WO2011147174A1 - Transfer method and system for connection management in automatic switching optical network - Google Patents

Transfer method and system for connection management in automatic switching optical network Download PDF

Info

Publication number
WO2011147174A1
WO2011147174A1 PCT/CN2010/079572 CN2010079572W WO2011147174A1 WO 2011147174 A1 WO2011147174 A1 WO 2011147174A1 CN 2010079572 W CN2010079572 W CN 2010079572W WO 2011147174 A1 WO2011147174 A1 WO 2011147174A1
Authority
WO
WIPO (PCT)
Prior art keywords
migration
connection information
network element
permanent connection
network
Prior art date
Application number
PCT/CN2010/079572
Other languages
French (fr)
Chinese (zh)
Inventor
梁树国
Original Assignee
中兴通讯股份有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 中兴通讯股份有限公司 filed Critical 中兴通讯股份有限公司
Publication of WO2011147174A1 publication Critical patent/WO2011147174A1/en

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04QSELECTING
    • H04Q11/00Selecting arrangements for multiplex systems
    • H04Q11/0001Selecting arrangements for multiplex systems using optical switching
    • H04Q11/0062Network aspects
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L41/00Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
    • H04L41/04Network management architectures or arrangements
    • H04L41/046Network management architectures or arrangements comprising network management agents or mobile agents therefor
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04QSELECTING
    • H04Q11/00Selecting arrangements for multiplex systems
    • H04Q11/0001Selecting arrangements for multiplex systems using optical switching
    • H04Q11/0062Network aspects
    • H04Q2011/0079Operation or maintenance aspects

Definitions

  • FIG. 2 is a schematic diagram showing the composition of an optical network after adding an ASON.
  • the network is mainly composed of: a network management layer, a network element proxy layer, a transport plane, and an ASON control plane.
  • ASON controls the migration collaboration between the three planes.
  • Chinese Patent Application No. 200810098298.9 discloses "a state transition based migration method in an automatic switched optical network", but the application only describes how each ASON node performs PC based on state transition from the perspective of ASON. SPC's mutual migration.
  • the migration management method of the connection management in other existing ASON optical networks has the following problems: For the migration of the soft permanent connection information during the connection management migration process, if the migration of the connection management involves multiple network elements, each network element has A migration of the soft and permanent connection information is required. It needs to be migrated multiple times. If there is a migration failure, the previous migration has already been migrated and needs to be restored to the original configuration.
  • the PC migration processing module is configured to: perform permanent connection information migration according to the intermediate migration result information reported by the network element proxy layer network element.
  • the network element proxy layer network element is further configured to: if the intermediate migration result is successful, report the intermediate migration result information to the network management layer network element after adding or deleting the corresponding permanent connection information; If the result of the intermediate migration is a failure, the network element of the network element of the network element does not perform the modification of the permanent connection information, and directly reports the intermediate migration result information to the network management network element.
  • the PC migration processing module is further configured as: If the result of the intermediate migration is successful, the corresponding permanent connection information is added or deleted. If the intermediate migration result is a failure, the permanent connection information is not modified.

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Data Exchanges In Wide-Area Networks (AREA)

Abstract

A transfer method for the connection management in an Automatic Switching Optical Network (ASON) is provided in the present invention. The method includes: based on the final transfer result reported by the initial node of the ASON, the network management layer determines to perform the transfer for the Soft Permanent Connection (SPC) information when the final transfer result is that the transfers of the SPC information of all the ASON nodes are successful. A transfer system for the connection management in an ASON is also provided in the present invention. The system includes a network element of the network management layer. Said network element of the network management layer includes a SPC transfer decision processing module. A network element of the network management layer in an ASON is further provided in the present invention. The technical solutions of the present invention can avoid multiple transfers and the middle transfers under the situation that the transfers are unsuccessful, thus the transfer efficiency is improved, and the burden of the network management layer is reduced.

