even when the used bandwidth reserved in the link aggregation group is excessive in LAG5. be able to. For example, when a specific link is linked down and the power supply is cut off, even if a hardware failure or the like occurs in the specific link, the use band is insufficient in the LAG 5 and the specific link is linked up. Until then, a hardware failure or the like cannot be detected. However, since it is possible to prevent a specific link from being disconnected from the power supply, a hardware failure or the like can be detected at any time, and an instantaneous shortage of bandwidth can be prevented. Moreover, it is possible to level out hardware failures by preventing an increase in the usage time of only a specific link component.
  • FIG. 4 is a diagram showing an example of the LAG management table.
  • the LAG management table 114 stores information indicating the current status of the LAG 5 for each item.
  • the items that manage the status of LAG5 are “Actor System ID”, “Actor Aggregation Key”, “Partner System ID”, “Partner Aggregation Key”, “PORT”, “Actor ECO Processing Mode”, “COR Processing Mode”, “COR Processing Mode”, “COR” There are “ECO processing execution flag”, “number of transmitted OCTETs”, and “number of received OCETETs”.
  • Actor indicates that the item is related to the own switch.
  • Partner indicates an item for the connection destination switch. Therefore, in the LAG management table 114 provided in the first network switch device 1, “Actor” means the first network switch device 1, and “Partner” means the second network switch device 2.
  • Actor System ID is the MAC address used by the LAG 5 in the own switch, in other words, in the first network switch device 1.
  • the “Actor Aggregation Key” is identification information for identifying the LAG 5 in the own switch, in other words, in the first network switch device 1.
  • Partner System ID is the MAC address used by the connection destination switch of the LAG 5 of the first network switch device 1, in other words, the LAG 5 of the second network switch device 2.
  • Partner Aggregation Key is identification information for identifying LAG 5 in the connection destination switch, in other words, in the second network switch device 2.
  • PORT is the port number of the first port 12 participating in the LAG 5 in the first network switching device 1 in other words, “PORT”.
  • “Actor ECO processing mode” indicates whether the ECO processing mode is valid or invalid in the self switch, in other words, in the LAG 5 of the first network switch device 1.
  • the “Partner ECO processing mode” indicates whether the ECO processing mode is “valid” or “invalid” in the connection destination switch, in other words, the LAG 5 of the second network switch device 2.
  • the “ECO processing mode” is a mode in which power supply is reduced by cutting off the power supply of the port, in other words, a mode realized by the LA-ECO frame.
  • the first network switch device 1 is in the ECO state when the “Actor ECO processing mode” is “valid”, and is in a state other than the ECO state when the “Actor ECO processing mode” is “invalid”.
  • the state in other words, the normal state.
  • the ECO state will be described later with reference to FIG.
  • the second network switch device 2 is in an ECO state when the “Partner ECO processing mode” is “valid”, and is in a state other than the ECO state when the “Partner ECO processing mode” is “invalid”. In other words, the normal state is assumed.
  • “ECO processing role” indicates whether in the ECO processing mode, the own switch, in other words, the first network switch device 1 is a master device or a slave device.
  • the ECO processing role is “MASTER”. Thereby, the first network switch device 1 increases or decreases the number of links of the LAG 5 in the ECO processing mode based on the use band information.
  • the ECO processing role is “SLAVE”. Thereby, the first network switch device 1 follows the ECO process executed by the second network switch device 2 as the master device in the ECO process mode.
  • the “ECO processing execution flag” indicates whether the switch itself, in other words, the first network switch device 1 is executing or stopping the ECO processing. In other words, the “ECO processing execution flag” indicates whether or not the first network switch device 1 is in the ECO processing mode.
  • Number of transmitted OCTETs is the number of OCETETs transmitted via LAG5.
  • the “number of received OCTETs” is the number of OCTETs received via LAG5.
  • the LAG management table 114 is created by the aggregation control unit 112.
  • the “Actor System ID”, “Actor Aggregation Key”, “Partner System ID”, “Partner Aggregation Key”, and “PORT” configure the LAG5, for example, the first or second network.
  • the “Actor ECO processing mode”, “Partner ECO processing mode”, “ECO processing role” and “ECO processing execution flag” are set by the aggregation control unit 112 when executing the ECO processing mode.
  • the “transmission OCTEET number” and the “reception OCTEET number” are set by the aggregation control unit 112 that has acquired the “transmission OCTEET number” and the “reception OCTEET number” from the monitoring unit 17 in the ECO processing mode.
  • the link aggregation control unit 11 includes a LAG management table 114A for managing LAG5.
  • the first network switch device 1 is registered as a master device and the second network switch device 2 is registered as a slave device in the LAG management table 114A.
  • the aggregation control unit 112A of the first network switch device 1 serving as the master device determines whether or not to execute the link down process and the link up process for the plurality of ports belonging to the LAG 5.
  • the link aggregation control unit 21 includes a LAG management table 114B for managing LAG5.
  • the first network switch device 1 is registered as a master device and the second network switch device 2 is registered as a slave device in the LAG management table 114B.
  • the aggregation control unit 112B of the second network switch device 2 that is the slave device performs the operation of the LAG5 according to the result of the link deletion process or the addition process of the LAG5 by the first network switch device 1 that is the master device. Execute link update processing.
  • FIG. 5 is a diagram showing an example of the port state management table.
  • the port status management table 113 stores information indicating the port status for each port.
  • the port is represented by a port number.
  • FIG. 5 it is assumed that there are six ports with port numbers 1 to 6 belonging to LAG5, and the six ports are in different port states.
  • the information indicating the port status includes “Link Up”, “Link Down”, “Power OFF”, “no PHY module”, “Link state unknown”, and “ECO auto-poweroff”.
  • Link Up indicates that the port is linked up.
  • the link up operation time is also stored.
  • the link up operation time is the time during which the port continues to operate after the link up.
  • the unit of the link up operation time is, for example, second.
  • Link Down indicates that the port is linked down.
  • Power OFF indicates that the power supply of the port is cut off.
  • No PHYmodule indicates that the state of the PHY module is unknown, such as the port PHY module cannot be recognized.
  • Link state unknown indicates that the link state of the port is unknown.
  • ECO auto-poweroff indicates that the port is in the ECO state.
  • ECO auto-poweroff in other words, the ECO state indicates that the power supply of the port is cut to reduce power consumption. Therefore, when the port is in the ECO state, the port is linked down, but the cause of the link down is not a hardware failure or a line failure, but the power supply of the port is cut to reduce power consumption. Can be determined.
  • the port state management table 113 is created by the switch management unit 111.
  • “Link Up”, “Link Down”, “Power OFF”, and “no PHY module” are updated by the switch management unit 111.
  • “Link Up”, “Link Down”, “Link state unknown”, and “ECO auto-poweroff” are determined in advance by the switch management unit 111 based on a request from the aggregation control unit 112, as will be described later. Updated at the same time.
  • the link aggregation control unit 11 includes a port state management table 113A that manages the state of the first port 12.
  • the port status management table 113 A includes an ECO status, in other words, “ECO”, indicating that the status of at least one first port 12 whose power supply has been cut off based on the used bandwidth information. registered as “auto-poweroff”.
  • the ECO state is a state in which the power supply of the port is cut off in order to reduce power consumption, and is realized by the LA-ECO frame, and is distinguished from the power off that is not based on the use band information. Accordingly, the aggregation control unit 112A excludes the occurrence of link down for at least one first port 12 registered as the ECO state in the port state management table 113A from the error notification target.
  • the link aggregation control unit 21 includes a port state management table 113B that manages the state of the second port 22.
  • the port state management table 113B includes at least one link down according to the link down of the at least one first port 12 whose power supply is cut off based on the used bandwidth information.
  • the state of the second port 22 is registered as an ECO state, in other words, “ECO auto-poweroff”.
  • the aggregation control unit 112B excludes link-down for at least one second port 22 registered as the ECO state in the second port state management table 113B from the error notification target.
  • FIG. 6 is a diagram showing an example of the LA-ECO frame. Actually, FIG. 6 shows an explanation of each field, the number of OCTET of each field, and information stored in each field in the LA-ECO frame, in other words, the ECO status notification frame.
  • “Destination Address” is a field for storing the destination MAC address of the LA-ECO frame.
  • Source Address is a field for storing the source MAC address of the LA-ECO frame.
  • Leength / Type is a field for storing a Type value indicating that the LA-ECO frame is an LA-ECO frame.
  • Subtype is a field that is not used in the network switch devices 1 and 2 in the examples of FIGS. 1 and 2.
  • “Version Number” is a field for storing the version number of the link aggregation control protocol.
  • “Actor System” is a field for storing the own switch, in other words, the MAC address of the LAG 5 of the first network switch device 1. Therefore, “Actor System” stores “Actor System ID” stored in the LAG management table 114 of FIG. “Actor Key” is a field that stores identification information for identifying the LAG 5 in the own switch, in other words, in the first network switch device 1. Therefore, “Actor Key” stores “Actor Aggregation Key” stored in the LAG management table 114 of FIG.
  • Partner System is a field for storing a connection destination switch of the first network switch device 1 in the LAG 5, in other words, a MAC address used by the second network switch device 2 in the LAG 5. Therefore, “Partner System” stores “Partner System ID” stored in the LAG management table 114 of FIG. “Partner Key” is a field for storing identification information for identifying the LAG 5 in the connection destination switch, in other words, in the second network switch device 2. Therefore, “Partner Key” stores “Partner Aggregation Key” stored in the LAG management table 114 of FIG.
  • “ECO mode” is a field for storing information indicating whether or not the frame is an LA-ECO frame. When the value of “ECO mode” is “1”, the frame is an LA-ECO frame, and therefore the ECO processing mode is valid. When the value of “ECO mode” is “0”, the ECO processing mode is invalid.
  • “Link Training” is a field for storing information indicating whether or not the port to be linked is being changed in the ECO processing mode. When the value of “Link Training” is “1”, it indicates that the first network switch device 1 is changing the port to be linked. When the value of “Link Training” is “0”, it indicates that the first network switch device 1 is not changing the port to be linked.
  • ACK and NACK are fields for storing responses to previously received frames, respectively.
  • ACK When the value of “ACK” is “1”, it indicates that the notification by the previously received frame is acknowledged.
  • NACK When the value of “NACK” is “1”, it indicates that the notification by the previously received frame is to be rejected.
  • Reserve is a reserved field that is not used in the network switch devices 1 and 2 in the examples of FIGS. 1 and 2.
  • FCS is a field for storing a checksum of a frame.
  • FIGS. 7A and 7B show a link aggregation monitoring process flow executed by the aggregation control unit 112A of the first network switch device 1 together.
  • the LAG monitoring unit 115A refers to the LAG management table 114A and determines whether the “Actor ECO processing mode” and the “Partner ECO processing mode” are valid or invalid (step S1). . In other words, the LAG monitoring unit 115A determines whether or not the first network switch device 1 that is “Actor” and the second network switch device 2 that is “Partner” are in the ECO processing mode.
  • the LAG monitoring unit 115A waits for elapse of a predetermined time (step S110) and repeats step S1.
  • the LAG monitoring unit 115A refers to the LAG management table 114A to determine “ECO processing role” (step S2). ). In other words, the LAG monitoring unit 115A determines whether or not the first network switch device 1 to which it belongs is a master device.
  • the LAG monitoring unit 115A waits for elapse of a predetermined time (step S110) and repeats step S1.
  • the LAG monitoring unit 115A When the “ECO processing role” is “master device (indicated as“ MASTER ”in FIG. 7A)”, the LAG monitoring unit 115A initializes a LAG check status storage area for storing the LAG check status (step S3), and LAG5. Is searched (step S4). In other words, in step S4, the LAG monitoring unit 115A determines whether there is a LAG 5 that has not been subjected to link aggregation monitoring processing.
  • the LAG check status storage area is provided in, for example, a memory included in the LAG monitoring unit 115A.
  • the LAG monitoring unit 115A waits for a predetermined time (step S110) and repeats step S1.
  • the LAG monitoring unit 115A selects one LAG5 from among the LAG5 for which link aggregation monitoring processing has not been processed, and for the LAG5 selected from the monitoring unit 17A.
  • Statistical information is acquired (step S5).
  • the number of transmitted OCTETs and the number of received OCTEETs are acquired.
  • the number of transmission OCETETs acquired from the monitoring unit 17A is the “current number of transmission OCTETs”, and the number of reception OCTETs acquired from the monitoring unit 17 is the “number of current reception OCTETs”.
  • the “current number of transmitted OCTETs” and “current number of received OCETETs” are stored in the LAG check status storage area.
  • the LAG monitoring unit 115A calculates the number of links necessary for transmission (step S6). Specifically, the LAG monitoring unit 115A refers to the LAG management table 114A and acquires the “number of transmission OCTETs”. The number of transmission OCTETs acquired from the LAG management table 114A is the “number of previous transmission OCTETs”. The “number of previous transmission OCTETs” is stored in the LAG check status storage area. Thereafter, the LAG monitoring unit 115A uses the value stored in the LAG check status storage area to calculate ⁇ (current transmission OCCTET number) ⁇ (previous transmission OCCTET number) ⁇ (one link per unit time). Divide by (reference band). Thereby, “the number of links necessary for transmission” is calculated. The reference bandwidth of one link per unit time can be known empirically and is determined in advance. The “number of links necessary for transmission” is stored in the LAG check status storage area.
  • the LAG monitoring unit 115A calculates the number of links necessary for reception (step S7). Specifically, the LAG monitoring unit 115A refers to the LAG management table 114A and acquires the “number of received OCTETs”. The number of received OCTETs acquired from the LAG management table 114A is “the previous number of received OCTETs”. The “previous received OCET number” is stored in the LAG check status storage area. Thereafter, the LAG monitoring unit 115A uses the value stored in the LAG check status storage area to calculate ⁇ (current received OCETET number) ⁇ (previous received OCCTET number) ⁇ (for one link per unit time). Divide by (reference band). Thereby, “the number of links necessary for reception” is calculated. The “number of links necessary for reception” is stored in the LAG check status storage area.
  • the LAG monitoring unit 115A compares the number of links necessary for transmission with the number of links necessary for reception using the value stored in the LAG check status storage area. (Step S8).
  • the number of necessary links is “1”.
  • the “necessary number of links” is stored in the LAG check status storage area.
  • the LAG monitoring unit 115A refers to the port state management table 113A and checks the number of first ports 12 linked up at that time among the first ports 12 belonging to the LAG 5 (step S9). . In other words, the LAG monitoring unit 115A extracts the number of the first ports 12 whose port state is “Link Up” in the port state management table 113A as “the current number of links”. The “current number of links” is stored in the LAG check status storage area.
  • the LAG monitoring unit 115A determines whether the “current number of links” is smaller than the “necessary number of links” using the value stored in the LAG check status storage area (step S10).
  • the LAG monitoring unit 115A executes the process of adding the first port 12 (step S11).
  • the addition process of the first port 12 is actually executed by the addition processing unit 117A activated by the LAG monitoring unit 115A.
  • the process of adding the first port 12 will be described later with reference to FIG. After step S11, step S14 is executed.
  • the LAG monitoring unit 115A When the “current number of links” is equal to or greater than the “necessary number of links” (No in step S10), the LAG monitoring unit 115A further uses the value stored in the LAG check status storage area to set the “current number of links”. It is determined whether or not it is larger than “the number of necessary links” (step S12). When the “current number of links” is larger than the “necessary number of links” (Yes in step S12), the LAG monitoring unit 115A executes the deletion process of the first port 12 (step S13). The deletion processing of the first port 12 is actually executed by the deletion processing unit 116A activated by the LAG monitoring unit 115A. The deletion process of the first port 12 will be described later with reference to FIG. After step S13, step S14 is executed.
  • the LAG monitoring unit 115A 1 port 12 replacement processing is executed. Specifically, the LAG monitoring unit 115A refers to the LAG management table 114A, extracts the first port 12 belonging to LAG5 (step S14), and refers to the port state management table 113A to identify the first port belonging to LAG5. It is determined whether or not there is a first port 12 in which the link-up operation time exceeds the reference time among the ports 12 (step S15). The reference time is determined in advance.
  • the LAG monitoring unit 115A waits for the elapse of a predetermined time (step S110) and repeats step S1. .
  • the LAG monitoring unit 115A When there is a first port 12 whose link-up operation time exceeds the reference time (step S15, Yes), the LAG monitoring unit 115A refers to the port state management table 113A and stores the first port 12 belonging to LAG5. Then, it is determined whether or not there is the first port 12 whose port state is “ECO auto-poweroff” (step S16).
  • step S16 When the first port 12 whose port state is “ECO auto-poweroff” does not exist (No in step S16), the LAG monitoring unit 115A waits for a predetermined time (step S110) and repeats step S1. .
  • step S16 When there is the first port 12 whose port status is “ECO auto-poweroff” (Yes in step S16), the LAG monitoring unit 115A executes the additional process of the first port 12 (step S17). As described above, the process of adding the first port 12 will be described later with reference to FIG.
  • the LAG monitoring unit 115A confirms that the number of links that are linked up is larger than the “current number of links” by confirming the state of the first port 12 belonging to LAG5 (step S1). S18). If the number of links that are linked up has not increased more than the “current number of links”, the LAG monitoring unit 115A repeats step S17. Thereafter, the LAG monitoring unit 115A designates the first port 12 whose link-up operation time extracted in step S15 exceeds the reference time, and executes the deletion process of the first port 12 (step S19). As described above, the deletion process of the first port 12 will be described later with reference to FIG. Thereafter, the LAG monitoring unit 115A repeats step S4.
