WO2011039214A2 - Methods and arrangements in a mobile telecommunications network - Google Patents
Methods and arrangements in a mobile telecommunications network Download PDFInfo
- Publication number
- WO2011039214A2 WO2011039214A2 PCT/EP2010/064405 EP2010064405W WO2011039214A2 WO 2011039214 A2 WO2011039214 A2 WO 2011039214A2 EP 2010064405 W EP2010064405 W EP 2010064405W WO 2011039214 A2 WO2011039214 A2 WO 2011039214A2
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- pucch
- power
- transmission
- pusch
- headroom report
- Prior art date
Links
Classifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W52/00—Power management, e.g. TPC [Transmission Power Control], power saving or power classes
- H04W52/04—TPC
- H04W52/30—TPC using constraints in the total amount of available transmission power
- H04W52/34—TPC management, i.e. sharing limited amount of power among users or channels or data types, e.g. cell loading
- H04W52/346—TPC management, i.e. sharing limited amount of power among users or channels or data types, e.g. cell loading distributing total power among users or channels
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W52/00—Power management, e.g. TPC [Transmission Power Control], power saving or power classes
- H04W52/04—TPC
- H04W52/30—TPC using constraints in the total amount of available transmission power
- H04W52/36—TPC using constraints in the total amount of available transmission power with a discrete range or set of values, e.g. step size, ramping or offsets
- H04W52/365—Power headroom reporting
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W52/00—Power management, e.g. TPC [Transmission Power Control], power saving or power classes
- H04W52/04—TPC
- H04W52/30—TPC using constraints in the total amount of available transmission power
- H04W52/36—TPC using constraints in the total amount of available transmission power with a discrete range or set of values, e.g. step size, ramping or offsets
- H04W52/367—Power values between minimum and maximum limits, e.g. dynamic range
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W72/00—Local resource management
- H04W72/12—Wireless traffic scheduling
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W52/00—Power management, e.g. TPC [Transmission Power Control], power saving or power classes
- H04W52/04—TPC
- H04W52/30—TPC using constraints in the total amount of available transmission power
- H04W52/34—TPC management, i.e. sharing limited amount of power among users or channels or data types, e.g. cell loading
Definitions
- the present invention relates to methods and arrangements in a mobile telecommunication network, and in particular to report transmit power headroom in conjunction with simultaneous transmission of physical uplink shared channels and physical uplink control channels.
- LTE Long Term Evolution
- 3GPP 3 rd Generation Partnership Project
- LTE specifications provide downlink peak rates up to 300 Mbps, an uplink of up to 75 Mbit/s and radio access network round-trip times of less than 10 ms.
- LTE supports scalable carrier bandwidths from 20 MHz down to 1.4 MHz and supports both FDD (Frequency Division Duplex) and TDD (Time Division Duplex).
- LTE uses OFDM (Orthogonal Frequency Division Multiplex) in the downlink and DFT (Discrete Fourier Transform)-spread OFDM in the uplink.
- OFDM Orthogonal Frequency Division Multiplex
- DFT Discrete Fourier Transform
- the basic LTE downlink physical resource can thus be seen as a time-frequency grid as illustrated in figure 1, where each resource element corresponds to one OFDM subcarrier during one OFDM symbol interval.
- resource allocation in LTE is typically described in terms of resource blocks, where a resource block corresponds to one slot (0.5 ms) in the time domain and 12 contiguous subcarriers in the frequency domain. Resource blocks are numbered in the frequency domain, starting with 0 from one end of the system bandwidth.
- Downlink transmissions are dynamically scheduled, i.e., in each subframe the base station transmits control information about to which terminals data is transmitted and upon which resource blocks the data is transmitted, in the current downlink subframe.
- This control signaling is typically transmitted in the first 1 , 2, 3 or 4 OFDM symbols in each subframe.
- a downlink system with 3 OFDM symbols as control is illustrated in figure 3.
- LTE uses hybrid-ARQ, where, after receiving downlink data in a subframe, the terminal attempts to decode it and reports to the base station whether the decoding was successful (ACK) or not (NAK). In case of an unsuccessful decoding attempt, the base station can retransmit the erroneous data.
- Uplink control signaling from the terminal to the base station consists of hybrid-ARQ acknowledgements for received downlink data; terminal reports related to the downlink channel conditions, used as assistance for the downlink scheduling; scheduling requests, indicating that a mobile terminal needs uplink resources for uplink data transmissions.
- the L1 /L2 control information (channel-status reports, hybrid- ARQ acknowledgments, and scheduling requests) is transmitted in uplink resources (resource blocks) specifically assigned for uplink L1 /L2 control on Physical Uplink Control Channel (PUCCH).
- uplink resources resource blocks
- PUCCH Physical Uplink Control Channel
- these resources are located at the edges of the total available cell bandwidth.
- Each such resource consists of twelve "subcarriers" (one resource block) within each of the two slots of an uplink subframe.
- these frequency resources are frequency hopping on the slot boundary, i.e.
