WO2011046220A1 - 移動通信方法、移動管理用ノード及びパケット交換機 - Google Patents

移動通信方法、移動管理用ノード及びパケット交換機 Download PDF

Info

Publication number
WO2011046220A1
WO2011046220A1 PCT/JP2010/068208 JP2010068208W WO2011046220A1 WO 2011046220 A1 WO2011046220 A1 WO 2011046220A1 JP 2010068208 W JP2010068208 W JP 2010068208W WO 2011046220 A1 WO2011046220 A1 WO 2011046220A1
Authority
WO
WIPO (PCT)
Prior art keywords
bearer
gateway device
mobile station
mobile communication
management node
Prior art date
Application number
PCT/JP2010/068208
Other languages
English (en)
French (fr)
Inventor
西田 克利
鈴木 啓介
慎 楢葉
Original Assignee
株式会社エヌ・ティ・ティ・ドコモ
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社エヌ・ティ・ティ・ドコモ filed Critical 株式会社エヌ・ティ・ティ・ドコモ
Priority to CN201080046692.3A priority Critical patent/CN102577482B/zh
Priority to BR112012008953-6A priority patent/BR112012008953A2/pt
Priority to US13/501,361 priority patent/US8462801B2/en
Priority to MX2012004393A priority patent/MX2012004393A/es
Priority to AU2010307635A priority patent/AU2010307635B2/en
Priority to KR20127009564A priority patent/KR101224000B1/ko
Priority to CA2777581A priority patent/CA2777581C/en
Priority to EP10823488.1A priority patent/EP2490475B1/en
Publication of WO2011046220A1 publication Critical patent/WO2011046220A1/ja
Priority to HK12113545.9A priority patent/HK1172768A1/zh

Links

Images

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W24/00Supervisory, monitoring or testing arrangements
    • H04W24/04Arrangements for maintaining operational condition
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W28/00Network traffic management; Network resource management
    • H04W28/02Traffic management, e.g. flow control or congestion control
    • H04W28/0252Traffic management, e.g. flow control or congestion control per individual bearer or channel
    • H04W28/0257Traffic management, e.g. flow control or congestion control per individual bearer or channel the individual bearer or channel having a maximum bit rate or a bit rate guarantee
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W28/00Network traffic management; Network resource management
    • H04W28/02Traffic management, e.g. flow control or congestion control
    • H04W28/0268Traffic management, e.g. flow control or congestion control using specific QoS parameters for wireless networks, e.g. QoS class identifier [QCI] or guaranteed bit rate [GBR]
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W76/00Connection management
    • H04W76/10Connection setup
    • H04W76/18Management of setup rejection or failure
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W76/00Connection management
    • H04W76/30Connection release
    • H04W76/38Connection release triggered by timers

