WO2010056606A2 - Récupération thermique de bitume superficiel au moyen d'inclusions à perméabilité accrue - Google Patents
Récupération thermique de bitume superficiel au moyen d'inclusions à perméabilité accrue Download PDFInfo
- Publication number
- WO2010056606A2 WO2010056606A2 PCT/US2009/063588 US2009063588W WO2010056606A2 WO 2010056606 A2 WO2010056606 A2 WO 2010056606A2 US 2009063588 W US2009063588 W US 2009063588W WO 2010056606 A2 WO2010056606 A2 WO 2010056606A2
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- hydrocarbons
- inclusion
- fluid
- wellbore
- formation
- Prior art date
Links
- 239000010426 asphalt Substances 0.000 title claims abstract description 20
- 230000035699 permeability Effects 0.000 title abstract description 10
- 238000011084 recovery Methods 0.000 title abstract description 6
- 229930195733 hydrocarbon Natural products 0.000 claims abstract description 109
- 150000002430 hydrocarbons Chemical class 0.000 claims abstract description 109
- 239000012530 fluid Substances 0.000 claims abstract description 100
- 238000000034 method Methods 0.000 claims abstract description 98
- 230000015572 biosynthetic process Effects 0.000 claims abstract description 88
- 230000001902 propagating effect Effects 0.000 claims abstract description 29
- 238000010438 heat treatment Methods 0.000 claims abstract description 17
- 238000004519 manufacturing process Methods 0.000 claims description 31
- 230000000977 initiatory effect Effects 0.000 claims description 26
- 238000002347 injection Methods 0.000 claims description 19
- 239000007924 injection Substances 0.000 claims description 19
- 238000005086 pumping Methods 0.000 claims description 12
- 238000005755 formation reaction Methods 0.000 description 68
- 238000010796 Steam-assisted gravity drainage Methods 0.000 description 7
- 239000007789 gas Substances 0.000 description 5
- 238000005065 mining Methods 0.000 description 5
- 230000000644 propagated effect Effects 0.000 description 5
- 230000008569 process Effects 0.000 description 4
- 238000009434 installation Methods 0.000 description 3
- 238000010793 Steam injection (oil industry) Methods 0.000 description 2
- 230000008901 benefit Effects 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- VNWKTOKETHGBQD-UHFFFAOYSA-N methane Chemical compound C VNWKTOKETHGBQD-UHFFFAOYSA-N 0.000 description 2
- 238000007789 sealing Methods 0.000 description 2
- 229910000831 Steel Inorganic materials 0.000 description 1
- 238000009825 accumulation Methods 0.000 description 1
- 238000007792 addition Methods 0.000 description 1
- 229910045601 alloy Inorganic materials 0.000 description 1
- 239000000956 alloy Substances 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000004891 communication Methods 0.000 description 1
- 125000004122 cyclic group Chemical group 0.000 description 1
- 238000012217 deletion Methods 0.000 description 1
- 230000037430 deletion Effects 0.000 description 1
- 238000006073 displacement reaction Methods 0.000 description 1
- 238000005553 drilling Methods 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 239000007788 liquid Substances 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 229920000642 polymer Polymers 0.000 description 1
- 230000001681 protective effect Effects 0.000 description 1
- 239000004576 sand Substances 0.000 description 1
- 238000010025 steaming Methods 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
- 230000000153 supplemental effect Effects 0.000 description 1
- 238000005406 washing Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/16—Enhanced recovery methods for obtaining hydrocarbons
- E21B43/24—Enhanced recovery methods for obtaining hydrocarbons using heat, e.g. steam injection
- E21B43/2405—Enhanced recovery methods for obtaining hydrocarbons using heat, e.g. steam injection in association with fracturing or crevice forming processes
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/25—Methods for stimulating production
- E21B43/26—Methods for stimulating production by forming crevices or fractures
- E21B43/261—Separate steps of (1) cementing, plugging or consolidating and (2) fracturing or attacking the formation
Definitions
- TECHNICAL FIELD The present disclosure relates generally to equipment utilized and operations performed in conjunction with a subterranean well and, in an embodiment described herein, more particularly provides for thermal recovery of shallow bitumen through increased permeability inclusions.
- bitumen can be recovered through surface mining processes down to depths of approximately 70 meters, and steam assisted gravity drainage (SAGD) thermal methods can effectively recover bitumen deposits deeper than approximately 140 meters.
- SAGD steam assisted gravity drainage
- apparatus and methods are provided which solve at least one problem in the art.
- One example is described below in which increased permeability inclusions are propagated into a formation and steam is injected into an upper portion of the inclusions while bitumen is produced from a lower portion of the inclusions.
- Another example is described below in which the steam injection is pulsed and a phase control valve permits production of the bitumen, but prevents production of the steam.
- a method of producing hydrocarbons from a subterranean formation includes the steps of: propagating at least one generally planar inclusion outward from a wellbore into the formation; injecting a fluid into the inclusion, thereby heating the hydrocarbons; and during the injecting step, producing the hydrocarbons from the wellbore.
- a well system for producing hydrocarbons from a subterranean formation intersected by a wellbore includes at least one generally planar inclusion extending outward from the wellbore into the formation.
- a fluid is injected into the inclusion, with the hydrocarbons being heated as a result of the injected fluid.
- the hydrocarbons are produced through a tubular string, with the tubular string extending to a location in the wellbore below the inclusion. The hydrocarbons are received into the tubular string at that location.
- a method of producing hydrocarbons from a subterranean formation includes the steps of: propagating at least one generally planar inclusion outward from a wellbore into the formation; injecting a fluid into the inclusion, thereby heating the hydrocarbons, the injecting step including varying a flow rate of the fluid into the inclusion while the fluid is continuously flowed into the inclusion; and during the injecting step, producing the hydrocarbons from the wellbore.
- a method of propagating at least one generally planar inclusion outward from a wellbore into a subterranean formation includes the steps of: providing an inclusion initiation tool which has at least one laterally outwardly extending projection, a lateral dimension of the inclusion initiation tool being larger than an internal lateral dimension of a portion of the wellbore; forcing the inclusion initiation tool into the wellbore portion, thereby forcing the projection into the formation to thereby initiate the inclusion; and then pumping a propagation fluid into the inclusion, thereby propagating the inclusion outward into the formation.
- FIG. 1 is a schematic cross-sectional view of representative earth formations in which a method embodying principles of the present disclosure may be practiced
- FIG. 2 is a schematic partially cross-sectional view showing production of bitumen from a formation using the method and associated apparatus;
- FIG. 3 is an enlarged scale cross-sectional view of increased permeability inclusions propagated into the formation in the method
- FIG. 4 is a schematic partially cross-sectional view of a completed well system embodying principles of the present disclosure
- FIG. 5 is a schematic partially cross-sectional view of another completed well system embodying principles of the present disclosure.
- FIG. 6 is a schematic partially cross-sectional view of yet another completed well system embodying principles of the present disclosure
- FIG. 7 is a schematic partially cross-sectional view of a further completed well system embodying principles of the present disclosure
- FIG. 8 is a schematic partially cross-sectional view of a still further completed well system embodying principles of the present disclosure.
- FIG. 9 is a schematic partially cross-sectional view of another completed well system embodying principles of the present disclosure
- FIG. 10 is a schematic partially cross-sectional view of yet another completed well system embodying principles of the present disclosure
- FIG. 11 is a schematic cross-sectional view showing initial steps (e.g., installation of casing in a wellbore) in another method of producing bitumen from the formation.
- FIG. 12 is a schematic cross-sectional view of the method after drilling of an open hole below the casing
- FIG. 13 is a schematic partially cross-sectional view of the method after installation of a work string
- FIG. 14 is a schematic cross-sectional view of a tool for initiating increased permeability inclusions in the formation
- FIG. 15 is a schematic partially cross-sectional view of the method following initiation of increased permeability inclusions in the formation
- FIG. 16 is a schematic partially cross-sectional view of the method after retrieval of the work string
- FIG. 17 is a partially cross-sectional view of the method after retrieval of the inclusion initiation tool
- FIG. 18 is a cross-sectional view of the method after enlargement of a sump portion of the wellbore
- FIG. 19 is a cross-sectional view of the method after installation of a liner string into the sump portion of the wellbore.
- FIG. 20 is a cross-sectional view of another completed well system embodying principles of the present disclosure.
- FIGS. 1-10 Representatively illustrated in FIGS. 1-10 are a well system 10 and associated methods which embody principles of the present disclosure.
- an earth formation 12 contains a deposit of bitumen or other relatively heavy weight hydrocarbons 14.