- one “resource” consists of 12 subcarriers at the upper part of the spectrum within the first slot of a subframe and an equally sized resource at the lower part of the spectrum during the second slot of the subframe or vice versa. If more resources are needed for the uplink L1 /L2 control signaling, e.g. in case of very large overall transmission bandwidth supporting a large number of users, additional resources blocks can be assigned next to the previously assigned resource blocks.
- the mobile terminal To transmit data in the uplink the mobile terminal has to been assigned an uplink resource for data transmission, on the Physical Uplink Shared Channel (PUSCH).
- PUSCH Physical Uplink Shared Channel
- the assignment In contrast to a data assignment in downlink, in uplink the assignment must always be consecutive in frequency, this to retain the signal carrier property of the uplink as illustrated in figure 5.
- the middle SC(Single Carrier Frequency Division Multiple Access (FDMA))- symbol (also referred to as DFT-spread OFDM), in each slot is used to transmit a reference symbol. If the mobile terminal has been assigned an uplink resource for data transmission and at the same time instance has control information to transmit, it will transmit the control information together with the data on PUSCH.
- FDMA Single Carrier Frequency Division Multiple Access
- Uplink power control is used both on the PUSCH and on PUCCH.
- the purpose is to ensure that the mobile terminal transmits with sufficient power, but at the same time not be too high, since that would only increase the interference to other users in the network.
- a parameterized open loop combined with a closed loop mechanism is used. Roughly, the open loop part is used to set a point of operation, around which the closed loop component operates. Different parameters such as targets and partial compensation factors for user and control plane are used.
- the mobile terminal sets the output power according to >101og I0 (M PUSCH PUSCH U) + a - PL + A TF (i) + /(») ⁇
- ⁇ CMAX is the configured maximum transmit power for the mobile terminal
- PUSCH is the number resource blocks assigned, O USCH O
- PL is the estimated pathloss
- ⁇ ⁇ ( ⁇ ) is transport format compensator
- /(/ ' ) is the a UE (User Equipment) specific offset or 'closed loop correction' .
- the function f may represent either absolute or accumulative offsets.
- the closed loop power control can be operated in two different modes either accumulated or absolute. Both modes are based on a TPC (Transmit power command) which is part of the downlink control signaling.
- TPC Transmit power command
- the closed loop correction function is reset every time a new power control command is received.
- the power control command is a delta correction with regard to the previously accumulated closed loop correction.
- the base station can filter the mobile terminals power in both time and frequency to provide an accurate power control operating point for the mobile terminal.
- KpuscH subframe before the current subframe and f(i - ⁇ ) is the accumulated power control value.
- the accumulated power control command is reset when changing cell, entering/leaving RRC active state, an absolute TPC command is received, P 0 PUCCH is received and when the mobile terminal (re) synchronizes.
- the base station has the possibility to request a power headroom report from the UE for PUSCH transmissions.
- the power headroom reports inform the base station how much transmission power the UE had left for the subframe i.
- the reported value is within the range of 40 to -23 dB, where a negative value indicates that the UE did not have enough amount of transmit power to fully conduct the transmission of data, or control information.
- the base station In order for the base station to schedule PUSCH effectively, the base station needs to be aware of the available transmission power of the UE. In the prior art, the base station requests a power headroom report from the UE, which indicates how much transmission power that is used in the UE based on a PUSCH transmission in subframe i. Future LTE releases, will give the possibility for the UE to transmit PUSCH
- the UE is requested to either report an individual power headroom report for PUCCH or a combined power headroom report for PUCCH and PUSCH according to embodiments.
- the combined power headroom report may be transmitted with the individual power headroom report for the PUSCH.
- the individual power headroom report and the combined power headroom reports may be valid for only one component carrier, e.g. for each individual component carrier, or for the sum of the component carriers.
- the base station is now able to know how much power that the PUCCH will take from the total available transmission power and correspondingly how much power which is left for the scheduled PUSCH transmission.
- a method in a UE for distributing available transmit power between PUCCH and PUSCH is determined, and at least one power headroom report indicating the available power for transmission on at least the PUCCH is transmitted to a base station.
- a method in a base station for distributing available transmit power of a UE between PUCCH and PUSCH is provided.
- at least one power headroom report indicating available power for transmission on at least the PUCCH is received from a UE and the UE is scheduled based on information of the at least one received power headroom report.
- a UE for distributing available transmit power between PUCCH and PUSCH is provided.
- the UE comprises a processor configured to determine available power for transmission on at least the PUCCH, and a transmitter configured to transmit to a base station at least one power headroom report indicating the available power for transmission on at least the PUCCH.
- a base station for distributing available transmit power of a UE between PUCCH and PUSCH comprises a receiver configured to receive from the UE at least one power headroom report indicating the available power for transmission on at least the PUCCH, and a processor configured to schedule the UE based on information of the at least one received power headroom report.
- Figure 1 illustrates the LTE downlink physical resources according to prior art.