Definitions

  • the present invention relates to a mobile communication method, a mobility management node, and a packet switch.
  • a GBR bearer is set between the gateway device S-GW and the gateway device P-GW (PDN Gateway).
  • step S1001 a failure occurs in the radio base station eNodeB, and a restart process is performed.
  • step S1002 the radio base station eNodeB receives the packet addressed to the mobile station UE transferred via the gateway device P-GW and the gateway device S-GW.
  • step S1003 the radio base station eNodeB , “Error Indication” is transmitted.
  • step S1004 the gateway device S-GW releases GBR bearer resources for the radio base station eNodeB, and in step S1005, buffers the packet addressed to the mobile station UE received from the gateway device P-GW.
  • step S1006 the gateway device S-GW transmits “Downlink Data Notification” for notifying a packet addressed to the mobile station UE being buffered to the mobility management node MME (Mobility Management Entity).
  • MME Mobility Management Entity
  • step S1007 the mobility management node MME transmits “Paging” addressed to the mobile station UE to the radio base station eNodeB and starts a paging timer.
  • step S1008 even if the mobile management node MME does not respond to “Paging” from the mobile station UE before the paging timer expires, the mobility management node MME determines whether the gateway device S-GW and gateway device P-GW Hold the GBR bearer in between without releasing it.
  • step S2000 by performing the GBR bearer setting process in step S2000, between the mobile station UE and the radio base station eNodeB, between the radio base station eNodeB and the gateway device S-GW, and the gateway device.
  • a GBR bearer is set between the S-GW and the gateway device P-GW.
  • step S2001 a failure occurs in the radio base station eNodeB, and a restart process is performed.
  • step S2002 the radio base station eNodeB transmits a RESET signal to the mobility management node MME.
  • step S2003 the mobility management node MME transmits “Release Access Bearer Request” to the gateway device S-GW.
  • the gateway device S-GW releases the GBR bearer resource for the radio base station eNodeB in step S2004, and transmits “Release Access Bearer Response” to the mobility management node MME in step S2005.
  • the gateway device S-GW When the gateway device S-GW receives a packet addressed to the mobile station UE from the gateway device P-GW in step S2006, the gateway device S-GW buffers the packet in step S2007.
  • step S2008 the gateway device S-GW transmits “Downlink Data Notification” for notifying a packet addressed to the mobile station UE being buffered to the mobility management node MME.
  • step S2009 the mobility management node MME transmits “Paging” addressed to the mobile station UE to the radio base station eNodeB and starts a paging timer.
  • step S2010 the mobility management node MME, even if there is no response to “Paging” from the mobile station UE before the paging timer expires, Hold the GBR bearer in between without releasing it.
  • 3GPP TS 23.401 3GPP TS24.301 3GPP TS 23.007 3GPP TS 23.060
  • the GBR bearer in the core network is disconnected at an appropriate timing.
  • the GBR bearer provides a service by time billing, there is a similar problem that an event in which such billing cannot be stopped occurs.
  • the present invention has been made in view of the above-described problems.
  • a failure occurs in a device in the radio access network while the GBR bearer is set, the GBR bearer in the core network is appropriately selected. It is an object of the present invention to provide a mobile communication method, a mobility management node, and a packet switch that can be disconnected at appropriate timing.
  • a first feature of the present invention is a mobile communication method in which a first bearer for a mobile station is set between a first gateway device and a radio base station, and the first gateway device and the second gateway When the first gateway device detects a failure of the radio base station in a state in which the second bearer for the mobile station is set up with the device, the first bearer is released and used for mobility management.
  • a second feature of the present invention is a mobile communication method, in which a first bearer for a mobile station is set between a first gateway device and a radio base station, and the first gateway device and the second gateway When the mobility management node detects a failure of the radio base station in a state where the second bearer for the mobile station is set up with the device, a bearer release request is sent to the first gateway device. Transmitting and starting a predetermined timer; the first gateway device releasing the first bearer in response to the bearer release request; and the mobility management node before the predetermined timer expires. And a step of starting a procedure for releasing the second bearer when a connection request is not received from the mobile station.
  • a third feature of the present invention is a mobility management node, in which a first bearer for a mobile station is set between a first gateway device and a radio base station. While the second bearer for the mobile station is set up with the gateway device, the first gateway device detects a failure of the radio base station, releases the first bearer, and moves the mobile When a downlink data notification for notifying a downlink data signal addressed to the mobile station being buffered is transmitted to the management node, a paging signal is transmitted to the mobile station And, when a response from the mobile station to the paging signal is not received within a predetermined period, the procedure for releasing the second bearer is started.
  • a fourth feature of the present invention is a mobility management node, wherein a first bearer for a mobile station is set between a first gateway device and a radio base station.
  • a bearer release request is transmitted to the first gateway device, and a predetermined timer In the case where a connection request is not received from the mobile station before the predetermined timer expires, a procedure for releasing the second bearer is started.
  • a fifth feature of the present invention is a mobile communication method, wherein a first bearer for a mobile station is set between a first gateway device and a radio network controller, and the first gateway device and the second In a state where the second bearer for the mobile station is set with the gateway device, when the first gateway device detects a failure of the radio network controller, the first bearer is released and a packet
  • a step of starting a procedure for releasing the second bearer when the packet switch does not receive a response from the mobile station to the paging signal within a predetermined period is summarized in that a and.
  • a sixth feature of the present invention is a mobile communication method, wherein a first bearer for a mobile station is set between a first gateway device and a radio network controller, and the first gateway device and the second If the packet switch detects a failure of the radio network controller while the second bearer for the mobile station is set up with the gateway device, it issues a bearer release request to the first gateway device. Transmitting, starting a predetermined timer, the first gateway device releasing the first bearer in response to the bearer release request, and before the packet switch expires the predetermined timer, And a step of starting a procedure for releasing the second bearer when a connection request is not received from the mobile station.
  • a seventh feature of the present invention is a packet switch, in which a first bearer for a mobile station is set between a first gateway device and a radio network controller, and the first gateway device and the second gateway In a state where the second bearer for the mobile station is set up with the device, the first gateway device detects a failure of the radio network controller, releases the first bearer, and the packet It is configured to transmit a paging signal to the mobile station when a downlink data notification for notifying a downlink data signal addressed to the mobile station being buffered is transmitted to the exchange. And when the response from the mobile station to the paging signal is not received within a predetermined period, the procedure for releasing the second bearer is started.
  • An eighth feature of the present invention is a packet switch, in which a first bearer for a mobile station is set between a first gateway device and a radio network controller, and the first gateway device and the second gateway When a failure of the radio network controller is detected in a state where the second bearer for the mobile station is set up with the device, a bearer release request is transmitted to the first gateway device, and a predetermined timer In the case where a connection request is not received from the mobile station before the predetermined timer expires, a procedure for releasing the second bearer is started. And
  • the GBR bearer in the core network is disconnected at an appropriate timing.
  • a mobile communication method, a mobile management node, and a packet switch can be provided.
  • FIG. 3 is a sequence diagram illustrating an operation of the mobile communication system according to the first embodiment of the present invention.
  • 3 is a flowchart for explaining the operation of the mobile communication system according to the first embodiment of the present invention.
  • FIG. 3 is a sequence diagram illustrating an operation of the mobile communication system according to the first embodiment of the present invention. It is a sequence diagram explaining operation
  • Mobile communication system according to the first embodiment of the present invention A mobile communication system according to a first embodiment of the present invention will be described with reference to FIGS.
  • the mobile communication system is an E-UTRAN mobile communication system.
  • a server device PCRF Policy and Charge Rule Function
  • a gateway device P-GW a gateway device P-GW
  • a gateway device S-GW a mobility management node MME
  • a radio base station eNodeB a radio base station eNodeB
  • a GBR bearer is set between the gateway device S-GW and the gateway device P-GW.
  • the GBR bearer between the radio base station eNodeB and the gateway device S-GW is referred to as a “first GBR bearer (first bearer)”, and the GBR bearer between the gateway device S-GW and the gateway device P-GW. Is referred to as a “second GBR bearer (second bearer)”.
  • step S100B of FIG. 2 a failure occurs in the radio base station eNodeB, and a restart process is performed. Thereafter, in step S100C of FIG. 2, the process A shown in FIG. 15 or the process B shown in FIG. 16 is performed.
  • step S101 the gateway device S-GW transmits “Downlink Data Notification” for notifying the mobile management node MME of a packet (downlink data signal) addressed to the buffered mobile station UE.
  • step S102 the mobility management node MME transmits a “Paging (paging signal)” addressed to the mobile station UE to the radio base station eNodeB and starts a paging timer.
  • Paging paging signal
  • the mobility management node MME performs the GBR bearer determination process shown in FIG. 3 in step S104.
  • step S104A the mobility management node MME determines whether or not the second GBR bearer for the mobile station UE exists. If “YES”, the operation proceeds to step S104B, and if “NO”, the operation proceeds to step S104D.
  • step S104B the mobility management node MME determines whether or not the second GBR bearer for the mobile station UE is a bearer that provides a service by time charging. If “YES”, the operation proceeds to step S104C, and if “NO”, the operation proceeds to step S104D.
  • step S104C the mobility management node MME starts the procedure after step S105 for releasing the second GBR bearer for the mobile station UE.
  • step S104D the mobility management node MME maintains the second GBR bearer for the mobile station UE without releasing it, and completes the process.
  • the mobility management node MME may send a signal requesting resource release for the radio base station eNodeB to the gateway device S-GW.
  • the QCI is information indicating the QoS level of the second GBR bearer.
  • Step S105 the mobility management node MME transmits “Delete Bearer Command” to the gateway device S-GW when it is determined in Step S104C that the second GBR bearer for the mobile station UE is released.
  • step S106 the second GBR bearer for the mobile station UE is released by starting the GBR bearer release procedure shown in FIG.
  • step S106A when the gateway device S-GW receives the “Delete Bearer Command”, the gateway device S-GW transmits the “Delete Bearer Command” to the gateway device P-GW.
  • step S106B the “PCEF Initiated IP-CAN Session Modification” procedure is performed between the gateway apparatus P-GW and the server apparatus PCRF, and when the charging process is performed at the application level, the charging process is stopped.
  • the gateway device P-GW transmits “Delete Bearer Request” to the gateway device S-GW in step S106D, and stops the charging process for the GBR bearer for the mobile station UE in step S106E.
  • step S106F the gateway device S-GW transmits “Delete Bearer Request” to the mobility management node MME.
  • step S106G the procedure shown in steps 4 to 7 of Fig. 5.4.4.1.1 of TS23.401 defined in 3GPP is executed.
  • step S106H the mobility management node MME transmits “Delete Bearer Response” to the gateway device S-GW.
  • step S106I the gateway device S-GW sends “ Send “Delete Bearer Response”.
  • the second GBR bearer when a failure occurs in the radio base station eNodeB in a state where the GBR bearer is set, the second GBR bearer is disconnected at an appropriate timing, The billing process for the second GBR bearer can be stopped.
  • Modification 1 With reference to FIG.5 and FIG.6, the mobile communication system which concerns on the example 1 of a change of the above-mentioned 1st Embodiment is demonstrated.
  • the mobile communication system according to the first modification will be described by focusing on differences from the mobile communication system according to the first embodiment described above.
  • steps S150A through S150C are the same as the operations in steps S100A through S100C shown in FIG.
  • Step 151 the gateway device S-GW transmits “Downlink Data Notification” including “Cause: Error Indication received RNC / eNodeB (predetermined information)” to the mobility management node MME.
  • step S152 the mobility management node MME transmits a “Paging (paging signal)” addressed to the mobile station UE to the radio base station eNodeB and starts a paging timer.
  • Paging paging signal
  • Step S153 If there is no response to “Paging” from the mobile station UE before the paging timer expires in Step S153, the mobility management node MME performs the GBR bearer determination process shown in FIG. 6 in Step S154.
  • step S154A the mobility management node MME determines whether or not the second GBR bearer for the mobile station UE exists. If “YES”, the operation proceeds to step S154B, and if “NO”, the operation proceeds to step S154E.
  • step S154B the mobility management node MME determines whether or not the second GBR bearer for the mobile station UE is a bearer that provides a service by time billing. If “YES”, the operation proceeds to step S154C, and if “NO”, the operation proceeds to step S154E.
  • step S154C the mobility management node MME corresponds to the reason that “Cause: Error Indication received from RNC / eNodeB” is included in the received “Downlink Data Notification” and the contents of the information element should be disconnected. It is determined whether or not to do so. If “YES”, the operation proceeds to step S154D, and if “NO”, the operation proceeds to step S154E.
  • step S154D the mobility management node MME releases the second GBR bearer for the mobile station UE.
  • step S154E the mobility management node MME maintains the second GBR bearer for the mobile station UE without releasing it, and completes the process.
  • the mobility management node MME may send a signal requesting resource release for the radio base station eNodeB to the gateway device S-GW.
  • the mobility management node MME may be configured not to perform the determination in step S154B.
  • the paging timer is different from the normal value. It may be configured to set to a value.
  • steps S155 and S156 are the same as the operations in steps S105 and S106 shown in FIG.
  • Modification 2 With reference to FIG.7 and FIG.8, the mobile communication system which concerns on the modification 2 of the above-mentioned 1st Embodiment is demonstrated.
  • the mobile communication system according to the second modification will be described by focusing on differences from the mobile communication system according to the first embodiment described above.
  • steps S200A and S200B are the same as the operations of steps S100A and S100B shown in FIG.
  • step S201 the radio base station eNodeB transmits a RESET signal to the mobility management node MME.
  • the mobility management node MME may perform the GBR bearer determination process shown in FIG. 3 or 6 in step S201A.
  • the mobility management node MME activates the GBR bearer release wait timer in step S202, and transmits “Release Access Bearer Request” to the gateway device S-GW in step S203.
  • step S204 the gateway device S-GW releases the GBR bearer resource for the radio base station eNodeB, and in step S205, transmits “Release Access Bearer Response” to the mobility management node MME.
  • the mobility management node MME sends “Delete” to the gateway device S-GW in step S207. Send “Bearer Command”.
