CN101854257A - Method and system for migrating connection management in automatic switch optical network (ASON) - Google Patents

Method and system for migrating connection management in automatic switch optical network (ASON) Download PDF

Info

Publication number
CN101854257A
CN101854257A CN201010186703A CN201010186703A CN101854257A CN 101854257 A CN101854257 A CN 101854257A CN 201010186703 A CN201010186703 A CN 201010186703A CN 201010186703 A CN201010186703 A CN 201010186703A CN 101854257 A CN101854257 A CN 101854257A
Authority
CN
China
Prior art keywords
migration
link information
nml
permanent link
ason
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201010186703A
Other languages
Chinese (zh)
Other versions
CN101854257B (en
Inventor
梁树国
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZTE Corp
Original Assignee
ZTE Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZTE Corp filed Critical ZTE Corp
Priority to CN201010186703.XA priority Critical patent/CN101854257B/en
Publication of CN101854257A publication Critical patent/CN101854257A/en
Priority to PCT/CN2010/079572 priority patent/WO2011147174A1/en
Application granted granted Critical
Publication of CN101854257B publication Critical patent/CN101854257B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04QSELECTING
    • H04Q11/00Selecting arrangements for multiplex systems
    • H04Q11/0001Selecting arrangements for multiplex systems using optical switching
    • H04Q11/0062Network aspects
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L41/00Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
    • H04L41/04Network management architectures or arrangements
    • H04L41/046Network management architectures or arrangements comprising network management agents or mobile agents therefor
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04QSELECTING
    • H04Q11/00Selecting arrangements for multiplex systems
    • H04Q11/0001Selecting arrangements for multiplex systems using optical switching
    • H04Q11/0062Network aspects
    • H04Q2011/0079Operation or maintenance aspects

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Data Exchanges In Wide-Area Networks (AREA)

Abstract

The invention relates to a method and a system for migrating connection management in an automatic switch optical network (ASON). A network management layer determines to migrate soft permanent connection (SPC) information according to a final migration result reported by a first node of the ASON when the final migration result indicates successful migration of the SPC information of all ASON nodes. The method and the system have the advantages that: after being migrated successfully, the permanent connection information is saved by a network element agent layer and reported to the network management layer to ensure that information of the network element agent layer is accordant with that of the network management layer, so that the method is kept accordant with a conventional method for connection configuration through the network management layer; and after the SPC information is migrated successfully, the first node of the ASON informs the network management layer of successful migration and the network management layer migrates the SPC information according to the final migration result to avoid multiple times of migration and intermediate migration under the condition of failure migration, so that migration efficiency is improved and the load of the network management layer is lowered.

