WO2012037856A1 - 一种过载控制处理方法及设备 - Google Patents

一种过载控制处理方法及设备 Download PDF

Info

Publication number
WO2012037856A1
WO2012037856A1 PCT/CN2011/079615 CN2011079615W WO2012037856A1 WO 2012037856 A1 WO2012037856 A1 WO 2012037856A1 CN 2011079615 W CN2011079615 W CN 2011079615W WO 2012037856 A1 WO2012037856 A1 WO 2012037856A1
Authority
WO
WIPO (PCT)
Prior art keywords
mme
function node
proxy
communication device
node device
Prior art date
Application number
PCT/CN2011/079615
Other languages
English (en)
French (fr)
Inventor
刘洋
杨义
Original Assignee
电信科学技术研究院
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 电信科学技术研究院 filed Critical 电信科学技术研究院
Publication of WO2012037856A1 publication Critical patent/WO2012037856A1/zh

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W8/00Network data management
    • H04W8/02Processing of mobility data, e.g. registration information at HLR [Home Location Register] or VLR [Visitor Location Register]; Transfer of mobility data, e.g. between HLR, VLR or external networks

Definitions

  • the present invention relates to wireless communication technologies, and in particular, to an overload control processing method and device.
  • FIG. 1 is a schematic diagram of an E-UTRAN (Evolved Global Terrestrial Radio Access Network) network architecture when a HeNB (Home Evolved Node B) is deployed
  • FIG. 2 is an RN.
  • Schematic diagram of the E-UTRAN network architecture of the relay node (Relay Node), Figure 1 and Figure 2 are the possible network architecture diagrams after the introduction of the HeNB and the RN in the E-UTRAN, as shown in the figure, the network architecture of the Relay and HeNB
  • the eNB Evolved Base Station
  • the eNB and the MME Mobility Management Entity
  • the HeNB can be directly connected to the MME or through a centralized proxy node HeNB GW (HeNB).
  • the gateway accesses the MME, and the HeNB can only connect to one HeNB GW.
  • the HeNB GW is similar to an eNB and has its own eNB ID (identification). It can establish an X2 interface with other eNBs. It also acts as a special network element with proxy functions. All HeNBs send or send S-APs to the HeNB (SI). The Application Protocol, SI Interface Application Protocol and X2-AP (X2 Application Protocol) messages are all transited or terminated by the HeNB GW.
  • De B Donor eNB, donor evolved base station
  • De B is the base station to which the RN accesses.
  • FIG. 3 is a schematic diagram of the overload protection process.
  • the load control process may be as follows: 1.
  • the MME decides to enter an overload state according to its own load and capacity state, and simultaneously sends an overload start to the eNB connected to the MME.
  • the (overload start) message informs the eNB to perform overload control, and can specify the eNB to perform the following three operations:
  • the eNB After receiving the overload control message of the MME, the eNB performs overload protection according to the control policy indicated in the message, and receives the RRC (Radio Resource Control) of the UE (User Equipment).
  • RRC Radio Resource Control
  • the connection establishment request is made, according to whether it contains S-TMSI (SAE-Temporary Mobile Subscriber Identify,
  • SAE Temporary Mobile Subscriber Identity
  • SAE System Architecture Evolution, information can be processed in two cases
  • the eNB may determine, according to the S-TMSI, the MME to which the UE belongs, if the MME that initiates the overload protection is the same MME, and the RRC connection establishment process satisfies the rejection policy. Then, the eNB may reject the RRC connection setup procedure with an RRC connection reject message.
  • the eNB cannot determine whether the registered MME of the UE is the MME that initiates the overload protection, and therefore cannot reject the RRC setup request, and the eNB sends an RRC connection setup to the UE. RRC connection established) message.
  • the UE sends an RRC connection setup complete message, which may carry the registered MME information, and the eNB determines whether it is received. If the MME is the MME that initiates the overload control and the rejection policy is met, the RRC connection release message may be used to release the message. RRC connection.
  • the eNB may select a UE for the UE by using the NNSF (Network Node Selection Function).
  • the MME that performs the access process does not have to reject the RRC connection. If all the MMEs connected to the eNB are in an overload state, the eNB can directly release the RRC connection process.
  • the technical problem to be solved by the present invention is to provide an overload control processing method and device for solving the problem that He B/RN cannot perform overload control.
  • An overload control processing method is provided in the embodiment of the present invention, including the following steps:
  • the proxy function node device receives the overload control message sent by the MME;
  • the proxy function node device notifies the communication device of the proxy of the MME that sends the overload control message, and notifies the communication device of its proxy to perform overload control on the MME.
  • An agent function node device is provided in the embodiment of the present invention, including:
  • a receiving module configured to receive an overload control message sent by the MME;
  • a notification module configured to notify the communication device of the proxy function node device proxy of the GUMMEI information of the MME that sends the overload control message, and notify the communication device of the proxy function node device proxy to perform overload control on the MME.
  • an overload control processing method including the following steps:
  • the communication device receives the globally unique mobility management entity identifier of the mobility management entity MME sent by the proxy function node device and sends an overload control message to the proxy function node device, and the GUMMEI information;
  • the communication device performs overload control on the corresponding MME according to the received GUMMEI information.
  • a communication device including:
  • a receiving module configured to receive, by the proxy function node device, a globally unique mobility management entity identifier of the mobility management entity MME that sends an overload control message to the proxy function node device, the GUMMEI information;
  • a control module configured to perform overload control on the corresponding MME according to the received GUMMEI information.
  • the MME can also effectively perform the overload control process initiated by the He B.
  • the MME also has the same problem with the load control process initiated by the RN under the DeNB, but due to the present invention.
  • the proxy function node device after receiving the overload control message sent by the MME, notifies the proxy communication device of the MME's GUMMEI information, and notifies the proxy communication device to perform overload control on the MME.
  • the technical solution provided by the embodiment of the present invention provides a corresponding solution to the problem, thereby ensuring the protocol flow. Correctness and completeness.
  • FIG. 1 is a schematic diagram of a possible E-UTRAN network architecture when a HeNB is deployed in the background art
  • FIG. 2 is a schematic diagram of an E-UTRAN network architecture including an RN in the background art
  • FIG. 3 is a schematic diagram of an overload protection process in the background art
  • FIG. 4 is a schematic flowchart of an implementation process of an overload control processing method according to an embodiment of the present invention.
  • FIG. 5 is a schematic flowchart of an implementation process of an overload control processing method according to a first embodiment of the present invention
  • FIG. 6 is a schematic flowchart of an implementation process of an overload control processing method in a second mode according to an embodiment of the present invention
  • FIG. 7 is a schematic flowchart of an implementation process of an overload control processing method in a fifth mode according to an embodiment of the present invention.
  • FIG. 8 is a schematic structural diagram of a network according to Embodiment 1 of the present invention.
  • FIG. 9 is a schematic structural diagram of a proxy function node device according to an embodiment of the present invention.
  • FIG. 10 is a schematic structural diagram of a communication device according to an embodiment of the present invention. detailed description
  • the current protocol flow between the e B and the MME is to overload the MME by the overload process.
  • the e B rejects the specific RRC connection establishment process for the MME.
  • the effect of overload protection is achieved.
  • a node HeNB GW with proxy function is introduced in the network architecture of He B.
  • the node De B with proxy function is introduced in the RN architecture, and the RN communicates with De B through the wireless interface Un.
  • the HeNB GW/De B introduced in the network architecture of the current HeNB/Relay has the function of the NSF, which can help the HeNB/Relay select an appropriate MME.
  • the overload start message may be used to notify the HeNB GW/De B when the MME needs to perform overload protection, that is, the HeNB GW and the DeNB can know the overload condition of the MME.
