WO2009057208A1 - Programme d'attribution de ressource, nœud de gestion, procédé d'attribution de ressource et système d'ordinateur parallèle - Google Patents
Programme d'attribution de ressource, nœud de gestion, procédé d'attribution de ressource et système d'ordinateur parallèle Download PDFInfo
- Publication number
- WO2009057208A1 WO2009057208A1 PCT/JP2007/071229 JP2007071229W WO2009057208A1 WO 2009057208 A1 WO2009057208 A1 WO 2009057208A1 JP 2007071229 W JP2007071229 W JP 2007071229W WO 2009057208 A1 WO2009057208 A1 WO 2009057208A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- resource assignment
- job
- computer system
- parallel job
- management node
- Prior art date
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F9/00—Arrangements for program control, e.g. control units
- G06F9/06—Arrangements for program control, e.g. control units using stored programs, i.e. using an internal store of processing equipment to receive or retain programs
- G06F9/46—Multiprogramming arrangements
- G06F9/50—Allocation of resources, e.g. of the central processing unit [CPU]
- G06F9/5005—Allocation of resources, e.g. of the central processing unit [CPU] to service a request
- G06F9/5027—Allocation of resources, e.g. of the central processing unit [CPU] to service a request the resource being a machine, e.g. CPUs, Servers, Terminals
Landscapes
- Engineering & Computer Science (AREA)
- Software Systems (AREA)
- Theoretical Computer Science (AREA)
- Physics & Mathematics (AREA)
- General Engineering & Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Multi Processors (AREA)
Abstract
En fonction du contenu de traitement d'une tâche parallèle, une pluralité de processeurs pouvant exécuter de manière efficace la tâche parallèle peuvent être attribués à la tâche parallèle. Lorsqu'une instruction d'entrée d'une tâche parallèle avec un type de tâche spécifié est mise en entrée, une ressource potentielle spécifiée en fonction du type de tâche spécifié est acquise d'un moyen de stockage de ressources potentielles spécifiées (2a). Une unité centrale d'un nœud de calcul indiqué par la ressource potentielle spécifiée ainsi acquise est ensuite attribuée à une tâche parallèle mise en entrée conformément à l'instruction d'entrée. Une requête d'exécution de la tâche parallèle indiquée par l'instruction d'entrée est transmise au nœud de calcul ayant l'unité centrale attribuée.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
PCT/JP2007/071229 WO2009057208A1 (fr) | 2007-10-31 | 2007-10-31 | Programme d'attribution de ressource, nœud de gestion, procédé d'attribution de ressource et système d'ordinateur parallèle |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
PCT/JP2007/071229 WO2009057208A1 (fr) | 2007-10-31 | 2007-10-31 | Programme d'attribution de ressource, nœud de gestion, procédé d'attribution de ressource et système d'ordinateur parallèle |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2009057208A1 true WO2009057208A1 (fr) | 2009-05-07 |
Family
ID=40590618
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/JP2007/071229 WO2009057208A1 (fr) | 2007-10-31 | 2007-10-31 | Programme d'attribution de ressource, nœud de gestion, procédé d'attribution de ressource et système d'ordinateur parallèle |
Country Status (1)
Country | Link |
---|---|
WO (1) | WO2009057208A1 (fr) |
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2011118013A1 (fr) * | 2010-03-25 | 2011-09-29 | 富士通株式会社 | Système de processeurs multi-cœurs, procédé de commande de contrôleur de mémoire et programme de commande de contrôleur de mémoire |