Description

The moving method of connection management and system in a kind of ASON
Technical field
The present invention relates to the communications field, the moving method and the system of connection management in a kind of ASON.
Background technology
Traditional optical-fiber network is by the capable configuration of NML, finish the configuration of network by NML, only preserve permanent connection (Permanent Connection abbreviates PC as) information, and this permanent link information all there is preservation at NML and network element Agent layer.As shown in Figure 1, traditional optical-fiber network is mainly by NML, network element Agent layer, and transmission plane formation, and wherein this transmission plane is meant that the veneer of concrete transport service connects a formed plane by optical fiber.
ASON (Automatic Switched Optical Network, ASON) is a kind of optical-fiber network that can realize automatic exchange of intelligence, has obtained certain development and application at present, and the trend that has range of application progressively to enlarge.
At present, in the ASON network, existing traditional permanent link information also has the new soft permanent connection that is applicable to the ASON network (Soft Permanent Connection abbreviates SPC as) information.For reasons such as network operations, need carry out the migration of connection management, and then the exchange message (being soft permanent link information) that traditional exchange message (being permanent link information) by the NML configuration is converted to the automatic management of ASON is arranged, and the reverse exchange message that ASON is managed automatically is converted to the needs of the exchange message of NML configuration.
Fig. 2 shows the composition schematic diagram that adds the optical-fiber network behind the ASON, this network mainly by: NML, network element Agent layer, transmit the plane, and the ASON control plane constitutes.Referring to Fig. 2, this network has following characteristics:
Permanent link information is a point-to-point, and each network element Agent layer all has the permanent link information of preservation, and needs consistent with the permanent link information of NML preservation;
Soft permanent link information is end to end, and the network element Agent layer is not preserved soft permanent link information, and this information only is kept on ASON control plane and the NML.
The migration of connection management relates to the migration cooperation between NML, network element Agent layer and the ASON control plane three in the ASON.In the existing patent documentation, Chinese patent application 200810098298.9 discloses the moving method of state exchange " in a kind of ASON based on ", but this application just to have described each ASON node from the angle of ASON be the mutual migration of how carrying out PC and SPC based on state exchange.
And the moving method of the connection management in other existing ASON optical-fiber networks has following problem: for the migration of the soft permanent link information in the connection management transition process, if the migration of connection management relates to a plurality of network elements, then each network element all needs to carry out once the migration of soft permanent link information, needs migration repeatedly; And, if migration failure is arranged, then before migration carried out migration also need to revert to original configuration.
Summary of the invention
The technical problem that the present invention solves provides the moving method and the system of connection management in a kind of ASON, in assurance and existing Web-compatible, improves the efficient of NML.
For solving the problems of the technologies described above, the invention provides the moving method of connection management in a kind of ASON, the final migration results that NML reports according to the first node of ASON (ASON), when this final migration results SPC link information that is whole ASON nodes was moved successfully, the migration of soft permanent link information was carried out in decision-making.
Wherein, described method further comprises the steps:
NML carries out the migration of connection management by the first node of network element Agent layer notice ASON;
The first node of ASON issues the migration request of connection management to each relevant ASON node;
Described each relevant ASON node is carried out corresponding migration operation, and with middle migration results notice network element Agent layer, the network element Agent layer is migration results information in the middle of NML reports;
The first node of ASON reports NML with final migration results by the network element Agent layer;
Whether NML carries out the migration of soft permanent link information according to described final migration results decision-making.
Wherein, if migration results be successfully in the middle of described, then the network element Agent layer increase or the corresponding permanent link information of deletion after, to NML report described in the middle of migration results information, NML also increases or deletes accordingly link information forever;
If migration results is failure in the middle of described, then the network element Agent layer is not carried out the modification of permanent link information, directly reports described middle migration results information to NML, and NML does not also carry out the modification of permanent link information.
Wherein, when the migration of soft permanent link information is carried out in the NML decision-making, then NML will increase or delete corresponding soft permanent link information;
Otherwise when the NML decision-making is not carried out the migration of soft permanent link information, then NML will not carry out the modification of soft permanent link information.
Wherein, described network element Agent layer is when increasing permanent link information, and the permanent link information that only will increase is kept in the database, is not handed down to transmit the plane;
Described network element Agent layer only with corresponding permanent link information deletion in the database, is not handed down to and transmits the plane when the permanent link information of deletion.
The present invention also provides the migratory system of connection management in a kind of ASON, and described system comprises NML, and described NML further comprises SPC migration decision-making treatment module, wherein:
Described SPC migration decision-making treatment module is used for, and the final migration results that reports according to the first node of ASON when this final migration results SPC link information that is whole ASON nodes move successfully, is made a strategic decision and carried out the migration of soft permanent link information.
Wherein, described system also comprises the network element Agent layer, and described NML also comprises PC migration process module,
Described network element Agent layer is used for, receive middle the migration results of the relevant ASON node notice of carrying out the connection management migration after, report centre migration results information to described NML;
