WO2012039626A1 - Production monitoring system and method - Google Patents

Production monitoring system and method Download PDF

Info

Publication number
WO2012039626A1
WO2012039626A1 PCT/NO2011/000265 NO2011000265W WO2012039626A1 WO 2012039626 A1 WO2012039626 A1 WO 2012039626A1 NO 2011000265 W NO2011000265 W NO 2011000265W WO 2012039626 A1 WO2012039626 A1 WO 2012039626A1
Authority
WO
WIPO (PCT)
Prior art keywords
production
injection
measurement signals
processes
computing hardware
Prior art date
Application number
PCT/NO2011/000265
Other languages
French (fr)
Inventor
Arild BØE
Original Assignee
Epsis As
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Epsis As filed Critical Epsis As
Priority to AU2011306526A priority Critical patent/AU2011306526B2/en
Priority to EP11827029.7A priority patent/EP2619636B1/en
Priority to BR112013006608-3A priority patent/BR112013006608A2/en
Publication of WO2012039626A1 publication Critical patent/WO2012039626A1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B44/00Automatic control systems specially adapted for drilling operations, i.e. self-operating systems which function to carry out or modify a drilling operation without intervention of a human operator, e.g. computer-controlled drilling systems; Systems specially adapted for monitoring a plurality of drilling variables or conditions
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B47/00Survey of boreholes or wells
    • E21B47/06Measuring temperature or pressure

Definitions

  • a contemporary problem is that software tools for controlling oil and/or gas production systems are insufficiently evolved for coping with complex dynamic characteristics of spatially-extensive porous oil and/or gas wells, namely a system of producers and injectors operating in conjunction with a heterogeneous porous medium.
  • the pressure p G within the formation 30 is defined by P G (x, y, z, t) wherein z, y, z are Cartesian coordinates for defining a region including the formation 30, and f denotes time.
  • the inventors of the present invention have devised improved methods of monitoring and controlling the system 10 as depicted in FIG. 5.
  • a conventional simulated approach for monitoring and controlling oil and gas production systems is to utilize multi-parameter input and output models based upon a conversion matrix for monitoring and controlling the systems.
  • such a simulated approach becomes too complex and computationally intensive, even when considerable computing power is applied to implement the simulated approach.
  • methods pursuant to the present invention are more efficient and are potentially susceptible to being implemented using relatively modest computing resources.
  • the present invention employs, in overview, a form of algorithm 300 as depicted in FIG. 7.
  • the algorithm 300 includes:
  • the set of parameters J j in Equations 3 and 4 corresponds closely to an injectivity index and a productivity index. These indices are defined by physical properties of the fluids conveyed via the boreholes 20A, 20B and also porosity characteristics of the geological formation 30. Moreover, the set of parameters K j , and K jp represent an interaction between a well 80 " and an injector well 80A " or a producing well 80B “p", namely as depicted in FIG. 5.

Abstract

A production monitoring system (10) comprises a plurality of injection and production units (80) coupled in operation to sensors (410) for measuring physical processes occurring in operation in the injection and production units (80) and generating corresponding measurement signals (420) for computing hardware (400). The computing hardware (400) is operable to execute software products (300) for processing the signals (420). Moreover, the software products (300) are adapted for the computing hardware (400) to analyse the measurement signals (420) to abstract a parameter representation of the measurement signals (420), and to apply a temporal analysis of the parameters to identify temporally slow processes and temporally fast processes therein, and to employ information representative of the slow processes and fast processes to control a management process for controlling operation of the system (10).