Description

一种自动交换光网络中连接管理的迁移方法及系统  Migration method and system for connection management in automatic switched optical network
技术领域 本发明涉及通信领域, 具体而言, 涉及一种自动交换光网络中连接管理 的迁移方法及系统。 TECHNICAL FIELD The present invention relates to the field of communications, and in particular to a method and system for migrating connection management in an automatic switched optical network.
背景技术 传统的光网络是通过网络管理层执行配置的, 由网络管理层完成网络的 配置, 只保存永久连接 ( Permanent Connection, 简称为 PC )信息, 并且该 永久连接信息在网络管理层和网元代理层都有保存。 如图 1所示, 传统的光 网络主要由网络管理层、 网元代理层, 以及传送平面构成, 其中该传送平面 是指具体传送业务的单板通过光纤连接所形成的一个平面。 自动交换光网络 ( Automatic Switched Optical Network, ASON )是一种 智能的可以实现自动交换的光网络, 目前得到了一定的发展和应用, 并且有 应用范围逐步扩大的趋势。 目前, 在 ASON 网络中, 既有传统的永久连接信息, 也有新的适用于 ASON网络的软永久连接 ( Soft Permanent Connection, 简称为 SPC )信息。 出于网络维护等原因, 需要进行连接管理的迁移, 进而有将传统的由网络管 理层配置的交换信息 (即永久连接信息 )转换为 ASON自动管理的交换信息 (即软永久连接信息), 以及反向的将 ASON自动管理的交换信息转换为网 络管理层配置的交换信息的需要。 图 2示出了加入 ASON后的光网络的组成示意图, 该网络主要由: 网络 管理层、 网元代理层、 传送平面, 以及 ASON控制平面构成。 参见图 2, 该 网络具有如下特点: 永久连接信息是点到点的, 每一个网元代理层都有保存永久连接信息, 并且需要和网络管理层保存的永久连接信息一致; 软永久连接信息是端到端的, 网元代理层没有保存软永久连接信息, 该 信息只保存在 ASON控制平面和网络管理层上。 自动交换光网络中连接管理的迁移涉及网络管理层、 网元代理层和A traditional optical network is configured by a network management layer, and the network management layer completes the configuration of the network, and only stores permanent connection (PC) information, and the permanent connection information is in the network management layer and the network element. The agent layer is saved. As shown in FIG. 1 , a conventional optical network is mainly composed of a network management layer, a network element proxy layer, and a transport plane, where the transport plane is a plane formed by a fiber-optic connection. Automatic Switched Optical Network (ASON) is an intelligent optical network that can realize automatic switching. It has been developed and applied in a certain way, and has a tendency to gradually expand its application range. Currently, in the ASON network, there are both traditional permanent connection information and a new Soft Permanent Connection (SPC) information for the ASON network. For network maintenance and other reasons, connection management migration is required, and then the traditional exchange information (ie, permanent connection information) configured by the network management layer is converted into ASON automatically managed exchange information (ie, soft permanent connection information), and Reverse the need to convert the exchange information automatically managed by ASON into the exchange information configured by the network management layer. FIG. 2 is a schematic diagram showing the composition of an optical network after adding an ASON. The network is mainly composed of: a network management layer, a network element proxy layer, a transport plane, and an ASON control plane. Referring to FIG. 2, the network has the following characteristics: The permanent connection information is point-to-point, and each network element agent layer has persistent connection information and needs to be consistent with the permanent connection information saved by the network management layer; the soft permanent connection information is End-to-end, the network element proxy layer does not save the soft permanent connection information, Information is only stored on the ASON control plane and network management. The migration of connection management in an automatic switched optical network involves the network management layer, the network element proxy layer, and
ASON控制平面三者之间的迁移协作。 现有的专利文献中, 中国专利申请 200810098298.9公开了 "一种自动交换光网络中基于状态转换的迁移方法", 但该申请只是从 ASON的角度描述了各个 ASON节点是如何基于状态转换进 行 PC与 SPC的相互迁移的。 而其他现有 ASON光网络中的连接管理的迁移方法具有如下问题: 对于 连接管理迁移过程中的软永久连接信息的迁移, 如果连接管理的迁移涉及到 多个网元, 则每一个网元都需要进行一次软永久连接信息的迁移, 需要迁移 多次; 并且, 如果有迁移失败的, 则之前迁移已经进行过迁移的还需要恢复 为原来的配置。 ASON controls the migration collaboration between the three planes. In the prior patent documents, Chinese Patent Application No. 200810098298.9 discloses "a state transition based migration method in an automatic switched optical network", but the application only describes how each ASON node performs PC based on state transition from the perspective of ASON. SPC's mutual migration. The migration management method of the connection management in other existing ASON optical networks has the following problems: For the migration of the soft permanent connection information during the connection management migration process, if the migration of the connection management involves multiple network elements, each network element has A migration of the soft and permanent connection information is required. It needs to be migrated multiple times. If there is a migration failure, the previous migration has already been migrated and needs to be restored to the original configuration.
发明内容 本发明解决的技术问题是提供一种自动交换光网络中连接管理的迁移方 法及系统, 在保证和已有网络兼容的同时, 提高网络管理层的效率。 为解决上述技术问题, 本发明提供了一种自动交换光网络中连接管理的 迁移方法, 该方法包括: 网络管理层根据自动交换光网络(ASON )首节点上>¾的最终迁移结果, 在该最终迁移结果为全部 ASON节点的软永久连接( SPC )信息迁移成功时, 决策进行软永久连接信息的迁移。 所述方法还包括: 网络管理层通过网元代理层通知 ASON首节点进行连接管理的迁移; SUMMARY OF THE INVENTION The technical problem to be solved by the present invention is to provide a migration method and system for connection management in an automatic switched optical network, which improves the efficiency of the network management layer while ensuring compatibility with existing networks. To solve the above technical problem, the present invention provides a method for migrating connection management in an automatic switched optical network, the method comprising: the network management layer according to a final migration result of >3⁄4 on the first node of the Automatically Switched Optical Network (ASON), The result of the final migration is that when the soft permanent connection (SPC) information of all ASON nodes is successfully migrated, the decision is made to migrate the soft permanent connection information. The method further includes: the network management layer notifying the ASON head node to perform connection management migration by using the network element proxy layer;
ASON首节点向每一个相关 ASON节点下发连接管理的迁移请求; 所述每一个相关 ASON节点执行相应的迁移操作,并将中间迁移结果通 知网元代理层, 网元代理层向网络管理层上报中间迁移结果信息; The ASON head node sends a connection management migration request to each of the associated ASON nodes; each of the associated ASON nodes performs a corresponding migration operation, and notifies the network element proxy layer of the intermediate migration result, and the network element agent layer reports to the network management layer. Intermediate migration result information;
ASON首节点将最终迁移结果通过网元代理层上 4艮给网络管理层; 网络管理层根据所述最终迁移结果决策是否进行软永久连接信息的迁 移。 所述方法还包括: The ASON head node passes the final migration result to the network management layer through the network element proxy layer. The network management layer determines whether to perform the migration of the soft permanent connection information according to the final migration result. The method further includes:
如果所述中间迁移结果为成功, 则网元代理层增加或删除相应的永久连 接信息后, 向网络管理层上报所述中间迁移结果信息, 网络管理层也增加或 删除相应的永久连接信息;  If the intermediate migration result is successful, the network agent layer reports the intermediate migration result information to the network management layer after adding or deleting the corresponding permanent connection information, and the network management layer also adds or deletes the corresponding permanent connection information;
