WO2011097808A1 - 用于传输和处理上行非连续资源分配信令的方法和设备 - Google Patents

用于传输和处理上行非连续资源分配信令的方法和设备 Download PDF

Info

Publication number
WO2011097808A1
WO2011097808A1 PCT/CN2010/070652 CN2010070652W WO2011097808A1 WO 2011097808 A1 WO2011097808 A1 WO 2011097808A1 CN 2010070652 W CN2010070652 W CN 2010070652W WO 2011097808 A1 WO2011097808 A1 WO 2011097808A1
Authority
WO
WIPO (PCT)
Prior art keywords
resource allocation
clusters
allocation signaling
discontinuous resource
uplink discontinuous
Prior art date
Application number
PCT/CN2010/070652
Other languages
English (en)
French (fr)
Inventor
仲崇显
孟艳
尤明礼
Original Assignee
上海贝尔股份有限公司
阿尔卡特朗讯
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 上海贝尔股份有限公司, 阿尔卡特朗讯 filed Critical 上海贝尔股份有限公司
Priority to CN201080051087.5A priority Critical patent/CN102612843B/zh
Priority to PCT/CN2010/070652 priority patent/WO2011097808A1/zh
Publication of WO2011097808A1 publication Critical patent/WO2011097808A1/zh

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W72/00Local resource management
    • H04W72/20Control channels or signalling for resource management
    • H04W72/23Control channels or signalling for resource management in the downlink direction of a wireless link, i.e. towards a terminal

