WO2010118773A1 - Overhead form traveller and method - Google Patents
Overhead form traveller and method Download PDFInfo
- Publication number
- WO2010118773A1 WO2010118773A1 PCT/EP2009/054470 EP2009054470W WO2010118773A1 WO 2010118773 A1 WO2010118773 A1 WO 2010118773A1 EP 2009054470 W EP2009054470 W EP 2009054470W WO 2010118773 A1 WO2010118773 A1 WO 2010118773A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- longitudinal load
- construction section
- load frame
- next construction
- cantilever structure
- Prior art date
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
- E01D21/10—Cantilevered erection
Definitions
- the present application relates to a method and apparatus for constructing overhanging or cantilever structures.
- the invention relates to the construction of concrete bridge elements cast in situ using the free cantilever method.
- Bridge decks and other spanning, cantilevering or overhanging structures are often constructed by casting concrete in situ, using a temporary structure of shuttering or formwork to define a volume into which concrete is then poured.
- a structure of reinforcing steel is usually assembled in the volume, or placed into the volume, before the concrete is poured. Once the concrete is sufficiently cured so that the structure can support itself, the formwork is removed.
- a conventional form traveler consists of a section of formwork which can be advanced in the direction of construction while being supported by the part of the structure which has already cured.
- a form traveler generally comprises a frame which provides support for the formwork and some means, such as rollers or rails, enabling it to travel forwards incrementally to each new section.
- Conventional concrete bridge structures may comprise, for example, a number of piers supporting a bridge deck having an open cross-section with webs (vertical load-bearing members), for example in a "double T" or a "U” arrangement, or a closed cross-section such as a box section, having a deck slab, one or more webs and a bottom slab. In a "U" section structure, the deck slab is the bottom slab.
- Conventional form traveler designs include the under-slung traveler and the overhead traveler. As its name suggests, an under-slung traveler is suspended underneath the bridge structure already erected, and extends beyond the end of the structure to support the formwork where the next section of the structure is to be cast. As construction progresses, the under-slung traveler is advanced underneath the developing structure.
- An overhead traveler is generally a frame mounted on top of the structure already erected, and it can be advanced forwards, on rails or rollers for example, to extend over the region where the next section is to be cast. In the case of an overhead traveler, the formwork hangs from the extended section of its frame.
- the weight of the construction elements including formwork, traveler, reinforcement and uncured concrete, together with all the necessary access gantry structures, is supported on the part of the structure which has already been built.
- the traveler can be advanced to the next section.
- conventional overhead travelers comprise a multi-truss framework with a truss frame aligned with each web element of the deck structure.
- the frames are transversely braced, for example using cross trusses between the frames, to give the traveler framework transverse rigidity.
- the framework is located either below the wings of the deck slab or below the bottom slab.
- the former arrangement has the disadvantage that the reactions into the bridge deck from the static weight of the traveler, the formwork and the concrete are not introduced directly into the webs (the webs being the parts of the deck structure with the greatest load-bearing capacity).
- the latter arrangement can only be used on a structure where the traveler's path is unobstructed by objects beneath the structure.
- under-slung travelers do have the significant advantage of allowing virtually unrestricted access to the construction space from above. This means, for example, that pre-fabricated steel reinforcement can be lowered whole into the construction space.
- Reinforcement steelwork cages for the entire web, bottom slab and top slab of a bridge deck can be pre-fabricated and then lowered into place by a crane on the already-constructed bridge deck. In this way, on-site reinforcement assembly work can be saved, thereby significantly speeding up the on-site construction process.
- the object of the present invention is to provide a method and apparatus for incremental construction of overhanging or self-supporting structures, which enables the static weight reactions to be introduced directly into the webs, which is not obstructed by piers or similar elements underneath the structure, and which permits substantially unrestricted access from above to the construction space within the formwork.
- Figure 1 illustrates a prior art overhead traveler.
- Figure 2 illustrates a plan view of the overhead traveler of the present invention.
- Figure 3 illustrates a side elevation of the overhead traveler of the present invention.
- Figure 4 illustrates a frontal elevation of the overhead traveller of the present invention.
- Figures 5 and 6 illustrate perspectives view of the overhead traveler of the present invention.
- FIG. 1 A prior art overhead form traveler is depicted in schematic form in figure 1.
- a bridge section is shown with three webs (9), a top slab (1 ) and a bottom slab (11 ).