- hydrocarbons 14 It is desired to produce the hydrocarbons 14, but they are located at a depth of between approximately 70 and 140 meters, where recovery by surface mining and SAGD methods are impractical. However, it should be clearly understood that the formation 12 and the hydrocarbons 14 could be at depths of other than 70-140 meters in keeping with the principles of this disclosure.
- the formation 12 is relatively unconsolidated or poorly cemented. However, in some circumstances the formation 12 may be able to bear substantial principal stresses.
- An overburden layer 16 extends from the formation 12 to the surface, and a relatively impermeable layer 18 underlies the formation 12.
- Each of the layers 16, 18 may include multiple sub-layers or zones, whether relatively permeable or impermeable.
- FIG. 2 the well system 10 is depicted after a wellbore 20 has been drilled into the formation 12.
- a casing string 22 has been installed and cemented in the wellbore 20.
- An open hole sump portion 24 of the wellbore 20 is then drilled downward from the lower end of the casing string 22.
- casing is used to indicate a protective lining for a wellbore.
- Casing can include tubular elements such as those known as casing, liner or tubing.
- Casing can be substantially rigid, flexible or expandable, and can be made of any material, including steels, other alloys, polymers, etc.
- Included in the casing string 22 is a tool 26 for forming generally planar inclusions 28 outward from the wellbore 20 into the formation 12. Although only two inclusions 28 are visible in FIG. 2, any number of inclusions (including one) may be formed into the formation 12 in keeping with the principles of this disclosure.
- the inclusions 28 may extend radially outward from the wellbore 20 in predetermined azimuthal directions. These inclusions 28 may be formed simultaneously, or in any order.
- the inclusions 28 may not be completely planar or flat in the geometric sense, in that they may include some curved portions, undulations, tortuosity, etc., but preferably the inclusions do extend in a generally planar manner outward from the wellbore 20.
- the inclusions 28 may be merely inclusions of increased permeability relative to the remainder of the formation 12, for example, if the formation is relatively unconsolidated or poorly cemented. In some applications (such as in formations which can bear substantial principal stresses), the inclusions 28 may be of the type known to those skilled in the art as "fractures.”
- the inclusions 28 may result from relative displacements in the material of the formation 12, from washing out, etc. Suitable methods of forming the inclusions 28 (some of which do not require use of a special tool 26) are described in U.S. patent application serial no. 11/966212 filed on December 28, 2007, serial nos . 11/832602, 11/832620 and 11/832615, all filed on August 1, 2007, and serial no. 11/610819, filed on December 14, 2006. The entire disclosures of these prior applications are incorporated herein by this reference.
- the inclusions 28 may be azimuthally oriented in preselected directions relative to the wellbore 20, as representatively illustrated in FIG. 3. Although the wellbore 20 and inclusions 28 are vertically oriented as illustrated in FIG. 2, they may be oriented in any other direction in keeping with the principles of this disclosure.
- a fluid 30 is injected into the formation 12. The fluid 30 is flowed downwardly via an annulus 32 formed radially between the casing string 22 and a tubular production string 34. The tubular string 34 extends downwardly to a location which is below the inclusions 28 (e.g., in the sump portion 24).
- the fluid 30 flows outward into the formation 12 via the inclusions 28.
- the hydrocarbons 14 in the formation 12 are heated.
- the fluid 30 may be steam or another liquid or gas which is capable of causing the heating of the hydrocarbons 14.
- the hydrocarbons 14 become mobile (or at least more mobile) in the formation 12 and can drain from the formation into the wellbore 20 via the inclusions 28. As shown in FIG. 2, the hydrocarbons 14 drain into the wellbore 20 and accumulate in the sump portion 24. The hydrocarbons 14 are, thus, able to be produced from the well via the production string 34.
- the hydrocarbons 14 may flow upward through the production string 34 as a result of the pressure exerted by the fluid 30 in the annulus 32.
- supplemental lift techniques may be employed to encourage the hydrocarbons 14 to flow upward through the production string 34.
- a relatively less dense fluid 36 (i.e., less dense as compared to the hydrocarbons 14) is injected into the tubular string 34 via another tubular injection string 38 installed in the well alongside the production string 34.
- the fluid 36 may be steam, another gas such as methane, or any other relatively less dense fluid or combination of fluids.
- Conventional artificial lift equipment (such as a gas lift mandrel 39, etc.) may be used in this method.
- the fluid 30 is injected into the wellbore
- a packer 42 set in the wellbore 20 above the inclusions 28 helps to contain the pressure exerted by the fluid 30, and thereby aids in forcing the hydrocarbons 14 to flow upward through the production string 34.
- FIG. 6 the techniques of FIGS. 4 & 5 are combined, i.e., the fluid 30 is injected into the formation 12 via the injection string 40, and the fluid 36 is injected into the production string 34 via the injection string 38.
- the fluid 30 is injected into the formation 12 via the injection string 40
- the fluid 36 is injected into the production string 34 via the injection string 38.
- a pulsing tool 44 is used with the injection string 40 to continuously vary a flow rate of the fluid 30 as it is being injected into the formation 12.
- Suitable pulsing tools are described in U.S. patent no. 7404416, and in U.S. patent application serial no. 12/120633, filed on May 14, 2008. The entire disclosures of the prior patent and application are incorporated herein by this reference.
- This varying of the flow rate of the fluid 30 into the formation 12 is beneficial, in that it optimizes distribution of the fluid in the formation and thereby helps to heat and mobilize a greater proportion of the hydrocarbons 14 in the formation.
- the flow rate of the fluid 30 as varied by the pulsing tool 44 preferably does not alternate between periods of flow and periods of no flow, or between periods of forward flow and periods of backward flow.
- the flow of the fluid 30 is preferably maintained in a forward direction (i.e., flowing into the formation 12) while the flow rate varies or pulses. This may be considered as an "AC" component of the fluid 30 flow rate imposed on a positive base flow rate of the fluid.
- the configuration of the well system 10 is similar in most respects to the system as depicted in FIG. 6.
- the production string 34 has a phase control valve 46 connected at a lower end of the production string.
- phase control valve 46 prevents steam or other gases from being produced along with the hydrocarbons 14 from the sump portion 24.
- a suitable phase control valve for use in the system 10 is described in U.S. patent application serial no. 12/039206, filed on February 28, 2008. The entire disclosure of this prior application is incorporated herein by this reference.
- both of the pulsing tool 44 and the phase control valve 46 are used with the respective injection string 40 and production string 34.
- any of the features described herein may be combined in the well system 10 as desired, without departing from the principles of this disclosure.
- multiple inclusion initiation tools 26a, 26b are used to propagate inclusions 28a, 28b at respective multiple depths in the formation 12.
- the fluid 30 is injected into each of the inclusions 28a, 28b and the hydrocarbons 14 are received into the wellbore 20 from each of the inclusions 28a, 28b.
- inclusions 28 may be formed at multiple different depths in a formation, and in other embodiments inclusions may be formed in multiple formations, in keeping with the principles of this disclosure.
- inclusions 28a, 28b there could be a relatively impermeable lithology (e.g., a layer of shale, etc.) between the upper and lower sets of inclusions 28a, 28b.
- the inclusion propagation tool 26 could be similar to any of the tools described in several previously filed patent applications. Most of these previously described tools involve expansion of a portion of a casing string to, for example, increase compressive stress in a radial direction relative to a wellbore.
- FIGS. 11-19 a method is representatively illustrated for forming the inclusions 28 in the system 10 without expanding casing.
- FIG. 11 depicts the method and system 10 after the wellbore 20 has been drilled into the formation 12, and the casing string 22 has been cemented in the wellbore. Note that, in this example, the casing string 22 does not extend across a portion of the formation 12 in which the inclusions 28 are to be initiated, and the casing string does not include an inclusion initiation tool 26.
- an intermediate open hole wellbore portion 48 is drilled below the lower end of the casing string 22.
- a diameter of the wellbore portion 48 may be equivalent to (and in other embodiments could be somewhat smaller than or larger than) a body portion of an inclusion initiation tool 26 installed in the wellbore portion 48 as described below.
- the inclusion initiation tool 26 is conveyed into the wellbore 20 on a tubular work string 50, and is installed in the wellbore portion 48.
- Force is used to drive the tool 26 through the earth surrounding the wellbore portion 48 below the casing string 22, since at least projections 52 extend outwardly from the body 54 of the tool and have a larger lateral dimension as compared to the diameter of the wellbore portion 48.