Definitions

  • the invention relates to the field of communications. More specifically, the present invention relates to a method and apparatus for transmitting and processing uplink discontinuous resource allocation signaling. Background technique
  • RA uplink discontinuous resource allocation
  • 3GPP LTE Rel-10 3GPP LTE Rel-10.
  • Discontinuous resource allocation enables multi-user diversity and improved average sector throughput as well as cell edge user equipment (UE) throughput.
  • UE cell edge user equipment
  • a method for transmitting uplink discontinuous resource allocation signaling including:
  • the uplink discontinuous resource allocation signaling includes a starting position and a length of the cluster range.
  • the number of clusters is at most more than two.
  • the number of clusters is at most three.
  • the number of clusters is at most four.
  • each cluster is the same size.
  • some of the clusters are fixed in position and some of the clusters are not fixed in position.
  • an apparatus for transmitting uplink discontinuous resource allocation signaling including:
  • Generating means configured to generate uplink discontinuous resource allocation signaling
  • a sending device configured to send the generated uplink discontinuous resource allocation signaling, where the uplink discontinuous resource allocation signaling includes a starting position and a length of the cluster range.
  • a method for processing uplink discontinuous resource allocation signaling including:
  • the uplink discontinuous resource allocation signaling includes a starting position and a length of the cluster range.
  • an apparatus for processing uplink discontinuous resource allocation signaling including:
  • a receiving device configured to receive uplink discontinuous resource allocation signaling
  • the processing device is configured to process the received uplink discontinuous resource allocation signaling, wherein the uplink non-contiguous resource allocation signaling includes a starting position and a length of the cluster range.
  • Figure la shows a scenario in which a total resource block group is partitioned into different cluster ranges in accordance with aspects of the present invention
  • Figure 1 b illustrates the case of dividing a total resource block group into different cluster ranges in accordance with aspects of the present invention.
  • FIG. 2 shows a flow chart of a method for transmitting uplink discontinuous resource allocation signaling, in accordance with an embodiment of the present invention
  • FIG. 3 illustrates an embodiment for transmitting uplink non-according according to an embodiment of the present invention.
  • FIG. 4 shows a flow chart of a method for processing uplink discontinuous resource allocation signaling, in accordance with an embodiment of the present invention
  • FIG. 5 shows a block diagram of an apparatus for processing uplink non-contiguous resource allocation signaling, in accordance with one embodiment of the present invention.
  • the core idea of the present invention is to use the starting position and length of the cluster range to transmit uplink discontinuous resource allocation signaling to the user equipment.
  • DCI Downstream Control Information
  • CM cubic metric
  • the average sector throughput of the discontinuous RA and the gain of the cell edge UE throughput relative to the SC-FDMA are evaluated.
  • the maximum number of clusters is limited to 1-8.
  • the total system bandwidth is 10MHz.
  • a 3-sector 19 hexagonal cell site layout model is employed.
  • the number of UEs per sector is on average 10, and the location of each UE is evenly distributed within the sector.
  • the SCM urban macro cell channel model is used, and the maximum UE transmit power is set to 24 dBm.
  • PF time-based fair
  • Tables la and lb show average sector throughput and cell edge UE throughput Can (5% of the cumulative distribution function (CDF)), where table la is for an antenna configuration of 1 * 2 (one antenna at the UE and two antennas at the base station), and table lb is for 1 *4 antenna configuration (one antenna at the UE and four antennas at the base station).
  • CDF cumulative distribution function
  • Table 1 3GPP case 1 Average sector throughput and cell edge UE throughput a Antenna configuration 1 *2
  • the number of maximum clusters should be set to at least more than two, in order to effectively obtain the discrete Fourier transform using positive clustering. Improved throughput of frequency division multiplexing multiple access (DFT-S-OFDMA). Furthermore, limiting the number of maximum clusters to 4 is sufficient to obtain most of the throughput gain.
  • DFT-S-OFDMA frequency division multiplexing multiple access
  • is the root mean square operation
  • ⁇ ( ⁇ is the normalized volt wave of the input signal.
  • Table 2 shows the CM values under different simulation conditions and the corresponding UE transmit power backoff, where Table 2a is for The case is the same for different cluster sizes, and Table 2b is for the case of different cluster random sizes.
  • Table 2 CM values for different numbers of clusters and corresponding UE Tx power backoff