  • step S208 the second GBR bearer for the mobile station UE is released by starting the GBR bearer release procedure shown in FIG.
  • the second GBR bearer is disconnected at an appropriate timing, and the charging process for the second GBR bearer is stopped. be able to.
  • the first feature of the present embodiment is a mobile communication method, which is a first GBR bearer (first bearer) for a mobile station UE between a gateway device S-GW (first gateway device) and a radio base station eNodeB. Is set, and the gateway device in the state where the second GBR bearer (second bearer) for the mobile station UE is set between the gateway device S-GW and the gateway device P-GW (second gateway device)
  • the S-GW detects a failure of the radio base station eNodeB
  • the S-GW releases the first GBR bearer and notifies the mobility management node MME of a downlink data signal addressed to the mobile station UE being buffered.
  • the process A for transmitting “Downlink Data Notification (downlink data notification)” and the mobility management node MME The mobile station UE transmits “Paging (paging signal)” to the mobile station UE and the mobile management node MME responds to “Paging” within a period (predetermined period) defined by the paging timer.
  • the gist of the present invention is to include a step C of starting a procedure for releasing the second GBR bearer.
  • the mobility management node MME further releases the second GBR bearer when it is determined that the second GBR bearer is a bearer that provides service by time charging. May start.
  • the procedure for releasing may be initiated.
  • the mobility management node MME further includes “Cause: Error Indication received from RNC / eNodeB (predetermined information)” in “Downlink Data Notification”.
  • a procedure for releasing the second GBR bearer may be started.
  • the gateway device S-GW detects a failure of the radio base station eNodeB when receiving the “Error Indication (error instruction signal)” from the radio base station eNodeB. May be.
  • a second feature of the present embodiment is a mobile communication method, in which a first GBR bearer for the mobile station UE is set between the gateway device S-GW and the radio base station eNodeB, and the gateway device S-GW
  • the gateway device S-GW When the mobility management node MME detects a failure of the radio base station eNodeB in a state where the second GBR bearer for the mobile station UE is set between the gateway device P-GW and the gateway device P-GW, the gateway device S-GW In response to the “Release Access Bearer Request”, the gateway device S-GW sends a “Release Access Bearer Request (bearer release request)” to start the GBR bearer release wait timer (predetermined timer), Step for releasing 1GBR bearer and node M for mobility management E is, before the GBR bearer release wait timer expires, if it does not receive a connection request from the mobile station UE, and the gist that a step of initiating a procedure for releasing the first 2
  • a third feature of the present embodiment is a mobility management node MME, in which a first GBR bearer for the mobile station UE is set between the gateway device S-GW and the radio base station eNodeB, and the gateway device S -although the second GBR bearer for the mobile station UE is set between the GW and the gateway device P-GW, the gateway device S-GW detects a failure of the radio base station eNodeB and releases the first GBR bearer
  • “Downlink Data Notification” is transmitted to the mobility management node MME, it is configured to transmit “Paging” to the mobile station UE, and is defined by the paging timer. If a response from the mobile station UE to “Paging” is not received within the period, the second GBR base The gist is that it is configured to start a procedure to release the ara.
  • the second GBR bearer may be configured to start a procedure for releasing the second GBR bearer when it is determined that the second GBR bearer is a bearer that provides a service by time charging. .
  • a procedure for releasing the second GBR bearer may be started.
  • Downlink Data Notification includes “Cause: Error Indication received received RNC / eNodeB”, and the contents of the information element fall under the reason to be disconnected. If determined, the procedure for releasing the second GBR bearer may be started.
  • a fourth feature of the present embodiment is a mobility management node MME, in which a first GBR bearer for the mobile station UE is set between the gateway device S-GW and the radio base station eNodeB, and the gateway device S -When a failure of the radio base station eNodeB is detected in a state where the second GBR bearer for the mobile station UE is set between the GW and the gateway device P-GW, "Release Access” is issued to the gateway device S-GW. "Bearer Request" is transmitted, and the GBR bearer release wait timer is configured to be started. If the connection request is not received from the mobile station UE before the GBR bearer release wait timer expires, the second GBR bearer is released. The gist is that the procedure is configured to start.
  • Mobile communication system according to the second embodiment With reference to FIG.9 and FIG.10, the mobile communication system which concerns on the above-mentioned 2nd Embodiment is demonstrated.
  • the mobile communication system according to the second embodiment of the present invention will be described by focusing on differences from the above-described mobile communication system according to the first embodiment.
  • the mobile communication system is a UTRAN mobile communication system, and as shown in FIGS. 9 and 10, a server apparatus PCRF, a gateway apparatus P-GW, a gateway apparatus S-GW, and a packet An exchange SGSN and a radio network controller RNC are provided.
  • a GBR bearer is set between the gateway device S-GW and the gateway device P-GW.
  • the GBR bearer between the radio network controller RNC and the gateway device S-GW is referred to as a “first GBR bearer (first bearer)”
  • the GBR between the gateway device S-GW and the gateway device P-GW is referred to as a “second GBR bearer (second bearer)”.
  • the GBR bearer between the radio network controller RNC and the gateway device S-GW is referred to as “Direct Tunnel”.
  • a GBR bearer may be set between the radio network controller RNC and the packet switch SGSN, and between the packet switch SGSN and the gateway device S-GW.
  • the GBR bearer is referred to as “Non-Direct Tunnel”.
  • step S300B a failure occurs in the radio network controller RNC, and the restart process is performed. Thereafter, in step S300C, process A shown in FIG. 15 or process B shown in FIG. 16 is performed.
  • the radio base station eNodeB in FIGS. 15 and 16 is regarded as a radio network controller RNC, and the mobility management node MME is regarded as a gateway device S-GW.
  • step S301 the gateway device S-GW transmits "Downlink Data Notification" to the packet switch SGSN.
  • step S302 the packet exchange SGSN transmits “Paging (paging signal)” addressed to the mobile station UE to the radio network controller RNC and starts a paging timer.
  • Paging paging signal
  • the packet switch SGSN performs the GBR bearer determination process shown in FIG. 3 in step S304.
  • step S305 when the packet switch SGSN determines to release the second GBR bearer for the mobile station UE, the packet switch SGSN transmits “Delete Bearer Command” to the gateway device S-GW.
  • Step S306 the second GBR bearer for the mobile station UE is released by starting the GBR bearer release procedure shown in FIG.
  • the second GBR bearer when a failure occurs in the radio network controller RNC in a state where the GBR bearer is set, the second GBR bearer is disconnected at an appropriate timing. The charging process for the second GBR bearer can be stopped.
  • Modification 1 With reference to FIG. 11, a mobile communication system according to Modification 1 of the second embodiment described above will be described. Hereinafter, the mobile communication system according to the first modification will be described by focusing on differences from the mobile communication system according to the second embodiment described above.
  • steps S350A to S350C are the same as the operations in steps S300A to S300C shown in FIG.
  • step 351 the gateway device S-GW transmits “Downlink Data Notification” including “Cause: Error Indication received from RNC / eNodeB (predetermined information)” to the packet switch SGSN.
  • step S352 the packet switch SGSN transmits “Paging (paging signal)” addressed to the mobile station UE to the radio network controller RNC and starts a paging timer.
  • Paging paging signal
  • step S353 If there is no response to “Paging” from the mobile station UE before the paging timer expires in step S353, the packet switch SGSN performs the GBR bearer determination process shown in FIG. 6 in step S354.
  • step S355 and S356 are the same as operation
  • Modification 2 With reference to FIG.12 and FIG.13, the mobile communication system which concerns on the modification 2 of the above-mentioned 2nd Embodiment is demonstrated.
  • the mobile communication system according to the second modification will be described by focusing on differences from the mobile communication system according to the second embodiment described above.
  • “Direct Tunnel” is applied, that is, packets transferred from the gateway device P-GW to the gateway device S-GW are wirelessly transmitted without going through the packet switch SGSN. It is configured to be transferred to the line control station RNC.
  • steps S400A and S400B are the same as the operations in steps S300A and S300B shown in FIG.
  • step S401 the radio network controller RNC transmits a RESET signal to the packet switch SGSN.
  • the packet switch SGSN may perform the GBR bearer determination process shown in FIG. 3 or 6 in step S401A.
  • the packet switch SGSN activates a GBR bearer release waiting timer in step S402, and transmits “Release Access Bearer Request” to the gateway device S-GW in step S403.
  • the gateway device S-GW releases the GBR bearer resource for the radio network controller RNC in step S404, and transmits "Release Access Bearer Response" to the packet switch SGSN in step S405.
  • the packet switch SGSN sends a “Delete Bearer Command” to the gateway device S-GW in step S407. ".
  • step S408 the second GBR bearer for the mobile station UE is released by starting the GBR bearer release procedure shown in FIG.
  • the packet switch SGSN may be configured to detect a failure in the radio network controller RNC by a method other than receiving a RESET signal from the radio network controller RNC.
  • the packet switch SGSN may be configured to detect a failure in the radio network controller RNC using RANAP signal processing or the like.
  • Modification 3 With reference to FIG. 14, a mobile communication system according to Modification 3 of the above-described second embodiment will be described. Hereinafter, the mobile communication system according to the third modification will be described by focusing on differences from the mobile communication system according to the second embodiment described above.
  • Non-Direct Tunnel is applied, that is, a packet transferred from the gateway device P-GW to the gateway device S-GW passes through the packet switch SGSN. It is configured to be transferred to the radio network controller RNC.
  • step S501 the radio network controller RNC transmits a RESET signal to the packet switch SGSN.
  • the packet switch SGSN may perform the GBR bearer determination process shown in FIG. 3 or FIG. 6 when receiving the RESET signal.
  • the packet switch SGSN activates a GBR bearer release waiting timer in step S502, and releases a GBR bearer resource for the radio network controller RNC in step S503.
  • step S504 If there is no connection request from the mobile station UE before the GBR bearer release waiting timer expires in step S504, the packet switch SGSN starts the GBR bearer release procedure shown in FIG. Release the second GBR bearer for use.
  • the first feature of the present embodiment is a mobile communication method, which is between a gateway device S-GW and a radio network controller RNC, or between a radio network controller RNC and a packet switch SGSN, and a packet.
  • a first GBR bearer for the mobile station UE is set between the exchange SGSN and the gateway device S-GW, and a second GBR bearer for the mobile station UE is set between the gateway device S-GW and the gateway device P-GW.
  • the gateway device S-GW or the packet switching unit SGSN detects a failure of the radio network controller RNC in the set state, the first GBR bearer is released and “Downlink Data Notification” is issued to the packet switching unit SGSN.
  • the gist is to include the step C.
  • step C the packet switch SGSN further starts a procedure for releasing the second GBR bearer when it is determined that the second GBR bearer is a bearer that provides service by time charging. May be.
  • the packet switch SGSN further includes “Cause: Error Received from RNC / eNodeB” in “Downlink Data Notification”, and this information element
  • a procedure for releasing the second GBR bearer may be started.
  • the gateway device S-GW may detect a failure of the radio network controller RNC when “Error Indication” is received from the radio network controller RNC. .
  • a second feature of the present embodiment is a mobile communication method, in which a first GBR bearer for the mobile station UE is set between the gateway device S-GW and the radio network controller RNC, and the gateway device S-
  • the packet switch SGSN detects a failure of the radio base station eNodeB in a state where the second GBR bearer for the mobile station UE is set between the GW and the gateway device P-GW
  • the gateway device S-GW “Release Access Bearer Request” is transmitted to start the GBR bearer release waiting timer
  • the gateway device S-GW releases the first GBR bearer according to “Release Access Bearer Request”
  • the packet switch SGSN, GBR bearer release waiting timer Before the expiration does not receive a connection request from the mobile station UE, and the gist that a step of initiating a procedure for releasing the first 2GBR bearer.
  • the third feature of the present embodiment is a packet switch SGSN, in which a first GBR bearer for the mobile station UE is set between the gateway device S-GW and the radio network controller RNC, and the gateway device S- While the second GBR bearer for the mobile station UE is set between the GW and the gateway device P-GW, the gateway device S-GW detects a failure of the radio network controller RNC and releases the first GBR bearer.
  • the gateway device S-GW detects a failure of the radio network controller RNC and releases the first GBR bearer.
  • “Downlink Data Notification” is transmitted to the packet switch SGSN, it is configured to transmit “Paging” to the mobile station UE, and within the period specified by the paging timer. If the mobile station UE does not receive a response to “Paging”, the second GBR bearer
  • the gist of the present invention is that it is configured to start a procedure for releasing.
  • the second GBR bearer may be configured to start a procedure for releasing the second GBR bearer when it is determined that the second GBR bearer is a bearer that provides a service by time charging. .
  • a procedure for releasing the second GBR bearer may be started.
  • Downlink Data Notification includes “Cause: Error Indication received received RNC / eNodeB”, and the contents of the information element fall under the reason to be disconnected. If determined, the procedure for releasing the second GBR bearer may be started.
  • a fourth feature of the present embodiment is a packet switch SGSN, in which a first GBR bearer for the mobile station UE is set between the gateway device S-GW and the radio network controller RNC, and the gateway device S- When a failure of the radio network controller RNC is detected in a state where the second GBR bearer for the mobile station UE is set between the GW and the gateway device P-GW, the gateway device S-GW is notified of “Release Access”. "Bearer Request" is transmitted, and the GBR bearer release wait timer is configured to be started. If the connection request is not received from the mobile station UE before the GBR bearer release wait timer expires, the second GBR bearer is released. The gist is that the procedure is configured to start.
  • the operations of the mobile station UE, the radio base station eNodeB, the mobility management node MME, the gateway device S-GW, the gateway device P-GW, the packet switch SGSN, the radio network controller RNC, and the like are performed by hardware. It may be implemented by a software module executed by a processor or a combination of both.
  • Software modules include RAM (Random Access Memory), flash memory, ROM (Read Only Memory), EPROM (Erasable Programmable ROM), EEPROM (Electronically Erasable and Programmable, Removable ROM, and Hard Disk). Alternatively, it may be provided in a storage medium of an arbitrary format such as a CD-ROM.
  • Such a storage medium is connected to the processor so that the processor can read and write information from and to the storage medium. Further, such a storage medium may be integrated in the processor.
  • Such a storage medium and processor may be provided in the ASIC.
  • Such an ASIC may be provided in the mobile station UE, the radio base station eNodeB, the mobility management node MME, the gateway device S-GW, the gateway device P-GW, the packet switching device SGSN, or the radio network controller RNC.
  • the storage medium and the processor are provided as discrete components in the mobile station UE, the radio base station eNodeB, the mobility management node MME, the gateway device S-GW, the gateway device P-GW, the packet switching device SGSN, and the radio network controller RNC. May be provided.