- the body 54 could also have a diameter greater than a diameter of the wellbore portion 48 if, for example, it is desired to increase radial compressive stress in the formation 12.
- FIG. 14 a cross-sectional view of the tool 26 driven into the formation 12 is representatively illustrated. In this view, it may be seen that the projections 52 extend outward into the formation 12 to thereby initiate the inclusions 28.
- the tool 26 is depicted in FIG. 14 as having eight equally radially spaced apart projections 52, it should be understood that the tool could be constructed with any number of projections (including one), and that any number of inclusions 28 may be initiated using the tool.
- the tool 26 could include two projections 52 spaced 180 degrees apart for initiation of two inclusions 28.
- Such a tool 26 could then be raised, azimuthally rotated somewhat, and then driven into the formation 12 again in order to initiate two additional inclusions 28. This process could be repeated as many times as desired to initiate as many inclusions 28 as desired.
- the inclusions 28 may be propagated outward into the formation 12 immediately after they are initiated or sometime thereafter, and the inclusions may be propagated sequentially, simultaneously or in any order in keeping with the principles of this disclosure. Any of the techniques described in the previous patent applications mentioned above (e.g., U.S. patent application serial nos. 11/966212, 11/832602, 11/832620, 11/832615 and 11/610819) for initiating and propagating the inclusions 28 may be used in the system 10 and associated methods described herein.
- the inclusions 28 have been propagated outward into the formation 12. This may be accomplished by setting a packer 56 in the casing string 22 and pumping fluid 58 through the work string 50 and outward into the inclusions 28 via the projections 52 on the tool 26.
- the tool 26 may or may not be expanded (e.g., using hydraulic actuators or any of the techniques described in the previous patent applications mentioned above) prior to or during the process of pumping the fluid 58 into the formation 12 to propagate the inclusions 28.
- the fluid 58 may be laden with sand or another proppant, so that after propagation of the inclusions 28, a high permeability flowpath will be defined by each of the inclusions for later injection of the fluid 30 and production of the hydrocarbons 14 from the formation 12.
- the body 54 could be expanded radially outward (e.g., using hydraulic actuators, etc.), and the fluid 58 could be pumped out of the expanded body to form the inclusions 28.
- the work string 50 has been retrieved from the well, leaving the tool 26 in the wellbore portion 48 after propagation of the inclusions 28.
- the tool 26 could be retrieved with the work string 50, if desired.
- the wellbore portion 48 has been enlarged to form the sump portion 24 for eventual accumulation of the hydrocarbons 14 therein.
- the wellbore portion 48 is enlarged when a washover tool (not shown) is used to retrieve the tool 26 from the wellbore portion.
- the wellbore portion 48 may itself serve as the sump portion 24 without being enlarged at all.
- the sump portion 24 has been extended further downward in the formation 12.
- the sump portion 24 could extend into the layer 18, if desired, as depicted in FIGS. 2-10.
- a tubular liner string 60 has been installed in the well, with a liner hanger 62 sealing and securing an upper end of the liner string in the casing string 22.
- a perforated or slotted section of liner 64 extends into the wellbore portion 24 opposite the inclusions 28, and an un-perforated or blank section of liner 66 extends into the wellbore portion below the inclusions.
- the perforated section of liner 64 allows the fluid 30 to be injected from within the liner string 60 into the inclusions 28.
- the perforated section of liner 64 may also allow the hydrocarbons 14 to flow into the liner string 60 from the inclusions 28. If the un-perforated section of liner 66 is open at its lower end, then the hydrocarbons 14 may also be allowed to flow into the liner string 60 through the lower end of the liner.
- the production string 34 may be installed (with its lower end extending into the liner string 60), along with any of the injection strings 38, 40, the pulsing tool 44 and/or the phase control valve 46, as desired.
- Another completion option is representatively illustrated in FIG. 20.
- the upper liner 64 is provided with a series of longitudinally distributed nozzles 68.
- the nozzles 68 serve to evenly distribute the injection of the fluid 30 into the inclusions 28, at least in part by maintaining a positive pressure differential from the interior to the exterior of the liner 64.
- the nozzles 68 may be appropriately configured (e.g., by diameter, length, flow restriction, etc.) to achieve a desired distribution of flow of the fluid 30, and it is not necessary for all of the nozzles to be the same configuration.
- the lower liner 66 is perforated or slotted to allow the hydrocarbons 14 to flow into the liner string 60.
- a flow control device 70 e.g., a check valve, pressure relief valve, etc.
- injection of the fluid 30 heats the hydrocarbons 14, which flow into the wellbore 20 and accumulate in the sump portion 24, and enter the lower end of the production string 34 via the flow control device 70.
- the fluid 30 can periodically enter the lower end of the production string 34 (e.g., when a level of the hydrocarbons 14 in the sump portion drops sufficiently) and thereby aid in lifting the hydrocarbons 14 upward through the production string.
- the flow control device 70 could also include a phase control valve (such as the valve 46 described above) to prevent steam or other gases from flowing into the upper liner 64 from the lower liner 66 through the flow control device.
- a phase control valve such as the valve 46 described above
- the phase control valve 46 could be included at the lower end of the production string as depicted in FIGS. 8-10 and described above .
- Any of the other completion options described above may also be included in the configuration of FIG. 20.
- the fluid 30 could be injected via an injection string 40, a relatively less dense fluid 36 could be injected via another injection string 38 and mandrel 39, a pulsing tool 44 could be used to vary the flow rate of the fluid 30, etc.
- system 10 and methods Some particularly useful features of the system 10 and methods are that only a single wellbore 20 is needed to both inject the fluid 30 and produce the hydrocarbons 14, the fluid may be injected simultaneously with production of the hydrocarbons, and production of the hydrocarbons is substantially immediate upon completion of the well.
- the system 10 and methods offer a very economical and effective way of producing large deposits of shallow bitumen which cannot currently be thermally produced using conventional completion techniques. Fewer wells are required, which reduces the environmental impact of such production.
- the methods do not require a heat-up phase of 3 to 4 months as with conventional SAGD techniques, nor do the methods preferably involve a cyclic steaming process in which production ceases during the steam injection phase. Instead, the hydrocarbons 14 are preferably continuously heated by injection of the fluid 30, and continuously produced during the injection, providing substantially immediate return on investment.
- the above disclosure provides to the art a method of producing hydrocarbons 14 from a subterranean formation 12.
- the method includes the steps of: propagating at least one generally planar inclusion 28 outward from a wellbore 20 into the formation 12; injecting a fluid 30 into the inclusion 28, thereby heating the hydrocarbons 14; and during the injecting step, producing the hydrocarbons 14 from the wellbore 20.
- the hydrocarbons 14 may comprise bitumen.
- the hydrocarbons 14 producing step may include flowing the hydrocarbons into the wellbore 20 at a depth of between approximately 70 meters and approximately 140 meters in the earth.
- the fluid 30 may comprise steam.
- the fluid 30 may be injected into the same inclusion 28 from which the hydrocarbons 14 are produced.
- the fluid 30 may be injected into an upper portion of the inclusion 28 which is above a lower portion of the inclusion from which the hydrocarbons 14 are produced.
- the fluid 30 may be injected at a varying flow rate while the hydrocarbons 14 are being produced.
- the hydrocarbons 14 may be produced through a tubular string 34 extending to a position in the wellbore 20 which is below the inclusion 28.
- a phase control valve 46 may prevent production of the fluid 30 with the hydrocarbons 14 through the tubular string 34.
- the inclusion 28 propagating step may include propagating a plurality of the inclusions into the formation 12 at one depth.
- the propagating step may also include propagating a plurality of the inclusions 28 into the formation 12 at another depth.
- the producing step may include producing the hydrocarbons 14 from the inclusions 28 at both depths .
- the inclusion 28 propagating step may be performed without expanding a casing in the wellbore 20.
- a well system 10 for producing hydrocarbons 14 from a subterranean formation 12 intersected by a wellbore 20 includes at least one generally planar inclusion 28 extending outward from the wellbore 20 into the formation 12.
- a fluid 30 is injected into the inclusion 28.
- the hydrocarbons 14 are heated as a result of the injected fluid 30.
- the hydrocarbons 14 are produced through a tubular string 34 which extends to a location in the wellbore 20 below the inclusion 28.
- the hydrocarbons 14 are received into the tubular string 34 at that location.
- a pulsing tool 44 may vary a flow rate of the fluid 30 as it is being injected.
- the fluid 30 may be injected via an annulus 32 formed between the tubular string 34 and the wellbore 20.
- the fluid 30 may be injected via a tubular injection string 40.