JP2012022451A (ja) * | 2010-07-13 | 2012-02-02 | Fujitsu Ltd | マルチコアプロセッサシステム,スケジュール管理プログラム及び同プログラムを記録したコンピュータ読取可能な記録媒体 |
JP2014127059A (ja) * | 2012-12-27 | 2014-07-07 | Nec Corp | 有効プロセッサコア配置装置、有効プロセッサコア配置方法および有効プロセッサコア配置プログラム |
JP2015162160A (ja) * | 2014-02-28 | 2015-09-07 | 日本電気株式会社 | ジョブ管理装置及びジョブ管理方法 |
JP2015231079A (ja) * | 2014-06-04 | 2015-12-21 | 日本電信電話株式会社 | スケジューリング装置および方法 |
JP2016048536A (ja) * | 2014-08-27 | 2016-04-07 | 財團法人資訊工業策進會 | クラスタコンピューティングシステム用のマスタデバイス、スレーブデバイスおよびそのコンピューティング方法 |
JP2016081430A (ja) * | 2014-10-21 | 2016-05-16 | 富士通株式会社 | 情報処理システム、制御装置および情報処理システムの制御方法 |
WO2018121251A1 (fr) * | 2016-12-30 | 2018-07-05 | Guangdong Oppo Mobile Telecommunications Corp., Ltd. | Procédé d'attribution de ressource d'application hôte, terminal mobile et support de stockage |
CN111045804A (zh) * | 2019-11-26 | 2020-04-21 | 泰康保险集团股份有限公司 | 一种任务分配方法、装置、介质及电子设备 |
CN113709550A (zh) * | 2021-08-25 | 2021-11-26 | 上海哔哩哔哩科技有限公司 | 直播间动画处理方法及系统 |
CN114564309A (zh) * | 2022-03-01 | 2022-05-31 | 航天科工智能运筹与信息安全研究院(武汉)有限公司 | 基于灵活配置实现性能提优的复杂算力系统并行处理方法 |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS61221832A (ja) * | 1985-03-19 | 1986-10-02 | Fujitsu Ltd | 処理選択方式 |
JPH06214962A (ja) * | 1993-01-19 | 1994-08-05 | Hitachi Ltd | 負荷分散制御方法および分散処理システム |
JPH06243113A (ja) * | 1993-02-19 | 1994-09-02 | Fujitsu Ltd | 並列計算機における計算モデルのマッピング法 |
JP2006031525A (ja) * | 2004-07-20 | 2006-02-02 | Sony Corp | 情報処理装置および情報処理方法、並びに、プログラム |
JP2006099162A (ja) * | 2004-09-28 | 2006-04-13 | Hitachi Software Eng Co Ltd | サービス指向アーキテクチャに基づく業務系Webシステムの運用・管理システム及びプログラム |
WO2007037006A1 (fr) * | 2005-09-29 | 2007-04-05 | Fujitsu Limited | Processeur multiconducteur |
WO2007043142A1 (fr) * | 2005-10-05 | 2007-04-19 | Fujitsu Limited | Dispositif de gestion de travaux et programme de gestion de travaux |
-
2007
- 2007-10-31 WO PCT/JP2007/071229 patent/WO2009057208A1/fr active Application Filing
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS61221832A (ja) * | 1985-03-19 | 1986-10-02 | Fujitsu Ltd | 処理選択方式 |
JPH06214962A (ja) * | 1993-01-19 | 1994-08-05 | Hitachi Ltd | 負荷分散制御方法および分散処理システム |
JPH06243113A (ja) * | 1993-02-19 | 1994-09-02 | Fujitsu Ltd | 並列計算機における計算モデルのマッピング法 |
JP2006031525A (ja) * | 2004-07-20 | 2006-02-02 | Sony Corp | 情報処理装置および情報処理方法、並びに、プログラム |
JP2006099162A (ja) * | 2004-09-28 | 2006-04-13 | Hitachi Software Eng Co Ltd | サービス指向アーキテクチャに基づく業務系Webシステムの運用・管理システム及びプログラム |
WO2007037006A1 (fr) * | 2005-09-29 | 2007-04-05 | Fujitsu Limited | Processeur multiconducteur |
WO2007043142A1 (fr) * | 2005-10-05 | 2007-04-19 | Fujitsu Limited | Dispositif de gestion de travaux et programme de gestion de travaux |
Cited By (17)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2011118013A1 (fr) * | 2010-03-25 | 2011-09-29 | 富士通株式会社 | Système de processeurs multi-cœurs, procédé de commande de contrôleur de mémoire et programme de commande de contrôleur de mémoire |
JP5472447B2 (ja) * | 2010-03-25 | 2014-04-16 | 富士通株式会社 | マルチコアプロセッサシステム、メモリコントローラ制御方法、およびメモリコントローラ制御プログラム |
US8990516B2 (en) | 2010-03-25 | 2015-03-24 | Fujitsu Limited | Multi-core shared memory system with memory port to memory space mapping |
JP2012022451A (ja) * | 2010-07-13 | 2012-02-02 | Fujitsu Ltd | マルチコアプロセッサシステム,スケジュール管理プログラム及び同プログラムを記録したコンピュータ読取可能な記録媒体 |
JP2014127059A (ja) * | 2012-12-27 | 2014-07-07 | Nec Corp | 有効プロセッサコア配置装置、有効プロセッサコア配置方法および有効プロセッサコア配置プログラム |
JP2015162160A (ja) * | 2014-02-28 | 2015-09-07 | 日本電気株式会社 | ジョブ管理装置及びジョブ管理方法 |
JP2015231079A (ja) * | 2014-06-04 | 2015-12-21 | 日本電信電話株式会社 | スケジューリング装置および方法 |
CN105511955A (zh) * | 2014-08-27 | 2016-04-20 | 财团法人资讯工业策进会 | 用于一丛集运算系统的主装置、从属装置及其运算方法 |