  • the CM value increases as the number of clusters increases. Therefore, in order to maintain a low CM value, the number of clusters cannot be too large. It can also be seen that when the number of clusters is equal to 4, the UE Tx power backoff is about 2dB, which means the most Large UE Tx power will be reduced to approximately 22 dB. According to the simulation results, when the maximum UE Tx power is reduced to 22 dB, the power limited UE is still less than 0.5%. Based on these analyses, the following conclusions are obtained:
  • two new non-continuous RA schemes are designed which can support scenarios in which the maximum number of clusters is equal to 3 and 4.
  • the proposed scheme divides the total resource block group (RBG) into different cluster ranges depending on whether the number of clusters is 3 or 4.
  • RBG includes a plurality of resource blocks, wherein the specification 3GPP TS 36.213 V8.2.0 has specified that for a bandwidth of 5/10/15/20 MHz, the size of the RBG is 2/3/4/4 resource blocks, respectively.
  • the size of the cluster range varies with the number of total RBGs, where the number of RBGs is related to the total bandwidth, while the size of the different cluster ranges is the same.
  • the bandwidth is 10 MHz, wherein the total bandwidth is divided into 50 resource blocks (RBs), of which 40 RBs are used for the physical uplink shared channel (PUSCH) (ie, In the cluster range), 10 RBs are used for physical uplink control channel (PUCCH) HOa and 110b transmission.
  • RBs resource blocks
  • PUSCH physical uplink shared channel
  • 10 RBs are used for physical uplink control channel (PUCCH) HOa and 110b transmission.
  • Each RBG has a size of 3 RBs. For a scenario with 3 clusters, each cluster includes 18 RBs, or 6 RBGs. For a scenario of 4 clusters, each cluster range includes 15 RBs, that is, 5 RBGs.
  • the initial location and length of the cluster range are used to transmit uplink discontinuous resource allocation signaling to the user equipment. For example, which RB or RBG a cluster range starts with, and how many RBs or RBGs the cluster range includes.
  • resource block allocation field sizes are used in 3GPP Tdocs.
  • the resource block allocation field can be calculated as follows
  • some cluster-wide locations are fixed, while other cluster-wide locations can be changed based on resource scheduling results.
  • the first cluster range 1 11 and the third cluster range 113 are fixed, and the position of the second cluster range 112 can be right or left according to the requirements of RA signaling.
  • the positions of the first cluster range 114 and the fourth cluster range 117 are fixed, and the second cluster range 115 and the third cluster range 116 may be correspondingly left or right. mobile.
  • cluster ranges overlap.
  • the individual cluster ranges may not overlap.
  • the size of each cluster range may be different.
  • FIG. 2 shows a flow diagram of a method for transmitting uplink discontinuous resource allocation signaling, in accordance with an embodiment of the present invention.
  • the method includes a step S210, configured to generate uplink discontinuous resource allocation signaling, and a step S220, configured to transmit, to the user equipment, the generated uplink discontinuous resource allocation signaling, where the uplink discontinuous resource allocation signaling includes a cluster-wide Starting position and length.
  • the number of clusters is at most more than two, for example, three or four, each cluster has the same size, some clusters are fixed in position, and some clusters are not fixed in position.
  • FIG. 3 shows a block diagram of an apparatus for transmitting uplink discontinuous resource allocation signaling, in accordance with an embodiment of the present invention.
  • the device 300 includes a generating device 310, configured to generate uplink discontinuous resource allocation signaling, and a sending device 320, configured to send the generated uplink discontinuous resource allocation signaling, where the uplink non-contiguous resource allocation Signaling includes the starting position of the cluster range And length.
  • the number of clusters is at most more than two, for example, three or four, each cluster has the same size, some clusters are fixed in position, and some clusters are not fixed in position.
  • the device is for example included in the network side, such as a base station and a radio network controller, rather than in the user equipment.
  • FIG. 4 shows a flow diagram of a method for processing uplink discontinuous resource allocation signaling, in accordance with an embodiment of the present invention.
  • the method includes a step S410, configured to receive uplink discontinuous resource allocation signaling, and a step S420, configured to process the received uplink discontinuous resource allocation signaling,
  • the i-up uplink non-contiguous resource allocation signaling includes a starting position and a length of the cluster range.
  • FIG. 5 shows a block diagram of an apparatus for processing uplink non-contiguous resource allocation signaling, in accordance with one embodiment of the present invention.
  • the device includes a receiving device 510, configured to receive uplink discontinuous resource allocation signaling, and a processing device 520, configured to process the received uplink discontinuous resource allocation signal.
  • the non-continuous resource allocation signaling of the uplink includes the starting position and length of the cluster range.
  • the device is for example included in a user device.