Described PC migration process module is used for, and carries out the migration of permanent link information according to the middle migration results information that described network element Agent layer reports.
Wherein, described network element Agent layer is further used for, if described middle migration results is successfully, then after increasing or deleting corresponding permanent link information, reports described middle migration results information to NML; If migration results is failure in the middle of described, then the network element Agent layer is not carried out the modification of permanent link information, directly reports described middle migration results information to NML;
Described PC migration process module is further used for, and the middle migration results according to described network element Agent layer reports if migration results is successfully in the middle of described, then increases or the corresponding permanent link information of deletion; If migration results is not then carried out the modification of permanent link information for failure in the middle of described.
Wherein, described SPC migration decision-making treatment module is further used for, and when the migration of soft permanent link information is carried out in decision-making, then increases or the corresponding soft permanent link information of deletion; Otherwise, when decision-making is not carried out the migration of soft permanent link information, then do not carry out the modification of soft permanent link information.
Wherein, described network element Agent layer is when increasing permanent link information, and the permanent link information that only will increase is kept in the database, is not handed down to transmit the plane;
Described network element Agent layer only with corresponding permanent link information deletion in the database, is not handed down to and transmits the plane when the permanent link information of deletion.
Compared with prior art, the present invention has the following advantages:
After soft permanent link information is moved successfully, move successfully by the first node informing network of ASON management level, NML carries out the migration of soft permanent link information according to this final migration results, avoid repeatedly moving and in the middle of under the situation of migration failure, move, thereby improved transport efficiency, reduced the burden of NML;
After permanent link information move successfully, preserved by the network element Agent layer and to put in storage, and the report network management level, the information of assurance network element Agent layer and NML is consistent, thereby passes through the method that NML is connected configuration and be consistent with traditional;
In addition, among the present invention program, the network element Agent layer increases permanent link information, just constructs after the related data warehouse-in and preserves, and is not handed down to and transmits the plane; Same, the network element Agent layer is deleted permanent link information, just corresponding link information in the database is deleted, and also can not be handed down to and transmit the plane, therefore, no matter moves success or not, can not influence existing transport service.
Description of drawings
Fig. 1 is that traditional optical-fiber network is formed schematic diagram;
Fig. 2 is that the optical-fiber network behind the adding ASON is formed schematic diagram;
Fig. 3 is that the PC migration of the embodiment of the invention is the schematic flow sheet of SPC;
Fig. 4 is that the SPC migration of the embodiment of the invention is the schematic flow sheet of PC.
Embodiment
Main purpose of the present invention is, the method that provides a kind of PC of realization and SPC to move mutually, its core concept is: the migration of soft permanent link information no longer is that each network element (being each ASON node) is handled separately, but NML carries out the migration of soft permanent link information according to final migration results, be after soft permanent link information is moved successfully, move successfully by the first node informing network of ASON management level, NML carries out the migration of soft permanent link information according to the successful notice of these whole SPC link information migrations.
The present invention carries out the migration of soft permanent link information according to the final migration results that the first node of ASON reports, and only need carry out once the migration of soft permanent link information; And, if migration has been failed, do not need to recover, because in transition process, do not change configuration yet.
Based on above-mentioned thought, the moving method of connection management in the ASON provided by the invention, specifically by the following technical solutions:
The final migration results that NML reports according to the first node of ASON when this final migration results SPC link information that is whole ASON nodes move successfully, is made a strategic decision and is carried out the migration of soft permanent link information.
Wherein, whether described NML carries out the migration of soft permanent link information according to final migration results decision-making, is meant: if final migration results is successfully, then NML need increase or delete corresponding soft permanent link information; If final migration results is failure, then NML can not revised soft permanent link information.
Further, the moving method of connection management of the present invention specifically can be divided into following steps:
Steps A. NML carries out the migration of connection management by the first node of network element Agent layer notice ASON;
The first node of step B.ASON issues the migration request of connection management to each relevant ASON node;
Each ASON node of step C. is carried out migration operation, and middle migration results notice network element Agent layer, the network element Agent layer is with middle migration results report network management level;
The first node of step D.ASON reports NML with final migration results by the network element Agent layer;
Step e. whether NML carries out the migration of SPC link information according to final migration results decision-making.
Wherein, among the above-mentioned steps C, if middle migration results is success, the network element Agent layer need increase or delete corresponding permanent link information, and after object information reported NML, NML also will increase or delete corresponding permanent link information; If middle migration results is failure, the network element Agent layer can not revised permanent link information, and after object information reported NML, NML can not revised permanent link information yet.
Among the above-mentioned steps E, if final migration results is success, NML need increase or delete corresponding soft permanent link information; If final migration results is failure, NML can not revised soft permanent link information.
Wherein, the network element Agent layer is when increasing permanent link information, and the permanent link information that only will increase is kept in the database, is not handed down to transmit the plane;
The network element Agent layer only with corresponding permanent link information deletion in the database, is not handed down to and transmits the plane when the permanent link information of deletion.