Description

PRODUCTION MONITORING SYSTEM AND METHOD
Technical field of invention
The present invention relates to production monitoring systems for monitoring production and injection from a configuration of oil and/or gas wells. Moreover, the invention concerns methods of monitoring aforesaid oil and/or gas wells for controlling operation of the wells. Furthermore, the invention relates to software products recorded on machine-readable data storage media, wherein the software products are executable upon computing hardware for implementing the aforementioned methods.
Background to the invention
Referring to FIG. 1 , a contemporary oil and/or gas production system 10 includes multiple production and injection wells 80 including corresponding boreholes 20 penetrating into an underground geological formation 30 bearing an oil deposit 40 and/or a gas deposit 50. Often, the geological formation 30 corresponds to one or more anticlines 60 which form a natural containment for the oil deposit 40 and/or gas deposit 50. The geological formation 30 is usually highly heterogeneous. The deposits 40, 50 are often contained within regions of porous rock with multiple fissures, cavities and structural weaknesses which define maximum pressures which can be sustained by the regions during oil and/or gas extraction. Excessive pressure applied to the geological formation 30, for example via water injection, can risk causing multiple unwanted fractures, namely "out of zone" fractures. When the geological formation 30 is associated with the system 10 being offshore, fracturing of boreholes 20 of the system 10 can cause multiple seabed surface fissures which can leak water and/or hydrocarbons, namely potentially causing severe environmental pollution in an offshore environment. Such an event of multiple seabed surface fissures is believe to have occurred in the Gulf of Mexico in connection with the oil rig Deepwater Horizon, April 2010.
A contemporary problem is that software tools for controlling oil and/or gas production systems are insufficiently evolved for coping with complex dynamic characteristics of spatially-extensive porous oil and/or gas wells, namely a system of producers and injectors operating in conjunction with a heterogeneous porous medium.
During recent years, oil and gas production systems have evolved to use real time data to an increasing extent. As sensor technology has become more reliable, engineers operating these systems are increasingly desirous to receive downhole sensor data such as pressure and temperature, acoustic noise data for sand detection, multiphase flow and similar. These sensor data provide the engineers with valuable information regarding the system and are employed both for detecting occurrence of various events, for example sand bursts, and to optimize production.
Control of oil and/or gas production systems 10 having multiple input and output parameters has been previously described in a published international PCT patent application no. WO2008/1001 8A2 (Nordtvedt & Midttund, Epsis AS). When these systems 10 exhibit complex dynamic characteristics with potentially abrupt temporal phenomena occurring, correct and safe control of the systems 10 requires special attention for achieving optimal production performance whilst simultaneously ensuring that safe and reliable operation is achieved. A difficulty arising is that contemporary software tools for controlling the system 10 are insufficiently capable of coping with large amounts of dynamically-acquired data, such that control and operation of the system 10 risks being compromised
Summary of the invention
The present invention seeks to provide an improved production monitoring system for providing enhanced control of complex oil and/or gas production systems.
The present invention seeks to provide an improved method of monitoring a complex production system comprising a plurality of producers and injectors operating in association with a heterogeneous porous medium.
According to a first aspect of the present invention, there is provided a production monitoring system as defined in claim 1 : there is provided a production monitoring system comprising a plurality of injection and production units coupled in operation to sensors for measuring physical processes occurring in operation in the injection and production units and generating corresponding measurement signals for computing hardware, wherein the computing hardware is operable to execute software products for processing the signals, characterized in that the software products are adapted for the computing hardware to analyse the measurement signals to abstract a parameter representation of the measurement signals, and to apply a temporal analysis of the parameters to identify temporally slow processes and temporally fast processes therein, and to employ information representative of the slow processes and fast processes to control a management process for controlling operation of the system.
The invention is of advantage in that analyzing the signals from the injection and production units into a plurality of temporal processes of mutually different time durations provides valuable insight into operation of the injection and production units and thereby enables the injection and production units to be controlled better.
Optionally, in the production monitoring system, the injection and production units have associated therewith production and injection rates (rA, rB), together with upper and lower borehole pressures (pu, pL) as the sensor signals, and the management processes is adapted to control the injection and production units in respect of one or more of: production rate, operating safety, maintenance requirement. Optionally, in the production monitoring system, the temporal analysis involves applying a temporal filter for analysing temporal characteristics of the measurement signals by modelling the measurement signals, and determining deviations between the measurement signals and corresponding modelled measurement signals for identifying the temporally fast processes. More optionally, the temporal filter employs a Kalman filter. Yet more optionally, the Kalman filter is formulated for N, injectors and Np producers as expressed by Equation 1
(Eq. 1):
∑κ .γ,(ή+∑κ„.γρ( +ρ;(ή Eq. 1
dt P wherein
K = parameters of the system;
Y = an output variable, measured response of the system;
P* = input variables to the system, namely pressure gradient to the system;
t = time; and
ij = reference indices, and wherein the output variable Y is defined by Equation 2 (Eq. 2) and Equation 3 (Eq. 3):
Figure imgf000005_0001
Figure imgf000005_0002
wherein Equation 4 (Eq. 4) defines a time derivative of the output variable: wherein
Jj= set of parameters associated wit the system; and
Qj = flow rate
Optionally, in the production monitoring system, the analysis is adapted for determining interaction between the injection and production units when intercepting a formation which is mutually common to the injection and production units.
Optionally, in the production monitoring system, the injection and production units include at least one of: oil and/or gas wells, multiple apparatus in a production facility, continuous mining facilities, geological water extraction facilities.
According to a second aspect of the invention, there is provided a method of monitoring a plurality of injection and production units, characterized in that the method includes:
(a) using sensors coupled to the injection and production units for measuring physical processes occurring in operation in the injection and production units and generating corresponding measurement signals for computing hardware, wherein the computing hardware is operable to execute software products for processing the signals;