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Mobile Radio Communication Systems (AREA)
  • Data Exchanges In Wide-Area Networks (AREA)
  • Telephonic Communication Services (AREA)

Abstract

 本発明に係る移動通信方法は、移動局UE用の第2GBRベアラが設定されている状態で、ゲートウェイ装置S-GWが、無線回線制御局RNCの故障を検出すると、第1GBRベアラを解放すると共に、パケット交換機SGSNに対して、「Downlink Data Notification」を送信する工程Aと、パケット交換機SGSNが、移動局UEに対して、「Paging」を送信する工程Bと、パケット交換機SGSNが、所定期間内に、「Paging」に対する移動局UEからの応答を受信しない場合、第2GBRベアラを解放する手順を開始する工程Cとを有することを要旨とする。

Description

移動通信方法、移動管理用ノード及びパケット交換機
 本発明は、移動通信方法、移動管理用ノード及びパケット交換機に関する。
 図15及び図16を参照して、E-UTRAN(Evolved UTRAN)方式の移動通信システムにおける無線基地局eNodeBの故障発生時のGBR(Guaranteed Bit Rate)ベアラの制御処理について説明する。
 第1に、図15を参照して、かかるGBRベアラの制御処理の第1例について説明する。
 図15に示すように、ステップS1000において、GBRベアラ設定処理を行うことによって、移動局UEと無線基地局eNodeBとの間、無線基地局eNodeBとゲートウェイ装置S-GW(Serving Gateway)との間、及び、ゲートウェイ装置S-GWとゲートウェイ装置P-GW(PDN Gateway)との間で、GBRベアラを設定する。
 ステップS1001において、無線基地局eNodeBにおいて故障が発生し、再開処理が実施される。
 無線基地局eNodeBは、ステップS1002において、ゲートウェイ装置P-GW及びゲートウェイ装置S-GWを経由して転送された移動局UE宛てのパケットを受信すると、ステップS1003において、ゲートウェイ装置S-GWに対して、「Error Indication」を送信する。
 ゲートウェイ装置S-GWは、ステップS1004において、無線基地局eNodeB向けのGBRベアラ用リソースを解放し、ステップS1005において、ゲートウェイ装置P-GWから受信した移動局UE宛てのパケットをバッファリングする。
 ステップS1006において、ゲートウェイ装置S-GWは、移動管理用ノードMME(Mobility Management Entity)に対して、バッファリング中の移動局UE宛てのパケットを通知するための「Downlink Data Notification」を送信する。
 ステップS1007において、移動管理用ノードMMEは、無線基地局eNodeBに対して、移動局UE宛ての「Paging」を送信すると共に、ページングタイマーを起動する。
 ステップS1008において、移動管理用ノードMMEは、ページングタイマーが満了するまでに、移動局UEからの「Paging」に対する応答が無い場合であっても、ゲートウェイ装置S-GWとゲートウェイ装置P-GWとの間のGBRベアラを解放せずに保持する。
 第2に、図16を参照して、かかるGBRベアラの制御処理の第2例について説明する。
 図16に示すように、ステップS2000において、GBRベアラ設定処理を行うことによって、移動局UEと無線基地局eNodeBとの間、無線基地局eNodeBとゲートウェイ装置S-GWとの間、及び、ゲートウェイ装置S-GWとゲートウェイ装置P-GWとの間で、GBRベアラを設定する。
 ステップS2001において、無線基地局eNodeBにおいて故障が発生し、再開処理が実施される。
 ステップS2002において、無線基地局eNodeBは、移動管理用ノードMMEに対して、RESET信号を送信する。
 ステップS2003において、移動管理用ノードMMEは、ゲートウェイ装置S-GWに対して、「Release Access Bearer Request」を送信する。
 ゲートウェイ装置S-GWは、ステップS2004において、無線基地局eNodeB向けのGBRベアラ用リソースを解放し、ステップS2005において、移動管理用ノードMMEに対して、「Release Access Bearer Response」を送信する。
 ゲートウェイ装置S-GWは、ステップS2006において、ゲートウェイ装置P-GWから移動局UE宛てのパケットを受信すると、ステップS2007において、かかるパケットをバッファリングする。
 ステップS2008において、ゲートウェイ装置S-GWは、移動管理用ノードMMEに対して、バッファリング中の移動局UE宛てのパケットを通知するための「Downlink Data Notification」を送信する。
 ステップS2009において、移動管理用ノードMMEは、無線基地局eNodeBに対して、移動局UE宛ての「Paging」を送信すると共に、ページングタイマーを起動する。
 ステップS2010において、移動管理用ノードMMEは、ページングタイマーが満了するまでに、移動局UEからの「Paging」に対する応答が無い場合であっても、ゲートウェイ装置S-GWとゲートウェイ装置P-GWとの間のGBRベアラを解放せずに保持する。
3GPP TS23.401 3GPP TS24.301 3GPP TS23.007 3GPP TS23.060
 しかしながら、かかる移動通信システムでは、図15及び図16に示すように、GBRベアラが設定されている状態で、無線基地局eNodeBにおいて故障が発生した場合であっても、コアネットワーク内のGBRベアラを適切なタイミングで切断することができず、GBRベアラにおいて時間課金によってサービスを提供している場合には、かかる課金を停止することができない事象が発生するという問題点があった。
 また、UTRAN方式の移動通信システムでも、GBRベアラが設定されている状態で、無線回線制御局RNCにおいて故障が発生した場合であっても、コアネットワーク内のGBRベアラを適切なタイミングで切断することができず、GBRベアラにおいて時間課金によってサービスを提供している場合には、かかる課金を停止することができない事象が発生するという同様の問題点があった。
 そこで、本発明は、上述の課題に鑑みてなされたものであり、GBRベアラが設定されている状態で、無線アクセスネットワーク内の装置において故障が発生した場合に、コアネットワーク内のGBRベアラを適切なタイミングで切断することができる移動通信方法、移動管理用ノード及びパケット交換機を提供することを目的とする。
 本発明の第1の特徴は、移動通信方法であって、第1ゲートウェイ装置と無線基地局との間で移動局用の第1ベアラが設定されており、該第1ゲートウェイ装置と第2ゲートウェイ装置との間で該移動局用の第2ベアラが設定されている状態で、該第1ゲートウェイ装置が、該無線基地局の故障を検出すると、該第1ベアラを解放すると共に、移動管理用ノードに対して、バッファリング中の該移動局宛ての下りリンクデータ信号を通知するための下りリンクデータ通知を送信する工程Aと、前記移動管理用ノードが、前記移動局に対して、ページング信号を送信する工程Bと、前記移動管理用ノードが、所定期間内に前記ページング信号に対する前記移動局からの応答を受信しない場合、前記第2ベアラを解放する手順を開始する工程Cとを有することを要旨とする。
 本発明の第2の特徴は、移動通信方法であって、第1ゲートウェイ装置と無線基地局との間で移動局用の第1ベアラが設定されており、該第1ゲートウェイ装置と第2ゲートウェイ装置との間で該移動局用の第2ベアラが設定されている状態で、移動管理用ノードが、該無線基地局の故障を検出すると、該第1ゲートウェイ装置に対して、ベアラ解放要求を送信し、所定タイマーを起動する工程と、前記第1ゲートウェイ装置が、前記ベアラ解放要求に応じて、前記第1ベアラを解放する工程と、前記移動管理用ノードが、前記所定タイマーが満了する前に、前記移動局から接続要求を受信しない場合、前記第2ベアラを解放する手順を開始する工程とを有することを要旨とする。
 本発明の第3の特徴は、移動管理用ノードであって、第1ゲートウェイ装置と無線基地局との間で移動局用の第1ベアラが設定されており、該第1ゲートウェイ装置と第2ゲートウェイ装置との間で該移動局用の第2ベアラが設定されている状態で、該第1ゲートウェイ装置が、該無線基地局の故障を検出し、該第1ベアラを解放すると共に、前記移動管理用ノードに対して、バッファリング中の該移動局宛ての下りリンクデータ信号を通知するための下りリンクデータ通知を送信した場合に、前記移動局に対して、ページング信号を送信するように構成されており、所定期間内に前記ページング信号に対する前記移動局からの応答を受信しない場合、前記第2ベアラを解放する手順を開始するように構成されていることを要旨とする。
 本発明の第4の特徴は、移動管理用ノードであって、第1ゲートウェイ装置と無線基地局との間で移動局用の第1ベアラが設定されており、該第1ゲートウェイ装置と第2ゲートウェイ装置との間で該移動局用の第2ベアラが設定されている状態で、該無線基地局の故障を検出すると、該第1ゲートウェイ装置に対して、ベアラ解放要求を送信し、所定タイマーを起動するように構成されており、前記所定タイマーが満了する前に、前記移動局から接続要求を受信しない場合、前記第2ベアラを解放する手順を開始するように構成されていることを要旨とする。
 本発明の第5の特徴は、移動通信方法であって、第1ゲートウェイ装置と無線回線制御局との間で移動局用の第1ベアラが設定されており、該第1ゲートウェイ装置と第2ゲートウェイ装置との間で該移動局用の第2ベアラが設定されている状態で、該第1ゲートウェイ装置が、該無線回線制御局の故障を検出すると、該第1ベアラを解放すると共に、パケット交換機に対して、バッファリング中の該移動局宛ての下りリンクデータ信号を通知するための下りリンクデータ通知を送信する工程Aと、前記パケット交換機が、前記移動局に対して、ページング信号を送信する工程Bと、前記パケット交換機が、所定期間内に前記ページング信号に対する前記移動局からの応答を受信しない場合、前記第2ベアラを解放する手順を開始する工程Cとを有することを要旨とする。
 本発明の第6の特徴は、移動通信方法であって、第1ゲートウェイ装置と無線回線制御局との間で移動局用の第1ベアラが設定されており、該第1ゲートウェイ装置と第2ゲートウェイ装置との間で該移動局用の第2ベアラが設定されている状態で、パケット交換機が、該無線回線制御局の故障を検出すると、該第1ゲートウェイ装置に対して、ベアラ解放要求を送信し、所定タイマーを起動する工程と、前記第1ゲートウェイ装置が、前記ベアラ解放要求に応じて、前記第1ベアラを解放する工程と、前記パケット交換機が、前記所定タイマーが満了する前に、前記移動局から接続要求を受信しない場合、前記第2ベアラを解放する手順を開始する工程とを有することを要旨とする。
 本発明の第7の特徴は、パケット交換機であって、第1ゲートウェイ装置と無線回線制御局との間で移動局用の第1ベアラが設定されており、該第1ゲートウェイ装置と第2ゲートウェイ装置との間で該移動局用の第2ベアラが設定されている状態で、該第1ゲートウェイ装置が、該無線回線制御局の故障を検出し、該第1ベアラを解放すると共に、前記パケット交換機に対して、バッファリング中の該移動局宛ての下りリンクデータ信号を通知するための下りリンクデータ通知を送信した場合に、前記移動局に対して、ページング信号を送信するように構成されており、所定期間内に前記ページング信号に対する前記移動局からの応答を受信しない場合、前記第2ベアラを解放する手順を開始するように構成されていることを要旨とする。
 本発明の第8の特徴は、パケット交換機であって、第1ゲートウェイ装置と無線回線制御局との間で移動局用の第1ベアラが設定されており、該第1ゲートウェイ装置と第2ゲートウェイ装置との間で該移動局用の第2ベアラが設定されている状態で、該無線回線制御局の故障を検出すると、該第1ゲートウェイ装置に対して、ベアラ解放要求を送信し、所定タイマーを起動するように構成されており、前記所定タイマーが満了する前に、前記移動局から接続要求を受信しない場合、前記第2ベアラを解放する手順を開始するように構成されていることを要旨とする。
 以上説明したように、本発明によれば、GBRベアラが設定されている状態で、無線アクセスネットワーク内の装置において故障が発生した場合に、コアネットワーク内のGBRベアラを適切なタイミングで切断することができる移動通信方法、移動管理用ノード及びパケット交換機を提供することができる。
本発明の第1の実施形態に係る移動通信システムの動作を説明するための図である。 本発明の第1の実施形態に係る移動通信システムの動作を説明するシーケンス図である。 本発明の第1の実施形態に係る移動通信システムの動作を説明するフローチャートである。 本発明の第1の実施形態に係る移動通信システムの動作を説明するシーケンス図である。 本発明の第1の実施形態の変更例1に係る移動通信システムの動作を説明するシーケンス図である。 本発明の第1の実施形態の変更例1に係る移動通信システムの動作を説明するフローチャートである。 本発明の第1の実施形態の変更例2に係る移動通信システムの動作を説明するための図である。 本発明の第1の実施形態の変更例2に係る移動通信システムの動作を説明するシーケンス図である。 本発明の第2の実施形態に係る移動通信システムの動作を説明するための図である。 本発明の第2の実施形態に係る移動通信システムの動作を説明するシーケンス図である。 本発明の第2の実施形態の変更例1に係る移動通信システムの動作を説明するシーケンス図である。 本発明の第2の実施形態の変更例2に係る移動通信システムの動作を説明するための図である。 本発明の第2の実施形態の変更例2に係る移動通信システムの動作を説明するシーケンス図である。 本発明の第2の実施形態の変更例3に係る移動通信システムの動作を説明するための図である。 従来の移動通信システムの動作を説明するシーケンス図である。 従来の移動通信システムの動作を説明するシーケンス図である。
(本発明の第1の実施形態に係る移動通信システム)
 図1乃至図4を参照して、本発明の第1の実施形態に係る移動通信システムについて説明する。
 本実施形態に係る移動通信システムは、E-UTRAN方式の移動通信システムであって、図1及び図2に示すように、サーバ装置PCRF(Policy and Charge Rule Function)と、ゲートウェイ装置P-GWと、ゲートウェイ装置S-GWと、移動管理用ノードMMEと、無線基地局eNodeBとを具備している。
 ここで、図1乃至図4を参照して、本発明の第1の実施形態に係る移動通信システムの動作について説明する。
 図1及び図2に示すように、図2のステップS100Aにおいて、GBRベアラ設定処理を行うことによって、移動局UEと無線基地局eNodeBとの間、無線基地局eNodeBとゲートウェイ装置S-GWとの間、及び、ゲートウェイ装置S-GWとゲートウェイ装置P-GWとの間で、GBRベアラを設定する。ここで、無線基地局eNodeBとゲートウェイ装置S-GWとの間のGBRベアラを「第1GBRベアラ(第1ベアラ)」と呼び、ゲートウェイ装置S-GWとゲートウェイ装置P-GWとの間のGBRベアラを「第2GBRベアラ(第2ベアラ)」と呼ぶものとする。
 図2のステップS100Bにおいて、無線基地局eNodeBにおいて故障が発生し、再開処理が実施される。その後、図2のステップS100Cにおいて、図15に示す処理A又は図16に示す処理Bが行われる。