  • the overload start message does not include the identifier information of the MME. Therefore, even if the HeNB GW/DeNB forwards the message to the HeNB/Relay, the HeNB/Relay cannot know which MMEs are overloaded, and therefore cannot perform corresponding Overload control.
  • the HeNB/RN under the HeNB GW/DeNB does not know this information, so the HeNB The /RN will also not be able to properly reject the RRC connection setup procedure connected to the MME.
  • FIG. 4 is a schematic diagram of an implementation process of an overload control processing method. As shown in the figure, the overload processing process may include the following steps:
  • Step 401 The proxy function node device receives an overload control message sent by the MME.
  • Step 402 The proxy function node device sends the GUMMEI of the MME of the overload control message (Globally
  • the Unique MME Identifier information informs the agent's communication device and informs its agent's communication device to perform overload control on the MME.
  • the proxy function node device having the proxy function may be a device such as a HeNB GW or a DeNB, and the proxy communication device may be a low-power base station including a device such as a HeNB and an RN, and the proxy communication device refers to a required communication device.
  • the HeNB, the RN, the HeNB GW, or the DeNB will be mainly used as an example.
  • these devices are relatively common, and are also devices in the possible network architecture in the E-UTRAN;
  • the device provided by the embodiment of the present invention can be applied to such a device, He B , RN, HeNB
  • the GW or the DeNB is only used to teach the person skilled in the art how to implement the present invention, but it does not mean that only these communication devices can be used.
  • the corresponding communication device can be selected in combination with practical needs.
  • the proxy function node device notifies the communication device of the proxy to perform overload control on the MME, and may notify the communication device of the proxy of the overload rejection criterion, and the proxy communication device forwards the access according to the notified rejection criterion.
  • the RRC connection can be used for overload control.
  • the He B GW and the DeNB may forward the message to the HeNB or the RN, and an overload occurs.
  • the MME information eg, GUMMEI
  • the HeNB or the RN performs corresponding access control; or through the new S 1 -AP/X2-AP procedure, the dedicated signaling is notified to notify the HeNB and the RN to occur.
  • Overloaded MME information For the DeNB, the RN can also be notified by a new air interface RRC message.
  • the HeNB GW or the DeNB may notify the HeNB and the RN to release the overload status of the corresponding MME in the same manner.
  • the proxy function node device notifies the communication device of the MME of the MME that sends the overload control message to the proxy, and may include one or a combination of the following:
  • the HeNB GW is used as an example.
  • the MME information (for example, GUMMEI) for overload protection can be sent to the HeNB through the overload start/stop message, and the HeNB performs the overload protection control.
  • FIG. 5 is a schematic flowchart of the implementation of the overload control processing method of the first method.
  • the HeNB GW adds relevant MME information (eg, GUMMEI) in the process of forwarding it to the HeNB.
  • relevant MME information eg, GUMMEI
  • the HeNB receives the RRC connection establishment request of the UE, it can perform control according to the existing protocol flow.
  • Manner 2 The GUMMEI information of the MME is notified to the proxy communication device by using the S1-AP interface message.
  • 6 is a schematic flowchart of an implementation process of an overload control processing method of the second method. As shown in the figure, in the manner of the HeNB GW, the HeNB GW may use the new S 1 -AP interface message to perform overload protection MME information (eg, GUMMEI) is sent to the HeNB and is handed over to the HeNB for overload protection control.
  • overload protection MME information eg, GUMMEI
  • the difference between the second mode and the first mode is that the HeNB GW transits the MME's overload start/stop message in the first mode, and the HeNB GW terminates the MME overload start/stop message in the second method.
  • the transit or termination mode is used. It mainly depends on how the HeNB GW handles non-UE related signaling.
  • Manner 3 The GUMMEI information of the MME is notified to the communication device of the proxy by using the X2-AP interface message.
  • the HeNB GW/DeNB may send the overload protected MME information (eg, GUMMEI) to the He B/RN through the X2-AP signaling through the X2 interface.
  • GUMMEI overload protected MME information
  • the MME message is used to notify the agent's communication device of the MME's GUMMEI information through the air interface.
  • De B can send the overload protected MME information (for example, GUMMEI) to He B/RNo through the air interface using the RRC message.
  • GUMMEI overload protected MME information
  • the proxy function node device may be a HeNB GW, and the proxy communication device is a HeNB;
  • the proxy function node device is a DeNB
  • the proxy communication device is an RN
  • FIG. 7 is a schematic flowchart of an implementation process of an overload control processing method in the fifth mode.
  • an initial UE message and a downlink nas transport may be utilized. Complete the corresponding control process.
  • the HeNB GW can be used as follows:
  • the HeNB When the HeNB sends the initial UE message to the HeNB GW, the HeNB needs to carry the S-TMSI or the GUMMEI information (if any), and after receiving the HeNB GW, the HeNB GW sends the message downlink NAS transmission message to the HeNB GW. HeNB, carrying the rejection criteria of overload at the same time. After receiving the HeNB, the RRC connection of the UE is released, and the HeNB can learn that the MME is in an overload state, and performs overload control on the subsequently accessed RRC connection according to the rejection criterion indicated in the downlink NAS transmission message.
  • the HeNB GW receives the overload start message of the multiple MMEs, in the foregoing process, the GUMMEI of the overloaded MME and the corresponding overload action (the overloaded behavior criterion, that is, the limitation and processing method after the overload) may be passed.
  • the downlink NAS transmission message is sent to the HeNB in parallel, and the HeNB performs subsequent overload control.
  • the HeNB GW may be notified of the overload state by using the foregoing manner.
  • the fifth mode is also applicable to the RN.
  • the HeNB GW used for the example may be a DeNB node, and the HeNB may be an RN node.
  • Embodiment 1 is a diagrammatic representation of Embodiment 1:
  • the MME initiates an overload process to the HeNB GW.
  • the HeNB GW receives the S1 interface or the X2.
  • the interface process is forwarded to the HeNB.
  • the HeNB GW needs to send the MME information (such as, for example, GUMMEI) to the HeNB.
  • the overload control at this time is performed by the HeNB.
  • the HeNB determines the registered MME of the UE according to the S-TMSI or GUMMEI information reported by the UE, and compares with the MME that is overloaded, and rejects the RRC if the rejection policy is met.
  • the connection establishment request or release of the RRC connection if not the same, the UE is allowed to access.
  • the MME initiates an overload process to the DeNB.
  • the DeNB forwards the MME to the RN through the process of adding the X2 interface.
  • the DeNB needs to send the MME information (such as GUMMEI) to the RN.
  • the overload control at this time is performed by the RN.
  • Embodiment 2 is a diagrammatic representation of Embodiment 1:
  • the HeNB GW After the HeNB GW receives the message, the HeNB GW forwards the message to the HeNB through the S1 interface. During the forwarding process, the HeNB GW adds the information of the overloaded MME (such as GUMMEI), and the overload occurs. The control is performed by the HeNB. For the subsequent processing method, refer to the first embodiment.
  • Embodiment 3 is a diagrammatic representation of Embodiment 3
  • the DeNB After receiving the overload start message sent by the MME, the DeNB notifies the RN by using an RRC message, where the RRC message includes the MME information (for example, GUMMEI), and the overload control is performed by the RN, and the subsequent processing is the same as that of the HeNB.
  • the RRC message includes the MME information (for example, GUMMEI)
  • the overload control is performed by the RN, and the subsequent processing is the same as that of the HeNB.
  • Embodiment 4 is a diagrammatic representation of Embodiment 4:
  • the HeNB GW/DeNB uses the same method to notify the HeNB and the MME that the corresponding MME has released the overload state, and does not need to notify the UE before the access process.
  • the S1-AP, X2-AP, RRC message used to notify the He B/RN may carry the identification information of the MME in the overloaded state (eg, GUMMEI), or may be used to notify the HeNB/RN when the last MME is overloaded.