- a flow control device 70 may provide one-way flow of the hydrocarbons 14 into the tubular string 34 from a portion 24 of the wellbore 20 below the inclusion 28.
- Also described above is a method of producing hydrocarbons 14 from a subterranean formation 12, with the method including the steps of: propagating at least one generally planar inclusion 28 outward from a wellbore 20 into the formation 12; injecting a fluid 30 into the inclusion 28, thereby heating the hydrocarbons 14, the injecting step including varying a flow rate of the fluid 30 into the inclusion 28 while the fluid 30 is continuously flowed into the inclusion 28; and during the injecting step, producing the hydrocarbons 14 from the wellbore 20.
- the above disclosure also provides a method of propagating at least one generally planar inclusion 28 outward from a wellbore 20 into a subterranean formation 12.
- the method includes the steps of: providing an inclusion initiation tool 26 which has at least one laterally outwardly extending projection 52, a lateral dimension of the inclusion initiation tool 26 being larger than an internal lateral dimension of a portion 48 of the wellbore 20; forcing the inclusion initiation tool 26 into the wellbore portion 48, thereby forcing the projection 52 into the formation 12 to thereby initiate the inclusion 28; and then pumping a propagation fluid 58 into the inclusion 28, thereby propagating the inclusion 28 outward into the formation 12.
- a body 54 of the inclusion initiation tool 26 may have a lateral dimension which is larger than the internal lateral dimension of the wellbore portion 48, whereby the tool forcing step further comprises forcing the body 54 into the wellbore portion 48, thereby increasing radial compressive stress in the formation 12.
- the fluid pumping step may include pumping the fluid 58 through the projection 52.
- the projection forcing step may be performed multiple times, with the inclusion initiation tool 26 being azimuthally rotated between the projection forcing steps.
- the method may include the step of expanding the inclusion initiation tool 26 in the wellbore portion 48.
- the expanding step may be performed prior to, or during, the pumping step.
- the method may include the step of retrieving the inclusion initiation tool 26 from the wellbore 20.
- the method may include the steps of injecting a heating fluid 30 into the inclusion 28, thereby heating hydrocarbons 14 in the formation 12; and during the injecting step, producing the hydrocarbons 14 from the wellbore 20.
Landscapes
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Production Of Liquid Hydrocarbon Mixture For Refining Petroleum (AREA)
- Working-Up Tar And Pitch (AREA)
Abstract
Priority Applications (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
BRPI0915244A BRPI0915244A2 (pt) | 2008-11-13 | 2009-11-06 | método para produzir hidrocarbonetos de uma formação subterrânea, sistema de poço para produzir hidrocarbonetos de uma formação subterrânea interceptada por um furo de poço e método para propagar pelo menos uma inclusão geralmente planar para fora de um furo de poço para uma formação subterrânea |
CN200980145476.1A CN102216561B (zh) | 2008-11-13 | 2009-11-06 | 通过增强渗透性包裹体的浅层沥青的热采 |
EP09752962A EP2350436A2 (fr) | 2008-11-13 | 2009-11-06 | Récupération thermique de bitume superficiel au moyen d'inclusions à perméabilité accrue |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US12/269,995 | 2008-11-13 | ||
US12/269,995 US8151874B2 (en) | 2006-02-27 | 2008-11-13 | Thermal recovery of shallow bitumen through increased permeability inclusions |
Publications (2)
Publication Number | Publication Date |
---|---|
WO2010056606A2 true WO2010056606A2 (fr) | 2010-05-20 |
WO2010056606A3 WO2010056606A3 (fr) | 2010-08-19 |
Family
ID=42102784
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/US2009/063588 WO2010056606A2 (fr) | 2008-11-13 | 2009-11-06 | Récupération thermique de bitume superficiel au moyen d'inclusions à perméabilité accrue |
Country Status (8)
Country | Link |
---|---|
US (2) | US8151874B2 (fr) |
EP (1) | EP2350436A2 (fr) |
CN (2) | CN102216561B (fr) |
BR (1) | BRPI0915244A2 (fr) |
CA (2) | CA2686050C (fr) |
EC (1) | ECSP11011128A (fr) |
RU (1) | RU2466271C1 (fr) |
WO (1) | WO2010056606A2 (fr) |
Families Citing this family (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US8955585B2 (en) | 2011-09-27 | 2015-02-17 | Halliburton Energy Services, Inc. | Forming inclusions in selected azimuthal orientations from a casing section |
US20140014327A1 (en) * | 2012-07-13 | 2014-01-16 | Schlumberger Technology Corporation | Methodology and system for producing fluids from a condensate gas reservoir |
KR101508969B1 (ko) * | 2013-05-08 | 2015-04-07 | 한국지질자원연구원 | 열전도방식을 이용한 오일샌드의 비투멘 채굴 시스템 |
KR101498879B1 (ko) * | 2013-06-05 | 2015-03-05 | 한국지질자원연구원 | 열공급 및 비투멘 채굴을 동시에 수행하는 단일파이프 방식의 비투멘 채굴 시스템 |
US9557794B2 (en) * | 2014-11-07 | 2017-01-31 | General Electric Company | System and method for distributing electrical power |
WO2016140664A1 (fr) * | 2015-03-04 | 2016-09-09 | Halliburton Energy Services, Inc. | Dispositif d'injection et de production actionné par vapeur |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5036918A (en) * | 1989-12-06 | 1991-08-06 | Mobil Oil Corporation | Method for improving sustained solids-free production from heavy oil reservoirs |
US6142229A (en) * | 1998-09-16 | 2000-11-07 | Atlantic Richfield Company | Method and system for producing fluids from low permeability formations |
US6443227B1 (en) * | 1998-11-17 | 2002-09-03 | Golder Sierra Llc | Azimuth control of hydraulic vertical fractures in unconsolidated and weakly cemented soils and sediments |
US20060162923A1 (en) * | 2005-01-25 | 2006-07-27 | World Energy Systems, Inc. | Method for producing viscous hydrocarbon using incremental fracturing |
US20070199697A1 (en) * | 2006-02-27 | 2007-08-30 | Grant Hocking | Enhanced hydrocarbon recovery by steam injection of oil sand formations |
WO2007112199A2 (fr) * | 2006-03-29 | 2007-10-04 | Geosierra Llc | Récupération améliorée d'hydrocarbures par vaporisation de solvants dans des formations de sable pétrolifère |
Family Cites Families (191)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US2732195A (en) * | 1956-01-24 | Ljungstrom | ||
US1789993A (en) * | 1929-08-02 | 1931-01-27 | Switzer Frank | Casing ripper |
US2178554A (en) * | 1938-01-26 | 1939-11-07 | Clifford P Bowie | Well slotter |
US2634961A (en) * | 1946-01-07 | 1953-04-14 | Svensk Skifferolje Aktiebolage | Method of electrothermal production of shale oil |
US2548360A (en) * | 1948-03-29 | 1951-04-10 | Stanley A Germain | Electric oil well heater |
US2687179A (en) * | 1948-08-26 | 1954-08-24 | Newton B Dismukes | Means for increasing the subterranean flow into and from wells |
US2642142A (en) * | 1949-04-20 | 1953-06-16 | Stanolind Oil & Gas Co | Hydraulic completion of wells |
US2780450A (en) * | 1952-03-07 | 1957-02-05 | Svenska Skifferolje Ab | Method of recovering oil and gases from non-consolidated bituminous geological formations by a heating treatment in situ |
US2862564A (en) * | 1955-02-21 | 1958-12-02 | Otis Eng Co | Anchoring devices for well tools |
US2870843A (en) * | 1955-06-21 | 1959-01-27 | Gulf Oil Corp | Apparatus for control of flow through the annulus of a dual-zone well |
US3062286A (en) * | 1959-11-13 | 1962-11-06 | Gulf Research Development Co | Selective fracturing process |
US3071481A (en) * | 1959-11-27 | 1963-01-01 | Gulf Oil Corp | Cement composition |
US3058730A (en) * | 1960-06-03 | 1962-10-16 | Fmc Corp | Method of forming underground communication between boreholes |