- Figure 2 illustrates the LTE time-domain structure according to prior art.
- Figure 3 illustrates the downlink subframes according to prior art.
- Figure 4 illustrates uplink L1 /L2 control signaling transmission on PUCCH according to prior art.
- Figure 5 illustrates the PUSCH resource assignment according to prior art.
- FIGS 6 and 7 are flowcharts of the methods according to embodiments of the present invention.
- Figure 8 illustrates the UE and the base station according to embodiments of the present invention.
- the base station configures 601 the UE whether or not simultaneous transmission of PUCCH and PUSCH is possible as illustrated in the flowchart of igure 6.
- the base station then signals 602 a parameter to the UE indicating whether simultaneous transmission of PUSCH and PUCCH is possible.
- the parameter may be signaled via RRC (Radio Resource Control
- the UE receives 701 the parameter indicating whether simultaneous transmission of PUSCH and PUCCH is possible, and configures 702 the uplink transmission based on the received parameter according to an embodiment.
- a corresponding method in a base station for distributing available transmit power of a UE between PUCCH, and Physical Uplink Shared Channel, PUSCH is provided.
- the base station receives 603 from the UE at least one power headroom report indicating the available power for transmission on at least the PUCCH, and schedules 604 the UE based on information of the at least one received power headroom report.
- PHPUCCH PCMAX - PUCCH power
- PCMAX is the maximum power for the UE
- PUCCH power is the power of PUCCH.
- PUCCH (0 — + ⁇ ( ⁇ ) ⁇ where P CMAX is the configured maximum transmit power for the mobile terminal, P 0 PUSCH ' ) > PL is the estimated pathloss, ⁇ ⁇ PUCCH (E) * s provided by higher layers.
- Each ⁇ ⁇ PUCCH ( ⁇ ) value is dependent on the PUCCH format.
- h(n) is also a PUCCH format dependent value, where nccji corresponds to the number of information bits for the channel quality information and nHARo is the number of HARQ bits.
- g(i) is the current PUCCH power adjustment state and i is the current subframe.
- the existing power headroom report for PUSCH is extended to also include PUCCH which is implies that the power headroom is reported for both PUSCH and PUCCH in the same report referred to as PHPUCCH+PUSCH, where PUSCH power + the PUCCH power) .
- PUCCH the power headroom is reported for both PUSCH and PUCCH in the same report referred to as PHPUCCH+PUSCH, where PUSCH power + the PUCCH power
- the power headroom can be expressed in dB in the mW or W domain.
- the power headroom report can be defined as:
- the power headroom report for PUSCH and PUCCH can also be used in combination with the existing power headroom report for PUSCH.
- the power headroom report indicating the available power for transmission on the PUCCH and the PUSCH is transmitted in combination with a power headroom report indicating the available power for transmission on PUSCH. In this way it is possible to determine the available power on both PUCCH and PUSCH.
- the power headroom report for PUSCH and PUCCH can also be used in combination with the power headroom report for PUCCH.
- the power headroom report indicating the available power for transmission on the PUCCH and the PUSCH is transmitted in combination with a power headroom report indicating the available power for transmission on PUCCH. In this way it is possible to determine the available power on both PUCCH and PUSCH.
- the power headroom report indicates the available transmission power for a given component carrier c.
- the power headroom report indicates the available power for
- PH PUCCH (C) P CMAX -PUCCH power(c) in addition to an existing power headroom report for PUSCH, e.g. defined for a specific component carrier.
- An example among many possible implementations is shown below:
- the power headroom report indicating the available power for transmission on the PUCCH and the PUSCH can be defined for a given component carrier.
- the power headroom report indicating the available power for transmission on the PUCCH and the PUSCH can transmitted in combination with a power headroom report indicating the available power for transmission on PUSCH.
- These power headroom reports can be defined for a given component carrier c. The transmission of the different reports may occur simultaneously or at separate instances.
- the power headroom report indicating the available power for transmission on the PUCCH and the PUSCH can transmitted in combination with a power headroom report indicating the available power for transmission on PUCCH.
- These power headroom reports can be defined for a given component carrier c. The transmission of the different reports may occur simultaneously or at separate instances.
- the power headroom report on a given component carrier may be triggered by a pathloss change on the same or on another component carrier.
- the UE may send a power headroom report for a carrier where the pathloss is changed beyond a certain threshold.
- a pathloss change on one component carrier may trigger a full power headroom report including reports for all component carriers.
- the power headroom reports indicating the available power for transmission on PUCCH, PUSCH and on PUCCH and PUSCH can be defined as a sum for all component carriers used by one UE. It should be noted that the principles described for PUSCH may also be applied for the sounding reference signals (SRS). I.e., when simultaneous transmission of SRS and PUCCH occurs, the embodiments of the present invention are also applicable if PUSCH or PUCCH is replaced by SRS.
- SRS sounding reference signals
- the present invention is also directed to a UE (User Equipment) and a base station, also referred to as an eNB in LTE.