  • the S 1 -AP, X2-AP, and RRC messages may not carry any MME information, and the HeNB/RN may cancel the overload control after receiving it.
  • Embodiment 5 is a diagrammatic representation of Embodiment 5:
  • the HeNB GW/DeNB After receiving the MME's overload start message, the HeNB GW/DeNB receives the initial UE message that the UE requests to access, and the HeNB GW/DeNB determines whether the MME is in an overload state according to the S-TMSI information or the GUMMEI information carried therein, and if so, Then, the rejection criterion of the overload control is sent to the HeNB/RN through the downlink NAS message transmission, and the HeNB/RN performs a subsequent overload control process.
  • an agent function node device is also provided in the embodiment of the present invention. Since the principle of the device solving the problem is similar to the overload control processing method, the implementation of the device can refer to the implementation of the method, and the repetition is performed. No longer.
  • FIG. 9 is a schematic structural diagram of a proxy function node device. As shown in the figure, the device may include:
  • the receiving module 901 is configured to receive an overload control message sent by the MME.
  • the notification module 902 is configured to notify the communication device of the proxy function node device proxy of the GUMMEI information of the MME that sends the overload control message, and notify the communication device of the proxy function node device proxy to perform overload control on the MME.
  • the notification module may include One of the following units or a combination thereof:
  • a forwarding notification unit configured to add the GUMMEI information of the MME to the received overload start or overload stop message, and forward the information to the communication device of the proxy function node device proxy;
  • the S1 notification unit is configured to notify the communication device of the proxy function node device proxy by the GUMMEI information of the MME by using the S1-AP interface message, and notify the communication device of the proxy function node device proxy to perform overload control on the MME; and the X2 notification unit is configured to: Notifying the communication device of the proxy function node device proxy by the X2-AP interface message, and notifying the communication device of the proxy function node device proxy to perform overload control on the MME; the NAS notification unit, configured to transmit the message to the MME through the NAS
  • the GUMMEI information informs the communication device of its agent, and notifies the communication device of the agent function node device agent to perform overload control on the MME.
  • the proxy function node device is He B GW, the communication device of the proxy function node device proxy is He B; or the proxy function node device is De B, and the proxy device of the proxy function node device proxy is the RN.
  • the notification module can include:
  • the air interface notification unit is configured to notify the communication device of the proxy function node device proxy by using the RRC message by using the RRC message, and notify the communication device of the proxy function node device proxy to perform overload control on the MME.
  • the proxy function node device is a DeNB
  • the communication device proxying the function node device proxy is an RN.
  • FIG. 10 is a schematic structural diagram of a communication device. As shown in the figure, the device may include:
  • the receiving module 1001 is configured to receive, by the proxy function node device, a globally unique mobility management entity identifier GUMMEI information of the mobility management entity MME that sends an overload control message to the proxy function node device;
  • the control module 1002 is configured to perform overload control on the corresponding MME according to the received GUMMEI information.
  • the notification module 1001 includes one or a combination of the following units:
  • a forwarding receiving unit configured to receive the GUMMEI information in an overload start overload start or overload stop overload stop message forwarded by the proxy function node device;
  • An S1 receiving unit configured to receive the GUMMEI information in an application protocol S1-AP interface message through an S1 interface
  • An X2 receiving unit configured to receive the GUMMEI information in an X2-AP interface protocol through an X2 interface application protocol;
  • the NAS receiving unit is configured to receive the GUMMEI information in a message transmitted through a downlink non-access stratum NAS.
  • the communication device may be a HeNB, and the proxy function node device may be a HeNB GW; Or, the communication device is an RN, and the proxy function node device is a DeNB,
  • the notification module 1001 includes:
  • the air interface receiving unit is configured to use, by using an air interface, the GUMMEI information of the MME sent by the RRC message receiving proxy function node device to send the overload control message to the proxy function node device.
  • the communication device is an RN
  • the proxy function node device is a DeNB.
  • the He B GW and the DeNB may forward the message to the HeNB or the RN, and include the overloaded MME information (eg, GUMMEI) to the message.
  • the overloaded MME information eg, GUMMEI
  • the HeNB or the RN performs the corresponding access control; or through the new S1-AP/X2AP process, defines the dedicated signaling to notify the HeNB and the RN that the overloaded MME information; for the DeNB, the new access control
  • the air interface RRC message informs the RN that after the HeNB GW/De B receives the MME's overload start message, it may determine whether the MME requested by the UE is in an overload state according to the S-TMSI information or the GUMMEI information carried in the initial UE message. If yes, the overload control rejection criterion and the corresponding GUMMEI information are sent to the He B/RN through the downlink NAS message transmission, and the HeNB/RN performs a subsequent overload control process. After receiving the overload stop message of the MME, the HeNB GW or the DeNB informs the HeNB and the RN to release the overload status of the corresponding MME in the same manner.
  • the MME can also perform the overload control process initiated by the HeNB, and the MME also has the same problem in the load control process initiated by the RN under the DeNB.
  • the solution gives a corresponding solution to this problem, which ensures the correctness and integrity of the protocol process.
  • embodiments of the present invention can be provided as a method, system, or computer program product. Accordingly, the present invention may take the form of an entirely hardware embodiment, an entirely software embodiment, or a combination of software and hardware. Moreover, the present invention can be embodied in the form of a computer program product embodied on one or more computer-usable storage interfaces (including but not limited to disk storage, CD-ROM, optical storage, etc.) containing computer usable program code.
  • computer-usable storage interfaces including but not limited to disk storage, CD-ROM, optical storage, etc.
  • embodiments of the present invention can be provided as a method, system, or computer program product. Accordingly, the present invention may take the form of an entirely hardware embodiment, an entirely software embodiment, or a combination of software and hardware. Moreover, the present invention is in the form of a computer program product embodied on one or more computer-usable storage interfaces (including but not limited to disk storage, CD-ROM, optical storage, etc.) containing computer usable program code.
  • the present invention has been described with reference to flowchart illustrations and/or block diagrams of methods, apparatus (system), and computer program products according to embodiments of the invention. It will be understood that each flow and/or block of the flowchart illustrations and/or FIG.
  • These computer program instructions can be provided to a processor of a general purpose computer, special purpose computer, embedded processor, or other programmable data processing device to produce a machine for the execution of instructions for execution by a processor of a computer or other programmable data processing device.
  • the computer program instructions can also be stored in a computer readable memory that can direct a computer or other programmable data processing device to operate in a particular manner, such that the instructions stored in the computer readable memory produce an article of manufacture comprising the instruction device.
  • the apparatus implements the functions specified in one or more blocks of a flow or a flow and/or block diagram of the flowchart.
  • These computer program instructions can also be loaded onto a computer or other programmable data processing device such that a series of operational steps are performed on a computer or other programmable device to produce computer-implemented processing for execution on a computer or other programmable device.
  • the instructions provide steps for implementing the functions specified in one or more of the flow or in a block or blocks of a flow diagram.