(b) using computing hardware executing the software products to analyse the measurement signals to abstract a parameter representation of the measurement signals;
(c) using the computing hardware to apply a temporal analysis of the parameters to identify temporally slow processes and temporally fast processes therein; and
(d) employing information representative of the slow processes and fast processes to control a management process for controlling operation of the system.
Optionally, the method includes the injection and production units having associated therewith production and injection rates (rA, rB), together with upper and lower borehole pressures (pu, pL) as the sensor signals, and the management processes being operable to control the injection and production units in respect of one or more of: production rate, operating safety, maintenance requirement. Optionally, the method includes the temporal analysis involving applying a temporal filter for analysing temporal characteristics of the measurement signals by modelling the measurement signals, and determining deviations between the measurement signals and corresponding modelled measurement signals for identifying the temporally fast processes. More optionally, the temporal filter employs a Kalman filter. According to a third aspect of the invention, there is provided a software product recorded on a machine-readable data storage medium, wherein the software product is executable on computing hardware for implementing a method pursuant to the second aspect of the invention. Description of the diagrams
Embodiments of the present invention will now be described, by way of example only, with reference to the following diagrams wherein:
FIG. 1 is an illustration of a contemporary oil and/or gas production system including multiple wells and boreholes;
FIG. 2 is a temporal graph illustrating production performance characteristics of the system of FIG. 1 ;
FIG. 3 is a simple representation of a pair of boreholes of the system of FIG. 1 ;
FIG. 4 is a more complex representation of a pair of boreholes of the system of FIG.
1;
FIG. 5 is a complex representation of the system of FIG. 1 with n pairs of injection and production boreholes;
FIG. 6 is an illustration of a contemporary temporal characteristic of the system of
FIG. 1 subject to periods of quasi-constant production interspersed with periodic well testing;
FIG. 7 is an illustration of functions included within a method of monitoring and controlling the system of FIG. 1 ; and
FIG. 8 is an illustration of the system of FIG. 1 coupled to computing hardware operable to execute software products for implementing a method pursuant to the present invention.
In the accompanying diagrams, an underlined number is employed to represent an item over which the underlined number is positioned or an item to which the underlined number is adjacent. A non-underlined number relates to an item identified by a line linking the non- underlined number to the item. When a number is non-underlined and accompanied by an associated arrow, the non-underlined number is used to identify a general item at which the arrow is pointing. Description of embodiments of the invention
Referring to FIG. 1 as described in the foregoing, the boreholes 20A, 20B are associated with wells 80A, 80B respectfully. The well 80A is employed to inject fluid, whereas the well 80B is employed to receive fluid from the geological formation 30. The geological formation 30 is usually heterogeneous in spatial nature. Temporally, the geological formation 30 exhibits a changing behaviour as depicted in FIG. 2 when fluid is removed from the formation 30 as denoted by a curve 120, wherein an abscissa axis 100 denotes time t, and an ordinate axis 110 represents a rate r of production of oil and/or gas from the geological formation 30. Initially, the oil deposit 40 and the gas deposit 50 will be under considerable natural pressure resulting in the well 80B producing oil and/or gas without the well 80A being required to inject fluid into the geological formation 30. Eventually, an apex 130 corresponding to maximum production rate is reached. After the apex 130, fluid increasingly has to be injected via the well 80A to maintain the production rate r from the well 80B. As the production rate r falls after the apex 130, a trajectory as denoted by 140 is eventually followed, unless advanced extraction techniques are used to flush out last remaining oil and gas from the geological formation 30 as denoted by a curve 150. For example, many older oil wells in Saudi Arabia are now believed to be past their apex 130, and Saudi Arabia is increasingly seeking oil and gas offshore in order to satisfy World demand for oil and gas. FIG. 2 represents a simple overview of production characteristics over a lifetime of the system 10 in respect of the borehole 20B adapted to extract fluid at a rate rB from the geological formation 30. For purposes of analysis, the system 10 can be represented as an equivalent electrical circuit as presented in FIG. 3, wherein pA represents a pressure developed by the well 80A in its borehole 20A, and pB represents a pressure developed by the well 80B in its borehole 20B. A flow resistance /cA corresponds to that of a spatial region near a distal end of the borehole 20A, and a flow resistance kB corresponds to that of a spatial region near a distal end of the borehole 20B. The geological formation 30 is typically porous such that the oil deposit 40 and the gas deposit 50 are included within pores and cavities of the geological formation 30; the formation 30 has a spatial capacity denoted by cG and has an equivalent pressure pG. Initially, the pressure pG is high from natural causes and will assist to maintain the production rate rB prior to the apex 130. Beyond the apex 130, the borehole 20A must be maintained under elevated pressure relative to the borehole 20B, in other words pA > PB, in order to maintain oil and gas production after the apex 130. After the apex 130, insufficient flow through the geological formation 30 can result in sedimentation and potential blockage, for example due to sand; conversely, excess pressure in the geological formation 30 can result in unwanted fracture. However, FIG. 3 is a gross simplification of a real oil and/or gas well. Moreover, the flow resistances / A, kB can be dynamically changing, for example due to sedimentation, fracture of porous fissures, and opening of fissures as oil is removed. Similarly, the capacity cG of the geological region can also be temporally varying during oil and gas extraction. The mean pressure pG of the geological formation 30 will not be directly determinable without an additional borehole being drilled which is expensive. Already from FIG. 3, it will be appreciated that an oil and/or gas well is a complex entity to measure, monitor and analyze.