Among the present invention, two aspect: PC that the migration of connection management is related and SPC, the processing that is permanent link information and soft permanent link information is as follows: after permanent link information is moved successfully, after running succeeded, each ASON node all can notify the network element Agent layer, preserve by the network element Agent layer, and the report network management level, guarantee the unanimity of both information; And the migration of soft permanent link information then is whether NML carries out according to final migration results decision.
Enforcement to technical solution of the present invention is described in further detail below in conjunction with the accompanying drawings and the specific embodiments.
As shown in Figure 1, the PC of embodiment of the invention migration specifically describes as follows for the flow process of SPC:
Step 1: the first node of NML notice ASON carries out the PC migration and is the operation of SPC;
The first node of step 2:ASON issues/notify each relevant ASON node to carry out the PC migration and is the request of SPC;
Step 3: each ASON node is carried out migration operation, and result notification network element Agent layer, if the result is success, the corresponding permanent link information of network element Agent layer deletion, and with the information report network management level of deleting; If the result is failure, the network element Agent layer can not revised permanent link information;
The first node of step 4:ASON is final migration results informing network management level;
Step 5: NML carries out final processing.If migration results is success, NML increases corresponding soft permanent link information, preserves warehouse-in, and this flow process finishes; If migration results is failure, NML can not increase soft permanent link information, and this flow process finishes.
As shown in Figure 2, the SPC of embodiment of the invention migration specifically describes as follows for the flow process of PC:
Step 1: the first node of NML notice ASON carries out the SPC migration and is the operation of PC;
ASON node that the first node of step 2:ASON notifies each to be correlated with carries out the SPC migration and is the request of PC;
Step 3: each ASON node is carried out migration operation, and result notification network element Agent layer.If the result is success, the network element Agent layer increases corresponding permanent link information, and the information report network management level that increase; If the result is failure, the network element Agent layer can not revised permanent link information;
The first node of step 4:ASON is final migration results informing network management level;
Step 5: NML carries out final processing.If migration results is success, the corresponding soft permanent link information of NML deletion is preserved warehouse-in, and this flow process finishes; If migration results is failure, NML can not revised soft permanent link information, and this flow process finishes.
Correspondingly, also provide the migratory system of connection management in a kind of ASON in the embodiment of the invention, in conjunction with shown in Figure 2, this system mainly comprises following function network element:
NML is mainly used in and issues migration request, receives the data that the network element Agent layer reports and carries out last migration process;
The network element Agent layer mainly is responsible for the information transmission between NML and the ASON control plane, and the database of the permanent link information of preservation of oneself is arranged;
The ASON control plane, the main process of being responsible for leading migration is coordinated a plurality of ASON nodes and is finished migration operation jointly.
Wherein, described NML further comprises SPC migration decision-making treatment module, be used for: the final migration results that reports according to the first node of ASON, when this final migration results SPC link information that is whole ASON nodes move successfully, make a strategic decision and carry out the migration of soft permanent link information.
In addition, described NML also comprises PC migration process module, wherein:
Described network element Agent layer is used for, receive middle the migration results of the relevant ASON node notice of carrying out the connection management migration after, report centre migration results information to described NML;
Described PC migration process module is used for, and carries out the migration of permanent link information according to the middle migration results information that described network element Agent layer reports.
In addition, described network element Agent layer is further used for, if described middle migration results is successfully, then after increasing or deleting corresponding permanent link information, reports described middle migration results information to NML; If migration results is failure in the middle of described, then the network element Agent layer is not carried out the modification of permanent link information, directly reports described middle migration results information to NML;
Described PC migration process module is further used for, and the middle migration results according to described network element Agent layer reports if migration results is successfully in the middle of described, then increases or the corresponding permanent link information of deletion; If migration results is not then carried out the modification of permanent link information for failure in the middle of described.
In addition, described SPC migration decision-making treatment module is further used for, and when the migration of soft permanent link information is carried out in decision-making, then increases or the corresponding soft permanent link information of deletion; Otherwise, when decision-making is not carried out the migration of soft permanent link information, then do not carry out the modification of soft permanent link information.
In addition, described network element Agent layer is when increasing permanent link information, and the permanent link information that only will increase is kept in the database, is not handed down to transmit the plane;
Described network element Agent layer only with corresponding permanent link information deletion in the database, is not handed down to and transmits the plane when the permanent link information of deletion.
In sum, the migration scheme of connection management of the present invention relates to NML, network element Agent layer and ASON control plane, and emphasis relates to the processing of NML and network element Agent layer; Adopt technical solution of the present invention, both kept and the compatibility of existing network configuration, can guarantee that again NML effectively manages, improve the efficient of NML.
Should be understood that; concerning the technical staff in field, the technology of the present invention place; can be equal to accordingly according to technical scheme of the present invention and design thereof and change or replace, and all these changes or replacement, all should belong to the protection range of claims of the present invention.