 ステップS101において、ゲートウェイ装置S-GWは、移動管理用ノードMMEに対して、バッファリング中の移動局UE宛てのパケット(下りデータ信号)を通知するための「Downlink Data Notification」を送信する。
 ステップS102において、移動管理用ノードMMEは、無線基地局eNodeBに対して、移動局UE宛ての「Paging(ページング信号)」を送信すると共に、ページングタイマーを起動する。
 移動管理用ノードMMEは、ステップS103において、ページングタイマーが満了するまでに、移動局UEからの「Paging」に対する応答が無い場合、ステップS104において、図3に示すGBRベアラ判定処理を行う。
 図3に示すように、ステップS104Aにおいて、移動管理用ノードMMEは、移動局UE用の第2GBRベアラが存在するか否かについて判定する。「YES」の場合、本動作は、ステップS104Bに進み、「NO」の場合、本動作は、ステップS104Dに進む。
 ステップS104Bにおいて、移動管理用ノードMMEは、移動局UE用の第2GBRベアラが、時間課金によってサービスを提供しているベアラであるか否かについて判定する。「YES」の場合、本動作は、ステップS104Cに進み、「NO」の場合、本動作は、ステップS104Dに進む。
 移動管理用ノードMMEは、ステップS104Cにおいて、かかる移動局UE用の第2GBRベアラを解放するステップS105以降の手順を開始する。一方、移動管理用ノードMMEは、ステップS104Dにおいて、かかる移動局UE用の第2GBRベアラを解放することなく維持し、処理を完了する。このとき、移動管理用ノードMMEは、ゲートウェイ装置S-GWに対して、無線基地局eNodeB向けのリソース解放を要求する信号を送出してもよい。
 なお、ステップS104Bにおいて、移動管理用ノードMMEは、上述の判定の代わりに、第2GBRベアラに所定QCI(QoS Class Identifier)、例えば、「QCI=1(Speech)」が割り当てられているか否かについて判定してもよいし、所定オペレータポリシーに基づく所定条件が満たされているか否かについて判定してもよい。ここで、QCIは、第2GBRベアラのQoSのレベルを示す情報である。
 ステップS105において、移動管理用ノードMMEは、ステップS104Cにおいて、かかる移動局UE用の第2GBRベアラを解放すると決定した場合に、ゲートウェイ装置S-GWに対して、「Delete Bearer Command」を送信する。
 ステップS106において、図4に示すGBRベアラ解放手順を開始することによって、移動局UE用の第2GBRベアラを解放する。
 図4に示すように、ステップS106Aにおいて、ゲートウェイ装置S-GWは、「Delete Bearer Command」を受信すると、ゲートウェイ装置P-GWに対して、かかる「Delete Bearer Command」を送信する。
 ステップS106Bにおいて、ゲートウェイ装置P-GWとサーバ装置PCRFとの間で、「PCEF Initiated IP-CAN Session Modification」手順を行い、アプリケーションレベルで課金処理が行われている場合、かかる課金処理を停止する。
 ゲートウェイ装置P-GWは、ステップS106Dにおいて、ゲートウェイ装置S-GWに対して、「Delete Bearer Request」を送信し、ステップS106Eにおいて、移動局UE用のGBRベアラに対する課金処理を停止する。
 ステップS106Fにおいて、ゲートウェイ装置S-GWは、移動管理用ノードMMEに対して、「Delete Bearer Request」を送信する。
 ステップS106Gにおいて、3GPPで規定されているTS23.401の図5.4.4.1-1のステップ4乃至7に示される手順を実行する。
 ステップS106Hにおいて、移動管理用ノードMMEは、ゲートウェイ装置S-GWに対して、「Delete Bearer Response」を送信し、ステップS106Iにおいて、ゲートウェイ装置S-GWは、ゲートウェイ装置P-GWに対して、「Delete Bearer Response」を送信する。
 本発明の第1の実施形態に係る移動通信システムによれば、GBRベアラが設定されている状態で、無線基地局eNodeBにおいて故障が発生した場合に、第2GBRベアラを適切なタイミングで切断し、第2GBRベアラに関する課金処理を停止することができる。
(変更例1)
 図5及び図6を参照して、上述の第1の実施形態の変更例1に係る移動通信システムについて説明する。以下、本変更例1に係る移動通信システムについて、上述の第1の実施形態に係る移動通信システムとの相違点に着目して説明する。
 図5に示すように、ステップS150A乃至S150Cの動作は、図2に示すステップS100A乃至S100Cの動作と同一である。
 ステップ151において、ゲートウェイ装置S-GWは、移動管理用ノードMMEに対して、「Cause:Error Indication received from RNC/eNodeB(所定情報)」を含む「Downlink Data Notification」を送信する。
 ステップS152において、移動管理用ノードMMEは、無線基地局eNodeBに対して、移動局UE宛ての「Paging(ページング信号)」を送信すると共に、ページングタイマーを起動する。
 移動管理用ノードMMEは、ステップS153において、ページングタイマーが満了するまでに、移動局UEからの「Paging」に対する応答が無い場合、ステップS154において、図6に示すGBRベアラ判定処理を行う。
 図6に示すように、ステップS154Aにおいて、移動管理用ノードMMEは、移動局UE用の第2GBRベアラが存在するか否かについて判定する。「YES」の場合、本動作は、ステップS154Bに進み、「NO」の場合、本動作は、ステップS154Eに進む。
 ステップS154Bにおいて、移動管理用ノードMMEは、移動局UE用の第2GBRベアラが、時間課金によってサービスを提供しているベアラであるか否かについて判定する。「YES」の場合、本動作は、ステップS154Cに進み、「NO」の場合、本動作は、ステップS154Eに進む。
 ステップS154Cにおいて、移動管理用ノードMMEは、受信した「Downlink Data Notification」に「Cause:Error Indication received from RNC/eNodeB」が含まれており、かつ、かかる情報要素の内容が切断すべき事由に該当するか否かについて判定する。「YES」の場合、本動作は、ステップS154Dに進み、「NO」の場合、本動作は、ステップS154Eに進む。
 移動管理用ノードMMEは、ステップS154Dにおいて、かかる移動局UE用の第2GBRベアラを解放する。一方、移動管理用ノードMMEは、ステップS154Eにおいて、かかる移動局UE用の第2GBRベアラを解放することなく維持し、処理を完了する。このとき、移動管理用ノードMMEは、ゲートウェイ装置S-GWに対して、無線基地局eNodeB向けのリソース解放を要求する信号を送出してもよい。
 なお、ステップS154Bにおいて、移動管理用ノードMMEは、上述の判定の代わりに、第2GBRベアラに所定QCI、例えば、「QCI=1(Speech)」が割り当てられているか否かについて判定してもよいし、所定オペレータポリシーに基づく所定条件が満たされているか否かについて判定してもよい。
 また、移動管理用ノードMMEは、ステップS154Bにおける判定を行わないように構成されていてもよい。
 さらに、「Downlink Data Notification」に「Cause:Error Indication received from RNC/eNodeB」が含まれており、かつ、かかる情報要素の内容が切断すべき事由に該当する場合、ページングタイマーを通常の値と異なる値に設定するように構成されていてもよい。
 この結果、GBRベアラを解放するまでの時間を短縮することができる等の効果を奏する。
 以降、ステップS155及びS156の動作は、図2に示すステップS105及びS106の動作と同一である。
(変更例2)
 図7及び図8を参照して、上述の第1の実施形態の変更例2に係る移動通信システムについて説明する。以下、本変更例2に係る移動通信システムについて、上述の第1の実施形態に係る移動通信システムとの相違点に着目して説明する。
 図8に示すように、ステップS200A及びS200Bの動作は、図2に示すステップS100A及びS100Bの動作と同一である。
 ステップS201において、無線基地局eNodeBは、移動管理用ノードMMEに対して、RESET信号を送信する。
 移動管理用ノードMMEは、RESET信号を受信した場合に、ステップS201Aにおいて、図3又は図6に示すGBRベアラ判定処理を行ってもよい。
 移動管理用ノードMMEは、ステップS202において、GBRベアラ解放待ちタイマーを起動し、ステップS203において、ゲートウェイ装置S-GWに対して、「Release Access Bearer Request」を送信する。
 ゲートウェイ装置S-GWは、ステップS204において、無線基地局eNodeB向けのGBRベアラ用リソースを解放し、ステップS205において、移動管理用ノードMMEに対して、「Release Access Bearer Response」を送信する。
 移動管理用ノードMMEは、ステップS206において、GBRベアラ解放待ちタイマーが満了するまでに、移動局UEからの接続要求がない場合には、ステップS207において、ゲートウェイ装置S-GWに対して、「Delete Bearer Command」を送信する。
 ステップS208において、図4に示すGBRベアラ解放手順を開始することによって、移動局UE用の第2GBRベアラを解放する。
 本変更例2に係る移動通信システムによれば、移動局UE宛てのパケットが存在していない場合であっても、第2GBRベアラを適切なタイミングで切断し、第2GBRベアラに関する課金処理を停止することができる。
 以上に述べた本実施形態の特徴は、以下のように表現されていてもよい。
 本実施形態の第1の特徴は、移動通信方法であって、ゲートウェイ装置S-GW(第1ゲートウェイ装置)と無線基地局eNodeBとの間で移動局UE用の第1GBRベアラ(第1ベアラ)が設定されており、ゲートウェイ装置S-GWとゲートウェイ装置P-GW(第2ゲートウェイ装置)との間で移動局UE用の第2GBRベアラ(第2ベアラ)が設定されている状態で、ゲートウェイ装置S-GWが、無線基地局eNodeBの故障を検出すると、第1GBRベアラを解放すると共に、移動管理用ノードMMEに対して、バッファリング中の移動局UE宛ての下りリンクデータ信号を通知するための「Downlink Data Notification(下りリンクデータ通知)」を送信する工程Aと、移動管理用ノードMMEが、移動局UEに対して、「Paging(ページング信号)」を送信する工程Bと、移動管理用ノードMMEが、ページングタイマーによって規定されている期間(所定期間)内に、「Paging」に対する移動局UEからの応答を受信しない場合、第2GBRベアラを解放する手順を開始する工程Cとを有することを要旨とする。
 本実施形態の第1の特徴において、工程Cにおいて、移動管理用ノードMMEは、更に、第2GBRベアラが時間課金によってサービスを提供するベアラであると判定した場合に、第2GBRベアラを解放する手順を開始してもよい。
 本実施形態の第1の特徴において、工程Cにおいて、移動管理用ノードMMEは、更に、第2GBRベアラに所定QCI(例えば、QCI=1)が割り当てられていると判定した場合に、第2GBRベアラを解放する手順を開始してもよい。
 本実施形態の第1の特徴において、工程Cにおいて、移動管理用ノードMMEは、更に、「Downlink Data Notification」に「Cause:Error Indication received from RNC/eNodeB(所定情報)」が含まれており、かつ、かかる情報要素の内容が切断すべき事由に該当すると判定した場合に、第2GBRベアラを解放する手順を開始してもよい。
 本実施形態の第1の特徴において、工程Aにおいて、ゲートウェイ装置S-GWは、無線基地局eNodeBから「Error Indication(エラー指示信号)」を受信した場合に、無線基地局eNodeBの故障を検出してもよい。
 本実施形態の第2の特徴は、移動通信方法であって、ゲートウェイ装置S-GWと無線基地局eNodeBとの間で移動局UE用の第1GBRベアラが設定されており、ゲートウェイ装置S-GWとゲートウェイ装置P-GWとの間で移動局UE用の第2GBRベアラが設定されている状態で、移動管理用ノードMMEが、無線基地局eNodeBの故障を検出すると、ゲートウェイ装置S-GWに対して、「Release Access Bearer Request(ベアラ解放要求)」を送信し、GBRベアラ解放待ちタイマー(所定タイマー)を起動する工程と、ゲートウェイ装置S-GWが、「Release Access Bearer Request」に応じて、第1GBRベアラを解放する工程と、移動管理用ノードMMEが、GBRベアラ解放待ちタイマーが満了する前に、移動局UEから接続要求を受信しない場合、第2GBRベアラを解放する手順を開始する工程とを有することを要旨とする。
 本実施形態の第3の特徴は、移動管理用ノードMMEであって、ゲートウェイ装置S-GWと無線基地局eNodeBとの間で移動局UE用の第1GBRベアラが設定されており、ゲートウェイ装置S-GWとゲートウェイ装置P-GWとの間で移動局UE用の第2GBRベアラが設定されている状態で、ゲートウェイ装置S-GWが、無線基地局eNodeBの故障を検出し、第1GBRベアラを解放すると共に、移動管理用ノードMMEに対して、「Downlink Data Notification」を送信した場合に、移動局UEに対して、「Paging」を送信するように構成されており、ページングタイマーによって規定されている期間内に「Paging」に対する移動局UEからの応答を受信しない場合、第2GBRベアラを解放する手順を開始するように構成されていることを要旨とする。
 本実施形態の第3の特徴において、更に、第2GBRベアラが時間課金によってサービスを提供するベアラであると判定した場合に、第2GBRベアラを解放する手順を開始するように構成されていてもよい。
 本実施形態の第3の特徴において、更に、第2GBRベアラに所定QCIが割り当てられていると判定した場合に、第2GBRベアラを解放する手順を開始するように構成されていてもよい。
 本実施形態の第3の特徴において、更に、「Downlink Data Notification」に「Cause:Error Indication received from RNC/eNodeB」が含まれており、かつ、かかる情報要素の内容が切断すべき事由に該当すると判定した場合に、第2GBRベアラを解放する手順を開始するように構成されていてもよい。
 本実施形態の第4の特徴は、移動管理用ノードMMEであって、ゲートウェイ装置S-GWと無線基地局eNodeBとの間で移動局UE用の第1GBRベアラが設定されており、ゲートウェイ装置S-GWとゲートウェイ装置P-GWとの間で移動局UE用の第2GBRベアラが設定されている状態で、無線基地局eNodeBの故障を検出すると、ゲートウェイ装置S-GWに対して、「Release Access Bearer Request」を送信し、GBRベアラ解放待ちタイマーを起動するように構成されており、GBRベアラ解放待ちタイマーが満了する前に、移動局UEから接続要求を受信しない場合、第2GBRベアラを解放する手順を開始するように構成されていることを要旨とする。
(第2の実施形態に係る移動通信システム)
 図9及び図10を参照して、上述の第2の実施形態に係る移動通信システムについて説明する。以下、本発明の第2の実施形態に係る移動通信システムについて、上述の第1の実施形態に係る移動通信システムとの相違点に着目して説明する。