Landscapes

  • Engineering & Computer Science (AREA)
  • Databases & Information Systems (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Mobile Radio Communication Systems (AREA)

Abstract

公开了一种过载控制处理方法及设备,包括:代理功能节点设备接收移动性管理实体发送的过载控制消息;代理功能节点设备将发送过载控制消息的移动性管理实体的全球唯一移动性管理实体标识信息通知其代理的通信设备,并通知其代理的通信设备对该移动性管理实体进行过载控制。本发明实施例提供的技术方案保证了协议流程的正确性和完整性。

Description

一种过载控制处理方法及设备 本申请要求在 2010年 9月 21日提交中国专利局、 申请号为 2010.9.21、 发明名称为"一种过 载控制处理方法及设备"的中国专利申请的优先权, 其全部内容通过引用结合在本申请中。 技术领域
本发明涉及无线通信技术, 特别涉及一种过载控制处理方法及设备。
背景技术
图 1为部署有 HeNB ( Home Evolved Node B , 演进的家庭基站 ) 时可能的 E-UTRAN ( Evolution- Universal Terrestrial Radio Access Network, 演进的全球地面无线接入网) 网 络架构示意图, 图 2为包含 RN ( Relay node, 中继节点) 的 E-UTRAN网络架构示意图, 图 1和图 2分别是 E-UTRAN中引入 HeNB和 RN之后的可能的网络架构图, 如图所示, Relay与 HeNB的网络架构类似, eNB (演进基站)之间是 X2接口, eNB和 MME ( Mobility Management Entity, 移动性管理实体)之间是 SI接口, HeNB可以和 MME直接连接, 也 可以通过一个集中代理节点 HeNB GW ( HeNB网关)接入到 MME, HeNB只能和一个 HeNB GW相连。 HeNB GW类似于一个 eNB , 拥有自己的 eNB ID (标识), 与其他 eNB 可以建立 X2接口, 同时作为一个特殊的网元, 具有代理功能, 所有 HeNB发出的或发往 HeNB的 Sl-AP ( SI Application Protocol, SI接口应用协议)和 X2-AP ( X2 Application Protocol, X2接口应用协议)消息都得由 HeNB GW进行中转或终结。图 2中的 De B( Donor eNB , 施主演进基站 ) 与 HeNB GW功能相似, De B即 RN接入的基站。
图 3为过载保护流程示意图, 如图所示,根据目前的协议, 负载控制的流程可以如下: 1、 MME根据自身负载和容量状态判决进入过载状态, 同时向与该 MME连接的 eNB 发送 overload start (过载开始 )消息, 通知 eNB进行过载控制, 同时可以指定 eNB进行以 下三种操作:
( 1 )针对非紧急呼叫, 拒绝所有主叫数据业务。
( 2 )针对非紧急呼叫, 拒绝所有主叫信令业务。
( 3 )只允许紧急业务和被叫接入。
2、 eNB收到 MME的过载控制消息后,根据消息中指示的控制策略进行过载保护, 在 收到 UE ( User Equipment, 用户设备) 的 RRC ( Radio Resource Control, 无线资源控制) 连接建立请求时, 根据其中是否包含 S-TMSI ( SAE-Temporary Mobile Subscriber Identify,
SAE-临时移动签约用户标识; SAE: System Architecture Evolution, 系统架构演进)信息可 以分为两种情况进行处理;
3、 如果 RRC连接建立请求中包含 S-TMSI信息, eNB可以根据 S-TMSI唯一的确定 这个 UE所属的 MME, 若与发起过载保护的 MME是同一个 MME, 且该 RRC连接建立 过程满足拒绝策略, 那么 eNB可以用 RRC connection reject ( RRC连接拒绝) 消息拒绝该 RRC连接建立过程。
4、 如果 RRC连接建立请求中没有包含 S-TMSI信息, 此时 eNB无法判断该 UE的注 册 MME是否为发起过载保护的 MME, 因此不能拒绝该 RRC建立请求, eNB向该 UE发 送 RRC connection setup ( RRC连接建立) 消息。
5、 UE发送 RRC连接建立完成消息, 其中可能携带了注册过的 MME信息, eNB收 到后进行判断, 如果该 MME是发起过载控制的 MME且满足拒绝策略, 则可以使用 RRC 连接释放消息释放该 RRC连接。
如果 UE在 RRC连接建立请求消息中没有携带 S-TMSI,且在 RRC连接建立完成消息 中也没有携带注册 MME信息,那么 eNB可以利用 NNSF( Network Node Selection Function, 网络节点选择功能)为 UE选择一个负荷较轻的 MME进行接入过程, 不必拒绝该 RRC连 接; 如果与该 eNB连接的所有 MME都处于过载状态, eNB可以直接释放该 RRC连接过 程。
现有技术的不足在于: 在目前部署了 HeNB/Relay 的网络架构中引入了 HeNB GW/De B后, HeNB GW/DeNB所代理的 HeNB/Relay并不能对过载的 MME进行相应的 过载控制。 发明内容
本发明所解决的技术问题在于提供了一种过载控制处理方法及设备, 用于解决 He B/RN无法进行过载控制的问题。
本发明实施例中提供了一种过载控制处理方法, 包括如下步骤:
代理功能节点设备接收 MME发送的过载控制消息;
代理功能节点设备将发送过载控制消息的 MME的 GUMMEI信息通知其代理的通信 设备 , 并通知其代理的通信设备对该 MME进行过载控制。
本发明实施例中提供了一种代理功能节点设备, 包括:
接收模块, 用于接收 MME发送的过载控制消息; 通知模块, 用于将发送过载控制消息的 MME的 GUMMEI信息通知代理功能节点设 备代理的通信设备, 并通知代理功能节点设备代理的通信设备对该 MME进行过载控制。
本实施例中提供了一种过载控制处理方法, 包括如下步骤:
通信设备接收代理功能节点设备发送的, 向该代理功能节点设备发送过载控制消息的 移动性管理实体 MME的全球唯一移动性管理实体标识 GUMMEI信息;
所述通信设备根据接收的 GUMMEI信息对相应的 MME进行过载控制。
本实施例中提供了一种通信设备, 包括:
