WO2009072138A1 - New mechanism for lifts - Google Patents

New mechanism for lifts Download PDF

Info

Publication number
WO2009072138A1
WO2009072138A1 PCT/IN2008/000185 IN2008000185W WO2009072138A1 WO 2009072138 A1 WO2009072138 A1 WO 2009072138A1 IN 2008000185 W IN2008000185 W IN 2008000185W WO 2009072138 A1 WO2009072138 A1 WO 2009072138A1
Authority
WO
WIPO (PCT)
Prior art keywords
cage
cages
chain
help
floors
Prior art date
Application number
PCT/IN2008/000185
Other languages
French (fr)
Inventor
Ramesh Kumar Chhabria
Original Assignee
Ramesh Kumar Chhabria
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ramesh Kumar Chhabria filed Critical Ramesh Kumar Chhabria
Publication of WO2009072138A1 publication Critical patent/WO2009072138A1/en

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B9/00Kinds or types of lifts in, or associated with, buildings or other structures
    • B66B9/10Kinds or types of lifts in, or associated with, buildings or other structures paternoster type
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B9/00Kinds or types of lifts in, or associated with, buildings or other structures
    • B66B9/02Kinds or types of lifts in, or associated with, buildings or other structures actuated mechanically otherwise than by rope or cable
    • B66B9/022Kinds or types of lifts in, or associated with, buildings or other structures actuated mechanically otherwise than by rope or cable by rack and pinion drives
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B9/00Kinds or types of lifts in, or associated with, buildings or other structures
    • B66B9/04Kinds or types of lifts in, or associated with, buildings or other structures actuated pneumatically or hydraulically

Definitions

  • Super lift is a new system of elevators for buildings applicable for any number of floors.
  • the main advantage is, it has no waiting time for passengers due to multiple cage system (instead of only one in present arrangement). Any person at any time on any floor gets the cage to go up or down almost immediately.
  • CA Cage
  • CH Chain
  • SP Sprockets
  • RG Rail Guide, to prevent turning of cage
  • RH Rail for horizontal movement
  • TF-I TPFL-I
  • GF Ground floor
  • 1 st F - 1°* Floor Each cage for every floor is fitted on chain links Ll & L2 (see top view).
  • the entire chain having all cages is moved by sprockets Sl, S2, S3, & S4 on top & sprockets S5, S6, S7, S 8 at bottom.
  • the main sprocket set Sl, S2 is driven by motor M, whose power varies as per number of cages etc. Chain moves only if all landing & cage doors are closed. When any cage has reached its destination it stops & that door is opened. Due to timer setting door closes automatically and chain moves again. When chain stops, all the floors will have two cages facing the floor, one for upward movement and one for downward movement.
  • a load cell includet(between chain link and cage measures the weight of the cage and conveys the information to the electronic control. If on right side, cage is not in synchronization with the floor, this small defect can be rectified by adjusting distance D & H as shown in figure 9.
  • the cage can be either pushed by hydraulic or pneumatic cylinder from left to right or allowed to be inverted as shown in figure 7.
  • E Some other designgare possible theoretically but not practical as shown in figure 3.
  • the cages instead of straight line, move in a circular motion similar to giant wheel but this design requires very large horizontal space equivalent to height of building which is not possible.
  • Another variation is possible as shown in figure 8 and 10.
  • the cage is in form of piston, which is moving in a vertical cylinder. The air above the cage is removed as described below, and cage is pushed up by air pressure due to vacuum on other side. After reaching top, the cylinder pushes cage to right and wire rope and motor lowers the cages as per the destination required.
  • Cylinder is cooled by cold water circulation as well as by shower. As soon as steam condenses in cylinder, huge collapse of volume and hence almost full vacuum is generated in cylinder. Due to this, upward atmospheric air force of 1 kg. /cm.sq. acts on bottom of piston and it moves up thereby raising weight upward movement top of piston due to rack and pinion operates Gear A, and this rotation rotates fly wheel F which rotates alternator AL giving power to out put (PO). Now air is released in cylinder and weight W (piston) moves down. Now same rack and pinion rotates Gear B in reverse direction and with help of gears C.D.& E rotates flywheel in same direction. Gears C & D are connected to free wheel and hence transmit power in one direction only. After piston has come down again steam is admitted and cycle repeated. Top and bottom movement timings are controlled by stoppers Sl & S2 and hence constant power is obtained. Same system can be used to operate bullet train.