In practice, pressures can be conveniently measured at top and bottom regions of the boreholes 20A, 20A; these pressures will be referred to as pAu and pAL for the borehole 20A, and PBU and pBL for the borehole 20B. Moreover, the boreholes 20A, 20B will themselves represent flow resistance hA, hB respectively to fluid flow therethrough. For example, in a case of directional drilling as contemporarily often employed in the North Sea, the boreholes 20A, 20B can be many kilometres long. If t is employed to denote time, a better representation for FIG. 1 is provided in FIG. 4. Thus, the flow resistances hA, kA, hB, kB as well as the capacity cG are potentially partially random functions of time t. Such complexity potentially renders the system 10 difficult to control for achieving optimal oil and/or gas production. However, such complexity extends beyond an equivalent model as represented in FIG. 4 on account of a real oil and gas producing system 10 being spatially extensive and intercepted by multiple pairs of boreholes 20, for example as represented in FIG. 5. In FIG. 5, there are n pairs of boreholes 20 which all communicate to varying extents with the geological formation 30. When the system 10 is implemented as a large production system, there are often many wells 80, and the formation 30 associated with the platforms 80 can include interlinked regions whose properties change in a complex temporal manner during oil and/or gas extraction. In practice, a complex array of boreholes 20 serves the geological formation 30 including many mutually coupled anticlines and layers of strata which exhibit unpredictable temporally varying flow resistance characteristics during oil and/or gas extraction therefrom, such that an equivalent model as illustrated in FIG. 5 is more pertinent to employ when attempting to monitor and control the system 10. It will be appreciated that optimal control of system 10 as depicted in FIG. 5 is highly complex, for example on account of the pressure pG within the geological formation 30 being a function of spatial location within formation 30. Conveniently, the pressure pG within the formation 30 is defined by PG(x, y, z, t) wherein z, y, z are Cartesian coordinates for defining a region including the formation 30, and f denotes time. The inventors of the present invention have devised improved methods of monitoring and controlling the system 10 as depicted in FIG. 5. A conventional simulated approach for monitoring and controlling oil and gas production systems is to utilize multi-parameter input and output models based upon a conversion matrix for monitoring and controlling the systems. However, such a simulated approach becomes too complex and computationally intensive, even when considerable computing power is applied to implement the simulated approach. In contradistinction, methods pursuant to the present invention are more efficient and are potentially susceptible to being implemented using relatively modest computing resources.
In the foregoing, the borehole 20A operable as an "injector" and the borehole 20B operable as a "producer" enable oil and/or gas production to occur. Continuous measurements of borehole distal pressure, namely PLA, PLB, and borehole proximate pressure (wellhead pressure), namely PUA, PUB, are made, together with measures of flow rates rA, rB for the "injector" and "producer" respectively. It is conventional operating practice to obtain information about the system 10 by maintaining the flow rates r temporally quasi-constant within the system 10, and to execute periodic tests 200 as illustrated in FIG. 6. In FIG. 6, an abscissa axis 210 denotes time t, and an ordinate axis 220 denotes a parameter of the system 10, for example well-head proximate pressure. The tests 200 conventionally involve applying a step perturbation change in flow rate r by applying a step change in one or more of the flow resistance hA and/or hB, or by changing the proximate wellhead pressures pAu> PBU A response of the system 10 to the step change perturbation at each well 80 provides insight into the flow resistances kA, kB, and also the capacity cG for each well 80, namely for a portion of the geological region 30 associated with the wells 80A, 80B. For example, a time constant associated with an exponential pressure response to a step change in flow rate r provides an indication of the capacity CG, and a magnitude of the pressure response provides an indication of the flow resistances kA, kB associated with the wells 80. However, such a quasi-constant measurement is only approximate when the geological formation 30 is extensive, porous and is intersected by multiple sets of boreholes 20. A problem with such a conventional approach to testing boreholes 20 of a complex oil and/or gas production system is that, as illustrated in FIG. 6, various discrete temporal events can occur which can influence borehole operation significantly in periods between tests 200. Moreover, it is uneconomical and/or undesirable to increase a frequency of the tests 200 on account of them being disruptive to production.
The inventors have appreciated, when controlling the system 10 including multiple pairs of mutually interacting boreholes 20, that it is desirable to monitor several parameters, for example sand content in the flow rB in the borehole 20B by way of acoustic measurement. Moreover, it is also desirable to monitor other parameters including: (i) productivity of the borehole 20B, namely how much oil and/or gas is being produced in the flow rB;
(ii) injectivity of the borehole 20A, namely an indication of the resistance kA; and
(iii) a pressure within the borehole 20 as represented by one or more of the pressures
Figure imgf000011_0001
These parameters are important to take into consideration for optimizing, planning and for determining an amount of personnel support which is required for given wells 80A, 80B associated with corresponding boreholes 20A, 20B. It will be appreciated that certain wells 80 optionally only have a single associated borehole 20, whereas other wells 80 optionally have two or more boreholes 20, for example in a situation of expensive offshore platforms where directional drilling is employed. The inventors have found that episodic testing can adversely influence production from the system 10. Moreover, such episodic testing is also often insufficiently representative of continuous parameter temporal changes and/or sudden parameter temporal changes. When operating the system 10, for example implemented as a complex configuration of wells 80 and associated boreholes 20 serving the geological formation 30, it is desirable to maintain constant rates of productivity, injectivity and reservoir pressure pG.
The present invention employs, in overview, a form of algorithm 300 as depicted in FIG. 7. The algorithm 300 includes:
(a) a first function 310 concerned with historical values of measured parameters, for example flow rate "Q" (which is representative of the flow rate ή, pressure P (representative of one or more of the pressures pAu, PAL, PBU, PBL);
(b) a second function 320 concerned with a conversion of measured parameters from the first function 310 to corresponding working abstract parameters for use in the algorithm 300;
(c) a third function 330 concerned with employing a Kalman filter for estimating fast and slow processes occurring within the facility 10 by processing converted parameters from the second function 320; and
(d) a fourth function 340 concerned with response modelling and prediction based upon identified fast and slow processes from the third function 330.
The functions 310, 320, 330, 340 are optionally executed concurrently and feed data between them on a continuous basis. Alternatively, the functions 310, 320, 330, 340 are executed in sequence which is repeated by way of a return 350 from the fourth function 340 back to the first function 310. The algorithm 300 will now be elucidated in further detail. A Kalman filter is a mathematical method which uses measurements that are observed in respect of time t that contain random variations, namely "noise", and other inaccuracies, and produces values that tend to be closer to true values of the measurements and their associated computed values. The Kalman filter produces estimates of true values of measurements and their associated computed values by predicting a value, estimating an uncertainty of the predicted value, and then computing a weighted average of the predicted value and the measured value. Most weight in the Kalman filter is given to the computed value of least uncertainty. Estimates produced by Kalman filters tend to be closer to true values than the original measurements because the weighted average has a better estimated uncertainty than either of the values that went into computing the weighted average.
