WO2010068013A9 - Structure temporaire à parois de retenue de sol destinée à une réserve d'eau et à des travaux de drainage à faible profondeur - Google Patents

Structure temporaire à parois de retenue de sol destinée à une réserve d'eau et à des travaux de drainage à faible profondeur Download PDF

Info

Publication number
WO2010068013A9
WO2010068013A9 PCT/KR2009/007306 KR2009007306W WO2010068013A9 WO 2010068013 A9 WO2010068013 A9 WO 2010068013A9 KR 2009007306 W KR2009007306 W KR 2009007306W WO 2010068013 A9 WO2010068013 A9 WO 2010068013A9
Authority
WO
WIPO (PCT)
Prior art keywords
guide
earth plate
water
structure suitable
pipe
Prior art date
Application number
PCT/KR2009/007306
Other languages
English (en)
Korean (ko)
Other versions
WO2010068013A2 (fr
WO2010068013A3 (fr
Inventor
박수범
김현곤
Original Assignee
코오롱건설주식회사
엘에스씨산업기술 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 코오롱건설주식회사, 엘에스씨산업기술 주식회사 filed Critical 코오롱건설주식회사
Publication of WO2010068013A2 publication Critical patent/WO2010068013A2/fr
Publication of WO2010068013A9 publication Critical patent/WO2010068013A9/fr
Publication of WO2010068013A3 publication Critical patent/WO2010068013A3/fr

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/06Foundation trenches ditches or narrow shafts
    • E02D17/08Bordering or stiffening the sides of ditches trenches or narrow shafts for foundations