Claims (10)

1. the moving method of connection management in the ASON is characterized in that,
The final migration results that NML reports according to the first node of ASON (ASON), when this final migration results SPC link information that is whole ASON nodes was moved successfully, the migration of soft permanent link information was carried out in decision-making.
2. the method for claim 1 is characterized in that, described method further comprises the steps:
NML carries out the migration of connection management by the first node of network element Agent layer notice ASON;
The first node of ASON issues the migration request of connection management to each relevant ASON node;
Described each relevant ASON node is carried out corresponding migration operation, and with middle migration results notice network element Agent layer, the network element Agent layer is migration results information in the middle of NML reports;
The first node of ASON reports NML with final migration results by the network element Agent layer;
Whether NML carries out the migration of soft permanent link information according to described final migration results decision-making.
3. method as claimed in claim 2 is characterized in that,
If migration results be successfully in the middle of described, then the network element Agent layer increase or the corresponding permanent link information of deletion after, to NML report described in the middle of migration results information, NML also increases or deletes accordingly link information forever;
If migration results is failure in the middle of described, then the network element Agent layer is not carried out the modification of permanent link information, directly reports described middle migration results information to NML, and NML does not also carry out the modification of permanent link information.
4. as claim 1,2 or 3 described methods, it is characterized in that,
When the migration of soft permanent link information is carried out in the NML decision-making, then NML will increase or delete corresponding soft permanent link information;
Otherwise when the NML decision-making is not carried out the migration of soft permanent link information, then NML will not carry out the modification of soft permanent link information.
5. method as claimed in claim 3 is characterized in that,
Described network element Agent layer is when increasing permanent link information, and the permanent link information that only will increase is kept in the database, is not handed down to transmit the plane;
Described network element Agent layer only with corresponding permanent link information deletion in the database, is not handed down to and transmits the plane when the permanent link information of deletion.
6. the migratory system of connection management in the ASON is characterized in that described system comprises NML, and described NML further comprises SPC migration decision-making treatment module, wherein:
Described SPC migration decision-making treatment module is used for, and the final migration results that reports according to the first node of ASON when this final migration results SPC link information that is whole ASON nodes move successfully, is made a strategic decision and carried out the migration of soft permanent link information.
7. system as claimed in claim 6 is characterized in that described system also comprises the network element Agent layer, and described NML also comprises PC migration process module,
Described network element Agent layer is used for, receive middle the migration results of the relevant ASON node notice of carrying out the connection management migration after, report centre migration results information to described NML;
Described PC migration process module is used for, and carries out the migration of permanent link information according to the middle migration results information that described network element Agent layer reports.
8. system as claimed in claim 7 is characterized in that,
Described network element Agent layer is further used for, if described middle migration results is successfully, then after increasing or deleting corresponding permanent link information, reports described middle migration results information to NML; If migration results is failure in the middle of described, then the network element Agent layer is not carried out the modification of permanent link information, directly reports described middle migration results information to NML;
Described PC migration process module is further used for, and the middle migration results according to described network element Agent layer reports if migration results is successfully in the middle of described, then increases or the corresponding permanent link information of deletion; If migration results is not then carried out the modification of permanent link information for failure in the middle of described.
9. as claim 6,7 or 8 described systems, it is characterized in that,
Described SPC migration decision-making treatment module is further used for, and when the migration of soft permanent link information is carried out in decision-making, then increases or the corresponding soft permanent link information of deletion; Otherwise, when decision-making is not carried out the migration of soft permanent link information, then do not carry out the modification of soft permanent link information.
10. system as claimed in claim 9 is characterized in that,
Described network element Agent layer is when increasing permanent link information, and the permanent link information that only will increase is kept in the database, is not handed down to transmit the plane;
Described network element Agent layer only with corresponding permanent link information deletion in the database, is not handed down to and transmits the plane when the permanent link information of deletion.
CN201010186703.XA 2010-05-25 2010-05-25 Method and system for migrating connection management in automatic switch optical network (ASON) Expired - Fee Related CN101854257B (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201010186703.XA CN101854257B (en) 2010-05-25 2010-05-25 Method and system for migrating connection management in automatic switch optical network (ASON)
PCT/CN2010/079572 WO2011147174A1 (en) 2010-05-25 2010-12-08 Transfer method and system for connection management in automatic switching optical network