- each web (9) is fixed a rail (6), and these rails (6) allow the traveler structure (20) to be advanced for each new section (7).
- the rails (6) are alsomoved forward in the direction of construction for each new section (7).
- the conventional traveler also comprises a structure of frames and diagonal bracing elements to give the traveler's frame structure (20) sufficient strength to support the load of the new section while the concrete is being poured and cured.
- the frames introduce loading during construction of a new section directly into, or near to, the webs of the previously completed section.
- the reinforcement required for each new section must be assembled in situ, since the structure of the traveler does not allow complete prefabricated reinforcement cages to be lowered down into the construction space.
- Such prefabricated reinforcement can also not be raised from below the bridge once the traveler has been advanced, because the traveler and the formwork obstruct access from below to the region where the reinforcement is required.
- Figures 2 to 6 show a simplified example, in schematic form and from various views, to illustrate the principle of the invention.
- Figures 2 to 6 show a similar bridge structure to the structure in figure 1 , comprising three webs (9), a bottom slab (11 ), and a top slab (1 ).
- the traveler shown in figures 2 to 6 has two load frames (3), mounted on rails (6) - one over each outer web.
- the load frames (3) according to the invention are arranged so that they can be rotated outwards to allow improved access to the construction space (7) from above.
- each load frame may be designed to allow a rotation of the frame about an axis substantially vertical (ie perpendicular to the upper plane of the structure) while still securing the load frame to the load- bearing outer webs (9a, 9c) as shown.
- the mid-portion of each load frame is mounted on a transverse beam (8), known as the lower crossbeam, which serves as a support for the mid-portions of each load frame.
- Respective reactions from the load frames are transferred to the rails (6) during launching of the traveler, then directly to the two outer webs (9a, 9c) during the construction of the new segment.
- the load frames are constructed such that they are capable of supporting the required loads without the need for bracing structures between them.
- the cantilever structure has two or more longitudinal webs
- the overhead traveler and method of the invention for structures which have only one longitudinal web.
- the proximal ends of both load frames are secured to the same web, and the load frames are splayed outward so as to afford access to the construction volume of the next section, in the same way as for structures with more than on longitudinal web.
- the load frames according to the present invention are each individually constructed to support the vertical load of the formwork and the concrete when it is poured, but also to resist any rotational or torsional forces on it due, for example, to the wind, or to non- vertical loads occasioned during the construction process.
- This strength is achieved, for example, by constructing each of the individual load frames as a three-dimensionally triangulated structure, as partially indicated in figure 5. Note that this structure is only indicated in part of the drawn element in order to simplify the drawing.
- each load frame When they are installed in their operational position, the load frames extend out over the next section to be constructed, but rotated at such an angle to the longitudinal axis or the structure that substantially no part of the frame is directly above the main load-bearing region (2) of the next construction section.
- the installion of each load frame at a splayed angle to the longitudinal axis of the bridge deck structure, and the absence of traveler components over the main load-bearing parts of the next section of the structure mean that the reinforcement elements for these load bearing parts (webs, top slap and bottom slab) and also for the central part of the deck slab (1 ), or bridge deck, can be pre-fabricated and positioned (by lowering from the deck by crane, for example) in the construction volume, thereby saving significant time assembling the reinforcement in situ before pouring concrete.
- the angular position of the load frames would normally be set once for each specific structure being built. For example, for the bridge depicted in figures 2 to 6, if the cross-section of the bridge does not vary significantly over the sections being cast, then the load frames can be rotated to their correct positions and then secured in place on the rails (6) and on the lower crossbeam (8). Then as each new construction section is prepared, the traveler is moved forwards, with its load frames in the splayed-out orientation, to its position above the next section.