  • FIG. 8 is a port addition process flow executed by the aggregation control unit 112A of the first network switch device 1.
  • the additional processing unit 117A refers to the port state management table 113A and extracts the first port 12 whose port state is “ECO auto-poweroff” from among the first ports 12 belonging to LAG5. (Step S21). The additional processing unit 117A determines whether the number of first ports 12 that are “ECO auto-poweroff” is “0” or “1 or more” (step S22). If the number of first ports 12 that are “ECO auto-poweroff” is “0”, the additional processing unit 117A ends the process.
  • the additional processing unit 117A newly starts link-up from the first port 12 that is “ECO auto-poweroff”.
  • the first port 12 to be added is determined (step S23).
  • the first port 12 to be added to the link-up is selected at random from the first port 12 that is “ECO auto-poweroff”, for example.
  • the additional processing unit 117A transmits a frame indicating that the LAG5 link update processing is being executed, in other words, an LA-ECO frame to the aggregation control unit 112B of the second network switch device 2 ( Step S24).
  • “Link Training” is set to “1” in the LA-ECO frame.
  • This LA-ECO frame is a link-up start notification.
  • the addition processing unit 117A waits for a response to the transmitted LA-ECO frame from the aggregation control unit 112B of the second network switch device 2 (step S25). In other words, the additional processing unit 117A waits for reception of a frame in which “ACK” indicating approval is “1” in the transmitted LA-ECO frame.
  • the additional processing unit 117A ends the processing.
  • the time-out time is predetermined.
  • the additional processing unit 117A sets an ECO processing execution flag for LAG5 in the LAG management table 114A (step S26). Furthermore, the addition processing unit 117A changes the state of the first port 12 to be added to the link-up determined in step S23 from “ECO auto-poweroff” to “Link state unknown” in the port state management table 113A (step S27). ). Furthermore, the addition processing unit 117A changes the LED 123 of the first port 12 to be added to the link-up to display a link-down state (step S28).
  • the addition processing unit 117A causes the power control unit 16A to supply power to the PHY module 122 of the first port 12 to be added to the link-up via the switch management unit 111A (step S29).
  • the additional processing unit 117A issues a request for power supply to the power control unit 16A to the switch management unit 111A, and the switch management unit 111A transmits the received power supply request to the power control unit 16A.
  • the power control unit 16A executes the received power supply.
  • power is supplied from the power supply control unit 16A to the PHY module 122 of the first port 12 to be added to the link-up.
  • the first port 12 to be added to the link up is linked up.
  • the addition processing unit 117A changes the state of the first port 12 to be added to the link up from “Link state unknown” to “Link Up”.
  • the additional processing unit 117A transmits a frame indicating that the LAG5 link update processing has ended, in other words, the LA-ECO frame to the aggregation control unit 112B of the second network switch device 2 (step S210).
  • “Link Training” is set to “0” in the LA-ECO frame.
  • This LA-ECO frame is a link up end notification.
  • the additional processing unit 117A drops the ECO processing execution flag for LAG5 from “1” to “0” in the LAG management table 114A (step S211).
  • the additional processing unit 117A confirms the state of the first port 12 belonging to the LAG5. As a result of the confirmation, if the first port 12 to be added to the link-up has not been linked up, the addition processing unit 117A indicates the state of the first port 12 to be added to the link-up in the port status management table 113A. From “Link state unknown” to “Link Down”, the switch management unit 111A is requested to report an error (step S212).
  • FIG. 10 is a port deletion processing flow executed by the aggregation control unit 112A of the first network switch device 1.
  • the deletion processing unit 116A refers to the port state management table 113A and extracts the first port 12 whose port state is “Link Up” from the first ports 12 belonging to LAG5 ( Step S31). Then, the deletion processing unit 116A determines whether the number of the first ports 12 that are “Link Up” is “1” or “2 or more” (step S32). When the number of the first ports 12 that are “Link Up” is “1”, the deletion processing unit 116A ends the port deletion processing.
  • the deletion processing unit 116A selects a port to be linked down from among the first ports 12 that are “Link Up”. Then, the first port 12 to be deleted from the middle of the first port 12 being linked up is determined (step S33). The first port 12 to be deleted from the link up is selected at random from, for example, the first ports 12 in the link up. Note that the first port 12 having a small port transition timer value may be selected.
  • the port transition timer value is a time obtained by subtracting the “link up operation time” from the “time allocated to the port”, and represents the remaining time during which the port is linked up.
  • the “time allocated to the port” is set sufficiently long so that the port transition timer value does not become a negative value.
  • the designated first port 12 is deleted from the link-up.
  • the deletion processing unit 116A transmits a frame indicating that the LAG5 link update processing is being executed, in other words, an LA-ECO frame to the aggregation control unit 112B of the second network switch device 2 ( Step S34).
  • “Link Training” is set to “1” in the LA-ECO frame.
  • This LA-ECO frame is a link down start notification.
  • the deletion processing unit 116A waits for a response to the transmitted LA-ECO frame from the aggregation control unit 112B of the second network switch device 2 (step S35). In other words, the deletion processing unit 116A waits for reception of a frame in which “ACK” indicating approval is “1” in the transmitted LA-ECO frame.
  • the deletion processing unit 116A ends the processing.
  • the time-out time is predetermined.
  • the deletion processing unit 116A When receiving the frame in which “ACK” is set to “1” in the transmitted LA-ECO frame, the deletion processing unit 116A changes the ECO processing execution flag for LAG5 from “0” to “1” in the LAG management table 114A. (Step S36).
  • the deletion processing unit 116A causes the power control unit 16A to cut off the power supply to the PHY module 122 of the first port 12 to be deleted from the link-up via the switch management unit 111A (step S37).
  • the deletion processing unit 116A issues a request for disconnecting the power supply to the power control unit 16A to the switch management unit 111A, and the switch management unit 111A controls the received power supply disconnection request for power supply control.
  • the power control unit 16A transmits the received power to the unit 16A. Thereby, the power supply to the PHY module 122 of the first port 12 to be deleted from the link up is cut off. In response to this, the first port 12 to be deleted from the link up is linked down.
  • deletion processing unit 116A changes the state of the first port 12 to be deleted from the link up from “Link Up” to “ECO auto-poweroff” in the port state management table 113A. Furthermore, the deletion processing unit 116A sets the LED 123 of the first port 12 to be deleted from the link-up to display the ECO state (Step S38).
  • the deletion processing unit 116A transmits a frame indicating that the LAG5 link update processing has been completed, in other words, an LA-ECO frame to the aggregation control unit 112B of the second network switch device 2 (step S39). ).
  • “Link Training” is set to “0” in the LA-ECO frame.
  • This LA-ECO frame is a link down end notification.
  • the deletion processing unit 116A drops the ECO processing execution flag for LAG5 from “1” to “0” in the LAG management table 114A (step S310).
  • the deletion processing unit 116A sets the link up operation time of the first port 12 to be deleted from the link up in the port state management table 113A as “0” (step S311), and ends the process.
  • FIG. 10 is an ECO frame reception process flow executed by the aggregation control unit 112B of the second network switch device 2.
  • step S41 the LAG monitoring unit 115B determines whether there is a LAG5 designated by the received LA-ECO frame.
  • the LAG monitoring unit 115B ends the process.
  • the LAG monitoring unit 115B determines whether or not there is a link update process being executed for the corresponding LAG 5 (step S42).
  • the LAG monitoring unit 115B determines whether the “Link Training” of the received LA-ECO frame is “1” or “0”. Is determined (step S43).
  • the LAG monitoring unit 115B determines whether “ACK” of the received LA-ECO frame is “1” or “0” (step S44). When “ACK” is “0”, the LAG monitoring unit 115B activates the update processing unit 118B that executes link update processing (step S45), and then ends the processing. The link update process will be described later with reference to FIG. When “ACK” is “1”, the LAG monitoring unit 115B ends the process.
  • the LAG monitoring unit 115B refers to the “ECO mode” of the received LA-ECO frame and sets the value of “ECO mode” in the LAG management table 114B. It records in “Partner ECO processing mode” (step S46), and the processing is terminated.
  • step S42 if there is an ongoing link update process for LAG5 specified by the received LA-ECO frame, the LAG monitoring unit 115B sets “Link Training” of the received LA-ECO frame to “1”. Whether it is “0” or not is determined (step S47).
  • the LAG monitoring unit 115B ends the process.
  • the LAG monitoring unit 115B determines whether “ACK” of the received LA-ECO frame is “1” or “0” (step S48).
  • the LAG monitoring unit 115B ends the process.
  • the LAG monitoring unit 115B sends an LA-ECO frame whose “Link Training” is “0” to the update processing unit 118B that is executing the update process of the link being executed. Is received (step S49), and the process is terminated.
  • FIG. 11 is a link update process flow executed by the aggregation control unit 112B of the second network switch device 2.
  • the update processing unit 118B supplies power from the power control unit 16B to the PHY modules of all the second ports 22 via the switch management unit 111B (step S51).
  • the update processing unit 118B issues a request for power supply to the power control unit 16B to the switch management unit 111B, and the switch management unit 111B transmits the received power supply request to the power control unit 16B.
  • the power control unit 16B executes the received power supply. As a result, power is supplied to all the PHY modules of the first port 22.
  • the update processing unit 118B refers to the port state management table 113B, and changes the LED of the second port 22 whose state is “ECO auto-poweroff” to display “Link Down” (step S52). . Furthermore, the update processing unit 118B changes the state of the second port 22 whose state is “ECO auto-poweroff” to “Link state unknown” in the port state management table 113B (step S53).
  • the update processing unit 118B sets the ECO processing execution flag for LAG5 from “0” to “1” in the LAG management table 114B (step S54).
  • the update processing unit 118B transmits a frame indicating that the execution of the link update processing of the LAG5 is accepted to the aggregation control unit 112A of the first network switch device 1 (step S55).
  • the frame indicating that the execution of the LAG5 link update process is accepted is a frame in which “ACK” is set to “1” in the received LA-ECO frame.
  • the update processing unit 118B waits to receive an LA-ECO frame in which “Link Training” is set to “0” from the aggregation control unit 112A of the first network switch device 1 (step S56). Actually, as described above, the LA-ECO frame in which “Link Training” is set to “0” is detected in step S49.
  • the update processing unit 118B ends the process.
  • the time-out time is predetermined.
  • the update processing unit 118B extracts the link down link by checking the state of the second port 22 belonging to LAG5. (Step S57).
  • the update processing unit 118B changes the state of the second port 22 that is linked down to “ECO auto-poweroff” in the port state management table 113B (step S58).
  • the update processing unit 118B cuts off the power supply from the power control unit 16B to the PHY module of the second port 22 that is linked down via the switch management unit 111B (step S59).
  • the update processing unit 118B issues a request to disconnect the power supply to the power control unit 16B to the switch management unit 111B, and the switch management unit 111B controls the received power supply disconnection request to control the power supply.
  • the power control unit 16B transmits the received power supply to the unit 16B. As a result, the power supply to the PHY module of the second port 22 that is linked down is cut off.
  • the update processing unit 118B displays the LED of the second port 22 that has been linked down, in other words, the LED of the second port 22 that has been deleted from the link up, as an ECO state display (step S510). Further, the update processing unit 118B drops the ECO processing execution flag for LAG5 from “1” to “0” in the LAG management table 114B (step S511). Then, the update processing unit 118B sets the link up operation time of the second port 22 that is linked down to “0” in the port state management table 113B (step S512), and ends the process.
  • FIG. 12 is an explanatory diagram of the link deletion process.
  • the first network switch device 1 transmits an LA-ECO frame to the second network switch device 2 prior to the link down process.
  • “Link Training” is set to “1” in the LA-ECO frame. Since “Link Training” is “1” and “ACK” is “0”, this LA-ECO frame is a link down start notification.
  • the second network switch device 2 When the second network switch device 2 receives the LA-ECO frame as the link down start notification, the plurality of second ports 22 are turned on in response to this, and the ECO processing execution flag for the LAG 5 is set. .
  • the second network switch device 2 transmits an LA-ECO frame to the first network switch device 1.
  • “Link Training” is set to “1”
  • “ACK” is set to “1”. Since “Link Training” is “1” and “ACK” is “1”, this LA-ECO frame is a response to the link down start notification.
  • the first network switch device 1 When the first network switch device 1 receives the LA-ECO frame as a response to the link-down start notification, the first network switch device 1 executes link-down processing accordingly.
  • the first network switch device 1 sets an ECO processing execution flag for the LAG 5. Thereafter, the first network switch device 1 cuts off the power supply to at least one of the first ports 12 among the plurality of first ports 12 belonging to the LAG 5 based on the use band information of the LAG 5. As a result, the first network switch device 1 links down at least one first port 12.
  • the first network switch device 1 excludes at least one first port 12 whose power supply has been cut off based on the used bandwidth information from the target of error notification indicating link-down. In response to this, the first network switch device 1 displays the LED 123 of the at least one first port 12 whose power supply is cut off based on the use band information as an ECO state display.
  • the first network switch device 1 transmits an LA-ECO frame to the second network switch device 2.
  • “Link Training” is set to “0” in the LA-ECO frame. Since “Link Training” is “0” and “ACK” is “0”, this LA-ECO frame is a link down end notification.
  • the first network switch device 1 clears the ECO processing execution flag for the LAG 5.
  • the second network switch device 2 When the second network switch device 2 receives the link down end notification, the second network switch device 2 checks the state of the plurality of second ports 22 belonging to the LAG 5 in response to the notification, and at least one second link link down is received. Port 22 is extracted. Then, the second network switch device 2 cuts off the power supply of at least one second port 22 that is linked down in response to the link down of the first port 12 among the plurality of second ports 22. . As a result, the power supply to the ports at both ends of the link that is linked down is cut off.
  • the second network switch device 2 sends at least one second port 22 whose power supply has been cut off based on the link down corresponding to the link down of the first port 12 to the target of error notification indicating the link down. Exclude from In response to this, the second network switch device 2 causes the LED of the at least one second port 22 whose power supply has been cut off based on the link down corresponding to the link down of the first port 12 to the ECO state. Display.
  • the second network switch device 2 drops the ECO processing execution flag for the LAG 5.
  • FIG. 13 is an explanatory diagram of the link addition process.
  • the first network switch device 1 transmits an LA-ECO frame to the second network switch device 2 prior to the link-up process.
  • “Link Training” is set to “1” in the LA-ECO frame. Since “Link Training” is “1” and “ACK” is “0”, this LA-ECO frame is a link-up start notification.
  • the second network switch device 2 When the second network switch device 2 receives the LA-ECO frame as the link-up start notification, the plurality of second ports 22 are turned on in response to this and the ECO processing execution flag for the LAG 5 is set to “ From “0” to “1”.
  • the second network switch device 2 transmits an LA-ECO frame to the first network switch device 1.
  • “Link Training” is set to “1”
  • “ACK” is set to “1”. Since “Link Training” is “1” and “ACK” is “1”, this LA-ECO frame is a response to the link-up start notification.
  • the first network switch device 1 When the first network switch device 1 receives the LA-ECO frame as a response to the link-up start notification, the first network switch device 1 executes link-up processing accordingly.
  • the first network switch device 1 sets an ECO processing execution flag for the LAG 5. Thereafter, the first network switch device 1 supplies power to at least one first port 12 among the plurality of first ports 12 belonging to the LAG 5 based on the used bandwidth information of the LAG 5. As a result, the first network switch device 1 links up the at least one first port 12.
  • the first network switch device 1 sets at least one first port 12 to which power is supplied based on the used bandwidth information as an error notification target indicating a link down. In response to this, the first network switch device 1 changes the LED 123 of at least one first port 12 to which power is supplied based on the use band information from the ECO state display to the link-up display.
  • the first network switch device 1 transmits an LA-ECO frame to the second network switch device 2.
  • “Link Training” is set to “0” in the LA-ECO frame. Since “Link Training” is “0” and “ACK” is “0”, this LA-ECO frame is a link-up end notification.
  • the first network switch device 1 drops the ECO processing execution flag for the LAG 5 from “1” to “0”.
  • the second network switch device 2 When the second network switch device 2 receives the link up end notification, the second network switch device 2 checks the state of the plurality of second ports 22 belonging to the LAG 5 and extracts the second port 22 that is linked down. To do. Then, the second network switch device 2 cuts off the power supply of the second port 22 that is linked down in response to the link down of the first port 12 among the plurality of second ports 22. As a result, the power supply to the ports at both ends of the link that is linked down is cut off, except for the port that is linked up, including the newly linked up port.
  • the second network switch device 2 excludes the second port 22 whose power supply has been cut off based on the link down in response to the link down of the first port 12 from the error notification target indicating the link down. In response to this, the second network switch device 2 displays the LED of the second port 22 whose power supply has been cut off based on the link down in response to the link down of the first port 12 as an ECO state display.
  • the second network switch device 2 drops the ECO processing execution flag for the LAG 5 from “1” to “0”.