Definitions

  • the present invention relates to the field of civil engineering, and more particularly, to a simple earth block structure (aka SK panel) used for construction for forming a pipeline such as a water pipe for water and sewage.
  • SK panel simple earth block structure
  • 1 to 3 show the structure and construction method of a conventional simple earthenware construction using a pipeline.
  • the simple earth block structure is installed to prevent the side collapse of the pit for the duct 2 for the pipework formed by the excavation work of the ground (1), basically a plurality of thumb piles (20) by H-pile, etc. ) And a space retaining member 40 for maintaining the gap between the thumb pile 20 with the earth block member (aka earth plate) 30 mounted between the thumb pile 20 and the pit soil portion 2 therebetween. ), And structures such as a water pipe (10) are installed on the bottom of the pit soil (2) reinforced by this.
  • the trench work in the pipeline construction has a feature that the depth of the excavation depth is very long and the length of the excavation portion is very long, compared to the general structure, so that a prefabricated earth block structure such as SK panel has a structure that is easy to assemble and dismantle. It is desirable to.
  • the depth of the first gulto work (L1) is about 2m
  • the total depth (L2) of the second gulto work is about 4m
  • the reason for proceeding the gulto work in two steps the low depth pit Due to the nature of the pipeline construction that the engine should be advanced at a high speed, the first work is carried out to the limit depth (about 2m) that can be carried out without the clogging structure. Because it is efficient.
  • the retaining member 30 is installed while being guided by both side grooves of the H-pile that is the thumb pile 20. Since the thumb pile 20, which is a reference of the installation, is bent, the installation work of the retaining member 30 is performed. There is no choice but to suffer from this difficulty.
  • the present invention has been made in order to solve the above problems, it is an object of the present invention to provide a low-depth simple earthquake structure of an efficient structure to facilitate the construction and increase the recycling rate of the material.
  • a simple earth block installed on both inner surfaces of both sides of the excavation portion 2 to prevent side collapse of the excavation portion 2 formed by the excavation operation of the ground (1)
  • a plurality of guide pipes 100 are formed in the core portion in the up and down direction guide pipe penetration hole 101, which is installed at predetermined intervals adjacent to the side surface of the pit member (2);
  • a plurality of inlet pipes 200 rotatably inserted into the inlet pipe guide through-holes 101 and installed to enter the lower soil body;
  • An upper earth plate 110 coupled to the rear surface of the plurality of guide pipes 100;
  • a lower earth plate 210 installed between the plurality of inlet pipes 200 by sliding downward along a guide groove 103 formed between the guide pipe 100 and the upper earth plate 110.
  • the upper earth plate 110 includes a plurality of guide plates 111 respectively coupled to the rear surfaces of the plurality of guide pipes 100; And a fixing plate 112 detachably coupled between the plurality of guide plates 111, wherein the guide groove 103 is formed by an area between the guide pipe 100 and the guide plate 111. desirable.
  • the "c" shaped coupler 113 is mounted to couple to the guide plate 111.
  • the guide parts 211 having a substantially triangular cross-sectional structure are formed on both side surfaces of the lower earth plate 210 to correspond to the shape of the guide groove 103.
  • a plurality of lower earth plate 210 is guided and installed in sequence, it is preferable that the plurality of lower earth plate 210 are mutually coupled.
  • a blade-shaped ground inserting portion 212 is formed on a bottom surface of the earth plate installed at the lowermost side of the plurality of lower earth plate 210.
  • a perforation device coupling part 201 is formed at the top of the inlet pipe 200 to couple with the perforation device.
  • the gap maintaining member 102 is installed between the guide pipe 100 and the guide pipe 100 installed on the opposite side.
  • the present invention provides a low-depth simple earthquake structure suitable for water and sewage construction of an efficient structure that is easy and safe to construct, and can increase the recycling rate of materials.
  • 1 to 3 shows a simple earthquake structure suitable for water supply and sewage construction of a conventional pipeline construction
  • 1 is a perspective view.
  • Figure 2a to 2j is a cross-sectional view showing the construction process.
  • Figure 4 shows an embodiment of a simple earthquake structure suitable for water and sewage construction according to the present invention
  • FIG. 4 is a perspective view of a first use state.
  • FIG. 5 is a perspective view of a second use state.
  • FIG. 10 is a perspective view of a root pipe.
  • FIG. 11 is a perspective view of a third use state.
  • FIG. 12 is a perspective view of a fourth use state.
  • Fig. 13 is a perspective view of a fifth use state.
  • 15 is a perspective view of a sixth use state
  • guide pipe 101 through hole for indentation pipe guide
  • the present invention is basically water and sewage work installed on both inner surfaces of the pit soil 2 to prevent side collapse of the pit soil 2 formed by the excavation of the ground (1) It relates to a simple earthquake structure suitable for use.
  • a plurality of guide pipes 100 are formed in the core portion in the up-and-down pipe guide through-holes 101, and are provided at predetermined intervals adjacent to the side surface of the pit part 2;
  • a plurality of inlet pipes 200 rotatably inserted into the inlet pipe guide through-holes 101 and installed to enter the lower soil body;
  • An upper earth plate 110 coupled to the rear surface of the plurality of guide pipes 100;
  • a lower earth plate 210 installed between the plurality of indentation pipes 200 by slide-driven downward along the guide groove 103 formed between the guide pipe 100 and the upper earth plate 110.
  • the thumb pile can be firmly fixed, and the construction is easy and safe. You can get it.
  • the indentation pipe 200 is guided by the guide pipe 100 while being entered into the ground, it is possible to suppress the warpage of the pipe during the ingress is added to the advantage that can increase the recycling rate of the material.
  • a guide groove 103 is naturally formed between the guide pipe 100 and the upper earth plate 110 (FIGS. 9 and 14), and the lower earth plate 210 is driven downward through the groove 103, so that the pit work and Simultaneous with the indentation work of the indentation pipe 200, the fall of the side soil sediment of the lower part of the pit part 2 can be prevented efficiently.
  • the lower earth plate 210 When the guide portion 211 having a substantially triangular cross-sectional structure is formed on both sides of the lower earth plate 210 to correspond to the shape of the guide groove 103, the lower earth plate 210 may be easily driven downward, and a rigid support structure may be provided. More preferred in that it can be achieved (Figs. 9 and 14).
  • the lower earth plate 210 When the depth of the pit soil 2 is deep, the lower earth plate 210 is provided with a plurality of guides sequentially installed, the plurality of lower earth plate 210 takes a structure that is mutually coupled by a separate coupler 213. It is preferable.
  • the bottom surface of the earth plate installed on the lowermost side of the plurality of lower earth plate 210 is formed by the blade-shaped ground inserting portion 212, it is preferable in terms of structural stability that the predetermined portion is inserted into the ground (Fig. 5, 11 ).
  • the upper earth plate 110 may be any structure provided on the rear surface of the guide pipe 100 to form the upper guide groove 103, but the plurality of guide plates 111 coupled to the rear surfaces of the plurality of guide pipes 100, respectively. ); It is more preferable to take an assembly structure including a fixing plate 112 detachably coupled between the plurality of guide plates 111 in terms of ease of transportation and construction of materials.
  • the guide groove 103 is formed by the area between the guide pipe 100 and the guide plate 111 (FIG. 9).
  • Both sides of the fixing plate 112 is equipped with a "c" -shaped coupler 113 to be coupled to the guide plate 111, and taking a structure that is mutually coupled by a bolt-nut fastening structure, etc. in terms of ease of construction and stability of the structure Preferred in (Fig. 7,8).
  • the indentation pipe 200 has a lower end thereof in the lower earth body by a punching device such as a rotary type, a rudder type, a bit type, and the like.
  • a punching device such as a rotary type, a rudder type, a bit type, and the like.
  • the drilling device coupling portion 201 is formed at the top of the coupling device for coupling with the above various drilling devices.
  • FIG. 10 illustrates an embodiment in which the inlet pipe 200 is coupled to a rotary drilling machine.
  • the bit and rod are exposed to the lower opening through the inner space of the inlet pipe 200 to crush the lower ground. The way is taken.
  • the gap maintaining member 102 is installed between the guide pipe 100 and the guide pipe 100 installed on the opposite side (FIGS. 6 and 7).
  • Such a structure according to the present invention has the advantage that it can be particularly effective in the case of low-depth water and sewage pipeline construction.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Sewage (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)
  • Retaining Walls (AREA)