如果所述中间迁移结果为失败, 则网元代理层不进行永久连接信息的修 改, 直接向网络管理层上报所述中间迁移结果信息, 网络管理层也不进行永 久连接信息的修改。 网络管理层决策进行软永久连接信息的迁移时, 所述方法还包括: 网络 管理层增加或删除相应的软永久连接信息; 所述方法还包括: 网络管理层决策不进行软永久连接信息的迁移时, 网 络管理层将不进行软永久连接信息的修改。 所述网元代理层在增加永久连接信息时, 仅将增加的永久连接信息保存 在数据库中, 不下发给传送平面; 所述网元代理层在删除永久连接信息时, 仅将数据库中相应的永久连接 信息删除, 不下发给传送平面。 为解决上述技术问题, 本发明还提供了一种自动交换光网络中连接管理 的迁移系统, 所述系统包括网络管理层网元, 所述网络管理层网元包括软永 久连接 ( SPC ) 迁移决策处理模块, 其中: 所述 SPC迁移决策处理模块设置为:根据 ASON首节点上报的最终迁移 结果,在该最终迁移结果为全部 ASON节点的 SPC连接信息迁移成功时,决 策进行软永久连接信息的迁移。 所述系统还包括网元代理层网元, 所述网络管理层网元还包括永久连接 ( PC ) 迁移处理模块, 所述网元代理层网元设置为: 收到执行连接管理迁移的相关 ASON节点 通知的中间迁移结果后, 向所述网络管理层网元上报中间迁移结果信息; 所述 PC迁移处理模块设置为: 根据所述网元代理层网元上报的中间迁 移结果信息进行永久连接信息的迁移。 所述网元代理层网元是设置按如下方式向所述网络管理层网元上报中间 迁移结果信息: 如果所述中间迁移结果为成功, 则在增加或删除相应的永久 连接信息后, 向网络管理层网元上报所述中间迁移结果信息; 如果所述中间 迁移结果为失败, 则网元代理层网元不进行永久连接信息的修改, 直接向网 络管理层网元上报所述中间迁移结果信息; 所述 PC迁移处理模块是设置为按如下方式根据所述网元代理层上报的 中间迁移结果信息进行永久连接信息的迁移: 根据所述网元代理层网元上报 的中间迁移结果, 如果所述中间迁移结果为成功, 则增加或删除相应的永久 连接信息; 如果所述中间迁移结果为失败, 则不进行永久连接信息的修改。 所述 SPC迁移决策处理模块还设置为: 决策进行软永久连接信息的迁移 时, 则增加或删除相应的软永久连接信息; 决策不进行软永久连接信息的迁 移时, 则不进行软永久连接信息的修改。 所述网元代理层网元还设置为: 在增加永久连接信息时, 仅将增加的永 久连接信息保存在数据库中, 不下发给传送平面; 以及在删除永久连接信息 时, 仅将数据库中相应的永久连接信息删除, 不下发给传送平面。 为解决上述技术问题, 本发明还提供了一种自动交换光网络中的网络管 理层网元, 所述网络管理层网元包括软永久连接(SPC )迁移决策处理模块, 其中: 所述 SPC迁移决策处理模块设置为:根据 ASON首节点上报的最终迁移 结果,在该最终迁移结果为全部 ASON节点的 SPC连接信息迁移成功时,决 策进行软永久连接信息的迁移。 所述网络管理层网元还包括永久连接 ( PC ) 迁移处理模块, 所述 PC迁移处理模块设置为: 接收网元代理层在收到执行连接管理迁 移的相关 ASON节点通知的中间迁移结果后, 向所述网络管理层网元上 "^的 中间迁移结果信息, 并根据所述网元代理层上报的中间迁移结果信息进行永 久连接信息的迁移。 所述 PC迁移处理模块是设置为按如下方式根据所述网元代理层上报的 中间迁移结果信息进行永久连接信息的迁移: 根据所述网元代理层上报的中 间迁移结果, 如果所述中间迁移结果为成功, 则增加或删除相应的永久连接 信息; 如果所述中间迁移结果为失败, 则不进行永久连接信息的修改。 所述 SPC迁移决策处理模块还设置为: 决策进行软永久连接信息的迁移 时, 则增加或删除相应的软永久连接信息; 决策不进行软永久连接信息的迁 移时, 则不进行软永久连接信息的修改。 If the result of the intermediate migration is a failure, the network agent layer does not modify the permanent connection information, directly reports the intermediate migration result information to the network management layer, and the network management layer does not modify the permanent connection information. When the network management layer determines the migration of the soft permanent connection information, the method further includes: the network management layer adds or deletes the corresponding soft permanent connection information; the method further includes: the network management layer determines not to perform the soft permanent connection information migration At the time, the network management layer will not modify the soft permanent connection information. When the network element proxy layer adds the persistent connection information, only the added permanent connection information is saved in the database, and is not sent to the transmission plane; when the network element proxy layer deletes the permanent connection information, only the corresponding one in the database is deleted. The permanent connection information is deleted and is not sent to the transmission plane. To solve the above technical problem, the present invention further provides a migration management system for connection management in an automatic switched optical network, where the system includes a network management layer network element, and the network management layer network element includes a soft permanent connection (SPC) migration decision. The processing module, wherein: the SPC migration decision processing module is configured to: according to the final migration result reported by the ASON first node, when the final migration result is that the SPC connection information of all the ASON nodes is successfully migrated, the soft permanent connection information is decided to be migrated. . The system further includes a network element proxy layer network element, where the network management layer network element further includes a permanent connection (PC) migration processing module, and the network element proxy layer network element is set to: receive the relevant ASON for performing connection management migration After the intermediate migration result is notified by the node, the intermediate migration result information is reported to the network management layer network element; The PC migration processing module is configured to: perform permanent connection information migration according to the intermediate migration result information reported by the network element proxy layer network element. The network element proxy layer network element is configured to report the intermediate migration result information to the network management layer network element as follows: if the intermediate migration result is successful, after adding or deleting the corresponding permanent connection information, to the network The management network element reports the intermediate migration result information. If the intermediate migration result is a failure, the network element proxy layer network element does not modify the permanent connection information, and directly reports the intermediate migration result information to the network management network element. The PC migration processing module is configured to perform the migration of the persistent connection information according to the intermediate migration result information reported by the network element proxy layer in the following manner: according to the intermediate migration result reported by the network element proxy layer network element, If the intermediate migration result is successful, the corresponding permanent connection information is added or deleted; if the intermediate migration result is a failure, the permanent connection information is not modified. The SPC migration decision processing module is further configured to: when the decision is made to migrate the soft permanent connection information, the corresponding soft permanent connection information is added or deleted; when the decision is not to perform the soft permanent connection information migration, the soft permanent connection information is not performed. Modifications. The network element proxy layer network element is further configured to: when adding the permanent connection information, only the added permanent connection information is saved in the database, and is not sent to the transmission plane; and when the permanent connection information is deleted, only the corresponding in the database is The permanent connection information is deleted and is not sent to the transmission plane. To solve the above technical problem, the present invention further provides a network management network element in an automatic switched optical network, where the network management layer network element includes a soft permanent connection (SPC) migration decision processing module, where: the SPC migration The decision processing module is configured to: according to the final migration result reported by the first node of the ASON, when the final migration result is that the SPC connection information of all the ASON nodes is successfully migrated, the soft permanent connection information is decided to be migrated. The network management layer network element further includes a permanent connection (PC) migration processing module, where the PC migration processing module is configured to: after receiving the intermediate migration result notified by the relevant network node agent performing the connection management migration, And performing migration of the permanent connection information according to the intermediate migration result information reported by the network element proxy layer. The PC migration processing module is configured to perform the migration of the persistent connection information according to the intermediate migration result information reported by the network element proxy layer according to the following: according to the intermediate migration result reported by the network element proxy layer, if the intermediate migration If the result is successful, the corresponding permanent connection information is added or deleted; if the intermediate migration result is a failure, the modification of the permanent connection information is not performed. The SPC migration decision processing module is further configured to: when the decision is made to migrate the soft permanent connection information, the corresponding soft permanent connection information is added or deleted; when the decision is not to perform the soft permanent connection information migration, the soft permanent connection information is not performed. Modifications.