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201010186703.XA CN101854257B (en) 2010-05-25 2010-05-25 Method and system for migrating connection management in automatic switch optical network (ASON)

Publications (2)

Publication Number Publication Date
CN101854257A true CN101854257A (en) 2010-10-06
CN101854257B CN101854257B (en) 2014-02-19

Family

ID=42805537

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201010186703.XA Expired - Fee Related CN101854257B (en) 2010-05-25 2010-05-25 Method and system for migrating connection management in automatic switch optical network (ASON)

Country Status (2)

Country Link
CN (1) CN101854257B (en)
WO (1) WO2011147174A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2011147174A1 (en) * 2010-05-25 2011-12-01 中兴通讯股份有限公司 Transfer method and system for connection management in automatic switching optical network

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20020146028A1 (en) * 2001-01-30 2002-10-10 Gee-Kung Chang Optical layer multicasting using a single sub-carrier header with active header detection, deletion, and re-insertion via a circulating optical path
CN1581796A (en) * 2003-07-31 2005-02-16 华为技术有限公司 Switching method between permanent connection and exchage connection in optical network
CN101299893A (en) * 2008-06-03 2008-11-05 中兴通讯股份有限公司 Method for automatically exchanging emigration based on status transition in optical network
CN101540938A (en) * 2009-05-06 2009-09-23 烽火通信科技股份有限公司 Method for realizing resource allocation in SDH-based ASON network
CN101626312A (en) * 2008-07-11 2010-01-13 中兴通讯股份有限公司 Method for realizing management plane of permanent connection and soft permanent connection transplantation

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1187993C (en) * 2003-01-16 2005-02-02 上海交通大学 Signaling cascading method of exchange connection in automatic exchange optic/transport network
CN100531079C (en) * 2005-05-09 2009-08-19 中兴通讯股份有限公司 Method for controlling SC/SPC connection in automatic exchange optical network
CN101854257B (en) * 2010-05-25 2014-02-19 中兴通讯股份有限公司南京分公司 Method and system for migrating connection management in automatic switch optical network (ASON)

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20020146028A1 (en) * 2001-01-30 2002-10-10 Gee-Kung Chang Optical layer multicasting using a single sub-carrier header with active header detection, deletion, and re-insertion via a circulating optical path
CN1581796A (en) * 2003-07-31 2005-02-16 华为技术有限公司 Switching method between permanent connection and exchage connection in optical network
CN101299893A (en) * 2008-06-03 2008-11-05 中兴通讯股份有限公司 Method for automatically exchanging emigration based on status transition in optical network
CN101626312A (en) * 2008-07-11 2010-01-13 中兴通讯股份有限公司 Method for realizing management plane of permanent connection and soft permanent connection transplantation
CN101540938A (en) * 2009-05-06 2009-09-23 烽火通信科技股份有限公司 Method for realizing resource allocation in SDH-based ASON network