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Mobile Radio Communication Systems (AREA)

Description

用于传输和处理上行非连续资源分配
信令的方法和设备 技术领域
本发明涉及通信领域。 更具体地, 本发明涉及用于传输和处理上 行非连续资源分配信令的方法和设备。 背景技术
与 3GPP LTE Rel-8相比较, 在 3GPP LTE Rel-10中将支持上行 的非连续资源分配 (RA ) 。 非连续资源分配能够实现多用户分集和 改善平均扇区吞吐量以及小区边缘用户设备 (UE )吞吐量。
因此, 需要用于传输和处理上行非连续资源分配信令的方案。 发明内容
根据本发明的一个方面, 提出了一种用于传输上行非连续资源 分配信令的方法, 包括:
生成上行非连续资源分配信令,
向用户设备传输生成的上行非连续资源分配信令,
其中该上行非连续资源分配信令包括簇范围的起始位置和长 度。
在本发明的一个实施方式中, 簇的数目最大多于 2个。
在本发明的一个实施方式中, 簇的数目最大为 3个。
在本发明的一个实施方式中, 簇的数目最大为 4个。
在本发明的一个实施方式中, 每个簇的大小相同。
在本发明的一个实施方式中, 一些簇的位置固定, 另外一些簇 的位置不固定。
在本发明的一个实施方式中, 根据仿真结果而确定簇的数目最 大需要多于 2个。 根据本发明的另一方面, 提出了一种用于传输上行非连续资源 分配信令的设备, 包括:
生成装置, 用于生成上行非连续资源分配信令;
发送装置, 用于发送所生成的上行非连续资源分配信令, 其中该上行非连续资源分配信令包括簇范围的起始位置和长 度。
根据本发明的又一方面, 提出了一种用于处理上行非连续资源 分配信令的方法, 包括:
接收上行非连续资源分配信令,
处理接收的上行非连续资源分配信令,
其中该上行非连续资源分配信令包括簇范围的起始位置和长 度。
根据本发明的再一方面, 提出了一种用于处理上行非连续资源 分配信令的设备, 包括:
接收装置, 用于接收上行非连续资源分配信令,
处理装置, 用于处理接收的上行非连续资源分配信令, 其中谅上行非连续资源分配信令包括簇范围的起始位置和长 度。 附图说明
通过以下结合附图的说明, 并且随着对本发明的更全面了解, 本发明的其他目的和效果将变得更加清楚和易于理解, 其中:
图 la示出了根据本发明的方案的将总的资源块组划分到不同的 簇范围中的情形;
图 1 b示出了根据本发明的方案的将总的资源块组划分到不同的 簇范围中的情形。
图 2 示出了根据本发明的一个实施方式的一种用于传输上行非 连续资源分配信令的方法的流程图;
图 3 示出了根据本发明的一个实施方式的一种用于传输上行非 连续资源分配信令的设备的框图;
图 4 示出了根据本发明的一个实施方式的一种用于处理上行非 连续资源分配信令的方法的流程图;
图 5 示出了根据本发明的一个实施方式的一种用于处理上行非 连续资源分配信令的设备的框图。
在所有的上述附图中, 相同的标号表示具有相同、 相似或相应 的特征或功能。 具体实施方式
本发明的核心思想是使用簇范围的起始位置和长度, 来向用户 设备传输上行非连续资源分配信令。
在非连续资源分配的情况下, 面临的主要挑战是找到灵活性和 信令开销之间的折中。 簇的数目是最重要的因素之一, 其影响下行 控制信息 (DCI ) 格式的复杂性以及关于立方度量 (CM ) 值和呑吐 量方面的性能。
为了确定最佳的最大簇的数目, 基于单个分量载波(CC ) 内的 系统级仿真(SLS ) , 来评估通过限制不同的最大簇数目而得到的非 连续 RA的吞吐量增益, 然后基于链路级仿真(LLS ) , 研究不同的 最大簇数目的 CM值和 UE发射 (Tx ) 功率的回退 (back-off ) 。
对于系统级仿真, 基于 3GPP 情况 1 (具有 2D天线图案, 其中 站点间距离 (ISD ) 等于 500m ) , 来评估非连续 RA的平均扇区吞 吐量和小区边缘 UE吞吐量相对于 SC-FDMA的增益。为了评估最大 簇数目和吞吐量性能之间的关系, 最大簇数目限制在 1-8内。总的系 统带宽是 10MHz。假定采用 3扇区 19六边形小区站点布局模型。每 个扇区的 UE的数目平均是 10, 并且每个 UE的位置在扇区内均匀 分布。 此外, 使用 SCM城市宏小区信道模型, 并且最大 UE发射功 率设置为 24dBm。 此外, 假定采用完全緩存业务模型, 并且使用基 于比例公平 (PF ) 的时间和频率域依赖于信道的调度方案。
表格 la和 lb示出了平均扇区吞吐量和小区边缘 UE吞吐量性 能(累积分布函数(CDF ) 中的 5%处) , 其中表格 la针对的是 1 *2 的天线配置情况(UE处一根天线, 而基站处两根天线), 而表格 lb 针对的是 1 *4的天线配置情况( UE处一根天线,而基站处四根天线)。
表 1 : 3GPP 情况 1下平均扇区吞吐量和小区边缘 UE吞吐量 a 天线配置 1 *2
Figure imgf000006_0001
b 天线配置 1 *4
Figure imgf000006_0002
基于表 1 中的仿真结果, 可以得出如下结论: 从吞吐量的观点 来看, 最大簇的数目应该设置为至少多于 2个, 以有效的获得使用 成簇的离散傅里叶变换扩展正交频分复用多址( DFT-S-OFDMA )的 吞吐量的改善。 此外, 将最大簇的数目限制到 4足够以获得吞吐量 增益的大多数。
另外, 通过链路级仿真来研究最大簇的数目对 CM值和 UE发 射功率的回退值的影响。
在仿真中,将带宽设定为 10MHz,并且每个符号每个块(chunk ) 的频率位置可以随意改变。
用于 CM值计算的公式为
20x IogI0 ™(0 ■1.52
CM = -
1.56 ^ ( l )
(·) 为均方根运算, ν (ή 为输入信号的归一化伏特波 在表格 2中示出了不同的仿真条件下的 CM值和对应的 UE发 射功率回退, 其中表格 2a针对的是不同簇大小相同的情况, 而表格 2b针对的是不同簇随机大小的情况。