与现有技术相比较, 本发明具有以下优点: 软永久连接信息迁移成功后,由 ASON首节点通知网络管理层迁移成功, 网络管理层根据该最终的迁移结果进行软永久连接信息的迁移, 避免多次迁 移以及在迁移失败的情况下的中间迁移, 从而提高了迁移效率, 降低了网络 管理层的负担; 永久连接信息迁移成功后, 由网元代理层保存入库, 并且上报网络管理 层, 保证网元代理层和网络管理层的信息一致, 从而与传统的通过网络管理 层进行连接配置的方法保持一致; 此外, 本发明方案中, 网元代理层增加永久连接信息, 只是构造相关数 据后入库保存, 并不下发给传送平面; 同样的, 网元代理层删除永久连接信 息, 只是把数据库中相应的连接信息删除掉, 也不会下发给传送平面, 因此, 无论迁移成功与否, 都不会影响已有的传送业务。 Compared with the prior art, the present invention has the following advantages: After the soft permanent connection information is successfully migrated, the ASON head node notifies the network management layer that the migration is successful, and the network management layer performs the soft permanent connection information migration according to the final migration result, thereby avoiding Multiple migrations and intermediate migrations in the case of migration failures improve migration efficiency and reduce the burden on the network management layer. After the permanent connection information is successfully migrated, the network element agent layer saves the storage and reports it to the network management layer. The information of the network element proxy layer and the network management layer is consistent, so that the method is the same as that of the traditional network management layer. In addition, in the solution of the present invention, the network element agent layer adds permanent connection information, but only after constructing related data. The inbound storage is not sent to the transport plane. Similarly, the NE proxy layer deletes the persistent connection information, but deletes the corresponding connection information in the database and does not send it to the transport plane. Therefore, whether the migration is successful or not , will not affect the existing transmission business.
附图概述 图 1是传统的光网络组成示意图; 图 2是加入 ASON后的光网络组成示意图; 图 3是本发明实施例的 PC迁移为 SPC的流程示意图; 图 4是本发明实施例的 SPC迁移为 PC的流程示意图。 本发明的较佳实施方式 本发明的主要目的是, 提供一种实现 PC与 SPC相互迁移的方法, 其核 心思想在于: 软永久连接信息的迁移不再是每个网元(即每个 ASON节点) 单独进行处理, 而是网络管理层根据最终的迁移结果进行软永久连接信息的 迁移, 即软永久连接信息迁移成功后, 由 ASON首节点通知网络管理层迁移 成功, 网络管理层根据该全部 SPC连接信息迁移成功的通知, 进行软永久连 接信息的迁移。 本发明根据 ASON首节点上报的最终迁移结果进行软永久连接信息的迁 移, 只需进行一次软永久连接信息的迁移; 并且, 如果迁移失败了, 也不需 要进行恢复, 因为在迁移过程中并没有改变配置。 1 is a schematic diagram of a conventional optical network; FIG. 2 is a schematic diagram of an optical network after adding an ASON; FIG. 3 is a schematic diagram of a flow of a PC being migrated to an SPC according to an embodiment of the present invention; Schematic diagram of the process of migrating to a PC. BEST MODE FOR CARRYING OUT THE INVENTION The main object of the present invention is to provide a method for realizing mutual migration between a PC and an SPC, the core idea of which is: the migration of soft permanent connection information is no longer each network element (ie, each ASON node) The network management layer performs the migration of the soft permanent connection information according to the final migration result. After the soft permanent connection information is successfully migrated, the ASON head node notifies the network management layer that the migration is successful, and the network management layer according to the entire SPC. The notification of the successful migration of the connection information, the migration of the soft permanent connection information. The invention performs the migration of the soft permanent connection information according to the final migration result reported by the first node of the ASON, and only needs to perform the migration of the soft permanent connection information; and if the migration fails, the recovery is not required, because there is no migration process. Change the configuration.
基于上述思想, 本发明提供的自动交换光网络中连接管理的迁移方法, 具体釆用以下技术方案: 网络管理层才艮据 ASON首节点上>¾的最终迁移结果,在该最终迁移结果 为全部 ASON节点的 SPC连接信息迁移成功时,决策进行软永久连接信息的 迁移。 其中, 所述网络管理层根据最终迁移结果决策是否进行软永久连接信息 的迁移, 是指: 如果最终迁移结果为成功, 则网络管理层需要增加或者删除 对应的软永久连接信息; 如果最终迁移结果是失败, 则网络管理层不会修改 软永久连接信息。 进一步地, 本发明连接管理的迁移方法具体可包括如下步骤: 步骤 A. 网络管理层通过网元代理层通知 ASON首节点进行连接管理的 迁移; 步骤 B. ASON首节点向每一个相关 ASON节点下发连接管理的迁移请 求; Based on the above idea, the migration method of the connection management in the automatic switched optical network provided by the present invention specifically uses the following technical solution: The network management layer is based on the final migration result of >3⁄4 on the ASON head node, and the final migration result is all When the SPC connection information of the ASON node is successfully migrated, the decision is made to migrate the soft permanent connection information. The network management layer determines whether to perform the soft permanent connection information migration according to the final migration result, if the final migration result is successful, the network management layer needs to add or delete the corresponding soft permanent connection information; If it is a failure, the network management layer will not modify the soft permanent connection information. Further, the migration method of the connection management of the present invention may specifically include the following steps: Step A. The network management layer notifies the ASON head node to perform connection management migration through the network element proxy layer; Step B. The ASON head node goes to each relevant ASON node. Send a connection request for management of the connection;
步骤 C. 每一个 ASON节点执行迁移操作, 把中间迁移结果通知网元代 理层, 网元代理层将中间迁移结果上报网络管理层; 步骤 D. ASON首节点将最终迁移结果通过网元代理层上 4艮给网络管理 层; Step C. Perform a migration operation on each ASON node, and notify the network element generation of the intermediate migration result. The management layer of the network element reports the intermediate migration result to the network management layer; Step D. The ASON first node passes the final migration result to the network management layer through the network element proxy layer;
步骤 E. 网络管理层根据最终迁移结果决策是否进行 SPC连接信息的迁 移。 其中, 上述步骤 C中, 如果中间迁移结果是成功, 网元代理层需要增加 或者删除对应的永久连接信息, 并且将结果信息上报给网络管理层后, 网络 管理层也要增加或者删除对应的永久连接信息; 如果中间迁移结果是失败, 网元代理层不会修改永久连接信息, 并且将结果信息上报给网络管理层后, 网络管理层也不会修改永久连接信息。 上述步骤 E中, 如果最终迁移结果是成功, 网络管理层需要增加或者删 除对应的软永久连接信息; 如果最终迁移结果是失败, 网络管理层不会修改 软永久连接信息。 其中, 网元代理层在增加永久连接信息时, 仅将增加的永久连接信息保 存在数据库中, 不下发给传送平面; 网元代理层在删除永久连接信息时, 仅将数据库中相应的永久连接信息 删除, 不下发给传送平面。 本发明中, 连接管理的迁移所涉及的两个方面: PC和 SPC, 即永久连接 信息和软永久连接信息的处理如下:永久连接信息迁移成功后,每一个 ASON 节点执行成功后都会通知网元代理层, 由网元代理层保存, 并上报网络管理 层, 保证两者信息的一致; 而软永久连接信息的迁移, 则是网络管理层根据 最终的迁移结果决定是否进行。  