Referring to FIG. 8, the algorithm 300 is based on a Kalman filter formulation of an oil and/or gas production system 10 having Λ/, injectors and Np producers. Downhole distal pressure measurements PLA, PLB as well as wellhead proximate pressure measurements PUA, PUB in the injector and producer boreholes 20A, 20B are made available to the algorithm 300. In certain situations, only wellhead proximate pressures pUA, PUB are measured and corresponding data is supplied to the algorithm 300. The algorithm 300 is also provided with measurements of injection and production flow rates rA, rB as a function of time t. The injection and production flow rates rA, rB are beneficially measured using at least one of: ultrasonic measurement sensors, electromagnetic measurement sensors, pressure difference sensors associated with a flow resistance (for example a flow orifice or section of pipe). The Kalman filter formulation for Λ/, injectors and Np producers is expressed by Equation 1 (Eq. 1): i j p wherein
K = parameters of the system 10;
Y = output variable, measured response of the system 10;
P* = input variables to the system 10, namely pressure gradient to the system 10;
t = time; and
i,j = reference indices, and wherein the output variable Y is defined by Equation 2 (Eq. 2) and Equation 3 (Eq. 3):
Figure imgf000013_0001
wherein Equation 4 (Eq. 4) defines a time derivative of the output variable:
Figure imgf000013_0002
wherein
Jj= set of parameters associated wit the system 10.
The set of parameters Jj in Equations 3 and 4 corresponds closely to an injectivity index and a productivity index. These indices are defined by physical properties of the fluids conveyed via the boreholes 20A, 20B and also porosity characteristics of the geological formation 30. Moreover, the set of parameters Kj, and Kjp represent an interaction between a well 80 " and an injector well 80A " or a producing well 80B "p", namely as depicted in FIG. 5.
In the aforementioned formulation, the time derivative of the output variable Y is affected by combination of pressure gradient, P*, related to the well 80 "/', ana" an influence from all system 10 variables at the time "r", including an influence from the well 80 "/' itself. In practice, the pressure gradient P* is susceptible to cause rapid changes as well as slow changes in operation of the system 10, whereas interactions between wells 80 are found normally to cause slow changes. Separating influences of fast processes within the system 10 from slow processes therein is significant for reducing a computational load when using the algorithm 300 to monitor and control the system 10.
In respect of slow changes occurring within the system 10, these are referred to as being "semi steady state" or "quasi steady state". A semi steady state for the system 10 and its associated geological formation 30 is defined as an operating condition wherein a rate of change of pressure within the geological formation 30 is independent of spatial location within the formation 30. Typically, the geological formation 30 achieves a semi steady state once initial pressure gradients have propagated within the geological formation 30 to reach its peripheral boundaries. It is feasible for the semi steady state to be a dynamic description, but its associated time scales need to be longer than a time frame in which transient events, for example transient pressure events, occur within the geological formation 30, for example at least a factor of 3 times difference in respective time frames, more preferably at least a factor of 10 times difference in respective time frames.
Referring to Equation 1 (Eq. 1) above:
(a) an interaction part thereof represents changes in respect of time t regarding an effective pressure within the geological formation 30, namely "reservoir pressure", as it is manifest at a well 80 with index "f ; and
(b) a pressure term thereof represents a change due to fluid flows into or out from the well 80 with index " .
Disregarding effects related to water aquifer and out-of-zone injections, for example resulting from natural phenomena, a normal semi steady state formulation corresponds to a single well 80 formulation wherein effects of other wells 80 in the system 10 are only accounted for through changes in a common reservoir pressure so that Equations 5 and 6 (Eq. 5 and Eq. 6) can be then used to describe the system 10:
Eq. 5
J j ύ
wherein
Figure imgf000014_0001
The Kalman filter formulation of Equation 1 (Eq. 1) above enables a recursive solution to be achieved wherein a zero-order solution for describing the system 10 corresponds to a solution obtained without interaction. This conclusion derived from mathematic analysis has enabled the inventors to appreciate that the complex system 10 can be conveniently separated out into quasi steady state characteristics on the first hand, and short term dynamic characteristics on the other hand. Such a conclusion would not be obvious from superficial inspection of the system 10 wherein events within the system 10 would be expected to occur in a continuous temporal spectrum requiring very considerable computing power to model accurately. Thus, a zero-order representation of the system 10 is provided in Equation 7 (Eq. 7) and Equation 8 (Eq. 8):
J,
Such a zero-order representation in respect of Y is, in many ways, similar to a Hall plot employed in injection monitoring.
A first order representation of the system 10 is provided in Equation 9 (Eq. 9) and Equation 10 (Eq. 10):
Figure imgf000015_0001
wherein interaction parameters are conveniently defined:
KH = - J KIP = - J? n
, - Eq. 10
J' S JP S Equation 9 (Eq. 9) corresponds to the semi steady state formation as provided in Equation 5 (Eq. 5). Thus, the present invention provides a Kalman filter formulation which reproduces semi steady state conditions within the system 10. However, the Kalman filter formulation is also a generalization because it does not assume uniformity amongst wells 80, neither does it assume well 80 interaction through a common reservoir pressure. This is a major benefit provided by the present invention.
The present invention allows for an alternative formulation of Equation 1 (Eq. 1), by assigning pursuant to Equation 11 (Eq. 11): which enables Equation 1 (Eq. 1) to be rewritten as Equation 12 (Eq. 12): dY,
=∑<*β +∑aJP-Yp + Pj + ΔΡ,■ therein Δ/>, Eq. 12
' p S
The state variables Y) and Q are generated from a time series of borehole pressures pmft), pLe(t), an initial pressure within the geological formation 30, and measured and/or allocated flow rates rA, rB. The injectivities, productivities and a matrix describing interactivity between wells 80 are estimated.
Aforementioned methods of monitoring and controlling the system 10 are not only capable of predicted quasi steady state conditions within the system 10, but also coping with transient situations after closing or opening a well 80 of the system 10. The method of the invention is based upon an assumption that a transient occurring within the system 10 is so fast such that interaction portions of Equation 1 (Eq. 1) and Equation 12 (Eq. 12) remain constant during the period of the transient. The constant interaction portions is representative of an effective change in the pressure of the geological formation 30 as observed from a given well 80 with index j. In other words, the method of the invention assumes that a time period of transient events which occur within a given well 80 of the system 10 is much shorter than a time scale in which the geological formation 30 responds generally to the transient events.