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
Description
Claims
Priority Applications (10)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
PCT/EP2009/054470 WO2010118773A1 (en) | 2009-04-15 | 2009-04-15 | Overhead form traveller and method |
JP2012505059A JP5484561B2 (en) | 2009-04-15 | 2009-04-15 | Elevated mobile work vehicle and method |
BRPI0925063-8A BRPI0925063A2 (en) | 2009-04-15 | 2009-04-15 | Superior advance carriage and method |
US13/263,878 US8869336B2 (en) | 2009-04-15 | 2009-04-15 | Overhead form traveller and method |
EP09779300A EP2419567A1 (en) | 2009-04-15 | 2009-04-15 | Overhead form traveller and method |
MX2011010551A MX2011010551A (en) | 2009-04-15 | 2009-04-15 | Overhead form traveller and method. |
CN200980158699.1A CN102395731B (en) | 2009-04-15 | 2009-04-15 | Overhead form traveller and method |
KR1020117024130A KR101630244B1 (en) | 2009-04-15 | 2009-04-15 | Apparatus For Supporting A Construction Section And Method of Constructing Construction Section |
AU2009344385A AU2009344385B2 (en) | 2009-04-15 | 2009-04-15 | Overhead form traveller and method |
HK12106125.1A HK1165519A1 (en) | 2009-04-15 | 2012-06-21 | Overhead form traveller and method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
PCT/EP2009/054470 WO2010118773A1 (en) | 2009-04-15 | 2009-04-15 | Overhead form traveller and method |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2010118773A1 true WO2010118773A1 (en) | 2010-10-21 |
Family
ID=41490346
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/EP2009/054470 WO2010118773A1 (en) | 2009-04-15 | 2009-04-15 | Overhead form traveller and method |
Country Status (10)
Country | Link |
---|---|
US (1) | US8869336B2 (en) |
EP (1) | EP2419567A1 (en) |
JP (1) | JP5484561B2 (en) |
KR (1) | KR101630244B1 (en) |
CN (1) | CN102395731B (en) |
AU (1) | AU2009344385B2 (en) |
BR (1) | BRPI0925063A2 (en) |
HK (1) | HK1165519A1 (en) |
MX (1) | MX2011010551A (en) |
WO (1) | WO2010118773A1 (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102168406A (en) * | 2011-03-18 | 2011-08-31 | 重庆城建控股(集团)有限责任公司 | Cluster numerical control installation system |
ES2424774A1 (en) * | 2012-04-02 | 2013-10-08 | Ulma C Y E, S. Coop | Movable structure suitable for supporting a formwork of a new bridge section in cantilever |
Families Citing this family (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP2419567A1 (en) * | 2009-04-15 | 2012-02-22 | VSL International AG | Overhead form traveller and method |
US8671490B1 (en) * | 2013-03-06 | 2014-03-18 | Mark Carney | Bridge span replacement system |
JP6533109B2 (en) * | 2015-07-14 | 2019-06-19 | オリエンタル白石株式会社 | Bridge demolition method |
CN110424277A (en) * | 2019-08-16 | 2019-11-08 | 江苏开通建设工程有限公司 | PC beam bridge Wavelike steel webplate hanging apparatus and construction method with low gantry crane |
CN110747761B (en) * | 2019-10-21 | 2021-03-23 | 宁波市政工程建设集团股份有限公司 | Dismantling construction method for temporary supporting system of small box girder type hidden cover beam prefabricated on road and bridge |
CN111021779B (en) * | 2019-12-19 | 2023-03-31 | 中建钢构工程有限公司 | Integral descending and dismantling construction method for space net rack and auxiliary supporting mechanism |
CN113614322B (en) * | 2020-03-05 | 2022-08-26 | 广州建筑股份有限公司 | Unequal span structure subsection rail-changing accumulated slippage construction method |
CN112458886A (en) * | 2020-12-18 | 2021-03-09 | 南南铝工程有限责任公司 | Half calabash shape aluminum alloy pedestrian bridge connection structure |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3937165A (en) * | 1973-09-21 | 1976-02-10 | Campenon Bernard Europe | Construction of bridge decking and like structures |
JPH0913328A (en) * | 1995-06-27 | 1997-01-14 | P S Co Ltd | Transfer method and device of extensible working vehicle |
JPH1192082A (en) * | 1997-09-24 | 1999-04-06 | Kitagawa Iron Works Co Ltd | Lifting device for construction of bridge beam |
JP2001226913A (en) * | 2000-02-15 | 2001-08-24 | Taisei Corp | Device and method for erecting bridge |
Family Cites Families (42)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US499622A (en) * | 1893-06-13 | Girder for traveling cranes | ||