Abstract

 第1のネットワークスイッチ装置1が、LAG5の使用帯域情報に基づいて、複数の第1ポート12の中の少なくとも1個の第1ポート12の電源供給を切断し前記少なくとも1個の第1ポート12をリンクダウンする。その後、第1のネットワークスイッチ装置1が、第2のネットワークスイッチ装置2にリンクダウン終了通知を送信する。リンクダウン終了通知を受信した第2のネットワークスイッチ装置2が、複数の第2ポート22の中のリンクダウンしている少なくとも1個の第2ポート22の電源供給を切断する。

Description

通信システムの制御方法、通信システム、通信装置
 本発明は、通信システムの制御方法、通信システム、通信装置に関する。
 ネットワークにおいて、複数の物理的なリンクを仮想的に1個のリンク(リンクアグリゲーショングループ(Link Aggregation Group))に束ねて使用することにより、束ねた複数の物理的なリンクの通信速度を合算した通信速度により通信を行うことができるリンクアグリゲーション(Link Aggregation)機能が知られている。リンクアグリゲーション機能は、イーサネット(登録商標)の機能の1つであり、IEEE(The Institute of Electrical and Electronics Engineers, Inc.)802.3adに規定されている。また、同様の機能として、ファイバチャネル(Fibre Channel)において、複数の物理的なポートを仮想的に1つのポートに束ねて使用することにより、束ねた複数の物理的なポートの通信速度を合算した通信速度により通信を行うことができるトランキング(Trunking)機能が知られている。
 また、ネットワーク中継装置間の通信における予備リンクを用いてリンクの冗長化を行うリンクアグリゲーション冗長化方法であって、所定の二以上のリンクを運用リンクとして用いてリンクアグリゲーショングループを作成するとともに、所定のリンクを擬似的に閉塞して予備リンクとし、リンクアグリゲーショングループにおける運用リンクの状態を監視し、運用リンクのうち一部の運用リンクが使用不可能な状態となると、使用不可能な状態となった一部の運用リンクをリンクアグリゲーショングループからデタッチし(切離し)、予備リンクの擬似的な閉塞状態を解除して、予備リンクをリンクアグリゲーショングループに運用リンクとしてアタッチする(追加する)ことが、提案されている。
 さらに、複数の無線部を有する無線基地局装置において、データ量検出部が、無線端末から各無線部への通信データ量である上りデータ量と、無線部から無線端末への通信データ量である下りデータ量とを比較し、上りデータ量の方が下りデータ量より大きい場合には、制御部が電源制御部にいずれかの無線部の送信部への電力供給を停止させ、下りデータ量の方が上りデータ量より大きい場合には、制御部が電源制御部にいずれかの無線部の受信部への電力供給を停止させ、上りデータ量と下りデータ量とが共に所定の閾値よりも小さい場合には、制御部が電源制御部にいずれかの無線部の送信部と受信部への電力供給を共に停止させることが、提案されている。
特開2004-349764号公報 特開2008-252282号公報
 リンクアグリゲーションにおいては、仮想的に束ねられたリンクアグリゲーショングループが使用帯域の冗長性を持つ。従って、通信に必要な帯域に対しリンクアグリゲーショングループにより確保された使用帯域が余剰となる期間が必然的に生じることになる。そこで、リンクアグリゲーショングループにおける冗長性を維持しつつ、通信を行う際の消費電力を削減することが望まれる。
 本発明は、リンクアグリゲーショングループを用いた通信における消費電力を削減することができる通信システムの制御方法を提供することを目的とする。
 開示される通信システムの制御方法は、第1の通信装置の複数の第1ポートと第2の通信装置の複数の第2ポートとを接続する複数のリンクを、仮想的な1個のリンクであるリンクアグリゲーショングループとして使用して、第1の通信装置と第2の通信装置との間において通信を行う通信システムの制御方法である。前記通信システムの制御方法は、第1の通信装置が、リンクアグリゲーショングループの使用帯域情報に基づいて、複数の第1ポートの中の少なくとも1個の第1ポートの電源供給を切断し前記少なくとも1個の第1ポートをリンクダウンするステップと、第1の通信装置が、リンクダウンするステップの後に、第2の通信装置にリンクダウン終了通知を送信するステップと、リンクダウン終了通知を受信した第2の通信装置が、複数の第2ポートの中のリンクダウンしている少なくとも1個の第2ポートの電源供給を切断するステップとを含む。
 開示される通信システムの制御方法によれば、リンクアグリゲーショングループにおいてリンクダウンしたリンクの両端のポートに対する電源供給を停止することができるので、リンクアグリゲーショングループを用いた通信における消費電力を削減することができる。
ネットワークスイッチ装置を含む通信システムの実施形態の一例を示す図である。 ネットワークスイッチ装置の構成の一例を示す図である。 リンクアグリゲーション制御部の構成の一例を示す図である。 LAG管理テーブルの一例を示す図である。 ポート状態管理テーブルの一例を示す図である。 LA-ECOフレームの一例を示す図である。 リンクアグリゲーション監視処理フロー(1)である。 リンクアグリゲーション監視処理フロー(2)である。 ポート追加処理フローチャートである。 ポート削除処理フローチャートである。 ECOフレーム受信処理フローチャートである。 リンク更新処理フローチャートである。 リンク削除処理の説明図である。 リンク追加処理の説明図である。
 以下、通信システムの制御方法、通信システム及び通信装置の実施形態の一例を説明する。
 一般に、ネットワークスイッチ装置のポートに実装され、ネットワーク機器等の通信機能を階層構造を用いて定義したOSI参照モデルの第1層に定義される物理層モジュールであるPHYモジュール(PHYsical layer module)は、実際に通信しているか否かに拘わらず、電源が供給されている限り一定の電力を消費する。従って、リンクアグリゲーショングループにおいて確保された使用帯域が余剰である場合には、リンクアップしているポートのPHYモジュールは通信を行わないにも拘わらず電力を消費している。
 しかし、リンクアグリゲーショングループにおいて、リンクアップしているポートの電源供給を切断した場合、確立されたリンクが切断されることによるリンクエラーが出力され、ハードウェア故障や伝送路の異常として処理されてしまう。従って、リンクアグリゲーショングループにおいて、リンクアップしているポートの電源供給を切断することはできない。
 以上から、リンクが確立されているポートについては、常にそのPHYモジュールの電源をONにして、リンクを確立しておく必要がある。従って、リンクアグリゲーショングループにおいて確保された使用帯域が余剰である場合には、リンクの両端におけるポートのPHYモジュールの消費電力が無駄となる。
 一方、リンクアグリゲーショングループにおいて確保された使用帯域が余剰である場合には、リンクアグリゲーショングループからリンクを削除し、使用帯域が不足している場合には、リンクアグリゲーショングループにリンクを追加することが考えられる。
 しかし、リンクアグリゲーショングループからリンクを削除しても、リンクの両端におけるポートのPHYモジュールの電源供給を切断しない限り、消費電力は削減されない。換言すれば、1個のリンクアグリゲーショングループからリンクを削除しても、使用帯域の余剰分を削減できるが、消費電力の削減を図ることはできない。なお、前述したように、実際にはリンクアグリゲーショングループにおいて、リンクアップしているポートの電源供給を切断することはできない。
 開示される通信システムの制御方法、通信システム及び通信装置によれば、リンクアグリゲーショングループにおける冗長性を維持しつつ、リンクアグリゲーショングループにおいてリンクダウンしたリンクの両端のポートの電源供給を切断し、通信装置における消費電力を削減する。
 図1は、ネットワークスイッチ装置を含む通信システムの一例を示す図である。
 通信システムは、通信装置である第1のネットワークスイッチ装置1と、通信装置である第2のネットワークスイッチ装置2と、これらの間を接続する複数のリンク3及び4とを含む。第1のネットワークスイッチ装置1は、フレームを中継するネットワーク中継装置であり、リンクアグリゲーション制御部11と、複数の第1ポート12と、第3ポート18とを含む。第2のネットワークスイッチ装置2は、フレームを中継するネットワーク中継装置であり、リンクアグリゲーション制御部21と、複数の第2ポート22と、第4ポート28とを含む。
 複数の第1ポート12は、各々、リンク3により、複数の第2ポート22と接続される。リンク3は、例えばケーブルや光ファイバ等の伝送経路である。複数の第1ポート12の数及び複数の第2ポート22の数は、「3」に限られない。
 通信システムは、LAG5を使用して、第1のネットワークスイッチ装置1と第2のネットワークスイッチ装置2との間において通信を行う。なお、以下の説明において、「リンクアグリゲーショングループ(Link Aggregation Group)」をLAGと言うこととする。LAG5は、リンクアグリゲーションによる通信におけるリンクの単位である。LAG5は、第1のネットワークスイッチ装置1の複数の第1ポート12と第2のネットワークスイッチ装置2の複数の第2ポート22とを接続する複数のリンク3を含む仮想的な1個のリンクである。
 LAG5を用いる通信は、リンクアグリゲーション制御部11及びリンクアグリゲーション制御部21により制御される。LAG5を用いる通信は、例えばリンクアグリゲーション制御プロトコル(LACP)に従って行われる通信である。リンクアグリゲーション制御プロトコルは、例えばIEEE802.3adにより規定されている。従って、リンクアグリゲーション制御部11及びリンクアグリゲーション制御部21が、リンクアグリゲーション制御プロトコルに従ってLAG5を制御することにより、LAG5を用いる通信が実行される。
 一方、第3ポート18は、第1のネットワークスイッチ装置1に含まれるポートであって、複数の第1ポート12以外のポートである。第3ポート18は、複数の第1ポート12と複数の第2ポート22とを接続するLAG5に属さないポートである。
 第4ポート28は、第2のネットワークスイッチ装置2に含まれるポートであって、複数の第2ポート22以外のポートである。第4ポート28は、複数の第1ポート12と複数の第2ポート22とを接続するLAG5に属さないポートである。 
 第3ポート18はリンク4により第4ポート28と接続される。リンク4は、例えばケーブルや光ファイバ等の伝送経路である。第3ポート18の数及び第4ポート28の数は、「1」に限られず、複数であっても良い。複数の第3ポート18及び複数の第4ポート28が設けられる場合、複数の第3ポート18と複数の第4ポート28とを接続する複数のリンクを、第1ポート12及び第2ポート22が属するLAG5以外のリンクアグリゲーショングループとして使用するようにしても良い。
 なお、第3ポート18は、第2のネットワークスイッチ装置2以外の通信装置と接続されるようにしても良い。第4ポート28は、第1のネットワークスイッチ装置1以外の通信装置と接続されるようにしても良い。
 図2は、ネットワークスイッチ装置の構成の一例を示す図である。
 第1のネットワークスイッチ装置1は、リンクアグリゲーション制御部11と複数の第1ポート12と第3ポート18に加えて、データスイッチング部13と、アグリゲータ部14と、送受信制御部15と、電源制御部16と、監視部17とを含む。リンクアグリゲーション制御部11は、スイッチ管理部111と、アグリゲーション制御部112とを含む。複数の第1ポート12は、各々、MAC部121と、PHYモジュール122と、LED(Light Emitting Diode)123とを含む。第3ポート18は、MAC部181と、PHYモジュール182と、LED183とを含む。第3ポート18は、第1ポート12と同様の構成を有していても良く、第1ポート12と異なる構成を有していても良い。
 次に、第2のネットワークスイッチ装置2は、例えば第1のネットワークスイッチ装置1と同様の構成を有する。第2ポート22は第1ポート12と同様の構成を有し、第4ポート28は第3ポート18と同様の構成を有する。第2のネットワークスイッチ装置2が、第1のネットワークスイッチ装置1と異なる構成を有するようにしても良い。
 例えば、第1のネットワークスイッチ装置1のスイッチ管理部111と第2のネットワークスイッチ装置2のスイッチ管理部111とを区別する場合、第1のネットワークスイッチ装置1のスイッチ管理部を「111A」と表し、第2のネットワークスイッチ装置2のスイッチ管理部を「111B」と表すこととする。換言すれば、第1のネットワークスイッチ装置1の要素には符号Aを付して表し、第2のネットワークスイッチ装置2の要素には符号Bを付して表すこととする。
 PHYモジュール122は、送受信を行なう送受信フレームについて、ネットワークにおける機能を階層的に表したOSI参照モデルの第7階層のうち第1層目に位置する物理層においてデータの送受信及び信号変換を行う物理デバイスである。PHYモジュール122の実装位置は、ポート番号で示される。ポート番号は、第1のネットワークスイッチ装置1において第1ポート12を一意に識別する識別情報である。PHYモジュール122は、ケーブルや光ケーブル等を介して受信した受信フレームをMAC部121に送信する。また、PHYモジュール122は、MAC部121からの送信フレームをケーブルや光ケーブルを介して宛先のPHYモジュールに送信する。PHYモジュール182も同様である。
 MAC部121は、PHYモジュール122に対応して設けられ、送受信フレームの伝送制御を行う。伝送制御としては、例えば、フレーム形式の検出や誤り検出等が行われる。MAC部181も同様である。
 MAC部121は、PHYモジュール122からの受信フレームを送受信制御部15に送信する。また、MAC部121は、送受信制御部15からの送信フレームをPHYモジュール122に送信する。一方、MAC部181は、PHYモジュール182からの受信フレームをデータスイッチング部13に送信する。また、MAC部181は、データスイッチング部13からの送信フレームをPHYモジュール182に送信する。
 LED123は、アグリゲーション制御部112の制御に従って、第1ポート12の状態を点灯を行なうことにより表示する。例えば、第1ポート12がリンクアップしている場合は「緑」、リンクダウンしている場合は「消灯」、エラーである場合は「橙点滅」により、各々の状態が表示される。LED183も同様である。
 電源制御部16は、複数のPHYモジュール122及びPHYモジュール182への電源供給を制御する。具体的には、電源制御部16は、スイッチ管理部111からの制御に従って、複数のPHYモジュール122及びPHYモジュール182に電源を供給し、また、電源の供給を切断する。
 送受信制御部15は、MAC部121に対応して設けられるコントローラ、パーサー、マルチプレクサ等である。送受信制御部15は、MAC部121からLACPフレームを受信した場合には、LACPフレームをアグリゲーション制御部112に送信する。また、送受信制御部15は、MAC部121からLACPフレーム以外のフレームを受信した場合には、LACPフレーム以外のフレームをアグリゲータ部14に送信する。更に、送受信制御部15は、アグリゲータ部14から送信されたフレームを、対応するMAC部121にそのまま送信する。
 アグリゲータ部14は、LAG5毎に設けられる。アグリゲータ部14は、対応する第1ポート12からの受信フレームを、データスイッチング部13に送信する。また、アグリゲータ部14は、データスイッチング部13からの送信フレームを、LAG5に属する第1ポート12に、予め定められた通信プロトコルに従って分散するように送信する。
 データスイッチング部13は、フレームのスイッチングを行う。換言すれば、データスイッチング部13は、アグリゲータ部14から受信したフレームにおける送信先MACに基づいて、送信先のアグリゲータ部14を決定し、受信したフレームを決定した送信先のアグリゲータ部14に送信する。
 監視部17は、監視対象である複数の第1ポート12の各々から収集した使用帯域情報を保持する。使用帯域情報としては、例えば、複数の第1ポート12毎の送受信量、LAG5の送受信量、複数の第1ポート12毎のエラー回数、LAG5のエラー回数がある。また、監視部17は、監視対象である第3ポート18から収集した使用帯域情報を保持する。使用帯域情報としては、例えば、第3ポート18の送受信量、第3ポート18のエラー回数がある。なお、複数のLAG5が存在する場合、送受信量やエラー回数は、リンクアグリゲーショングループ毎に収集される。
 スイッチ管理部111は、後述するポート状態管理テーブル113を用いて、第1のネットワークスイッチ装置1に含まれる複数の第1ポート12及び第3ポート18の各々を管理する。具体的には、スイッチ管理部111は、複数の第1ポート12及び第3ポート18の各々に実装されたPHYモジュール122及び182を監視する。そして、スイッチ管理部111は、監視の結果に基づいて、伝送路状態(リンクステータス)を判断し、また、アグリゲーション制御部112からの依頼に応じて、電源制御部16を介してPHYモジュール122及び182の電源供給を制御する。
 アグリゲーション制御部112は、後述するLAG管理テーブル114を用いて、LAG5を管理する。具体的には、アグリゲーション制御部112は、LAG5に必要な情報であるリンクアグリゲーション情報を、LACPフレームを用いて他のアグリゲーション制御部112と交換する。LACPフレームは、前述のリンクアグリゲーション制御プロトコルに従うフレームである。
 図3は、リンクアグリゲーション制御部の構成の一例を示す図である。
 リンクアグリゲーション制御部11は、スイッチ管理部111と、アグリゲーション制御部112と、ポート状態管理テーブル113と、LAG管理テーブル114とを含む。アグリゲーション制御部112は、LAG監視部115と、削除処理部116と、追加処理部117と、更新処理部118とを含む。
 なお、リンクアグリゲーション制御部21は、リンクアグリゲーション制御部11と同様の構成を有する。例えば、リンクアグリゲーション制御部11のアグリゲーション制御部112とリンクアグリゲーション制御部21のアグリゲーション制御部112とを区別する場合には、リンクアグリゲーション制御部11のアグリゲーション制御部を「112A」と表し、リンクアグリゲーション制御部21のアグリゲーション制御部を「112B」と表すこととする。換言すれば、リンクアグリゲーション制御部11の要素には符号Aを付して表し、リンクアグリゲーション制御部21の要素には符号Bを付して表すこととする。
 アグリゲーション制御部112は、自己の属する第1のネットワークスイッチ装置1がリンクアグリゲーション制御におけるマスタ装置である場合に、LAG5を監視した結果に基づいて、LAG5のリンクの削除処理又は追加処理を実行する。リンクアグリゲーション制御におけるマスタ装置は、ECO処理モードにおいて、LAG5のリンクの数を減少又は増加させる。LAG5の監視は、LAG監視部115により実行される。LAG5のリンクの削除処理は、削除処理部116により実行される。LAG5のリンクの追加処理は、追加処理部117により実行される。