Landscapes

  • Engineering & Computer Science (AREA)
  • Automation & Control Theory (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Types And Forms Of Lifts (AREA)

Abstract

A new method of, elevator in which multiple cages on each floor are connected by conveyor chain which lifts all cages on one side in upward direction and lowers all cages on other side in downward direction, thereby giving very huge efficiency of moving people up and down very fast. In this variations are possible of having either alternate cages or one cage in 3 floors on 1 in 4 floors etc. and the number of cages on the chain will decide the level of efficiency as compared to single cage at present. The entire chain having all cages is moved by sprockets on top & bottom. When any cage has reached its destination it stops & that door is opened. Due to timer setting door closes automatically and chain moves again. When chain stops, all the floors will have two cages facing the floor, one for upward movement and one for downward movement. At any time at any floor if person wants to go up or down he has to only press a proper button outside and almost instantly the door of cage available on that floor opens and he (or they) go inside. After pressing suitable buttons inside the cage, the whole chain starts moving tiU that cage comes to its destination and stops, Variations in above(A)2 ducts are side by side and chain links are connected at front and back of the cage. Here the door will be in two parts and cage will have vertical partition. (B) The cages are not connected by chain but they are independently driven by either motor or fuel engine etc.and they move up and down with the help of rack, pinion and brake. At the top, the cage can be either pushed by hydraulic or pneumatic cylinder from left to right or allowed to be inverted (C) The cage is in form of piston, which is moving in a vertical cylinder. The air above the cage is removed with the help of steam, ether vapour etc. and further condenses with the help of shower /cooling water which creates vacuum and air pressure pushes the cage upward at very high speed. The lowering of the cage due to gravity is controlled by normal chain, gearbox and wire rope mechanism.