- the UE is configured to wirelessly communicate with a mobile telecommunication network via base stations.
- the UE and the base station comprise antennas, power amplifiers and other software means and electronic circuitry enabling the wireless
- Figure 8 illustrates schematically a UE and a base station according to embodiments of the present invention.
- the UE 806 is adapted to distribute the available transmit power of a UE between PUCCH and PUSCH.
- the UE comprises a processor 804 configured to determine available power for transmission on at least the PUCCH and a transmitter 805 configured to transmit to a base station at least one power headroom report 821 indicating the available power for transmission on at least the PUCCH.
- the transmitter is configured to transmit data on PUSCH and control information on PUCCH.
- the UE comprises a receiver 803 configured to receive a parameter 825 indicating whether simultaneous transmission of PUSCH and PUCCH is possible and to e.g. receive scheduling information 820.
- the processor 804 is further configured to configure the uplink transmission based on the received parameter.
- the base station 800 is adapted to distribute the available transmit power of a UE between PUCCH and PUSCH.
- the base station comprises a receiver 807 for receiving at least one power headroom report 821 indicating the available power for transmission on at least the PUCCH and a processor 801 configured to schedule the UE based on information of the at least one received power headroom report.
- the base station comprises a transmitter 802 for transmitting scheduling information 820 regarding how to schedule future uplink transmission in the UE, wherein the scheduling information 820 is based on the headroom reports 821.
- the processor 801 may be configured to configure the UE whether or not simultaneous transmission of PUCCH and PUSCH is possible, and the transmitter 802 may be configured to signal a parameter 825 to the UE indicating whether simultaneous transmission of PUSCH and PUCCH is possible.
- the respective processor 804, 801 of the UE and the base station may be one processor or a plurality of processors configured to perform the different tasks assigned to the respective above mentioned processor of the UE and the base station.
- the available power for transmission in the different embodiment is the available remaining power that can be used for transmission on the relevant physical channel such as PUCCH and PUSCH when the power allocated for the respective channel(s) is reduced from the configured maximum transmit power for the mobile terminal.
Landscapes
- Engineering & Computer Science (AREA)
- Computer Networks & Wireless Communication (AREA)
- Signal Processing (AREA)
- Mobile Radio Communication Systems (AREA)
Priority Applications (20)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
BR112012007385-0A BR112012007385B1 (pt) | 2009-10-02 | 2010-09-29 | método para um equipamento de usuário para reportar headroom de potência, equipamento de usuário relacionado, método para uma estação base para escalonamento de um equipamento de usuário e estação base relacionada |
KR1020127010724A KR101785124B1 (ko) | 2009-10-02 | 2010-09-29 | 이동전기통신망에서 방법 및 장치 |
AU2010303058A AU2010303058B2 (en) | 2009-10-02 | 2010-09-29 | Methods and arrangements in a mobile telecommunications network |
PL14197192T PL2849505T3 (pl) | 2009-10-02 | 2010-09-29 | Sposoby i układy raportowania zapasu mocy w sieci telekomunikacji mobilnej |
JP2012531382A JP5678070B2 (ja) | 2009-10-02 | 2010-09-29 | 無線通信ネットワークにおける方法及び装置 |
ES10759642.1T ES2535332T3 (es) | 2009-10-02 | 2010-09-29 | Métodos y disposiciones en una red de telecomunicaciones móvil |
MX2012003447A MX2012003447A (es) | 2009-10-02 | 2010-09-29 | Metodos y arreglos en una red de telecomunicaciones movil. |
RU2012117825/07A RU2517366C2 (ru) | 2009-10-02 | 2010-09-29 | Способы и устройства в мобильной телекоммуникационной сети |
SG2012016051A SG179028A1 (en) | 2009-10-02 | 2010-09-29 | Methods and arrangements in a mobile telecommunications network |