US1891160A (en) * | 1931-02-16 | 1932-12-13 | Svend Friis Jespersen | Sliding form for casting columnar or box shaped concrete structures, such as chimneys, silos, and the like |
US3027633A (en) * | 1955-08-19 | 1962-04-03 | Yuba Cons Ind Inc | Method and apparatus for bridge construction |
DE1258888B (en) * | 1966-04-01 | 1968-01-18 | Strabag Bau Ag | Method for the production of multi-span bridges od. Like. And device for this |
ES353042A1 (en) * | 1967-04-24 | 1969-10-16 | Binder Co Ag | Traveling beam for the production of bridge sections |
US3571835A (en) * | 1967-10-30 | 1971-03-23 | Dyckerhoff & Widmann Ag | Apparatus for concreting multiple section structures, particularly bridge supports of reinforced or prestressed concrete |
US3511057A (en) * | 1968-10-14 | 1970-05-12 | Strabag Bau Ag | Erection and construction of multispan bridges and piers |
US3706125A (en) * | 1970-08-10 | 1972-12-19 | John P Hopkins Co | Pipe line construction method |
DE2140797A1 (en) * | 1971-08-14 | 1973-03-01 | Egon Gelhard | IN-HOUSE ASSEMBLY DEVICE |
US3985480A (en) * | 1972-08-18 | 1976-10-12 | Dyckerhoff & Widmann Ag | Apparatus for the sectional cantilever construction of bridge girder systems |
US3989218A (en) * | 1973-07-17 | 1976-11-02 | Societe D'etudes De Genie Civil Et De Techniques Industrielles (Ge.C.T.I.) | Cantilever form used in bridge construction |
US4087220A (en) * | 1974-03-12 | 1978-05-02 | Kurt Koss | Apparatus for building a concrete bridge superstructure |
DE2607805C3 (en) * | 1976-02-26 | 1979-05-31 | Dyckerhoff & Widmann Ag, 8000 Muenchen | Device for the section-by-section, free front construction of multi-span bridge structures made of reinforced or prestressed concrete |
DE2736524A1 (en) * | 1977-08-12 | 1979-02-22 | Philipp Dipl Ing Schreck | PROCESS FOR SECTIONAL PRODUCTION OF AN IN-SITE CONCRETE SLAB AND EQUIPMENT FOR CARRYING OUT THE PROCESS |
US4282978A (en) * | 1980-01-28 | 1981-08-11 | Antonio Zambon | Bridge crane for the emplacement of elongate prefabricated members of structures spanning a multiplicity of spaced-apart supports |
US4301565A (en) * | 1980-03-19 | 1981-11-24 | Irwin Weinbaum | Method and system for the removal and replacement of a bridge |
DE3124038C2 (en) * | 1981-06-19 | 1985-03-07 | Philipp Holzmann Ag, 6000 Frankfurt | Method and device for producing structures such as bridges using precast concrete girders |
US4799279A (en) * | 1985-12-02 | 1989-01-24 | Figg And Muller Engineers, Inc. | Method of constructing the approach and main spans of a cable stayed segmental bridge |
DE3818922A1 (en) * | 1988-06-02 | 1989-12-07 | Mannesmann Ag | SUPPORT OF A CARRIER |
US5195204A (en) * | 1990-07-27 | 1993-03-23 | J. Muller International | Construction equipment and method for precast segmental bridges |
US5511268A (en) * | 1994-08-08 | 1996-04-30 | The United States Of America As Represented By The Secretary Of Commerce | Construction of large structures by robotic crane placement of modular bridge sections |
US5575607A (en) * | 1994-11-02 | 1996-11-19 | United Technologies Corporation | Jet engine transport vehicle lift system and a build cell |
US5511266A (en) * | 1994-12-06 | 1996-04-30 | Bridgesys Corporation | Continuous incrementally erecting viaduct construction system |
CN1123861A (en) * | 1995-08-28 | 1996-06-05 | 铁道部大桥工程局 | Construction of prestressed concrete stayed cable bridge |
JP3038154B2 (en) * | 1996-09-10 | 2000-05-08 | 株式会社ピー・エス | Overhang work equipment |
US5921415A (en) * | 1997-07-03 | 1999-07-13 | Markelz; Paul H. | Bridge erection system |
US5960502A (en) * | 1997-07-18 | 1999-10-05 | Sherman; Yury | Method and mechanism for erection of prefabricated modular deck of viaducts, motorway flyovers and the like |
US6169954B1 (en) * | 1999-04-09 | 2001-01-02 | Mccrary Homer T. | Intelligent public transit system using dual-mode vehicles |
KR100866106B1 (en) * | 2001-04-10 | 2008-10-31 | 아르까디 알렉세예비치 꼬르나쩨끼 | Method and installation for building a highway and a highway |
US7461427B2 (en) * | 2004-12-06 | 2008-12-09 | Ronald Hugh D | Bridge construction system and method |