表 2: 不同数目的簇的 CM值和对应的 UE Tx功率回退
a 不同簇相同大小
Figure imgf000007_0001
b 不同簇随机大小
Figure imgf000007_0002
从表格 2中的仿真结果可以看出, CM值随着簇的数目的增加而 增大。 因此, 为了保持低的 CM值, 簇的数目不能太大。 也可以看 :出, 当簇的数目等于 4时, UE Tx功率回退大约是 2dB, 这意味着最 大 UE Tx功率将降低到大约 22dB。根据仿真结果, 当最大 UE Tx功 率降低到 22dB时, 功率受限的 UE仍然少于 0.5%。 基于这些分析, 得到如下的结论:
从 CM值和 UE Tx功率回退的观点, 最大簇的数目应谅设置到
4。
因此, 基于如上所述的系统级和链路级仿真结果, 可以得出: 为了得到吞吐量性能和 CM值之间的较好的折中, 最大簇的数目应 该设置在 2-4之间。
在本发明的实施方式中,设计了 2种新的非连续 RA方案, 其能 支持最大簇的数目等于 3和 4的场景。
如图 la和 lb所示, 所提出的方案根据簇的数目是 3还是 4将 总的资源块组(RBG ) 划分到不同的簇范围中。 每个 RBG包括多个 资源块, 其中规范 3GPP TS 36.213 V8.2.0 已经规定, 对于 5/10/15/20MHZ的带宽, RBG的大小分别为 2/3/4/4个资源块。 簇范 围的大小随着总的 RBG的数目的变化而变化, 其中 RBG的数目与 总的带宽有关, 而不同簇范围的大小是相同的。
在图 la和 lb示出了的实施方式中, 针对的是 10MH z的带宽, 其中总带宽被分成 50个资源块 (RB ) , 其中 40个 RB用于物理上 行共享信道 (PUSCH ) (即用于簇范围) 传输, 10个 RB用于物理 上行控制信道 (PUCCH ) HOa和 110b传输。 每个 RBG的大小为 3 个 RB。 对于 3个簇限制的场景, 每个簇范围包括 18个 RB, 即 6个 RBG。 对于 4个簇的场景, 每个簇范围包括 15个 RB, 即 5个 RBG。
在本发明中, 使用簇范围的起始位置和长度, 来向用户设备传 输上行非连续资源分配信令。 例如, 一个簇范围开始于哪个 RB 或 RBG, 并且该簇范围包括多少个 RB或 RBG。
为了测量不同方案的信令开销, 在 3GPP Tdocs中使用资源块分 配字段大小。
在本发明中, 对于 3 个簇的场景, 可以如下计算资源块分配字 段大小: NCN 3 = 3 x log2( G '(w G十 l)/2) ( 2 ) ; 对于 4个簇的场景, 可以如下计算资源块分配字段大 Λ|'
Figure imgf000009_0001
其中 表示每个簇的 RBG的数目。
为了改善非连续 RA 信令的灵活性, 一些簇范围的位置是固定 的, 而另一些簇范围的位置可以根据资源调度结果而改变。 对于 3 个簇的场景, 如图 la所示, 第一簇范围 1 11和第三簇范围 113是固 定的, 而第二簇范围 112的位置可以根据 RA信令的要求, 向右或 向左移动。 对于 4个簇的场景, 如图 lb所示, 第一簇范围 114和第 四簇范围 117的位置是固定的,而第二簇范围 115和第三簇范围 116 可以相应地向左或向右移动。
从图 la和图 lb可以看出, 一些簇范围有重叠。 当然, 本领域 的技术人员应该理解, 本发明不限于此。 在本发明的另外一些实施 方式中, 各个簇范围可以不重叠。 另外, 在本发明的另外一些实施 方式中, 各个簇范围的大小可以不相同。
图 2 示出了根据本发明的一个实施方式的一种用于传输上行非 连续资源分配信令的方法的流程图。
该方法包括步驟 S210, 用于生成上行非连续资源分配信令, 以 及步骤 S220 ,用于向用户设备传输生成的上行非连续资源分配信令, 其中该上行非连续资源分配信令包括簇范围的起始位置和长 度。
其中, 簇的数目最大多于 2个, 例如为 3个或 4个, 每个簇的 大小相同, 一些簇的位置固定, 另外一些簇的位置不固定。
其中, 根据仿真结果而确定簇的数目最大需要多于 2个。
图 3 示出了根据本发明的一个实施方式的一种用于传输上行非 连续资源分配信令的设备的框图。
如图 3所示, 该设备 300包括生成装置 310, 用于生成上行非连 续资源分配信令; 发送装置 320, 用于发送所生成的上行非连续资源 分配信令, 其中该上行非连续资源分配信令包括簇范围的起始位置 和长度。 ' 其中, 簇的数目最大多于 2个, 例如为 3个或 4个, 每个簇的 大小相同, 一些簇的位置固定, 另外一些簇的位置不固定。
其中, 根据仿真结果而确定簇的数目最大需要多于 2个。
该设备例如包括在网络侧, 例如基站和无线网络控制器中, 而 不是在用户设备中。
图 4 示出了根据本发明的一个实施方式的一种用于处理上行非 连续资源分配信令的方法的流程图。
该方法包括步骤 S410, 用于接收上行非连续资源分配信令, 以 及步骤 S420, 用于处理接收的上行非连续资源分配信令,
其中 i亥上行非连续资源分配信令包括簇范围的起始位置和长 度。
图 5 示出了根据本发明的一个实施方式的一种用于处理上行非 连续资源分配信令的设备的框图。
如图 5所示, 该设备包括接收装置 510, 用于接收上行非连续资 源分配信令, 处理装置 520, 用于处理接收的上行非连续资源分配信 令,
其中 ·ΐ亥上行非连续资源分配信令包括簇范围的起始位置和长 度。
该设备例如包括在用户设备中。
应当注意, 为了使本发明更容易理解, 上面的描述省略了对于本 领域的技术人员来说是公知的、 并且对于本发明的实现可能是必需 的更具体的一些技术细节。
提供本发明的说明书的目的是为了说明和描述,而不是用来穷举 或将本发明限制为所公开的形式。 对本领域的普通技术人员而言, 许多修改和变更都是显而易见的。 因此, 选择并描述实施方式是为 了更好地解释本发明的原理及其实际应用, 并使本领域普通技术人 员明白, 在不脱离本发明实质的前提下, 所有修改和变更均落入由 权利要求所限定的本发明的保护范围之内。