EP14197192.9A EP2849505B1 (de) | 2009-10-02 | 2010-09-29 | Verfahren und Anordnungen zur Berichterstattung über Leistungsreserve in einem mobilen Telekommunikationsnetzwerk |
IN2169DEN2012 IN2012DN02169A (de) | 2009-10-02 | 2010-09-29 | |
EP19193587.3A EP3624509A1 (de) | 2009-10-02 | 2010-09-29 | Verfahren und anordnungen zur berichterstattung über leistungsreserve in einem mobilen telekommunikationsnetzwerk |
CN201080045137.9A CN102577543B (zh) | 2009-10-02 | 2010-09-29 | 移动电信网络中的方法和设备 |
NZ599092A NZ599092A (en) | 2009-10-02 | 2010-09-29 | Methods and arrangements in a mobile telecommunications network |
EP10759642.1A EP2484162B1 (de) | 2009-10-02 | 2010-09-29 | Verfahren und anordnungen in einem mobilen telekommunikationsnetz |
CA2776348A CA2776348C (en) | 2009-10-02 | 2010-09-29 | Methods and arrangements in a mobile telecommunications network |
ZA2012/01801A ZA201201801B (en) | 2009-10-02 | 2012-03-12 | Methods and arrangements in a mobile telecommunications network |
IL218699A IL218699A (en) | 2009-10-02 | 2012-03-18 | Method for used equipment or base station for reporting of applied power and user equipment and base station using the method |
MA34812A MA33698B1 (fr) | 2009-10-02 | 2012-04-26 | Procédés et agencements utilisés dans un réseau de télécommunications mobiles |
HK13100029.0A HK1173023A1 (zh) | 2009-10-02 | 2013-01-02 | 移動電信網絡中的方法和設備 |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US24809209P | 2009-10-02 | 2009-10-02 | |
US61/248,092 | 2009-10-02 |
Publications (2)
Publication Number | Publication Date |
---|---|
WO2011039214A2 true WO2011039214A2 (en) | 2011-04-07 |
WO2011039214A3 WO2011039214A3 (en) | 2011-06-03 |
Family
ID=43805745
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/EP2010/064405 WO2011039214A2 (en) | 2009-10-02 | 2010-09-29 | Methods and arrangements in a mobile telecommunications network |
Country Status (23)
Country | Link |
---|---|
US (1) | US20110080838A1 (de) |
EP (3) | EP2484162B1 (de) |
JP (3) | JP5678070B2 (de) |
KR (1) | KR101785124B1 (de) |
CN (2) | CN105338610B (de) |
AU (1) | AU2010303058B2 (de) |
BR (1) | BR112012007385B1 (de) |
CA (1) | CA2776348C (de) |
DK (1) | DK2849505T3 (de) |
ES (2) | ES2535332T3 (de) |
HK (2) | HK1173023A1 (de) |
IL (1) | IL218699A (de) |
IN (1) | IN2012DN02169A (de) |
MA (1) | MA33698B1 (de) |
MX (1) | MX2012003447A (de) |
MY (1) | MY163280A (de) |
NZ (1) | NZ599092A (de) |
PL (1) | PL2849505T3 (de) |
PT (1) | PT2849505T (de) |
RU (1) | RU2517366C2 (de) |
SG (1) | SG179028A1 (de) |
WO (1) | WO2011039214A2 (de) |
ZA (1) | ZA201201801B (de) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2012148193A2 (ko) * | 2011-04-27 | 2012-11-01 | (주)팬택 | 통신 시스템에서 기준신호 전송 전력 제어 장치 및 방법 |
JP2013236287A (ja) * | 2012-05-10 | 2013-11-21 | Sharp Corp | 端末、通信方法および集積回路 |
JP2014517595A (ja) * | 2011-05-06 | 2014-07-17 | クゥアルコム・インコーポレイテッド | 電力管理最大電力低減に関連する電力ヘッドルーム・レポート |
US10660086B2 (en) | 2010-04-06 | 2020-05-19 | Samsung Electronics Co., Ltd. | Method and apparatus for processing scheduling information in mobile communication system |
Families Citing this family (21)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103607766A (zh) | 2008-03-20 | 2014-02-26 | 交互数字专利控股公司 | 在Cell_FACH状态或空闲模式中执行E-DCH传输的E-TFC约束的方法及WTRU |
EP2409529B1 (de) * | 2009-03-17 | 2013-09-18 | Unwired Planet, LLC | Leistungszurückweichen für Mehrträger-Aufwärtsstreckenübertragungen |
KR101734948B1 (ko) * | 2009-10-09 | 2017-05-12 | 삼성전자주식회사 | 파워 헤드룸 보고, 자원 할당 및 전력 제어 방법 |
EP2317815A1 (de) | 2009-11-02 | 2011-05-04 | Panasonic Corporation | Leistungsgrenzenmeldung in einem Carrier-Aggregation-Kommunikationssystem |
US8537767B2 (en) * | 2010-04-06 | 2013-09-17 | Sunplus Technology Co., Ltd | Method for performing power headroom reporting procedure and PHR MAC control element |
CN102238551A (zh) * | 2010-05-06 | 2011-11-09 | 宏达国际电子股份有限公司 | 改善上链路传输或信令的方法及其相关通讯装置 |
US8891446B2 (en) * | 2010-05-10 | 2014-11-18 | Qualcomm Incorporated | Power control with cross-subframe assignment |