US3059909A (en) * | 1960-12-09 | 1962-10-23 | Chrysler Corp | Thermostatic fuel mixture control |
US3225828A (en) * | 1963-06-05 | 1965-12-28 | American Coldset Corp | Downhole vertical slotting tool |
US3270816A (en) * | 1963-12-19 | 1966-09-06 | Dow Chemical Co | Method of establishing communication between wells |
US3301723A (en) * | 1964-02-06 | 1967-01-31 | Du Pont | Gelled compositions containing galactomannan gums |
US3280913A (en) * | 1964-04-06 | 1966-10-25 | Exxon Production Research Co | Vertical fracturing process and apparatus for wells |
US3349847A (en) * | 1964-07-28 | 1967-10-31 | Gulf Research Development Co | Process for recovering oil by in situ combustion |
US3353599A (en) * | 1964-08-04 | 1967-11-21 | Gulf Oil Corp | Method and apparatus for stabilizing formations |
US3284281A (en) * | 1964-08-31 | 1966-11-08 | Phillips Petroleum Co | Production of oil from oil shale through fractures |
US3338317A (en) * | 1965-09-22 | 1967-08-29 | Schlumberger Technology Corp | Oriented perforating apparatus |
US3695354A (en) * | 1970-03-30 | 1972-10-03 | Shell Oil Co | Halogenating extraction of oil from oil shale |
US3690380A (en) * | 1970-06-22 | 1972-09-12 | Donovan B Grable | Well apparatus and method of placing apertured inserts in well pipe |
US3739852A (en) * | 1971-05-10 | 1973-06-19 | Exxon Production Research Co | Thermal process for recovering oil |
US3727688A (en) * | 1972-02-09 | 1973-04-17 | Phillips Petroleum Co | Hydraulic fracturing method |
US3779915A (en) * | 1972-09-21 | 1973-12-18 | Dow Chemical Co | Acid composition and use thereof in treating fluid-bearing geologic formations |
US3913671A (en) * | 1973-09-28 | 1975-10-21 | Texaco Inc | Recovery of petroleum from viscous petroleum containing formations including tar sand deposits |
US3884303A (en) * | 1974-03-27 | 1975-05-20 | Shell Oil Co | Vertically expanded structure-biased horizontal fracturing |
US3888312A (en) * | 1974-04-29 | 1975-06-10 | Halliburton Co | Method and compositions for fracturing well formations |
US3948325A (en) * | 1975-04-03 | 1976-04-06 | The Western Company Of North America | Fracturing of subsurface formations with Bingham plastic fluids |
US4005750A (en) * | 1975-07-01 | 1977-02-01 | The United States Of America As Represented By The United States Energy Research And Development Administration | Method for selectively orienting induced fractures in subterranean earth formations |
US3994340A (en) * | 1975-10-30 | 1976-11-30 | Chevron Research Company | Method of recovering viscous petroleum from tar sand |
US4018293A (en) * | 1976-01-12 | 1977-04-19 | The Keller Corporation | Method and apparatus for controlled fracturing of subterranean formations |
US4099570A (en) * | 1976-04-09 | 1978-07-11 | Donald Bruce Vandergrift | Oil production processes and apparatus |
US4066127A (en) * | 1976-08-23 | 1978-01-03 | Texaco Inc. | Processes for producing bitumen from tar sands and methods for forming a gravel pack in tar sands |
US4119151A (en) * | 1977-02-25 | 1978-10-10 | Homco International, Inc. | Casing slotter |
US4116275A (en) * | 1977-03-14 | 1978-09-26 | Exxon Production Research Company | Recovery of hydrocarbons by in situ thermal extraction |
US4085803A (en) * | 1977-03-14 | 1978-04-25 | Exxon Production Research Company | Method for oil recovery using a horizontal well with indirect heating |
US4109722A (en) * | 1977-04-28 | 1978-08-29 | Texaco Inc. | Thermal oil recovery method |
US4114687A (en) * | 1977-10-14 | 1978-09-19 | Texaco Inc. | Systems for producing bitumen from tar sands |
US4265310A (en) * | 1978-10-03 | 1981-05-05 | Continental Oil Company | Fracture preheat oil recovery process |
US4362213A (en) * | 1978-12-29 | 1982-12-07 | Hydrocarbon Research, Inc. | Method of in situ oil extraction using hot solvent vapor injection |
US4280569A (en) | 1979-06-25 | 1981-07-28 | Standard Oil Company (Indiana) | Fluid flow restrictor valve for a drill hole coring tool |
US4271696A (en) * | 1979-07-09 | 1981-06-09 | M. D. Wood, Inc. | Method of determining change in subsurface structure due to application of fluid pressure to the earth |
CA1130201A (fr) * | 1979-07-10 | 1982-08-24 | Esso Resources Canada Limited | Methode d'extraction continue d'hydrocarbures lourds par ecoulement en chute accompagne d'injection de fluides chauds |
US4311194A (en) * | 1979-08-20 | 1982-01-19 | Otis Engineering Corporation | Liner hanger and running and setting tool |
US4280559A (en) * | 1979-10-29 | 1981-07-28 | Exxon Production Research Company | Method for producing heavy crude |
US4519454A (en) * | 1981-10-01 | 1985-05-28 | Mobil Oil Corporation | Combined thermal and solvent stimulation |
US4491179A (en) * | 1982-04-26 | 1985-01-01 | Pirson Sylvain J | Method for oil recovery by in situ exfoliation drive |
US4450913A (en) * | 1982-06-14 | 1984-05-29 | Texaco Inc. | Superheated solvent method for recovering viscous petroleum |
US4454916A (en) * | 1982-11-29 | 1984-06-19 | Mobil Oil Corporation | In-situ combustion method for recovery of oil and combustible gas |
US4566536A (en) * | 1983-11-21 | 1986-01-28 | Mobil Oil Corporation | Method for operating an injection well in an in-situ combustion oil recovery using oxygen |
US4474237A (en) * | 1983-12-07 | 1984-10-02 | Mobil Oil Corporation | Method for initiating an oxygen driven in-situ combustion process |
US4513819A (en) * | 1984-02-27 | 1985-04-30 | Mobil Oil Corporation | Cyclic solvent assisted steam injection process for recovery of viscous oil |
US4597441A (en) * | 1984-05-25 | 1986-07-01 | World Energy Systems, Inc. | Recovery of oil by in situ hydrogenation |
US4598770A (en) * | 1984-10-25 | 1986-07-08 | Mobil Oil Corporation | Thermal recovery method for viscous oil |
US4625800A (en) * | 1984-11-21 | 1986-12-02 | Mobil Oil Corporation | Method of recovering medium or high gravity crude oil |
US4678037A (en) * | 1985-12-06 | 1987-07-07 | Amoco Corporation | Method and apparatus for completing a plurality of zones in a wellbore |
US4706751A (en) * | 1986-01-31 | 1987-11-17 | S-Cal Research Corp. | Heavy oil recovery process |
US4697642A (en) * | 1986-06-27 | 1987-10-06 | Tenneco Oil Company | Gravity stabilized thermal miscible displacement process |
US4716960A (en) * | 1986-07-14 | 1988-01-05 | Production Technologies International, Inc. | Method and system for introducing electric current into a well |
US4696345A (en) * | 1986-08-21 | 1987-09-29 | Chevron Research Company | Hasdrive with multiple offset producers |
US4834181A (en) * | 1987-12-29 | 1989-05-30 | Mobil Oil Corporation | Creation of multi-azimuth permeable hydraulic fractures |
CA1295547C (fr) * | 1988-10-11 | 1992-02-11 | David J. Stephens | Procede de recuperation de bitumes lourds |
US5131471A (en) * | 1989-08-16 | 1992-07-21 | Chevron Research And Technology Company | Single well injection and production system |
US4977961A (en) * | 1989-08-16 | 1990-12-18 | Chevron Research Company | Method to create parallel vertical fractures in inclined wellbores |
US4926941A (en) * | 1989-10-10 | 1990-05-22 | Shell Oil Company | Method of producing tar sand deposits containing conductive layers |
US5002431A (en) * | 1989-12-05 | 1991-03-26 | Marathon Oil Company | Method of forming a horizontal contamination barrier |
GB2240798A (en) * | 1990-02-12 | 1991-08-14 | Shell Int Research | Method and apparatus for perforating a well liner and for fracturing a surrounding formation |
US5010964A (en) * | 1990-04-06 | 1991-04-30 | Atlantic Richfield Company | Method and apparatus for orienting wellbore perforations |
US5211714A (en) * | 1990-04-12 | 1993-05-18 | Halliburton Logging Services, Inc. | Wireline supported perforating gun enabling oriented perforations |