 また、アグリゲーション制御部112は、自己の属する第1のネットワークスイッチ装置1がリンクアグリゲーション制御におけるスレーブ装置である場合に、マスタ装置である第2のネットワークスイッチ装置2によるLAG5のリンクの削除処理の結果又は追加処理の結果に従って、LAG5のリンクの更新処理を実行する。リンクアグリゲーション制御におけるスレーブ装置は、ECO処理モードにおいて、マスタ装置によるLAG5のリンクの数を削除処理又は増加処理に従う。マスタ装置によるリンクの削除処理の結果又は追加処理の結果に従うリンクの更新処理は、更新処理部118により実行される。
 図1~図3の例においては、第1のネットワークスイッチ装置1がリンクアグリゲーション制御におけるマスタ装置であり、第2のネットワークスイッチ装置2がリンクアグリゲーション制御におけるスレーブ装置である。ネットワークスイッチ装置1及び2のいずれをマスタ装置とするかは、LAG管理テーブル114において予め定められる。LAG管理テーブル114については、図4を参照して後述する。
 アグリゲーション制御部112は、LAG5の使用帯域情報に基づいて、必要なリンクの数を算出し、必要なリンクの数とLAG5に現在リンクアップしているリンクの数とを比較する。LAG5の使用帯域情報は、監視部17から取得される。そして、アグリゲーション制御部112は、必要なリンクの数とLAG5に現在リンクアップしているリンクの数との比較の結果に基づいて、必要なリンクの数が現在リンクアップしているリンクの数より少ない場合に、リンクの削除処理としてリンクダウン処理を実行する。また、アグリゲーション制御部112は、必要なリンクの数とLAG5に現在リンクアップしているリンクの数との比較の結果に基づいて、必要なリンクの数が現在リンクアップしているリンクの数より多い場合に、リンクの追加処理としてリンクアップ処理を実行する。
 アグリゲーション制御部112は、LAG5の使用帯域情報に基づいて、LAG5のリンクの削除処理を実行する。具体的には、アグリゲーション制御部112は、複数の第1ポート12の中の少なくとも1個の第1ポート12の電源供給を切断するとともにリンクダウン処理を行なう。
 第1ポート12の電源供給の切断と第1ポート12のリンクダウン処理とは、いずれを先に実行しても良い。図3の例においては、アグリゲーション制御部112は、少なくとも1個の第1ポート12の電源供給を切断することにより、少なくとも1個の第1ポート12のリンクダウン処理を行なう。
 アグリゲーション制御部112は、リンクダウン処理の後に、第2のネットワークスイッチ装置2にリンクダウン処理を終了した旨のリンクダウン終了通知を送信する。リンクダウン終了通知を受信した第2のネットワークスイッチ装置2は、複数の第2ポート22の中のリンクダウンしている少なくとも1個の第2ポート22の電源供給を切断する。これにより、リンクの両端の第1ポート21及び第2ポート22の電源供給を切断することができる。
 アグリゲーション制御部112は、使用帯域情報に基づいて電源供給を切断された少なくとも1個の第1ポート12を、リンクダウンを示すエラー通知の対象から除外する。これにより、第1のネットワークスイッチ装置1において、使用帯域情報に基づいて電源供給を切断されたことに起因するリンクダウンとエラーの発生による本来のリンクダウンとを区別することができる。エラー通知の対象とするか否かは、ポート状態管理テーブル113において設定される。ポート状態管理テーブル113については、図5を参照して後述する。
 第2のネットワークスイッチ装置2において、アグリゲーション制御部112Bは、使用帯域情報に基づいて電源供給を切断されたことによりリンクダウンした第1ポート12にケーブル等を介して接続される第2ポート22を、リンクダウンを示すエラー通知の対象から除外する。これにより、第2のネットワークスイッチ装置2において、使用帯域情報に基づいて電源供給を切断されたことに起因するリンクダウンとエラーの発生による本来のリンクダウンとを区別することができる。
 アグリゲーション制御部112は、リンクの削除処理、換言すれば、リンクダウン処理に先立って、第2のネットワークスイッチ装置2にリンクダウン開始通知を送信する。リンクダウン開始通知を受信した第2のネットワークスイッチ装置2は、全ての第2ポート22の電源を一旦投入し、リンクダウン開始通知に対する応答をアグリゲーション制御部112に返信する。リンクダウン開始通知に対する応答を受信したアグリゲーション制御部112は、リンクダウン処理を実行する。
 これにより、複数の第2ポート22の全ての電源が一旦投入され、リンクアップされなかったリンクの第2ポート22のみについて電源が切断される。このため、アグリゲーション制御部112における第1ポート12のリンクダウン処理とは独立に、第2のネットワークスイッチ装置2における第2ポート22のリンクダウン処理を実行することができる。また、ユーザやネットワーク監視装置によるアグリゲーション制御部112における第1ポート12の監視に基づいて、第2のネットワークスイッチ装置2における第2ポート22をユーザがリンクダウンする必要を無くすことができる。
 アグリゲーション制御部112は、LAG5の使用帯域情報に基づいて、LAG5のリンクの追加処理を実行する。具体的には、アグリゲーション制御部112は、複数の第1ポート12の中の少なくとも1個の第1ポート12の電源を投入するとともに第1ポート12をリンクアップする。なお、リンクアップされる第1ポート12は、電源を投入されたポートである。
 アグリゲーション制御部112は、リンクアップ処理の終了後に、第2のネットワークスイッチ装置2にリンクアップ終了通知を送信する。リンクアップ終了通知を受信した第2のネットワークスイッチ装置2は、複数の第2ポート22の中のリンクダウンしている第2ポート22の電源供給を切断する。これにより、リンクの両端の第1ポート21及び第2ポート22の電源供給を切断することができる。
 アグリゲーション制御部112は、リンクの追加処理の開始に先立って、第2のネットワークスイッチ装置2にリンクアップ開始通知を送信する。リンクアップ開始通知を受信した第2のネットワークスイッチ装置2は、一旦、全ての第2ポート22の電源を投入し、リンクアップ開始通知に対する応答をアグリゲーション制御部112に返信する。リンクアップ開始通知に対する応答を受信したアグリゲーション制御部112は、リンクアップ処理を実行する。
 これにより、複数の第2ポート22について一旦全ての電源が投入され、リンクアップされなかったリンクの第2ポート22のみについて電源が切断される。このため、アグリゲーション制御部112における第1ポート12のリンクアップとは独立に、第2のネットワークスイッチ装置2における第2ポート22のリンクアップ処理を実行することができる。また、ユーザやネットワーク監視装置によるアグリゲーション制御部112における第1ポート12の監視に基づいて、第2のネットワークスイッチ装置2における第2ポート22をリンクアップする必要を無くすことができる。
 アグリゲーション制御部112は、リンクアップ処理及びリンクダウン処理において、LA-ECOフレームを生成して使用する。LA-ECOフレームは、ポートの電源供給を切断して消費電力を削減するためのフレーム、換言すれば、後述するECO処理モードを実現するフレームである。具体的には、LA-ECOフレームは、LACPフレームの一種であって、リンクアップ開始通知、リンクアップ終了通知、リンクダウン開始通知、リンクダウン終了通知のためのフレームである。また、LA-ECOフレームは、リンクアップ開始通知に対する応答、リンクアップ終了通知に対する応答、リンクダウン開始通知に対する応答、リンクダウン終了通知に対する応答としても使用される。
 例えば、フレームに含まれる複数のOCTETの中の予め定められた位置の1又は複数のOCTET(以下、特定OCTETという)が、そのフレームがLA-ECOフレームであるか否かを表すために用いられる。換言すれば、LA-ECOフレームの特定OCTETは、予め定められた値を有する。更に、LA-ECOフレームの特定OCTETの値に基づいて、そのフレームは、リンクアップ開始通知、リンクアップ終了通知、リンクダウン開始通知、リンクダウン終了通知、又は、これらの応答のいずれかであると判断される。LA-ECOフレームについては、図6を参照して後述する。
 アグリゲーション制御部112は、自己の属する第1のネットワークスイッチ装置1がリンクアグリゲーション制御におけるマスタ装置である場合に、LAG5を監視の結果に基づいて、LAG5のリンクアップするポート(換言すれば、リンク)の交替処理を実行する。具体的には、アグリゲーション制御部112は、LAG5の使用帯域情報に基づいて、現在リンクアップしているポートについて、リンクアップしている時間が予め定められた閾値を超えているかを判断する。リンクアップしている時間は、後述するように、ポート状態管理テーブル113における「リンクアップ稼働時間」である。
 そして、アグリゲーション制御部112は、リンクアップしている時間が閾値を超えているポートが存在する場合に、リンクアップ処理を実行した後におけるリンクアップしている時間が閾値を超えているポートについて、リンクダウン処理を実行する。また、アグリゲーション制御部112は、リンクダウン処理の対象となるポートの数と同一の数のポートを、リンクダウンしている複数のポートの中から選択して、選択したポートについてリンクアップ処理を実行する。
 上記のポートの交代処理により、LAG5において、リンクアグリゲーショングループにおいて確保された使用帯域が余剰である場合であっても、特定のリンクがリンクダウンして電源が切断されたままとなることを防止することができる。例えば、特定のリンクがリンクダウンして電源が切断されたままである場合、その特定のリンクにおいてハードウェア故障等が発生しても、LAG5において使用帯域が不足してその特定のリンクをリンクアップするまで、ハードウェア故障等を検出することができない。しかし、特定のリンクが電源供給を切断され続けることを防止することができるので、随時ハードウェア故障等を検出することができ、瞬間的な帯域の不足を生じることを防止することができる。また、特定のリンクの部品のみの使用時間が増加することを防止して、ハードウェア故障を平準化することができる。
 図4は、LAG管理テーブルの一例を示す図である。
 LAG管理テーブル114は、項目毎にLAG5の現在の状況を示す情報を格納する。LAG5の状況を管理する項目としては、「Actor System ID」「Actor Aggregation Key」「Partner System ID」「Partner Aggregation Key」「PORT」「Actor ECO処理モード」「Partner ECO処理モード」「ECO処理役割」「ECO処理実行フラグ」「送信OCTET数」「受信OCTET数」がある。
 ここで、「Actor」は、自スイッチについての項目であることを示す。「Partner」は、接続先スイッチについての項目であることを示す。従って、第1のネットワークスイッチ装置1に設けられるLAG管理テーブル114においては、「Actor」は第1のネットワークスイッチ装置1を意味し、「Partner」は第2のネットワークスイッチ装置2を意味する。
 「Actor System ID」は、自スイッチ、換言すれば、第1のネットワークスイッチ装置1において、LAG5が使用するMACアドレスである。「Actor Aggregation Key」は、自スイッチ、換言すれば、第1のネットワークスイッチ装置1において、LAG5を識別する識別情報である。
 「Partner System ID」は、第1のネットワークスイッチ装置1のLAG5の接続先スイッチ、換言すれば、第2のネットワークスイッチ装置2のLAG5が使用するMACアドレスである。「Partner Aggregation Key」は、接続先スイッチ、換言すれば、第2のネットワークスイッチ装置2において、LAG5を識別する識別情報である。
 「PORT」は、自スイッチ、換言すれば、第1のネットワークスイッチ装置1においてLAG5に参加している第1ポート12のポート番号である。
 「Actor ECO処理モード」は、自スイッチ、換言すれば、第1のネットワークスイッチ装置1のLAG5においてECO処理モードが有効であるか無効であるかを示す。「Partner ECO処理モード」は、接続先スイッチ、換言すれば、第2のネットワークスイッチ装置2のLAG5においてECO処理モードが「有効」であるか「無効」であるかを示す。
 ここで、「ECO処理モード」は、ポートの電源供給を切断して消費電力を削減するモード、換言すれば、LA-ECOフレームにより実現されるモードである。従って、第1のネットワークスイッチ装置1は、「Actor ECO処理モード」が「有効」である場合にはECO状態とされ、「Actor ECO処理モード」が「無効」である場合にはECO状態以外の状態、換言すれば、通常の状態とされる。ECO状態については、図5を参照して後述する。第2のネットワークスイッチ装置2は、「Partner ECO処理モード」が「有効」である場合にはECO状態とされ、「Partner ECO処理モード」が「無効」である場合にはECO状態以外の状態、換言すれば、通常の状態とされる。
 「ECO処理役割」は、ECO処理モードにおいて、自スイッチ、換言すれば、第1のネットワークスイッチ装置1がマスタ装置であるかスレーブ装置であるかを示す。第1のネットワークスイッチ装置1がマスタ装置である場合、ECO処理役割は「MASTER」とされる。これにより、第1のネットワークスイッチ装置1は、使用帯域情報に基づいて、ECO処理モードにおいて、LAG5のリンクの数を増加又は減少させる。第1のネットワークスイッチ装置1がスレーブ装置である場合、ECO処理役割は「SLAVE」とされる。これにより、第1のネットワークスイッチ装置1は、ECO処理モードにおいて、マスタ装置である第2のネットワークスイッチ装置2が実行するECO処理に追従する。
 「ECO処理実行フラグ」は、自スイッチ、換言すれば、第1のネットワークスイッチ装置1がECO処理を実行中であるか停止中であるかを示す。換言すれば、「ECO処理実行フラグ」により、第1のネットワークスイッチ装置1がECO処理モードであるか否かが示される。
 「送信OCTET数」は、LAG5を介して送信されたOCTETの数である。「受信OCTET数」は、LAG5を介して受信されたOCTETの数である。
 LAG管理テーブル114は、アグリゲーション制御部112により作成される。LAG管理テーブル114において、「Actor System ID」、「Actor Aggregation Key」、「Partner System ID」、「Partner Aggregation Key」及び「PORT」は、LAG5を構成する際に、例えば第1又は第2ネットワーク装置に接続するコンピュータから、アグリゲーション制御部112にそれぞれ入力される。「Actor ECO処理モード」、「Partner ECO処理モード」、「ECO処理役割」及び「ECO処理実行フラグ」は、ECO処理モードを実行する際に、アグリゲーション制御部112によりそれぞれ設定される。「送信OCTET数」及び「受信OCTET数」は、ECO処理モードにおいて、監視部17から「送信OCTET数」及び「受信OCTET数」を取得したアグリゲーション制御部112により設定される。
 リンクアグリゲーション制御部11は、LAG5を管理するLAG管理テーブル114Aを含む。第1のネットワークスイッチ装置1において、LAG管理テーブル114Aには、第1のネットワークスイッチ装置1がマスタ装置として登録され、第2のネットワークスイッチ装置2がスレーブ装置として登録される。これにより、マスタ装置である第1のネットワークスイッチ装置1のアグリゲーション制御部112Aは、LAG5に属する複数のポートについてのリンクダウン処理及びリンクアップ処理を実行するか否かについて、それぞれ決定を行なう。
 リンクアグリゲーション制御部21は、LAG5を管理するLAG管理テーブル114Bを含む。第2のネットワークスイッチ装置2において、LAG管理テーブル114Bには、第1のネットワークスイッチ装置1がマスタ装置として登録され、第2のネットワークスイッチ装置2がスレーブ装置として登録される。これにより、スレーブ装置である第2のネットワークスイッチ装置2のアグリゲーション制御部112Bは、マスタ装置である第1のネットワークスイッチ装置1によるLAG5のリンクの削除処理の結果又は追加処理の結果に従って、LAG5のリンクの更新処理を実行する。
 図5は、ポート状態管理テーブルの一例を示す図である。
 ポート状態管理テーブル113は、ポート毎にポートの状態を示す情報を格納する。ポート状態管理テーブル113において、ポートはポート番号により表される。なお、図5においては、LAG5に属するポートがポート番号1~6までの6個存在し、6個のポートが各々異なるポート状態であるものとする。
 ポート状態を示す情報としては、「Link Up」、「Link Down」、「Power OFF」、「no PHY module」、「Link state unknown」及び「ECO auto-poweroff」がある。
 「Link Up」は、ポートがリンクアップしていることを示す。ポート状態がリンクアップである場合には、リンクアップ稼働時間も格納される。リンクアップ稼働時間は、ポートがリンクアップしてから稼動を継続している時間である。リンクアップ稼働時間の単位は、例えば秒である。
 「Link Down」は、ポートがリンクダウンしていることを示す。「Power OFF」は、ポートの電源供給が切断されていることを示す。「no PHYmodule」は、ポートのPHYモジュールが認識できない等、PHYモジュールの状態が不明であることを示す。「Link state unknown」は、ポートのリンクの状態が不明であることを示す。
 「ECO auto-poweroff」は、ポートがECO状態であることを示す。「ECO auto-poweroff」、換言すれば、ECO状態は、消費電力の削減のために、ポートの電源供給が切断されていることを示す。従って、ポートがECO状態である場合には、ポートはリンクダウンしているが、リンクダウンの原因はハードウェア故障や回線障害等ではなく、消費電力の削減のためにポートの電源供給が切断されたことが判別できる。
 ポート状態管理テーブル113は、スイッチ管理部111により作成される。ポート状態管理テーブル113において、「Link Up」、「Link Down」、「Power OFF」及び「no PHY module」は、スイッチ管理部111により更新される。また、「Link Up」、「Link Down」、「Link state unknown」及び「ECO auto-poweroff」は、後述するように、アグリゲーション制御部112の依頼に基づいて、スイッチ管理部111により、予め定められたタイミングで更新される。