US8638868B2 (en) | 2010-06-23 | 2014-01-28 | Telefonaktiebolaget L M Ericsson (Publ) | Methods and apparatus for varying reduced transmission resources |
KR101740366B1 (ko) * | 2010-06-28 | 2017-05-29 | 삼성전자주식회사 | 이동 통신 시스템에서 역방향 최대 전송 전력을 보고하는 방법 및 장치 |
EP2400803B1 (de) * | 2010-06-28 | 2019-12-11 | Samsung Electronics Co., Ltd. | Verfahren und Vorrichtung zur Meldung maximaler Übertragungsleistung bei drahtloser Kommunikation |
US8954106B2 (en) * | 2010-08-10 | 2015-02-10 | Samsung Electronics Co., Ltd. | Method and apparatus for configuring power headroom information in mobile communication system supporting carrier aggregation |
KR20120018041A (ko) * | 2010-08-20 | 2012-02-29 | 주식회사 팬택 | 다중 요소 반송파 시스템에서 잉여전력에 관한 정보의 전송장치 및 방법 |
US8687727B2 (en) * | 2010-11-05 | 2014-04-01 | Intel Corporation | Coordinated multi-point transmission using interference feedback |
CN105493420B (zh) * | 2013-08-06 | 2018-09-28 | Lg电子株式会社 | 用于无线通信的方法和设备 |
CN110677905B (zh) * | 2013-11-08 | 2023-06-16 | 株式会社Kt | 用于控制上行链路传输功率的方法及其装置 |
US10834687B2 (en) * | 2016-11-21 | 2020-11-10 | Qualcomm Incorporated | Power headroom reporting for systems with multiple transmission time intervals |
CN108347762B (zh) * | 2017-01-24 | 2022-07-29 | 北京三星通信技术研究有限公司 | 功率余量报告的上报方法和上报装置 |
CN109392072B (zh) * | 2017-08-14 | 2021-08-03 | 普天信息技术有限公司 | 功率余量的计算方法 |
CN108199744A (zh) * | 2018-02-09 | 2018-06-22 | 北京佰才邦技术有限公司 | 通信参数指示方法、基站、通信方法和用户设备 |
US10681644B2 (en) * | 2018-08-21 | 2020-06-09 | Qualcomm Incorporated | Reporting actual uplink transmission power |
US20220104137A1 (en) * | 2019-01-11 | 2022-03-31 | Telefonaktiebolaget Lm Ericsson (Publ) | Power Control Reporting in a Wireless Communication System |
Family Cites Families (32)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR980007105A (ko) * | 1996-06-28 | 1998-03-30 | 김광호 | 이동국 송신전력 제어방법 |
US6426960B2 (en) * | 1997-06-24 | 2002-07-30 | Qualcomm Incorporated | Increased capacity data transmission in a CDMA wireless communication system |
US9078225B2 (en) * | 2003-06-16 | 2015-07-07 | Telefonaktiebolaget L M Ericsson (Publ) | Dynamic mobile power headroom threshold for determining rate increases in the reverse traffic channel of a CDMA network |
US7408895B2 (en) * | 2005-04-20 | 2008-08-05 | Interdigital Technology Corporation | Method and apparatus for scheduling transmissions via an enhanced dedicated channel |
RU2386213C2 (ru) * | 2005-09-22 | 2010-04-10 | Мицубиси Денки Кабусики Кайся | Способ связи |
US7996032B2 (en) * | 2006-03-27 | 2011-08-09 | Qualcomm Incorporated | Power control and resource management in orthogonal wireless systems |
CN101669400B (zh) * | 2007-03-01 | 2012-08-22 | 株式会社Ntt都科摩 | 基站装置和通信控制方法 |
BRPI0809412B1 (pt) * | 2007-03-19 | 2018-05-08 | Ntt Docomo Inc | equipamento de usuário para comunicar com um aparelho de estação base em um sistema de comunicação móvel |
CA2691230C (en) * | 2007-06-20 | 2015-11-24 | Nokia Siemens Networks Oy | Power headroom reporting method |
CN101340622B (zh) * | 2007-07-06 | 2012-01-11 | 中兴通讯股份有限公司 | 多载波增强上行链路功率资源的分配方法 |
CN101340711B (zh) * | 2007-07-06 | 2012-05-23 | 中兴通讯股份有限公司 | 多载波增强上行接入系统的调度信息上报方法 |
WO2009022599A1 (ja) * | 2007-08-14 | 2009-02-19 | Ntt Docomo, Inc. | 受信装置及びデータ取得方法 |
US20090088195A1 (en) * | 2007-09-28 | 2009-04-02 | Nokia Corporation | Method and apparatus for signaling of scheduling information |
EP2213131A4 (de) * | 2007-11-09 | 2014-01-08 | Nortel Networks Ltd | Aufwärtsstrecken-leistungsregelung mit interference-over-thermal-(lot)-lastregelung |
US20090175187A1 (en) * | 2008-01-07 | 2009-07-09 | Kristina Jersenius | Method and Arrangement for Triggering Power Headroom Report Transmissions in a Telecommunications System |
US8233458B2 (en) * | 2008-01-07 | 2012-07-31 | Lg Electronics Inc. | Method of controlling transmission power in a wireless communication system |
AU2009228928B2 (en) * | 2008-03-26 | 2014-04-03 | Cellular Communications Equipment Llc | Extension of power headroom reporting and trigger conditions |
WO2010013963A2 (en) * | 2008-07-30 | 2010-02-04 | Lg Electronics Inc. | Method and apparatus of transmitting control information in wireless communication system |