Abstract

L'invention concerne une structure temporaire à parois de retenue de sol installée des deux côtés intérieurs d'une partie d'excavation (2) pour éviter l'effondrement de la paroi latérale de la partie d'excavation (2) formée par des travaux de fondations effectués dans le sol (1). La structure temporaire à parois de retenue de sol selon l'invention est caractérisée en ce qu'elle comprend : plusieurs conduits de guidage (100) présentant un orifice traversant (101) destiné au guide de conduit intégré s'étendant profondément et verticalement dans le sol, les conduits de guidage (100) étant installés adjacents sur un côté de la partie de l'excavation (2), à une certaine distance de celle-ci; une plaque supérieure de retenue de sol (110) accouplée au côté arrière des conduits de guidage (100); une plaque inférieure de retenue de sol (210) montée entre plusieurs conduits intégrés (200) par glissement le long d'une rainure de guidage (103) formée entre le conduit de guidage (100) et la plaque supérieure de retenue de sol (110). Ainsi, la structure temporaire à parois de retenue de sol présente l'avantage de permettre de réaliser des constructions de manière pratique et en toute sécurité, et d'augmenter le taux de recyclabilité des matériaux.
PCT/KR2009/007306 2008-12-08 2009-12-08 Structure temporaire à parois de retenue de sol destinée à une réserve d'eau et à des travaux de drainage à faible profondeur WO2010068013A2 (fr)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
KR10-2008-0123801 2008-12-08
KR1020080123801A KR100891949B1 (ko) 2008-12-08 2008-12-08 상하수도 공사에 적합한 저심도용 간이 흙막이 구조물

Publications (3)

Publication Number Publication Date
WO2010068013A2 WO2010068013A2 (fr) 2010-06-17
WO2010068013A9 true WO2010068013A9 (fr) 2010-09-02
WO2010068013A3 WO2010068013A3 (fr) 2010-10-21

Family

ID=40757281

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/KR2009/007306 WO2010068013A2 (fr) 2008-12-08 2009-12-08 Structure temporaire à parois de retenue de sol destinée à une réserve d'eau et à des travaux de drainage à faible profondeur

Country Status (2)

Country Link
KR (1) KR100891949B1 (fr)
WO (1) WO2010068013A2 (fr)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103590410A (zh) * 2013-07-30 2014-02-19 中铁四局集团第一工程有限公司 铁路路基排水沟定位仪的定位施工方法

Families Citing this family (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101266161B1 (ko) 2010-06-29 2013-05-21 엘에스씨산업기술 주식회사 2열말뚝흙막이공법 및 그 말뚝 연결구
KR101266160B1 (ko) 2010-06-29 2013-05-21 엘에스씨산업기술 주식회사 2열말뚝흙막이공법 및 그 말뚝 연결구
CN102587391A (zh) * 2011-01-10 2012-07-18 孙冬梁 一种大口径砖混倒挂井施工工艺
KR101225526B1 (ko) * 2011-02-17 2013-01-23 코오롱글로벌 주식회사 엄지말뚝 가이드장치 및 이를 이용한 2열 흙막이 구조물 시공방법
CN102912797A (zh) * 2012-10-19 2013-02-06 中国建筑第六工程局有限公司 一种含有降水功能的基坑支护方法
KR102148267B1 (ko) * 2020-06-01 2020-08-26 김광수 상하수도 공사용 흙막이 구조물 설치방법
KR102244507B1 (ko) 2020-10-15 2021-04-26 이원식 자립형 흙막이 토류벽체
KR102244505B1 (ko) 2020-10-15 2021-04-23 이원식 자립형 흙막이 구조물 및 이를 활용한 흙막이 시공방법
CN113106981A (zh) * 2021-03-31 2021-07-13 河南省远基岩土工程有限公司 一种基坑增深补强支护体
CN114809006B (zh) * 2022-04-23 2023-05-23 中国五冶集团有限公司 一种防止变形的深基坑支护结构