 本実施形態に係る移動通信システムは、UTRAN方式の移動通信システムであって、図9及び図10に示すように、サーバ装置PCRFと、ゲートウェイ装置P-GWと、ゲートウェイ装置S-GWと、パケット交換機SGSNと、無線回線制御局RNCとを具備している。
 ここで、図9及び図10を参照して、本発明の第2の実施形態に係る移動通信システムの動作について説明する。
 図9及び図10に示すように、ステップS300Aにおいて、GBRベアラ設定処理を行うことによって、移動局UEと無線回線制御局RNCとの間、無線回線制御局RNCとゲートウェイ装置S-GWとの間、及び、ゲートウェイ装置S-GWとゲートウェイ装置P-GWとの間で、GBRベアラを設定する。ここで、無線回線制御局RNCとゲートウェイ装置S-GWとの間のGBRベアラを「第1GBRベアラ(第1ベアラ)」と呼び、ゲートウェイ装置S-GWとゲートウェイ装置P-GWとの間のGBRベアラを「第2GBRベアラ(第2ベアラ)」と呼ぶものとする。
 なお、無線回線制御局RNCとゲートウェイ装置S-GWとの間のGBRベアラは「Direct Tunnel」と呼ぶ。また、「Direct Tunnel」の代わりに、無線回線制御局RNCとパケット交換機SGSNとの間、及び、パケット交換機SGSNとゲートウェイ装置S-GWとの間で、GBRベアラが設定されていてもよい。この場合、当該GBRベアラは「Non-Direct Tunnel」と呼ぶ。
 ステップS300Bにおいて、無線回線制御局RNCにおいて故障が発生し、再開処理が実施される。その後、ステップS300Cにおいて、図15に示す処理A又は図16に示す処理Bが行われる。
 なお、第2の実施形態において、図15及び図16における無線基地局eNodeBは、無線回線制御局RNCと看做し、移動管理用ノードMMEは、ゲートウェイ装置S-GWと看做す。
 ステップS301において、ゲートウェイ装置S-GWは、パケット交換機SGSNに対して、「Downlink Data Notification」を送信する。
 ステップS302において、パケット交換機SGSNは、無線回線制御局RNCに対して、移動局UE宛ての「Paging(ページング信号)」を送信すると共に、ページングタイマーを起動する。
 パケット交換機SGSNは、ステップS303において、ページングタイマーが満了するまでに、移動局UEからの「Paging」に対する応答が無い場合、ステップS304において、図3に示すGBRベアラ判定処理を行う。
 ステップS305において、パケット交換機SGSNは、かかる移動局UE用の第2GBRベアラを解放すると決定した場合に、ゲートウェイ装置S-GWに対して、「Delete Bearer Command」を送信する。
 ステップS306において、図4に示すGBRベアラ解放手順を開始することによって、移動局UE用の第2GBRベアラを解放する。
 本発明の第2の実施形態に係る移動通信システムによれば、GBRベアラが設定されている状態で、無線回線制御局RNCにおいて故障が発生した場合に、第2GBRベアラを適切なタイミングで切断し、第2GBRベアラに関する課金処理を停止することができる。
(変更例1)
 図11を参照して、上述の第2の実施形態の変更例1に係る移動通信システムについて説明する。以下、本変更例1に係る移動通信システムについて、上述の第2の実施形態に係る移動通信システムとの相違点に着目して説明する。
 図11に示すように、ステップS350A乃至S350Cの動作は、図10に示すステップS300A乃至S300Cの動作と同一である。
 ステップ351において、ゲートウェイ装置S-GWは、パケット交換機SGSNに対して、「Cause:Error Indication received from RNC/eNodeB(所定情報)」を含む「Downlink Data Notification」を送信する。
 ステップS352において、パケット交換機SGSNは、無線回線制御局RNCに対して、移動局UE宛ての「Paging(ページング信号)」を送信すると共に、ページングタイマーを起動する。
 パケット交換機SGSNは、ステップS353において、ページングタイマーが満了するまでに、移動局UEからの「Paging」に対する応答が無い場合、ステップS354において、図6に示すGBRベアラ判定処理を行う。
 以降、ステップS355及びS356の動作は、図10に示すステップS305及びS306の動作と同一である。
(変更例2)
 図12及び図13を参照して、上述の第2の実施形態の変更例2に係る移動通信システムについて説明する。以下、本変更例2に係る移動通信システムについて、上述の第2の実施形態に係る移動通信システムとの相違点に着目して説明する。
 本変更例2に係る移動通信システムでは、「Direct Tunnel」が適用されている、すなわち、ゲートウェイ装置P-GWからゲートウェイ装置S-GWに転送されたパケットは、パケット交換機SGSNを経由することなく無線回線制御局RNCに転送されるように構成されている。
 図13に示すように、ステップS400A及びS400Bの動作は、図10に示すステップS300A及びS300Bの動作と同一である。
 ステップS401において、無線回線制御局RNCは、パケット交換機SGSNに対して、RESET信号を送信する。
 パケット交換機SGSNは、RESET信号を受信した場合に、ステップS401Aにおいて、図3又は図6に示すGBRベアラ判定処理を行ってもよい。
 パケット交換機SGSNは、ステップS402において、GBRベアラ解放待ちタイマーを起動し、ステップS403において、ゲートウェイ装置S-GWに対して、「Release Access Bearer Request」を送信する。
 ゲートウェイ装置S-GWは、ステップS404において、無線回線制御局RNC向けのGBRベアラ用リソースを解放し、ステップS405において、パケット交換機SGSNに対して、「Release Access Bearer Response」を送信する。
 パケット交換機SGSNは、ステップS406において、GBRベアラ解放待ちタイマーが満了するまでに、移動局UEからの接続要求がない場合には、ステップS407において、ゲートウェイ装置S-GWに対して、「Delete Bearer Command」を送信する。
 ステップS408において、図4に示すGBRベアラ解放手順を開始することによって、移動局UE用の第2GBRベアラを解放する。
 なお、ステップS401において、パケット交換機SGSNは、無線回線制御局RNCからRESET信号を受信する以外の方法で、無線回線制御局RNCにおける故障を検出するように構成されていてもよい。
 例えば、パケット交換機SGSNは、RANAP信号処理等を用いて、無線回線制御局RNCにおける故障を検出するように構成されていてもよい。
(変更例3)
 図14を参照して、上述の第2の実施形態の変更例3に係る移動通信システムについて説明する。以下、本変更例3に係る移動通信システムについて、上述の第2の実施形態に係る移動通信システムとの相違点に着目して説明する。
 本変更例3に係る移動通信システムでは、「Non-Direct Tunnel」が適用されている、すなわち、ゲートウェイ装置P-GWからゲートウェイ装置S-GWに転送されたパケットは、パケット交換機SGSNを経由して無線回線制御局RNCに転送されるように構成されている。
 図13に示すステップS400A及びS400Bの動作が行われた後、ステップS501において、無線回線制御局RNCは、パケット交換機SGSNに対して、RESET信号を送信する。
 パケット交換機SGSNは、RESET信号を受信した場合に、図3又は図6に示すGBRベアラ判定処理を行ってもよい。
 パケット交換機SGSNは、ステップS502において、GBRベアラ解放待ちタイマーを起動し、ステップS503において、無線回線制御局RNC向けのGBRベアラ用リソースを解放する。
 パケット交換機SGSNは、ステップS504において、GBRベアラ解放待ちタイマーが満了するまでに、移動局UEからの接続要求がない場合には、図4に示すGBRベアラ解放手順を開始することによって、移動局UE用の第2GBRベアラを解放する。
 以上に述べた本実施形態の特徴は、以下のように表現されていてもよい。
 本実施形態の第1の特徴は、移動通信方法であって、ゲートウェイ装置S-GWと無線回線制御局RNCとの間、或いは、無線回線制御局RNCとパケット交換機SGSNとの間、及び、パケット交換機SGSNとゲートウェイ装置S-GWとの間で移動局UE用の第1GBRベアラが設定されており、ゲートウェイ装置S-GWとゲートウェイ装置P-GWとの間で移動局UE用の第2GBRベアラが設定されている状態で、ゲートウェイ装置S-GW或いはパケット交換機SGSNが、無線回線制御局RNCの故障を検出すると、第1GBRベアラを解放すると共に、パケット交換機SGSNに対して、「Downlink Data Notification」を送信する工程Aと、パケット交換機SGSNが、移動局UEに対して、「Paging」を送信する工程Bと、パケット交換機SGSNが、ページングタイマーによって規定されている期間内に、「Paging」に対する移動局UEからの応答を受信しない場合、第2GBRベアラを解放する手順を開始する工程Cとを有することを要旨とする。
 本実施形態の第1の特徴において、工程Cにおいて、パケット交換機SGSNは、更に、第2GBRベアラが時間課金によってサービスを提供するベアラであると判定した場合に、第2GBRベアラを解放する手順を開始してもよい。
 本実施形態の第1の特徴において、工程Cにおいて、パケット交換機SGSNは、更に、第2GBRベアラに所定QCI(例えば、QCI=1)が割り当てられていると判定した場合に、第2GBRベアラを解放する手順を開始してもよい。
 本実施形態の第1の特徴において、工程Cにおいて、パケット交換機SGSNは、更に、「Downlink Data Notification」に「Cause:Error Indication received from RNC/eNodeB」が含まれており、かつ、かかる情報要素の内容が切断すべき事由に該当すると判定した場合に、第2GBRベアラを解放する手順を開始してもよい。
 本実施形態の第1の特徴において、工程Aにおいて、ゲートウェイ装置S-GWは、無線回線制御局RNCから「Error Indication」を受信した場合に、無線回線制御局RNCの故障を検出してもよい。
 本実施形態の第2の特徴は、移動通信方法であって、ゲートウェイ装置S-GWと無線回線制御局RNCとの間で移動局UE用の第1GBRベアラが設定されており、ゲートウェイ装置S-GWとゲートウェイ装置P-GWとの間で移動局UE用の第2GBRベアラが設定されている状態で、パケット交換機SGSNが、無線基地局eNodeBの故障を検出すると、ゲートウェイ装置S-GWに対して、「Release Access Bearer Request」を送信し、GBRベアラ解放待ちタイマーを起動する工程と、ゲートウェイ装置S-GWが、「Release Access Bearer Request」に応じて、第1GBRベアラを解放する工程と、パケット交換機SGSNが、GBRベアラ解放待ちタイマーが満了する前に、移動局UEから接続要求を受信しない場合、第2GBRベアラを解放する手順を開始する工程とを有することを要旨とする。
 本実施形態の第3の特徴は、パケット交換機SGSNであって、ゲートウェイ装置S-GWと無線回線制御局RNCとの間で移動局UE用の第1GBRベアラが設定されており、ゲートウェイ装置S-GWとゲートウェイ装置P-GWとの間で移動局UE用の第2GBRベアラが設定されている状態で、ゲートウェイ装置S-GWが、無線回線制御局RNCの故障を検出し、第1GBRベアラを解放すると共に、パケット交換機SGSNに対して、「Downlink Data Notification」を送信した場合に、移動局UEに対して、「Paging」を送信するように構成されており、ページングタイマーによって規定されている期間内に「Paging」に対する移動局UEからの応答を受信しない場合、第2GBRベアラを解放する手順を開始するように構成されていることを要旨とする。
 本実施形態の第3の特徴において、更に、第2GBRベアラが時間課金によってサービスを提供するベアラであると判定した場合に、第2GBRベアラを解放する手順を開始するように構成されていてもよい。
 本実施形態の第3の特徴において、更に、第2GBRベアラに所定QCIが割り当てられていると判定した場合に、第2GBRベアラを解放する手順を開始するように構成されていてもよい。
 本実施形態の第3の特徴において、更に、「Downlink Data Notification」に「Cause:Error Indication received from RNC/eNodeB」が含まれており、かつ、かかる情報要素の内容が切断すべき事由に該当すると判定した場合に、第2GBRベアラを解放する手順を開始するように構成されていてもよい。
 本実施形態の第4の特徴は、パケット交換機SGSNであって、ゲートウェイ装置S-GWと無線回線制御局RNCとの間で移動局UE用の第1GBRベアラが設定されており、ゲートウェイ装置S-GWとゲートウェイ装置P-GWとの間で移動局UE用の第2GBRベアラが設定されている状態で、無線回線制御局RNCの故障を検出すると、ゲートウェイ装置S-GWに対して、「Release Access Bearer Request」を送信し、GBRベアラ解放待ちタイマーを起動するように構成されており、GBRベアラ解放待ちタイマーが満了する前に、移動局UEから接続要求を受信しない場合、第2GBRベアラを解放する手順を開始するように構成されていることを要旨とする。
 なお、上述の移動局UEや無線基地局eNodeBや移動管理用ノードMMEやゲートウェイ装置S-GWやゲートウェイ装置P-GWやパケット交換機SGSNや無線回線制御局RNC等の動作は、ハードウェアによって実施されてもよいし、プロセッサによって実行されるソフトウェアモジュールによって実施されてもよいし、両者の組み合わせによって実施されてもよい。
 ソフトウェアモジュールは、RAM(Random Access Memory)や、フラッシュメモリや、ROM(Read Only Memory)や、EPROM(Erasable Programmable ROM)や、EEPROM(Electronically Erasable and Programmable ROM)や、レジスタや、ハードディスクや、リムーバブルディスクや、CD-ROMといった任意形式の記憶媒体内に設けられていてもよい。
 かかる記憶媒体は、プロセッサが当該記憶媒体に情報を読み書きできるように、当該プロセッサに接続されている。また、かかる記憶媒体は、プロセッサに集積されていてもよい。また、かかる記憶媒体及びプロセッサは、ASIC内に設けられていてもよい。かかるASICは、移動局UEや無線基地局eNodeBや移動管理用ノードMMEやゲートウェイ装置S-GWやゲートウェイ装置P-GWやパケット交換装置SGSNや無線回線制御局RNC内に設けられていてもよい。また、かかる記憶媒体及びプロセッサは、ディスクリートコンポーネントとして移動局UEや無線基地局eNodeBや移動管理用ノードMMEやゲートウェイ装置S-GWやゲートウェイ装置P-GWやパケット交換装置SGSNや無線回線制御局RNC内に設けられていてもよい。
 以上、上述の実施形態を用いて本発明について詳細に説明したが、当業者にとっては、本発明が本明細書中に説明した実施形態に限定されるものではないということは明らかである。本発明は、特許請求の範囲の記載により定まる本発明の趣旨及び範囲を逸脱することなく修正及び変更態様として実施することができる。従って、本明細書の記載は、例示説明を目的とするものであり、本発明に対して何ら制限的な意味を有するものではない。