WO2010018226A2 (en) * | 2008-08-15 | 2010-02-18 | Nokia Siemens Networks Oy | Backward compatible physical uplink control channel resource mapping |
JP4636153B2 (ja) * | 2008-09-26 | 2011-02-23 | ブラザー工業株式会社 | 画像処理装置、およびネットワークシステム |
US8982801B2 (en) * | 2009-02-09 | 2015-03-17 | Interdigital Patent Holdings, Inc. | Apparatus and method for uplink power control for a wireless transmitter/receiver unit utilizing multiple carriers |
EP2415315A2 (de) * | 2009-03-30 | 2012-02-08 | Research In Motion Limited | Benutzergeräte-komponententrägervergabe |
CN201780605U (zh) * | 2009-04-22 | 2011-03-30 | 万信电子科技有限公司 | 服装试穿系统 |
US8437798B2 (en) * | 2009-04-27 | 2013-05-07 | Motorola Mobility Llc | Uplink scheduling support in multi-carrier wireless communication systems |
US20100272091A1 (en) * | 2009-04-27 | 2010-10-28 | Motorola, Inc. | Uplink Scheduling Supoort in Multi-Carrier Wireless Communication Systems |
EP2433376A4 (de) * | 2009-04-28 | 2014-12-03 | Nokia Corp | Feedback für kanalstatusinformationen |
WO2010124745A1 (en) * | 2009-04-30 | 2010-11-04 | Telefonaktiebolaget L M Ericsson (Publ) | Method and arrangement in a wireless communications system |
ES2694674T3 (es) * | 2009-05-22 | 2018-12-26 | Blackberry Limited | Reporte de margen de potencia para operadores agregados |
HUE043222T2 (hu) * | 2009-06-26 | 2019-08-28 | Sun Patent Trust | Rádiós kommunikációs berendezés és rádiós kommunikációs eljárás |
CA2771081C (en) * | 2009-08-14 | 2016-09-27 | Research In Motion Limited | Method and apparatus for power sharing carrier set for carrier aggregation |
TW201611639A (zh) * | 2009-10-01 | 2016-03-16 | 內數位專利控股公司 | 功綠控制方法及裝置 |
EP3145108A1 (de) * | 2010-06-18 | 2017-03-22 | BlackBerry Limited | System und verfahren zur übertragung von uplink-steuerungsinformationen in einer trägeraggregation |
-
2010
- 2010-09-28 US US12/892,240 patent/US20110080838A1/en not_active Abandoned
- 2010-09-29 EP EP10759642.1A patent/EP2484162B1/de active Active
- 2010-09-29 RU RU2012117825/07A patent/RU2517366C2/ru active
- 2010-09-29 KR KR1020127010724A patent/KR101785124B1/ko active IP Right Grant
- 2010-09-29 CN CN201510804835.7A patent/CN105338610B/zh active Active
- 2010-09-29 ES ES10759642.1T patent/ES2535332T3/es active Active
- 2010-09-29 JP JP2012531382A patent/JP5678070B2/ja active Active
- 2010-09-29 CA CA2776348A patent/CA2776348C/en active Active
- 2010-09-29 EP EP14197192.9A patent/EP2849505B1/de active Active
- 2010-09-29 CN CN201080045137.9A patent/CN102577543B/zh active Active
- 2010-09-29 PT PT141971929T patent/PT2849505T/pt unknown
- 2010-09-29 IN IN2169DEN2012 patent/IN2012DN02169A/en unknown
- 2010-09-29 MX MX2012003447A patent/MX2012003447A/es active IP Right Grant
- 2010-09-29 EP EP19193587.3A patent/EP3624509A1/de active Pending
- 2010-09-29 DK DK14197192T patent/DK2849505T3/da active
- 2010-09-29 MY MYPI2012001065A patent/MY163280A/en unknown
- 2010-09-29 NZ NZ599092A patent/NZ599092A/xx unknown
- 2010-09-29 AU AU2010303058A patent/AU2010303058B2/en active Active
- 2010-09-29 SG SG2012016051A patent/SG179028A1/en unknown
- 2010-09-29 WO PCT/EP2010/064405 patent/WO2011039214A2/en active Application Filing
- 2010-09-29 PL PL14197192T patent/PL2849505T3/pl unknown
- 2010-09-29 BR BR112012007385-0A patent/BR112012007385B1/pt active IP Right Grant
- 2010-09-29 ES ES14197192T patent/ES2755892T3/es active Active
-
2012
- 2012-03-12 ZA ZA2012/01801A patent/ZA201201801B/en unknown
- 2012-03-18 IL IL218699A patent/IL218699A/en active IP Right Grant
- 2012-04-26 MA MA34812A patent/MA33698B1/fr unknown
-
2013
- 2013-01-02 HK HK13100029.0A patent/HK1173023A1/zh unknown
-
2015
- 2015-01-05 JP JP2015000494A patent/JP2015111855A/ja active Pending
-
2016
- 2016-05-23 JP JP2016102718A patent/JP2016187189A/ja active Pending
- 2016-08-12 HK HK16109635.4A patent/HK1221593A1/zh unknown
Non-Patent Citations (1)
Title |
---|
None |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US10660086B2 (en) | 2010-04-06 | 2020-05-19 | Samsung Electronics Co., Ltd. | Method and apparatus for processing scheduling information in mobile communication system |