Step E. The network management layer decides whether to move the SPC connection information according to the final migration result. In the foregoing step C, if the intermediate migration result is successful, the network element proxy layer needs to add or delete the corresponding permanent connection information, and after reporting the result information to the network management layer, the network management layer also needs to add or delete the corresponding permanent Connection information; If the intermediate migration result is a failure, the network agent layer does not modify the permanent connection information, and the result information is reported to the network management layer, and the network management layer does not modify the permanent connection information. In the above step E, if the final migration result is successful, the network management layer needs to add or delete the corresponding soft permanent connection information; if the final migration result is a failure, the network management layer does not modify the soft permanent connection information. When the network element proxy layer adds the permanent connection information, only the added permanent connection information is saved in the database and is not sent to the transmission plane; when the network element proxy layer deletes the permanent connection information, only the corresponding permanent connection in the database is deleted. The information is deleted and is not sent to the delivery plane. In the present invention, two aspects involved in the migration of the connection management are: PC and SPC, that is, the processing of the permanent connection information and the soft permanent connection information is as follows: after the permanent connection information is successfully migrated, the network element is notified after each ASON node is successfully executed. The agent layer is saved by the network element agent layer and reported to the network management layer to ensure the consistency of the two information. The soft permanent connection information is migrated by the network management layer according to the final migration result.
下面将结合附图及具体实施例对本发明技术方案的实施作进一步详细说 明。 需要说明的是, 在不冲突的情况下, 本发明的实施例以及实施例中的特 征可以任意相互组合。 如图 3所示, 本发明实施例的 PC迁移为 SPC的流程具体描述如下: 步骤 1 : 网络管理层通知 ASON首节点进行 PC迁移为 SPC的操作; 步骤 2: ASON首节点下发 /通知每一个相关的 ASON节点进行 PC迁移 为 SPC的请求; 步骤 3: 每一个 ASON节点执行迁移操作, 并把结果通知网元代理层, 如果结果是成功, 网元代理层删除相应的永久连接信息, 并将删除的信息上 报网络管理层; 如果结果是失败, 网元代理层不会修改永久连接信息; 步骤 4: ASON首节点把最终的迁移结果通知网络管理层; 步骤 5: 网络管理层进行最终的处理。 如果迁移结果是成功, 网络管理 层增加相应的软永久连接信息, 保存入库, 本流程结束; 如果迁移结果是失 败, 网络管理层不会增加软永久连接信息, 本流程结束。 The implementation of the technical solution of the present invention will be further described in detail below with reference to the accompanying drawings and specific embodiments. It should be noted that the embodiments of the present invention and the features in the embodiments may be arbitrarily combined with each other without conflict. As shown in FIG. 3, the process of the PC migration to the SPC in the embodiment of the present invention is specifically described as follows: Step 1: The network management layer notifies the ASON head node to perform the PC migration to the SPC operation. Step 2: The ASON head node sends/notifies each relevant ASON node to perform the PC migration to the SPC request. Step 3: Each ASON node performs The migration operation is performed, and the result is notified to the network element proxy layer. If the result is successful, the network element proxy layer deletes the corresponding permanent connection information, and reports the deleted information to the network management layer; if the result is a failure, the network element proxy layer does not modify Permanent connection information; Step 4: The ASON head node notifies the network management layer of the final migration result; Step 5: The network management layer performs the final processing. If the migration result is successful, the network management layer adds the corresponding soft permanent connection information and saves the storage, and the process ends. If the migration result is a failure, the network management layer does not add the soft permanent connection information, and the process ends.
如图 4所示, 本发明实施例的 SPC迁移为 PC的流程具体描述如下: 步骤 1 : 网络管理层通知 ASON首节点进行 SPC迁移为 PC的操作; 步骤 2: ASON首节点通知每一个相关的 ASON节点进行 SPC迁移为 PC的请求; 步骤 3: 每一个 ASON节点执行迁移操作, 并把结果通知网元代理层。 如果结果是成功, 网元代理层增加相应的永久连接信息, 并把增加的信息上 报网络管理层; 如果结果是失败, 网元代理层不会修改永久连接信息; 步骤 4: ASON首节点把最终的迁移结果通知网络管理层; 步骤 5: 网络管理层进行最终的处理。 如果迁移结果是成功, 网络管理 层删除相应的软永久连接信息, 保存入库, 本流程结束; 如果迁移结果是失 败, 网络管理层不会修改软永久连接信息, 本流程结束。 As shown in FIG. 4, the flow of the SPC migration to the PC in the embodiment of the present invention is specifically described as follows: Step 1: The network management layer notifies the ASON head node to perform the SPC migration to the PC operation; Step 2: The ASON head node notifies each related The ASON node performs the SPC migration request to the PC; Step 3: Each ASON node performs a migration operation, and notifies the network element proxy layer of the result. If the result is successful, the network element agent layer adds the corresponding permanent connection information, and reports the added information to the network management layer; if the result is a failure, the network element agent layer does not modify the permanent connection information; Step 4: The ASON head node puts the final The migration result informs the network management layer; Step 5: The network management layer performs the final processing. If the migration result is successful, the network management layer deletes the corresponding soft permanent connection information and saves the storage, and the process ends. If the migration result is unsuccessful, the network management layer does not modify the soft permanent connection information, and the process ends.
相应地, 本发明实施例中还提供一种自动交换光网络中连接管理的迁移 系统, 结合图 2所示, 该系统主要包括以下功能网元: 网络管理层设备, 主要设置为: 下发迁移请求、 接收网元代理层设备上 报的数据和执行最后的迁移处理; 网元代理层网元, 主要设置为: 传递网络管理层网元和 ASON控制平面 网元之间的信息, 并且有自己的保存永久连接信息的数据库; Correspondingly, the embodiment of the present invention further provides a migration management system for the connection management in the optical switching network. As shown in FIG. 2, the system mainly includes the following functional network elements: The network management layer device, the main configuration is as follows: Requesting and receiving on the network element proxy layer device Reporting data and performing the final migration process; the network element proxy layer network element is mainly configured to: transmit information between the network management layer network element and the ASON control plane network element, and have its own database for storing permanent connection information;
ASON控制平面网元, 主要设置为: 主导迁移的过程, 协调多个 ASON 节点共同完成迁移操作。 其中, 所述网络管理层网元进一步包括 SPC迁移决策处理模块, SPC迁 移决策处理模块设置为: 根据 ASON首节点上报的最终迁移结果, 在该最终 迁移结果为全部 ASON节点的 SPC连接信息迁移成功时,决策进行软永久连 接信息的迁移。 此外, 所述网络管理层网元还包括 PC迁移处理模块, 其中: 所述网元代理层网元设置为: 收到执行连接管理迁移的相关 ASON节点 通知的中间迁移结果后, 向所述网络管理层网元上报中间迁移结果信息; 所述 PC迁移处理模块设置为: 根据所述网元代理层网元上报的中间迁 移结果信息进行永久连接信息的迁移。 此外, 所述网元代理层网元还设置为: 如果所述中间迁移结果为成功, 则在增加或删除相应的永久连接信息后, 向网络管理层网元上报所述中间迁 移结果信息; 如果所述中间迁移结果为失败, 则网元代理层网元不进行永久 连接信息的修改, 直接向网络管理层网元上报所述中间迁移结果信息; 所述 PC迁移处理模块还设置为: 根据所述网元代理层网元上报的中间 迁移结果, 如果所述中间迁移结果为成功, 则增加或删除相应的永久连接信 息; 如果所述中间迁移结果为失败, 则不进行永久连接信息的修改。 此外, 所述 SPC迁移决策处理模块还设置为: 决策进行软永久连接信息 的迁移时, 则增加或删除相应的软永久连接信息; 决策不进行软永久连接信 息的迁移时, 则不进行软永久连接信息的修改。 此外, 所述网元代理层网元在增加永久连接信息时, 仅将增加的永久连 接信息保存在数据库中, 不下发给 ASON传送平面网元; 所述网元代理层网元在删除永久连接信息时, 仅将数据库中相应的永久 连接信息删除, 不下发给 ASON传送平面网元。 