Claims

权 利 要 求 书
1. 一种用于传输上行非连续资源分配信令的方法, 包括: 生成上行非连续资源分配信令,
向用户设备传输生成的上行非连续资源分配信令,
其中该上行非连续资源分配信令包括簇范围的起始位置和长
2. 根据权利要求 1所述的方法,
其中簇的数目最大多于 2个。
3. 根据权利要求 2所述的方法,
其中簇的数目最大为 3个。
4: 根据权利要求 2所述的方法,
其中簇的数目最大为 4个。
5. 根据权利要求 2所述的方法,
其中每个簇的大小相同。
6. 根据权利要求 2所述的方法,
其中一些簇的位置固定, 另外一些簇的位置不固定。
7. 根据权利要求 2所述的方法,
其中根据仿真结果而确定簇的数目最大需要多于 2个。
8. 一种用于传输上行非连续资源分配信令的设备, 包括: 生成装置, 用于生成上行非连续资源分配信令;
发送装置, 用于发送所生成的上行非连续资源分配信令, 其中该上行非连续资源分配信令包括簇范围的起始位置和长
9. 根据权利要求 8所述的设备,
其中簇的数目最大多于 2个。
10. 根据权利要求 9所述的设备,
其中簇的数目最大为 3个。
11. 根据权利要求 9所述的设备, 其中簇的数目最大为 4个。
12. 根据权利要求 9所述的设备,
其中每个簇的大小相同。
13. 根据权利要求 9所述的设备,
其中一些簇的位置固定, 另外一些簇的位置不固定。
14. 根据权利要求 9所述的设备,
其中根据仿真结果而确定簇的数目最大需要多于 2个。
15. 一种用于处理上行非连续资源分配信令的方法, 包括: 接收上行非连续资源分配信令,
处理接收的上行非连续资源分配信令,
其中该上行非连续资源分配信令包括簇范围的起始位置和长
16. 一种用于处理上行非连续资源分配信令的设备, 包括: 接收装置, 用于接收上行非连续资源分配信令,
处理装置, 用于处理接收的上行非连续资源分配信令, 其中该上行非连续资源分配信令包括簇范围的起始位置和长
PCT/CN2010/070652 2010-02-11 2010-02-11 用于传输和处理上行非连续资源分配信令的方法和设备 WO2011097808A1 (zh)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201080051087.5A CN102612843B (zh) 2010-02-11 2010-02-11 用于传输和处理上行非连续资源分配信令的方法和设备
PCT/CN2010/070652 WO2011097808A1 (zh) 2010-02-11 2010-02-11 用于传输和处理上行非连续资源分配信令的方法和设备