Claims (10)

  1.  第1ゲートウェイ装置と無線基地局との間で移動局用の第1ベアラが設定されており、該第1ゲートウェイ装置と第2ゲートウェイ装置との間で該移動局用の第2ベアラが設定されている状態で、移動管理用ノードが、該無線基地局からエラー指示信号を受信すると、該第1ゲートウェイ装置に対して、ベアラ解放要求を送信する工程Aと、
     前記第1ゲートウェイ装置が、前記ベアラ解放要求に応じて、前記第1ベアラを解放する工程Bと、
     前記移動管理用ノードが、前記第2ベアラを解放する手順を開始する工程Cとを有することを特徴とする移動通信方法。
  2.  前記工程Cにおいて、前記移動管理用ノードは、更に、前記第2ベアラが時間課金によってサービスを提供するベアラであると判定した場合に、前記第2ベアラを解放する手順を開始することを特徴とする請求項1に記載の移動通信方法。
  3.  前記工程Cにおいて、前記移動管理用ノードは、更に、前記第2ベアラに所定QCIが割り当てられていると判定した場合に、前記第2ベアラを解放する手順を開始することを特徴とする請求項1に記載の移動通信方法。
  4.  前記工程Cにおいて、前記移動管理用ノードは、更に、前記第2ベアラがGBRベアラである場合に、前記第2ベアラを解放する手順を開始することを特徴とする請求項1に記載の移動通信方法。
  5.  第1ゲートウェイ装置と無線基地局との間で移動局用の第1ベアラが設定されており、該第1ゲートウェイ装置と第2ゲートウェイ装置との間で該移動局用の第2ベアラが設定されている状態で、該無線基地局からエラー指示信号を受信すると、該第1ゲートウェイ装置に対して、ベアラ解放要求を送信し、 前記第2ベアラを解放する手順を開始するように構成されていることを特徴とする移動管理用ノード。
  6.  第1ゲートウェイ装置と無線回線制御局との間で移動局用の第1ベアラが設定されており、該第1ゲートウェイ装置と第2ゲートウェイ装置との間で該移動局用の第2ベアラが設定されている状態で、パケット交換機が、該無線回線制御局からエラー指示信号を受信すると、該第1ゲートウェイ装置に対して、ベアラ解放要求を送信する工程Aと、
     前記第1ゲートウェイ装置が、前記ベアラ解放要求に応じて、前記第1ベアラを解放する工程Bと、
     前記パケット交換機が、前記第2ベアラを解放する手順を開始する工程Cとを有することを特徴とする移動通信方法。
  7.  前記工程Cにおいて、前記パケット交換機は、更に、前記第2ベアラが時間課金によってサービスを提供するベアラであると判定した場合に、前記第2ベアラを解放する手順を開始することを特徴とする請求項6に記載の移動通信方法。
  8.  前記工程Cにおいて、前記パケット交換機は、更に、前記第2ベアラに所定QCIが割り当てられていると判定した場合に、前記第2ベアラを解放する手順を開始することを特徴とする請求項6に記載の移動通信方法。
  9.  前記工程Cにおいて、前記パケット交換機は、更に、前記第2ベアラがGBRベアラである場合に、前記第2ベアラを解放する手順を開始することを特徴とする請求項6に記載の移動通信方法。
  10.  第1ゲートウェイ装置と無線回線制御局との間で移動局用の第1ベアラが設定されており、該第1ゲートウェイ装置と第2ゲートウェイ装置との間で該移動局用の第2ベアラが設定されている状態で、該無線回線制御局からエラー指示信号を受信すると、該第1ゲートウェイ装置に対して、ベアラ解放要求を送信し、前記第2ベアラを解放する手順を開始するように構成されていることを特徴とするパケット交換機。
PCT/JP2010/068208 2009-10-16 2010-10-15 移動通信方法、移動管理用ノード及びパケット交換機 WO2011046220A1 (ja)