For illustrating the present invention by example, injectivity during an injection transient occurring within the system 10 is described by Equation 13 (Eq. 13):
Figure imgf000016_0001
The method of the present invention, namely utilizing the algorithm 300, applied to monitor and control the system 10 would employ a data set corresponding to well 80 pressure/injection rate versus time. Whenever a shut-in or start-up of a given well 80 occurs within the system 10, sensor data from the given well 80 is provided to a computing arrangement at a sufficient frequency for describing time scale of the shut-in and start-up. The algorithm 300 is beneficially implemented as one or more software products stored on machine-readable data storage media. During operation of the system 10, the one or more software products are executable on computing hardware coupled via one or more interfaces to the multiple wells 80 whose boreholes 20 intersect with the geological formation 30. The one or more software products enable operation of the system 10 to be monitored, as well as accommodating control back to the multiple wells 80 of the system 10 for improving operation of the system 10. Such control can be optimized in several different ways, for example for maximum oil and gas production, for minimum maintenance and testing, for lowest operating pressure when there is a risk of fracture of the geological formation 30 for example.
As aforementioned, the algorithm 300 employs Kalman filter methods, or equivalent alternative estimation methods, to estimate model parameters for Equation 1 and Equation 12 (Eq. 1 and Eq. 12) based upon measurements of pressures p and rate r as a function of time t. The algorithm 300 employs two different time scales:
(a) a "fast-loop" solution for determining estimations of individual parameters of individual wells 80. Time periods for the "fast loop" solution are minutes, and potentially faster when transients in well 80 operation are to be monitored;
(b) a "slow-loop" solution uses Equation 9 (Eq. 9), alternatively Equation 12 (Eq. 12), to estimate slow changes in either individual well 80 parameters or due to well 80 interaction effects.
In respect of the "fast-loop" solution, the algorithm 300 takes account of rapid changes in the system 10 such as opening and closing of wells 80, fracture events, and bursts or similar. These rapid changes are conveniently monitored by rapid measurable changes in injectivities and/or productivities. For example, a fracture resulting in a change of injectivity will be manifest as a rapid change in the injectivity of a particular well 80. The "fast-loop" solution employed in the algorithm 300 takes account of operational changes such as opening or closing chokes, opening or closing a sleeve and other changes modifying the response of the system 10 and/or its associated surface sub-system 400. On account of operational changes being known within the system 10, for example opening or closing of valves and chokes, discriminating between effects of operational changes and events determined by the boreholes 20 and the geological formation 30 is achieved within the algorithm 300. If aforementioned operation changes involve opening a sleeve to another layer, corresponding changes in productivity and/or injectivity provide useful information regarding chosen operating strategies. The "fast-loop" and "slow-loop" solutions employed in the algorithm 300 take account of phenomena resulting in slow changes, for example over time periods of weeks, in parameters describing the system 10. Thus, the solutions take account of single well 80 as well as multi-well 80 changes within the system 10. Example multi-well 80 changes are accounted for in the interaction part of Equation 1 and Equation 12 (Eq. 1 and Eq. 12), for example changes in effective overall pressure in the geological formation 30 (i.e. "reservoir pressure"), "out-of-zone" injections and aquifer support. Example single well 80 changes include slow degradation or improvements in productivity and injectivity caused by skin developments or similar processes; "skin development" refers to formation of surface layers within the borehole 20 and in the geological formation 30 which resist flow of fluid via surfaces onto which the layers have formed, wherein the skin development can potentially have detrimental or beneficial characteristics depending upon circumstances. Moreover, the "fast-loop" and "slow-loop" solutions are also able to identify to long term effects of rapid event-type changes, for example as identified in changes in production and/or injection rates in wells 80.
The algorithm 300 is thus operable, via its Kalman filter, to compute estimates of parameters including:
(i) productivities and injectivities of the wells 80 of the gas and/or oil production system
10;
(ii) storage characteristics and/or change in average reservoir pressure of the geological formation 30;
(iii) interactivities between wells 80 of the system 10; and
(iv) aquifer influx and/or "out-of-zone" outflux in respect of the geological formation 30 and its associated wells 80.
The algorithm 300, namely implemented in computing hardware 400 and sensing instruments 410 coupled thereto, has technical effect in that it senses physical conditions of the system 10 as sensed signals, analyses the signals, and then generates outputs which can be used for controlling operation of the system 10 to improve its productivity, increase operating safety and/or reduce maintenance costs. Improved operating safety is achieved by more appropriate control which assists to avoid blowouts, fractures and similar. Enhanced productivity is achieved by employing a more suitable injectivity strategy. Reduced maintenance can be achieved by maintaining appropriate productivity rates and/or injectivity rates for avoiding sedimentation which can block wells 80 and which is costly and time-consuming to rectify. Although use of the algorithm 300 is described in relation to oil and/or gas production, it can also be used for controlling other types of industrial processes and also mining operations, for example continuous seabed suction systems for extracting valuable minerals from ocean floor sediments and silt; such ocean mining processes must maintain appropriate flow rates and move extraction nozzles to most valuable mineral deposits in a dynamic real-time basis, namely activities which are advantageously controlled by using computing hardware executing the algorithm 300.
The present invention is susceptible to being used with existing contemporary injection and production wells 80, both in on-shore applications and also in off-shore applications.
Modifications to embodiments of the invention described in the foregoing are possible without departing from the scope of the invention as defined by the accompanying claims. Expressions such as "including", "comprising", "incorporating", "consisting of, "have", "is" used to describe and claim the present invention are intended to be construed in a nonexclusive manner, namely allowing for items, components or elements not explicitly described also to be present. Reference to the singular is also to be construed to relate to the plural. Numerals included within parentheses in the accompanying claims are intended to assist understanding of the claims and should not be construed in any way to limit subject matter claimed by these claims.