接收模块, 用于接收代理功能节点设备发送的, 向该代理功能节点设备发送过载控制 消息的移动性管理实体 MME的全球唯一移动性管理实体标识 GUMMEI信息;
控制模块, 用于根据接收的 GUMMEI信息对相应的 MME进行过载控制。
本发明有益效果如下:
现有协议流程无法保证存在 He B GW的场景下, MME还能够对 He B发起的过载 控制过程有效进行, MME对 DeNB下的 RN发起的负载控制过程也存在同样的问题, 但 是由于在本发明实施例提供的技术方案中, 代理功能节点设备在接收到 MME发送的过载 控制消息后, 便将 MME的 GUMMEI信息通知其代理的通信设备, 并通知其代理的通信 设备对该 MME进行过载控制。克服了 He B/Relay因无法获知哪些 MME发生了过载情况, 因而无法进行相应的过载控制的问题, 本发明实施例提供的技术方案针对这个问题给出了 相应的解决方案, 从而保证了协议流程的正确性和完整性。 附图说明
图 1为背景技术中部署有 HeNB时可能的 E-UTRAN网络架构示意图;
图 2为背景技术中包含 RN的 E-UTRAN网络架构示意图;
图 3为背景技术中过载保护流程示意图;
图 4为本发明实施例中过载控制处理方法实施流程示意图;
图 5为本发明实施例中方式一的过载控制处理方法实施流程示意图;
图 6为本发明实施例中方式二的过载控制处理方法实施流程示意图;
图 7为本发明实施例中方式五的过载控制处理方法实施流程示意图;
图 8为本发明实施例一的网络结构示意图;
图 9为本发明实施例中代理功能节点设备结构示意图;
图 10为本发明实施例中通信设备结构示意图。 具体实施方式
发明人在发明过程中注意到:
在 e B与 MME之间,现有的协议流程是通过 overload过程对 MME进行过载保护的, e B在收到 MME的 overload start控制消息后,会拒绝针对该 MME的特定 RRC连接建立 过程,从而达到过载保护的效果。在 He B的网络架构中引入了具有代理功能的节点 HeNB GW, RN架构中引入了具有代理功能的节点 De B, RN通过无线接口 Un与 De B进行 通信。
目前的 HeNB/Relay的网络架构中引入的 HeNB GW/De B具备 NSF的功能, 可以 帮助 HeNB/Relay选择合适的 MME。 在 MME需要进行过载保护的时候可以使用 overload start消息通知 HeNB GW/De B,即 HeNB GW和 DeNB可以知道 MME的过载情况。但是, overload start消息中并不包含 MME的标识信息, 因此, 即使 HeNB GW/DeNB将该消息转 发给 HeNB/Relay, HeNB/Relay也无法获知哪些 MME发生了过载情况, 因此也就无法进 行相应的过载控制。 也即, 在 MME对 HeNB GW或 DeNB发起过载控制的过程中, 即使 HeNB GW和 DeNB知道是哪些 MME发生了过载,但是 HeNB GW/DeNB下面的 HeNB/RN 却是不知道这个信息的, 因此 HeNB/RN也将无法正确的拒绝连接到该 MME的 RRC连接 建立过程。
鉴于此, 本发明实施例中将提供一种过载保护的控制方案, 用于解决 HeNB/RN无法 进行过载控制的问题。 下面结合附图对本发明的具体实施方式进行说明。
图 4为过载控制处理方法实施流程示意图, 如图所示, 在过载处理过程中可以包括如 下步骤:
步骤 401、 代理功能节点设备接收 MME发送的过载控制消息;
步骤 402、 代理功能节点设备将发送过载控制消息的 MME 的 GUMMEI ( Globally
Unique MME Identifier, 全球唯一 MME标识)信息通知其代理的通信设备, 并通知其代理 的通信设备对该 MME进行过载控制。
本发明实施例中, 具有代理功能的代理功能节点设备可以是 HeNB GW或 DeNB等设 备, 其代理的通信设备可以是包含 HeNB、 RN等设备的低功率基站, 被代理的通信设备是 指需要通过代理功能节点设备才能与核心网通信的类型基站。
下面的实施中也将主要以 HeNB、 RN、 HeNB GW或 DeNB为例进行说明, 在实施中 以之为例是由于这几种设备比较常见,也是 E-UTRAN中可能的网络架构中的设备; 但是, 从理论上来说, 只要它们之间满足代理与被代理, 并且被代理的通信设备需要通过代理的 设备与核心网通信,那么这样的设备都可应用本发明实施例提供的方案, He B、RN、HeNB GW或 DeNB为例仅用于教导本领域技术人员具体如何实施本发明, 但不意味仅能使用这 些通信设备 , 实施过程中可以结合实践需要来选取相应的通信设备。
实施中, 代理功能节点设备通知其代理的通信设备对该 MME进行过载控制, 可以是 将过载的拒绝准则通知其代理的通信设备 , 其代理的通信设备根据通知的的拒绝准则对后 续接入的 RRC连接进行过载控制即可。
在以 He B、 RN、 He B GW或 DeNB为例进行实施中, He B GW和 DeNB在收到 MME发来的过载控制请求消息后, 可以将该消息转发给 HeNB或 RN, 同时将发生过载的 MME信息 (如, GUMMEI ) 包含到该消息中, 由 HeNB或 RN做相应的接入控制; 或是 通过新的 S 1 -AP/X2-AP过程, 定义专用的信令通知 HeNB和 RN发生过载的 MME信息; 对于 DeNB来说, 还可以通过新的空口 RRC消息通知 RN。 后续 HeNB GW或 DeNB收到 MME的 overload stop (过载停止 )消息后, 也可以按同样的方式告知 HeNB和 RN解除对 应 MME的过载状态。
下面对这几种方式进行说明。
实施中, 代理功能节点设备将发送过载控制消息的 MME的 GUMMEI信息通知其代 理的通信设备, 可以包括以下方式之一或者其组合:
方式一、将 MME的 GUMMEI信息添加进接收的 overload start或 overload stop消息后, 转发给其代理的通信设备。
该方式下, 以 HeNB GW为例, 可以通过 overload start/stop消息将进行过载保护的 MME信息 (如, GUMMEI )发送给 HeNB , 交由 HeNB进行过载保护的控制。
图 5为方式一的过载控制处理方法实施流程示意图,如图所示, HeNB GW收到 overload start/stop消息后,在将其转发给 HeNB的过程中,添加相关的 MME信息(如, GUMMEI ), 开启负载控制过程后,如果 HeNB收到 UE的 RRC连接建立请求, 就可以按照现有的协议 流程进行控制了。