 リンクアグリゲーション制御部11は、第1ポート12の状態を管理するポート状態管理テーブル113Aを含む。第1のネットワークスイッチ装置1において、ポート状態管理テーブル113Aには、使用帯域情報に基づいて電源供給を切断された少なくとも1個の第1ポート12の状態が、ECO状態、換言すれば、「ECO auto-poweroff」として登録される。ECO状態は、消費電力を削減するためにポートの電源供給を切断した状態であって、LA-ECOフレームにより実現される状態であり、使用帯域情報に基づかない電源の切断と区別される。これにより、アグリゲーション制御部112Aは、ポート状態管理テーブル113AにECO状態として登録された少なくとも1個の第1ポート12についてのリンクダウンの発生を、エラー通知の対象から除外する。
 リンクアグリゲーション制御部21は、第2ポート22の状態を管理するポート状態管理テーブル113Bを含む。第2のネットワークスイッチ装置2において、ポート状態管理テーブル113Bには、使用帯域情報に基づいて電源供給を切断された少なくとも1個の第1ポート12のリンクダウンに応じてリンクダウンした少なくとも1個の第2ポート22の状態が、ECO状態、換言すれば、「ECO auto-poweroff」として登録される。これにより、アグリゲーション制御部112Bは、第2ポート状態管理テーブル113BにECO状態として登録された少なくとも1個の第2ポート22についてのリンクダウンを、エラー通知の対象から除外する。
 図6は、LA-ECOフレームの一例を示す図である。実際には、図6は、LA-ECOフレーム、換言すれば、ECO状態通知フレームにおける、各フィールドと、各フィールドのOCTETの数と、各フィールドに格納される情報についての説明を示す。
 「Destination Address」は、LA-ECOフレームの送信先MACアドレスを格納するフィールドである。「Source Address」は、LA-ECOフレームの送信元MACアドレスを格納するフィールドである。「Length/Type」は、LA-ECOフレームがLA-ECOフレームであることを示すType値を格納するフィールドである。「Subtype」は、図1及び図2の例のネットワークスイッチ装置1及び2においては使用されないフィールドである。「Version Number」は、リンクアグリゲーション制御プロトコルの版数を格納するフィールドである。
 「Actor System」は、自スイッチ、換言すれば、第1のネットワークスイッチ装置1のLAG5のMACアドレスを格納するフィールドである。従って、「Actor System」は、図4のLAG管理テーブル114に格納された「Actor System ID」を格納する。「Actor Key」は、自スイッチ、換言すれば、第1のネットワークスイッチ装置1において、LAG5を識別する識別情報を格納するフィールドである。従って、「Actor Key」は、図4のLAG管理テーブル114に格納された「Actor Aggregation Key」を格納する。
 「Partner System」は、LAG5において第1のネットワークスイッチ装置1の接続先スイッチ、換言すれば、LAG5において第2のネットワークスイッチ装置2が使用するMACアドレスを格納するフィールドである。従って、「Partner System」は、図4のLAG管理テーブル114に格納された「Partner System ID」を格納する。「Partner Key」は、接続先スイッチ、換言すれば、第2のネットワークスイッチ装置2において、LAG5を識別する識別情報を格納するフィールドである。従って、「Partner Key」は、図4のLAG管理テーブル114に格納された「Partner Aggregation Key」を格納する。
 「ECO mode」は、フレームがLA-ECOフレームであるか否かを示す情報を格納するフィールドである。「ECO mode」の値が「1」である場合、フレームはLA-ECOフレームであり、従って、ECO処理モードは有効である。「ECO mode」の値が「0」である場合、ECO処理モードは無効である。「Link Training」は、ECO処理モードにおいて、リンクを行なうポートを変更中であるか否かを示す情報を格納するフィールドである。「Link Training」の値が「1」である場合、第1のネットワークスイッチ装置1がリンクを行なうポートを変更中である旨を示す。「Link Training」の値が「0」である場合、第1のネットワークスイッチ装置1はリンクを行なうポートを変更中ではない旨を示す。
 「ACK」及び「NACK」は、各々、先に受信したフレームに対する応答を格納するフィールドである。「ACK」の値が「1」である場合、先に受信したフレームによる通知を了承することを示す。「NACK」の値が「1」である場合、先に受信したフレームによる通知を却下することを示す。「reserve」は、図1及び図2の例のネットワークスイッチ装置1及び2においては使用されない予約済みフィールドである。「FCS」は、フレームのチェックサムを格納するフィールドである。
 以下、図7A~図13を参照して、アグリゲーション制御部112について詳細に説明する。
 図7A及び図7Bは、一体となって、第1のネットワークスイッチ装置1のアグリゲーション制御部112Aが実行するリンクアグリゲーション監視処理フローを示す。
 アグリゲーション制御部112Aにおいて、LAG監視部115Aは、LAG管理テーブル114Aを参照して、「Actor ECO処理モード」及び「Partner ECO処理モード」が有効であるか無効であるかを判断する(ステップS1)。換言すれば、LAG監視部115Aは、「Actor」である第1のネットワークスイッチ装置1及び「Partner」である第2のネットワークスイッチ装置2がECO処理モードであるか否かを判断する。
 LAG管理テーブル114Aにおいて「Actor ECO処理モード」及び「Partner ECO処理モード」が無効である場合、LAG監視部115Aは、予め定められた時間の経過を待って(ステップS110)、ステップS1を繰り返す。
 LAG管理テーブル114Aにおいて「Actor ECO処理モード」及び「Partner ECO処理モード」が有効である場合、LAG監視部115Aは、LAG管理テーブル114Aを参照して、「ECO処理役割」を判断する(ステップS2)。換言すれば、LAG監視部115Aは、自己が属する第1のネットワークスイッチ装置1がマスタ装置であるか否かを判断する。
 「ECO処理役割」が「スレーブ装置(図7Aにおいては、SLAVEと表示)」である場合、LAG監視部115Aは、予め定められた時間の経過を待って(ステップS110)、ステップS1を繰り返す。
 「ECO処理役割」が「マスタ装置(図7Aにおいては、MASTERと表示)」である場合、LAG監視部115Aは、LAGチェック状況を格納するLAGチェック状況格納領域を初期化し(ステップS3)、LAG5をサーチする(ステップS4)。換言すれば、ステップS4において、LAG監視部115Aは、リンクアグリゲーション監視処理が未処理のLAG5が存在するか否かを判断する。LAGチェック状況格納領域は、例えばLAG監視部115Aが有するメモリ内に設けられる。
 リンクアグリゲーション監視処理が未処理のLAG5が存在しない場合、LAG監視部115Aは、予め定められた時間の経過を待って(ステップS110)、ステップS1を繰り返す。
 リンクアグリゲーション監視処理が未処理のLAG5が存在する場合、LAG監視部115Aは、リンクアグリゲーション監視処理が未処理のLAG5の中から1個のLAG5を選択して、監視部17Aから選択したLAG5についての統計情報を獲得する(ステップS5)。統計情報としては、送信OCTET数と、受信OCTET数とが獲得される。監視部17Aから獲得した送信OCTET数は「現在の送信OCTET数」であり、監視部17から獲得した受信OCTET数は「現在の受信OCTET数」である。「現在の送信OCTET数」及び「現在の受信OCTET数」は、LAGチェック状況格納領域に格納される。
 この後、LAG監視部115Aは、送信に必要なリンク数を算出する(ステップS6)。具体的には、LAG監視部115Aは、LAG管理テーブル114Aを参照して、「送信OCTET数」を取得する。LAG管理テーブル114Aから取得した送信OCTET数は「前回の送信OCTET数」である。「前回の送信OCTET数」は、LAGチェック状況格納領域に格納される。この後、LAG監視部115Aは、LAGチェック状況格納領域に格納した値を用いて、{(現在の送信OCTET数)-(前回の送信OCTET数)}を(単位時間当たりの1個のリンクの基準帯域)で割る。これにより、「送信に必要なリンク数」が算出される。単位時間当たりの1個のリンクの基準帯域は、経験的に知ることができ、予め定められる。「送信に必要なリンク数」は、LAGチェック状況格納領域に格納される。
 次に、LAG監視部115Aは、受信に必要なリンク数を算出する(ステップS7)。具体的には、LAG監視部115Aは、LAG管理テーブル114Aを参照して、「受信OCTET数」を取得する。LAG管理テーブル114Aから取得した受信OCTET数は「前回の受信OCTET数」である。「前回の受信OCTET数」は、LAGチェック状況格納領域に格納される。この後、LAG監視部115Aは、LAGチェック状況格納領域に格納した値を用いて、{(現在の受信OCTET数)-(前回の受信OCTET数)}を(単位時間当たりの1個のリンクの基準帯域)で割る。これにより、「受信に必要なリンク数」が算出される。「受信に必要なリンク数」は、LAGチェック状況格納領域に格納される。
 更に、LAG監視部115Aは、LAGチェック状況格納領域に格納した値を用いて、送信に必要なリンク数と受信に必要なリンク数とを比較して、大きい方をLAG5における「必要なリンク数」とする(ステップS8)。なお、「必要なリンク数」が「0」となった場合には、第1のネットワークスイッチ装置1と第2のネットワークスイッチ装置2との間の通信が全て遮断されるのを防ぐため、「必要なリンク数」を「1」とする。「必要なリンク数」は、LAGチェック状況格納領域に格納される。
 この後、LAG監視部115Aは、ポート状態管理テーブル113Aを参照して、LAG5に属する第1ポート12の中で、その時点でリンクアップしている第1ポート12の数を調べる(ステップS9)。換言すれば、LAG監視部115Aは、ポート状態管理テーブル113Aにおいてポート状態が「Link Up」である第1ポート12の数を、「現在のリンク数」として抽出する。「現在のリンク数」は、LAGチェック状況格納領域に格納される。
 この後、LAG監視部115Aは、LAGチェック状況格納領域に格納した値を用いて、「現在のリンク数」が「必要なリンク数」よりも小さいか否かを判断する(ステップS10)。「現在のリンク数」が「必要なリンク数」よりも小さい場合(ステップS10 Yes)、LAG監視部115Aは、第1ポート12の追加処理を実行する(ステップS11)。第1ポート12の追加処理は、実際には、LAG監視部115Aにより起動された追加処理部117Aが実行する。第1ポート12の追加処理については、図8を参照して後述する。ステップS11の後、ステップS14が実行される。
 「現在のリンク数」が「必要なリンク数」以上の場合(ステップS10 No)、LAG監視部115Aは、更に、LAGチェック状況格納領域に格納した値を用いて、「現在のリンク数」が「必要なリンク数」よりも大きいか否かを判断する(ステップS12)。「現在のリンク数」が「必要なリンク数」よりも大きい場合(ステップS12 Yes)、LAG監視部115Aは、第1ポート12の削除処理を実行する(ステップS13)。第1ポート12の削除処理は、実際には、LAG監視部115Aにより起動された削除処理部116Aが実行する。第1ポート12の削除処理については、図9を参照して後述する。ステップS13の後、ステップS14が実行される。
 「現在のリンク数」が「必要なリンク数」以下の場合(ステップS12 No)、換言すれば、「現在のリンク数」が「必要なリンク数」と等しい場合、LAG監視部115Aは、第1ポート12の交替処理を実行する。具体的には、LAG監視部115Aは、LAG管理テーブル114Aを参照して、LAG5に属する第1ポート12を抽出し(ステップS14)、ポート状態管理テーブル113Aを参照して、LAG5に属する第1ポート12の中で、リンクアップ稼働時間が基準時間を越えている第1ポート12が存在するか否かを判断する(ステップS15)。基準時間は、予め定められる。
 リンクアップ稼働時間が基準時間を越えている第1ポート12が存在しない場合(ステップS15 No)、LAG監視部115Aは、予め定められた時間の経過を待って(ステップS110)、ステップS1を繰り返す。
 リンクアップ稼働時間が基準時間を越えている第1ポート12が存在する場合(ステップS15 Yes)、LAG監視部115Aは、ポート状態管理テーブル113Aを参照して、LAG5に属する第1ポート12の中で、ポート状態が「ECO auto-poweroff」である第1ポート12が存在するか否かを判断する(ステップS16)。
 ポート状態が「ECO auto-poweroff」である第1ポート12が存在しない場合(ステップS16 No)、LAG監視部115Aは、予め定められた時間の経過を待って(ステップS110)、ステップS1を繰り返す。
 ポート状態が「ECO auto-poweroff」である第1ポート12が存在する場合(ステップS16 Yes)、LAG監視部115Aは、第1ポート12の追加処理を実行する(ステップS17)。前述したように、第1ポート12の追加処理については、図8を参照して後述する。
 この後、LAG監視部115Aは、LAG5に属する第1ポート12の状態を確認することにより、リンクアップしているリンクの数が「現在のリンク数」よりも増えていることを確認する(ステップS18)。なお、リンクアップしているリンクの数が「現在のリンク数」よりも増えていない場合には、LAG監視部115Aは、ステップS17を繰り返す。この後、LAG監視部115Aは、ステップS15において抽出したリンクアップ稼働時間が基準時間を越えている第1ポート12を指定して、第1ポート12の削除処理を実行する(ステップS19)。前述したように、第1ポート12の削除処理については、図9を参照して後述する。この後、LAG監視部115Aは、ステップS4を繰り返す。
 図8は、第1のネットワークスイッチ装置1のアグリゲーション制御部112Aが実行するポート追加処理フローである。
 アグリゲーション制御部112Aにおいて、追加処理部117Aは、ポート状態管理テーブル113Aを参照して、LAG5に属する第1ポート12の中で、ポート状態が「ECO auto-poweroff」である第1ポート12を抽出する(ステップS21)。そして、追加処理部117Aは、「ECO auto-poweroff」である第1ポート12の数が「0」であるか「1以上」であるかを判断する(ステップS22)。「ECO auto-poweroff」である第1ポート12の数が「0」である場合、追加処理部117Aは、処理を終了する。
 「ECO auto-poweroff」である第1ポート12の数が「1以上」である場合、追加処理部117Aは、「ECO auto-poweroff」である第1ポート12の中から、新たにリンクアップに追加する第1ポート12を決定する(ステップS23)。リンクアップに追加する第1ポート12は、例えば、「ECO auto-poweroff」である第1ポート12の中からランダムに選択される。
 この後、追加処理部117Aは、LAG5のリンクの更新処理を実行中であることを示すフレーム、換言すれば、LA-ECOフレームを第2のネットワークスイッチ装置2のアグリゲーション制御部112Bに送信する(ステップS24)。この時、LA-ECOフレームにおいて、「Link Training」が「1」とされる。このLA-ECOフレームは、リンクアップ開始通知である。
 この後、追加処理部117Aは、第2のネットワークスイッチ装置2のアグリゲーション制御部112Bから、送信したLA-ECOフレームに対する応答を待つ(ステップS25)。換言すれば、追加処理部117Aは、送信したLA-ECOフレームにおいて了承を示す「ACK」が「1」とされたフレームの受信を待つ。
 送信したLA-ECOフレームにおいて却下を示す「NACK」が「1」であるフレームを受信した場合、又は、何も受信することなくタイムアウトした場合、追加処理部117Aは、処理を終了する。タイムアウトの時間は予め定められる。
 送信したLA-ECOフレームにおいて「ACK」が「1」であるフレームを受信した場合、追加処理部117Aは、LAG管理テーブル114Aにおいて、LAG5についてのECO処理実行フラグを立てる(ステップS26)。更に、追加処理部117Aは、ポート状態管理テーブル113Aにおいて、ステップS23で決定したリンクアップに追加する第1ポート12の状態を、「ECO auto-poweroff」から「Link state unknown」にする(ステップS27)。更に、追加処理部117Aは、リンクアップに追加する第1ポート12のLED123を、リンクダウン状態の表示に変更する(ステップS28)。
 この後、追加処理部117Aは、スイッチ管理部111Aを介して、リンクアップに追加する第1ポート12のPHYモジュール122への電源を電源制御部16Aに供給させる(ステップS29)。換言すれば、追加処理部117Aは、スイッチ管理部111Aに対して電源制御部16Aへの電源供給の依頼を発行し、スイッチ管理部111Aは、受信した電源供給の依頼を電源制御部16Aへ送信し、電源制御部16Aは受信した電源供給を実行する。これにより、リンクアップに追加する第1ポート12のPHYモジュール122へ電源制御部16Aから電源が供給される。これに応じて、リンクアップに追加する第1ポート12がリンクアップする。また、追加処理部117Aは、ポート状態管理テーブル113Aにおいて、リンクアップに追加する第1ポート12の状態を、「Link state unknown」から「Link Up」にする。
 この後、追加処理部117Aは、LAG5のリンクの更新処理を終了したことを示すフレーム、換言すれば、LA-ECOフレームを第2のネットワークスイッチ装置2のアグリゲーション制御部112Bに送信する(ステップS210)。この時、LA-ECOフレームにおいて、「Link Training」が「0」とされる。このLA-ECOフレームは、リンクアップ終了通知である。更に、追加処理部117Aは、LAG管理テーブル114Aにおいて、LAG5についてのECO処理実行フラグを「1」から「0」に落とす(ステップS211)。
 この後、追加処理部117Aは、LAG5に属する第1ポート12の状態を確認する。確認の結果、リンクアップに追加する第1ポート12がリンクアップしなかった場合には、追加処理部117Aは、ポート状態管理テーブル113Aにおいて、リンクアップに追加する第1ポート12の状態を、「Link state unknown」から「Link Down」にして、スイッチ管理部111Aにエラー通報を依頼する(ステップS212)。
 図10は、第1のネットワークスイッチ装置1のアグリゲーション制御部112Aが実行するポート削除処理フローである。
 アグリゲーション制御部112Aにおいて、削除処理部116Aは、ポート状態管理テーブル113Aを参照して、LAG5に属する第1ポート12の中で、ポート状態が「Link Up」である第1ポート12を抽出する(ステップS31)。そして、削除処理部116Aは、「Link Up」である第1ポート12の数が「1」であるか「2以上」であるかを判断する(ステップS32)。「Link Up」である第1ポート12の数が「1」である場合、削除処理部116Aは、ポートの削除処理を終了する。