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2011147174A1 (en) * 2010-05-25 2011-12-01 中兴通讯股份有限公司 Transfer method and system for connection management in automatic switching optical network

Also Published As

Publication number Publication date
WO2011147174A1 (en) 2011-12-01
CN101854257B (en) 2014-02-19

Similar Documents

Publication Publication Date Title
CN1648867B (en) Data processing system
CN102904738B (en) Work order processing method, relevant device and relevant system
CN102368836B (en) Method for realizing flexible configuration transference between passive optical network (PON) ports
CN103647598B (en) A kind of communication many hierarchical protection method based on ASON
CN101998456A (en) Self-organization network parameter configuration control method and parameter modification control system
CN105635086A (en) Method for accessing external storage of switch from control plane and data plane
CN102355414B (en) Automatic protection switching state machine processing method and device
CN103559198A (en) Data synchronizing method and equipment
CN101854257B (en) Method and system for migrating connection management in automatic switch optical network (ASON)
CN102377589B (en) Right management control method and terminal
CN105871737A (en) Communication flow control device used for communication between redundant networks
CN106330698A (en) Local routing recovery method and device
CN101621526A (en) iSCSI method and apparatus for preventing useless connection from occupying system resources
CN102045228B (en) A kind of discover method of looped network protection information and system
CN101345590B (en) SNCP business collocation method
CN101834710B (en) Method and system for controlling protection switching in plane protection group of automatic switch optical network (ASON)
CN101848052B (en) Service mapping configuration method and system of multi-domain network
CN104052623A (en) Message processing method and message processing system in Ethernet passive optical network
CN105635930A (en) Execution method and device of deletion operation for group member resources, and originator device
CN104735097A (en) Information collecting method and system
CN101494604B (en) Migrating method and migrating device for VRF, and VRF distributed communication system
CN101179350A (en) Method and apparatus for managing optical channel data cell sharing protection subnet
CN111404738B (en) Flow table and configuration hot modification method of network controller
CN104507107A (en) Pre-processing method of signaling data
CN101540938A (en) Method for realizing resource allocation in SDH-based ASON network

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: NANJING BRANCH OF ZTE CORPORATION

Free format text: FORMER OWNER: ZTE CORPORATION

Effective date: 20131225

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 518057 SHENZHEN, GUANGDONG PROVINCE TO: 210012 NANJING, JIANGSU PROVINCE

TA01 Transfer of patent application right

Effective date of registration: 20131225

Address after: 210012 Zhongxing communication, No. 68, Bauhinia Road, Yuhuatai District, Jiangsu, Nanjing

Applicant after: Nanjing Branch of Zhongxing Communication Co., Ltd.

Address before: 518057 Nanshan District Guangdong high tech Industrial Park, South Road, science and technology, ZTE building, Ministry of Justice

Applicant before: ZTE Corporation

Effective date of registration: 20131225

Address after: 210012 Zhongxing communication, No. 68, Bauhinia Road, Yuhuatai District, Jiangsu, Nanjing

Applicant after: Nanjing Branch of Zhongxing Communication Co., Ltd.

Address before: 518057 Nanshan District Guangdong high tech Industrial Park, South Road, science and technology, ZTE building, Ministry of Justice

Applicant before: ZTE Corporation

C14 Grant of patent or utility model
GR01 Patent grant
C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20150715

Address after: 518057 Nanshan District Guangdong high tech Industrial Park, South Road, science and technology, ZTE building, Ministry of Justice

Patentee after: ZTE Corporation

Address before: 210012 Zhongxing communication, No. 68, Bauhinia Road, Yuhuatai District, Jiangsu, Nanjing

Patentee before: Nanjing Branch of Zhongxing Communication Co., Ltd.

Effective date of registration: 20150715

Address after: 518057 Nanshan District Guangdong high tech Industrial Park, South Road, science and technology, ZTE building, Ministry of Justice

Patentee after: ZTE Corporation

Address before: 210012 Zhongxing communication, No. 68, Bauhinia Road, Yuhuatai District, Jiangsu, Nanjing

Patentee before: Nanjing Branch of Zhongxing Communication Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140219

Termination date: 20190525