方式二、 通过 S1-AP接口消息将 MME的 GUMMEI信息通知其代理的通信设备。 图 6为方式二的过载控制处理方法实施流程示意图,如图所示,该方式下,以 HeNB GW 为例, HeNB GW可以通过新的 S 1 -AP接口消息将过载保护的 MME信息(如, GUMMEI ) 发送给 HeNB , 交由 HeNB进行过载保护的控制。
方式二与方式一的区别是, 方式一中 HeNB GW中转了 MME的 overload start/stop消 息, 方法二中 HeNB GW终结了 MME的 overload start/stop消息, 具体实施中, 釆用中转 或终结的方式主要取决于 HeNB GW对非 UE相关信令的处理方式。
方式三、 通过 X2-AP接口消息将 MME的 GUMMEI信息通知其代理的通信设备。 该方式下, HeNB GW/DeNB可以通过 X2接口使用 X2-AP信令将过载保护的 MME 信息 (如, GUMMEI )发送给 He B/RN。
方式四、 通过空口使用 RRC消息将 MME的 GUMMEI信息通知其代理的通信设备。 该方式下, De B可以通过空口使用 RRC消息将过载保护的 MME信息(如, GUMMEI ) 发送给 He B/RNo
实施中, 代理功能节点设备可以是 HeNB GW, 其代理的通信设备是 HeNB;
或, 代理功能节点设备是 DeNB, 其代理的通信设备是 RN。
方式五、 通过 NAS ( Non Access Stratum, 非接入层 )传输消息将 MME的 GUMMEI 信息通知其代理的通信设备。
图 7为方式五的过载控制处理方法实施流程示意图,如图所示,该方式下,以 HeNB GW 为例, 可以利用 initial UE message (初始 UE消息)和 downlink nas transport (下行 NAS 传输)等过程完成相应的控制流程。 实施中, 以 HeNB GW为例可以如下:
HeNB在向 HeNB GW发送初始 UE消息时, 需要携带 S-TMSI或 GUMMEI信息(如 果存在), HeNB GW收到后, 发现与之对应的 MME处于过载状态, 那么 HeNB GW发送 消息下行 NAS传输消息给 HeNB , 同时携带过载的拒绝准则。 HeNB收到后, 释放该 UE 的 RRC连接, 同时 HeNB可获知该 MME处于过载状态, 根据下行 NAS传输消息中指示 的拒绝准则对后续接入的 RRC连接进行过载控制。
相应的, 如果 HeNB GW收到多个 MME的 overload start消息, 那么在上述过程中, 可以将过载的 MME的 GUMMEI以及对应的 overload action (过载的行为准则, 即过载后 的限制和处理方法)通过下行 NAS传输消息一并发给 HeNB , 由 HeNB进行后续的过载控 制。
如果 HeNB GW后续收到了 MME的 overload stop消息, 则也可以通过上述其它方式 通知 HeNB解除过载状态。
方式五对 RN也适用, 其中的用以示例的 HeNB GW可以是 DeNB节点, HeNB可以 是 RN节点。
下面再以实例进行说明。
实施例一:
图 8为实施例一的网络结构示意图, 在所有部署了 HeNB GW场景下的 MME发起的 overload控制过程中, MME向 HeNB GW发起 overload过程, HeNB GW收到后, 通过新 增的 S1接口或 X2接口过程转发给 HeNB, 转发的过程中, HeNB GW需要将发生过载的 MME信息 (如, 如 GUMMEI )发送给 HeNB。 此时的过载控制由 HeNB进行。 每次 HeNB在 UE发起 RRC连接建立过程中,根据从 UE上报的 S-TMSI或 GUMMEI 信息判断该 UE的注册 MME,同时与发生过载的 MME进行对比,若相同且满足拒绝策略, 则拒绝该 RRC连接建立请求或释放该 RRC连接, 若不相同, 则允许该 UE接入。
MME向 DeNB发起 overload过程, DeNB收到后,通过新增 X2接口过程转发给 RN, 转发的过程中, DeNB需要将发生过载的 MME信息 (如, 如 GUMMEI )发送给 RN。 此 时的过载控制由 RN进行。
实施例二:
MME发起的 overload过程, HeNB GW收到后,将这条消息通过 S 1接口转发给 HeNB , 转发的过程中, HeNB GW在其中添加发生了过载的 MME的信息 (如 GUMMEI ), 此时 的过载控制由 HeNB进行, 后续处理方法可以参见实施例一。
实施例三:
DeNB收到 MME发来的 overload start消息后, 通过 RRC消息通知 RN, 该 RRC消息 中包含发生过载的 MME信息 (如, 如 GUMMEI ), 此时的过载控制由 RN进行, 后续处 理与 HeNB相同。
实施例四:
针对上述三种实施例的场景, 当 MME发送 overload stop消息时, HeNB GW/DeNB釆 用同样的方法, 通知 HeNB和 RN相应的 MME已经解除过载状态, 不必再对 UE的接入 过程做之前通知过的限制。 用于通知 He B/RN的 S1-AP、 X2-AP, RRC消息可以携带解 除过载状态 MME的标识信息(如, GUMMEI ), 或者, 当最后一个 MME过载解除时, 用 于通知 HeNB/RN的 S 1 -AP、 X2-AP、 RRC消息可以不携带任何 MME信息, HeNB/RN收 到后取消过载控制即可。
实施例五:
HeNB GW/DeNB收到 MME的 overload start消息后, 又收到 UE请求接入的初始 UE 消息, HeNB GW/DeNB根据其中携带的 S-TMSI信息或 GUMMEI信息判决该 MME是否 处于过载状态,若是,则通过下行 NAS消息传输将过载控制的拒绝准则发送给 HeNB/RN, 由 HeNB/RN进行后续的过载控制过程。
基于同一发明构思, 本发明实施例中还提供了一种代理功能节点设备, 由于该设备解 决问题的原理与一种过载控制处理方法相似, 因此该设备的实施可以参见方法的实施, 重 复之处不再赘述。
图 9为代理功能节点设备结构示意图, 如图所示, 设备中可以包括:
接收模块 901 , 用于接收 MME发送的过载控制消息; 通知模块 902,用于将发送过载控制消息的 MME的 GUMMEI信息通知代理功能节点 设备代理的通信设备,并通知代理功能节点设备代理的通信设备对该 MME进行过载控制; 实施中, 通知模块可以包括以下单元之一或者其组合:
转发通知单元,用于将 MME的 GUMMEI信息添加进接收的 overload start或 overload stop消息后, 转发给代理功能节点设备代理的通信设备;