Description

NEW MECHANISM FOR LIFTS
COMPLETE SPECIFICATION:
This invention of new mechanism is described under various salient points. (A) Super lift is a new system of elevators for buildings applicable for any number of floors. The main advantage is, it has no waiting time for passengers due to multiple cage system (instead of only one in present arrangement). Any person at any time on any floor gets the cage to go up or down almost immediately. Please refer figure 1. CA=Cage, CH = Chain, SP = Sprockets RG = Rail Guide, to prevent turning of cage, RH = Rail for horizontal movement, TF - Top Floor, TF-I = TPFL-I, GF = Ground floor, 1st F - 1°* Floor. Each cage for every floor is fitted on chain links Ll & L2 (see top view). The entire chain having all cages is moved by sprockets Sl, S2, S3, & S4 on top & sprockets S5, S6, S7, S 8 at bottom. The main sprocket set Sl, S2 is driven by motor M, whose power varies as per number of cages etc. Chain moves only if all landing & cage doors are closed. When any cage has reached its destination it stops & that door is opened. Due to timer setting door closes automatically and chain moves again. When chain stops, all the floors will have two cages facing the floor, one for upward movement and one for downward movement. At any time at any floor if person wants to go up or down he has to only press a proper button outside and almost instantly the door of cage available on that floor opens and he (or they) go inside. After pressing suitable buttons inside the cage, the whole chain starts moving till that cage comes to its destination and stops, with each cage automatically facing each floor. Similarly simultaneously if different people have entered different cages the chain starts and stops with the help of electronic logic control according to various instructions given by passengers inside different cages & outside,
/* similar present single cage system. One side of the chain caters to upward movement and simultaneously other side of the chain caters to downward movement. If building haj^90
*$~ floors the efficiency this super lift is 180 times the present single cage system as 90 cages are doing upward movement^ and 90 cages at same time are doing downward movement. This new design is very efficient than the conventional single cage system at present. The cost of manufacturing this will be only marginally more than the present, but performance and superior service will be much better. The difference between present design and new one is similar to the difference between bullock cart and car. (B) When instructions are " ten floors - no stop " the conveyor automatically goes in high-speed mode to reduce time. And if load is more in the morning in up direction, automatically * alternate cage'*'* mode will operate. Here alternate cages will be used instead of all to reduce load. Similarly I in 3 or l in 4 or l in 5 cages can be used instead of all if very high efficiency is not required. To reduce cost chain can have alternate cages onryj. in 3 cages only etc, and rest of the space on conveyor will be kept blank. Efficiency will be directly proportional to number of cages on chain. Alternate cage arrangement is shown in fig 2 & 1 cage in 4 floors arrangement in figure 9. (C) All other normal features will be similar to the system in present single cage design. Either every cage will have a geared motor or separate drive for cage and landing doors, or one motor can be common for 4 or 5 cages and all drives can be connected by a chain. During power failure an auxiliary battery operated motor will bring the conveyor to the nearest position and only loaded cage doors will open one by one and passengers allowed to go out. The conveyor will have some dummy positions at top and bottom, where it will not face any floor. Here there will be no landing door and only cage door, which will open during power failure. Normally people are supposed to vacate the last cage on top and bottom and hence there is no possibility of any passenger available in dummy positions but in emergency, door can be opened and people can come coH A load cell includet(between chain link and cage measures the weight of the cage and conveys the information to the electronic control. If on right side, cage is not in synchronization with the floor, this small defect can be rectified by adjusting distance D & H as shown in figure 9. As whole cage width has to pass through the bottom the civil work AB has to be supported from the sides by MS beams as bottom has to be clear (See figure 4). (D) Variations in above conveyor design are possible with some changes as shown in various attached figures. See figure 5. CH = Chains, DO = Doors 2 ducts are side by side and chain links are connected at front and back of the cage. Here the door will be in two parts and cage will have vertical separate partition. Another variation and design is possible as shown in figures 6 and 7. DO = Doors. The cages are not connected by chain but they are independently driven by either motor or fuel engine etc. and they move up and down with the help of rack, pinion and brake. At the top, the cage can be either pushed by hydraulic or pneumatic cylinder from left to right or allowed to be inverted as shown in figure 7. (E) Some other designgare possible theoretically but not practical as shown in figure 3. Here the cages instead of straight line, move in a circular motion similar to giant wheel but this design requires very large horizontal space equivalent to height of building which is not possible. Another variation is possible as shown in figure 8 and 10. The cage is in form of piston, which is moving in a vertical cylinder. The air above the cage is removed as described below, and cage is pushed up by air pressure due to vacuum on other side. After reaching top, the cylinder pushes cage to right and wire rope and motor lowers the cages as per the destination required. The removal of air is done as below: - The system uses a completely different method which is very powerful to give huge power. Atmospheric air pressure at 1 kg. /cm.sq. Ls used (naturally always available). To make use of it, it is necessary to remove air from top chamber at cheap cost. Please refer figure 10. Piston moves freely up and down metal cylinder MC. Boiler B provides steam or ether vapour which is kept under constant pressure in receiver R.£pteam is sent to metal cylinder MC by valve VI till cylinder is full and reaches valve V2, where it is sensed by sensor at valve V2. Valve Vl is closed and steam has removed all air from cylinder C which has escaped to atmosphere through condenser CO. Cylinder is cooled by cold water circulation as well as by shower. As soon as steam condenses in cylinder, huge collapse of volume and hence almost full vacuum is generated in cylinder. Due to this, upward atmospheric air force of 1 kg. /cm.sq. acts on bottom of piston and it moves up thereby raising weight
Figure imgf000005_0001
upward movement top of piston due to rack and pinion operates Gear A, and this rotation rotates fly wheel F which rotates alternator AL giving power to out put (PO). Now air is released in cylinder and weight W (piston) moves down. Now same rack and pinion rotates Gear B in reverse direction and with help of gears C.D.& E rotates flywheel in same direction. Gears C & D are connected to free wheel and hence transmit power in one direction only. After piston has come down again steam is admitted and cycle repeated. Top and bottom movement timings are controlled by stoppers Sl & S2 and hence constant power is obtained. Same system can be used to operate bullet train.
Consider piston as train see fig/E) CYL = Cylinder, P = Piston, (Cage), PO = Power
C Output, V = Vacuum, CW = Cold Water, WPD = Waste Pallet Dispenser, HW = Hot Water, R5= Receiver, F = Fire, B = Boiler, W = weight, CO = Condenser, MC = Metal Cylinder. Cylinder is a long pipe fitted from one city to another. If air is removed from other side at cheap cost as above oiston (train) will move at bullet speed from one city to another. Above system can have various different applications. One of them is raising the cage of elevators to very great height at cheapest cost.
The major design changes in elevator design have been described above. AU other systems like opening doors etc, KS* ill be similar to existing single cage design.