Priority Applications (9)

Application Number Priority Date Filing Date Title
CN201080046692.3A CN102577482B (zh) 2009-10-16 2010-10-15 移动通信方法、移动管理用节点以及分组交换机
BR112012008953-6A BR112012008953A2 (pt) 2009-10-16 2010-10-15 método de comunicação móvel, nodo de gerenciamento de mobilidade, intercambiador de pacote
US13/501,361 US8462801B2 (en) 2009-10-16 2010-10-15 Mobile communication method, mobility management node, and packet exchanger
MX2012004393A MX2012004393A (es) 2009-10-16 2010-10-15 Metodo de comunicacion movil, nodo de adminitracion de movilidad e intercambiador de paquetes.
AU2010307635A AU2010307635B2 (en) 2009-10-16 2010-10-15 Mobile communication method, mobility management node, and packet exchanger
KR20127009564A KR101224000B1 (ko) 2009-10-16 2010-10-15 이동통신방법, 이동관리용 노드 및 패킷 교환기
CA2777581A CA2777581C (en) 2009-10-16 2010-10-15 Mobile communication method, mobility management node, and packet exchanger
EP10823488.1A EP2490475B1 (en) 2009-10-16 2010-10-15 GBR bearer release when the MME/SGSN fails to page the UE
HK12113545.9A HK1172768A1 (zh) 2009-10-16 2012-12-28 未能尋呼到 時釋放 載體

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2009-239881 2009-10-16
JP2009239881A JP4648479B1 (ja) 2009-10-16 2009-10-16 移動通信方法、移動管理用ノード及びパケット交換機

Publications (1)

Publication Number Publication Date
WO2011046220A1 true WO2011046220A1 (ja) 2011-04-21

Family

ID=43836083

Family Applications (2)

Application Number Title Priority Date Filing Date
PCT/JP2010/068207 WO2011046219A1 (ja) 2009-10-16 2010-10-15 移動通信方法、移動管理用ノード及びパケット交換機
PCT/JP2010/068208 WO2011046220A1 (ja) 2009-10-16 2010-10-15 移動通信方法、移動管理用ノード及びパケット交換機

Family Applications Before (1)

Application Number Title Priority Date Filing Date
PCT/JP2010/068207 WO2011046219A1 (ja) 2009-10-16 2010-10-15 移動通信方法、移動管理用ノード及びパケット交換機

Country Status (12)

Country Link
US (2) US8462801B2 (ja)
EP (2) EP2490474B1 (ja)
JP (1) JP4648479B1 (ja)
KR (2) KR101182744B1 (ja)
CN (2) CN102577481B (ja)
AU (1) AU2010307635B2 (ja)
BR (1) BR112012008953A2 (ja)
CA (2) CA2777580C (ja)
HK (1) HK1172768A1 (ja)
MX (2) MX2012004393A (ja)
RU (1) RU2510593C2 (ja)
WO (2) WO2011046219A1 (ja)

Families Citing this family (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2544470A1 (en) * 2011-07-04 2013-01-09 Koninklijke KPN N.V. Triggering with QoS parameters
GB2493349A (en) * 2011-07-29 2013-02-06 Intellectual Ventures Holding 81 Llc Mobile communications network with simplified handover
JP5421969B2 (ja) * 2011-10-03 2014-02-19 株式会社Nttドコモ 移動通信方法、移動管理ノード、パケット交換機及び移動局
JP6403402B2 (ja) * 2014-03-12 2018-10-10 Kddi株式会社 通信装置、基地局装置、通信システムおよび通信方法
US10517132B2 (en) * 2015-07-17 2019-12-24 Telefonaktiebolaget Lm Ericsson (Publ) Terminal devices, network nodes and methods of operating the same
EP3393153B1 (en) 2015-12-31 2021-02-17 Huawei Technologies Co., Ltd. Method and device for processing packets
US10003454B2 (en) 2016-04-22 2018-06-19 Kandou Labs, S.A. Sampler with low input kickback
IT201700018570A1 (it) * 2017-02-20 2018-08-20 Telecom Italia Spa Comunicazione machine-to-machine in una rete di comunicazione mobile
CN109600829B (zh) * 2017-09-30 2020-11-06 深圳市海思半导体有限公司 一种恢复网络的方法及设备
KR20230099050A (ko) 2021-12-27 2023-07-04 주영민 휴대용 애완견 배설물 수거기

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008172294A (ja) * 2007-01-05 2008-07-24 Ntt Docomo Inc 移動通信システム、移動通信方法、アクセス装置及びゲートウェイ情報記憶装置

Family Cites Families (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FI111312B (fi) * 2000-08-25 2003-06-30 Nokia Corp Yhteyden päätelaitteeseen valvonta tietoliikennejärjestelmässä
WO2002032166A1 (en) * 2000-10-09 2002-04-18 Nokia Corporation Connection release in a two-layer communication network
WO2003084156A1 (fr) * 2002-03-29 2003-10-09 Ntt Docomo, Inc. Procede d'administration de communication dans une communication de type connexion, dispositif de relais associe et dispositif de gestion de comptabilite
KR20050007977A (ko) * 2003-07-12 2005-01-21 삼성전자주식회사 이동 통신 시스템에서의 보코더의 모드 및 전송율 제어 방법
CN100499636C (zh) * 2004-06-14 2009-06-10 华为技术有限公司 一种实现端到端服务质量可靠性保证的方法
CN101022648B (zh) * 2006-02-14 2010-06-09 中兴通讯股份有限公司 宽带码分多址系统寻呼触发的资源释放方法
FI20075062A0 (fi) * 2007-02-01 2007-02-01 Nokia Corp Menetelmä, laite, järjestelmä, tietokoneohjelmatuote ja tietokoneohjelman jakeluväline
JP5025440B2 (ja) * 2007-12-04 2012-09-12 株式会社日立国際電気 通信システム及びゲートウェイ
CN101534497B (zh) * 2008-03-10 2010-12-08 大唐移动通信设备有限公司 分组数据网连接中承载处理的方法及移动性管理实体设备
US8179903B2 (en) * 2008-03-12 2012-05-15 Qualcomm Incorporated Providing multiple levels of service for wireless communication devices communicating with a small coverage access point
US8218436B2 (en) * 2008-03-21 2012-07-10 Research In Motion Limited Dynamic aggregated maximum bit rate for evolved packet system non-guaranteed bit rate quality of service enforcement and network bandwidth utilization
CN102227150B (zh) * 2008-04-30 2014-11-05 华为技术有限公司 资源处理的方法、通信系统和移动性管理网元
CN101572942B (zh) * 2008-04-30 2012-04-04 华为技术有限公司 一种隐分离方法、系统和装置

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008172294A (ja) * 2007-01-05 2008-07-24 Ntt Docomo Inc 移動通信システム、移動通信方法、アクセス装置及びゲートウェイ情報記憶装置

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
"TS 23.007 V9.1.0", 3GPP, September 2009 (2009-09-01) *

Also Published As

Publication number Publication date
AU2010307635B2 (en) 2014-05-01
CA2777580C (en) 2015-03-17
RU2012118482A (ru) 2013-11-27
KR101182744B1 (ko) 2012-09-13
US8693400B2 (en) 2014-04-08
BR112012008953A2 (pt) 2020-09-15
MX2012004389A (es) 2012-05-29
EP2490474A4 (en) 2013-07-24
HK1172768A1 (zh) 2013-04-26
US20120230286A1 (en) 2012-09-13
AU2010307635A1 (en) 2012-05-17
RU2510593C2 (ru) 2014-03-27
CN102577482B (zh) 2015-12-16
WO2011046219A1 (ja) 2011-04-21
MX2012004393A (es) 2012-05-29
EP2490474A1 (en) 2012-08-22
EP2490475A1 (en) 2012-08-22
CA2777580A1 (en) 2011-04-21
US8462801B2 (en) 2013-06-11
CN102577482A (zh) 2012-07-11
EP2490475A4 (en) 2013-07-24
CA2777581C (en) 2015-04-21
CA2777581A1 (en) 2011-04-21
KR20120084297A (ko) 2012-07-27
CN102577481B (zh) 2014-07-23
CN102577481A (zh) 2012-07-11
EP2490475B1 (en) 2016-01-27
US20120263110A1 (en) 2012-10-18
EP2490474B1 (en) 2016-01-06
KR20120052420A (ko) 2012-05-23
JP2011087200A (ja) 2011-04-28
JP4648479B1 (ja) 2011-03-09
KR101224000B1 (ko) 2013-01-21

Similar Documents

Publication Publication Date Title
JP4648479B1 (ja) 移動通信方法、移動管理用ノード及びパケット交換機
US10506465B2 (en) Overload control in a packet mobile communication system
US9282534B2 (en) Mobile communication method, session control node, gateway device, and mobility management node
EP2757824A2 (en) Method and apparatus for controlling traffic in wireless communication system
EP2480022A1 (en) Bearer processing method and mobile management device
EP2819455A1 (en) Off-path notification of RAN congestion information in an EPS network
WO2013051512A1 (ja) 移動通信方法、移動管理ノード、パケット交換機及び移動局
JP2010183542A (ja) 移動通信方法、ゲートウェイ装置及びサーバ装置
JP6561995B2 (ja) 制御装置及びその方法
JP4647720B1 (ja) 移動通信方法、移動管理用ノード及びパケット交換機
JP2011087321A (ja) 移動通信方法、移動管理用ノード及びパケット交換機
CN101959318A (zh) 一种释放无线资源的方法及系统
JP6228470B2 (ja) 通信システムおよび通信制御方法
JP2012039248A (ja) 移動通信方法及び無線アクセスネットワーク装置

Legal Events

Date Code Title Description
WWE Wipo information: entry into national phase

Ref document number: 201080046692.3

Country of ref document: CN

121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 10823488

Country of ref document: EP

Kind code of ref document: A1

WWE Wipo information: entry into national phase

Ref document number: 2777581

Country of ref document: CA

ENP Entry into the national phase

Ref document number: 20127009564

Country of ref document: KR

Kind code of ref document: A

WWE Wipo information: entry into national phase

Ref document number: MX/A/2012/004393

Country of ref document: MX

NENP Non-entry into the national phase

Ref country code: DE

WWE Wipo information: entry into national phase

Ref document number: 2010307635

Country of ref document: AU

WWE Wipo information: entry into national phase

Ref document number: 3804/CHENP/2012

Country of ref document: IN

WWE Wipo information: entry into national phase

Ref document number: 2010823488

Country of ref document: EP

ENP Entry into the national phase

Ref document number: 2010307635

Country of ref document: AU

Date of ref document: 20101015

Kind code of ref document: A

WWE Wipo information: entry into national phase

Ref document number: 13501361

Country of ref document: US

REG Reference to national code

Ref country code: BR

Ref legal event code: B01A

Ref document number: 112012008953

Country of ref document: BR

ENP Entry into the national phase

Ref document number: 112012008953

Country of ref document: BR

Kind code of ref document: A2

Effective date: 20120416