US8029710B2 (en) * | 2006-11-03 | 2011-10-04 | University Of Southern California | Gantry robotics system and related material transport for contour crafting |
US7478450B2 (en) * | 2005-11-29 | 2009-01-20 | Charles Fong | Longitudinally offset bridge substructure support system |
CA2634458C (en) * | 2005-12-20 | 2013-06-18 | Flatiron Constructors, Inc. | Method and apparatus for bridge construction |
KR20080107085A (en) * | 2007-06-05 | 2008-12-10 | 삼성물산 주식회사 | Construction method for girder in bridge and crane for pulling up girder, vehicle for carriage girder, girder used for the same |
AU2009230956B2 (en) * | 2008-04-01 | 2013-02-14 | Beijing Shengtianyi Parking Management Co., Ltd. | Multi-purpose load lifting working platform or/and composite bridge structure |
CN101324056B (en) * | 2008-08-06 | 2011-01-12 | 中铁大桥局股份有限公司 | Upside suspension type moving die carrier |
EP2419567A1 (en) * | 2009-04-15 | 2012-02-22 | VSL International AG | Overhead form traveller and method |
CN102251475B (en) * | 2010-05-19 | 2013-08-07 | 北京万桥兴业机械有限公司 | Position changing platform and carrying frame integrated machine and bridge erection method |
CA2791536C (en) * | 2011-10-04 | 2015-09-22 | Sps New England | Bridge beam placement system and apparatus |
US8621697B2 (en) * | 2012-03-19 | 2014-01-07 | Union Pacific Railroad Company | Bridge cap installation system and method |
US20140026335A1 (en) * | 2012-07-27 | 2014-01-30 | OCCI, Inc. | System and method for bridge replacement |
US8671490B1 (en) * | 2013-03-06 | 2014-03-18 | Mark Carney | Bridge span replacement system |
-
2009
- 2009-04-15 EP EP09779300A patent/EP2419567A1/en not_active Withdrawn
- 2009-04-15 MX MX2011010551A patent/MX2011010551A/en active IP Right Grant
- 2009-04-15 BR BRPI0925063-8A patent/BRPI0925063A2/en not_active IP Right Cessation
- 2009-04-15 US US13/263,878 patent/US8869336B2/en not_active Expired - Fee Related
- 2009-04-15 JP JP2012505059A patent/JP5484561B2/en not_active Expired - Fee Related
- 2009-04-15 CN CN200980158699.1A patent/CN102395731B/en not_active Expired - Fee Related
- 2009-04-15 WO PCT/EP2009/054470 patent/WO2010118773A1/en active Application Filing
- 2009-04-15 KR KR1020117024130A patent/KR101630244B1/en active IP Right Grant
- 2009-04-15 AU AU2009344385A patent/AU2009344385B2/en not_active Ceased
-
2012
- 2012-06-21 HK HK12106125.1A patent/HK1165519A1/en not_active IP Right Cessation
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3937165A (en) * | 1973-09-21 | 1976-02-10 | Campenon Bernard Europe | Construction of bridge decking and like structures |
JPH0913328A (en) * | 1995-06-27 | 1997-01-14 | P S Co Ltd | Transfer method and device of extensible working vehicle |
JPH1192082A (en) * | 1997-09-24 | 1999-04-06 | Kitagawa Iron Works Co Ltd | Lifting device for construction of bridge beam |
JP2001226913A (en) * | 2000-02-15 | 2001-08-24 | Taisei Corp | Device and method for erecting bridge |
Non-Patent Citations (1)
Title |
---|
See also references of EP2419567A1 * |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102168406A (en) * | 2011-03-18 | 2011-08-31 | 重庆城建控股(集团)有限责任公司 | Cluster numerical control installation system |
ES2424774A1 (en) * | 2012-04-02 | 2013-10-08 | Ulma C Y E, S. Coop | Movable structure suitable for supporting a formwork of a new bridge section in cantilever |
WO2013149771A1 (en) | 2012-04-02 | 2013-10-10 | Ulma C Y E, S. Coop | Movable structure suitable for supporting a formwork of a new bridge section in cantilever |
Also Published As
Publication number | Publication date |
---|---|
US20120036811A1 (en) | 2012-02-16 |
JP2012524182A (en) | 2012-10-11 |
US8869336B2 (en) | 2014-10-28 |
EP2419567A1 (en) | 2012-02-22 |
KR20120016610A (en) | 2012-02-24 |
BRPI0925063A2 (en) | 2015-07-28 |
HK1165519A1 (en) | 2012-10-05 |
AU2009344385A1 (en) | 2011-10-06 |
CN102395731A (en) | 2012-03-28 |
CN102395731B (en) | 2014-08-20 |
MX2011010551A (en) | 2011-10-19 |
AU2009344385B2 (en) | 2015-11-26 |
KR101630244B1 (en) | 2016-06-14 |
JP5484561B2 (en) | 2014-05-07 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US8869336B2 (en) | Overhead form traveller and method | |