Claims

CLAIMS 1. A production monitoring system (10) comprising a plurality of injection and production units (80) coupled in operation to sensors (410) for measuring physical processes occurring in operation in the injection and production units (80) and generating corresponding measurement signals (420) for computing hardware (400), wherein said computing hardware (400) is operable to execute software products (300) for processing said signals (420), characterized in that the software products (300) are adapted for said computing hardware (400) to analyse said measurement signals (420) to abstract a parameter representation of said measurement signals (420), and to apply a temporal analysis of said parameters to identify temporally slow processes and temporally fast processes therein, and to employ information representative of said slow processes and fast processes to control a management process for controlling operation of the system (10).
2. A production monitoring system (10) as claimed in claim 1 , wherein said injection and production units (80) have associated therewith production and injection rates (rA, rB), together with upper and lower borehole pressures ( u, PL) as the sensor signals (420), and the management processes is adapted to control said injection and production units (80) in respect of one or more of: production rate, operating safety, maintenance requirement.
3. A production monitoring system (10) as claimed in claim 1 or 2, wherein said temporal analysis involves applying a temporal filter (330) for analysing temporal characteristics of said measurement signals (420) by modelling said measurement signals, and determining deviations between said measurement signals (420) and corresponding modelled measurement signals for identifying said temporally fast processes.
4. A production monitoring system (10) as claimed in claim 3, wherein said temporal filter (330) employs a Kalman filter.
5. A production monitoring system (10) as claimed in claim 4, wherein the Kalman filter is formulated for /V, injectors and Np producers as expressed by Equation 1 (Eq. 1 ):
∑KjrY, (t)+∑KJp.Yp(t)+ P;(t) Eq. 1
dt • P wherein
K = parameters of the system (10);
Y = an output variable, measured response of the system (10);
P* = input variables to the system (10), namely pressure gradient to the system (10);
t = time; and
i,j = reference indices, and wherein the output variable Y is defined by Equation 2 (Eq. 2) and Equation 3 (Eq. 3):
Figure imgf000021_0001
Figure imgf000021_0002
wherein Equation 4 (Eq. 4) defines a time derivative of the output variable:
Figure imgf000021_0003
wherein
Jj= set of parameters associated wit the system (10); and
Qj = flow rate
6. A production monitoring system (10) as claimed in any one of the preceding claims, wherein said analysis is adapted for determining interaction between the injection and production units (80) when intercepting a formation (30) which is mutually common to the injection and production units (80).
7. A production monitoring system (10) as claimed in any one of the preceding claims, wherein the injection and production units (80) include at least one of: oil and/or gas wells, multiple apparatus in a production facility, continuous mining facilities, geological water extraction facilities.
8. A method of monitoring a plurality of production units (80), characterized in that said method includes: (a) using sensors (410) coupled to the injection and production units (80) for measuring physical processes occurring in operation in the injection and production units (80) and generating corresponding measurement signals (420) for computing hardware (400), wherein said computing hardware (400) is operable to execute software products (300) for processing said signals (420);
(b) using computing hardware (400) executing said software products (300) to analyse said measurement signals (420) to abstract a parameter representation of said measurement signals (420);
(c) using said computing hardware (400) to apply a temporal analysis of said parameters to identify temporally slow processes and temporally fast processes therein; and
(d) employing information representative of said slow processes and fast processes to control a management process for controlling operation of the system (10).
9. A method as claimed in claim 8, wherein said injection and production units (80) have associated therewith injection and production rates (rA, rB), together with upper and lower borehole pressures ( u, p_) as the sensor signals (420), and the management processes is operable to control said production units (80) in respect of one or more of: production rate, operating safety, maintenance requirement.
10. A method as claimed in claim 8 or 9, wherein said temporal analysis involves applying a temporal filter (330) for analysing temporal characteristics of said measurement signals (420) by modelling said measurement signals, and determining deviations between said measurement signals (420) and corresponding modelled measurement signals for identifying said temporally fast processes.
11. A method as claimed in claim 10, wherein said temporal filter (330) employs a Kalman filter.
12. A software product (300) recorded on a machine-readable data storage medium, wherein said software product (300) is executable on computing hardware (400) for implementing a method as claimed in any one of claims 8 to 11.
PCT/NO2011/000265 2010-09-21 2011-09-21 Production monitoring system and method WO2012039626A1 (en)

Priority Applications (3)

Application Number Priority Date Filing Date Title
AU2011306526A AU2011306526B2 (en) 2010-09-21 2011-09-21 Production monitoring system and method
EP11827029.7A EP2619636B1 (en) 2010-09-21 2011-09-21 Production monitoring system and method
BR112013006608-3A BR112013006608A2 (en) 2010-09-21 2011-09-21 production monitoring system and method

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
NO20101311A NO331098B1 (en) 2010-09-21 2010-09-21 PRODUCTION MEASUREMENT SYSTEM AND PROCEDURE
NO20101311 2010-09-21

Publications (1)

Publication Number Publication Date
WO2012039626A1 true WO2012039626A1 (en) 2012-03-29

Family

ID=44970853

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/NO2011/000265 WO2012039626A1 (en) 2010-09-21 2011-09-21 Production monitoring system and method

Country Status (5)