S1通知单元, 用于通过 S1-AP接口消息将 MME的 GUMMEI信息通知代理功能节点 设备代理的通信设备,并通知代理功能节点设备代理的通信设备对该 MME进行过载控制; X2通知单元,用于通过 X2-AP接口消息将 MME的 GUMMEI信息通知代理功能节点 设备代理的通信设备,并通知代理功能节点设备代理的通信设备对该 MME进行过载控制; NAS通知单元,用于通过 NAS传输消息将 MME的 GUMMEI信息通知其代理的通信 设备, 并通知代理功能节点设备代理的通信设备对该 MME进行过载控制。
实施中,代理功能节点设备是 He B GW,代理功能节点设备代理的通信设备是 He B; 或, 代理功能节点设备是 De B, 代理功能节点设备代理的通信设备是 RN。
实施中, 通知模块可以包括:
空口通知单元, 用于通过空口使用 RRC消息将 MME的 GUMMEI信息通知代理功能 节点设备代理的通信设备, 并通知代理功能节点设备代理的通信设备对该 MME进行过载 控制。
实施中, 代理功能节点设备是 DeNB, 代理功能节点设备代理的通信设备是 RN。 图 10为通信设备结构示意图, 如图所示, 设备中可以包括:
接收模块 1001 , 用于接收代理功能节点设备发送的, 向该代理功能节点设备发送过载 控制消息的移动性管理实体 MME的全球唯一移动性管理实体标识 GUMMEI信息;
控制模块 1002, 用于根据接收的 GUMMEI信息对相应的 MME进行过载控制。
实施中, 通知模块 1001包括以下单元之一或者其组合:
转发接收单元, 用于在代理功能节点设备转发的过载开始 overload start或过载停止 overload stop消息中, 接收所述 GUMMEI信息;
S 1接收单元, 用于在通过 S 1接口应用协议 S 1 -AP接口消息中, 接收所述 GUMMEI 信息;
X2接收单元, 用于在通过 X2接口应用协议 X2-AP接口消息中, 接收所述 GUMMEI 信息;
NAS接收单元,用于在通过下行非接入层 NAS传输消息中,接收所述 GUMMEI信息。 实施中, 通信设备可以是 HeNB, 代理功能节点设备可以是 HeNB GW; 或, 通信设备是 RN, 代理功能节点设备是 DeNB,
实施中, 通知模块 1001包括:
空口接收单元, 用于通过空口使用 RRC 消息接收代理功能节点设备发送的, 向该代 理功能节点设备发送过载控制消息的 MME的 GUMMEI信息。
实施中, 通信设备是 RN, 代理功能节点设备是 DeNB。
为了描述的方便,以上所述装置的各部分以功能分为各种模块或单元分别描述。 当然, 在实施本发明时可以把各模块或单元的功能在同一个或多个软件或硬件中实现。
由上述实施例可见, He B GW和 DeNB在收到 MME发来的过载控制请求消息后, 可以将该消息转发给 HeNB或 RN, 同时将发生过载的 MME信息 (如, GUMMEI ) 包含 到该消息中, 由 HeNB或 RN做相应的接入控制; 或是通过新的 S1-AP/X2AP过程, 定义 专用的信令通知 HeNB和 RN发生过载的 MME信息; 对与 DeNB来说, 还可以通过新的 空口 RRC消息通知 RN, 还可以在 HeNB GW/De B收到 MME的 overload start消息后, 根据初始 UE消息中携带的 S-TMSI信息或 GUMMEI信息判决该 UE请求接入的 MME是 否处于过载状态, 若是, 则通过下行 NAS 消息传输将过载控制的拒绝准则以及相应的 GUMMEI信息发送给 He B/RN, 由 HeNB/RN进行后续的过载控制过程。后续 HeNB GW 或 DeNB收到 MME的 overload stop消息后,以同样的方式告知 HeNB和 RN解除对应 MME 的过载状态。
现有协议流程无法保证存在 HeNB GW的场景下, MME还能够对 HeNB发起的过载 控制过程有效进行, MME对 DeNB下的 RN发起的负载控制过程也存在同样的问题, 本 发明实施例提供的技术方案针对这个问题给出了相应的解决方案, 保证了协议流程的正确 性和完整性。
本领域内的技术人员应明白, 本发明的实施例可提供为方法、 系统、 或计算机程序产 品。 因此, 本发明可釆用完全硬件实施例、 完全软件实施例、 或结合软件和硬件方面的实 施例的形式。 而且, 本发明可釆用在一个或多个其中包含有计算机可用程序代码的计算机 可用存储介盾 (包括但不限于磁盘存储器、 CD-ROM、 光学存储器等)上实施的计算机程 序产品的形式。
本领域内的技术人员应明白, 本发明的实施例可提供为方法、 系统、 或计算机程序产 品。 因此, 本发明可釆用完全硬件实施例、 完全软件实施例、 或结合软件和硬件方面的实 施例的形式。 而且, 本发明可釆用在一个或多个其中包含有计算机可用程序代码的计算机 可用存储介盾 (包括但不限于磁盘存储器、 CD-ROM、 光学存储器等)上实施的计算机程 序产品的形式。 本发明是参照根据本发明实施例的方法、 设备(系统)、 和计算机程序产品的流程图 和 /或方框图来描述的。 应理解可由计算机程序指令实现流程图和 /或方框图中的每一流 程和 /或方框、 以及流程图和 /或方框图中的流程和 /或方框的结合。 可提供这些计算机 程序指令到通用计算机、 专用计算机、 嵌入式处理机或其他可编程数据处理设备的处理器 以产生一个机器, 使得通过计算机或其他可编程数据处理设备的处理器执行的指令产生用 于实现在流程图一个流程或多个流程和 /或方框图一个方框或多个方框中指定的功能的 装置。
这些计算机程序指令也可存储在能引导计算机或其他可编程数据处理设备以特定方 式工作的计算机可读存储器中, 使得存储在该计算机可读存储器中的指令产生包括指令装 置的制造品, 该指令装置实现在流程图一个流程或多个流程和 /或方框图一个方框或多个 方框中指定的功能。
这些计算机程序指令也可装载到计算机或其他可编程数据处理设备上, 使得在计算机 或其他可编程设备上执行一系列操作步骤以产生计算机实现的处理, 从而在计算机或其他 可编程设备上执行的指令提供用于实现在流程图一个流程或多个流程和 /或方框图一个 方框或多个方框中指定的功能的步骤。
尽管已描述了本发明的优选实施例, 但本领域内的技术人员一旦得知了基本创造性概 念, 则可对这些实施例作出另外的变更和修改。 所以, 所附权利要求意欲解释为包括优选 实施例以及落入本发明范围的所有变更和修改。
显然, 本领域的技术人员可以对本发明实施例进行各种改动和变型而不脱离本发明实 施例的精神和范围。 这样, 倘若本发明实施例的这些修改和变型属于本发明权利要求及其 等同技术的范围之内, 则本发明也意图包含这些改动和变型在内。