The ASON control plane network element is mainly set as follows: The process of leading the migration, coordinating multiple ASON nodes to complete the migration operation together. The network management layer network element further includes an SPC migration decision processing module, and the SPC migration decision processing module is configured to: according to the final migration result reported by the ASON head node, the SPC connection information of all the ASON nodes is successfully migrated according to the final migration result. When the decision is made, the soft permanent connection information is migrated. In addition, the network management layer network element further includes a PC migration processing module, where: the network element proxy layer network element is configured to: after receiving an intermediate migration result notified by the relevant ASON node performing the connection management migration, to the network The management network element reports the intermediate migration result information. The PC migration processing module is configured to: perform permanent connection information migration according to the intermediate migration result information reported by the network element proxy layer network element. In addition, the network element proxy layer network element is further configured to: if the intermediate migration result is successful, report the intermediate migration result information to the network management layer network element after adding or deleting the corresponding permanent connection information; If the result of the intermediate migration is a failure, the network element of the network element of the network element does not perform the modification of the permanent connection information, and directly reports the intermediate migration result information to the network management network element. The PC migration processing module is further configured as: If the result of the intermediate migration is successful, the corresponding permanent connection information is added or deleted. If the intermediate migration result is a failure, the permanent connection information is not modified. In addition, the SPC migration decision processing module is further configured to: when the decision is made to migrate the soft permanent connection information, the corresponding soft permanent connection information is added or deleted; when the decision is not to perform the soft permanent connection information migration, the soft permanent is not performed. Modification of connection information. In addition, the network element proxy layer network element only saves the added permanent connection information in the database when the permanent connection information is added, and does not send the information to the ASON transport plane network element; the network element proxy layer network element deletes the permanent connection. Information, only the corresponding permanent in the database The connection information is deleted and is not sent to the ASON transport plane network element.
本实施例还提供了一种自动交换光网络中的网络管理层网元, 所述网络 管理层网元包括软永久连接 ( SPC ) 迁移决策处理模块, 其中: 所述 SPC迁移决策处理模块设置为:根据 ASON首节点上报的最终迁移 结果,在该最终迁移结果为全部 ASON节点的 SPC连接信息迁移成功时,决 策进行软永久连接信息的迁移。 优选的, 所述网络管理层网元还包括永久连接 ( PC ) 迁移处理模块, 所述 PC迁移处理模块设置为: 接收网元代理层在收到执行连接管理迁 移的相关 ASON节点通知的中间迁移结果后, 向所述网络管理层网元上 "^的 中间迁移结果信息, 并根据所述网元代理层上报的中间迁移结果信息进行永 久连接信息的迁移。 所述 PC迁移处理模块是设置为按如下方式根据所述网元代理层上报的 中间迁移结果信息进行永久连接信息的迁移: 根据所述网元代理层上报的中 间迁移结果, 如果所述中间迁移结果为成功, 则增加或删除相应的永久连接 信息; 如果所述中间迁移结果为失败, 则不进行永久连接信息的修改。 所述 SPC迁移决策处理模块还设置为: 决策进行软永久连接信息的迁移 时, 则增加或删除相应的软永久连接信息; 决策不进行软永久连接信息的迁 移时, 则不进行软永久连接信息的修改。 The embodiment further provides a network management network element in the automatic switching optical network, where the network management network element includes a soft permanent connection (SPC) migration decision processing module, where: the SPC migration decision processing module is set to According to the final migration result reported by the first node of the ASON, when the final migration result is that the SPC connection information of all the ASON nodes is successfully migrated, the decision is made to migrate the soft permanent connection information. Preferably, the network management layer network element further includes a permanent connection (PC) migration processing module, where the PC migration processing module is configured to: the intermediate network agent layer receives the intermediate migration of the relevant ASON node notification for performing the connection management migration. After the result, the migration information of the middle is migrated to the network management layer network element, and the permanent connection information is migrated according to the intermediate migration result information reported by the network element proxy layer. The PC migration processing module is set to Performing the migration of the persistent connection information according to the intermediate migration result information reported by the network element proxy layer as follows: According to the intermediate migration result reported by the network element proxy layer, if the intermediate migration result is successful, the corresponding increase or delete is performed. The permanent connection information; if the intermediate migration result is a failure, the modification of the permanent connection information is not performed. The SPC migration decision processing module is further configured to: when the decision is made to migrate the soft permanent connection information, add or delete the corresponding Soft permanent connection information; when the decision does not perform soft permanent connection information migration , the modification of the soft permanent connection information is not performed.
综上所述, 本发明连接管理的迁移方案涉及网络管理层、 网元代理层和 ASON控制平面, 且重点涉及网络管理层和网元代理层的处理; 釆用本发明 技术方案, 既保持和已有网络配置的兼容, 又能保证网络管理层有效的进行 管理, 提高网络管理层的效率。 In summary, the migration management scheme of the connection management of the present invention involves a network management layer, a network element proxy layer, and an ASON control plane, and focuses on the processing of the network management layer and the network element proxy layer; The compatibility of the existing network configuration ensures the effective management of the network management layer and improves the efficiency of the network management layer.
本领域普通技术人员可以理解上述方法中的全部或部分步骤可通过程序 来指令相关硬件完成, 所述程序可以存储于计算机可读存储介质中, 如只读 存储器、 磁盘或光盘等。 可选地, 上述实施例的全部或部分步骤也可以使用 一个或多个集成电路来实现。 相应地, 上述实施例中的各模块可以釆用硬件 的形式实现, 也可以釆用软件功能模块的形式实现。 本发明不限制于任何特 定形式的硬件和软件的结合。 应当理解的是, 对本发明技术所在领域的技术人员来说, 可以根据本发 明的技术方案及其构思进行相应的等同改变或替换,而所有这些改变或替换, 都应属于本发明所附权利要求的保护范围。 One of ordinary skill in the art can understand that all or part of the above steps can be completed by a program to instruct related hardware, and the program can be stored in a computer readable storage medium, such as read only. Memory, disk or disc, etc. Alternatively, all or part of the steps of the above embodiments may also be implemented using one or more integrated circuits. Correspondingly, each module in the foregoing embodiment may be implemented in the form of hardware, or may be implemented in the form of a software function module. The invention is not limited to any specific form of combination of hardware and software. It should be understood that those skilled in the art to which the present invention pertains may make corresponding equivalent changes or substitutions in accordance with the technical solutions of the present invention, and all such changes or substitutions should be included in the appended claims. The scope of protection.
工业实用性 本发明的技术方案避免了多次迁移以及在迁移失败的情况下的中间迁 移, 从而提高了迁移效率, 降低了网络管理层的负担; 而且, 保证了网元代 理层和网络管理层的信息一致, 从而与传统的通过网络管理层进行连接配置 的方法保持一致。 此外, 本发明方案无论迁移成功与否, 都不会影响已有的 传送业务。 INDUSTRIAL APPLICABILITY The technical solution of the present invention avoids multiple migrations and intermediate migration in the case of migration failure, thereby improving migration efficiency and reducing the burden on the network management layer; and ensuring the network element agent layer and network management layer The information is consistent, which is consistent with the traditional method of connection configuration through the network management layer. In addition, the solution of the present invention does not affect the existing transmission service regardless of whether the migration is successful or not.