Country Link
EP (1) EP2619636B1 (en)
AU (1) AU2011306526B2 (en)
BR (1) BR112013006608A2 (en)
NO (1) NO331098B1 (en)
WO (1) WO2012039626A1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2018088909A1 (en) * 2016-11-09 2018-05-17 Statoil Petroleum As System and method for providing information on production value and/or emissions of a hydrocarbon production system
EP3259647A4 (en) * 2015-02-20 2018-10-03 Production Monitoring AS Production monitoring - multi volume dynamic semi steady parametric model

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2008025622A1 (en) * 2006-08-30 2008-03-06 Shell Internationale Research Maatschappij B.V. Method for controlling and/or optimizing production of oil and/or gas wells and facilities
WO2008100148A2 (en) * 2007-02-15 2008-08-21 Epsis As Data handling system
US20100059217A1 (en) * 2008-03-03 2010-03-11 Satellite Systems & Solutions, Inc. Method and Apparatus for Mitigating Environmental Impact Due to Fluid Leaks

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20080201706A1 (en) * 2007-02-15 2008-08-21 Jan-Erik Nordtvedt Data handling system
US8170801B2 (en) * 2007-02-26 2012-05-01 Bp Exploration Operating Company Limited Determining fluid rate and phase information for a hydrocarbon well using predictive models
EP2222937B1 (en) * 2007-10-30 2014-12-31 BP Corporation North America Inc. An intelligent drilling advisor

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2008025622A1 (en) * 2006-08-30 2008-03-06 Shell Internationale Research Maatschappij B.V. Method for controlling and/or optimizing production of oil and/or gas wells and facilities
WO2008100148A2 (en) * 2007-02-15 2008-08-21 Epsis As Data handling system
US20100059217A1 (en) * 2008-03-03 2010-03-11 Satellite Systems & Solutions, Inc. Method and Apparatus for Mitigating Environmental Impact Due to Fluid Leaks

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP3259647A4 (en) * 2015-02-20 2018-10-03 Production Monitoring AS Production monitoring - multi volume dynamic semi steady parametric model
WO2018088909A1 (en) * 2016-11-09 2018-05-17 Statoil Petroleum As System and method for providing information on production value and/or emissions of a hydrocarbon production system
US11168545B2 (en) 2016-11-09 2021-11-09 Equinor Energy As System and method for providing information on production value and/or emissions of a hydrocarbon production system

Also Published As

Publication number Publication date
EP2619636A4 (en) 2017-04-26
EP2619636A1 (en) 2013-07-31
BR112013006608A2 (en) 2020-09-15
AU2011306526A1 (en) 2013-04-11
NO20101311A1 (en) 2011-10-03
EP2619636B1 (en) 2018-08-29
NO331098B1 (en) 2011-10-03
AU2011306526B2 (en) 2014-11-27

Similar Documents

Publication Publication Date Title
Rocha-Valadez et al. Assessing wellbore integrity in sustained-casing-pressure annulus
Møyner et al. The application of flow diagnostics for reservoir management
WO2016153636A1 (en) Method and apparatus for early detection of kicks
US8275589B2 (en) Modeling a reservoir using a compartment model and a geomechanical model
US20080262737A1 (en) System and Method for Monitoring and Controlling Production from Wells
CN104863577B (en) The method that formation pore pressure is predicted using the P wave propagation time
CA2863796C (en) Modeling and analysis of hydraulic fracture propagation to surface from a casing shoe
EP3455458B1 (en) Multi-step subsidence inversion for modeling lithospheric layer thickness through geological time
US8594818B2 (en) Production monitoring system and method
Bohloli et al. Determination of the fracture pressure from CO2 injection time-series datasets
Gomes et al. Impact of Reservoir Reactions on Thermodynamic Scale Predictions
Singh Machine learning for surveillance of fluid leakage from reservoir using only injection rates and bottomhole pressures
Akinbinu Prediction of fracture gradient from formation pressures and depth using correlation and stepwise multiple regression techniques
AU2011306526B2 (en) Production monitoring system and method
CN114660269B (en) Method for recovering natural gas dynamic hiding process of ancient buried hill
Sagen et al. A coupled dynamic reservoir and pipeline model–development and initial experience
Suleymanov et al. Oil reservoir waterflooding efficiency evaluation method
Han et al. Understanding Well Performance of Unconventional Extended Laterals in New Mexico, Delaware Basin
CN111963161A (en) Method and device for determining hidden abnormal oil well
Denney Intelligent-well completions in Agbami: value added and execution performance
US20180010430A1 (en) Production monitoring - multi volume dynamic semi steady parametric model
CN113537668B (en) Method and system for evaluating crude oil geological reserves in unfilled karst cave
Obidegwu et al. Using 4D seismic surveys and history matching to estimate critical and maximum gas saturation
Ogali Waterflood optimization using streamline simulation
CN117345204A (en) Encryption well stratum pressure prediction method and device considering complicated well pattern and stress sensitivity

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 11827029

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

WWE Wipo information: entry into national phase

Ref document number: 2011827029

Country of ref document: EP

ENP Entry into the national phase

Ref document number: 2011306526

Country of ref document: AU

Date of ref document: 20110921

Kind code of ref document: A

REG Reference to national code

Ref country code: BR

Ref legal event code: B01A

Ref document number: 112013006608

Country of ref document: BR

REG Reference to national code

Ref country code: BR

Ref legal event code: B01E

Ref document number: 112013006608

Country of ref document: BR

ENPW Started to enter national phase and was withdrawn or failed for other reasons

Ref document number: 112013006608

Country of ref document: BR

ENP Entry into the national phase

Ref document number: 112013006608

Country of ref document: BR

Kind code of ref document: A2

Effective date: 20130322