US8522381B1 (en) | System and method for bridge pier replacement | |
US20150021119A1 (en) | Self-launching movable scaffolding system | |
WO2014200443A1 (en) | Self-launching movable scaffolding system | |
CN102953337B (en) | Bridge construction method | |
CN109137747B (en) | Elastic hanging bracket for large-span arch bridge girder construction | |
CN114657884A (en) | Descending type movable formwork construction method for abutment assembling and segmented propelling | |
JP2000144640A (en) | Arch rib constructing device for concrete arch bridge | |
RU2495184C1 (en) | Method to disassemble bridge span and device for realisation of this method | |
JP4104910B2 (en) | How to build arch ribs for concrete arch bridges | |
CN112211112A (en) | Steel box girder installation method adopting double-guide-girder erection machine on existing bridge | |
US4478773A (en) | Scaffolding girder for constructing multiple-span bridge structures movable from one bridge to another | |
KR100632202B1 (en) | Self-moving movable scafolding system | |
CN112554075A (en) | Integrated prefabricated pier stud installation adjustment cast-in-place device and construction method | |
CN108797350B (en) | Tower column inner and outer stiff skeleton device and construction method thereof | |
KR200360622Y1 (en) | Self-moving movable scafolding system | |
CN110184929A (en) | A kind of public affairs rail is built together bridge major-minor line generalization construction method | |
CN108755669A (en) | Across tunnel steel reinforced concrete bored concrete pile, conversion beam construction method | |
CN114645515B (en) | Casting equipment and casting method for concrete segmental box girder | |
Heggade | Segmental precast technology for multi-span bridges (production, transportation and launching) | |
CN115976962A (en) | Construction method for closure section of external stiff framework of cast-in-place box girder | |
WO2024112990A1 (en) | Method for producing a bridge from pier segments, longitudinal beams, and deck slab elements | |
CN116971283A (en) | Bridge structure of beam-arch combined system and jacking and turning construction method | |
CN114622488A (en) | Segment beam overwater lifting station and segment beam lifting method | |
US2147001A (en) | Bridge construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
WWE | Wipo information: entry into national phase |
Ref document number: 200980158699.1 Country of ref document: CN |
|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 09779300 Country of ref document: EP Kind code of ref document: A1 |
|
WWE | Wipo information: entry into national phase |
Ref document number: 1872/MUMNP/2011 Country of ref document: IN |
|
WWE | Wipo information: entry into national phase |
Ref document number: 2009344385 Country of ref document: AU |
|
WWE | Wipo information: entry into national phase |
Ref document number: 11117507 Country of ref document: CO |
|
REEP | Request for entry into the european phase |
Ref document number: 2009779300 Country of ref document: EP |
|
WWE | Wipo information: entry into national phase |
Ref document number: 2009779300 Country of ref document: EP |
|
ENP | Entry into the national phase |
Ref document number: 2009344385 Country of ref document: AU Date of ref document: 20090415 Kind code of ref document: A |
|
WWE | Wipo information: entry into national phase |
Ref document number: MX/A/2011/010551 Country of ref document: MX |
|
WWE | Wipo information: entry into national phase |
Ref document number: 13263878 Country of ref document: US |
|
ENP | Entry into the national phase |
Ref document number: 20117024130 Country of ref document: KR Kind code of ref document: A |
|
WWE | Wipo information: entry into national phase |
Ref document number: 2012505059 Country of ref document: JP |
|
NENP | Non-entry into the national phase |
Ref country code: DE |
|
REG | Reference to national code |
Ref country code: BR Ref legal event code: B01A Ref document number: PI0925063 Country of ref document: BR |
|
ENP | Entry into the national phase |
Ref document number: PI0925063 Country of ref document: BR Kind code of ref document: A2 Effective date: 20111003 |