Claims

权 利 要 求 书 Claim
1、 一种自动交换光网络中连接管理的迁移方法, 该方法包括: 网络管理层根据自动交换光网络(ASON )首节点上>¾的最终迁移结果, 在该最终迁移结果为全部 ASON节点的软永久连接( SPC )信息迁移成功时, 决策进行软永久连接信息的迁移。 A migration method for connection management in an automatic switched optical network, the method comprising: the network management layer according to a final migration result of >3⁄4 on the first node of the automatic switched optical network (ASON), where the final migration result is all ASON nodes. When the soft permanent connection (SPC) information migration succeeds, the decision is made to migrate the soft permanent connection information.
2、 如权利要求 1所述的方法, 其中, 所述方法还包括: 网络管理层通过网元代理层通知 ASON首节点进行连接管理的迁移; 2. The method according to claim 1, wherein the method further comprises: the network management layer notifying the ASON head node to perform connection management migration by using the network element proxy layer;
ASON首节点向每一个相关 ASON节点下发连接管理的迁移请求; 所述每一个相关 ASON节点执行相应的迁移操作,并将中间迁移结果通 知网元代理层, 网元代理层向网络管理层上报中间迁移结果信息; The ASON head node sends a connection management migration request to each of the associated ASON nodes; each of the associated ASON nodes performs a corresponding migration operation, and notifies the network element proxy layer of the intermediate migration result, and the network element agent layer reports to the network management layer. Intermediate migration result information;
ASON首节点将最终迁移结果通过网元代理层上 4艮给网络管理层; 网络管理层根据所述最终迁移结果决策是否进行软永久连接信息的迁 移。 The ASON head node passes the final migration result to the network management layer through the network element proxy layer; the network management layer decides whether to perform the soft permanent connection information migration according to the final migration result.
3、 如权利要求 2所述的方法, 其还包括: 如果所述中间迁移结果为成功, 则网元代理层增加或删除相应的永久连 接信息后, 向网络管理层上报所述中间迁移结果信息, 网络管理层也增加或 删除相应的永久连接信息; 如果所述中间迁移结果为失败, 则网元代理层不进行永久连接信息的修 改, 直接向网络管理层上报所述中间迁移结果信息, 网络管理层也不进行永 久连接信息的修改。 The method of claim 2, further comprising: if the intermediate migration result is successful, the network element proxy layer reports the intermediate migration result information to the network management layer after adding or deleting the corresponding permanent connection information. The network management layer also adds or deletes the corresponding permanent connection information; if the intermediate migration result is a failure, the network element proxy layer does not modify the permanent connection information, and directly reports the intermediate migration result information to the network management layer, and the network Management does not make changes to the permanent connection information.
4、 如权利要求 1、 2或 3所述的方法, 其中, 网络管理层决策进行软永久连接信息的迁移时, 所述方法还包括: 网络 管理层增加或删除相应的软永久连接信息; 所述方法还包括: 网络管理层决策不进行软永久连接信息的迁移时, 网 络管理层将不进行软永久连接信息的修改。 The method according to claim 1, 2 or 3, wherein, when the network management layer decides to perform the migration of the soft permanent connection information, the method further includes: adding, by the network management layer, the corresponding soft permanent connection information; The method further includes: when the network management layer determines that the soft permanent connection information is not migrated, the network management layer does not modify the soft permanent connection information.
5、 如权利要求 3所述的方法, 其中, 所述网元代理层在增加永久连接信息时 , 仅将增加的永久连接信息保存 在数据库中, 不下发给传送平面; 所述网元代理层在删除永久连接信息时 , 仅将数据库中相应的永久连接 信息删除, 不下发给传送平面。 The method according to claim 3, wherein, when the network element proxy layer adds the persistent connection information, only the added permanent connection information is saved in the database, and is not sent to the transmission plane; When the permanent connection information is deleted, only the corresponding permanent connection information in the database is deleted and is not sent to the delivery plane.
6、一种自动交换光网络中连接管理的迁移系统,所述系统包括网络管理 层网元, 所述网络管理层网元包括软永久连接 ( SPC ) 迁移决策处理模块, 其中: 所述 SPC迁移决策处理模块设置为:根据 ASON首节点上报的最终迁移 结果,在该最终迁移结果为全部 ASON节点的 SPC连接信息迁移成功时,决 策进行软永久连接信息的迁移。 A migration management system for connection management in an optical switching network, the system comprising a network management layer network element, wherein the network management layer network element comprises a soft permanent connection (SPC) migration decision processing module, wherein: the SPC migration The decision processing module is configured to: according to the final migration result reported by the first node of the ASON, when the final migration result is that the SPC connection information of all the ASON nodes is successfully migrated, the soft permanent connection information is decided to be migrated.
7、 如权利要求 6所述的系统, 其中, 所述系统还包括网元代理层网元, 所述网络管理层网元还包括永久连接 ( PC ) 迁移处理模块, 所述网元代理层网元设置为: 收到执行连接管理迁移的相关 ASON节点 通知的中间迁移结果后, 向所述网络管理层网元上报中间迁移结果信息; 所述 PC迁移处理模块设置为: 根据所述网元代理层网元上报的中间迁 移结果信息进行永久连接信息的迁移。 The system of claim 6, wherein the system further comprises a network element proxy layer network element, wherein the network management layer network element further comprises a permanent connection (PC) migration processing module, and the network element proxy layer network The element is configured to: report the intermediate migration result information to the network management layer network element after receiving the intermediate migration result of the related ASON node notification that performs the connection management migration; the PC migration processing module is configured to: according to the network element proxy The intermediate migration result information reported by the layer network element performs the migration of the permanent connection information.
8、 如权利要求 7所述的系统, 其中, 所述网元代理层网元是设置按如下方式向所述网络管理层网元上 ^艮中间 迁移结果信息: 如果所述中间迁移结果为成功, 则在增加或删除相应的永久 连接信息后, 向网络管理层网元上报所述中间迁移结果信息; 如果所述中间 迁移结果为失败, 则网元代理层网元不进行永久连接信息的修改, 直接向网 络管理层网元上报所述中间迁移结果信息; 所述 PC迁移处理模块是设置为按如下方式根据所述网元代理层上报的 中间迁移结果信息进行永久连接信息的迁移: 根据所述网元代理层网元上报 的中间迁移结果, 如果所述中间迁移结果为成功, 则增加或删除相应的永久 连接信息; 如果所述中间迁移结果为失败, 则不进行永久连接信息的修改。 8. The system according to claim 7, wherein the network element proxy layer network element is configured to perform intermediate migration result information to the network management layer network element as follows: if the intermediate migration result is successful After the corresponding permanent connection information is added or deleted, the intermediate migration result information is reported to the network management network element; if the intermediate migration result is failed, the network element proxy layer network element does not modify the permanent connection information. Directly reporting the intermediate migration result information to the network management network element; The PC migration processing module is configured to perform the migration of the persistent connection information according to the intermediate migration result information reported by the network element proxy layer in the following manner: according to the intermediate migration result reported by the network element proxy layer network element, if If the intermediate migration result is successful, the corresponding permanent connection information is added or deleted; if the intermediate migration result is failed, the permanent connection information is not modified.
9、 如权利要求 6、 7或 8所述的系统, 其中, 所述 SPC迁移决策处理模块还设置为: 决策进行软永久连接信息的迁移 时, 则增加或删除相应的软永久连接信息; 决策不进行软永久连接信息的迁 移时, 则不进行软永久连接信息的修改。 9. The system according to claim 6, 7 or 8, wherein the SPC migration decision processing module is further configured to: add or delete corresponding soft permanent connection information when the decision is made to migrate the soft permanent connection information; When the soft permanent connection information is not migrated, the soft permanent connection information is not modified.
10、 如权利要求 9所述的系统, 其中, 所述网元代理层网元还设置为: 在增加永久连接信息时, 仅将增加的永 久连接信息保存在数据库中, 不下发给传送平面; 以及在删除永久连接信息 时, 仅将数据库中相应的永久连接信息删除, 不下发给传送平面。 The system of claim 9, wherein the network element proxy layer network element is further configured to: when the permanent connection information is added, only the added permanent connection information is saved in the database, and is not sent to the transmission plane; When the permanent connection information is deleted, only the corresponding permanent connection information in the database is deleted and is not sent to the delivery plane.
11、 一种自动交换光网络中的网络管理层网元, 所述网络管理层网元包 括软永久连接 ( SPC ) 迁移决策处理模块, 其中: 所述 SPC迁移决策处理模块设置为:根据 ASON首节点上报的最终迁移 结果,在该最终迁移结果为全部 ASON节点的 SPC连接信息迁移成功时,决 策进行软永久连接信息的迁移。 11. A network management network element in an automatic switched optical network, where the network management network element includes a soft permanent connection (SPC) migration decision processing module, where: the SPC migration decision processing module is set to: according to the ASON first The final migration result reported by the node is used to decide to migrate the soft permanent connection information when the final migration result is that the SPC connection information of all ASON nodes is successfully migrated.
12、如权利要求 11所述的网络管理层网元, 其中, 所述网络管理层网元 还包括永久连接 ( PC ) 迁移处理模块, 所述 PC迁移处理模块设置为: 接收网元代理层在收到执行连接管理迁 移的相关 ASON节点通知的中间迁移结果后, 向所述网络管理层网元上 "^的 中间迁移结果信息, 并根据所述网元代理层上报的中间迁移结果信息进行永 久连接信息的迁移。 The network management layer network element of claim 11, wherein the network management layer network element further comprises a permanent connection (PC) migration processing module, and the PC migration processing module is configured to: the receiving network element proxy layer is After receiving the intermediate migration result of the related ASON node notification of the connection management migration, the intermediate migration result information of the "^" on the network management layer network element is performed, and the permanent migration result information reported by the network element proxy layer is permanently performed. Migration of connection information.
13、 如权利要求 12所述的网络管理层网元, 其中, 所述 PC迁移处理模块是设置为按如下方式根据所述网元代理层上报的 中间迁移结果信息进行永久连接信息的迁移: 根据所述网元代理层上报的中 间迁移结果, 如果所述中间迁移结果为成功, 则增加或删除相应的永久连接 信息; 如果所述中间迁移结果为失败, 则不进行永久连接信息的修改。 13. The network management layer network element according to claim 12, wherein The PC migration processing module is configured to perform the migration of the persistent connection information according to the intermediate migration result information reported by the network element proxy layer according to the following: according to the intermediate migration result reported by the network element proxy layer, if the intermediate migration If the result is successful, the corresponding permanent connection information is added or deleted; if the intermediate migration result is a failure, the modification of the permanent connection information is not performed.
14、 如权利要求 11或 12或 13所述的网络管理层网元, 其中, 所述 SPC迁移决策处理模块还设置为: 决策进行软永久连接信息的迁移 时, 则增加或删除相应的软永久连接信息; 决策不进行软永久连接信息的迁 移时, 则不进行软永久连接信息的修改。 The network management layer network element according to claim 11 or 12 or 13, wherein the SPC migration decision processing module is further configured to: add or delete a corresponding soft permanent when the decision is made to migrate the soft permanent connection information. Connection information; When the decision does not perform the migration of the soft permanent connection information, the modification of the soft permanent connection information is not performed.
PCT/CN2010/079572 2010-05-25 2010-12-08 Transfer method and system for connection management in automatic switching optical network WO2011147174A1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201010186703.X 2010-05-25
CN201010186703.XA CN101854257B (en) 2010-05-25 2010-05-25 Method and system for migrating connection management in automatic switch optical network (ASON)