US11368953B2 (en) | 2010-04-06 | 2022-06-21 | Samsung Electronics Co., Ltd. | Method and apparatus for processing scheduling information in mobile communication system |
WO2012148193A2 (ko) * | 2011-04-27 | 2012-11-01 | (주)팬택 | 통신 시스템에서 기준신호 전송 전력 제어 장치 및 방법 |
WO2012148193A3 (ko) * | 2011-04-27 | 2012-12-20 | (주)팬택 | 통신 시스템에서 기준신호 전송 전력 제어 장치 및 방법 |
JP2014517595A (ja) * | 2011-05-06 | 2014-07-17 | クゥアルコム・インコーポレイテッド | 電力管理最大電力低減に関連する電力ヘッドルーム・レポート |
US9185666B2 (en) | 2011-05-06 | 2015-11-10 | Qualcomm Incorporated | Power headroom reporting related to power management maximum power reduction |
JP2013236287A (ja) * | 2012-05-10 | 2013-11-21 | Sharp Corp | 端末、通信方法および集積回路 |
US9661589B2 (en) | 2012-05-10 | 2017-05-23 | Sharp Kabushiki Kaisha | Terminal, communication method, and integrated circuit |
Also Published As
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP2484162B1 (de) | Verfahren und anordnungen in einem mobilen telekommunikationsnetz | |
CN107580797B (zh) | 无线通信系统中适配用于上行链路传输的重复等级的方法和装置 | |
KR101882280B1 (ko) | 무선 통신 시스템에서 상향링크 신호를 송신 또는 수신하기 위한 방법 및 이를 위한 장치 | |
US8311053B2 (en) | Methods for controlling an uplink signal transmission power and communication devices | |
US8447343B2 (en) | Methods and arrangements in a mobile telecommunication network | |
JP6376564B2 (ja) | 端末装置、基地局装置、通信方法および集積回路 | |
US20120188947A1 (en) | Uplink Power Control in Wireless Communication Systems | |
JP6410153B2 (ja) | 端末装置、基地局装置、通信方法および集積回路 | |
WO2014208952A1 (ko) | 무선 통신 시스템에서 사운딩 참조 신호의 전송 전력을 제어하는 방법 및 이를 위한 장치 | |
WO2015005325A1 (ja) | 端末装置、基地局装置、通信方法、および集積回路 | |
JP6362114B2 (ja) | 端末装置、基地局装置、および通信方法 | |
EP3136798A1 (de) | Verfahren zur bestimmung der sendeleistung der direkten vorrichtung-zu-vorrichtung-kommunikation in einem drahtloskommunikationssystem und vorrichtung dafür | |
WO2014208951A1 (ko) | 무선 통신 시스템에서 사운딩 참조 신호의 전송 전력을 제어하는 방법 및 이를 위한 장치 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
WWE | Wipo information: entry into national phase |
Ref document number: 201080045137.9 Country of ref document: CN |
|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 10759642 Country of ref document: EP Kind code of ref document: A1 |
|
DPE1 | Request for preliminary examination filed after expiration of 19th month from priority date (pct application filed from 20040101) | ||
WWE | Wipo information: entry into national phase |
Ref document number: 12012500490 Country of ref document: PH |
|
WWE | Wipo information: entry into national phase |
Ref document number: 2169/DELNP/2012 Country of ref document: IN |
|
WWE | Wipo information: entry into national phase |
Ref document number: 218699 Country of ref document: IL |
|
WWE | Wipo information: entry into national phase |
Ref document number: 2012531382 Country of ref document: JP |
|
WWE | Wipo information: entry into national phase |
Ref document number: MX/A/2012/003447 Country of ref document: MX |
|
NENP | Non-entry into the national phase |
Ref country code: DE |
|
WWE | Wipo information: entry into national phase |
Ref document number: 2776348 Country of ref document: CA Ref document number: 2010303058 Country of ref document: AU |
|
WWE | Wipo information: entry into national phase |
Ref document number: 2010759642 Country of ref document: EP |
|
ENP | Entry into the national phase |
Ref document number: 2010303058 Country of ref document: AU Date of ref document: 20100929 Kind code of ref document: A Ref document number: 20127010724 Country of ref document: KR Kind code of ref document: A |
|
WWE | Wipo information: entry into national phase |
Ref document number: 2012117825 Country of ref document: RU |
|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 10759642 Country of ref document: EP Kind code of ref document: A2 |
|
REG | Reference to national code |
Ref country code: BR Ref legal event code: B01A Ref document number: 112012007385 Country of ref document: BR |
|
ENP | Entry into the national phase |
Ref document number: 112012007385 Country of ref document: BR Kind code of ref document: A2 Effective date: 20120330 |