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3486824B2 (ja) * 1994-11-16 2004-01-13 池野通建株式会社 スライド矢板およびそれによる土留工法
JPH0921132A (ja) * 1995-07-05 1997-01-21 Nippon Steel Metal Prod Co Ltd 当て矢板用スライド支柱およびこの支柱を用いた埋設管の敷設方法
KR20070118828A (ko) * 2006-06-13 2007-12-18 이더테크놀로지(주) 트랜치 굴착용 조립식 흙막이 장치
KR100782007B1 (ko) * 2006-08-21 2007-12-06 주식회사 삼보기술단 흙막이 벽 시공방법
KR200434427Y1 (ko) 2006-09-30 2006-12-20 김상훈 슬라이딩 버팀 장치

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103590410A (zh) * 2013-07-30 2014-02-19 中铁四局集团第一工程有限公司 铁路路基排水沟定位仪的定位施工方法
CN103590410B (zh) * 2013-07-30 2015-11-18 中铁四局集团第一工程有限公司 铁路路基排水沟定位仪的定位施工方法

Also Published As

Publication number Publication date
WO2010068013A2 (fr) 2010-06-17
WO2010068013A3 (fr) 2010-10-21
KR100891949B1 (ko) 2009-04-08

Similar Documents

Publication Publication Date Title
WO2010068013A2 (fr) Structure temporaire à parois de retenue de sol destinée à une réserve d'eau et à des travaux de drainage à faible profondeur
WO2017048056A1 (fr) Structure de blocage en terre de type barrière contre l'eau pour installation temporaire et procédé de construction
WO2010068014A9 (fr) Structure temporaire à parois de retenue de sol destinée à une réserve d'eau et à des travaux de drainage souterrains profonds
WO2022059977A1 (fr) Appareil pour connecter consécutivement des barres d'acier de recouvrement de murs préfabriqués, et procédé de construction de celui-ci
KR100782007B1 (ko) 흙막이 벽 시공방법
KR100977206B1 (ko) 연속으로 직선 및 곡선 구간에 깊이, 폭 조절이 가능한흙막이 벽체 구조 및 그 설치 공법
KR100744192B1 (ko) 관로공사용 간이 흙막이 구조물
WO2018147680A1 (fr) Structure et procédé de construction de retenue de terre temporaire
WO2020032453A1 (fr) Pieux de support de construction de parois multiples utilisés dans la construction de ports, de rivières, de barrages et de bâtiments en béton qui peuvent empêcher l'entrée de terre et d'eau, et procédé de construction de parois multiples utilisant les mêmes pieux de support
WO2012011783A2 (fr) Structure de renfort pour une pile
WO2024075920A1 (fr) Pieu de soldat utilisant un support de guidage et un support de support, et procédé de construction d'une structure de retenue de terre temporaire l'utilisant
WO2013022194A1 (fr) Procédé de construction de mur souterrain
KR20100063979A (ko) 연속벽용 가이드 및 이를 이용한 연속벽 시공방법
WO2014189333A1 (fr) Ensemble tube accouplé à des brides et procédé d'installation de palplanches à l'aide dudit ensemble
WO2010107153A1 (fr) Caisson fuselé, pile fuselée utilisant ledit caisson, procédé de construction du caisson, structure de cofferdam fuselée utilisant ledit caisson, et procédé de construction dudit caisson
WO2016122215A1 (fr) Pieu vissé pour renforcement des sols présentant une plaque de renforcement à extrémité avant extensible accouplée à celui-ci
WO2010093080A1 (fr) Excavatrice et procédé d'étayage souterrain polygonal
JP7301203B1 (ja) 浅堀掘削溝用土留め装置
KR100531250B1 (ko) 건축단지의 조성을 위한 기초공사용 토류판구조
CN216640633U (zh) 一种可重复利用的基坑排水装置
WO2017135636A1 (fr) Dispositif de sécurité permettant d'installer une plaque de rétention de sol
KR200416567Y1 (ko) 파일 챔버식 흙막이 장치
CN218027482U (zh) 一种水利工程防渗墙
KR101044999B1 (ko) 흙막이 구조물의 어미말뚝 가이드 및 이를 이용한 어미말뚝설치방법
CN219993365U (zh) 一种市政土建用围挡

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 09832098

Country of ref document: EP

Kind code of ref document: A2

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 09832098

Country of ref document: EP

Kind code of ref document: A2