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/CN2010/070652 WO2011097808A1 (zh) 2010-02-11 2010-02-11 用于传输和处理上行非连续资源分配信令的方法和设备

Publications (1)

Publication Number Publication Date
WO2011097808A1 true WO2011097808A1 (zh) 2011-08-18

Family

ID=44367158

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2010/070652 WO2011097808A1 (zh) 2010-02-11 2010-02-11 用于传输和处理上行非连续资源分配信令的方法和设备

Country Status (2)

Country Link
CN (1) CN102612843B (zh)
WO (1) WO2011097808A1 (zh)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101272615A (zh) * 2007-03-22 2008-09-24 中兴通讯股份有限公司 资源分配信令中的资源位置域传输方法及装置
WO2008155732A2 (en) * 2007-06-19 2008-12-24 Nokia Corporation Resource-block-cluster-based load indication
CN101399800A (zh) * 2007-09-27 2009-04-01 中兴通讯股份有限公司 基于正交频分复用系统的资源分配信息表示方法
CN101621846A (zh) * 2008-07-01 2010-01-06 中兴通讯股份有限公司 频谱资源分类及划分方法
CN101657018A (zh) * 2009-08-18 2010-02-24 中兴通讯股份有限公司 无线信道资源分配的指示方法及基站、解码方法及终端

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101272615A (zh) * 2007-03-22 2008-09-24 中兴通讯股份有限公司 资源分配信令中的资源位置域传输方法及装置
WO2008155732A2 (en) * 2007-06-19 2008-12-24 Nokia Corporation Resource-block-cluster-based load indication
CN101399800A (zh) * 2007-09-27 2009-04-01 中兴通讯股份有限公司 基于正交频分复用系统的资源分配信息表示方法
CN101621846A (zh) * 2008-07-01 2010-01-06 中兴通讯股份有限公司 频谱资源分类及划分方法
CN101657018A (zh) * 2009-08-18 2010-02-24 中兴通讯股份有限公司 无线信道资源分配的指示方法及基站、解码方法及终端

Also Published As

Publication number Publication date
CN102612843B (zh) 2014-04-02
CN102612843A (zh) 2012-07-25

Similar Documents

Publication Publication Date Title
US11184903B1 (en) Methods and systems for performance enhancement of downlink shared channels
CN110049557B (zh) 随机接入方法及装置
KR102292994B1 (ko) 무선 통신 시스템에서 타이밍 조정 방법 및 장치
US20210266906A1 (en) Apparatus and methods for efficient wireless channel usage
EP3484229B1 (en) Wireless communication terminal using trigger information
US10390337B2 (en) Aperiodic channel state information (CSI) reporting for carrier aggregation
TWI771337B (zh) 傳輸上行控制訊息的方法、終端設備和網路設備
JP7379475B2 (ja) アンライセンスサブバンドのダウンリンク制御
CN109565825B (zh) 非授权上行传输方法和装置
WO2015000304A1 (zh) 上行发送功率校准方法及其相关设备和系统
CN105052044A (zh) 信息传输的方法、基站和用户设备
WO2017132967A1 (zh) 数据发送方法、数据接收方法、用户设备及基站
WO2020244393A1 (zh) 一种数据传输方法及装置
WO2019214523A1 (zh) 一种通信方法及装置
WO2019191901A1 (en) Method and devices for resource allocation in a wireless communication system
CN114342530A (zh) 针对交错传输的频域资源分配
US20230080567A1 (en) Methods and systems for performance enhancement of downlink shared channels
TW201818751A (zh) 傳輸信號的方法、終端設備和網路設備
WO2013067929A1 (zh) 一种资源分配的方法及基站
CN109996339B (zh) 一种通信方法及装置
CN109691212B (zh) 非授权上行传输的小区切换方法和设备
WO2011097808A1 (zh) 用于传输和处理上行非连续资源分配信令的方法和设备
CN109417794B (zh) 终端装置、基站装置、通信方法以及集成电路
EP3840281A1 (en) Communication method and apparatus
CN115023914A (zh) 信息处理方法及设备

Legal Events

Date Code Title Description
WWE Wipo information: entry into national phase

Ref document number: 201080051087.5

Country of ref document: CN

121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 10845482

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 10845482

Country of ref document: EP

Kind code of ref document: A1