JP2016048536A (ja) * | 2014-08-27 | 2016-04-07 | 財團法人資訊工業策進會 | クラスタコンピューティングシステム用のマスタデバイス、スレーブデバイスおよびそのコンピューティング方法 |
JP2016081430A (ja) * | 2014-10-21 | 2016-05-16 | 富士通株式会社 | 情報処理システム、制御装置および情報処理システムの制御方法 |
WO2018121251A1 (fr) * | 2016-12-30 | 2018-07-05 | Guangdong Oppo Mobile Telecommunications Corp., Ltd. | Procédé d'attribution de ressource d'application hôte, terminal mobile et support de stockage |
US10365951B2 (en) | 2016-12-30 | 2019-07-30 | Guangdong Oppo Mobile Telecommunications Corp. Ltd. | Hot application resource allocation method, mobile terminal and storage medium |
CN111045804A (zh) * | 2019-11-26 | 2020-04-21 | 泰康保险集团股份有限公司 | 一种任务分配方法、装置、介质及电子设备 |
CN111045804B (zh) * | 2019-11-26 | 2024-03-19 | 泰康保险集团股份有限公司 | 一种任务分配方法、装置、介质及电子设备 |
CN113709550A (zh) * | 2021-08-25 | 2021-11-26 | 上海哔哩哔哩科技有限公司 | 直播间动画处理方法及系统 |
CN114564309A (zh) * | 2022-03-01 | 2022-05-31 | 航天科工智能运筹与信息安全研究院(武汉)有限公司 | 基于灵活配置实现性能提优的复杂算力系统并行处理方法 |
CN114564309B (zh) * | 2022-03-01 | 2024-04-09 | 航天科工智能运筹与信息安全研究院(武汉)有限公司 | 基于灵活配置实现性能提优的复杂算力系统并行处理方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2009057208A1 (fr) | Programme d'attribution de ressource, nœud de gestion, procédé d'attribution de ressource et système d'ordinateur parallèle | |
Nghiem et al. | Towards efficient resource provisioning in MapReduce | |
Tang et al. | A self-adaptive scheduling algorithm for reduce start time | |
CN102360309B (zh) | 片上多核异构系统的调度系统与调度执行方法 | |
Ananthanarayanan et al. | Why let resources idle? Aggressive cloning of jobs with Dolly | |
US20100257527A1 (en) | Computer applications classifier | |
US20130298112A1 (en) | Control Flow Graph Application Configuration | |
US20130283286A1 (en) | Apparatus and method for resource allocation in clustered computing environment | |
JP2009541848A5 (fr) | ||
BR112016020148A8 (pt) | método, produto de programa de computador e sistema para gerenciamento de recursos com base em perfis de utilização de recurso específicos para dispositivo ou específicos para usuário". | |
JP2014521184A5 (fr) | ||
MY155867A (en) | Scheduling collections in a scheduler | |
WO2008121910A3 (fr) | Noyaux de systèmes d'exploitation maîtres et subordonnés pour systèmes multiprocesseurs hétérogènes | |
RU2010149255A (ru) | Экземпляры планировщика в процессе | |
ATE546774T1 (de) | Durchführung einer änderung an einer virtuellen konfigurationstopologie | |
WO2008121917A3 (fr) | Programmation homogène pour systèmes multiprocesseurs hétérogènes | |
WO2007008519A3 (fr) | Calcul par machine a elements actifs | |
US20130219395A1 (en) | Batch scheduler management of tasks | |
US10083066B2 (en) | Processing data by using simultaneous multithreading | |
KR20120066189A (ko) | 매니코어 시스템에서 응용 프로그램의 상태를 동적으로 재구성하는 장치 및 방법 | |
WO2011084883A3 (fr) | Génération de liste de tâches, modèles de parallélisme et gestion de mémoire pour des systèmes multicoeurs | |
WO2019126797A3 (fr) | Système et procédé d'exécution d'instructions | |
Hou et al. | Characterizing and understanding end-to-end multi-modal neural networks on GPUs | |
JP2017073000A (ja) | 並列化方法、並列化ツール、車載装置 | |
Sun et al. | A virtual machine based task scheduling approach to improving data locality for virtualized Hadoop |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 07830963 Country of ref document: EP Kind code of ref document: A1 |
|
NENP | Non-entry into the national phase |
Ref country code: DE |
|
122 | Ep: pct application non-entry in european phase |
Ref document number: 07830963 Country of ref document: EP Kind code of ref document: A1 |
|
NENP | Non-entry into the national phase |
Ref country code: JP |