Claims

权 利 要 求
1、 一种过载控制处理方法, 其特征在于, 包括如下步骤:
代理功能节点设备接收移动性管理实体 MME发送的过载控制消息;
代理功能节点设备将发送过载控制消息的 MME 的全球唯一移动性管理实体标识 GUMMEI信息通知其代理的通信设备 ,并通知其代理的通信设备对该 MME进行过载控制。
2、 如权利要求 1 所述的方法, 其特征在于, 代理功能节点设备将发送过载控制消息 的 MME的 GUMMEI信息通知其代理的通信设备, 包括以下方式之一或者其组合:
将 MME的 GUMMEI信息添加进接收的过载开始 overload start或过载停止 overload stop消息后, 转发给其代理的通信设备;
通过 S1接口应用协议 S1-AP接口消息将 MME的 GUMMEI信息通知其代理的通信设 备;
通过 X2接口应用协议 X2-AP接口消息将 MME的 GUMMEI信息通知其代理的通信 设备;
通过下行非接入层 NAS传输消息将 MME的 GUMMEI信息通知其代理的通信设备。
3、 如权利要求 2 所述的方法, 其特征在于, 代理功能节点设备是演进的家庭基站网 关 He B GW, 其代理的通信设备是演进的家庭基站 He B;
或, 代理功能节点设备是施主演进基站 De B , 其代理的通信设备是中继节点 RN。
4、 如权利要求 1 所述的方法, 其特征在于, 代理功能节点设备将发送过载控制消息 的 MME的 GUMMEI信息通知其代理的通信设备时, 通过空口使用无线资源控制 RRC消 息将 MME的 GUMMEI信息通知其代理的通信设备。
5、 如权利要求 4所述的方法, 其特征在于, 代理功能节点设备是 DeNB , 其代理的通 信设备是腿。
6、 一种代理功能节点设备, 其特征在于, 包括:
接收模块, 用于接收 MME发送的过载控制消息;
通知模块, 用于将发送过载控制消息的 MME的 GUMMEI信息通知代理功能节点设 备代理的通信设备, 并通知代理功能节点设备代理的通信设备对该 MME进行过载控制。
7、 如权利要求 6所述的设备, 其特征在于, 通知模块包括以下单元之一或者其组合: 转发通知单元,用于将 MME的 GUMMEI信息添加进接收的 overload start或 overload stop消息后, 转发给代理功能节点设备代理的通信设备;
S1通知单元, 用于通过 S1-AP接口消息将 MME的 GUMMEI信息通知代理功能节点 设备代理的通信设备,并通知代理功能节点设备代理的通信设备对该 MME进行过载控制;
X2通知单元,用于通过 X2-AP接口消息将 MME的 GUMMEI信息通知代理功能节点 设备代理的通信设备,并通知代理功能节点设备代理的通信设备对该 MME进行过载控制; NAS通知单元,用于通过 NAS传输消息将 MME的 GUMMEI信息通知其代理的通信 设备, 并通知代理功能节点设备代理的通信设备对该 MME进行过载控制。
8、 如权利要求 7所述的设备, 其特征在于, 代理功能节点设备是 He B GW, 代理功 能节点设备代理的通信设备是 He B;
或, 代理功能节点设备是 De B, 代理功能节点设备代理的通信设备是 RN。
9、 如权利要求 6所述的设备, 其特征在于, 通知模块包括:
空口通知单元, 用于通过空口使用 RRC消息将 MME的 GUMMEI信息通知代理功能 节点设备代理的通信设备, 并通知代理功能节点设备代理的通信设备对该 MME进行过载 控制。
10、 如权利要求 9所述的设备, 其特征在于, 代理功能节点设备是 DeNB, 代理功能 节点设备代理的通信设备是腿。
11、 一种过载控制处理方法, 其特征在于, 包括如下步骤:
通信设备接收代理功能节点设备发送的, 向该代理功能节点设备发送过载控制消息的 移动性管理实体 MME的全球唯一移动性管理实体标识 GUMMEI信息;
所述通信设备根据接收的 GUMMEI信息对相应的 MME进行过载控制。
12、如权利要求 11所述的方法,其特征在于,通信设备接收代理功能节点设备发送的, 向该代理功能节点设备发送过载控制消息的 MME的 GUMMEI信息, 包括以下方式之一 或者其组合:
在代理功能节点设备转发的过载开始 overload start或过载停止 overload stop消息中, 接收所述 GUMMEI信息;
在通过 S 1接口应用协议 S 1 -AP接口消息中, 接收所述 GUMMEI信息;
在通过 X2接口应用协议 X2-AP接口消息中, 接收所述 GUMMEI信息;
在通过下行非接入层 NAS传输消息中, 接收所述 GUMMEI信息。
13、如权利要求 12所述的方法,其特征在于,所述通信设备是演进的家庭基站 HeNB, 所述代理功能节点设备是演进的家庭基站网关 HeNB GW;
或, 所述通信设备是中继节点 RN, 所述代理功能节点设备是施主演进基站 DeNB。
14、如权利要求 11所述的方法, 其特征在于, 所述通信设备接收代理功能节点设备发 送的, 向该代理功能节点设备发送过载控制消息的 MME的 GUMMEI信息时, 通过空口 使用无线资源控制 RRC消息接收所述 MME的 GUMMEI信息。
15、 如权利要求 14所述的方法, 其特征在于, 所述通信设备是 RN, 所述代理功能节 点设备是 De肌
16、 一种通信设备, 其特征在于, 包括:
接收模块, 用于接收代理功能节点设备发送的, 向该代理功能节点设备发送过载控制 消息的移动性管理实体 MME的全球唯一移动性管理实体标识 GUMMEI信息;
控制模块, 用于根据接收的 GUMMEI信息对相应的 MME进行过载控制。
17、 如权利要求 16 所述的设备, 其特征在于, 所述接收模块包括以下单元之一或者 其组合:
转发接收单元, 用于在代理功能节点设备转发的过载开始 overload start或过载停止 overload stop消息中, 接收所述 GUMMEI信息;
S 1接收单元, 用于在通过 S 1接口应用协议 S 1 -AP接口消息中, 接收所述 GUMMEI 信息;
X2接收单元, 用于在通过 X2接口应用协议 X2-AP接口消息中, 接收所述 GUMMEI 信息;
NAS接收单元,用于在通过下行非接入层 NAS传输消息中,接收所述 GUMMEI信息。
18、 如权利要求 17所述的设备, 其特征在于, 所述通信设备是 He B, 所述代理功能 节点设备是 He B GW;
或, 所述通信设备是 RN, 所述代理功能节点设备是 De B,
19、 如权利要求 16所述的设备, 其特征在于, 所述接收模块包括:
空口接收单元, 用于通过空口使用 RRC 消息接收代理功能节点设备发送的, 向该代 理功能节点设备发送过载控制消息的 MME的 GUMMEI信息。
20、 如权利要求 19所述的设备, 其特征在于, 所述通信设备是 RN, 所述代理功能节 点设备是 De肌
PCT/CN2011/079615 2010-09-21 2011-09-14 一种过载控制处理方法及设备 WO2012037856A1 (zh)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN2010102901841A CN102413497A (zh) 2010-09-21 2010-09-21 一种过载控制处理方法及设备
CN201010290184.1 2010-09-21

Publications (1)

Publication Number Publication Date
WO2012037856A1 true WO2012037856A1 (zh) 2012-03-29

Family

ID=45873432

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2011/079615 WO2012037856A1 (zh) 2010-09-21 2011-09-14 一种过载控制处理方法及设备

Country Status (2)

Country Link
CN (1) CN102413497A (zh)
WO (1) WO2012037856A1 (zh)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112203336B (zh) * 2016-03-31 2022-05-17 华为技术有限公司 无线接入控制方法、装置及系统
WO2020199195A1 (zh) * 2019-04-04 2020-10-08 华为技术有限公司 一种数据处理方法、中继设备和网络设备

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101459928A (zh) * 2008-04-16 2009-06-17 中兴通讯股份有限公司 网元间的过载通知方法
CN101730033A (zh) * 2008-11-03 2010-06-09 中兴通讯股份有限公司 一种长期演进网络中的过载控制方法及系统

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101459928A (zh) * 2008-04-16 2009-06-17 中兴通讯股份有限公司 网元间的过载通知方法
CN101730033A (zh) * 2008-11-03 2010-06-09 中兴通讯股份有限公司 一种长期演进网络中的过载控制方法及系统

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
NEC: "Handling of MME Overload in an RN deployment", 3GPP TSG-RAN WG3#69, 15 August 2010 (2010-08-15), Retrieved from the Internet <URL:http://www.3gpp.org/ftp/tsg_ran/WG3_Iu/TSGR3_69/Docs/R3-102312.zip> *

Also Published As

Publication number Publication date
CN102413497A (zh) 2012-04-11

Similar Documents

Publication Publication Date Title
JP6972023B2 (ja) 無線通信システムの端末の方法、無線通信システムの基地局の方法、端末、及び基地局
US10342066B2 (en) Method and apparatus for dual connectivity management
CN109892003B (zh) 经由具有中继能力的用户装备ue在远程ue和电信网络之间建立连接的方法和系统
US10932174B2 (en) Communication system
US10342061B2 (en) Radio communication system and control method
WO2018165996A1 (zh) 切换方法和装置
JP6656361B2 (ja) 無線リソース制御(rrc)接続を解放する方法および装置
JP2017502571A (ja) モバイル通信システム、基地局、及びそれらの方法
WO2013170650A1 (zh) 一种集群业务实现系统及装置
WO2014166440A1 (zh) 集群中继方法、装置、系统及存储介质
WO2012019554A1 (zh) 获取控制节点信息的方法、设备及系统
JP2016504809A (ja) ローカルipアクセス接続を解放する方法および装置、移動管理ユニット、無線側ネットワーク要素
WO2014117386A1 (zh) 数据交互的方法和装置
WO2017117804A1 (zh) 终端设备、接入网设备、空口配置方法和无线通信系统
WO2018202131A1 (zh) 通信方法、装置及系统
WO2011130990A1 (zh) 基站切换中无线资源连接重建立拒绝的方法、系统和装置
WO2014166458A1 (zh) 切换方法、装置、基站、系统及计算机存储介质
JP6067145B2 (ja) X2プロキシを実現する方法およびシステム
WO2012155656A1 (zh) 一种宿主基站、中继节点设备及增强路径转换的方法
JP5412566B1 (ja) ハンドオーバ元無線基地局、ハンドオーバ先無線基地局、無線通信システムおよび無線通信方法
WO2012037856A1 (zh) 一种过载控制处理方法及设备
WO2015077982A1 (zh) 信息交互装置、基站和通信系统
JP2014057259A (ja) 移動通信システムおよび移動通信方法
WO2011060687A1 (zh) 一种基站去注册方法及系统
WO2012142875A1 (zh) 一种确定设备类型的方法、系统和设备

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 11826383

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 11826383

Country of ref document: EP

Kind code of ref document: A1