 「Link Up」である第1ポート12の数が「2以上」である場合、削除処理部116Aは、「Link Up」である第1ポート12の中から、リンクダウンさせるポートを選択する、換言すれば、リンクアップ中の第1ポート12の仲から削除する第1ポート12を決定する(ステップS33)。リンクアップから削除する第1ポート12は、例えばリンクアップ中の第1ポート12の中からランダムに選択される。なお、ポート遷移タイマ値が少ない第1ポート12を選択するようにしても良い。ポート遷移タイマ値は、「ポートに割当てられた時間」から「リンクアップ稼動時間」を引いた時間であり、ポートがリンクアップしている時間の残り時間を表す。「ポートに割当てられた時間」は、ポート遷移タイマ値が負の値にならないように、十分に長くされる。また、上位のコンピュータからリンクアップから削除する第1ポート12が指定された場合には、指定された第1ポート12がリンクアップから削除される。
 この後、削除処理部116Aは、LAG5のリンクの更新処理を実行中であることを示すフレーム、換言すれば、LA-ECOフレームを第2のネットワークスイッチ装置2のアグリゲーション制御部112Bに送信する(ステップS34)。この時、LA-ECOフレームにおいて、「Link Training」が「1」とされる。このLA-ECOフレームは、リンクダウン開始通知である。
 この後、削除処理部116Aは、第2のネットワークスイッチ装置2のアグリゲーション制御部112Bから、送信したLA-ECOフレームに対する応答を待つ(ステップS35)。換言すれば、削除処理部116Aは、送信したLA-ECOフレームにおいて了承を示す「ACK」が「1」とされたフレームの受信を待つ。
 送信したLA-ECOフレームにおいて却下を示す「NACK」が「1」とされたフレームを受信した場合、又は、何も受信することなくタイムアウトした場合、削除処理部116Aは、処理を終了する。タイムアウトの時間は予め定められる。
 送信したLA-ECOフレームにおいて「ACK」が「1」とされたフレームを受信した場合、削除処理部116Aは、LAG管理テーブル114Aにおいて、LAG5についてのECO処理実行フラグを「0」から「1」に立てる(ステップS36)。
 この後、削除処理部116Aは、スイッチ管理部111Aを介して、電源制御部16Aに、リンクアップから削除する第1ポート12のPHYモジュール122への電源供給を切断させる(ステップS37)。換言すれば、削除処理部116Aは、スイッチ管理部111Aに対して電源制御部16Aへの電源供給の切断の依頼を発行し、スイッチ管理部111Aは、受信した電源供給の切断の依頼を電源制御部16Aへ送信し、電源制御部16Aは受信した電源供給の切断を実行する。これにより、リンクアップから削除する第1ポート12のPHYモジュール122への電源供給が切断される。これに応じて、リンクアップから削除する第1ポート12がリンクダウンする。また、削除処理部116Aは、ポート状態管理テーブル113Aにおいて、リンクアップから削除する第1ポート12の状態を、「Link Up」から「ECO auto-poweroff」にする。更に、削除処理部116Aは、リンクアップから削除する第1ポート12のLED123を、ECO状態の表示とする(ステップS38)。
 この後、削除処理部116Aは、LAG5のリンクの更新処理を終了したことを示すフレーム、換言すれば、LA-ECOフレームを第2のネットワークスイッチ装置2のアグリゲーション制御部112Bに送信する(ステップS39)。この時、LA-ECOフレームにおいて、「Link Training」が「0」とされる。このLA-ECOフレームは、リンクダウン終了通知である。更に、削除処理部116Aは、LAG管理テーブル114Aにおいて、LAG5についてのECO処理実行フラグを「1」から「0」に落とす(ステップS310)。
 この後、削除処理部116Aは、ポート状態管理テーブル113Aにおいて、リンクアップから削除する第1ポート12のリンクアップ稼働時間を「0」として(ステップS311)、処理を終了する。
 図10は、第2のネットワークスイッチ装置2のアグリゲーション制御部112Bが実行するECOフレーム受信処理フローである。
 第2のネットワークスイッチ装置2のアグリゲーション制御部112Bにおいて、LAG監視部115Bは、第1のネットワークスイッチ装置1のアグリゲーション制御部112AからLA-ECOフレームを受信すると、受信したLA-ECOフレームにより指定されたLAG5をサーチする(ステップS41)。換言すれば、ステップS41において、LAG監視部115Bは、受信したLA-ECOフレームにより指定されたLAG5が存在するか否かを判断する。
 受信したLA-ECOフレームにより指定されたLAG5が存在しない場合、LAG監視部115Bは、処理を終了する。
 受信したLA-ECOフレームにより指定されたLAG5が存在する場合、LAG監視部115Bは、該当するLAG5について、実行中のリンクの更新処理があるか否かを判断する(ステップS42)。
 受信したLA-ECOフレームにより指定されたLAG5について、実行中のリンクの更新処理がない場合、LAG監視部115Bは、受信したLA-ECOフレームの「Link Training」が「1」であるか「0」であるかを判断する(ステップS43)。
 「Link Training」が「1」である場合、LAG監視部115Bは、受信したLA-ECOフレームの「ACK」が「1」であるか「0」であるかを判断する(ステップS44)。「ACK」が「0」である場合、LAG監視部115Bは、リンクの更新処理を実行する更新処理部118Bを起動して(ステップS45)、その後、処理を終了する。リンクの更新処理については、図11を参照して後述する。「ACK」が「1」である場合、LAG監視部115Bは、処理を終了する。
 ステップS43において、「Link Training」が「0」である場合、LAG監視部115Bは、受信したLA-ECOフレームの「ECO mode」を参照して、「ECO mode」の値をLAG管理テーブル114Bの「Partner ECO処理モード」に記録して(ステップS46)、処理を終了する。
 ステップS42において、受信したLA-ECOフレームにより指定されたLAG5について、実行中のリンクの更新処理がある場合、LAG監視部115Bは、受信したLA-ECOフレームの「Link Training」が「1」であるか「0」であるかを判断する(ステップS47)。
 「Link Training」が「1」である場合、LAG監視部115Bは、処理を終了する。「Link Training」が「0」である場合、LAG監視部115Bは、受信したLA-ECOフレームの「ACK」が「1」であるか「0」であるかを判断する(ステップS48)。「ACK」が「1」である場合、LAG監視部115Bは、処理を終了する。「ACK」が「0」である場合、LAG監視部115Bは、実行中のリンクの更新処理を実行中の更新処理部118Bに対して、「Link Training」が「0」であるLA-ECOフレームを受信したことを通知して(ステップS49)、処理を終了する。
 図11は、第2のネットワークスイッチ装置2のアグリゲーション制御部112Bが実行するリンク更新処理フローである。
 アグリゲーション制御部112Bにおいて、更新処理部118Bは、スイッチ管理部111Bを介して、全ての第2ポート22のPHYモジュールへ電源制御部16Bから電源を供給させる(ステップS51)。換言すれば、更新処理部118Bは、スイッチ管理部111Bに対して電源制御部16Bへの電源供給の依頼を発行し、スイッチ管理部111Bは、受信した電源供給の依頼を電源制御部16Bへ送信し、電源制御部16Bは受信した電源供給を実行する。これにより、全ての第1ポート22のPHYモジュールへ電源が供給される。
 この後、更新処理部118Bは、ポート状態管理テーブル113Bを参照して、状態が「ECO auto-poweroff」である第2ポート22のLEDを、「Link Down」の表示に変更する(ステップS52)。更に、更新処理部118Bは、状態が「ECO auto-poweroff」である第2ポート22の状態を、ポート状態管理テーブル113Bにおいて、「Link state unknown」に変更する(ステップS53)。
 この後、更新処理部118Bは、LAG管理テーブル114Bにおいて、LAG5についてのECO処理実行フラグを「0」から「1」に立てる(ステップS54)。
 この後、更新処理部118Bは、LAG5のリンクの更新処理の実行を了解することを示すフレームを第1のネットワークスイッチ装置1のアグリゲーション制御部112Aに送信する(ステップS55)。LAG5のリンクの更新処理の実行を了解することを示すフレームは、受信したLA-ECOフレームにおいて「ACK」が「1」とされたフレームである。
 この後、更新処理部118Bは、第1のネットワークスイッチ装置1のアグリゲーション制御部112Aから「Link Training」が「0」とされたLA-ECOフレームを受信するのを待つ(ステップS56)。なお、実際には、前述したように、「Link Training」が「0」とされたLA-ECOフレームは、ステップS49において検出される。
 なお、何も受信することなくタイムアウトした場合、更新処理部118Bは、処理を終了する。タイムアウトの時間は予め定められる。
 「Link Training」が「0」とされたLA-ECOフレームを受信した場合、更新処理部118Bは、LAG5に属する第2ポート22の状態を確認することにより、リンクダウンしているリンクを抽出する(ステップS57)。
 この後、更新処理部118Bは、ポート状態管理テーブル113Bにおいて、リンクダウンしている第2ポート22の状態を、「ECO auto-poweroff」に変更する(ステップS58)。
 更に、更新処理部118Bは、スイッチ管理部111Bを介して、リンクダウンしている第2ポート22のPHYモジュールへの電源制御部16Bからの電源供給を切断させる(ステップS59)。換言すれば、更新処理部118Bは、スイッチ管理部111Bに対して電源制御部16Bへの電源供給の切断の依頼を発行し、スイッチ管理部111Bは、受信した電源供給の切断の依頼を電源制御部16Bへ送信し、電源制御部16Bは受信した電源供給の切断を実行する。これにより、リンクダウンしている第2ポート22のPHYモジュールへの電源供給が切断される。
 この後、更新処理部118Bは、リンクダウンしている第2ポート22のLED、換言すれば、リンクアップから削除された第2ポート22のLEDを、ECO状態の表示とする(ステップS510)。更に、更新処理部118Bは、LAG管理テーブル114Bにおいて、LAG5についてのECO処理実行フラグを「1」から「0」に落とす(ステップS511)。そして、更新処理部118Bは、ポート状態管理テーブル113Bにおいて、リンクダウンしている第2ポート22のリンクアップ稼働時間を「0」として(ステップS512)、処理を終了する。
 図12は、リンク削除処理の説明図である。
 第1のネットワークスイッチ装置1は、リンクダウン処理に先立って、第2のネットワークスイッチ装置2にLA-ECOフレームを送信する。この時、LA-ECOフレームにおいて、「Link Training」が「1」とされる。「Link Training」が「1」であり、「ACK」が「0」であるので、このLA-ECOフレームは、リンクダウン開始通知である。
 第2のネットワークスイッチ装置2が、リンクダウン開始通知としてのLA-ECOフレームを受信した場合、これに応じて、複数の第2ポート22の電源を投入し、LAG5についてのECO処理実行フラグを立てる。
 この後、第2のネットワークスイッチ装置2が、第1のネットワークスイッチ装置1にLA-ECOフレームを送信する。この時、LA-ECOフレームにおいて、「Link Training」が「1」とされ、「ACK」が「1」とされる。「Link Training」が「1」であり、「ACK」が「1」であるので、このLA-ECOフレームは、リンクダウン開始通知に対する応答である。
 第1のネットワークスイッチ装置1は、リンクダウン開始通知に対する応答としてのLA-ECOフレームを受信した場合、これに応じて、リンクダウン処理を実行する。
 具体的には、第1のネットワークスイッチ装置1は、LAG5についてのECO処理実行フラグを立てる。その後、第1のネットワークスイッチ装置1は、LAG5の使用帯域情報に基づいて、LAG5に属する複数の第1ポート12の中で、少なくとも1個の第1ポート12の電源供給を切断する。これにより、第1のネットワークスイッチ装置1は、少なくとも1個の第1ポート12をリンクダウンする。
 更に、第1のネットワークスイッチ装置1は、使用帯域情報に基づいて電源供給を切断された少なくとも1個の第1ポート12を、リンクダウンを示すエラー通知の対象から除外する。これに応じて、第1のネットワークスイッチ装置1は、使用帯域情報に基づいて電源供給を切断された少なくとも1個の第1ポート12のLED123を、ECO状態の表示とする。
 このリンクダウン処理の後に、第1のネットワークスイッチ装置1は、第2のネットワークスイッチ装置2にLA-ECOフレームを送信する。この時、LA-ECOフレームにおいて、「Link Training」が「0」とされる。「Link Training」が「0」であり、「ACK」が「0」であるので、このLA-ECOフレームは、リンクダウン終了通知である。
 この後、第1のネットワークスイッチ装置1は、LAG5についてのECO処理実行フラグを落とす。
 第2のネットワークスイッチ装置2は、リンクダウン終了通知を受信した場合、これに応じて、LAG5に属する複数の第2ポート22の状態をチェックして、リンクダウンしている少なくとも1個の第2ポート22を抽出する。そして、第2のネットワークスイッチ装置2は、複数の第2ポート22の中で、第1ポート12のリンクダウンに応じてリンクダウンしている少なくとも1個の第2ポート22の電源供給を切断する。これにより、リンクダウンしているリンクの両端のポートの電源供給が切断される。
 更に、第2のネットワークスイッチ装置2は、第1ポート12のリンクダウンに応じたリンクダウンに基づいて電源供給を切断された少なくとも1個の第2ポート22を、リンクダウンを示すエラー通知の対象から除外する。これに応じて、第2のネットワークスイッチ装置2は、第1ポート12のリンクダウンに応じたリンクダウンに基づいて電源供給を切断された少なくとも1個の第2ポート22のLEDを、ECO状態の表示とする。
 この後、第2のネットワークスイッチ装置2は、LAG5についてのECO処理実行フラグを落とす。
 図13は、リンク追加処理の説明図である。
 第1のネットワークスイッチ装置1は、リンクアップ処理に先立って、第2のネットワークスイッチ装置2にLA-ECOフレームを送信する。この時、LA-ECOフレームにおいて、「Link Training」が「1」とされる。「Link Training」が「1」であり、「ACK」が「0」であるので、このLA-ECOフレームは、リンクアップ開始通知である。
 第2のネットワークスイッチ装置2が、リンクアップ開始通知としてのLA-ECOフレームを受信した場合、これに応じて、複数の第2ポート22の電源を投入し、LAG5についてのECO処理実行フラグを「0」から「1」に立てる。
 この後、第2のネットワークスイッチ装置2が、第1のネットワークスイッチ装置1にLA-ECOフレームを送信する。この時、LA-ECOフレームにおいて、「Link Training」が「1」とされ、「ACK」が「1」とされる。「Link Training」が「1」で「ACK」が「1」であるので、このLA-ECOフレームは、リンクアップ開始通知に対する応答である。
 第1のネットワークスイッチ装置1は、リンクアップ開始通知に対する応答としてのLA-ECOフレームを受信した場合、これに応じて、リンクアップ処理を実行する。
 具体的には、第1のネットワークスイッチ装置1は、LAG5についてのECO処理実行フラグを立てる。その後、第1のネットワークスイッチ装置1は、LAG5の使用帯域情報に基づいて、LAG5に属する複数の第1ポート12の中で、少なくとも1個の第1ポート12の電源を供給する。これにより、第1のネットワークスイッチ装置1は、前記少なくとも1個の第1ポート12をリンクアップする。
 更に、第1のネットワークスイッチ装置1は、使用帯域情報に基づいて電源を供給された少なくとも1個の第1ポート12を、リンクダウンを示すエラー通知の対象とする。これに応じて、第1のネットワークスイッチ装置1は、使用帯域情報に基づいて電源を供給された少なくとも1個の第1ポート12のLED123を、ECO状態の表示からリンクアップの表示とする。
 このリンクアップ処理の後に、第1のネットワークスイッチ装置1は、第2のネットワークスイッチ装置2にLA-ECOフレームを送信する。この時、LA-ECOフレームにおいて、「Link Training」が「0」とされる。「Link Training」が「0」であり、「ACK」が「0」であるので、このLA-ECOフレームは、リンクアップ終了通知である。
 この後、第1のネットワークスイッチ装置1は、LAG5についてのECO処理実行フラグを「1」から「0」に落とす。
 第2のネットワークスイッチ装置2は、リンクアップ終了通知を受信した場合、これに応じて、LAG5に属する複数の第2ポート22の状態をチェックして、リンクダウンしている第2ポート22を抽出する。そして、第2のネットワークスイッチ装置2は、複数の第2ポート22の中で、第1ポート12のリンクダウンに応じてリンクダウンしている第2ポート22の電源供給を切断する。これにより、新たにリンクアップしたポートを含むリンクアップしているポートを除いて、リンクダウンしているリンクの両端のポートの電源供給が切断される。
 更に、第2のネットワークスイッチ装置2は、第1ポート12のリンクダウンに応じたリンクダウンに基づいて電源供給を切断された第2ポート22を、リンクダウンを示すエラー通知の対象から除外する。これに応じて、第2のネットワークスイッチ装置2は、第1ポート12のリンクダウンに応じたリンクダウンに基づいて電源供給を切断された第2ポート22のLEDを、ECO状態の表示とする。
 この後、第2のネットワークスイッチ装置2は、LAG5についてのECO処理実行フラグを「1」から「0」に落とす。
  1  第1のネットワークスイッチ装置
  2  第2のネットワークスイッチ装置
  3、4  リンク
  5  リンクアグリゲーショングループ(LAG)
  11、21  リンクアグリゲーション制御部
  12  第1ポート
  13  データスイッチング部
  14  アグリゲータ部
  15  送受信制御部
  16  電源制御部
  17  監視部
  18  第3ポート
  22  第2ポート
  28  第4ポート
  111  スイッチ管理部
  112  アグリゲーション制御部
  121  MAC部
  122  PHYモジュール
  123  LED
  113  ポート状態管理テーブル
  114  LAG管理テーブル
  115  LAG監視部
  116  削除処理部
  117  追加処理部
  118  更新処理部