Claims

1. A new method of operating elevator in buildings as described above under points (A), (B), (C), (D), (E), in which multiple cages on each floor are connected by conveyor chain which lifts all cages on one side in upward direction and lowers all cages on other side in downward direction, thereby giving very huge efficiency of moving people up and down very fast, hi this variations are possible of having either alternate cages or one cage in 3 floors on 1 in 4 floors etc. and the number of cages on the chain will decide the level of efficiency as compared to single cage at present. Alternate cage arrangement is shown in figure 2 & 1 cage in 4 floors arrangement in figure <f
2. A new method of operating elevators in buildings as described above under points (A), (B), (C), (D), & (E) in which various variations of designs are possible for example having two ducts side by side as shown in figure 5. Or cages are moved up and down by independently driven motor or fuel engine and supported on back side by rack, pinion and brake. The top cage is pushed by hydraulic or pneumatic cylinders from left to right or allowed to be inverted to a circular duct at the top, as shownjfigure 6 and 7.
3. A new system of operating elevator with the help of vacuum as described above as shown in figure 8 and 10 where air is removed from the cylinder with the help of steam, ether vapour etc. and further condenses with the help of shower /cooling water which creates vacuum and air pressure pushes the cage upward at very high speed. The lowering of the cage due to gravity is controlled by normal chain, gearbox and wire rope mechanism.
4. The new system of operating elevators with the help of multiple cages as described in points (A), (B), (C), (D), (E), in which many other minor variations in designs are possible keeping the main idea of multiple cage
PCT/IN2008/000185 2007-12-06 2008-03-25 New mechanism for lifts WO2009072138A1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
IN2394MU2007 2007-12-06
IN2394/MUM/2007 2007-12-06

Publications (1)

Publication Number Publication Date
WO2009072138A1 true WO2009072138A1 (en) 2009-06-11

Family

ID=40039808

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/IN2008/000185 WO2009072138A1 (en) 2007-12-06 2008-03-25 New mechanism for lifts

Country Status (1)

Country Link
WO (1) WO2009072138A1 (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102502381A (en) * 2011-12-13 2012-06-20 三一重工股份有限公司 Hoister
EP3002242A1 (en) 2014-09-30 2016-04-06 Inventio AG Control method for an elevator system with individually driven cabins and closed track
EP3002243A1 (en) 2014-09-30 2016-04-06 Inventio AG Elevator system with individually driven cabins and closed track
WO2016058940A1 (en) * 2014-10-16 2016-04-21 Thyssenkrupp Elevator Ag Method for operating a transport system and corresponding transport system
CN105545040A (en) * 2015-12-08 2016-05-04 曾广沅 Circulating lifting device
CN107311012A (en) * 2017-08-09 2017-11-03 张博飞 Independently using gear many cars can be driven to go in ring intelligent elevator
EP3233700B1 (en) * 2014-12-17 2023-08-23 Inventio Ag Lift facility with a braking system