US5054551A (en) * | 1990-08-03 | 1991-10-08 | Chevron Research And Technology Company | In-situ heated annulus refining process |
US5060726A (en) * | 1990-08-23 | 1991-10-29 | Shell Oil Company | Method and apparatus for producing tar sand deposits containing conductive layers having little or no vertical communication |
US5046559A (en) * | 1990-08-23 | 1991-09-10 | Shell Oil Company | Method and apparatus for producing hydrocarbon bearing deposits in formations having shale layers |
US5111881A (en) * | 1990-09-07 | 1992-05-12 | Halliburton Company | Method to control fracture orientation in underground formation |
US5105886A (en) * | 1990-10-24 | 1992-04-21 | Mobil Oil Corporation | Method for the control of solids accompanying hydrocarbon production from subterranean formations |
US5060287A (en) * | 1990-12-04 | 1991-10-22 | Shell Oil Company | Heater utilizing copper-nickel alloy core |
US5065818A (en) * | 1991-01-07 | 1991-11-19 | Shell Oil Company | Subterranean heaters |
US5123487A (en) * | 1991-01-08 | 1992-06-23 | Halliburton Services | Repairing leaks in casings |
US5148869A (en) * | 1991-01-31 | 1992-09-22 | Mobil Oil Corporation | Single horizontal wellbore process/apparatus for the in-situ extraction of viscous oil by gravity action using steam plus solvent vapor |
CA2046107C (fr) * | 1991-07-03 | 1994-12-06 | Geryl Owen Brannan | Methode de recuperation d'hydrocarbures dans un puits horizontal decale lateralement et verticalement |
US5215146A (en) * | 1991-08-29 | 1993-06-01 | Mobil Oil Corporation | Method for reducing startup time during a steam assisted gravity drainage process in parallel horizontal wells |
CA2058255C (fr) * | 1991-12-20 | 1997-02-11 | Roland P. Leaute | Recuperation de amelioration des hydrocarbures a l'aide de la combusion in situ et de drains horizontaux |
US5211230A (en) * | 1992-02-21 | 1993-05-18 | Mobil Oil Corporation | Method for enhanced oil recovery through a horizontal production well in a subsurface formation by in-situ combustion |
US5318123A (en) * | 1992-06-11 | 1994-06-07 | Halliburton Company | Method for optimizing hydraulic fracturing through control of perforation orientation |
US5392854A (en) * | 1992-06-12 | 1995-02-28 | Shell Oil Company | Oil recovery process |
US5255742A (en) * | 1992-06-12 | 1993-10-26 | Shell Oil Company | Heat injection process |
US5297626A (en) * | 1992-06-12 | 1994-03-29 | Shell Oil Company | Oil recovery process |
US5944446A (en) | 1992-08-31 | 1999-08-31 | Golder Sierra Llc | Injection of mixtures into subterranean formations |
US5325923A (en) * | 1992-09-29 | 1994-07-05 | Halliburton Company | Well completions with expandable casing portions |
US5396957A (en) * | 1992-09-29 | 1995-03-14 | Halliburton Company | Well completions with expandable casing portions |
US5361856A (en) | 1992-09-29 | 1994-11-08 | Halliburton Company | Well jetting apparatus and met of modifying a well therewith |
US5360066A (en) * | 1992-12-16 | 1994-11-01 | Halliburton Company | Method for controlling sand production of formations and for optimizing hydraulic fracturing through perforation orientation |
US5394941A (en) * | 1993-06-21 | 1995-03-07 | Halliburton Company | Fracture oriented completion tool system |
US5335724A (en) * | 1993-07-28 | 1994-08-09 | Halliburton Company | Directionally oriented slotting method |
US5372195A (en) * | 1993-09-13 | 1994-12-13 | The United States Of America As Represented By The Secretary Of The Interior | Method for directional hydraulic fracturing |
US5607016A (en) | 1993-10-15 | 1997-03-04 | Butler; Roger M. | Process and apparatus for the recovery of hydrocarbons from a reservoir of hydrocarbons |
US5407009A (en) * | 1993-11-09 | 1995-04-18 | University Technologies International Inc. | Process and apparatus for the recovery of hydrocarbons from a hydrocarbon deposit |
US5411094A (en) * | 1993-11-22 | 1995-05-02 | Mobil Oil Corporation | Imbibition process using a horizontal well for oil production from low permeability reservoirs |
US5404952A (en) * | 1993-12-20 | 1995-04-11 | Shell Oil Company | Heat injection process and apparatus |
CA2114456C (fr) * | 1994-01-28 | 2004-08-31 | Thomas James Boone | Procede de recuperation thermique pour l'extraction de petrole de formations souterraines |
US5431224A (en) * | 1994-04-19 | 1995-07-11 | Mobil Oil Corporation | Method of thermal stimulation for recovery of hydrocarbons |
US5472049A (en) * | 1994-04-20 | 1995-12-05 | Union Oil Company Of California | Hydraulic fracturing of shallow wells |
TW358120B (en) | 1994-08-24 | 1999-05-11 | Shell Int Research | Hydrocarbon conversion catalysts |
US5431225A (en) * | 1994-09-21 | 1995-07-11 | Halliburton Company | Sand control well completion methods for poorly consolidated formations |
ZA96241B (en) | 1995-01-16 | 1996-08-14 | Shell Int Research | Method of creating a casing in a borehole |
US5829520A (en) | 1995-02-14 | 1998-11-03 | Baker Hughes Incorporated | Method and apparatus for testing, completion and/or maintaining wellbores using a sensor device |
US5564499A (en) | 1995-04-07 | 1996-10-15 | Willis; Roger B. | Method and device for slotting well casing and scoring surrounding rock to facilitate hydraulic fractures |
US5626191A (en) | 1995-06-23 | 1997-05-06 | Petroleum Recovery Institute | Oilfield in-situ combustion process |
US5824214A (en) | 1995-07-11 | 1998-10-20 | Mobil Oil Corporation | Method for hydrotreating and upgrading heavy crude oil during production |
ATE191254T1 (de) | 1995-12-27 | 2000-04-15 | Shell Int Research | Flamenlose verbrennvorrichtung und verfahren |
US5931230A (en) * | 1996-02-20 | 1999-08-03 | Mobil Oil Corporation | Visicous oil recovery using steam in horizontal well |
US6283216B1 (en) | 1996-03-11 | 2001-09-04 | Schlumberger Technology Corporation | Apparatus and method for establishing branch wells from a parent well |
US5743334A (en) | 1996-04-04 | 1998-04-28 | Chevron U.S.A. Inc. | Evaluating a hydraulic fracture treatment in a wellbore |
US5771973A (en) * | 1996-07-26 | 1998-06-30 | Amoco Corporation | Single well vapor extraction process |
CA2185837C (fr) | 1996-09-18 | 2001-08-07 | Alberta Oil Sands Technology And Research Authority | Methode utilisant des solvants pour la mobilisation d'huile lourde visqueuse |
US6079499A (en) | 1996-10-15 | 2000-06-27 | Shell Oil Company | Heater well method and apparatus |
US6056057A (en) | 1996-10-15 | 2000-05-02 | Shell Oil Company | Heater well method and apparatus |
US5871637A (en) | 1996-10-21 | 1999-02-16 | Exxon Research And Engineering Company | Process for upgrading heavy oil using alkaline earth metal hydroxide |
US5765642A (en) | 1996-12-23 | 1998-06-16 | Halliburton Energy Services, Inc. | Subterranean formation fracturing methods |
US5862858A (en) | 1996-12-26 | 1999-01-26 | Shell Oil Company | Flameless combustor |
US6116343A (en) | 1997-02-03 | 2000-09-12 | Halliburton Energy Services, Inc. | One-trip well perforation/proppant fracturing apparatus and methods |
US6023554A (en) | 1997-05-20 | 2000-02-08 | Shell Oil Company | Electrical heater |
US5981447A (en) | 1997-05-28 | 1999-11-09 | Schlumberger Technology Corporation | Method and composition for controlling fluid loss in high permeability hydrocarbon bearing formations |
US6003599A (en) | 1997-09-15 | 1999-12-21 | Schlumberger Technology Corporation | Azimuth-oriented perforating system and method |
GB9723031D0 (en) | 1997-11-01 | 1998-01-07 | Petroline Wellsystems Ltd | Downhole tubing location method |
AU1478199A (en) | 1997-12-11 | 1999-06-28 | Petroleum Recovery Institute | Oilfield in situ hydrocarbon upgrading process |