Claims (10)

  1.  第1の通信装置の複数の第1ポートと第2の通信装置の複数の第2ポートとを接続する複数のリンクを、仮想的な1個のリンクであるリンクアグリゲーショングループとして使用して、前記第1の通信装置と前記第2の通信装置との間において通信を行う通信システムの制御方法であって、
     前記第1の通信装置が、前記リンクアグリゲーショングループの使用帯域情報に基づいて、前記複数の第1ポートの中の少なくとも1個の第1ポートの電源供給を切断し前記少なくとも1個の第1ポートをリンクダウンするステップと、
     前記第1の通信装置が、前記リンクダウンするステップの後に、前記第2の通信装置にリンクダウン終了通知を送信するステップと、
     前記リンクダウン終了通知を受信した前記第2の通信装置が、前記複数の第2ポートの中のリンクダウンしている少なくとも1個の第2ポートの電源供給を切断するステップとを含む
     ことを特徴とする通信システムの制御方法。
  2.  前記第1の通信装置が、前記使用帯域情報に基づいて電源供給を切断された前記少なくとも1個の第1ポートを、リンクダウンを示すエラー通知の対象から除外し、
     前記第2の通信装置が、前記使用帯域情報に基づいて電源供給を切断された前記少なくとも1個の第1ポートのリンクダウンに応じてリンクダウンした前記少なくとも1個の第2ポートを、リンクダウンを示すエラー通知の対象から除外する
     ことを特徴とする請求項1に記載の通信システムの制御方法。
  3.  前記通信システムの制御方法が、更に、
     前記第1の通信装置が、前記リンクダウンするステップに先立って、前記第2の通信装置にリンクダウン開始通知を送信するステップと、
     前記リンクダウン開始通知を受信した前記第2の通信装置が、前記複数の第2ポートの電源を投入し、前記リンクダウン開始通知に対する応答を前記第1の通信装置に返信するステップとを含む
     ことを特徴とする請求項1に記載の通信システムの制御方法。
  4.  前記通信システムの制御方法が、更に、
     前記第1の通信装置が、前記通信システムのグループの使用帯域情報に基づいて、前記複数の第1ポートの中の少なくとも1個の第1ポートの電源を投入し前記少なくとも1個の第1ポートをリンクアップするステップと、
     前記第1の通信装置が、前記リンクアップするステップの後に、前記第2の通信装置にリンクアップ終了通知を送信するステップと、
     前記リンクアップ終了通知を受信した前記第2の通信装置が、前記複数の第2ポートの中のリンクダウンしている第2ポートの電源供給を切断するステップとを含む
     ことを特徴とする請求項1に記載の通信システムの制御方法。
  5.  前記通信システムの制御方法が、更に、
     前記第1の通信装置が、前記リンクアップするステップに先立って、前記第2の通信装置にリンクアップ開始通知を送信するステップと、
     前記リンクアップ開始通知を受信した前記第2の通信装置が、前記複数の第2ポートの電源を投入し、前記リンクアップ開始通知に対する応答を前記第1の通信装置に返信するステップとを含む
     ことを特徴とする請求項4に記載の通信システムの制御方法。
  6.  前記通信システムの制御方法が、更に、
     前記第1の通信装置が、前記通信システムのグループの使用帯域情報に基づいて必要なリンクの数を算出し、前記必要なリンクの数と現在リンクアップしているリンクの数とを比較するステップを含み、
     前記第1の通信装置が、前記比較に基づいて、前記必要なリンクの数が現在リンクアップしているリンクの数より少ない場合に前記リンクダウンするステップを実行し、前記必要なリンクの数が現在リンクアップしているリンクの数より多い場合に前記リンクアップするステップを実行する
     ことを特徴とする請求項4に記載の通信システムの制御方法。
  7.  前記通信システムの制御方法が、更に、
     前記第1の通信装置が、前記通信システムのグループの使用帯域情報に基づいて、現在リンクアップしているリンクについて、前記リンクアップしている時間が予め定められた閾値を超えているかを判断するステップを含み、
     前記第1の通信装置が、前記リンクアップしている時間が前記閾値を超えているリンクが存在する場合に、前記リンクアップするステップを実行した後に、前記リンクアップしている時間が前記閾値を超えているリンクについて、前記リンクダウンするステップを実行する
     ことを特徴とする請求項1に記載の通信システムの制御方法。
  8.  第1の通信装置の複数の第1ポートと第2の通信装置の複数の第2ポートとを接続する複数のリンクを、仮想的な1個のリンクであるリンクアグリゲーショングループとして使用して、前記第1の通信装置と前記第2の通信装置との間において通信を行う通信システムであって、
     前記リンクアグリゲーショングループの使用帯域情報に基づいて、前記複数の第1ポートの中の少なくとも1個の第1ポートの電源供給を切断し前記少なくとも1個の第1ポートをリンクダウンし、前記第2の通信装置にリンクダウン終了通知を送信する第1の通信装置と、
     前記リンクダウン終了通知を受信した前記第2の通信装置が、前記複数の第2ポートの中のリンクダウンしている少なくとも1個の第2ポートの電源供給を切断する第2の通信装置とを含む
     ことを特徴とする通信システム。
  9.  複数のリンクを、仮想的な1個のリンクであるリンクアグリゲーショングループとして使用して、他の通信装置との間において通信を行う通信装置であって、
     前記複数のリンクを介して、他の通信装置の複数の第2のポートと接続される複数の第1のポートと、
     前記リンクアグリゲーショングループの使用帯域情報に基づいて、前記複数の第1のポートの中の少なくとも1個の第1のポートの電源供給を切断し前記少なくとも1個の第1のポートをリンクダウンし、前記他の通信装置にリンクダウン終了通知を送信するリンクアグリゲーション制御部とを含む
     ことを特徴とする通信装置。
  10.  複数のリンクを、仮想的な1個のリンクであるリンクアグリゲーショングループとして使用して、他の通信装置との間において通信を行う通信装置であって、
     前記複数のリンクを介して、他の通信装置の複数の第1のポートと接続される複数の第2のポートと、
     前記他の通信装置から、前記リンクアグリゲーショングループの使用帯域情報に基づいて前記複数の第1のポートの中の少なくとも1個の第1のポートの電源供給を切断し前記少なくとも1個の第1のポートをリンクダウンしたことを示す、リンクダウン終了通知を受信し、前記複数の第2ポートの中のリンクダウンしている少なくとも1個の第2ポートの電源供給を切断するリンクアグリゲーション制御部とを含む
     ことを特徴とする通信装置。
PCT/JP2010/070331 2010-11-16 2010-11-16 通信システムの制御方法、通信システム、通信装置 WO2012066625A1 (ja)