Publications (1)

Publication Number Publication Date
WO2011147174A1 true WO2011147174A1 (en) 2011-12-01

Family

ID=42805537

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2010/079572 WO2011147174A1 (en) 2010-05-25 2010-12-08 Transfer method and system for connection management in automatic switching optical network

Country Status (2)

Country Link
CN (1) CN101854257B (en)
WO (1) WO2011147174A1 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101854257B (en) * 2010-05-25 2014-02-19 中兴通讯股份有限公司南京分公司 Method and system for migrating connection management in automatic switch optical network (ASON)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1431833A (en) * 2003-01-16 2003-07-23 上海交通大学 Signaling cascading method of exchange connection in automatic exchange optic/transport network
US6813276B2 (en) * 2001-01-30 2004-11-02 The Regents Of The University Of California Optical layer multicasting using a single sub-carrier header with active header detection, deletion, and re-insertion via a circulating optical path
CN1581796A (en) * 2003-07-31 2005-02-16 华为技术有限公司 Switching method between permanent connection and exchage connection in optical network
CN1863108A (en) * 2005-05-09 2006-11-15 中兴通讯股份有限公司 Method for controlling SC/SPC connection in automatic exchange optical network
CN101299893A (en) * 2008-06-03 2008-11-05 中兴通讯股份有限公司 Method for automatically exchanging emigration based on status transition in optical network
CN101540938A (en) * 2009-05-06 2009-09-23 烽火通信科技股份有限公司 Method for realizing resource allocation in SDH-based ASON network
CN101626312A (en) * 2008-07-11 2010-01-13 中兴通讯股份有限公司 Method for realizing management plane of permanent connection and soft permanent connection transplantation
CN101854257A (en) * 2010-05-25 2010-10-06 中兴通讯股份有限公司 Method and system for migrating connection management in automatic switch optical network (ASON)

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6813276B2 (en) * 2001-01-30 2004-11-02 The Regents Of The University Of California Optical layer multicasting using a single sub-carrier header with active header detection, deletion, and re-insertion via a circulating optical path
CN1431833A (en) * 2003-01-16 2003-07-23 上海交通大学 Signaling cascading method of exchange connection in automatic exchange optic/transport network
CN1581796A (en) * 2003-07-31 2005-02-16 华为技术有限公司 Switching method between permanent connection and exchage connection in optical network
CN1863108A (en) * 2005-05-09 2006-11-15 中兴通讯股份有限公司 Method for controlling SC/SPC connection in automatic exchange optical network
CN101299893A (en) * 2008-06-03 2008-11-05 中兴通讯股份有限公司 Method for automatically exchanging emigration based on status transition in optical network
CN101626312A (en) * 2008-07-11 2010-01-13 中兴通讯股份有限公司 Method for realizing management plane of permanent connection and soft permanent connection transplantation
CN101540938A (en) * 2009-05-06 2009-09-23 烽火通信科技股份有限公司 Method for realizing resource allocation in SDH-based ASON network
CN101854257A (en) * 2010-05-25 2010-10-06 中兴通讯股份有限公司 Method and system for migrating connection management in automatic switch optical network (ASON)

Also Published As

Publication number Publication date
CN101854257B (en) 2014-02-19
CN101854257A (en) 2010-10-06

Similar Documents

Publication Publication Date Title
WO2019080235A1 (en) Ethereum-based blockchain system and transaction data processing method
US8379645B2 (en) Link data transmission method, node and system
US9894166B2 (en) Registration method and system for common service entity
WO2018133662A1 (en) Data redistribution method and apparatus, and database cluster
JPWO2010106991A1 (en) Data replication management method and system
CN102959910A (en) Notifying a controller of a change to a packet forwarding configuration of a network element over a communication channel
JP2004326478A (en) Storage device system and management program
JP2016530608A (en) Replicating data between mirrored data sites
WO2018137572A1 (en) Strategy management method, device, and system
US20050081095A1 (en) Method of setting backup of home location register
WO2005011302A1 (en) A method of transformation between permanent connection and switched connection in optical network
WO2021129754A1 (en) Message processing method and device, and storage medium
CN107547374B (en) Aggregation route processing method and device
WO2009146652A1 (en) Connection transfer method and system in an automatically switched optical network
JP5697672B2 (en) A method for improved server redundancy in dynamic networks
CN101621526B (en) iSCSI method and apparatus for preventing useless connection from occupying system resources
WO2018036521A1 (en) Resource adjustment method, apparatus, and system
WO2011147174A1 (en) Transfer method and system for connection management in automatic switching optical network
JP5417387B2 (en) Subscriber data management method and call control system
CN102136936B (en) Method, node and system for preventing control plane faults from influencing operation of forward data plane
JP2014236364A (en) Network control device and network control program
WO2022083281A1 (en) Message transmission method and system, electronic device, and storage medium
CN111858193A (en) Method and system for realizing server pool service
CN101325814A (en) Method and system for managing resource state in automatic exchange optical network
CN112003929B (en) RabbitMQ cluster-based thermal restoration method, system, device and medium

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 10852043

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 10852043

Country of ref document: EP

Kind code of ref document: A1