US6119776A (en) * | 1998-02-12 | 2000-09-19 | Halliburton Energy Services, Inc. | Methods of stimulating and producing multiple stratified reservoirs |
US6360819B1 (en) | 1998-02-24 | 2002-03-26 | Shell Oil Company | Electrical heater |
EP1092080B1 (fr) | 1998-07-01 | 2003-01-29 | Shell Internationale Research Maatschappij B.V. | Procede et outil pour fracturer une formation souterraine |
CA2243105C (fr) | 1998-07-10 | 2001-11-13 | Igor J. Mokrys | Exploitation de gisements d'hydrocarbures sous pression elevee par injection de vapeur |
US6076046A (en) | 1998-07-24 | 2000-06-13 | Schlumberger Technology Corporation | Post-closure analysis in hydraulic fracturing |
US6446727B1 (en) | 1998-11-12 | 2002-09-10 | Sclumberger Technology Corporation | Process for hydraulically fracturing oil and gas wells |
US7185710B2 (en) | 1998-12-07 | 2007-03-06 | Enventure Global Technology | Mono-diameter wellbore casing |
US6739392B2 (en) | 1998-12-07 | 2004-05-25 | Shell Oil Company | Forming a wellbore casing while simultaneously drilling a wellbore |
US6508307B1 (en) | 1999-07-22 | 2003-01-21 | Schlumberger Technology Corporation | Techniques for hydraulic fracturing combining oriented perforating and low viscosity fluids |
US6427776B1 (en) | 2000-03-27 | 2002-08-06 | Weatherford/Lamb, Inc. | Sand removal and device retrieval tool |
WO2001081240A2 (fr) | 2000-04-24 | 2001-11-01 | Shell Internationale Research Maatschappij B.V. | Recuperation in situ dans une formation houillere |
DZ3387A1 (fr) | 2000-07-18 | 2002-01-24 | Exxonmobil Upstream Res Co | Procede pour traiter les intervalles multiples dans un trou de forage |
US6372678B1 (en) | 2000-09-28 | 2002-04-16 | Fairmount Minerals, Ltd | Proppant composition for gas and oil well fracturing |
CA2342955C (fr) | 2001-04-04 | 2005-06-14 | Roland P. Leaute | Additif liquide a la vapeur pour ameliorer le retablissement de la stimulation cyclique par la vapeur ou la stimulation cyclique par la vapeur au laser |
CA2349234C (fr) | 2001-05-31 | 2004-12-14 | Imperial Oil Resources Limited | Procede solvant cyclique pour bitume in situ et production de petrole lourd |
US6550539B2 (en) | 2001-06-20 | 2003-04-22 | Weatherford/Lamb, Inc. | Tie back and method for use with expandable tubulars |
CA2351148C (fr) | 2001-06-21 | 2008-07-29 | John Nenniger | Methode et appareil pour ameliorer la production d'hydrocarbures lourds |
MY135121A (en) | 2001-07-18 | 2008-02-29 | Shell Int Research | Wellbore system with annular seal member |
US6591908B2 (en) | 2001-08-22 | 2003-07-15 | Alberta Science And Research Authority | Hydrocarbon production process with decreasing steam and/or water/solvent ratio |
US6662874B2 (en) | 2001-09-28 | 2003-12-16 | Halliburton Energy Services, Inc. | System and method for fracturing a subterranean well formation for improving hydrocarbon production |
US6725933B2 (en) | 2001-09-28 | 2004-04-27 | Halliburton Energy Services, Inc. | Method and apparatus for acidizing a subterranean well formation for improving hydrocarbon production |
US6719054B2 (en) | 2001-09-28 | 2004-04-13 | Halliburton Energy Services, Inc. | Method for acid stimulating a subterranean well formation for improving hydrocarbon production |
US6820690B2 (en) | 2001-10-22 | 2004-11-23 | Schlumberger Technology Corp. | Technique utilizing an insertion guide within a wellbore |
US7066284B2 (en) | 2001-11-14 | 2006-06-27 | Halliburton Energy Services, Inc. | Method and apparatus for a monodiameter wellbore, monodiameter casing, monobore, and/or monowell |
US6883611B2 (en) | 2002-04-12 | 2005-04-26 | Halliburton Energy Services, Inc. | Sealed multilateral junction system |
US6732800B2 (en) | 2002-06-12 | 2004-05-11 | Schlumberger Technology Corporation | Method of completing a well in an unconsolidated formation |
US7055598B2 (en) | 2002-08-26 | 2006-06-06 | Halliburton Energy Services, Inc. | Fluid flow control device and method for use of same |
US6792720B2 (en) | 2002-09-05 | 2004-09-21 | Geosierra Llc | Seismic base isolation by electro-osmosis during an earthquake event |
US7152676B2 (en) | 2002-10-18 | 2006-12-26 | Schlumberger Technology Corporation | Techniques and systems associated with perforation and the installation of downhole tools |
CA2522546A1 (fr) | 2003-04-14 | 2004-10-28 | Enventure Global Technology | Appareil et procede d'expansion radiale d'un gainage de puits et de forage d'un puits |
US7044225B2 (en) * | 2003-09-16 | 2006-05-16 | Joseph Haney | Shaped charge |
US7316274B2 (en) | 2004-03-05 | 2008-01-08 | Baker Hughes Incorporated | One trip perforating, cementing, and sand management apparatus and method |
US6991037B2 (en) * | 2003-12-30 | 2006-01-31 | Geosierra Llc | Multiple azimuth control of vertical hydraulic fractures in unconsolidated and weakly cemented sediments |
US7404416B2 (en) | 2004-03-25 | 2008-07-29 | Halliburton Energy Services, Inc. | Apparatus and method for creating pulsating fluid flow, and method of manufacture for the apparatus |
US7159660B2 (en) | 2004-05-28 | 2007-01-09 | Halliburton Energy Services, Inc. | Hydrajet perforation and fracturing tool |
US7069989B2 (en) | 2004-06-07 | 2006-07-04 | Leon Marmorshteyn | Method of increasing productivity and recovery of wells in oil and gas fields |
US7228908B2 (en) * | 2004-12-02 | 2007-06-12 | Halliburton Energy Services, Inc. | Hydrocarbon sweep into horizontal transverse fractured wells |
US7219732B2 (en) * | 2004-12-02 | 2007-05-22 | Halliburton Energy Services, Inc. | Methods of sequentially injecting different sealant compositions into a wellbore to improve zonal isolation |
US7412331B2 (en) * | 2004-12-16 | 2008-08-12 | Chevron U.S.A. Inc. | Method for predicting rate of penetration using bit-specific coefficient of sliding friction and mechanical efficiency as a function of confined compressive strength |
US7555414B2 (en) | 2004-12-16 | 2009-06-30 | Chevron U.S.A. Inc. | Method for estimating confined compressive strength for rock formations utilizing skempton theory |
RU2289684C1 (ru) * | 2005-05-04 | 2006-12-20 | Открытое акционерное общество "Всероссийский нефтегазовый научно-исследовательский институт им. А.П. Крылова" (ОАО ВНИИнефть) | Способ разработки месторождений высоковязких нефтей или битума |
US20070199701A1 (en) | 2006-02-27 | 2007-08-30 | Grant Hocking | Ehanced hydrocarbon recovery by in situ combustion of oil sand formations |
US20070199706A1 (en) | 2006-02-27 | 2007-08-30 | Grant Hocking | Enhanced hydrocarbon recovery by convective heating of oil sand formations |
US7404441B2 (en) | 2006-02-27 | 2008-07-29 | Geosierra, Llc | Hydraulic feature initiation and propagation control in unconsolidated and weakly cemented sediments |
US20070199700A1 (en) | 2006-02-27 | 2007-08-30 | Grant Hocking | Enhanced hydrocarbon recovery by in situ combustion of oil sand formations |
US7591306B2 (en) | 2006-02-27 | 2009-09-22 | Geosierra Llc | Enhanced hydrocarbon recovery by steam injection of oil sand formations |
US20070199699A1 (en) | 2006-02-27 | 2007-08-30 | Grant Hocking | Enhanced Hydrocarbon Recovery By Vaporizing Solvents in Oil Sand Formations |
US7866395B2 (en) | 2006-02-27 | 2011-01-11 | Geosierra Llc | Hydraulic fracture initiation and propagation control in unconsolidated and weakly cemented sediments |
US20070199710A1 (en) | 2006-02-27 | 2007-08-30 | Grant Hocking | Enhanced hydrocarbon recovery by convective heating of oil sand formations |
US7604054B2 (en) | 2006-02-27 | 2009-10-20 | Geosierra Llc | Enhanced hydrocarbon recovery by convective heating of oil sand formations |
US20070199712A1 (en) | 2006-02-27 | 2007-08-30 | Grant Hocking | Enhanced hydrocarbon recovery by steam injection of oil sand formations |