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB741072A (en) * 1953-10-14 1955-11-23 J & E Hall Ltd Lifts
GB1393669A (en) * 1971-07-07 1975-05-07 Trebron Holdings Ltd Transport systems
US4071135A (en) * 1975-04-28 1978-01-31 Mitsubishi Denki Kabushiki Kaisha Passenger transportation apparatus

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB741072A (en) * 1953-10-14 1955-11-23 J & E Hall Ltd Lifts
GB1393669A (en) * 1971-07-07 1975-05-07 Trebron Holdings Ltd Transport systems
US4071135A (en) * 1975-04-28 1978-01-31 Mitsubishi Denki Kabushiki Kaisha Passenger transportation apparatus

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102502381A (en) * 2011-12-13 2012-06-20 三一重工股份有限公司 Hoister
EP3002242A1 (en) 2014-09-30 2016-04-06 Inventio AG Control method for an elevator system with individually driven cabins and closed track
EP3002243A1 (en) 2014-09-30 2016-04-06 Inventio AG Elevator system with individually driven cabins and closed track
US10486941B2 (en) 2014-09-30 2019-11-26 Inventio Ag Lift system having individually driven cars and a closed track
WO2016058940A1 (en) * 2014-10-16 2016-04-21 Thyssenkrupp Elevator Ag Method for operating a transport system and corresponding transport system
US10703603B2 (en) 2014-10-16 2020-07-07 Thyssenkrupp Elevator Ag Operating a cyclical transport system based on an equal cycle time
EP3233700B1 (en) * 2014-12-17 2023-08-23 Inventio Ag Lift facility with a braking system
CN105545040A (en) * 2015-12-08 2016-05-04 曾广沅 Circulating lifting device
CN107311012A (en) * 2017-08-09 2017-11-03 张博飞 Independently using gear many cars can be driven to go in ring intelligent elevator

Similar Documents

Publication Publication Date Title
WO2009072138A1 (en) New mechanism for lifts
CN111108055B (en) Intelligent multi-car elevator system
CN109422161B (en) Intelligent multi-car elevator
US6955245B2 (en) Elevator installation comprising a number of individually propelled cars in at least three adjacent hoistways
CN204433998U (en) A kind of elevator control gear of supreme down call button
JP2006027902A (en) Lift installation having at least three vertical lift shafts mutually adjacently arranged and method for operating the same lift shafts
CZ298415B6 (en) Elevator
KR20170089860A (en) Method for operating an elevator system
CN106276511B (en) Telescopic single double-deck elevator powered by switchable system
CN106081789A (en) A kind of lift circulation elevator system continuously
CN103879862B (en) Driving device and driving method of pneumatic elevator
CN104401851A (en) Multi-layer vacuum pneumatic elevator
CN106241518A (en) A kind of elevating method of continuous lift circulation elevator system
KR20130021348A (en) Multilayer parking system
CN203529674U (en) Energy-saving elevator set with tractor driving two lift cars
CN102408053B (en) Multilayer lift
CN105984786A (en) Vertical transportation method and equipment
CN204342224U (en) The pneumatic elevator of a kind of multi-layer vacuum
CA2189923A1 (en) Fail-safe movement of elevator cabs between car frames and landings
CN203898966U (en) High-rise escape device
CN202245627U (en) Multi-layer elevator
CN113120726A (en) External elevator suitable for old community transformation
CN206580420U (en) Upper apparatus for ride instead of walk downstairs
CN205873595U (en) Domestic bbservation elevator of single cylinder type
CN108996372B (en) Elevator system and working method thereof

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 08856273

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 08856273

Country of ref document: EP

Kind code of ref document: A1