Priority Applications (4)

Application Number Priority Date Filing Date Title
PCT/JP2010/070331 WO2012066625A1 (ja) 2010-11-16 2010-11-16 通信システムの制御方法、通信システム、通信装置
JP2012544024A JP5534026B2 (ja) 2010-11-16 2010-11-16 通信システムの制御方法、通信システム、通信装置
EP10859681.8A EP2642699A1 (en) 2010-11-16 2010-11-16 Method of controlling communication system, communication system, communication device
US13/892,343 US20130250829A1 (en) 2010-11-16 2013-05-13 Method for controlling communication system, communication system, and communication apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/JP2010/070331 WO2012066625A1 (ja) 2010-11-16 2010-11-16 通信システムの制御方法、通信システム、通信装置

Related Child Applications (1)

Application Number Title Priority Date Filing Date
US13/892,343 Continuation US20130250829A1 (en) 2010-11-16 2013-05-13 Method for controlling communication system, communication system, and communication apparatus

Publications (1)

Publication Number Publication Date
WO2012066625A1 true WO2012066625A1 (ja) 2012-05-24

Family

ID=46083591

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2010/070331 WO2012066625A1 (ja) 2010-11-16 2010-11-16 通信システムの制御方法、通信システム、通信装置

Country Status (4)

Country Link
US (1) US20130250829A1 (ja)
EP (1) EP2642699A1 (ja)
JP (1) JP5534026B2 (ja)
WO (1) WO2012066625A1 (ja)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102916899A (zh) * 2012-09-28 2013-02-06 华为技术有限公司 一种Trunk组网下的节能方法和装置
WO2015141467A1 (ja) * 2014-03-17 2015-09-24 日本電気株式会社 受信装置、回線数認識回路、回線数認識方法及びプログラム
JP2018519728A (ja) * 2015-05-21 2018-07-19 ホアウェイ・テクノロジーズ・カンパニー・リミテッド トランスポートソフトウェアデファインドネットワーキング(sdn)−論理リンクアグリゲーション(lag)メンバ信号伝達
JP2019092122A (ja) * 2017-11-16 2019-06-13 富士通株式会社 中継装置及びプログラム
US10425319B2 (en) 2015-05-21 2019-09-24 Huawei Technologies Co., Ltd. Transport software defined networking (SDN)—zero configuration adjacency via packet snooping

Families Citing this family (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102364892B (zh) * 2011-10-12 2013-04-24 华为技术有限公司 一种lacp链路切换、数据传输方法与装置
US9608899B2 (en) * 2011-11-21 2017-03-28 Qualcomm Incorporated Packet-based aggregation of data streams across disparate networking interfaces
CN102769568B (zh) * 2012-07-19 2015-10-21 中兴通讯股份有限公司 一种基于虚拟交换集群的流量转发方法及系统
CN104283724B (zh) * 2014-10-31 2017-10-27 大唐移动通信设备有限公司 一种聚合组状态的管理方法和设备
US9548892B2 (en) * 2015-01-26 2017-01-17 Arista Networks, Inc. Method and system for preventing polarization in a network
US10171306B2 (en) * 2015-02-26 2019-01-01 Cisco Technology, Inc. Automatic discovery and provisioning of multi-chassis etherchannel peers
US10565041B2 (en) * 2017-05-19 2020-02-18 Western Digital Technologies, Inc. Managing phys of a data storage target device
US11088963B2 (en) * 2019-12-16 2021-08-10 Dell Products L.P. Automatic aggregated networking device backup link configuration system
US11652753B2 (en) * 2020-07-29 2023-05-16 Hewlett Packard Enterprise Development Lp Link aggregation group optimization
CN112260901B (zh) * 2020-10-23 2022-05-03 北京信而泰科技股份有限公司 网络损伤仪和网络损伤仪的使用方法
CN112468393B (zh) * 2020-11-04 2022-09-09 烽火通信科技股份有限公司 基于链路eee和功耗选择转发端口的方法、装置与电子设备

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004349764A (ja) 2003-05-20 2004-12-09 Nec Corp リンクアグリゲーション冗長化方法、システム、プログラム、及びネットワーク中継装置
WO2007029297A1 (ja) * 2005-09-02 2007-03-15 Fujitsu Limited ネットワークインタフェース制御プログラムおよびネットワークインタフェース制御装置
JP2008252282A (ja) 2007-03-29 2008-10-16 Kyocera Corp 無線基地局装置

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7327748B2 (en) * 2002-01-28 2008-02-05 Alcatel Lucent Enterprise switching device and method
JP2006005437A (ja) * 2004-06-15 2006-01-05 Fujitsu Ltd トラフィック分散制御装置
US7729361B2 (en) * 2006-02-24 2010-06-01 Cisco Technology, Inc. Method and system for power-efficient adaptive link aggregation
US7813341B2 (en) * 2008-01-29 2010-10-12 International Business Machines Corporation Overhead reduction for multi-link networking environments
JP5513342B2 (ja) * 2010-02-26 2014-06-04 アラクサラネットワークス株式会社 パケット中継装置
CN102792657A (zh) * 2010-03-01 2012-11-21 日本电气株式会社 传送装置、传送方法和传送系统
US20130003549A1 (en) * 2011-06-30 2013-01-03 Broadcom Corporation Resilient Hashing for Load Balancing of Traffic Flows

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004349764A (ja) 2003-05-20 2004-12-09 Nec Corp リンクアグリゲーション冗長化方法、システム、プログラム、及びネットワーク中継装置
WO2007029297A1 (ja) * 2005-09-02 2007-03-15 Fujitsu Limited ネットワークインタフェース制御プログラムおよびネットワークインタフェース制御装置
JP2008252282A (ja) 2007-03-29 2008-10-16 Kyocera Corp 無線基地局装置

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
YOSHIYUKI KAWANO ET AL.: "LACP Based Dynamic Link Control Scheme for Energy Efficient Ethernet", IEICE TECHNICAL REPORT, IN2007- 216, vol. 107, no. 525, 28 February 2008 (2008-02-28), pages 343 - 348, XP008170493 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102916899A (zh) * 2012-09-28 2013-02-06 华为技术有限公司 一种Trunk组网下的节能方法和装置
WO2015141467A1 (ja) * 2014-03-17 2015-09-24 日本電気株式会社 受信装置、回線数認識回路、回線数認識方法及びプログラム
JP2018519728A (ja) * 2015-05-21 2018-07-19 ホアウェイ・テクノロジーズ・カンパニー・リミテッド トランスポートソフトウェアデファインドネットワーキング(sdn)−論理リンクアグリゲーション(lag)メンバ信号伝達
US10425319B2 (en) 2015-05-21 2019-09-24 Huawei Technologies Co., Ltd. Transport software defined networking (SDN)—zero configuration adjacency via packet snooping
JP2019092122A (ja) * 2017-11-16 2019-06-13 富士通株式会社 中継装置及びプログラム
JP7020070B2 (ja) 2017-11-16 2022-02-16 富士通株式会社 中継装置及びプログラム

Also Published As

Publication number Publication date
JP5534026B2 (ja) 2014-06-25
EP2642699A1 (en) 2013-09-25
JPWO2012066625A1 (ja) 2014-05-12
US20130250829A1 (en) 2013-09-26

Similar Documents

Publication Publication Date Title
JP5534026B2 (ja) 通信システムの制御方法、通信システム、通信装置
US9143890B2 (en) Network, master, hub and method for providing a bluetooth infrastructure
US8971337B2 (en) Packet relay device
US8400912B2 (en) Activating a tunnel upon receiving a control packet
US6681248B1 (en) Method for port connectivity discovery in transparent high bandwidth networks
CN102055525B (zh) 环路检测和控制方法
US7719956B2 (en) Trunk network system for multipoint-to-multipoint relay
US9385944B2 (en) Communication system, path switching method and communication device
CN104301146A (zh) 软件定义网络中的链路切换方法和装置
CN103209099B (zh) 一种节点间的网络通信线路的自动切换保护方法
CN102724030A (zh) 一种高可靠性的堆叠系统
JP2012522455A (ja) エネルギー効率のよいイーサネット・ネットワーク・ノードおよびイーサネット・ネットワーク・ノードの使用方法
CN111654435B (zh) 一种基于lacp的链路保护故障处理系统及方法
CN105340230A (zh) 虚拟机架拓扑管理
CN105656645A (zh) 堆叠系统的故障处理的决策方法和装置
US8279752B1 (en) Activating tunnels using control packets
CN103227725A (zh) 一种防火墙双机备份的方法及装置
CN106936510B (zh) 调节光功率的方法、网络设备和网管设备
CN101340377B (zh) 一种用于二层网络数据传输的方法、装置及其系统
JP5974911B2 (ja) 通信システムおよびネットワーク中継装置
US7860090B2 (en) Method for processing LMP packets, LMP packet processing unit and LMP packet processing node
CN102064956A (zh) 老化时间的调整方法及系统、调制解调器
CN104468234A (zh) 一种光纤网络和无线Mesh网络双备份的高鲁棒通信网络
JP2016535950A (ja) ポートステータス同期化方法、関連のデバイス、及びシステム
US20130064130A1 (en) Method for dynamically adjusting switching loop and network equipment

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 10859681

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 2012544024

Country of ref document: JP

Kind code of ref document: A

WWE Wipo information: entry into national phase

Ref document number: 2010859681

Country of ref document: EP

NENP Non-entry into the national phase

Ref country code: DE