US20070199711A1 (en) | 2006-02-27 | 2007-08-30 | Grant Hocking | Enhanced hydrocarbon recovery by vaporizing solvents in oil sand formations |
US7748458B2 (en) | 2006-02-27 | 2010-07-06 | Geosierra Llc | Initiation and propagation control of vertical hydraulic fractures in unconsolidated and weakly cemented sediments |
US20070199695A1 (en) | 2006-02-27 | 2007-08-30 | Grant Hocking | Hydraulic Fracture Initiation and Propagation Control in Unconsolidated and Weakly Cemented Sediments |
US7520325B2 (en) | 2006-02-27 | 2009-04-21 | Geosierra Llc | Enhanced hydrocarbon recovery by in situ combustion of oil sand formations |
US7814978B2 (en) | 2006-12-14 | 2010-10-19 | Halliburton Energy Services, Inc. | Casing expansion and formation compression for permeability plane orientation |
RU2333340C1 (ru) * | 2007-02-02 | 2008-09-10 | Открытое акционерное общество "Татнефть" им. В.Д. Шашина | Способ строительства многоствольной скважины для добычи высоковязкой нефти |
US7909094B2 (en) | 2007-07-06 | 2011-03-22 | Halliburton Energy Services, Inc. | Oscillating fluid flow in a wellbore |
US7647966B2 (en) | 2007-08-01 | 2010-01-19 | Halliburton Energy Services, Inc. | Method for drainage of heavy oil reservoir via horizontal wellbore |
US7640975B2 (en) * | 2007-08-01 | 2010-01-05 | Halliburton Energy Services, Inc. | Flow control for increased permeability planes in unconsolidated formations |
US7640982B2 (en) | 2007-08-01 | 2010-01-05 | Halliburton Energy Services, Inc. | Method of injection plane initiation in a well |
US7832477B2 (en) | 2007-12-28 | 2010-11-16 | Halliburton Energy Services, Inc. | Casing deformation and control for inclusion propagation |
US7866400B2 (en) | 2008-02-28 | 2011-01-11 | Halliburton Energy Services, Inc. | Phase-controlled well flow control and associated methods |
-
2008
- 2008-11-13 US US12/269,995 patent/US8151874B2/en active Active
-
2009
- 2009-11-06 EP EP09752962A patent/EP2350436A2/fr not_active Withdrawn
- 2009-11-06 CN CN200980145476.1A patent/CN102216561B/zh not_active Expired - Fee Related
- 2009-11-06 RU RU2011123874/03A patent/RU2466271C1/ru not_active IP Right Cessation
- 2009-11-06 BR BRPI0915244A patent/BRPI0915244A2/pt not_active IP Right Cessation
- 2009-11-06 WO PCT/US2009/063588 patent/WO2010056606A2/fr active Application Filing
- 2009-11-06 CN CN201410231938.4A patent/CN104018818B/zh not_active Expired - Fee Related
- 2009-11-09 CA CA2686050A patent/CA2686050C/fr active Active
- 2009-11-09 CA CA2821503A patent/CA2821503C/fr active Active
-
2011
- 2011-06-13 EC ECSP11011128 patent/ECSP11011128A/es unknown
-
2012
- 2012-03-03 US US13/411,542 patent/US8863840B2/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5036918A (en) * | 1989-12-06 | 1991-08-06 | Mobil Oil Corporation | Method for improving sustained solids-free production from heavy oil reservoirs |
US6142229A (en) * | 1998-09-16 | 2000-11-07 | Atlantic Richfield Company | Method and system for producing fluids from low permeability formations |
US6443227B1 (en) * | 1998-11-17 | 2002-09-03 | Golder Sierra Llc | Azimuth control of hydraulic vertical fractures in unconsolidated and weakly cemented soils and sediments |
US20060162923A1 (en) * | 2005-01-25 | 2006-07-27 | World Energy Systems, Inc. | Method for producing viscous hydrocarbon using incremental fracturing |
US20070199697A1 (en) * | 2006-02-27 | 2007-08-30 | Grant Hocking | Enhanced hydrocarbon recovery by steam injection of oil sand formations |
WO2007112199A2 (fr) * | 2006-03-29 | 2007-10-04 | Geosierra Llc | Récupération améliorée d'hydrocarbures par vaporisation de solvants dans des formations de sable pétrolifère |
Also Published As
Publication number | Publication date |
---|---|
CN102216561A (zh) | 2011-10-12 |
EP2350436A2 (fr) | 2011-08-03 |
ECSP11011128A (es) | 2011-09-30 |
CN104018818A (zh) | 2014-09-03 |
CN102216561B (zh) | 2014-10-22 |
US8151874B2 (en) | 2012-04-10 |
US20090101347A1 (en) | 2009-04-23 |
RU2466271C1 (ru) | 2012-11-10 |
CA2821503C (fr) | 2015-09-15 |
BRPI0915244A2 (pt) | 2016-11-01 |
US8863840B2 (en) | 2014-10-21 |
CA2821503A1 (fr) | 2010-05-13 |
CN104018818B (zh) | 2017-04-12 |
CA2686050A1 (fr) | 2010-05-13 |
WO2010056606A3 (fr) | 2010-08-19 |
CA2686050C (fr) | 2015-02-03 |
US20120160495A1 (en) | 2012-06-28 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US9856700B2 (en) | Method of testing a subsurface formation for the presence of hydrocarbon fluids | |
US7832477B2 (en) | Casing deformation and control for inclusion propagation | |
AU2009210651B2 (en) | Apparatus, assembly and process for injecting fluid into a subterranean well | |
CA2732675C (fr) | Ensemble de forage au jet hydraulique fond de trou et procede de stimulation d'un puits de production | |
AU2011293190B2 (en) | Upgoing drainholes for reducing liquid-loading in gas wells | |
US7422063B2 (en) | Hydrocarbon recovery from subterranean formations | |
US8863840B2 (en) | Thermal recovery of shallow bitumen through increased permeability inclusions | |
WO2009018019A2 (fr) | Évacuation d'un réservoir d'huile lourde via un puits de forage horizontal | |
US9482082B2 (en) | Method and apparatus for stimulating a geothermal well | |
East et al. | Hydrajet perforating and proppant plug diversion in multi-interval horizontal well fracture stimulation: case histories | |
CN103380262A (zh) | 在软地层中的井眼的多个层段中保持充足的流体静压的方法 | |
McDaniel et al. | Coiled-tubing deployment of hydrajet-fracturing technique enhances safety and flexibility, reduces job time | |
Masood* et al. | Making the Connection Between Conventional and Unconventional | |
McNeil et al. | Low-rate fracture treatment in the Bakken shale using state-of-the-art hybrid coiled-tubing system | |
Jakobsen et al. | Pinpoint hydrajet fracturing in multilayered sandstone formation completed with slotted liners | |
CA2748994C (fr) | Ensemble de forage au jet hydraulique de fond de trou et procede de stimulation d'un puits de production | |
Saquib Ali Memon et al. | Optimum Production Design System for Multizone Well | |
WO2024035725A1 (fr) | Procédé d'augmentation de la récupération d'hydrocarbures d'un puits de forage pénétrant dans une formation d'hydrocarbures étanche au moyen d'un outil d'hydrojet qui projette un fluide à régulation thermique | |
RU115003U1 (ru) | Система добычи сырья из подземного пласта, пересекаемого стволом скважины с множеством боковых каналов | |
Bybee | New Opportunities for Time-Sensitive Gulf of Mexico Completions | |
Hamilton et al. | Reliable Method of Achieving Annular Isolatoin for a Multi-Stage Frachtrue Treatment in an Air-Drilled Hole |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
WWE | Wipo information: entry into national phase |
Ref document number: 200980145476.1 Country of ref document: CN |
|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 09752962 Country of ref document: EP Kind code of ref document: A2 |
|
WWE | Wipo information: entry into national phase |
Ref document number: 2009752962 Country of ref document: EP |
|
NENP | Non-entry into the national phase in: |
Ref country code: DE |
|
WWE | Wipo information: entry into national phase |
Ref document number: 2011123874 Country of ref document: RU |
|
REG | Reference to national code |
Ref country code: BR Ref legal event code: B01E Ref document number: PI0915244 Country of ref document: BR Free format text: ESCLARECA A OMISSAO DE GRANT HOCKING DO QUADRO DE DEPOSITANTES, UMA VEZ QUE O MESMO CONSTA NA PUBLICACAO WO 2010/056606. |
|
ENP | Entry into the national phase in: |
Ref document number: PI0915244 Country of ref document: BR Kind code of ref document: A2 Effective date: 20110510 |